SLAC Magnetic Measurements Date: 04-25-2018 Time: 21:48:15 Project: LCLS2 Magnet Type: Undulator Magnet Name: SXU_PXI_CMM Serial Number: 00 Run Number: 232 Measurement Device: pxi4464 Operator: jeb Comment: Long-term measurements Nb/Na = 95/300 tb/ta = 1s / 4s 21:48:15 Ambient Measurement Device(s) Being Used, type = None 21:48:15 Magnet Voltage Measurement Device(s) Being Used, type = None 21:48:16 Temperature Measurement Device(s) Being Used, type = HPTHERM_HP34970 21:48:16 XMAG Device(s) Being Used, type = None 21:48:16 Ambient Measurement Device(s) Being Used, type = None 21:48:18 Temperature Measurement, Probe Number = 0, T = 20.254000 C 21:48:19 Temperature Measurement, Probe Number = 1, T = 20.187000 C 21:48:20 Temperature Measurement, Probe Number = 2, T = 20.221000 C 21:48:20 Temperature Measurement, Probe Number = 3, T = 20.180000 C 21:48:21 Temperature Measurement, Probe Number = 4, T = 20.494000 C 21:48:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.19 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.49 21:48:21 Integrated Voltage Measurement... 21:48:42 Voltage Offset Correction: v_off_ini = 0.000006692 V, v_off_fin = 0.000008808 V 21:48:42 Integrated Voltage Measurement Delta Gap = 0.0040009 m VT = 0.171133268 Vs 21:48:43 Integrated Voltage Measurement... 21:49:02 Voltage Offset Correction: v_off_ini = 0.000008057 V, v_off_fin = 0.000005295 V 21:49:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171003460 Vs 21:49:05 Temperature Measurement, Probe Number = 0, T = 20.252000 C 21:49:06 Temperature Measurement, Probe Number = 1, T = 20.187000 C 21:49:06 Temperature Measurement, Probe Number = 2, T = 20.221000 C 21:49:07 Temperature Measurement, Probe Number = 3, T = 20.180000 C 21:49:08 Temperature Measurement, Probe Number = 4, T = 20.460000 C 21:49:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.19 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.46 21:49:08 Integrated Voltage Measurement... 21:49:27 Voltage Offset Correction: v_off_ini = 0.000006285 V, v_off_fin = 0.000008808 V 21:49:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171111626 Vs 21:49:27 Integrated Voltage Measurement... 21:49:47 Voltage Offset Correction: v_off_ini = 0.000008319 V, v_off_fin = 0.000005684 V 21:49:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000004 Vs 21:49:49 Temperature Measurement, Probe Number = 0, T = 20.251000 C 21:49:50 Temperature Measurement, Probe Number = 1, T = 20.183000 C 21:49:51 Temperature Measurement, Probe Number = 2, T = 20.216000 C 21:49:51 Temperature Measurement, Probe Number = 3, T = 20.174000 C 21:49:52 Temperature Measurement, Probe Number = 4, T = 20.386000 C 21:49:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.39 21:49:52 Integrated Voltage Measurement... 21:50:11 Voltage Offset Correction: v_off_ini = 0.000006717 V, v_off_fin = 0.000008467 V 21:50:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171111384 Vs 21:50:12 Integrated Voltage Measurement... 21:50:31 Voltage Offset Correction: v_off_ini = 0.000008003 V, v_off_fin = 0.000005095 V 21:50:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171006024 Vs 21:50:34 Temperature Measurement, Probe Number = 0, T = 20.254000 C 21:50:35 Temperature Measurement, Probe Number = 1, T = 20.186000 C 21:50:35 Temperature Measurement, Probe Number = 2, T = 20.217000 C 21:50:36 Temperature Measurement, Probe Number = 3, T = 20.176000 C 21:50:36 Temperature Measurement, Probe Number = 4, T = 20.290000 C 21:50:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.19 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.29 21:50:37 Integrated Voltage Measurement... 21:50:56 Voltage Offset Correction: v_off_ini = 0.000006465 V, v_off_fin = 0.000008656 V 21:50:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171111942 Vs 21:50:56 Integrated Voltage Measurement... 21:51:15 Voltage Offset Correction: v_off_ini = 0.000008143 V, v_off_fin = 0.000005683 V 21:51:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999087 Vs 21:51:18 Temperature Measurement, Probe Number = 0, T = 20.258000 C 21:51:19 Temperature Measurement, Probe Number = 1, T = 20.189000 C 21:51:20 Temperature Measurement, Probe Number = 2, T = 20.220000 C 21:51:20 Temperature Measurement, Probe Number = 3, T = 20.178000 C 21:51:21 Temperature Measurement, Probe Number = 4, T = 20.244000 C 21:51:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.26 P1 = Bottom 2, Value = 20.19 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.24 21:51:21 Integrated Voltage Measurement... 21:51:40 Voltage Offset Correction: v_off_ini = 0.000006598 V, v_off_fin = 0.000009147 V 21:51:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171115936 Vs 21:51:41 Integrated Voltage Measurement... 21:52:00 Voltage Offset Correction: v_off_ini = 0.000008529 V, v_off_fin = 0.000005571 V 21:52:00 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170996485 Vs 21:52:02 Temperature Measurement, Probe Number = 0, T = 20.256000 C 21:52:03 Temperature Measurement, Probe Number = 1, T = 20.192000 C 21:52:04 Temperature Measurement, Probe Number = 2, T = 20.219000 C 21:52:04 Temperature Measurement, Probe Number = 3, T = 20.180000 C 21:52:05 Temperature Measurement, Probe Number = 4, T = 20.269000 C 21:52:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.26 P1 = Bottom 2, Value = 20.19 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.27 21:52:05 Integrated Voltage Measurement... 21:52:25 Voltage Offset Correction: v_off_ini = 0.000006790 V, v_off_fin = 0.000008574 V 21:52:25 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171116155 Vs 21:52:25 Integrated Voltage Measurement... 21:52:45 Voltage Offset Correction: v_off_ini = 0.000008234 V, v_off_fin = 0.000005033 V 21:52:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001222 Vs 21:52:47 Temperature Measurement, Probe Number = 0, T = 20.256000 C 21:52:48 Temperature Measurement, Probe Number = 1, T = 20.192000 C 21:52:49 Temperature Measurement, Probe Number = 2, T = 20.220000 C 21:52:49 Temperature Measurement, Probe Number = 3, T = 20.180000 C 21:52:50 Temperature Measurement, Probe Number = 4, T = 20.319000 C 21:52:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.26 P1 = Bottom 2, Value = 20.19 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.32 21:52:50 Integrated Voltage Measurement... 21:53:10 Voltage Offset Correction: v_off_ini = 0.000006411 V, v_off_fin = 0.000008697 V 21:53:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171108654 Vs 21:53:10 Integrated Voltage Measurement... 21:53:29 Voltage Offset Correction: v_off_ini = 0.000008125 V, v_off_fin = 0.000005582 V 21:53:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002255 Vs 21:53:32 Temperature Measurement, Probe Number = 0, T = 20.257000 C 21:53:33 Temperature Measurement, Probe Number = 1, T = 20.189000 C 21:53:34 Temperature Measurement, Probe Number = 2, T = 20.222000 C 21:53:34 Temperature Measurement, Probe Number = 3, T = 20.180000 C 21:53:35 Temperature Measurement, Probe Number = 4, T = 20.397000 C 21:53:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.26 P1 = Bottom 2, Value = 20.19 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.40 21:53:35 Integrated Voltage Measurement... 21:53:55 Voltage Offset Correction: v_off_ini = 0.000006468 V, v_off_fin = 0.000008662 V 21:53:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171118136 Vs 21:53:55 Integrated Voltage Measurement... 21:54:15 Voltage Offset Correction: v_off_ini = 0.000008132 V, v_off_fin = 0.000005731 V 21:54:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000019 Vs 21:54:18 Temperature Measurement, Probe Number = 0, T = 20.251000 C 21:54:18 Temperature Measurement, Probe Number = 1, T = 20.182000 C 21:54:19 Temperature Measurement, Probe Number = 2, T = 20.217000 C 21:54:20 Temperature Measurement, Probe Number = 3, T = 20.175000 C 21:54:20 Temperature Measurement, Probe Number = 4, T = 20.337000 C 21:54:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.34 21:54:21 Integrated Voltage Measurement... 21:54:40 Voltage Offset Correction: v_off_ini = 0.000006567 V, v_off_fin = 0.000008358 V 21:54:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171108104 Vs 21:54:40 Integrated Voltage Measurement... 21:55:00 Voltage Offset Correction: v_off_ini = 0.000008008 V, v_off_fin = 0.000005608 V 21:55:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171004010 Vs 21:55:02 Temperature Measurement, Probe Number = 0, T = 20.251000 C 21:55:03 Temperature Measurement, Probe Number = 1, T = 20.183000 C 21:55:04 Temperature Measurement, Probe Number = 2, T = 20.216000 C 21:55:04 Temperature Measurement, Probe Number = 3, T = 20.177000 C 21:55:05 Temperature Measurement, Probe Number = 4, T = 20.265000 C 21:55:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.27 21:55:05 Integrated Voltage Measurement... 21:55:25 Voltage Offset Correction: v_off_ini = 0.000007009 V, v_off_fin = 0.000008520 V 21:55:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171113699 Vs 21:55:25 Integrated Voltage Measurement... 21:55:44 Voltage Offset Correction: v_off_ini = 0.000008180 V, v_off_fin = 0.000005266 V 21:55:44 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171001800 Vs 22:25:47 Temperature Measurement, Probe Number = 0, T = 20.249000 C 22:25:48 Temperature Measurement, Probe Number = 1, T = 20.175000 C 22:25:49 Temperature Measurement, Probe Number = 2, T = 20.218000 C 22:25:49 Temperature Measurement, Probe Number = 3, T = 20.174000 C 22:25:50 Temperature Measurement, Probe Number = 4, T = 20.373000 C 22:25:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.37 22:25:50 Integrated Voltage Measurement... 22:26:09 Voltage Offset Correction: v_off_ini = 0.000007610 V, v_off_fin = 0.000009079 V 22:26:10 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171159502 Vs 22:26:10 Integrated Voltage Measurement... 22:26:29 Voltage Offset Correction: v_off_ini = 0.000008566 V, v_off_fin = 0.000005834 V 22:26:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171008403 Vs 22:26:32 Temperature Measurement, Probe Number = 0, T = 20.250000 C 22:26:32 Temperature Measurement, Probe Number = 1, T = 20.180000 C 22:26:33 Temperature Measurement, Probe Number = 2, T = 20.216000 C 22:26:34 Temperature Measurement, Probe Number = 3, T = 20.175000 C 22:26:34 Temperature Measurement, Probe Number = 4, T = 20.266000 C 22:26:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.27 22:26:35 Integrated Voltage Measurement... 22:26:54 Voltage Offset Correction: v_off_ini = 0.000006518 V, v_off_fin = 0.000008743 V 22:26:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171119994 Vs 22:26:54 Integrated Voltage Measurement... 22:27:13 Voltage Offset Correction: v_off_ini = 0.000008145 V, v_off_fin = 0.000005761 V 22:27:13 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171005260 Vs 22:27:16 Temperature Measurement, Probe Number = 0, T = 20.255000 C 22:27:16 Temperature Measurement, Probe Number = 1, T = 20.184000 C 22:27:17 Temperature Measurement, Probe Number = 2, T = 20.221000 C 22:27:18 Temperature Measurement, Probe Number = 3, T = 20.177000 C 22:27:18 Temperature Measurement, Probe Number = 4, T = 20.235000 C 22:27:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.23 22:27:19 Integrated Voltage Measurement... 22:27:38 Voltage Offset Correction: v_off_ini = 0.000006342 V, v_off_fin = 0.000009376 V 22:27:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171127719 Vs 22:27:38 Integrated Voltage Measurement... 22:27:57 Voltage Offset Correction: v_off_ini = 0.000008557 V, v_off_fin = 0.000006277 V 22:27:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171001279 Vs 22:28:00 Temperature Measurement, Probe Number = 0, T = 20.253000 C 22:28:01 Temperature Measurement, Probe Number = 1, T = 20.187000 C 22:28:01 Temperature Measurement, Probe Number = 2, T = 20.219000 C 22:28:02 Temperature Measurement, Probe Number = 3, T = 20.179000 C 22:28:03 Temperature Measurement, Probe Number = 4, T = 20.236000 C 22:28:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.19 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.24 22:28:03 Integrated Voltage Measurement... 22:28:22 Voltage Offset Correction: v_off_ini = 0.000007009 V, v_off_fin = 0.000009138 V 22:28:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171130215 Vs 22:28:22 Integrated Voltage Measurement... 22:28:42 Voltage Offset Correction: v_off_ini = 0.000008993 V, v_off_fin = 0.000006391 V 22:28:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171004522 Vs 22:28:44 Temperature Measurement, Probe Number = 0, T = 20.255000 C 22:28:45 Temperature Measurement, Probe Number = 1, T = 20.185000 C 22:28:46 Temperature Measurement, Probe Number = 2, T = 20.225000 C 22:28:46 Temperature Measurement, Probe Number = 3, T = 20.183000 C 22:28:47 Temperature Measurement, Probe Number = 4, T = 20.412000 C 22:28:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.41 22:28:47 Integrated Voltage Measurement... 22:29:07 Voltage Offset Correction: v_off_ini = 0.000007388 V, v_off_fin = 0.000009394 V 22:29:07 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171135590 Vs 22:29:07 Integrated Voltage Measurement... 22:29:27 Voltage Offset Correction: v_off_ini = 0.000009094 V, v_off_fin = 0.000006332 V 22:29:27 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171001431 Vs 22:29:30 Temperature Measurement, Probe Number = 0, T = 20.250000 C 22:29:30 Temperature Measurement, Probe Number = 1, T = 20.182000 C 22:29:31 Temperature Measurement, Probe Number = 2, T = 20.222000 C 22:29:32 Temperature Measurement, Probe Number = 3, T = 20.181000 C 22:29:32 Temperature Measurement, Probe Number = 4, T = 20.468000 C 22:29:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.47 22:29:32 Integrated Voltage Measurement... 22:29:52 Voltage Offset Correction: v_off_ini = 0.000007166 V, v_off_fin = 0.000009549 V 22:29:52 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171130834 Vs 22:29:52 Integrated Voltage Measurement... 22:30:11 Voltage Offset Correction: v_off_ini = 0.000008983 V, v_off_fin = 0.000005407 V 22:30:11 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171004385 Vs 22:30:14 Temperature Measurement, Probe Number = 0, T = 20.250000 C 22:30:15 Temperature Measurement, Probe Number = 1, T = 20.178000 C 22:30:15 Temperature Measurement, Probe Number = 2, T = 20.218000 C 22:30:16 Temperature Measurement, Probe Number = 3, T = 20.176000 C 22:30:17 Temperature Measurement, Probe Number = 4, T = 20.362000 C 22:30:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.36 22:30:17 Integrated Voltage Measurement... 22:30:36 Voltage Offset Correction: v_off_ini = 0.000006200 V, v_off_fin = 0.000008567 V 22:30:36 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171121062 Vs 22:30:36 Integrated Voltage Measurement... 22:30:55 Voltage Offset Correction: v_off_ini = 0.000008362 V, v_off_fin = 0.000005398 V 22:30:55 Integrated Voltage Measurement Delta Gap = -0.0040005 m VT = -0.171010042 Vs 22:30:58 Temperature Measurement, Probe Number = 0, T = 20.246000 C 22:30:59 Temperature Measurement, Probe Number = 1, T = 20.175000 C 22:31:00 Temperature Measurement, Probe Number = 2, T = 20.216000 C 22:31:00 Temperature Measurement, Probe Number = 3, T = 20.173000 C 22:31:01 Temperature Measurement, Probe Number = 4, T = 20.225000 C 22:31:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.23 22:31:01 Integrated Voltage Measurement... 22:31:20 Voltage Offset Correction: v_off_ini = 0.000006087 V, v_off_fin = 0.000008311 V 22:31:20 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171116285 Vs 22:31:20 Integrated Voltage Measurement... 22:31:40 Voltage Offset Correction: v_off_ini = 0.000007667 V, v_off_fin = 0.000005049 V 22:31:40 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171011252 Vs 22:31:43 Temperature Measurement, Probe Number = 0, T = 20.243000 C 22:31:43 Temperature Measurement, Probe Number = 1, T = 20.178000 C 22:31:44 Temperature Measurement, Probe Number = 2, T = 20.213000 C 22:31:45 Temperature Measurement, Probe Number = 3, T = 20.174000 C 22:31:45 Temperature Measurement, Probe Number = 4, T = 20.156000 C 22:31:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.16 22:31:46 Integrated Voltage Measurement... 22:32:05 Voltage Offset Correction: v_off_ini = 0.000006985 V, v_off_fin = 0.000008986 V 22:32:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171121788 Vs 22:32:05 Integrated Voltage Measurement... 22:32:24 Voltage Offset Correction: v_off_ini = 0.000008711 V, v_off_fin = 0.000005340 V 22:32:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171002977 Vs 22:32:27 Temperature Measurement, Probe Number = 0, T = 20.244000 C 22:32:28 Temperature Measurement, Probe Number = 1, T = 20.177000 C 22:32:29 Temperature Measurement, Probe Number = 2, T = 20.214000 C 22:32:29 Temperature Measurement, Probe Number = 3, T = 20.172000 C 22:32:30 Temperature Measurement, Probe Number = 4, T = 20.129000 C 22:32:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.13 22:32:30 Integrated Voltage Measurement... 22:32:50 Voltage Offset Correction: v_off_ini = 0.000006647 V, v_off_fin = 0.000008572 V 22:32:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171122797 Vs 22:32:50 Integrated Voltage Measurement... 22:33:09 Voltage Offset Correction: v_off_ini = 0.000008279 V, v_off_fin = 0.000005391 V 22:33:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001091 Vs 23:03:12 Temperature Measurement, Probe Number = 0, T = 20.242000 C 23:03:13 Temperature Measurement, Probe Number = 1, T = 20.171000 C 23:03:14 Temperature Measurement, Probe Number = 2, T = 20.216000 C 23:03:14 Temperature Measurement, Probe Number = 3, T = 20.173000 C 23:03:15 Temperature Measurement, Probe Number = 4, T = 20.347000 C 23:03:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.35 23:03:15 Integrated Voltage Measurement... 23:03:34 Voltage Offset Correction: v_off_ini = 0.000007541 V, v_off_fin = 0.000009010 V 23:03:34 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171162997 Vs 23:03:35 Integrated Voltage Measurement... 23:03:54 Voltage Offset Correction: v_off_ini = 0.000008265 V, v_off_fin = 0.000005678 V 23:03:54 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171007721 Vs 23:03:57 Temperature Measurement, Probe Number = 0, T = 20.245000 C 23:03:57 Temperature Measurement, Probe Number = 1, T = 20.175000 C 23:03:58 Temperature Measurement, Probe Number = 2, T = 20.216000 C 23:03:59 Temperature Measurement, Probe Number = 3, T = 20.173000 C 23:03:59 Temperature Measurement, Probe Number = 4, T = 20.311000 C 23:03:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.31 23:04:00 Integrated Voltage Measurement... 23:04:19 Voltage Offset Correction: v_off_ini = 0.000006827 V, v_off_fin = 0.000009019 V 23:04:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171126441 Vs 23:04:20 Integrated Voltage Measurement... 23:04:39 Voltage Offset Correction: v_off_ini = 0.000008619 V, v_off_fin = 0.000005354 V 23:04:39 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171008541 Vs 23:04:42 Temperature Measurement, Probe Number = 0, T = 20.247000 C 23:04:42 Temperature Measurement, Probe Number = 1, T = 20.179000 C 23:04:43 Temperature Measurement, Probe Number = 2, T = 20.219000 C 23:04:44 Temperature Measurement, Probe Number = 3, T = 20.178000 C 23:04:44 Temperature Measurement, Probe Number = 4, T = 20.332000 C 23:04:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.33 23:04:45 Integrated Voltage Measurement... 23:05:04 Voltage Offset Correction: v_off_ini = 0.000006878 V, v_off_fin = 0.000008597 V 23:05:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171130258 Vs 23:05:04 Integrated Voltage Measurement... 23:05:23 Voltage Offset Correction: v_off_ini = 0.000008306 V, v_off_fin = 0.000005358 V 23:05:24 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171008958 Vs 23:05:26 Temperature Measurement, Probe Number = 0, T = 20.248000 C 23:05:27 Temperature Measurement, Probe Number = 1, T = 20.179000 C 23:05:28 Temperature Measurement, Probe Number = 2, T = 20.217000 C 23:05:28 Temperature Measurement, Probe Number = 3, T = 20.175000 C 23:05:29 Temperature Measurement, Probe Number = 4, T = 20.278000 C 23:05:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.28 23:05:29 Integrated Voltage Measurement... 23:05:49 Voltage Offset Correction: v_off_ini = 0.000006478 V, v_off_fin = 0.000009160 V 23:05:49 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171126016 Vs 23:05:49 Integrated Voltage Measurement... 23:06:08 Voltage Offset Correction: v_off_ini = 0.000008175 V, v_off_fin = 0.000005441 V 23:06:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171008367 Vs 23:06:11 Temperature Measurement, Probe Number = 0, T = 20.243000 C 23:06:12 Temperature Measurement, Probe Number = 1, T = 20.172000 C 23:06:13 Temperature Measurement, Probe Number = 2, T = 20.215000 C 23:06:13 Temperature Measurement, Probe Number = 3, T = 20.172000 C 23:06:14 Temperature Measurement, Probe Number = 4, T = 20.176000 C 23:06:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.18 23:06:14 Integrated Voltage Measurement... 23:06:33 Voltage Offset Correction: v_off_ini = 0.000006502 V, v_off_fin = 0.000008320 V 23:06:34 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171125939 Vs 23:06:34 Integrated Voltage Measurement... 23:06:53 Voltage Offset Correction: v_off_ini = 0.000007907 V, v_off_fin = 0.000005055 V 23:06:53 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171012602 Vs 23:06:56 Temperature Measurement, Probe Number = 0, T = 20.245000 C 23:06:57 Temperature Measurement, Probe Number = 1, T = 20.175000 C 23:06:57 Temperature Measurement, Probe Number = 2, T = 20.217000 C 23:06:58 Temperature Measurement, Probe Number = 3, T = 20.176000 C 23:06:59 Temperature Measurement, Probe Number = 4, T = 20.261000 C 23:06:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.26 23:06:59 Integrated Voltage Measurement... 23:07:18 Voltage Offset Correction: v_off_ini = 0.000006026 V, v_off_fin = 0.000008604 V 23:07:18 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171126594 Vs 23:07:19 Integrated Voltage Measurement... 23:07:38 Voltage Offset Correction: v_off_ini = 0.000008304 V, v_off_fin = 0.000004816 V 23:07:38 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171011927 Vs 23:07:41 Temperature Measurement, Probe Number = 0, T = 20.241000 C 23:07:41 Temperature Measurement, Probe Number = 1, T = 20.172000 C 23:07:42 Temperature Measurement, Probe Number = 2, T = 20.214000 C 23:07:43 Temperature Measurement, Probe Number = 3, T = 20.173000 C 23:07:43 Temperature Measurement, Probe Number = 4, T = 20.264000 C 23:07:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.26 23:07:44 Integrated Voltage Measurement... 23:08:03 Voltage Offset Correction: v_off_ini = 0.000006442 V, v_off_fin = 0.000008746 V 23:08:03 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171120143 Vs 23:08:03 Integrated Voltage Measurement... 23:08:22 Voltage Offset Correction: v_off_ini = 0.000008209 V, v_off_fin = 0.000005277 V 23:08:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171011360 Vs 23:08:25 Temperature Measurement, Probe Number = 0, T = 20.246000 C 23:08:26 Temperature Measurement, Probe Number = 1, T = 20.177000 C 23:08:26 Temperature Measurement, Probe Number = 2, T = 20.217000 C 23:08:27 Temperature Measurement, Probe Number = 3, T = 20.178000 C 23:08:28 Temperature Measurement, Probe Number = 4, T = 20.332000 C 23:08:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.33 23:08:28 Integrated Voltage Measurement... 23:08:47 Voltage Offset Correction: v_off_ini = 0.000006145 V, v_off_fin = 0.000009229 V 23:08:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171124086 Vs 23:08:48 Integrated Voltage Measurement... 23:09:07 Voltage Offset Correction: v_off_ini = 0.000009154 V, v_off_fin = 0.000005727 V 23:09:07 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171003792 Vs 23:09:09 Temperature Measurement, Probe Number = 0, T = 20.242000 C 23:09:10 Temperature Measurement, Probe Number = 1, T = 20.173000 C 23:09:11 Temperature Measurement, Probe Number = 2, T = 20.215000 C 23:09:11 Temperature Measurement, Probe Number = 3, T = 20.175000 C 23:09:12 Temperature Measurement, Probe Number = 4, T = 20.388000 C 23:09:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.39 23:09:12 Integrated Voltage Measurement... 23:09:31 Voltage Offset Correction: v_off_ini = 0.000006825 V, v_off_fin = 0.000009686 V 23:09:32 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171138411 Vs 23:09:32 Integrated Voltage Measurement... 23:09:51 Voltage Offset Correction: v_off_ini = 0.000009384 V, v_off_fin = 0.000006431 V 23:09:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999331 Vs 23:09:54 Temperature Measurement, Probe Number = 0, T = 20.239000 C 23:09:54 Temperature Measurement, Probe Number = 1, T = 20.173000 C 23:09:55 Temperature Measurement, Probe Number = 2, T = 20.213000 C 23:09:56 Temperature Measurement, Probe Number = 3, T = 20.173000 C 23:09:56 Temperature Measurement, Probe Number = 4, T = 20.321000 C 23:09:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.32 23:09:57 Integrated Voltage Measurement... 23:10:16 Voltage Offset Correction: v_off_ini = 0.000007352 V, v_off_fin = 0.000009716 V 23:10:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171139241 Vs 23:10:16 Integrated Voltage Measurement... 23:10:35 Voltage Offset Correction: v_off_ini = 0.000009090 V, v_off_fin = 0.000005972 V 23:10:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171003978 Vs 23:40:38 Temperature Measurement, Probe Number = 0, T = 20.243000 C 23:40:39 Temperature Measurement, Probe Number = 1, T = 20.168000 C 23:40:40 Temperature Measurement, Probe Number = 2, T = 20.220000 C 23:40:41 Temperature Measurement, Probe Number = 3, T = 20.174000 C 23:40:41 Temperature Measurement, Probe Number = 4, T = 20.262000 C 23:40:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.26 23:40:41 Integrated Voltage Measurement... 23:41:01 Voltage Offset Correction: v_off_ini = 0.000007872 V, v_off_fin = 0.000008959 V 23:41:01 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171172216 Vs 23:41:02 Integrated Voltage Measurement... 23:41:21 Voltage Offset Correction: v_off_ini = 0.000008605 V, v_off_fin = 0.000006047 V 23:41:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171008192 Vs 23:41:24 Temperature Measurement, Probe Number = 0, T = 20.243000 C 23:41:24 Temperature Measurement, Probe Number = 1, T = 20.169000 C 23:41:25 Temperature Measurement, Probe Number = 2, T = 20.220000 C 23:41:26 Temperature Measurement, Probe Number = 3, T = 20.173000 C 23:41:26 Temperature Measurement, Probe Number = 4, T = 20.326000 C 23:41:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.33 23:41:26 Integrated Voltage Measurement... 23:41:46 Voltage Offset Correction: v_off_ini = 0.000007233 V, v_off_fin = 0.000009332 V 23:41:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171137814 Vs 23:41:47 Integrated Voltage Measurement... 23:42:06 Voltage Offset Correction: v_off_ini = 0.000009115 V, v_off_fin = 0.000006375 V 23:42:06 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171005717 Vs 23:42:09 Temperature Measurement, Probe Number = 0, T = 20.237000 C 23:42:09 Temperature Measurement, Probe Number = 1, T = 20.170000 C 23:42:10 Temperature Measurement, Probe Number = 2, T = 20.213000 C 23:42:11 Temperature Measurement, Probe Number = 3, T = 20.172000 C 23:42:11 Temperature Measurement, Probe Number = 4, T = 20.242000 C 23:42:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.24 23:42:11 Integrated Voltage Measurement... 23:42:31 Voltage Offset Correction: v_off_ini = 0.000007584 V, v_off_fin = 0.000009829 V 23:42:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171139594 Vs 23:42:31 Integrated Voltage Measurement... 23:42:51 Voltage Offset Correction: v_off_ini = 0.000009057 V, v_off_fin = 0.000005906 V 23:42:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171008863 Vs 23:42:53 Temperature Measurement, Probe Number = 0, T = 20.228000 C 23:42:54 Temperature Measurement, Probe Number = 1, T = 20.162000 C 23:42:55 Temperature Measurement, Probe Number = 2, T = 20.205000 C 23:42:55 Temperature Measurement, Probe Number = 3, T = 20.167000 C 23:42:56 Temperature Measurement, Probe Number = 4, T = 20.191000 C 23:42:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.19 23:42:56 Integrated Voltage Measurement... 23:43:16 Voltage Offset Correction: v_off_ini = 0.000007233 V, v_off_fin = 0.000009260 V 23:43:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171132569 Vs 23:43:16 Integrated Voltage Measurement... 23:43:35 Voltage Offset Correction: v_off_ini = 0.000008669 V, v_off_fin = 0.000005542 V 23:43:35 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171010185 Vs 23:43:38 Temperature Measurement, Probe Number = 0, T = 20.233000 C 23:43:38 Temperature Measurement, Probe Number = 1, T = 20.163000 C 23:43:39 Temperature Measurement, Probe Number = 2, T = 20.211000 C 23:43:40 Temperature Measurement, Probe Number = 3, T = 20.172000 C 23:43:40 Temperature Measurement, Probe Number = 4, T = 20.186000 C 23:43:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.19 23:43:41 Integrated Voltage Measurement... 23:44:00 Voltage Offset Correction: v_off_ini = 0.000006776 V, v_off_fin = 0.000009166 V 23:44:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171134264 Vs 23:44:00 Integrated Voltage Measurement... 23:44:20 Voltage Offset Correction: v_off_ini = 0.000008780 V, v_off_fin = 0.000005226 V 23:44:20 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171009040 Vs 23:44:22 Temperature Measurement, Probe Number = 0, T = 20.239000 C 23:44:23 Temperature Measurement, Probe Number = 1, T = 20.170000 C 23:44:24 Temperature Measurement, Probe Number = 2, T = 20.212000 C 23:44:24 Temperature Measurement, Probe Number = 3, T = 20.173000 C 23:44:25 Temperature Measurement, Probe Number = 4, T = 20.252000 C 23:44:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.25 23:44:25 Integrated Voltage Measurement... 23:44:44 Voltage Offset Correction: v_off_ini = 0.000007032 V, v_off_fin = 0.000009144 V 23:44:44 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171133426 Vs 23:44:44 Integrated Voltage Measurement... 23:45:04 Voltage Offset Correction: v_off_ini = 0.000008362 V, v_off_fin = 0.000005566 V 23:45:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171012578 Vs 23:45:06 Temperature Measurement, Probe Number = 0, T = 20.234000 C 23:45:07 Temperature Measurement, Probe Number = 1, T = 20.163000 C 23:45:08 Temperature Measurement, Probe Number = 2, T = 20.212000 C 23:45:08 Temperature Measurement, Probe Number = 3, T = 20.169000 C 23:45:09 Temperature Measurement, Probe Number = 4, T = 20.288000 C 23:45:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.29 23:45:09 Integrated Voltage Measurement... 23:45:29 Voltage Offset Correction: v_off_ini = 0.000006739 V, v_off_fin = 0.000009102 V 23:45:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171132693 Vs 23:45:29 Integrated Voltage Measurement... 23:45:49 Voltage Offset Correction: v_off_ini = 0.000008361 V, v_off_fin = 0.000005765 V 23:45:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171012915 Vs 23:45:52 Temperature Measurement, Probe Number = 0, T = 20.234000 C 23:45:52 Temperature Measurement, Probe Number = 1, T = 20.166000 C 23:45:53 Temperature Measurement, Probe Number = 2, T = 20.207000 C 23:45:54 Temperature Measurement, Probe Number = 3, T = 20.167000 C 23:45:54 Temperature Measurement, Probe Number = 4, T = 20.202000 C 23:45:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.20 23:45:55 Integrated Voltage Measurement... 23:46:14 Voltage Offset Correction: v_off_ini = 0.000006924 V, v_off_fin = 0.000009175 V 23:46:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171131143 Vs 23:46:14 Integrated Voltage Measurement... 23:46:34 Voltage Offset Correction: v_off_ini = 0.000008968 V, v_off_fin = 0.000005986 V 23:46:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171009184 Vs 23:46:37 Temperature Measurement, Probe Number = 0, T = 20.236000 C 23:46:37 Temperature Measurement, Probe Number = 1, T = 20.167000 C 23:46:38 Temperature Measurement, Probe Number = 2, T = 20.208000 C 23:46:39 Temperature Measurement, Probe Number = 3, T = 20.168000 C 23:46:39 Temperature Measurement, Probe Number = 4, T = 20.187000 C 23:46:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.19 23:46:39 Integrated Voltage Measurement... 23:46:59 Voltage Offset Correction: v_off_ini = 0.000006745 V, v_off_fin = 0.000009093 V 23:46:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171131552 Vs 23:46:59 Integrated Voltage Measurement... 23:47:18 Voltage Offset Correction: v_off_ini = 0.000008787 V, v_off_fin = 0.000005424 V 23:47:18 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171013796 Vs 23:47:21 Temperature Measurement, Probe Number = 0, T = 20.238000 C 23:47:22 Temperature Measurement, Probe Number = 1, T = 20.166000 C 23:47:23 Temperature Measurement, Probe Number = 2, T = 20.212000 C 23:47:23 Temperature Measurement, Probe Number = 3, T = 20.173000 C 23:47:24 Temperature Measurement, Probe Number = 4, T = 20.265000 C 23:47:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.27 23:47:24 Integrated Voltage Measurement... 23:47:43 Voltage Offset Correction: v_off_ini = 0.000007099 V, v_off_fin = 0.000008944 V 23:47:44 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171132759 Vs 23:47:44 Integrated Voltage Measurement... 23:48:03 Voltage Offset Correction: v_off_ini = 0.000008705 V, v_off_fin = 0.000005433 V 23:48:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171010389 Vs 00:18:06 Temperature Measurement, Probe Number = 0, T = 20.225000 C 00:18:07 Temperature Measurement, Probe Number = 1, T = 20.154000 C 00:18:07 Temperature Measurement, Probe Number = 2, T = 20.207000 C 00:18:08 Temperature Measurement, Probe Number = 3, T = 20.162000 C 00:18:09 Temperature Measurement, Probe Number = 4, T = 20.085000 C 00:18:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.09 00:18:09 Integrated Voltage Measurement... 00:18:28 Voltage Offset Correction: v_off_ini = 0.000007140 V, v_off_fin = 0.000009806 V 00:18:28 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171166751 Vs 00:18:28 Integrated Voltage Measurement... 00:18:48 Voltage Offset Correction: v_off_ini = 0.000008683 V, v_off_fin = 0.000006068 V 00:18:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171009521 Vs 00:18:51 Temperature Measurement, Probe Number = 0, T = 20.227000 C 00:18:51 Temperature Measurement, Probe Number = 1, T = 20.156000 C 00:18:52 Temperature Measurement, Probe Number = 2, T = 20.207000 C 00:18:52 Temperature Measurement, Probe Number = 3, T = 20.163000 C 00:18:53 Temperature Measurement, Probe Number = 4, T = 20.079000 C 00:18:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.08 00:18:53 Integrated Voltage Measurement... 00:19:13 Voltage Offset Correction: v_off_ini = 0.000006930 V, v_off_fin = 0.000009183 V 00:19:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171130873 Vs 00:19:13 Integrated Voltage Measurement... 00:19:32 Voltage Offset Correction: v_off_ini = 0.000008901 V, v_off_fin = 0.000005232 V 00:19:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171011724 Vs 00:19:35 Temperature Measurement, Probe Number = 0, T = 20.228000 C 00:19:36 Temperature Measurement, Probe Number = 1, T = 20.157000 C 00:19:36 Temperature Measurement, Probe Number = 2, T = 20.208000 C 00:19:37 Temperature Measurement, Probe Number = 3, T = 20.164000 C 00:19:38 Temperature Measurement, Probe Number = 4, T = 20.060000 C 00:19:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.06 00:19:38 Integrated Voltage Measurement... 00:19:57 Voltage Offset Correction: v_off_ini = 0.000006715 V, v_off_fin = 0.000008793 V 00:19:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171132092 Vs 00:19:57 Integrated Voltage Measurement... 00:20:16 Voltage Offset Correction: v_off_ini = 0.000009457 V, v_off_fin = 0.000004979 V 00:20:16 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171012089 Vs 00:20:19 Temperature Measurement, Probe Number = 0, T = 20.228000 C 00:20:20 Temperature Measurement, Probe Number = 1, T = 20.156000 C 00:20:20 Temperature Measurement, Probe Number = 2, T = 20.207000 C 00:20:21 Temperature Measurement, Probe Number = 3, T = 20.163000 C 00:20:22 Temperature Measurement, Probe Number = 4, T = 20.016000 C 00:20:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.02 00:20:22 Integrated Voltage Measurement... 00:20:41 Voltage Offset Correction: v_off_ini = 0.000006361 V, v_off_fin = 0.000008744 V 00:20:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171129062 Vs 00:20:42 Integrated Voltage Measurement... 00:21:01 Voltage Offset Correction: v_off_ini = 0.000008200 V, v_off_fin = 0.000005353 V 00:21:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171018674 Vs 00:21:04 Temperature Measurement, Probe Number = 0, T = 20.222000 C 00:21:04 Temperature Measurement, Probe Number = 1, T = 20.152000 C 00:21:05 Temperature Measurement, Probe Number = 2, T = 20.202000 C 00:21:06 Temperature Measurement, Probe Number = 3, T = 20.160000 C 00:21:06 Temperature Measurement, Probe Number = 4, T = 20.066000 C 00:21:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.07 00:21:07 Integrated Voltage Measurement... 00:21:26 Voltage Offset Correction: v_off_ini = 0.000006609 V, v_off_fin = 0.000008884 V 00:21:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171130007 Vs 00:21:26 Integrated Voltage Measurement... 00:21:45 Voltage Offset Correction: v_off_ini = 0.000008240 V, v_off_fin = 0.000005612 V 00:21:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171012117 Vs 00:21:48 Temperature Measurement, Probe Number = 0, T = 20.228000 C 00:21:49 Temperature Measurement, Probe Number = 1, T = 20.160000 C 00:21:50 Temperature Measurement, Probe Number = 2, T = 20.205000 C 00:21:50 Temperature Measurement, Probe Number = 3, T = 20.163000 C 00:21:51 Temperature Measurement, Probe Number = 4, T = 20.072000 C 00:21:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.07 00:21:51 Integrated Voltage Measurement... 00:22:10 Voltage Offset Correction: v_off_ini = 0.000006928 V, v_off_fin = 0.000008779 V 00:22:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171129909 Vs 00:22:11 Integrated Voltage Measurement... 00:22:30 Voltage Offset Correction: v_off_ini = 0.000008729 V, v_off_fin = 0.000005466 V 00:22:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171014538 Vs 00:22:33 Temperature Measurement, Probe Number = 0, T = 20.227000 C 00:22:34 Temperature Measurement, Probe Number = 1, T = 20.156000 C 00:22:34 Temperature Measurement, Probe Number = 2, T = 20.208000 C 00:22:35 Temperature Measurement, Probe Number = 3, T = 20.163000 C 00:22:36 Temperature Measurement, Probe Number = 4, T = 20.173000 C 00:22:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.17 00:22:36 Integrated Voltage Measurement... 00:22:55 Voltage Offset Correction: v_off_ini = 0.000006765 V, v_off_fin = 0.000009083 V 00:22:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171133552 Vs 00:22:55 Integrated Voltage Measurement... 00:23:14 Voltage Offset Correction: v_off_ini = 0.000008270 V, v_off_fin = 0.000005551 V 00:23:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171015490 Vs 00:23:17 Temperature Measurement, Probe Number = 0, T = 20.222000 C 00:23:18 Temperature Measurement, Probe Number = 1, T = 20.148000 C 00:23:19 Temperature Measurement, Probe Number = 2, T = 20.205000 C 00:23:19 Temperature Measurement, Probe Number = 3, T = 20.160000 C 00:23:20 Temperature Measurement, Probe Number = 4, T = 20.201000 C 00:23:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.20 00:23:20 Integrated Voltage Measurement... 00:23:40 Voltage Offset Correction: v_off_ini = 0.000007271 V, v_off_fin = 0.000009346 V 00:23:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171137373 Vs 00:23:40 Integrated Voltage Measurement... 00:23:59 Voltage Offset Correction: v_off_ini = 0.000008504 V, v_off_fin = 0.000005559 V 00:23:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171015310 Vs 00:24:02 Temperature Measurement, Probe Number = 0, T = 20.228000 C 00:24:03 Temperature Measurement, Probe Number = 1, T = 20.158000 C 00:24:03 Temperature Measurement, Probe Number = 2, T = 20.207000 C 00:24:04 Temperature Measurement, Probe Number = 3, T = 20.166000 C 00:24:05 Temperature Measurement, Probe Number = 4, T = 20.261000 C 00:24:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.26 00:24:05 Integrated Voltage Measurement... 00:24:24 Voltage Offset Correction: v_off_ini = 0.000006971 V, v_off_fin = 0.000008969 V 00:24:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171130807 Vs 00:24:24 Integrated Voltage Measurement... 00:24:43 Voltage Offset Correction: v_off_ini = 0.000008156 V, v_off_fin = 0.000005484 V 00:24:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171017068 Vs 00:24:46 Temperature Measurement, Probe Number = 0, T = 20.231000 C 00:24:47 Temperature Measurement, Probe Number = 1, T = 20.157000 C 00:24:48 Temperature Measurement, Probe Number = 2, T = 20.213000 C 00:24:48 Temperature Measurement, Probe Number = 3, T = 20.168000 C 00:24:49 Temperature Measurement, Probe Number = 4, T = 20.331000 C 00:24:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.33 00:24:49 Integrated Voltage Measurement... 00:25:08 Voltage Offset Correction: v_off_ini = 0.000006569 V, v_off_fin = 0.000009027 V 00:25:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171131496 Vs 00:25:09 Integrated Voltage Measurement... 00:25:28 Voltage Offset Correction: v_off_ini = 0.000008478 V, v_off_fin = 0.000005718 V 00:25:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171011599 Vs 00:55:31 Temperature Measurement, Probe Number = 0, T = 20.218000 C 00:55:32 Temperature Measurement, Probe Number = 1, T = 20.145000 C 00:55:32 Temperature Measurement, Probe Number = 2, T = 20.202000 C 00:55:33 Temperature Measurement, Probe Number = 3, T = 20.158000 C 00:55:34 Temperature Measurement, Probe Number = 4, T = 20.088000 C 00:55:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.09 00:55:34 Integrated Voltage Measurement... 00:55:53 Voltage Offset Correction: v_off_ini = 0.000007630 V, v_off_fin = 0.000009327 V 00:55:53 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171165969 Vs 00:55:54 Integrated Voltage Measurement... 00:56:13 Voltage Offset Correction: v_off_ini = 0.000008705 V, v_off_fin = 0.000005889 V 00:56:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171011400 Vs 00:56:15 Temperature Measurement, Probe Number = 0, T = 20.216000 C 00:56:16 Temperature Measurement, Probe Number = 1, T = 20.143000 C 00:56:17 Temperature Measurement, Probe Number = 2, T = 20.200000 C 00:56:17 Temperature Measurement, Probe Number = 3, T = 20.157000 C 00:56:18 Temperature Measurement, Probe Number = 4, T = 20.111000 C 00:56:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.11 00:56:18 Integrated Voltage Measurement... 00:56:38 Voltage Offset Correction: v_off_ini = 0.000006970 V, v_off_fin = 0.000009078 V 00:56:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171130774 Vs 00:56:38 Integrated Voltage Measurement... 00:56:58 Voltage Offset Correction: v_off_ini = 0.000008421 V, v_off_fin = 0.000006016 V 00:56:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171011849 Vs 00:57:01 Temperature Measurement, Probe Number = 0, T = 20.213000 C 00:57:01 Temperature Measurement, Probe Number = 1, T = 20.145000 C 00:57:02 Temperature Measurement, Probe Number = 2, T = 20.196000 C 00:57:03 Temperature Measurement, Probe Number = 3, T = 20.157000 C 00:57:03 Temperature Measurement, Probe Number = 4, T = 20.096000 C 00:57:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.10 00:57:03 Integrated Voltage Measurement... 00:57:23 Voltage Offset Correction: v_off_ini = 0.000007070 V, v_off_fin = 0.000009438 V 00:57:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171130418 Vs 00:57:23 Integrated Voltage Measurement... 00:57:42 Voltage Offset Correction: v_off_ini = 0.000008684 V, v_off_fin = 0.000005752 V 00:57:42 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171012268 Vs 00:57:45 Temperature Measurement, Probe Number = 0, T = 20.221000 C 00:57:45 Temperature Measurement, Probe Number = 1, T = 20.154000 C 00:57:46 Temperature Measurement, Probe Number = 2, T = 20.201000 C 00:57:47 Temperature Measurement, Probe Number = 3, T = 20.161000 C 00:57:47 Temperature Measurement, Probe Number = 4, T = 20.107000 C 00:57:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.11 00:57:48 Integrated Voltage Measurement... 00:58:07 Voltage Offset Correction: v_off_ini = 0.000006514 V, v_off_fin = 0.000009296 V 00:58:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171134051 Vs 00:58:07 Integrated Voltage Measurement... 00:58:26 Voltage Offset Correction: v_off_ini = 0.000008924 V, v_off_fin = 0.000005915 V 00:58:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171014471 Vs 00:58:29 Temperature Measurement, Probe Number = 0, T = 20.219000 C 00:58:30 Temperature Measurement, Probe Number = 1, T = 20.147000 C 00:58:31 Temperature Measurement, Probe Number = 2, T = 20.200000 C 00:58:31 Temperature Measurement, Probe Number = 3, T = 20.156000 C 00:58:32 Temperature Measurement, Probe Number = 4, T = 20.190000 C 00:58:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.19 00:58:32 Integrated Voltage Measurement... 00:58:52 Voltage Offset Correction: v_off_ini = 0.000007273 V, v_off_fin = 0.000009548 V 00:58:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171134827 Vs 00:58:52 Integrated Voltage Measurement... 00:59:11 Voltage Offset Correction: v_off_ini = 0.000008480 V, v_off_fin = 0.000005659 V 00:59:11 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171013057 Vs 00:59:14 Temperature Measurement, Probe Number = 0, T = 20.211000 C 00:59:14 Temperature Measurement, Probe Number = 1, T = 20.142000 C 00:59:15 Temperature Measurement, Probe Number = 2, T = 20.194000 C 00:59:16 Temperature Measurement, Probe Number = 3, T = 20.154000 C 00:59:16 Temperature Measurement, Probe Number = 4, T = 20.219000 C 00:59:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.22 00:59:17 Integrated Voltage Measurement... 00:59:36 Voltage Offset Correction: v_off_ini = 0.000006483 V, v_off_fin = 0.000008978 V 00:59:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171132027 Vs 00:59:36 Integrated Voltage Measurement... 00:59:55 Voltage Offset Correction: v_off_ini = 0.000008598 V, v_off_fin = 0.000005142 V 00:59:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171017855 Vs 00:59:58 Temperature Measurement, Probe Number = 0, T = 20.218000 C 00:59:59 Temperature Measurement, Probe Number = 1, T = 20.147000 C 01:00:00 Temperature Measurement, Probe Number = 2, T = 20.199000 C 01:00:00 Temperature Measurement, Probe Number = 3, T = 20.157000 C 01:00:01 Temperature Measurement, Probe Number = 4, T = 20.164000 C 01:00:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.16 01:00:01 Integrated Voltage Measurement... 01:00:20 Voltage Offset Correction: v_off_ini = 0.000006420 V, v_off_fin = 0.000008610 V 01:00:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171124681 Vs 01:00:20 Integrated Voltage Measurement... 01:00:40 Voltage Offset Correction: v_off_ini = 0.000008123 V, v_off_fin = 0.000005623 V 01:00:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171019749 Vs 01:00:43 Temperature Measurement, Probe Number = 0, T = 20.216000 C 01:00:43 Temperature Measurement, Probe Number = 1, T = 20.143000 C 01:00:44 Temperature Measurement, Probe Number = 2, T = 20.199000 C 01:00:45 Temperature Measurement, Probe Number = 3, T = 20.156000 C 01:00:45 Temperature Measurement, Probe Number = 4, T = 20.117000 C 01:00:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.12 01:00:45 Integrated Voltage Measurement... 01:01:05 Voltage Offset Correction: v_off_ini = 0.000006595 V, v_off_fin = 0.000009048 V 01:01:05 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171130354 Vs 01:01:05 Integrated Voltage Measurement... 01:01:24 Voltage Offset Correction: v_off_ini = 0.000008496 V, v_off_fin = 0.000005570 V 01:01:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171011363 Vs 01:01:27 Temperature Measurement, Probe Number = 0, T = 20.216000 C 01:01:28 Temperature Measurement, Probe Number = 1, T = 20.144000 C 01:01:29 Temperature Measurement, Probe Number = 2, T = 20.200000 C 01:01:29 Temperature Measurement, Probe Number = 3, T = 20.157000 C 01:01:30 Temperature Measurement, Probe Number = 4, T = 20.057000 C 01:01:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.06 01:01:30 Integrated Voltage Measurement... 01:01:49 Voltage Offset Correction: v_off_ini = 0.000006774 V, v_off_fin = 0.000008528 V 01:01:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171127405 Vs 01:01:50 Integrated Voltage Measurement... 01:02:09 Voltage Offset Correction: v_off_ini = 0.000008321 V, v_off_fin = 0.000005634 V 01:02:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171013423 Vs 01:02:12 Temperature Measurement, Probe Number = 0, T = 20.216000 C 01:02:12 Temperature Measurement, Probe Number = 1, T = 20.146000 C 01:02:13 Temperature Measurement, Probe Number = 2, T = 20.197000 C 01:02:14 Temperature Measurement, Probe Number = 3, T = 20.155000 C 01:02:14 Temperature Measurement, Probe Number = 4, T = 20.064000 C 01:02:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.06 01:02:14 Integrated Voltage Measurement... 01:02:34 Voltage Offset Correction: v_off_ini = 0.000006733 V, v_off_fin = 0.000008989 V 01:02:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171129037 Vs 01:02:34 Integrated Voltage Measurement... 01:02:53 Voltage Offset Correction: v_off_ini = 0.000008502 V, v_off_fin = 0.000005169 V 01:02:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171013768 Vs 01:32:56 Temperature Measurement, Probe Number = 0, T = 20.207000 C 01:32:57 Temperature Measurement, Probe Number = 1, T = 20.139000 C 01:32:58 Temperature Measurement, Probe Number = 2, T = 20.195000 C 01:32:58 Temperature Measurement, Probe Number = 3, T = 20.153000 C 01:32:59 Temperature Measurement, Probe Number = 4, T = 20.266000 C 01:32:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.27 01:32:59 Integrated Voltage Measurement... 01:33:19 Voltage Offset Correction: v_off_ini = 0.000007174 V, v_off_fin = 0.000008576 V 01:33:19 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171162973 Vs 01:33:19 Integrated Voltage Measurement... 01:33:39 Voltage Offset Correction: v_off_ini = 0.000008457 V, v_off_fin = 0.000005375 V 01:33:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171015434 Vs 01:33:41 Temperature Measurement, Probe Number = 0, T = 20.215000 C 01:33:42 Temperature Measurement, Probe Number = 1, T = 20.145000 C 01:33:43 Temperature Measurement, Probe Number = 2, T = 20.200000 C 01:33:43 Temperature Measurement, Probe Number = 3, T = 20.158000 C 01:33:44 Temperature Measurement, Probe Number = 4, T = 20.277000 C 01:33:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.28 01:33:44 Integrated Voltage Measurement... 01:34:04 Voltage Offset Correction: v_off_ini = 0.000006626 V, v_off_fin = 0.000008736 V 01:34:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171125027 Vs 01:34:04 Integrated Voltage Measurement... 01:34:23 Voltage Offset Correction: v_off_ini = 0.000008075 V, v_off_fin = 0.000004546 V 01:34:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171018329 Vs 01:34:26 Temperature Measurement, Probe Number = 0, T = 20.215000 C 01:34:26 Temperature Measurement, Probe Number = 1, T = 20.147000 C 01:34:27 Temperature Measurement, Probe Number = 2, T = 20.203000 C 01:34:28 Temperature Measurement, Probe Number = 3, T = 20.162000 C 01:34:28 Temperature Measurement, Probe Number = 4, T = 20.273000 C 01:34:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.27 01:34:28 Integrated Voltage Measurement... 01:34:48 Voltage Offset Correction: v_off_ini = 0.000005785 V, v_off_fin = 0.000008335 V 01:34:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171125073 Vs 01:34:48 Integrated Voltage Measurement... 01:35:08 Voltage Offset Correction: v_off_ini = 0.000007896 V, v_off_fin = 0.000005636 V 01:35:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171019504 Vs 01:35:11 Temperature Measurement, Probe Number = 0, T = 20.213000 C 01:35:11 Temperature Measurement, Probe Number = 1, T = 20.143000 C 01:35:12 Temperature Measurement, Probe Number = 2, T = 20.201000 C 01:35:13 Temperature Measurement, Probe Number = 3, T = 20.159000 C 01:35:13 Temperature Measurement, Probe Number = 4, T = 20.288000 C 01:35:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.29 01:35:13 Integrated Voltage Measurement... 01:35:33 Voltage Offset Correction: v_off_ini = 0.000006482 V, v_off_fin = 0.000008502 V 01:35:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171129452 Vs 01:35:34 Integrated Voltage Measurement... 01:35:53 Voltage Offset Correction: v_off_ini = 0.000008242 V, v_off_fin = 0.000005376 V 01:35:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171017122 Vs 01:35:56 Temperature Measurement, Probe Number = 0, T = 20.209000 C 01:35:56 Temperature Measurement, Probe Number = 1, T = 20.145000 C 01:35:57 Temperature Measurement, Probe Number = 2, T = 20.195000 C 01:35:58 Temperature Measurement, Probe Number = 3, T = 20.156000 C 01:35:58 Temperature Measurement, Probe Number = 4, T = 20.219000 C 01:35:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.22 01:35:59 Integrated Voltage Measurement... 01:36:18 Voltage Offset Correction: v_off_ini = 0.000006791 V, v_off_fin = 0.000008816 V 01:36:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171130974 Vs 01:36:18 Integrated Voltage Measurement... 01:36:37 Voltage Offset Correction: v_off_ini = 0.000008400 V, v_off_fin = 0.000005559 V 01:36:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171011925 Vs 01:36:40 Temperature Measurement, Probe Number = 0, T = 20.215000 C 01:36:41 Temperature Measurement, Probe Number = 1, T = 20.146000 C 01:36:42 Temperature Measurement, Probe Number = 2, T = 20.202000 C 01:36:42 Temperature Measurement, Probe Number = 3, T = 20.160000 C 01:36:43 Temperature Measurement, Probe Number = 4, T = 20.266000 C 01:36:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.27 01:36:43 Integrated Voltage Measurement... 01:37:02 Voltage Offset Correction: v_off_ini = 0.000006695 V, v_off_fin = 0.000008728 V 01:37:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171134804 Vs 01:37:02 Integrated Voltage Measurement... 01:37:21 Voltage Offset Correction: v_off_ini = 0.000008453 V, v_off_fin = 0.000005822 V 01:37:22 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171015899 Vs 01:37:24 Temperature Measurement, Probe Number = 0, T = 20.217000 C 01:37:25 Temperature Measurement, Probe Number = 1, T = 20.150000 C 01:37:26 Temperature Measurement, Probe Number = 2, T = 20.202000 C 01:37:26 Temperature Measurement, Probe Number = 3, T = 20.161000 C 01:37:27 Temperature Measurement, Probe Number = 4, T = 20.349000 C 01:37:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.35 01:37:27 Integrated Voltage Measurement... 01:37:46 Voltage Offset Correction: v_off_ini = 0.000006987 V, v_off_fin = 0.000009207 V 01:37:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171139591 Vs 01:37:47 Integrated Voltage Measurement... 01:38:06 Voltage Offset Correction: v_off_ini = 0.000009031 V, v_off_fin = 0.000005687 V 01:38:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171015475 Vs 01:38:09 Temperature Measurement, Probe Number = 0, T = 20.218000 C 01:38:10 Temperature Measurement, Probe Number = 1, T = 20.146000 C 01:38:11 Temperature Measurement, Probe Number = 2, T = 20.203000 C 01:38:11 Temperature Measurement, Probe Number = 3, T = 20.157000 C 01:38:12 Temperature Measurement, Probe Number = 4, T = 20.398000 C 01:38:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.40 01:38:12 Integrated Voltage Measurement... 01:38:31 Voltage Offset Correction: v_off_ini = 0.000006965 V, v_off_fin = 0.000008863 V 01:38:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171132693 Vs 01:38:32 Integrated Voltage Measurement... 01:38:51 Voltage Offset Correction: v_off_ini = 0.000008137 V, v_off_fin = 0.000005210 V 01:38:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171022950 Vs 01:38:54 Temperature Measurement, Probe Number = 0, T = 20.208000 C 01:38:55 Temperature Measurement, Probe Number = 1, T = 20.145000 C 01:38:55 Temperature Measurement, Probe Number = 2, T = 20.195000 C 01:38:56 Temperature Measurement, Probe Number = 3, T = 20.154000 C 01:38:57 Temperature Measurement, Probe Number = 4, T = 20.329000 C 01:38:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.33 01:38:57 Integrated Voltage Measurement... 01:39:16 Voltage Offset Correction: v_off_ini = 0.000006530 V, v_off_fin = 0.000009087 V 01:39:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171131951 Vs 01:39:17 Integrated Voltage Measurement... 01:39:36 Voltage Offset Correction: v_off_ini = 0.000008566 V, v_off_fin = 0.000005265 V 01:39:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171013800 Vs 01:39:38 Temperature Measurement, Probe Number = 0, T = 20.212000 C 01:39:39 Temperature Measurement, Probe Number = 1, T = 20.146000 C 01:39:40 Temperature Measurement, Probe Number = 2, T = 20.197000 C 01:39:40 Temperature Measurement, Probe Number = 3, T = 20.157000 C 01:39:41 Temperature Measurement, Probe Number = 4, T = 20.238000 C 01:39:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.24 01:39:41 Integrated Voltage Measurement... 01:40:01 Voltage Offset Correction: v_off_ini = 0.000006414 V, v_off_fin = 0.000009202 V 01:40:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171133288 Vs 01:40:01 Integrated Voltage Measurement... 01:40:20 Voltage Offset Correction: v_off_ini = 0.000008371 V, v_off_fin = 0.000005771 V 01:40:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171013084 Vs 02:10:23 Temperature Measurement, Probe Number = 0, T = 20.204000 C 02:10:24 Temperature Measurement, Probe Number = 1, T = 20.139000 C 02:10:25 Temperature Measurement, Probe Number = 2, T = 20.193000 C 02:10:25 Temperature Measurement, Probe Number = 3, T = 20.152000 C 02:10:26 Temperature Measurement, Probe Number = 4, T = 20.260000 C 02:10:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.26 02:10:26 Integrated Voltage Measurement... 02:10:45 Voltage Offset Correction: v_off_ini = 0.000007295 V, v_off_fin = 0.000008928 V 02:10:46 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171169479 Vs 02:10:46 Integrated Voltage Measurement... 02:11:05 Voltage Offset Correction: v_off_ini = 0.000008120 V, v_off_fin = 0.000005912 V 02:11:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171018102 Vs 02:11:08 Temperature Measurement, Probe Number = 0, T = 20.209000 C 02:11:09 Temperature Measurement, Probe Number = 1, T = 20.141000 C 02:11:09 Temperature Measurement, Probe Number = 2, T = 20.199000 C 02:11:10 Temperature Measurement, Probe Number = 3, T = 20.155000 C 02:11:11 Temperature Measurement, Probe Number = 4, T = 20.299000 C 02:11:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.30 02:11:11 Integrated Voltage Measurement... 02:11:30 Voltage Offset Correction: v_off_ini = 0.000006763 V, v_off_fin = 0.000009100 V 02:11:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171133868 Vs 02:11:31 Integrated Voltage Measurement... 02:11:50 Voltage Offset Correction: v_off_ini = 0.000008539 V, v_off_fin = 0.000005909 V 02:11:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171014095 Vs 02:11:53 Temperature Measurement, Probe Number = 0, T = 20.202000 C 02:11:53 Temperature Measurement, Probe Number = 1, T = 20.133000 C 02:11:54 Temperature Measurement, Probe Number = 2, T = 20.191000 C 02:11:55 Temperature Measurement, Probe Number = 3, T = 20.147000 C 02:11:55 Temperature Measurement, Probe Number = 4, T = 20.293000 C 02:11:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.29 02:11:55 Integrated Voltage Measurement... 02:12:14 Voltage Offset Correction: v_off_ini = 0.000006728 V, v_off_fin = 0.000009080 V 02:12:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171137148 Vs 02:12:15 Integrated Voltage Measurement... 02:12:34 Voltage Offset Correction: v_off_ini = 0.000008503 V, v_off_fin = 0.000005895 V 02:12:34 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171015007 Vs 02:12:37 Temperature Measurement, Probe Number = 0, T = 20.208000 C 02:12:37 Temperature Measurement, Probe Number = 1, T = 20.138000 C 02:12:38 Temperature Measurement, Probe Number = 2, T = 20.193000 C 02:12:39 Temperature Measurement, Probe Number = 3, T = 20.149000 C 02:12:39 Temperature Measurement, Probe Number = 4, T = 20.179000 C 02:12:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.18 02:12:40 Integrated Voltage Measurement... 02:12:59 Voltage Offset Correction: v_off_ini = 0.000006787 V, v_off_fin = 0.000008628 V 02:12:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171136477 Vs 02:12:59 Integrated Voltage Measurement... 02:13:18 Voltage Offset Correction: v_off_ini = 0.000007972 V, v_off_fin = 0.000005517 V 02:13:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171020182 Vs 02:13:21 Temperature Measurement, Probe Number = 0, T = 20.212000 C 02:13:22 Temperature Measurement, Probe Number = 1, T = 20.141000 C 02:13:22 Temperature Measurement, Probe Number = 2, T = 20.197000 C 02:13:23 Temperature Measurement, Probe Number = 3, T = 20.155000 C 02:13:24 Temperature Measurement, Probe Number = 4, T = 20.077000 C 02:13:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.08 02:13:24 Integrated Voltage Measurement... 02:13:43 Voltage Offset Correction: v_off_ini = 0.000006517 V, v_off_fin = 0.000009304 V 02:13:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171135121 Vs 02:13:44 Integrated Voltage Measurement... 02:14:03 Voltage Offset Correction: v_off_ini = 0.000008855 V, v_off_fin = 0.000005956 V 02:14:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171008236 Vs 02:14:06 Temperature Measurement, Probe Number = 0, T = 20.219000 C 02:14:06 Temperature Measurement, Probe Number = 1, T = 20.148000 C 02:14:07 Temperature Measurement, Probe Number = 2, T = 20.206000 C 02:14:08 Temperature Measurement, Probe Number = 3, T = 20.163000 C 02:14:08 Temperature Measurement, Probe Number = 4, T = 20.194000 C 02:14:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.19 02:14:09 Integrated Voltage Measurement... 02:14:28 Voltage Offset Correction: v_off_ini = 0.000006337 V, v_off_fin = 0.000008760 V 02:14:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171133173 Vs 02:14:28 Integrated Voltage Measurement... 02:14:48 Voltage Offset Correction: v_off_ini = 0.000008190 V, v_off_fin = 0.000005031 V 02:14:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171021968 Vs 02:14:50 Temperature Measurement, Probe Number = 0, T = 20.214000 C 02:14:51 Temperature Measurement, Probe Number = 1, T = 20.145000 C 02:14:52 Temperature Measurement, Probe Number = 2, T = 20.200000 C 02:14:52 Temperature Measurement, Probe Number = 3, T = 20.158000 C 02:14:53 Temperature Measurement, Probe Number = 4, T = 20.261000 C 02:14:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.26 02:14:53 Integrated Voltage Measurement... 02:15:13 Voltage Offset Correction: v_off_ini = 0.000006510 V, v_off_fin = 0.000008506 V 02:15:13 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171130172 Vs 02:15:13 Integrated Voltage Measurement... 02:15:32 Voltage Offset Correction: v_off_ini = 0.000008165 V, v_off_fin = 0.000005035 V 02:15:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171018238 Vs 02:15:35 Temperature Measurement, Probe Number = 0, T = 20.212000 C 02:15:35 Temperature Measurement, Probe Number = 1, T = 20.143000 C 02:15:36 Temperature Measurement, Probe Number = 2, T = 20.196000 C 02:15:37 Temperature Measurement, Probe Number = 3, T = 20.154000 C 02:15:37 Temperature Measurement, Probe Number = 4, T = 20.296000 C 02:15:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.30 02:15:38 Integrated Voltage Measurement... 02:15:58 Voltage Offset Correction: v_off_ini = 0.000006076 V, v_off_fin = 0.000008382 V 02:15:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171132449 Vs 02:15:59 Integrated Voltage Measurement... 02:16:18 Voltage Offset Correction: v_off_ini = 0.000007964 V, v_off_fin = 0.000004788 V 02:16:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171014305 Vs 02:16:21 Temperature Measurement, Probe Number = 0, T = 20.210000 C 02:16:22 Temperature Measurement, Probe Number = 1, T = 20.143000 C 02:16:22 Temperature Measurement, Probe Number = 2, T = 20.193000 C 02:16:23 Temperature Measurement, Probe Number = 3, T = 20.150000 C 02:16:24 Temperature Measurement, Probe Number = 4, T = 20.216000 C 02:16:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.22 02:16:24 Integrated Voltage Measurement... 02:16:43 Voltage Offset Correction: v_off_ini = 0.000005848 V, v_off_fin = 0.000008332 V 02:16:43 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171127290 Vs 02:16:43 Integrated Voltage Measurement... 02:17:03 Voltage Offset Correction: v_off_ini = 0.000007345 V, v_off_fin = 0.000004595 V 02:17:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171025738 Vs 02:17:06 Temperature Measurement, Probe Number = 0, T = 20.211000 C 02:17:06 Temperature Measurement, Probe Number = 1, T = 20.140000 C 02:17:07 Temperature Measurement, Probe Number = 2, T = 20.194000 C 02:17:07 Temperature Measurement, Probe Number = 3, T = 20.148000 C 02:17:08 Temperature Measurement, Probe Number = 4, T = 20.135000 C 02:17:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.14 02:17:08 Integrated Voltage Measurement... 02:17:28 Voltage Offset Correction: v_off_ini = 0.000005664 V, v_off_fin = 0.000008248 V 02:17:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171126786 Vs 02:17:28 Integrated Voltage Measurement... 02:17:47 Voltage Offset Correction: v_off_ini = 0.000007678 V, v_off_fin = 0.000005084 V 02:17:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171022243 Vs 02:47:50 Temperature Measurement, Probe Number = 0, T = 20.199000 C 02:47:51 Temperature Measurement, Probe Number = 1, T = 20.130000 C 02:47:52 Temperature Measurement, Probe Number = 2, T = 20.188000 C 02:47:52 Temperature Measurement, Probe Number = 3, T = 20.146000 C 02:47:53 Temperature Measurement, Probe Number = 4, T = 20.188000 C 02:47:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.19 02:47:53 Integrated Voltage Measurement... 02:48:12 Voltage Offset Correction: v_off_ini = 0.000006237 V, v_off_fin = 0.000009033 V 02:48:13 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171169118 Vs 02:48:13 Integrated Voltage Measurement... 02:48:32 Voltage Offset Correction: v_off_ini = 0.000008469 V, v_off_fin = 0.000005783 V 02:48:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171015462 Vs 02:48:35 Temperature Measurement, Probe Number = 0, T = 20.208000 C 02:48:35 Temperature Measurement, Probe Number = 1, T = 20.136000 C 02:48:36 Temperature Measurement, Probe Number = 2, T = 20.197000 C 02:48:37 Temperature Measurement, Probe Number = 3, T = 20.152000 C 02:48:37 Temperature Measurement, Probe Number = 4, T = 20.218000 C 02:48:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.22 02:48:38 Integrated Voltage Measurement... 02:48:57 Voltage Offset Correction: v_off_ini = 0.000006661 V, v_off_fin = 0.000008357 V 02:48:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171131292 Vs 02:48:57 Integrated Voltage Measurement... 02:49:17 Voltage Offset Correction: v_off_ini = 0.000007818 V, v_off_fin = 0.000004861 V 02:49:17 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171024742 Vs 02:49:19 Temperature Measurement, Probe Number = 0, T = 20.206000 C 02:49:20 Temperature Measurement, Probe Number = 1, T = 20.135000 C 02:49:21 Temperature Measurement, Probe Number = 2, T = 20.197000 C 02:49:21 Temperature Measurement, Probe Number = 3, T = 20.154000 C 02:49:22 Temperature Measurement, Probe Number = 4, T = 20.327000 C 02:49:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.33 02:49:22 Integrated Voltage Measurement... 02:49:42 Voltage Offset Correction: v_off_ini = 0.000006160 V, v_off_fin = 0.000008478 V 02:49:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171132203 Vs 02:49:42 Integrated Voltage Measurement... 02:50:01 Voltage Offset Correction: v_off_ini = 0.000007931 V, v_off_fin = 0.000005419 V 02:50:01 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171022395 Vs 02:50:04 Temperature Measurement, Probe Number = 0, T = 20.204000 C 02:50:05 Temperature Measurement, Probe Number = 1, T = 20.133000 C 02:50:05 Temperature Measurement, Probe Number = 2, T = 20.195000 C 02:50:06 Temperature Measurement, Probe Number = 3, T = 20.155000 C 02:50:06 Temperature Measurement, Probe Number = 4, T = 20.402000 C 02:50:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.40 02:50:07 Integrated Voltage Measurement... 02:50:27 Voltage Offset Correction: v_off_ini = 0.000006450 V, v_off_fin = 0.000008651 V 02:50:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171138381 Vs 02:50:27 Integrated Voltage Measurement... 02:50:46 Voltage Offset Correction: v_off_ini = 0.000008471 V, v_off_fin = 0.000004976 V 02:50:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171016261 Vs 02:50:49 Temperature Measurement, Probe Number = 0, T = 20.202000 C 02:50:50 Temperature Measurement, Probe Number = 1, T = 20.134000 C 02:50:50 Temperature Measurement, Probe Number = 2, T = 20.189000 C 02:50:51 Temperature Measurement, Probe Number = 3, T = 20.148000 C 02:50:52 Temperature Measurement, Probe Number = 4, T = 20.390000 C 02:50:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.39 02:50:52 Integrated Voltage Measurement... 02:51:11 Voltage Offset Correction: v_off_ini = 0.000006158 V, v_off_fin = 0.000008780 V 02:51:11 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171129729 Vs 02:51:11 Integrated Voltage Measurement... 02:51:30 Voltage Offset Correction: v_off_ini = 0.000008255 V, v_off_fin = 0.000005300 V 02:51:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171019714 Vs 02:51:33 Temperature Measurement, Probe Number = 0, T = 20.204000 C 02:51:34 Temperature Measurement, Probe Number = 1, T = 20.135000 C 02:51:35 Temperature Measurement, Probe Number = 2, T = 20.189000 C 02:51:35 Temperature Measurement, Probe Number = 3, T = 20.147000 C 02:51:36 Temperature Measurement, Probe Number = 4, T = 20.318000 C 02:51:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.32 02:51:36 Integrated Voltage Measurement... 02:51:55 Voltage Offset Correction: v_off_ini = 0.000006253 V, v_off_fin = 0.000009073 V 02:51:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171133111 Vs 02:51:56 Integrated Voltage Measurement... 02:52:15 Voltage Offset Correction: v_off_ini = 0.000008316 V, v_off_fin = 0.000005535 V 02:52:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171018679 Vs 02:52:18 Temperature Measurement, Probe Number = 0, T = 20.206000 C 02:52:18 Temperature Measurement, Probe Number = 1, T = 20.134000 C 02:52:19 Temperature Measurement, Probe Number = 2, T = 20.196000 C 02:52:20 Temperature Measurement, Probe Number = 3, T = 20.151000 C 02:52:20 Temperature Measurement, Probe Number = 4, T = 20.384000 C 02:52:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.38 02:52:21 Integrated Voltage Measurement... 02:52:40 Voltage Offset Correction: v_off_ini = 0.000006335 V, v_off_fin = 0.000008809 V 02:52:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171130608 Vs 02:52:40 Integrated Voltage Measurement... 02:53:00 Voltage Offset Correction: v_off_ini = 0.000008357 V, v_off_fin = 0.000005318 V 02:53:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171017641 Vs 02:53:02 Temperature Measurement, Probe Number = 0, T = 20.204000 C 02:53:03 Temperature Measurement, Probe Number = 1, T = 20.138000 C 02:53:04 Temperature Measurement, Probe Number = 2, T = 20.192000 C 02:53:04 Temperature Measurement, Probe Number = 3, T = 20.152000 C 02:53:05 Temperature Measurement, Probe Number = 4, T = 20.323000 C 02:53:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.32 02:53:05 Integrated Voltage Measurement... 02:53:24 Voltage Offset Correction: v_off_ini = 0.000006476 V, v_off_fin = 0.000009350 V 02:53:25 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171130364 Vs 02:53:25 Integrated Voltage Measurement... 02:53:44 Voltage Offset Correction: v_off_ini = 0.000008547 V, v_off_fin = 0.000004974 V 02:53:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171016311 Vs 02:53:47 Temperature Measurement, Probe Number = 0, T = 20.203000 C 02:53:48 Temperature Measurement, Probe Number = 1, T = 20.134000 C 02:53:48 Temperature Measurement, Probe Number = 2, T = 20.193000 C 02:53:49 Temperature Measurement, Probe Number = 3, T = 20.152000 C 02:53:50 Temperature Measurement, Probe Number = 4, T = 20.337000 C 02:53:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.34 02:53:50 Integrated Voltage Measurement... 02:54:09 Voltage Offset Correction: v_off_ini = 0.000006549 V, v_off_fin = 0.000008529 V 02:54:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171129946 Vs 02:54:10 Integrated Voltage Measurement... 02:54:29 Voltage Offset Correction: v_off_ini = 0.000008052 V, v_off_fin = 0.000005063 V 02:54:29 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171015580 Vs 02:54:31 Temperature Measurement, Probe Number = 0, T = 20.205000 C 02:54:32 Temperature Measurement, Probe Number = 1, T = 20.135000 C 02:54:33 Temperature Measurement, Probe Number = 2, T = 20.195000 C 02:54:33 Temperature Measurement, Probe Number = 3, T = 20.155000 C 02:54:34 Temperature Measurement, Probe Number = 4, T = 20.383000 C 02:54:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.38 02:54:34 Integrated Voltage Measurement... 02:54:54 Voltage Offset Correction: v_off_ini = 0.000006196 V, v_off_fin = 0.000007890 V 02:54:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171126549 Vs 02:54:54 Integrated Voltage Measurement... 02:55:13 Voltage Offset Correction: v_off_ini = 0.000007895 V, v_off_fin = 0.000005284 V 02:55:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171021102 Vs 03:25:16 Temperature Measurement, Probe Number = 0, T = 20.200000 C 03:25:17 Temperature Measurement, Probe Number = 1, T = 20.129000 C 03:25:18 Temperature Measurement, Probe Number = 2, T = 20.191000 C 03:25:18 Temperature Measurement, Probe Number = 3, T = 20.146000 C 03:25:19 Temperature Measurement, Probe Number = 4, T = 20.381000 C 03:25:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.38 03:25:19 Integrated Voltage Measurement... 03:25:38 Voltage Offset Correction: v_off_ini = 0.000007074 V, v_off_fin = 0.000008206 V 03:25:39 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171172755 Vs 03:25:39 Integrated Voltage Measurement... 03:25:58 Voltage Offset Correction: v_off_ini = 0.000008282 V, v_off_fin = 0.000004831 V 03:25:58 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171023147 Vs 03:26:01 Temperature Measurement, Probe Number = 0, T = 20.201000 C 03:26:02 Temperature Measurement, Probe Number = 1, T = 20.132000 C 03:26:02 Temperature Measurement, Probe Number = 2, T = 20.191000 C 03:26:03 Temperature Measurement, Probe Number = 3, T = 20.147000 C 03:26:03 Temperature Measurement, Probe Number = 4, T = 20.413000 C 03:26:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.41 03:26:04 Integrated Voltage Measurement... 03:26:23 Voltage Offset Correction: v_off_ini = 0.000006141 V, v_off_fin = 0.000008630 V 03:26:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171127981 Vs 03:26:23 Integrated Voltage Measurement... 03:26:42 Voltage Offset Correction: v_off_ini = 0.000007875 V, v_off_fin = 0.000005345 V 03:26:43 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171021697 Vs 03:26:45 Temperature Measurement, Probe Number = 0, T = 20.201000 C 03:26:46 Temperature Measurement, Probe Number = 1, T = 20.129000 C 03:26:47 Temperature Measurement, Probe Number = 2, T = 20.191000 C 03:26:47 Temperature Measurement, Probe Number = 3, T = 20.146000 C 03:26:48 Temperature Measurement, Probe Number = 4, T = 20.429000 C 03:26:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.43 03:26:48 Integrated Voltage Measurement... 03:27:08 Voltage Offset Correction: v_off_ini = 0.000005869 V, v_off_fin = 0.000008652 V 03:27:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171128233 Vs 03:27:08 Integrated Voltage Measurement... 03:27:27 Voltage Offset Correction: v_off_ini = 0.000008287 V, v_off_fin = 0.000005137 V 03:27:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171017283 Vs 03:27:30 Temperature Measurement, Probe Number = 0, T = 20.202000 C 03:27:31 Temperature Measurement, Probe Number = 1, T = 20.132000 C 03:27:32 Temperature Measurement, Probe Number = 2, T = 20.191000 C 03:27:32 Temperature Measurement, Probe Number = 3, T = 20.147000 C 03:27:33 Temperature Measurement, Probe Number = 4, T = 20.399000 C 03:27:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.40 03:27:33 Integrated Voltage Measurement... 03:27:53 Voltage Offset Correction: v_off_ini = 0.000006571 V, v_off_fin = 0.000009138 V 03:27:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171132933 Vs 03:27:53 Integrated Voltage Measurement... 03:28:12 Voltage Offset Correction: v_off_ini = 0.000008671 V, v_off_fin = 0.000005720 V 03:28:13 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171014806 Vs 03:28:15 Temperature Measurement, Probe Number = 0, T = 20.206000 C 03:28:16 Temperature Measurement, Probe Number = 1, T = 20.136000 C 03:28:17 Temperature Measurement, Probe Number = 2, T = 20.196000 C 03:28:17 Temperature Measurement, Probe Number = 3, T = 20.154000 C 03:28:18 Temperature Measurement, Probe Number = 4, T = 20.456000 C 03:28:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.46 03:28:18 Integrated Voltage Measurement... 03:28:37 Voltage Offset Correction: v_off_ini = 0.000007130 V, v_off_fin = 0.000009057 V 03:28:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171137173 Vs 03:28:38 Integrated Voltage Measurement... 03:28:57 Voltage Offset Correction: v_off_ini = 0.000008555 V, v_off_fin = 0.000005357 V 03:28:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171011136 Vs 03:29:00 Temperature Measurement, Probe Number = 0, T = 20.204000 C 03:29:00 Temperature Measurement, Probe Number = 1, T = 20.130000 C 03:29:01 Temperature Measurement, Probe Number = 2, T = 20.195000 C 03:29:02 Temperature Measurement, Probe Number = 3, T = 20.151000 C 03:29:02 Temperature Measurement, Probe Number = 4, T = 20.440000 C 03:29:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.44 03:29:03 Integrated Voltage Measurement... 03:29:22 Voltage Offset Correction: v_off_ini = 0.000007217 V, v_off_fin = 0.000009203 V 03:29:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171137189 Vs 03:29:22 Integrated Voltage Measurement... 03:29:41 Voltage Offset Correction: v_off_ini = 0.000008693 V, v_off_fin = 0.000005367 V 03:29:42 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171012093 Vs 03:29:44 Temperature Measurement, Probe Number = 0, T = 20.200000 C 03:29:45 Temperature Measurement, Probe Number = 1, T = 20.132000 C 03:29:46 Temperature Measurement, Probe Number = 2, T = 20.192000 C 03:29:46 Temperature Measurement, Probe Number = 3, T = 20.149000 C 03:29:47 Temperature Measurement, Probe Number = 4, T = 20.381000 C 03:29:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.38 03:29:47 Integrated Voltage Measurement... 03:30:07 Voltage Offset Correction: v_off_ini = 0.000006550 V, v_off_fin = 0.000008745 V 03:30:07 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171130863 Vs 03:30:07 Integrated Voltage Measurement... 03:30:26 Voltage Offset Correction: v_off_ini = 0.000008366 V, v_off_fin = 0.000005316 V 03:30:26 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171013490 Vs 03:30:29 Temperature Measurement, Probe Number = 0, T = 20.200000 C 03:30:30 Temperature Measurement, Probe Number = 1, T = 20.132000 C 03:30:30 Temperature Measurement, Probe Number = 2, T = 20.187000 C 03:30:31 Temperature Measurement, Probe Number = 3, T = 20.144000 C 03:30:32 Temperature Measurement, Probe Number = 4, T = 20.259000 C 03:30:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.26 03:30:32 Integrated Voltage Measurement... 03:30:51 Voltage Offset Correction: v_off_ini = 0.000006118 V, v_off_fin = 0.000008865 V 03:30:51 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171128066 Vs 03:30:51 Integrated Voltage Measurement... 03:31:11 Voltage Offset Correction: v_off_ini = 0.000007932 V, v_off_fin = 0.000005415 V 03:31:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171015116 Vs 03:31:13 Temperature Measurement, Probe Number = 0, T = 20.198000 C 03:31:14 Temperature Measurement, Probe Number = 1, T = 20.134000 C 03:31:15 Temperature Measurement, Probe Number = 2, T = 20.186000 C 03:31:15 Temperature Measurement, Probe Number = 3, T = 20.143000 C 03:31:16 Temperature Measurement, Probe Number = 4, T = 20.248000 C 03:31:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.25 03:31:16 Integrated Voltage Measurement... 03:31:36 Voltage Offset Correction: v_off_ini = 0.000005902 V, v_off_fin = 0.000008105 V 03:31:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171122022 Vs 03:31:36 Integrated Voltage Measurement... 03:31:56 Voltage Offset Correction: v_off_ini = 0.000007735 V, v_off_fin = 0.000005170 V 03:31:56 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171022581 Vs 03:31:59 Temperature Measurement, Probe Number = 0, T = 20.200000 C 03:31:59 Temperature Measurement, Probe Number = 1, T = 20.128000 C 03:32:00 Temperature Measurement, Probe Number = 2, T = 20.190000 C 03:32:01 Temperature Measurement, Probe Number = 3, T = 20.146000 C 03:32:01 Temperature Measurement, Probe Number = 4, T = 20.199000 C 03:32:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.20 03:32:02 Integrated Voltage Measurement... 03:32:21 Voltage Offset Correction: v_off_ini = 0.000006577 V, v_off_fin = 0.000008820 V 03:32:21 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171125730 Vs 03:32:21 Integrated Voltage Measurement... 03:32:41 Voltage Offset Correction: v_off_ini = 0.000008262 V, v_off_fin = 0.000004979 V 03:32:41 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171022603 Vs 04:02:44 Temperature Measurement, Probe Number = 0, T = 20.196000 C 04:02:44 Temperature Measurement, Probe Number = 1, T = 20.130000 C 04:02:45 Temperature Measurement, Probe Number = 2, T = 20.187000 C 04:02:46 Temperature Measurement, Probe Number = 3, T = 20.147000 C 04:02:46 Temperature Measurement, Probe Number = 4, T = 20.242000 C 04:02:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.24 04:02:47 Integrated Voltage Measurement... 04:03:06 Voltage Offset Correction: v_off_ini = 0.000006880 V, v_off_fin = 0.000008811 V 04:03:06 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171168754 Vs 04:03:06 Integrated Voltage Measurement... 04:03:25 Voltage Offset Correction: v_off_ini = 0.000008095 V, v_off_fin = 0.000004788 V 04:03:26 Integrated Voltage Measurement Delta Gap = -0.0040005 m VT = -0.171025458 Vs 04:03:28 Temperature Measurement, Probe Number = 0, T = 20.198000 C 04:03:29 Temperature Measurement, Probe Number = 1, T = 20.127000 C 04:03:30 Temperature Measurement, Probe Number = 2, T = 20.190000 C 04:03:30 Temperature Measurement, Probe Number = 3, T = 20.148000 C 04:03:31 Temperature Measurement, Probe Number = 4, T = 20.383000 C 04:03:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.38 04:03:31 Integrated Voltage Measurement... 04:03:51 Voltage Offset Correction: v_off_ini = 0.000006004 V, v_off_fin = 0.000008627 V 04:03:51 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171125045 Vs 04:03:51 Integrated Voltage Measurement... 04:04:10 Voltage Offset Correction: v_off_ini = 0.000007911 V, v_off_fin = 0.000004530 V 04:04:10 Integrated Voltage Measurement Delta Gap = -0.0040005 m VT = -0.171025239 Vs 04:04:13 Temperature Measurement, Probe Number = 0, T = 20.203000 C 04:04:13 Temperature Measurement, Probe Number = 1, T = 20.131000 C 04:04:14 Temperature Measurement, Probe Number = 2, T = 20.195000 C 04:04:15 Temperature Measurement, Probe Number = 3, T = 20.150000 C 04:04:15 Temperature Measurement, Probe Number = 4, T = 20.524000 C 04:04:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.52 04:04:16 Integrated Voltage Measurement... 04:04:35 Voltage Offset Correction: v_off_ini = 0.000005270 V, v_off_fin = 0.000008476 V 04:04:35 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171124003 Vs 04:04:35 Integrated Voltage Measurement... 04:04:54 Voltage Offset Correction: v_off_ini = 0.000008103 V, v_off_fin = 0.000005622 V 04:04:54 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171019986 Vs 04:04:57 Temperature Measurement, Probe Number = 0, T = 20.200000 C 04:04:58 Temperature Measurement, Probe Number = 1, T = 20.126000 C 04:04:58 Temperature Measurement, Probe Number = 2, T = 20.194000 C 04:04:59 Temperature Measurement, Probe Number = 3, T = 20.146000 C 04:04:59 Temperature Measurement, Probe Number = 4, T = 20.529000 C 04:05:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.53 04:05:00 Integrated Voltage Measurement... 04:05:19 Voltage Offset Correction: v_off_ini = 0.000006478 V, v_off_fin = 0.000008617 V 04:05:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171132403 Vs 04:05:19 Integrated Voltage Measurement... 04:05:39 Voltage Offset Correction: v_off_ini = 0.000008211 V, v_off_fin = 0.000005695 V 04:05:39 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171023817 Vs 04:05:42 Temperature Measurement, Probe Number = 0, T = 20.191000 C 04:05:42 Temperature Measurement, Probe Number = 1, T = 20.122000 C 04:05:43 Temperature Measurement, Probe Number = 2, T = 20.184000 C 04:05:44 Temperature Measurement, Probe Number = 3, T = 20.139000 C 04:05:44 Temperature Measurement, Probe Number = 4, T = 20.425000 C 04:05:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.43 04:05:45 Integrated Voltage Measurement... 04:06:04 Voltage Offset Correction: v_off_ini = 0.000006453 V, v_off_fin = 0.000009146 V 04:06:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171131996 Vs 04:06:05 Integrated Voltage Measurement... 04:06:24 Voltage Offset Correction: v_off_ini = 0.000008794 V, v_off_fin = 0.000004907 V 04:06:24 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171015814 Vs 04:06:27 Temperature Measurement, Probe Number = 0, T = 20.192000 C 04:06:27 Temperature Measurement, Probe Number = 1, T = 20.123000 C 04:06:28 Temperature Measurement, Probe Number = 2, T = 20.180000 C 04:06:29 Temperature Measurement, Probe Number = 3, T = 20.137000 C 04:06:30 Temperature Measurement, Probe Number = 4, T = 20.352000 C 04:06:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.35 04:06:30 Integrated Voltage Measurement... 04:06:50 Voltage Offset Correction: v_off_ini = 0.000006525 V, v_off_fin = 0.000008857 V 04:06:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171132624 Vs 04:06:50 Integrated Voltage Measurement... 04:07:09 Voltage Offset Correction: v_off_ini = 0.000008375 V, v_off_fin = 0.000005344 V 04:07:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171016567 Vs 04:07:12 Temperature Measurement, Probe Number = 0, T = 20.195000 C 04:07:13 Temperature Measurement, Probe Number = 1, T = 20.125000 C 04:07:14 Temperature Measurement, Probe Number = 2, T = 20.186000 C 04:07:14 Temperature Measurement, Probe Number = 3, T = 20.139000 C 04:07:15 Temperature Measurement, Probe Number = 4, T = 20.231000 C 04:07:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.23 04:07:15 Integrated Voltage Measurement... 04:07:34 Voltage Offset Correction: v_off_ini = 0.000007186 V, v_off_fin = 0.000009075 V 04:07:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171132687 Vs 04:07:35 Integrated Voltage Measurement... 04:07:54 Voltage Offset Correction: v_off_ini = 0.000008393 V, v_off_fin = 0.000005312 V 04:07:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171020576 Vs 04:07:57 Temperature Measurement, Probe Number = 0, T = 20.199000 C 04:07:57 Temperature Measurement, Probe Number = 1, T = 20.127000 C 04:07:58 Temperature Measurement, Probe Number = 2, T = 20.192000 C 04:07:59 Temperature Measurement, Probe Number = 3, T = 20.147000 C 04:07:59 Temperature Measurement, Probe Number = 4, T = 20.364000 C 04:07:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.36 04:08:00 Integrated Voltage Measurement... 04:08:19 Voltage Offset Correction: v_off_ini = 0.000006636 V, v_off_fin = 0.000009319 V 04:08:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171129479 Vs 04:08:19 Integrated Voltage Measurement... 04:08:38 Voltage Offset Correction: v_off_ini = 0.000008381 V, v_off_fin = 0.000005672 V 04:08:39 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171018462 Vs 04:08:41 Temperature Measurement, Probe Number = 0, T = 20.200000 C 04:08:42 Temperature Measurement, Probe Number = 1, T = 20.129000 C 04:08:43 Temperature Measurement, Probe Number = 2, T = 20.190000 C 04:08:43 Temperature Measurement, Probe Number = 3, T = 20.142000 C 04:08:44 Temperature Measurement, Probe Number = 4, T = 20.409000 C 04:08:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.41 04:08:44 Integrated Voltage Measurement... 04:09:03 Voltage Offset Correction: v_off_ini = 0.000006008 V, v_off_fin = 0.000008728 V 04:09:03 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171133392 Vs 04:09:04 Integrated Voltage Measurement... 04:09:23 Voltage Offset Correction: v_off_ini = 0.000007922 V, v_off_fin = 0.000005051 V 04:09:23 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171025905 Vs 04:09:26 Temperature Measurement, Probe Number = 0, T = 20.189000 C 04:09:26 Temperature Measurement, Probe Number = 1, T = 20.119000 C 04:09:27 Temperature Measurement, Probe Number = 2, T = 20.183000 C 04:09:28 Temperature Measurement, Probe Number = 3, T = 20.138000 C 04:09:28 Temperature Measurement, Probe Number = 4, T = 20.326000 C 04:09:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.33 04:09:29 Integrated Voltage Measurement... 04:09:48 Voltage Offset Correction: v_off_ini = 0.000006566 V, v_off_fin = 0.000008975 V 04:09:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171130763 Vs 04:09:48 Integrated Voltage Measurement... 04:10:08 Voltage Offset Correction: v_off_ini = 0.000008323 V, v_off_fin = 0.000005348 V 04:10:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171016723 Vs 04:40:11 Temperature Measurement, Probe Number = 0, T = 20.182000 C 04:40:12 Temperature Measurement, Probe Number = 1, T = 20.111000 C 04:40:13 Temperature Measurement, Probe Number = 2, T = 20.175000 C 04:40:13 Temperature Measurement, Probe Number = 3, T = 20.131000 C 04:40:14 Temperature Measurement, Probe Number = 4, T = 20.170000 C 04:40:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.17 04:40:14 Integrated Voltage Measurement... 04:40:33 Voltage Offset Correction: v_off_ini = 0.000006085 V, v_off_fin = 0.000008010 V 04:40:34 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171152261 Vs 04:40:34 Integrated Voltage Measurement... 04:40:53 Voltage Offset Correction: v_off_ini = 0.000007722 V, v_off_fin = 0.000004501 V 04:40:53 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171027090 Vs 04:40:56 Temperature Measurement, Probe Number = 0, T = 20.189000 C 04:40:57 Temperature Measurement, Probe Number = 1, T = 20.124000 C 04:40:57 Temperature Measurement, Probe Number = 2, T = 20.180000 C 04:40:58 Temperature Measurement, Probe Number = 3, T = 20.137000 C 04:40:59 Temperature Measurement, Probe Number = 4, T = 20.232000 C 04:40:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.23 04:40:59 Integrated Voltage Measurement... 04:41:18 Voltage Offset Correction: v_off_ini = 0.000005405 V, v_off_fin = 0.000007848 V 04:41:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171117830 Vs 04:41:19 Integrated Voltage Measurement... 04:41:38 Voltage Offset Correction: v_off_ini = 0.000007708 V, v_off_fin = 0.000004552 V 04:41:38 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171024612 Vs 04:41:41 Temperature Measurement, Probe Number = 0, T = 20.194000 C 04:41:41 Temperature Measurement, Probe Number = 1, T = 20.126000 C 04:41:42 Temperature Measurement, Probe Number = 2, T = 20.188000 C 04:41:43 Temperature Measurement, Probe Number = 3, T = 20.143000 C 04:41:43 Temperature Measurement, Probe Number = 4, T = 20.356000 C 04:41:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.36 04:41:43 Integrated Voltage Measurement... 04:42:02 Voltage Offset Correction: v_off_ini = 0.000006067 V, v_off_fin = 0.000008257 V 04:42:03 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171120494 Vs 04:42:03 Integrated Voltage Measurement... 04:42:22 Voltage Offset Correction: v_off_ini = 0.000007749 V, v_off_fin = 0.000004968 V 04:42:22 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171024155 Vs 04:42:25 Temperature Measurement, Probe Number = 0, T = 20.197000 C 04:42:26 Temperature Measurement, Probe Number = 1, T = 20.125000 C 04:42:26 Temperature Measurement, Probe Number = 2, T = 20.186000 C 04:42:27 Temperature Measurement, Probe Number = 3, T = 20.139000 C 04:42:28 Temperature Measurement, Probe Number = 4, T = 20.386000 C 04:42:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.39 04:42:28 Integrated Voltage Measurement... 04:42:47 Voltage Offset Correction: v_off_ini = 0.000005799 V, v_off_fin = 0.000007973 V 04:42:47 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171119684 Vs 04:42:48 Integrated Voltage Measurement... 04:43:06 Voltage Offset Correction: v_off_ini = 0.000007536 V, v_off_fin = 0.000004389 V 04:43:07 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171029230 Vs 04:43:09 Temperature Measurement, Probe Number = 0, T = 20.184000 C 04:43:10 Temperature Measurement, Probe Number = 1, T = 20.119000 C 04:43:11 Temperature Measurement, Probe Number = 2, T = 20.178000 C 04:43:11 Temperature Measurement, Probe Number = 3, T = 20.136000 C 04:43:12 Temperature Measurement, Probe Number = 4, T = 20.351000 C 04:43:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.35 04:43:12 Integrated Voltage Measurement... 04:43:31 Voltage Offset Correction: v_off_ini = 0.000005801 V, v_off_fin = 0.000008204 V 04:43:31 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171126488 Vs 04:43:32 Integrated Voltage Measurement... 04:43:51 Voltage Offset Correction: v_off_ini = 0.000007614 V, v_off_fin = 0.000004642 V 04:43:51 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171028652 Vs 04:43:54 Temperature Measurement, Probe Number = 0, T = 20.185000 C 04:43:54 Temperature Measurement, Probe Number = 1, T = 20.119000 C 04:43:55 Temperature Measurement, Probe Number = 2, T = 20.180000 C 04:43:56 Temperature Measurement, Probe Number = 3, T = 20.138000 C 04:43:56 Temperature Measurement, Probe Number = 4, T = 20.230000 C 04:43:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.23 04:43:56 Integrated Voltage Measurement... 04:44:16 Voltage Offset Correction: v_off_ini = 0.000005587 V, v_off_fin = 0.000007925 V 04:44:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171122568 Vs 04:44:16 Integrated Voltage Measurement... 04:44:35 Voltage Offset Correction: v_off_ini = 0.000007779 V, v_off_fin = 0.000004623 V 04:44:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171025869 Vs 04:44:38 Temperature Measurement, Probe Number = 0, T = 20.194000 C 04:44:39 Temperature Measurement, Probe Number = 1, T = 20.121000 C 04:44:40 Temperature Measurement, Probe Number = 2, T = 20.184000 C 04:44:40 Temperature Measurement, Probe Number = 3, T = 20.138000 C 04:44:41 Temperature Measurement, Probe Number = 4, T = 20.264000 C 04:44:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.26 04:44:41 Integrated Voltage Measurement... 04:45:00 Voltage Offset Correction: v_off_ini = 0.000005939 V, v_off_fin = 0.000008697 V 04:45:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171127289 Vs 04:45:01 Integrated Voltage Measurement... 04:45:20 Voltage Offset Correction: v_off_ini = 0.000007817 V, v_off_fin = 0.000004907 V 04:45:20 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171024696 Vs 04:45:23 Temperature Measurement, Probe Number = 0, T = 20.186000 C 04:45:23 Temperature Measurement, Probe Number = 1, T = 20.118000 C 04:45:24 Temperature Measurement, Probe Number = 2, T = 20.179000 C 04:45:25 Temperature Measurement, Probe Number = 3, T = 20.135000 C 04:45:25 Temperature Measurement, Probe Number = 4, T = 20.210000 C 04:45:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.21 04:45:25 Integrated Voltage Measurement... 04:45:45 Voltage Offset Correction: v_off_ini = 0.000006030 V, v_off_fin = 0.000008108 V 04:45:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171123420 Vs 04:45:45 Integrated Voltage Measurement... 04:46:04 Voltage Offset Correction: v_off_ini = 0.000007194 V, v_off_fin = 0.000004429 V 04:46:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171026789 Vs 04:46:07 Temperature Measurement, Probe Number = 0, T = 20.191000 C 04:46:08 Temperature Measurement, Probe Number = 1, T = 20.124000 C 04:46:09 Temperature Measurement, Probe Number = 2, T = 20.183000 C 04:46:09 Temperature Measurement, Probe Number = 3, T = 20.140000 C 04:46:10 Temperature Measurement, Probe Number = 4, T = 20.239000 C 04:46:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.24 04:46:10 Integrated Voltage Measurement... 04:46:30 Voltage Offset Correction: v_off_ini = 0.000005450 V, v_off_fin = 0.000007628 V 04:46:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171118472 Vs 04:46:30 Integrated Voltage Measurement... 04:46:50 Voltage Offset Correction: v_off_ini = 0.000007246 V, v_off_fin = 0.000004053 V 04:46:50 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171027972 Vs 04:46:53 Temperature Measurement, Probe Number = 0, T = 20.194000 C 04:46:53 Temperature Measurement, Probe Number = 1, T = 20.126000 C 04:46:54 Temperature Measurement, Probe Number = 2, T = 20.188000 C 04:46:55 Temperature Measurement, Probe Number = 3, T = 20.143000 C 04:46:55 Temperature Measurement, Probe Number = 4, T = 20.369000 C 04:46:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.37 04:46:55 Integrated Voltage Measurement... 04:47:15 Voltage Offset Correction: v_off_ini = 0.000005055 V, v_off_fin = 0.000008065 V 04:47:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171116351 Vs 04:47:15 Integrated Voltage Measurement... 04:47:34 Voltage Offset Correction: v_off_ini = 0.000007542 V, v_off_fin = 0.000004468 V 04:47:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171026201 Vs 05:17:37 Temperature Measurement, Probe Number = 0, T = 20.188000 C 05:17:38 Temperature Measurement, Probe Number = 1, T = 20.116000 C 05:17:39 Temperature Measurement, Probe Number = 2, T = 20.183000 C 05:17:39 Temperature Measurement, Probe Number = 3, T = 20.138000 C 05:17:40 Temperature Measurement, Probe Number = 4, T = 20.379000 C 05:17:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.38 05:17:40 Integrated Voltage Measurement... 05:17:59 Voltage Offset Correction: v_off_ini = 0.000006233 V, v_off_fin = 0.000007966 V 05:18:00 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171158105 Vs 05:18:00 Integrated Voltage Measurement... 05:18:19 Voltage Offset Correction: v_off_ini = 0.000007420 V, v_off_fin = 0.000004450 V 05:18:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171027034 Vs 05:18:22 Temperature Measurement, Probe Number = 0, T = 20.190000 C 05:18:22 Temperature Measurement, Probe Number = 1, T = 20.120000 C 05:18:23 Temperature Measurement, Probe Number = 2, T = 20.183000 C 05:18:24 Temperature Measurement, Probe Number = 3, T = 20.141000 C 05:18:24 Temperature Measurement, Probe Number = 4, T = 20.316000 C 05:18:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.32 05:18:24 Integrated Voltage Measurement... 