Electrical Work Plans

Electrical Work Plans (EWPs) are required for all live electrical work - including voltage testing.

  • EWPs are official documents and must be numbered.  Obtain a number from the EWP binder in Dianna Tibbetts's office
  • Electrical Work Plans must be reviewed and approved by the Department Head Phil Cutino.
  • A copy of all Electrical Work Plans must be sent to the SLAC electrical safety office
  • A copy of all approved Electrical Work Plans shall be placed in the EWP binder in Dianna Tibbetts's office

Labeling of Electrical Panels and Disconnects

Electrical panels and disconnects must be labeled with the electrical hazard category and the PPE requirements.  These PPE requirements must be followed.  If you need to operate a disconnect or panel that is not labeled, contact the Building Manager.