Downtime 2008 LCLS Laser Scanning |
|||||||||||||||||||||||||||
A laser scan survey of the LCLS facility began in August 2008. A laser scan of the LCLS beamline will be made ranging from the photo-injector (Sector 20 in the linac) through to the Far Experimental Hall (FEH).
|
|