05:18:44 Voltage Offset Correction: v_off_ini = 0.000005895 V, v_off_fin = 0.000008291 V 05:18:44 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171118040 Vs 05:18:44 Integrated Voltage Measurement... 05:19:03 Voltage Offset Correction: v_off_ini = 0.000007627 V, v_off_fin = 0.000005331 V 05:19:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171020356 Vs 05:19:06 Temperature Measurement, Probe Number = 0, T = 20.181000 C 05:19:07 Temperature Measurement, Probe Number = 1, T = 20.112000 C 05:19:07 Temperature Measurement, Probe Number = 2, T = 20.176000 C 05:19:08 Temperature Measurement, Probe Number = 3, T = 20.136000 C 05:19:09 Temperature Measurement, Probe Number = 4, T = 20.313000 C 05:19:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.31 05:19:09 Integrated Voltage Measurement... 05:19:28 Voltage Offset Correction: v_off_ini = 0.000006406 V, v_off_fin = 0.000008381 V 05:19:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171121806 Vs 05:19:28 Integrated Voltage Measurement... 05:19:48 Voltage Offset Correction: v_off_ini = 0.000007492 V, v_off_fin = 0.000004999 V 05:19:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171020165 Vs 05:19:50 Temperature Measurement, Probe Number = 0, T = 20.186000 C 05:19:51 Temperature Measurement, Probe Number = 1, T = 20.120000 C 05:19:52 Temperature Measurement, Probe Number = 2, T = 20.176000 C 05:19:52 Temperature Measurement, Probe Number = 3, T = 20.135000 C 05:19:53 Temperature Measurement, Probe Number = 4, T = 20.270000 C 05:19:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.27 05:19:53 Integrated Voltage Measurement... 05:20:13 Voltage Offset Correction: v_off_ini = 0.000006035 V, v_off_fin = 0.000008642 V 05:20:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171117247 Vs 05:20:13 Integrated Voltage Measurement... 05:20:32 Voltage Offset Correction: v_off_ini = 0.000007514 V, v_off_fin = 0.000004461 V 05:20:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171024783 Vs 05:20:35 Temperature Measurement, Probe Number = 0, T = 20.191000 C 05:20:36 Temperature Measurement, Probe Number = 1, T = 20.120000 C 05:20:36 Temperature Measurement, Probe Number = 2, T = 20.184000 C 05:20:37 Temperature Measurement, Probe Number = 3, T = 20.141000 C 05:20:38 Temperature Measurement, Probe Number = 4, T = 20.400000 C 05:20:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.40 05:20:38 Integrated Voltage Measurement... 05:20:57 Voltage Offset Correction: v_off_ini = 0.000005574 V, v_off_fin = 0.000008002 V 05:20:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171116307 Vs 05:20:57 Integrated Voltage Measurement... 05:21:17 Voltage Offset Correction: v_off_ini = 0.000007545 V, v_off_fin = 0.000004586 V 05:21:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171025373 Vs 05:21:20 Temperature Measurement, Probe Number = 0, T = 20.185000 C 05:21:20 Temperature Measurement, Probe Number = 1, T = 20.113000 C 05:21:21 Temperature Measurement, Probe Number = 2, T = 20.179000 C 05:21:22 Temperature Measurement, Probe Number = 3, T = 20.136000 C 05:21:22 Temperature Measurement, Probe Number = 4, T = 20.329000 C 05:21:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.33 05:21:22 Integrated Voltage Measurement... 05:21:42 Voltage Offset Correction: v_off_ini = 0.000005435 V, v_off_fin = 0.000007596 V 05:21:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171112696 Vs 05:21:42 Integrated Voltage Measurement... 05:22:01 Voltage Offset Correction: v_off_ini = 0.000006998 V, v_off_fin = 0.000004616 V 05:22:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171025483 Vs 05:22:04 Temperature Measurement, Probe Number = 0, T = 20.188000 C 05:22:05 Temperature Measurement, Probe Number = 1, T = 20.119000 C 05:22:05 Temperature Measurement, Probe Number = 2, T = 20.180000 C 05:22:06 Temperature Measurement, Probe Number = 3, T = 20.138000 C 05:22:07 Temperature Measurement, Probe Number = 4, T = 20.296000 C 05:22:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.30 05:22:07 Integrated Voltage Measurement... 05:22:26 Voltage Offset Correction: v_off_ini = 0.000005587 V, v_off_fin = 0.000007687 V 05:22:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171111446 Vs 05:22:27 Integrated Voltage Measurement... 05:22:46 Voltage Offset Correction: v_off_ini = 0.000007570 V, v_off_fin = 0.000004905 V 05:22:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171024560 Vs 05:22:49 Temperature Measurement, Probe Number = 0, T = 20.185000 C 05:22:49 Temperature Measurement, Probe Number = 1, T = 20.115000 C 05:22:50 Temperature Measurement, Probe Number = 2, T = 20.179000 C 05:22:51 Temperature Measurement, Probe Number = 3, T = 20.135000 C 05:22:51 Temperature Measurement, Probe Number = 4, T = 20.339000 C 05:22:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.34 05:22:52 Integrated Voltage Measurement... 05:23:11 Voltage Offset Correction: v_off_ini = 0.000005841 V, v_off_fin = 0.000007832 V 05:23:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171112413 Vs 05:23:11 Integrated Voltage Measurement... 05:23:30 Voltage Offset Correction: v_off_ini = 0.000007249 V, v_off_fin = 0.000004673 V 05:23:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171019597 Vs 05:23:33 Temperature Measurement, Probe Number = 0, T = 20.188000 C 05:23:34 Temperature Measurement, Probe Number = 1, T = 20.115000 C 05:23:34 Temperature Measurement, Probe Number = 2, T = 20.179000 C 05:23:35 Temperature Measurement, Probe Number = 3, T = 20.135000 C 05:23:36 Temperature Measurement, Probe Number = 4, T = 20.272000 C 05:23:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.27 05:23:36 Integrated Voltage Measurement... 05:23:55 Voltage Offset Correction: v_off_ini = 0.000005898 V, v_off_fin = 0.000008026 V 05:23:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171117067 Vs 05:23:56 Integrated Voltage Measurement... 05:24:15 Voltage Offset Correction: v_off_ini = 0.000007213 V, v_off_fin = 0.000004140 V 05:24:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171025463 Vs 05:24:18 Temperature Measurement, Probe Number = 0, T = 20.187000 C 05:24:19 Temperature Measurement, Probe Number = 1, T = 20.112000 C 05:24:19 Temperature Measurement, Probe Number = 2, T = 20.180000 C 05:24:20 Temperature Measurement, Probe Number = 3, T = 20.133000 C 05:24:21 Temperature Measurement, Probe Number = 4, T = 20.203000 C 05:24:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.20 05:24:21 Integrated Voltage Measurement... 05:24:40 Voltage Offset Correction: v_off_ini = 0.000005168 V, v_off_fin = 0.000007464 V 05:24:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171108848 Vs 05:24:40 Integrated Voltage Measurement... 05:25:00 Voltage Offset Correction: v_off_ini = 0.000007236 V, v_off_fin = 0.000004363 V 05:25:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171025225 Vs 05:55:03 Temperature Measurement, Probe Number = 0, T = 20.179000 C 05:55:03 Temperature Measurement, Probe Number = 1, T = 20.110000 C 05:55:04 Temperature Measurement, Probe Number = 2, T = 20.174000 C 05:55:05 Temperature Measurement, Probe Number = 3, T = 20.132000 C 05:55:05 Temperature Measurement, Probe Number = 4, T = 20.344000 C 05:55:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.34 05:55:06 Integrated Voltage Measurement... 05:55:25 Voltage Offset Correction: v_off_ini = 0.000006744 V, v_off_fin = 0.000008143 V 05:55:25 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171153210 Vs 05:55:26 Integrated Voltage Measurement... 05:55:45 Voltage Offset Correction: v_off_ini = 0.000008120 V, v_off_fin = 0.000004913 V 05:55:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171022250 Vs 05:55:48 Temperature Measurement, Probe Number = 0, T = 20.183000 C 05:55:48 Temperature Measurement, Probe Number = 1, T = 20.114000 C 05:55:49 Temperature Measurement, Probe Number = 2, T = 20.177000 C 05:55:50 Temperature Measurement, Probe Number = 3, T = 20.135000 C 05:55:50 Temperature Measurement, Probe Number = 4, T = 20.324000 C 05:55:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.32 05:55:51 Integrated Voltage Measurement... 05:56:10 Voltage Offset Correction: v_off_ini = 0.000006239 V, v_off_fin = 0.000008595 V 05:56:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171117570 Vs 05:56:10 Integrated Voltage Measurement... 05:56:29 Voltage Offset Correction: v_off_ini = 0.000007770 V, v_off_fin = 0.000005015 V 05:56:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171016416 Vs 05:56:32 Temperature Measurement, Probe Number = 0, T = 20.181000 C 05:56:33 Temperature Measurement, Probe Number = 1, T = 20.106000 C 05:56:34 Temperature Measurement, Probe Number = 2, T = 20.176000 C 05:56:34 Temperature Measurement, Probe Number = 3, T = 20.132000 C 05:56:35 Temperature Measurement, Probe Number = 4, T = 20.271000 C 05:56:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.27 05:56:35 Integrated Voltage Measurement... 05:56:54 Voltage Offset Correction: v_off_ini = 0.000005614 V, v_off_fin = 0.000008339 V 05:56:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171114553 Vs 05:56:55 Integrated Voltage Measurement... 05:57:14 Voltage Offset Correction: v_off_ini = 0.000007767 V, v_off_fin = 0.000004819 V 05:57:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171021864 Vs 05:57:17 Temperature Measurement, Probe Number = 0, T = 20.180000 C 05:57:18 Temperature Measurement, Probe Number = 1, T = 20.110000 C 05:57:18 Temperature Measurement, Probe Number = 2, T = 20.176000 C 05:57:19 Temperature Measurement, Probe Number = 3, T = 20.131000 C 05:57:20 Temperature Measurement, Probe Number = 4, T = 20.209000 C 05:57:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.21 05:57:20 Integrated Voltage Measurement... 05:57:39 Voltage Offset Correction: v_off_ini = 0.000005870 V, v_off_fin = 0.000007825 V 05:57:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171114288 Vs 05:57:39 Integrated Voltage Measurement... 05:57:59 Voltage Offset Correction: v_off_ini = 0.000007284 V, v_off_fin = 0.000004476 V 05:57:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171020908 Vs 05:58:01 Temperature Measurement, Probe Number = 0, T = 20.185000 C 05:58:02 Temperature Measurement, Probe Number = 1, T = 20.111000 C 05:58:03 Temperature Measurement, Probe Number = 2, T = 20.181000 C 05:58:03 Temperature Measurement, Probe Number = 3, T = 20.135000 C 05:58:04 Temperature Measurement, Probe Number = 4, T = 20.275000 C 05:58:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.27 05:58:04 Integrated Voltage Measurement... 05:58:23 Voltage Offset Correction: v_off_ini = 0.000005841 V, v_off_fin = 0.000008741 V 05:58:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171120786 Vs 05:58:24 Integrated Voltage Measurement... 05:58:43 Voltage Offset Correction: v_off_ini = 0.000008290 V, v_off_fin = 0.000004488 V 05:58:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171017156 Vs 05:58:46 Temperature Measurement, Probe Number = 0, T = 20.186000 C 05:58:47 Temperature Measurement, Probe Number = 1, T = 20.113000 C 05:58:48 Temperature Measurement, Probe Number = 2, T = 20.178000 C 05:58:48 Temperature Measurement, Probe Number = 3, T = 20.134000 C 05:58:49 Temperature Measurement, Probe Number = 4, T = 20.292000 C 05:58:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.29 05:58:49 Integrated Voltage Measurement... 05:59:08 Voltage Offset Correction: v_off_ini = 0.000006116 V, v_off_fin = 0.000008460 V 05:59:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171120889 Vs 05:59:09 Integrated Voltage Measurement... 05:59:28 Voltage Offset Correction: v_off_ini = 0.000007828 V, v_off_fin = 0.000003938 V 05:59:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171021095 Vs 05:59:31 Temperature Measurement, Probe Number = 0, T = 20.186000 C 05:59:31 Temperature Measurement, Probe Number = 1, T = 20.109000 C 05:59:32 Temperature Measurement, Probe Number = 2, T = 20.183000 C 05:59:33 Temperature Measurement, Probe Number = 3, T = 20.135000 C 05:59:33 Temperature Measurement, Probe Number = 4, T = 20.422000 C 05:59:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.42 05:59:34 Integrated Voltage Measurement... 05:59:53 Voltage Offset Correction: v_off_ini = 0.000005599 V, v_off_fin = 0.000008039 V 05:59:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171114452 Vs 05:59:53 Integrated Voltage Measurement... 06:00:13 Voltage Offset Correction: v_off_ini = 0.000007204 V, v_off_fin = 0.000005071 V 06:00:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171025528 Vs 06:00:16 Temperature Measurement, Probe Number = 0, T = 20.180000 C 06:00:16 Temperature Measurement, Probe Number = 1, T = 20.109000 C 06:00:17 Temperature Measurement, Probe Number = 2, T = 20.173000 C 06:00:18 Temperature Measurement, Probe Number = 3, T = 20.127000 C 06:00:18 Temperature Measurement, Probe Number = 4, T = 20.393000 C 06:00:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.39 06:00:18 Integrated Voltage Measurement... 06:00:38 Voltage Offset Correction: v_off_ini = 0.000006164 V, v_off_fin = 0.000008458 V 06:00:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171113231 Vs 06:00:38 Integrated Voltage Measurement... 06:00:57 Voltage Offset Correction: v_off_ini = 0.000007879 V, v_off_fin = 0.000004938 V 06:00:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171021308 Vs 06:01:00 Temperature Measurement, Probe Number = 0, T = 20.185000 C 06:01:01 Temperature Measurement, Probe Number = 1, T = 20.113000 C 06:01:02 Temperature Measurement, Probe Number = 2, T = 20.178000 C 06:01:02 Temperature Measurement, Probe Number = 3, T = 20.135000 C 06:01:03 Temperature Measurement, Probe Number = 4, T = 20.360000 C 06:01:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.36 06:01:03 Integrated Voltage Measurement... 06:01:23 Voltage Offset Correction: v_off_ini = 0.000005811 V, v_off_fin = 0.000008166 V 06:01:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171113533 Vs 06:01:23 Integrated Voltage Measurement... 06:01:42 Voltage Offset Correction: v_off_ini = 0.000007632 V, v_off_fin = 0.000004695 V 06:01:42 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171024382 Vs 06:01:45 Temperature Measurement, Probe Number = 0, T = 20.181000 C 06:01:45 Temperature Measurement, Probe Number = 1, T = 20.108000 C 06:01:46 Temperature Measurement, Probe Number = 2, T = 20.175000 C 06:01:47 Temperature Measurement, Probe Number = 3, T = 20.129000 C 06:01:47 Temperature Measurement, Probe Number = 4, T = 20.373000 C 06:01:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.37 06:01:47 Integrated Voltage Measurement... 06:02:07 Voltage Offset Correction: v_off_ini = 0.000005448 V, v_off_fin = 0.000008322 V 06:02:07 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171116168 Vs 06:02:07 Integrated Voltage Measurement... 06:02:27 Voltage Offset Correction: v_off_ini = 0.000008029 V, v_off_fin = 0.000004729 V 06:02:27 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171020558 Vs 06:32:29 Temperature Measurement, Probe Number = 0, T = 20.168000 C 06:32:30 Temperature Measurement, Probe Number = 1, T = 20.095000 C 06:32:31 Temperature Measurement, Probe Number = 2, T = 20.163000 C 06:32:32 Temperature Measurement, Probe Number = 3, T = 20.117000 C 06:32:32 Temperature Measurement, Probe Number = 4, T = 20.097000 C 06:32:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.10 06:32:33 Integrated Voltage Measurement... 06:32:52 Voltage Offset Correction: v_off_ini = 0.000006946 V, v_off_fin = 0.000008661 V 06:32:52 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171158872 Vs 06:32:52 Integrated Voltage Measurement... 06:33:11 Voltage Offset Correction: v_off_ini = 0.000008270 V, v_off_fin = 0.000005368 V 06:33:11 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171016236 Vs 06:33:14 Temperature Measurement, Probe Number = 0, T = 20.167000 C 06:33:15 Temperature Measurement, Probe Number = 1, T = 20.099000 C 06:33:15 Temperature Measurement, Probe Number = 2, T = 20.163000 C 06:33:16 Temperature Measurement, Probe Number = 3, T = 20.119000 C 06:33:17 Temperature Measurement, Probe Number = 4, T = 20.021000 C 06:33:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.02 06:33:17 Integrated Voltage Measurement... 06:33:36 Voltage Offset Correction: v_off_ini = 0.000006417 V, v_off_fin = 0.000008643 V 06:33:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171119976 Vs 06:33:37 Integrated Voltage Measurement... 06:33:56 Voltage Offset Correction: v_off_ini = 0.000007803 V, v_off_fin = 0.000005076 V 06:33:56 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171013673 Vs 06:33:59 Temperature Measurement, Probe Number = 0, T = 20.174000 C 06:33:59 Temperature Measurement, Probe Number = 1, T = 20.106000 C 06:34:00 Temperature Measurement, Probe Number = 2, T = 20.167000 C 06:34:01 Temperature Measurement, Probe Number = 3, T = 20.124000 C 06:34:01 Temperature Measurement, Probe Number = 4, T = 20.025000 C 06:34:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.02 06:34:01 Integrated Voltage Measurement... 06:34:21 Voltage Offset Correction: v_off_ini = 0.000006467 V, v_off_fin = 0.000008897 V 06:34:21 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171122442 Vs 06:34:21 Integrated Voltage Measurement... 06:34:41 Voltage Offset Correction: v_off_ini = 0.000008322 V, v_off_fin = 0.000004987 V 06:34:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171020534 Vs 06:34:44 Temperature Measurement, Probe Number = 0, T = 20.178000 C 06:34:44 Temperature Measurement, Probe Number = 1, T = 20.107000 C 06:34:45 Temperature Measurement, Probe Number = 2, T = 20.169000 C 06:34:46 Temperature Measurement, Probe Number = 3, T = 20.124000 C 06:34:46 Temperature Measurement, Probe Number = 4, T = 20.129000 C 06:34:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.13 06:34:47 Integrated Voltage Measurement... 06:35:06 Voltage Offset Correction: v_off_ini = 0.000006136 V, v_off_fin = 0.000008722 V 06:35:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171121504 Vs 06:35:06 Integrated Voltage Measurement... 06:35:25 Voltage Offset Correction: v_off_ini = 0.000008246 V, v_off_fin = 0.000005481 V 06:35:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171011303 Vs 06:35:28 Temperature Measurement, Probe Number = 0, T = 20.180000 C 06:35:29 Temperature Measurement, Probe Number = 1, T = 20.106000 C 06:35:30 Temperature Measurement, Probe Number = 2, T = 20.175000 C 06:35:30 Temperature Measurement, Probe Number = 3, T = 20.129000 C 06:35:31 Temperature Measurement, Probe Number = 4, T = 20.165000 C 06:35:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.16 06:35:31 Integrated Voltage Measurement... 06:35:51 Voltage Offset Correction: v_off_ini = 0.000006570 V, v_off_fin = 0.000009413 V 06:35:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171131381 Vs 06:35:51 Integrated Voltage Measurement... 06:36:11 Voltage Offset Correction: v_off_ini = 0.000008385 V, v_off_fin = 0.000004944 V 06:36:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171014332 Vs 06:36:13 Temperature Measurement, Probe Number = 0, T = 20.178000 C 06:36:14 Temperature Measurement, Probe Number = 1, T = 20.103000 C 06:36:15 Temperature Measurement, Probe Number = 2, T = 20.169000 C 06:36:15 Temperature Measurement, Probe Number = 3, T = 20.123000 C 06:36:16 Temperature Measurement, Probe Number = 4, T = 20.152000 C 06:36:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.15 06:36:16 Integrated Voltage Measurement... 06:36:35 Voltage Offset Correction: v_off_ini = 0.000005970 V, v_off_fin = 0.000008914 V 06:36:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171124364 Vs 06:36:36 Integrated Voltage Measurement... 06:36:55 Voltage Offset Correction: v_off_ini = 0.000008318 V, v_off_fin = 0.000005157 V 06:36:55 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171017595 Vs 06:36:58 Temperature Measurement, Probe Number = 0, T = 20.178000 C 06:36:59 Temperature Measurement, Probe Number = 1, T = 20.107000 C 06:36:59 Temperature Measurement, Probe Number = 2, T = 20.169000 C 06:37:00 Temperature Measurement, Probe Number = 3, T = 20.123000 C 06:37:01 Temperature Measurement, Probe Number = 4, T = 20.202000 C 06:37:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.20 06:37:01 Integrated Voltage Measurement... 06:37:20 Voltage Offset Correction: v_off_ini = 0.000006397 V, v_off_fin = 0.000008962 V 06:37:20 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171123339 Vs 06:37:20 Integrated Voltage Measurement... 06:37:40 Voltage Offset Correction: v_off_ini = 0.000008007 V, v_off_fin = 0.000004796 V 06:37:40 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171021854 Vs 06:37:43 Temperature Measurement, Probe Number = 0, T = 20.176000 C 06:37:43 Temperature Measurement, Probe Number = 1, T = 20.106000 C 06:37:44 Temperature Measurement, Probe Number = 2, T = 20.170000 C 06:37:45 Temperature Measurement, Probe Number = 3, T = 20.127000 C 06:37:45 Temperature Measurement, Probe Number = 4, T = 20.151000 C 06:37:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.15 06:37:45 Integrated Voltage Measurement... 06:38:05 Voltage Offset Correction: v_off_ini = 0.000006090 V, v_off_fin = 0.000008724 V 06:38:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171124055 Vs 06:38:05 Integrated Voltage Measurement... 06:38:24 Voltage Offset Correction: v_off_ini = 0.000007661 V, v_off_fin = 0.000005265 V 06:38:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171016501 Vs 06:38:27 Temperature Measurement, Probe Number = 0, T = 20.180000 C 06:38:28 Temperature Measurement, Probe Number = 1, T = 20.108000 C 06:38:29 Temperature Measurement, Probe Number = 2, T = 20.174000 C 06:38:29 Temperature Measurement, Probe Number = 3, T = 20.130000 C 06:38:30 Temperature Measurement, Probe Number = 4, T = 20.186000 C 06:38:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.19 06:38:30 Integrated Voltage Measurement... 06:38:49 Voltage Offset Correction: v_off_ini = 0.000006335 V, v_off_fin = 0.000008759 V 06:38:49 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171127470 Vs 06:38:50 Integrated Voltage Measurement... 06:39:09 Voltage Offset Correction: v_off_ini = 0.000008248 V, v_off_fin = 0.000005190 V 06:39:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171023023 Vs 06:39:12 Temperature Measurement, Probe Number = 0, T = 20.181000 C 06:39:12 Temperature Measurement, Probe Number = 1, T = 20.110000 C 06:39:13 Temperature Measurement, Probe Number = 2, T = 20.171000 C 06:39:14 Temperature Measurement, Probe Number = 3, T = 20.128000 C 06:39:14 Temperature Measurement, Probe Number = 4, T = 20.262000 C 06:39:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.26 06:39:15 Integrated Voltage Measurement... 06:39:35 Voltage Offset Correction: v_off_ini = 0.000006067 V, v_off_fin = 0.000008850 V 06:39:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171123882 Vs 06:39:35 Integrated Voltage Measurement... 06:39:54 Voltage Offset Correction: v_off_ini = 0.000008397 V, v_off_fin = 0.000005544 V 06:39:55 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171012643 Vs 07:09:57 Temperature Measurement, Probe Number = 0, T = 20.175000 C 07:09:58 Temperature Measurement, Probe Number = 1, T = 20.103000 C 07:09:59 Temperature Measurement, Probe Number = 2, T = 20.172000 C 07:10:00 Temperature Measurement, Probe Number = 3, T = 20.125000 C 07:10:00 Temperature Measurement, Probe Number = 4, T = 20.267000 C 07:10:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.27 07:10:00 Integrated Voltage Measurement... 07:10:20 Voltage Offset Correction: v_off_ini = 0.000005833 V, v_off_fin = 0.000008041 V 07:10:21 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171158379 Vs 07:10:21 Integrated Voltage Measurement... 07:10:40 Voltage Offset Correction: v_off_ini = 0.000007230 V, v_off_fin = 0.000005360 V 07:10:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171028218 Vs 07:10:43 Temperature Measurement, Probe Number = 0, T = 20.177000 C 07:10:44 Temperature Measurement, Probe Number = 1, T = 20.106000 C 07:10:44 Temperature Measurement, Probe Number = 2, T = 20.172000 C 07:10:45 Temperature Measurement, Probe Number = 3, T = 20.126000 C 07:10:45 Temperature Measurement, Probe Number = 4, T = 20.322000 C 07:10:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.32 07:10:46 Integrated Voltage Measurement... 07:11:05 Voltage Offset Correction: v_off_ini = 0.000005870 V, v_off_fin = 0.000008234 V 07:11:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171115934 Vs 07:11:05 Integrated Voltage Measurement... 07:11:24 Voltage Offset Correction: v_off_ini = 0.000007434 V, v_off_fin = 0.000005149 V 07:11:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171020941 Vs 07:11:27 Temperature Measurement, Probe Number = 0, T = 20.181000 C 07:11:28 Temperature Measurement, Probe Number = 1, T = 20.106000 C 07:11:29 Temperature Measurement, Probe Number = 2, T = 20.176000 C 07:11:29 Temperature Measurement, Probe Number = 3, T = 20.130000 C 07:11:30 Temperature Measurement, Probe Number = 4, T = 20.406000 C 07:11:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.41 07:11:30 Integrated Voltage Measurement... 07:11:49 Voltage Offset Correction: v_off_ini = 0.000005848 V, v_off_fin = 0.000008345 V 07:11:49 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171121567 Vs 07:11:50 Integrated Voltage Measurement... 07:12:09 Voltage Offset Correction: v_off_ini = 0.000008381 V, v_off_fin = 0.000004671 V 07:12:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171021606 Vs 07:12:12 Temperature Measurement, Probe Number = 0, T = 20.180000 C 07:12:13 Temperature Measurement, Probe Number = 1, T = 20.110000 C 07:12:14 Temperature Measurement, Probe Number = 2, T = 20.175000 C 07:12:14 Temperature Measurement, Probe Number = 3, T = 20.130000 C 07:12:15 Temperature Measurement, Probe Number = 4, T = 20.490000 C 07:12:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.49 07:12:15 Integrated Voltage Measurement... 07:12:35 Voltage Offset Correction: v_off_ini = 0.000006685 V, v_off_fin = 0.000008987 V 07:12:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171123121 Vs 07:12:35 Integrated Voltage Measurement... 07:12:54 Voltage Offset Correction: v_off_ini = 0.000008118 V, v_off_fin = 0.000004808 V 07:12:54 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171017160 Vs 07:12:57 Temperature Measurement, Probe Number = 0, T = 20.181000 C 07:12:58 Temperature Measurement, Probe Number = 1, T = 20.110000 C 07:12:58 Temperature Measurement, Probe Number = 2, T = 20.179000 C 07:12:59 Temperature Measurement, Probe Number = 3, T = 20.134000 C 07:13:00 Temperature Measurement, Probe Number = 4, T = 20.505000 C 07:13:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.50 07:13:00 Integrated Voltage Measurement... 07:13:19 Voltage Offset Correction: v_off_ini = 0.000006186 V, v_off_fin = 0.000009923 V 07:13:19 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171123557 Vs 07:13:19 Integrated Voltage Measurement... 07:13:38 Voltage Offset Correction: v_off_ini = 0.000008135 V, v_off_fin = 0.000005105 V 07:13:39 Integrated Voltage Measurement Delta Gap = -0.0040005 m VT = -0.171017662 Vs 07:13:41 Temperature Measurement, Probe Number = 0, T = 20.181000 C 07:13:42 Temperature Measurement, Probe Number = 1, T = 20.112000 C 07:13:43 Temperature Measurement, Probe Number = 2, T = 20.175000 C 07:13:43 Temperature Measurement, Probe Number = 3, T = 20.130000 C 07:13:44 Temperature Measurement, Probe Number = 4, T = 20.464000 C 07:13:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.46 07:13:44 Integrated Voltage Measurement... 07:14:03 Voltage Offset Correction: v_off_ini = 0.000005744 V, v_off_fin = 0.000008454 V 07:14:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171120377 Vs 07:14:04 Integrated Voltage Measurement... 07:14:23 Voltage Offset Correction: v_off_ini = 0.000007525 V, v_off_fin = 0.000004945 V 07:14:23 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171027446 Vs 07:14:26 Temperature Measurement, Probe Number = 0, T = 20.177000 C 07:14:27 Temperature Measurement, Probe Number = 1, T = 20.105000 C 07:14:27 Temperature Measurement, Probe Number = 2, T = 20.174000 C 07:14:28 Temperature Measurement, Probe Number = 3, T = 20.128000 C 07:14:29 Temperature Measurement, Probe Number = 4, T = 20.498000 C 07:14:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.50 07:14:29 Integrated Voltage Measurement... 07:14:48 Voltage Offset Correction: v_off_ini = 0.000005908 V, v_off_fin = 0.000008623 V 07:14:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171120436 Vs 07:14:49 Integrated Voltage Measurement... 07:15:07 Voltage Offset Correction: v_off_ini = 0.000008526 V, v_off_fin = 0.000004548 V 07:15:08 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171018994 Vs 07:15:10 Temperature Measurement, Probe Number = 0, T = 20.179000 C 07:15:11 Temperature Measurement, Probe Number = 1, T = 20.109000 C 07:15:12 Temperature Measurement, Probe Number = 2, T = 20.171000 C 07:15:12 Temperature Measurement, Probe Number = 3, T = 20.127000 C 07:15:13 Temperature Measurement, Probe Number = 4, T = 20.469000 C 07:15:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.47 07:15:13 Integrated Voltage Measurement... 07:15:32 Voltage Offset Correction: v_off_ini = 0.000005806 V, v_off_fin = 0.000008522 V 07:15:32 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171116824 Vs 07:15:33 Integrated Voltage Measurement... 07:15:52 Voltage Offset Correction: v_off_ini = 0.000007945 V, v_off_fin = 0.000004321 V 07:15:52 Integrated Voltage Measurement Delta Gap = -0.0040005 m VT = -0.171021885 Vs 07:15:54 Temperature Measurement, Probe Number = 0, T = 20.168000 C 07:15:55 Temperature Measurement, Probe Number = 1, T = 20.099000 C 07:15:56 Temperature Measurement, Probe Number = 2, T = 20.165000 C 07:15:56 Temperature Measurement, Probe Number = 3, T = 20.121000 C 07:15:57 Temperature Measurement, Probe Number = 4, T = 20.366000 C 07:15:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.37 07:15:57 Integrated Voltage Measurement... 07:16:16 Voltage Offset Correction: v_off_ini = 0.000005249 V, v_off_fin = 0.000007906 V 07:16:16 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171116182 Vs 07:16:17 Integrated Voltage Measurement... 07:16:36 Voltage Offset Correction: v_off_ini = 0.000007150 V, v_off_fin = 0.000004676 V 07:16:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171022963 Vs 07:16:39 Temperature Measurement, Probe Number = 0, T = 20.170000 C 07:16:39 Temperature Measurement, Probe Number = 1, T = 20.104000 C 07:16:40 Temperature Measurement, Probe Number = 2, T = 20.166000 C 07:16:41 Temperature Measurement, Probe Number = 3, T = 20.124000 C 07:16:41 Temperature Measurement, Probe Number = 4, T = 20.325000 C 07:16:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.32 07:16:41 Integrated Voltage Measurement... 07:17:01 Voltage Offset Correction: v_off_ini = 0.000005301 V, v_off_fin = 0.000007960 V 07:17:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171114909 Vs 07:17:01 Integrated Voltage Measurement... 07:17:20 Voltage Offset Correction: v_off_ini = 0.000007855 V, v_off_fin = 0.000003851 V 07:17:20 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171024513 Vs 07:47:23 Temperature Measurement, Probe Number = 0, T = 20.167000 C 07:47:24 Temperature Measurement, Probe Number = 1, T = 20.095000 C 07:47:25 Temperature Measurement, Probe Number = 2, T = 20.163000 C 07:47:26 Temperature Measurement, Probe Number = 3, T = 20.115000 C 07:47:26 Temperature Measurement, Probe Number = 4, T = 20.024000 C 07:47:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.02 07:47:26 Integrated Voltage Measurement... 07:47:45 Voltage Offset Correction: v_off_ini = 0.000006170 V, v_off_fin = 0.000007522 V 07:47:46 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171157573 Vs 07:47:46 Integrated Voltage Measurement... 07:48:05 Voltage Offset Correction: v_off_ini = 0.000007252 V, v_off_fin = 0.000004452 V 07:48:06 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171025411 Vs 07:48:08 Temperature Measurement, Probe Number = 0, T = 20.164000 C 07:48:09 Temperature Measurement, Probe Number = 1, T = 20.092000 C 07:48:10 Temperature Measurement, Probe Number = 2, T = 20.158000 C 07:48:10 Temperature Measurement, Probe Number = 3, T = 20.112000 C 07:48:11 Temperature Measurement, Probe Number = 4, T = 20.029000 C 07:48:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.03 07:48:11 Integrated Voltage Measurement... 07:48:31 Voltage Offset Correction: v_off_ini = 0.000005317 V, v_off_fin = 0.000007793 V 07:48:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171112177 Vs 07:48:31 Integrated Voltage Measurement... 07:48:51 Voltage Offset Correction: v_off_ini = 0.000007226 V, v_off_fin = 0.000004003 V 07:48:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171023474 Vs 07:48:54 Temperature Measurement, Probe Number = 0, T = 20.164000 C 07:48:54 Temperature Measurement, Probe Number = 1, T = 20.094000 C 07:48:55 Temperature Measurement, Probe Number = 2, T = 20.161000 C 07:48:55 Temperature Measurement, Probe Number = 3, T = 20.116000 C 07:48:56 Temperature Measurement, Probe Number = 4, T = 20.054000 C 07:48:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.05 07:48:56 Integrated Voltage Measurement... 07:49:16 Voltage Offset Correction: v_off_ini = 0.000005703 V, v_off_fin = 0.000008274 V 07:49:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171111337 Vs 07:49:16 Integrated Voltage Measurement... 07:49:35 Voltage Offset Correction: v_off_ini = 0.000007572 V, v_off_fin = 0.000004976 V 07:49:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171022113 Vs 07:49:38 Temperature Measurement, Probe Number = 0, T = 20.168000 C 07:49:39 Temperature Measurement, Probe Number = 1, T = 20.100000 C 07:49:40 Temperature Measurement, Probe Number = 2, T = 20.164000 C 07:49:40 Temperature Measurement, Probe Number = 3, T = 20.120000 C 07:49:41 Temperature Measurement, Probe Number = 4, T = 20.093000 C 07:49:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.09 07:49:41 Integrated Voltage Measurement... 07:50:01 Voltage Offset Correction: v_off_ini = 0.000005798 V, v_off_fin = 0.000008157 V 07:50:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171114276 Vs 07:50:01 Integrated Voltage Measurement... 07:50:20 Voltage Offset Correction: v_off_ini = 0.000007961 V, v_off_fin = 0.000004944 V 07:50:20 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171021533 Vs 07:50:23 Temperature Measurement, Probe Number = 0, T = 20.168000 C 07:50:23 Temperature Measurement, Probe Number = 1, T = 20.101000 C 07:50:24 Temperature Measurement, Probe Number = 2, T = 20.165000 C 07:50:25 Temperature Measurement, Probe Number = 3, T = 20.121000 C 07:50:25 Temperature Measurement, Probe Number = 4, T = 20.222000 C 07:50:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.22 07:50:25 Integrated Voltage Measurement... 07:50:45 Voltage Offset Correction: v_off_ini = 0.000004852 V, v_off_fin = 0.000008292 V 07:50:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171120130 Vs 07:50:45 Integrated Voltage Measurement... 07:51:04 Voltage Offset Correction: v_off_ini = 0.000008018 V, v_off_fin = 0.000004615 V 07:51:05 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171019608 Vs 07:51:07 Temperature Measurement, Probe Number = 0, T = 20.168000 C 07:51:08 Temperature Measurement, Probe Number = 1, T = 20.101000 C 07:51:09 Temperature Measurement, Probe Number = 2, T = 20.164000 C 07:51:09 Temperature Measurement, Probe Number = 3, T = 20.121000 C 07:51:10 Temperature Measurement, Probe Number = 4, T = 20.242000 C 07:51:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.24 07:51:10 Integrated Voltage Measurement... 07:51:29 Voltage Offset Correction: v_off_ini = 0.000005533 V, v_off_fin = 0.000008261 V 07:51:30 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171117330 Vs 07:51:30 Integrated Voltage Measurement... 07:51:49 Voltage Offset Correction: v_off_ini = 0.000007114 V, v_off_fin = 0.000004520 V 07:51:49 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171021024 Vs 07:51:52 Temperature Measurement, Probe Number = 0, T = 20.163000 C 07:51:53 Temperature Measurement, Probe Number = 1, T = 20.101000 C 07:51:53 Temperature Measurement, Probe Number = 2, T = 20.159000 C 07:51:54 Temperature Measurement, Probe Number = 3, T = 20.117000 C 07:51:55 Temperature Measurement, Probe Number = 4, T = 20.214000 C 07:51:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.21 07:51:55 Integrated Voltage Measurement... 07:52:14 Voltage Offset Correction: v_off_ini = 0.000005577 V, v_off_fin = 0.000007754 V 07:52:14 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171113979 Vs 07:52:14 Integrated Voltage Measurement... 07:52:34 Voltage Offset Correction: v_off_ini = 0.000007406 V, v_off_fin = 0.000004682 V 07:52:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171023502 Vs 07:52:37 Temperature Measurement, Probe Number = 0, T = 20.167000 C 07:52:38 Temperature Measurement, Probe Number = 1, T = 20.100000 C 07:52:38 Temperature Measurement, Probe Number = 2, T = 20.163000 C 07:52:39 Temperature Measurement, Probe Number = 3, T = 20.118000 C 07:52:40 Temperature Measurement, Probe Number = 4, T = 20.182000 C 07:52:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.18 07:52:40 Integrated Voltage Measurement... 07:52:59 Voltage Offset Correction: v_off_ini = 0.000005230 V, v_off_fin = 0.000008497 V 07:52:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171104419 Vs 07:53:00 Integrated Voltage Measurement... 07:53:19 Voltage Offset Correction: v_off_ini = 0.000007304 V, v_off_fin = 0.000004625 V 07:53:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171017637 Vs 07:53:22 Temperature Measurement, Probe Number = 0, T = 20.170000 C 07:53:22 Temperature Measurement, Probe Number = 1, T = 20.104000 C 07:53:23 Temperature Measurement, Probe Number = 2, T = 20.164000 C 07:53:23 Temperature Measurement, Probe Number = 3, T = 20.117000 C 07:53:24 Temperature Measurement, Probe Number = 4, T = 20.197000 C 07:53:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.20 07:53:24 Integrated Voltage Measurement... 07:53:44 Voltage Offset Correction: v_off_ini = 0.000005715 V, v_off_fin = 0.000008089 V 07:53:44 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171114331 Vs 07:53:44 Integrated Voltage Measurement... 07:54:03 Voltage Offset Correction: v_off_ini = 0.000007508 V, v_off_fin = 0.000004679 V 07:54:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171016901 Vs 07:54:06 Temperature Measurement, Probe Number = 0, T = 20.175000 C 07:54:07 Temperature Measurement, Probe Number = 1, T = 20.105000 C 07:54:07 Temperature Measurement, Probe Number = 2, T = 20.166000 C 07:54:08 Temperature Measurement, Probe Number = 3, T = 20.123000 C 07:54:09 Temperature Measurement, Probe Number = 4, T = 20.131000 C 07:54:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.13 07:54:09 Integrated Voltage Measurement... 07:54:28 Voltage Offset Correction: v_off_ini = 0.000005163 V, v_off_fin = 0.000007588 V 07:54:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171108929 Vs 07:54:29 Integrated Voltage Measurement... 07:54:48 Voltage Offset Correction: v_off_ini = 0.000006871 V, v_off_fin = 0.000004096 V 07:54:48 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171024671 Vs 08:24:51 Temperature Measurement, Probe Number = 0, T = 20.167000 C 08:24:52 Temperature Measurement, Probe Number = 1, T = 20.096000 C 08:24:52 Temperature Measurement, Probe Number = 2, T = 20.164000 C 08:24:53 Temperature Measurement, Probe Number = 3, T = 20.118000 C 08:24:54 Temperature Measurement, Probe Number = 4, T = 20.301000 C 08:24:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.30 08:24:54 Integrated Voltage Measurement... 08:25:13 Voltage Offset Correction: v_off_ini = 0.000006685 V, v_off_fin = 0.000008024 V 08:25:13 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171159296 Vs 08:25:13 Integrated Voltage Measurement... 08:25:33 Voltage Offset Correction: v_off_ini = 0.000008116 V, v_off_fin = 0.000004423 V 08:25:33 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171015825 Vs 08:25:36 Temperature Measurement, Probe Number = 0, T = 20.168000 C 08:25:36 Temperature Measurement, Probe Number = 1, T = 20.097000 C 08:25:37 Temperature Measurement, Probe Number = 2, T = 20.165000 C 08:25:37 Temperature Measurement, Probe Number = 3, T = 20.118000 C 08:25:38 Temperature Measurement, Probe Number = 4, T = 20.351000 C 08:25:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.35 08:25:38 Integrated Voltage Measurement... 08:25:58 Voltage Offset Correction: v_off_ini = 0.000005555 V, v_off_fin = 0.000008059 V 08:25:58 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171107408 Vs 08:25:58 Integrated Voltage Measurement... 08:26:17 Voltage Offset Correction: v_off_ini = 0.000007697 V, v_off_fin = 0.000004967 V 08:26:17 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171016568 Vs 08:26:20 Temperature Measurement, Probe Number = 0, T = 20.161000 C 08:26:21 Temperature Measurement, Probe Number = 1, T = 20.090000 C 08:26:21 Temperature Measurement, Probe Number = 2, T = 20.158000 C 08:26:22 Temperature Measurement, Probe Number = 3, T = 20.110000 C 08:26:23 Temperature Measurement, Probe Number = 4, T = 20.270000 C 08:26:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.27 08:26:23 Integrated Voltage Measurement... 08:26:43 Voltage Offset Correction: v_off_ini = 0.000005141 V, v_off_fin = 0.000008531 V 08:26:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171106549 Vs 08:26:43 Integrated Voltage Measurement... 08:27:02 Voltage Offset Correction: v_off_ini = 0.000007294 V, v_off_fin = 0.000004034 V 08:27:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171016138 Vs 08:27:05 Temperature Measurement, Probe Number = 0, T = 20.161000 C 08:27:06 Temperature Measurement, Probe Number = 1, T = 20.090000 C 08:27:06 Temperature Measurement, Probe Number = 2, T = 20.156000 C 08:27:07 Temperature Measurement, Probe Number = 3, T = 20.106000 C 08:27:08 Temperature Measurement, Probe Number = 4, T = 20.265000 C 08:27:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.27 08:27:08 Integrated Voltage Measurement... 08:27:27 Voltage Offset Correction: v_off_ini = 0.000005883 V, v_off_fin = 0.000008111 V 08:27:27 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171111668 Vs 08:27:28 Integrated Voltage Measurement... 08:27:47 Voltage Offset Correction: v_off_ini = 0.000007289 V, v_off_fin = 0.000004389 V 08:27:47 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171017864 Vs 08:27:50 Temperature Measurement, Probe Number = 0, T = 20.157000 C 08:27:50 Temperature Measurement, Probe Number = 1, T = 20.086000 C 08:27:51 Temperature Measurement, Probe Number = 2, T = 20.152000 C 08:27:52 Temperature Measurement, Probe Number = 3, T = 20.104000 C 08:27:52 Temperature Measurement, Probe Number = 4, T = 20.176000 C 08:27:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.18 08:27:52 Integrated Voltage Measurement... 08:28:12 Voltage Offset Correction: v_off_ini = 0.000005564 V, v_off_fin = 0.000008658 V 08:28:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171108701 Vs 08:28:12 Integrated Voltage Measurement... 08:28:31 Voltage Offset Correction: v_off_ini = 0.000008098 V, v_off_fin = 0.000004731 V 08:28:31 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171010753 Vs 08:28:34 Temperature Measurement, Probe Number = 0, T = 20.162000 C 08:28:35 Temperature Measurement, Probe Number = 1, T = 20.091000 C 08:28:36 Temperature Measurement, Probe Number = 2, T = 20.154000 C 08:28:36 Temperature Measurement, Probe Number = 3, T = 20.106000 C 08:28:37 Temperature Measurement, Probe Number = 4, T = 20.142000 C 08:28:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.14 08:28:37 Integrated Voltage Measurement... 08:28:56 Voltage Offset Correction: v_off_ini = 0.000004897 V, v_off_fin = 0.000008270 V 08:28:56 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171106033 Vs 08:28:57 Integrated Voltage Measurement... 08:29:16 Voltage Offset Correction: v_off_ini = 0.000007601 V, v_off_fin = 0.000004614 V 08:29:16 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171016944 Vs 08:29:19 Temperature Measurement, Probe Number = 0, T = 20.164000 C 08:29:19 Temperature Measurement, Probe Number = 1, T = 20.092000 C 08:29:20 Temperature Measurement, Probe Number = 2, T = 20.159000 C 08:29:21 Temperature Measurement, Probe Number = 3, T = 20.107000 C 08:29:21 Temperature Measurement, Probe Number = 4, T = 20.196000 C 08:29:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.20 08:29:22 Integrated Voltage Measurement... 08:29:41 Voltage Offset Correction: v_off_ini = 0.000006049 V, v_off_fin = 0.000008359 V 08:29:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171113392 Vs 08:29:41 Integrated Voltage Measurement... 08:30:00 Voltage Offset Correction: v_off_ini = 0.000007767 V, v_off_fin = 0.000004935 V 08:30:01 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171010414 Vs 08:30:03 Temperature Measurement, Probe Number = 0, T = 20.165000 C 08:30:04 Temperature Measurement, Probe Number = 1, T = 20.090000 C 08:30:05 Temperature Measurement, Probe Number = 2, T = 20.159000 C 08:30:05 Temperature Measurement, Probe Number = 3, T = 20.107000 C 08:30:06 Temperature Measurement, Probe Number = 4, T = 20.232000 C 08:30:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.23 08:30:06 Integrated Voltage Measurement... 08:30:25 Voltage Offset Correction: v_off_ini = 0.000005732 V, v_off_fin = 0.000007794 V 08:30:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171108349 Vs 08:30:26 Integrated Voltage Measurement... 08:30:45 Voltage Offset Correction: v_off_ini = 0.000007286 V, v_off_fin = 0.000004458 V 08:30:45 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171017752 Vs 08:30:48 Temperature Measurement, Probe Number = 0, T = 20.167000 C 08:30:49 Temperature Measurement, Probe Number = 1, T = 20.091000 C 08:30:49 Temperature Measurement, Probe Number = 2, T = 20.159000 C 08:30:50 Temperature Measurement, Probe Number = 3, T = 20.108000 C 08:30:51 Temperature Measurement, Probe Number = 4, T = 20.171000 C 08:30:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.17 08:30:51 Integrated Voltage Measurement... 08:31:10 Voltage Offset Correction: v_off_ini = 0.000005788 V, v_off_fin = 0.000007814 V 08:31:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171105324 Vs 08:31:11 Integrated Voltage Measurement... 08:31:29 Voltage Offset Correction: v_off_ini = 0.000007227 V, v_off_fin = 0.000004615 V 08:31:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171012897 Vs 08:31:32 Temperature Measurement, Probe Number = 0, T = 20.169000 C 08:31:33 Temperature Measurement, Probe Number = 1, T = 20.091000 C 08:31:34 Temperature Measurement, Probe Number = 2, T = 20.163000 C 08:31:34 Temperature Measurement, Probe Number = 3, T = 20.110000 C 08:31:35 Temperature Measurement, Probe Number = 4, T = 20.132000 C 08:31:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.13 08:31:35 Integrated Voltage Measurement... 08:31:55 Voltage Offset Correction: v_off_ini = 0.000005812 V, v_off_fin = 0.000008520 V 08:31:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171110115 Vs 08:31:55 Integrated Voltage Measurement... 08:32:14 Voltage Offset Correction: v_off_ini = 0.000007475 V, v_off_fin = 0.000005219 V 08:32:14 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171016334 Vs 09:02:17 Temperature Measurement, Probe Number = 0, T = 20.156000 C 09:02:18 Temperature Measurement, Probe Number = 1, T = 20.086000 C 09:02:19 Temperature Measurement, Probe Number = 2, T = 20.154000 C 09:02:19 Temperature Measurement, Probe Number = 3, T = 20.106000 C 09:02:20 Temperature Measurement, Probe Number = 4, T = 20.088000 C 09:02:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.09 09:02:20 Integrated Voltage Measurement... 09:02:39 Voltage Offset Correction: v_off_ini = 0.000007358 V, v_off_fin = 0.000008964 V 09:02:40 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171152220 Vs 09:02:40 Integrated Voltage Measurement... 09:02:59 Voltage Offset Correction: v_off_ini = 0.000007935 V, v_off_fin = 0.000004603 V 09:02:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171014553 Vs 09:03:02 Temperature Measurement, Probe Number = 0, T = 20.153000 C 09:03:03 Temperature Measurement, Probe Number = 1, T = 20.087000 C 09:03:03 Temperature Measurement, Probe Number = 2, T = 20.150000 C 09:03:04 Temperature Measurement, Probe Number = 3, T = 20.104000 C 09:03:05 Temperature Measurement, Probe Number = 4, T = 20.107000 C 09:03:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.11 09:03:05 Integrated Voltage Measurement... 09:03:24 Voltage Offset Correction: v_off_ini = 0.000005792 V, v_off_fin = 0.000008671 V 09:03:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171114664 Vs 09:03:24 Integrated Voltage Measurement... 09:03:43 Voltage Offset Correction: v_off_ini = 0.000008611 V, v_off_fin = 0.000005205 V 09:03:44 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171006366 Vs 09:03:46 Temperature Measurement, Probe Number = 0, T = 20.156000 C 09:03:47 Temperature Measurement, Probe Number = 1, T = 20.089000 C 09:03:48 Temperature Measurement, Probe Number = 2, T = 20.152000 C 09:03:48 Temperature Measurement, Probe Number = 3, T = 20.105000 C 09:03:49 Temperature Measurement, Probe Number = 4, T = 20.062000 C 09:03:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.06 09:03:49 Integrated Voltage Measurement... 09:04:08 Voltage Offset Correction: v_off_ini = 0.000005598 V, v_off_fin = 0.000008328 V 09:04:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171112338 Vs 09:04:09 Integrated Voltage Measurement... 09:04:28 Voltage Offset Correction: v_off_ini = 0.000007760 V, v_off_fin = 0.000004790 V 09:04:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171015401 Vs 09:04:31 Temperature Measurement, Probe Number = 0, T = 20.164000 C 09:04:32 Temperature Measurement, Probe Number = 1, T = 20.098000 C 09:04:32 Temperature Measurement, Probe Number = 2, T = 20.160000 C 09:04:33 Temperature Measurement, Probe Number = 3, T = 20.115000 C 09:04:34 Temperature Measurement, Probe Number = 4, T = 20.113000 C 09:04:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.11 09:04:34 Integrated Voltage Measurement... 09:04:54 Voltage Offset Correction: v_off_ini = 0.000005420 V, v_off_fin = 0.000009015 V 09:04:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171115220 Vs 09:04:54 Integrated Voltage Measurement... 09:05:14 Voltage Offset Correction: v_off_ini = 0.000008350 V, v_off_fin = 0.000005864 V 09:05:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171003423 Vs 09:05:17 Temperature Measurement, Probe Number = 0, T = 20.167000 C 09:05:18 Temperature Measurement, Probe Number = 1, T = 20.099000 C 09:05:18 Temperature Measurement, Probe Number = 2, T = 20.163000 C 09:05:19 Temperature Measurement, Probe Number = 3, T = 20.114000 C 09:05:20 Temperature Measurement, Probe Number = 4, T = 20.200000 C 09:05:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.20 09:05:20 Integrated Voltage Measurement... 09:05:39 Voltage Offset Correction: v_off_ini = 0.000006912 V, v_off_fin = 0.000009324 V 09:05:39 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171112687 Vs 09:05:39 Integrated Voltage Measurement... 09:05:58 Voltage Offset Correction: v_off_ini = 0.000008207 V, v_off_fin = 0.000005094 V 09:05:59 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171011381 Vs 09:06:01 Temperature Measurement, Probe Number = 0, T = 20.163000 C 09:06:02 Temperature Measurement, Probe Number = 1, T = 20.091000 C 09:06:03 Temperature Measurement, Probe Number = 2, T = 20.158000 C 09:06:03 Temperature Measurement, Probe Number = 3, T = 20.110000 C 09:06:04 Temperature Measurement, Probe Number = 4, T = 20.194000 C 09:06:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.19 09:06:04 Integrated Voltage Measurement... 09:06:25 Voltage Offset Correction: v_off_ini = 0.000006143 V, v_off_fin = 0.000007958 V 09:06:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171111251 Vs 09:06:25 Integrated Voltage Measurement... 09:06:45 Voltage Offset Correction: v_off_ini = 0.000007557 V, v_off_fin = 0.000004423 V 09:06:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171016185 Vs 09:06:48 Temperature Measurement, Probe Number = 0, T = 20.164000 C 09:06:48 Temperature Measurement, Probe Number = 1, T = 20.095000 C 09:06:49 Temperature Measurement, Probe Number = 2, T = 20.160000 C 09:06:50 Temperature Measurement, Probe Number = 3, T = 20.114000 C 09:06:50 Temperature Measurement, Probe Number = 4, T = 20.161000 C 09:06:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.16 09:06:51 Integrated Voltage Measurement... 09:07:10 Voltage Offset Correction: v_off_ini = 0.000005950 V, v_off_fin = 0.000008027 V 09:07:10 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171110710 Vs 09:07:10 Integrated Voltage Measurement... 09:07:30 Voltage Offset Correction: v_off_ini = 0.000007517 V, v_off_fin = 0.000004972 V 09:07:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171015944 Vs 09:07:32 Temperature Measurement, Probe Number = 0, T = 20.155000 C 09:07:33 Temperature Measurement, Probe Number = 1, T = 20.087000 C 09:07:34 Temperature Measurement, Probe Number = 2, T = 20.153000 C 09:07:34 Temperature Measurement, Probe Number = 3, T = 20.109000 C 09:07:35 Temperature Measurement, Probe Number = 4, T = 20.226000 C 09:07:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.23 09:07:35 Integrated Voltage Measurement... 09:07:54 Voltage Offset Correction: v_off_ini = 0.000006088 V, v_off_fin = 0.000009130 V 09:07:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171117752 Vs 09:07:55 Integrated Voltage Measurement... 09:08:14 Voltage Offset Correction: v_off_ini = 0.000008837 V, v_off_fin = 0.000005582 V 09:08:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171008823 Vs 09:08:17 Temperature Measurement, Probe Number = 0, T = 20.159000 C 09:08:17 Temperature Measurement, Probe Number = 1, T = 20.089000 C 09:08:18 Temperature Measurement, Probe Number = 2, T = 20.154000 C 09:08:19 Temperature Measurement, Probe Number = 3, T = 20.106000 C 09:08:19 Temperature Measurement, Probe Number = 4, T = 20.296000 C 09:08:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.30 09:08:20 Integrated Voltage Measurement... 09:08:39 Voltage Offset Correction: v_off_ini = 0.000006760 V, v_off_fin = 0.000008629 V 09:08:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171117115 Vs 09:08:39 Integrated Voltage Measurement... 09:08:58 Voltage Offset Correction: v_off_ini = 0.000007667 V, v_off_fin = 0.000004733 V 09:08:58 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171015447 Vs 09:09:01 Temperature Measurement, Probe Number = 0, T = 20.161000 C 09:09:02 Temperature Measurement, Probe Number = 1, T = 20.091000 C 09:09:02 Temperature Measurement, Probe Number = 2, T = 20.154000 C 09:09:03 Temperature Measurement, Probe Number = 3, T = 20.107000 C 09:09:04 Temperature Measurement, Probe Number = 4, T = 20.246000 C 09:09:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.25 09:09:04 Integrated Voltage Measurement... 09:09:23 Voltage Offset Correction: v_off_ini = 0.000006190 V, v_off_fin = 0.000008245 V 09:09:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171119189 Vs 09:09:23 Integrated Voltage Measurement... 09:09:42 Voltage Offset Correction: v_off_ini = 0.000007584 V, v_off_fin = 0.000005174 V 09:09:42 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171013887 Vs 09:39:45 Temperature Measurement, Probe Number = 0, T = 20.158000 C 09:39:46 Temperature Measurement, Probe Number = 1, T = 20.085000 C 09:39:47 Temperature Measurement, Probe Number = 2, T = 20.155000 C 09:39:47 Temperature Measurement, Probe Number = 3, T = 20.104000 C 09:39:48 Temperature Measurement, Probe Number = 4, T = 20.280000 C 09:39:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.28 09:39:48 Integrated Voltage Measurement... 09:40:08 Voltage Offset Correction: v_off_ini = 0.000007486 V, v_off_fin = 0.000009009 V 09:40:08 Integrated Voltage Measurement Delta Gap = 0.0040020 m VT = 0.171183663 Vs 09:40:08 Integrated Voltage Measurement... 09:40:28 Voltage Offset Correction: v_off_ini = 0.000008457 V, v_off_fin = 0.000005101 V 09:40:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990552 Vs 09:40:31 Temperature Measurement, Probe Number = 0, T = 20.167000 C 09:40:31 Temperature Measurement, Probe Number = 1, T = 20.092000 C 09:40:32 Temperature Measurement, Probe Number = 2, T = 20.160000 C 09:40:33 Temperature Measurement, Probe Number = 3, T = 20.108000 C 09:40:33 Temperature Measurement, Probe Number = 4, T = 20.360000 C 09:40:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.36 09:40:34 Integrated Voltage Measurement... 09:40:53 Voltage Offset Correction: v_off_ini = 0.000006834 V, v_off_fin = 0.000008990 V 09:40:53 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171095926 Vs 09:40:53 Integrated Voltage Measurement... 09:41:13 Voltage Offset Correction: v_off_ini = 0.000008179 V, v_off_fin = 0.000005723 V 09:41:13 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170989720 Vs 09:41:16 Temperature Measurement, Probe Number = 0, T = 20.167000 C 09:41:16 Temperature Measurement, Probe Number = 1, T = 20.092000 C 09:41:17 Temperature Measurement, Probe Number = 2, T = 20.160000 C 09:41:18 Temperature Measurement, Probe Number = 3, T = 20.107000 C 09:41:18 Temperature Measurement, Probe Number = 4, T = 20.354000 C 09:41:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.35 09:41:18 Integrated Voltage Measurement... 09:41:38 Voltage Offset Correction: v_off_ini = 0.000006515 V, v_off_fin = 0.000009050 V 09:41:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171104295 Vs 09:41:38 Integrated Voltage Measurement... 09:41:58 Voltage Offset Correction: v_off_ini = 0.000008265 V, v_off_fin = 0.000005975 V 09:41:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988919 Vs 09:42:01 Temperature Measurement, Probe Number = 0, T = 20.158000 C 09:42:01 Temperature Measurement, Probe Number = 1, T = 20.085000 C 09:42:02 Temperature Measurement, Probe Number = 2, T = 20.153000 C 09:42:03 Temperature Measurement, Probe Number = 3, T = 20.104000 C 09:42:03 Temperature Measurement, Probe Number = 4, T = 20.268000 C 09:42:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.27 09:42:03 Integrated Voltage Measurement... 09:42:24 Voltage Offset Correction: v_off_ini = 0.000006597 V, v_off_fin = 0.000008382 V 09:42:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171098569 Vs 09:42:24 Integrated Voltage Measurement... 09:42:43 Voltage Offset Correction: v_off_ini = 0.000007694 V, v_off_fin = 0.000005181 V 09:42:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992205 Vs 09:42:46 Temperature Measurement, Probe Number = 0, T = 20.163000 C 09:42:47 Temperature Measurement, Probe Number = 1, T = 20.088000 C 09:42:47 Temperature Measurement, Probe Number = 2, T = 20.158000 C 09:42:48 Temperature Measurement, Probe Number = 3, T = 20.108000 C 09:42:49 Temperature Measurement, Probe Number = 4, T = 20.246000 C 09:42:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.25 09:42:49 Integrated Voltage Measurement... 09:43:08 Voltage Offset Correction: v_off_ini = 0.000006124 V, v_off_fin = 0.000008490 V 09:43:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171096250 Vs 09:43:09 Integrated Voltage Measurement... 09:43:28 Voltage Offset Correction: v_off_ini = 0.000008245 V, v_off_fin = 0.000005343 V 09:43:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995664 Vs 09:43:31 Temperature Measurement, Probe Number = 0, T = 20.160000 C 09:43:32 Temperature Measurement, Probe Number = 1, T = 20.086000 C 09:43:32 Temperature Measurement, Probe Number = 2, T = 20.155000 C 09:43:33 Temperature Measurement, Probe Number = 3, T = 20.104000 C 09:43:34 Temperature Measurement, Probe Number = 4, T = 20.179000 C 09:43:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.18 09:43:34 Integrated Voltage Measurement... 09:43:53 Voltage Offset Correction: v_off_ini = 0.000006563 V, v_off_fin = 0.000007801 V 09:43:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171093187 Vs 09:43:54 Integrated Voltage Measurement... 09:44:13 Voltage Offset Correction: v_off_ini = 0.000007379 V, v_off_fin = 0.000005055 V 09:44:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991243 Vs 09:44:16 Temperature Measurement, Probe Number = 0, T = 20.164000 C 09:44:17 Temperature Measurement, Probe Number = 1, T = 20.090000 C 09:44:17 Temperature Measurement, Probe Number = 2, T = 20.161000 C 09:44:18 Temperature Measurement, Probe Number = 3, T = 20.108000 C 09:44:19 Temperature Measurement, Probe Number = 4, T = 20.282000 C 09:44:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.28 09:44:19 Integrated Voltage Measurement... 09:44:38 Voltage Offset Correction: v_off_ini = 0.000005758 V, v_off_fin = 0.000008439 V 09:44:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171090371 Vs 09:44:39 Integrated Voltage Measurement... 09:44:58 Voltage Offset Correction: v_off_ini = 0.000008123 V, v_off_fin = 0.000005049 V 09:44:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991031 Vs 09:45:01 Temperature Measurement, Probe Number = 0, T = 20.164000 C 09:45:02 Temperature Measurement, Probe Number = 1, T = 20.090000 C 09:45:02 Temperature Measurement, Probe Number = 2, T = 20.160000 C 09:45:03 Temperature Measurement, Probe Number = 3, T = 20.110000 C 09:45:04 Temperature Measurement, Probe Number = 4, T = 20.377000 C 09:45:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.38 09:45:04 Integrated Voltage Measurement... 09:45:23 Voltage Offset Correction: v_off_ini = 0.000005869 V, v_off_fin = 0.000007868 V 09:45:23 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171085480 Vs 09:45:23 Integrated Voltage Measurement... 09:45:42 Voltage Offset Correction: v_off_ini = 0.000007800 V, v_off_fin = 0.000004724 V 09:45:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989271 Vs 09:45:45 Temperature Measurement, Probe Number = 0, T = 20.163000 C 09:45:46 Temperature Measurement, Probe Number = 1, T = 20.090000 C 09:45:47 Temperature Measurement, Probe Number = 2, T = 20.158000 C 09:45:47 Temperature Measurement, Probe Number = 3, T = 20.107000 C 09:45:48 Temperature Measurement, Probe Number = 4, T = 20.295000 C 09:45:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.30 09:45:48 Integrated Voltage Measurement... 09:46:08 Voltage Offset Correction: v_off_ini = 0.000005754 V, v_off_fin = 0.000008439 V 09:46:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171091786 Vs 09:46:08 Integrated Voltage Measurement... 09:46:27 Voltage Offset Correction: v_off_ini = 0.000007465 V, v_off_fin = 0.000005092 V 09:46:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987370 Vs 09:46:30 Temperature Measurement, Probe Number = 0, T = 20.169000 C 09:46:31 Temperature Measurement, Probe Number = 1, T = 20.094000 C 09:46:31 Temperature Measurement, Probe Number = 2, T = 20.163000 C 09:46:32 Temperature Measurement, Probe Number = 3, T = 20.111000 C 09:46:33 Temperature Measurement, Probe Number = 4, T = 20.348000 C 09:46:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.35 09:46:33 Integrated Voltage Measurement... 09:46:52 Voltage Offset Correction: v_off_ini = 0.000005824 V, v_off_fin = 0.000008466 V 09:46:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171084024 Vs 09:46:53 Integrated Voltage Measurement... 09:47:12 Voltage Offset Correction: v_off_ini = 0.000007654 V, v_off_fin = 0.000005030 V 09:47:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984758 Vs 10:17:15 Temperature Measurement, Probe Number = 0, T = 20.170000 C 10:17:16 Temperature Measurement, Probe Number = 1, T = 20.091000 C 10:17:16 Temperature Measurement, Probe Number = 2, T = 20.162000 C 10:17:17 Temperature Measurement, Probe Number = 3, T = 20.107000 C 10:17:18 Temperature Measurement, Probe Number = 4, T = 20.423000 C 10:17:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.42 10:17:18 Integrated Voltage Measurement... 10:17:37 Voltage Offset Correction: v_off_ini = 0.000006668 V, v_off_fin = 0.000008036 V 10:17:37 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171128064 Vs 10:17:37 Integrated Voltage Measurement... 10:17:56 Voltage Offset Correction: v_off_ini = 0.000007436 V, v_off_fin = 0.000004122 V 10:17:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002454 Vs 10:17:59 Temperature Measurement, Probe Number = 0, T = 20.170000 C 10:18:00 Temperature Measurement, Probe Number = 1, T = 20.094000 C 10:18:01 Temperature Measurement, Probe Number = 2, T = 20.162000 C 10:18:01 Temperature Measurement, Probe Number = 3, T = 20.109000 C 10:18:02 Temperature Measurement, Probe Number = 4, T = 20.399000 C 10:18:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.40 10:18:02 Integrated Voltage Measurement... 10:18:21 Voltage Offset Correction: v_off_ini = 0.000005566 V, v_off_fin = 0.000007954 V 10:18:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171092970 Vs 10:18:22 Integrated Voltage Measurement... 10:18:41 Voltage Offset Correction: v_off_ini = 0.000007220 V, v_off_fin = 0.000004290 V 10:18:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000345 Vs 10:18:44 Temperature Measurement, Probe Number = 0, T = 20.173000 C 10:18:45 Temperature Measurement, Probe Number = 1, T = 20.093000 C 10:18:45 Temperature Measurement, Probe Number = 2, T = 20.160000 C 10:18:46 Temperature Measurement, Probe Number = 3, T = 20.104000 C 10:18:47 Temperature Measurement, Probe Number = 4, T = 20.400000 C 10:18:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.40 10:18:47 Integrated Voltage Measurement... 10:19:06 Voltage Offset Correction: v_off_ini = 0.000005833 V, v_off_fin = 0.000008344 V 10:19:06 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171091082 Vs 10:19:06 Integrated Voltage Measurement... 10:19:25 Voltage Offset Correction: v_off_ini = 0.000008201 V, v_off_fin = 0.000004582 V 10:19:26 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994407 Vs 10:19:28 Temperature Measurement, Probe Number = 0, T = 20.171000 C 10:19:29 Temperature Measurement, Probe Number = 1, T = 20.091000 C 10:19:30 Temperature Measurement, Probe Number = 2, T = 20.159000 C 10:19:30 Temperature Measurement, Probe Number = 3, T = 20.102000 C 10:19:31 Temperature Measurement, Probe Number = 4, T = 20.478000 C 10:19:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.48 10:19:31 Integrated Voltage Measurement... 10:19:51 Voltage Offset Correction: v_off_ini = 0.000005288 V, v_off_fin = 0.000007615 V 10:19:51 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171085831 Vs 10:19:51 Integrated Voltage Measurement... 10:20:11 Voltage Offset Correction: v_off_ini = 0.000007656 V, v_off_fin = 0.000003874 V 10:20:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000931 Vs 10:20:14 Temperature Measurement, Probe Number = 0, T = 20.172000 C 10:20:14 Temperature Measurement, Probe Number = 1, T = 20.091000 C 10:20:15 Temperature Measurement, Probe Number = 2, T = 20.162000 C 10:20:15 Temperature Measurement, Probe Number = 3, T = 20.106000 C 10:20:16 Temperature Measurement, Probe Number = 4, T = 20.482000 C 10:20:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.48 10:20:16 Integrated Voltage Measurement... 10:20:36 Voltage Offset Correction: v_off_ini = 0.000004992 V, v_off_fin = 0.000007554 V 10:20:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171089540 Vs 10:20:36 Integrated Voltage Measurement... 10:20:55 Voltage Offset Correction: v_off_ini = 0.000006968 V, v_off_fin = 0.000004063 V 10:20:56 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171002828 Vs 10:20:58 Temperature Measurement, Probe Number = 0, T = 20.161000 C 10:20:59 Temperature Measurement, Probe Number = 1, T = 20.087000 C 10:21:00 Temperature Measurement, Probe Number = 2, T = 20.154000 C 10:21:00 Temperature Measurement, Probe Number = 3, T = 20.103000 C 10:21:01 Temperature Measurement, Probe Number = 4, T = 20.477000 C 10:21:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.48 10:21:01 Integrated Voltage Measurement... 10:21:20 Voltage Offset Correction: v_off_ini = 0.000005445 V, v_off_fin = 0.000007409 V 10:21:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171089419 Vs 10:21:21 Integrated Voltage Measurement... 10:21:40 Voltage Offset Correction: v_off_ini = 0.000006882 V, v_off_fin = 0.000004226 V 10:21:40 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171005209 Vs 10:21:43 Temperature Measurement, Probe Number = 0, T = 20.167000 C 10:21:43 Temperature Measurement, Probe Number = 1, T = 20.092000 C 10:21:44 Temperature Measurement, Probe Number = 2, T = 20.160000 C 10:21:45 Temperature Measurement, Probe Number = 3, T = 20.107000 C 10:21:45 Temperature Measurement, Probe Number = 4, T = 20.477000 C 10:21:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.48 10:21:46 Integrated Voltage Measurement... 10:22:05 Voltage Offset Correction: v_off_ini = 0.000005638 V, v_off_fin = 0.000008051 V 10:22:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171089568 Vs 10:22:05 Integrated Voltage Measurement... 10:22:24 Voltage Offset Correction: v_off_ini = 0.000008214 V, v_off_fin = 0.000004931 V 10:22:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995760 Vs 10:22:27 Temperature Measurement, Probe Number = 0, T = 20.173000 C 10:22:28 Temperature Measurement, Probe Number = 1, T = 20.092000 C 10:22:29 Temperature Measurement, Probe Number = 2, T = 20.161000 C 10:22:29 Temperature Measurement, Probe Number = 3, T = 20.107000 C 10:22:30 Temperature Measurement, Probe Number = 4, T = 20.363000 C 10:22:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.36 10:22:30 Integrated Voltage Measurement... 10:22:50 Voltage Offset Correction: v_off_ini = 0.000005744 V, v_off_fin = 0.000008070 V 10:22:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171093557 Vs 10:22:50 Integrated Voltage Measurement... 10:23:09 Voltage Offset Correction: v_off_ini = 0.000007503 V, v_off_fin = 0.000004334 V 10:23:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002051 Vs 10:23:12 Temperature Measurement, Probe Number = 0, T = 20.174000 C 10:23:13 Temperature Measurement, Probe Number = 1, T = 20.090000 C 10:23:13 Temperature Measurement, Probe Number = 2, T = 20.166000 C 10:23:14 Temperature Measurement, Probe Number = 3, T = 20.104000 C 10:23:15 Temperature Measurement, Probe Number = 4, T = 20.430000 C 10:23:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.43 10:23:15 Integrated Voltage Measurement... 10:23:34 Voltage Offset Correction: v_off_ini = 0.000005955 V, v_off_fin = 0.000008366 V 10:23:34 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171097565 Vs 10:23:34 Integrated Voltage Measurement... 10:23:54 Voltage Offset Correction: v_off_ini = 0.000008011 V, v_off_fin = 0.000005252 V 10:23:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000278 Vs 10:23:57 Temperature Measurement, Probe Number = 0, T = 20.169000 C 10:23:57 Temperature Measurement, Probe Number = 1, T = 20.090000 C 10:23:58 Temperature Measurement, Probe Number = 2, T = 20.161000 C 10:23:59 Temperature Measurement, Probe Number = 3, T = 20.105000 C 10:23:59 Temperature Measurement, Probe Number = 4, T = 20.400000 C 10:23:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.40 10:23:59 Integrated Voltage Measurement... 10:24:19 Voltage Offset Correction: v_off_ini = 0.000006828 V, v_off_fin = 0.000008276 V 10:24:19 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171101279 Vs 10:24:19 Integrated Voltage Measurement... 10:24:38 Voltage Offset Correction: v_off_ini = 0.000007858 V, v_off_fin = 0.000005091 V 10:24:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995366 Vs 10:54:41 Temperature Measurement, Probe Number = 0, T = 20.171000 C 10:54:42 Temperature Measurement, Probe Number = 1, T = 20.092000 C 10:54:43 Temperature Measurement, Probe Number = 2, T = 20.160000 C 10:54:43 Temperature Measurement, Probe Number = 3, T = 20.104000 C 10:54:44 Temperature Measurement, Probe Number = 4, T = 20.291000 C 10:54:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.29 10:54:44 Integrated Voltage Measurement... 10:55:04 Voltage Offset Correction: v_off_ini = 0.000006341 V, v_off_fin = 0.000007827 V 10:55:04 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171142333 Vs 10:55:04 Integrated Voltage Measurement... 10:55:23 Voltage Offset Correction: v_off_ini = 0.000006181 V, v_off_fin = 0.000004744 V 10:55:24 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000444 Vs 10:55:26 Temperature Measurement, Probe Number = 0, T = 20.173000 C 10:55:27 Temperature Measurement, Probe Number = 1, T = 20.095000 C 10:55:28 Temperature Measurement, Probe Number = 2, T = 20.161000 C 10:55:28 Temperature Measurement, Probe Number = 3, T = 20.107000 C 10:55:29 Temperature Measurement, Probe Number = 4, T = 20.309000 C 10:55:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.31 10:55:29 Integrated Voltage Measurement... 10:55:49 Voltage Offset Correction: v_off_ini = 0.000005502 V, v_off_fin = 0.000007768 V 10:55:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171083601 Vs 10:55:49 Integrated Voltage Measurement... 10:56:08 Voltage Offset Correction: v_off_ini = 0.000007257 V, v_off_fin = 0.000003739 V 10:56:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171003511 Vs 10:56:11 Temperature Measurement, Probe Number = 0, T = 20.171000 C 10:56:12 Temperature Measurement, Probe Number = 1, T = 20.092000 C 10:56:12 Temperature Measurement, Probe Number = 2, T = 20.160000 C 10:56:13 Temperature Measurement, Probe Number = 3, T = 20.104000 C 10:56:14 Temperature Measurement, Probe Number = 4, T = 20.288000 C 10:56:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.29 10:56:14 Integrated Voltage Measurement... 10:56:33 Voltage Offset Correction: v_off_ini = 0.000005381 V, v_off_fin = 0.000006958 V 10:56:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076620 Vs 10:56:33 Integrated Voltage Measurement... 10:56:53 Voltage Offset Correction: v_off_ini = 0.000006649 V, v_off_fin = 0.000003681 V 10:56:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171003455 Vs 10:56:56 Temperature Measurement, Probe Number = 0, T = 20.170000 C 10:56:56 Temperature Measurement, Probe Number = 1, T = 20.092000 C 10:56:57 Temperature Measurement, Probe Number = 2, T = 20.160000 C 10:56:58 Temperature Measurement, Probe Number = 3, T = 20.106000 C 10:56:58 Temperature Measurement, Probe Number = 4, T = 20.253000 C 10:56:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.25 10:56:58 Integrated Voltage Measurement... 10:57:18 Voltage Offset Correction: v_off_ini = 0.000004914 V, v_off_fin = 0.000007916 V 10:57:18 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171080082 Vs 10:57:18 Integrated Voltage Measurement... 10:57:38 Voltage Offset Correction: v_off_ini = 0.000007069 V, v_off_fin = 0.000003623 V 10:57:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000793 Vs 10:57:41 Temperature Measurement, Probe Number = 0, T = 20.177000 C 10:57:41 Temperature Measurement, Probe Number = 1, T = 20.100000 C 10:57:42 Temperature Measurement, Probe Number = 2, T = 20.167000 C 10:57:43 Temperature Measurement, Probe Number = 3, T = 20.113000 C 10:57:43 Temperature Measurement, Probe Number = 4, T = 20.289000 C 10:57:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.29 10:57:44 Integrated Voltage Measurement... 10:58:03 Voltage Offset Correction: v_off_ini = 0.000004922 V, v_off_fin = 0.000007500 V 10:58:03 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171080667 Vs 10:58:04 Integrated Voltage Measurement... 10:58:23 Voltage Offset Correction: v_off_ini = 0.000006729 V, v_off_fin = 0.000003902 V 10:58:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171004934 Vs 10:58:26 Temperature Measurement, Probe Number = 0, T = 20.182000 C 10:58:26 Temperature Measurement, Probe Number = 1, T = 20.102000 C 10:58:27 Temperature Measurement, Probe Number = 2, T = 20.173000 C 10:58:28 Temperature Measurement, Probe Number = 3, T = 20.117000 C 10:58:28 Temperature Measurement, Probe Number = 4, T = 20.446000 C 10:58:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.45 10:58:29 Integrated Voltage Measurement... 10:58:48 Voltage Offset Correction: v_off_ini = 0.000005651 V, v_off_fin = 0.000008045 V 10:58:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171082098 Vs 10:58:48 Integrated Voltage Measurement... 10:59:07 Voltage Offset Correction: v_off_ini = 0.000007143 V, v_off_fin = 0.000004490 V 10:59:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998869 Vs 10:59:10 Temperature Measurement, Probe Number = 0, T = 20.177000 C 10:59:11 Temperature Measurement, Probe Number = 1, T = 20.100000 C 10:59:12 Temperature Measurement, Probe Number = 2, T = 20.167000 C 10:59:12 Temperature Measurement, Probe Number = 3, T = 20.112000 C 10:59:13 Temperature Measurement, Probe Number = 4, T = 20.485000 C 10:59:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.48 10:59:13 Integrated Voltage Measurement... 10:59:32 Voltage Offset Correction: v_off_ini = 0.000005586 V, v_off_fin = 0.000008267 V 10:59:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171084980 Vs 10:59:33 Integrated Voltage Measurement... 10:59:52 Voltage Offset Correction: v_off_ini = 0.000007530 V, v_off_fin = 0.000004360 V 10:59:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997729 Vs 10:59:55 Temperature Measurement, Probe Number = 0, T = 20.176000 C 10:59:55 Temperature Measurement, Probe Number = 1, T = 20.099000 C 10:59:56 Temperature Measurement, Probe Number = 2, T = 20.164000 C 10:59:57 Temperature Measurement, Probe Number = 3, T = 20.109000 C 10:59:57 Temperature Measurement, Probe Number = 4, T = 20.478000 C 10:59:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.48 10:59:58 Integrated Voltage Measurement... 11:00:17 Voltage Offset Correction: v_off_ini = 0.000005714 V, v_off_fin = 0.000008059 V 11:00:17 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171086471 Vs 11:00:18 Integrated Voltage Measurement... 11:00:37 Voltage Offset Correction: v_off_ini = 0.000007170 V, v_off_fin = 0.000004614 V 11:00:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999868 Vs 11:00:40 Temperature Measurement, Probe Number = 0, T = 20.179000 C 11:00:40 Temperature Measurement, Probe Number = 1, T = 20.100000 C 11:00:41 Temperature Measurement, Probe Number = 2, T = 20.164000 C 11:00:42 Temperature Measurement, Probe Number = 3, T = 20.110000 C 11:00:42 Temperature Measurement, Probe Number = 4, T = 20.410000 C 11:00:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.41 11:00:43 Integrated Voltage Measurement... 11:01:02 Voltage Offset Correction: v_off_ini = 0.000005353 V, v_off_fin = 0.000006935 V 11:01:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075074 Vs 11:01:02 Integrated Voltage Measurement... 11:01:21 Voltage Offset Correction: v_off_ini = 0.000007050 V, v_off_fin = 0.000004396 V 11:01:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002825 Vs 11:01:24 Temperature Measurement, Probe Number = 0, T = 20.183000 C 11:01:25 Temperature Measurement, Probe Number = 1, T = 20.104000 C 11:01:26 Temperature Measurement, Probe Number = 2, T = 20.171000 C 11:01:26 Temperature Measurement, Probe Number = 3, T = 20.115000 C 11:01:27 Temperature Measurement, Probe Number = 4, T = 20.400000 C 11:01:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.40 11:01:27 Integrated Voltage Measurement... 11:01:46 Voltage Offset Correction: v_off_ini = 0.000005912 V, v_off_fin = 0.000007574 V 11:01:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079404 Vs 11:01:47 Integrated Voltage Measurement... 11:02:06 Voltage Offset Correction: v_off_ini = 0.000006805 V, v_off_fin = 0.000004379 V 11:02:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171006754 Vs 11:32:09 Temperature Measurement, Probe Number = 0, T = 20.189000 C 11:32:10 Temperature Measurement, Probe Number = 1, T = 20.117000 C 11:32:11 Temperature Measurement, Probe Number = 2, T = 20.179000 C 11:32:12 Temperature Measurement, Probe Number = 3, T = 20.128000 C 11:32:12 Temperature Measurement, Probe Number = 4, T = 20.590000 C 11:32:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.59 11:32:12 Integrated Voltage Measurement... 11:32:31 Voltage Offset Correction: v_off_ini = 0.000005459 V, v_off_fin = 0.000007504 V 11:32:32 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171130321 Vs 11:32:32 Integrated Voltage Measurement... 11:32:51 Voltage Offset Correction: v_off_ini = 0.000006871 V, v_off_fin = 0.000003999 V 11:32:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988635 Vs 11:32:54 Temperature Measurement, Probe Number = 0, T = 20.192000 C 11:32:55 Temperature Measurement, Probe Number = 1, T = 20.117000 C 11:32:55 Temperature Measurement, Probe Number = 2, T = 20.180000 C 11:32:56 Temperature Measurement, Probe Number = 3, T = 20.129000 C 11:32:57 Temperature Measurement, Probe Number = 4, T = 20.607000 C 11:32:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.61 11:32:57 Integrated Voltage Measurement... 11:33:16 Voltage Offset Correction: v_off_ini = 0.000005544 V, v_off_fin = 0.000007310 V 11:33:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171068562 Vs 11:33:17 Integrated Voltage Measurement... 11:33:36 Voltage Offset Correction: v_off_ini = 0.000007101 V, v_off_fin = 0.000004486 V 11:33:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984083 Vs 11:33:39 Temperature Measurement, Probe Number = 0, T = 20.193000 C 11:33:40 Temperature Measurement, Probe Number = 1, T = 20.120000 C 11:33:40 Temperature Measurement, Probe Number = 2, T = 20.179000 C 11:33:41 Temperature Measurement, Probe Number = 3, T = 20.129000 C 11:33:42 Temperature Measurement, Probe Number = 4, T = 20.588000 C 11:33:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.59 11:33:42 Integrated Voltage Measurement... 11:34:01 Voltage Offset Correction: v_off_ini = 0.000005475 V, v_off_fin = 0.000007249 V 11:34:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065585 Vs 11:34:02 Integrated Voltage Measurement... 11:34:21 Voltage Offset Correction: v_off_ini = 0.000006211 V, v_off_fin = 0.000003610 V 11:34:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990787 Vs 11:34:24 Temperature Measurement, Probe Number = 0, T = 20.195000 C 11:34:25 Temperature Measurement, Probe Number = 1, T = 20.118000 C 11:34:25 Temperature Measurement, Probe Number = 2, T = 20.180000 C 11:34:26 Temperature Measurement, Probe Number = 3, T = 20.128000 C 11:34:27 Temperature Measurement, Probe Number = 4, T = 20.577000 C 11:34:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.58 11:34:27 Integrated Voltage Measurement... 11:34:46 Voltage Offset Correction: v_off_ini = 0.000005308 V, v_off_fin = 0.000007183 V 11:34:46 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171064821 Vs 11:34:47 Integrated Voltage Measurement... 11:35:06 Voltage Offset Correction: v_off_ini = 0.000007162 V, v_off_fin = 0.000004263 V 11:35:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988118 Vs 11:35:09 Temperature Measurement, Probe Number = 0, T = 20.196000 C 11:35:09 Temperature Measurement, Probe Number = 1, T = 20.117000 C 11:35:10 Temperature Measurement, Probe Number = 2, T = 20.179000 C 11:35:10 Temperature Measurement, Probe Number = 3, T = 20.126000 C 11:35:11 Temperature Measurement, Probe Number = 4, T = 20.482000 C 11:35:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.48 11:35:11 Integrated Voltage Measurement... 11:35:30 Voltage Offset Correction: v_off_ini = 0.000005371 V, v_off_fin = 0.000007785 V 11:35:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072596 Vs 11:35:31 Integrated Voltage Measurement... 11:35:50 Voltage Offset Correction: v_off_ini = 0.000007359 V, v_off_fin = 0.000004496 V 11:35:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982399 Vs 11:35:53 Temperature Measurement, Probe Number = 0, T = 20.192000 C 11:35:53 Temperature Measurement, Probe Number = 1, T = 20.117000 C 11:35:54 Temperature Measurement, Probe Number = 2, T = 20.178000 C 11:35:55 Temperature Measurement, Probe Number = 3, T = 20.125000 C 11:35:55 Temperature Measurement, Probe Number = 4, T = 20.511000 C 11:35:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.51 11:35:56 Integrated Voltage Measurement... 11:36:15 Voltage Offset Correction: v_off_ini = 0.000005190 V, v_off_fin = 0.000007889 V 11:36:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071804 Vs 11:36:15 Integrated Voltage Measurement... 11:36:34 Voltage Offset Correction: v_off_ini = 0.000007378 V, v_off_fin = 0.000004395 V 11:36:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981980 Vs 11:36:37 Temperature Measurement, Probe Number = 0, T = 20.196000 C 11:36:38 Temperature Measurement, Probe Number = 1, T = 20.119000 C 11:36:39 Temperature Measurement, Probe Number = 2, T = 20.181000 C 11:36:39 Temperature Measurement, Probe Number = 3, T = 20.129000 C 11:36:40 Temperature Measurement, Probe Number = 4, T = 20.500000 C 11:36:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.50 11:36:40 Integrated Voltage Measurement... 11:37:00 Voltage Offset Correction: v_off_ini = 0.000003811 V, v_off_fin = 0.000006758 V 11:37:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059333 Vs 11:37:00 Integrated Voltage Measurement... 11:37:19 Voltage Offset Correction: v_off_ini = 0.000006466 V, v_off_fin = 0.000003930 V 11:37:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989935 Vs 11:37:22 Temperature Measurement, Probe Number = 0, T = 20.193000 C 11:37:23 Temperature Measurement, Probe Number = 1, T = 20.118000 C 11:37:24 Temperature Measurement, Probe Number = 2, T = 20.181000 C 11:37:24 Temperature Measurement, Probe Number = 3, T = 20.129000 C 11:37:25 Temperature Measurement, Probe Number = 4, T = 20.567000 C 11:37:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.57 11:37:25 Integrated Voltage Measurement... 11:37:45 Voltage Offset Correction: v_off_ini = 0.000004436 V, v_off_fin = 0.000007425 V 11:37:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171069614 Vs 11:37:45 Integrated Voltage Measurement... 11:38:04 Voltage Offset Correction: v_off_ini = 0.000006960 V, v_off_fin = 0.000004169 V 11:38:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981823 Vs 11:38:07 Temperature Measurement, Probe Number = 0, T = 20.195000 C 11:38:08 Temperature Measurement, Probe Number = 1, T = 20.119000 C 11:38:08 Temperature Measurement, Probe Number = 2, T = 20.181000 C 11:38:09 Temperature Measurement, Probe Number = 3, T = 20.128000 C 11:38:10 Temperature Measurement, Probe Number = 4, T = 20.638000 C 11:38:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.64 11:38:10 Integrated Voltage Measurement... 11:38:29 Voltage Offset Correction: v_off_ini = 0.000005399 V, v_off_fin = 0.000007845 V 11:38:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079417 Vs 11:38:29 Integrated Voltage Measurement... 11:38:49 Voltage Offset Correction: v_off_ini = 0.000008020 V, v_off_fin = 0.000004704 V 11:38:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980406 Vs 11:38:52 Temperature Measurement, Probe Number = 0, T = 20.193000 C 11:38:53 Temperature Measurement, Probe Number = 1, T = 20.118000 C 11:38:53 Temperature Measurement, Probe Number = 2, T = 20.179000 C 11:38:54 Temperature Measurement, Probe Number = 3, T = 20.125000 C 11:38:54 Temperature Measurement, Probe Number = 4, T = 20.624000 C 11:38:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.62 11:38:55 Integrated Voltage Measurement... 11:39:14 Voltage Offset Correction: v_off_ini = 0.000005958 V, v_off_fin = 0.000008277 V 11:39:14 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171078442 Vs 11:39:14 Integrated Voltage Measurement... 11:39:34 Voltage Offset Correction: v_off_ini = 0.000007910 V, v_off_fin = 0.000005020 V 11:39:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979824 Vs 12:09:37 Temperature Measurement, Probe Number = 0, T = 20.185000 C 12:09:38 Temperature Measurement, Probe Number = 1, T = 20.111000 C 12:09:38 Temperature Measurement, Probe Number = 2, T = 20.175000 C 12:09:39 Temperature Measurement, Probe Number = 3, T = 20.121000 C 12:09:40 Temperature Measurement, Probe Number = 4, T = 20.288000 C 12:09:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.29 12:09:40 Integrated Voltage Measurement... 12:09:59 Voltage Offset Correction: v_off_ini = 0.000005996 V, v_off_fin = 0.000007359 V 12:09:59 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171115832 Vs 12:09:59 Integrated Voltage Measurement... 12:10:19 Voltage Offset Correction: v_off_ini = 0.000006936 V, v_off_fin = 0.000003707 V 12:10:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170998412 Vs 12:10:22 Temperature Measurement, Probe Number = 0, T = 20.190000 C 12:10:22 Temperature Measurement, Probe Number = 1, T = 20.117000 C 12:10:23 Temperature Measurement, Probe Number = 2, T = 20.177000 C 12:10:23 Temperature Measurement, Probe Number = 3, T = 20.124000 C 12:10:24 Temperature Measurement, Probe Number = 4, T = 20.239000 C 12:10:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.24 12:10:24 Integrated Voltage Measurement... 12:10:44 Voltage Offset Correction: v_off_ini = 0.000006296 V, v_off_fin = 0.000008085 V 12:10:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171089220 Vs 12:10:44 Integrated Voltage Measurement... 12:11:04 Voltage Offset Correction: v_off_ini = 0.000006928 V, v_off_fin = 0.000004028 V 12:11:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000231 Vs 12:11:07 Temperature Measurement, Probe Number = 0, T = 20.194000 C 12:11:07 Temperature Measurement, Probe Number = 1, T = 20.117000 C 12:11:08 Temperature Measurement, Probe Number = 2, T = 20.178000 C 12:11:09 Temperature Measurement, Probe Number = 3, T = 20.125000 C 12:11:09 Temperature Measurement, Probe Number = 4, T = 20.266000 C 12:11:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.27 12:11:09 Integrated Voltage Measurement... 12:11:29 Voltage Offset Correction: v_off_ini = 0.000005144 V, v_off_fin = 0.000006836 V 12:11:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074561 Vs 12:11:29 Integrated Voltage Measurement... 12:11:48 Voltage Offset Correction: v_off_ini = 0.000006629 V, v_off_fin = 0.000003106 V 12:11:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171005719 Vs 12:11:51 Temperature Measurement, Probe Number = 0, T = 20.188000 C 12:11:52 Temperature Measurement, Probe Number = 1, T = 20.111000 C 12:11:52 Temperature Measurement, Probe Number = 2, T = 20.175000 C 12:11:53 Temperature Measurement, Probe Number = 3, T = 20.123000 C 12:11:54 Temperature Measurement, Probe Number = 4, T = 20.281000 C 12:11:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.28 12:11:54 Integrated Voltage Measurement... 12:12:13 Voltage Offset Correction: v_off_ini = 0.000004997 V, v_off_fin = 0.000007343 V 12:12:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074007 Vs 12:12:13 Integrated Voltage Measurement... 12:12:33 Voltage Offset Correction: v_off_ini = 0.000006569 V, v_off_fin = 0.000003490 V 12:12:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982966 Vs 12:12:36 Temperature Measurement, Probe Number = 0, T = 20.195000 C 12:12:36 Temperature Measurement, Probe Number = 1, T = 20.120000 C 12:12:37 Temperature Measurement, Probe Number = 2, T = 20.180000 C 12:12:37 Temperature Measurement, Probe Number = 3, T = 20.127000 C 12:12:38 Temperature Measurement, Probe Number = 4, T = 20.330000 C 12:12:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.33 12:12:38 Integrated Voltage Measurement... 12:12:58 Voltage Offset Correction: v_off_ini = 0.000005337 V, v_off_fin = 0.000008123 V 12:12:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075920 Vs 12:12:58 Integrated Voltage Measurement... 12:13:17 Voltage Offset Correction: v_off_ini = 0.000006849 V, v_off_fin = 0.000008538 V 12:13:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986363 Vs 12:13:20 Temperature Measurement, Probe Number = 0, T = 20.200000 C 12:13:21 Temperature Measurement, Probe Number = 1, T = 20.124000 C 12:13:21 Temperature Measurement, Probe Number = 2, T = 20.186000 C 12:13:22 Temperature Measurement, Probe Number = 3, T = 20.133000 C 12:13:23 Temperature Measurement, Probe Number = 4, T = 20.428000 C 12:13:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.43 12:13:23 Integrated Voltage Measurement... 12:13:42 Voltage Offset Correction: v_off_ini = 0.000008781 V, v_off_fin = 0.000009050 V 12:13:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171094365 Vs 12:13:43 Integrated Voltage Measurement... 12:14:02 Voltage Offset Correction: v_off_ini = 0.000007985 V, v_off_fin = 0.000004392 V 12:14:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989464 Vs 12:14:05 Temperature Measurement, Probe Number = 0, T = 20.203000 C 12:14:06 Temperature Measurement, Probe Number = 1, T = 20.124000 C 12:14:06 Temperature Measurement, Probe Number = 2, T = 20.186000 C 12:14:07 Temperature Measurement, Probe Number = 3, T = 20.132000 C 12:14:08 Temperature Measurement, Probe Number = 4, T = 20.459000 C 12:14:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.46 12:14:08 Integrated Voltage Measurement... 12:14:28 Voltage Offset Correction: v_off_ini = 0.000005348 V, v_off_fin = 0.000007170 V 12:14:28 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171076213 Vs 12:14:28 Integrated Voltage Measurement... 12:14:47 Voltage Offset Correction: v_off_ini = 0.000007283 V, v_off_fin = 0.000004060 V 12:14:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988451 Vs 12:14:50 Temperature Measurement, Probe Number = 0, T = 20.197000 C 12:14:51 Temperature Measurement, Probe Number = 1, T = 20.120000 C 12:14:52 Temperature Measurement, Probe Number = 2, T = 20.183000 C 12:14:52 Temperature Measurement, Probe Number = 3, T = 20.129000 C 12:14:53 Temperature Measurement, Probe Number = 4, T = 20.499000 C 12:14:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.50 12:14:53 Integrated Voltage Measurement... 12:15:12 Voltage Offset Correction: v_off_ini = 0.000005156 V, v_off_fin = 0.000007853 V 12:15:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171081752 Vs 12:15:13 Integrated Voltage Measurement... 12:15:32 Voltage Offset Correction: v_off_ini = 0.000007205 V, v_off_fin = 0.000004243 V 12:15:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988523 Vs 12:15:35 Temperature Measurement, Probe Number = 0, T = 20.196000 C 12:15:35 Temperature Measurement, Probe Number = 1, T = 20.120000 C 12:15:36 Temperature Measurement, Probe Number = 2, T = 20.183000 C 12:15:37 Temperature Measurement, Probe Number = 3, T = 20.129000 C 12:15:37 Temperature Measurement, Probe Number = 4, T = 20.561000 C 12:15:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.56 12:15:38 Integrated Voltage Measurement... 12:15:57 Voltage Offset Correction: v_off_ini = 0.000005481 V, v_off_fin = 0.000007425 V 12:15:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171078200 Vs 12:15:57 Integrated Voltage Measurement... 12:16:16 Voltage Offset Correction: v_off_ini = 0.000007094 V, v_off_fin = 0.000005951 V 12:16:17 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986047 Vs 12:16:19 Temperature Measurement, Probe Number = 0, T = 20.195000 C 12:16:20 Temperature Measurement, Probe Number = 1, T = 20.118000 C 12:16:21 Temperature Measurement, Probe Number = 2, T = 20.182000 C 12:16:21 Temperature Measurement, Probe Number = 3, T = 20.129000 C 12:16:22 Temperature Measurement, Probe Number = 4, T = 20.540000 C 12:16:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.54 12:16:22 Integrated Voltage Measurement... 12:16:41 Voltage Offset Correction: v_off_ini = 0.000005617 V, v_off_fin = 0.000007545 V 12:16:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171086266 Vs 12:16:42 Integrated Voltage Measurement... 12:17:01 Voltage Offset Correction: v_off_ini = 0.000007246 V, v_off_fin = 0.000005873 V 12:17:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981984 Vs 12:47:04 Temperature Measurement, Probe Number = 0, T = 20.190000 C 12:47:05 Temperature Measurement, Probe Number = 1, T = 20.114000 C 12:47:06 Temperature Measurement, Probe Number = 2, T = 20.180000 C 12:47:06 Temperature Measurement, Probe Number = 3, T = 20.127000 C 12:47:07 Temperature Measurement, Probe Number = 4, T = 20.515000 C 12:47:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.52 12:47:07 Integrated Voltage Measurement... 12:47:26 Voltage Offset Correction: v_off_ini = 0.000005914 V, v_off_fin = 0.000007694 V 12:47:26 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171117215 Vs 12:47:27 Integrated Voltage Measurement... 12:47:46 Voltage Offset Correction: v_off_ini = 0.000006866 V, v_off_fin = 0.000004429 V 12:47:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993223 Vs 12:47:49 Temperature Measurement, Probe Number = 0, T = 20.192000 C 12:47:49 Temperature Measurement, Probe Number = 1, T = 20.118000 C 12:47:50 Temperature Measurement, Probe Number = 2, T = 20.178000 C 12:47:51 Temperature Measurement, Probe Number = 3, T = 20.127000 C 12:47:51 Temperature Measurement, Probe Number = 4, T = 20.467000 C 12:47:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.47 12:47:52 Integrated Voltage Measurement... 12:48:11 Voltage Offset Correction: v_off_ini = 0.000005673 V, v_off_fin = 0.000007654 V 12:48:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079784 Vs 12:48:11 Integrated Voltage Measurement... 12:48:31 Voltage Offset Correction: v_off_ini = 0.000007092 V, v_off_fin = 0.000004431 V 12:48:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993613 Vs 12:48:34 Temperature Measurement, Probe Number = 0, T = 20.198000 C 12:48:34 Temperature Measurement, Probe Number = 1, T = 20.121000 C 12:48:35 Temperature Measurement, Probe Number = 2, T = 20.185000 C 12:48:36 Temperature Measurement, Probe Number = 3, T = 20.129000 C 12:48:36 Temperature Measurement, Probe Number = 4, T = 20.411000 C 12:48:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.41 12:48:36 Integrated Voltage Measurement... 12:48:56 Voltage Offset Correction: v_off_ini = 0.000005466 V, v_off_fin = 0.000007639 V 12:48:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078085 Vs 12:48:56 Integrated Voltage Measurement... 12:49:15 Voltage Offset Correction: v_off_ini = 0.000007035 V, v_off_fin = 0.000004214 V 12:49:16 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170996315 Vs 12:49:18 Temperature Measurement, Probe Number = 0, T = 20.196000 C 12:49:19 Temperature Measurement, Probe Number = 1, T = 20.119000 C 12:49:20 Temperature Measurement, Probe Number = 2, T = 20.182000 C 12:49:20 Temperature Measurement, Probe Number = 3, T = 20.126000 C 12:49:21 Temperature Measurement, Probe Number = 4, T = 20.428000 C 12:49:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.43 12:49:21 Integrated Voltage Measurement... 12:49:40 Voltage Offset Correction: v_off_ini = 0.000005290 V, v_off_fin = 0.000007156 V 12:49:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078927 Vs 12:49:41 Integrated Voltage Measurement... 12:50:00 Voltage Offset Correction: v_off_ini = 0.000007268 V, v_off_fin = 0.000004086 V 12:50:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001704 Vs 12:50:03 Temperature Measurement, Probe Number = 0, T = 20.192000 C 12:50:04 Temperature Measurement, Probe Number = 1, T = 20.118000 C 12:50:04 Temperature Measurement, Probe Number = 2, T = 20.180000 C 12:50:05 Temperature Measurement, Probe Number = 3, T = 20.126000 C 12:50:06 Temperature Measurement, Probe Number = 4, T = 20.355000 C 12:50:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.36 12:50:06 Integrated Voltage Measurement... 