Executive Summary
Appendix B Volume 2, Self-Evaluation FY2006

Return to Table of Contents

The Stanford Linear Accelerator Center is proud of its performance in goals 4 – 8 of the Appendix B Performance Evaluation Measurement Plan (PEMP).  (Performance in goals 1 -3 was reported on separately in volume 1.)  Providing excellent operations programs is as important as executing the scientific programs on which SLAC’s reputation is based. 

Overall goal scores are summarized in the table which follows.  This year’s performance resulted in objectives grades of four A/A-‘s, five B+’s, and one B.  Performance against the goals and objectives was below the B level in three areas: 

  • The SLAC DART and TRC rates were higher than the SC goals set in Objective 5.1 resulting in a B- rating.
  • Two incidents of unauthorized work occurred resulting in a B-for Objective 5.2.
  • The Information Technology cost analysis required by performance measure 6.4.d was not completed resulting in a B- rating for Objective 6.4.
  • The maintenance investment index goals of 2% was not attained and resulted in a B- rating for Objective 7.1
  • Certain emergency management system performance milestones were missed resulting in a B- rating for Objective 8.1.

SLAC is committed to improvement in these three areas in the coming year and the FY2007 PEMP has already established new levels of performance in each.  The newly formed Office of Assurance and SLAC senior management will closely track performance in these areas.