12:50:25 Voltage Offset Correction: v_off_ini = 0.000004740 V, v_off_fin = 0.000007013 V 12:50:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078384 Vs 12:50:26 Integrated Voltage Measurement... 12:50:44 Voltage Offset Correction: v_off_ini = 0.000006768 V, v_off_fin = 0.000004648 V 12:50:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996331 Vs 12:50:47 Temperature Measurement, Probe Number = 0, T = 20.195000 C 12:50:48 Temperature Measurement, Probe Number = 1, T = 20.119000 C 12:50:49 Temperature Measurement, Probe Number = 2, T = 20.182000 C 12:50:49 Temperature Measurement, Probe Number = 3, T = 20.128000 C 12:50:50 Temperature Measurement, Probe Number = 4, T = 20.357000 C 12:50:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.36 12:50:50 Integrated Voltage Measurement... 12:51:09 Voltage Offset Correction: v_off_ini = 0.000005146 V, v_off_fin = 0.000006798 V 12:51:10 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171081823 Vs 12:51:10 Integrated Voltage Measurement... 12:51:29 Voltage Offset Correction: v_off_ini = 0.000006667 V, v_off_fin = 0.000003217 V 12:51:29 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170999660 Vs 12:51:32 Temperature Measurement, Probe Number = 0, T = 20.196000 C 12:51:33 Temperature Measurement, Probe Number = 1, T = 20.121000 C 12:51:33 Temperature Measurement, Probe Number = 2, T = 20.181000 C 12:51:34 Temperature Measurement, Probe Number = 3, T = 20.127000 C 12:51:35 Temperature Measurement, Probe Number = 4, T = 20.285000 C 12:51:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.29 12:51:35 Integrated Voltage Measurement... 12:51:54 Voltage Offset Correction: v_off_ini = 0.000004911 V, v_off_fin = 0.000007753 V 12:51:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171077338 Vs 12:51:55 Integrated Voltage Measurement... 12:52:14 Voltage Offset Correction: v_off_ini = 0.000007059 V, v_off_fin = 0.000003827 V 12:52:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995077 Vs 12:52:17 Temperature Measurement, Probe Number = 0, T = 20.191000 C 12:52:17 Temperature Measurement, Probe Number = 1, T = 20.114000 C 12:52:18 Temperature Measurement, Probe Number = 2, T = 20.178000 C 12:52:19 Temperature Measurement, Probe Number = 3, T = 20.123000 C 12:52:19 Temperature Measurement, Probe Number = 4, T = 20.257000 C 12:52:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.26 12:52:19 Integrated Voltage Measurement... 12:52:39 Voltage Offset Correction: v_off_ini = 0.000004592 V, v_off_fin = 0.000006357 V 12:52:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072045 Vs 12:52:40 Integrated Voltage Measurement... 12:52:59 Voltage Offset Correction: v_off_ini = 0.000006347 V, v_off_fin = 0.000003641 V 12:52:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996304 Vs 12:53:02 Temperature Measurement, Probe Number = 0, T = 20.195000 C 12:53:02 Temperature Measurement, Probe Number = 1, T = 20.120000 C 12:53:03 Temperature Measurement, Probe Number = 2, T = 20.180000 C 12:53:04 Temperature Measurement, Probe Number = 3, T = 20.127000 C 12:53:04 Temperature Measurement, Probe Number = 4, T = 20.302000 C 12:53:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.30 12:53:04 Integrated Voltage Measurement... 12:53:24 Voltage Offset Correction: v_off_ini = 0.000004926 V, v_off_fin = 0.000008092 V 12:53:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171085580 Vs 12:53:24 Integrated Voltage Measurement... 12:53:44 Voltage Offset Correction: v_off_ini = 0.000007853 V, v_off_fin = 0.000003774 V 12:53:44 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170991614 Vs 12:53:47 Temperature Measurement, Probe Number = 0, T = 20.193000 C 12:53:47 Temperature Measurement, Probe Number = 1, T = 20.115000 C 12:53:48 Temperature Measurement, Probe Number = 2, T = 20.180000 C 12:53:49 Temperature Measurement, Probe Number = 3, T = 20.123000 C 12:53:49 Temperature Measurement, Probe Number = 4, T = 20.254000 C 12:53:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.25 12:53:50 Integrated Voltage Measurement... 12:54:09 Voltage Offset Correction: v_off_ini = 0.000004953 V, v_off_fin = 0.000007714 V 12:54:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171079519 Vs 12:54:09 Integrated Voltage Measurement... 12:54:29 Voltage Offset Correction: v_off_ini = 0.000006998 V, v_off_fin = 0.000003854 V 12:54:29 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994899 Vs 13:24:32 Temperature Measurement, Probe Number = 0, T = 20.200000 C 13:24:32 Temperature Measurement, Probe Number = 1, T = 20.122000 C 13:24:33 Temperature Measurement, Probe Number = 2, T = 20.188000 C 13:24:34 Temperature Measurement, Probe Number = 3, T = 20.132000 C 13:24:34 Temperature Measurement, Probe Number = 4, T = 20.406000 C 13:24:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.41 13:24:35 Integrated Voltage Measurement... 13:24:54 Voltage Offset Correction: v_off_ini = 0.000005547 V, v_off_fin = 0.000007165 V 13:24:54 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171131524 Vs 13:24:54 Integrated Voltage Measurement... 13:25:13 Voltage Offset Correction: v_off_ini = 0.000006322 V, v_off_fin = 0.000003849 V 13:25:14 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170999461 Vs 13:25:16 Temperature Measurement, Probe Number = 0, T = 20.204000 C 13:25:17 Temperature Measurement, Probe Number = 1, T = 20.123000 C 13:25:18 Temperature Measurement, Probe Number = 2, T = 20.189000 C 13:25:18 Temperature Measurement, Probe Number = 3, T = 20.134000 C 13:25:19 Temperature Measurement, Probe Number = 4, T = 20.476000 C 13:25:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.48 13:25:19 Integrated Voltage Measurement... 13:25:38 Voltage Offset Correction: v_off_ini = 0.000005213 V, v_off_fin = 0.000009784 V 13:25:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073132 Vs 13:25:39 Integrated Voltage Measurement... 13:25:58 Voltage Offset Correction: v_off_ini = 0.000008861 V, v_off_fin = 0.000004195 V 13:25:58 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170990894 Vs 13:26:01 Temperature Measurement, Probe Number = 0, T = 20.202000 C 13:26:01 Temperature Measurement, Probe Number = 1, T = 20.125000 C 13:26:02 Temperature Measurement, Probe Number = 2, T = 20.186000 C 13:26:03 Temperature Measurement, Probe Number = 3, T = 20.132000 C 13:26:03 Temperature Measurement, Probe Number = 4, T = 20.439000 C 13:26:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.44 13:26:04 Integrated Voltage Measurement... 13:26:23 Voltage Offset Correction: v_off_ini = 0.000005364 V, v_off_fin = 0.000007599 V 13:26:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171083600 Vs 13:26:23 Integrated Voltage Measurement... 13:26:43 Voltage Offset Correction: v_off_ini = 0.000006894 V, v_off_fin = 0.000004513 V 13:26:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994050 Vs 13:26:45 Temperature Measurement, Probe Number = 0, T = 20.200000 C 13:26:46 Temperature Measurement, Probe Number = 1, T = 20.123000 C 13:26:47 Temperature Measurement, Probe Number = 2, T = 20.186000 C 13:26:47 Temperature Measurement, Probe Number = 3, T = 20.133000 C 13:26:48 Temperature Measurement, Probe Number = 4, T = 20.383000 C 13:26:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.38 13:26:48 Integrated Voltage Measurement... 13:27:08 Voltage Offset Correction: v_off_ini = 0.000005162 V, v_off_fin = 0.000007605 V 13:27:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171082341 Vs 13:27:08 Integrated Voltage Measurement... 13:27:28 Voltage Offset Correction: v_off_ini = 0.000007261 V, v_off_fin = 0.000004022 V 13:27:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997243 Vs 13:27:30 Temperature Measurement, Probe Number = 0, T = 20.204000 C 13:27:31 Temperature Measurement, Probe Number = 1, T = 20.125000 C 13:27:32 Temperature Measurement, Probe Number = 2, T = 20.188000 C 13:27:32 Temperature Measurement, Probe Number = 3, T = 20.133000 C 13:27:33 Temperature Measurement, Probe Number = 4, T = 20.367000 C 13:27:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.37 13:27:33 Integrated Voltage Measurement... 13:27:53 Voltage Offset Correction: v_off_ini = 0.000004996 V, v_off_fin = 0.000007407 V 13:27:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078524 Vs 13:27:53 Integrated Voltage Measurement... 13:28:12 Voltage Offset Correction: v_off_ini = 0.000006467 V, v_off_fin = 0.000003318 V 13:28:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001013 Vs 13:28:15 Temperature Measurement, Probe Number = 0, T = 20.204000 C 13:28:15 Temperature Measurement, Probe Number = 1, T = 20.125000 C 13:28:16 Temperature Measurement, Probe Number = 2, T = 20.186000 C 13:28:17 Temperature Measurement, Probe Number = 3, T = 20.133000 C 13:28:17 Temperature Measurement, Probe Number = 4, T = 20.352000 C 13:28:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.35 13:28:18 Integrated Voltage Measurement... 13:28:37 Voltage Offset Correction: v_off_ini = 0.000005150 V, v_off_fin = 0.000007135 V 13:28:37 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171078104 Vs 13:28:37 Integrated Voltage Measurement... 13:28:56 Voltage Offset Correction: v_off_ini = 0.000006533 V, v_off_fin = 0.000003697 V 13:28:56 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977453 Vs 13:28:59 Temperature Measurement, Probe Number = 0, T = 20.204000 C 13:29:00 Temperature Measurement, Probe Number = 1, T = 20.127000 C 13:29:00 Temperature Measurement, Probe Number = 2, T = 20.187000 C 13:29:01 Temperature Measurement, Probe Number = 3, T = 20.133000 C 13:29:02 Temperature Measurement, Probe Number = 4, T = 20.353000 C 13:29:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.35 13:29:02 Integrated Voltage Measurement... 13:29:21 Voltage Offset Correction: v_off_ini = 0.000005126 V, v_off_fin = 0.000006870 V 13:29:21 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171103937 Vs 13:29:21 Integrated Voltage Measurement... 13:29:41 Voltage Offset Correction: v_off_ini = 0.000006890 V, v_off_fin = 0.000003597 V 13:29:41 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980628 Vs 13:29:44 Temperature Measurement, Probe Number = 0, T = 20.203000 C 13:29:44 Temperature Measurement, Probe Number = 1, T = 20.125000 C 13:29:45 Temperature Measurement, Probe Number = 2, T = 20.190000 C 13:29:46 Temperature Measurement, Probe Number = 3, T = 20.136000 C 13:29:46 Temperature Measurement, Probe Number = 4, T = 20.402000 C 13:29:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.40 13:29:47 Integrated Voltage Measurement... 13:30:06 Voltage Offset Correction: v_off_ini = 0.000016070 V, v_off_fin = 0.000016411 V 13:30:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171094441 Vs 13:30:06 Integrated Voltage Measurement... 13:30:25 Voltage Offset Correction: v_off_ini = 0.000007489 V, v_off_fin = 0.000004324 V 13:30:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170970625 Vs 13:30:28 Temperature Measurement, Probe Number = 0, T = 20.195000 C 13:30:29 Temperature Measurement, Probe Number = 1, T = 20.121000 C 13:30:29 Temperature Measurement, Probe Number = 2, T = 20.183000 C 13:30:30 Temperature Measurement, Probe Number = 3, T = 20.130000 C 13:30:31 Temperature Measurement, Probe Number = 4, T = 20.360000 C 13:30:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.36 13:30:31 Integrated Voltage Measurement... 13:30:50 Voltage Offset Correction: v_off_ini = 0.000004974 V, v_off_fin = 0.000007421 V 13:30:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171102194 Vs 13:30:51 Integrated Voltage Measurement... 13:31:10 Voltage Offset Correction: v_off_ini = 0.000006895 V, v_off_fin = 0.000003375 V 13:31:10 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170974604 Vs 13:31:13 Temperature Measurement, Probe Number = 0, T = 20.201000 C 13:31:13 Temperature Measurement, Probe Number = 1, T = 20.125000 C 13:31:14 Temperature Measurement, Probe Number = 2, T = 20.186000 C 13:31:15 Temperature Measurement, Probe Number = 3, T = 20.133000 C 13:31:15 Temperature Measurement, Probe Number = 4, T = 20.321000 C 13:31:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.32 13:31:16 Integrated Voltage Measurement... 13:31:35 Voltage Offset Correction: v_off_ini = 0.000016159 V, v_off_fin = 0.000017891 V 13:31:35 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171092647 Vs 13:31:36 Integrated Voltage Measurement... 13:31:55 Voltage Offset Correction: v_off_ini = 0.000007627 V, v_off_fin = 0.000004265 V 13:31:55 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971562 Vs 14:01:58 Temperature Measurement, Probe Number = 0, T = 20.195000 C 14:01:59 Temperature Measurement, Probe Number = 1, T = 20.114000 C 14:01:59 Temperature Measurement, Probe Number = 2, T = 20.183000 C 14:02:00 Temperature Measurement, Probe Number = 3, T = 20.125000 C 14:02:01 Temperature Measurement, Probe Number = 4, T = 20.340000 C 14:02:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.34 14:02:01 Integrated Voltage Measurement... 14:02:20 Voltage Offset Correction: v_off_ini = 0.000005661 V, v_off_fin = 0.000007650 V 14:02:20 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171112207 Vs 14:02:20 Integrated Voltage Measurement... 14:02:40 Voltage Offset Correction: v_off_ini = 0.000006551 V, v_off_fin = 0.000004445 V 14:02:40 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171004815 Vs 14:02:43 Temperature Measurement, Probe Number = 0, T = 20.197000 C 14:02:43 Temperature Measurement, Probe Number = 1, T = 20.116000 C 14:02:44 Temperature Measurement, Probe Number = 2, T = 20.185000 C 14:02:45 Temperature Measurement, Probe Number = 3, T = 20.127000 C 14:02:45 Temperature Measurement, Probe Number = 4, T = 20.440000 C 14:02:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.44 14:02:45 Integrated Voltage Measurement... 14:03:05 Voltage Offset Correction: v_off_ini = 0.000005209 V, v_off_fin = 0.000007181 V 14:03:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080194 Vs 14:03:05 Integrated Voltage Measurement... 14:03:25 Voltage Offset Correction: v_off_ini = 0.000006919 V, v_off_fin = 0.000003613 V 14:03:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171005113 Vs 14:03:28 Temperature Measurement, Probe Number = 0, T = 20.199000 C 14:03:28 Temperature Measurement, Probe Number = 1, T = 20.123000 C 14:03:29 Temperature Measurement, Probe Number = 2, T = 20.187000 C 14:03:30 Temperature Measurement, Probe Number = 3, T = 20.131000 C 14:03:30 Temperature Measurement, Probe Number = 4, T = 20.492000 C 14:03:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.49 14:03:31 Integrated Voltage Measurement... 14:03:50 Voltage Offset Correction: v_off_ini = 0.000004897 V, v_off_fin = 0.000007655 V 14:03:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079833 Vs 14:03:51 Integrated Voltage Measurement... 14:04:10 Voltage Offset Correction: v_off_ini = 0.000006721 V, v_off_fin = 0.000004271 V 14:04:10 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171002535 Vs 14:04:13 Temperature Measurement, Probe Number = 0, T = 20.202000 C 14:04:13 Temperature Measurement, Probe Number = 1, T = 20.124000 C 14:04:14 Temperature Measurement, Probe Number = 2, T = 20.188000 C 14:04:15 Temperature Measurement, Probe Number = 3, T = 20.131000 C 14:04:15 Temperature Measurement, Probe Number = 4, T = 20.552000 C 14:04:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.55 14:04:16 Integrated Voltage Measurement... 14:04:35 Voltage Offset Correction: v_off_ini = 0.000005198 V, v_off_fin = 0.000007358 V 14:04:35 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171087151 Vs 14:04:35 Integrated Voltage Measurement... 14:04:54 Voltage Offset Correction: v_off_ini = 0.000007230 V, v_off_fin = 0.000004133 V 14:04:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998820 Vs 14:04:57 Temperature Measurement, Probe Number = 0, T = 20.202000 C 14:04:58 Temperature Measurement, Probe Number = 1, T = 20.121000 C 14:04:59 Temperature Measurement, Probe Number = 2, T = 20.188000 C 14:04:59 Temperature Measurement, Probe Number = 3, T = 20.130000 C 14:05:00 Temperature Measurement, Probe Number = 4, T = 20.608000 C 14:05:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.61 14:05:00 Integrated Voltage Measurement... 14:05:19 Voltage Offset Correction: v_off_ini = 0.000004991 V, v_off_fin = 0.000006966 V 14:05:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171087143 Vs 14:05:20 Integrated Voltage Measurement... 14:05:39 Voltage Offset Correction: v_off_ini = 0.000006769 V, v_off_fin = 0.000003839 V 14:05:39 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171003231 Vs 14:05:42 Temperature Measurement, Probe Number = 0, T = 20.197000 C 14:05:42 Temperature Measurement, Probe Number = 1, T = 20.120000 C 14:05:43 Temperature Measurement, Probe Number = 2, T = 20.182000 C 14:05:43 Temperature Measurement, Probe Number = 3, T = 20.129000 C 14:05:44 Temperature Measurement, Probe Number = 4, T = 20.503000 C 14:05:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.50 14:05:44 Integrated Voltage Measurement... 14:06:03 Voltage Offset Correction: v_off_ini = 0.000004753 V, v_off_fin = 0.000007492 V 14:06:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171081159 Vs 14:06:04 Integrated Voltage Measurement... 14:06:23 Voltage Offset Correction: v_off_ini = 0.000006759 V, v_off_fin = 0.000004326 V 14:06:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171009106 Vs 14:06:26 Temperature Measurement, Probe Number = 0, T = 20.195000 C 14:06:27 Temperature Measurement, Probe Number = 1, T = 20.120000 C 14:06:27 Temperature Measurement, Probe Number = 2, T = 20.180000 C 14:06:28 Temperature Measurement, Probe Number = 3, T = 20.127000 C 14:06:29 Temperature Measurement, Probe Number = 4, T = 20.390000 C 14:06:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.39 14:06:29 Integrated Voltage Measurement... 14:06:48 Voltage Offset Correction: v_off_ini = 0.000005101 V, v_off_fin = 0.000007624 V 14:06:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171083888 Vs 14:06:49 Integrated Voltage Measurement... 14:07:08 Voltage Offset Correction: v_off_ini = 0.000006877 V, v_off_fin = 0.000004097 V 14:07:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171003627 Vs 14:07:10 Temperature Measurement, Probe Number = 0, T = 20.197000 C 14:07:11 Temperature Measurement, Probe Number = 1, T = 20.116000 C 14:07:12 Temperature Measurement, Probe Number = 2, T = 20.181000 C 14:07:12 Temperature Measurement, Probe Number = 3, T = 20.125000 C 14:07:13 Temperature Measurement, Probe Number = 4, T = 20.351000 C 14:07:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.35 14:07:13 Integrated Voltage Measurement... 14:07:33 Voltage Offset Correction: v_off_ini = 0.000004998 V, v_off_fin = 0.000007892 V 14:07:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171090133 Vs 14:07:33 Integrated Voltage Measurement... 14:07:52 Voltage Offset Correction: v_off_ini = 0.000007639 V, v_off_fin = 0.000004819 V 14:07:53 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170996933 Vs 14:07:55 Temperature Measurement, Probe Number = 0, T = 20.202000 C 14:07:56 Temperature Measurement, Probe Number = 1, T = 20.120000 C 14:07:57 Temperature Measurement, Probe Number = 2, T = 20.191000 C 14:07:57 Temperature Measurement, Probe Number = 3, T = 20.131000 C 14:07:58 Temperature Measurement, Probe Number = 4, T = 20.409000 C 14:07:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.41 14:07:58 Integrated Voltage Measurement... 14:08:18 Voltage Offset Correction: v_off_ini = 0.000005666 V, v_off_fin = 0.000007814 V 14:08:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171086126 Vs 14:08:18 Integrated Voltage Measurement... 14:08:38 Voltage Offset Correction: v_off_ini = 0.000006800 V, v_off_fin = 0.000004111 V 14:08:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171007622 Vs 14:08:41 Temperature Measurement, Probe Number = 0, T = 20.200000 C 14:08:41 Temperature Measurement, Probe Number = 1, T = 20.119000 C 14:08:42 Temperature Measurement, Probe Number = 2, T = 20.185000 C 14:08:43 Temperature Measurement, Probe Number = 3, T = 20.129000 C 14:08:43 Temperature Measurement, Probe Number = 4, T = 20.437000 C 14:08:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.44 14:08:44 Integrated Voltage Measurement... 14:09:03 Voltage Offset Correction: v_off_ini = 0.000005883 V, v_off_fin = 0.000007766 V 14:09:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171082875 Vs 14:09:03 Integrated Voltage Measurement... 14:09:22 Voltage Offset Correction: v_off_ini = 0.000006786 V, v_off_fin = 0.000003988 V 14:09:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002453 Vs 14:39:25 Temperature Measurement, Probe Number = 0, T = 20.202000 C 14:39:26 Temperature Measurement, Probe Number = 1, T = 20.125000 C 14:39:27 Temperature Measurement, Probe Number = 2, T = 20.189000 C 14:39:28 Temperature Measurement, Probe Number = 3, T = 20.133000 C 14:39:28 Temperature Measurement, Probe Number = 4, T = 20.268000 C 14:39:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.27 14:39:29 Integrated Voltage Measurement... 14:39:48 Voltage Offset Correction: v_off_ini = 0.000005720 V, v_off_fin = 0.000008162 V 14:39:48 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171132004 Vs 14:39:48 Integrated Voltage Measurement... 14:40:07 Voltage Offset Correction: v_off_ini = 0.000007302 V, v_off_fin = 0.000003808 V 14:40:07 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171002878 Vs 14:40:10 Temperature Measurement, Probe Number = 0, T = 20.204000 C 14:40:11 Temperature Measurement, Probe Number = 1, T = 20.125000 C 14:40:11 Temperature Measurement, Probe Number = 2, T = 20.188000 C 14:40:12 Temperature Measurement, Probe Number = 3, T = 20.133000 C 14:40:13 Temperature Measurement, Probe Number = 4, T = 20.287000 C 14:40:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.29 14:40:13 Integrated Voltage Measurement... 14:40:32 Voltage Offset Correction: v_off_ini = 0.000005124 V, v_off_fin = 0.000007951 V 14:40:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171083111 Vs 14:40:33 Integrated Voltage Measurement... 14:40:52 Voltage Offset Correction: v_off_ini = 0.000006970 V, v_off_fin = 0.000003246 V 14:40:52 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171008878 Vs 14:40:55 Temperature Measurement, Probe Number = 0, T = 20.201000 C 14:40:55 Temperature Measurement, Probe Number = 1, T = 20.124000 C 14:40:56 Temperature Measurement, Probe Number = 2, T = 20.185000 C 14:40:57 Temperature Measurement, Probe Number = 3, T = 20.131000 C 14:40:57 Temperature Measurement, Probe Number = 4, T = 20.291000 C 14:40:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.29 14:40:57 Integrated Voltage Measurement... 14:41:17 Voltage Offset Correction: v_off_ini = 0.000004966 V, v_off_fin = 0.000007864 V 14:41:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171082967 Vs 14:41:17 Integrated Voltage Measurement... 14:41:36 Voltage Offset Correction: v_off_ini = 0.000007136 V, v_off_fin = 0.000003828 V 14:41:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171008297 Vs 14:41:39 Temperature Measurement, Probe Number = 0, T = 20.205000 C 14:41:40 Temperature Measurement, Probe Number = 1, T = 20.125000 C 14:41:41 Temperature Measurement, Probe Number = 2, T = 20.192000 C 14:41:41 Temperature Measurement, Probe Number = 3, T = 20.136000 C 14:41:42 Temperature Measurement, Probe Number = 4, T = 20.374000 C 14:41:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.37 14:41:42 Integrated Voltage Measurement... 14:42:01 Voltage Offset Correction: v_off_ini = 0.000005301 V, v_off_fin = 0.000006718 V 14:42:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171081478 Vs 14:42:02 Integrated Voltage Measurement... 14:42:21 Voltage Offset Correction: v_off_ini = 0.000007361 V, v_off_fin = 0.000003969 V 14:42:21 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171008989 Vs 14:42:24 Temperature Measurement, Probe Number = 0, T = 20.207000 C 14:42:24 Temperature Measurement, Probe Number = 1, T = 20.129000 C 14:42:25 Temperature Measurement, Probe Number = 2, T = 20.193000 C 14:42:26 Temperature Measurement, Probe Number = 3, T = 20.139000 C 14:42:26 Temperature Measurement, Probe Number = 4, T = 20.493000 C 14:42:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.49 14:42:27 Integrated Voltage Measurement... 14:42:46 Voltage Offset Correction: v_off_ini = 0.000004686 V, v_off_fin = 0.000007418 V 14:42:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171082091 Vs 14:42:47 Integrated Voltage Measurement... 14:43:06 Voltage Offset Correction: v_off_ini = 0.000006579 V, v_off_fin = 0.000003768 V 14:43:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002316 Vs 14:43:09 Temperature Measurement, Probe Number = 0, T = 20.208000 C 14:43:09 Temperature Measurement, Probe Number = 1, T = 20.128000 C 14:43:10 Temperature Measurement, Probe Number = 2, T = 20.195000 C 14:43:11 Temperature Measurement, Probe Number = 3, T = 20.137000 C 14:43:11 Temperature Measurement, Probe Number = 4, T = 20.586000 C 14:43:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.59 14:43:12 Integrated Voltage Measurement... 14:43:31 Voltage Offset Correction: v_off_ini = 0.000005281 V, v_off_fin = 0.000008012 V 14:43:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171087626 Vs 14:43:31 Integrated Voltage Measurement... 14:43:51 Voltage Offset Correction: v_off_ini = 0.000007360 V, v_off_fin = 0.000004080 V 14:43:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171004394 Vs 14:43:53 Temperature Measurement, Probe Number = 0, T = 20.207000 C 14:43:54 Temperature Measurement, Probe Number = 1, T = 20.127000 C 14:43:55 Temperature Measurement, Probe Number = 2, T = 20.188000 C 14:43:55 Temperature Measurement, Probe Number = 3, T = 20.131000 C 14:43:56 Temperature Measurement, Probe Number = 4, T = 20.545000 C 14:43:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.55 14:43:56 Integrated Voltage Measurement... 14:44:16 Voltage Offset Correction: v_off_ini = 0.000005415 V, v_off_fin = 0.000007649 V 14:44:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171084601 Vs 14:44:16 Integrated Voltage Measurement... 14:44:36 Voltage Offset Correction: v_off_ini = 0.000007061 V, v_off_fin = 0.000003633 V 14:44:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171008802 Vs 14:44:39 Temperature Measurement, Probe Number = 0, T = 20.202000 C 14:44:39 Temperature Measurement, Probe Number = 1, T = 20.127000 C 14:44:40 Temperature Measurement, Probe Number = 2, T = 20.186000 C 14:44:41 Temperature Measurement, Probe Number = 3, T = 20.133000 C 14:44:41 Temperature Measurement, Probe Number = 4, T = 20.423000 C 14:44:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.42 14:44:41 Integrated Voltage Measurement... 14:45:01 Voltage Offset Correction: v_off_ini = 0.000005364 V, v_off_fin = 0.000007302 V 14:45:02 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171082713 Vs 14:45:02 Integrated Voltage Measurement... 14:45:22 Voltage Offset Correction: v_off_ini = 0.000006455 V, v_off_fin = 0.000003980 V 14:45:22 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.171002069 Vs 14:45:24 Temperature Measurement, Probe Number = 0, T = 20.205000 C 14:45:25 Temperature Measurement, Probe Number = 1, T = 20.127000 C 14:45:26 Temperature Measurement, Probe Number = 2, T = 20.186000 C 14:45:26 Temperature Measurement, Probe Number = 3, T = 20.131000 C 14:45:27 Temperature Measurement, Probe Number = 4, T = 20.377000 C 14:45:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.38 14:45:27 Integrated Voltage Measurement... 14:45:46 Voltage Offset Correction: v_off_ini = 0.000005061 V, v_off_fin = 0.000007225 V 14:45:47 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171078794 Vs 14:45:47 Integrated Voltage Measurement... 14:46:06 Voltage Offset Correction: v_off_ini = 0.000006524 V, v_off_fin = 0.000003553 V 14:46:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171010593 Vs 14:46:09 Temperature Measurement, Probe Number = 0, T = 20.198000 C 14:46:10 Temperature Measurement, Probe Number = 1, T = 20.120000 C 14:46:10 Temperature Measurement, Probe Number = 2, T = 20.182000 C 14:46:11 Temperature Measurement, Probe Number = 3, T = 20.128000 C 14:46:12 Temperature Measurement, Probe Number = 4, T = 20.335000 C 14:46:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.34 14:46:12 Integrated Voltage Measurement... 14:46:31 Voltage Offset Correction: v_off_ini = 0.000004923 V, v_off_fin = 0.000006752 V 14:46:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076147 Vs 14:46:32 Integrated Voltage Measurement... 14:46:51 Voltage Offset Correction: v_off_ini = 0.000006447 V, v_off_fin = 0.000004119 V 14:46:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171009525 Vs 15:16:54 Temperature Measurement, Probe Number = 0, T = 20.197000 C 15:16:55 Temperature Measurement, Probe Number = 1, T = 20.121000 C 15:16:55 Temperature Measurement, Probe Number = 2, T = 20.184000 C 15:16:56 Temperature Measurement, Probe Number = 3, T = 20.129000 C 15:16:57 Temperature Measurement, Probe Number = 4, T = 20.468000 C 15:16:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.47 15:16:57 Integrated Voltage Measurement... 15:17:16 Voltage Offset Correction: v_off_ini = 0.000005886 V, v_off_fin = 0.000007328 V 15:17:16 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171120946 Vs 15:17:16 Integrated Voltage Measurement... 15:17:36 Voltage Offset Correction: v_off_ini = 0.000007300 V, v_off_fin = 0.000003752 V 15:17:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171007708 Vs 15:17:39 Temperature Measurement, Probe Number = 0, T = 20.199000 C 15:17:40 Temperature Measurement, Probe Number = 1, T = 20.125000 C 15:17:40 Temperature Measurement, Probe Number = 2, T = 20.183000 C 15:17:41 Temperature Measurement, Probe Number = 3, T = 20.129000 C 15:17:42 Temperature Measurement, Probe Number = 4, T = 20.350000 C 15:17:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.35 15:17:42 Integrated Voltage Measurement... 15:18:02 Voltage Offset Correction: v_off_ini = 0.000004667 V, v_off_fin = 0.000007512 V 15:18:02 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171069822 Vs 15:18:02 Integrated Voltage Measurement... 15:18:21 Voltage Offset Correction: v_off_ini = 0.000006572 V, v_off_fin = 0.000003964 V 15:18:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171006557 Vs 15:18:24 Temperature Measurement, Probe Number = 0, T = 20.202000 C 15:18:24 Temperature Measurement, Probe Number = 1, T = 20.126000 C 15:18:25 Temperature Measurement, Probe Number = 2, T = 20.184000 C 15:18:26 Temperature Measurement, Probe Number = 3, T = 20.130000 C 15:18:26 Temperature Measurement, Probe Number = 4, T = 20.345000 C 15:18:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.34 15:18:27 Integrated Voltage Measurement... 15:18:46 Voltage Offset Correction: v_off_ini = 0.000005169 V, v_off_fin = 0.000007514 V 15:18:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080219 Vs 15:18:46 Integrated Voltage Measurement... 15:19:06 Voltage Offset Correction: v_off_ini = 0.000007182 V, v_off_fin = 0.000004995 V 15:19:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996368 Vs 15:19:09 Temperature Measurement, Probe Number = 0, T = 20.203000 C 15:19:09 Temperature Measurement, Probe Number = 1, T = 20.126000 C 15:19:10 Temperature Measurement, Probe Number = 2, T = 20.188000 C 15:19:11 Temperature Measurement, Probe Number = 3, T = 20.132000 C 15:19:11 Temperature Measurement, Probe Number = 4, T = 20.395000 C 15:19:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.39 15:19:12 Integrated Voltage Measurement... 15:19:31 Voltage Offset Correction: v_off_ini = 0.000005670 V, v_off_fin = 0.000007804 V 15:19:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171085726 Vs 15:19:31 Integrated Voltage Measurement... 15:19:51 Voltage Offset Correction: v_off_ini = 0.000007451 V, v_off_fin = 0.000004112 V 15:19:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999659 Vs 15:19:53 Temperature Measurement, Probe Number = 0, T = 20.207000 C 15:19:54 Temperature Measurement, Probe Number = 1, T = 20.125000 C 15:19:55 Temperature Measurement, Probe Number = 2, T = 20.190000 C 15:19:55 Temperature Measurement, Probe Number = 3, T = 20.133000 C 15:19:56 Temperature Measurement, Probe Number = 4, T = 20.436000 C 15:19:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.44 15:19:56 Integrated Voltage Measurement... 15:20:15 Voltage Offset Correction: v_off_ini = 0.000005433 V, v_off_fin = 0.000007740 V 15:20:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171083168 Vs 15:20:16 Integrated Voltage Measurement... 15:20:35 Voltage Offset Correction: v_off_ini = 0.000007121 V, v_off_fin = 0.000004077 V 15:20:35 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171003954 Vs 15:20:38 Temperature Measurement, Probe Number = 0, T = 20.204000 C 15:20:39 Temperature Measurement, Probe Number = 1, T = 20.125000 C 15:20:39 Temperature Measurement, Probe Number = 2, T = 20.187000 C 15:20:40 Temperature Measurement, Probe Number = 3, T = 20.132000 C 15:20:41 Temperature Measurement, Probe Number = 4, T = 20.416000 C 15:20:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.42 15:20:41 Integrated Voltage Measurement... 15:21:00 Voltage Offset Correction: v_off_ini = 0.000005242 V, v_off_fin = 0.000007627 V 15:21:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079599 Vs 15:21:01 Integrated Voltage Measurement... 15:21:20 Voltage Offset Correction: v_off_ini = 0.000007278 V, v_off_fin = 0.000004282 V 15:21:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002505 Vs 15:21:23 Temperature Measurement, Probe Number = 0, T = 20.203000 C 15:21:23 Temperature Measurement, Probe Number = 1, T = 20.127000 C 15:21:24 Temperature Measurement, Probe Number = 2, T = 20.187000 C 15:21:25 Temperature Measurement, Probe Number = 3, T = 20.133000 C 15:21:25 Temperature Measurement, Probe Number = 4, T = 20.442000 C 15:21:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.44 15:21:26 Integrated Voltage Measurement... 15:21:45 Voltage Offset Correction: v_off_ini = 0.000005442 V, v_off_fin = 0.000007802 V 15:21:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171089976 Vs 15:21:46 Integrated Voltage Measurement... 15:22:05 Voltage Offset Correction: v_off_ini = 0.000007131 V, v_off_fin = 0.000004197 V 15:22:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001933 Vs 15:22:08 Temperature Measurement, Probe Number = 0, T = 20.202000 C 15:22:09 Temperature Measurement, Probe Number = 1, T = 20.127000 C 15:22:09 Temperature Measurement, Probe Number = 2, T = 20.185000 C 15:22:10 Temperature Measurement, Probe Number = 3, T = 20.132000 C 15:22:11 Temperature Measurement, Probe Number = 4, T = 20.328000 C 15:22:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.33 15:22:11 Integrated Voltage Measurement... 15:22:30 Voltage Offset Correction: v_off_ini = 0.000004983 V, v_off_fin = 0.000007431 V 15:22:30 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171079939 Vs 15:22:31 Integrated Voltage Measurement... 15:22:50 Voltage Offset Correction: v_off_ini = 0.000006918 V, v_off_fin = 0.000004250 V 15:22:50 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171004376 Vs 15:22:52 Temperature Measurement, Probe Number = 0, T = 20.205000 C 15:22:53 Temperature Measurement, Probe Number = 1, T = 20.125000 C 15:22:54 Temperature Measurement, Probe Number = 2, T = 20.186000 C 15:22:54 Temperature Measurement, Probe Number = 3, T = 20.130000 C 15:22:55 Temperature Measurement, Probe Number = 4, T = 20.265000 C 15:22:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.27 15:22:55 Integrated Voltage Measurement... 15:23:15 Voltage Offset Correction: v_off_ini = 0.000005231 V, v_off_fin = 0.000006746 V 15:23:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080101 Vs 15:23:15 Integrated Voltage Measurement... 15:23:35 Voltage Offset Correction: v_off_ini = 0.000006817 V, v_off_fin = 0.000003679 V 15:23:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171006057 Vs 15:23:37 Temperature Measurement, Probe Number = 0, T = 20.201000 C 15:23:38 Temperature Measurement, Probe Number = 1, T = 20.122000 C 15:23:39 Temperature Measurement, Probe Number = 2, T = 20.186000 C 15:23:39 Temperature Measurement, Probe Number = 3, T = 20.130000 C 15:23:40 Temperature Measurement, Probe Number = 4, T = 20.290000 C 15:23:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.29 15:23:40 Integrated Voltage Measurement... 15:24:00 Voltage Offset Correction: v_off_ini = 0.000004779 V, v_off_fin = 0.000007949 V 15:24:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171082146 Vs 15:24:00 Integrated Voltage Measurement... 15:24:19 Voltage Offset Correction: v_off_ini = 0.000007405 V, v_off_fin = 0.000004472 V 15:24:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171001417 Vs 15:54:22 Temperature Measurement, Probe Number = 0, T = 20.199000 C 15:54:23 Temperature Measurement, Probe Number = 1, T = 20.124000 C 15:54:24 Temperature Measurement, Probe Number = 2, T = 20.185000 C 15:54:24 Temperature Measurement, Probe Number = 3, T = 20.131000 C 15:54:25 Temperature Measurement, Probe Number = 4, T = 20.443000 C 15:54:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.44 15:54:25 Integrated Voltage Measurement... 15:54:45 Voltage Offset Correction: v_off_ini = 0.000005343 V, v_off_fin = 0.000007261 V 15:54:45 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171118016 Vs 15:54:45 Integrated Voltage Measurement... 15:55:04 Voltage Offset Correction: v_off_ini = 0.000006947 V, v_off_fin = 0.000004170 V 15:55:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171009400 Vs 15:55:07 Temperature Measurement, Probe Number = 0, T = 20.205000 C 15:55:08 Temperature Measurement, Probe Number = 1, T = 20.126000 C 15:55:08 Temperature Measurement, Probe Number = 2, T = 20.191000 C 15:55:09 Temperature Measurement, Probe Number = 3, T = 20.132000 C 15:55:10 Temperature Measurement, Probe Number = 4, T = 20.448000 C 15:55:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.45 15:55:10 Integrated Voltage Measurement... 15:55:29 Voltage Offset Correction: v_off_ini = 0.000005065 V, v_off_fin = 0.000007643 V 15:55:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078513 Vs 15:55:30 Integrated Voltage Measurement... 15:55:49 Voltage Offset Correction: v_off_ini = 0.000007555 V, v_off_fin = 0.000004849 V 15:55:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998550 Vs 15:55:52 Temperature Measurement, Probe Number = 0, T = 20.201000 C 15:55:52 Temperature Measurement, Probe Number = 1, T = 20.122000 C 15:55:53 Temperature Measurement, Probe Number = 2, T = 20.187000 C 15:55:54 Temperature Measurement, Probe Number = 3, T = 20.129000 C 15:55:54 Temperature Measurement, Probe Number = 4, T = 20.512000 C 15:55:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.51 15:55:54 Integrated Voltage Measurement... 15:56:14 Voltage Offset Correction: v_off_ini = 0.000005602 V, v_off_fin = 0.000007824 V 15:56:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171085447 Vs 15:56:14 Integrated Voltage Measurement... 15:56:33 Voltage Offset Correction: v_off_ini = 0.000007279 V, v_off_fin = 0.000004521 V 15:56:33 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000698 Vs 15:56:36 Temperature Measurement, Probe Number = 0, T = 20.207000 C 15:56:37 Temperature Measurement, Probe Number = 1, T = 20.130000 C 15:56:37 Temperature Measurement, Probe Number = 2, T = 20.193000 C 15:56:38 Temperature Measurement, Probe Number = 3, T = 20.138000 C 15:56:39 Temperature Measurement, Probe Number = 4, T = 20.517000 C 15:56:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.52 15:56:39 Integrated Voltage Measurement... 15:56:58 Voltage Offset Correction: v_off_ini = 0.000005684 V, v_off_fin = 0.000008348 V 15:56:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171086216 Vs 15:56:58 Integrated Voltage Measurement... 15:57:17 Voltage Offset Correction: v_off_ini = 0.000007831 V, v_off_fin = 0.000004379 V 15:57:18 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170993105 Vs 15:57:20 Temperature Measurement, Probe Number = 0, T = 20.209000 C 15:57:21 Temperature Measurement, Probe Number = 1, T = 20.129000 C 15:57:22 Temperature Measurement, Probe Number = 2, T = 20.195000 C 15:57:22 Temperature Measurement, Probe Number = 3, T = 20.137000 C 15:57:23 Temperature Measurement, Probe Number = 4, T = 20.503000 C 15:57:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.50 15:57:23 Integrated Voltage Measurement... 15:57:42 Voltage Offset Correction: v_off_ini = 0.000006300 V, v_off_fin = 0.000008369 V 15:57:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171087634 Vs 15:57:43 Integrated Voltage Measurement... 15:58:02 Voltage Offset Correction: v_off_ini = 0.000007912 V, v_off_fin = 0.000005088 V 15:58:02 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170992059 Vs 15:58:05 Temperature Measurement, Probe Number = 0, T = 20.208000 C 15:58:05 Temperature Measurement, Probe Number = 1, T = 20.127000 C 15:58:06 Temperature Measurement, Probe Number = 2, T = 20.194000 C 15:58:07 Temperature Measurement, Probe Number = 3, T = 20.136000 C 15:58:07 Temperature Measurement, Probe Number = 4, T = 20.520000 C 15:58:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.52 15:58:08 Integrated Voltage Measurement... 15:58:27 Voltage Offset Correction: v_off_ini = 0.000005547 V, v_off_fin = 0.000007892 V 15:58:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171086637 Vs 15:58:28 Integrated Voltage Measurement... 15:58:47 Voltage Offset Correction: v_off_ini = 0.000008015 V, v_off_fin = 0.000004577 V 15:58:48 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170989965 Vs 15:58:50 Temperature Measurement, Probe Number = 0, T = 20.202000 C 15:58:51 Temperature Measurement, Probe Number = 1, T = 20.126000 C 15:58:52 Temperature Measurement, Probe Number = 2, T = 20.188000 C 15:58:52 Temperature Measurement, Probe Number = 3, T = 20.132000 C 15:58:53 Temperature Measurement, Probe Number = 4, T = 20.501000 C 15:58:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.50 15:58:53 Integrated Voltage Measurement... 15:59:14 Voltage Offset Correction: v_off_ini = 0.000005734 V, v_off_fin = 0.000006835 V 15:59:14 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171078222 Vs 15:59:14 Integrated Voltage Measurement... 15:59:33 Voltage Offset Correction: v_off_ini = 0.000007158 V, v_off_fin = 0.000003750 V 15:59:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000202 Vs 15:59:36 Temperature Measurement, Probe Number = 0, T = 20.205000 C 15:59:37 Temperature Measurement, Probe Number = 1, T = 20.126000 C 15:59:38 Temperature Measurement, Probe Number = 2, T = 20.190000 C 15:59:38 Temperature Measurement, Probe Number = 3, T = 20.131000 C 15:59:39 Temperature Measurement, Probe Number = 4, T = 20.468000 C 15:59:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.47 15:59:39 Integrated Voltage Measurement... 15:59:59 Voltage Offset Correction: v_off_ini = 0.000005496 V, v_off_fin = 0.000007456 V 15:59:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080774 Vs 15:59:59 Integrated Voltage Measurement... 16:00:18 Voltage Offset Correction: v_off_ini = 0.000007240 V, v_off_fin = 0.000004306 V 16:00:18 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170995411 Vs 16:00:21 Temperature Measurement, Probe Number = 0, T = 20.198000 C 16:00:21 Temperature Measurement, Probe Number = 1, T = 20.118000 C 16:00:22 Temperature Measurement, Probe Number = 2, T = 20.184000 C 16:00:23 Temperature Measurement, Probe Number = 3, T = 20.126000 C 16:00:23 Temperature Measurement, Probe Number = 4, T = 20.413000 C 16:00:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.41 16:00:24 Integrated Voltage Measurement... 16:00:43 Voltage Offset Correction: v_off_ini = 0.000007253 V, v_off_fin = 0.000009416 V 16:00:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171103045 Vs 16:00:43 Integrated Voltage Measurement... 16:01:03 Voltage Offset Correction: v_off_ini = 0.000007297 V, v_off_fin = 0.000005160 V 16:01:03 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170992639 Vs 16:01:06 Temperature Measurement, Probe Number = 0, T = 20.203000 C 16:01:06 Temperature Measurement, Probe Number = 1, T = 20.124000 C 16:01:07 Temperature Measurement, Probe Number = 2, T = 20.187000 C 16:01:08 Temperature Measurement, Probe Number = 3, T = 20.131000 C 16:01:08 Temperature Measurement, Probe Number = 4, T = 20.489000 C 16:01:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.49 16:01:09 Integrated Voltage Measurement... 16:01:28 Voltage Offset Correction: v_off_ini = 0.000006499 V, v_off_fin = 0.000009097 V 16:01:28 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171091797 Vs 16:01:28 Integrated Voltage Measurement... 16:01:47 Voltage Offset Correction: v_off_ini = 0.000008179 V, v_off_fin = 0.000004533 V 16:01:48 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170984133 Vs 16:31:50 Temperature Measurement, Probe Number = 0, T = 20.194000 C 16:31:51 Temperature Measurement, Probe Number = 1, T = 20.118000 C 16:31:52 Temperature Measurement, Probe Number = 2, T = 20.182000 C 16:31:53 Temperature Measurement, Probe Number = 3, T = 20.128000 C 16:31:53 Temperature Measurement, Probe Number = 4, T = 20.173000 C 16:31:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.17 16:31:53 Integrated Voltage Measurement... 16:32:13 Voltage Offset Correction: v_off_ini = 0.000005626 V, v_off_fin = 0.000007365 V 16:32:13 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171123215 Vs 16:32:13 Integrated Voltage Measurement... 16:32:32 Voltage Offset Correction: v_off_ini = 0.000007039 V, v_off_fin = 0.000004100 V 16:32:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170999449 Vs 16:32:35 Temperature Measurement, Probe Number = 0, T = 20.199000 C 16:32:36 Temperature Measurement, Probe Number = 1, T = 20.123000 C 16:32:36 Temperature Measurement, Probe Number = 2, T = 20.182000 C 16:32:37 Temperature Measurement, Probe Number = 3, T = 20.127000 C 16:32:38 Temperature Measurement, Probe Number = 4, T = 20.258000 C 16:32:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.26 16:32:38 Integrated Voltage Measurement... 16:32:57 Voltage Offset Correction: v_off_ini = 0.000005364 V, v_off_fin = 0.000007910 V 16:32:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171083404 Vs 16:32:57 Integrated Voltage Measurement... 16:33:17 Voltage Offset Correction: v_off_ini = 0.000007391 V, v_off_fin = 0.000003615 V 16:33:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171004728 Vs 16:33:20 Temperature Measurement, Probe Number = 0, T = 20.199000 C 16:33:20 Temperature Measurement, Probe Number = 1, T = 20.122000 C 16:33:21 Temperature Measurement, Probe Number = 2, T = 20.183000 C 16:33:22 Temperature Measurement, Probe Number = 3, T = 20.129000 C 16:33:22 Temperature Measurement, Probe Number = 4, T = 20.201000 C 16:33:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.20 16:33:22 Integrated Voltage Measurement... 16:33:42 Voltage Offset Correction: v_off_ini = 0.000004390 V, v_off_fin = 0.000007713 V 16:33:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078456 Vs 16:33:42 Integrated Voltage Measurement... 16:34:01 Voltage Offset Correction: v_off_ini = 0.000007234 V, v_off_fin = 0.000004166 V 16:34:01 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000103 Vs 16:34:04 Temperature Measurement, Probe Number = 0, T = 20.197000 C 16:34:05 Temperature Measurement, Probe Number = 1, T = 20.119000 C 16:34:05 Temperature Measurement, Probe Number = 2, T = 20.185000 C 16:34:06 Temperature Measurement, Probe Number = 3, T = 20.128000 C 16:34:07 Temperature Measurement, Probe Number = 4, T = 20.363000 C 16:34:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.36 16:34:07 Integrated Voltage Measurement... 16:34:27 Voltage Offset Correction: v_off_ini = 0.000005365 V, v_off_fin = 0.000007732 V 16:34:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171085741 Vs 16:34:27 Integrated Voltage Measurement... 16:34:46 Voltage Offset Correction: v_off_ini = 0.000007179 V, v_off_fin = 0.000004363 V 16:34:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171003090 Vs 16:34:49 Temperature Measurement, Probe Number = 0, T = 20.202000 C 16:34:50 Temperature Measurement, Probe Number = 1, T = 20.122000 C 16:34:51 Temperature Measurement, Probe Number = 2, T = 20.185000 C 16:34:51 Temperature Measurement, Probe Number = 3, T = 20.128000 C 16:34:52 Temperature Measurement, Probe Number = 4, T = 20.360000 C 16:34:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.36 16:34:52 Integrated Voltage Measurement... 16:35:11 Voltage Offset Correction: v_off_ini = 0.000004931 V, v_off_fin = 0.000007406 V 16:35:11 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171076956 Vs 16:35:12 Integrated Voltage Measurement... 16:35:31 Voltage Offset Correction: v_off_ini = 0.000006782 V, v_off_fin = 0.000006096 V 16:35:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171006825 Vs 16:35:34 Temperature Measurement, Probe Number = 0, T = 20.196000 C 16:35:35 Temperature Measurement, Probe Number = 1, T = 20.118000 C 16:35:35 Temperature Measurement, Probe Number = 2, T = 20.182000 C 16:35:36 Temperature Measurement, Probe Number = 3, T = 20.127000 C 16:35:37 Temperature Measurement, Probe Number = 4, T = 20.401000 C 16:35:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.40 16:35:37 Integrated Voltage Measurement... 16:35:56 Voltage Offset Correction: v_off_ini = 0.000006271 V, v_off_fin = 0.000009204 V 16:35:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171101148 Vs 16:35:57 Integrated Voltage Measurement... 16:36:16 Voltage Offset Correction: v_off_ini = 0.000008634 V, v_off_fin = 0.000005529 V 16:36:16 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980049 Vs 16:36:19 Temperature Measurement, Probe Number = 0, T = 20.197000 C 16:36:20 Temperature Measurement, Probe Number = 1, T = 20.124000 C 16:36:20 Temperature Measurement, Probe Number = 2, T = 20.183000 C 16:36:21 Temperature Measurement, Probe Number = 3, T = 20.132000 C 16:36:22 Temperature Measurement, Probe Number = 4, T = 20.356000 C 16:36:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.36 16:36:22 Integrated Voltage Measurement... 16:36:41 Voltage Offset Correction: v_off_ini = 0.000006291 V, v_off_fin = 0.000008406 V 16:36:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171100112 Vs 16:36:41 Integrated Voltage Measurement... 16:37:01 Voltage Offset Correction: v_off_ini = 0.000008055 V, v_off_fin = 0.000006679 V 16:37:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978168 Vs 16:37:04 Temperature Measurement, Probe Number = 0, T = 20.205000 C 16:37:04 Temperature Measurement, Probe Number = 1, T = 20.128000 C 16:37:05 Temperature Measurement, Probe Number = 2, T = 20.191000 C 16:37:05 Temperature Measurement, Probe Number = 3, T = 20.139000 C 16:37:06 Temperature Measurement, Probe Number = 4, T = 20.432000 C 16:37:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.43 16:37:06 Integrated Voltage Measurement... 16:37:26 Voltage Offset Correction: v_off_ini = 0.000007758 V, v_off_fin = 0.000008996 V 16:37:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171100845 Vs 16:37:26 Integrated Voltage Measurement... 16:37:45 Voltage Offset Correction: v_off_ini = 0.000008471 V, v_off_fin = 0.000007975 V 16:37:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977548 Vs 16:37:48 Temperature Measurement, Probe Number = 0, T = 20.206000 C 16:37:49 Temperature Measurement, Probe Number = 1, T = 20.127000 C 16:37:49 Temperature Measurement, Probe Number = 2, T = 20.189000 C 16:37:50 Temperature Measurement, Probe Number = 3, T = 20.135000 C 16:37:51 Temperature Measurement, Probe Number = 4, T = 20.441000 C 16:37:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.44 16:37:51 Integrated Voltage Measurement... 16:38:10 Voltage Offset Correction: v_off_ini = 0.000007818 V, v_off_fin = 0.000008704 V 16:38:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171103586 Vs 16:38:10 Integrated Voltage Measurement... 16:38:29 Voltage Offset Correction: v_off_ini = 0.000008564 V, v_off_fin = 0.000008727 V 16:38:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975286 Vs 16:38:32 Temperature Measurement, Probe Number = 0, T = 20.199000 C 16:38:33 Temperature Measurement, Probe Number = 1, T = 20.128000 C 16:38:34 Temperature Measurement, Probe Number = 2, T = 20.184000 C 16:38:34 Temperature Measurement, Probe Number = 3, T = 20.134000 C 16:38:35 Temperature Measurement, Probe Number = 4, T = 20.383000 C 16:38:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.38 16:38:35 Integrated Voltage Measurement... 16:38:54 Voltage Offset Correction: v_off_ini = 0.000007381 V, v_off_fin = 0.000008814 V 16:38:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171105851 Vs 16:38:55 Integrated Voltage Measurement... 16:39:14 Voltage Offset Correction: v_off_ini = 0.000008848 V, v_off_fin = 0.000008238 V 16:39:14 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170973429 Vs 17:09:17 Temperature Measurement, Probe Number = 0, T = 20.199000 C 17:09:17 Temperature Measurement, Probe Number = 1, T = 20.125000 C 17:09:18 Temperature Measurement, Probe Number = 2, T = 20.187000 C 17:09:19 Temperature Measurement, Probe Number = 3, T = 20.135000 C 17:09:20 Temperature Measurement, Probe Number = 4, T = 20.243000 C 17:09:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.24 17:09:20 Integrated Voltage Measurement... 17:09:39 Voltage Offset Correction: v_off_ini = 0.000006078 V, v_off_fin = 0.000007273 V 17:09:39 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171136810 Vs 17:09:39 Integrated Voltage Measurement... 17:09:58 Voltage Offset Correction: v_off_ini = 0.000006669 V, v_off_fin = 0.000004251 V 17:09:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002462 Vs 17:10:01 Temperature Measurement, Probe Number = 0, T = 20.206000 C 17:10:02 Temperature Measurement, Probe Number = 1, T = 20.129000 C 17:10:03 Temperature Measurement, Probe Number = 2, T = 20.191000 C 17:10:03 Temperature Measurement, Probe Number = 3, T = 20.136000 C 17:10:04 Temperature Measurement, Probe Number = 4, T = 20.311000 C 17:10:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.31 17:10:04 Integrated Voltage Measurement... 17:10:23 Voltage Offset Correction: v_off_ini = 0.000004728 V, v_off_fin = 0.000007618 V 17:10:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072484 Vs 17:10:24 Integrated Voltage Measurement... 17:10:43 Voltage Offset Correction: v_off_ini = 0.000006755 V, v_off_fin = 0.000003981 V 17:10:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000634 Vs 17:10:46 Temperature Measurement, Probe Number = 0, T = 20.208000 C 17:10:47 Temperature Measurement, Probe Number = 1, T = 20.135000 C 17:10:48 Temperature Measurement, Probe Number = 2, T = 20.194000 C 17:10:48 Temperature Measurement, Probe Number = 3, T = 20.140000 C 17:10:49 Temperature Measurement, Probe Number = 4, T = 20.382000 C 17:10:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.38 17:10:49 Integrated Voltage Measurement... 17:11:09 Voltage Offset Correction: v_off_ini = 0.000004616 V, v_off_fin = 0.000007651 V 17:11:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074019 Vs 17:11:09 Integrated Voltage Measurement... 17:11:29 Voltage Offset Correction: v_off_ini = 0.000006999 V, v_off_fin = 0.000003412 V 17:11:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999803 Vs 17:11:31 Temperature Measurement, Probe Number = 0, T = 20.209000 C 17:11:32 Temperature Measurement, Probe Number = 1, T = 20.137000 C 17:11:33 Temperature Measurement, Probe Number = 2, T = 20.191000 C 17:11:33 Temperature Measurement, Probe Number = 3, T = 20.140000 C 17:11:34 Temperature Measurement, Probe Number = 4, T = 20.431000 C 17:11:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.43 17:11:34 Integrated Voltage Measurement... 17:11:54 Voltage Offset Correction: v_off_ini = 0.000005312 V, v_off_fin = 0.000007694 V 17:11:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171081660 Vs 17:11:55 Integrated Voltage Measurement... 17:12:14 Voltage Offset Correction: v_off_ini = 0.000006831 V, v_off_fin = 0.000003166 V 17:12:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994637 Vs 17:12:17 Temperature Measurement, Probe Number = 0, T = 20.212000 C 17:12:17 Temperature Measurement, Probe Number = 1, T = 20.135000 C 17:12:18 Temperature Measurement, Probe Number = 2, T = 20.195000 C 17:12:18 Temperature Measurement, Probe Number = 3, T = 20.141000 C 17:12:19 Temperature Measurement, Probe Number = 4, T = 20.473000 C 17:12:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.47 17:12:19 Integrated Voltage Measurement... 17:12:39 Voltage Offset Correction: v_off_ini = 0.000005082 V, v_off_fin = 0.000008314 V 17:12:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171083629 Vs 17:12:39 Integrated Voltage Measurement... 17:12:59 Voltage Offset Correction: v_off_ini = 0.000007760 V, v_off_fin = 0.000004306 V 17:12:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992116 Vs 17:13:01 Temperature Measurement, Probe Number = 0, T = 20.205000 C 17:13:02 Temperature Measurement, Probe Number = 1, T = 20.129000 C 17:13:03 Temperature Measurement, Probe Number = 2, T = 20.191000 C 17:13:03 Temperature Measurement, Probe Number = 3, T = 20.138000 C 17:13:04 Temperature Measurement, Probe Number = 4, T = 20.514000 C 17:13:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.51 17:13:04 Integrated Voltage Measurement... 17:13:24 Voltage Offset Correction: v_off_ini = 0.000005574 V, v_off_fin = 0.000007833 V 17:13:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171085299 Vs 17:13:24 Integrated Voltage Measurement... 17:13:43 Voltage Offset Correction: v_off_ini = 0.000007578 V, v_off_fin = 0.000004368 V 17:13:43 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997576 Vs 17:13:46 Temperature Measurement, Probe Number = 0, T = 20.209000 C 17:13:47 Temperature Measurement, Probe Number = 1, T = 20.129000 C 17:13:48 Temperature Measurement, Probe Number = 2, T = 20.197000 C 17:13:48 Temperature Measurement, Probe Number = 3, T = 20.138000 C 17:13:49 Temperature Measurement, Probe Number = 4, T = 20.530000 C 17:13:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.53 17:13:49 Integrated Voltage Measurement... 17:14:08 Voltage Offset Correction: v_off_ini = 0.000005326 V, v_off_fin = 0.000007986 V 17:14:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171083208 Vs 17:14:09 Integrated Voltage Measurement... 17:14:28 Voltage Offset Correction: v_off_ini = 0.000007303 V, v_off_fin = 0.000004803 V 17:14:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991423 Vs 17:14:31 Temperature Measurement, Probe Number = 0, T = 20.203000 C 17:14:31 Temperature Measurement, Probe Number = 1, T = 20.131000 C 17:14:32 Temperature Measurement, Probe Number = 2, T = 20.188000 C 17:14:33 Temperature Measurement, Probe Number = 3, T = 20.138000 C 17:14:33 Temperature Measurement, Probe Number = 4, T = 20.400000 C 17:14:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.40 17:14:34 Integrated Voltage Measurement... 17:14:53 Voltage Offset Correction: v_off_ini = 0.000005664 V, v_off_fin = 0.000007831 V 17:14:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171084652 Vs 17:14:53 Integrated Voltage Measurement... 17:15:12 Voltage Offset Correction: v_off_ini = 0.000007424 V, v_off_fin = 0.000003829 V 17:15:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995119 Vs 17:15:15 Temperature Measurement, Probe Number = 0, T = 20.210000 C 17:15:16 Temperature Measurement, Probe Number = 1, T = 20.133000 C 17:15:17 Temperature Measurement, Probe Number = 2, T = 20.193000 C 17:15:17 Temperature Measurement, Probe Number = 3, T = 20.140000 C 17:15:18 Temperature Measurement, Probe Number = 4, T = 20.420000 C 17:15:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.42 17:15:18 Integrated Voltage Measurement... 17:15:38 Voltage Offset Correction: v_off_ini = 0.000005557 V, v_off_fin = 0.000007923 V 17:15:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080129 Vs 17:15:38 Integrated Voltage Measurement... 17:15:57 Voltage Offset Correction: v_off_ini = 0.000006949 V, v_off_fin = 0.000004126 V 17:15:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170991321 Vs 17:16:00 Temperature Measurement, Probe Number = 0, T = 20.208000 C 17:16:01 Temperature Measurement, Probe Number = 1, T = 20.130000 C 17:16:01 Temperature Measurement, Probe Number = 2, T = 20.190000 C 17:16:02 Temperature Measurement, Probe Number = 3, T = 20.136000 C 17:16:03 Temperature Measurement, Probe Number = 4, T = 20.464000 C 17:16:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.46 17:16:03 Integrated Voltage Measurement... 17:16:22 Voltage Offset Correction: v_off_ini = 0.000005178 V, v_off_fin = 0.000007043 V 17:16:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171081009 Vs 17:16:22 Integrated Voltage Measurement... 17:16:42 Voltage Offset Correction: v_off_ini = 0.000007227 V, v_off_fin = 0.000004448 V 17:16:42 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997110 Vs 17:46:45 Temperature Measurement, Probe Number = 0, T = 20.205000 C 17:46:45 Temperature Measurement, Probe Number = 1, T = 20.126000 C 17:46:46 Temperature Measurement, Probe Number = 2, T = 20.190000 C 17:46:47 Temperature Measurement, Probe Number = 3, T = 20.136000 C 17:46:47 Temperature Measurement, Probe Number = 4, T = 20.299000 C 17:46:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.30 17:46:48 Integrated Voltage Measurement... 17:47:07 Voltage Offset Correction: v_off_ini = 0.000005593 V, v_off_fin = 0.000008022 V 17:47:07 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171118876 Vs 17:47:07 Integrated Voltage Measurement... 17:47:27 Voltage Offset Correction: v_off_ini = 0.000006917 V, v_off_fin = 0.000004220 V 17:47:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996990 Vs 17:47:29 Temperature Measurement, Probe Number = 0, T = 20.203000 C 17:47:30 Temperature Measurement, Probe Number = 1, T = 20.125000 C 17:47:31 Temperature Measurement, Probe Number = 2, T = 20.187000 C 17:47:31 Temperature Measurement, Probe Number = 3, T = 20.131000 C 17:47:32 Temperature Measurement, Probe Number = 4, T = 20.317000 C 17:47:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.32 17:47:32 Integrated Voltage Measurement... 17:47:52 Voltage Offset Correction: v_off_ini = 0.000005157 V, v_off_fin = 0.000007369 V 17:47:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078409 Vs 17:47:52 Integrated Voltage Measurement... 17:48:11 Voltage Offset Correction: v_off_ini = 0.000006478 V, v_off_fin = 0.000003556 V 17:48:11 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171001903 Vs 17:48:14 Temperature Measurement, Probe Number = 0, T = 20.196000 C 17:48:15 Temperature Measurement, Probe Number = 1, T = 20.123000 C 17:48:15 Temperature Measurement, Probe Number = 2, T = 20.182000 C 17:48:16 Temperature Measurement, Probe Number = 3, T = 20.129000 C 17:48:17 Temperature Measurement, Probe Number = 4, T = 20.317000 C 17:48:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.32 17:48:17 Integrated Voltage Measurement... 17:48:36 Voltage Offset Correction: v_off_ini = 0.000004933 V, v_off_fin = 0.000007652 V 17:48:36 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171078107 Vs 17:48:36 Integrated Voltage Measurement... 17:48:56 Voltage Offset Correction: v_off_ini = 0.000006957 V, v_off_fin = 0.000003727 V 17:48:56 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171001869 Vs 17:48:59 Temperature Measurement, Probe Number = 0, T = 20.200000 C 17:48:59 Temperature Measurement, Probe Number = 1, T = 20.124000 C 17:49:00 Temperature Measurement, Probe Number = 2, T = 20.184000 C 17:49:01 Temperature Measurement, Probe Number = 3, T = 20.129000 C 17:49:01 Temperature Measurement, Probe Number = 4, T = 20.306000 C 17:49:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.31 17:49:01 Integrated Voltage Measurement... 17:49:21 Voltage Offset Correction: v_off_ini = 0.000004961 V, v_off_fin = 0.000007876 V 17:49:21 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171078343 Vs 17:49:21 Integrated Voltage Measurement... 17:49:40 Voltage Offset Correction: v_off_ini = 0.000007016 V, v_off_fin = 0.000003658 V 17:49:40 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000695 Vs 17:49:43 Temperature Measurement, Probe Number = 0, T = 20.207000 C 17:49:44 Temperature Measurement, Probe Number = 1, T = 20.128000 C 17:49:44 Temperature Measurement, Probe Number = 2, T = 20.190000 C 17:49:45 Temperature Measurement, Probe Number = 3, T = 20.137000 C 17:49:46 Temperature Measurement, Probe Number = 4, T = 20.414000 C 17:49:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.41 17:49:46 Integrated Voltage Measurement... 17:50:05 Voltage Offset Correction: v_off_ini = 0.000004861 V, v_off_fin = 0.000007298 V 17:50:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171079774 Vs 17:50:05 Integrated Voltage Measurement... 17:50:25 Voltage Offset Correction: v_off_ini = 0.000006828 V, v_off_fin = 0.000004200 V 17:50:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171003375 Vs 17:50:28 Temperature Measurement, Probe Number = 0, T = 20.207000 C 17:50:28 Temperature Measurement, Probe Number = 1, T = 20.125000 C 17:50:29 Temperature Measurement, Probe Number = 2, T = 20.192000 C 17:50:30 Temperature Measurement, Probe Number = 3, T = 20.136000 C 17:50:30 Temperature Measurement, Probe Number = 4, T = 20.433000 C 17:50:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.43 17:50:31 Integrated Voltage Measurement... 17:50:50 Voltage Offset Correction: v_off_ini = 0.000004733 V, v_off_fin = 0.000007629 V 17:50:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171078901 Vs 17:50:50 Integrated Voltage Measurement... 17:51:09 Voltage Offset Correction: v_off_ini = 0.000006930 V, v_off_fin = 0.000003572 V 17:51:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171003391 Vs 17:51:12 Temperature Measurement, Probe Number = 0, T = 20.204000 C 17:51:13 Temperature Measurement, Probe Number = 1, T = 20.123000 C 17:51:13 Temperature Measurement, Probe Number = 2, T = 20.187000 C 17:51:14 Temperature Measurement, Probe Number = 3, T = 20.133000 C 17:51:15 Temperature Measurement, Probe Number = 4, T = 20.367000 C 17:51:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.37 17:51:15 Integrated Voltage Measurement... 17:51:34 Voltage Offset Correction: v_off_ini = 0.000004954 V, v_off_fin = 0.000007670 V 17:51:34 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171081255 Vs 17:51:35 Integrated Voltage Measurement... 17:51:54 Voltage Offset Correction: v_off_ini = 0.000006745 V, v_off_fin = 0.000003750 V 17:51:54 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171002618 Vs 17:51:57 Temperature Measurement, Probe Number = 0, T = 20.208000 C 17:51:57 Temperature Measurement, Probe Number = 1, T = 20.126000 C 17:51:58 Temperature Measurement, Probe Number = 2, T = 20.188000 C 17:51:59 Temperature Measurement, Probe Number = 3, T = 20.131000 C 17:51:59 Temperature Measurement, Probe Number = 4, T = 20.337000 C 17:51:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.34 17:52:00 Integrated Voltage Measurement... 17:52:19 Voltage Offset Correction: v_off_ini = 0.000004963 V, v_off_fin = 0.000007687 V 17:52:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080521 Vs 17:52:19 Integrated Voltage Measurement... 17:52:38 Voltage Offset Correction: v_off_ini = 0.000007013 V, v_off_fin = 0.000003793 V 17:52:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996438 Vs 17:52:41 Temperature Measurement, Probe Number = 0, T = 20.205000 C 17:52:42 Temperature Measurement, Probe Number = 1, T = 20.126000 C 17:52:43 Temperature Measurement, Probe Number = 2, T = 20.184000 C 17:52:43 Temperature Measurement, Probe Number = 3, T = 20.130000 C 17:52:44 Temperature Measurement, Probe Number = 4, T = 20.256000 C 17:52:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.26 17:52:44 Integrated Voltage Measurement... 17:53:05 Voltage Offset Correction: v_off_ini = 0.000004826 V, v_off_fin = 0.000006919 V 17:53:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171079570 Vs 17:53:05 Integrated Voltage Measurement... 17:53:24 Voltage Offset Correction: v_off_ini = 0.000006119 V, v_off_fin = 0.000003764 V 17:53:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996567 Vs 17:53:27 Temperature Measurement, Probe Number = 0, T = 20.206000 C 17:53:28 Temperature Measurement, Probe Number = 1, T = 20.123000 C 17:53:29 Temperature Measurement, Probe Number = 2, T = 20.189000 C 17:53:29 Temperature Measurement, Probe Number = 3, T = 20.134000 C 17:53:30 Temperature Measurement, Probe Number = 4, T = 20.237000 C 17:53:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.24 17:53:30 Integrated Voltage Measurement... 17:53:49 Voltage Offset Correction: v_off_ini = 0.000004690 V, v_off_fin = 0.000007586 V 17:53:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171081135 Vs 17:53:50 Integrated Voltage Measurement... 17:54:09 Voltage Offset Correction: v_off_ini = 0.000006967 V, v_off_fin = 0.000004089 V 17:54:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997811 Vs 18:24:12 Temperature Measurement, Probe Number = 0, T = 20.194000 C 18:24:13 Temperature Measurement, Probe Number = 1, T = 20.118000 C 18:24:14 Temperature Measurement, Probe Number = 2, T = 20.180000 C 18:24:14 Temperature Measurement, Probe Number = 3, T = 20.125000 C 18:24:15 Temperature Measurement, Probe Number = 4, T = 20.233000 C 18:24:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.23 18:24:15 Integrated Voltage Measurement... 18:24:34 Voltage Offset Correction: v_off_ini = 0.000005727 V, v_off_fin = 0.000007195 V 18:24:34 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171112922 Vs 18:24:35 Integrated Voltage Measurement... 18:24:54 Voltage Offset Correction: v_off_ini = 0.000006598 V, v_off_fin = 0.000003920 V 18:24:54 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171010153 Vs 18:24:57 Temperature Measurement, Probe Number = 0, T = 20.199000 C 18:24:58 Temperature Measurement, Probe Number = 1, T = 20.121000 C 18:24:58 Temperature Measurement, Probe Number = 2, T = 20.185000 C 18:24:59 Temperature Measurement, Probe Number = 3, T = 20.130000 C 18:25:00 Temperature Measurement, Probe Number = 4, T = 20.284000 C 18:25:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.28 18:25:00 Integrated Voltage Measurement... 18:25:19 Voltage Offset Correction: v_off_ini = 0.000004868 V, v_off_fin = 0.000007461 V 18:25:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080754 Vs 18:25:19 Integrated Voltage Measurement... 18:25:39 Voltage Offset Correction: v_off_ini = 0.000006892 V, v_off_fin = 0.000004151 V 18:25:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002235 Vs 18:25:41 Temperature Measurement, Probe Number = 0, T = 20.202000 C 18:25:42 Temperature Measurement, Probe Number = 1, T = 20.122000 C 18:25:43 Temperature Measurement, Probe Number = 2, T = 20.185000 C 18:25:43 Temperature Measurement, Probe Number = 3, T = 20.129000 C 18:25:44 Temperature Measurement, Probe Number = 4, T = 20.332000 C 18:25:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.33 18:25:44 Integrated Voltage Measurement... 18:26:03 Voltage Offset Correction: v_off_ini = 0.000004909 V, v_off_fin = 0.000007652 V 18:26:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171082052 Vs 18:26:04 Integrated Voltage Measurement... 18:26:23 Voltage Offset Correction: v_off_ini = 0.000006871 V, v_off_fin = 0.000003875 V 18:26:23 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171007575 Vs 18:26:26 Temperature Measurement, Probe Number = 0, T = 20.203000 C 18:26:26 Temperature Measurement, Probe Number = 1, T = 20.120000 C 18:26:27 Temperature Measurement, Probe Number = 2, T = 20.187000 C 18:26:28 Temperature Measurement, Probe Number = 3, T = 20.127000 C 18:26:28 Temperature Measurement, Probe Number = 4, T = 20.336000 C 18:26:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.34 18:26:29 Integrated Voltage Measurement... 18:26:48 Voltage Offset Correction: v_off_ini = 0.000004644 V, v_off_fin = 0.000008266 V 18:26:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171087465 Vs 18:26:48 Integrated Voltage Measurement... 18:27:07 Voltage Offset Correction: v_off_ini = 0.000007252 V, v_off_fin = 0.000003862 V 18:27:08 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171003212 Vs 18:27:10 Temperature Measurement, Probe Number = 0, T = 20.202000 C 18:27:11 Temperature Measurement, Probe Number = 1, T = 20.121000 C 18:27:12 Temperature Measurement, Probe Number = 2, T = 20.182000 C 18:27:12 Temperature Measurement, Probe Number = 3, T = 20.123000 C 18:27:13 Temperature Measurement, Probe Number = 4, T = 20.331000 C 18:27:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.33 18:27:13 Integrated Voltage Measurement... 18:27:32 Voltage Offset Correction: v_off_ini = 0.000004690 V, v_off_fin = 0.000007280 V 18:27:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171082321 Vs 18:27:33 Integrated Voltage Measurement... 18:27:52 Voltage Offset Correction: v_off_ini = 0.000006988 V, v_off_fin = 0.000004382 V 18:27:52 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171002508 Vs 18:27:55 Temperature Measurement, Probe Number = 0, T = 20.203000 C 18:27:55 Temperature Measurement, Probe Number = 1, T = 20.118000 C 18:27:56 Temperature Measurement, Probe Number = 2, T = 20.186000 C 18:27:56 Temperature Measurement, Probe Number = 3, T = 20.129000 C 18:27:57 Temperature Measurement, Probe Number = 4, T = 20.374000 C 18:27:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.37 18:27:57 Integrated Voltage Measurement... 18:28:17 Voltage Offset Correction: v_off_ini = 0.000004917 V, v_off_fin = 0.000007833 V 18:28:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171086442 Vs 18:28:17 Integrated Voltage Measurement... 18:28:36 Voltage Offset Correction: v_off_ini = 0.000006923 V, v_off_fin = 0.000004348 V 18:28:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171003502 Vs 18:28:39 Temperature Measurement, Probe Number = 0, T = 20.201000 C 18:28:40 Temperature Measurement, Probe Number = 1, T = 20.120000 C 18:28:40 Temperature Measurement, Probe Number = 2, T = 20.184000 C 18:28:41 Temperature Measurement, Probe Number = 3, T = 20.129000 C 18:28:42 Temperature Measurement, Probe Number = 4, T = 20.461000 C 18:28:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.46 18:28:42 Integrated Voltage Measurement... 18:29:01 Voltage Offset Correction: v_off_ini = 0.000005160 V, v_off_fin = 0.000007401 V 18:29:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171082159 Vs 18:29:02 Integrated Voltage Measurement... 18:29:21 Voltage Offset Correction: v_off_ini = 0.000007341 V, v_off_fin = 0.000004328 V 18:29:21 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000476 Vs 18:29:24 Temperature Measurement, Probe Number = 0, T = 20.202000 C 18:29:24 Temperature Measurement, Probe Number = 1, T = 20.120000 C 18:29:25 Temperature Measurement, Probe Number = 2, T = 20.185000 C 18:29:26 Temperature Measurement, Probe Number = 3, T = 20.128000 C 18:29:26 Temperature Measurement, Probe Number = 4, T = 20.458000 C 18:29:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.46 18:29:27 Integrated Voltage Measurement... 18:29:46 Voltage Offset Correction: v_off_ini = 0.000004784 V, v_off_fin = 0.000007182 V 18:29:46 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171083188 Vs 18:29:46 Integrated Voltage Measurement... 18:30:05 Voltage Offset Correction: v_off_ini = 0.000006815 V, v_off_fin = 0.000003723 V 18:30:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171005815 Vs 18:30:08 Temperature Measurement, Probe Number = 0, T = 20.203000 C 18:30:09 Temperature Measurement, Probe Number = 1, T = 20.119000 C 18:30:10 Temperature Measurement, Probe Number = 2, T = 20.187000 C 18:30:10 Temperature Measurement, Probe Number = 3, T = 20.128000 C 18:30:11 Temperature Measurement, Probe Number = 4, T = 20.482000 C 18:30:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.48 18:30:11 Integrated Voltage Measurement... 18:30:31 Voltage Offset Correction: v_off_ini = 0.000004896 V, v_off_fin = 0.000007405 V 18:30:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171082111 Vs 18:30:31 Integrated Voltage Measurement... 18:30:50 Voltage Offset Correction: v_off_ini = 0.000006966 V, v_off_fin = 0.000003910 V 18:30:50 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171006815 Vs 18:30:53 Temperature Measurement, Probe Number = 0, T = 20.205000 C 18:30:53 Temperature Measurement, Probe Number = 1, T = 20.122000 C 18:30:54 Temperature Measurement, Probe Number = 2, T = 20.188000 C 18:30:55 Temperature Measurement, Probe Number = 3, T = 20.131000 C 18:30:55 Temperature Measurement, Probe Number = 4, T = 20.508000 C 18:30:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.51 18:30:55 Integrated Voltage Measurement... 18:31:15 Voltage Offset Correction: v_off_ini = 0.000005035 V, v_off_fin = 0.000007749 V 18:31:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171083786 Vs 18:31:15 Integrated Voltage Measurement... 18:31:34 Voltage Offset Correction: v_off_ini = 0.000006490 V, v_off_fin = 0.000003483 V 18:31:34 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000999 Vs 19:01:37 Temperature Measurement, Probe Number = 0, T = 20.201000 C 19:01:38 Temperature Measurement, Probe Number = 1, T = 20.123000 C 19:01:38 Temperature Measurement, Probe Number = 2, T = 20.187000 C 19:01:39 Temperature Measurement, Probe Number = 3, T = 20.132000 C 19:01:40 Temperature Measurement, Probe Number = 4, T = 20.293000 C 19:01:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.29 19:01:40 Integrated Voltage Measurement... 19:01:59 Voltage Offset Correction: v_off_ini = 0.000006113 V, v_off_fin = 0.000008216 V 19:01:59 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171133617 Vs 19:01:59 Integrated Voltage Measurement... 19:02:18 Voltage Offset Correction: v_off_ini = 0.000007081 V, v_off_fin = 0.000004216 V 19:02:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001405 Vs 19:02:21 Temperature Measurement, Probe Number = 0, T = 20.198000 C 19:02:22 Temperature Measurement, Probe Number = 1, T = 20.122000 C 19:02:23 Temperature Measurement, Probe Number = 2, T = 20.184000 C 19:02:23 Temperature Measurement, Probe Number = 3, T = 20.129000 C 19:02:24 Temperature Measurement, Probe Number = 4, T = 20.385000 C 19:02:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.39 19:02:24 Integrated Voltage Measurement... 19:02:43 Voltage Offset Correction: v_off_ini = 0.000005125 V, v_off_fin = 0.000007285 V 19:02:44 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171080716 Vs 19:02:44 Integrated Voltage Measurement... 19:03:03 Voltage Offset Correction: v_off_ini = 0.000007056 V, v_off_fin = 0.000003387 V 19:03:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171001801 Vs 19:03:06 Temperature Measurement, Probe Number = 0, T = 20.199000 C 19:03:06 Temperature Measurement, Probe Number = 1, T = 20.121000 C 19:03:07 Temperature Measurement, Probe Number = 2, T = 20.185000 C 19:03:08 Temperature Measurement, Probe Number = 3, T = 20.128000 C 19:03:08 Temperature Measurement, Probe Number = 4, T = 20.327000 C 19:03:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.33 19:03:09 Integrated Voltage Measurement... 19:03:28 Voltage Offset Correction: v_off_ini = 0.000004734 V, v_off_fin = 0.000007606 V 19:03:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078237 Vs 19:03:28 Integrated Voltage Measurement... 19:03:48 Voltage Offset Correction: v_off_ini = 0.000006478 V, v_off_fin = 0.000003541 V 19:03:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171006159 Vs 19:03:50 Temperature Measurement, Probe Number = 0, T = 20.202000 C 19:03:51 Temperature Measurement, Probe Number = 1, T = 20.124000 C 19:03:52 Temperature Measurement, Probe Number = 2, T = 20.189000 C 19:03:52 Temperature Measurement, Probe Number = 3, T = 20.131000 C 19:03:53 Temperature Measurement, Probe Number = 4, T = 20.376000 C 19:03:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.38 19:03:53 Integrated Voltage Measurement... 19:04:13 Voltage Offset Correction: v_off_ini = 0.000004913 V, v_off_fin = 0.000007662 V 19:04:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078815 Vs 19:04:13 Integrated Voltage Measurement... 19:04:32 Voltage Offset Correction: v_off_ini = 0.000007149 V, v_off_fin = 0.000004320 V 19:04:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997215 Vs 19:04:35 Temperature Measurement, Probe Number = 0, T = 20.200000 C 19:04:35 Temperature Measurement, Probe Number = 1, T = 20.121000 C 19:04:36 Temperature Measurement, Probe Number = 2, T = 20.183000 C 19:04:37 Temperature Measurement, Probe Number = 3, T = 20.128000 C 19:04:37 Temperature Measurement, Probe Number = 4, T = 20.346000 C 19:04:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.35 19:04:38 Integrated Voltage Measurement... 19:04:57 Voltage Offset Correction: v_off_ini = 0.000005241 V, v_off_fin = 0.000008138 V 19:04:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171087260 Vs 19:04:57 Integrated Voltage Measurement... 19:05:17 Voltage Offset Correction: v_off_ini = 0.000007076 V, v_off_fin = 0.000004712 V 19:05:17 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170996895 Vs 19:05:19 Temperature Measurement, Probe Number = 0, T = 20.203000 C 19:05:20 Temperature Measurement, Probe Number = 1, T = 20.123000 C 19:05:21 Temperature Measurement, Probe Number = 2, T = 20.184000 C 19:05:21 Temperature Measurement, Probe Number = 3, T = 20.128000 C 19:05:22 Temperature Measurement, Probe Number = 4, T = 20.282000 C 19:05:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.28 19:05:22 Integrated Voltage Measurement... 19:05:42 Voltage Offset Correction: v_off_ini = 0.000005289 V, v_off_fin = 0.000007596 V 19:05:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171084180 Vs 19:05:42 Integrated Voltage Measurement... 19:06:01 Voltage Offset Correction: v_off_ini = 0.000007294 V, v_off_fin = 0.000004263 V 19:06:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991680 Vs 19:06:04 Temperature Measurement, Probe Number = 0, T = 20.201000 C 19:06:04 Temperature Measurement, Probe Number = 1, T = 20.120000 C 19:06:05 Temperature Measurement, Probe Number = 2, T = 20.184000 C 19:06:06 Temperature Measurement, Probe Number = 3, T = 20.127000 C 19:06:06 Temperature Measurement, Probe Number = 4, T = 20.214000 C 19:06:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.21 19:06:07 Integrated Voltage Measurement... 19:06:26 Voltage Offset Correction: v_off_ini = 0.000004353 V, v_off_fin = 0.000007533 V 19:06:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171077755 Vs 19:06:26 Integrated Voltage Measurement... 19:06:45 Voltage Offset Correction: v_off_ini = 0.000006979 V, v_off_fin = 0.000004459 V 19:06:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995950 Vs 19:06:48 Temperature Measurement, Probe Number = 0, T = 20.202000 C 19:06:49 Temperature Measurement, Probe Number = 1, T = 20.123000 C 19:06:49 Temperature Measurement, Probe Number = 2, T = 20.183000 C 19:06:50 Temperature Measurement, Probe Number = 3, T = 20.128000 C 19:06:51 Temperature Measurement, Probe Number = 4, T = 20.232000 C 19:06:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.23 19:06:51 Integrated Voltage Measurement... 19:07:10 Voltage Offset Correction: v_off_ini = 0.000005078 V, v_off_fin = 0.000007061 V 19:07:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079728 Vs 19:07:10 Integrated Voltage Measurement... 19:07:29 Voltage Offset Correction: v_off_ini = 0.000006747 V, v_off_fin = 0.000004263 V 19:07:29 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171001227 Vs 19:07:32 Temperature Measurement, Probe Number = 0, T = 20.201000 C 19:07:33 Temperature Measurement, Probe Number = 1, T = 20.122000 C 19:07:34 Temperature Measurement, Probe Number = 2, T = 20.183000 C 19:07:34 Temperature Measurement, Probe Number = 3, T = 20.127000 C 19:07:35 Temperature Measurement, Probe Number = 4, T = 20.271000 C 19:07:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.27 19:07:35 Integrated Voltage Measurement... 19:07:54 Voltage Offset Correction: v_off_ini = 0.000004894 V, v_off_fin = 0.000007115 V 19:07:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171080756 Vs 19:07:55 Integrated Voltage Measurement... 19:08:14 Voltage Offset Correction: v_off_ini = 0.000006156 V, v_off_fin = 0.000003323 V 19:08:14 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171007359 Vs 19:08:17 Temperature Measurement, Probe Number = 0, T = 20.200000 C 19:08:17 Temperature Measurement, Probe Number = 1, T = 20.118000 C 19:08:18 Temperature Measurement, Probe Number = 2, T = 20.183000 C 19:08:19 Temperature Measurement, Probe Number = 3, T = 20.126000 C 19:08:19 Temperature Measurement, Probe Number = 4, T = 20.283000 C 19:08:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.28 19:08:20 Integrated Voltage Measurement... 19:08:39 Voltage Offset Correction: v_off_ini = 0.000004337 V, v_off_fin = 0.000007093 V 19:08:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071894 Vs 19:08:39 Integrated Voltage Measurement... 19:08:59 Voltage Offset Correction: v_off_ini = 0.000006419 V, v_off_fin = 0.000003126 V 19:08:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171004409 Vs 19:39:01 Temperature Measurement, Probe Number = 0, T = 20.190000 C 19:39:02 Temperature Measurement, Probe Number = 1, T = 20.113000 C 19:39:03 Temperature Measurement, Probe Number = 2, T = 20.177000 C 19:39:04 Temperature Measurement, Probe Number = 3, T = 20.125000 C 19:39:04 Temperature Measurement, Probe Number = 4, T = 20.440000 C 19:39:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.44 19:39:05 Integrated Voltage Measurement... 19:39:24 Voltage Offset Correction: v_off_ini = 0.000006162 V, v_off_fin = 0.000007800 V 19:39:24 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171123384 Vs 19:39:24 Integrated Voltage Measurement... 19:39:43 Voltage Offset Correction: v_off_ini = 0.000007098 V, v_off_fin = 0.000003692 V 19:39:43 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171005461 Vs 19:39:46 Temperature Measurement, Probe Number = 0, T = 20.194000 C 19:39:47 Temperature Measurement, Probe Number = 1, T = 20.118000 C 19:39:48 Temperature Measurement, Probe Number = 2, T = 20.179000 C 19:39:48 Temperature Measurement, Probe Number = 3, T = 20.126000 C 19:39:49 Temperature Measurement, Probe Number = 4, T = 20.397000 C 19:39:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.40 19:39:49 Integrated Voltage Measurement... 19:40:08 Voltage Offset Correction: v_off_ini = 0.000004942 V, v_off_fin = 0.000006991 V 19:40:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171077235 Vs 19:40:08 Integrated Voltage Measurement... 19:40:27 Voltage Offset Correction: v_off_ini = 0.000006477 V, v_off_fin = 0.000003724 V 19:40:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171004255 Vs 19:40:30 Temperature Measurement, Probe Number = 0, T = 20.199000 C 19:40:31 Temperature Measurement, Probe Number = 1, T = 20.120000 C 19:40:32 Temperature Measurement, Probe Number = 2, T = 20.185000 C 19:40:32 Temperature Measurement, Probe Number = 3, T = 20.126000 C 19:40:33 Temperature Measurement, Probe Number = 4, T = 20.411000 C 19:40:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.41 19:40:33 Integrated Voltage Measurement... 19:40:52 Voltage Offset Correction: v_off_ini = 0.000004933 V, v_off_fin = 0.000007624 V 19:40:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171082262 Vs 19:40:52 Integrated Voltage Measurement... 19:41:11 Voltage Offset Correction: v_off_ini = 0.000007163 V, v_off_fin = 0.000004202 V 19:41:12 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170999476 Vs 19:41:14 Temperature Measurement, Probe Number = 0, T = 20.199000 C 19:41:15 Temperature Measurement, Probe Number = 1, T = 20.118000 C 19:41:16 Temperature Measurement, Probe Number = 2, T = 20.186000 C 19:41:16 Temperature Measurement, Probe Number = 3, T = 20.127000 C 19:41:17 Temperature Measurement, Probe Number = 4, T = 20.447000 C 19:41:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.45 19:41:17 Integrated Voltage Measurement... 19:41:36 Voltage Offset Correction: v_off_ini = 0.000005321 V, v_off_fin = 0.000007883 V 19:41:37 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171091072 Vs 19:41:37 Integrated Voltage Measurement... 19:41:56 Voltage Offset Correction: v_off_ini = 0.000007144 V, v_off_fin = 0.000003889 V 19:41:56 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171004540 Vs 19:41:59 Temperature Measurement, Probe Number = 0, T = 20.197000 C 19:42:00 Temperature Measurement, Probe Number = 1, T = 20.119000 C 19:42:00 Temperature Measurement, Probe Number = 2, T = 20.181000 C 19:42:01 Temperature Measurement, Probe Number = 3, T = 20.127000 C 19:42:01 Temperature Measurement, Probe Number = 4, T = 20.413000 C 19:42:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.41 19:42:02 Integrated Voltage Measurement... 19:42:21 Voltage Offset Correction: v_off_ini = 0.000005214 V, v_off_fin = 0.000007712 V 19:42:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171085878 Vs 19:42:21 Integrated Voltage Measurement... 19:42:40 Voltage Offset Correction: v_off_ini = 0.000007030 V, v_off_fin = 0.000005111 V 19:42:41 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170999579 Vs 19:42:43 Temperature Measurement, Probe Number = 0, T = 20.198000 C 19:42:44 Temperature Measurement, Probe Number = 1, T = 20.116000 C 19:42:45 Temperature Measurement, Probe Number = 2, T = 20.180000 C 19:42:45 Temperature Measurement, Probe Number = 3, T = 20.122000 C 19:42:46 Temperature Measurement, Probe Number = 4, T = 20.302000 C 19:42:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.30 19:42:46 Integrated Voltage Measurement... 19:43:05 Voltage Offset Correction: v_off_ini = 0.000004927 V, v_off_fin = 0.000007771 V 19:43:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171084930 Vs 19:43:06 Integrated Voltage Measurement... 19:43:25 Voltage Offset Correction: v_off_ini = 0.000006606 V, v_off_fin = 0.000004393 V 19:43:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001586 Vs 19:43:28 Temperature Measurement, Probe Number = 0, T = 20.199000 C 19:43:28 Temperature Measurement, Probe Number = 1, T = 20.118000 C 19:43:29 Temperature Measurement, Probe Number = 2, T = 20.181000 C 19:43:30 Temperature Measurement, Probe Number = 3, T = 20.125000 C 19:43:30 Temperature Measurement, Probe Number = 4, T = 20.304000 C 19:43:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.30 19:43:31 Integrated Voltage Measurement... 19:43:50 Voltage Offset Correction: v_off_ini = 0.000005264 V, v_off_fin = 0.000008220 V 19:43:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171088772 Vs 19:43:50 Integrated Voltage Measurement... 19:44:09 Voltage Offset Correction: v_off_ini = 0.000007607 V, v_off_fin = 0.000004754 V 19:44:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998420 Vs 19:44:12 Temperature Measurement, Probe Number = 0, T = 20.193000 C 19:44:13 Temperature Measurement, Probe Number = 1, T = 20.114000 C 19:44:14 Temperature Measurement, Probe Number = 2, T = 20.179000 C 19:44:14 Temperature Measurement, Probe Number = 3, T = 20.121000 C 19:44:15 Temperature Measurement, Probe Number = 4, T = 20.261000 C 19:44:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.26 19:44:15 Integrated Voltage Measurement... 19:44:34 Voltage Offset Correction: v_off_ini = 0.000005851 V, v_off_fin = 0.000007908 V 19:44:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171087340 Vs 19:44:35 Integrated Voltage Measurement... 19:44:54 Voltage Offset Correction: v_off_ini = 0.000007293 V, v_off_fin = 0.000004980 V 19:44:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994209 Vs 19:44:57 Temperature Measurement, Probe Number = 0, T = 20.196000 C 19:44:57 Temperature Measurement, Probe Number = 1, T = 20.115000 C 19:44:58 Temperature Measurement, Probe Number = 2, T = 20.183000 C 19:44:59 Temperature Measurement, Probe Number = 3, T = 20.122000 C 19:44:59 Temperature Measurement, Probe Number = 4, T = 20.159000 C 19:44:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.16 19:44:59 Integrated Voltage Measurement... 19:45:18 Voltage Offset Correction: v_off_ini = 0.000005254 V, v_off_fin = 0.000007556 V 19:45:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171086829 Vs 19:45:19 Integrated Voltage Measurement... 19:45:38 Voltage Offset Correction: v_off_ini = 0.000007383 V, v_off_fin = 0.000004246 V 19:45:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998320 Vs 19:45:41 Temperature Measurement, Probe Number = 0, T = 20.198000 C 19:45:41 Temperature Measurement, Probe Number = 1, T = 20.116000 C 19:45:42 Temperature Measurement, Probe Number = 2, T = 20.180000 C 19:45:43 Temperature Measurement, Probe Number = 3, T = 20.123000 C 19:45:43 Temperature Measurement, Probe Number = 4, T = 20.159000 C 19:45:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.16 19:45:43 Integrated Voltage Measurement... 19:46:03 Voltage Offset Correction: v_off_ini = 0.000005871 V, v_off_fin = 0.000007825 V 19:46:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171088277 Vs 19:46:03 Integrated Voltage Measurement... 19:46:22 Voltage Offset Correction: v_off_ini = 0.000007297 V, v_off_fin = 0.000004423 V 19:46:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171004860 Vs 20:16:25 Temperature Measurement, Probe Number = 0, T = 20.185000 C 20:16:26 Temperature Measurement, Probe Number = 1, T = 20.106000 C 20:16:27 Temperature Measurement, Probe Number = 2, T = 20.174000 C 20:16:27 Temperature Measurement, Probe Number = 3, T = 20.118000 C 20:16:28 Temperature Measurement, Probe Number = 4, T = 20.238000 C 20:16:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.24 20:16:28 Integrated Voltage Measurement... 20:16:48 Voltage Offset Correction: v_off_ini = 0.000005977 V, v_off_fin = 0.000007235 V 20:16:48 Integrated Voltage Measurement Delta Gap = 0.0040010 m VT = 0.171120970 Vs 20:16:48 Integrated Voltage Measurement... 20:17:07 Voltage Offset Correction: v_off_ini = 0.000006976 V, v_off_fin = 0.000004181 V 20:17:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171011266 Vs 20:17:10 Temperature Measurement, Probe Number = 0, T = 20.192000 C 20:17:11 Temperature Measurement, Probe Number = 1, T = 20.114000 C 20:17:12 Temperature Measurement, Probe Number = 2, T = 20.179000 C 20:17:12 Temperature Measurement, Probe Number = 3, T = 20.123000 C 20:17:13 Temperature Measurement, Probe Number = 4, T = 20.280000 C 20:17:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.28 20:17:13 Integrated Voltage Measurement... 20:17:32 Voltage Offset Correction: v_off_ini = 0.000005069 V, v_off_fin = 0.000007902 V 20:17:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171085122 Vs 20:17:33 Integrated Voltage Measurement... 20:17:52 Voltage Offset Correction: v_off_ini = 0.000007216 V, v_off_fin = 0.000003901 V 20:17:52 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171007812 Vs 20:17:55 Temperature Measurement, Probe Number = 0, T = 20.195000 C 20:17:55 Temperature Measurement, Probe Number = 1, T = 20.116000 C 20:17:56 Temperature Measurement, Probe Number = 2, T = 20.181000 C 20:17:57 Temperature Measurement, Probe Number = 3, T = 20.125000 C 20:17:57 Temperature Measurement, Probe Number = 4, T = 20.359000 C 20:17:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.36 20:17:57 Integrated Voltage Measurement... 20:18:17 Voltage Offset Correction: v_off_ini = 0.000005174 V, v_off_fin = 0.000007129 V 20:18:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171087093 Vs 20:18:18 Integrated Voltage Measurement... 20:18:37 Voltage Offset Correction: v_off_ini = 0.000006856 V, v_off_fin = 0.000003934 V 20:18:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171010134 Vs 20:18:40 Temperature Measurement, Probe Number = 0, T = 20.191000 C 20:18:40 Temperature Measurement, Probe Number = 1, T = 20.109000 C 20:18:41 Temperature Measurement, Probe Number = 2, T = 20.179000 C 20:18:42 Temperature Measurement, Probe Number = 3, T = 20.121000 C 20:18:42 Temperature Measurement, Probe Number = 4, T = 20.401000 C 20:18:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.40 20:18:42 Integrated Voltage Measurement... 20:19:02 Voltage Offset Correction: v_off_ini = 0.000004543 V, v_off_fin = 0.000007087 V 20:19:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171086982 Vs 20:19:02 Integrated Voltage Measurement... 20:19:21 Voltage Offset Correction: v_off_ini = 0.000006510 V, v_off_fin = 0.000003756 V 20:19:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171014688 Vs 20:19:24 Temperature Measurement, Probe Number = 0, T = 20.189000 C 20:19:25 Temperature Measurement, Probe Number = 1, T = 20.109000 C 20:19:26 Temperature Measurement, Probe Number = 2, T = 20.176000 C 20:19:26 Temperature Measurement, Probe Number = 3, T = 20.119000 C 20:19:27 Temperature Measurement, Probe Number = 4, T = 20.328000 C 20:19:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.33 20:19:27 Integrated Voltage Measurement... 20:19:46 Voltage Offset Correction: v_off_ini = 0.000004921 V, v_off_fin = 0.000007482 V 20:19:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171085376 Vs 20:19:46 Integrated Voltage Measurement... 20:20:06 Voltage Offset Correction: v_off_ini = 0.000006879 V, v_off_fin = 0.000003916 V 20:20:06 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171010571 Vs 20:20:09 Temperature Measurement, Probe Number = 0, T = 20.183000 C 20:20:09 Temperature Measurement, Probe Number = 1, T = 20.104000 C 20:20:10 Temperature Measurement, Probe Number = 2, T = 20.173000 C 20:20:11 Temperature Measurement, Probe Number = 3, T = 20.117000 C 20:20:11 Temperature Measurement, Probe Number = 4, T = 20.306000 C 20:20:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.31 20:20:11 Integrated Voltage Measurement... 20:20:31 Voltage Offset Correction: v_off_ini = 0.000005153 V, v_off_fin = 0.000007844 V 20:20:31 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171087888 Vs 20:20:31 Integrated Voltage Measurement... 20:20:51 Voltage Offset Correction: v_off_ini = 0.000006753 V, v_off_fin = 0.000004692 V 20:20:51 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.171003349 Vs 20:20:54 Temperature Measurement, Probe Number = 0, T = 20.188000 C 20:20:54 Temperature Measurement, Probe Number = 1, T = 20.110000 C 20:20:55 Temperature Measurement, Probe Number = 2, T = 20.175000 C 20:20:56 Temperature Measurement, Probe Number = 3, T = 20.119000 C 20:20:56 Temperature Measurement, Probe Number = 4, T = 20.323000 C 20:20:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.32 20:20:57 Integrated Voltage Measurement... 20:21:16 Voltage Offset Correction: v_off_ini = 0.000005374 V, v_off_fin = 0.000007363 V 20:21:16 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171086373 Vs 20:21:16 Integrated Voltage Measurement... 20:21:35 Voltage Offset Correction: v_off_ini = 0.000006922 V, v_off_fin = 0.000004122 V 20:21:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171007702 Vs 20:21:38 Temperature Measurement, Probe Number = 0, T = 20.191000 C 20:21:39 Temperature Measurement, Probe Number = 1, T = 20.112000 C 20:21:39 Temperature Measurement, Probe Number = 2, T = 20.179000 C 20:21:40 Temperature Measurement, Probe Number = 3, T = 20.122000 C 20:21:41 Temperature Measurement, Probe Number = 4, T = 20.378000 C 20:21:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.38 20:21:41 Integrated Voltage Measurement... 20:22:00 Voltage Offset Correction: v_off_ini = 0.000005047 V, v_off_fin = 0.000007550 V 20:22:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171091743 Vs 20:22:00 Integrated Voltage Measurement... 20:22:20 Voltage Offset Correction: v_off_ini = 0.000007115 V, v_off_fin = 0.000003637 V 20:22:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171005779 Vs 20:22:23 Temperature Measurement, Probe Number = 0, T = 20.192000 C 20:22:23 Temperature Measurement, Probe Number = 1, T = 20.112000 C 20:22:24 Temperature Measurement, Probe Number = 2, T = 20.179000 C 20:22:25 Temperature Measurement, Probe Number = 3, T = 20.123000 C 20:22:25 Temperature Measurement, Probe Number = 4, T = 20.403000 C 20:22:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.40 20:22:25 Integrated Voltage Measurement... 20:22:45 Voltage Offset Correction: v_off_ini = 0.000005038 V, v_off_fin = 0.000006972 V 20:22:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171087368 Vs 20:22:45 Integrated Voltage Measurement... 20:23:04 Voltage Offset Correction: v_off_ini = 0.000006381 V, v_off_fin = 0.000003930 V 20:23:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171010433 Vs 20:23:07 Temperature Measurement, Probe Number = 0, T = 20.190000 C 20:23:08 Temperature Measurement, Probe Number = 1, T = 20.112000 C 20:23:09 Temperature Measurement, Probe Number = 2, T = 20.176000 C 20:23:09 Temperature Measurement, Probe Number = 3, T = 20.123000 C 20:23:10 Temperature Measurement, Probe Number = 4, T = 20.368000 C 20:23:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.37 20:23:10 Integrated Voltage Measurement... 20:23:29 Voltage Offset Correction: v_off_ini = 0.000004960 V, v_off_fin = 0.000008058 V 20:23:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171088913 Vs 20:23:30 Integrated Voltage Measurement... 20:23:49 Voltage Offset Correction: v_off_ini = 0.000007154 V, v_off_fin = 0.000004183 V 20:23:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171010987 Vs 20:53:52 Temperature Measurement, Probe Number = 0, T = 20.180000 C 20:53:53 Temperature Measurement, Probe Number = 1, T = 20.105000 C 20:53:53 Temperature Measurement, Probe Number = 2, T = 20.170000 C 20:53:54 Temperature Measurement, Probe Number = 3, T = 20.118000 C 20:53:55 Temperature Measurement, Probe Number = 4, T = 20.409000 C 20:53:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.41 20:53:55 Integrated Voltage Measurement... 20:54:14 Voltage Offset Correction: v_off_ini = 0.000005430 V, v_off_fin = 0.000007048 V 20:54:14 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171125238 Vs 20:54:14 Integrated Voltage Measurement... 20:54:34 Voltage Offset Correction: v_off_ini = 0.000006440 V, v_off_fin = 0.000003654 V 20:54:34 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171005482 Vs 20:54:37 Temperature Measurement, Probe Number = 0, T = 20.191000 C 20:54:37 Temperature Measurement, Probe Number = 1, T = 20.112000 C 20:54:38 Temperature Measurement, Probe Number = 2, T = 20.177000 C 20:54:39 Temperature Measurement, Probe Number = 3, T = 20.123000 C 20:54:39 Temperature Measurement, Probe Number = 4, T = 20.290000 C 20:54:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.29 20:54:40 Integrated Voltage Measurement... 20:54:59 Voltage Offset Correction: v_off_ini = 0.000004873 V, v_off_fin = 0.000007530 V 20:54:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075722 Vs 20:54:59 Integrated Voltage Measurement... 20:55:18 Voltage Offset Correction: v_off_ini = 0.000006522 V, v_off_fin = 0.000004213 V 20:55:18 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000597 Vs 20:55:21 Temperature Measurement, Probe Number = 0, T = 20.188000 C 20:55:22 Temperature Measurement, Probe Number = 1, T = 20.110000 C 20:55:22 Temperature Measurement, Probe Number = 2, T = 20.177000 C 20:55:23 Temperature Measurement, Probe Number = 3, T = 20.121000 C 20:55:24 Temperature Measurement, Probe Number = 4, T = 20.333000 C 20:55:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.33 20:55:24 Integrated Voltage Measurement... 20:55:43 Voltage Offset Correction: v_off_ini = 0.000005215 V, v_off_fin = 0.000007380 V 20:55:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171081947 Vs 20:55:44 Integrated Voltage Measurement... 20:56:03 Voltage Offset Correction: v_off_ini = 0.000006972 V, v_off_fin = 0.000003842 V 20:56:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001374 Vs 20:56:06 Temperature Measurement, Probe Number = 0, T = 20.188000 C 20:56:06 Temperature Measurement, Probe Number = 1, T = 20.111000 C 20:56:07 Temperature Measurement, Probe Number = 2, T = 20.176000 C 20:56:08 Temperature Measurement, Probe Number = 3, T = 20.122000 C 20:56:08 Temperature Measurement, Probe Number = 4, T = 20.236000 C 20:56:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.24 20:56:09 Integrated Voltage Measurement... 20:56:28 Voltage Offset Correction: v_off_ini = 0.000005281 V, v_off_fin = 0.000007461 V 20:56:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171077538 Vs 20:56:28 Integrated Voltage Measurement... 20:56:47 Voltage Offset Correction: v_off_ini = 0.000007148 V, v_off_fin = 0.000004028 V 20:56:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998198 Vs 20:56:50 Temperature Measurement, Probe Number = 0, T = 20.190000 C 20:56:51 Temperature Measurement, Probe Number = 1, T = 20.113000 C 20:56:52 Temperature Measurement, Probe Number = 2, T = 20.180000 C 20:56:52 Temperature Measurement, Probe Number = 3, T = 20.125000 C 20:56:53 Temperature Measurement, Probe Number = 4, T = 20.333000 C 20:56:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.33 20:56:53 Integrated Voltage Measurement... 20:57:12 Voltage Offset Correction: v_off_ini = 0.000005354 V, v_off_fin = 0.000007820 V 20:57:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171082779 Vs 20:57:13 Integrated Voltage Measurement... 20:57:32 Voltage Offset Correction: v_off_ini = 0.000007418 V, v_off_fin = 0.000003793 V 20:57:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170999618 Vs 20:57:35 Temperature Measurement, Probe Number = 0, T = 20.194000 C 20:57:36 Temperature Measurement, Probe Number = 1, T = 20.116000 C 20:57:36 Temperature Measurement, Probe Number = 2, T = 20.182000 C 20:57:37 Temperature Measurement, Probe Number = 3, T = 20.128000 C 20:57:38 Temperature Measurement, Probe Number = 4, T = 20.468000 C 20:57:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.47 20:57:38 Integrated Voltage Measurement... 20:57:57 Voltage Offset Correction: v_off_ini = 0.000005375 V, v_off_fin = 0.000008003 V 20:57:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171082808 Vs 20:57:57 Integrated Voltage Measurement... 20:58:17 Voltage Offset Correction: v_off_ini = 0.000007475 V, v_off_fin = 0.000003848 V 20:58:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995807 Vs 20:58:19 Temperature Measurement, Probe Number = 0, T = 20.196000 C 20:58:20 Temperature Measurement, Probe Number = 1, T = 20.118000 C 20:58:21 Temperature Measurement, Probe Number = 2, T = 20.182000 C 20:58:21 Temperature Measurement, Probe Number = 3, T = 20.129000 C 20:58:22 Temperature Measurement, Probe Number = 4, T = 20.592000 C 20:58:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.59 20:58:22 Integrated Voltage Measurement... 20:58:41 Voltage Offset Correction: v_off_ini = 0.000004664 V, v_off_fin = 0.000007321 V 20:58:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076723 Vs 20:58:42 Integrated Voltage Measurement... 20:59:01 Voltage Offset Correction: v_off_ini = 0.000006337 V, v_off_fin = 0.000003283 V 20:59:01 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171010323 Vs 20:59:04 Temperature Measurement, Probe Number = 0, T = 20.190000 C 20:59:05 Temperature Measurement, Probe Number = 1, T = 20.108000 C 20:59:05 Temperature Measurement, Probe Number = 2, T = 20.178000 C 20:59:06 Temperature Measurement, Probe Number = 3, T = 20.123000 C 20:59:07 Temperature Measurement, Probe Number = 4, T = 20.568000 C 20:59:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.57 20:59:07 Integrated Voltage Measurement... 20:59:26 Voltage Offset Correction: v_off_ini = 0.000004063 V, v_off_fin = 0.000007226 V 20:59:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171068850 Vs 20:59:27 Integrated Voltage Measurement... 20:59:46 Voltage Offset Correction: v_off_ini = 0.000006675 V, v_off_fin = 0.000004268 V 20:59:46 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171001561 Vs 20:59:49 Temperature Measurement, Probe Number = 0, T = 20.189000 C 20:59:49 Temperature Measurement, Probe Number = 1, T = 20.110000 C 20:59:50 Temperature Measurement, Probe Number = 2, T = 20.177000 C 20:59:51 Temperature Measurement, Probe Number = 3, T = 20.122000 C 20:59:51 Temperature Measurement, Probe Number = 4, T = 20.493000 C 20:59:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.49 20:59:51 Integrated Voltage Measurement... 21:00:11 Voltage Offset Correction: v_off_ini = 0.000005318 V, v_off_fin = 0.000007686 V 21:00:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171081627 Vs 21:00:11 Integrated Voltage Measurement... 21:00:31 Voltage Offset Correction: v_off_ini = 0.000006959 V, v_off_fin = 0.000004315 V 21:00:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998688 Vs 21:00:33 Temperature Measurement, Probe Number = 0, T = 20.187000 C 21:00:34 Temperature Measurement, Probe Number = 1, T = 20.114000 C 21:00:35 Temperature Measurement, Probe Number = 2, T = 20.175000 C 21:00:35 Temperature Measurement, Probe Number = 3, T = 20.123000 C 21:00:36 Temperature Measurement, Probe Number = 4, T = 20.466000 C 21:00:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.47 21:00:36 Integrated Voltage Measurement... 21:00:55 Voltage Offset Correction: v_off_ini = 0.000004535 V, v_off_fin = 0.000007272 V 21:00:56 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171070991 Vs 21:00:56 Integrated Voltage Measurement... 21:01:15 Voltage Offset Correction: v_off_ini = 0.000006745 V, v_off_fin = 0.000003691 V 21:01:15 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171002791 Vs 21:31:18 Temperature Measurement, Probe Number = 0, T = 20.198000 C 21:31:18 Temperature Measurement, Probe Number = 1, T = 20.122000 C 21:31:19 Temperature Measurement, Probe Number = 2, T = 20.186000 C 21:31:20 Temperature Measurement, Probe Number = 3, T = 20.131000 C 21:31:20 Temperature Measurement, Probe Number = 4, T = 20.408000 C 21:31:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.41 21:31:21 Integrated Voltage Measurement... 21:31:40 Voltage Offset Correction: v_off_ini = 0.000005466 V, v_off_fin = 0.000006935 V 21:31:40 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171128520 Vs 21:31:40 Integrated Voltage Measurement... 21:31:59 Voltage Offset Correction: v_off_ini = 0.000006420 V, v_off_fin = 0.000003972 V 21:31:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001010 Vs 21:32:02 Temperature Measurement, Probe Number = 0, T = 20.194000 C 21:32:03 Temperature Measurement, Probe Number = 1, T = 20.112000 C 21:32:03 Temperature Measurement, Probe Number = 2, T = 20.184000 C 21:32:04 Temperature Measurement, Probe Number = 3, T = 20.125000 C 21:32:05 Temperature Measurement, Probe Number = 4, T = 20.469000 C 21:32:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.47 21:32:05 Integrated Voltage Measurement... 21:32:24 Voltage Offset Correction: v_off_ini = 0.000005011 V, v_off_fin = 0.000007029 V 21:32:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079169 Vs 21:32:25 Integrated Voltage Measurement... 21:32:44 Voltage Offset Correction: v_off_ini = 0.000006837 V, v_off_fin = 0.000003855 V 21:32:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996133 Vs 21:32:47 Temperature Measurement, Probe Number = 0, T = 20.187000 C 21:32:47 Temperature Measurement, Probe Number = 1, T = 20.110000 C 21:32:48 Temperature Measurement, Probe Number = 2, T = 20.176000 C 21:32:48 Temperature Measurement, Probe Number = 3, T = 20.122000 C 21:32:49 Temperature Measurement, Probe Number = 4, T = 20.410000 C 21:32:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.41 21:32:49 Integrated Voltage Measurement... 21:33:09 Voltage Offset Correction: v_off_ini = 0.000004767 V, v_off_fin = 0.000007286 V 21:33:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171077826 Vs 21:33:09 Integrated Voltage Measurement... 21:33:28 Voltage Offset Correction: v_off_ini = 0.000006602 V, v_off_fin = 0.000003552 V 21:33:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000795 Vs 21:33:31 Temperature Measurement, Probe Number = 0, T = 20.188000 C 21:33:32 Temperature Measurement, Probe Number = 1, T = 20.110000 C 21:33:32 Temperature Measurement, Probe Number = 2, T = 20.175000 C 21:33:33 Temperature Measurement, Probe Number = 3, T = 20.119000 C 21:33:34 Temperature Measurement, Probe Number = 4, T = 20.355000 C 21:33:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.36 21:33:34 Integrated Voltage Measurement... 21:33:53 Voltage Offset Correction: v_off_ini = 0.000004983 V, v_off_fin = 0.000006961 V 21:33:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073879 Vs 21:33:53 Integrated Voltage Measurement... 21:34:13 Voltage Offset Correction: v_off_ini = 0.000006464 V, v_off_fin = 0.000004136 V 21:34:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001321 Vs 21:34:16 Temperature Measurement, Probe Number = 0, T = 20.190000 C 21:34:16 Temperature Measurement, Probe Number = 1, T = 20.116000 C 21:34:17 Temperature Measurement, Probe Number = 2, T = 20.178000 C 21:34:18 Temperature Measurement, Probe Number = 3, T = 20.125000 C 21:34:18 Temperature Measurement, Probe Number = 4, T = 20.420000 C 21:34:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.42 21:34:18 Integrated Voltage Measurement... 21:34:38 Voltage Offset Correction: v_off_ini = 0.000005379 V, v_off_fin = 0.000007515 V 21:34:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171081805 Vs 21:34:38 Integrated Voltage Measurement... 21:34:57 Voltage Offset Correction: v_off_ini = 0.000006686 V, v_off_fin = 0.000003674 V 21:34:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997400 Vs 21:35:00 Temperature Measurement, Probe Number = 0, T = 20.193000 C 21:35:00 Temperature Measurement, Probe Number = 1, T = 20.120000 C 21:35:01 Temperature Measurement, Probe Number = 2, T = 20.180000 C 21:35:02 Temperature Measurement, Probe Number = 3, T = 20.129000 C 21:35:02 Temperature Measurement, Probe Number = 4, T = 20.466000 C 21:35:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.47 21:35:02 Integrated Voltage Measurement... 21:35:22 Voltage Offset Correction: v_off_ini = 0.000004888 V, v_off_fin = 0.000007492 V 21:35:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079982 Vs 21:35:22 Integrated Voltage Measurement... 21:35:41 Voltage Offset Correction: v_off_ini = 0.000006962 V, v_off_fin = 0.000003710 V 21:35:41 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994546 Vs 21:35:44 Temperature Measurement, Probe Number = 0, T = 20.196000 C 21:35:45 Temperature Measurement, Probe Number = 1, T = 20.117000 C 21:35:45 Temperature Measurement, Probe Number = 2, T = 20.185000 C 21:35:46 Temperature Measurement, Probe Number = 3, T = 20.129000 C 21:35:47 Temperature Measurement, Probe Number = 4, T = 20.479000 C 21:35:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.48 21:35:47 Integrated Voltage Measurement... 21:36:06 Voltage Offset Correction: v_off_ini = 0.000005100 V, v_off_fin = 0.000006774 V 21:36:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080110 Vs 21:36:07 Integrated Voltage Measurement... 21:36:26 Voltage Offset Correction: v_off_ini = 0.000006243 V, v_off_fin = 0.000003287 V 21:36:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171003138 Vs 21:36:29 Temperature Measurement, Probe Number = 0, T = 20.194000 C 21:36:29 Temperature Measurement, Probe Number = 1, T = 20.115000 C 21:36:30 Temperature Measurement, Probe Number = 2, T = 20.182000 C 21:36:31 Temperature Measurement, Probe Number = 3, T = 20.126000 C 21:36:31 Temperature Measurement, Probe Number = 4, T = 20.537000 C 21:36:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.54 21:36:32 Integrated Voltage Measurement... 21:36:51 Voltage Offset Correction: v_off_ini = 0.000004470 V, v_off_fin = 0.000006788 V 21:36:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075752 Vs 21:36:51 Integrated Voltage Measurement... 21:37:16 Voltage Offset Correction: v_off_ini = 0.000006556 V, v_off_fin = 0.000004804 V 21:37:16 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170996627 Vs 21:37:19 Temperature Measurement, Probe Number = 0, T = 20.193000 C 21:37:20 Temperature Measurement, Probe Number = 1, T = 20.115000 C 21:37:20 Temperature Measurement, Probe Number = 2, T = 20.179000 C 21:37:21 Temperature Measurement, Probe Number = 3, T = 20.123000 C 21:37:22 Temperature Measurement, Probe Number = 4, T = 20.470000 C 21:37:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.47 21:37:22 Integrated Voltage Measurement... 21:37:42 Voltage Offset Correction: v_off_ini = 0.000005097 V, v_off_fin = 0.000007027 V 21:37:42 Integrated Voltage Measurement Delta Gap = 0.0040002 m VT = 0.171068451 Vs 21:37:42 Integrated Voltage Measurement... 21:38:01 Voltage Offset Correction: v_off_ini = 0.000006338 V, v_off_fin = 0.000003871 V 21:38:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998837 Vs 21:38:04 Temperature Measurement, Probe Number = 0, T = 20.185000 C 21:38:05 Temperature Measurement, Probe Number = 1, T = 20.107000 C 21:38:05 Temperature Measurement, Probe Number = 2, T = 20.175000 C 21:38:06 Temperature Measurement, Probe Number = 3, T = 20.119000 C 21:38:07 Temperature Measurement, Probe Number = 4, T = 20.351000 C 21:38:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.35 21:38:07 Integrated Voltage Measurement... 21:38:26 Voltage Offset Correction: v_off_ini = 0.000004409 V, v_off_fin = 0.000007404 V 21:38:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080767 Vs 21:38:27 Integrated Voltage Measurement... 21:38:46 Voltage Offset Correction: v_off_ini = 0.000006739 V, v_off_fin = 0.000003998 V 21:38:46 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997913 Vs 22:08:49 Temperature Measurement, Probe Number = 0, T = 20.198000 C 22:08:49 Temperature Measurement, Probe Number = 1, T = 20.121000 C 22:08:50 Temperature Measurement, Probe Number = 2, T = 20.186000 C 22:08:51 Temperature Measurement, Probe Number = 3, T = 20.131000 C 22:08:51 Temperature Measurement, Probe Number = 4, T = 20.574000 C 22:08:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.57 22:08:52 Integrated Voltage Measurement... 22:09:11 Voltage Offset Correction: v_off_ini = 0.000005357 V, v_off_fin = 0.000007411 V 22:09:11 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171118557 Vs 22:09:11 Integrated Voltage Measurement... 22:09:30 Voltage Offset Correction: v_off_ini = 0.000006465 V, v_off_fin = 0.000003720 V 22:09:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997794 Vs 22:09:33 Temperature Measurement, Probe Number = 0, T = 20.199000 C 22:09:34 Temperature Measurement, Probe Number = 1, T = 20.118000 C 22:09:34 Temperature Measurement, Probe Number = 2, T = 20.183000 C 22:09:35 Temperature Measurement, Probe Number = 3, T = 20.124000 C 22:09:36 Temperature Measurement, Probe Number = 4, T = 20.569000 C 22:09:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.57 22:09:36 Integrated Voltage Measurement... 22:09:55 Voltage Offset Correction: v_off_ini = 0.000005120 V, v_off_fin = 0.000006670 V 22:09:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073073 Vs 22:09:55 Integrated Voltage Measurement... 22:10:15 Voltage Offset Correction: v_off_ini = 0.000006006 V, v_off_fin = 0.000003803 V 22:10:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171008865 Vs 22:10:18 Temperature Measurement, Probe Number = 0, T = 20.192000 C 22:10:18 Temperature Measurement, Probe Number = 1, T = 20.115000 C 22:10:19 Temperature Measurement, Probe Number = 2, T = 20.179000 C 22:10:20 Temperature Measurement, Probe Number = 3, T = 20.124000 C 22:10:20 Temperature Measurement, Probe Number = 4, T = 20.393000 C 22:10:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.39 22:10:20 Integrated Voltage Measurement... 22:10:40 Voltage Offset Correction: v_off_ini = 0.000004868 V, v_off_fin = 0.000006877 V 22:10:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071102 Vs 22:10:41 Integrated Voltage Measurement... 22:11:00 Voltage Offset Correction: v_off_ini = 0.000006584 V, v_off_fin = 0.000003887 V 22:11:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996631 Vs 22:11:03 Temperature Measurement, Probe Number = 0, T = 20.197000 C 22:11:04 Temperature Measurement, Probe Number = 1, T = 20.119000 C 22:11:04 Temperature Measurement, Probe Number = 2, T = 20.185000 C 22:11:05 Temperature Measurement, Probe Number = 3, T = 20.128000 C 22:11:06 Temperature Measurement, Probe Number = 4, T = 20.445000 C 22:11:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.45 22:11:06 Integrated Voltage Measurement... 22:11:25 Voltage Offset Correction: v_off_ini = 0.000004619 V, v_off_fin = 0.000007083 V 22:11:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071430 Vs 22:11:26 Integrated Voltage Measurement... 22:11:45 Voltage Offset Correction: v_off_ini = 0.000006201 V, v_off_fin = 0.000003668 V 22:11:45 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171001502 Vs 22:11:48 Temperature Measurement, Probe Number = 0, T = 20.197000 C 22:11:48 Temperature Measurement, Probe Number = 1, T = 20.118000 C 22:11:49 Temperature Measurement, Probe Number = 2, T = 20.185000 C 22:11:50 Temperature Measurement, Probe Number = 3, T = 20.129000 C 22:11:50 Temperature Measurement, Probe Number = 4, T = 20.501000 C 22:11:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.50 22:11:51 Integrated Voltage Measurement... 22:12:10 Voltage Offset Correction: v_off_ini = 0.000004980 V, v_off_fin = 0.000006498 V 22:12:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072714 Vs 22:12:10 Integrated Voltage Measurement... 22:12:29 Voltage Offset Correction: v_off_ini = 0.000006277 V, v_off_fin = 0.000003523 V 22:12:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996945 Vs 22:12:32 Temperature Measurement, Probe Number = 0, T = 20.202000 C 22:12:33 Temperature Measurement, Probe Number = 1, T = 20.124000 C 22:12:34 Temperature Measurement, Probe Number = 2, T = 20.189000 C 22:12:34 Temperature Measurement, Probe Number = 3, T = 20.133000 C 22:12:35 Temperature Measurement, Probe Number = 4, T = 20.521000 C 22:12:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.52 22:12:35 Integrated Voltage Measurement... 22:12:55 Voltage Offset Correction: v_off_ini = 0.000005017 V, v_off_fin = 0.000006832 V 22:12:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078705 Vs 22:12:55 Integrated Voltage Measurement... 22:13:14 Voltage Offset Correction: v_off_ini = 0.000006367 V, v_off_fin = 0.000003671 V 22:13:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990513 Vs 22:13:17 Temperature Measurement, Probe Number = 0, T = 20.196000 C 22:13:18 Temperature Measurement, Probe Number = 1, T = 20.118000 C 22:13:19 Temperature Measurement, Probe Number = 2, T = 20.185000 C 22:13:19 Temperature Measurement, Probe Number = 3, T = 20.127000 C 22:13:20 Temperature Measurement, Probe Number = 4, T = 20.569000 C 22:13:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.57 22:13:20 Integrated Voltage Measurement... 22:13:39 Voltage Offset Correction: v_off_ini = 0.000004784 V, v_off_fin = 0.000006956 V 22:13:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074406 Vs 22:13:40 Integrated Voltage Measurement... 22:13:59 Voltage Offset Correction: v_off_ini = 0.000006211 V, v_off_fin = 0.000003546 V 22:13:59 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170998837 Vs 22:14:02 Temperature Measurement, Probe Number = 0, T = 20.197000 C 22:14:03 Temperature Measurement, Probe Number = 1, T = 20.117000 C 22:14:03 Temperature Measurement, Probe Number = 2, T = 20.183000 C 22:14:04 Temperature Measurement, Probe Number = 3, T = 20.125000 C 22:14:05 Temperature Measurement, Probe Number = 4, T = 20.514000 C 22:14:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.51 22:14:05 Integrated Voltage Measurement... 22:14:24 Voltage Offset Correction: v_off_ini = 0.000004659 V, v_off_fin = 0.000007634 V 22:14:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074407 Vs 22:14:25 Integrated Voltage Measurement... 22:14:44 Voltage Offset Correction: v_off_ini = 0.000006747 V, v_off_fin = 0.000003701 V 22:14:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991953 Vs 22:14:47 Temperature Measurement, Probe Number = 0, T = 20.190000 C 22:14:47 Temperature Measurement, Probe Number = 1, T = 20.112000 C 22:14:48 Temperature Measurement, Probe Number = 2, T = 20.177000 C 22:14:49 Temperature Measurement, Probe Number = 3, T = 20.121000 C 22:14:49 Temperature Measurement, Probe Number = 4, T = 20.465000 C 22:14:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.46 22:14:49 Integrated Voltage Measurement... 22:15:09 Voltage Offset Correction: v_off_ini = 0.000004891 V, v_off_fin = 0.000006316 V 22:15:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074775 Vs 22:15:09 Integrated Voltage Measurement... 22:15:28 Voltage Offset Correction: v_off_ini = 0.000006300 V, v_off_fin = 0.000004024 V 22:15:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995968 Vs 22:15:31 Temperature Measurement, Probe Number = 0, T = 20.194000 C 22:15:32 Temperature Measurement, Probe Number = 1, T = 20.116000 C 22:15:32 Temperature Measurement, Probe Number = 2, T = 20.179000 C 22:15:33 Temperature Measurement, Probe Number = 3, T = 20.123000 C 22:15:34 Temperature Measurement, Probe Number = 4, T = 20.410000 C 22:15:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.41 22:15:34 Integrated Voltage Measurement... 22:15:53 Voltage Offset Correction: v_off_ini = 0.000004768 V, v_off_fin = 0.000007012 V 22:15:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075773 Vs 22:15:54 Integrated Voltage Measurement... 22:16:13 Voltage Offset Correction: v_off_ini = 0.000006014 V, v_off_fin = 0.000003262 V 22:16:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993885 Vs 22:46:16 Temperature Measurement, Probe Number = 0, T = 20.200000 C 22:46:17 Temperature Measurement, Probe Number = 1, T = 20.120000 C 22:46:17 Temperature Measurement, Probe Number = 2, T = 20.185000 C 22:46:18 Temperature Measurement, Probe Number = 3, T = 20.128000 C 22:46:18 Temperature Measurement, Probe Number = 4, T = 20.507000 C 22:46:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.51 22:46:19 Integrated Voltage Measurement... 22:46:38 Voltage Offset Correction: v_off_ini = 0.000005234 V, v_off_fin = 0.000006811 V 22:46:39 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171122771 Vs 22:46:39 Integrated Voltage Measurement... 22:46:58 Voltage Offset Correction: v_off_ini = 0.000006491 V, v_off_fin = 0.000003819 V 22:46:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997823 Vs 22:47:01 Temperature Measurement, Probe Number = 0, T = 20.202000 C 22:47:02 Temperature Measurement, Probe Number = 1, T = 20.122000 C 22:47:02 Temperature Measurement, Probe Number = 2, T = 20.188000 C 22:47:03 Temperature Measurement, Probe Number = 3, T = 20.131000 C 22:47:04 Temperature Measurement, Probe Number = 4, T = 20.548000 C 22:47:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.55 22:47:04 Integrated Voltage Measurement... 22:47:23 Voltage Offset Correction: v_off_ini = 0.000004652 V, v_off_fin = 0.000006843 V 22:47:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073299 Vs 22:47:24 Integrated Voltage Measurement... 22:47:43 Voltage Offset Correction: v_off_ini = 0.000006586 V, v_off_fin = 0.000004000 V 22:47:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994289 Vs 22:47:46 Temperature Measurement, Probe Number = 0, T = 20.201000 C 22:47:46 Temperature Measurement, Probe Number = 1, T = 20.122000 C 22:47:47 Temperature Measurement, Probe Number = 2, T = 20.190000 C 22:47:48 Temperature Measurement, Probe Number = 3, T = 20.132000 C 22:47:48 Temperature Measurement, Probe Number = 4, T = 20.573000 C 22:47:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.57 22:47:49 Integrated Voltage Measurement... 22:48:08 Voltage Offset Correction: v_off_ini = 0.000004325 V, v_off_fin = 0.000007136 V 22:48:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073632 Vs 22:48:08 Integrated Voltage Measurement... 22:48:27 Voltage Offset Correction: v_off_ini = 0.000006718 V, v_off_fin = 0.000004071 V 22:48:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990920 Vs 22:48:30 Temperature Measurement, Probe Number = 0, T = 20.198000 C 22:48:31 Temperature Measurement, Probe Number = 1, T = 20.118000 C 22:48:32 Temperature Measurement, Probe Number = 2, T = 20.183000 C 22:48:32 Temperature Measurement, Probe Number = 3, T = 20.127000 C 22:48:33 Temperature Measurement, Probe Number = 4, T = 20.547000 C 22:48:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.55 22:48:33 Integrated Voltage Measurement... 22:48:52 Voltage Offset Correction: v_off_ini = 0.000004815 V, v_off_fin = 0.000007342 V 22:48:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076390 Vs 22:48:53 Integrated Voltage Measurement... 22:49:12 Voltage Offset Correction: v_off_ini = 0.000006745 V, v_off_fin = 0.000004247 V 22:49:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991153 Vs 22:49:15 Temperature Measurement, Probe Number = 0, T = 20.198000 C 22:49:15 Temperature Measurement, Probe Number = 1, T = 20.116000 C 22:49:16 Temperature Measurement, Probe Number = 2, T = 20.183000 C 22:49:17 Temperature Measurement, Probe Number = 3, T = 20.127000 C 22:49:17 Temperature Measurement, Probe Number = 4, T = 20.513000 C 22:49:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.51 22:49:17 Integrated Voltage Measurement... 22:49:37 Voltage Offset Correction: v_off_ini = 0.000003951 V, v_off_fin = 0.000006650 V 22:49:37 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171071542 Vs 22:49:37 Integrated Voltage Measurement... 22:49:56 Voltage Offset Correction: v_off_ini = 0.000006023 V, v_off_fin = 0.000004561 V 22:49:56 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170998496 Vs 22:49:59 Temperature Measurement, Probe Number = 0, T = 20.198000 C 22:50:00 Temperature Measurement, Probe Number = 1, T = 20.117000 C 22:50:00 Temperature Measurement, Probe Number = 2, T = 20.182000 C 22:50:01 Temperature Measurement, Probe Number = 3, T = 20.123000 C 22:50:02 Temperature Measurement, Probe Number = 4, T = 20.531000 C 22:50:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.53 22:50:02 Integrated Voltage Measurement... 22:50:21 Voltage Offset Correction: v_off_ini = 0.000004606 V, v_off_fin = 0.000006629 V 22:50:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072764 Vs 22:50:21 Integrated Voltage Measurement... 22:50:41 Voltage Offset Correction: v_off_ini = 0.000006417 V, v_off_fin = 0.000003911 V 22:50:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995084 Vs 22:50:44 Temperature Measurement, Probe Number = 0, T = 20.194000 C 22:50:44 Temperature Measurement, Probe Number = 1, T = 20.116000 C 22:50:45 Temperature Measurement, Probe Number = 2, T = 20.177000 C 22:50:46 Temperature Measurement, Probe Number = 3, T = 20.122000 C 22:50:46 Temperature Measurement, Probe Number = 4, T = 20.439000 C 22:50:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.44 22:50:46 Integrated Voltage Measurement... 22:51:06 Voltage Offset Correction: v_off_ini = 0.000004718 V, v_off_fin = 0.000006521 V 22:51:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074861 Vs 22:51:06 Integrated Voltage Measurement... 22:51:26 Voltage Offset Correction: v_off_ini = 0.000006538 V, v_off_fin = 0.000003540 V 22:51:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998029 Vs 22:51:28 Temperature Measurement, Probe Number = 0, T = 20.200000 C 22:51:29 Temperature Measurement, Probe Number = 1, T = 20.119000 C 22:51:30 Temperature Measurement, Probe Number = 2, T = 20.186000 C 22:51:30 Temperature Measurement, Probe Number = 3, T = 20.128000 C 22:51:31 Temperature Measurement, Probe Number = 4, T = 20.498000 C 22:51:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.50 22:51:31 Integrated Voltage Measurement... 22:51:51 Voltage Offset Correction: v_off_ini = 0.000004938 V, v_off_fin = 0.000007123 V 22:51:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078826 Vs 22:51:51 Integrated Voltage Measurement... 22:52:11 Voltage Offset Correction: v_off_ini = 0.000006468 V, v_off_fin = 0.000004732 V 22:52:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992829 Vs 22:52:14 Temperature Measurement, Probe Number = 0, T = 20.196000 C 22:52:14 Temperature Measurement, Probe Number = 1, T = 20.113000 C 22:52:15 Temperature Measurement, Probe Number = 2, T = 20.183000 C 22:52:16 Temperature Measurement, Probe Number = 3, T = 20.124000 C 22:52:16 Temperature Measurement, Probe Number = 4, T = 20.519000 C 22:52:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.52 22:52:17 Integrated Voltage Measurement... 22:52:36 Voltage Offset Correction: v_off_ini = 0.000005022 V, v_off_fin = 0.000006632 V 22:52:36 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171077080 Vs 22:52:36 Integrated Voltage Measurement... 22:52:56 Voltage Offset Correction: v_off_ini = 0.000006232 V, v_off_fin = 0.000003723 V 22:52:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000221 Vs 22:52:59 Temperature Measurement, Probe Number = 0, T = 20.195000 C 22:52:59 Temperature Measurement, Probe Number = 1, T = 20.114000 C 22:53:00 Temperature Measurement, Probe Number = 2, T = 20.179000 C 22:53:01 Temperature Measurement, Probe Number = 3, T = 20.121000 C 22:53:01 Temperature Measurement, Probe Number = 4, T = 20.503000 C 22:53:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.50 22:53:01 Integrated Voltage Measurement... 22:53:21 Voltage Offset Correction: v_off_ini = 0.000004740 V, v_off_fin = 0.000006783 V 22:53:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076462 Vs 22:53:21 Integrated Voltage Measurement... 22:53:40 Voltage Offset Correction: v_off_ini = 0.000006332 V, v_off_fin = 0.000004014 V 22:53:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995099 Vs 23:23:43 Temperature Measurement, Probe Number = 0, T = 20.203000 C 23:23:44 Temperature Measurement, Probe Number = 1, T = 20.120000 C 23:23:45 Temperature Measurement, Probe Number = 2, T = 20.188000 C 23:23:45 Temperature Measurement, Probe Number = 3, T = 20.128000 C 23:23:46 Temperature Measurement, Probe Number = 4, T = 20.570000 C 23:23:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.57 23:23:46 Integrated Voltage Measurement... 23:24:06 Voltage Offset Correction: v_off_ini = 0.000004960 V, v_off_fin = 0.000006988 V 23:24:06 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171120292 Vs 23:24:06 Integrated Voltage Measurement... 23:24:25 Voltage Offset Correction: v_off_ini = 0.000006852 V, v_off_fin = 0.000004211 V 23:24:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998158 Vs 23:24:28 Temperature Measurement, Probe Number = 0, T = 20.198000 C 23:24:29 Temperature Measurement, Probe Number = 1, T = 20.115000 C 23:24:29 Temperature Measurement, Probe Number = 2, T = 20.180000 C 23:24:30 Temperature Measurement, Probe Number = 3, T = 20.121000 C 23:24:31 Temperature Measurement, Probe Number = 4, T = 20.493000 C 23:24:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.49 23:24:31 Integrated Voltage Measurement... 23:24:50 Voltage Offset Correction: v_off_ini = 0.000004682 V, v_off_fin = 0.000007208 V 23:24:50 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171075983 Vs 23:24:50 Integrated Voltage Measurement... 23:25:10 Voltage Offset Correction: v_off_ini = 0.000006853 V, v_off_fin = 0.000004131 V 23:25:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001283 Vs 23:25:13 Temperature Measurement, Probe Number = 0, T = 20.198000 C 23:25:13 Temperature Measurement, Probe Number = 1, T = 20.114000 C 23:25:14 Temperature Measurement, Probe Number = 2, T = 20.181000 C 23:25:15 Temperature Measurement, Probe Number = 3, T = 20.118000 C 23:25:15 Temperature Measurement, Probe Number = 4, T = 20.447000 C 23:25:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.45 23:25:15 Integrated Voltage Measurement... 23:25:35 Voltage Offset Correction: v_off_ini = 0.000004569 V, v_off_fin = 0.000006601 V 23:25:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073681 Vs 23:25:35 Integrated Voltage Measurement... 23:25:54 Voltage Offset Correction: v_off_ini = 0.000006348 V, v_off_fin = 0.000003593 V 23:25:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999910 Vs 23:25:57 Temperature Measurement, Probe Number = 0, T = 20.200000 C 23:25:58 Temperature Measurement, Probe Number = 1, T = 20.119000 C 23:25:58 Temperature Measurement, Probe Number = 2, T = 20.183000 C 23:25:59 Temperature Measurement, Probe Number = 3, T = 20.122000 C 23:26:00 Temperature Measurement, Probe Number = 4, T = 20.414000 C 23:26:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.41 23:26:00 Integrated Voltage Measurement... 23:26:19 Voltage Offset Correction: v_off_ini = 0.000004260 V, v_off_fin = 0.000007038 V 23:26:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171081074 Vs 23:26:20 Integrated Voltage Measurement... 23:26:39 Voltage Offset Correction: v_off_ini = 0.000006807 V, v_off_fin = 0.000004027 V 23:26:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001956 Vs 23:26:42 Temperature Measurement, Probe Number = 0, T = 20.199000 C 23:26:42 Temperature Measurement, Probe Number = 1, T = 20.116000 C 23:26:43 Temperature Measurement, Probe Number = 2, T = 20.182000 C 23:26:44 Temperature Measurement, Probe Number = 3, T = 20.123000 C 23:26:44 Temperature Measurement, Probe Number = 4, T = 20.515000 C 23:26:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.52 23:26:45 Integrated Voltage Measurement... 23:27:04 Voltage Offset Correction: v_off_ini = 0.000004695 V, v_off_fin = 0.000007347 V 23:27:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080332 Vs 23:27:04 Integrated Voltage Measurement... 23:27:23 Voltage Offset Correction: v_off_ini = 0.000007018 V, v_off_fin = 0.000004436 V 23:27:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990689 Vs 23:27:26 Temperature Measurement, Probe Number = 0, T = 20.205000 C 23:27:27 Temperature Measurement, Probe Number = 1, T = 20.121000 C 23:27:28 Temperature Measurement, Probe Number = 2, T = 20.186000 C 23:27:28 Temperature Measurement, Probe Number = 3, T = 20.128000 C 23:27:29 Temperature Measurement, Probe Number = 4, T = 20.587000 C 23:27:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.59 23:27:29 Integrated Voltage Measurement... 23:27:48 Voltage Offset Correction: v_off_ini = 0.000005930 V, v_off_fin = 0.000007552 V 23:27:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171084840 Vs 23:27:49 Integrated Voltage Measurement... 23:28:08 Voltage Offset Correction: v_off_ini = 0.000006652 V, v_off_fin = 0.000004004 V 23:28:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993094 Vs 23:28:11 Temperature Measurement, Probe Number = 0, T = 20.202000 C 23:28:12 Temperature Measurement, Probe Number = 1, T = 20.118000 C 23:28:12 Temperature Measurement, Probe Number = 2, T = 20.185000 C 23:28:13 Temperature Measurement, Probe Number = 3, T = 20.126000 C 23:28:14 Temperature Measurement, Probe Number = 4, T = 20.635000 C 23:28:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.64 23:28:14 Integrated Voltage Measurement... 23:28:33 Voltage Offset Correction: v_off_ini = 0.000005152 V, v_off_fin = 0.000007521 V 23:28:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171084438 Vs 23:28:34 Integrated Voltage Measurement... 23:28:52 Voltage Offset Correction: v_off_ini = 0.000006947 V, v_off_fin = 0.000004393 V 23:28:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989413 Vs 23:28:55 Temperature Measurement, Probe Number = 0, T = 20.202000 C 23:28:56 Temperature Measurement, Probe Number = 1, T = 20.118000 C 23:28:57 Temperature Measurement, Probe Number = 2, T = 20.186000 C 23:28:57 Temperature Measurement, Probe Number = 3, T = 20.124000 C 23:28:58 Temperature Measurement, Probe Number = 4, T = 20.627000 C 23:28:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.63 23:28:58 Integrated Voltage Measurement... 23:29:17 Voltage Offset Correction: v_off_ini = 0.000004668 V, v_off_fin = 0.000007405 V 23:29:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171084791 Vs 23:29:18 Integrated Voltage Measurement... 23:29:38 Voltage Offset Correction: v_off_ini = 0.000007057 V, v_off_fin = 0.000004116 V 23:29:38 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170997728 Vs 23:29:41 Temperature Measurement, Probe Number = 0, T = 20.191000 C 23:29:42 Temperature Measurement, Probe Number = 1, T = 20.111000 C 23:29:42 Temperature Measurement, Probe Number = 2, T = 20.176000 C 23:29:43 Temperature Measurement, Probe Number = 3, T = 20.119000 C 23:29:43 Temperature Measurement, Probe Number = 4, T = 20.495000 C 23:29:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.50 23:29:44 Integrated Voltage Measurement... 23:30:03 Voltage Offset Correction: v_off_ini = 0.000005356 V, v_off_fin = 0.000007434 V 23:30:03 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171075099 Vs 23:30:03 Integrated Voltage Measurement... 23:30:22 Voltage Offset Correction: v_off_ini = 0.000006943 V, v_off_fin = 0.000005038 V 23:30:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992130 Vs 23:30:25 Temperature Measurement, Probe Number = 0, T = 20.202000 C 23:30:26 Temperature Measurement, Probe Number = 1, T = 20.121000 C 23:30:26 Temperature Measurement, Probe Number = 2, T = 20.182000 C 23:30:27 Temperature Measurement, Probe Number = 3, T = 20.125000 C 23:30:28 Temperature Measurement, Probe Number = 4, T = 20.512000 C 23:30:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.51 23:30:28 Integrated Voltage Measurement... 23:30:47 Voltage Offset Correction: v_off_ini = 0.000005013 V, v_off_fin = 0.000007384 V 23:30:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171084150 Vs 23:30:48 Integrated Voltage Measurement... 23:31:07 Voltage Offset Correction: v_off_ini = 0.000006917 V, v_off_fin = 0.000004134 V 23:31:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987661 Vs 00:01:10 Temperature Measurement, Probe Number = 0, T = 20.199000 C 00:01:10 Temperature Measurement, Probe Number = 1, T = 20.119000 C 00:01:11 Temperature Measurement, Probe Number = 2, T = 20.180000 C 00:01:12 Temperature Measurement, Probe Number = 3, T = 20.123000 C 00:01:12 Temperature Measurement, Probe Number = 4, T = 20.543000 C 00:01:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.54 00:01:13 Integrated Voltage Measurement... 00:01:32 Voltage Offset Correction: v_off_ini = 0.000005755 V, v_off_fin = 0.000007232 V 00:01:32 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171121916 Vs 00:01:32 Integrated Voltage Measurement... 00:01:51 Voltage Offset Correction: v_off_ini = 0.000006925 V, v_off_fin = 0.000004403 V 00:01:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994057 Vs 00:01:54 Temperature Measurement, Probe Number = 0, T = 20.198000 C 00:01:55 Temperature Measurement, Probe Number = 1, T = 20.118000 C 00:01:56 Temperature Measurement, Probe Number = 2, T = 20.179000 C 00:01:56 Temperature Measurement, Probe Number = 3, T = 20.123000 C 00:01:57 Temperature Measurement, Probe Number = 4, T = 20.536000 C 00:01:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.54 00:01:57 Integrated Voltage Measurement... 00:02:16 Voltage Offset Correction: v_off_ini = 0.000004589 V, v_off_fin = 0.000006912 V 00:02:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078603 Vs 00:02:17 Integrated Voltage Measurement... 00:02:35 Voltage Offset Correction: v_off_ini = 0.000006353 V, v_off_fin = 0.000004245 V 00:02:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994976 Vs 00:02:38 Temperature Measurement, Probe Number = 0, T = 20.191000 C 00:02:39 Temperature Measurement, Probe Number = 1, T = 20.111000 C 00:02:40 Temperature Measurement, Probe Number = 2, T = 20.172000 C 00:02:40 Temperature Measurement, Probe Number = 3, T = 20.117000 C 00:02:41 Temperature Measurement, Probe Number = 4, T = 20.512000 C 00:02:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.51 00:02:41 Integrated Voltage Measurement... 00:03:00 Voltage Offset Correction: v_off_ini = 0.000004520 V, v_off_fin = 0.000007725 V 00:03:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171085162 Vs 00:03:01 Integrated Voltage Measurement... 00:03:20 Voltage Offset Correction: v_off_ini = 0.000007287 V, v_off_fin = 0.000004225 V 00:03:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990818 Vs 00:03:22 Temperature Measurement, Probe Number = 0, T = 20.193000 C 00:03:23 Temperature Measurement, Probe Number = 1, T = 20.112000 C 00:03:24 Temperature Measurement, Probe Number = 2, T = 20.175000 C 00:03:24 Temperature Measurement, Probe Number = 3, T = 20.118000 C 00:03:25 Temperature Measurement, Probe Number = 4, T = 20.406000 C 00:03:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.41 00:03:25 Integrated Voltage Measurement... 00:03:44 Voltage Offset Correction: v_off_ini = 0.000005145 V, v_off_fin = 0.000007307 V 00:03:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171084639 Vs 00:03:45 Integrated Voltage Measurement... 00:04:04 Voltage Offset Correction: v_off_ini = 0.000007044 V, v_off_fin = 0.000004793 V 00:04:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990765 Vs 00:04:07 Temperature Measurement, Probe Number = 0, T = 20.195000 C 00:04:07 Temperature Measurement, Probe Number = 1, T = 20.112000 C 00:04:08 Temperature Measurement, Probe Number = 2, T = 20.177000 C 00:04:09 Temperature Measurement, Probe Number = 3, T = 20.118000 C 00:04:09 Temperature Measurement, Probe Number = 4, T = 20.491000 C 00:04:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.49 00:04:09 Integrated Voltage Measurement... 00:04:29 Voltage Offset Correction: v_off_ini = 0.000005235 V, v_off_fin = 0.000007666 V 00:04:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171087755 Vs 00:04:29 Integrated Voltage Measurement... 00:04:48 Voltage Offset Correction: v_off_ini = 0.000006617 V, v_off_fin = 0.000004312 V 00:04:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994045 Vs 00:04:51 Temperature Measurement, Probe Number = 0, T = 20.193000 C 00:04:52 Temperature Measurement, Probe Number = 1, T = 20.114000 C 00:04:53 Temperature Measurement, Probe Number = 2, T = 20.173000 C 00:04:53 Temperature Measurement, Probe Number = 3, T = 20.116000 C 00:04:54 Temperature Measurement, Probe Number = 4, T = 20.472000 C 00:04:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.47 00:04:54 Integrated Voltage Measurement... 00:05:13 Voltage Offset Correction: v_off_ini = 0.000005253 V, v_off_fin = 0.000007489 V 00:05:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171082433 Vs 00:05:14 Integrated Voltage Measurement... 00:05:33 Voltage Offset Correction: v_off_ini = 0.000006934 V, v_off_fin = 0.000004143 V 00:05:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992710 Vs 00:05:36 Temperature Measurement, Probe Number = 0, T = 20.196000 C 00:05:36 Temperature Measurement, Probe Number = 1, T = 20.116000 C 00:05:37 Temperature Measurement, Probe Number = 2, T = 20.173000 C 00:05:38 Temperature Measurement, Probe Number = 3, T = 20.115000 C 00:05:38 Temperature Measurement, Probe Number = 4, T = 20.478000 C 00:05:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.48 00:05:39 Integrated Voltage Measurement... 00:05:58 Voltage Offset Correction: v_off_ini = 0.000005303 V, v_off_fin = 0.000007229 V 00:05:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171086228 Vs 00:05:58 Integrated Voltage Measurement... 00:06:17 Voltage Offset Correction: v_off_ini = 0.000006450 V, v_off_fin = 0.000003812 V 00:06:18 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997646 Vs 00:06:20 Temperature Measurement, Probe Number = 0, T = 20.191000 C 00:06:21 Temperature Measurement, Probe Number = 1, T = 20.115000 C 00:06:22 Temperature Measurement, Probe Number = 2, T = 20.172000 C 00:06:22 Temperature Measurement, Probe Number = 3, T = 20.116000 C 00:06:23 Temperature Measurement, Probe Number = 4, T = 20.365000 C 00:06:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.36 00:06:23 Integrated Voltage Measurement... 00:06:43 Voltage Offset Correction: v_off_ini = 0.000004628 V, v_off_fin = 0.000007040 V 00:06:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080878 Vs 00:06:43 Integrated Voltage Measurement... 00:07:02 Voltage Offset Correction: v_off_ini = 0.000006650 V, v_off_fin = 0.000004101 V 00:07:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993244 Vs 00:07:05 Temperature Measurement, Probe Number = 0, T = 20.200000 C 00:07:06 Temperature Measurement, Probe Number = 1, T = 20.121000 C 00:07:06 Temperature Measurement, Probe Number = 2, T = 20.181000 C 00:07:07 Temperature Measurement, Probe Number = 3, T = 20.123000 C 00:07:08 Temperature Measurement, Probe Number = 4, T = 20.374000 C 00:07:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.37 00:07:08 Integrated Voltage Measurement... 00:07:27 Voltage Offset Correction: v_off_ini = 0.000004702 V, v_off_fin = 0.000007048 V 00:07:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171083600 Vs 00:07:27 Integrated Voltage Measurement... 00:07:47 Voltage Offset Correction: v_off_ini = 0.000006978 V, v_off_fin = 0.000004856 V 00:07:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986641 Vs 00:07:50 Temperature Measurement, Probe Number = 0, T = 20.204000 C 00:07:50 Temperature Measurement, Probe Number = 1, T = 20.125000 C 00:07:51 Temperature Measurement, Probe Number = 2, T = 20.182000 C 00:07:52 Temperature Measurement, Probe Number = 3, T = 20.125000 C 00:07:52 Temperature Measurement, Probe Number = 4, T = 20.386000 C 00:07:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.39 00:07:52 Integrated Voltage Measurement... 00:08:12 Voltage Offset Correction: v_off_ini = 0.000005424 V, v_off_fin = 0.000007295 V 00:08:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171087664 Vs 00:08:12 Integrated Voltage Measurement... 00:08:32 Voltage Offset Correction: v_off_ini = 0.000006543 V, v_off_fin = 0.000004533 V 00:08:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993526 Vs 00:38:35 Temperature Measurement, Probe Number = 0, T = 20.196000 C 00:38:36 Temperature Measurement, Probe Number = 1, T = 20.118000 C 00:38:37 Temperature Measurement, Probe Number = 2, T = 20.177000 C 00:38:37 Temperature Measurement, Probe Number = 3, T = 20.122000 C 00:38:38 Temperature Measurement, Probe Number = 4, T = 20.470000 C 00:38:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.47 00:38:38 Integrated Voltage Measurement... 00:38:57 Voltage Offset Correction: v_off_ini = 0.000005258 V, v_off_fin = 0.000007211 V 00:38:57 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171117370 Vs 00:38:58 Integrated Voltage Measurement... 00:39:17 Voltage Offset Correction: v_off_ini = 0.000006300 V, v_off_fin = 0.000002967 V 00:39:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171003712 Vs 00:39:20 Temperature Measurement, Probe Number = 0, T = 20.202000 C 00:39:20 Temperature Measurement, Probe Number = 1, T = 20.122000 C 00:39:21 Temperature Measurement, Probe Number = 2, T = 20.182000 C 00:39:22 Temperature Measurement, Probe Number = 3, T = 20.126000 C 00:39:22 Temperature Measurement, Probe Number = 4, T = 20.564000 C 00:39:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.56 00:39:23 Integrated Voltage Measurement... 00:39:42 Voltage Offset Correction: v_off_ini = 0.000004002 V, v_off_fin = 0.000006294 V 00:39:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070663 Vs 00:39:42 Integrated Voltage Measurement... 00:40:01 Voltage Offset Correction: v_off_ini = 0.000006109 V, v_off_fin = 0.000003535 V 00:40:01 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000645 Vs 00:40:04 Temperature Measurement, Probe Number = 0, T = 20.198000 C 00:40:05 Temperature Measurement, Probe Number = 1, T = 20.118000 C 00:40:05 Temperature Measurement, Probe Number = 2, T = 20.178000 C 00:40:06 Temperature Measurement, Probe Number = 3, T = 20.121000 C 00:40:07 Temperature Measurement, Probe Number = 4, T = 20.587000 C 00:40:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.59 00:40:07 Integrated Voltage Measurement... 00:40:26 Voltage Offset Correction: v_off_ini = 0.000004666 V, v_off_fin = 0.000006819 V 00:40:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075835 Vs 00:40:26 Integrated Voltage Measurement... 00:40:46 Voltage Offset Correction: v_off_ini = 0.000006501 V, v_off_fin = 0.000003568 V 00:40:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999302 Vs 00:40:48 Temperature Measurement, Probe Number = 0, T = 20.192000 C 00:40:49 Temperature Measurement, Probe Number = 1, T = 20.113000 C 00:40:50 Temperature Measurement, Probe Number = 2, T = 20.173000 C 00:40:50 Temperature Measurement, Probe Number = 3, T = 20.116000 C 00:40:51 Temperature Measurement, Probe Number = 4, T = 20.514000 C 00:40:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.51 00:40:51 Integrated Voltage Measurement... 00:41:11 Voltage Offset Correction: v_off_ini = 0.000004785 V, v_off_fin = 0.000007179 V 00:41:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079659 Vs 00:41:11 Integrated Voltage Measurement... 00:41:30 Voltage Offset Correction: v_off_ini = 0.000006575 V, v_off_fin = 0.000003952 V 00:41:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996215 Vs 00:41:33 Temperature Measurement, Probe Number = 0, T = 20.198000 C 00:41:34 Temperature Measurement, Probe Number = 1, T = 20.120000 C 00:41:34 Temperature Measurement, Probe Number = 2, T = 20.176000 C 00:41:35 Temperature Measurement, Probe Number = 3, T = 20.121000 C 00:41:36 Temperature Measurement, Probe Number = 4, T = 20.532000 C 00:41:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.53 00:41:36 Integrated Voltage Measurement... 00:41:55 Voltage Offset Correction: v_off_ini = 0.000004642 V, v_off_fin = 0.000007485 V 00:41:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171087274 Vs 00:41:55 Integrated Voltage Measurement... 00:42:15 Voltage Offset Correction: v_off_ini = 0.000006310 V, v_off_fin = 0.000004248 V 00:42:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996044 Vs 00:42:18 Temperature Measurement, Probe Number = 0, T = 20.202000 C 00:42:18 Temperature Measurement, Probe Number = 1, T = 20.123000 C 00:42:19 Temperature Measurement, Probe Number = 2, T = 20.180000 C 00:42:20 Temperature Measurement, Probe Number = 3, T = 20.124000 C 00:42:20 Temperature Measurement, Probe Number = 4, T = 20.510000 C 00:42:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.51 00:42:21 Integrated Voltage Measurement... 00:42:40 Voltage Offset Correction: v_off_ini = 0.000004495 V, v_off_fin = 0.000006713 V 00:42:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079964 Vs 00:42:41 Integrated Voltage Measurement... 00:43:00 Voltage Offset Correction: v_off_ini = 0.000006672 V, v_off_fin = 0.000003955 V 00:43:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996116 Vs 00:43:03 Temperature Measurement, Probe Number = 0, T = 20.200000 C 00:43:03 Temperature Measurement, Probe Number = 1, T = 20.118000 C 00:43:04 Temperature Measurement, Probe Number = 2, T = 20.183000 C 00:43:05 Temperature Measurement, Probe Number = 3, T = 20.123000 C 00:43:05 Temperature Measurement, Probe Number = 4, T = 20.578000 C 00:43:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.58 00:43:06 Integrated Voltage Measurement... 00:43:25 Voltage Offset Correction: v_off_ini = 0.000005209 V, v_off_fin = 0.000007139 V 00:43:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171084786 Vs 00:43:25 Integrated Voltage Measurement... 00:43:44 Voltage Offset Correction: v_off_ini = 0.000006820 V, v_off_fin = 0.000004134 V 00:43:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994707 Vs 00:43:47 Temperature Measurement, Probe Number = 0, T = 20.197000 C 00:43:48 Temperature Measurement, Probe Number = 1, T = 20.118000 C 00:43:49 Temperature Measurement, Probe Number = 2, T = 20.179000 C 00:43:49 Temperature Measurement, Probe Number = 3, T = 20.122000 C 00:43:50 Temperature Measurement, Probe Number = 4, T = 20.636000 C 00:43:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.64 00:43:50 Integrated Voltage Measurement... 00:44:09 Voltage Offset Correction: v_off_ini = 0.000004885 V, v_off_fin = 0.000007768 V 00:44:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171087570 Vs 00:44:10 Integrated Voltage Measurement... 00:44:29 Voltage Offset Correction: v_off_ini = 0.000006991 V, v_off_fin = 0.000003840 V 00:44:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993036 Vs 00:44:32 Temperature Measurement, Probe Number = 0, T = 20.198000 C 00:44:33 Temperature Measurement, Probe Number = 1, T = 20.118000 C 00:44:33 Temperature Measurement, Probe Number = 2, T = 20.179000 C 00:44:34 Temperature Measurement, Probe Number = 3, T = 20.123000 C 00:44:35 Temperature Measurement, Probe Number = 4, T = 20.654000 C 00:44:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.65 00:44:35 Integrated Voltage Measurement... 00:44:54 Voltage Offset Correction: v_off_ini = 0.000005013 V, v_off_fin = 0.000006884 V 00:44:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171083996 Vs 00:44:54 Integrated Voltage Measurement... 00:45:13 Voltage Offset Correction: v_off_ini = 0.000006453 V, v_off_fin = 0.000003182 V 00:45:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998975 Vs 00:45:16 Temperature Measurement, Probe Number = 0, T = 20.187000 C 00:45:17 Temperature Measurement, Probe Number = 1, T = 20.105000 C 00:45:18 Temperature Measurement, Probe Number = 2, T = 20.169000 C 00:45:18 Temperature Measurement, Probe Number = 3, T = 20.113000 C 00:45:19 Temperature Measurement, Probe Number = 4, T = 20.495000 C 00:45:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.50 00:45:19 Integrated Voltage Measurement... 00:45:39 Voltage Offset Correction: v_off_ini = 0.000004080 V, v_off_fin = 0.000006433 V 00:45:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076269 Vs 00:45:39 Integrated Voltage Measurement... 00:45:58 Voltage Offset Correction: v_off_ini = 0.000005789 V, v_off_fin = 0.000003303 V 00:45:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001496 Vs 01:16:01 Temperature Measurement, Probe Number = 0, T = 20.193000 C 01:16:02 Temperature Measurement, Probe Number = 1, T = 20.111000 C 01:16:03 Temperature Measurement, Probe Number = 2, T = 20.173000 C 01:16:03 Temperature Measurement, Probe Number = 3, T = 20.113000 C 01:16:04 Temperature Measurement, Probe Number = 4, T = 20.460000 C 01:16:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.46 01:16:04 Integrated Voltage Measurement... 01:16:23 Voltage Offset Correction: v_off_ini = 0.000005350 V, v_off_fin = 0.000007117 V 01:16:24 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171123025 Vs 01:16:24 Integrated Voltage Measurement... 01:16:43 Voltage Offset Correction: v_off_ini = 0.000006532 V, v_off_fin = 0.000003653 V 01:16:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996711 Vs 01:16:46 Temperature Measurement, Probe Number = 0, T = 20.200000 C 01:16:47 Temperature Measurement, Probe Number = 1, T = 20.116000 C 01:16:47 Temperature Measurement, Probe Number = 2, T = 20.177000 C 01:16:48 Temperature Measurement, Probe Number = 3, T = 20.116000 C 01:16:49 Temperature Measurement, Probe Number = 4, T = 20.457000 C 01:16:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.46 01:16:49 Integrated Voltage Measurement... 01:17:08 Voltage Offset Correction: v_off_ini = 0.000004829 V, v_off_fin = 0.000006924 V 01:17:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171077162 Vs 01:17:09 Integrated Voltage Measurement... 01:17:28 Voltage Offset Correction: v_off_ini = 0.000006423 V, v_off_fin = 0.000004060 V 01:17:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993864 Vs 01:17:30 Temperature Measurement, Probe Number = 0, T = 20.191000 C 01:17:31 Temperature Measurement, Probe Number = 1, T = 20.114000 C 01:17:32 Temperature Measurement, Probe Number = 2, T = 20.169000 C 01:17:32 Temperature Measurement, Probe Number = 3, T = 20.114000 C 01:17:33 Temperature Measurement, Probe Number = 4, T = 20.453000 C 01:17:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.45 01:17:33 Integrated Voltage Measurement... 01:17:52 Voltage Offset Correction: v_off_ini = 0.000004599 V, v_off_fin = 0.000007033 V 01:17:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075383 Vs 01:17:53 Integrated Voltage Measurement... 01:18:12 Voltage Offset Correction: v_off_ini = 0.000006592 V, v_off_fin = 0.000003258 V 01:18:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999422 Vs 01:18:15 Temperature Measurement, Probe Number = 0, T = 20.200000 C 01:18:16 Temperature Measurement, Probe Number = 1, T = 20.118000 C 01:18:16 Temperature Measurement, Probe Number = 2, T = 20.177000 C 01:18:17 Temperature Measurement, Probe Number = 3, T = 20.118000 C 01:18:18 Temperature Measurement, Probe Number = 4, T = 20.471000 C 01:18:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.47 01:18:18 Integrated Voltage Measurement... 01:18:37 Voltage Offset Correction: v_off_ini = 0.000004531 V, v_off_fin = 0.000006537 V 01:18:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076169 Vs 01:18:38 Integrated Voltage Measurement... 01:18:57 Voltage Offset Correction: v_off_ini = 0.000006339 V, v_off_fin = 0.000003734 V 01:18:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994566 Vs 01:19:00 Temperature Measurement, Probe Number = 0, T = 20.197000 C 01:19:00 Temperature Measurement, Probe Number = 1, T = 20.118000 C 01:19:01 Temperature Measurement, Probe Number = 2, T = 20.176000 C 01:19:02 Temperature Measurement, Probe Number = 3, T = 20.119000 C 01:19:02 Temperature Measurement, Probe Number = 4, T = 20.466000 C 01:19:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.47 01:19:02 Integrated Voltage Measurement... 01:19:22 Voltage Offset Correction: v_off_ini = 0.000004838 V, v_off_fin = 0.000007280 V 01:19:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078315 Vs 01:19:22 Integrated Voltage Measurement... 01:19:42 Voltage Offset Correction: v_off_ini = 0.000006652 V, v_off_fin = 0.000003133 V 01:19:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999333 Vs 01:19:45 Temperature Measurement, Probe Number = 0, T = 20.196000 C 01:19:45 Temperature Measurement, Probe Number = 1, T = 20.118000 C 01:19:46 Temperature Measurement, Probe Number = 2, T = 20.174000 C 01:19:47 Temperature Measurement, Probe Number = 3, T = 20.118000 C 01:19:47 Temperature Measurement, Probe Number = 4, T = 20.491000 C 01:19:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.49 01:19:47 Integrated Voltage Measurement... 01:20:07 Voltage Offset Correction: v_off_ini = 0.000004734 V, v_off_fin = 0.000006646 V 01:20:07 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171068574 Vs 01:20:07 Integrated Voltage Measurement... 01:20:26 Voltage Offset Correction: v_off_ini = 0.000006481 V, v_off_fin = 0.000003380 V 01:20:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997449 Vs 01:20:29 Temperature Measurement, Probe Number = 0, T = 20.198000 C 01:20:30 Temperature Measurement, Probe Number = 1, T = 20.119000 C 01:20:31 Temperature Measurement, Probe Number = 2, T = 20.176000 C 01:20:31 Temperature Measurement, Probe Number = 3, T = 20.119000 C 01:20:32 Temperature Measurement, Probe Number = 4, T = 20.523000 C 01:20:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.52 01:20:32 Integrated Voltage Measurement... 01:20:52 Voltage Offset Correction: v_off_ini = 0.000004429 V, v_off_fin = 0.000007165 V 01:20:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079760 Vs 01:20:52 Integrated Voltage Measurement... 01:21:11 Voltage Offset Correction: v_off_ini = 0.000006599 V, v_off_fin = 0.000003442 V 01:21:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997329 Vs 01:21:14 Temperature Measurement, Probe Number = 0, T = 20.196000 C 01:21:15 Temperature Measurement, Probe Number = 1, T = 20.118000 C 01:21:16 Temperature Measurement, Probe Number = 2, T = 20.173000 C 01:21:16 Temperature Measurement, Probe Number = 3, T = 20.117000 C 01:21:17 Temperature Measurement, Probe Number = 4, T = 20.499000 C 01:21:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.50 01:21:17 Integrated Voltage Measurement... 01:21:36 Voltage Offset Correction: v_off_ini = 0.000004646 V, v_off_fin = 0.000007070 V 01:21:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171068295 Vs 01:21:37 Integrated Voltage Measurement... 01:21:56 Voltage Offset Correction: v_off_ini = 0.000006313 V, v_off_fin = 0.000003054 V 01:21:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998906 Vs 01:21:59 Temperature Measurement, Probe Number = 0, T = 20.198000 C 01:22:00 Temperature Measurement, Probe Number = 1, T = 20.120000 C 01:22:00 Temperature Measurement, Probe Number = 2, T = 20.176000 C 01:22:01 Temperature Measurement, Probe Number = 3, T = 20.120000 C 01:22:01 Temperature Measurement, Probe Number = 4, T = 20.525000 C 01:22:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.52 01:22:02 Integrated Voltage Measurement... 01:22:21 Voltage Offset Correction: v_off_ini = 0.000004275 V, v_off_fin = 0.000006842 V 01:22:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075421 Vs 01:22:21 Integrated Voltage Measurement... 01:22:41 Voltage Offset Correction: v_off_ini = 0.000006300 V, v_off_fin = 0.000003948 V 01:22:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997930 Vs 01:22:44 Temperature Measurement, Probe Number = 0, T = 20.198000 C 01:22:44 Temperature Measurement, Probe Number = 1, T = 20.120000 C 01:22:45 Temperature Measurement, Probe Number = 2, T = 20.173000 C 01:22:46 Temperature Measurement, Probe Number = 3, T = 20.115000 C 01:22:46 Temperature Measurement, Probe Number = 4, T = 20.476000 C 01:22:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.48 01:22:47 Integrated Voltage Measurement... 01:23:06 Voltage Offset Correction: v_off_ini = 0.000004919 V, v_off_fin = 0.000006871 V 01:23:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075852 Vs 01:23:06 Integrated Voltage Measurement... 01:23:25 Voltage Offset Correction: v_off_ini = 0.000006209 V, v_off_fin = 0.000003588 V 01:23:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000006 Vs 01:53:28 Temperature Measurement, Probe Number = 0, T = 20.197000 C 01:53:29 Temperature Measurement, Probe Number = 1, T = 20.119000 C 01:53:30 Temperature Measurement, Probe Number = 2, T = 20.174000 C 01:53:30 Temperature Measurement, Probe Number = 3, T = 20.118000 C 01:53:31 Temperature Measurement, Probe Number = 4, T = 20.386000 C 01:53:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.39 01:53:31 Integrated Voltage Measurement... 01:53:51 Voltage Offset Correction: v_off_ini = 0.000005247 V, v_off_fin = 0.000006993 V 01:53:52 Integrated Voltage Measurement Delta Gap = 0.0040010 m VT = 0.171119599 Vs 01:53:52 Integrated Voltage Measurement... 01:54:11 Voltage Offset Correction: v_off_ini = 0.000006340 V, v_off_fin = 0.000003640 V 01:54:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999315 Vs 01:54:14 Temperature Measurement, Probe Number = 0, T = 20.194000 C 01:54:14 Temperature Measurement, Probe Number = 1, T = 20.114000 C 01:54:15 Temperature Measurement, Probe Number = 2, T = 20.167000 C 01:54:16 Temperature Measurement, Probe Number = 3, T = 20.110000 C 01:54:16 Temperature Measurement, Probe Number = 4, T = 20.355000 C 01:54:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.36 01:54:17 Integrated Voltage Measurement... 01:54:36 Voltage Offset Correction: v_off_ini = 0.000004851 V, v_off_fin = 0.000006806 V 01:54:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075249 Vs 01:54:36 Integrated Voltage Measurement... 01:54:56 Voltage Offset Correction: v_off_ini = 0.000006466 V, v_off_fin = 0.000003745 V 01:54:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171006590 Vs 01:54:59 Temperature Measurement, Probe Number = 0, T = 20.196000 C 01:54:59 Temperature Measurement, Probe Number = 1, T = 20.120000 C 01:55:00 Temperature Measurement, Probe Number = 2, T = 20.170000 C 01:55:01 Temperature Measurement, Probe Number = 3, T = 20.115000 C 01:55:01 Temperature Measurement, Probe Number = 4, T = 20.282000 C 01:55:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.28 01:55:01 Integrated Voltage Measurement... 01:55:21 Voltage Offset Correction: v_off_ini = 0.000004030 V, v_off_fin = 0.000007215 V 01:55:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070031 Vs 01:55:21 Integrated Voltage Measurement... 01:55:41 Voltage Offset Correction: v_off_ini = 0.000005821 V, v_off_fin = 0.000004002 V 01:55:41 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.171006520 Vs 01:55:44 Temperature Measurement, Probe Number = 0, T = 20.196000 C 01:55:44 Temperature Measurement, Probe Number = 1, T = 20.116000 C 01:55:45 Temperature Measurement, Probe Number = 2, T = 20.172000 C 01:55:46 Temperature Measurement, Probe Number = 3, T = 20.113000 C 01:55:46 Temperature Measurement, Probe Number = 4, T = 20.325000 C 01:55:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.32 01:55:47 Integrated Voltage Measurement... 01:56:06 Voltage Offset Correction: v_off_ini = 0.000004667 V, v_off_fin = 0.000006534 V 01:56:06 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171071710 Vs 01:56:06 Integrated Voltage Measurement... 01:56:26 Voltage Offset Correction: v_off_ini = 0.000005836 V, v_off_fin = 0.000003819 V 01:56:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171005513 Vs 01:56:29 Temperature Measurement, Probe Number = 0, T = 20.201000 C 01:56:29 Temperature Measurement, Probe Number = 1, T = 20.120000 C 01:56:30 Temperature Measurement, Probe Number = 2, T = 20.175000 C 01:56:31 Temperature Measurement, Probe Number = 3, T = 20.118000 C 01:56:31 Temperature Measurement, Probe Number = 4, T = 20.417000 C 01:56:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.42 01:56:32 Integrated Voltage Measurement... 01:56:51 Voltage Offset Correction: v_off_ini = 0.000005010 V, v_off_fin = 0.000006830 V 01:56:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080608 Vs 01:56:51 Integrated Voltage Measurement... 01:57:11 Voltage Offset Correction: v_off_ini = 0.000006328 V, v_off_fin = 0.000003091 V 01:57:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171005858 Vs 01:57:14 Temperature Measurement, Probe Number = 0, T = 20.200000 C 01:57:15 Temperature Measurement, Probe Number = 1, T = 20.121000 C 01:57:15 Temperature Measurement, Probe Number = 2, T = 20.171000 C 01:57:16 Temperature Measurement, Probe Number = 3, T = 20.116000 C 01:57:17 Temperature Measurement, Probe Number = 4, T = 20.483000 C 01:57:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.48 01:57:17 Integrated Voltage Measurement... 01:57:36 Voltage Offset Correction: v_off_ini = 0.000004436 V, v_off_fin = 0.000006349 V 01:57:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075331 Vs 01:57:36 Integrated Voltage Measurement... 01:57:56 Voltage Offset Correction: v_off_ini = 0.000006002 V, v_off_fin = 0.000003338 V 01:57:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171007568 Vs 01:57:59 Temperature Measurement, Probe Number = 0, T = 20.202000 C 01:58:00 Temperature Measurement, Probe Number = 1, T = 20.122000 C 01:58:00 Temperature Measurement, Probe Number = 2, T = 20.174000 C 01:58:01 Temperature Measurement, Probe Number = 3, T = 20.117000 C 01:58:02 Temperature Measurement, Probe Number = 4, T = 20.516000 C 01:58:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.52 01:58:02 Integrated Voltage Measurement... 01:58:21 Voltage Offset Correction: v_off_ini = 0.000004746 V, v_off_fin = 0.000007677 V 01:58:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075290 Vs 01:58:22 Integrated Voltage Measurement... 01:58:41 Voltage Offset Correction: v_off_ini = 0.000006731 V, v_off_fin = 0.000003419 V 01:58:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001534 Vs 01:58:44 Temperature Measurement, Probe Number = 0, T = 20.202000 C 01:58:44 Temperature Measurement, Probe Number = 1, T = 20.121000 C 01:58:45 Temperature Measurement, Probe Number = 2, T = 20.176000 C 01:58:46 Temperature Measurement, Probe Number = 3, T = 20.117000 C 01:58:46 Temperature Measurement, Probe Number = 4, T = 20.512000 C 01:58:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.51 01:58:47 Integrated Voltage Measurement... 01:59:06 Voltage Offset Correction: v_off_ini = 0.000004348 V, v_off_fin = 0.000006897 V 01:59:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078357 Vs 01:59:06 Integrated Voltage Measurement... 01:59:25 Voltage Offset Correction: v_off_ini = 0.000006373 V, v_off_fin = 0.000004053 V 01:59:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000113 Vs 01:59:28 Temperature Measurement, Probe Number = 0, T = 20.194000 C 01:59:29 Temperature Measurement, Probe Number = 1, T = 20.116000 C 01:59:30 Temperature Measurement, Probe Number = 2, T = 20.170000 C 01:59:30 Temperature Measurement, Probe Number = 3, T = 20.114000 C 01:59:31 Temperature Measurement, Probe Number = 4, T = 20.480000 C 01:59:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.48 01:59:31 Integrated Voltage Measurement... 01:59:50 Voltage Offset Correction: v_off_ini = 0.000004446 V, v_off_fin = 0.000007359 V 01:59:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171086776 Vs 01:59:51 Integrated Voltage Measurement... 02:00:10 Voltage Offset Correction: v_off_ini = 0.000006653 V, v_off_fin = 0.000004037 V 02:00:10 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997963 Vs 02:00:12 Temperature Measurement, Probe Number = 0, T = 20.199000 C 02:00:13 Temperature Measurement, Probe Number = 1, T = 20.118000 C 02:00:14 Temperature Measurement, Probe Number = 2, T = 20.176000 C 02:00:14 Temperature Measurement, Probe Number = 3, T = 20.118000 C 02:00:15 Temperature Measurement, Probe Number = 4, T = 20.562000 C 02:00:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.56 02:00:15 Integrated Voltage Measurement... 02:00:34 Voltage Offset Correction: v_off_ini = 0.000005032 V, v_off_fin = 0.000007449 V 02:00:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171084873 Vs 02:00:35 Integrated Voltage Measurement... 02:00:54 Voltage Offset Correction: v_off_ini = 0.000006501 V, v_off_fin = 0.000003925 V 02:00:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001053 Vs 02:30:57 Temperature Measurement, Probe Number = 0, T = 20.200000 C 02:30:58 Temperature Measurement, Probe Number = 1, T = 20.119000 C 02:30:59 Temperature Measurement, Probe Number = 2, T = 20.175000 C 02:30:59 Temperature Measurement, Probe Number = 3, T = 20.117000 C 02:31:00 Temperature Measurement, Probe Number = 4, T = 20.308000 C 02:31:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.31 02:31:00 Integrated Voltage Measurement... 02:31:20 Voltage Offset Correction: v_off_ini = 0.000004969 V, v_off_fin = 0.000006615 V 02:31:20 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171115622 Vs 02:31:20 Integrated Voltage Measurement... 02:31:39 Voltage Offset Correction: v_off_ini = 0.000006171 V, v_off_fin = 0.000003710 V 02:31:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002561 Vs 02:31:42 Temperature Measurement, Probe Number = 0, T = 20.207000 C 02:31:43 Temperature Measurement, Probe Number = 1, T = 20.124000 C 02:31:44 Temperature Measurement, Probe Number = 2, T = 20.181000 C 02:31:44 Temperature Measurement, Probe Number = 3, T = 20.122000 C 02:31:45 Temperature Measurement, Probe Number = 4, T = 20.430000 C 02:31:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.43 02:31:45 Integrated Voltage Measurement... 02:32:04 Voltage Offset Correction: v_off_ini = 0.000004327 V, v_off_fin = 0.000007215 V 02:32:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078458 Vs 02:32:05 Integrated Voltage Measurement... 02:32:24 Voltage Offset Correction: v_off_ini = 0.000006202 V, v_off_fin = 0.000003262 V 02:32:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171003645 Vs 02:32:27 Temperature Measurement, Probe Number = 0, T = 20.207000 C 02:32:27 Temperature Measurement, Probe Number = 1, T = 20.128000 C 02:32:28 Temperature Measurement, Probe Number = 2, T = 20.179000 C 02:32:29 Temperature Measurement, Probe Number = 3, T = 20.122000 C 02:32:29 Temperature Measurement, Probe Number = 4, T = 20.443000 C 02:32:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.44 02:32:30 Integrated Voltage Measurement... 02:32:49 Voltage Offset Correction: v_off_ini = 0.000004379 V, v_off_fin = 0.000006752 V 02:32:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078306 Vs 02:32:50 Integrated Voltage Measurement... 02:33:09 Voltage Offset Correction: v_off_ini = 0.000006005 V, v_off_fin = 0.000003568 V 02:33:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171010064 Vs 02:33:12 Temperature Measurement, Probe Number = 0, T = 20.204000 C 02:33:13 Temperature Measurement, Probe Number = 1, T = 20.124000 C 02:33:14 Temperature Measurement, Probe Number = 2, T = 20.180000 C 02:33:14 Temperature Measurement, Probe Number = 3, T = 20.120000 C 02:33:15 Temperature Measurement, Probe Number = 4, T = 20.508000 C 02:33:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.51 02:33:15 Integrated Voltage Measurement... 02:33:34 Voltage Offset Correction: v_off_ini = 0.000004378 V, v_off_fin = 0.000006941 V 02:33:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071008 Vs 02:33:35 Integrated Voltage Measurement... 02:33:54 Voltage Offset Correction: v_off_ini = 0.000006029 V, v_off_fin = 0.000003300 V 02:33:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171010290 Vs 02:33:57 Temperature Measurement, Probe Number = 0, T = 20.195000 C 02:33:58 Temperature Measurement, Probe Number = 1, T = 20.116000 C 02:33:58 Temperature Measurement, Probe Number = 2, T = 20.170000 C 02:33:59 Temperature Measurement, Probe Number = 3, T = 20.113000 C 02:34:00 Temperature Measurement, Probe Number = 4, T = 20.414000 C 02:34:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.41 02:34:00 Integrated Voltage Measurement... 02:34:19 Voltage Offset Correction: v_off_ini = 0.000004197 V, v_off_fin = 0.000007047 V 02:34:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171069446 Vs 02:34:20 Integrated Voltage Measurement... 02:34:39 Voltage Offset Correction: v_off_ini = 0.000006454 V, v_off_fin = 0.000003702 V 02:34:39 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170999429 Vs 02:34:42 Temperature Measurement, Probe Number = 0, T = 20.196000 C 02:34:42 Temperature Measurement, Probe Number = 1, T = 20.118000 C 02:34:43 Temperature Measurement, Probe Number = 2, T = 20.169000 C 02:34:44 Temperature Measurement, Probe Number = 3, T = 20.113000 C 02:34:44 Temperature Measurement, Probe Number = 4, T = 20.354000 C 02:34:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.35 02:34:45 Integrated Voltage Measurement... 02:35:04 Voltage Offset Correction: v_off_ini = 0.000004668 V, v_off_fin = 0.000007145 V 02:35:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079089 Vs 02:35:04 Integrated Voltage Measurement... 02:35:23 Voltage Offset Correction: v_off_ini = 0.000006671 V, v_off_fin = 0.000003656 V 02:35:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997293 Vs 02:35:26 Temperature Measurement, Probe Number = 0, T = 20.199000 C 02:35:27 Temperature Measurement, Probe Number = 1, T = 20.116000 C 02:35:28 Temperature Measurement, Probe Number = 2, T = 20.168000 C 02:35:28 Temperature Measurement, Probe Number = 3, T = 20.108000 C 02:35:29 Temperature Measurement, Probe Number = 4, T = 20.337000 C 02:35:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.34 02:35:29 Integrated Voltage Measurement... 02:35:49 Voltage Offset Correction: v_off_ini = 0.000004685 V, v_off_fin = 0.000006811 V 02:35:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073659 Vs 02:35:49 Integrated Voltage Measurement... 02:36:08 Voltage Offset Correction: v_off_ini = 0.000006141 V, v_off_fin = 0.000003840 V 02:36:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998210 Vs 02:36:11 Temperature Measurement, Probe Number = 0, T = 20.196000 C 02:36:12 Temperature Measurement, Probe Number = 1, T = 20.115000 C 02:36:13 Temperature Measurement, Probe Number = 2, T = 20.167000 C 02:36:13 Temperature Measurement, Probe Number = 3, T = 20.107000 C 02:36:14 Temperature Measurement, Probe Number = 4, T = 20.214000 C 02:36:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.21 02:36:14 Integrated Voltage Measurement... 02:36:33 Voltage Offset Correction: v_off_ini = 0.000004851 V, v_off_fin = 0.000007011 V 02:36:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075863 Vs 02:36:34 Integrated Voltage Measurement... 02:36:53 Voltage Offset Correction: v_off_ini = 0.000006360 V, v_off_fin = 0.000003148 V 02:36:54 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171008130 Vs 02:36:56 Temperature Measurement, Probe Number = 0, T = 20.200000 C 02:36:57 Temperature Measurement, Probe Number = 1, T = 20.116000 C 02:36:58 Temperature Measurement, Probe Number = 2, T = 20.171000 C 02:36:58 Temperature Measurement, Probe Number = 3, T = 20.111000 C 02:36:59 Temperature Measurement, Probe Number = 4, T = 20.309000 C 02:36:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.31 02:36:59 Integrated Voltage Measurement... 02:37:19 Voltage Offset Correction: v_off_ini = 0.000004368 V, v_off_fin = 0.000006937 V 02:37:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074307 Vs 02:37:19 Integrated Voltage Measurement... 02:37:39 Voltage Offset Correction: v_off_ini = 0.000005913 V, v_off_fin = 0.000003613 V 02:37:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171007001 Vs 02:37:41 Temperature Measurement, Probe Number = 0, T = 20.192000 C 02:37:42 Temperature Measurement, Probe Number = 1, T = 20.105000 C 02:37:43 Temperature Measurement, Probe Number = 2, T = 20.168000 C 02:37:43 Temperature Measurement, Probe Number = 3, T = 20.106000 C 02:37:44 Temperature Measurement, Probe Number = 4, T = 20.323000 C 02:37:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.32 02:37:44 Integrated Voltage Measurement... 02:38:04 Voltage Offset Correction: v_off_ini = 0.000004071 V, v_off_fin = 0.000006680 V 02:38:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074145 Vs 02:38:05 Integrated Voltage Measurement... 02:38:24 Voltage Offset Correction: v_off_ini = 0.000006061 V, v_off_fin = 0.000003882 V 02:38:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999427 Vs 03:08:27 Temperature Measurement, Probe Number = 0, T = 20.190000 C 03:08:28 Temperature Measurement, Probe Number = 1, T = 20.111000 C 03:08:28 Temperature Measurement, Probe Number = 2, T = 20.167000 C 03:08:29 Temperature Measurement, Probe Number = 3, T = 20.111000 C 03:08:30 Temperature Measurement, Probe Number = 4, T = 20.438000 C 03:08:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.44 03:08:30 Integrated Voltage Measurement... 03:08:49 Voltage Offset Correction: v_off_ini = 0.000005187 V, v_off_fin = 0.000006537 V 03:08:49 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171122974 Vs 03:08:49 Integrated Voltage Measurement... 03:09:09 Voltage Offset Correction: v_off_ini = 0.000006399 V, v_off_fin = 0.000003853 V 03:09:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171003424 Vs 03:09:11 Temperature Measurement, Probe Number = 0, T = 20.196000 C 03:09:12 Temperature Measurement, Probe Number = 1, T = 20.119000 C 03:09:13 Temperature Measurement, Probe Number = 2, T = 20.169000 C 03:09:13 Temperature Measurement, Probe Number = 3, T = 20.113000 C 03:09:14 Temperature Measurement, Probe Number = 4, T = 20.372000 C 03:09:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.37 03:09:14 Integrated Voltage Measurement... 03:09:33 Voltage Offset Correction: v_off_ini = 0.000003948 V, v_off_fin = 0.000007587 V 03:09:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080436 Vs 03:09:34 Integrated Voltage Measurement... 03:09:53 Voltage Offset Correction: v_off_ini = 0.000007026 V, v_off_fin = 0.000004176 V 03:09:53 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994039 Vs 03:09:56 Temperature Measurement, Probe Number = 0, T = 20.204000 C 03:09:56 Temperature Measurement, Probe Number = 1, T = 20.124000 C 03:09:57 Temperature Measurement, Probe Number = 2, T = 20.178000 C 03:09:58 Temperature Measurement, Probe Number = 3, T = 20.121000 C 03:09:58 Temperature Measurement, Probe Number = 4, T = 20.393000 C 03:09:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.39 03:09:59 Integrated Voltage Measurement... 03:10:18 Voltage Offset Correction: v_off_ini = 0.000005027 V, v_off_fin = 0.000007109 V 03:10:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080343 Vs 03:10:18 Integrated Voltage Measurement... 03:10:38 Voltage Offset Correction: v_off_ini = 0.000006846 V, v_off_fin = 0.000003916 V 03:10:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000890 Vs 03:10:41 Temperature Measurement, Probe Number = 0, T = 20.205000 C 03:10:41 Temperature Measurement, Probe Number = 1, T = 20.122000 C 03:10:42 Temperature Measurement, Probe Number = 2, T = 20.177000 C 03:10:43 Temperature Measurement, Probe Number = 3, T = 20.119000 C 03:10:43 Temperature Measurement, Probe Number = 4, T = 20.501000 C 03:10:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.50 03:10:43 Integrated Voltage Measurement... 03:11:03 Voltage Offset Correction: v_off_ini = 0.000004797 V, v_off_fin = 0.000007363 V 03:11:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171081394 Vs 03:11:03 Integrated Voltage Measurement... 03:11:22 Voltage Offset Correction: v_off_ini = 0.000006356 V, v_off_fin = 0.000004295 V 03:11:22 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170999073 Vs 03:11:25 Temperature Measurement, Probe Number = 0, T = 20.207000 C 03:11:26 Temperature Measurement, Probe Number = 1, T = 20.125000 C 03:11:26 Temperature Measurement, Probe Number = 2, T = 20.178000 C 03:11:27 Temperature Measurement, Probe Number = 3, T = 20.122000 C 03:11:28 Temperature Measurement, Probe Number = 4, T = 20.554000 C 03:11:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.55 03:11:28 Integrated Voltage Measurement... 03:11:47 Voltage Offset Correction: v_off_ini = 0.000005219 V, v_off_fin = 0.000007248 V 03:11:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171083973 Vs 03:11:47 Integrated Voltage Measurement... 03:12:07 Voltage Offset Correction: v_off_ini = 0.000007119 V, v_off_fin = 0.000004168 V 03:12:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002838 Vs 03:12:09 Temperature Measurement, Probe Number = 0, T = 20.207000 C 03:12:10 Temperature Measurement, Probe Number = 1, T = 20.121000 C 03:12:11 Temperature Measurement, Probe Number = 2, T = 20.181000 C 03:12:11 Temperature Measurement, Probe Number = 3, T = 20.121000 C 03:12:12 Temperature Measurement, Probe Number = 4, T = 20.629000 C 03:12:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.63 03:12:12 Integrated Voltage Measurement... 03:12:32 Voltage Offset Correction: v_off_ini = 0.000004927 V, v_off_fin = 0.000007747 V 03:12:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171088743 Vs 03:12:32 Integrated Voltage Measurement... 03:12:51 Voltage Offset Correction: v_off_ini = 0.000007506 V, v_off_fin = 0.000004013 V 03:12:51 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170998510 Vs 03:12:54 Temperature Measurement, Probe Number = 0, T = 20.205000 C 03:12:55 Temperature Measurement, Probe Number = 1, T = 20.121000 C 03:12:55 Temperature Measurement, Probe Number = 2, T = 20.181000 C 03:12:56 Temperature Measurement, Probe Number = 3, T = 20.121000 C 03:12:57 Temperature Measurement, Probe Number = 4, T = 20.673000 C 03:12:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.67 03:12:57 Integrated Voltage Measurement... 03:13:16 Voltage Offset Correction: v_off_ini = 0.000005300 V, v_off_fin = 0.000007546 V 03:13:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171090292 Vs 03:13:17 Integrated Voltage Measurement... 03:13:36 Voltage Offset Correction: v_off_ini = 0.000006790 V, v_off_fin = 0.000003797 V 03:13:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170996808 Vs 03:13:39 Temperature Measurement, Probe Number = 0, T = 20.205000 C 03:13:39 Temperature Measurement, Probe Number = 1, T = 20.121000 C 03:13:40 Temperature Measurement, Probe Number = 2, T = 20.180000 C 03:13:41 Temperature Measurement, Probe Number = 3, T = 20.121000 C 03:13:41 Temperature Measurement, Probe Number = 4, T = 20.657000 C 03:13:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.66 03:13:42 Integrated Voltage Measurement... 03:14:01 Voltage Offset Correction: v_off_ini = 0.000005533 V, v_off_fin = 0.000008010 V 03:14:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171089779 Vs 03:14:02 Integrated Voltage Measurement... 03:14:21 Voltage Offset Correction: v_off_ini = 0.000007275 V, v_off_fin = 0.000004544 V 03:14:21 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170995201 Vs 03:14:24 Temperature Measurement, Probe Number = 0, T = 20.204000 C 03:14:24 Temperature Measurement, Probe Number = 1, T = 20.120000 C 03:14:25 Temperature Measurement, Probe Number = 2, T = 20.176000 C 03:14:26 Temperature Measurement, Probe Number = 3, T = 20.117000 C 03:14:26 Temperature Measurement, Probe Number = 4, T = 20.640000 C 03:14:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.64 03:14:27 Integrated Voltage Measurement... 03:14:46 Voltage Offset Correction: v_off_ini = 0.000005508 V, v_off_fin = 0.000007703 V 03:14:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171090793 Vs 03:14:46 Integrated Voltage Measurement... 03:15:05 Voltage Offset Correction: v_off_ini = 0.000007207 V, v_off_fin = 0.000003649 V 03:15:05 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994348 Vs 03:15:08 Temperature Measurement, Probe Number = 0, T = 20.199000 C 03:15:09 Temperature Measurement, Probe Number = 1, T = 20.119000 C 03:15:10 Temperature Measurement, Probe Number = 2, T = 20.169000 C 03:15:10 Temperature Measurement, Probe Number = 3, T = 20.114000 C 03:15:11 Temperature Measurement, Probe Number = 4, T = 20.511000 C 03:15:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.51 03:15:11 Integrated Voltage Measurement... 03:15:30 Voltage Offset Correction: v_off_ini = 0.000004820 V, v_off_fin = 0.000007748 V 03:15:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171086068 Vs 03:15:31 Integrated Voltage Measurement... 03:15:50 Voltage Offset Correction: v_off_ini = 0.000007075 V, v_off_fin = 0.000003822 V 03:15:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997461 Vs 03:45:53 Temperature Measurement, Probe Number = 0, T = 20.197000 C 03:45:54 Temperature Measurement, Probe Number = 1, T = 20.116000 C 03:45:55 Temperature Measurement, Probe Number = 2, T = 20.169000 C 03:45:55 Temperature Measurement, Probe Number = 3, T = 20.110000 C 03:45:56 Temperature Measurement, Probe Number = 4, T = 20.473000 C 03:45:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.47 03:45:56 Integrated Voltage Measurement... 03:46:15 Voltage Offset Correction: v_off_ini = 0.000005665 V, v_off_fin = 0.000007021 V 03:46:16 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171121311 Vs 03:46:16 Integrated Voltage Measurement... 03:46:35 Voltage Offset Correction: v_off_ini = 0.000006047 V, v_off_fin = 0.000003893 V 03:46:35 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171009616 Vs 03:46:38 Temperature Measurement, Probe Number = 0, T = 20.195000 C 03:46:38 Temperature Measurement, Probe Number = 1, T = 20.116000 C 03:46:39 Temperature Measurement, Probe Number = 2, T = 20.170000 C 03:46:40 Temperature Measurement, Probe Number = 3, T = 20.112000 C 03:46:40 Temperature Measurement, Probe Number = 4, T = 20.494000 C 03:46:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.49 03:46:41 Integrated Voltage Measurement... 03:47:00 Voltage Offset Correction: v_off_ini = 0.000005135 V, v_off_fin = 0.000007424 V 03:47:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171082017 Vs 03:47:00 Integrated Voltage Measurement... 03:47:19 Voltage Offset Correction: v_off_ini = 0.000006577 V, v_off_fin = 0.000003039 V 03:47:20 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171006955 Vs 03:47:22 Temperature Measurement, Probe Number = 0, T = 20.189000 C 03:47:23 Temperature Measurement, Probe Number = 1, T = 20.112000 C 03:47:24 Temperature Measurement, Probe Number = 2, T = 20.165000 C 03:47:24 Temperature Measurement, Probe Number = 3, T = 20.109000 C 03:47:25 Temperature Measurement, Probe Number = 4, T = 20.452000 C 03:47:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.45 03:47:25 Integrated Voltage Measurement... 03:47:44 Voltage Offset Correction: v_off_ini = 0.000004112 V, v_off_fin = 0.000006646 V 03:47:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171075936 Vs 03:47:45 Integrated Voltage Measurement... 03:48:04 Voltage Offset Correction: v_off_ini = 0.000006029 V, v_off_fin = 0.000003086 V 03:48:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171010909 Vs 03:48:07 Temperature Measurement, Probe Number = 0, T = 20.195000 C 03:48:08 Temperature Measurement, Probe Number = 1, T = 20.119000 C 03:48:08 Temperature Measurement, Probe Number = 2, T = 20.166000 C 03:48:09 Temperature Measurement, Probe Number = 3, T = 20.113000 C 03:48:10 Temperature Measurement, Probe Number = 4, T = 20.387000 C 03:48:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.39 03:48:10 Integrated Voltage Measurement... 03:48:29 Voltage Offset Correction: v_off_ini = 0.000004213 V, v_off_fin = 0.000006907 V 03:48:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076054 Vs 03:48:29 Integrated Voltage Measurement... 03:48:48 Voltage Offset Correction: v_off_ini = 0.000006259 V, v_off_fin = 0.000002733 V 03:48:49 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171008370 Vs 03:48:51 Temperature Measurement, Probe Number = 0, T = 20.199000 C 03:48:52 Temperature Measurement, Probe Number = 1, T = 20.119000 C 03:48:53 Temperature Measurement, Probe Number = 2, T = 20.168000 C 03:48:53 Temperature Measurement, Probe Number = 3, T = 20.111000 C 03:48:54 Temperature Measurement, Probe Number = 4, T = 20.398000 C 03:48:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.40 03:48:54 Integrated Voltage Measurement... 03:49:13 Voltage Offset Correction: v_off_ini = 0.000004160 V, v_off_fin = 0.000006940 V 03:49:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079658 Vs 03:49:14 Integrated Voltage Measurement... 03:49:33 Voltage Offset Correction: v_off_ini = 0.000006565 V, v_off_fin = 0.000003130 V 03:49:33 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171005206 Vs 03:49:36 Temperature Measurement, Probe Number = 0, T = 20.201000 C 03:49:37 Temperature Measurement, Probe Number = 1, T = 20.122000 C 03:49:37 Temperature Measurement, Probe Number = 2, T = 20.173000 C 03:49:38 Temperature Measurement, Probe Number = 3, T = 20.115000 C 03:49:39 Temperature Measurement, Probe Number = 4, T = 20.512000 C 03:49:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.51 03:49:39 Integrated Voltage Measurement... 03:49:58 Voltage Offset Correction: v_off_ini = 0.000004502 V, v_off_fin = 0.000006672 V 03:49:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171077431 Vs 03:49:59 Integrated Voltage Measurement... 03:50:18 Voltage Offset Correction: v_off_ini = 0.000006250 V, v_off_fin = 0.000003246 V 03:50:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171006873 Vs 03:50:20 Temperature Measurement, Probe Number = 0, T = 20.204000 C 03:50:21 Temperature Measurement, Probe Number = 1, T = 20.120000 C 03:50:22 Temperature Measurement, Probe Number = 2, T = 20.178000 C 03:50:22 Temperature Measurement, Probe Number = 3, T = 20.116000 C 03:50:23 Temperature Measurement, Probe Number = 4, T = 20.589000 C 03:50:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.59 03:50:23 Integrated Voltage Measurement... 03:50:43 Voltage Offset Correction: v_off_ini = 0.000004304 V, v_off_fin = 0.000007252 V 03:50:43 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171083543 Vs 03:50:44 Integrated Voltage Measurement... 03:51:03 Voltage Offset Correction: v_off_ini = 0.000006545 V, v_off_fin = 0.000003757 V 03:51:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995697 Vs 03:51:06 Temperature Measurement, Probe Number = 0, T = 20.200000 C 03:51:06 Temperature Measurement, Probe Number = 1, T = 20.118000 C 03:51:07 Temperature Measurement, Probe Number = 2, T = 20.174000 C 03:51:08 Temperature Measurement, Probe Number = 3, T = 20.111000 C 03:51:08 Temperature Measurement, Probe Number = 4, T = 20.598000 C 03:51:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.60 03:51:08 Integrated Voltage Measurement... 03:51:28 Voltage Offset Correction: v_off_ini = 0.000005861 V, v_off_fin = 0.000008117 V 03:51:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171095209 Vs 03:51:29 Integrated Voltage Measurement... 03:51:48 Voltage Offset Correction: v_off_ini = 0.000006668 V, v_off_fin = 0.000004253 V 03:51:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000121 Vs 03:51:51 Temperature Measurement, Probe Number = 0, T = 20.196000 C 03:51:51 Temperature Measurement, Probe Number = 1, T = 20.120000 C 03:51:52 Temperature Measurement, Probe Number = 2, T = 20.167000 C 03:51:53 Temperature Measurement, Probe Number = 3, T = 20.111000 C 03:51:53 Temperature Measurement, Probe Number = 4, T = 20.510000 C 03:51:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.51 03:51:53 Integrated Voltage Measurement... 03:52:13 Voltage Offset Correction: v_off_ini = 0.000004812 V, v_off_fin = 0.000006356 V 03:52:14 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171080948 Vs 03:52:14 Integrated Voltage Measurement... 03:52:33 Voltage Offset Correction: v_off_ini = 0.000006271 V, v_off_fin = 0.000003323 V 03:52:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171005823 Vs 03:52:36 Temperature Measurement, Probe Number = 0, T = 20.199000 C 03:52:36 Temperature Measurement, Probe Number = 1, T = 20.120000 C 03:52:37 Temperature Measurement, Probe Number = 2, T = 20.172000 C 03:52:38 Temperature Measurement, Probe Number = 3, T = 20.114000 C 03:52:38 Temperature Measurement, Probe Number = 4, T = 20.579000 C 03:52:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.58 03:52:39 Integrated Voltage Measurement... 03:52:58 Voltage Offset Correction: v_off_ini = 0.000004112 V, v_off_fin = 0.000007092 V 03:52:58 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171084148 Vs 03:52:58 Integrated Voltage Measurement... 03:53:18 Voltage Offset Correction: v_off_ini = 0.000006447 V, v_off_fin = 0.000003637 V 03:53:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171006783 Vs 04:23:20 Temperature Measurement, Probe Number = 0, T = 20.199000 C 04:23:21 Temperature Measurement, Probe Number = 1, T = 20.119000 C 04:23:22 Temperature Measurement, Probe Number = 2, T = 20.172000 C 04:23:23 Temperature Measurement, Probe Number = 3, T = 20.114000 C 04:23:23 Temperature Measurement, Probe Number = 4, T = 20.401000 C 04:23:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.40 04:23:24 Integrated Voltage Measurement... 04:23:43 Voltage Offset Correction: v_off_ini = 0.000005770 V, v_off_fin = 0.000006980 V 04:23:43 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171129362 Vs 04:23:43 Integrated Voltage Measurement... 04:24:02 Voltage Offset Correction: v_off_ini = 0.000006937 V, v_off_fin = 0.000003848 V 04:24:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002111 Vs 04:24:05 Temperature Measurement, Probe Number = 0, T = 20.202000 C 04:24:06 Temperature Measurement, Probe Number = 1, T = 20.119000 C 04:24:07 Temperature Measurement, Probe Number = 2, T = 20.176000 C 04:24:07 Temperature Measurement, Probe Number = 3, T = 20.116000 C 04:24:08 Temperature Measurement, Probe Number = 4, T = 20.409000 C 04:24:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.41 04:24:08 Integrated Voltage Measurement... 04:24:27 Voltage Offset Correction: v_off_ini = 0.000004939 V, v_off_fin = 0.000007342 V 04:24:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171084447 Vs 04:24:28 Integrated Voltage Measurement... 04:24:47 Voltage Offset Correction: v_off_ini = 0.000006866 V, v_off_fin = 0.000003642 V 04:24:47 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171002425 Vs 04:24:50 Temperature Measurement, Probe Number = 0, T = 20.202000 C 04:24:50 Temperature Measurement, Probe Number = 1, T = 20.122000 C 04:24:51 Temperature Measurement, Probe Number = 2, T = 20.173000 C 04:24:52 Temperature Measurement, Probe Number = 3, T = 20.115000 C 04:24:52 Temperature Measurement, Probe Number = 4, T = 20.346000 C 04:24:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.35 04:24:53 Integrated Voltage Measurement... 04:25:12 Voltage Offset Correction: v_off_ini = 0.000005007 V, v_off_fin = 0.000007741 V 04:25:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171086291 Vs 04:25:12 Integrated Voltage Measurement... 04:25:31 Voltage Offset Correction: v_off_ini = 0.000006631 V, v_off_fin = 0.000003281 V 04:25:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170998669 Vs 04:25:34 Temperature Measurement, Probe Number = 0, T = 20.205000 C 04:25:35 Temperature Measurement, Probe Number = 1, T = 20.122000 C 04:25:36 Temperature Measurement, Probe Number = 2, T = 20.173000 C 04:25:36 Temperature Measurement, Probe Number = 3, T = 20.114000 C 04:25:37 Temperature Measurement, Probe Number = 4, T = 20.369000 C 04:25:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.37 04:25:37 Integrated Voltage Measurement... 04:25:56 Voltage Offset Correction: v_off_ini = 0.000003797 V, v_off_fin = 0.000007089 V 04:25:56 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171077359 Vs 04:25:56 Integrated Voltage Measurement... 04:26:16 Voltage Offset Correction: v_off_ini = 0.000006464 V, v_off_fin = 0.000003996 V 04:26:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171004297 Vs 04:26:19 Temperature Measurement, Probe Number = 0, T = 20.204000 C 04:26:19 Temperature Measurement, Probe Number = 1, T = 20.124000 C 04:26:20 Temperature Measurement, Probe Number = 2, T = 20.174000 C 04:26:21 Temperature Measurement, Probe Number = 3, T = 20.116000 C 04:26:21 Temperature Measurement, Probe Number = 4, T = 20.432000 C 04:26:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.43 04:26:21 Integrated Voltage Measurement... 04:26:41 Voltage Offset Correction: v_off_ini = 0.000004739 V, v_off_fin = 0.000007223 V 04:26:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080387 Vs 04:26:41 Integrated Voltage Measurement... 04:27:01 Voltage Offset Correction: v_off_ini = 0.000006621 V, v_off_fin = 0.000003660 V 04:27:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002854 Vs 04:27:03 Temperature Measurement, Probe Number = 0, T = 20.207000 C 04:27:04 Temperature Measurement, Probe Number = 1, T = 20.125000 C 04:27:05 Temperature Measurement, Probe Number = 2, T = 20.177000 C 04:27:05 Temperature Measurement, Probe Number = 3, T = 20.118000 C 04:27:06 Temperature Measurement, Probe Number = 4, T = 20.532000 C 04:27:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.53 04:27:06 Integrated Voltage Measurement... 04:27:26 Voltage Offset Correction: v_off_ini = 0.000004541 V, v_off_fin = 0.000006941 V 04:27:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171083040 Vs 04:27:26 Integrated Voltage Measurement... 04:27:46 Voltage Offset Correction: v_off_ini = 0.000006721 V, v_off_fin = 0.000004029 V 04:27:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996030 Vs 04:27:49 Temperature Measurement, Probe Number = 0, T = 20.203000 C 04:27:49 Temperature Measurement, Probe Number = 1, T = 20.122000 C 04:27:50 Temperature Measurement, Probe Number = 2, T = 20.174000 C 04:27:50 Temperature Measurement, Probe Number = 3, T = 20.116000 C 04:27:51 Temperature Measurement, Probe Number = 4, T = 20.560000 C 04:27:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.56 04:27:51 Integrated Voltage Measurement... 04:28:11 Voltage Offset Correction: v_off_ini = 0.000004053 V, v_off_fin = 0.000007205 V 04:28:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080432 Vs 04:28:11 Integrated Voltage Measurement... 04:28:30 Voltage Offset Correction: v_off_ini = 0.000006663 V, v_off_fin = 0.000003138 V 04:28:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000077 Vs 04:28:33 Temperature Measurement, Probe Number = 0, T = 20.204000 C 04:28:34 Temperature Measurement, Probe Number = 1, T = 20.128000 C 04:28:34 Temperature Measurement, Probe Number = 2, T = 20.175000 C 04:28:35 Temperature Measurement, Probe Number = 3, T = 20.119000 C 04:28:36 Temperature Measurement, Probe Number = 4, T = 20.573000 C 04:28:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.57 04:28:36 Integrated Voltage Measurement... 04:28:56 Voltage Offset Correction: v_off_ini = 0.000005259 V, v_off_fin = 0.000007817 V 04:28:56 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171089304 Vs 04:28:56 Integrated Voltage Measurement... 04:29:15 Voltage Offset Correction: v_off_ini = 0.000006665 V, v_off_fin = 0.000004664 V 04:29:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995335 Vs 04:29:18 Temperature Measurement, Probe Number = 0, T = 20.211000 C 04:29:19 Temperature Measurement, Probe Number = 1, T = 20.134000 C 04:29:19 Temperature Measurement, Probe Number = 2, T = 20.181000 C 04:29:20 Temperature Measurement, Probe Number = 3, T = 20.124000 C 04:29:21 Temperature Measurement, Probe Number = 4, T = 20.663000 C 04:29:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.66 04:29:21 Integrated Voltage Measurement... 04:29:40 Voltage Offset Correction: v_off_ini = 0.000005025 V, v_off_fin = 0.000007451 V 04:29:40 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171086013 Vs 04:29:40 Integrated Voltage Measurement... 04:30:00 Voltage Offset Correction: v_off_ini = 0.000006570 V, v_off_fin = 0.000003727 V 04:30:00 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170998595 Vs 04:30:03 Temperature Measurement, Probe Number = 0, T = 20.215000 C 04:30:03 Temperature Measurement, Probe Number = 1, T = 20.139000 C 04:30:04 Temperature Measurement, Probe Number = 2, T = 20.185000 C 04:30:05 Temperature Measurement, Probe Number = 3, T = 20.128000 C 04:30:05 Temperature Measurement, Probe Number = 4, T = 20.675000 C 04:30:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.68 04:30:06 Integrated Voltage Measurement... 04:30:25 Voltage Offset Correction: v_off_ini = 0.000004543 V, v_off_fin = 0.000007180 V 04:30:25 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171081252 Vs 04:30:25 Integrated Voltage Measurement... 04:30:44 Voltage Offset Correction: v_off_ini = 0.000006581 V, v_off_fin = 0.000003148 V 04:30:45 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170995184 Vs 05:00:47 Temperature Measurement, Probe Number = 0, T = 20.211000 C 05:00:48 Temperature Measurement, Probe Number = 1, T = 20.137000 C 05:00:49 Temperature Measurement, Probe Number = 2, T = 20.183000 C 05:00:49 Temperature Measurement, Probe Number = 3, T = 20.130000 C 05:00:50 Temperature Measurement, Probe Number = 4, T = 20.615000 C 05:00:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.61 05:00:50 Integrated Voltage Measurement... 05:01:09 Voltage Offset Correction: v_off_ini = 0.000004749 V, v_off_fin = 0.000006530 V 05:01:10 Integrated Voltage Measurement Delta Gap = 0.0040022 m VT = 0.171141077 Vs 05:01:10 Integrated Voltage Measurement... 05:01:29 Voltage Offset Correction: v_off_ini = 0.000006009 V, v_off_fin = 0.000003364 V 05:01:29 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994165 Vs 05:01:32 Temperature Measurement, Probe Number = 0, T = 20.215000 C 05:01:32 Temperature Measurement, Probe Number = 1, T = 20.139000 C 05:01:33 Temperature Measurement, Probe Number = 2, T = 20.186000 C 05:01:34 Temperature Measurement, Probe Number = 3, T = 20.133000 C 05:01:34 Temperature Measurement, Probe Number = 4, T = 20.627000 C 05:01:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.63 05:01:34 Integrated Voltage Measurement... 05:01:54 Voltage Offset Correction: v_off_ini = 0.000004430 V, v_off_fin = 0.000006617 V 05:01:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064511 Vs 05:01:54 Integrated Voltage Measurement... 05:02:14 Voltage Offset Correction: v_off_ini = 0.000006081 V, v_off_fin = 0.000003262 V 05:02:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000374 Vs 05:02:17 Temperature Measurement, Probe Number = 0, T = 20.213000 C 05:02:17 Temperature Measurement, Probe Number = 1, T = 20.140000 C 05:02:18 Temperature Measurement, Probe Number = 2, T = 20.186000 C 05:02:19 Temperature Measurement, Probe Number = 3, T = 20.134000 C 05:02:19 Temperature Measurement, Probe Number = 4, T = 20.627000 C 05:02:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.63 05:02:19 Integrated Voltage Measurement... 05:02:39 Voltage Offset Correction: v_off_ini = 0.000004021 V, v_off_fin = 0.000006640 V 05:02:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171065107 Vs 05:02:39 Integrated Voltage Measurement... 05:02:58 Voltage Offset Correction: v_off_ini = 0.000006050 V, v_off_fin = 0.000002767 V 05:02:59 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170996138 Vs 05:03:01 Temperature Measurement, Probe Number = 0, T = 20.214000 C 05:03:02 Temperature Measurement, Probe Number = 1, T = 20.139000 C 05:03:03 Temperature Measurement, Probe Number = 2, T = 20.188000 C 05:03:03 Temperature Measurement, Probe Number = 3, T = 20.132000 C 05:03:04 Temperature Measurement, Probe Number = 4, T = 20.606000 C 05:03:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.61 05:03:04 Integrated Voltage Measurement... 05:03:23 Voltage Offset Correction: v_off_ini = 0.000004309 V, v_off_fin = 0.000006676 V 05:03:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171069260 Vs 05:03:24 Integrated Voltage Measurement... 05:03:43 Voltage Offset Correction: v_off_ini = 0.000006321 V, v_off_fin = 0.000003290 V 05:03:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993495 Vs 05:03:46 Temperature Measurement, Probe Number = 0, T = 20.209000 C 05:03:46 Temperature Measurement, Probe Number = 1, T = 20.131000 C 05:03:47 Temperature Measurement, Probe Number = 2, T = 20.179000 C 05:03:48 Temperature Measurement, Probe Number = 3, T = 20.124000 C 05:03:48 Temperature Measurement, Probe Number = 4, T = 20.578000 C 05:03:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.58 05:03:49 Integrated Voltage Measurement... 05:04:08 Voltage Offset Correction: v_off_ini = 0.000004554 V, v_off_fin = 0.000006784 V 05:04:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061948 Vs 05:04:09 Integrated Voltage Measurement... 05:04:28 Voltage Offset Correction: v_off_ini = 0.000006594 V, v_off_fin = 0.000003367 V 05:04:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993402 Vs 05:04:31 Temperature Measurement, Probe Number = 0, T = 20.214000 C 05:04:31 Temperature Measurement, Probe Number = 1, T = 20.138000 C 05:04:32 Temperature Measurement, Probe Number = 2, T = 20.187000 C 05:04:33 Temperature Measurement, Probe Number = 3, T = 20.133000 C 05:04:33 Temperature Measurement, Probe Number = 4, T = 20.672000 C 05:04:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.67 05:04:33 Integrated Voltage Measurement... 05:04:52 Voltage Offset Correction: v_off_ini = 0.000003649 V, v_off_fin = 0.000006949 V 05:04:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171064099 Vs 05:04:53 Integrated Voltage Measurement... 05:05:12 Voltage Offset Correction: v_off_ini = 0.000006486 V, v_off_fin = 0.000003245 V 05:05:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992516 Vs 05:05:15 Temperature Measurement, Probe Number = 0, T = 20.216000 C 05:05:16 Temperature Measurement, Probe Number = 1, T = 20.136000 C 05:05:16 Temperature Measurement, Probe Number = 2, T = 20.184000 C 05:05:17 Temperature Measurement, Probe Number = 3, T = 20.127000 C 05:05:18 Temperature Measurement, Probe Number = 4, T = 20.685000 C 05:05:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.68 05:05:18 Integrated Voltage Measurement... 05:05:37 Voltage Offset Correction: v_off_ini = 0.000003997 V, v_off_fin = 0.000007256 V 05:05:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171067936 Vs 05:05:38 Integrated Voltage Measurement... 05:05:57 Voltage Offset Correction: v_off_ini = 0.000006984 V, v_off_fin = 0.000003660 V 05:05:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985923 Vs 05:05:59 Temperature Measurement, Probe Number = 0, T = 20.213000 C 05:06:00 Temperature Measurement, Probe Number = 1, T = 20.137000 C 05:06:01 Temperature Measurement, Probe Number = 2, T = 20.183000 C 05:06:01 Temperature Measurement, Probe Number = 3, T = 20.130000 C 05:06:02 Temperature Measurement, Probe Number = 4, T = 20.725000 C 05:06:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.73 05:06:02 Integrated Voltage Measurement... 05:06:22 Voltage Offset Correction: v_off_ini = 0.000004273 V, v_off_fin = 0.000007446 V 05:06:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171073544 Vs 05:06:22 Integrated Voltage Measurement... 05:06:41 Voltage Offset Correction: v_off_ini = 0.000007094 V, v_off_fin = 0.000003057 V 05:06:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993073 Vs 05:06:44 Temperature Measurement, Probe Number = 0, T = 20.217000 C 05:06:45 Temperature Measurement, Probe Number = 1, T = 20.139000 C 05:06:45 Temperature Measurement, Probe Number = 2, T = 20.187000 C 05:06:46 Temperature Measurement, Probe Number = 3, T = 20.131000 C 05:06:47 Temperature Measurement, Probe Number = 4, T = 20.731000 C 05:06:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.73 05:06:47 Integrated Voltage Measurement... 05:07:06 Voltage Offset Correction: v_off_ini = 0.000004031 V, v_off_fin = 0.000006743 V 05:07:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065788 Vs 05:07:07 Integrated Voltage Measurement... 05:07:26 Voltage Offset Correction: v_off_ini = 0.000005929 V, v_off_fin = 0.000003604 V 05:07:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994097 Vs 05:07:29 Temperature Measurement, Probe Number = 0, T = 20.214000 C 05:07:30 Temperature Measurement, Probe Number = 1, T = 20.136000 C 05:07:30 Temperature Measurement, Probe Number = 2, T = 20.183000 C 05:07:31 Temperature Measurement, Probe Number = 3, T = 20.128000 C 05:07:32 Temperature Measurement, Probe Number = 4, T = 20.693000 C 05:07:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.69 05:07:32 Integrated Voltage Measurement... 05:07:51 Voltage Offset Correction: v_off_ini = 0.000004565 V, v_off_fin = 0.000006264 V 05:07:51 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171063286 Vs 05:07:51 Integrated Voltage Measurement... 05:08:11 Voltage Offset Correction: v_off_ini = 0.000005876 V, v_off_fin = 0.000002814 V 05:08:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997760 Vs 05:38:14 Temperature Measurement, Probe Number = 0, T = 20.215000 C 05:38:14 Temperature Measurement, Probe Number = 1, T = 20.138000 C 05:38:15 Temperature Measurement, Probe Number = 2, T = 20.187000 C 05:38:16 Temperature Measurement, Probe Number = 3, T = 20.132000 C 05:38:16 Temperature Measurement, Probe Number = 4, T = 20.547000 C 05:38:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.55 05:38:17 Integrated Voltage Measurement... 05:38:36 Voltage Offset Correction: v_off_ini = 0.000005430 V, v_off_fin = 0.000007046 V 05:38:36 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171114902 Vs 05:38:37 Integrated Voltage Measurement... 05:38:56 Voltage Offset Correction: v_off_ini = 0.000006352 V, v_off_fin = 0.000003431 V 05:38:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002037 Vs 05:38:59 Temperature Measurement, Probe Number = 0, T = 20.219000 C 05:38:59 Temperature Measurement, Probe Number = 1, T = 20.139000 C 05:39:00 Temperature Measurement, Probe Number = 2, T = 20.190000 C 05:39:01 Temperature Measurement, Probe Number = 3, T = 20.134000 C 05:39:01 Temperature Measurement, Probe Number = 4, T = 20.533000 C 05:39:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.53 05:39:01 Integrated Voltage Measurement... 05:39:21 Voltage Offset Correction: v_off_ini = 0.000004137 V, v_off_fin = 0.000006816 V 05:39:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070298 Vs 05:39:22 Integrated Voltage Measurement... 05:39:41 Voltage Offset Correction: v_off_ini = 0.000006020 V, v_off_fin = 0.000002960 V 05:39:41 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171001864 Vs 05:39:43 Temperature Measurement, Probe Number = 0, T = 20.217000 C 05:39:44 Temperature Measurement, Probe Number = 1, T = 20.138000 C 05:39:45 Temperature Measurement, Probe Number = 2, T = 20.188000 C 05:39:45 Temperature Measurement, Probe Number = 3, T = 20.131000 C 05:39:46 Temperature Measurement, Probe Number = 4, T = 20.595000 C 05:39:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.59 05:39:46 Integrated Voltage Measurement... 05:40:05 Voltage Offset Correction: v_off_ini = 0.000004166 V, v_off_fin = 0.000007111 V 05:40:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171078525 Vs 05:40:06 Integrated Voltage Measurement... 05:40:25 Voltage Offset Correction: v_off_ini = 0.000006971 V, v_off_fin = 0.000003470 V 05:40:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170999429 Vs 05:40:28 Temperature Measurement, Probe Number = 0, T = 20.210000 C 05:40:28 Temperature Measurement, Probe Number = 1, T = 20.132000 C 05:40:29 Temperature Measurement, Probe Number = 2, T = 20.181000 C 05:40:29 Temperature Measurement, Probe Number = 3, T = 20.126000 C 05:40:30 Temperature Measurement, Probe Number = 4, T = 20.599000 C 05:40:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.60 05:40:30 Integrated Voltage Measurement... 05:40:49 Voltage Offset Correction: v_off_ini = 0.000004380 V, v_off_fin = 0.000006830 V 05:40:50 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171072239 Vs 05:40:50 Integrated Voltage Measurement... 05:41:09 Voltage Offset Correction: v_off_ini = 0.000006159 V, v_off_fin = 0.000003114 V 05:41:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170999616 Vs 05:41:12 Temperature Measurement, Probe Number = 0, T = 20.217000 C 05:41:12 Temperature Measurement, Probe Number = 1, T = 20.140000 C 05:41:13 Temperature Measurement, Probe Number = 2, T = 20.186000 C 05:41:14 Temperature Measurement, Probe Number = 3, T = 20.131000 C 05:41:14 Temperature Measurement, Probe Number = 4, T = 20.607000 C 05:41:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.61 05:41:15 Integrated Voltage Measurement... 05:41:34 Voltage Offset Correction: v_off_ini = 0.000003843 V, v_off_fin = 0.000006801 V 05:41:34 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171070918 Vs 05:41:34 Integrated Voltage Measurement... 05:41:53 Voltage Offset Correction: v_off_ini = 0.000006201 V, v_off_fin = 0.000003232 V 05:41:54 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171003870 Vs 05:41:56 Temperature Measurement, Probe Number = 0, T = 20.219000 C 05:41:57 Temperature Measurement, Probe Number = 1, T = 20.136000 C 05:41:58 Temperature Measurement, Probe Number = 2, T = 20.187000 C 05:41:58 Temperature Measurement, Probe Number = 3, T = 20.126000 C 05:41:59 Temperature Measurement, Probe Number = 4, T = 20.629000 C 05:41:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.63 05:41:59 Integrated Voltage Measurement... 05:42:19 Voltage Offset Correction: v_off_ini = 0.000004037 V, v_off_fin = 0.000006968 V 05:42:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171072157 Vs 05:42:19 Integrated Voltage Measurement... 05:42:38 Voltage Offset Correction: v_off_ini = 0.000005960 V, v_off_fin = 0.000003979 V 05:42:38 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997832 Vs 05:42:41 Temperature Measurement, Probe Number = 0, T = 20.215000 C 05:42:42 Temperature Measurement, Probe Number = 1, T = 20.137000 C 05:42:42 Temperature Measurement, Probe Number = 2, T = 20.185000 C 05:42:43 Temperature Measurement, Probe Number = 3, T = 20.128000 C 05:42:44 Temperature Measurement, Probe Number = 4, T = 20.603000 C 05:42:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.60 05:42:44 Integrated Voltage Measurement... 05:43:03 Voltage Offset Correction: v_off_ini = 0.000004000 V, v_off_fin = 0.000007541 V 05:43:03 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171077342 Vs 05:43:03 Integrated Voltage Measurement... 05:43:23 Voltage Offset Correction: v_off_ini = 0.000006516 V, v_off_fin = 0.000003738 V 05:43:23 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170995541 Vs 05:43:26 Temperature Measurement, Probe Number = 0, T = 20.218000 C 05:43:26 Temperature Measurement, Probe Number = 1, T = 20.136000 C 05:43:27 Temperature Measurement, Probe Number = 2, T = 20.189000 C 05:43:28 Temperature Measurement, Probe Number = 3, T = 20.130000 C 05:43:28 Temperature Measurement, Probe Number = 4, T = 20.600000 C 05:43:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.60 05:43:28 Integrated Voltage Measurement... 05:43:48 Voltage Offset Correction: v_off_ini = 0.000004297 V, v_off_fin = 0.000007400 V 05:43:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076425 Vs 05:43:48 Integrated Voltage Measurement... 05:44:08 Voltage Offset Correction: v_off_ini = 0.000006484 V, v_off_fin = 0.000003791 V 05:44:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999521 Vs 05:44:10 Temperature Measurement, Probe Number = 0, T = 20.219000 C 05:44:11 Temperature Measurement, Probe Number = 1, T = 20.139000 C 05:44:12 Temperature Measurement, Probe Number = 2, T = 20.189000 C 05:44:12 Temperature Measurement, Probe Number = 3, T = 20.131000 C 05:44:13 Temperature Measurement, Probe Number = 4, T = 20.598000 C 05:44:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.60 05:44:13 Integrated Voltage Measurement... 05:44:32 Voltage Offset Correction: v_off_ini = 0.000004930 V, v_off_fin = 0.000008273 V 05:44:32 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171083205 Vs 05:44:33 Integrated Voltage Measurement... 05:44:52 Voltage Offset Correction: v_off_ini = 0.000007212 V, v_off_fin = 0.000004215 V 05:44:52 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994657 Vs 05:44:55 Temperature Measurement, Probe Number = 0, T = 20.221000 C 05:44:55 Temperature Measurement, Probe Number = 1, T = 20.140000 C 05:44:56 Temperature Measurement, Probe Number = 2, T = 20.194000 C 05:44:57 Temperature Measurement, Probe Number = 3, T = 20.134000 C 05:44:57 Temperature Measurement, Probe Number = 4, T = 20.609000 C 05:44:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.61 05:44:57 Integrated Voltage Measurement... 05:45:17 Voltage Offset Correction: v_off_ini = 0.000004808 V, v_off_fin = 0.000007380 V 05:45:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171081287 Vs 05:45:17 Integrated Voltage Measurement... 05:45:36 Voltage Offset Correction: v_off_ini = 0.000006558 V, v_off_fin = 0.000003383 V 05:45:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991426 Vs 06:15:39 Temperature Measurement, Probe Number = 0, T = 20.219000 C 06:15:40 Temperature Measurement, Probe Number = 1, T = 20.140000 C 06:15:41 Temperature Measurement, Probe Number = 2, T = 20.189000 C 06:15:41 Temperature Measurement, Probe Number = 3, T = 20.132000 C 06:15:42 Temperature Measurement, Probe Number = 4, T = 20.633000 C 06:15:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.63 06:15:42 Integrated Voltage Measurement... 06:16:02 Voltage Offset Correction: v_off_ini = 0.000005299 V, v_off_fin = 0.000007110 V 06:16:02 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171125445 Vs 06:16:02 Integrated Voltage Measurement... 06:16:22 Voltage Offset Correction: v_off_ini = 0.000006380 V, v_off_fin = 0.000004322 V 06:16:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992327 Vs 06:16:25 Temperature Measurement, Probe Number = 0, T = 20.215000 C 06:16:25 Temperature Measurement, Probe Number = 1, T = 20.133000 C 06:16:26 Temperature Measurement, Probe Number = 2, T = 20.183000 C 06:16:27 Temperature Measurement, Probe Number = 3, T = 20.126000 C 06:16:27 Temperature Measurement, Probe Number = 4, T = 20.598000 C 06:16:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.60 06:16:28 Integrated Voltage Measurement... 06:16:47 Voltage Offset Correction: v_off_ini = 0.000004675 V, v_off_fin = 0.000006723 V 06:16:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073080 Vs 06:16:48 Integrated Voltage Measurement... 06:17:07 Voltage Offset Correction: v_off_ini = 0.000006301 V, v_off_fin = 0.000003118 V 06:17:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997299 Vs 06:17:10 Temperature Measurement, Probe Number = 0, T = 20.215000 C 06:17:10 Temperature Measurement, Probe Number = 1, T = 20.137000 C 06:17:11 Temperature Measurement, Probe Number = 2, T = 20.185000 C 06:17:12 Temperature Measurement, Probe Number = 3, T = 20.130000 C 06:17:12 Temperature Measurement, Probe Number = 4, T = 20.533000 C 06:17:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.53 06:17:13 Integrated Voltage Measurement... 06:17:32 Voltage Offset Correction: v_off_ini = 0.000004694 V, v_off_fin = 0.000006912 V 06:17:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171071031 Vs 06:17:32 Integrated Voltage Measurement... 06:17:51 Voltage Offset Correction: v_off_ini = 0.000006505 V, v_off_fin = 0.000003387 V 06:17:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999296 Vs 06:17:54 Temperature Measurement, Probe Number = 0, T = 20.220000 C 06:17:55 Temperature Measurement, Probe Number = 1, T = 20.141000 C 06:17:56 Temperature Measurement, Probe Number = 2, T = 20.190000 C 06:17:56 Temperature Measurement, Probe Number = 3, T = 20.134000 C 06:17:57 Temperature Measurement, Probe Number = 4, T = 20.632000 C 06:17:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.63 06:17:57 Integrated Voltage Measurement... 06:18:16 Voltage Offset Correction: v_off_ini = 0.000004621 V, v_off_fin = 0.000007199 V 06:18:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076689 Vs 06:18:17 Integrated Voltage Measurement... 06:18:36 Voltage Offset Correction: v_off_ini = 0.000006744 V, v_off_fin = 0.000003760 V 06:18:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170995669 Vs 06:18:39 Temperature Measurement, Probe Number = 0, T = 20.222000 C 06:18:39 Temperature Measurement, Probe Number = 1, T = 20.140000 C 06:18:40 Temperature Measurement, Probe Number = 2, T = 20.188000 C 06:18:41 Temperature Measurement, Probe Number = 3, T = 20.130000 C 06:18:41 Temperature Measurement, Probe Number = 4, T = 20.664000 C 06:18:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.66 06:18:42 Integrated Voltage Measurement... 06:19:01 Voltage Offset Correction: v_off_ini = 0.000004078 V, v_off_fin = 0.000007091 V 06:19:01 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171079309 Vs 06:19:01 Integrated Voltage Measurement... 06:19:21 Voltage Offset Correction: v_off_ini = 0.000006215 V, v_off_fin = 0.000003466 V 06:19:21 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171002088 Vs 06:19:23 Temperature Measurement, Probe Number = 0, T = 20.222000 C 06:19:24 Temperature Measurement, Probe Number = 1, T = 20.142000 C 06:19:25 Temperature Measurement, Probe Number = 2, T = 20.186000 C 06:19:25 Temperature Measurement, Probe Number = 3, T = 20.130000 C 06:19:26 Temperature Measurement, Probe Number = 4, T = 20.626000 C 06:19:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.63 06:19:26 Integrated Voltage Measurement... 06:19:45 Voltage Offset Correction: v_off_ini = 0.000004035 V, v_off_fin = 0.000006561 V 06:19:46 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171076567 Vs 06:19:46 Integrated Voltage Measurement... 06:20:05 Voltage Offset Correction: v_off_ini = 0.000006123 V, v_off_fin = 0.000003591 V 06:20:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171007229 Vs 06:20:08 Temperature Measurement, Probe Number = 0, T = 20.217000 C 06:20:09 Temperature Measurement, Probe Number = 1, T = 20.140000 C 06:20:09 Temperature Measurement, Probe Number = 2, T = 20.185000 C 06:20:10 Temperature Measurement, Probe Number = 3, T = 20.130000 C 06:20:11 Temperature Measurement, Probe Number = 4, T = 20.721000 C 06:20:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.72 06:20:11 Integrated Voltage Measurement... 06:20:30 Voltage Offset Correction: v_off_ini = 0.000004199 V, v_off_fin = 0.000006655 V 06:20:30 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171074176 Vs 06:20:31 Integrated Voltage Measurement... 06:20:50 Voltage Offset Correction: v_off_ini = 0.000006181 V, v_off_fin = 0.000003413 V 06:20:50 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171002988 Vs 06:20:53 Temperature Measurement, Probe Number = 0, T = 20.215000 C 06:20:53 Temperature Measurement, Probe Number = 1, T = 20.138000 C 06:20:54 Temperature Measurement, Probe Number = 2, T = 20.183000 C 06:20:54 Temperature Measurement, Probe Number = 3, T = 20.129000 C 06:20:55 Temperature Measurement, Probe Number = 4, T = 20.634000 C 06:20:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.63 06:20:55 Integrated Voltage Measurement... 06:21:14 Voltage Offset Correction: v_off_ini = 0.000004624 V, v_off_fin = 0.000006859 V 06:21:15 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171074854 Vs 06:21:15 Integrated Voltage Measurement... 06:21:34 Voltage Offset Correction: v_off_ini = 0.000006519 V, v_off_fin = 0.000003473 V 06:21:34 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170999726 Vs 06:21:37 Temperature Measurement, Probe Number = 0, T = 20.223000 C 06:21:38 Temperature Measurement, Probe Number = 1, T = 20.143000 C 06:21:38 Temperature Measurement, Probe Number = 2, T = 20.194000 C 06:21:39 Temperature Measurement, Probe Number = 3, T = 20.135000 C 06:21:40 Temperature Measurement, Probe Number = 4, T = 20.632000 C 06:21:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.63 06:21:40 Integrated Voltage Measurement... 06:21:59 Voltage Offset Correction: v_off_ini = 0.000004794 V, v_off_fin = 0.000006789 V 06:22:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171074355 Vs 06:22:00 Integrated Voltage Measurement... 06:22:19 Voltage Offset Correction: v_off_ini = 0.000006159 V, v_off_fin = 0.000002632 V 06:22:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997952 Vs 06:22:22 Temperature Measurement, Probe Number = 0, T = 20.224000 C 06:22:22 Temperature Measurement, Probe Number = 1, T = 20.141000 C 06:22:23 Temperature Measurement, Probe Number = 2, T = 20.192000 C 06:22:24 Temperature Measurement, Probe Number = 3, T = 20.132000 C 06:22:24 Temperature Measurement, Probe Number = 4, T = 20.673000 C 06:22:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.67 06:22:25 Integrated Voltage Measurement... 06:22:44 Voltage Offset Correction: v_off_ini = 0.000004264 V, v_off_fin = 0.000007484 V 06:22:44 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171074079 Vs 06:22:44 Integrated Voltage Measurement... 06:23:03 Voltage Offset Correction: v_off_ini = 0.000006812 V, v_off_fin = 0.000004163 V 06:23:04 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170993080 Vs 06:53:06 Temperature Measurement, Probe Number = 0, T = 20.219000 C 06:53:07 Temperature Measurement, Probe Number = 1, T = 20.139000 C 06:53:08 Temperature Measurement, Probe Number = 2, T = 20.189000 C 06:53:08 Temperature Measurement, Probe Number = 3, T = 20.132000 C 06:53:09 Temperature Measurement, Probe Number = 4, T = 20.716000 C 06:53:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.72 06:53:09 Integrated Voltage Measurement... 06:53:28 Voltage Offset Correction: v_off_ini = 0.000005272 V, v_off_fin = 0.000006995 V 06:53:29 Integrated Voltage Measurement Delta Gap = 0.0040017 m VT = 0.171132711 Vs 06:53:29 Integrated Voltage Measurement... 06:53:48 Voltage Offset Correction: v_off_ini = 0.000006312 V, v_off_fin = 0.000003272 V 06:53:48 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171003463 Vs 06:53:51 Temperature Measurement, Probe Number = 0, T = 20.222000 C 06:53:52 Temperature Measurement, Probe Number = 1, T = 20.145000 C 06:53:52 Temperature Measurement, Probe Number = 2, T = 20.188000 C 06:53:53 Temperature Measurement, Probe Number = 3, T = 20.133000 C 06:53:54 Temperature Measurement, Probe Number = 4, T = 20.655000 C 06:53:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.66 06:53:54 Integrated Voltage Measurement... 06:54:13 Voltage Offset Correction: v_off_ini = 0.000004240 V, v_off_fin = 0.000007282 V 06:54:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074809 Vs 06:54:14 Integrated Voltage Measurement... 06:54:33 Voltage Offset Correction: v_off_ini = 0.000006427 V, v_off_fin = 0.000003551 V 06:54:33 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171003718 Vs 06:54:36 Temperature Measurement, Probe Number = 0, T = 20.222000 C 06:54:36 Temperature Measurement, Probe Number = 1, T = 20.142000 C 06:54:37 Temperature Measurement, Probe Number = 2, T = 20.190000 C 06:54:38 Temperature Measurement, Probe Number = 3, T = 20.134000 C 06:54:38 Temperature Measurement, Probe Number = 4, T = 20.617000 C 06:54:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.62 06:54:38 Integrated Voltage Measurement... 06:54:58 Voltage Offset Correction: v_off_ini = 0.000004186 V, v_off_fin = 0.000006617 V 06:54:58 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171076584 Vs 06:54:58 Integrated Voltage Measurement... 06:55:17 Voltage Offset Correction: v_off_ini = 0.000005960 V, v_off_fin = 0.000002786 V 06:55:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171008839 Vs 06:55:20 Temperature Measurement, Probe Number = 0, T = 20.215000 C 06:55:21 Temperature Measurement, Probe Number = 1, T = 20.137000 C 06:55:22 Temperature Measurement, Probe Number = 2, T = 20.185000 C 06:55:22 Temperature Measurement, Probe Number = 3, T = 20.128000 C 06:55:23 Temperature Measurement, Probe Number = 4, T = 20.529000 C 06:55:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.53 06:55:23 Integrated Voltage Measurement... 06:55:42 Voltage Offset Correction: v_off_ini = 0.000003943 V, v_off_fin = 0.000006596 V 06:55:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071661 Vs 06:55:43 Integrated Voltage Measurement... 06:56:02 Voltage Offset Correction: v_off_ini = 0.000006110 V, v_off_fin = 0.000003263 V 06:56:02 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171005817 Vs 06:56:05 Temperature Measurement, Probe Number = 0, T = 20.218000 C 06:56:05 Temperature Measurement, Probe Number = 1, T = 20.141000 C 06:56:06 Temperature Measurement, Probe Number = 2, T = 20.189000 C 06:56:07 Temperature Measurement, Probe Number = 3, T = 20.133000 C 06:56:07 Temperature Measurement, Probe Number = 4, T = 20.508000 C 06:56:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.51 06:56:08 Integrated Voltage Measurement... 06:56:27 Voltage Offset Correction: v_off_ini = 0.000004230 V, v_off_fin = 0.000007181 V 06:56:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075886 Vs 06:56:27 Integrated Voltage Measurement... 06:56:47 Voltage Offset Correction: v_off_ini = 0.000006326 V, v_off_fin = 0.000002964 V 06:56:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993240 Vs 06:56:50 Temperature Measurement, Probe Number = 0, T = 20.217000 C 06:56:50 Temperature Measurement, Probe Number = 1, T = 20.136000 C 06:56:51 Temperature Measurement, Probe Number = 2, T = 20.188000 C 06:56:52 Temperature Measurement, Probe Number = 3, T = 20.129000 C 06:56:52 Temperature Measurement, Probe Number = 4, T = 20.532000 C 06:56:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.53 06:56:52 Integrated Voltage Measurement... 06:57:12 Voltage Offset Correction: v_off_ini = 0.000004533 V, v_off_fin = 0.000006954 V 06:57:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058917 Vs 06:57:12 Integrated Voltage Measurement... 06:57:31 Voltage Offset Correction: v_off_ini = 0.000006473 V, v_off_fin = 0.000003167 V 06:57:31 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170992881 Vs 06:57:34 Temperature Measurement, Probe Number = 0, T = 20.209000 C 06:57:34 Temperature Measurement, Probe Number = 1, T = 20.131000 C 06:57:35 Temperature Measurement, Probe Number = 2, T = 20.181000 C 06:57:36 Temperature Measurement, Probe Number = 3, T = 20.125000 C 06:57:36 Temperature Measurement, Probe Number = 4, T = 20.442000 C 06:57:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.44 06:57:37 Integrated Voltage Measurement... 06:57:56 Voltage Offset Correction: v_off_ini = 0.000004325 V, v_off_fin = 0.000007205 V 06:57:56 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171063775 Vs 06:57:56 Integrated Voltage Measurement... 06:58:15 Voltage Offset Correction: v_off_ini = 0.000006232 V, v_off_fin = 0.000004070 V 06:58:15 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988451 Vs 06:58:18 Temperature Measurement, Probe Number = 0, T = 20.220000 C 06:58:19 Temperature Measurement, Probe Number = 1, T = 20.141000 C 06:58:19 Temperature Measurement, Probe Number = 2, T = 20.189000 C 06:58:20 Temperature Measurement, Probe Number = 3, T = 20.132000 C 06:58:20 Temperature Measurement, Probe Number = 4, T = 20.532000 C 06:58:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.53 06:58:21 Integrated Voltage Measurement... 06:58:40 Voltage Offset Correction: v_off_ini = 0.000004186 V, v_off_fin = 0.000006682 V 06:58:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064381 Vs 06:58:40 Integrated Voltage Measurement... 06:59:00 Voltage Offset Correction: v_off_ini = 0.000006100 V, v_off_fin = 0.000003675 V 06:59:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993656 Vs 06:59:03 Temperature Measurement, Probe Number = 0, T = 20.224000 C 06:59:03 Temperature Measurement, Probe Number = 1, T = 20.145000 C 06:59:04 Temperature Measurement, Probe Number = 2, T = 20.193000 C 06:59:05 Temperature Measurement, Probe Number = 3, T = 20.136000 C 06:59:05 Temperature Measurement, Probe Number = 4, T = 20.591000 C 06:59:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.59 06:59:05 Integrated Voltage Measurement... 06:59:25 Voltage Offset Correction: v_off_ini = 0.000004239 V, v_off_fin = 0.000006575 V 06:59:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064744 Vs 06:59:25 Integrated Voltage Measurement... 06:59:45 Voltage Offset Correction: v_off_ini = 0.000006344 V, v_off_fin = 0.000003013 V 06:59:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991514 Vs 06:59:48 Temperature Measurement, Probe Number = 0, T = 20.221000 C 06:59:49 Temperature Measurement, Probe Number = 1, T = 20.140000 C 06:59:49 Temperature Measurement, Probe Number = 2, T = 20.188000 C 06:59:50 Temperature Measurement, Probe Number = 3, T = 20.130000 C 06:59:50 Temperature Measurement, Probe Number = 4, T = 20.636000 C 06:59:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.64 06:59:51 Integrated Voltage Measurement... 07:00:10 Voltage Offset Correction: v_off_ini = 0.000005079 V, v_off_fin = 0.000007005 V 07:00:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066915 Vs 07:00:10 Integrated Voltage Measurement... 07:00:30 Voltage Offset Correction: v_off_ini = 0.000006732 V, v_off_fin = 0.000004662 V 07:00:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990256 Vs 07:30:33 Temperature Measurement, Probe Number = 0, T = 20.225000 C 07:30:34 Temperature Measurement, Probe Number = 1, T = 20.143000 C 07:30:34 Temperature Measurement, Probe Number = 2, T = 20.192000 C 07:30:35 Temperature Measurement, Probe Number = 3, T = 20.133000 C 07:30:35 Temperature Measurement, Probe Number = 4, T = 20.578000 C 07:30:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.58 07:30:36 Integrated Voltage Measurement... 07:30:55 Voltage Offset Correction: v_off_ini = 0.000005955 V, v_off_fin = 0.000007637 V 07:30:55 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171120595 Vs 07:30:55 Integrated Voltage Measurement... 07:31:15 Voltage Offset Correction: v_off_ini = 0.000006765 V, v_off_fin = 0.000003629 V 07:31:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989549 Vs 07:31:17 Temperature Measurement, Probe Number = 0, T = 20.223000 C 07:31:18 Temperature Measurement, Probe Number = 1, T = 20.142000 C 07:31:19 Temperature Measurement, Probe Number = 2, T = 20.189000 C 07:31:19 Temperature Measurement, Probe Number = 3, T = 20.131000 C 07:31:20 Temperature Measurement, Probe Number = 4, T = 20.589000 C 07:31:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.59 07:31:20 Integrated Voltage Measurement... 07:31:40 Voltage Offset Correction: v_off_ini = 0.000004931 V, v_off_fin = 0.000007237 V 07:31:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066663 Vs 07:31:40 Integrated Voltage Measurement... 07:32:00 Voltage Offset Correction: v_off_ini = 0.000006213 V, v_off_fin = 0.000003362 V 07:32:00 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171002655 Vs 07:32:03 Temperature Measurement, Probe Number = 0, T = 20.223000 C 07:32:03 Temperature Measurement, Probe Number = 1, T = 20.142000 C 07:32:04 Temperature Measurement, Probe Number = 2, T = 20.189000 C 07:32:05 Temperature Measurement, Probe Number = 3, T = 20.132000 C 07:32:05 Temperature Measurement, Probe Number = 4, T = 20.577000 C 07:32:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.58 07:32:05 Integrated Voltage Measurement... 07:32:25 Voltage Offset Correction: v_off_ini = 0.000004220 V, v_off_fin = 0.000006965 V 07:32:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080114 Vs 07:32:25 Integrated Voltage Measurement... 07:32:44 Voltage Offset Correction: v_off_ini = 0.000006614 V, v_off_fin = 0.000003594 V 07:32:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999386 Vs 07:32:47 Temperature Measurement, Probe Number = 0, T = 20.221000 C 07:32:48 Temperature Measurement, Probe Number = 1, T = 20.141000 C 07:32:48 Temperature Measurement, Probe Number = 2, T = 20.185000 C 07:32:49 Temperature Measurement, Probe Number = 3, T = 20.126000 C 07:32:50 Temperature Measurement, Probe Number = 4, T = 20.498000 C 07:32:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.50 07:32:50 Integrated Voltage Measurement... 07:33:09 Voltage Offset Correction: v_off_ini = 0.000004386 V, v_off_fin = 0.000007760 V 07:33:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171080752 Vs 07:33:10 Integrated Voltage Measurement... 07:33:29 Voltage Offset Correction: v_off_ini = 0.000006730 V, v_off_fin = 0.000002993 V 07:33:29 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171005144 Vs 07:33:32 Temperature Measurement, Probe Number = 0, T = 20.214000 C 07:33:32 Temperature Measurement, Probe Number = 1, T = 20.139000 C 07:33:33 Temperature Measurement, Probe Number = 2, T = 20.181000 C 07:33:34 Temperature Measurement, Probe Number = 3, T = 20.125000 C 07:33:34 Temperature Measurement, Probe Number = 4, T = 20.356000 C 07:33:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.36 07:33:35 Integrated Voltage Measurement... 07:33:54 Voltage Offset Correction: v_off_ini = 0.000004542 V, v_off_fin = 0.000006896 V 07:33:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074844 Vs 07:33:54 Integrated Voltage Measurement... 07:34:13 Voltage Offset Correction: v_off_ini = 0.000006326 V, v_off_fin = 0.000003109 V 07:34:13 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000797 Vs 07:34:16 Temperature Measurement, Probe Number = 0, T = 20.224000 C 07:34:17 Temperature Measurement, Probe Number = 1, T = 20.145000 C 07:34:17 Temperature Measurement, Probe Number = 2, T = 20.191000 C 07:34:18 Temperature Measurement, Probe Number = 3, T = 20.132000 C 07:34:19 Temperature Measurement, Probe Number = 4, T = 20.434000 C 07:34:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.43 07:34:19 Integrated Voltage Measurement... 07:34:38 Voltage Offset Correction: v_off_ini = 0.000004076 V, v_off_fin = 0.000007232 V 07:34:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171077526 Vs 07:34:39 Integrated Voltage Measurement... 07:34:58 Voltage Offset Correction: v_off_ini = 0.000006577 V, v_off_fin = 0.000003563 V 07:34:58 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171008495 Vs 07:35:01 Temperature Measurement, Probe Number = 0, T = 20.222000 C 07:35:01 Temperature Measurement, Probe Number = 1, T = 20.144000 C 07:35:02 Temperature Measurement, Probe Number = 2, T = 20.188000 C 07:35:03 Temperature Measurement, Probe Number = 3, T = 20.129000 C 07:35:03 Temperature Measurement, Probe Number = 4, T = 20.489000 C 07:35:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.49 07:35:04 Integrated Voltage Measurement... 07:35:23 Voltage Offset Correction: v_off_ini = 0.000004697 V, v_off_fin = 0.000007098 V 07:35:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171081581 Vs 07:35:23 Integrated Voltage Measurement... 07:35:42 Voltage Offset Correction: v_off_ini = 0.000006335 V, v_off_fin = 0.000003165 V 07:35:43 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171002270 Vs 07:35:45 Temperature Measurement, Probe Number = 0, T = 20.223000 C 07:35:46 Temperature Measurement, Probe Number = 1, T = 20.146000 C 07:35:47 Temperature Measurement, Probe Number = 2, T = 20.189000 C 07:35:47 Temperature Measurement, Probe Number = 3, T = 20.132000 C 07:35:48 Temperature Measurement, Probe Number = 4, T = 20.487000 C 07:35:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.49 07:35:48 Integrated Voltage Measurement... 07:36:08 Voltage Offset Correction: v_off_ini = 0.000003464 V, v_off_fin = 0.000006837 V 07:36:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171079394 Vs 07:36:08 Integrated Voltage Measurement... 07:36:28 Voltage Offset Correction: v_off_ini = 0.000006006 V, v_off_fin = 0.000003276 V 07:36:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171006406 Vs 07:36:30 Temperature Measurement, Probe Number = 0, T = 20.225000 C 07:36:31 Temperature Measurement, Probe Number = 1, T = 20.144000 C 07:36:32 Temperature Measurement, Probe Number = 2, T = 20.190000 C 07:36:32 Temperature Measurement, Probe Number = 3, T = 20.133000 C 07:36:33 Temperature Measurement, Probe Number = 4, T = 20.532000 C 07:36:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.53 07:36:33 Integrated Voltage Measurement... 07:36:52 Voltage Offset Correction: v_off_ini = 0.000004040 V, v_off_fin = 0.000006849 V 07:36:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076710 Vs 07:36:53 Integrated Voltage Measurement... 07:37:12 Voltage Offset Correction: v_off_ini = 0.000006238 V, v_off_fin = 0.000003707 V 07:37:12 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171006189 Vs 07:37:15 Temperature Measurement, Probe Number = 0, T = 20.228000 C 07:37:16 Temperature Measurement, Probe Number = 1, T = 20.148000 C 07:37:16 Temperature Measurement, Probe Number = 2, T = 20.194000 C 07:37:17 Temperature Measurement, Probe Number = 3, T = 20.138000 C 07:37:18 Temperature Measurement, Probe Number = 4, T = 20.561000 C 07:37:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.56 07:37:18 Integrated Voltage Measurement... 07:37:37 Voltage Offset Correction: v_off_ini = 0.000004780 V, v_off_fin = 0.000007061 V 07:37:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171077309 Vs 07:37:38 Integrated Voltage Measurement... 07:37:57 Voltage Offset Correction: v_off_ini = 0.000006470 V, v_off_fin = 0.000003236 V 07:37:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171003301 Vs 08:08:00 Temperature Measurement, Probe Number = 0, T = 20.224000 C 08:08:01 Temperature Measurement, Probe Number = 1, T = 20.146000 C 08:08:02 Temperature Measurement, Probe Number = 2, T = 20.190000 C 08:08:02 Temperature Measurement, Probe Number = 3, T = 20.136000 C 08:08:03 Temperature Measurement, Probe Number = 4, T = 20.538000 C 08:08:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.54 08:08:03 Integrated Voltage Measurement... 08:08:23 Voltage Offset Correction: v_off_ini = 0.000005253 V, v_off_fin = 0.000006694 V 08:08:23 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171128039 Vs 08:08:23 Integrated Voltage Measurement... 08:08:42 Voltage Offset Correction: v_off_ini = 0.000006027 V, v_off_fin = 0.000003214 V 08:08:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000225 Vs 08:08:45 Temperature Measurement, Probe Number = 0, T = 20.231000 C 08:08:46 Temperature Measurement, Probe Number = 1, T = 20.155000 C 08:08:47 Temperature Measurement, Probe Number = 2, T = 20.197000 C 08:08:47 Temperature Measurement, Probe Number = 3, T = 20.142000 C 08:08:48 Temperature Measurement, Probe Number = 4, T = 20.547000 C 08:08:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.55 08:08:48 Integrated Voltage Measurement... 08:09:07 Voltage Offset Correction: v_off_ini = 0.000004314 V, v_off_fin = 0.000007065 V 08:09:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072787 Vs 08:09:08 Integrated Voltage Measurement... 08:09:27 Voltage Offset Correction: v_off_ini = 0.000006371 V, v_off_fin = 0.000003501 V 08:09:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171006206 Vs 08:09:30 Temperature Measurement, Probe Number = 0, T = 20.233000 C 08:09:31 Temperature Measurement, Probe Number = 1, T = 20.155000 C 08:09:31 Temperature Measurement, Probe Number = 2, T = 20.199000 C 08:09:32 Temperature Measurement, Probe Number = 3, T = 20.144000 C 08:09:33 Temperature Measurement, Probe Number = 4, T = 20.663000 C 08:09:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.66 08:09:33 Integrated Voltage Measurement... 08:09:52 Voltage Offset Correction: v_off_ini = 0.000004849 V, v_off_fin = 0.000007173 V 08:09:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071265 Vs 08:09:53 Integrated Voltage Measurement... 08:10:12 Voltage Offset Correction: v_off_ini = 0.000006282 V, v_off_fin = 0.000003752 V 08:10:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999678 Vs 08:10:15 Temperature Measurement, Probe Number = 0, T = 20.235000 C 08:10:15 Temperature Measurement, Probe Number = 1, T = 20.151000 C 08:10:16 Temperature Measurement, Probe Number = 2, T = 20.200000 C 08:10:17 Temperature Measurement, Probe Number = 3, T = 20.143000 C 08:10:17 Temperature Measurement, Probe Number = 4, T = 20.673000 C 08:10:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.67 08:10:18 Integrated Voltage Measurement... 08:10:37 Voltage Offset Correction: v_off_ini = 0.000004520 V, v_off_fin = 0.000006474 V 08:10:37 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171077065 Vs 08:10:37 Integrated Voltage Measurement... 08:10:56 Voltage Offset Correction: v_off_ini = 0.000006015 V, v_off_fin = 0.000003774 V 08:10:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000634 Vs 08:10:59 Temperature Measurement, Probe Number = 0, T = 20.230000 C 08:11:00 Temperature Measurement, Probe Number = 1, T = 20.152000 C 08:11:01 Temperature Measurement, Probe Number = 2, T = 20.196000 C 08:11:01 Temperature Measurement, Probe Number = 3, T = 20.143000 C 08:11:02 Temperature Measurement, Probe Number = 4, T = 20.581000 C 08:11:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.58 08:11:02 Integrated Voltage Measurement... 08:11:21 Voltage Offset Correction: v_off_ini = 0.000004739 V, v_off_fin = 0.000007361 V 08:11:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171076123 Vs 08:11:22 Integrated Voltage Measurement... 08:11:41 Voltage Offset Correction: v_off_ini = 0.000006491 V, v_off_fin = 0.000002946 V 08:11:41 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171007589 Vs 08:11:44 Temperature Measurement, Probe Number = 0, T = 20.227000 C 08:11:44 Temperature Measurement, Probe Number = 1, T = 20.150000 C 08:11:45 Temperature Measurement, Probe Number = 2, T = 20.195000 C 08:11:46 Temperature Measurement, Probe Number = 3, T = 20.140000 C 08:11:46 Temperature Measurement, Probe Number = 4, T = 20.559000 C 08:11:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.56 08:11:47 Integrated Voltage Measurement... 08:12:06 Voltage Offset Correction: v_off_ini = 0.000004167 V, v_off_fin = 0.000006883 V 08:12:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071426 Vs 08:12:06 Integrated Voltage Measurement... 08:12:25 Voltage Offset Correction: v_off_ini = 0.000005669 V, v_off_fin = 0.000003449 V 08:12:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002877 Vs 08:12:28 Temperature Measurement, Probe Number = 0, T = 20.225000 C 08:12:29 Temperature Measurement, Probe Number = 1, T = 20.152000 C 08:12:30 Temperature Measurement, Probe Number = 2, T = 20.192000 C 08:12:30 Temperature Measurement, Probe Number = 3, T = 20.138000 C 08:12:31 Temperature Measurement, Probe Number = 4, T = 20.555000 C 08:12:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.55 08:12:31 Integrated Voltage Measurement... 08:12:51 Voltage Offset Correction: v_off_ini = 0.000004609 V, v_off_fin = 0.000006750 V 08:12:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073410 Vs 08:12:51 Integrated Voltage Measurement... 08:13:11 Voltage Offset Correction: v_off_ini = 0.000006549 V, v_off_fin = 0.000003465 V 08:13:11 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171002789 Vs 08:13:13 Temperature Measurement, Probe Number = 0, T = 20.227000 C 08:13:14 Temperature Measurement, Probe Number = 1, T = 20.155000 C 08:13:15 Temperature Measurement, Probe Number = 2, T = 20.194000 C 08:13:15 Temperature Measurement, Probe Number = 3, T = 20.141000 C 08:13:16 Temperature Measurement, Probe Number = 4, T = 20.553000 C 08:13:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.55 08:13:16 Integrated Voltage Measurement... 08:13:35 Voltage Offset Correction: v_off_ini = 0.000003591 V, v_off_fin = 0.000006699 V 08:13:36 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171070365 Vs 08:13:36 Integrated Voltage Measurement... 08:13:55 Voltage Offset Correction: v_off_ini = 0.000006195 V, v_off_fin = 0.000003615 V 08:13:55 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000934 Vs 08:13:58 Temperature Measurement, Probe Number = 0, T = 20.235000 C 08:13:59 Temperature Measurement, Probe Number = 1, T = 20.161000 C 08:13:59 Temperature Measurement, Probe Number = 2, T = 20.201000 C 08:14:00 Temperature Measurement, Probe Number = 3, T = 20.146000 C 08:14:00 Temperature Measurement, Probe Number = 4, T = 20.638000 C 08:14:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.64 08:14:01 Integrated Voltage Measurement... 08:14:20 Voltage Offset Correction: v_off_ini = 0.000004453 V, v_off_fin = 0.000007183 V 08:14:20 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171073411 Vs 08:14:20 Integrated Voltage Measurement... 08:14:40 Voltage Offset Correction: v_off_ini = 0.000006323 V, v_off_fin = 0.000003871 V 08:14:40 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170999514 Vs 08:14:43 Temperature Measurement, Probe Number = 0, T = 20.240000 C 08:14:43 Temperature Measurement, Probe Number = 1, T = 20.165000 C 08:14:44 Temperature Measurement, Probe Number = 2, T = 20.205000 C 08:14:45 Temperature Measurement, Probe Number = 3, T = 20.151000 C 08:14:45 Temperature Measurement, Probe Number = 4, T = 20.709000 C 08:14:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.71 08:14:45 Integrated Voltage Measurement... 08:15:05 Voltage Offset Correction: v_off_ini = 0.000004757 V, v_off_fin = 0.000007179 V 08:15:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171077376 Vs 08:15:05 Integrated Voltage Measurement... 08:15:24 Voltage Offset Correction: v_off_ini = 0.000006899 V, v_off_fin = 0.000003358 V 08:15:24 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170993014 Vs 08:45:27 Temperature Measurement, Probe Number = 0, T = 20.224000 C 08:45:28 Temperature Measurement, Probe Number = 1, T = 20.152000 C 08:45:29 Temperature Measurement, Probe Number = 2, T = 20.194000 C 08:45:29 Temperature Measurement, Probe Number = 3, T = 20.142000 C 08:45:30 Temperature Measurement, Probe Number = 4, T = 20.392000 C 08:45:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.39 08:45:30 Integrated Voltage Measurement... 08:45:49 Voltage Offset Correction: v_off_ini = 0.000005571 V, v_off_fin = 0.000007615 V 08:45:49 Integrated Voltage Measurement Delta Gap = 0.0040020 m VT = 0.171140475 Vs 08:45:49 Integrated Voltage Measurement... 08:46:09 Voltage Offset Correction: v_off_ini = 0.000006613 V, v_off_fin = 0.000003880 V 08:46:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978407 Vs 08:46:11 Temperature Measurement, Probe Number = 0, T = 20.228000 C 08:46:12 Temperature Measurement, Probe Number = 1, T = 20.158000 C 08:46:13 Temperature Measurement, Probe Number = 2, T = 20.195000 C 08:46:13 Temperature Measurement, Probe Number = 3, T = 20.144000 C 08:46:14 Temperature Measurement, Probe Number = 4, T = 20.446000 C 08:46:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.45 08:46:14 Integrated Voltage Measurement... 08:46:34 Voltage Offset Correction: v_off_ini = 0.000004662 V, v_off_fin = 0.000007711 V 08:46:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061494 Vs 08:46:34 Integrated Voltage Measurement... 08:46:53 Voltage Offset Correction: v_off_ini = 0.000007250 V, v_off_fin = 0.000004094 V 08:46:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970705 Vs 08:46:56 Temperature Measurement, Probe Number = 0, T = 20.233000 C 08:46:56 Temperature Measurement, Probe Number = 1, T = 20.160000 C 08:46:57 Temperature Measurement, Probe Number = 2, T = 20.199000 C 08:46:58 Temperature Measurement, Probe Number = 3, T = 20.146000 C 08:46:58 Temperature Measurement, Probe Number = 4, T = 20.407000 C 08:46:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.41 08:46:59 Integrated Voltage Measurement... 08:47:19 Voltage Offset Correction: v_off_ini = 0.000004911 V, v_off_fin = 0.000006949 V 08:47:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061585 Vs 08:47:20 Integrated Voltage Measurement... 08:47:39 Voltage Offset Correction: v_off_ini = 0.000005955 V, v_off_fin = 0.000003069 V 08:47:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982344 Vs 08:47:42 Temperature Measurement, Probe Number = 0, T = 20.238000 C 08:47:43 Temperature Measurement, Probe Number = 1, T = 20.166000 C 08:47:43 Temperature Measurement, Probe Number = 2, T = 20.200000 C 08:47:44 Temperature Measurement, Probe Number = 3, T = 20.148000 C 08:47:45 Temperature Measurement, Probe Number = 4, T = 20.368000 C 08:47:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.37 08:47:45 Integrated Voltage Measurement... 08:48:04 Voltage Offset Correction: v_off_ini = 0.000003841 V, v_off_fin = 0.000007194 V 08:48:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054399 Vs 08:48:04 Integrated Voltage Measurement... 08:48:24 Voltage Offset Correction: v_off_ini = 0.000006413 V, v_off_fin = 0.000003724 V 08:48:24 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170985630 Vs 08:48:27 Temperature Measurement, Probe Number = 0, T = 20.237000 C 08:48:27 Temperature Measurement, Probe Number = 1, T = 20.163000 C 08:48:28 Temperature Measurement, Probe Number = 2, T = 20.202000 C 08:48:29 Temperature Measurement, Probe Number = 3, T = 20.150000 C 08:48:29 Temperature Measurement, Probe Number = 4, T = 20.445000 C 08:48:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.45 08:48:30 Integrated Voltage Measurement... 08:48:49 Voltage Offset Correction: v_off_ini = 0.000004300 V, v_off_fin = 0.000006479 V 08:48:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054063 Vs 08:48:50 Integrated Voltage Measurement... 08:49:09 Voltage Offset Correction: v_off_ini = 0.000005885 V, v_off_fin = 0.000003546 V 08:49:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990078 Vs 08:49:12 Temperature Measurement, Probe Number = 0, T = 20.235000 C 08:49:13 Temperature Measurement, Probe Number = 1, T = 20.160000 C 08:49:13 Temperature Measurement, Probe Number = 2, T = 20.200000 C 08:49:14 Temperature Measurement, Probe Number = 3, T = 20.147000 C 08:49:15 Temperature Measurement, Probe Number = 4, T = 20.482000 C 08:49:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.48 08:49:15 Integrated Voltage Measurement... 08:49:34 Voltage Offset Correction: v_off_ini = 0.000003893 V, v_off_fin = 0.000006471 V 08:49:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058325 Vs 08:49:35 Integrated Voltage Measurement... 08:49:54 Voltage Offset Correction: v_off_ini = 0.000005888 V, v_off_fin = 0.000003229 V 08:49:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995704 Vs 08:49:57 Temperature Measurement, Probe Number = 0, T = 20.230000 C 08:49:57 Temperature Measurement, Probe Number = 1, T = 20.157000 C 08:49:58 Temperature Measurement, Probe Number = 2, T = 20.196000 C 08:49:59 Temperature Measurement, Probe Number = 3, T = 20.145000 C 08:49:59 Temperature Measurement, Probe Number = 4, T = 20.345000 C 08:49:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.34 08:50:00 Integrated Voltage Measurement... 08:50:19 Voltage Offset Correction: v_off_ini = 0.000003893 V, v_off_fin = 0.000007158 V 08:50:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054168 Vs 08:50:20 Integrated Voltage Measurement... 08:50:39 Voltage Offset Correction: v_off_ini = 0.000005823 V, v_off_fin = 0.000003364 V 08:50:39 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171002162 Vs 08:50:42 Temperature Measurement, Probe Number = 0, T = 20.231000 C 08:50:42 Temperature Measurement, Probe Number = 1, T = 20.158000 C 08:50:43 Temperature Measurement, Probe Number = 2, T = 20.198000 C 08:50:44 Temperature Measurement, Probe Number = 3, T = 20.145000 C 08:50:44 Temperature Measurement, Probe Number = 4, T = 20.284000 C 08:50:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.28 08:50:45 Integrated Voltage Measurement... 08:51:03 Voltage Offset Correction: v_off_ini = 0.000004005 V, v_off_fin = 0.000006687 V 08:51:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058596 Vs 08:51:04 Integrated Voltage Measurement... 08:51:23 Voltage Offset Correction: v_off_ini = 0.000005997 V, v_off_fin = 0.000003373 V 08:51:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990998 Vs 08:51:26 Temperature Measurement, Probe Number = 0, T = 20.226000 C 08:51:27 Temperature Measurement, Probe Number = 1, T = 20.156000 C 08:51:27 Temperature Measurement, Probe Number = 2, T = 20.196000 C 08:51:28 Temperature Measurement, Probe Number = 3, T = 20.145000 C 08:51:28 Temperature Measurement, Probe Number = 4, T = 20.229000 C 08:51:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.23 08:51:29 Integrated Voltage Measurement... 08:51:48 Voltage Offset Correction: v_off_ini = 0.000005001 V, v_off_fin = 0.000007021 V 08:51:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064731 Vs 08:51:49 Integrated Voltage Measurement... 08:52:08 Voltage Offset Correction: v_off_ini = 0.000007128 V, v_off_fin = 0.000003195 V 08:52:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990109 Vs 08:52:11 Temperature Measurement, Probe Number = 0, T = 20.235000 C 08:52:12 Temperature Measurement, Probe Number = 1, T = 20.162000 C 08:52:12 Temperature Measurement, Probe Number = 2, T = 20.203000 C 08:52:13 Temperature Measurement, Probe Number = 3, T = 20.152000 C 08:52:14 Temperature Measurement, Probe Number = 4, T = 20.210000 C 08:52:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.21 08:52:14 Integrated Voltage Measurement... 08:52:33 Voltage Offset Correction: v_off_ini = 0.000004326 V, v_off_fin = 0.000006791 V 08:52:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055875 Vs 08:52:34 Integrated Voltage Measurement... 08:52:52 Voltage Offset Correction: v_off_ini = 0.000006157 V, v_off_fin = 0.000002421 V 08:52:53 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170992000 Vs 09:22:56 Temperature Measurement, Probe Number = 0, T = 20.242000 C 09:22:56 Temperature Measurement, Probe Number = 1, T = 20.167000 C 09:22:57 Temperature Measurement, Probe Number = 2, T = 20.210000 C 09:22:58 Temperature Measurement, Probe Number = 3, T = 20.157000 C 09:22:58 Temperature Measurement, Probe Number = 4, T = 20.588000 C 09:22:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.59 09:22:59 Integrated Voltage Measurement... 09:23:18 Voltage Offset Correction: v_off_ini = 0.000005128 V, v_off_fin = 0.000006792 V 09:23:18 Integrated Voltage Measurement Delta Gap = 0.0040044 m VT = 0.171170353 Vs 09:23:18 Integrated Voltage Measurement... 09:23:37 Voltage Offset Correction: v_off_ini = 0.000006280 V, v_off_fin = 0.000003730 V 09:23:38 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170916636 Vs 09:23:40 Temperature Measurement, Probe Number = 0, T = 20.241000 C 09:23:41 Temperature Measurement, Probe Number = 1, T = 20.169000 C 09:23:42 Temperature Measurement, Probe Number = 2, T = 20.211000 C 09:23:42 Temperature Measurement, Probe Number = 3, T = 20.158000 C 09:23:43 Temperature Measurement, Probe Number = 4, T = 20.557000 C 09:23:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.56 09:23:43 Integrated Voltage Measurement... 09:24:02 Voltage Offset Correction: v_off_ini = 0.000004078 V, v_off_fin = 0.000006917 V 09:24:02 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.170989201 Vs 09:24:02 Integrated Voltage Measurement... 09:24:22 Voltage Offset Correction: v_off_ini = 0.000006406 V, v_off_fin = 0.000003243 V 09:24:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170916242 Vs 09:24:25 Temperature Measurement, Probe Number = 0, T = 20.240000 C 09:24:26 Temperature Measurement, Probe Number = 1, T = 20.170000 C 09:24:27 Temperature Measurement, Probe Number = 2, T = 20.208000 C 09:24:27 Temperature Measurement, Probe Number = 3, T = 20.157000 C 09:24:28 Temperature Measurement, Probe Number = 4, T = 20.518000 C 09:24:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.52 09:24:28 Integrated Voltage Measurement... 09:24:47 Voltage Offset Correction: v_off_ini = 0.000004456 V, v_off_fin = 0.000007051 V 09:24:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.170982965 Vs 09:24:48 Integrated Voltage Measurement... 09:25:07 Voltage Offset Correction: v_off_ini = 0.000006472 V, v_off_fin = 0.000003255 V 09:25:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170913744 Vs 09:25:10 Temperature Measurement, Probe Number = 0, T = 20.243000 C 09:25:11 Temperature Measurement, Probe Number = 1, T = 20.167000 C 09:25:11 Temperature Measurement, Probe Number = 2, T = 20.209000 C 09:25:12 Temperature Measurement, Probe Number = 3, T = 20.156000 C 09:25:13 Temperature Measurement, Probe Number = 4, T = 20.440000 C 09:25:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.44 09:25:13 Integrated Voltage Measurement... 09:25:32 Voltage Offset Correction: v_off_ini = 0.000004495 V, v_off_fin = 0.000007532 V 09:25:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.170992391 Vs 09:25:33 Integrated Voltage Measurement... 09:25:52 Voltage Offset Correction: v_off_ini = 0.000006345 V, v_off_fin = 0.000003032 V 09:25:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170925531 Vs 09:25:55 Temperature Measurement, Probe Number = 0, T = 20.240000 C 09:25:56 Temperature Measurement, Probe Number = 1, T = 20.166000 C 09:25:56 Temperature Measurement, Probe Number = 2, T = 20.206000 C 09:25:57 Temperature Measurement, Probe Number = 3, T = 20.152000 C 09:25:58 Temperature Measurement, Probe Number = 4, T = 20.435000 C 09:25:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.43 09:25:58 Integrated Voltage Measurement... 09:26:17 Voltage Offset Correction: v_off_ini = 0.000004482 V, v_off_fin = 0.000007055 V 09:26:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.170998369 Vs 09:26:18 Integrated Voltage Measurement... 09:26:37 Voltage Offset Correction: v_off_ini = 0.000006157 V, v_off_fin = 0.000003611 V 09:26:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170920707 Vs 09:26:40 Temperature Measurement, Probe Number = 0, T = 20.234000 C 09:26:40 Temperature Measurement, Probe Number = 1, T = 20.163000 C 09:26:41 Temperature Measurement, Probe Number = 2, T = 20.201000 C 09:26:42 Temperature Measurement, Probe Number = 3, T = 20.150000 C 09:26:42 Temperature Measurement, Probe Number = 4, T = 20.402000 C 09:26:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.40 09:26:42 Integrated Voltage Measurement... 09:27:02 Voltage Offset Correction: v_off_ini = 0.000004821 V, v_off_fin = 0.000006931 V 09:27:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171000196 Vs 09:27:02 Integrated Voltage Measurement... 09:27:21 Voltage Offset Correction: v_off_ini = 0.000006396 V, v_off_fin = 0.000003552 V 09:27:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170922387 Vs 09:27:24 Temperature Measurement, Probe Number = 0, T = 20.238000 C 09:27:25 Temperature Measurement, Probe Number = 1, T = 20.164000 C 09:27:26 Temperature Measurement, Probe Number = 2, T = 20.204000 C 09:27:26 Temperature Measurement, Probe Number = 3, T = 20.150000 C 09:27:27 Temperature Measurement, Probe Number = 4, T = 20.403000 C 09:27:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.40 09:27:27 Integrated Voltage Measurement... 09:27:46 Voltage Offset Correction: v_off_ini = 0.000004477 V, v_off_fin = 0.000007095 V 09:27:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.170997568 Vs 09:27:47 Integrated Voltage Measurement... 09:28:06 Voltage Offset Correction: v_off_ini = 0.000005908 V, v_off_fin = 0.000003101 V 09:28:06 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170923147 Vs 09:28:09 Temperature Measurement, Probe Number = 0, T = 20.240000 C 09:28:09 Temperature Measurement, Probe Number = 1, T = 20.166000 C 09:28:10 Temperature Measurement, Probe Number = 2, T = 20.208000 C 09:28:11 Temperature Measurement, Probe Number = 3, T = 20.154000 C 09:28:11 Temperature Measurement, Probe Number = 4, T = 20.419000 C 09:28:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.42 09:28:12 Integrated Voltage Measurement... 09:28:31 Voltage Offset Correction: v_off_ini = 0.000004135 V, v_off_fin = 0.000006761 V 09:28:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.170998455 Vs 09:28:31 Integrated Voltage Measurement... 09:28:51 Voltage Offset Correction: v_off_ini = 0.000006398 V, v_off_fin = 0.000003442 V 09:28:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170927864 Vs 09:28:53 Temperature Measurement, Probe Number = 0, T = 20.245000 C 09:28:54 Temperature Measurement, Probe Number = 1, T = 20.170000 C 09:28:55 Temperature Measurement, Probe Number = 2, T = 20.213000 C 09:28:55 Temperature Measurement, Probe Number = 3, T = 20.161000 C 09:28:56 Temperature Measurement, Probe Number = 4, T = 20.431000 C 09:28:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.43 09:28:56 Integrated Voltage Measurement... 09:29:16 Voltage Offset Correction: v_off_ini = 0.000004137 V, v_off_fin = 0.000006600 V 09:29:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.170995069 Vs 09:29:16 Integrated Voltage Measurement... 09:29:35 Voltage Offset Correction: v_off_ini = 0.000006414 V, v_off_fin = 0.000003159 V 09:29:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170930298 Vs 09:29:38 Temperature Measurement, Probe Number = 0, T = 20.245000 C 09:29:39 Temperature Measurement, Probe Number = 1, T = 20.172000 C 09:29:40 Temperature Measurement, Probe Number = 2, T = 20.213000 C 09:29:40 Temperature Measurement, Probe Number = 3, T = 20.162000 C 09:29:41 Temperature Measurement, Probe Number = 4, T = 20.522000 C 09:29:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.52 09:29:41 Integrated Voltage Measurement... 09:30:01 Voltage Offset Correction: v_off_ini = 0.000004626 V, v_off_fin = 0.000006858 V 09:30:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171001665 Vs 09:30:01 Integrated Voltage Measurement... 09:30:21 Voltage Offset Correction: v_off_ini = 0.000006542 V, v_off_fin = 0.000002888 V 09:30:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170930067 Vs 10:00:24 Temperature Measurement, Probe Number = 0, T = 20.247000 C 10:00:24 Temperature Measurement, Probe Number = 1, T = 20.169000 C 10:00:25 Temperature Measurement, Probe Number = 2, T = 20.213000 C 10:00:26 Temperature Measurement, Probe Number = 3, T = 20.159000 C 10:00:26 Temperature Measurement, Probe Number = 4, T = 20.540000 C 10:00:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.54 10:00:26 Integrated Voltage Measurement... 10:00:46 Voltage Offset Correction: v_off_ini = 0.000004872 V, v_off_fin = 0.000006277 V 10:00:46 Integrated Voltage Measurement Delta Gap = 0.0040007 m VT = 0.171024717 Vs 10:00:46 Integrated Voltage Measurement... 10:01:06 Voltage Offset Correction: v_off_ini = 0.000005702 V, v_off_fin = 0.000003219 V 10:01:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953403 Vs 10:01:09 Temperature Measurement, Probe Number = 0, T = 20.252000 C 10:01:10 Temperature Measurement, Probe Number = 1, T = 20.172000 C 10:01:10 Temperature Measurement, Probe Number = 2, T = 20.216000 C 10:01:11 Temperature Measurement, Probe Number = 3, T = 20.160000 C 10:01:11 Temperature Measurement, Probe Number = 4, T = 20.565000 C 10:01:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.57 10:01:12 Integrated Voltage Measurement... 10:01:31 Voltage Offset Correction: v_off_ini = 0.000004397 V, v_off_fin = 0.000006671 V 10:01:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171008192 Vs 10:01:31 Integrated Voltage Measurement... 10:01:51 Voltage Offset Correction: v_off_ini = 0.000005963 V, v_off_fin = 0.000002947 V 10:01:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170945472 Vs 10:01:54 Temperature Measurement, Probe Number = 0, T = 20.254000 C 10:01:54 Temperature Measurement, Probe Number = 1, T = 20.176000 C 10:01:55 Temperature Measurement, Probe Number = 2, T = 20.220000 C 10:01:56 Temperature Measurement, Probe Number = 3, T = 20.165000 C 10:01:56 Temperature Measurement, Probe Number = 4, T = 20.630000 C 10:01:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.63 10:01:56 Integrated Voltage Measurement... 10:02:16 Voltage Offset Correction: v_off_ini = 0.000004271 V, v_off_fin = 0.000007426 V 10:02:17 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171012857 Vs 10:02:17 Integrated Voltage Measurement... 10:02:36 Voltage Offset Correction: v_off_ini = 0.000005956 V, v_off_fin = 0.000003155 V 10:02:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170941824 Vs 10:02:39 Temperature Measurement, Probe Number = 0, T = 20.251000 C 10:02:39 Temperature Measurement, Probe Number = 1, T = 20.176000 C 10:02:40 Temperature Measurement, Probe Number = 2, T = 20.217000 C 10:02:41 Temperature Measurement, Probe Number = 3, T = 20.163000 C 10:02:41 Temperature Measurement, Probe Number = 4, T = 20.607000 C 10:02:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.61 10:02:42 Integrated Voltage Measurement... 10:03:01 Voltage Offset Correction: v_off_ini = 0.000003812 V, v_off_fin = 0.000006850 V 10:03:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171013611 Vs 10:03:01 Integrated Voltage Measurement... 10:03:21 Voltage Offset Correction: v_off_ini = 0.000006263 V, v_off_fin = 0.000003310 V 10:03:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170946046 Vs 10:03:24 Temperature Measurement, Probe Number = 0, T = 20.248000 C 10:03:24 Temperature Measurement, Probe Number = 1, T = 20.174000 C 10:03:25 Temperature Measurement, Probe Number = 2, T = 20.214000 C 10:03:26 Temperature Measurement, Probe Number = 3, T = 20.160000 C 10:03:26 Temperature Measurement, Probe Number = 4, T = 20.642000 C 10:03:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.64 10:03:26 Integrated Voltage Measurement... 10:03:46 Voltage Offset Correction: v_off_ini = 0.000003679 V, v_off_fin = 0.000006570 V 10:03:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171008858 Vs 10:03:46 Integrated Voltage Measurement... 10:04:06 Voltage Offset Correction: v_off_ini = 0.000005676 V, v_off_fin = 0.000003364 V 10:04:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170945896 Vs 10:04:09 Temperature Measurement, Probe Number = 0, T = 20.247000 C 10:04:09 Temperature Measurement, Probe Number = 1, T = 20.173000 C 10:04:10 Temperature Measurement, Probe Number = 2, T = 20.213000 C 10:04:11 Temperature Measurement, Probe Number = 3, T = 20.159000 C 10:04:11 Temperature Measurement, Probe Number = 4, T = 20.579000 C 10:04:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.58 10:04:11 Integrated Voltage Measurement... 10:04:31 Voltage Offset Correction: v_off_ini = 0.000004152 V, v_off_fin = 0.000006909 V 10:04:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171014053 Vs 10:04:31 Integrated Voltage Measurement... 10:04:50 Voltage Offset Correction: v_off_ini = 0.000006015 V, v_off_fin = 0.000003301 V 10:04:50 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170940900 Vs 10:04:53 Temperature Measurement, Probe Number = 0, T = 20.252000 C 10:04:54 Temperature Measurement, Probe Number = 1, T = 20.174000 C 10:04:54 Temperature Measurement, Probe Number = 2, T = 20.220000 C 10:04:55 Temperature Measurement, Probe Number = 3, T = 20.164000 C 10:04:56 Temperature Measurement, Probe Number = 4, T = 20.561000 C 10:04:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.56 10:04:56 Integrated Voltage Measurement... 10:05:15 Voltage Offset Correction: v_off_ini = 0.000004416 V, v_off_fin = 0.000006857 V 10:05:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171016014 Vs 10:05:15 Integrated Voltage Measurement... 10:05:34 Voltage Offset Correction: v_off_ini = 0.000005713 V, v_off_fin = 0.000003326 V 10:05:35 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170945145 Vs 10:05:37 Temperature Measurement, Probe Number = 0, T = 20.255000 C 10:05:38 Temperature Measurement, Probe Number = 1, T = 20.178000 C 10:05:39 Temperature Measurement, Probe Number = 2, T = 20.223000 C 10:05:39 Temperature Measurement, Probe Number = 3, T = 20.164000 C 10:05:40 Temperature Measurement, Probe Number = 4, T = 20.583000 C 10:05:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.58 10:05:40 Integrated Voltage Measurement... 10:06:00 Voltage Offset Correction: v_off_ini = 0.000004575 V, v_off_fin = 0.000006711 V 10:06:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171017449 Vs 10:06:00 Integrated Voltage Measurement... 10:06:19 Voltage Offset Correction: v_off_ini = 0.000006060 V, v_off_fin = 0.000003633 V 10:06:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170939142 Vs 10:06:22 Temperature Measurement, Probe Number = 0, T = 20.254000 C 10:06:23 Temperature Measurement, Probe Number = 1, T = 20.181000 C 10:06:24 Temperature Measurement, Probe Number = 2, T = 20.218000 C 10:06:24 Temperature Measurement, Probe Number = 3, T = 20.164000 C 10:06:25 Temperature Measurement, Probe Number = 4, T = 20.623000 C 10:06:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.62 10:06:25 Integrated Voltage Measurement... 10:06:44 Voltage Offset Correction: v_off_ini = 0.000003939 V, v_off_fin = 0.000007832 V 10:06:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171027218 Vs 10:06:45 Integrated Voltage Measurement... 10:07:04 Voltage Offset Correction: v_off_ini = 0.000006804 V, v_off_fin = 0.000004312 V 10:07:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170934182 Vs 10:07:07 Temperature Measurement, Probe Number = 0, T = 20.255000 C 10:07:08 Temperature Measurement, Probe Number = 1, T = 20.179000 C 10:07:08 Temperature Measurement, Probe Number = 2, T = 20.221000 C 10:07:09 Temperature Measurement, Probe Number = 3, T = 20.166000 C 10:07:10 Temperature Measurement, Probe Number = 4, T = 20.641000 C 10:07:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.64 10:07:10 Integrated Voltage Measurement... 10:07:30 Voltage Offset Correction: v_off_ini = 0.000005419 V, v_off_fin = 0.000007687 V 10:07:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025677 Vs 10:07:30 Integrated Voltage Measurement... 10:07:49 Voltage Offset Correction: v_off_ini = 0.000007186 V, v_off_fin = 0.000005116 V 10:07:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170928652 Vs 10:37:52 Temperature Measurement, Probe Number = 0, T = 20.253000 C 10:37:53 Temperature Measurement, Probe Number = 1, T = 20.176000 C 10:37:53 Temperature Measurement, Probe Number = 2, T = 20.221000 C 10:37:54 Temperature Measurement, Probe Number = 3, T = 20.166000 C 10:37:55 Temperature Measurement, Probe Number = 4, T = 20.398000 C 10:37:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.40 10:37:55 Integrated Voltage Measurement... 10:38:14 Voltage Offset Correction: v_off_ini = 0.000006872 V, v_off_fin = 0.000007900 V 10:38:15 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171078848 Vs 10:38:15 Integrated Voltage Measurement... 10:38:34 Voltage Offset Correction: v_off_ini = 0.000007524 V, v_off_fin = 0.000005542 V 10:38:34 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170932952 Vs 10:38:37 Temperature Measurement, Probe Number = 0, T = 20.254000 C 10:38:37 Temperature Measurement, Probe Number = 1, T = 20.179000 C 10:38:38 Temperature Measurement, Probe Number = 2, T = 20.222000 C 10:38:39 Temperature Measurement, Probe Number = 3, T = 20.168000 C 10:38:39 Temperature Measurement, Probe Number = 4, T = 20.452000 C 10:38:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.45 10:38:40 Integrated Voltage Measurement... 10:38:59 Voltage Offset Correction: v_off_ini = 0.000005479 V, v_off_fin = 0.000008261 V 10:38:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033265 Vs 10:39:00 Integrated Voltage Measurement... 10:39:19 Voltage Offset Correction: v_off_ini = 0.000007279 V, v_off_fin = 0.000007093 V 10:39:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170936868 Vs 10:39:22 Temperature Measurement, Probe Number = 0, T = 20.251000 C 10:39:23 Temperature Measurement, Probe Number = 1, T = 20.171000 C 10:39:23 Temperature Measurement, Probe Number = 2, T = 20.220000 C 10:39:24 Temperature Measurement, Probe Number = 3, T = 20.163000 C 10:39:25 Temperature Measurement, Probe Number = 4, T = 20.527000 C 10:39:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.53 10:39:25 Integrated Voltage Measurement... 10:39:44 Voltage Offset Correction: v_off_ini = 0.000005397 V, v_off_fin = 0.000008479 V 10:39:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034442 Vs 10:39:45 Integrated Voltage Measurement... 10:40:03 Voltage Offset Correction: v_off_ini = 0.000007728 V, v_off_fin = 0.000005282 V 10:40:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170927448 Vs 10:40:06 Temperature Measurement, Probe Number = 0, T = 20.256000 C 10:40:07 Temperature Measurement, Probe Number = 1, T = 20.178000 C 10:40:08 Temperature Measurement, Probe Number = 2, T = 20.221000 C 10:40:08 Temperature Measurement, Probe Number = 3, T = 20.167000 C 10:40:09 Temperature Measurement, Probe Number = 4, T = 20.571000 C 10:40:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.26 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.57 10:40:09 Integrated Voltage Measurement... 10:40:28 Voltage Offset Correction: v_off_ini = 0.000005877 V, v_off_fin = 0.000008599 V 10:40:29 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171041285 Vs 10:40:29 Integrated Voltage Measurement... 10:40:48 Voltage Offset Correction: v_off_ini = 0.000008578 V, v_off_fin = 0.000006244 V 10:40:48 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170927999 Vs 10:40:51 Temperature Measurement, Probe Number = 0, T = 20.255000 C 10:40:52 Temperature Measurement, Probe Number = 1, T = 20.176000 C 10:40:52 Temperature Measurement, Probe Number = 2, T = 20.221000 C 10:40:53 Temperature Measurement, Probe Number = 3, T = 20.165000 C 10:40:54 Temperature Measurement, Probe Number = 4, T = 20.560000 C 10:40:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.56 10:40:54 Integrated Voltage Measurement... 10:41:14 Voltage Offset Correction: v_off_ini = 0.000007214 V, v_off_fin = 0.000010048 V 10:41:14 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044634 Vs 10:41:14 Integrated Voltage Measurement... 10:41:33 Voltage Offset Correction: v_off_ini = 0.000008061 V, v_off_fin = 0.000004450 V 10:41:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170933886 Vs 10:41:36 Temperature Measurement, Probe Number = 0, T = 20.256000 C 10:41:37 Temperature Measurement, Probe Number = 1, T = 20.179000 C 10:41:38 Temperature Measurement, Probe Number = 2, T = 20.221000 C 10:41:38 Temperature Measurement, Probe Number = 3, T = 20.166000 C 10:41:39 Temperature Measurement, Probe Number = 4, T = 20.557000 C 10:41:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.26 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.56 10:41:39 Integrated Voltage Measurement... 10:41:59 Voltage Offset Correction: v_off_ini = 0.000005301 V, v_off_fin = 0.000007675 V 10:41:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171032767 Vs 10:41:59 Integrated Voltage Measurement... 10:42:18 Voltage Offset Correction: v_off_ini = 0.000009001 V, v_off_fin = 0.000005835 V 10:42:18 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170934558 Vs 10:42:21 Temperature Measurement, Probe Number = 0, T = 20.253000 C 10:42:22 Temperature Measurement, Probe Number = 1, T = 20.178000 C 10:42:23 Temperature Measurement, Probe Number = 2, T = 20.218000 C 10:42:23 Temperature Measurement, Probe Number = 3, T = 20.164000 C 10:42:24 Temperature Measurement, Probe Number = 4, T = 20.516000 C 10:42:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.52 10:42:24 Integrated Voltage Measurement... 10:42:43 Voltage Offset Correction: v_off_ini = 0.000005391 V, v_off_fin = 0.000006870 V 10:42:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033936 Vs 10:42:44 Integrated Voltage Measurement... 10:43:03 Voltage Offset Correction: v_off_ini = 0.000007691 V, v_off_fin = 0.000004307 V 10:43:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170927882 Vs 10:43:06 Temperature Measurement, Probe Number = 0, T = 20.254000 C 10:43:06 Temperature Measurement, Probe Number = 1, T = 20.179000 C 10:43:07 Temperature Measurement, Probe Number = 2, T = 20.220000 C 10:43:08 Temperature Measurement, Probe Number = 3, T = 20.166000 C 10:43:08 Temperature Measurement, Probe Number = 4, T = 20.456000 C 10:43:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.46 10:43:09 Integrated Voltage Measurement... 10:43:28 Voltage Offset Correction: v_off_ini = 0.000005344 V, v_off_fin = 0.000007781 V 10:43:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171032440 Vs 10:43:28 Integrated Voltage Measurement... 10:43:47 Voltage Offset Correction: v_off_ini = 0.000009539 V, v_off_fin = 0.000007413 V 10:43:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170935056 Vs 10:43:50 Temperature Measurement, Probe Number = 0, T = 20.251000 C 10:43:51 Temperature Measurement, Probe Number = 1, T = 20.176000 C 10:43:52 Temperature Measurement, Probe Number = 2, T = 20.216000 C 10:43:52 Temperature Measurement, Probe Number = 3, T = 20.162000 C 10:43:53 Temperature Measurement, Probe Number = 4, T = 20.434000 C 10:43:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.43 10:43:53 Integrated Voltage Measurement... 10:44:13 Voltage Offset Correction: v_off_ini = 0.000005329 V, v_off_fin = 0.000007933 V 10:44:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024934 Vs 10:44:13 Integrated Voltage Measurement... 10:44:32 Voltage Offset Correction: v_off_ini = 0.000007122 V, v_off_fin = 0.000005183 V 10:44:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170925134 Vs 10:44:35 Temperature Measurement, Probe Number = 0, T = 20.255000 C 10:44:36 Temperature Measurement, Probe Number = 1, T = 20.180000 C 10:44:36 Temperature Measurement, Probe Number = 2, T = 20.218000 C 10:44:37 Temperature Measurement, Probe Number = 3, T = 20.164000 C 10:44:37 Temperature Measurement, Probe Number = 4, T = 20.423000 C 10:44:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.42 10:44:38 Integrated Voltage Measurement... 10:44:57 Voltage Offset Correction: v_off_ini = 0.000005670 V, v_off_fin = 0.000008082 V 10:44:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171035911 Vs 10:44:57 Integrated Voltage Measurement... 10:45:17 Voltage Offset Correction: v_off_ini = 0.000007521 V, v_off_fin = 0.000004728 V 10:45:17 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170927652 Vs 11:15:19 Temperature Measurement, Probe Number = 0, T = 20.253000 C 11:15:20 Temperature Measurement, Probe Number = 1, T = 20.177000 C 11:15:21 Temperature Measurement, Probe Number = 2, T = 20.221000 C 11:15:22 Temperature Measurement, Probe Number = 3, T = 20.167000 C 11:15:22 Temperature Measurement, Probe Number = 4, T = 20.304000 C 11:15:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.30 11:15:23 Integrated Voltage Measurement... 11:15:42 Voltage Offset Correction: v_off_ini = 0.000006206 V, v_off_fin = 0.000008131 V 11:15:42 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171089714 Vs 11:15:42 Integrated Voltage Measurement... 11:16:02 Voltage Offset Correction: v_off_ini = 0.000007435 V, v_off_fin = 0.000004652 V 11:16:02 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170930867 Vs 11:16:05 Temperature Measurement, Probe Number = 0, T = 20.258000 C 11:16:05 Temperature Measurement, Probe Number = 1, T = 20.184000 C 11:16:06 Temperature Measurement, Probe Number = 2, T = 20.225000 C 11:16:07 Temperature Measurement, Probe Number = 3, T = 20.171000 C 11:16:07 Temperature Measurement, Probe Number = 4, T = 20.397000 C 11:16:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.26 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.40 11:16:07 Integrated Voltage Measurement... 11:16:27 Voltage Offset Correction: v_off_ini = 0.000005518 V, v_off_fin = 0.000008252 V 11:16:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029765 Vs 11:16:27 Integrated Voltage Measurement... 11:16:47 Voltage Offset Correction: v_off_ini = 0.000007473 V, v_off_fin = 0.000004949 V 11:16:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170929324 Vs 11:16:50 Temperature Measurement, Probe Number = 0, T = 20.259000 C 11:16:50 Temperature Measurement, Probe Number = 1, T = 20.181000 C 11:16:51 Temperature Measurement, Probe Number = 2, T = 20.226000 C 11:16:52 Temperature Measurement, Probe Number = 3, T = 20.170000 C 11:16:52 Temperature Measurement, Probe Number = 4, T = 20.464000 C 11:16:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.26 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.46 11:16:52 Integrated Voltage Measurement... 11:17:12 Voltage Offset Correction: v_off_ini = 0.000005427 V, v_off_fin = 0.000007763 V 11:17:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030347 Vs 11:17:12 Integrated Voltage Measurement... 11:17:32 Voltage Offset Correction: v_off_ini = 0.000007246 V, v_off_fin = 0.000005397 V 11:17:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170932251 Vs 11:17:35 Temperature Measurement, Probe Number = 0, T = 20.259000 C 11:17:35 Temperature Measurement, Probe Number = 1, T = 20.181000 C 11:17:36 Temperature Measurement, Probe Number = 2, T = 20.228000 C 11:17:37 Temperature Measurement, Probe Number = 3, T = 20.171000 C 11:17:37 Temperature Measurement, Probe Number = 4, T = 20.482000 C 11:17:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.26 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.48 11:17:38 Integrated Voltage Measurement... 11:17:57 Voltage Offset Correction: v_off_ini = 0.000004999 V, v_off_fin = 0.000007778 V 11:17:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029274 Vs 11:17:57 Integrated Voltage Measurement... 11:18:17 Voltage Offset Correction: v_off_ini = 0.000007458 V, v_off_fin = 0.000005080 V 11:18:17 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170931838 Vs 11:18:20 Temperature Measurement, Probe Number = 0, T = 20.256000 C 11:18:20 Temperature Measurement, Probe Number = 1, T = 20.181000 C 11:18:21 Temperature Measurement, Probe Number = 2, T = 20.223000 C 11:18:22 Temperature Measurement, Probe Number = 3, T = 20.169000 C 11:18:22 Temperature Measurement, Probe Number = 4, T = 20.501000 C 11:18:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.26 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.50 11:18:22 Integrated Voltage Measurement... 11:18:42 Voltage Offset Correction: v_off_ini = 0.000008253 V, v_off_fin = 0.000009880 V 11:18:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035874 Vs 11:18:42 Integrated Voltage Measurement... 11:19:01 Voltage Offset Correction: v_off_ini = 0.000007580 V, v_off_fin = 0.000004687 V 11:19:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170930826 Vs 11:19:04 Temperature Measurement, Probe Number = 0, T = 20.250000 C 11:19:05 Temperature Measurement, Probe Number = 1, T = 20.177000 C 11:19:05 Temperature Measurement, Probe Number = 2, T = 20.218000 C 11:19:06 Temperature Measurement, Probe Number = 3, T = 20.166000 C 11:19:06 Temperature Measurement, Probe Number = 4, T = 20.469000 C 11:19:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.47 11:19:07 Integrated Voltage Measurement... 11:19:26 Voltage Offset Correction: v_off_ini = 0.000006011 V, v_off_fin = 0.000007855 V 11:19:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171035931 Vs 11:19:26 Integrated Voltage Measurement... 11:19:46 Voltage Offset Correction: v_off_ini = 0.000006888 V, v_off_fin = 0.000004601 V 11:19:46 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170933324 Vs 11:19:49 Temperature Measurement, Probe Number = 0, T = 20.257000 C 11:19:49 Temperature Measurement, Probe Number = 1, T = 20.185000 C 11:19:50 Temperature Measurement, Probe Number = 2, T = 20.222000 C 11:19:51 Temperature Measurement, Probe Number = 3, T = 20.170000 C 11:19:51 Temperature Measurement, Probe Number = 4, T = 20.541000 C 11:19:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.26 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.54 11:19:52 Integrated Voltage Measurement... 11:20:11 Voltage Offset Correction: v_off_ini = 0.000005624 V, v_off_fin = 0.000008486 V 11:20:11 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171037016 Vs 11:20:11 Integrated Voltage Measurement... 11:20:30 Voltage Offset Correction: v_off_ini = 0.000008089 V, v_off_fin = 0.000005628 V 11:20:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170922274 Vs 11:20:33 Temperature Measurement, Probe Number = 0, T = 20.261000 C 11:20:34 Temperature Measurement, Probe Number = 1, T = 20.187000 C 11:20:34 Temperature Measurement, Probe Number = 2, T = 20.225000 C 11:20:35 Temperature Measurement, Probe Number = 3, T = 20.173000 C 11:20:36 Temperature Measurement, Probe Number = 4, T = 20.610000 C 11:20:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.26 P1 = Bottom 2, Value = 20.19 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.61 11:20:36 Integrated Voltage Measurement... 11:20:55 Voltage Offset Correction: v_off_ini = 0.000006074 V, v_off_fin = 0.000008215 V 11:20:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042323 Vs 11:20:55 Integrated Voltage Measurement... 11:21:15 Voltage Offset Correction: v_off_ini = 0.000007688 V, v_off_fin = 0.000004934 V 11:21:15 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170924836 Vs 11:21:17 Temperature Measurement, Probe Number = 0, T = 20.260000 C 11:21:18 Temperature Measurement, Probe Number = 1, T = 20.184000 C 11:21:19 Temperature Measurement, Probe Number = 2, T = 20.230000 C 11:21:19 Temperature Measurement, Probe Number = 3, T = 20.176000 C 11:21:20 Temperature Measurement, Probe Number = 4, T = 20.631000 C 11:21:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.26 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.63 11:21:20 Integrated Voltage Measurement... 11:21:39 Voltage Offset Correction: v_off_ini = 0.000004882 V, v_off_fin = 0.000008614 V 11:21:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036118 Vs 11:21:40 Integrated Voltage Measurement... 11:21:59 Voltage Offset Correction: v_off_ini = 0.000008028 V, v_off_fin = 0.000004507 V 11:21:59 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170926190 Vs 11:22:02 Temperature Measurement, Probe Number = 0, T = 20.259000 C 11:22:03 Temperature Measurement, Probe Number = 1, T = 20.182000 C 11:22:03 Temperature Measurement, Probe Number = 2, T = 20.227000 C 11:22:04 Temperature Measurement, Probe Number = 3, T = 20.172000 C 11:22:05 Temperature Measurement, Probe Number = 4, T = 20.623000 C 11:22:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.26 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.62 11:22:05 Integrated Voltage Measurement... 11:22:24 Voltage Offset Correction: v_off_ini = 0.000004442 V, v_off_fin = 0.000007195 V 11:22:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171022836 Vs 11:22:25 Integrated Voltage Measurement... 11:22:44 Voltage Offset Correction: v_off_ini = 0.000005629 V, v_off_fin = 0.000002986 V 11:22:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170945820 Vs 11:52:47 Temperature Measurement, Probe Number = 0, T = 20.244000 C 11:52:47 Temperature Measurement, Probe Number = 1, T = 20.164000 C 11:52:48 Temperature Measurement, Probe Number = 2, T = 20.214000 C 11:52:49 Temperature Measurement, Probe Number = 3, T = 20.158000 C 11:52:49 Temperature Measurement, Probe Number = 4, T = 20.215000 C 11:52:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.21 11:52:50 Integrated Voltage Measurement... 11:53:09 Voltage Offset Correction: v_off_ini = 0.000005076 V, v_off_fin = 0.000006776 V 11:53:09 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171061432 Vs 11:53:09 Integrated Voltage Measurement... 11:53:28 Voltage Offset Correction: v_off_ini = 0.000006353 V, v_off_fin = 0.000003511 V 11:53:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951217 Vs 11:53:31 Temperature Measurement, Probe Number = 0, T = 20.247000 C 11:53:32 Temperature Measurement, Probe Number = 1, T = 20.168000 C 11:53:33 Temperature Measurement, Probe Number = 2, T = 20.216000 C 11:53:33 Temperature Measurement, Probe Number = 3, T = 20.161000 C 11:53:34 Temperature Measurement, Probe Number = 4, T = 20.332000 C 11:53:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.33 11:53:34 Integrated Voltage Measurement... 11:53:53 Voltage Offset Correction: v_off_ini = 0.000004130 V, v_off_fin = 0.000006562 V 11:53:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020541 Vs 11:53:54 Integrated Voltage Measurement... 11:54:13 Voltage Offset Correction: v_off_ini = 0.000006170 V, v_off_fin = 0.000003385 V 11:54:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957827 Vs 11:54:16 Temperature Measurement, Probe Number = 0, T = 20.253000 C 11:54:16 Temperature Measurement, Probe Number = 1, T = 20.175000 C 11:54:17 Temperature Measurement, Probe Number = 2, T = 20.220000 C 11:54:18 Temperature Measurement, Probe Number = 3, T = 20.166000 C 11:54:18 Temperature Measurement, Probe Number = 4, T = 20.349000 C 11:54:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.35 11:54:19 Integrated Voltage Measurement... 11:54:38 Voltage Offset Correction: v_off_ini = 0.000004129 V, v_off_fin = 0.000007310 V 11:54:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171027861 Vs 11:54:38 Integrated Voltage Measurement... 11:54:57 Voltage Offset Correction: v_off_ini = 0.000006633 V, v_off_fin = 0.000002803 V 11:54:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953495 Vs 11:55:00 Temperature Measurement, Probe Number = 0, T = 20.253000 C 11:55:01 Temperature Measurement, Probe Number = 1, T = 20.173000 C 11:55:02 Temperature Measurement, Probe Number = 2, T = 20.220000 C 11:55:02 Temperature Measurement, Probe Number = 3, T = 20.162000 C 11:55:03 Temperature Measurement, Probe Number = 4, T = 20.413000 C 11:55:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.41 11:55:03 Integrated Voltage Measurement... 11:55:22 Voltage Offset Correction: v_off_ini = 0.000004477 V, v_off_fin = 0.000006179 V 11:55:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171025774 Vs 11:55:23 Integrated Voltage Measurement... 11:55:42 Voltage Offset Correction: v_off_ini = 0.000005830 V, v_off_fin = 0.000002888 V 11:55:42 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170964089 Vs 11:55:45 Temperature Measurement, Probe Number = 0, T = 20.250000 C 11:55:46 Temperature Measurement, Probe Number = 1, T = 20.170000 C 11:55:46 Temperature Measurement, Probe Number = 2, T = 20.219000 C 11:55:47 Temperature Measurement, Probe Number = 3, T = 20.162000 C 11:55:48 Temperature Measurement, Probe Number = 4, T = 20.497000 C 11:55:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.50 11:55:48 Integrated Voltage Measurement... 11:56:07 Voltage Offset Correction: v_off_ini = 0.000004032 V, v_off_fin = 0.000006741 V 11:56:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023114 Vs 11:56:08 Integrated Voltage Measurement... 11:56:27 Voltage Offset Correction: v_off_ini = 0.000005919 V, v_off_fin = 0.000003002 V 11:56:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957869 Vs 11:56:30 Temperature Measurement, Probe Number = 0, T = 20.251000 C 11:56:31 Temperature Measurement, Probe Number = 1, T = 20.170000 C 11:56:31 Temperature Measurement, Probe Number = 2, T = 20.217000 C 11:56:32 Temperature Measurement, Probe Number = 3, T = 20.158000 C 11:56:33 Temperature Measurement, Probe Number = 4, T = 20.476000 C 11:56:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.48 11:56:33 Integrated Voltage Measurement... 11:56:52 Voltage Offset Correction: v_off_ini = 0.000004102 V, v_off_fin = 0.000005983 V 11:56:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020574 Vs 11:56:53 Integrated Voltage Measurement... 11:57:12 Voltage Offset Correction: v_off_ini = 0.000006050 V, v_off_fin = 0.000003481 V 11:57:12 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170952331 Vs 11:57:15 Temperature Measurement, Probe Number = 0, T = 20.252000 C 11:57:15 Temperature Measurement, Probe Number = 1, T = 20.172000 C 11:57:16 Temperature Measurement, Probe Number = 2, T = 20.219000 C 11:57:17 Temperature Measurement, Probe Number = 3, T = 20.161000 C 11:57:17 Temperature Measurement, Probe Number = 4, T = 20.463000 C 11:57:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.46 11:57:18 Integrated Voltage Measurement... 11:57:37 Voltage Offset Correction: v_off_ini = 0.000004467 V, v_off_fin = 0.000006752 V 11:57:37 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171028077 Vs 11:57:37 Integrated Voltage Measurement... 11:57:56 Voltage Offset Correction: v_off_ini = 0.000006579 V, v_off_fin = 0.000002937 V 11:57:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170958443 Vs 11:57:59 Temperature Measurement, Probe Number = 0, T = 20.252000 C 11:58:00 Temperature Measurement, Probe Number = 1, T = 20.170000 C 11:58:01 Temperature Measurement, Probe Number = 2, T = 20.222000 C 11:58:01 Temperature Measurement, Probe Number = 3, T = 20.162000 C 11:58:02 Temperature Measurement, Probe Number = 4, T = 20.517000 C 11:58:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.52 11:58:02 Integrated Voltage Measurement... 11:58:21 Voltage Offset Correction: v_off_ini = 0.000004329 V, v_off_fin = 0.000007378 V 11:58:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171024898 Vs 11:58:22 Integrated Voltage Measurement... 11:58:41 Voltage Offset Correction: v_off_ini = 0.000006075 V, v_off_fin = 0.000004073 V 11:58:41 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170955370 Vs 11:58:44 Temperature Measurement, Probe Number = 0, T = 20.249000 C 11:58:44 Temperature Measurement, Probe Number = 1, T = 20.169000 C 11:58:45 Temperature Measurement, Probe Number = 2, T = 20.219000 C 11:58:46 Temperature Measurement, Probe Number = 3, T = 20.158000 C 11:58:46 Temperature Measurement, Probe Number = 4, T = 20.459000 C 11:58:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.46 11:58:46 Integrated Voltage Measurement... 11:59:06 Voltage Offset Correction: v_off_ini = 0.000004602 V, v_off_fin = 0.000006669 V 11:59:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171033650 Vs 11:59:06 Integrated Voltage Measurement... 11:59:25 Voltage Offset Correction: v_off_ini = 0.000006368 V, v_off_fin = 0.000003654 V 11:59:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170954981 Vs 11:59:28 Temperature Measurement, Probe Number = 0, T = 20.252000 C 11:59:29 Temperature Measurement, Probe Number = 1, T = 20.176000 C 11:59:29 Temperature Measurement, Probe Number = 2, T = 20.218000 C 11:59:30 Temperature Measurement, Probe Number = 3, T = 20.165000 C 11:59:31 Temperature Measurement, Probe Number = 4, T = 20.466000 C 11:59:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.47 11:59:31 Integrated Voltage Measurement... 11:59:50 Voltage Offset Correction: v_off_ini = 0.000004293 V, v_off_fin = 0.000006861 V 11:59:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171026436 Vs 11:59:50 Integrated Voltage Measurement... 12:00:10 Voltage Offset Correction: v_off_ini = 0.000006143 V, v_off_fin = 0.000003750 V 12:00:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951786 Vs 12:30:13 Temperature Measurement, Probe Number = 0, T = 20.244000 C 12:30:13 Temperature Measurement, Probe Number = 1, T = 20.167000 C 12:30:14 Temperature Measurement, Probe Number = 2, T = 20.215000 C 12:30:15 Temperature Measurement, Probe Number = 3, T = 20.159000 C 12:30:15 Temperature Measurement, Probe Number = 4, T = 20.259000 C 12:30:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.26 12:30:16 Integrated Voltage Measurement... 12:30:35 Voltage Offset Correction: v_off_ini = 0.000005675 V, v_off_fin = 0.000006810 V 12:30:35 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171074506 Vs 12:30:35 Integrated Voltage Measurement... 12:30:54 Voltage Offset Correction: v_off_ini = 0.000006707 V, v_off_fin = 0.000008013 V 12:30:55 Integrated Voltage Measurement Delta Gap = -0.0040005 m VT = -0.170943231 Vs 12:30:57 Temperature Measurement, Probe Number = 0, T = 20.250000 C 12:30:58 Temperature Measurement, Probe Number = 1, T = 20.173000 C 12:30:59 Temperature Measurement, Probe Number = 2, T = 20.222000 C 12:30:59 Temperature Measurement, Probe Number = 3, T = 20.161000 C 12:31:00 Temperature Measurement, Probe Number = 4, T = 20.281000 C 12:31:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.28 12:31:00 Integrated Voltage Measurement... 12:31:19 Voltage Offset Correction: v_off_ini = 0.000004438 V, v_off_fin = 0.000007339 V 12:31:20 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171026252 Vs 12:31:20 Integrated Voltage Measurement... 12:31:39 Voltage Offset Correction: v_off_ini = 0.000007606 V, v_off_fin = 0.000003598 V 12:31:39 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170948160 Vs 12:31:42 Temperature Measurement, Probe Number = 0, T = 20.255000 C 12:31:42 Temperature Measurement, Probe Number = 1, T = 20.179000 C 12:31:43 Temperature Measurement, Probe Number = 2, T = 20.222000 C 12:31:44 Temperature Measurement, Probe Number = 3, T = 20.166000 C 12:31:44 Temperature Measurement, Probe Number = 4, T = 20.352000 C 12:31:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.35 12:31:45 Integrated Voltage Measurement... 12:32:04 Voltage Offset Correction: v_off_ini = 0.000004609 V, v_off_fin = 0.000007743 V 12:32:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171034692 Vs 12:32:04 Integrated Voltage Measurement... 12:32:24 Voltage Offset Correction: v_off_ini = 0.000006414 V, v_off_fin = 0.000004332 V 12:32:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170942218 Vs 12:32:27 Temperature Measurement, Probe Number = 0, T = 20.256000 C 12:32:28 Temperature Measurement, Probe Number = 1, T = 20.177000 C 12:32:28 Temperature Measurement, Probe Number = 2, T = 20.219000 C 12:32:29 Temperature Measurement, Probe Number = 3, T = 20.162000 C 12:32:30 Temperature Measurement, Probe Number = 4, T = 20.407000 C 12:32:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.26 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.41 12:32:30 Integrated Voltage Measurement... 12:32:49 Voltage Offset Correction: v_off_ini = 0.000005274 V, v_off_fin = 0.000008254 V 12:32:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024471 Vs 12:32:49 Integrated Voltage Measurement... 12:33:09 Voltage Offset Correction: v_off_ini = 0.000006956 V, v_off_fin = 0.000003873 V 12:33:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170950750 Vs 12:33:12 Temperature Measurement, Probe Number = 0, T = 20.251000 C 12:33:12 Temperature Measurement, Probe Number = 1, T = 20.173000 C 12:33:13 Temperature Measurement, Probe Number = 2, T = 20.217000 C 12:33:14 Temperature Measurement, Probe Number = 3, T = 20.161000 C 12:33:14 Temperature Measurement, Probe Number = 4, T = 20.390000 C 12:33:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.39 12:33:14 Integrated Voltage Measurement... 12:33:34 Voltage Offset Correction: v_off_ini = 0.000004516 V, v_off_fin = 0.000007066 V 12:33:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029118 Vs 12:33:34 Integrated Voltage Measurement... 12:33:53 Voltage Offset Correction: v_off_ini = 0.000006004 V, v_off_fin = 0.000003675 V 12:33:53 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170954299 Vs 12:33:56 Temperature Measurement, Probe Number = 0, T = 20.245000 C 12:33:57 Temperature Measurement, Probe Number = 1, T = 20.171000 C 12:33:57 Temperature Measurement, Probe Number = 2, T = 20.213000 C 12:33:58 Temperature Measurement, Probe Number = 3, T = 20.158000 C 12:33:59 Temperature Measurement, Probe Number = 4, T = 20.324000 C 12:33:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.32 12:33:59 Integrated Voltage Measurement... 12:34:18 Voltage Offset Correction: v_off_ini = 0.000003944 V, v_off_fin = 0.000007254 V 12:34:18 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171027111 Vs 12:34:19 Integrated Voltage Measurement... 12:34:38 Voltage Offset Correction: v_off_ini = 0.000007249 V, v_off_fin = 0.000003666 V 12:34:38 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170951406 Vs 12:34:41 Temperature Measurement, Probe Number = 0, T = 20.253000 C 12:34:41 Temperature Measurement, Probe Number = 1, T = 20.176000 C 12:34:42 Temperature Measurement, Probe Number = 2, T = 20.219000 C 12:34:43 Temperature Measurement, Probe Number = 3, T = 20.163000 C 12:34:43 Temperature Measurement, Probe Number = 4, T = 20.426000 C 12:34:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.43 12:34:44 Integrated Voltage Measurement... 12:35:03 Voltage Offset Correction: v_off_ini = 0.000004825 V, v_off_fin = 0.000007606 V 12:35:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028631 Vs 12:35:03 Integrated Voltage Measurement... 12:35:23 Voltage Offset Correction: v_off_ini = 0.000007296 V, v_off_fin = 0.000003773 V 12:35:23 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170949325 Vs 12:35:26 Temperature Measurement, Probe Number = 0, T = 20.253000 C 12:35:26 Temperature Measurement, Probe Number = 1, T = 20.173000 C 12:35:27 Temperature Measurement, Probe Number = 2, T = 20.220000 C 12:35:28 Temperature Measurement, Probe Number = 3, T = 20.163000 C 12:35:28 Temperature Measurement, Probe Number = 4, T = 20.482000 C 12:35:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.48 12:35:29 Integrated Voltage Measurement... 12:35:48 Voltage Offset Correction: v_off_ini = 0.000005551 V, v_off_fin = 0.000008128 V 12:35:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038930 Vs 12:35:48 Integrated Voltage Measurement... 12:36:08 Voltage Offset Correction: v_off_ini = 0.000007299 V, v_off_fin = 0.000004478 V 12:36:08 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170947885 Vs 12:36:11 Temperature Measurement, Probe Number = 0, T = 20.253000 C 12:36:11 Temperature Measurement, Probe Number = 1, T = 20.171000 C 12:36:12 Temperature Measurement, Probe Number = 2, T = 20.220000 C 12:36:13 Temperature Measurement, Probe Number = 3, T = 20.163000 C 12:36:13 Temperature Measurement, Probe Number = 4, T = 20.464000 C 12:36:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.46 12:36:14 Integrated Voltage Measurement... 12:36:33 Voltage Offset Correction: v_off_ini = 0.000005143 V, v_off_fin = 0.000007955 V 12:36:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042892 Vs 12:36:34 Integrated Voltage Measurement... 12:36:53 Voltage Offset Correction: v_off_ini = 0.000007734 V, v_off_fin = 0.000003431 V 12:36:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170944967 Vs 12:36:56 Temperature Measurement, Probe Number = 0, T = 20.251000 C 12:36:57 Temperature Measurement, Probe Number = 1, T = 20.168000 C 12:36:57 Temperature Measurement, Probe Number = 2, T = 20.218000 C 12:36:58 Temperature Measurement, Probe Number = 3, T = 20.158000 C 12:36:59 Temperature Measurement, Probe Number = 4, T = 20.506000 C 12:36:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.51 12:36:59 Integrated Voltage Measurement... 12:37:18 Voltage Offset Correction: v_off_ini = 0.000004666 V, v_off_fin = 0.000007568 V 12:37:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035405 Vs 12:37:19 Integrated Voltage Measurement... 12:37:38 Voltage Offset Correction: v_off_ini = 0.000006682 V, v_off_fin = 0.000004067 V 12:37:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170947631 Vs 13:07:41 Temperature Measurement, Probe Number = 0, T = 20.244000 C 13:07:42 Temperature Measurement, Probe Number = 1, T = 20.168000 C 13:07:43 Temperature Measurement, Probe Number = 2, T = 20.215000 C 13:07:43 Temperature Measurement, Probe Number = 3, T = 20.162000 C 13:07:44 Temperature Measurement, Probe Number = 4, T = 20.491000 C 13:07:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.49 13:07:44 Integrated Voltage Measurement... 13:08:03 Voltage Offset Correction: v_off_ini = 0.000004994 V, v_off_fin = 0.000006812 V 13:08:03 Integrated Voltage Measurement Delta Gap = 0.0040019 m VT = 0.171085812 Vs 13:08:04 Integrated Voltage Measurement... 13:08:23 Voltage Offset Correction: v_off_ini = 0.000006113 V, v_off_fin = 0.000003006 V 13:08:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953161 Vs 13:08:26 Temperature Measurement, Probe Number = 0, T = 20.244000 C 13:08:26 Temperature Measurement, Probe Number = 1, T = 20.166000 C 13:08:27 Temperature Measurement, Probe Number = 2, T = 20.216000 C 13:08:28 Temperature Measurement, Probe Number = 3, T = 20.162000 C 13:08:28 Temperature Measurement, Probe Number = 4, T = 20.498000 C 13:08:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.50 13:08:29 Integrated Voltage Measurement... 13:08:48 Voltage Offset Correction: v_off_ini = 0.000003078 V, v_off_fin = 0.000006706 V 13:08:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171007855 Vs 13:08:49 Integrated Voltage Measurement... 13:09:08 Voltage Offset Correction: v_off_ini = 0.000005638 V, v_off_fin = 0.000002963 V 13:09:08 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170954938 Vs 13:09:11 Temperature Measurement, Probe Number = 0, T = 20.249000 C 13:09:11 Temperature Measurement, Probe Number = 1, T = 20.172000 C 13:09:12 Temperature Measurement, Probe Number = 2, T = 20.218000 C 13:09:13 Temperature Measurement, Probe Number = 3, T = 20.162000 C 13:09:13 Temperature Measurement, Probe Number = 4, T = 20.472000 C 13:09:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.47 13:09:14 Integrated Voltage Measurement... 13:09:33 Voltage Offset Correction: v_off_ini = 0.000003584 V, v_off_fin = 0.000006196 V 13:09:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171009274 Vs 13:09:33 Integrated Voltage Measurement... 13:09:53 Voltage Offset Correction: v_off_ini = 0.000005676 V, v_off_fin = 0.000002820 V 13:09:53 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170951924 Vs 13:09:55 Temperature Measurement, Probe Number = 0, T = 20.249000 C 13:09:56 Temperature Measurement, Probe Number = 1, T = 20.174000 C 13:09:57 Temperature Measurement, Probe Number = 2, T = 20.219000 C 13:09:57 Temperature Measurement, Probe Number = 3, T = 20.162000 C 13:09:58 Temperature Measurement, Probe Number = 4, T = 20.450000 C 13:09:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.45 13:09:58 Integrated Voltage Measurement... 13:10:17 Voltage Offset Correction: v_off_ini = 0.000003409 V, v_off_fin = 0.000006452 V 13:10:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171009853 Vs 13:10:18 Integrated Voltage Measurement... 13:10:37 Voltage Offset Correction: v_off_ini = 0.000005789 V, v_off_fin = 0.000003176 V 13:10:37 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170951218 Vs 13:10:40 Temperature Measurement, Probe Number = 0, T = 20.249000 C 13:10:41 Temperature Measurement, Probe Number = 1, T = 20.176000 C 13:10:41 Temperature Measurement, Probe Number = 2, T = 20.218000 C 13:10:42 Temperature Measurement, Probe Number = 3, T = 20.163000 C 13:10:43 Temperature Measurement, Probe Number = 4, T = 20.430000 C 13:10:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.43 13:10:43 Integrated Voltage Measurement... 13:11:02 Voltage Offset Correction: v_off_ini = 0.000003424 V, v_off_fin = 0.000006849 V 13:11:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171011504 Vs 13:11:03 Integrated Voltage Measurement... 13:11:22 Voltage Offset Correction: v_off_ini = 0.000005665 V, v_off_fin = 0.000002638 V 13:11:22 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170956183 Vs 13:11:25 Temperature Measurement, Probe Number = 0, T = 20.242000 C 13:11:26 Temperature Measurement, Probe Number = 1, T = 20.170000 C 13:11:26 Temperature Measurement, Probe Number = 2, T = 20.212000 C 13:11:27 Temperature Measurement, Probe Number = 3, T = 20.160000 C 13:11:27 Temperature Measurement, Probe Number = 4, T = 20.368000 C 13:11:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.37 13:11:28 Integrated Voltage Measurement... 13:11:47 Voltage Offset Correction: v_off_ini = 0.000003041 V, v_off_fin = 0.000006865 V 13:11:47 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171012518 Vs 13:11:48 Integrated Voltage Measurement... 13:12:07 Voltage Offset Correction: v_off_ini = 0.000005827 V, v_off_fin = 0.000002894 V 13:12:07 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170948486 Vs 13:12:10 Temperature Measurement, Probe Number = 0, T = 20.243000 C 13:12:10 Temperature Measurement, Probe Number = 1, T = 20.171000 C 13:12:11 Temperature Measurement, Probe Number = 2, T = 20.210000 C 13:12:12 Temperature Measurement, Probe Number = 3, T = 20.159000 C 13:12:12 Temperature Measurement, Probe Number = 4, T = 20.289000 C 13:12:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.29 13:12:13 Integrated Voltage Measurement... 13:12:32 Voltage Offset Correction: v_off_ini = 0.000004048 V, v_off_fin = 0.000006714 V 13:12:32 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171014732 Vs 13:12:32 Integrated Voltage Measurement... 13:12:51 Voltage Offset Correction: v_off_ini = 0.000006277 V, v_off_fin = 0.000003057 V 13:12:51 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170945994 Vs 13:12:54 Temperature Measurement, Probe Number = 0, T = 20.244000 C 13:12:55 Temperature Measurement, Probe Number = 1, T = 20.173000 C 13:12:55 Temperature Measurement, Probe Number = 2, T = 20.214000 C 13:12:56 Temperature Measurement, Probe Number = 3, T = 20.160000 C 13:12:57 Temperature Measurement, Probe Number = 4, T = 20.295000 C 13:12:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.30 13:12:57 Integrated Voltage Measurement... 13:13:17 Voltage Offset Correction: v_off_ini = 0.000004047 V, v_off_fin = 0.000006737 V 13:13:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171016416 Vs 13:13:17 Integrated Voltage Measurement... 13:13:37 Voltage Offset Correction: v_off_ini = 0.000006417 V, v_off_fin = 0.000003407 V 13:13:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170942732 Vs 13:13:40 Temperature Measurement, Probe Number = 0, T = 20.237000 C 13:13:40 Temperature Measurement, Probe Number = 1, T = 20.163000 C 13:13:41 Temperature Measurement, Probe Number = 2, T = 20.210000 C 13:13:42 Temperature Measurement, Probe Number = 3, T = 20.158000 C 13:13:42 Temperature Measurement, Probe Number = 4, T = 20.306000 C 13:13:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.31 13:13:42 Integrated Voltage Measurement... 13:14:02 Voltage Offset Correction: v_off_ini = 0.000004048 V, v_off_fin = 0.000006347 V 13:14:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171011660 Vs 13:14:02 Integrated Voltage Measurement... 13:14:21 Voltage Offset Correction: v_off_ini = 0.000006216 V, v_off_fin = 0.000003225 V 13:14:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170946588 Vs 13:14:24 Temperature Measurement, Probe Number = 0, T = 20.235000 C 13:14:25 Temperature Measurement, Probe Number = 1, T = 20.162000 C 13:14:26 Temperature Measurement, Probe Number = 2, T = 20.209000 C 13:14:26 Temperature Measurement, Probe Number = 3, T = 20.155000 C 13:14:27 Temperature Measurement, Probe Number = 4, T = 20.377000 C 13:14:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.38 13:14:27 Integrated Voltage Measurement... 13:14:47 Voltage Offset Correction: v_off_ini = 0.000003410 V, v_off_fin = 0.000006474 V 13:14:47 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171013972 Vs 13:14:47 Integrated Voltage Measurement... 13:15:06 Voltage Offset Correction: v_off_ini = 0.000005679 V, v_off_fin = 0.000003064 V 13:15:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952514 Vs 13:45:09 Temperature Measurement, Probe Number = 0, T = 20.252000 C 13:45:10 Temperature Measurement, Probe Number = 1, T = 20.173000 C 13:45:11 Temperature Measurement, Probe Number = 2, T = 20.225000 C 13:45:12 Temperature Measurement, Probe Number = 3, T = 20.166000 C 13:45:12 Temperature Measurement, Probe Number = 4, T = 20.470000 C 13:45:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.47 13:45:13 Integrated Voltage Measurement... 13:45:32 Voltage Offset Correction: v_off_ini = 0.000005278 V, v_off_fin = 0.000007236 V 13:45:32 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171079946 Vs 13:45:32 Integrated Voltage Measurement... 13:45:51 Voltage Offset Correction: v_off_ini = 0.000006653 V, v_off_fin = 0.000003724 V 13:45:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170938270 Vs 13:45:54 Temperature Measurement, Probe Number = 0, T = 20.253000 C 13:45:55 Temperature Measurement, Probe Number = 1, T = 20.175000 C 13:45:56 Temperature Measurement, Probe Number = 2, T = 20.222000 C 13:45:56 Temperature Measurement, Probe Number = 3, T = 20.167000 C 13:45:57 Temperature Measurement, Probe Number = 4, T = 20.492000 C 13:45:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.49 13:45:57 Integrated Voltage Measurement... 13:46:17 Voltage Offset Correction: v_off_ini = 0.000004776 V, v_off_fin = 0.000007034 V 13:46:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025606 Vs 13:46:17 Integrated Voltage Measurement... 13:46:36 Voltage Offset Correction: v_off_ini = 0.000006881 V, v_off_fin = 0.000004263 V 13:46:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170938137 Vs 13:46:39 Temperature Measurement, Probe Number = 0, T = 20.249000 C 13:46:40 Temperature Measurement, Probe Number = 1, T = 20.170000 C 13:46:41 Temperature Measurement, Probe Number = 2, T = 20.223000 C 13:46:41 Temperature Measurement, Probe Number = 3, T = 20.166000 C 13:46:42 Temperature Measurement, Probe Number = 4, T = 20.522000 C 13:46:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.52 13:46:42 Integrated Voltage Measurement... 13:47:02 Voltage Offset Correction: v_off_ini = 0.000004573 V, v_off_fin = 0.000007197 V 13:47:02 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171034095 Vs 13:47:02 Integrated Voltage Measurement... 13:47:21 Voltage Offset Correction: v_off_ini = 0.000006765 V, v_off_fin = 0.000003958 V 13:47:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170937083 Vs 13:47:24 Temperature Measurement, Probe Number = 0, T = 20.248000 C 13:47:24 Temperature Measurement, Probe Number = 1, T = 20.168000 C 13:47:25 Temperature Measurement, Probe Number = 2, T = 20.216000 C 13:47:26 Temperature Measurement, Probe Number = 3, T = 20.161000 C 13:47:26 Temperature Measurement, Probe Number = 4, T = 20.481000 C 13:47:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.48 13:47:27 Integrated Voltage Measurement... 13:47:47 Voltage Offset Correction: v_off_ini = 0.000004797 V, v_off_fin = 0.000006045 V 13:47:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028325 Vs 13:47:47 Integrated Voltage Measurement... 13:48:06 Voltage Offset Correction: v_off_ini = 0.000005416 V, v_off_fin = 0.000004012 V 13:48:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170944449 Vs 13:48:09 Temperature Measurement, Probe Number = 0, T = 20.247000 C 13:48:10 Temperature Measurement, Probe Number = 1, T = 20.167000 C 13:48:11 Temperature Measurement, Probe Number = 2, T = 20.220000 C 13:48:11 Temperature Measurement, Probe Number = 3, T = 20.163000 C 13:48:12 Temperature Measurement, Probe Number = 4, T = 20.493000 C 13:48:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.49 13:48:12 Integrated Voltage Measurement... 13:48:32 Voltage Offset Correction: v_off_ini = 0.000003961 V, v_off_fin = 0.000006432 V 13:48:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025061 Vs 13:48:32 Integrated Voltage Measurement... 13:48:51 Voltage Offset Correction: v_off_ini = 0.000005822 V, v_off_fin = 0.000003066 V 13:48:52 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170946400 Vs 13:48:54 Temperature Measurement, Probe Number = 0, T = 20.248000 C 13:48:55 Temperature Measurement, Probe Number = 1, T = 20.164000 C 13:48:56 Temperature Measurement, Probe Number = 2, T = 20.221000 C 13:48:56 Temperature Measurement, Probe Number = 3, T = 20.163000 C 13:48:57 Temperature Measurement, Probe Number = 4, T = 20.504000 C 13:48:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.50 13:48:57 Integrated Voltage Measurement... 13:49:17 Voltage Offset Correction: v_off_ini = 0.000005197 V, v_off_fin = 0.000006846 V 13:49:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031396 Vs 13:49:17 Integrated Voltage Measurement... 13:49:36 Voltage Offset Correction: v_off_ini = 0.000006526 V, v_off_fin = 0.000003556 V 13:49:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170939910 Vs 13:49:39 Temperature Measurement, Probe Number = 0, T = 20.247000 C 13:49:40 Temperature Measurement, Probe Number = 1, T = 20.167000 C 13:49:40 Temperature Measurement, Probe Number = 2, T = 20.218000 C 13:49:41 Temperature Measurement, Probe Number = 3, T = 20.161000 C 13:49:42 Temperature Measurement, Probe Number = 4, T = 20.471000 C 13:49:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.47 13:49:42 Integrated Voltage Measurement... 13:50:01 Voltage Offset Correction: v_off_ini = 0.000005419 V, v_off_fin = 0.000007538 V 13:50:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171036283 Vs 13:50:01 Integrated Voltage Measurement... 13:50:21 Voltage Offset Correction: v_off_ini = 0.000006930 V, v_off_fin = 0.000007346 V 13:50:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949425 Vs 13:50:24 Temperature Measurement, Probe Number = 0, T = 20.251000 C 13:50:24 Temperature Measurement, Probe Number = 1, T = 20.168000 C 13:50:25 Temperature Measurement, Probe Number = 2, T = 20.218000 C 13:50:26 Temperature Measurement, Probe Number = 3, T = 20.159000 C 13:50:26 Temperature Measurement, Probe Number = 4, T = 20.424000 C 13:50:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.42 13:50:26 Integrated Voltage Measurement... 13:50:46 Voltage Offset Correction: v_off_ini = 0.000004016 V, v_off_fin = 0.000006728 V 13:50:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023266 Vs 13:50:46 Integrated Voltage Measurement... 13:51:06 Voltage Offset Correction: v_off_ini = 0.000005592 V, v_off_fin = 0.000003451 V 13:51:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170944346 Vs 13:51:09 Temperature Measurement, Probe Number = 0, T = 20.253000 C 13:51:09 Temperature Measurement, Probe Number = 1, T = 20.171000 C 13:51:10 Temperature Measurement, Probe Number = 2, T = 20.220000 C 13:51:11 Temperature Measurement, Probe Number = 3, T = 20.162000 C 13:51:11 Temperature Measurement, Probe Number = 4, T = 20.458000 C 13:51:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.46 13:51:12 Integrated Voltage Measurement... 13:51:31 Voltage Offset Correction: v_off_ini = 0.000004518 V, v_off_fin = 0.000006106 V 13:51:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171013345 Vs 13:51:31 Integrated Voltage Measurement... 13:51:51 Voltage Offset Correction: v_off_ini = 0.000005806 V, v_off_fin = 0.000003093 V 13:51:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955569 Vs 13:51:54 Temperature Measurement, Probe Number = 0, T = 20.250000 C 13:51:54 Temperature Measurement, Probe Number = 1, T = 20.172000 C 13:51:55 Temperature Measurement, Probe Number = 2, T = 20.220000 C 13:51:56 Temperature Measurement, Probe Number = 3, T = 20.166000 C 13:51:56 Temperature Measurement, Probe Number = 4, T = 20.461000 C 13:51:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.46 13:51:56 Integrated Voltage Measurement... 13:52:16 Voltage Offset Correction: v_off_ini = 0.000004351 V, v_off_fin = 0.000006494 V 13:52:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171023447 Vs 13:52:16 Integrated Voltage Measurement... 13:52:35 Voltage Offset Correction: v_off_ini = 0.000006496 V, v_off_fin = 0.000003775 V 13:52:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170945798 Vs 14:22:38 Temperature Measurement, Probe Number = 0, T = 20.243000 C 14:22:39 Temperature Measurement, Probe Number = 1, T = 20.162000 C 14:22:40 Temperature Measurement, Probe Number = 2, T = 20.218000 C 14:22:40 Temperature Measurement, Probe Number = 3, T = 20.161000 C 14:22:41 Temperature Measurement, Probe Number = 4, T = 20.313000 C 14:22:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.31 14:22:41 Integrated Voltage Measurement... 14:23:01 Voltage Offset Correction: v_off_ini = 0.000005516 V, v_off_fin = 0.000006577 V 14:23:01 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171076195 Vs 14:23:01 Integrated Voltage Measurement... 14:23:20 Voltage Offset Correction: v_off_ini = 0.000008537 V, v_off_fin = 0.000005170 V 14:23:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954614 Vs 14:23:23 Temperature Measurement, Probe Number = 0, T = 20.240000 C 14:23:24 Temperature Measurement, Probe Number = 1, T = 20.162000 C 14:23:24 Temperature Measurement, Probe Number = 2, T = 20.214000 C 14:23:25 Temperature Measurement, Probe Number = 3, T = 20.159000 C 14:23:26 Temperature Measurement, Probe Number = 4, T = 20.300000 C 14:23:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.30 14:23:26 Integrated Voltage Measurement... 14:23:46 Voltage Offset Correction: v_off_ini = 0.000004536 V, v_off_fin = 0.000006733 V 14:23:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035527 Vs 14:23:46 Integrated Voltage Measurement... 14:24:05 Voltage Offset Correction: v_off_ini = 0.000006011 V, v_off_fin = 0.000004135 V 14:24:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170947451 Vs 14:24:08 Temperature Measurement, Probe Number = 0, T = 20.243000 C 14:24:09 Temperature Measurement, Probe Number = 1, T = 20.161000 C 14:24:09 Temperature Measurement, Probe Number = 2, T = 20.213000 C 14:24:10 Temperature Measurement, Probe Number = 3, T = 20.156000 C 14:24:11 Temperature Measurement, Probe Number = 4, T = 20.283000 C 14:24:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.28 14:24:11 Integrated Voltage Measurement... 14:24:31 Voltage Offset Correction: v_off_ini = 0.000005496 V, v_off_fin = 0.000006070 V 14:24:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035407 Vs 14:24:31 Integrated Voltage Measurement... 14:24:50 Voltage Offset Correction: v_off_ini = 0.000005833 V, v_off_fin = 0.000003113 V 14:24:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951063 Vs 14:24:53 Temperature Measurement, Probe Number = 0, T = 20.240000 C 14:24:54 Temperature Measurement, Probe Number = 1, T = 20.159000 C 14:24:54 Temperature Measurement, Probe Number = 2, T = 20.212000 C 14:24:55 Temperature Measurement, Probe Number = 3, T = 20.156000 C 14:24:56 Temperature Measurement, Probe Number = 4, T = 20.223000 C 14:24:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.22 14:24:56 Integrated Voltage Measurement... 14:25:15 Voltage Offset Correction: v_off_ini = 0.000006195 V, v_off_fin = 0.000009043 V 14:25:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171035200 Vs 14:25:16 Integrated Voltage Measurement... 14:25:35 Voltage Offset Correction: v_off_ini = 0.000006384 V, v_off_fin = 0.000003601 V 14:25:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170947592 Vs 14:25:38 Temperature Measurement, Probe Number = 0, T = 20.238000 C 14:25:38 Temperature Measurement, Probe Number = 1, T = 20.157000 C 14:25:39 Temperature Measurement, Probe Number = 2, T = 20.212000 C 14:25:40 Temperature Measurement, Probe Number = 3, T = 20.155000 C 14:25:40 Temperature Measurement, Probe Number = 4, T = 20.260000 C 14:25:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.26 14:25:41 Integrated Voltage Measurement... 14:26:00 Voltage Offset Correction: v_off_ini = 0.000005716 V, v_off_fin = 0.000007969 V 14:26:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037633 Vs 14:26:01 Integrated Voltage Measurement... 14:26:20 Voltage Offset Correction: v_off_ini = 0.000006679 V, v_off_fin = 0.000003413 V 14:26:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949267 Vs 14:26:23 Temperature Measurement, Probe Number = 0, T = 20.244000 C 14:26:24 Temperature Measurement, Probe Number = 1, T = 20.166000 C 14:26:25 Temperature Measurement, Probe Number = 2, T = 20.217000 C 14:26:25 Temperature Measurement, Probe Number = 3, T = 20.161000 C 14:26:26 Temperature Measurement, Probe Number = 4, T = 20.292000 C 14:26:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.29 14:26:26 Integrated Voltage Measurement... 14:26:45 Voltage Offset Correction: v_off_ini = 0.000004161 V, v_off_fin = 0.000007090 V 14:26:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030912 Vs 14:26:46 Integrated Voltage Measurement... 14:27:05 Voltage Offset Correction: v_off_ini = 0.000009018 V, v_off_fin = 0.000005881 V 14:27:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950000 Vs 14:27:08 Temperature Measurement, Probe Number = 0, T = 20.250000 C 14:27:09 Temperature Measurement, Probe Number = 1, T = 20.165000 C 14:27:10 Temperature Measurement, Probe Number = 2, T = 20.221000 C 14:27:10 Temperature Measurement, Probe Number = 3, T = 20.160000 C 14:27:11 Temperature Measurement, Probe Number = 4, T = 20.371000 C 14:27:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.37 14:27:11 Integrated Voltage Measurement... 14:27:30 Voltage Offset Correction: v_off_ini = 0.000003798 V, v_off_fin = 0.000007183 V 14:27:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024741 Vs 14:27:31 Integrated Voltage Measurement... 14:27:50 Voltage Offset Correction: v_off_ini = 0.000006020 V, v_off_fin = 0.000003128 V 14:27:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958225 Vs 14:27:52 Temperature Measurement, Probe Number = 0, T = 20.253000 C 14:27:53 Temperature Measurement, Probe Number = 1, T = 20.173000 C 14:27:54 Temperature Measurement, Probe Number = 2, T = 20.224000 C 14:27:54 Temperature Measurement, Probe Number = 3, T = 20.165000 C 14:27:55 Temperature Measurement, Probe Number = 4, T = 20.392000 C 14:27:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.39 14:27:55 Integrated Voltage Measurement... 14:28:15 Voltage Offset Correction: v_off_ini = 0.000003941 V, v_off_fin = 0.000007822 V 14:28:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171032181 Vs 14:28:15 Integrated Voltage Measurement... 14:28:34 Voltage Offset Correction: v_off_ini = 0.000007190 V, v_off_fin = 0.000004670 V 14:28:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950202 Vs 14:28:37 Temperature Measurement, Probe Number = 0, T = 20.257000 C 14:28:38 Temperature Measurement, Probe Number = 1, T = 20.175000 C 14:28:39 Temperature Measurement, Probe Number = 2, T = 20.227000 C 14:28:39 Temperature Measurement, Probe Number = 3, T = 20.168000 C 14:28:40 Temperature Measurement, Probe Number = 4, T = 20.436000 C 14:28:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.26 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.44 14:28:40 Integrated Voltage Measurement... 14:29:00 Voltage Offset Correction: v_off_ini = 0.000004097 V, v_off_fin = 0.000007646 V 14:29:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037493 Vs 14:29:00 Integrated Voltage Measurement... 14:29:20 Voltage Offset Correction: v_off_ini = 0.000006462 V, v_off_fin = 0.000002631 V 14:29:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958631 Vs 14:29:23 Temperature Measurement, Probe Number = 0, T = 20.257000 C 14:29:24 Temperature Measurement, Probe Number = 1, T = 20.172000 C 14:29:24 Temperature Measurement, Probe Number = 2, T = 20.227000 C 14:29:25 Temperature Measurement, Probe Number = 3, T = 20.169000 C 14:29:26 Temperature Measurement, Probe Number = 4, T = 20.466000 C 14:29:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.26 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.47 14:29:26 Integrated Voltage Measurement... 14:29:45 Voltage Offset Correction: v_off_ini = 0.000005157 V, v_off_fin = 0.000007836 V 14:29:45 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171028172 Vs 14:29:45 Integrated Voltage Measurement... 14:30:04 Voltage Offset Correction: v_off_ini = 0.000006410 V, v_off_fin = 0.000003884 V 14:30:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959912 Vs 15:00:07 Temperature Measurement, Probe Number = 0, T = 20.243000 C 15:00:08 Temperature Measurement, Probe Number = 1, T = 20.159000 C 15:00:09 Temperature Measurement, Probe Number = 2, T = 20.219000 C 15:00:09 Temperature Measurement, Probe Number = 3, T = 20.157000 C 15:00:10 Temperature Measurement, Probe Number = 4, T = 20.435000 C 15:00:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.43 15:00:10 Integrated Voltage Measurement... 15:00:29 Voltage Offset Correction: v_off_ini = 0.000004471 V, v_off_fin = 0.000006996 V 15:00:30 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171075661 Vs 15:00:30 Integrated Voltage Measurement... 15:00:49 Voltage Offset Correction: v_off_ini = 0.000006244 V, v_off_fin = 0.000003358 V 15:00:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962630 Vs 15:00:52 Temperature Measurement, Probe Number = 0, T = 20.238000 C 15:00:53 Temperature Measurement, Probe Number = 1, T = 20.159000 C 15:00:53 Temperature Measurement, Probe Number = 2, T = 20.215000 C 15:00:54 Temperature Measurement, Probe Number = 3, T = 20.159000 C 15:00:55 Temperature Measurement, Probe Number = 4, T = 20.380000 C 15:00:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.38 15:00:55 Integrated Voltage Measurement... 15:01:14 Voltage Offset Correction: v_off_ini = 0.000003746 V, v_off_fin = 0.000006463 V 15:01:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171019978 Vs 15:01:15 Integrated Voltage Measurement... 15:01:34 Voltage Offset Correction: v_off_ini = 0.000006503 V, v_off_fin = 0.000002846 V 15:01:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948347 Vs 15:01:37 Temperature Measurement, Probe Number = 0, T = 20.241000 C 15:01:37 Temperature Measurement, Probe Number = 1, T = 20.163000 C 15:01:38 Temperature Measurement, Probe Number = 2, T = 20.218000 C 15:01:39 Temperature Measurement, Probe Number = 3, T = 20.161000 C 15:01:39 Temperature Measurement, Probe Number = 4, T = 20.289000 C 15:01:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.29 15:01:40 Integrated Voltage Measurement... 15:01:59 Voltage Offset Correction: v_off_ini = 0.000003856 V, v_off_fin = 0.000006854 V 15:01:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030552 Vs 15:01:59 Integrated Voltage Measurement... 15:02:18 Voltage Offset Correction: v_off_ini = 0.000006590 V, v_off_fin = 0.000003953 V 15:02:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949141 Vs 15:02:21 Temperature Measurement, Probe Number = 0, T = 20.250000 C 15:02:22 Temperature Measurement, Probe Number = 1, T = 20.170000 C 15:02:23 Temperature Measurement, Probe Number = 2, T = 20.225000 C 15:02:23 Temperature Measurement, Probe Number = 3, T = 20.168000 C 15:02:24 Temperature Measurement, Probe Number = 4, T = 20.336000 C 15:02:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.34 15:02:24 Integrated Voltage Measurement... 15:02:43 Voltage Offset Correction: v_off_ini = 0.000006381 V, v_off_fin = 0.000007124 V 15:02:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025696 Vs 15:02:44 Integrated Voltage Measurement... 15:03:03 Voltage Offset Correction: v_off_ini = 0.000007306 V, v_off_fin = 0.000003029 V 15:03:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948792 Vs 15:03:06 Temperature Measurement, Probe Number = 0, T = 20.257000 C 15:03:06 Temperature Measurement, Probe Number = 1, T = 20.178000 C 15:03:07 Temperature Measurement, Probe Number = 2, T = 20.232000 C 15:03:08 Temperature Measurement, Probe Number = 3, T = 20.175000 C 15:03:08 Temperature Measurement, Probe Number = 4, T = 20.432000 C 15:03:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.26 P1 = Bottom 2, Value = 20.18 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.43 15:03:08 Integrated Voltage Measurement... 15:03:28 Voltage Offset Correction: v_off_ini = 0.000005408 V, v_off_fin = 0.000006830 V 15:03:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031974 Vs 15:03:28 Integrated Voltage Measurement... 15:03:48 Voltage Offset Correction: v_off_ini = 0.000007511 V, v_off_fin = 0.000003942 V 15:03:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170946270 Vs 15:03:50 Temperature Measurement, Probe Number = 0, T = 20.255000 C 15:03:51 Temperature Measurement, Probe Number = 1, T = 20.173000 C 15:03:52 Temperature Measurement, Probe Number = 2, T = 20.229000 C 15:03:52 Temperature Measurement, Probe Number = 3, T = 20.171000 C 15:03:53 Temperature Measurement, Probe Number = 4, T = 20.465000 C 15:03:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.46 15:03:53 Integrated Voltage Measurement... 15:04:13 Voltage Offset Correction: v_off_ini = 0.000004474 V, v_off_fin = 0.000009672 V 15:04:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033901 Vs 15:04:13 Integrated Voltage Measurement... 15:04:32 Voltage Offset Correction: v_off_ini = 0.000005982 V, v_off_fin = 0.000005107 V 15:04:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170947378 Vs 15:04:35 Temperature Measurement, Probe Number = 0, T = 20.254000 C 15:04:36 Temperature Measurement, Probe Number = 1, T = 20.171000 C 15:04:36 Temperature Measurement, Probe Number = 2, T = 20.229000 C 15:04:37 Temperature Measurement, Probe Number = 3, T = 20.171000 C 15:04:38 Temperature Measurement, Probe Number = 4, T = 20.540000 C 15:04:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.54 15:04:38 Integrated Voltage Measurement... 15:04:57 Voltage Offset Correction: v_off_ini = 0.000003936 V, v_off_fin = 0.000006776 V 15:04:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171031003 Vs 15:04:57 Integrated Voltage Measurement... 15:05:17 Voltage Offset Correction: v_off_ini = 0.000005982 V, v_off_fin = 0.000003095 V 15:05:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953152 Vs 15:05:20 Temperature Measurement, Probe Number = 0, T = 20.255000 C 15:05:20 Temperature Measurement, Probe Number = 1, T = 20.170000 C 15:05:21 Temperature Measurement, Probe Number = 2, T = 20.228000 C 15:05:22 Temperature Measurement, Probe Number = 3, T = 20.168000 C 15:05:22 Temperature Measurement, Probe Number = 4, T = 20.576000 C 15:05:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.58 15:05:22 Integrated Voltage Measurement... 15:05:42 Voltage Offset Correction: v_off_ini = 0.000004620 V, v_off_fin = 0.000007878 V 15:05:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031433 Vs 15:05:42 Integrated Voltage Measurement... 15:06:01 Voltage Offset Correction: v_off_ini = 0.000006336 V, v_off_fin = 0.000003721 V 15:06:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170946736 Vs 15:06:04 Temperature Measurement, Probe Number = 0, T = 20.249000 C 15:06:05 Temperature Measurement, Probe Number = 1, T = 20.169000 C 15:06:05 Temperature Measurement, Probe Number = 2, T = 20.222000 C 15:06:06 Temperature Measurement, Probe Number = 3, T = 20.165000 C 15:06:07 Temperature Measurement, Probe Number = 4, T = 20.599000 C 15:06:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.60 15:06:07 Integrated Voltage Measurement... 15:06:26 Voltage Offset Correction: v_off_ini = 0.000006304 V, v_off_fin = 0.000008661 V 15:06:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044377 Vs 15:06:26 Integrated Voltage Measurement... 15:06:46 Voltage Offset Correction: v_off_ini = 0.000006576 V, v_off_fin = 0.000003446 V 15:06:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170939759 Vs 15:06:49 Temperature Measurement, Probe Number = 0, T = 20.249000 C 15:06:49 Temperature Measurement, Probe Number = 1, T = 20.168000 C 15:06:50 Temperature Measurement, Probe Number = 2, T = 20.226000 C 15:06:51 Temperature Measurement, Probe Number = 3, T = 20.169000 C 15:06:51 Temperature Measurement, Probe Number = 4, T = 20.649000 C 15:06:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.65 15:06:51 Integrated Voltage Measurement... 15:07:11 Voltage Offset Correction: v_off_ini = 0.000004748 V, v_off_fin = 0.000006961 V 15:07:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041183 Vs 15:07:11 Integrated Voltage Measurement... 15:07:30 Voltage Offset Correction: v_off_ini = 0.000006073 V, v_off_fin = 0.000003242 V 15:07:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953839 Vs 15:37:33 Temperature Measurement, Probe Number = 0, T = 20.240000 C 15:37:34 Temperature Measurement, Probe Number = 1, T = 20.161000 C 15:37:35 Temperature Measurement, Probe Number = 2, T = 20.218000 C 15:37:35 Temperature Measurement, Probe Number = 3, T = 20.160000 C 15:37:36 Temperature Measurement, Probe Number = 4, T = 20.288000 C 15:37:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.29 15:37:36 Integrated Voltage Measurement... 15:37:56 Voltage Offset Correction: v_off_ini = 0.000005578 V, v_off_fin = 0.000006567 V 15:37:56 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171084555 Vs 15:37:56 Integrated Voltage Measurement... 15:38:15 Voltage Offset Correction: v_off_ini = 0.000006477 V, v_off_fin = 0.000003380 V 15:38:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957999 Vs 15:38:18 Temperature Measurement, Probe Number = 0, T = 20.242000 C 15:38:18 Temperature Measurement, Probe Number = 1, T = 20.158000 C 15:38:19 Temperature Measurement, Probe Number = 2, T = 20.218000 C 15:38:20 Temperature Measurement, Probe Number = 3, T = 20.159000 C 15:38:20 Temperature Measurement, Probe Number = 4, T = 20.358000 C 15:38:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.36 15:38:21 Integrated Voltage Measurement... 15:38:40 Voltage Offset Correction: v_off_ini = 0.000004334 V, v_off_fin = 0.000006932 V 15:38:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036377 Vs 15:38:40 Integrated Voltage Measurement... 15:39:00 Voltage Offset Correction: v_off_ini = 0.000006732 V, v_off_fin = 0.000004224 V 15:39:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955987 Vs 15:39:03 Temperature Measurement, Probe Number = 0, T = 20.243000 C 15:39:03 Temperature Measurement, Probe Number = 1, T = 20.164000 C 15:39:04 Temperature Measurement, Probe Number = 2, T = 20.217000 C 15:39:05 Temperature Measurement, Probe Number = 3, T = 20.163000 C 15:39:05 Temperature Measurement, Probe Number = 4, T = 20.394000 C 15:39:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.39 15:39:05 Integrated Voltage Measurement... 15:39:25 Voltage Offset Correction: v_off_ini = 0.000004881 V, v_off_fin = 0.000007106 V 15:39:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034315 Vs 15:39:26 Integrated Voltage Measurement... 15:39:45 Voltage Offset Correction: v_off_ini = 0.000006588 V, v_off_fin = 0.000003677 V 15:39:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953824 Vs 15:39:48 Temperature Measurement, Probe Number = 0, T = 20.245000 C 15:39:48 Temperature Measurement, Probe Number = 1, T = 20.162000 C 15:39:49 Temperature Measurement, Probe Number = 2, T = 20.217000 C 15:39:50 Temperature Measurement, Probe Number = 3, T = 20.160000 C 15:39:50 Temperature Measurement, Probe Number = 4, T = 20.413000 C 15:39:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.41 15:39:51 Integrated Voltage Measurement... 15:40:10 Voltage Offset Correction: v_off_ini = 0.000004795 V, v_off_fin = 0.000006987 V 15:40:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039528 Vs 15:40:10 Integrated Voltage Measurement... 15:40:29 Voltage Offset Correction: v_off_ini = 0.000006469 V, v_off_fin = 0.000003616 V 15:40:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957206 Vs 15:40:32 Temperature Measurement, Probe Number = 0, T = 20.245000 C 15:40:33 Temperature Measurement, Probe Number = 1, T = 20.160000 C 15:40:33 Temperature Measurement, Probe Number = 2, T = 20.216000 C 15:40:34 Temperature Measurement, Probe Number = 3, T = 20.155000 C 15:40:35 Temperature Measurement, Probe Number = 4, T = 20.327000 C 15:40:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.33 15:40:35 Integrated Voltage Measurement... 15:40:55 Voltage Offset Correction: v_off_ini = 0.000004941 V, v_off_fin = 0.000006379 V 15:40:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036703 Vs 15:40:55 Integrated Voltage Measurement... 15:41:15 Voltage Offset Correction: v_off_ini = 0.000006159 V, v_off_fin = 0.000003395 V 15:41:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960638 Vs 15:41:18 Temperature Measurement, Probe Number = 0, T = 20.237000 C 15:41:18 Temperature Measurement, Probe Number = 1, T = 20.156000 C 15:41:19 Temperature Measurement, Probe Number = 2, T = 20.212000 C 15:41:20 Temperature Measurement, Probe Number = 3, T = 20.157000 C 15:41:20 Temperature Measurement, Probe Number = 4, T = 20.265000 C 15:41:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.27 15:41:20 Integrated Voltage Measurement... 15:41:39 Voltage Offset Correction: v_off_ini = 0.000004074 V, v_off_fin = 0.000006925 V 15:41:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030290 Vs 15:41:40 Integrated Voltage Measurement... 15:41:59 Voltage Offset Correction: v_off_ini = 0.000006602 V, v_off_fin = 0.000003708 V 15:41:59 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170960112 Vs 15:42:02 Temperature Measurement, Probe Number = 0, T = 20.238000 C 15:42:03 Temperature Measurement, Probe Number = 1, T = 20.159000 C 15:42:03 Temperature Measurement, Probe Number = 2, T = 20.211000 C 15:42:04 Temperature Measurement, Probe Number = 3, T = 20.157000 C 15:42:05 Temperature Measurement, Probe Number = 4, T = 20.262000 C 15:42:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.26 15:42:05 Integrated Voltage Measurement... 15:42:24 Voltage Offset Correction: v_off_ini = 0.000004938 V, v_off_fin = 0.000006568 V 15:42:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034599 Vs 15:42:25 Integrated Voltage Measurement... 15:42:44 Voltage Offset Correction: v_off_ini = 0.000006432 V, v_off_fin = 0.000003650 V 15:42:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962305 Vs 15:42:47 Temperature Measurement, Probe Number = 0, T = 20.237000 C 15:42:48 Temperature Measurement, Probe Number = 1, T = 20.157000 C 15:42:48 Temperature Measurement, Probe Number = 2, T = 20.212000 C 15:42:49 Temperature Measurement, Probe Number = 3, T = 20.157000 C 15:42:50 Temperature Measurement, Probe Number = 4, T = 20.322000 C 15:42:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.32 15:42:50 Integrated Voltage Measurement... 15:43:09 Voltage Offset Correction: v_off_ini = 0.000004076 V, v_off_fin = 0.000006581 V 15:43:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030485 Vs 15:43:10 Integrated Voltage Measurement... 15:43:29 Voltage Offset Correction: v_off_ini = 0.000006590 V, v_off_fin = 0.000003001 V 15:43:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960510 Vs 15:43:32 Temperature Measurement, Probe Number = 0, T = 20.240000 C 15:43:33 Temperature Measurement, Probe Number = 1, T = 20.160000 C 15:43:33 Temperature Measurement, Probe Number = 2, T = 20.215000 C 15:43:34 Temperature Measurement, Probe Number = 3, T = 20.160000 C 15:43:35 Temperature Measurement, Probe Number = 4, T = 20.330000 C 15:43:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.33 15:43:35 Integrated Voltage Measurement... 15:43:55 Voltage Offset Correction: v_off_ini = 0.000003963 V, v_off_fin = 0.000006160 V 15:43:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171026864 Vs 15:43:55 Integrated Voltage Measurement... 15:44:14 Voltage Offset Correction: v_off_ini = 0.000005960 V, v_off_fin = 0.000003093 V 15:44:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963180 Vs 15:44:17 Temperature Measurement, Probe Number = 0, T = 20.243000 C 15:44:18 Temperature Measurement, Probe Number = 1, T = 20.160000 C 15:44:18 Temperature Measurement, Probe Number = 2, T = 20.222000 C 15:44:19 Temperature Measurement, Probe Number = 3, T = 20.162000 C 15:44:20 Temperature Measurement, Probe Number = 4, T = 20.377000 C 15:44:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.38 15:44:20 Integrated Voltage Measurement... 15:44:39 Voltage Offset Correction: v_off_ini = 0.000004178 V, v_off_fin = 0.000007269 V 15:44:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033236 Vs 15:44:40 Integrated Voltage Measurement... 15:44:59 Voltage Offset Correction: v_off_ini = 0.000005667 V, v_off_fin = 0.000003810 V 15:44:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955275 Vs 16:15:02 Temperature Measurement, Probe Number = 0, T = 20.247000 C 16:15:03 Temperature Measurement, Probe Number = 1, T = 20.169000 C 16:15:03 Temperature Measurement, Probe Number = 2, T = 20.226000 C 16:15:04 Temperature Measurement, Probe Number = 3, T = 20.170000 C 16:15:05 Temperature Measurement, Probe Number = 4, T = 20.539000 C 16:15:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.54 16:15:05 Integrated Voltage Measurement... 16:15:24 Voltage Offset Correction: v_off_ini = 0.000005926 V, v_off_fin = 0.000006997 V 16:15:24 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171086821 Vs 16:15:24 Integrated Voltage Measurement... 16:15:43 Voltage Offset Correction: v_off_ini = 0.000006216 V, v_off_fin = 0.000003964 V 16:15:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952067 Vs 16:15:46 Temperature Measurement, Probe Number = 0, T = 20.249000 C 16:15:47 Temperature Measurement, Probe Number = 1, T = 20.172000 C 16:15:48 Temperature Measurement, Probe Number = 2, T = 20.225000 C 16:15:48 Temperature Measurement, Probe Number = 3, T = 20.170000 C 16:15:49 Temperature Measurement, Probe Number = 4, T = 20.493000 C 16:15:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.49 16:15:49 Integrated Voltage Measurement... 16:16:08 Voltage Offset Correction: v_off_ini = 0.000004140 V, v_off_fin = 0.000006822 V 16:16:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024750 Vs 16:16:09 Integrated Voltage Measurement... 16:16:28 Voltage Offset Correction: v_off_ini = 0.000006388 V, v_off_fin = 0.000003375 V 16:16:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958652 Vs 16:16:31 Temperature Measurement, Probe Number = 0, T = 20.250000 C 16:16:32 Temperature Measurement, Probe Number = 1, T = 20.172000 C 16:16:33 Temperature Measurement, Probe Number = 2, T = 20.224000 C 16:16:33 Temperature Measurement, Probe Number = 3, T = 20.170000 C 16:16:34 Temperature Measurement, Probe Number = 4, T = 20.439000 C 16:16:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.44 16:16:34 Integrated Voltage Measurement... 16:16:53 Voltage Offset Correction: v_off_ini = 0.000004248 V, v_off_fin = 0.000006891 V 16:16:53 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171021479 Vs 16:16:54 Integrated Voltage Measurement... 16:17:13 Voltage Offset Correction: v_off_ini = 0.000005913 V, v_off_fin = 0.000003262 V 16:17:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958097 Vs 16:17:16 Temperature Measurement, Probe Number = 0, T = 20.248000 C 16:17:16 Temperature Measurement, Probe Number = 1, T = 20.171000 C 16:17:17 Temperature Measurement, Probe Number = 2, T = 20.224000 C 16:17:18 Temperature Measurement, Probe Number = 3, T = 20.169000 C 16:17:18 Temperature Measurement, Probe Number = 4, T = 20.393000 C 16:17:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.39 16:17:18 Integrated Voltage Measurement... 16:17:38 Voltage Offset Correction: v_off_ini = 0.000004160 V, v_off_fin = 0.000006696 V 16:17:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025770 Vs 16:17:38 Integrated Voltage Measurement... 16:17:57 Voltage Offset Correction: v_off_ini = 0.000005963 V, v_off_fin = 0.000003711 V 16:17:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961435 Vs 16:18:00 Temperature Measurement, Probe Number = 0, T = 20.251000 C 16:18:01 Temperature Measurement, Probe Number = 1, T = 20.172000 C 16:18:02 Temperature Measurement, Probe Number = 2, T = 20.226000 C 16:18:02 Temperature Measurement, Probe Number = 3, T = 20.169000 C 16:18:03 Temperature Measurement, Probe Number = 4, T = 20.356000 C 16:18:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.36 16:18:03 Integrated Voltage Measurement... 16:18:22 Voltage Offset Correction: v_off_ini = 0.000004419 V, v_off_fin = 0.000006678 V 16:18:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171022550 Vs 16:18:23 Integrated Voltage Measurement... 16:18:42 Voltage Offset Correction: v_off_ini = 0.000006608 V, v_off_fin = 0.000003127 V 16:18:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956024 Vs 16:18:45 Temperature Measurement, Probe Number = 0, T = 20.251000 C 16:18:45 Temperature Measurement, Probe Number = 1, T = 20.174000 C 16:18:46 Temperature Measurement, Probe Number = 2, T = 20.226000 C 16:18:47 Temperature Measurement, Probe Number = 3, T = 20.172000 C 16:18:47 Temperature Measurement, Probe Number = 4, T = 20.375000 C 16:18:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.38 16:18:48 Integrated Voltage Measurement... 16:19:07 Voltage Offset Correction: v_off_ini = 0.000003991 V, v_off_fin = 0.000006263 V 16:19:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020712 Vs 16:19:08 Integrated Voltage Measurement... 16:19:27 Voltage Offset Correction: v_off_ini = 0.000005727 V, v_off_fin = 0.000003261 V 16:19:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955937 Vs 16:19:30 Temperature Measurement, Probe Number = 0, T = 20.250000 C 16:19:30 Temperature Measurement, Probe Number = 1, T = 20.173000 C 16:19:31 Temperature Measurement, Probe Number = 2, T = 20.226000 C 16:19:32 Temperature Measurement, Probe Number = 3, T = 20.170000 C 16:19:32 Temperature Measurement, Probe Number = 4, T = 20.412000 C 16:19:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.41 16:19:33 Integrated Voltage Measurement... 16:19:52 Voltage Offset Correction: v_off_ini = 0.000003606 V, v_off_fin = 0.000006668 V 16:19:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171018438 Vs 16:19:53 Integrated Voltage Measurement... 16:20:12 Voltage Offset Correction: v_off_ini = 0.000005868 V, v_off_fin = 0.000004007 V 16:20:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950298 Vs 16:20:15 Temperature Measurement, Probe Number = 0, T = 20.253000 C 16:20:16 Temperature Measurement, Probe Number = 1, T = 20.174000 C 16:20:16 Temperature Measurement, Probe Number = 2, T = 20.227000 C 16:20:17 Temperature Measurement, Probe Number = 3, T = 20.173000 C 16:20:18 Temperature Measurement, Probe Number = 4, T = 20.430000 C 16:20:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.43 16:20:18 Integrated Voltage Measurement... 16:20:37 Voltage Offset Correction: v_off_ini = 0.000003988 V, v_off_fin = 0.000007037 V 16:20:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023011 Vs 16:20:37 Integrated Voltage Measurement... 16:20:57 Voltage Offset Correction: v_off_ini = 0.000006453 V, v_off_fin = 0.000003528 V 16:20:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955878 Vs 16:21:00 Temperature Measurement, Probe Number = 0, T = 20.251000 C 16:21:00 Temperature Measurement, Probe Number = 1, T = 20.174000 C 16:21:01 Temperature Measurement, Probe Number = 2, T = 20.228000 C 16:21:02 Temperature Measurement, Probe Number = 3, T = 20.173000 C 16:21:02 Temperature Measurement, Probe Number = 4, T = 20.479000 C 16:21:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.48 16:21:02 Integrated Voltage Measurement... 16:21:22 Voltage Offset Correction: v_off_ini = 0.000004527 V, v_off_fin = 0.000006469 V 16:21:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023702 Vs 16:21:22 Integrated Voltage Measurement... 16:21:41 Voltage Offset Correction: v_off_ini = 0.000006069 V, v_off_fin = 0.000002868 V 16:21:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959209 Vs 16:21:44 Temperature Measurement, Probe Number = 0, T = 20.252000 C 16:21:45 Temperature Measurement, Probe Number = 1, T = 20.172000 C 16:21:45 Temperature Measurement, Probe Number = 2, T = 20.229000 C 16:21:46 Temperature Measurement, Probe Number = 3, T = 20.173000 C 16:21:47 Temperature Measurement, Probe Number = 4, T = 20.445000 C 16:21:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.45 16:21:47 Integrated Voltage Measurement... 16:22:07 Voltage Offset Correction: v_off_ini = 0.000004693 V, v_off_fin = 0.000006301 V 16:22:07 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171023708 Vs 16:22:07 Integrated Voltage Measurement... 16:22:26 Voltage Offset Correction: v_off_ini = 0.000006207 V, v_off_fin = 0.000003494 V 16:22:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954609 Vs 16:52:29 Temperature Measurement, Probe Number = 0, T = 20.245000 C 16:52:30 Temperature Measurement, Probe Number = 1, T = 20.166000 C 16:52:30 Temperature Measurement, Probe Number = 2, T = 20.226000 C 16:52:31 Temperature Measurement, Probe Number = 3, T = 20.170000 C 16:52:32 Temperature Measurement, Probe Number = 4, T = 20.489000 C 16:52:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.49 16:52:32 Integrated Voltage Measurement... 16:52:51 Voltage Offset Correction: v_off_ini = 0.000005297 V, v_off_fin = 0.000006401 V 16:52:51 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171068568 Vs 16:52:52 Integrated Voltage Measurement... 16:53:11 Voltage Offset Correction: v_off_ini = 0.000006399 V, v_off_fin = 0.000003350 V 16:53:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960125 Vs 16:53:14 Temperature Measurement, Probe Number = 0, T = 20.245000 C 16:53:14 Temperature Measurement, Probe Number = 1, T = 20.167000 C 16:53:15 Temperature Measurement, Probe Number = 2, T = 20.223000 C 16:53:16 Temperature Measurement, Probe Number = 3, T = 20.167000 C 16:53:16 Temperature Measurement, Probe Number = 4, T = 20.511000 C 16:53:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.51 16:53:17 Integrated Voltage Measurement... 16:53:36 Voltage Offset Correction: v_off_ini = 0.000004237 V, v_off_fin = 0.000006865 V 16:53:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024115 Vs 16:53:36 Integrated Voltage Measurement... 16:53:56 Voltage Offset Correction: v_off_ini = 0.000006583 V, v_off_fin = 0.000003224 V 16:53:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960754 Vs 16:53:59 Temperature Measurement, Probe Number = 0, T = 20.247000 C 16:53:59 Temperature Measurement, Probe Number = 1, T = 20.169000 C 16:54:00 Temperature Measurement, Probe Number = 2, T = 20.227000 C 16:54:01 Temperature Measurement, Probe Number = 3, T = 20.172000 C 16:54:01 Temperature Measurement, Probe Number = 4, T = 20.506000 C 16:54:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.51 16:54:02 Integrated Voltage Measurement... 16:54:22 Voltage Offset Correction: v_off_ini = 0.000003907 V, v_off_fin = 0.000006272 V 16:54:22 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171020800 Vs 16:54:22 Integrated Voltage Measurement... 16:54:41 Voltage Offset Correction: v_off_ini = 0.000006202 V, v_off_fin = 0.000003644 V 16:54:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955587 Vs 16:54:44 Temperature Measurement, Probe Number = 0, T = 20.250000 C 16:54:45 Temperature Measurement, Probe Number = 1, T = 20.170000 C 16:54:46 Temperature Measurement, Probe Number = 2, T = 20.230000 C 16:54:46 Temperature Measurement, Probe Number = 3, T = 20.173000 C 16:54:47 Temperature Measurement, Probe Number = 4, T = 20.480000 C 16:54:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.48 16:54:47 Integrated Voltage Measurement... 16:55:06 Voltage Offset Correction: v_off_ini = 0.000004020 V, v_off_fin = 0.000006760 V 16:55:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171022595 Vs 16:55:06 Integrated Voltage Measurement... 16:55:26 Voltage Offset Correction: v_off_ini = 0.000006685 V, v_off_fin = 0.000003448 V 16:55:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954206 Vs 16:55:29 Temperature Measurement, Probe Number = 0, T = 20.241000 C 16:55:29 Temperature Measurement, Probe Number = 1, T = 20.163000 C 16:55:30 Temperature Measurement, Probe Number = 2, T = 20.223000 C 16:55:31 Temperature Measurement, Probe Number = 3, T = 20.167000 C 16:55:31 Temperature Measurement, Probe Number = 4, T = 20.414000 C 16:55:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.41 16:55:31 Integrated Voltage Measurement... 16:55:51 Voltage Offset Correction: v_off_ini = 0.000004303 V, v_off_fin = 0.000006638 V 16:55:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023048 Vs 16:55:51 Integrated Voltage Measurement... 16:56:10 Voltage Offset Correction: v_off_ini = 0.000005916 V, v_off_fin = 0.000003408 V 16:56:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955758 Vs 16:56:13 Temperature Measurement, Probe Number = 0, T = 20.246000 C 16:56:14 Temperature Measurement, Probe Number = 1, T = 20.166000 C 16:56:14 Temperature Measurement, Probe Number = 2, T = 20.228000 C 16:56:15 Temperature Measurement, Probe Number = 3, T = 20.171000 C 16:56:16 Temperature Measurement, Probe Number = 4, T = 20.475000 C 16:56:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.48 16:56:16 Integrated Voltage Measurement... 16:56:36 Voltage Offset Correction: v_off_ini = 0.000003937 V, v_off_fin = 0.000006470 V 16:56:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025365 Vs 16:56:36 Integrated Voltage Measurement... 16:56:55 Voltage Offset Correction: v_off_ini = 0.000006872 V, v_off_fin = 0.000003085 V 16:56:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952002 Vs 16:56:58 Temperature Measurement, Probe Number = 0, T = 20.248000 C 16:56:59 Temperature Measurement, Probe Number = 1, T = 20.171000 C 16:57:00 Temperature Measurement, Probe Number = 2, T = 20.225000 C 16:57:00 Temperature Measurement, Probe Number = 3, T = 20.170000 C 16:57:01 Temperature Measurement, Probe Number = 4, T = 20.491000 C 16:57:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.49 16:57:01 Integrated Voltage Measurement... 16:57:22 Voltage Offset Correction: v_off_ini = 0.000004145 V, v_off_fin = 0.000006213 V 16:57:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020187 Vs 16:57:22 Integrated Voltage Measurement... 16:57:41 Voltage Offset Correction: v_off_ini = 0.000005357 V, v_off_fin = 0.000002890 V 16:57:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954588 Vs 16:57:44 Temperature Measurement, Probe Number = 0, T = 20.246000 C 16:57:45 Temperature Measurement, Probe Number = 1, T = 20.167000 C 16:57:46 Temperature Measurement, Probe Number = 2, T = 20.226000 C 16:57:46 Temperature Measurement, Probe Number = 3, T = 20.168000 C 16:57:47 Temperature Measurement, Probe Number = 4, T = 20.382000 C 16:57:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.38 16:57:47 Integrated Voltage Measurement... 16:58:06 Voltage Offset Correction: v_off_ini = 0.000003784 V, v_off_fin = 0.000006086 V 16:58:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171016265 Vs 16:58:07 Integrated Voltage Measurement... 16:58:26 Voltage Offset Correction: v_off_ini = 0.000005497 V, v_off_fin = 0.000003004 V 16:58:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958453 Vs 16:58:29 Temperature Measurement, Probe Number = 0, T = 20.240000 C 16:58:30 Temperature Measurement, Probe Number = 1, T = 20.163000 C 16:58:30 Temperature Measurement, Probe Number = 2, T = 20.219000 C 16:58:31 Temperature Measurement, Probe Number = 3, T = 20.163000 C 16:58:32 Temperature Measurement, Probe Number = 4, T = 20.284000 C 16:58:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.28 16:58:32 Integrated Voltage Measurement... 16:58:51 Voltage Offset Correction: v_off_ini = 0.000003566 V, v_off_fin = 0.000006326 V 16:58:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171012770 Vs 16:58:52 Integrated Voltage Measurement... 16:59:11 Voltage Offset Correction: v_off_ini = 0.000005296 V, v_off_fin = 0.000003255 V 16:59:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958861 Vs 16:59:14 Temperature Measurement, Probe Number = 0, T = 20.239000 C 16:59:14 Temperature Measurement, Probe Number = 1, T = 20.163000 C 16:59:15 Temperature Measurement, Probe Number = 2, T = 20.219000 C 16:59:16 Temperature Measurement, Probe Number = 3, T = 20.163000 C 16:59:16 Temperature Measurement, Probe Number = 4, T = 20.273000 C 16:59:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.27 16:59:16 Integrated Voltage Measurement... 16:59:36 Voltage Offset Correction: v_off_ini = 0.000004359 V, v_off_fin = 0.000006619 V 16:59:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020417 Vs 16:59:36 Integrated Voltage Measurement... 16:59:55 Voltage Offset Correction: v_off_ini = 0.000005764 V, v_off_fin = 0.000003028 V 16:59:56 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170955364 Vs 17:29:58 Temperature Measurement, Probe Number = 0, T = 20.242000 C 17:29:59 Temperature Measurement, Probe Number = 1, T = 20.163000 C 17:30:00 Temperature Measurement, Probe Number = 2, T = 20.224000 C 17:30:01 Temperature Measurement, Probe Number = 3, T = 20.169000 C 17:30:01 Temperature Measurement, Probe Number = 4, T = 20.458000 C 17:30:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.46 17:30:01 Integrated Voltage Measurement... 17:30:20 Voltage Offset Correction: v_off_ini = 0.000005408 V, v_off_fin = 0.000006929 V 17:30:21 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171082381 Vs 17:30:21 Integrated Voltage Measurement... 17:30:40 Voltage Offset Correction: v_off_ini = 0.000006403 V, v_off_fin = 0.000003264 V 17:30:40 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170957099 Vs 17:30:43 Temperature Measurement, Probe Number = 0, T = 20.244000 C 17:30:44 Temperature Measurement, Probe Number = 1, T = 20.168000 C 17:30:44 Temperature Measurement, Probe Number = 2, T = 20.224000 C 17:30:45 Temperature Measurement, Probe Number = 3, T = 20.170000 C 17:30:46 Temperature Measurement, Probe Number = 4, T = 20.436000 C 17:30:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.44 17:30:46 Integrated Voltage Measurement... 17:31:05 Voltage Offset Correction: v_off_ini = 0.000004460 V, v_off_fin = 0.000006977 V 17:31:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171026159 Vs 17:31:06 Integrated Voltage Measurement... 17:31:25 Voltage Offset Correction: v_off_ini = 0.000006003 V, v_off_fin = 0.000002808 V 17:31:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961220 Vs 17:31:28 Temperature Measurement, Probe Number = 0, T = 20.243000 C 17:31:28 Temperature Measurement, Probe Number = 1, T = 20.166000 C 17:31:29 Temperature Measurement, Probe Number = 2, T = 20.224000 C 17:31:30 Temperature Measurement, Probe Number = 3, T = 20.170000 C 17:31:30 Temperature Measurement, Probe Number = 4, T = 20.423000 C 17:31:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.42 17:31:30 Integrated Voltage Measurement... 17:31:49 Voltage Offset Correction: v_off_ini = 0.000003748 V, v_off_fin = 0.000007066 V 17:31:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171020235 Vs 17:31:50 Integrated Voltage Measurement... 17:32:09 Voltage Offset Correction: v_off_ini = 0.000005859 V, v_off_fin = 0.000002427 V 17:32:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170960666 Vs 17:32:12 Temperature Measurement, Probe Number = 0, T = 20.244000 C 17:32:13 Temperature Measurement, Probe Number = 1, T = 20.165000 C 17:32:13 Temperature Measurement, Probe Number = 2, T = 20.227000 C 17:32:14 Temperature Measurement, Probe Number = 3, T = 20.171000 C 17:32:15 Temperature Measurement, Probe Number = 4, T = 20.415000 C 17:32:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.41 17:32:15 Integrated Voltage Measurement... 17:32:34 Voltage Offset Correction: v_off_ini = 0.000003758 V, v_off_fin = 0.000006422 V 17:32:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171021485 Vs 17:32:35 Integrated Voltage Measurement... 17:32:54 Voltage Offset Correction: v_off_ini = 0.000006168 V, v_off_fin = 0.000003000 V 17:32:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959097 Vs 17:32:57 Temperature Measurement, Probe Number = 0, T = 20.244000 C 17:32:58 Temperature Measurement, Probe Number = 1, T = 20.166000 C 17:32:58 Temperature Measurement, Probe Number = 2, T = 20.224000 C 17:32:59 Temperature Measurement, Probe Number = 3, T = 20.168000 C 17:33:00 Temperature Measurement, Probe Number = 4, T = 20.409000 C 17:33:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.41 17:33:00 Integrated Voltage Measurement... 17:33:19 Voltage Offset Correction: v_off_ini = 0.000003775 V, v_off_fin = 0.000006175 V 17:33:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171021120 Vs 17:33:20 Integrated Voltage Measurement... 17:33:39 Voltage Offset Correction: v_off_ini = 0.000005789 V, v_off_fin = 0.000002822 V 17:33:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956915 Vs 17:33:42 Temperature Measurement, Probe Number = 0, T = 20.245000 C 17:33:42 Temperature Measurement, Probe Number = 1, T = 20.169000 C 17:33:43 Temperature Measurement, Probe Number = 2, T = 20.225000 C 17:33:44 Temperature Measurement, Probe Number = 3, T = 20.172000 C 17:33:44 Temperature Measurement, Probe Number = 4, T = 20.320000 C 17:33:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.32 17:33:44 Integrated Voltage Measurement... 17:34:04 Voltage Offset Correction: v_off_ini = 0.000004053 V, v_off_fin = 0.000006501 V 17:34:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171025053 Vs 17:34:05 Integrated Voltage Measurement... 17:34:24 Voltage Offset Correction: v_off_ini = 0.000006118 V, v_off_fin = 0.000002992 V 17:34:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952723 Vs 17:34:27 Temperature Measurement, Probe Number = 0, T = 20.249000 C 17:34:27 Temperature Measurement, Probe Number = 1, T = 20.171000 C 17:34:28 Temperature Measurement, Probe Number = 2, T = 20.231000 C 17:34:29 Temperature Measurement, Probe Number = 3, T = 20.176000 C 17:34:29 Temperature Measurement, Probe Number = 4, T = 20.461000 C 17:34:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.46 17:34:30 Integrated Voltage Measurement... 17:34:49 Voltage Offset Correction: v_off_ini = 0.000004165 V, v_off_fin = 0.000006795 V 17:34:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029217 Vs 17:34:49 Integrated Voltage Measurement... 17:35:09 Voltage Offset Correction: v_off_ini = 0.000006327 V, v_off_fin = 0.000003107 V 17:35:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953705 Vs 17:35:12 Temperature Measurement, Probe Number = 0, T = 20.246000 C 17:35:12 Temperature Measurement, Probe Number = 1, T = 20.169000 C 17:35:13 Temperature Measurement, Probe Number = 2, T = 20.226000 C 17:35:13 Temperature Measurement, Probe Number = 3, T = 20.171000 C 17:35:14 Temperature Measurement, Probe Number = 4, T = 20.498000 C 17:35:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.50 17:35:14 Integrated Voltage Measurement... 17:35:33 Voltage Offset Correction: v_off_ini = 0.000003671 V, v_off_fin = 0.000006726 V 17:35:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171022855 Vs 17:35:34 Integrated Voltage Measurement... 17:35:53 Voltage Offset Correction: v_off_ini = 0.000006035 V, v_off_fin = 0.000002513 V 17:35:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955064 Vs 17:35:56 Temperature Measurement, Probe Number = 0, T = 20.245000 C 17:35:56 Temperature Measurement, Probe Number = 1, T = 20.170000 C 17:35:57 Temperature Measurement, Probe Number = 2, T = 20.225000 C 17:35:58 Temperature Measurement, Probe Number = 3, T = 20.173000 C 17:35:58 Temperature Measurement, Probe Number = 4, T = 20.565000 C 17:35:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.57 17:35:59 Integrated Voltage Measurement... 17:36:18 Voltage Offset Correction: v_off_ini = 0.000003635 V, v_off_fin = 0.000006205 V 17:36:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017467 Vs 17:36:19 Integrated Voltage Measurement... 17:36:38 Voltage Offset Correction: v_off_ini = 0.000005925 V, v_off_fin = 0.000003197 V 17:36:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955815 Vs 17:36:41 Temperature Measurement, Probe Number = 0, T = 20.249000 C 17:36:41 Temperature Measurement, Probe Number = 1, T = 20.171000 C 17:36:42 Temperature Measurement, Probe Number = 2, T = 20.233000 C 17:36:43 Temperature Measurement, Probe Number = 3, T = 20.178000 C 17:36:43 Temperature Measurement, Probe Number = 4, T = 20.613000 C 17:36:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.61 17:36:44 Integrated Voltage Measurement... 17:37:03 Voltage Offset Correction: v_off_ini = 0.000003618 V, v_off_fin = 0.000006456 V 17:37:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171019968 Vs 17:37:03 Integrated Voltage Measurement... 17:37:23 Voltage Offset Correction: v_off_ini = 0.000006000 V, v_off_fin = 0.000003308 V 17:37:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955547 Vs 18:07:26 Temperature Measurement, Probe Number = 0, T = 20.244000 C 18:07:26 Temperature Measurement, Probe Number = 1, T = 20.166000 C 18:07:27 Temperature Measurement, Probe Number = 2, T = 20.227000 C 18:07:28 Temperature Measurement, Probe Number = 3, T = 20.170000 C 18:07:28 Temperature Measurement, Probe Number = 4, T = 20.345000 C 18:07:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.34 18:07:29 Integrated Voltage Measurement... 18:07:48 Voltage Offset Correction: v_off_ini = 0.000005561 V, v_off_fin = 0.000007563 V 18:07:48 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171075161 Vs 18:07:48 Integrated Voltage Measurement... 18:08:08 Voltage Offset Correction: v_off_ini = 0.000005519 V, v_off_fin = 0.000003142 V 18:08:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957356 Vs 18:08:10 Temperature Measurement, Probe Number = 0, T = 20.244000 C 18:08:11 Temperature Measurement, Probe Number = 1, T = 20.166000 C 18:08:12 Temperature Measurement, Probe Number = 2, T = 20.227000 C 18:08:12 Temperature Measurement, Probe Number = 3, T = 20.168000 C 18:08:13 Temperature Measurement, Probe Number = 4, T = 20.314000 C 18:08:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.31 18:08:13 Integrated Voltage Measurement... 18:08:32 Voltage Offset Correction: v_off_ini = 0.000004052 V, v_off_fin = 0.000006130 V 18:08:33 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171017149 Vs 18:08:33 Integrated Voltage Measurement... 18:08:52 Voltage Offset Correction: v_off_ini = 0.000005672 V, v_off_fin = 0.000003226 V 18:08:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955264 Vs 18:08:55 Temperature Measurement, Probe Number = 0, T = 20.246000 C 18:08:55 Temperature Measurement, Probe Number = 1, T = 20.170000 C 18:08:56 Temperature Measurement, Probe Number = 2, T = 20.228000 C 18:08:57 Temperature Measurement, Probe Number = 3, T = 20.172000 C 18:08:57 Temperature Measurement, Probe Number = 4, T = 20.342000 C 18:08:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.34 18:08:58 Integrated Voltage Measurement... 18:09:17 Voltage Offset Correction: v_off_ini = 0.000004276 V, v_off_fin = 0.000007345 V 18:09:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031083 Vs 18:09:17 Integrated Voltage Measurement... 18:09:37 Voltage Offset Correction: v_off_ini = 0.000006598 V, v_off_fin = 0.000003861 V 18:09:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952822 Vs 18:09:40 Temperature Measurement, Probe Number = 0, T = 20.250000 C 18:09:40 Temperature Measurement, Probe Number = 1, T = 20.171000 C 18:09:41 Temperature Measurement, Probe Number = 2, T = 20.231000 C 18:09:42 Temperature Measurement, Probe Number = 3, T = 20.176000 C 18:09:42 Temperature Measurement, Probe Number = 4, T = 20.413000 C 18:09:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.41 18:09:43 Integrated Voltage Measurement... 18:10:02 Voltage Offset Correction: v_off_ini = 0.000004945 V, v_off_fin = 0.000007086 V 18:10:02 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171035720 Vs 18:10:03 Integrated Voltage Measurement... 18:10:22 Voltage Offset Correction: v_off_ini = 0.000006829 V, v_off_fin = 0.000003079 V 18:10:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957262 Vs 18:10:25 Temperature Measurement, Probe Number = 0, T = 20.251000 C 18:10:25 Temperature Measurement, Probe Number = 1, T = 20.172000 C 18:10:26 Temperature Measurement, Probe Number = 2, T = 20.233000 C 18:10:27 Temperature Measurement, Probe Number = 3, T = 20.174000 C 18:10:27 Temperature Measurement, Probe Number = 4, T = 20.399000 C 18:10:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.40 18:10:28 Integrated Voltage Measurement... 18:10:47 Voltage Offset Correction: v_off_ini = 0.000003930 V, v_off_fin = 0.000006893 V 18:10:47 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171033350 Vs 18:10:47 Integrated Voltage Measurement... 18:11:07 Voltage Offset Correction: v_off_ini = 0.000006309 V, v_off_fin = 0.000003853 V 18:11:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952096 Vs 18:11:10 Temperature Measurement, Probe Number = 0, T = 20.253000 C 18:11:10 Temperature Measurement, Probe Number = 1, T = 20.172000 C 18:11:11 Temperature Measurement, Probe Number = 2, T = 20.232000 C 18:11:12 Temperature Measurement, Probe Number = 3, T = 20.173000 C 18:11:12 Temperature Measurement, Probe Number = 4, T = 20.340000 C 18:11:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.34 18:11:13 Integrated Voltage Measurement... 18:11:32 Voltage Offset Correction: v_off_ini = 0.000004118 V, v_off_fin = 0.000007087 V 18:11:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023184 Vs 18:11:32 Integrated Voltage Measurement... 18:11:51 Voltage Offset Correction: v_off_ini = 0.000006000 V, v_off_fin = 0.000002943 V 18:11:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957644 Vs 18:11:54 Temperature Measurement, Probe Number = 0, T = 20.246000 C 18:11:55 Temperature Measurement, Probe Number = 1, T = 20.168000 C 18:11:56 Temperature Measurement, Probe Number = 2, T = 20.227000 C 18:11:56 Temperature Measurement, Probe Number = 3, T = 20.171000 C 18:11:57 Temperature Measurement, Probe Number = 4, T = 20.397000 C 18:11:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.40 18:11:57 Integrated Voltage Measurement... 18:12:16 Voltage Offset Correction: v_off_ini = 0.000004012 V, v_off_fin = 0.000006609 V 18:12:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171026280 Vs 18:12:17 Integrated Voltage Measurement... 18:12:36 Voltage Offset Correction: v_off_ini = 0.000006418 V, v_off_fin = 0.000003461 V 18:12:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170956812 Vs 18:12:39 Temperature Measurement, Probe Number = 0, T = 20.244000 C 18:12:39 Temperature Measurement, Probe Number = 1, T = 20.168000 C 18:12:40 Temperature Measurement, Probe Number = 2, T = 20.225000 C 18:12:41 Temperature Measurement, Probe Number = 3, T = 20.172000 C 18:12:41 Temperature Measurement, Probe Number = 4, T = 20.400000 C 18:12:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.40 18:12:42 Integrated Voltage Measurement... 18:13:01 Voltage Offset Correction: v_off_ini = 0.000003657 V, v_off_fin = 0.000006223 V 18:13:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020717 Vs 18:13:02 Integrated Voltage Measurement... 18:13:21 Voltage Offset Correction: v_off_ini = 0.000005656 V, v_off_fin = 0.000003060 V 18:13:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961248 Vs 18:13:24 Temperature Measurement, Probe Number = 0, T = 20.250000 C 18:13:24 Temperature Measurement, Probe Number = 1, T = 20.171000 C 18:13:25 Temperature Measurement, Probe Number = 2, T = 20.231000 C 18:13:26 Temperature Measurement, Probe Number = 3, T = 20.174000 C 18:13:26 Temperature Measurement, Probe Number = 4, T = 20.389000 C 18:13:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.39 18:13:27 Integrated Voltage Measurement... 18:13:46 Voltage Offset Correction: v_off_ini = 0.000003899 V, v_off_fin = 0.000006163 V 18:13:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171026859 Vs 18:13:47 Integrated Voltage Measurement... 18:14:06 Voltage Offset Correction: v_off_ini = 0.000005858 V, v_off_fin = 0.000002763 V 18:14:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957346 Vs 18:14:09 Temperature Measurement, Probe Number = 0, T = 20.248000 C 18:14:10 Temperature Measurement, Probe Number = 1, T = 20.169000 C 18:14:10 Temperature Measurement, Probe Number = 2, T = 20.230000 C 18:14:11 Temperature Measurement, Probe Number = 3, T = 20.173000 C 18:14:12 Temperature Measurement, Probe Number = 4, T = 20.456000 C 18:14:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.46 18:14:12 Integrated Voltage Measurement... 18:14:31 Voltage Offset Correction: v_off_ini = 0.000004482 V, v_off_fin = 0.000006971 V 18:14:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035127 Vs 18:14:32 Integrated Voltage Measurement... 18:14:51 Voltage Offset Correction: v_off_ini = 0.000006556 V, v_off_fin = 0.000004022 V 18:14:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951048 Vs 18:44:54 Temperature Measurement, Probe Number = 0, T = 20.236000 C 18:44:55 Temperature Measurement, Probe Number = 1, T = 20.157000 C 18:44:56 Temperature Measurement, Probe Number = 2, T = 20.222000 C 18:44:57 Temperature Measurement, Probe Number = 3, T = 20.166000 C 18:44:57 Temperature Measurement, Probe Number = 4, T = 20.433000 C 18:44:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.43 18:44:57 Integrated Voltage Measurement... 18:45:17 Voltage Offset Correction: v_off_ini = 0.000005407 V, v_off_fin = 0.000006376 V 18:45:17 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171068383 Vs 18:45:18 Integrated Voltage Measurement... 18:45:37 Voltage Offset Correction: v_off_ini = 0.000006197 V, v_off_fin = 0.000003499 V 18:45:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956198 Vs 18:45:39 Temperature Measurement, Probe Number = 0, T = 20.241000 C 18:45:40 Temperature Measurement, Probe Number = 1, T = 20.160000 C 18:45:41 Temperature Measurement, Probe Number = 2, T = 20.223000 C 18:45:41 Temperature Measurement, Probe Number = 3, T = 20.167000 C 18:45:42 Temperature Measurement, Probe Number = 4, T = 20.414000 C 18:45:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.41 18:45:42 Integrated Voltage Measurement... 18:46:02 Voltage Offset Correction: v_off_ini = 0.000004167 V, v_off_fin = 0.000006288 V 18:46:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028073 Vs 18:46:02 Integrated Voltage Measurement... 18:46:21 Voltage Offset Correction: v_off_ini = 0.000006075 V, v_off_fin = 0.000002977 V 18:46:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958009 Vs 18:46:24 Temperature Measurement, Probe Number = 0, T = 20.240000 C 18:46:25 Temperature Measurement, Probe Number = 1, T = 20.161000 C 18:46:26 Temperature Measurement, Probe Number = 2, T = 20.223000 C 18:46:26 Temperature Measurement, Probe Number = 3, T = 20.169000 C 18:46:27 Temperature Measurement, Probe Number = 4, T = 20.454000 C 18:46:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.45 18:46:27 Integrated Voltage Measurement... 18:46:46 Voltage Offset Correction: v_off_ini = 0.000004252 V, v_off_fin = 0.000006601 V 18:46:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028222 Vs 18:46:47 Integrated Voltage Measurement... 18:47:06 Voltage Offset Correction: v_off_ini = 0.000006138 V, v_off_fin = 0.000003314 V 18:47:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957224 Vs 18:47:09 Temperature Measurement, Probe Number = 0, T = 20.245000 C 18:47:10 Temperature Measurement, Probe Number = 1, T = 20.164000 C 18:47:10 Temperature Measurement, Probe Number = 2, T = 20.230000 C 18:47:11 Temperature Measurement, Probe Number = 3, T = 20.173000 C 18:47:12 Temperature Measurement, Probe Number = 4, T = 20.525000 C 18:47:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.52 18:47:12 Integrated Voltage Measurement... 18:47:31 Voltage Offset Correction: v_off_ini = 0.000003945 V, v_off_fin = 0.000006683 V 18:47:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171027542 Vs 18:47:32 Integrated Voltage Measurement... 18:47:50 Voltage Offset Correction: v_off_ini = 0.000006094 V, v_off_fin = 0.000003187 V 18:47:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957208 Vs 18:47:53 Temperature Measurement, Probe Number = 0, T = 20.244000 C 18:47:54 Temperature Measurement, Probe Number = 1, T = 20.165000 C 18:47:55 Temperature Measurement, Probe Number = 2, T = 20.230000 C 18:47:55 Temperature Measurement, Probe Number = 3, T = 20.173000 C 18:47:56 Temperature Measurement, Probe Number = 4, T = 20.534000 C 18:47:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.53 18:47:56 Integrated Voltage Measurement... 18:48:16 Voltage Offset Correction: v_off_ini = 0.000003665 V, v_off_fin = 0.000006690 V 18:48:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171030030 Vs 18:48:16 Integrated Voltage Measurement... 18:48:36 Voltage Offset Correction: v_off_ini = 0.000006136 V, v_off_fin = 0.000003202 V 18:48:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959256 Vs 18:48:39 Temperature Measurement, Probe Number = 0, T = 20.244000 C 18:48:39 Temperature Measurement, Probe Number = 1, T = 20.163000 C 18:48:40 Temperature Measurement, Probe Number = 2, T = 20.231000 C 18:48:41 Temperature Measurement, Probe Number = 3, T = 20.172000 C 18:48:41 Temperature Measurement, Probe Number = 4, T = 20.560000 C 18:48:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.56 18:48:41 Integrated Voltage Measurement... 18:49:02 Voltage Offset Correction: v_off_ini = 0.000003728 V, v_off_fin = 0.000006912 V 18:49:02 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171031576 Vs 18:49:03 Integrated Voltage Measurement... 18:49:22 Voltage Offset Correction: v_off_ini = 0.000005819 V, v_off_fin = 0.000003139 V 18:49:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958479 Vs 18:49:25 Temperature Measurement, Probe Number = 0, T = 20.244000 C 18:49:25 Temperature Measurement, Probe Number = 1, T = 20.164000 C 18:49:26 Temperature Measurement, Probe Number = 2, T = 20.227000 C 18:49:27 Temperature Measurement, Probe Number = 3, T = 20.168000 C 18:49:27 Temperature Measurement, Probe Number = 4, T = 20.521000 C 18:49:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.52 18:49:28 Integrated Voltage Measurement... 18:49:47 Voltage Offset Correction: v_off_ini = 0.000003393 V, v_off_fin = 0.000006327 V 18:49:47 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171026010 Vs 18:49:47 Integrated Voltage Measurement... 18:50:06 Voltage Offset Correction: v_off_ini = 0.000005560 V, v_off_fin = 0.000002638 V 18:50:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966927 Vs 18:50:09 Temperature Measurement, Probe Number = 0, T = 20.245000 C 18:50:10 Temperature Measurement, Probe Number = 1, T = 20.164000 C 18:50:11 Temperature Measurement, Probe Number = 2, T = 20.226000 C 18:50:11 Temperature Measurement, Probe Number = 3, T = 20.166000 C 18:50:12 Temperature Measurement, Probe Number = 4, T = 20.505000 C 18:50:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.50 18:50:12 Integrated Voltage Measurement... 18:50:32 Voltage Offset Correction: v_off_ini = 0.000003764 V, v_off_fin = 0.000006905 V 18:50:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030758 Vs 18:50:32 Integrated Voltage Measurement... 18:50:51 Voltage Offset Correction: v_off_ini = 0.000005941 V, v_off_fin = 0.000002882 V 18:50:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962136 Vs 18:50:54 Temperature Measurement, Probe Number = 0, T = 20.247000 C 18:50:55 Temperature Measurement, Probe Number = 1, T = 20.166000 C 18:50:56 Temperature Measurement, Probe Number = 2, T = 20.229000 C 18:50:56 Temperature Measurement, Probe Number = 3, T = 20.170000 C 18:50:57 Temperature Measurement, Probe Number = 4, T = 20.557000 C 18:50:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.56 18:50:57 Integrated Voltage Measurement... 18:51:17 Voltage Offset Correction: v_off_ini = 0.000003819 V, v_off_fin = 0.000006133 V 18:51:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028052 Vs 18:51:17 Integrated Voltage Measurement... 18:51:36 Voltage Offset Correction: v_off_ini = 0.000005660 V, v_off_fin = 0.000003290 V 18:51:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959864 Vs 18:51:39 Temperature Measurement, Probe Number = 0, T = 20.246000 C 18:51:40 Temperature Measurement, Probe Number = 1, T = 20.165000 C 18:51:40 Temperature Measurement, Probe Number = 2, T = 20.230000 C 18:51:41 Temperature Measurement, Probe Number = 3, T = 20.172000 C 18:51:42 Temperature Measurement, Probe Number = 4, T = 20.597000 C 18:51:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.60 18:51:42 Integrated Voltage Measurement... 18:52:01 Voltage Offset Correction: v_off_ini = 0.000003682 V, v_off_fin = 0.000006644 V 18:52:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171029836 Vs 18:52:01 Integrated Voltage Measurement... 18:52:21 Voltage Offset Correction: v_off_ini = 0.000005935 V, v_off_fin = 0.000003122 V 18:52:21 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170961686 Vs 19:22:24 Temperature Measurement, Probe Number = 0, T = 20.243000 C 19:22:24 Temperature Measurement, Probe Number = 1, T = 20.163000 C 19:22:25 Temperature Measurement, Probe Number = 2, T = 20.228000 C 19:22:26 Temperature Measurement, Probe Number = 3, T = 20.169000 C 19:22:26 Temperature Measurement, Probe Number = 4, T = 20.524000 C 19:22:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.52 19:22:27 Integrated Voltage Measurement... 19:22:47 Voltage Offset Correction: v_off_ini = 0.000004435 V, v_off_fin = 0.000006613 V 19:22:47 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171071608 Vs 19:22:47 Integrated Voltage Measurement... 19:23:06 Voltage Offset Correction: v_off_ini = 0.000005691 V, v_off_fin = 0.000003351 V 19:23:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958811 Vs 19:23:09 Temperature Measurement, Probe Number = 0, T = 20.241000 C 19:23:10 Temperature Measurement, Probe Number = 1, T = 20.158000 C 19:23:11 Temperature Measurement, Probe Number = 2, T = 20.223000 C 19:23:11 Temperature Measurement, Probe Number = 3, T = 20.162000 C 19:23:12 Temperature Measurement, Probe Number = 4, T = 20.536000 C 19:23:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.54 19:23:12 Integrated Voltage Measurement... 19:23:31 Voltage Offset Correction: v_off_ini = 0.000004240 V, v_off_fin = 0.000006449 V 19:23:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023232 Vs 19:23:32 Integrated Voltage Measurement... 19:23:51 Voltage Offset Correction: v_off_ini = 0.000006306 V, v_off_fin = 0.000002927 V 19:23:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959094 Vs 19:23:54 Temperature Measurement, Probe Number = 0, T = 20.241000 C 19:23:54 Temperature Measurement, Probe Number = 1, T = 20.162000 C 19:23:55 Temperature Measurement, Probe Number = 2, T = 20.223000 C 19:23:56 Temperature Measurement, Probe Number = 3, T = 20.164000 C 19:23:56 Temperature Measurement, Probe Number = 4, T = 20.462000 C 19:23:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.46 19:23:57 Integrated Voltage Measurement... 19:24:16 Voltage Offset Correction: v_off_ini = 0.000003643 V, v_off_fin = 0.000006992 V 19:24:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171025488 Vs 19:24:16 Integrated Voltage Measurement... 19:24:36 Voltage Offset Correction: v_off_ini = 0.000006113 V, v_off_fin = 0.000003375 V 19:24:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960263 Vs 19:24:38 Temperature Measurement, Probe Number = 0, T = 20.245000 C 19:24:39 Temperature Measurement, Probe Number = 1, T = 20.166000 C 19:24:40 Temperature Measurement, Probe Number = 2, T = 20.229000 C 19:24:40 Temperature Measurement, Probe Number = 3, T = 20.172000 C 19:24:41 Temperature Measurement, Probe Number = 4, T = 20.508000 C 19:24:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.51 19:24:41 Integrated Voltage Measurement... 19:25:01 Voltage Offset Correction: v_off_ini = 0.000003730 V, v_off_fin = 0.000006702 V 19:25:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024377 Vs 19:25:01 Integrated Voltage Measurement... 19:25:20 Voltage Offset Correction: v_off_ini = 0.000005805 V, v_off_fin = 0.000003583 V 19:25:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959027 Vs 19:25:23 Temperature Measurement, Probe Number = 0, T = 20.246000 C 19:25:24 Temperature Measurement, Probe Number = 1, T = 20.166000 C 19:25:25 Temperature Measurement, Probe Number = 2, T = 20.231000 C 19:25:25 Temperature Measurement, Probe Number = 3, T = 20.173000 C 19:25:26 Temperature Measurement, Probe Number = 4, T = 20.546000 C 19:25:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.55 19:25:26 Integrated Voltage Measurement... 19:25:45 Voltage Offset Correction: v_off_ini = 0.000003960 V, v_off_fin = 0.000006372 V 19:25:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023191 Vs 19:25:45 Integrated Voltage Measurement... 19:26:05 Voltage Offset Correction: v_off_ini = 0.000005869 V, v_off_fin = 0.000002996 V 19:26:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968352 Vs 19:26:08 Temperature Measurement, Probe Number = 0, T = 20.248000 C 19:26:08 Temperature Measurement, Probe Number = 1, T = 20.169000 C 19:26:09 Temperature Measurement, Probe Number = 2, T = 20.234000 C 19:26:10 Temperature Measurement, Probe Number = 3, T = 20.175000 C 19:26:10 Temperature Measurement, Probe Number = 4, T = 20.591000 C 19:26:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.25 P1 = Bottom 2, Value = 20.17 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.18 P4 = Room, Value = 20.59 19:26:11 Integrated Voltage Measurement... 19:26:30 Voltage Offset Correction: v_off_ini = 0.000004050 V, v_off_fin = 0.000006668 V 19:26:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023971 Vs 19:26:30 Integrated Voltage Measurement... 19:26:49 Voltage Offset Correction: v_off_ini = 0.000005797 V, v_off_fin = 0.000003666 V 19:26:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959940 Vs 19:26:52 Temperature Measurement, Probe Number = 0, T = 20.240000 C 19:26:53 Temperature Measurement, Probe Number = 1, T = 20.159000 C 19:26:54 Temperature Measurement, Probe Number = 2, T = 20.227000 C 19:26:54 Temperature Measurement, Probe Number = 3, T = 20.167000 C 19:26:55 Temperature Measurement, Probe Number = 4, T = 20.565000 C 19:26:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.57 19:26:55 Integrated Voltage Measurement... 19:27:14 Voltage Offset Correction: v_off_ini = 0.000004052 V, v_off_fin = 0.000006742 V 19:27:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024804 Vs 19:27:15 Integrated Voltage Measurement... 19:27:34 Voltage Offset Correction: v_off_ini = 0.000005753 V, v_off_fin = 0.000003221 V 19:27:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963857 Vs 19:27:37 Temperature Measurement, Probe Number = 0, T = 20.240000 C 19:27:37 Temperature Measurement, Probe Number = 1, T = 20.165000 C 19:27:38 Temperature Measurement, Probe Number = 2, T = 20.226000 C 19:27:39 Temperature Measurement, Probe Number = 3, T = 20.172000 C 19:27:39 Temperature Measurement, Probe Number = 4, T = 20.586000 C 19:27:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.59 19:27:39 Integrated Voltage Measurement... 19:27:59 Voltage Offset Correction: v_off_ini = 0.000003677 V, v_off_fin = 0.000006105 V 19:27:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171022032 Vs 19:27:59 Integrated Voltage Measurement... 19:28:18 Voltage Offset Correction: v_off_ini = 0.000005436 V, v_off_fin = 0.000002967 V 19:28:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960388 Vs 19:28:21 Temperature Measurement, Probe Number = 0, T = 20.244000 C 19:28:22 Temperature Measurement, Probe Number = 1, T = 20.164000 C 19:28:22 Temperature Measurement, Probe Number = 2, T = 20.230000 C 19:28:23 Temperature Measurement, Probe Number = 3, T = 20.172000 C 19:28:24 Temperature Measurement, Probe Number = 4, T = 20.623000 C 19:28:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.62 19:28:24 Integrated Voltage Measurement... 19:28:43 Voltage Offset Correction: v_off_ini = 0.000004033 V, v_off_fin = 0.000007011 V 19:28:44 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171029467 Vs 19:28:44 Integrated Voltage Measurement... 19:29:03 Voltage Offset Correction: v_off_ini = 0.000006143 V, v_off_fin = 0.000003196 V 19:29:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958584 Vs 19:29:06 Temperature Measurement, Probe Number = 0, T = 20.238000 C 19:29:06 Temperature Measurement, Probe Number = 1, T = 20.162000 C 19:29:07 Temperature Measurement, Probe Number = 2, T = 20.224000 C 19:29:08 Temperature Measurement, Probe Number = 3, T = 20.165000 C 19:29:08 Temperature Measurement, Probe Number = 4, T = 20.628000 C 19:29:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.63 19:29:09 Integrated Voltage Measurement... 19:29:28 Voltage Offset Correction: v_off_ini = 0.000003968 V, v_off_fin = 0.000006377 V 19:29:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024857 Vs 19:29:28 Integrated Voltage Measurement... 19:29:47 Voltage Offset Correction: v_off_ini = 0.000005666 V, v_off_fin = 0.000002821 V 19:29:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963757 Vs 19:59:50 Temperature Measurement, Probe Number = 0, T = 20.233000 C 19:59:51 Temperature Measurement, Probe Number = 1, T = 20.151000 C 19:59:52 Temperature Measurement, Probe Number = 2, T = 20.217000 C 19:59:52 Temperature Measurement, Probe Number = 3, T = 20.157000 C 19:59:53 Temperature Measurement, Probe Number = 4, T = 20.381000 C 19:59:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.38 19:59:53 Integrated Voltage Measurement... 20:00:12 Voltage Offset Correction: v_off_ini = 0.000004692 V, v_off_fin = 0.000006391 V 20:00:13 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171076515 Vs 20:00:13 Integrated Voltage Measurement... 20:00:32 Voltage Offset Correction: v_off_ini = 0.000006197 V, v_off_fin = 0.000002958 V 20:00:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962523 Vs 20:00:35 Temperature Measurement, Probe Number = 0, T = 20.238000 C 20:00:35 Temperature Measurement, Probe Number = 1, T = 20.156000 C 20:00:36 Temperature Measurement, Probe Number = 2, T = 20.221000 C 20:00:37 Temperature Measurement, Probe Number = 3, T = 20.163000 C 20:00:37 Temperature Measurement, Probe Number = 4, T = 20.441000 C 20:00:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.44 20:00:38 Integrated Voltage Measurement... 20:00:57 Voltage Offset Correction: v_off_ini = 0.000004189 V, v_off_fin = 0.000006671 V 20:00:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171027718 Vs 20:00:57 Integrated Voltage Measurement... 20:01:17 Voltage Offset Correction: v_off_ini = 0.000006092 V, v_off_fin = 0.000003142 V 20:01:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958659 Vs 20:01:19 Temperature Measurement, Probe Number = 0, T = 20.236000 C 20:01:20 Temperature Measurement, Probe Number = 1, T = 20.160000 C 20:01:21 Temperature Measurement, Probe Number = 2, T = 20.220000 C 20:01:21 Temperature Measurement, Probe Number = 3, T = 20.165000 C 20:01:22 Temperature Measurement, Probe Number = 4, T = 20.485000 C 20:01:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.48 20:01:22 Integrated Voltage Measurement... 20:01:41 Voltage Offset Correction: v_off_ini = 0.000004492 V, v_off_fin = 0.000006579 V 20:01:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029412 Vs 20:01:42 Integrated Voltage Measurement... 20:02:01 Voltage Offset Correction: v_off_ini = 0.000006176 V, v_off_fin = 0.000003174 V 20:02:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958664 Vs 20:02:04 Temperature Measurement, Probe Number = 0, T = 20.237000 C 20:02:05 Temperature Measurement, Probe Number = 1, T = 20.157000 C 20:02:05 Temperature Measurement, Probe Number = 2, T = 20.221000 C 20:02:06 Temperature Measurement, Probe Number = 3, T = 20.163000 C 20:02:07 Temperature Measurement, Probe Number = 4, T = 20.409000 C 20:02:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.41 20:02:07 Integrated Voltage Measurement... 20:02:26 Voltage Offset Correction: v_off_ini = 0.000004203 V, v_off_fin = 0.000006584 V 20:02:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031905 Vs 20:02:27 Integrated Voltage Measurement... 20:02:46 Voltage Offset Correction: v_off_ini = 0.000005783 V, v_off_fin = 0.000002896 V 20:02:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965618 Vs 20:02:49 Temperature Measurement, Probe Number = 0, T = 20.237000 C 20:02:50 Temperature Measurement, Probe Number = 1, T = 20.157000 C 20:02:50 Temperature Measurement, Probe Number = 2, T = 20.220000 C 20:02:51 Temperature Measurement, Probe Number = 3, T = 20.163000 C 20:02:52 Temperature Measurement, Probe Number = 4, T = 20.454000 C 20:02:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.45 20:02:52 Integrated Voltage Measurement... 20:03:11 Voltage Offset Correction: v_off_ini = 0.000004124 V, v_off_fin = 0.000006250 V 20:03:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031527 Vs 20:03:12 Integrated Voltage Measurement... 20:03:31 Voltage Offset Correction: v_off_ini = 0.000006156 V, v_off_fin = 0.000002388 V 20:03:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967733 Vs 20:03:34 Temperature Measurement, Probe Number = 0, T = 20.235000 C 20:03:35 Temperature Measurement, Probe Number = 1, T = 20.159000 C 20:03:36 Temperature Measurement, Probe Number = 2, T = 20.218000 C 20:03:36 Temperature Measurement, Probe Number = 3, T = 20.161000 C 20:03:37 Temperature Measurement, Probe Number = 4, T = 20.459000 C 20:03:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.46 20:03:37 Integrated Voltage Measurement... 20:03:56 Voltage Offset Correction: v_off_ini = 0.000003592 V, v_off_fin = 0.000005829 V 20:03:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023630 Vs 20:03:57 Integrated Voltage Measurement... 20:04:16 Voltage Offset Correction: v_off_ini = 0.000005603 V, v_off_fin = 0.000002705 V 20:04:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961290 Vs 20:04:19 Temperature Measurement, Probe Number = 0, T = 20.235000 C 20:04:19 Temperature Measurement, Probe Number = 1, T = 20.157000 C 20:04:20 Temperature Measurement, Probe Number = 2, T = 20.219000 C 20:04:21 Temperature Measurement, Probe Number = 3, T = 20.163000 C 20:04:21 Temperature Measurement, Probe Number = 4, T = 20.432000 C 20:04:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.43 20:04:21 Integrated Voltage Measurement... 20:04:41 Voltage Offset Correction: v_off_ini = 0.000004112 V, v_off_fin = 0.000006270 V 20:04:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028904 Vs 20:04:42 Integrated Voltage Measurement... 20:05:01 Voltage Offset Correction: v_off_ini = 0.000006250 V, v_off_fin = 0.000003287 V 20:05:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958934 Vs 20:05:04 Temperature Measurement, Probe Number = 0, T = 20.242000 C 20:05:04 Temperature Measurement, Probe Number = 1, T = 20.163000 C 20:05:05 Temperature Measurement, Probe Number = 2, T = 20.225000 C 20:05:05 Temperature Measurement, Probe Number = 3, T = 20.168000 C 20:05:06 Temperature Measurement, Probe Number = 4, T = 20.417000 C 20:05:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.42 20:05:06 Integrated Voltage Measurement... 20:05:26 Voltage Offset Correction: v_off_ini = 0.000004020 V, v_off_fin = 0.000007221 V 20:05:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033630 Vs 20:05:26 Integrated Voltage Measurement... 20:05:45 Voltage Offset Correction: v_off_ini = 0.000006344 V, v_off_fin = 0.000002951 V 20:05:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958557 Vs 20:05:48 Temperature Measurement, Probe Number = 0, T = 20.243000 C 20:05:49 Temperature Measurement, Probe Number = 1, T = 20.161000 C 20:05:50 Temperature Measurement, Probe Number = 2, T = 20.226000 C 20:05:50 Temperature Measurement, Probe Number = 3, T = 20.168000 C 20:05:51 Temperature Measurement, Probe Number = 4, T = 20.453000 C 20:05:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.23 P3 = Top 2, Value = 20.17 P4 = Room, Value = 20.45 20:05:51 Integrated Voltage Measurement... 20:06:10 Voltage Offset Correction: v_off_ini = 0.000003693 V, v_off_fin = 0.000006233 V 20:06:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024936 Vs 20:06:11 Integrated Voltage Measurement... 20:06:30 Voltage Offset Correction: v_off_ini = 0.000005622 V, v_off_fin = 0.000002938 V 20:06:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964956 Vs 20:06:33 Temperature Measurement, Probe Number = 0, T = 20.240000 C 20:06:33 Temperature Measurement, Probe Number = 1, T = 20.158000 C 20:06:34 Temperature Measurement, Probe Number = 2, T = 20.223000 C 20:06:35 Temperature Measurement, Probe Number = 3, T = 20.164000 C 20:06:35 Temperature Measurement, Probe Number = 4, T = 20.498000 C 20:06:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.16 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.50 20:06:35 Integrated Voltage Measurement... 20:06:55 Voltage Offset Correction: v_off_ini = 0.000004136 V, v_off_fin = 0.000006485 V 20:06:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030729 Vs 20:06:55 Integrated Voltage Measurement... 20:07:15 Voltage Offset Correction: v_off_ini = 0.000006425 V, v_off_fin = 0.000003529 V 20:07:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960576 Vs 20:37:17 Temperature Measurement, Probe Number = 0, T = 20.234000 C 20:37:18 Temperature Measurement, Probe Number = 1, T = 20.149000 C 20:37:19 Temperature Measurement, Probe Number = 2, T = 20.220000 C 20:37:20 Temperature Measurement, Probe Number = 3, T = 20.159000 C 20:37:20 Temperature Measurement, Probe Number = 4, T = 20.472000 C 20:37:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.47 20:37:21 Integrated Voltage Measurement... 20:37:40 Voltage Offset Correction: v_off_ini = 0.000005139 V, v_off_fin = 0.000007249 V 20:37:40 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171077632 Vs 20:37:40 Integrated Voltage Measurement... 20:37:59 Voltage Offset Correction: v_off_ini = 0.000006823 V, v_off_fin = 0.000003420 V 20:37:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957792 Vs 20:38:02 Temperature Measurement, Probe Number = 0, T = 20.235000 C 20:38:03 Temperature Measurement, Probe Number = 1, T = 20.150000 C 20:38:04 Temperature Measurement, Probe Number = 2, T = 20.217000 C 20:38:04 Temperature Measurement, Probe Number = 3, T = 20.157000 C 20:38:05 Temperature Measurement, Probe Number = 4, T = 20.452000 C 20:38:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.45 20:38:05 Integrated Voltage Measurement... 20:38:24 Voltage Offset Correction: v_off_ini = 0.000004389 V, v_off_fin = 0.000007534 V 20:38:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039330 Vs 20:38:25 Integrated Voltage Measurement... 20:38:44 Voltage Offset Correction: v_off_ini = 0.000007413 V, v_off_fin = 0.000003591 V 20:38:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954317 Vs 20:38:47 Temperature Measurement, Probe Number = 0, T = 20.236000 C 20:38:47 Temperature Measurement, Probe Number = 1, T = 20.153000 C 20:38:48 Temperature Measurement, Probe Number = 2, T = 20.220000 C 20:38:49 Temperature Measurement, Probe Number = 3, T = 20.161000 C 20:38:50 Temperature Measurement, Probe Number = 4, T = 20.436000 C 20:38:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.24 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.44 20:38:50 Integrated Voltage Measurement... 20:39:09 Voltage Offset Correction: v_off_ini = 0.000004262 V, v_off_fin = 0.000006681 V 20:39:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030679 Vs 20:39:09 Integrated Voltage Measurement... 20:39:29 Voltage Offset Correction: v_off_ini = 0.000006263 V, v_off_fin = 0.000002808 V 20:39:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961328 Vs 20:39:31 Temperature Measurement, Probe Number = 0, T = 20.232000 C 20:39:32 Temperature Measurement, Probe Number = 1, T = 20.148000 C 20:39:33 Temperature Measurement, Probe Number = 2, T = 20.217000 C 20:39:33 Temperature Measurement, Probe Number = 3, T = 20.157000 C 20:39:34 Temperature Measurement, Probe Number = 4, T = 20.482000 C 20:39:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.48 20:39:34 Integrated Voltage Measurement... 20:39:54 Voltage Offset Correction: v_off_ini = 0.000004352 V, v_off_fin = 0.000006657 V 20:39:54 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171030332 Vs 20:39:54 Integrated Voltage Measurement... 20:40:13 Voltage Offset Correction: v_off_ini = 0.000005971 V, v_off_fin = 0.000003159 V 20:40:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960131 Vs 20:40:16 Temperature Measurement, Probe Number = 0, T = 20.232000 C 20:40:16 Temperature Measurement, Probe Number = 1, T = 20.149000 C 20:40:17 Temperature Measurement, Probe Number = 2, T = 20.217000 C 20:40:18 Temperature Measurement, Probe Number = 3, T = 20.156000 C 20:40:18 Temperature Measurement, Probe Number = 4, T = 20.461000 C 20:40:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.46 20:40:19 Integrated Voltage Measurement... 20:40:38 Voltage Offset Correction: v_off_ini = 0.000004478 V, v_off_fin = 0.000006904 V 20:40:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033508 Vs 20:40:38 Integrated Voltage Measurement... 20:40:58 Voltage Offset Correction: v_off_ini = 0.000006166 V, v_off_fin = 0.000003416 V 20:40:58 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170961578 Vs 20:41:01 Temperature Measurement, Probe Number = 0, T = 20.231000 C 20:41:01 Temperature Measurement, Probe Number = 1, T = 20.149000 C 20:41:02 Temperature Measurement, Probe Number = 2, T = 20.215000 C 20:41:03 Temperature Measurement, Probe Number = 3, T = 20.156000 C 20:41:03 Temperature Measurement, Probe Number = 4, T = 20.351000 C 20:41:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.35 20:41:04 Integrated Voltage Measurement... 20:41:23 Voltage Offset Correction: v_off_ini = 0.000004228 V, v_off_fin = 0.000006179 V 20:41:23 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171027664 Vs 20:41:23 Integrated Voltage Measurement... 20:41:43 Voltage Offset Correction: v_off_ini = 0.000006170 V, v_off_fin = 0.000002741 V 20:41:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966924 Vs 20:41:46 Temperature Measurement, Probe Number = 0, T = 20.233000 C 20:41:46 Temperature Measurement, Probe Number = 1, T = 20.152000 C 20:41:47 Temperature Measurement, Probe Number = 2, T = 20.217000 C 20:41:48 Temperature Measurement, Probe Number = 3, T = 20.158000 C 20:41:48 Temperature Measurement, Probe Number = 4, T = 20.386000 C 20:41:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.39 20:41:48 Integrated Voltage Measurement... 20:42:08 Voltage Offset Correction: v_off_ini = 0.000004014 V, v_off_fin = 0.000006444 V 20:42:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033655 Vs 20:42:08 Integrated Voltage Measurement... 20:42:27 Voltage Offset Correction: v_off_ini = 0.000006082 V, v_off_fin = 0.000003425 V 20:42:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963348 Vs 20:42:30 Temperature Measurement, Probe Number = 0, T = 20.230000 C 20:42:31 Temperature Measurement, Probe Number = 1, T = 20.153000 C 20:42:32 Temperature Measurement, Probe Number = 2, T = 20.216000 C 20:42:32 Temperature Measurement, Probe Number = 3, T = 20.158000 C 20:42:33 Temperature Measurement, Probe Number = 4, T = 20.467000 C 20:42:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.47 20:42:33 Integrated Voltage Measurement... 20:42:52 Voltage Offset Correction: v_off_ini = 0.000004561 V, v_off_fin = 0.000007030 V 20:42:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034091 Vs 20:42:53 Integrated Voltage Measurement... 20:43:12 Voltage Offset Correction: v_off_ini = 0.000006613 V, v_off_fin = 0.000003520 V 20:43:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961207 Vs 20:43:15 Temperature Measurement, Probe Number = 0, T = 20.234000 C 20:43:15 Temperature Measurement, Probe Number = 1, T = 20.150000 C 20:43:16 Temperature Measurement, Probe Number = 2, T = 20.218000 C 20:43:17 Temperature Measurement, Probe Number = 3, T = 20.159000 C 20:43:17 Temperature Measurement, Probe Number = 4, T = 20.432000 C 20:43:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.43 20:43:18 Integrated Voltage Measurement... 20:43:37 Voltage Offset Correction: v_off_ini = 0.000004355 V, v_off_fin = 0.000006529 V 20:43:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031199 Vs 20:43:38 Integrated Voltage Measurement... 20:43:57 Voltage Offset Correction: v_off_ini = 0.000005835 V, v_off_fin = 0.000002900 V 20:43:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963374 Vs 20:44:00 Temperature Measurement, Probe Number = 0, T = 20.232000 C 20:44:01 Temperature Measurement, Probe Number = 1, T = 20.147000 C 20:44:01 Temperature Measurement, Probe Number = 2, T = 20.216000 C 20:44:02 Temperature Measurement, Probe Number = 3, T = 20.154000 C 20:44:03 Temperature Measurement, Probe Number = 4, T = 20.457000 C 20:44:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.46 20:44:03 Integrated Voltage Measurement... 20:44:22 Voltage Offset Correction: v_off_ini = 0.000004028 V, v_off_fin = 0.000007076 V 20:44:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036297 Vs 20:44:22 Integrated Voltage Measurement... 20:44:42 Voltage Offset Correction: v_off_ini = 0.000006193 V, v_off_fin = 0.000003515 V 20:44:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961602 Vs 21:14:45 Temperature Measurement, Probe Number = 0, T = 20.228000 C 21:14:46 Temperature Measurement, Probe Number = 1, T = 20.149000 C 21:14:46 Temperature Measurement, Probe Number = 2, T = 20.214000 C 21:14:47 Temperature Measurement, Probe Number = 3, T = 20.156000 C 21:14:48 Temperature Measurement, Probe Number = 4, T = 20.306000 C 21:14:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.31 21:14:48 Integrated Voltage Measurement... 21:15:07 Voltage Offset Correction: v_off_ini = 0.000005096 V, v_off_fin = 0.000006516 V 21:15:07 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171075690 Vs 21:15:08 Integrated Voltage Measurement... 21:15:27 Voltage Offset Correction: v_off_ini = 0.000006182 V, v_off_fin = 0.000002884 V 21:15:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967566 Vs 21:15:30 Temperature Measurement, Probe Number = 0, T = 20.229000 C 21:15:30 Temperature Measurement, Probe Number = 1, T = 20.148000 C 21:15:31 Temperature Measurement, Probe Number = 2, T = 20.214000 C 21:15:32 Temperature Measurement, Probe Number = 3, T = 20.157000 C 21:15:32 Temperature Measurement, Probe Number = 4, T = 20.372000 C 21:15:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.37 21:15:33 Integrated Voltage Measurement... 21:15:52 Voltage Offset Correction: v_off_ini = 0.000004478 V, v_off_fin = 0.000006347 V 21:15:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036716 Vs 21:15:52 Integrated Voltage Measurement... 21:16:11 Voltage Offset Correction: v_off_ini = 0.000005875 V, v_off_fin = 0.000002680 V 21:16:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970630 Vs 21:16:14 Temperature Measurement, Probe Number = 0, T = 20.232000 C 21:16:15 Temperature Measurement, Probe Number = 1, T = 20.145000 C 21:16:16 Temperature Measurement, Probe Number = 2, T = 20.216000 C 21:16:16 Temperature Measurement, Probe Number = 3, T = 20.153000 C 21:16:17 Temperature Measurement, Probe Number = 4, T = 20.421000 C 21:16:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.22 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.42 21:16:17 Integrated Voltage Measurement... 21:16:36 Voltage Offset Correction: v_off_ini = 0.000004135 V, v_off_fin = 0.000006600 V 21:16:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033118 Vs 21:16:37 Integrated Voltage Measurement... 21:16:56 Voltage Offset Correction: v_off_ini = 0.000006215 V, v_off_fin = 0.000003051 V 21:16:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969205 Vs 21:16:59 Temperature Measurement, Probe Number = 0, T = 20.230000 C 21:16:59 Temperature Measurement, Probe Number = 1, T = 20.145000 C 21:17:00 Temperature Measurement, Probe Number = 2, T = 20.212000 C 21:17:01 Temperature Measurement, Probe Number = 3, T = 20.151000 C 21:17:01 Temperature Measurement, Probe Number = 4, T = 20.474000 C 21:17:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.47 21:17:02 Integrated Voltage Measurement... 21:17:21 Voltage Offset Correction: v_off_ini = 0.000004118 V, v_off_fin = 0.000006315 V 21:17:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036678 Vs 21:17:21 Integrated Voltage Measurement... 21:17:41 Voltage Offset Correction: v_off_ini = 0.000006435 V, v_off_fin = 0.000003502 V 21:17:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966031 Vs 21:17:43 Temperature Measurement, Probe Number = 0, T = 20.226000 C 21:17:44 Temperature Measurement, Probe Number = 1, T = 20.142000 C 21:17:45 Temperature Measurement, Probe Number = 2, T = 20.211000 C 21:17:45 Temperature Measurement, Probe Number = 3, T = 20.152000 C 21:17:46 Temperature Measurement, Probe Number = 4, T = 20.515000 C 21:17:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.52 21:17:46 Integrated Voltage Measurement... 21:18:05 Voltage Offset Correction: v_off_ini = 0.000003873 V, v_off_fin = 0.000006396 V 21:18:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034872 Vs 21:18:06 Integrated Voltage Measurement... 21:18:25 Voltage Offset Correction: v_off_ini = 0.000005957 V, v_off_fin = 0.000003067 V 21:18:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968615 Vs 21:18:28 Temperature Measurement, Probe Number = 0, T = 20.223000 C 21:18:29 Temperature Measurement, Probe Number = 1, T = 20.140000 C 21:18:29 Temperature Measurement, Probe Number = 2, T = 20.208000 C 21:18:30 Temperature Measurement, Probe Number = 3, T = 20.149000 C 21:18:31 Temperature Measurement, Probe Number = 4, T = 20.450000 C 21:18:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.45 21:18:31 Integrated Voltage Measurement... 21:18:50 Voltage Offset Correction: v_off_ini = 0.000004178 V, v_off_fin = 0.000006830 V 21:18:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033358 Vs 21:18:51 Integrated Voltage Measurement... 21:19:10 Voltage Offset Correction: v_off_ini = 0.000005533 V, v_off_fin = 0.000003587 V 21:19:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971842 Vs 21:19:13 Temperature Measurement, Probe Number = 0, T = 20.225000 C 21:19:14 Temperature Measurement, Probe Number = 1, T = 20.144000 C 21:19:14 Temperature Measurement, Probe Number = 2, T = 20.209000 C 21:19:15 Temperature Measurement, Probe Number = 3, T = 20.152000 C 21:19:16 Temperature Measurement, Probe Number = 4, T = 20.372000 C 21:19:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.37 21:19:16 Integrated Voltage Measurement... 21:19:35 Voltage Offset Correction: v_off_ini = 0.000004099 V, v_off_fin = 0.000006767 V 21:19:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035532 Vs 21:19:36 Integrated Voltage Measurement... 21:19:55 Voltage Offset Correction: v_off_ini = 0.000006376 V, v_off_fin = 0.000003161 V 21:19:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966925 Vs 21:19:58 Temperature Measurement, Probe Number = 0, T = 20.226000 C 21:19:58 Temperature Measurement, Probe Number = 1, T = 20.146000 C 21:19:59 Temperature Measurement, Probe Number = 2, T = 20.213000 C 21:20:00 Temperature Measurement, Probe Number = 3, T = 20.155000 C 21:20:00 Temperature Measurement, Probe Number = 4, T = 20.410000 C 21:20:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.16 P4 = Room, Value = 20.41 21:20:01 Integrated Voltage Measurement... 21:20:20 Voltage Offset Correction: v_off_ini = 0.000003869 V, v_off_fin = 0.000006394 V 21:20:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035214 Vs 21:20:20 Integrated Voltage Measurement... 21:20:39 Voltage Offset Correction: v_off_ini = 0.000006658 V, v_off_fin = 0.000003361 V 21:20:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964798 Vs 21:20:42 Temperature Measurement, Probe Number = 0, T = 20.224000 C 21:20:43 Temperature Measurement, Probe Number = 1, T = 20.143000 C 21:20:44 Temperature Measurement, Probe Number = 2, T = 20.210000 C 21:20:44 Temperature Measurement, Probe Number = 3, T = 20.152000 C 21:20:45 Temperature Measurement, Probe Number = 4, T = 20.380000 C 21:20:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.38 21:20:45 Integrated Voltage Measurement... 21:21:04 Voltage Offset Correction: v_off_ini = 0.000004130 V, v_off_fin = 0.000006590 V 21:21:05 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171040188 Vs 21:21:05 Integrated Voltage Measurement... 21:21:24 Voltage Offset Correction: v_off_ini = 0.000006676 V, v_off_fin = 0.000003394 V 21:21:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964175 Vs 21:21:27 Temperature Measurement, Probe Number = 0, T = 20.230000 C 21:21:27 Temperature Measurement, Probe Number = 1, T = 20.146000 C 21:21:28 Temperature Measurement, Probe Number = 2, T = 20.209000 C 21:21:29 Temperature Measurement, Probe Number = 3, T = 20.150000 C 21:21:29 Temperature Measurement, Probe Number = 4, T = 20.346000 C 21:21:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.23 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.35 21:21:30 Integrated Voltage Measurement... 21:21:49 Voltage Offset Correction: v_off_ini = 0.000004152 V, v_off_fin = 0.000006376 V 21:21:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033280 Vs 21:21:49 Integrated Voltage Measurement... 21:22:08 Voltage Offset Correction: v_off_ini = 0.000006274 V, v_off_fin = 0.000003268 V 21:22:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965534 Vs 21:52:11 Temperature Measurement, Probe Number = 0, T = 20.213000 C 21:52:12 Temperature Measurement, Probe Number = 1, T = 20.132000 C 21:52:13 Temperature Measurement, Probe Number = 2, T = 20.201000 C 21:52:14 Temperature Measurement, Probe Number = 3, T = 20.142000 C 21:52:14 Temperature Measurement, Probe Number = 4, T = 20.297000 C 21:52:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.30 21:52:14 Integrated Voltage Measurement... 21:52:34 Voltage Offset Correction: v_off_ini = 0.000005530 V, v_off_fin = 0.000006387 V 21:52:34 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171075988 Vs 21:52:35 Integrated Voltage Measurement... 21:52:54 Voltage Offset Correction: v_off_ini = 0.000006127 V, v_off_fin = 0.000003488 V 21:52:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966127 Vs 21:52:57 Temperature Measurement, Probe Number = 0, T = 20.221000 C 21:52:57 Temperature Measurement, Probe Number = 1, T = 20.140000 C 21:52:58 Temperature Measurement, Probe Number = 2, T = 20.209000 C 21:52:59 Temperature Measurement, Probe Number = 3, T = 20.149000 C 21:52:59 Temperature Measurement, Probe Number = 4, T = 20.336000 C 21:52:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.34 21:52:59 Integrated Voltage Measurement... 21:53:19 Voltage Offset Correction: v_off_ini = 0.000003969 V, v_off_fin = 0.000006366 V 21:53:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041009 Vs 21:53:19 Integrated Voltage Measurement... 21:53:38 Voltage Offset Correction: v_off_ini = 0.000006453 V, v_off_fin = 0.000003919 V 21:53:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966690 Vs 21:53:41 Temperature Measurement, Probe Number = 0, T = 20.217000 C 21:53:42 Temperature Measurement, Probe Number = 1, T = 20.134000 C 21:53:43 Temperature Measurement, Probe Number = 2, T = 20.205000 C 21:53:43 Temperature Measurement, Probe Number = 3, T = 20.145000 C 21:53:44 Temperature Measurement, Probe Number = 4, T = 20.369000 C 21:53:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.37 21:53:44 Integrated Voltage Measurement... 21:54:04 Voltage Offset Correction: v_off_ini = 0.000004595 V, v_off_fin = 0.000006411 V 21:54:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042877 Vs 21:54:04 Integrated Voltage Measurement... 21:54:24 Voltage Offset Correction: v_off_ini = 0.000006043 V, v_off_fin = 0.000002677 V 21:54:24 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170975306 Vs 21:54:27 Temperature Measurement, Probe Number = 0, T = 20.216000 C 21:54:27 Temperature Measurement, Probe Number = 1, T = 20.135000 C 21:54:28 Temperature Measurement, Probe Number = 2, T = 20.203000 C 21:54:29 Temperature Measurement, Probe Number = 3, T = 20.143000 C 21:54:29 Temperature Measurement, Probe Number = 4, T = 20.427000 C 21:54:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.43 21:54:30 Integrated Voltage Measurement... 21:54:49 Voltage Offset Correction: v_off_ini = 0.000004414 V, v_off_fin = 0.000006325 V 21:54:49 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171033742 Vs 21:54:49 Integrated Voltage Measurement... 21:55:08 Voltage Offset Correction: v_off_ini = 0.000005908 V, v_off_fin = 0.000003179 V 21:55:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974435 Vs 21:55:11 Temperature Measurement, Probe Number = 0, T = 20.217000 C 21:55:12 Temperature Measurement, Probe Number = 1, T = 20.135000 C 21:55:13 Temperature Measurement, Probe Number = 2, T = 20.203000 C 21:55:13 Temperature Measurement, Probe Number = 3, T = 20.143000 C 21:55:14 Temperature Measurement, Probe Number = 4, T = 20.478000 C 21:55:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.48 21:55:14 Integrated Voltage Measurement... 21:55:34 Voltage Offset Correction: v_off_ini = 0.000004099 V, v_off_fin = 0.000006693 V 21:55:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038498 Vs 21:55:34 Integrated Voltage Measurement... 21:55:54 Voltage Offset Correction: v_off_ini = 0.000005976 V, v_off_fin = 0.000003086 V 21:55:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971441 Vs 21:55:57 Temperature Measurement, Probe Number = 0, T = 20.213000 C 21:55:57 Temperature Measurement, Probe Number = 1, T = 20.133000 C 21:55:58 Temperature Measurement, Probe Number = 2, T = 20.200000 C 21:55:59 Temperature Measurement, Probe Number = 3, T = 20.142000 C 21:55:59 Temperature Measurement, Probe Number = 4, T = 20.414000 C 21:55:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.41 21:55:59 Integrated Voltage Measurement... 21:56:19 Voltage Offset Correction: v_off_ini = 0.000004343 V, v_off_fin = 0.000006335 V 21:56:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040719 Vs 21:56:19 Integrated Voltage Measurement... 21:56:39 Voltage Offset Correction: v_off_ini = 0.000006122 V, v_off_fin = 0.000003649 V 21:56:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969522 Vs 21:56:41 Temperature Measurement, Probe Number = 0, T = 20.219000 C 21:56:42 Temperature Measurement, Probe Number = 1, T = 20.137000 C 21:56:43 Temperature Measurement, Probe Number = 2, T = 20.207000 C 21:56:44 Temperature Measurement, Probe Number = 3, T = 20.148000 C 21:56:44 Temperature Measurement, Probe Number = 4, T = 20.424000 C 21:56:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.42 21:56:44 Integrated Voltage Measurement... 21:57:04 Voltage Offset Correction: v_off_ini = 0.000004338 V, v_off_fin = 0.000006665 V 21:57:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040648 Vs 21:57:04 Integrated Voltage Measurement... 21:57:23 Voltage Offset Correction: v_off_ini = 0.000006311 V, v_off_fin = 0.000003245 V 21:57:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967768 Vs 21:57:26 Temperature Measurement, Probe Number = 0, T = 20.224000 C 21:57:27 Temperature Measurement, Probe Number = 1, T = 20.137000 C 21:57:28 Temperature Measurement, Probe Number = 2, T = 20.212000 C 21:57:28 Temperature Measurement, Probe Number = 3, T = 20.150000 C 21:57:29 Temperature Measurement, Probe Number = 4, T = 20.445000 C 21:57:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.45 21:57:29 Integrated Voltage Measurement... 21:57:48 Voltage Offset Correction: v_off_ini = 0.000004262 V, v_off_fin = 0.000006540 V 21:57:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038926 Vs 21:57:49 Integrated Voltage Measurement... 21:58:08 Voltage Offset Correction: v_off_ini = 0.000006348 V, v_off_fin = 0.000003072 V 21:58:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970722 Vs 21:58:11 Temperature Measurement, Probe Number = 0, T = 20.214000 C 21:58:11 Temperature Measurement, Probe Number = 1, T = 20.130000 C 21:58:12 Temperature Measurement, Probe Number = 2, T = 20.203000 C 21:58:13 Temperature Measurement, Probe Number = 3, T = 20.143000 C 21:58:13 Temperature Measurement, Probe Number = 4, T = 20.407000 C 21:58:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.41 21:58:14 Integrated Voltage Measurement... 21:58:33 Voltage Offset Correction: v_off_ini = 0.000004449 V, v_off_fin = 0.000007348 V 21:58:33 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171037445 Vs 21:58:33 Integrated Voltage Measurement... 21:58:52 Voltage Offset Correction: v_off_ini = 0.000006354 V, v_off_fin = 0.000003738 V 21:58:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964554 Vs 21:58:55 Temperature Measurement, Probe Number = 0, T = 20.216000 C 21:58:56 Temperature Measurement, Probe Number = 1, T = 20.137000 C 21:58:56 Temperature Measurement, Probe Number = 2, T = 20.202000 C 21:58:57 Temperature Measurement, Probe Number = 3, T = 20.144000 C 21:58:58 Temperature Measurement, Probe Number = 4, T = 20.380000 C 21:58:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.38 21:58:58 Integrated Voltage Measurement... 21:59:17 Voltage Offset Correction: v_off_ini = 0.000005036 V, v_off_fin = 0.000007350 V 21:59:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046344 Vs 21:59:18 Integrated Voltage Measurement... 21:59:37 Voltage Offset Correction: v_off_ini = 0.000006950 V, v_off_fin = 0.000003766 V 21:59:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965751 Vs 22:29:40 Temperature Measurement, Probe Number = 0, T = 20.211000 C 22:29:41 Temperature Measurement, Probe Number = 1, T = 20.130000 C 22:29:41 Temperature Measurement, Probe Number = 2, T = 20.200000 C 22:29:42 Temperature Measurement, Probe Number = 3, T = 20.141000 C 22:29:43 Temperature Measurement, Probe Number = 4, T = 20.368000 C 22:29:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.37 22:29:43 Integrated Voltage Measurement... 22:30:02 Voltage Offset Correction: v_off_ini = 0.000004910 V, v_off_fin = 0.000007094 V 22:30:02 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171079955 Vs 22:30:03 Integrated Voltage Measurement... 22:30:22 Voltage Offset Correction: v_off_ini = 0.000006311 V, v_off_fin = 0.000003977 V 22:30:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963673 Vs 22:30:25 Temperature Measurement, Probe Number = 0, T = 20.214000 C 22:30:25 Temperature Measurement, Probe Number = 1, T = 20.132000 C 22:30:26 Temperature Measurement, Probe Number = 2, T = 20.200000 C 22:30:27 Temperature Measurement, Probe Number = 3, T = 20.142000 C 22:30:27 Temperature Measurement, Probe Number = 4, T = 20.365000 C 22:30:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.36 22:30:28 Integrated Voltage Measurement... 22:30:47 Voltage Offset Correction: v_off_ini = 0.000004381 V, v_off_fin = 0.000007086 V 22:30:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039129 Vs 22:30:47 Integrated Voltage Measurement... 22:31:06 Voltage Offset Correction: v_off_ini = 0.000006594 V, v_off_fin = 0.000003949 V 22:31:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958281 Vs 22:31:09 Temperature Measurement, Probe Number = 0, T = 20.215000 C 22:31:10 Temperature Measurement, Probe Number = 1, T = 20.134000 C 22:31:10 Temperature Measurement, Probe Number = 2, T = 20.201000 C 22:31:11 Temperature Measurement, Probe Number = 3, T = 20.142000 C 22:31:12 Temperature Measurement, Probe Number = 4, T = 20.388000 C 22:31:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.39 22:31:12 Integrated Voltage Measurement... 22:31:31 Voltage Offset Correction: v_off_ini = 0.000004768 V, v_off_fin = 0.000007725 V 22:31:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044802 Vs 22:31:32 Integrated Voltage Measurement... 22:31:51 Voltage Offset Correction: v_off_ini = 0.000006823 V, v_off_fin = 0.000003760 V 22:31:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964298 Vs 22:31:54 Temperature Measurement, Probe Number = 0, T = 20.213000 C 22:31:54 Temperature Measurement, Probe Number = 1, T = 20.133000 C 22:31:55 Temperature Measurement, Probe Number = 2, T = 20.199000 C 22:31:56 Temperature Measurement, Probe Number = 3, T = 20.140000 C 22:31:56 Temperature Measurement, Probe Number = 4, T = 20.259000 C 22:31:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.26 22:31:57 Integrated Voltage Measurement... 22:32:16 Voltage Offset Correction: v_off_ini = 0.000004782 V, v_off_fin = 0.000007116 V 22:32:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039689 Vs 22:32:16 Integrated Voltage Measurement... 22:32:35 Voltage Offset Correction: v_off_ini = 0.000006742 V, v_off_fin = 0.000003195 V 22:32:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962887 Vs 22:32:38 Temperature Measurement, Probe Number = 0, T = 20.214000 C 22:32:39 Temperature Measurement, Probe Number = 1, T = 20.134000 C 22:32:40 Temperature Measurement, Probe Number = 2, T = 20.200000 C 22:32:40 Temperature Measurement, Probe Number = 3, T = 20.142000 C 22:32:41 Temperature Measurement, Probe Number = 4, T = 20.174000 C 22:32:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.17 22:32:41 Integrated Voltage Measurement... 22:33:00 Voltage Offset Correction: v_off_ini = 0.000004450 V, v_off_fin = 0.000007217 V 22:33:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171036581 Vs 22:33:01 Integrated Voltage Measurement... 22:33:20 Voltage Offset Correction: v_off_ini = 0.000006567 V, v_off_fin = 0.000004090 V 22:33:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967709 Vs 22:33:23 Temperature Measurement, Probe Number = 0, T = 20.215000 C 22:33:24 Temperature Measurement, Probe Number = 1, T = 20.136000 C 22:33:25 Temperature Measurement, Probe Number = 2, T = 20.200000 C 22:33:25 Temperature Measurement, Probe Number = 3, T = 20.143000 C 22:33:26 Temperature Measurement, Probe Number = 4, T = 20.172000 C 22:33:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.17 22:33:26 Integrated Voltage Measurement... 22:33:45 Voltage Offset Correction: v_off_ini = 0.000004847 V, v_off_fin = 0.000006805 V 22:33:45 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171036307 Vs 22:33:46 Integrated Voltage Measurement... 22:34:05 Voltage Offset Correction: v_off_ini = 0.000006075 V, v_off_fin = 0.000003235 V 22:34:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970674 Vs 22:34:08 Temperature Measurement, Probe Number = 0, T = 20.215000 C 22:34:08 Temperature Measurement, Probe Number = 1, T = 20.134000 C 22:34:09 Temperature Measurement, Probe Number = 2, T = 20.202000 C 22:34:10 Temperature Measurement, Probe Number = 3, T = 20.144000 C 22:34:10 Temperature Measurement, Probe Number = 4, T = 20.268000 C 22:34:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.27 22:34:11 Integrated Voltage Measurement... 22:34:32 Voltage Offset Correction: v_off_ini = 0.000004259 V, v_off_fin = 0.000006727 V 22:34:32 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171035970 Vs 22:34:32 Integrated Voltage Measurement... 22:34:52 Voltage Offset Correction: v_off_ini = 0.000006067 V, v_off_fin = 0.000003369 V 22:34:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966721 Vs 22:34:54 Temperature Measurement, Probe Number = 0, T = 20.211000 C 22:34:55 Temperature Measurement, Probe Number = 1, T = 20.131000 C 22:34:56 Temperature Measurement, Probe Number = 2, T = 20.198000 C 22:34:56 Temperature Measurement, Probe Number = 3, T = 20.140000 C 22:34:57 Temperature Measurement, Probe Number = 4, T = 20.309000 C 22:34:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.31 22:34:57 Integrated Voltage Measurement... 22:35:16 Voltage Offset Correction: v_off_ini = 0.000004356 V, v_off_fin = 0.000006601 V 22:35:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035141 Vs 22:35:17 Integrated Voltage Measurement... 22:35:36 Voltage Offset Correction: v_off_ini = 0.000005722 V, v_off_fin = 0.000002881 V 22:35:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972734 Vs 22:35:39 Temperature Measurement, Probe Number = 0, T = 20.215000 C 22:35:40 Temperature Measurement, Probe Number = 1, T = 20.132000 C 22:35:41 Temperature Measurement, Probe Number = 2, T = 20.201000 C 22:35:41 Temperature Measurement, Probe Number = 3, T = 20.140000 C 22:35:42 Temperature Measurement, Probe Number = 4, T = 20.291000 C 22:35:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.29 22:35:42 Integrated Voltage Measurement... 22:36:01 Voltage Offset Correction: v_off_ini = 0.000004051 V, v_off_fin = 0.000006731 V 22:36:02 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171032329 Vs 22:36:02 Integrated Voltage Measurement... 22:36:21 Voltage Offset Correction: v_off_ini = 0.000006001 V, v_off_fin = 0.000003081 V 22:36:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968158 Vs 22:36:24 Temperature Measurement, Probe Number = 0, T = 20.215000 C 22:36:25 Temperature Measurement, Probe Number = 1, T = 20.134000 C 22:36:26 Temperature Measurement, Probe Number = 2, T = 20.206000 C 22:36:26 Temperature Measurement, Probe Number = 3, T = 20.146000 C 22:36:27 Temperature Measurement, Probe Number = 4, T = 20.359000 C 22:36:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.21 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.36 22:36:27 Integrated Voltage Measurement... 22:36:46 Voltage Offset Correction: v_off_ini = 0.000004191 V, v_off_fin = 0.000007137 V 22:36:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037036 Vs 22:36:47 Integrated Voltage Measurement... 22:37:06 Voltage Offset Correction: v_off_ini = 0.000005643 V, v_off_fin = 0.000003342 V 22:37:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968387 Vs 23:07:09 Temperature Measurement, Probe Number = 0, T = 20.199000 C 23:07:09 Temperature Measurement, Probe Number = 1, T = 20.117000 C 23:07:10 Temperature Measurement, Probe Number = 2, T = 20.190000 C 23:07:11 Temperature Measurement, Probe Number = 3, T = 20.129000 C 23:07:11 Temperature Measurement, Probe Number = 4, T = 20.253000 C 23:07:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.25 23:07:12 Integrated Voltage Measurement... 23:07:31 Voltage Offset Correction: v_off_ini = 0.000004908 V, v_off_fin = 0.000006517 V 23:07:31 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171078894 Vs 23:07:31 Integrated Voltage Measurement... 23:07:50 Voltage Offset Correction: v_off_ini = 0.000005980 V, v_off_fin = 0.000003215 V 23:07:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969589 Vs 23:07:53 Temperature Measurement, Probe Number = 0, T = 20.197000 C 23:07:54 Temperature Measurement, Probe Number = 1, T = 20.121000 C 23:07:54 Temperature Measurement, Probe Number = 2, T = 20.189000 C 23:07:55 Temperature Measurement, Probe Number = 3, T = 20.132000 C 23:07:56 Temperature Measurement, Probe Number = 4, T = 20.198000 C 23:07:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.20 23:07:56 Integrated Voltage Measurement... 23:08:16 Voltage Offset Correction: v_off_ini = 0.000003668 V, v_off_fin = 0.000007153 V 23:08:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036897 Vs 23:08:16 Integrated Voltage Measurement... 23:08:35 Voltage Offset Correction: v_off_ini = 0.000006173 V, v_off_fin = 0.000003822 V 23:08:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966892 Vs 23:08:38 Temperature Measurement, Probe Number = 0, T = 20.206000 C 23:08:39 Temperature Measurement, Probe Number = 1, T = 20.126000 C 23:08:40 Temperature Measurement, Probe Number = 2, T = 20.194000 C 23:08:40 Temperature Measurement, Probe Number = 3, T = 20.134000 C 23:08:41 Temperature Measurement, Probe Number = 4, T = 20.247000 C 23:08:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.25 23:08:41 Integrated Voltage Measurement... 23:09:01 Voltage Offset Correction: v_off_ini = 0.000004812 V, v_off_fin = 0.000006584 V 23:09:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039040 Vs 23:09:01 Integrated Voltage Measurement... 23:09:21 Voltage Offset Correction: v_off_ini = 0.000006384 V, v_off_fin = 0.000002829 V 23:09:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970185 Vs 23:09:24 Temperature Measurement, Probe Number = 0, T = 20.209000 C 23:09:24 Temperature Measurement, Probe Number = 1, T = 20.127000 C 23:09:25 Temperature Measurement, Probe Number = 2, T = 20.198000 C 23:09:26 Temperature Measurement, Probe Number = 3, T = 20.138000 C 23:09:26 Temperature Measurement, Probe Number = 4, T = 20.223000 C 23:09:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.22 23:09:27 Integrated Voltage Measurement... 23:09:46 Voltage Offset Correction: v_off_ini = 0.000004399 V, v_off_fin = 0.000007160 V 23:09:46 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171033017 Vs 23:09:46 Integrated Voltage Measurement... 23:10:05 Voltage Offset Correction: v_off_ini = 0.000006419 V, v_off_fin = 0.000004144 V 23:10:06 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170962352 Vs 23:10:08 Temperature Measurement, Probe Number = 0, T = 20.205000 C 23:10:09 Temperature Measurement, Probe Number = 1, T = 20.123000 C 23:10:10 Temperature Measurement, Probe Number = 2, T = 20.194000 C 23:10:10 Temperature Measurement, Probe Number = 3, T = 20.134000 C 23:10:11 Temperature Measurement, Probe Number = 4, T = 20.266000 C 23:10:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.27 23:10:11 Integrated Voltage Measurement... 23:10:31 Voltage Offset Correction: v_off_ini = 0.000004598 V, v_off_fin = 0.000007142 V 23:10:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040179 Vs 23:10:31 Integrated Voltage Measurement... 23:10:50 Voltage Offset Correction: v_off_ini = 0.000006330 V, v_off_fin = 0.000002752 V 23:10:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967392 Vs 23:10:53 Temperature Measurement, Probe Number = 0, T = 20.206000 C 23:10:54 Temperature Measurement, Probe Number = 1, T = 20.124000 C 23:10:54 Temperature Measurement, Probe Number = 2, T = 20.192000 C 23:10:55 Temperature Measurement, Probe Number = 3, T = 20.134000 C 23:10:56 Temperature Measurement, Probe Number = 4, T = 20.269000 C 23:10:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.27 23:10:56 Integrated Voltage Measurement... 23:11:15 Voltage Offset Correction: v_off_ini = 0.000004485 V, v_off_fin = 0.000007002 V 23:11:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036371 Vs 23:11:16 Integrated Voltage Measurement... 23:11:35 Voltage Offset Correction: v_off_ini = 0.000006088 V, v_off_fin = 0.000003103 V 23:11:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967914 Vs 23:11:38 Temperature Measurement, Probe Number = 0, T = 20.206000 C 23:11:38 Temperature Measurement, Probe Number = 1, T = 20.125000 C 23:11:39 Temperature Measurement, Probe Number = 2, T = 20.193000 C 23:11:40 Temperature Measurement, Probe Number = 3, T = 20.133000 C 23:11:40 Temperature Measurement, Probe Number = 4, T = 20.248000 C 23:11:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.25 23:11:41 Integrated Voltage Measurement... 23:12:00 Voltage Offset Correction: v_off_ini = 0.000003460 V, v_off_fin = 0.000006583 V 23:12:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171039215 Vs 23:12:00 Integrated Voltage Measurement... 23:12:20 Voltage Offset Correction: v_off_ini = 0.000006144 V, v_off_fin = 0.000003105 V 23:12:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968644 Vs 23:12:22 Temperature Measurement, Probe Number = 0, T = 20.203000 C 23:12:23 Temperature Measurement, Probe Number = 1, T = 20.126000 C 23:12:24 Temperature Measurement, Probe Number = 2, T = 20.190000 C 23:12:24 Temperature Measurement, Probe Number = 3, T = 20.133000 C 23:12:25 Temperature Measurement, Probe Number = 4, T = 20.239000 C 23:12:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.24 23:12:25 Integrated Voltage Measurement... 23:12:45 Voltage Offset Correction: v_off_ini = 0.000004140 V, v_off_fin = 0.000006065 V 23:12:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033972 Vs 23:12:45 Integrated Voltage Measurement... 23:13:04 Voltage Offset Correction: v_off_ini = 0.000006137 V, v_off_fin = 0.000002840 V 23:13:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967417 Vs 23:13:07 Temperature Measurement, Probe Number = 0, T = 20.208000 C 23:13:08 Temperature Measurement, Probe Number = 1, T = 20.127000 C 23:13:08 Temperature Measurement, Probe Number = 2, T = 20.194000 C 23:13:09 Temperature Measurement, Probe Number = 3, T = 20.139000 C 23:13:10 Temperature Measurement, Probe Number = 4, T = 20.241000 C 23:13:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.24 23:13:10 Integrated Voltage Measurement... 23:13:29 Voltage Offset Correction: v_off_ini = 0.000004125 V, v_off_fin = 0.000006513 V 23:13:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036974 Vs 23:13:30 Integrated Voltage Measurement... 23:13:49 Voltage Offset Correction: v_off_ini = 0.000006375 V, v_off_fin = 0.000003192 V 23:13:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967952 Vs 23:13:52 Temperature Measurement, Probe Number = 0, T = 20.207000 C 23:13:52 Temperature Measurement, Probe Number = 1, T = 20.127000 C 23:13:53 Temperature Measurement, Probe Number = 2, T = 20.197000 C 23:13:54 Temperature Measurement, Probe Number = 3, T = 20.136000 C 23:13:54 Temperature Measurement, Probe Number = 4, T = 20.271000 C 23:13:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.27 23:13:55 Integrated Voltage Measurement... 23:14:14 Voltage Offset Correction: v_off_ini = 0.000004150 V, v_off_fin = 0.000006355 V 23:14:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039395 Vs 23:14:14 Integrated Voltage Measurement... 23:14:34 Voltage Offset Correction: v_off_ini = 0.000006391 V, v_off_fin = 0.000003362 V 23:14:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970018 Vs 23:44:37 Temperature Measurement, Probe Number = 0, T = 20.193000 C 23:44:38 Temperature Measurement, Probe Number = 1, T = 20.113000 C 23:44:38 Temperature Measurement, Probe Number = 2, T = 20.185000 C 23:44:39 Temperature Measurement, Probe Number = 3, T = 20.127000 C 23:44:40 Temperature Measurement, Probe Number = 4, T = 20.292000 C 23:44:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.29 23:44:40 Integrated Voltage Measurement... 23:44:59 Voltage Offset Correction: v_off_ini = 0.000005211 V, v_off_fin = 0.000006882 V 23:44:59 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171087682 Vs 23:44:59 Integrated Voltage Measurement... 23:45:18 Voltage Offset Correction: v_off_ini = 0.000006326 V, v_off_fin = 0.000003392 V 23:45:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974610 Vs 23:45:21 Temperature Measurement, Probe Number = 0, T = 20.196000 C 23:45:22 Temperature Measurement, Probe Number = 1, T = 20.117000 C 23:45:23 Temperature Measurement, Probe Number = 2, T = 20.185000 C 23:45:23 Temperature Measurement, Probe Number = 3, T = 20.127000 C 23:45:24 Temperature Measurement, Probe Number = 4, T = 20.169000 C 23:45:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.17 23:45:24 Integrated Voltage Measurement... 23:45:43 Voltage Offset Correction: v_off_ini = 0.000005095 V, v_off_fin = 0.000007267 V 23:45:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044409 Vs 23:45:44 Integrated Voltage Measurement... 23:46:03 Voltage Offset Correction: v_off_ini = 0.000006372 V, v_off_fin = 0.000003610 V 23:46:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961474 Vs 23:46:06 Temperature Measurement, Probe Number = 0, T = 20.193000 C 23:46:06 Temperature Measurement, Probe Number = 1, T = 20.112000 C 23:46:07 Temperature Measurement, Probe Number = 2, T = 20.183000 C 23:46:08 Temperature Measurement, Probe Number = 3, T = 20.125000 C 23:46:08 Temperature Measurement, Probe Number = 4, T = 20.170000 C 23:46:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.17 23:46:08 Integrated Voltage Measurement... 23:46:28 Voltage Offset Correction: v_off_ini = 0.000004824 V, v_off_fin = 0.000006902 V 23:46:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040677 Vs 23:46:28 Integrated Voltage Measurement... 23:46:47 Voltage Offset Correction: v_off_ini = 0.000006477 V, v_off_fin = 0.000003118 V 23:46:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971642 Vs 23:46:50 Temperature Measurement, Probe Number = 0, T = 20.195000 C 23:46:51 Temperature Measurement, Probe Number = 1, T = 20.113000 C 23:46:51 Temperature Measurement, Probe Number = 2, T = 20.186000 C 23:46:52 Temperature Measurement, Probe Number = 3, T = 20.129000 C 23:46:53 Temperature Measurement, Probe Number = 4, T = 20.263000 C 23:46:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.26 23:46:53 Integrated Voltage Measurement... 23:47:12 Voltage Offset Correction: v_off_ini = 0.000004078 V, v_off_fin = 0.000006425 V 23:47:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171036582 Vs 23:47:13 Integrated Voltage Measurement... 23:47:32 Voltage Offset Correction: v_off_ini = 0.000005685 V, v_off_fin = 0.000003169 V 23:47:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972411 Vs 23:47:35 Temperature Measurement, Probe Number = 0, T = 20.195000 C 23:47:36 Temperature Measurement, Probe Number = 1, T = 20.113000 C 23:47:36 Temperature Measurement, Probe Number = 2, T = 20.186000 C 23:47:37 Temperature Measurement, Probe Number = 3, T = 20.128000 C 23:47:38 Temperature Measurement, Probe Number = 4, T = 20.284000 C 23:47:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.28 23:47:38 Integrated Voltage Measurement... 23:47:57 Voltage Offset Correction: v_off_ini = 0.000004244 V, v_off_fin = 0.000006899 V 23:47:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037635 Vs 23:47:58 Integrated Voltage Measurement... 23:48:17 Voltage Offset Correction: v_off_ini = 0.000006242 V, v_off_fin = 0.000002997 V 23:48:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970863 Vs 23:48:20 Temperature Measurement, Probe Number = 0, T = 20.197000 C 23:48:20 Temperature Measurement, Probe Number = 1, T = 20.112000 C 23:48:21 Temperature Measurement, Probe Number = 2, T = 20.186000 C 23:48:22 Temperature Measurement, Probe Number = 3, T = 20.125000 C 23:48:22 Temperature Measurement, Probe Number = 4, T = 20.238000 C 23:48:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.24 23:48:23 Integrated Voltage Measurement... 23:48:42 Voltage Offset Correction: v_off_ini = 0.000003667 V, v_off_fin = 0.000006685 V 23:48:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038100 Vs 23:48:42 Integrated Voltage Measurement... 23:49:01 Voltage Offset Correction: v_off_ini = 0.000006348 V, v_off_fin = 0.000002575 V 23:49:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966417 Vs 23:49:04 Temperature Measurement, Probe Number = 0, T = 20.197000 C 23:49:05 Temperature Measurement, Probe Number = 1, T = 20.114000 C 23:49:06 Temperature Measurement, Probe Number = 2, T = 20.186000 C 23:49:06 Temperature Measurement, Probe Number = 3, T = 20.124000 C 23:49:07 Temperature Measurement, Probe Number = 4, T = 20.303000 C 23:49:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.30 23:49:07 Integrated Voltage Measurement... 23:49:26 Voltage Offset Correction: v_off_ini = 0.000003951 V, v_off_fin = 0.000007250 V 23:49:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171043093 Vs 23:49:26 Integrated Voltage Measurement... 23:49:45 Voltage Offset Correction: v_off_ini = 0.000006342 V, v_off_fin = 0.000002425 V 23:49:46 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170973620 Vs 23:49:48 Temperature Measurement, Probe Number = 0, T = 20.195000 C 23:49:49 Temperature Measurement, Probe Number = 1, T = 20.113000 C 23:49:50 Temperature Measurement, Probe Number = 2, T = 20.183000 C 23:49:50 Temperature Measurement, Probe Number = 3, T = 20.124000 C 23:49:51 Temperature Measurement, Probe Number = 4, T = 20.224000 C 23:49:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.22 23:49:51 Integrated Voltage Measurement... 23:50:11 Voltage Offset Correction: v_off_ini = 0.000003496 V, v_off_fin = 0.000006653 V 23:50:11 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171043888 Vs 23:50:11 Integrated Voltage Measurement... 23:50:30 Voltage Offset Correction: v_off_ini = 0.000006136 V, v_off_fin = 0.000002866 V 23:50:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970678 Vs 23:50:33 Temperature Measurement, Probe Number = 0, T = 20.196000 C 23:50:34 Temperature Measurement, Probe Number = 1, T = 20.113000 C 23:50:35 Temperature Measurement, Probe Number = 2, T = 20.185000 C 23:50:35 Temperature Measurement, Probe Number = 3, T = 20.124000 C 23:50:36 Temperature Measurement, Probe Number = 4, T = 20.181000 C 23:50:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.18 23:50:36 Integrated Voltage Measurement... 23:50:55 Voltage Offset Correction: v_off_ini = 0.000003848 V, v_off_fin = 0.000006802 V 23:50:56 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171040938 Vs 23:50:56 Integrated Voltage Measurement... 23:51:15 Voltage Offset Correction: v_off_ini = 0.000006340 V, v_off_fin = 0.000003602 V 23:51:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972218 Vs 23:51:18 Temperature Measurement, Probe Number = 0, T = 20.200000 C 23:51:19 Temperature Measurement, Probe Number = 1, T = 20.117000 C 23:51:19 Temperature Measurement, Probe Number = 2, T = 20.188000 C 23:51:20 Temperature Measurement, Probe Number = 3, T = 20.126000 C 23:51:21 Temperature Measurement, Probe Number = 4, T = 20.169000 C 23:51:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.17 23:51:21 Integrated Voltage Measurement... 23:51:40 Voltage Offset Correction: v_off_ini = 0.000004519 V, v_off_fin = 0.000006700 V 23:51:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039583 Vs 23:51:41 Integrated Voltage Measurement... 23:52:01 Voltage Offset Correction: v_off_ini = 0.000006340 V, v_off_fin = 0.000003422 V 23:52:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970374 Vs 00:22:04 Temperature Measurement, Probe Number = 0, T = 20.189000 C 00:22:05 Temperature Measurement, Probe Number = 1, T = 20.109000 C 00:22:05 Temperature Measurement, Probe Number = 2, T = 20.182000 C 00:22:06 Temperature Measurement, Probe Number = 3, T = 20.120000 C 00:22:07 Temperature Measurement, Probe Number = 4, T = 20.268000 C 00:22:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.27 00:22:07 Integrated Voltage Measurement... 00:22:26 Voltage Offset Correction: v_off_ini = 0.000005211 V, v_off_fin = 0.000006835 V 00:22:26 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171078356 Vs 00:22:27 Integrated Voltage Measurement... 00:22:46 Voltage Offset Correction: v_off_ini = 0.000006472 V, v_off_fin = 0.000003383 V 00:22:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970746 Vs 00:22:49 Temperature Measurement, Probe Number = 0, T = 20.194000 C 00:22:49 Temperature Measurement, Probe Number = 1, T = 20.112000 C 00:22:50 Temperature Measurement, Probe Number = 2, T = 20.185000 C 00:22:50 Temperature Measurement, Probe Number = 3, T = 20.124000 C 00:22:51 Temperature Measurement, Probe Number = 4, T = 20.250000 C 00:22:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.25 00:22:51 Integrated Voltage Measurement... 00:23:10 Voltage Offset Correction: v_off_ini = 0.000004492 V, v_off_fin = 0.000007038 V 00:23:11 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050315 Vs 00:23:11 Integrated Voltage Measurement... 00:23:30 Voltage Offset Correction: v_off_ini = 0.000006954 V, v_off_fin = 0.000003921 V 00:23:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969980 Vs 00:23:33 Temperature Measurement, Probe Number = 0, T = 20.193000 C 00:23:34 Temperature Measurement, Probe Number = 1, T = 20.109000 C 00:23:34 Temperature Measurement, Probe Number = 2, T = 20.185000 C 00:23:35 Temperature Measurement, Probe Number = 3, T = 20.121000 C 00:23:36 Temperature Measurement, Probe Number = 4, T = 20.283000 C 00:23:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.28 00:23:36 Integrated Voltage Measurement... 00:23:55 Voltage Offset Correction: v_off_ini = 0.000004713 V, v_off_fin = 0.000007398 V 00:23:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051748 Vs 00:23:56 Integrated Voltage Measurement... 00:24:15 Voltage Offset Correction: v_off_ini = 0.000006631 V, v_off_fin = 0.000003375 V 00:24:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966611 Vs 00:24:18 Temperature Measurement, Probe Number = 0, T = 20.187000 C 00:24:18 Temperature Measurement, Probe Number = 1, T = 20.104000 C 00:24:19 Temperature Measurement, Probe Number = 2, T = 20.178000 C 00:24:20 Temperature Measurement, Probe Number = 3, T = 20.117000 C 00:24:20 Temperature Measurement, Probe Number = 4, T = 20.286000 C 00:24:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.29 00:24:21 Integrated Voltage Measurement... 00:24:40 Voltage Offset Correction: v_off_ini = 0.000003821 V, v_off_fin = 0.000007380 V 00:24:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054923 Vs 00:24:40 Integrated Voltage Measurement... 00:25:00 Voltage Offset Correction: v_off_ini = 0.000006855 V, v_off_fin = 0.000004140 V 00:25:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965056 Vs 00:25:02 Temperature Measurement, Probe Number = 0, T = 20.184000 C 00:25:03 Temperature Measurement, Probe Number = 1, T = 20.100000 C 00:25:04 Temperature Measurement, Probe Number = 2, T = 20.176000 C 00:25:04 Temperature Measurement, Probe Number = 3, T = 20.116000 C 00:25:05 Temperature Measurement, Probe Number = 4, T = 20.308000 C 00:25:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.31 00:25:05 Integrated Voltage Measurement... 00:25:25 Voltage Offset Correction: v_off_ini = 0.000005190 V, v_off_fin = 0.000007424 V 00:25:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049788 Vs 00:25:25 Integrated Voltage Measurement... 00:25:44 Voltage Offset Correction: v_off_ini = 0.000007213 V, v_off_fin = 0.000003670 V 00:25:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967866 Vs 00:25:47 Temperature Measurement, Probe Number = 0, T = 20.185000 C 00:25:48 Temperature Measurement, Probe Number = 1, T = 20.103000 C 00:25:49 Temperature Measurement, Probe Number = 2, T = 20.177000 C 00:25:49 Temperature Measurement, Probe Number = 3, T = 20.116000 C 00:25:50 Temperature Measurement, Probe Number = 4, T = 20.277000 C 00:25:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.28 00:25:50 Integrated Voltage Measurement... 00:26:09 Voltage Offset Correction: v_off_ini = 0.000005213 V, v_off_fin = 0.000007224 V 00:26:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052441 Vs 00:26:10 Integrated Voltage Measurement... 00:26:29 Voltage Offset Correction: v_off_ini = 0.000007008 V, v_off_fin = 0.000003681 V 00:26:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962995 Vs 00:26:32 Temperature Measurement, Probe Number = 0, T = 20.187000 C 00:26:33 Temperature Measurement, Probe Number = 1, T = 20.105000 C 00:26:33 Temperature Measurement, Probe Number = 2, T = 20.179000 C 00:26:34 Temperature Measurement, Probe Number = 3, T = 20.116000 C 00:26:34 Temperature Measurement, Probe Number = 4, T = 20.182000 C 00:26:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.18 00:26:35 Integrated Voltage Measurement... 00:26:54 Voltage Offset Correction: v_off_ini = 0.000004934 V, v_off_fin = 0.000007263 V 00:26:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053301 Vs 00:26:54 Integrated Voltage Measurement... 00:27:14 Voltage Offset Correction: v_off_ini = 0.000006606 V, v_off_fin = 0.000003793 V 00:27:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963745 Vs 00:27:17 Temperature Measurement, Probe Number = 0, T = 20.191000 C 00:27:17 Temperature Measurement, Probe Number = 1, T = 20.103000 C 00:27:18 Temperature Measurement, Probe Number = 2, T = 20.179000 C 00:27:18 Temperature Measurement, Probe Number = 3, T = 20.116000 C 00:27:19 Temperature Measurement, Probe Number = 4, T = 20.142000 C 00:27:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.14 00:27:19 Integrated Voltage Measurement... 00:27:39 Voltage Offset Correction: v_off_ini = 0.000004580 V, v_off_fin = 0.000007134 V 00:27:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046793 Vs 00:27:39 Integrated Voltage Measurement... 00:27:58 Voltage Offset Correction: v_off_ini = 0.000006125 V, v_off_fin = 0.000002229 V 00:27:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976071 Vs 00:28:01 Temperature Measurement, Probe Number = 0, T = 20.187000 C 00:28:01 Temperature Measurement, Probe Number = 1, T = 20.105000 C 00:28:02 Temperature Measurement, Probe Number = 2, T = 20.181000 C 00:28:03 Temperature Measurement, Probe Number = 3, T = 20.116000 C 00:28:03 Temperature Measurement, Probe Number = 4, T = 20.109000 C 00:28:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.11 00:28:04 Integrated Voltage Measurement... 00:28:23 Voltage Offset Correction: v_off_ini = 0.000003893 V, v_off_fin = 0.000006426 V 00:28:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042415 Vs 00:28:23 Integrated Voltage Measurement... 00:28:43 Voltage Offset Correction: v_off_ini = 0.000006155 V, v_off_fin = 0.000003517 V 00:28:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975616 Vs 00:28:45 Temperature Measurement, Probe Number = 0, T = 20.190000 C 00:28:46 Temperature Measurement, Probe Number = 1, T = 20.107000 C 00:28:47 Temperature Measurement, Probe Number = 2, T = 20.182000 C 00:28:47 Temperature Measurement, Probe Number = 3, T = 20.118000 C 00:28:48 Temperature Measurement, Probe Number = 4, T = 20.076000 C 00:28:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.08 00:28:48 Integrated Voltage Measurement... 00:29:08 Voltage Offset Correction: v_off_ini = 0.000004546 V, v_off_fin = 0.000007153 V 00:29:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045935 Vs 00:29:08 Integrated Voltage Measurement... 00:29:27 Voltage Offset Correction: v_off_ini = 0.000006119 V, v_off_fin = 0.000003841 V 00:29:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967808 Vs 00:59:30 Temperature Measurement, Probe Number = 0, T = 20.173000 C 00:59:31 Temperature Measurement, Probe Number = 1, T = 20.093000 C 00:59:32 Temperature Measurement, Probe Number = 2, T = 20.168000 C 00:59:32 Temperature Measurement, Probe Number = 3, T = 20.108000 C 00:59:33 Temperature Measurement, Probe Number = 4, T = 20.123000 C 00:59:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.12 00:59:33 Integrated Voltage Measurement... 00:59:52 Voltage Offset Correction: v_off_ini = 0.000004831 V, v_off_fin = 0.000006495 V 00:59:52 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171085192 Vs 00:59:53 Integrated Voltage Measurement... 01:00:12 Voltage Offset Correction: v_off_ini = 0.000006379 V, v_off_fin = 0.000002721 V 01:00:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978058 Vs 01:00:14 Temperature Measurement, Probe Number = 0, T = 20.172000 C 01:00:15 Temperature Measurement, Probe Number = 1, T = 20.091000 C 01:00:16 Temperature Measurement, Probe Number = 2, T = 20.167000 C 01:00:16 Temperature Measurement, Probe Number = 3, T = 20.109000 C 01:00:17 Temperature Measurement, Probe Number = 4, T = 20.143000 C 01:00:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.14 01:00:17 Integrated Voltage Measurement... 01:00:37 Voltage Offset Correction: v_off_ini = 0.000003703 V, v_off_fin = 0.000006714 V 01:00:37 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047258 Vs 01:00:37 Integrated Voltage Measurement... 01:00:56 Voltage Offset Correction: v_off_ini = 0.000006329 V, v_off_fin = 0.000002878 V 01:00:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978447 Vs 01:00:59 Temperature Measurement, Probe Number = 0, T = 20.176000 C 01:01:00 Temperature Measurement, Probe Number = 1, T = 20.095000 C 01:01:00 Temperature Measurement, Probe Number = 2, T = 20.170000 C 01:01:01 Temperature Measurement, Probe Number = 3, T = 20.113000 C 01:01:02 Temperature Measurement, Probe Number = 4, T = 20.217000 C 01:01:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.22 01:01:02 Integrated Voltage Measurement... 01:01:21 Voltage Offset Correction: v_off_ini = 0.000004454 V, v_off_fin = 0.000007209 V 01:01:21 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049326 Vs 01:01:21 Integrated Voltage Measurement... 01:01:41 Voltage Offset Correction: v_off_ini = 0.000006730 V, v_off_fin = 0.000002909 V 01:01:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976256 Vs 01:01:44 Temperature Measurement, Probe Number = 0, T = 20.175000 C 01:01:44 Temperature Measurement, Probe Number = 1, T = 20.094000 C 01:01:45 Temperature Measurement, Probe Number = 2, T = 20.168000 C 01:01:46 Temperature Measurement, Probe Number = 3, T = 20.112000 C 01:01:46 Temperature Measurement, Probe Number = 4, T = 20.240000 C 01:01:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.24 01:01:46 Integrated Voltage Measurement... 01:02:06 Voltage Offset Correction: v_off_ini = 0.000004333 V, v_off_fin = 0.000006739 V 01:02:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047213 Vs 01:02:07 Integrated Voltage Measurement... 01:02:26 Voltage Offset Correction: v_off_ini = 0.000006282 V, v_off_fin = 0.000003368 V 01:02:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971672 Vs 01:02:29 Temperature Measurement, Probe Number = 0, T = 20.177000 C 01:02:30 Temperature Measurement, Probe Number = 1, T = 20.092000 C 01:02:30 Temperature Measurement, Probe Number = 2, T = 20.170000 C 01:02:31 Temperature Measurement, Probe Number = 3, T = 20.113000 C 01:02:32 Temperature Measurement, Probe Number = 4, T = 20.309000 C 01:02:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.31 01:02:32 Integrated Voltage Measurement... 01:02:51 Voltage Offset Correction: v_off_ini = 0.000004067 V, v_off_fin = 0.000007424 V 01:02:51 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049644 Vs 01:02:51 Integrated Voltage Measurement... 01:03:11 Voltage Offset Correction: v_off_ini = 0.000006996 V, v_off_fin = 0.000003044 V 01:03:11 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170972140 Vs 01:03:14 Temperature Measurement, Probe Number = 0, T = 20.175000 C 01:03:15 Temperature Measurement, Probe Number = 1, T = 20.091000 C 01:03:15 Temperature Measurement, Probe Number = 2, T = 20.167000 C 01:03:16 Temperature Measurement, Probe Number = 3, T = 20.108000 C 01:03:17 Temperature Measurement, Probe Number = 4, T = 20.344000 C 01:03:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.34 01:03:17 Integrated Voltage Measurement... 01:03:36 Voltage Offset Correction: v_off_ini = 0.000004681 V, v_off_fin = 0.000006956 V 01:03:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051566 Vs 01:03:37 Integrated Voltage Measurement... 01:03:56 Voltage Offset Correction: v_off_ini = 0.000006619 V, v_off_fin = 0.000003316 V 01:03:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972932 Vs 01:03:59 Temperature Measurement, Probe Number = 0, T = 20.174000 C 01:04:00 Temperature Measurement, Probe Number = 1, T = 20.091000 C 01:04:01 Temperature Measurement, Probe Number = 2, T = 20.167000 C 01:04:01 Temperature Measurement, Probe Number = 3, T = 20.106000 C 01:04:02 Temperature Measurement, Probe Number = 4, T = 20.220000 C 01:04:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.22 01:04:02 Integrated Voltage Measurement... 01:04:21 Voltage Offset Correction: v_off_ini = 0.000004661 V, v_off_fin = 0.000006940 V 01:04:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048097 Vs 01:04:22 Integrated Voltage Measurement... 01:04:41 Voltage Offset Correction: v_off_ini = 0.000006647 V, v_off_fin = 0.000003940 V 01:04:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971811 Vs 01:04:44 Temperature Measurement, Probe Number = 0, T = 20.174000 C 01:04:44 Temperature Measurement, Probe Number = 1, T = 20.089000 C 01:04:45 Temperature Measurement, Probe Number = 2, T = 20.167000 C 01:04:46 Temperature Measurement, Probe Number = 3, T = 20.104000 C 01:04:46 Temperature Measurement, Probe Number = 4, T = 20.234000 C 01:04:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.23 01:04:47 Integrated Voltage Measurement... 01:05:06 Voltage Offset Correction: v_off_ini = 0.000004263 V, v_off_fin = 0.000007169 V 01:05:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053855 Vs 01:05:06 Integrated Voltage Measurement... 01:05:25 Voltage Offset Correction: v_off_ini = 0.000006244 V, v_off_fin = 0.000003405 V 01:05:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968496 Vs 01:05:28 Temperature Measurement, Probe Number = 0, T = 20.174000 C 01:05:29 Temperature Measurement, Probe Number = 1, T = 20.090000 C 01:05:30 Temperature Measurement, Probe Number = 2, T = 20.166000 C 01:05:30 Temperature Measurement, Probe Number = 3, T = 20.105000 C 01:05:31 Temperature Measurement, Probe Number = 4, T = 20.178000 C 01:05:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.18 01:05:31 Integrated Voltage Measurement... 01:05:52 Voltage Offset Correction: v_off_ini = 0.000004418 V, v_off_fin = 0.000006856 V 01:05:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051559 Vs 01:05:52 Integrated Voltage Measurement... 01:06:11 Voltage Offset Correction: v_off_ini = 0.000006065 V, v_off_fin = 0.000003503 V 01:06:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966309 Vs 01:06:14 Temperature Measurement, Probe Number = 0, T = 20.178000 C 01:06:15 Temperature Measurement, Probe Number = 1, T = 20.095000 C 01:06:16 Temperature Measurement, Probe Number = 2, T = 20.171000 C 01:06:16 Temperature Measurement, Probe Number = 3, T = 20.113000 C 01:06:17 Temperature Measurement, Probe Number = 4, T = 20.275000 C 01:06:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.27 01:06:17 Integrated Voltage Measurement... 01:06:36 Voltage Offset Correction: v_off_ini = 0.000004478 V, v_off_fin = 0.000006989 V 01:06:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054017 Vs 01:06:37 Integrated Voltage Measurement... 01:06:56 Voltage Offset Correction: v_off_ini = 0.000006849 V, v_off_fin = 0.000003243 V 01:06:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968835 Vs 01:36:59 Temperature Measurement, Probe Number = 0, T = 20.162000 C 01:37:00 Temperature Measurement, Probe Number = 1, T = 20.079000 C 01:37:00 Temperature Measurement, Probe Number = 2, T = 20.160000 C 01:37:01 Temperature Measurement, Probe Number = 3, T = 20.098000 C 01:37:02 Temperature Measurement, Probe Number = 4, T = 20.226000 C 01:37:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.23 01:37:02 Integrated Voltage Measurement... 01:37:21 Voltage Offset Correction: v_off_ini = 0.000004870 V, v_off_fin = 0.000006384 V 01:37:21 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171091704 Vs 01:37:22 Integrated Voltage Measurement... 01:37:41 Voltage Offset Correction: v_off_ini = 0.000006462 V, v_off_fin = 0.000003421 V 01:37:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970760 Vs 01:37:44 Temperature Measurement, Probe Number = 0, T = 20.162000 C 01:37:45 Temperature Measurement, Probe Number = 1, T = 20.083000 C 01:37:45 Temperature Measurement, Probe Number = 2, T = 20.160000 C 01:37:46 Temperature Measurement, Probe Number = 3, T = 20.101000 C 01:37:47 Temperature Measurement, Probe Number = 4, T = 20.199000 C 01:37:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.20 01:37:47 Integrated Voltage Measurement... 01:38:06 Voltage Offset Correction: v_off_ini = 0.000004319 V, v_off_fin = 0.000006799 V 01:38:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031473 Vs 01:38:07 Integrated Voltage Measurement... 01:38:25 Voltage Offset Correction: v_off_ini = 0.000006316 V, v_off_fin = 0.000002301 V 01:38:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971779 Vs 01:38:28 Temperature Measurement, Probe Number = 0, T = 20.172000 C 01:38:29 Temperature Measurement, Probe Number = 1, T = 20.092000 C 01:38:30 Temperature Measurement, Probe Number = 2, T = 20.168000 C 01:38:30 Temperature Measurement, Probe Number = 3, T = 20.110000 C 01:38:31 Temperature Measurement, Probe Number = 4, T = 20.258000 C 01:38:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.26 01:38:31 Integrated Voltage Measurement... 01:38:51 Voltage Offset Correction: v_off_ini = 0.000003928 V, v_off_fin = 0.000006021 V 01:38:51 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171037786 Vs 01:38:51 Integrated Voltage Measurement... 01:39:10 Voltage Offset Correction: v_off_ini = 0.000005739 V, v_off_fin = 0.000002820 V 01:39:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972507 Vs 01:39:13 Temperature Measurement, Probe Number = 0, T = 20.175000 C 01:39:14 Temperature Measurement, Probe Number = 1, T = 20.094000 C 01:39:15 Temperature Measurement, Probe Number = 2, T = 20.171000 C 01:39:15 Temperature Measurement, Probe Number = 3, T = 20.113000 C 01:39:16 Temperature Measurement, Probe Number = 4, T = 20.322000 C 01:39:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.32 01:39:16 Integrated Voltage Measurement... 01:39:35 Voltage Offset Correction: v_off_ini = 0.000003875 V, v_off_fin = 0.000006845 V 01:39:36 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171040298 Vs 01:39:36 Integrated Voltage Measurement... 01:39:55 Voltage Offset Correction: v_off_ini = 0.000006325 V, v_off_fin = 0.000002622 V 01:39:55 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170972394 Vs 01:39:58 Temperature Measurement, Probe Number = 0, T = 20.170000 C 01:39:59 Temperature Measurement, Probe Number = 1, T = 20.091000 C 01:39:59 Temperature Measurement, Probe Number = 2, T = 20.165000 C 01:40:00 Temperature Measurement, Probe Number = 3, T = 20.107000 C 01:40:01 Temperature Measurement, Probe Number = 4, T = 20.329000 C 01:40:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.33 01:40:01 Integrated Voltage Measurement... 01:40:20 Voltage Offset Correction: v_off_ini = 0.000003902 V, v_off_fin = 0.000006224 V 01:40:20 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171036165 Vs 01:40:20 Integrated Voltage Measurement... 01:40:40 Voltage Offset Correction: v_off_ini = 0.000005989 V, v_off_fin = 0.000003443 V 01:40:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974348 Vs 01:40:43 Temperature Measurement, Probe Number = 0, T = 20.168000 C 01:40:44 Temperature Measurement, Probe Number = 1, T = 20.086000 C 01:40:44 Temperature Measurement, Probe Number = 2, T = 20.163000 C 01:40:45 Temperature Measurement, Probe Number = 3, T = 20.103000 C 01:40:46 Temperature Measurement, Probe Number = 4, T = 20.260000 C 01:40:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.26 01:40:46 Integrated Voltage Measurement... 01:41:05 Voltage Offset Correction: v_off_ini = 0.000004088 V, v_off_fin = 0.000006587 V 01:41:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031562 Vs 01:41:06 Integrated Voltage Measurement... 01:41:25 Voltage Offset Correction: v_off_ini = 0.000006409 V, v_off_fin = 0.000002261 V 01:41:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971345 Vs 01:41:28 Temperature Measurement, Probe Number = 0, T = 20.171000 C 01:41:28 Temperature Measurement, Probe Number = 1, T = 20.090000 C 01:41:29 Temperature Measurement, Probe Number = 2, T = 20.164000 C 01:41:30 Temperature Measurement, Probe Number = 3, T = 20.103000 C 01:41:30 Temperature Measurement, Probe Number = 4, T = 20.330000 C 01:41:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.33 01:41:30 Integrated Voltage Measurement... 01:41:49 Voltage Offset Correction: v_off_ini = 0.000003854 V, v_off_fin = 0.000006735 V 01:41:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171041100 Vs 01:41:50 Integrated Voltage Measurement... 01:42:09 Voltage Offset Correction: v_off_ini = 0.000006029 V, v_off_fin = 0.000002603 V 01:42:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971360 Vs 01:42:12 Temperature Measurement, Probe Number = 0, T = 20.174000 C 01:42:12 Temperature Measurement, Probe Number = 1, T = 20.092000 C 01:42:13 Temperature Measurement, Probe Number = 2, T = 20.169000 C 01:42:14 Temperature Measurement, Probe Number = 3, T = 20.110000 C 01:42:14 Temperature Measurement, Probe Number = 4, T = 20.374000 C 01:42:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.37 01:42:15 Integrated Voltage Measurement... 01:42:34 Voltage Offset Correction: v_off_ini = 0.000004155 V, v_off_fin = 0.000006542 V 01:42:34 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171038917 Vs 01:42:34 Integrated Voltage Measurement... 01:42:53 Voltage Offset Correction: v_off_ini = 0.000006119 V, v_off_fin = 0.000002440 V 01:42:54 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971809 Vs 01:42:56 Temperature Measurement, Probe Number = 0, T = 20.173000 C 01:42:57 Temperature Measurement, Probe Number = 1, T = 20.089000 C 01:42:58 Temperature Measurement, Probe Number = 2, T = 20.169000 C 01:42:58 Temperature Measurement, Probe Number = 3, T = 20.107000 C 01:42:59 Temperature Measurement, Probe Number = 4, T = 20.440000 C 01:42:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.44 01:42:59 Integrated Voltage Measurement... 01:43:19 Voltage Offset Correction: v_off_ini = 0.000004140 V, v_off_fin = 0.000006542 V 01:43:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039134 Vs 01:43:19 Integrated Voltage Measurement... 01:43:38 Voltage Offset Correction: v_off_ini = 0.000005928 V, v_off_fin = 0.000003244 V 01:43:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971960 Vs 01:43:41 Temperature Measurement, Probe Number = 0, T = 20.166000 C 01:43:42 Temperature Measurement, Probe Number = 1, T = 20.085000 C 01:43:42 Temperature Measurement, Probe Number = 2, T = 20.163000 C 01:43:43 Temperature Measurement, Probe Number = 3, T = 20.103000 C 01:43:44 Temperature Measurement, Probe Number = 4, T = 20.405000 C 01:43:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 01:43:44 Integrated Voltage Measurement... 01:44:03 Voltage Offset Correction: v_off_ini = 0.000004551 V, v_off_fin = 0.000007010 V 01:44:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040610 Vs 01:44:03 Integrated Voltage Measurement... 01:44:23 Voltage Offset Correction: v_off_ini = 0.000005812 V, v_off_fin = 0.000002423 V 01:44:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971835 Vs 02:14:25 Temperature Measurement, Probe Number = 0, T = 20.157000 C 02:14:26 Temperature Measurement, Probe Number = 1, T = 20.079000 C 02:14:27 Temperature Measurement, Probe Number = 2, T = 20.154000 C 02:14:27 Temperature Measurement, Probe Number = 3, T = 20.097000 C 02:14:28 Temperature Measurement, Probe Number = 4, T = 20.216000 C 02:14:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.22 02:14:28 Integrated Voltage Measurement... 02:14:48 Voltage Offset Correction: v_off_ini = 0.000004800 V, v_off_fin = 0.000006795 V 02:14:48 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171081288 Vs 02:14:48 Integrated Voltage Measurement... 02:15:07 Voltage Offset Correction: v_off_ini = 0.000006152 V, v_off_fin = 0.000003084 V 02:15:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972930 Vs 02:15:10 Temperature Measurement, Probe Number = 0, T = 20.160000 C 02:15:11 Temperature Measurement, Probe Number = 1, T = 20.080000 C 02:15:12 Temperature Measurement, Probe Number = 2, T = 20.159000 C 02:15:12 Temperature Measurement, Probe Number = 3, T = 20.100000 C 02:15:13 Temperature Measurement, Probe Number = 4, T = 20.253000 C 02:15:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.25 02:15:13 Integrated Voltage Measurement... 02:15:32 Voltage Offset Correction: v_off_ini = 0.000004420 V, v_off_fin = 0.000006800 V 02:15:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040520 Vs 02:15:33 Integrated Voltage Measurement... 02:15:52 Voltage Offset Correction: v_off_ini = 0.000006429 V, v_off_fin = 0.000003036 V 02:15:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970370 Vs 02:15:55 Temperature Measurement, Probe Number = 0, T = 20.160000 C 02:15:55 Temperature Measurement, Probe Number = 1, T = 20.081000 C 02:15:56 Temperature Measurement, Probe Number = 2, T = 20.161000 C 02:15:57 Temperature Measurement, Probe Number = 3, T = 20.102000 C 02:15:57 Temperature Measurement, Probe Number = 4, T = 20.328000 C 02:15:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.33 02:15:58 Integrated Voltage Measurement... 02:16:17 Voltage Offset Correction: v_off_ini = 0.000004090 V, v_off_fin = 0.000007486 V 02:16:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046552 Vs 02:16:17 Integrated Voltage Measurement... 02:16:37 Voltage Offset Correction: v_off_ini = 0.000006942 V, v_off_fin = 0.000003837 V 02:16:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964770 Vs 02:16:39 Temperature Measurement, Probe Number = 0, T = 20.151000 C 02:16:40 Temperature Measurement, Probe Number = 1, T = 20.067000 C 02:16:41 Temperature Measurement, Probe Number = 2, T = 20.153000 C 02:16:41 Temperature Measurement, Probe Number = 3, T = 20.092000 C 02:16:42 Temperature Measurement, Probe Number = 4, T = 20.323000 C 02:16:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.32 02:16:42 Integrated Voltage Measurement... 02:17:02 Voltage Offset Correction: v_off_ini = 0.000004644 V, v_off_fin = 0.000006726 V 02:17:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041376 Vs 02:17:02 Integrated Voltage Measurement... 02:17:22 Voltage Offset Correction: v_off_ini = 0.000006047 V, v_off_fin = 0.000003269 V 02:17:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973736 Vs 02:17:24 Temperature Measurement, Probe Number = 0, T = 20.149000 C 02:17:25 Temperature Measurement, Probe Number = 1, T = 20.063000 C 02:17:26 Temperature Measurement, Probe Number = 2, T = 20.147000 C 02:17:26 Temperature Measurement, Probe Number = 3, T = 20.088000 C 02:17:27 Temperature Measurement, Probe Number = 4, T = 20.220000 C 02:17:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.22 02:17:27 Integrated Voltage Measurement... 02:17:47 Voltage Offset Correction: v_off_ini = 0.000004349 V, v_off_fin = 0.000006964 V 02:17:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041561 Vs 02:17:47 Integrated Voltage Measurement... 02:18:06 Voltage Offset Correction: v_off_ini = 0.000006884 V, v_off_fin = 0.000003408 V 02:18:06 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170964626 Vs 02:18:09 Temperature Measurement, Probe Number = 0, T = 20.151000 C 02:18:10 Temperature Measurement, Probe Number = 1, T = 20.070000 C 02:18:10 Temperature Measurement, Probe Number = 2, T = 20.148000 C 02:18:11 Temperature Measurement, Probe Number = 3, T = 20.090000 C 02:18:11 Temperature Measurement, Probe Number = 4, T = 20.234000 C 02:18:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.23 02:18:12 Integrated Voltage Measurement... 02:18:32 Voltage Offset Correction: v_off_ini = 0.000003985 V, v_off_fin = 0.000006660 V 02:18:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041127 Vs 02:18:32 Integrated Voltage Measurement... 02:18:51 Voltage Offset Correction: v_off_ini = 0.000005955 V, v_off_fin = 0.000003556 V 02:18:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968414 Vs 02:18:54 Temperature Measurement, Probe Number = 0, T = 20.160000 C 02:18:55 Temperature Measurement, Probe Number = 1, T = 20.077000 C 02:18:55 Temperature Measurement, Probe Number = 2, T = 20.153000 C 02:18:56 Temperature Measurement, Probe Number = 3, T = 20.094000 C 02:18:57 Temperature Measurement, Probe Number = 4, T = 20.265000 C 02:18:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.27 02:18:57 Integrated Voltage Measurement... 02:19:16 Voltage Offset Correction: v_off_ini = 0.000004109 V, v_off_fin = 0.000007150 V 02:19:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045121 Vs 02:19:16 Integrated Voltage Measurement... 02:19:36 Voltage Offset Correction: v_off_ini = 0.000006280 V, v_off_fin = 0.000002984 V 02:19:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972547 Vs 02:19:39 Temperature Measurement, Probe Number = 0, T = 20.161000 C 02:19:39 Temperature Measurement, Probe Number = 1, T = 20.075000 C 02:19:40 Temperature Measurement, Probe Number = 2, T = 20.159000 C 02:19:41 Temperature Measurement, Probe Number = 3, T = 20.096000 C 02:19:41 Temperature Measurement, Probe Number = 4, T = 20.334000 C 02:19:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.33 02:19:42 Integrated Voltage Measurement... 02:20:01 Voltage Offset Correction: v_off_ini = 0.000004393 V, v_off_fin = 0.000006703 V 02:20:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039139 Vs 02:20:01 Integrated Voltage Measurement... 02:20:20 Voltage Offset Correction: v_off_ini = 0.000005898 V, v_off_fin = 0.000002824 V 02:20:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972397 Vs 02:20:23 Temperature Measurement, Probe Number = 0, T = 20.162000 C 02:20:24 Temperature Measurement, Probe Number = 1, T = 20.076000 C 02:20:25 Temperature Measurement, Probe Number = 2, T = 20.158000 C 02:20:25 Temperature Measurement, Probe Number = 3, T = 20.098000 C 02:20:26 Temperature Measurement, Probe Number = 4, T = 20.342000 C 02:20:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.34 02:20:26 Integrated Voltage Measurement... 02:20:45 Voltage Offset Correction: v_off_ini = 0.000004053 V, v_off_fin = 0.000006733 V 02:20:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040829 Vs 02:20:46 Integrated Voltage Measurement... 02:21:05 Voltage Offset Correction: v_off_ini = 0.000006234 V, v_off_fin = 0.000003547 V 02:21:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978016 Vs 02:21:08 Temperature Measurement, Probe Number = 0, T = 20.161000 C 02:21:09 Temperature Measurement, Probe Number = 1, T = 20.076000 C 02:21:09 Temperature Measurement, Probe Number = 2, T = 20.155000 C 02:21:10 Temperature Measurement, Probe Number = 3, T = 20.094000 C 02:21:11 Temperature Measurement, Probe Number = 4, T = 20.390000 C 02:21:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.39 02:21:11 Integrated Voltage Measurement... 02:21:30 Voltage Offset Correction: v_off_ini = 0.000004398 V, v_off_fin = 0.000007418 V 02:21:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047615 Vs 02:21:31 Integrated Voltage Measurement... 02:21:50 Voltage Offset Correction: v_off_ini = 0.000006388 V, v_off_fin = 0.000003451 V 02:21:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969685 Vs 02:51:53 Temperature Measurement, Probe Number = 0, T = 20.153000 C 02:51:54 Temperature Measurement, Probe Number = 1, T = 20.071000 C 02:51:55 Temperature Measurement, Probe Number = 2, T = 20.151000 C 02:51:55 Temperature Measurement, Probe Number = 3, T = 20.092000 C 02:51:56 Temperature Measurement, Probe Number = 4, T = 20.313000 C 02:51:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.31 02:51:56 Integrated Voltage Measurement... 02:52:15 Voltage Offset Correction: v_off_ini = 0.000005542 V, v_off_fin = 0.000006752 V 02:52:15 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171088566 Vs 02:52:16 Integrated Voltage Measurement... 02:52:35 Voltage Offset Correction: v_off_ini = 0.000006322 V, v_off_fin = 0.000003577 V 02:52:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968169 Vs 02:52:38 Temperature Measurement, Probe Number = 0, T = 20.147000 C 02:52:38 Temperature Measurement, Probe Number = 1, T = 20.064000 C 02:52:39 Temperature Measurement, Probe Number = 2, T = 20.147000 C 02:52:40 Temperature Measurement, Probe Number = 3, T = 20.087000 C 02:52:40 Temperature Measurement, Probe Number = 4, T = 20.355000 C 02:52:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.36 02:52:41 Integrated Voltage Measurement... 02:53:00 Voltage Offset Correction: v_off_ini = 0.000004714 V, v_off_fin = 0.000007258 V 02:53:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043776 Vs 02:53:00 Integrated Voltage Measurement... 02:53:19 Voltage Offset Correction: v_off_ini = 0.000007136 V, v_off_fin = 0.000002861 V 02:53:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960156 Vs 02:53:22 Temperature Measurement, Probe Number = 0, T = 20.151000 C 02:53:23 Temperature Measurement, Probe Number = 1, T = 20.068000 C 02:53:24 Temperature Measurement, Probe Number = 2, T = 20.148000 C 02:53:24 Temperature Measurement, Probe Number = 3, T = 20.088000 C 02:53:25 Temperature Measurement, Probe Number = 4, T = 20.240000 C 02:53:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.24 02:53:25 Integrated Voltage Measurement... 02:53:45 Voltage Offset Correction: v_off_ini = 0.000004595 V, v_off_fin = 0.000007048 V 02:53:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171048376 Vs 02:53:45 Integrated Voltage Measurement... 02:54:04 Voltage Offset Correction: v_off_ini = 0.000005983 V, v_off_fin = 0.000002673 V 02:54:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969368 Vs 02:54:07 Temperature Measurement, Probe Number = 0, T = 20.156000 C 02:54:08 Temperature Measurement, Probe Number = 1, T = 20.073000 C 02:54:09 Temperature Measurement, Probe Number = 2, T = 20.152000 C 02:54:09 Temperature Measurement, Probe Number = 3, T = 20.093000 C 02:54:10 Temperature Measurement, Probe Number = 4, T = 20.202000 C 02:54:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.20 02:54:10 Integrated Voltage Measurement... 02:54:29 Voltage Offset Correction: v_off_ini = 0.000003559 V, v_off_fin = 0.000006564 V 02:54:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039669 Vs 02:54:30 Integrated Voltage Measurement... 02:54:49 Voltage Offset Correction: v_off_ini = 0.000006147 V, v_off_fin = 0.000002432 V 02:54:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975434 Vs 02:54:52 Temperature Measurement, Probe Number = 0, T = 20.145000 C 02:54:53 Temperature Measurement, Probe Number = 1, T = 20.061000 C 02:54:53 Temperature Measurement, Probe Number = 2, T = 20.144000 C 02:54:54 Temperature Measurement, Probe Number = 3, T = 20.084000 C 02:54:54 Temperature Measurement, Probe Number = 4, T = 20.203000 C 02:54:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.20 02:54:55 Integrated Voltage Measurement... 02:55:14 Voltage Offset Correction: v_off_ini = 0.000003576 V, v_off_fin = 0.000005931 V 02:55:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035484 Vs 02:55:15 Integrated Voltage Measurement... 02:55:34 Voltage Offset Correction: v_off_ini = 0.000005792 V, v_off_fin = 0.000002350 V 02:55:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974005 Vs 02:55:37 Temperature Measurement, Probe Number = 0, T = 20.142000 C 02:55:37 Temperature Measurement, Probe Number = 1, T = 20.063000 C 02:55:38 Temperature Measurement, Probe Number = 2, T = 20.140000 C 02:55:39 Temperature Measurement, Probe Number = 3, T = 20.083000 C 02:55:39 Temperature Measurement, Probe Number = 4, T = 20.150000 C 02:55:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.15 02:55:39 Integrated Voltage Measurement... 02:55:59 Voltage Offset Correction: v_off_ini = 0.000003413 V, v_off_fin = 0.000006121 V 02:55:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034014 Vs 02:55:59 Integrated Voltage Measurement... 02:56:18 Voltage Offset Correction: v_off_ini = 0.000005981 V, v_off_fin = 0.000003057 V 02:56:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969258 Vs 02:56:21 Temperature Measurement, Probe Number = 0, T = 20.149000 C 02:56:22 Temperature Measurement, Probe Number = 1, T = 20.070000 C 02:56:22 Temperature Measurement, Probe Number = 2, T = 20.145000 C 02:56:23 Temperature Measurement, Probe Number = 3, T = 20.086000 C 02:56:24 Temperature Measurement, Probe Number = 4, T = 20.197000 C 02:56:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.20 02:56:24 Integrated Voltage Measurement... 02:56:43 Voltage Offset Correction: v_off_ini = 0.000004427 V, v_off_fin = 0.000006563 V 02:56:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039270 Vs 02:56:44 Integrated Voltage Measurement... 02:57:04 Voltage Offset Correction: v_off_ini = 0.000005735 V, v_off_fin = 0.000003028 V 02:57:04 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170970323 Vs 02:57:07 Temperature Measurement, Probe Number = 0, T = 20.152000 C 02:57:07 Temperature Measurement, Probe Number = 1, T = 20.072000 C 02:57:08 Temperature Measurement, Probe Number = 2, T = 20.149000 C 02:57:09 Temperature Measurement, Probe Number = 3, T = 20.088000 C 02:57:09 Temperature Measurement, Probe Number = 4, T = 20.237000 C 02:57:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.24 02:57:10 Integrated Voltage Measurement... 02:57:29 Voltage Offset Correction: v_off_ini = 0.000004805 V, v_off_fin = 0.000006774 V 02:57:29 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171036236 Vs 02:57:29 Integrated Voltage Measurement... 02:57:49 Voltage Offset Correction: v_off_ini = 0.000005866 V, v_off_fin = 0.000003524 V 02:57:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968471 Vs 02:57:52 Temperature Measurement, Probe Number = 0, T = 20.154000 C 02:57:52 Temperature Measurement, Probe Number = 1, T = 20.071000 C 02:57:53 Temperature Measurement, Probe Number = 2, T = 20.154000 C 02:57:54 Temperature Measurement, Probe Number = 3, T = 20.092000 C 02:57:54 Temperature Measurement, Probe Number = 4, T = 20.311000 C 02:57:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.31 02:57:54 Integrated Voltage Measurement... 02:58:14 Voltage Offset Correction: v_off_ini = 0.000004381 V, v_off_fin = 0.000006910 V 02:58:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040256 Vs 02:58:14 Integrated Voltage Measurement... 02:58:33 Voltage Offset Correction: v_off_ini = 0.000006513 V, v_off_fin = 0.000003511 V 02:58:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968105 Vs 02:58:36 Temperature Measurement, Probe Number = 0, T = 20.145000 C 02:58:37 Temperature Measurement, Probe Number = 1, T = 20.065000 C 02:58:38 Temperature Measurement, Probe Number = 2, T = 20.145000 C 02:58:38 Temperature Measurement, Probe Number = 3, T = 20.088000 C 02:58:39 Temperature Measurement, Probe Number = 4, T = 20.307000 C 02:58:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.31 02:58:39 Integrated Voltage Measurement... 02:58:58 Voltage Offset Correction: v_off_ini = 0.000003900 V, v_off_fin = 0.000006406 V 02:58:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037725 Vs 02:58:59 Integrated Voltage Measurement... 02:59:19 Voltage Offset Correction: v_off_ini = 0.000005882 V, v_off_fin = 0.000003183 V 02:59:19 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170974607 Vs 03:29:22 Temperature Measurement, Probe Number = 0, T = 20.148000 C 03:29:22 Temperature Measurement, Probe Number = 1, T = 20.065000 C 03:29:23 Temperature Measurement, Probe Number = 2, T = 20.143000 C 03:29:24 Temperature Measurement, Probe Number = 3, T = 20.081000 C 03:29:24 Temperature Measurement, Probe Number = 4, T = 20.285000 C 03:29:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.29 03:29:25 Integrated Voltage Measurement... 03:29:44 Voltage Offset Correction: v_off_ini = 0.000004712 V, v_off_fin = 0.000006477 V 03:29:44 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171080214 Vs 03:29:44 Integrated Voltage Measurement... 03:30:03 Voltage Offset Correction: v_off_ini = 0.000006438 V, v_off_fin = 0.000003834 V 03:30:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966158 Vs 03:30:06 Temperature Measurement, Probe Number = 0, T = 20.143000 C 03:30:07 Temperature Measurement, Probe Number = 1, T = 20.062000 C 03:30:07 Temperature Measurement, Probe Number = 2, T = 20.140000 C 03:30:08 Temperature Measurement, Probe Number = 3, T = 20.079000 C 03:30:09 Temperature Measurement, Probe Number = 4, T = 20.188000 C 03:30:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.19 03:30:09 Integrated Voltage Measurement... 03:30:28 Voltage Offset Correction: v_off_ini = 0.000004514 V, v_off_fin = 0.000006412 V 03:30:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041175 Vs 03:30:29 Integrated Voltage Measurement... 03:30:47 Voltage Offset Correction: v_off_ini = 0.000006011 V, v_off_fin = 0.000003091 V 03:30:48 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170970644 Vs 03:30:50 Temperature Measurement, Probe Number = 0, T = 20.145000 C 03:30:51 Temperature Measurement, Probe Number = 1, T = 20.067000 C 03:30:52 Temperature Measurement, Probe Number = 2, T = 20.140000 C 03:30:52 Temperature Measurement, Probe Number = 3, T = 20.083000 C 03:30:53 Temperature Measurement, Probe Number = 4, T = 20.119000 C 03:30:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.12 03:30:53 Integrated Voltage Measurement... 03:31:12 Voltage Offset Correction: v_off_ini = 0.000003904 V, v_off_fin = 0.000006066 V 03:31:13 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171038902 Vs 03:31:13 Integrated Voltage Measurement... 03:31:32 Voltage Offset Correction: v_off_ini = 0.000005888 V, v_off_fin = 0.000003439 V 03:31:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967302 Vs 03:31:35 Temperature Measurement, Probe Number = 0, T = 20.149000 C 03:31:35 Temperature Measurement, Probe Number = 1, T = 20.067000 C 03:31:36 Temperature Measurement, Probe Number = 2, T = 20.145000 C 03:31:37 Temperature Measurement, Probe Number = 3, T = 20.085000 C 03:31:37 Temperature Measurement, Probe Number = 4, T = 20.138000 C 03:31:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.14 03:31:38 Integrated Voltage Measurement... 03:31:57 Voltage Offset Correction: v_off_ini = 0.000004409 V, v_off_fin = 0.000006288 V 03:31:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039543 Vs 03:31:57 Integrated Voltage Measurement... 03:32:16 Voltage Offset Correction: v_off_ini = 0.000006100 V, v_off_fin = 0.000003109 V 03:32:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966834 Vs 03:32:19 Temperature Measurement, Probe Number = 0, T = 20.148000 C 03:32:20 Temperature Measurement, Probe Number = 1, T = 20.066000 C 03:32:20 Temperature Measurement, Probe Number = 2, T = 20.144000 C 03:32:21 Temperature Measurement, Probe Number = 3, T = 20.081000 C 03:32:22 Temperature Measurement, Probe Number = 4, T = 20.219000 C 03:32:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.22 03:32:22 Integrated Voltage Measurement... 03:32:41 Voltage Offset Correction: v_off_ini = 0.000004545 V, v_off_fin = 0.000006451 V 03:32:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036757 Vs 03:32:41 Integrated Voltage Measurement... 03:33:01 Voltage Offset Correction: v_off_ini = 0.000005921 V, v_off_fin = 0.000003123 V 03:33:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967095 Vs 03:33:03 Temperature Measurement, Probe Number = 0, T = 20.142000 C 03:33:04 Temperature Measurement, Probe Number = 1, T = 20.062000 C 03:33:05 Temperature Measurement, Probe Number = 2, T = 20.139000 C 03:33:05 Temperature Measurement, Probe Number = 3, T = 20.080000 C 03:33:06 Temperature Measurement, Probe Number = 4, T = 20.206000 C 03:33:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.21 03:33:06 Integrated Voltage Measurement... 03:33:26 Voltage Offset Correction: v_off_ini = 0.000003787 V, v_off_fin = 0.000006623 V 03:33:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037814 Vs 03:33:26 Integrated Voltage Measurement... 03:33:45 Voltage Offset Correction: v_off_ini = 0.000005909 V, v_off_fin = 0.000002785 V 03:33:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971832 Vs 03:33:48 Temperature Measurement, Probe Number = 0, T = 20.142000 C 03:33:48 Temperature Measurement, Probe Number = 1, T = 20.063000 C 03:33:49 Temperature Measurement, Probe Number = 2, T = 20.140000 C 03:33:50 Temperature Measurement, Probe Number = 3, T = 20.083000 C 03:33:50 Temperature Measurement, Probe Number = 4, T = 20.290000 C 03:33:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.29 03:33:51 Integrated Voltage Measurement... 03:34:10 Voltage Offset Correction: v_off_ini = 0.000004130 V, v_off_fin = 0.000006231 V 03:34:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040974 Vs 03:34:10 Integrated Voltage Measurement... 03:34:29 Voltage Offset Correction: v_off_ini = 0.000006253 V, v_off_fin = 0.000002958 V 03:34:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170970698 Vs 03:34:32 Temperature Measurement, Probe Number = 0, T = 20.146000 C 03:34:33 Temperature Measurement, Probe Number = 1, T = 20.067000 C 03:34:34 Temperature Measurement, Probe Number = 2, T = 20.144000 C 03:34:34 Temperature Measurement, Probe Number = 3, T = 20.086000 C 03:34:35 Temperature Measurement, Probe Number = 4, T = 20.354000 C 03:34:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.35 03:34:35 Integrated Voltage Measurement... 03:34:54 Voltage Offset Correction: v_off_ini = 0.000004367 V, v_off_fin = 0.000006572 V 03:34:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036458 Vs 03:34:55 Integrated Voltage Measurement... 03:35:14 Voltage Offset Correction: v_off_ini = 0.000005989 V, v_off_fin = 0.000003654 V 03:35:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967998 Vs 03:35:17 Temperature Measurement, Probe Number = 0, T = 20.149000 C 03:35:17 Temperature Measurement, Probe Number = 1, T = 20.068000 C 03:35:18 Temperature Measurement, Probe Number = 2, T = 20.149000 C 03:35:19 Temperature Measurement, Probe Number = 3, T = 20.088000 C 03:35:19 Temperature Measurement, Probe Number = 4, T = 20.415000 C 03:35:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.41 03:35:20 Integrated Voltage Measurement... 03:35:39 Voltage Offset Correction: v_off_ini = 0.000004754 V, v_off_fin = 0.000006898 V 03:35:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039710 Vs 03:35:39 Integrated Voltage Measurement... 03:35:59 Voltage Offset Correction: v_off_ini = 0.000006579 V, v_off_fin = 0.000003739 V 03:35:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967288 Vs 03:36:02 Temperature Measurement, Probe Number = 0, T = 20.151000 C 03:36:03 Temperature Measurement, Probe Number = 1, T = 20.068000 C 03:36:03 Temperature Measurement, Probe Number = 2, T = 20.145000 C 03:36:04 Temperature Measurement, Probe Number = 3, T = 20.083000 C 03:36:04 Temperature Measurement, Probe Number = 4, T = 20.417000 C 03:36:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.42 03:36:05 Integrated Voltage Measurement... 03:36:24 Voltage Offset Correction: v_off_ini = 0.000004435 V, v_off_fin = 0.000007424 V 03:36:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039651 Vs 03:36:24 Integrated Voltage Measurement... 03:36:43 Voltage Offset Correction: v_off_ini = 0.000006407 V, v_off_fin = 0.000003488 V 03:36:44 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170969017 Vs 04:06:46 Temperature Measurement, Probe Number = 0, T = 20.132000 C 04:06:47 Temperature Measurement, Probe Number = 1, T = 20.054000 C 04:06:48 Temperature Measurement, Probe Number = 2, T = 20.130000 C 04:06:49 Temperature Measurement, Probe Number = 3, T = 20.074000 C 04:06:49 Temperature Measurement, Probe Number = 4, T = 20.262000 C 04:06:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.26 04:06:49 Integrated Voltage Measurement... 04:07:09 Voltage Offset Correction: v_off_ini = 0.000004484 V, v_off_fin = 0.000006882 V 04:07:09 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171073455 Vs 04:07:09 Integrated Voltage Measurement... 04:07:29 Voltage Offset Correction: v_off_ini = 0.000005886 V, v_off_fin = 0.000003481 V 04:07:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973224 Vs 04:07:32 Temperature Measurement, Probe Number = 0, T = 20.139000 C 04:07:32 Temperature Measurement, Probe Number = 1, T = 20.057000 C 04:07:33 Temperature Measurement, Probe Number = 2, T = 20.137000 C 04:07:34 Temperature Measurement, Probe Number = 3, T = 20.077000 C 04:07:34 Temperature Measurement, Probe Number = 4, T = 20.338000 C 04:07:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.34 04:07:34 Integrated Voltage Measurement... 04:07:54 Voltage Offset Correction: v_off_ini = 0.000004551 V, v_off_fin = 0.000006824 V 04:07:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036461 Vs 04:07:54 Integrated Voltage Measurement... 04:08:13 Voltage Offset Correction: v_off_ini = 0.000006553 V, v_off_fin = 0.000003099 V 04:08:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967059 Vs 04:08:16 Temperature Measurement, Probe Number = 0, T = 20.136000 C 04:08:17 Temperature Measurement, Probe Number = 1, T = 20.054000 C 04:08:18 Temperature Measurement, Probe Number = 2, T = 20.134000 C 04:08:18 Temperature Measurement, Probe Number = 3, T = 20.074000 C 04:08:19 Temperature Measurement, Probe Number = 4, T = 20.353000 C 04:08:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.35 04:08:19 Integrated Voltage Measurement... 04:08:39 Voltage Offset Correction: v_off_ini = 0.000004283 V, v_off_fin = 0.000006372 V 04:08:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171032065 Vs 04:08:39 Integrated Voltage Measurement... 04:08:58 Voltage Offset Correction: v_off_ini = 0.000005451 V, v_off_fin = 0.000002889 V 04:08:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970558 Vs 04:09:01 Temperature Measurement, Probe Number = 0, T = 20.140000 C 04:09:02 Temperature Measurement, Probe Number = 1, T = 20.058000 C 04:09:03 Temperature Measurement, Probe Number = 2, T = 20.139000 C 04:09:03 Temperature Measurement, Probe Number = 3, T = 20.076000 C 04:09:04 Temperature Measurement, Probe Number = 4, T = 20.405000 C 04:09:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.41 04:09:04 Integrated Voltage Measurement... 04:09:24 Voltage Offset Correction: v_off_ini = 0.000004198 V, v_off_fin = 0.000006817 V 04:09:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037658 Vs 04:09:24 Integrated Voltage Measurement... 04:09:43 Voltage Offset Correction: v_off_ini = 0.000006228 V, v_off_fin = 0.000003245 V 04:09:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962994 Vs 04:09:46 Temperature Measurement, Probe Number = 0, T = 20.140000 C 04:09:47 Temperature Measurement, Probe Number = 1, T = 20.056000 C 04:09:48 Temperature Measurement, Probe Number = 2, T = 20.135000 C 04:09:48 Temperature Measurement, Probe Number = 3, T = 20.074000 C 04:09:49 Temperature Measurement, Probe Number = 4, T = 20.414000 C 04:09:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.41 04:09:49 Integrated Voltage Measurement... 04:10:09 Voltage Offset Correction: v_off_ini = 0.000004034 V, v_off_fin = 0.000006788 V 04:10:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038874 Vs 04:10:09 Integrated Voltage Measurement... 04:10:28 Voltage Offset Correction: v_off_ini = 0.000005761 V, v_off_fin = 0.000003417 V 04:10:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966314 Vs 04:10:31 Temperature Measurement, Probe Number = 0, T = 20.136000 C 04:10:32 Temperature Measurement, Probe Number = 1, T = 20.055000 C 04:10:33 Temperature Measurement, Probe Number = 2, T = 20.133000 C 04:10:33 Temperature Measurement, Probe Number = 3, T = 20.074000 C 04:10:34 Temperature Measurement, Probe Number = 4, T = 20.394000 C 04:10:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.39 04:10:34 Integrated Voltage Measurement... 04:10:53 Voltage Offset Correction: v_off_ini = 0.000004642 V, v_off_fin = 0.000006570 V 04:10:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036960 Vs 04:10:54 Integrated Voltage Measurement... 04:11:13 Voltage Offset Correction: v_off_ini = 0.000006024 V, v_off_fin = 0.000003883 V 04:11:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974302 Vs 04:11:16 Temperature Measurement, Probe Number = 0, T = 20.141000 C 04:11:17 Temperature Measurement, Probe Number = 1, T = 20.059000 C 04:11:18 Temperature Measurement, Probe Number = 2, T = 20.137000 C 04:11:18 Temperature Measurement, Probe Number = 3, T = 20.079000 C 04:11:19 Temperature Measurement, Probe Number = 4, T = 20.391000 C 04:11:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.39 04:11:19 Integrated Voltage Measurement... 04:11:38 Voltage Offset Correction: v_off_ini = 0.000004561 V, v_off_fin = 0.000007011 V 04:11:39 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171034057 Vs 04:11:39 Integrated Voltage Measurement... 04:11:58 Voltage Offset Correction: v_off_ini = 0.000006187 V, v_off_fin = 0.000003363 V 04:11:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968230 Vs 04:12:01 Temperature Measurement, Probe Number = 0, T = 20.139000 C 04:12:02 Temperature Measurement, Probe Number = 1, T = 20.056000 C 04:12:02 Temperature Measurement, Probe Number = 2, T = 20.139000 C 04:12:03 Temperature Measurement, Probe Number = 3, T = 20.075000 C 04:12:04 Temperature Measurement, Probe Number = 4, T = 20.412000 C 04:12:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.41 04:12:04 Integrated Voltage Measurement... 04:12:23 Voltage Offset Correction: v_off_ini = 0.000004243 V, v_off_fin = 0.000006595 V 04:12:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028514 Vs 04:12:24 Integrated Voltage Measurement... 04:12:43 Voltage Offset Correction: v_off_ini = 0.000006158 V, v_off_fin = 0.000003605 V 04:12:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964399 Vs 04:12:46 Temperature Measurement, Probe Number = 0, T = 20.130000 C 04:12:46 Temperature Measurement, Probe Number = 1, T = 20.052000 C 04:12:47 Temperature Measurement, Probe Number = 2, T = 20.130000 C 04:12:47 Temperature Measurement, Probe Number = 3, T = 20.069000 C 04:12:48 Temperature Measurement, Probe Number = 4, T = 20.385000 C 04:12:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.39 04:12:48 Integrated Voltage Measurement... 04:13:08 Voltage Offset Correction: v_off_ini = 0.000004306 V, v_off_fin = 0.000007013 V 04:13:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041705 Vs 04:13:09 Integrated Voltage Measurement... 04:13:39 Voltage Offset Correction: v_off_ini = 0.000006734 V, v_off_fin = 0.000004443 V 04:13:39 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170959587 Vs 04:13:42 Temperature Measurement, Probe Number = 0, T = 20.135000 C 04:13:42 Temperature Measurement, Probe Number = 1, T = 20.053000 C 04:13:43 Temperature Measurement, Probe Number = 2, T = 20.131000 C 04:13:44 Temperature Measurement, Probe Number = 3, T = 20.069000 C 04:13:44 Temperature Measurement, Probe Number = 4, T = 20.382000 C 04:13:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.38 04:13:45 Integrated Voltage Measurement... 04:14:05 Voltage Offset Correction: v_off_ini = 0.000004946 V, v_off_fin = 0.000006682 V 04:14:05 Integrated Voltage Measurement Delta Gap = 0.0040002 m VT = 0.171021914 Vs 04:14:05 Integrated Voltage Measurement... 04:14:24 Voltage Offset Correction: v_off_ini = 0.000006116 V, v_off_fin = 0.000003474 V 04:14:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963092 Vs 04:44:27 Temperature Measurement, Probe Number = 0, T = 20.134000 C 04:44:28 Temperature Measurement, Probe Number = 1, T = 20.050000 C 04:44:29 Temperature Measurement, Probe Number = 2, T = 20.131000 C 04:44:30 Temperature Measurement, Probe Number = 3, T = 20.069000 C 04:44:30 Temperature Measurement, Probe Number = 4, T = 20.370000 C 04:44:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.37 04:44:30 Integrated Voltage Measurement... 04:44:49 Voltage Offset Correction: v_off_ini = 0.000005161 V, v_off_fin = 0.000006716 V 04:44:50 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171074768 Vs 04:44:50 Integrated Voltage Measurement... 04:45:09 Voltage Offset Correction: v_off_ini = 0.000006350 V, v_off_fin = 0.000003764 V 04:45:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968097 Vs 04:45:12 Temperature Measurement, Probe Number = 0, T = 20.127000 C 04:45:13 Temperature Measurement, Probe Number = 1, T = 20.041000 C 04:45:13 Temperature Measurement, Probe Number = 2, T = 20.125000 C 04:45:14 Temperature Measurement, Probe Number = 3, T = 20.060000 C 04:45:15 Temperature Measurement, Probe Number = 4, T = 20.300000 C 04:45:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.30 04:45:15 Integrated Voltage Measurement... 04:45:34 Voltage Offset Correction: v_off_ini = 0.000004942 V, v_off_fin = 0.000007406 V 04:45:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042015 Vs 04:45:35 Integrated Voltage Measurement... 04:45:54 Voltage Offset Correction: v_off_ini = 0.000006537 V, v_off_fin = 0.000003278 V 04:45:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970178 Vs 04:45:57 Temperature Measurement, Probe Number = 0, T = 20.128000 C 04:45:58 Temperature Measurement, Probe Number = 1, T = 20.048000 C 04:45:59 Temperature Measurement, Probe Number = 2, T = 20.124000 C 04:45:59 Temperature Measurement, Probe Number = 3, T = 20.063000 C 04:46:00 Temperature Measurement, Probe Number = 4, T = 20.176000 C 04:46:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.18 04:46:00 Integrated Voltage Measurement... 04:46:20 Voltage Offset Correction: v_off_ini = 0.000004762 V, v_off_fin = 0.000006887 V 04:46:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040699 Vs 04:46:20 Integrated Voltage Measurement... 04:46:40 Voltage Offset Correction: v_off_ini = 0.000006428 V, v_off_fin = 0.000002957 V 04:46:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963839 Vs 04:46:43 Temperature Measurement, Probe Number = 0, T = 20.134000 C 04:46:43 Temperature Measurement, Probe Number = 1, T = 20.053000 C 04:46:44 Temperature Measurement, Probe Number = 2, T = 20.128000 C 04:46:45 Temperature Measurement, Probe Number = 3, T = 20.067000 C 04:46:45 Temperature Measurement, Probe Number = 4, T = 20.166000 C 04:46:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.17 04:46:45 Integrated Voltage Measurement... 04:47:05 Voltage Offset Correction: v_off_ini = 0.000004132 V, v_off_fin = 0.000006830 V 04:47:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037261 Vs 04:47:05 Integrated Voltage Measurement... 04:47:24 Voltage Offset Correction: v_off_ini = 0.000005850 V, v_off_fin = 0.000002834 V 04:47:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971617 Vs 04:47:27 Temperature Measurement, Probe Number = 0, T = 20.140000 C 04:47:28 Temperature Measurement, Probe Number = 1, T = 20.054000 C 04:47:29 Temperature Measurement, Probe Number = 2, T = 20.133000 C 04:47:29 Temperature Measurement, Probe Number = 3, T = 20.070000 C 04:47:30 Temperature Measurement, Probe Number = 4, T = 20.258000 C 04:47:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.26 04:47:30 Integrated Voltage Measurement... 04:47:50 Voltage Offset Correction: v_off_ini = 0.000003921 V, v_off_fin = 0.000007185 V 04:47:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035354 Vs 04:47:50 Integrated Voltage Measurement... 04:48:09 Voltage Offset Correction: v_off_ini = 0.000006416 V, v_off_fin = 0.000003964 V 04:48:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170963449 Vs 04:48:12 Temperature Measurement, Probe Number = 0, T = 20.138000 C 04:48:13 Temperature Measurement, Probe Number = 1, T = 20.053000 C 04:48:13 Temperature Measurement, Probe Number = 2, T = 20.135000 C 04:48:14 Temperature Measurement, Probe Number = 3, T = 20.071000 C 04:48:15 Temperature Measurement, Probe Number = 4, T = 20.300000 C 04:48:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.30 04:48:15 Integrated Voltage Measurement... 04:48:34 Voltage Offset Correction: v_off_ini = 0.000004331 V, v_off_fin = 0.000006934 V 04:48:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044469 Vs 04:48:34 Integrated Voltage Measurement... 04:48:54 Voltage Offset Correction: v_off_ini = 0.000006576 V, v_off_fin = 0.000002789 V 04:48:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969044 Vs 04:48:57 Temperature Measurement, Probe Number = 0, T = 20.135000 C 04:48:57 Temperature Measurement, Probe Number = 1, T = 20.051000 C 04:48:58 Temperature Measurement, Probe Number = 2, T = 20.129000 C 04:48:59 Temperature Measurement, Probe Number = 3, T = 20.068000 C 04:48:59 Temperature Measurement, Probe Number = 4, T = 20.339000 C 04:48:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.34 04:48:59 Integrated Voltage Measurement... 04:49:19 Voltage Offset Correction: v_off_ini = 0.000004150 V, v_off_fin = 0.000007105 V 04:49:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042077 Vs 04:49:19 Integrated Voltage Measurement... 04:49:38 Voltage Offset Correction: v_off_ini = 0.000006449 V, v_off_fin = 0.000003581 V 04:49:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966549 Vs 04:49:41 Temperature Measurement, Probe Number = 0, T = 20.130000 C 04:49:42 Temperature Measurement, Probe Number = 1, T = 20.047000 C 04:49:42 Temperature Measurement, Probe Number = 2, T = 20.125000 C 04:49:43 Temperature Measurement, Probe Number = 3, T = 20.064000 C 04:49:43 Temperature Measurement, Probe Number = 4, T = 20.253000 C 04:49:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.25 04:49:44 Integrated Voltage Measurement... 04:50:03 Voltage Offset Correction: v_off_ini = 0.000004158 V, v_off_fin = 0.000006651 V 04:50:03 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171041220 Vs 04:50:03 Integrated Voltage Measurement... 04:50:23 Voltage Offset Correction: v_off_ini = 0.000006502 V, v_off_fin = 0.000002687 V 04:50:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968917 Vs 04:50:25 Temperature Measurement, Probe Number = 0, T = 20.132000 C 04:50:26 Temperature Measurement, Probe Number = 1, T = 20.050000 C 04:50:27 Temperature Measurement, Probe Number = 2, T = 20.126000 C 04:50:27 Temperature Measurement, Probe Number = 3, T = 20.065000 C 04:50:28 Temperature Measurement, Probe Number = 4, T = 20.277000 C 04:50:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.28 04:50:28 Integrated Voltage Measurement... 04:50:47 Voltage Offset Correction: v_off_ini = 0.000003989 V, v_off_fin = 0.000006424 V 04:50:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035856 Vs 04:50:48 Integrated Voltage Measurement... 04:51:07 Voltage Offset Correction: v_off_ini = 0.000006169 V, v_off_fin = 0.000002822 V 04:51:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971051 Vs 04:51:10 Temperature Measurement, Probe Number = 0, T = 20.129000 C 04:51:11 Temperature Measurement, Probe Number = 1, T = 20.045000 C 04:51:11 Temperature Measurement, Probe Number = 2, T = 20.125000 C 04:51:12 Temperature Measurement, Probe Number = 3, T = 20.064000 C 04:51:13 Temperature Measurement, Probe Number = 4, T = 20.302000 C 04:51:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.30 04:51:13 Integrated Voltage Measurement... 04:51:32 Voltage Offset Correction: v_off_ini = 0.000004235 V, v_off_fin = 0.000006723 V 04:51:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039273 Vs 04:51:33 Integrated Voltage Measurement... 04:51:52 Voltage Offset Correction: v_off_ini = 0.000005970 V, v_off_fin = 0.000002679 V 04:51:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971281 Vs 05:21:55 Temperature Measurement, Probe Number = 0, T = 20.123000 C 05:21:56 Temperature Measurement, Probe Number = 1, T = 20.041000 C 05:21:56 Temperature Measurement, Probe Number = 2, T = 20.120000 C 05:21:57 Temperature Measurement, Probe Number = 3, T = 20.060000 C 05:21:57 Temperature Measurement, Probe Number = 4, T = 20.329000 C 05:21:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.33 05:21:58 Integrated Voltage Measurement... 05:22:17 Voltage Offset Correction: v_off_ini = 0.000005178 V, v_off_fin = 0.000006675 V 05:22:17 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171082135 Vs 05:22:17 Integrated Voltage Measurement... 05:22:37 Voltage Offset Correction: v_off_ini = 0.000006092 V, v_off_fin = 0.000003086 V 05:22:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978933 Vs 05:22:40 Temperature Measurement, Probe Number = 0, T = 20.123000 C 05:22:40 Temperature Measurement, Probe Number = 1, T = 20.043000 C 05:22:41 Temperature Measurement, Probe Number = 2, T = 20.120000 C 05:22:42 Temperature Measurement, Probe Number = 3, T = 20.061000 C 05:22:42 Temperature Measurement, Probe Number = 4, T = 20.337000 C 05:22:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.34 05:22:42 Integrated Voltage Measurement... 05:23:02 Voltage Offset Correction: v_off_ini = 0.000004173 V, v_off_fin = 0.000006488 V 05:23:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040628 Vs 05:23:02 Integrated Voltage Measurement... 05:23:21 Voltage Offset Correction: v_off_ini = 0.000006473 V, v_off_fin = 0.000003345 V 05:23:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973629 Vs 05:23:24 Temperature Measurement, Probe Number = 0, T = 20.120000 C 05:23:25 Temperature Measurement, Probe Number = 1, T = 20.039000 C 05:23:25 Temperature Measurement, Probe Number = 2, T = 20.117000 C 05:23:26 Temperature Measurement, Probe Number = 3, T = 20.058000 C 05:23:27 Temperature Measurement, Probe Number = 4, T = 20.281000 C 05:23:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.28 05:23:27 Integrated Voltage Measurement... 05:23:47 Voltage Offset Correction: v_off_ini = 0.000003904 V, v_off_fin = 0.000006046 V 05:23:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039049 Vs 05:23:47 Integrated Voltage Measurement... 05:24:06 Voltage Offset Correction: v_off_ini = 0.000005543 V, v_off_fin = 0.000003444 V 05:24:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971703 Vs 05:24:09 Temperature Measurement, Probe Number = 0, T = 20.125000 C 05:24:10 Temperature Measurement, Probe Number = 1, T = 20.044000 C 05:24:10 Temperature Measurement, Probe Number = 2, T = 20.120000 C 05:24:11 Temperature Measurement, Probe Number = 3, T = 20.062000 C 05:24:12 Temperature Measurement, Probe Number = 4, T = 20.333000 C 05:24:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.33 05:24:12 Integrated Voltage Measurement... 05:24:31 Voltage Offset Correction: v_off_ini = 0.000003966 V, v_off_fin = 0.000006805 V 05:24:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037269 Vs 05:24:31 Integrated Voltage Measurement... 05:24:50 Voltage Offset Correction: v_off_ini = 0.000006237 V, v_off_fin = 0.000003067 V 05:24:50 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170970757 Vs 05:24:53 Temperature Measurement, Probe Number = 0, T = 20.129000 C 05:24:54 Temperature Measurement, Probe Number = 1, T = 20.046000 C 05:24:55 Temperature Measurement, Probe Number = 2, T = 20.124000 C 05:24:55 Temperature Measurement, Probe Number = 3, T = 20.064000 C 05:24:56 Temperature Measurement, Probe Number = 4, T = 20.381000 C 05:24:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.38 05:24:56 Integrated Voltage Measurement... 05:25:16 Voltage Offset Correction: v_off_ini = 0.000004345 V, v_off_fin = 0.000007024 V 05:25:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045569 Vs 05:25:16 Integrated Voltage Measurement... 05:25:35 Voltage Offset Correction: v_off_ini = 0.000006370 V, v_off_fin = 0.000003118 V 05:25:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968007 Vs 05:25:38 Temperature Measurement, Probe Number = 0, T = 20.128000 C 05:25:39 Temperature Measurement, Probe Number = 1, T = 20.043000 C 05:25:40 Temperature Measurement, Probe Number = 2, T = 20.124000 C 05:25:40 Temperature Measurement, Probe Number = 3, T = 20.061000 C 05:25:41 Temperature Measurement, Probe Number = 4, T = 20.410000 C 05:25:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.41 05:25:41 Integrated Voltage Measurement... 05:26:00 Voltage Offset Correction: v_off_ini = 0.000004384 V, v_off_fin = 0.000006909 V 05:26:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171043295 Vs 05:26:01 Integrated Voltage Measurement... 05:26:20 Voltage Offset Correction: v_off_ini = 0.000005752 V, v_off_fin = 0.000003203 V 05:26:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969810 Vs 05:26:23 Temperature Measurement, Probe Number = 0, T = 20.123000 C 05:26:24 Temperature Measurement, Probe Number = 1, T = 20.041000 C 05:26:24 Temperature Measurement, Probe Number = 2, T = 20.116000 C 05:26:25 Temperature Measurement, Probe Number = 3, T = 20.056000 C 05:26:26 Temperature Measurement, Probe Number = 4, T = 20.334000 C 05:26:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.33 05:26:26 Integrated Voltage Measurement... 05:26:45 Voltage Offset Correction: v_off_ini = 0.000004352 V, v_off_fin = 0.000006876 V 05:26:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041922 Vs 05:26:46 Integrated Voltage Measurement... 05:27:05 Voltage Offset Correction: v_off_ini = 0.000006158 V, v_off_fin = 0.000003447 V 05:27:05 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170973964 Vs 05:27:08 Temperature Measurement, Probe Number = 0, T = 20.127000 C 05:27:08 Temperature Measurement, Probe Number = 1, T = 20.042000 C 05:27:09 Temperature Measurement, Probe Number = 2, T = 20.122000 C 05:27:10 Temperature Measurement, Probe Number = 3, T = 20.061000 C 05:27:10 Temperature Measurement, Probe Number = 4, T = 20.424000 C 05:27:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.42 05:27:11 Integrated Voltage Measurement... 05:27:30 Voltage Offset Correction: v_off_ini = 0.000003940 V, v_off_fin = 0.000007035 V 05:27:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043848 Vs 05:27:30 Integrated Voltage Measurement... 05:27:49 Voltage Offset Correction: v_off_ini = 0.000006240 V, v_off_fin = 0.000003486 V 05:27:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967218 Vs 05:27:53 Temperature Measurement, Probe Number = 0, T = 20.126000 C 05:27:53 Temperature Measurement, Probe Number = 1, T = 20.042000 C 05:27:54 Temperature Measurement, Probe Number = 2, T = 20.123000 C 05:27:55 Temperature Measurement, Probe Number = 3, T = 20.062000 C 05:27:55 Temperature Measurement, Probe Number = 4, T = 20.491000 C 05:27:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.49 05:27:55 Integrated Voltage Measurement... 05:28:15 Voltage Offset Correction: v_off_ini = 0.000004416 V, v_off_fin = 0.000007353 V 05:28:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045151 Vs 05:28:15 Integrated Voltage Measurement... 05:28:34 Voltage Offset Correction: v_off_ini = 0.000006389 V, v_off_fin = 0.000003569 V 05:28:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968460 Vs 05:28:37 Temperature Measurement, Probe Number = 0, T = 20.124000 C 05:28:38 Temperature Measurement, Probe Number = 1, T = 20.036000 C 05:28:38 Temperature Measurement, Probe Number = 2, T = 20.119000 C 05:28:39 Temperature Measurement, Probe Number = 3, T = 20.055000 C 05:28:40 Temperature Measurement, Probe Number = 4, T = 20.474000 C 05:28:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.47 05:28:40 Integrated Voltage Measurement... 05:28:59 Voltage Offset Correction: v_off_ini = 0.000004460 V, v_off_fin = 0.000006820 V 05:29:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044980 Vs 05:29:00 Integrated Voltage Measurement... 05:29:19 Voltage Offset Correction: v_off_ini = 0.000006193 V, v_off_fin = 0.000003204 V 05:29:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968981 Vs 05:59:22 Temperature Measurement, Probe Number = 0, T = 20.110000 C 05:59:23 Temperature Measurement, Probe Number = 1, T = 20.033000 C 05:59:23 Temperature Measurement, Probe Number = 2, T = 20.105000 C 05:59:24 Temperature Measurement, Probe Number = 3, T = 20.049000 C 05:59:25 Temperature Measurement, Probe Number = 4, T = 20.213000 C 05:59:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.21 05:59:25 Integrated Voltage Measurement... 05:59:44 Voltage Offset Correction: v_off_ini = 0.000005307 V, v_off_fin = 0.000006624 V 05:59:44 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171086227 Vs 05:59:45 Integrated Voltage Measurement... 06:00:04 Voltage Offset Correction: v_off_ini = 0.000006518 V, v_off_fin = 0.000003163 V 06:00:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971251 Vs 06:00:06 Temperature Measurement, Probe Number = 0, T = 20.117000 C 06:00:07 Temperature Measurement, Probe Number = 1, T = 20.034000 C 06:00:08 Temperature Measurement, Probe Number = 2, T = 20.110000 C 06:00:08 Temperature Measurement, Probe Number = 3, T = 20.051000 C 06:00:09 Temperature Measurement, Probe Number = 4, T = 20.274000 C 06:00:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.27 06:00:09 Integrated Voltage Measurement... 06:00:29 Voltage Offset Correction: v_off_ini = 0.000004160 V, v_off_fin = 0.000006657 V 06:00:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038861 Vs 06:00:29 Integrated Voltage Measurement... 06:00:49 Voltage Offset Correction: v_off_ini = 0.000005980 V, v_off_fin = 0.000003254 V 06:00:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972978 Vs 06:00:51 Temperature Measurement, Probe Number = 0, T = 20.118000 C 06:00:52 Temperature Measurement, Probe Number = 1, T = 20.034000 C 06:00:53 Temperature Measurement, Probe Number = 2, T = 20.110000 C 06:00:53 Temperature Measurement, Probe Number = 3, T = 20.049000 C 06:00:54 Temperature Measurement, Probe Number = 4, T = 20.275000 C 06:00:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.27 06:00:54 Integrated Voltage Measurement... 06:01:13 Voltage Offset Correction: v_off_ini = 0.000004379 V, v_off_fin = 0.000006891 V 06:01:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040118 Vs 06:01:14 Integrated Voltage Measurement... 06:01:33 Voltage Offset Correction: v_off_ini = 0.000006115 V, v_off_fin = 0.000002921 V 06:01:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978100 Vs 06:01:36 Temperature Measurement, Probe Number = 0, T = 20.122000 C 06:01:37 Temperature Measurement, Probe Number = 1, T = 20.039000 C 06:01:37 Temperature Measurement, Probe Number = 2, T = 20.116000 C 06:01:38 Temperature Measurement, Probe Number = 3, T = 20.055000 C 06:01:39 Temperature Measurement, Probe Number = 4, T = 20.327000 C 06:01:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.33 06:01:39 Integrated Voltage Measurement... 06:01:58 Voltage Offset Correction: v_off_ini = 0.000003494 V, v_off_fin = 0.000006311 V 06:01:58 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171040843 Vs 06:01:59 Integrated Voltage Measurement... 06:02:18 Voltage Offset Correction: v_off_ini = 0.000005948 V, v_off_fin = 0.000003283 V 06:02:18 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170972392 Vs 06:02:21 Temperature Measurement, Probe Number = 0, T = 20.122000 C 06:02:21 Temperature Measurement, Probe Number = 1, T = 20.039000 C 06:02:22 Temperature Measurement, Probe Number = 2, T = 20.115000 C 06:02:23 Temperature Measurement, Probe Number = 3, T = 20.056000 C 06:02:23 Temperature Measurement, Probe Number = 4, T = 20.388000 C 06:02:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.39 06:02:23 Integrated Voltage Measurement... 06:02:43 Voltage Offset Correction: v_off_ini = 0.000003992 V, v_off_fin = 0.000006659 V 06:02:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040861 Vs 06:02:43 Integrated Voltage Measurement... 06:03:02 Voltage Offset Correction: v_off_ini = 0.000006290 V, v_off_fin = 0.000002629 V 06:03:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977787 Vs 06:03:05 Temperature Measurement, Probe Number = 0, T = 20.121000 C 06:03:06 Temperature Measurement, Probe Number = 1, T = 20.039000 C 06:03:07 Temperature Measurement, Probe Number = 2, T = 20.114000 C 06:03:07 Temperature Measurement, Probe Number = 3, T = 20.054000 C 06:03:08 Temperature Measurement, Probe Number = 4, T = 20.326000 C 06:03:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.33 06:03:08 Integrated Voltage Measurement... 06:03:28 Voltage Offset Correction: v_off_ini = 0.000003756 V, v_off_fin = 0.000006565 V 06:03:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040517 Vs 06:03:28 Integrated Voltage Measurement... 06:03:47 Voltage Offset Correction: v_off_ini = 0.000005873 V, v_off_fin = 0.000003013 V 06:03:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974302 Vs 06:03:50 Temperature Measurement, Probe Number = 0, T = 20.116000 C 06:03:51 Temperature Measurement, Probe Number = 1, T = 20.035000 C 06:03:52 Temperature Measurement, Probe Number = 2, T = 20.108000 C 06:03:52 Temperature Measurement, Probe Number = 3, T = 20.050000 C 06:03:53 Temperature Measurement, Probe Number = 4, T = 20.275000 C 06:03:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.27 06:03:53 Integrated Voltage Measurement... 06:04:12 Voltage Offset Correction: v_off_ini = 0.000003580 V, v_off_fin = 0.000006138 V 06:04:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040225 Vs 06:04:13 Integrated Voltage Measurement... 06:04:32 Voltage Offset Correction: v_off_ini = 0.000005451 V, v_off_fin = 0.000002572 V 06:04:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975460 Vs 06:04:35 Temperature Measurement, Probe Number = 0, T = 20.117000 C 06:04:35 Temperature Measurement, Probe Number = 1, T = 20.036000 C 06:04:36 Temperature Measurement, Probe Number = 2, T = 20.110000 C 06:04:37 Temperature Measurement, Probe Number = 3, T = 20.051000 C 06:04:37 Temperature Measurement, Probe Number = 4, T = 20.356000 C 06:04:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.36 06:04:38 Integrated Voltage Measurement... 06:04:58 Voltage Offset Correction: v_off_ini = 0.000003920 V, v_off_fin = 0.000006497 V 06:04:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045123 Vs 06:04:59 Integrated Voltage Measurement... 06:05:18 Voltage Offset Correction: v_off_ini = 0.000006348 V, v_off_fin = 0.000003221 V 06:05:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973047 Vs 06:05:21 Temperature Measurement, Probe Number = 0, T = 20.114000 C 06:05:21 Temperature Measurement, Probe Number = 1, T = 20.033000 C 06:05:22 Temperature Measurement, Probe Number = 2, T = 20.109000 C 06:05:23 Temperature Measurement, Probe Number = 3, T = 20.051000 C 06:05:23 Temperature Measurement, Probe Number = 4, T = 20.313000 C 06:05:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.31 06:05:24 Integrated Voltage Measurement... 06:05:43 Voltage Offset Correction: v_off_ini = 0.000003896 V, v_off_fin = 0.000006521 V 06:05:43 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042766 Vs 06:05:43 Integrated Voltage Measurement... 06:06:03 Voltage Offset Correction: v_off_ini = 0.000006232 V, v_off_fin = 0.000003179 V 06:06:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975242 Vs 06:06:06 Temperature Measurement, Probe Number = 0, T = 20.117000 C 06:06:06 Temperature Measurement, Probe Number = 1, T = 20.033000 C 06:06:07 Temperature Measurement, Probe Number = 2, T = 20.110000 C 06:06:08 Temperature Measurement, Probe Number = 3, T = 20.049000 C 06:06:08 Temperature Measurement, Probe Number = 4, T = 20.334000 C 06:06:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.33 06:06:08 Integrated Voltage Measurement... 06:06:28 Voltage Offset Correction: v_off_ini = 0.000004165 V, v_off_fin = 0.000006793 V 06:06:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040595 Vs 06:06:28 Integrated Voltage Measurement... 06:06:47 Voltage Offset Correction: v_off_ini = 0.000006262 V, v_off_fin = 0.000002866 V 06:06:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968736 Vs 06:36:50 Temperature Measurement, Probe Number = 0, T = 20.109000 C 06:36:51 Temperature Measurement, Probe Number = 1, T = 20.023000 C 06:36:52 Temperature Measurement, Probe Number = 2, T = 20.104000 C 06:36:52 Temperature Measurement, Probe Number = 3, T = 20.042000 C 06:36:53 Temperature Measurement, Probe Number = 4, T = 20.285000 C 06:36:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.29 06:36:53 Integrated Voltage Measurement... 06:37:12 Voltage Offset Correction: v_off_ini = 0.000005008 V, v_off_fin = 0.000006229 V 06:37:12 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171084231 Vs 06:37:13 Integrated Voltage Measurement... 06:37:32 Voltage Offset Correction: v_off_ini = 0.000005900 V, v_off_fin = 0.000002560 V 06:37:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976636 Vs 06:37:35 Temperature Measurement, Probe Number = 0, T = 20.111000 C 06:37:35 Temperature Measurement, Probe Number = 1, T = 20.028000 C 06:37:36 Temperature Measurement, Probe Number = 2, T = 20.104000 C 06:37:37 Temperature Measurement, Probe Number = 3, T = 20.043000 C 06:37:37 Temperature Measurement, Probe Number = 4, T = 20.224000 C 06:37:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.22 06:37:37 Integrated Voltage Measurement... 06:37:57 Voltage Offset Correction: v_off_ini = 0.000003989 V, v_off_fin = 0.000006649 V 06:37:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042689 Vs 06:37:57 Integrated Voltage Measurement... 06:38:16 Voltage Offset Correction: v_off_ini = 0.000006370 V, v_off_fin = 0.000003053 V 06:38:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972354 Vs 06:38:19 Temperature Measurement, Probe Number = 0, T = 20.112000 C 06:38:20 Temperature Measurement, Probe Number = 1, T = 20.031000 C 06:38:20 Temperature Measurement, Probe Number = 2, T = 20.104000 C 06:38:21 Temperature Measurement, Probe Number = 3, T = 20.044000 C 06:38:22 Temperature Measurement, Probe Number = 4, T = 20.240000 C 06:38:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.24 06:38:22 Integrated Voltage Measurement... 06:38:42 Voltage Offset Correction: v_off_ini = 0.000003778 V, v_off_fin = 0.000006746 V 06:38:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040385 Vs 06:38:42 Integrated Voltage Measurement... 06:39:01 Voltage Offset Correction: v_off_ini = 0.000006027 V, v_off_fin = 0.000003156 V 06:39:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972026 Vs 06:39:04 Temperature Measurement, Probe Number = 0, T = 20.119000 C 06:39:05 Temperature Measurement, Probe Number = 1, T = 20.037000 C 06:39:05 Temperature Measurement, Probe Number = 2, T = 20.113000 C 06:39:06 Temperature Measurement, Probe Number = 3, T = 20.051000 C 06:39:06 Temperature Measurement, Probe Number = 4, T = 20.365000 C 06:39:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.36 06:39:07 Integrated Voltage Measurement... 06:39:26 Voltage Offset Correction: v_off_ini = 0.000003577 V, v_off_fin = 0.000006462 V 06:39:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171039568 Vs 06:39:26 Integrated Voltage Measurement... 06:39:45 Voltage Offset Correction: v_off_ini = 0.000005975 V, v_off_fin = 0.000002873 V 06:39:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973061 Vs 06:39:48 Temperature Measurement, Probe Number = 0, T = 20.121000 C 06:39:49 Temperature Measurement, Probe Number = 1, T = 20.033000 C 06:39:49 Temperature Measurement, Probe Number = 2, T = 20.115000 C 06:39:50 Temperature Measurement, Probe Number = 3, T = 20.051000 C 06:39:51 Temperature Measurement, Probe Number = 4, T = 20.422000 C 06:39:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.42 06:39:51 Integrated Voltage Measurement... 06:40:10 Voltage Offset Correction: v_off_ini = 0.000004520 V, v_off_fin = 0.000006443 V 06:40:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041688 Vs 06:40:10 Integrated Voltage Measurement... 06:40:30 Voltage Offset Correction: v_off_ini = 0.000006239 V, v_off_fin = 0.000003025 V 06:40:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170973028 Vs 06:40:33 Temperature Measurement, Probe Number = 0, T = 20.120000 C 06:40:33 Temperature Measurement, Probe Number = 1, T = 20.034000 C 06:40:34 Temperature Measurement, Probe Number = 2, T = 20.111000 C 06:40:35 Temperature Measurement, Probe Number = 3, T = 20.047000 C 06:40:35 Temperature Measurement, Probe Number = 4, T = 20.398000 C 06:40:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.40 06:40:35 Integrated Voltage Measurement... 06:40:54 Voltage Offset Correction: v_off_ini = 0.000004582 V, v_off_fin = 0.000006939 V 06:40:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046201 Vs 06:40:55 Integrated Voltage Measurement... 06:41:14 Voltage Offset Correction: v_off_ini = 0.000006279 V, v_off_fin = 0.000003203 V 06:41:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970638 Vs 06:41:17 Temperature Measurement, Probe Number = 0, T = 20.116000 C 06:41:18 Temperature Measurement, Probe Number = 1, T = 20.030000 C 06:41:19 Temperature Measurement, Probe Number = 2, T = 20.106000 C 06:41:19 Temperature Measurement, Probe Number = 3, T = 20.042000 C 06:41:20 Temperature Measurement, Probe Number = 4, T = 20.309000 C 06:41:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.31 06:41:20 Integrated Voltage Measurement... 06:41:39 Voltage Offset Correction: v_off_ini = 0.000005222 V, v_off_fin = 0.000006337 V 06:41:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041581 Vs 06:41:40 Integrated Voltage Measurement... 06:41:59 Voltage Offset Correction: v_off_ini = 0.000005425 V, v_off_fin = 0.000002883 V 06:41:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978981 Vs 06:42:02 Temperature Measurement, Probe Number = 0, T = 20.115000 C 06:42:02 Temperature Measurement, Probe Number = 1, T = 20.032000 C 06:42:03 Temperature Measurement, Probe Number = 2, T = 20.106000 C 06:42:04 Temperature Measurement, Probe Number = 3, T = 20.044000 C 06:42:04 Temperature Measurement, Probe Number = 4, T = 20.244000 C 06:42:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.24 06:42:05 Integrated Voltage Measurement... 06:42:24 Voltage Offset Correction: v_off_ini = 0.000004031 V, v_off_fin = 0.000006201 V 06:42:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041379 Vs 06:42:25 Integrated Voltage Measurement... 06:42:44 Voltage Offset Correction: v_off_ini = 0.000006319 V, v_off_fin = 0.000002443 V 06:42:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971946 Vs 06:42:47 Temperature Measurement, Probe Number = 0, T = 20.116000 C 06:42:48 Temperature Measurement, Probe Number = 1, T = 20.034000 C 06:42:48 Temperature Measurement, Probe Number = 2, T = 20.108000 C 06:42:49 Temperature Measurement, Probe Number = 3, T = 20.047000 C 06:42:49 Temperature Measurement, Probe Number = 4, T = 20.243000 C 06:42:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.24 06:42:50 Integrated Voltage Measurement... 06:43:09 Voltage Offset Correction: v_off_ini = 0.000004103 V, v_off_fin = 0.000006836 V 06:43:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046453 Vs 06:43:10 Integrated Voltage Measurement... 06:43:29 Voltage Offset Correction: v_off_ini = 0.000006528 V, v_off_fin = 0.000002532 V 06:43:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970606 Vs 06:43:31 Temperature Measurement, Probe Number = 0, T = 20.117000 C 06:43:32 Temperature Measurement, Probe Number = 1, T = 20.033000 C 06:43:33 Temperature Measurement, Probe Number = 2, T = 20.111000 C 06:43:33 Temperature Measurement, Probe Number = 3, T = 20.049000 C 06:43:34 Temperature Measurement, Probe Number = 4, T = 20.298000 C 06:43:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.30 06:43:34 Integrated Voltage Measurement... 06:43:54 Voltage Offset Correction: v_off_ini = 0.000004366 V, v_off_fin = 0.000006713 V 06:43:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045224 Vs 06:43:54 Integrated Voltage Measurement... 06:44:13 Voltage Offset Correction: v_off_ini = 0.000006182 V, v_off_fin = 0.000003253 V 06:44:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970679 Vs 07:14:16 Temperature Measurement, Probe Number = 0, T = 20.120000 C 07:14:17 Temperature Measurement, Probe Number = 1, T = 20.037000 C 07:14:18 Temperature Measurement, Probe Number = 2, T = 20.111000 C 07:14:18 Temperature Measurement, Probe Number = 3, T = 20.051000 C 07:14:19 Temperature Measurement, Probe Number = 4, T = 20.370000 C 07:14:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.37 07:14:19 Integrated Voltage Measurement... 07:14:38 Voltage Offset Correction: v_off_ini = 0.000005607 V, v_off_fin = 0.000006845 V 07:14:39 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171097983 Vs 07:14:39 Integrated Voltage Measurement... 07:14:58 Voltage Offset Correction: v_off_ini = 0.000006366 V, v_off_fin = 0.000003743 V 07:14:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973217 Vs 07:15:01 Temperature Measurement, Probe Number = 0, T = 20.123000 C 07:15:02 Temperature Measurement, Probe Number = 1, T = 20.041000 C 07:15:02 Temperature Measurement, Probe Number = 2, T = 20.112000 C 07:15:03 Temperature Measurement, Probe Number = 3, T = 20.053000 C 07:15:04 Temperature Measurement, Probe Number = 4, T = 20.428000 C 07:15:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.43 07:15:04 Integrated Voltage Measurement... 07:15:23 Voltage Offset Correction: v_off_ini = 0.000004588 V, v_off_fin = 0.000007147 V 07:15:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050692 Vs 07:15:23 Integrated Voltage Measurement... 07:15:42 Voltage Offset Correction: v_off_ini = 0.000006469 V, v_off_fin = 0.000003781 V 07:15:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968452 Vs 07:15:45 Temperature Measurement, Probe Number = 0, T = 20.123000 C 07:15:46 Temperature Measurement, Probe Number = 1, T = 20.039000 C 07:15:47 Temperature Measurement, Probe Number = 2, T = 20.114000 C 07:15:47 Temperature Measurement, Probe Number = 3, T = 20.053000 C 07:15:48 Temperature Measurement, Probe Number = 4, T = 20.456000 C 07:15:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.46 07:15:48 Integrated Voltage Measurement... 07:16:08 Voltage Offset Correction: v_off_ini = 0.000004821 V, v_off_fin = 0.000007211 V 07:16:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053235 Vs 07:16:08 Integrated Voltage Measurement... 07:16:27 Voltage Offset Correction: v_off_ini = 0.000006617 V, v_off_fin = 0.000004659 V 07:16:27 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170966045 Vs 07:16:30 Temperature Measurement, Probe Number = 0, T = 20.115000 C 07:16:31 Temperature Measurement, Probe Number = 1, T = 20.035000 C 07:16:31 Temperature Measurement, Probe Number = 2, T = 20.107000 C 07:16:32 Temperature Measurement, Probe Number = 3, T = 20.048000 C 07:16:33 Temperature Measurement, Probe Number = 4, T = 20.486000 C 07:16:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.49 07:16:33 Integrated Voltage Measurement... 07:16:52 Voltage Offset Correction: v_off_ini = 0.000004545 V, v_off_fin = 0.000007259 V 07:16:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052636 Vs 07:16:53 Integrated Voltage Measurement... 07:17:12 Voltage Offset Correction: v_off_ini = 0.000006631 V, v_off_fin = 0.000003809 V 07:17:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967826 Vs 07:17:15 Temperature Measurement, Probe Number = 0, T = 20.112000 C 07:17:15 Temperature Measurement, Probe Number = 1, T = 20.028000 C 07:17:16 Temperature Measurement, Probe Number = 2, T = 20.104000 C 07:17:17 Temperature Measurement, Probe Number = 3, T = 20.045000 C 07:17:17 Temperature Measurement, Probe Number = 4, T = 20.469000 C 07:17:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.47 07:17:18 Integrated Voltage Measurement... 07:17:37 Voltage Offset Correction: v_off_ini = 0.000004752 V, v_off_fin = 0.000006933 V 07:17:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050560 Vs 07:17:37 Integrated Voltage Measurement... 07:17:56 Voltage Offset Correction: v_off_ini = 0.000011015 V, v_off_fin = 0.000002625 V 07:17:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972875 Vs 07:17:59 Temperature Measurement, Probe Number = 0, T = 20.110000 C 07:18:00 Temperature Measurement, Probe Number = 1, T = 20.026000 C 07:18:01 Temperature Measurement, Probe Number = 2, T = 20.103000 C 07:18:01 Temperature Measurement, Probe Number = 3, T = 20.041000 C 07:18:02 Temperature Measurement, Probe Number = 4, T = 20.399000 C 07:18:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.40 07:18:02 Integrated Voltage Measurement... 07:18:21 Voltage Offset Correction: v_off_ini = 0.000004295 V, v_off_fin = 0.000006723 V 07:18:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047468 Vs 07:18:22 Integrated Voltage Measurement... 07:18:41 Voltage Offset Correction: v_off_ini = 0.000006282 V, v_off_fin = 0.000003508 V 07:18:41 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170969153 Vs 07:18:44 Temperature Measurement, Probe Number = 0, T = 20.114000 C 07:18:45 Temperature Measurement, Probe Number = 1, T = 20.029000 C 07:18:45 Temperature Measurement, Probe Number = 2, T = 20.105000 C 07:18:46 Temperature Measurement, Probe Number = 3, T = 20.045000 C 07:18:47 Temperature Measurement, Probe Number = 4, T = 20.382000 C 07:18:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.38 07:18:47 Integrated Voltage Measurement... 07:19:06 Voltage Offset Correction: v_off_ini = 0.000004873 V, v_off_fin = 0.000006599 V 07:19:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052575 Vs 07:19:06 Integrated Voltage Measurement... 07:19:26 Voltage Offset Correction: v_off_ini = 0.000006187 V, v_off_fin = 0.000003022 V 07:19:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971926 Vs 07:19:28 Temperature Measurement, Probe Number = 0, T = 20.111000 C 07:19:29 Temperature Measurement, Probe Number = 1, T = 20.026000 C 07:19:30 Temperature Measurement, Probe Number = 2, T = 20.103000 C 07:19:30 Temperature Measurement, Probe Number = 3, T = 20.041000 C 07:19:31 Temperature Measurement, Probe Number = 4, T = 20.423000 C 07:19:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.42 07:19:31 Integrated Voltage Measurement... 07:19:50 Voltage Offset Correction: v_off_ini = 0.000004115 V, v_off_fin = 0.000006748 V 07:19:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045054 Vs 07:19:51 Integrated Voltage Measurement... 07:20:10 Voltage Offset Correction: v_off_ini = 0.000006425 V, v_off_fin = 0.000003126 V 07:20:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971708 Vs 07:20:13 Temperature Measurement, Probe Number = 0, T = 20.104000 C 07:20:14 Temperature Measurement, Probe Number = 1, T = 20.021000 C 07:20:14 Temperature Measurement, Probe Number = 2, T = 20.097000 C 07:20:15 Temperature Measurement, Probe Number = 3, T = 20.038000 C 07:20:16 Temperature Measurement, Probe Number = 4, T = 20.442000 C 07:20:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.44 07:20:16 Integrated Voltage Measurement... 07:20:35 Voltage Offset Correction: v_off_ini = 0.000004090 V, v_off_fin = 0.000006381 V 07:20:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042662 Vs 07:20:35 Integrated Voltage Measurement... 07:20:55 Voltage Offset Correction: v_off_ini = 0.000005815 V, v_off_fin = 0.000003190 V 07:20:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972659 Vs 07:20:58 Temperature Measurement, Probe Number = 0, T = 20.111000 C 07:20:58 Temperature Measurement, Probe Number = 1, T = 20.028000 C 07:20:59 Temperature Measurement, Probe Number = 2, T = 20.104000 C 07:21:00 Temperature Measurement, Probe Number = 3, T = 20.044000 C 07:21:00 Temperature Measurement, Probe Number = 4, T = 20.365000 C 07:21:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.36 07:21:00 Integrated Voltage Measurement... 07:21:20 Voltage Offset Correction: v_off_ini = 0.000004385 V, v_off_fin = 0.000007074 V 07:21:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044295 Vs 07:21:20 Integrated Voltage Measurement... 07:21:40 Voltage Offset Correction: v_off_ini = 0.000006204 V, v_off_fin = 0.000003236 V 07:21:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973089 Vs 07:51:43 Temperature Measurement, Probe Number = 0, T = 20.101000 C 07:51:43 Temperature Measurement, Probe Number = 1, T = 20.017000 C 07:51:44 Temperature Measurement, Probe Number = 2, T = 20.094000 C 07:51:45 Temperature Measurement, Probe Number = 3, T = 20.032000 C 07:51:45 Temperature Measurement, Probe Number = 4, T = 20.183000 C 07:51:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.18 07:51:46 Integrated Voltage Measurement... 07:52:05 Voltage Offset Correction: v_off_ini = 0.000005454 V, v_off_fin = 0.000006460 V 07:52:05 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171090740 Vs 07:52:05 Integrated Voltage Measurement... 07:52:25 Voltage Offset Correction: v_off_ini = 0.000006572 V, v_off_fin = 0.000003402 V 07:52:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968347 Vs 07:52:28 Temperature Measurement, Probe Number = 0, T = 20.109000 C 07:52:28 Temperature Measurement, Probe Number = 1, T = 20.023000 C 07:52:29 Temperature Measurement, Probe Number = 2, T = 20.098000 C 07:52:30 Temperature Measurement, Probe Number = 3, T = 20.038000 C 07:52:30 Temperature Measurement, Probe Number = 4, T = 20.140000 C 07:52:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.14 07:52:30 Integrated Voltage Measurement... 07:52:50 Voltage Offset Correction: v_off_ini = 0.000004086 V, v_off_fin = 0.000006955 V 07:52:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048663 Vs 07:52:50 Integrated Voltage Measurement... 07:53:10 Voltage Offset Correction: v_off_ini = 0.000006496 V, v_off_fin = 0.000003296 V 07:53:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967674 Vs 07:53:13 Temperature Measurement, Probe Number = 0, T = 20.109000 C 07:53:13 Temperature Measurement, Probe Number = 1, T = 20.024000 C 07:53:14 Temperature Measurement, Probe Number = 2, T = 20.100000 C 07:53:15 Temperature Measurement, Probe Number = 3, T = 20.039000 C 07:53:15 Temperature Measurement, Probe Number = 4, T = 20.273000 C 07:53:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.27 07:53:15 Integrated Voltage Measurement... 07:53:35 Voltage Offset Correction: v_off_ini = 0.000005283 V, v_off_fin = 0.000007027 V 07:53:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046232 Vs 07:53:35 Integrated Voltage Measurement... 07:53:55 Voltage Offset Correction: v_off_ini = 0.000006129 V, v_off_fin = 0.000003998 V 07:53:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965452 Vs 07:53:57 Temperature Measurement, Probe Number = 0, T = 20.108000 C 07:53:58 Temperature Measurement, Probe Number = 1, T = 20.027000 C 07:53:59 Temperature Measurement, Probe Number = 2, T = 20.100000 C 07:53:59 Temperature Measurement, Probe Number = 3, T = 20.041000 C 07:54:00 Temperature Measurement, Probe Number = 4, T = 20.296000 C 07:54:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.30 07:54:00 Integrated Voltage Measurement... 07:54:20 Voltage Offset Correction: v_off_ini = 0.000004541 V, v_off_fin = 0.000006970 V 07:54:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046212 Vs 07:54:21 Integrated Voltage Measurement... 07:54:40 Voltage Offset Correction: v_off_ini = 0.000006201 V, v_off_fin = 0.000003909 V 07:54:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963651 Vs 07:54:43 Temperature Measurement, Probe Number = 0, T = 20.109000 C 07:54:43 Temperature Measurement, Probe Number = 1, T = 20.027000 C 07:54:44 Temperature Measurement, Probe Number = 2, T = 20.105000 C 07:54:45 Temperature Measurement, Probe Number = 3, T = 20.041000 C 07:54:45 Temperature Measurement, Probe Number = 4, T = 20.379000 C 07:54:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.38 07:54:45 Integrated Voltage Measurement... 07:55:05 Voltage Offset Correction: v_off_ini = 0.000004709 V, v_off_fin = 0.000006567 V 07:55:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047061 Vs 07:55:05 Integrated Voltage Measurement... 07:55:24 Voltage Offset Correction: v_off_ini = 0.000005851 V, v_off_fin = 0.000003622 V 07:55:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969099 Vs 07:55:27 Temperature Measurement, Probe Number = 0, T = 20.108000 C 07:55:28 Temperature Measurement, Probe Number = 1, T = 20.022000 C 07:55:28 Temperature Measurement, Probe Number = 2, T = 20.101000 C 07:55:29 Temperature Measurement, Probe Number = 3, T = 20.034000 C 07:55:30 Temperature Measurement, Probe Number = 4, T = 20.325000 C 07:55:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.32 07:55:30 Integrated Voltage Measurement... 07:55:49 Voltage Offset Correction: v_off_ini = 0.000004604 V, v_off_fin = 0.000006940 V 07:55:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046538 Vs 07:55:50 Integrated Voltage Measurement... 07:56:09 Voltage Offset Correction: v_off_ini = 0.000006282 V, v_off_fin = 0.000004338 V 07:56:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968209 Vs 07:56:12 Temperature Measurement, Probe Number = 0, T = 20.107000 C 07:56:13 Temperature Measurement, Probe Number = 1, T = 20.024000 C 07:56:13 Temperature Measurement, Probe Number = 2, T = 20.097000 C 07:56:14 Temperature Measurement, Probe Number = 3, T = 20.034000 C 07:56:15 Temperature Measurement, Probe Number = 4, T = 20.307000 C 07:56:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.31 07:56:15 Integrated Voltage Measurement... 07:56:34 Voltage Offset Correction: v_off_ini = 0.000004472 V, v_off_fin = 0.000006902 V 07:56:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049745 Vs 07:56:35 Integrated Voltage Measurement... 07:56:54 Voltage Offset Correction: v_off_ini = 0.000006764 V, v_off_fin = 0.000003454 V 07:56:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971387 Vs 07:56:57 Temperature Measurement, Probe Number = 0, T = 20.109000 C 07:56:58 Temperature Measurement, Probe Number = 1, T = 20.027000 C 07:56:58 Temperature Measurement, Probe Number = 2, T = 20.103000 C 07:56:59 Temperature Measurement, Probe Number = 3, T = 20.039000 C 07:57:00 Temperature Measurement, Probe Number = 4, T = 20.297000 C 07:57:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.30 07:57:00 Integrated Voltage Measurement... 07:57:19 Voltage Offset Correction: v_off_ini = 0.000004364 V, v_off_fin = 0.000006117 V 07:57:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039224 Vs 07:57:20 Integrated Voltage Measurement... 07:57:39 Voltage Offset Correction: v_off_ini = 0.000005938 V, v_off_fin = 0.000003440 V 07:57:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969123 Vs 07:57:42 Temperature Measurement, Probe Number = 0, T = 20.106000 C 07:57:42 Temperature Measurement, Probe Number = 1, T = 20.023000 C 07:57:43 Temperature Measurement, Probe Number = 2, T = 20.097000 C 07:57:44 Temperature Measurement, Probe Number = 3, T = 20.036000 C 07:57:44 Temperature Measurement, Probe Number = 4, T = 20.320000 C 07:57:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.32 07:57:45 Integrated Voltage Measurement... 07:58:04 Voltage Offset Correction: v_off_ini = 0.000004703 V, v_off_fin = 0.000006839 V 07:58:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041089 Vs 07:58:04 Integrated Voltage Measurement... 07:58:23 Voltage Offset Correction: v_off_ini = 0.000006169 V, v_off_fin = 0.000002753 V 07:58:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967447 Vs 07:58:27 Temperature Measurement, Probe Number = 0, T = 20.110000 C 07:58:27 Temperature Measurement, Probe Number = 1, T = 20.027000 C 07:58:28 Temperature Measurement, Probe Number = 2, T = 20.102000 C 07:58:29 Temperature Measurement, Probe Number = 3, T = 20.040000 C 07:58:29 Temperature Measurement, Probe Number = 4, T = 20.352000 C 07:58:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.35 07:58:29 Integrated Voltage Measurement... 07:58:48 Voltage Offset Correction: v_off_ini = 0.000004045 V, v_off_fin = 0.000006521 V 07:58:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036580 Vs 07:58:49 Integrated Voltage Measurement... 07:59:08 Voltage Offset Correction: v_off_ini = 0.000005572 V, v_off_fin = 0.000003234 V 07:59:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974120 Vs 08:29:11 Temperature Measurement, Probe Number = 0, T = 20.102000 C 08:29:12 Temperature Measurement, Probe Number = 1, T = 20.017000 C 08:29:13 Temperature Measurement, Probe Number = 2, T = 20.094000 C 08:29:13 Temperature Measurement, Probe Number = 3, T = 20.030000 C 08:29:14 Temperature Measurement, Probe Number = 4, T = 20.359000 C 08:29:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.36 08:29:14 Integrated Voltage Measurement... 08:29:33 Voltage Offset Correction: v_off_ini = 0.000005065 V, v_off_fin = 0.000007028 V 08:29:34 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171086874 Vs 08:29:34 Integrated Voltage Measurement... 08:29:53 Voltage Offset Correction: v_off_ini = 0.000006079 V, v_off_fin = 0.000003077 V 08:29:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974372 Vs 08:29:56 Temperature Measurement, Probe Number = 0, T = 20.103000 C 08:29:56 Temperature Measurement, Probe Number = 1, T = 20.022000 C 08:29:57 Temperature Measurement, Probe Number = 2, T = 20.094000 C 08:29:58 Temperature Measurement, Probe Number = 3, T = 20.033000 C 08:29:58 Temperature Measurement, Probe Number = 4, T = 20.288000 C 08:29:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.29 08:29:59 Integrated Voltage Measurement... 08:30:18 Voltage Offset Correction: v_off_ini = 0.000003815 V, v_off_fin = 0.000006352 V 08:30:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037050 Vs 08:30:19 Integrated Voltage Measurement... 08:30:38 Voltage Offset Correction: v_off_ini = 0.000005832 V, v_off_fin = 0.000002977 V 08:30:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979709 Vs 08:30:41 Temperature Measurement, Probe Number = 0, T = 20.107000 C 08:30:42 Temperature Measurement, Probe Number = 1, T = 20.025000 C 08:30:42 Temperature Measurement, Probe Number = 2, T = 20.098000 C 08:30:43 Temperature Measurement, Probe Number = 3, T = 20.038000 C 08:30:44 Temperature Measurement, Probe Number = 4, T = 20.278000 C 08:30:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.28 08:30:44 Integrated Voltage Measurement... 08:31:03 Voltage Offset Correction: v_off_ini = 0.000004051 V, v_off_fin = 0.000006558 V 08:31:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043420 Vs 08:31:04 Integrated Voltage Measurement... 08:31:23 Voltage Offset Correction: v_off_ini = 0.000006115 V, v_off_fin = 0.000002844 V 08:31:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972373 Vs 08:31:26 Temperature Measurement, Probe Number = 0, T = 20.111000 C 08:31:26 Temperature Measurement, Probe Number = 1, T = 20.028000 C 08:31:27 Temperature Measurement, Probe Number = 2, T = 20.102000 C 08:31:28 Temperature Measurement, Probe Number = 3, T = 20.040000 C 08:31:28 Temperature Measurement, Probe Number = 4, T = 20.357000 C 08:31:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.36 08:31:28 Integrated Voltage Measurement... 08:31:47 Voltage Offset Correction: v_off_ini = 0.000004691 V, v_off_fin = 0.000006716 V 08:31:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046383 Vs 08:31:48 Integrated Voltage Measurement... 08:32:07 Voltage Offset Correction: v_off_ini = 0.000006065 V, v_off_fin = 0.000003729 V 08:32:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973942 Vs 08:32:10 Temperature Measurement, Probe Number = 0, T = 20.104000 C 08:32:11 Temperature Measurement, Probe Number = 1, T = 20.021000 C 08:32:11 Temperature Measurement, Probe Number = 2, T = 20.095000 C 08:32:12 Temperature Measurement, Probe Number = 3, T = 20.035000 C 08:32:13 Temperature Measurement, Probe Number = 4, T = 20.392000 C 08:32:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.39 08:32:13 Integrated Voltage Measurement... 08:32:32 Voltage Offset Correction: v_off_ini = 0.000004149 V, v_off_fin = 0.000006485 V 08:32:32 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171043537 Vs 08:32:33 Integrated Voltage Measurement... 08:32:53 Voltage Offset Correction: v_off_ini = 0.000006187 V, v_off_fin = 0.000003182 V 08:32:53 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170971006 Vs 08:32:55 Temperature Measurement, Probe Number = 0, T = 20.107000 C 08:32:56 Temperature Measurement, Probe Number = 1, T = 20.024000 C 08:32:57 Temperature Measurement, Probe Number = 2, T = 20.099000 C 08:32:57 Temperature Measurement, Probe Number = 3, T = 20.038000 C 08:32:58 Temperature Measurement, Probe Number = 4, T = 20.456000 C 08:32:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.46 08:32:58 Integrated Voltage Measurement... 08:33:18 Voltage Offset Correction: v_off_ini = 0.000004237 V, v_off_fin = 0.000006395 V 08:33:18 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171037181 Vs 08:33:18 Integrated Voltage Measurement... 08:33:37 Voltage Offset Correction: v_off_ini = 0.000005856 V, v_off_fin = 0.000003107 V 08:33:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973347 Vs 08:33:40 Temperature Measurement, Probe Number = 0, T = 20.107000 C 08:33:41 Temperature Measurement, Probe Number = 1, T = 20.022000 C 08:33:41 Temperature Measurement, Probe Number = 2, T = 20.099000 C 08:33:42 Temperature Measurement, Probe Number = 3, T = 20.038000 C 08:33:43 Temperature Measurement, Probe Number = 4, T = 20.527000 C 08:33:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.53 08:33:43 Integrated Voltage Measurement... 08:34:02 Voltage Offset Correction: v_off_ini = 0.000004157 V, v_off_fin = 0.000006465 V 08:34:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039789 Vs 08:34:03 Integrated Voltage Measurement... 08:34:22 Voltage Offset Correction: v_off_ini = 0.000005938 V, v_off_fin = 0.000003477 V 08:34:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972208 Vs 08:34:25 Temperature Measurement, Probe Number = 0, T = 20.104000 C 08:34:25 Temperature Measurement, Probe Number = 1, T = 20.025000 C 08:34:26 Temperature Measurement, Probe Number = 2, T = 20.095000 C 08:34:27 Temperature Measurement, Probe Number = 3, T = 20.037000 C 08:34:27 Temperature Measurement, Probe Number = 4, T = 20.531000 C 08:34:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.53 08:34:28 Integrated Voltage Measurement... 08:34:47 Voltage Offset Correction: v_off_ini = 0.000004293 V, v_off_fin = 0.000006292 V 08:34:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038956 Vs 08:34:47 Integrated Voltage Measurement... 08:35:07 Voltage Offset Correction: v_off_ini = 0.000005839 V, v_off_fin = 0.000002649 V 08:35:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973569 Vs 08:35:10 Temperature Measurement, Probe Number = 0, T = 20.108000 C 08:35:10 Temperature Measurement, Probe Number = 1, T = 20.026000 C 08:35:11 Temperature Measurement, Probe Number = 2, T = 20.099000 C 08:35:12 Temperature Measurement, Probe Number = 3, T = 20.036000 C 08:35:12 Temperature Measurement, Probe Number = 4, T = 20.514000 C 08:35:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.51 08:35:12 Integrated Voltage Measurement... 08:35:32 Voltage Offset Correction: v_off_ini = 0.000003795 V, v_off_fin = 0.000006898 V 08:35:32 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171040079 Vs 08:35:32 Integrated Voltage Measurement... 08:35:52 Voltage Offset Correction: v_off_ini = 0.000005799 V, v_off_fin = 0.000003201 V 08:35:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972942 Vs 08:35:54 Temperature Measurement, Probe Number = 0, T = 20.106000 C 08:35:55 Temperature Measurement, Probe Number = 1, T = 20.022000 C 08:35:56 Temperature Measurement, Probe Number = 2, T = 20.099000 C 08:35:56 Temperature Measurement, Probe Number = 3, T = 20.036000 C 08:35:57 Temperature Measurement, Probe Number = 4, T = 20.412000 C 08:35:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.41 08:35:57 Integrated Voltage Measurement... 08:36:17 Voltage Offset Correction: v_off_ini = 0.000003666 V, v_off_fin = 0.000005876 V 08:36:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036648 Vs 08:36:17 Integrated Voltage Measurement... 08:36:37 Voltage Offset Correction: v_off_ini = 0.000005472 V, v_off_fin = 0.000002987 V 08:36:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977943 Vs 09:06:40 Temperature Measurement, Probe Number = 0, T = 20.101000 C 09:06:41 Temperature Measurement, Probe Number = 1, T = 20.021000 C 09:06:41 Temperature Measurement, Probe Number = 2, T = 20.093000 C 09:06:42 Temperature Measurement, Probe Number = 3, T = 20.033000 C 09:06:43 Temperature Measurement, Probe Number = 4, T = 20.450000 C 09:06:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.45 09:06:43 Integrated Voltage Measurement... 09:07:02 Voltage Offset Correction: v_off_ini = 0.000005701 V, v_off_fin = 0.000006933 V 09:07:02 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171085486 Vs 09:07:02 Integrated Voltage Measurement... 09:07:21 Voltage Offset Correction: v_off_ini = 0.000006169 V, v_off_fin = 0.000003626 V 09:07:22 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170968686 Vs 09:07:24 Temperature Measurement, Probe Number = 0, T = 20.103000 C 09:07:25 Temperature Measurement, Probe Number = 1, T = 20.021000 C 09:07:26 Temperature Measurement, Probe Number = 2, T = 20.095000 C 09:07:26 Temperature Measurement, Probe Number = 3, T = 20.035000 C 09:07:27 Temperature Measurement, Probe Number = 4, T = 20.452000 C 09:07:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.45 09:07:27 Integrated Voltage Measurement... 09:07:47 Voltage Offset Correction: v_off_ini = 0.000004680 V, v_off_fin = 0.000006146 V 09:07:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039656 Vs 09:07:47 Integrated Voltage Measurement... 09:08:07 Voltage Offset Correction: v_off_ini = 0.000006723 V, v_off_fin = 0.000002985 V 09:08:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971354 Vs 09:08:10 Temperature Measurement, Probe Number = 0, T = 20.102000 C 09:08:10 Temperature Measurement, Probe Number = 1, T = 20.021000 C 09:08:11 Temperature Measurement, Probe Number = 2, T = 20.093000 C 09:08:12 Temperature Measurement, Probe Number = 3, T = 20.034000 C 09:08:12 Temperature Measurement, Probe Number = 4, T = 20.385000 C 09:08:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.39 09:08:12 Integrated Voltage Measurement... 09:08:32 Voltage Offset Correction: v_off_ini = 0.000004423 V, v_off_fin = 0.000007429 V 09:08:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042682 Vs 09:08:32 Integrated Voltage Measurement... 09:08:52 Voltage Offset Correction: v_off_ini = 0.000006350 V, v_off_fin = 0.000003991 V 09:08:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965211 Vs 09:08:55 Temperature Measurement, Probe Number = 0, T = 20.108000 C 09:08:56 Temperature Measurement, Probe Number = 1, T = 20.029000 C 09:08:56 Temperature Measurement, Probe Number = 2, T = 20.098000 C 09:08:57 Temperature Measurement, Probe Number = 3, T = 20.039000 C 09:08:57 Temperature Measurement, Probe Number = 4, T = 20.425000 C 09:08:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.43 09:08:58 Integrated Voltage Measurement... 09:09:17 Voltage Offset Correction: v_off_ini = 0.000005459 V, v_off_fin = 0.000006575 V 09:09:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039632 Vs 09:09:17 Integrated Voltage Measurement... 09:09:37 Voltage Offset Correction: v_off_ini = 0.000006449 V, v_off_fin = 0.000003583 V 09:09:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963828 Vs 09:09:39 Temperature Measurement, Probe Number = 0, T = 20.111000 C 09:09:40 Temperature Measurement, Probe Number = 1, T = 20.030000 C 09:09:41 Temperature Measurement, Probe Number = 2, T = 20.101000 C 09:09:41 Temperature Measurement, Probe Number = 3, T = 20.041000 C 09:09:42 Temperature Measurement, Probe Number = 4, T = 20.455000 C 09:09:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.45 09:09:42 Integrated Voltage Measurement... 09:10:02 Voltage Offset Correction: v_off_ini = 0.000004681 V, v_off_fin = 0.000007272 V 09:10:02 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171040628 Vs 09:10:02 Integrated Voltage Measurement... 09:10:21 Voltage Offset Correction: v_off_ini = 0.000006431 V, v_off_fin = 0.000003347 V 09:10:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963302 Vs 09:10:24 Temperature Measurement, Probe Number = 0, T = 20.110000 C 09:10:25 Temperature Measurement, Probe Number = 1, T = 20.027000 C 09:10:25 Temperature Measurement, Probe Number = 2, T = 20.102000 C 09:10:26 Temperature Measurement, Probe Number = 3, T = 20.042000 C 09:10:27 Temperature Measurement, Probe Number = 4, T = 20.494000 C 09:10:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.49 09:10:27 Integrated Voltage Measurement... 09:10:46 Voltage Offset Correction: v_off_ini = 0.000004023 V, v_off_fin = 0.000006844 V 09:10:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041160 Vs 09:10:46 Integrated Voltage Measurement... 09:11:06 Voltage Offset Correction: v_off_ini = 0.000006074 V, v_off_fin = 0.000003552 V 09:11:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967846 Vs 09:11:08 Temperature Measurement, Probe Number = 0, T = 20.109000 C 09:11:09 Temperature Measurement, Probe Number = 1, T = 20.023000 C 09:11:10 Temperature Measurement, Probe Number = 2, T = 20.095000 C 09:11:10 Temperature Measurement, Probe Number = 3, T = 20.033000 C 09:11:11 Temperature Measurement, Probe Number = 4, T = 20.527000 C 09:11:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.53 09:11:11 Integrated Voltage Measurement... 09:11:31 Voltage Offset Correction: v_off_ini = 0.000004837 V, v_off_fin = 0.000006956 V 09:11:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041827 Vs 09:11:31 Integrated Voltage Measurement... 09:11:50 Voltage Offset Correction: v_off_ini = 0.000006192 V, v_off_fin = 0.000003624 V 09:11:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961291 Vs 09:11:53 Temperature Measurement, Probe Number = 0, T = 20.102000 C 09:11:54 Temperature Measurement, Probe Number = 1, T = 20.021000 C 09:11:55 Temperature Measurement, Probe Number = 2, T = 20.091000 C 09:11:55 Temperature Measurement, Probe Number = 3, T = 20.032000 C 09:11:56 Temperature Measurement, Probe Number = 4, T = 20.452000 C 09:11:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.45 09:11:56 Integrated Voltage Measurement... 09:12:15 Voltage Offset Correction: v_off_ini = 0.000004064 V, v_off_fin = 0.000006552 V 09:12:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035283 Vs 09:12:16 Integrated Voltage Measurement... 09:12:35 Voltage Offset Correction: v_off_ini = 0.000005865 V, v_off_fin = 0.000003169 V 09:12:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962985 Vs 09:12:38 Temperature Measurement, Probe Number = 0, T = 20.108000 C 09:12:38 Temperature Measurement, Probe Number = 1, T = 20.025000 C 09:12:39 Temperature Measurement, Probe Number = 2, T = 20.099000 C 09:12:40 Temperature Measurement, Probe Number = 3, T = 20.038000 C 09:12:40 Temperature Measurement, Probe Number = 4, T = 20.468000 C 09:12:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.47 09:12:41 Integrated Voltage Measurement... 09:13:00 Voltage Offset Correction: v_off_ini = 0.000004583 V, v_off_fin = 0.000007027 V 09:13:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039337 Vs 09:13:00 Integrated Voltage Measurement... 09:13:19 Voltage Offset Correction: v_off_ini = 0.000006251 V, v_off_fin = 0.000003007 V 09:13:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960452 Vs 09:13:22 Temperature Measurement, Probe Number = 0, T = 20.107000 C 09:13:23 Temperature Measurement, Probe Number = 1, T = 20.023000 C 09:13:24 Temperature Measurement, Probe Number = 2, T = 20.100000 C 09:13:24 Temperature Measurement, Probe Number = 3, T = 20.039000 C 09:13:25 Temperature Measurement, Probe Number = 4, T = 20.476000 C 09:13:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.48 09:13:25 Integrated Voltage Measurement... 09:13:44 Voltage Offset Correction: v_off_ini = 0.000004156 V, v_off_fin = 0.000006736 V 09:13:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035465 Vs 09:13:45 Integrated Voltage Measurement... 09:14:04 Voltage Offset Correction: v_off_ini = 0.000006443 V, v_off_fin = 0.000003227 V 09:14:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966138 Vs 09:44:07 Temperature Measurement, Probe Number = 0, T = 20.103000 C 09:44:08 Temperature Measurement, Probe Number = 1, T = 20.023000 C 09:44:09 Temperature Measurement, Probe Number = 2, T = 20.094000 C 09:44:09 Temperature Measurement, Probe Number = 3, T = 20.034000 C 09:44:10 Temperature Measurement, Probe Number = 4, T = 20.437000 C 09:44:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.44 09:44:10 Integrated Voltage Measurement... 09:44:30 Voltage Offset Correction: v_off_ini = 0.000005582 V, v_off_fin = 0.000006370 V 09:44:30 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171080734 Vs 09:44:30 Integrated Voltage Measurement... 09:44:49 Voltage Offset Correction: v_off_ini = 0.000005666 V, v_off_fin = 0.000002762 V 09:44:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964393 Vs 09:44:52 Temperature Measurement, Probe Number = 0, T = 20.098000 C 09:44:53 Temperature Measurement, Probe Number = 1, T = 20.020000 C 09:44:53 Temperature Measurement, Probe Number = 2, T = 20.090000 C 09:44:54 Temperature Measurement, Probe Number = 3, T = 20.032000 C 09:44:55 Temperature Measurement, Probe Number = 4, T = 20.324000 C 09:44:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.32 09:44:55 Integrated Voltage Measurement... 09:45:14 Voltage Offset Correction: v_off_ini = 0.000003805 V, v_off_fin = 0.000005807 V 09:45:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023343 Vs 09:45:15 Integrated Voltage Measurement... 09:45:34 Voltage Offset Correction: v_off_ini = 0.000005679 V, v_off_fin = 0.000003048 V 09:45:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967652 Vs 09:45:37 Temperature Measurement, Probe Number = 0, T = 20.104000 C 09:45:37 Temperature Measurement, Probe Number = 1, T = 20.026000 C 09:45:38 Temperature Measurement, Probe Number = 2, T = 20.093000 C 09:45:39 Temperature Measurement, Probe Number = 3, T = 20.035000 C 09:45:39 Temperature Measurement, Probe Number = 4, T = 20.246000 C 09:45:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.25 09:45:39 Integrated Voltage Measurement... 09:45:59 Voltage Offset Correction: v_off_ini = 0.000003648 V, v_off_fin = 0.000006298 V 09:45:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025858 Vs 09:45:59 Integrated Voltage Measurement... 09:46:18 Voltage Offset Correction: v_off_ini = 0.000005763 V, v_off_fin = 0.000002665 V 09:46:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967824 Vs 09:46:21 Temperature Measurement, Probe Number = 0, T = 20.105000 C 09:46:22 Temperature Measurement, Probe Number = 1, T = 20.027000 C 09:46:23 Temperature Measurement, Probe Number = 2, T = 20.094000 C 09:46:23 Temperature Measurement, Probe Number = 3, T = 20.036000 C 09:46:24 Temperature Measurement, Probe Number = 4, T = 20.257000 C 09:46:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.26 09:46:24 Integrated Voltage Measurement... 09:46:44 Voltage Offset Correction: v_off_ini = 0.000003439 V, v_off_fin = 0.000006669 V 09:46:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030004 Vs 09:46:45 Integrated Voltage Measurement... 09:47:04 Voltage Offset Correction: v_off_ini = 0.000005865 V, v_off_fin = 0.000002827 V 09:47:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968591 Vs 09:47:07 Temperature Measurement, Probe Number = 0, T = 20.108000 C 09:47:07 Temperature Measurement, Probe Number = 1, T = 20.030000 C 09:47:08 Temperature Measurement, Probe Number = 2, T = 20.097000 C 09:47:09 Temperature Measurement, Probe Number = 3, T = 20.040000 C 09:47:09 Temperature Measurement, Probe Number = 4, T = 20.389000 C 09:47:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.39 09:47:10 Integrated Voltage Measurement... 09:47:29 Voltage Offset Correction: v_off_ini = 0.000003529 V, v_off_fin = 0.000006025 V 09:47:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171022488 Vs 09:47:30 Integrated Voltage Measurement... 09:47:49 Voltage Offset Correction: v_off_ini = 0.000005893 V, v_off_fin = 0.000002814 V 09:47:50 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170966652 Vs 09:47:52 Temperature Measurement, Probe Number = 0, T = 20.107000 C 09:47:53 Temperature Measurement, Probe Number = 1, T = 20.029000 C 09:47:54 Temperature Measurement, Probe Number = 2, T = 20.097000 C 09:47:54 Temperature Measurement, Probe Number = 3, T = 20.039000 C 09:47:55 Temperature Measurement, Probe Number = 4, T = 20.462000 C 09:47:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.46 09:47:55 Integrated Voltage Measurement... 09:48:14 Voltage Offset Correction: v_off_ini = 0.000004254 V, v_off_fin = 0.000006280 V 09:48:15 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171026519 Vs 09:48:15 Integrated Voltage Measurement... 09:48:34 Voltage Offset Correction: v_off_ini = 0.000005646 V, v_off_fin = 0.000002892 V 09:48:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964935 Vs 09:48:37 Temperature Measurement, Probe Number = 0, T = 20.105000 C 09:48:38 Temperature Measurement, Probe Number = 1, T = 20.024000 C 09:48:38 Temperature Measurement, Probe Number = 2, T = 20.096000 C 09:48:39 Temperature Measurement, Probe Number = 3, T = 20.038000 C 09:48:40 Temperature Measurement, Probe Number = 4, T = 20.480000 C 09:48:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.48 09:48:40 Integrated Voltage Measurement... 09:48:59 Voltage Offset Correction: v_off_ini = 0.000004737 V, v_off_fin = 0.000006930 V 09:48:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037213 Vs 09:49:00 Integrated Voltage Measurement... 09:49:19 Voltage Offset Correction: v_off_ini = 0.000006238 V, v_off_fin = 0.000003313 V 09:49:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958339 Vs 09:49:22 Temperature Measurement, Probe Number = 0, T = 20.106000 C 09:49:22 Temperature Measurement, Probe Number = 1, T = 20.022000 C 09:49:23 Temperature Measurement, Probe Number = 2, T = 20.093000 C 09:49:24 Temperature Measurement, Probe Number = 3, T = 20.032000 C 09:49:24 Temperature Measurement, Probe Number = 4, T = 20.443000 C 09:49:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.44 09:49:25 Integrated Voltage Measurement... 09:49:44 Voltage Offset Correction: v_off_ini = 0.000004219 V, v_off_fin = 0.000006406 V 09:49:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031750 Vs 09:49:44 Integrated Voltage Measurement... 09:50:03 Voltage Offset Correction: v_off_ini = 0.000005956 V, v_off_fin = 0.000003142 V 09:50:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961974 Vs 09:50:06 Temperature Measurement, Probe Number = 0, T = 20.102000 C 09:50:07 Temperature Measurement, Probe Number = 1, T = 20.021000 C 09:50:08 Temperature Measurement, Probe Number = 2, T = 20.092000 C 09:50:08 Temperature Measurement, Probe Number = 3, T = 20.033000 C 09:50:09 Temperature Measurement, Probe Number = 4, T = 20.339000 C 09:50:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.34 09:50:09 Integrated Voltage Measurement... 09:50:28 Voltage Offset Correction: v_off_ini = 0.000003672 V, v_off_fin = 0.000006360 V 09:50:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031528 Vs 09:50:29 Integrated Voltage Measurement... 09:50:48 Voltage Offset Correction: v_off_ini = 0.000006052 V, v_off_fin = 0.000002916 V 09:50:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959097 Vs 09:50:51 Temperature Measurement, Probe Number = 0, T = 20.109000 C 09:50:51 Temperature Measurement, Probe Number = 1, T = 20.027000 C 09:50:52 Temperature Measurement, Probe Number = 2, T = 20.095000 C 09:50:53 Temperature Measurement, Probe Number = 3, T = 20.037000 C 09:50:53 Temperature Measurement, Probe Number = 4, T = 20.329000 C 09:50:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.33 09:50:54 Integrated Voltage Measurement... 09:51:13 Voltage Offset Correction: v_off_ini = 0.000003736 V, v_off_fin = 0.000006494 V 09:51:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028652 Vs 09:51:13 Integrated Voltage Measurement... 09:51:32 Voltage Offset Correction: v_off_ini = 0.000005805 V, v_off_fin = 0.000002697 V 09:51:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961741 Vs 10:21:35 Temperature Measurement, Probe Number = 0, T = 20.101000 C 10:21:36 Temperature Measurement, Probe Number = 1, T = 20.026000 C 10:21:37 Temperature Measurement, Probe Number = 2, T = 20.094000 C 10:21:38 Temperature Measurement, Probe Number = 3, T = 20.038000 C 10:21:38 Temperature Measurement, Probe Number = 4, T = 20.347000 C 10:21:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.35 10:21:39 Integrated Voltage Measurement... 10:21:58 Voltage Offset Correction: v_off_ini = 0.000004942 V, v_off_fin = 0.000006716 V 10:21:58 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171084793 Vs 10:21:58 Integrated Voltage Measurement... 10:22:17 Voltage Offset Correction: v_off_ini = 0.000005702 V, v_off_fin = 0.000003423 V 10:22:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962839 Vs 10:22:20 Temperature Measurement, Probe Number = 0, T = 20.104000 C 10:22:21 Temperature Measurement, Probe Number = 1, T = 20.030000 C 10:22:22 Temperature Measurement, Probe Number = 2, T = 20.096000 C 10:22:22 Temperature Measurement, Probe Number = 3, T = 20.040000 C 10:22:23 Temperature Measurement, Probe Number = 4, T = 20.368000 C 10:22:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.37 10:22:23 Integrated Voltage Measurement... 10:22:42 Voltage Offset Correction: v_off_ini = 0.000003605 V, v_off_fin = 0.000006570 V 10:22:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024430 Vs 10:22:43 Integrated Voltage Measurement... 10:23:02 Voltage Offset Correction: v_off_ini = 0.000006580 V, v_off_fin = 0.000003909 V 10:23:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948872 Vs 10:23:05 Temperature Measurement, Probe Number = 0, T = 20.110000 C 10:23:05 Temperature Measurement, Probe Number = 1, T = 20.035000 C 10:23:06 Temperature Measurement, Probe Number = 2, T = 20.101000 C 10:23:07 Temperature Measurement, Probe Number = 3, T = 20.046000 C 10:23:07 Temperature Measurement, Probe Number = 4, T = 20.407000 C 10:23:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 10:23:08 Integrated Voltage Measurement... 10:23:27 Voltage Offset Correction: v_off_ini = 0.000004992 V, v_off_fin = 0.000007172 V 10:23:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035815 Vs 10:23:27 Integrated Voltage Measurement... 10:23:46 Voltage Offset Correction: v_off_ini = 0.000006517 V, v_off_fin = 0.000004192 V 10:23:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950665 Vs 10:23:49 Temperature Measurement, Probe Number = 0, T = 20.111000 C 10:23:50 Temperature Measurement, Probe Number = 1, T = 20.035000 C 10:23:51 Temperature Measurement, Probe Number = 2, T = 20.102000 C 10:23:51 Temperature Measurement, Probe Number = 3, T = 20.045000 C 10:23:52 Temperature Measurement, Probe Number = 4, T = 20.439000 C 10:23:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.44 10:23:52 Integrated Voltage Measurement... 10:24:11 Voltage Offset Correction: v_off_ini = 0.000004847 V, v_off_fin = 0.000007416 V 10:24:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042252 Vs 10:24:12 Integrated Voltage Measurement... 10:24:31 Voltage Offset Correction: v_off_ini = 0.000006783 V, v_off_fin = 0.000003621 V 10:24:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170945354 Vs 10:24:34 Temperature Measurement, Probe Number = 0, T = 20.108000 C 10:24:34 Temperature Measurement, Probe Number = 1, T = 20.033000 C 10:24:35 Temperature Measurement, Probe Number = 2, T = 20.100000 C 10:24:36 Temperature Measurement, Probe Number = 3, T = 20.042000 C 10:24:36 Temperature Measurement, Probe Number = 4, T = 20.414000 C 10:24:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.41 10:24:37 Integrated Voltage Measurement... 10:24:56 Voltage Offset Correction: v_off_ini = 0.000005065 V, v_off_fin = 0.000007652 V 10:24:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038025 Vs 10:24:56 Integrated Voltage Measurement... 10:25:16 Voltage Offset Correction: v_off_ini = 0.000006695 V, v_off_fin = 0.000003507 V 10:25:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949577 Vs 10:25:18 Temperature Measurement, Probe Number = 0, T = 20.108000 C 10:25:19 Temperature Measurement, Probe Number = 1, T = 20.032000 C 10:25:20 Temperature Measurement, Probe Number = 2, T = 20.099000 C 10:25:20 Temperature Measurement, Probe Number = 3, T = 20.042000 C 10:25:21 Temperature Measurement, Probe Number = 4, T = 20.393000 C 10:25:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.39 10:25:21 Integrated Voltage Measurement... 10:25:41 Voltage Offset Correction: v_off_ini = 0.000004518 V, v_off_fin = 0.000007066 V 10:25:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171033561 Vs 10:25:41 Integrated Voltage Measurement... 10:26:00 Voltage Offset Correction: v_off_ini = 0.000006303 V, v_off_fin = 0.000003690 V 10:26:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949165 Vs 10:26:03 Temperature Measurement, Probe Number = 0, T = 20.104000 C 10:26:04 Temperature Measurement, Probe Number = 1, T = 20.027000 C 10:26:04 Temperature Measurement, Probe Number = 2, T = 20.095000 C 10:26:05 Temperature Measurement, Probe Number = 3, T = 20.038000 C 10:26:06 Temperature Measurement, Probe Number = 4, T = 20.331000 C 10:26:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.33 10:26:06 Integrated Voltage Measurement... 10:26:25 Voltage Offset Correction: v_off_ini = 0.000004356 V, v_off_fin = 0.000006888 V 10:26:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030161 Vs 10:26:26 Integrated Voltage Measurement... 10:26:45 Voltage Offset Correction: v_off_ini = 0.000006608 V, v_off_fin = 0.000003713 V 10:26:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951245 Vs 10:26:48 Temperature Measurement, Probe Number = 0, T = 20.110000 C 10:26:48 Temperature Measurement, Probe Number = 1, T = 20.032000 C 10:26:49 Temperature Measurement, Probe Number = 2, T = 20.100000 C 10:26:50 Temperature Measurement, Probe Number = 3, T = 20.043000 C 10:26:50 Temperature Measurement, Probe Number = 4, T = 20.289000 C 10:26:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.29 10:26:51 Integrated Voltage Measurement... 10:27:10 Voltage Offset Correction: v_off_ini = 0.000005024 V, v_off_fin = 0.000007222 V 10:27:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035458 Vs 10:27:11 Integrated Voltage Measurement... 10:27:30 Voltage Offset Correction: v_off_ini = 0.000006223 V, v_off_fin = 0.000002928 V 10:27:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956494 Vs 10:27:33 Temperature Measurement, Probe Number = 0, T = 20.109000 C 10:27:34 Temperature Measurement, Probe Number = 1, T = 20.029000 C 10:27:34 Temperature Measurement, Probe Number = 2, T = 20.096000 C 10:27:35 Temperature Measurement, Probe Number = 3, T = 20.038000 C 10:27:36 Temperature Measurement, Probe Number = 4, T = 20.390000 C 10:27:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.39 10:27:36 Integrated Voltage Measurement... 10:27:55 Voltage Offset Correction: v_off_ini = 0.000004471 V, v_off_fin = 0.000006888 V 10:27:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029984 Vs 10:27:55 Integrated Voltage Measurement... 10:28:15 Voltage Offset Correction: v_off_ini = 0.000006458 V, v_off_fin = 0.000003225 V 10:28:15 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170954705 Vs 10:28:18 Temperature Measurement, Probe Number = 0, T = 20.111000 C 10:28:18 Temperature Measurement, Probe Number = 1, T = 20.033000 C 10:28:19 Temperature Measurement, Probe Number = 2, T = 20.096000 C 10:28:20 Temperature Measurement, Probe Number = 3, T = 20.038000 C 10:28:20 Temperature Measurement, Probe Number = 4, T = 20.462000 C 10:28:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.46 10:28:21 Integrated Voltage Measurement... 10:28:40 Voltage Offset Correction: v_off_ini = 0.000003843 V, v_off_fin = 0.000006471 V 10:28:40 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171026334 Vs 10:28:40 Integrated Voltage Measurement... 10:28:59 Voltage Offset Correction: v_off_ini = 0.000005920 V, v_off_fin = 0.000002764 V 10:29:00 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170955865 Vs 10:59:02 Temperature Measurement, Probe Number = 0, T = 20.113000 C 10:59:03 Temperature Measurement, Probe Number = 1, T = 20.037000 C 10:59:04 Temperature Measurement, Probe Number = 2, T = 20.105000 C 10:59:04 Temperature Measurement, Probe Number = 3, T = 20.049000 C 10:59:05 Temperature Measurement, Probe Number = 4, T = 20.473000 C 10:59:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.47 10:59:05 Integrated Voltage Measurement... 10:59:25 Voltage Offset Correction: v_off_ini = 0.000004695 V, v_off_fin = 0.000005842 V 10:59:25 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171082557 Vs 10:59:25 Integrated Voltage Measurement... 10:59:44 Voltage Offset Correction: v_off_ini = 0.000005758 V, v_off_fin = 0.000003006 V 10:59:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955094 Vs 10:59:47 Temperature Measurement, Probe Number = 0, T = 20.114000 C 10:59:47 Temperature Measurement, Probe Number = 1, T = 20.038000 C 10:59:48 Temperature Measurement, Probe Number = 2, T = 20.104000 C 10:59:49 Temperature Measurement, Probe Number = 3, T = 20.047000 C 10:59:49 Temperature Measurement, Probe Number = 4, T = 20.477000 C 10:59:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.48 10:59:50 Integrated Voltage Measurement... 11:00:10 Voltage Offset Correction: v_off_ini = 0.000004275 V, v_off_fin = 0.000006672 V 11:00:10 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171028227 Vs 11:00:10 Integrated Voltage Measurement... 11:00:29 Voltage Offset Correction: v_off_ini = 0.000006418 V, v_off_fin = 0.000003108 V 11:00:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170946836 Vs 11:00:32 Temperature Measurement, Probe Number = 0, T = 20.108000 C 11:00:33 Temperature Measurement, Probe Number = 1, T = 20.029000 C 11:00:33 Temperature Measurement, Probe Number = 2, T = 20.102000 C 11:00:34 Temperature Measurement, Probe Number = 3, T = 20.044000 C 11:00:35 Temperature Measurement, Probe Number = 4, T = 20.378000 C 11:00:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.38 11:00:35 Integrated Voltage Measurement... 11:00:54 Voltage Offset Correction: v_off_ini = 0.000004480 V, v_off_fin = 0.000006253 V 11:00:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171020811 Vs 11:00:54 Integrated Voltage Measurement... 11:01:14 Voltage Offset Correction: v_off_ini = 0.000005691 V, v_off_fin = 0.000003216 V 11:01:14 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170958843 Vs 11:01:17 Temperature Measurement, Probe Number = 0, T = 20.111000 C 11:01:17 Temperature Measurement, Probe Number = 1, T = 20.035000 C 11:01:18 Temperature Measurement, Probe Number = 2, T = 20.103000 C 11:01:19 Temperature Measurement, Probe Number = 3, T = 20.046000 C 11:01:19 Temperature Measurement, Probe Number = 4, T = 20.377000 C 11:01:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.38 11:01:19 Integrated Voltage Measurement... 11:01:39 Voltage Offset Correction: v_off_ini = 0.000004150 V, v_off_fin = 0.000006198 V 11:01:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171018483 Vs 11:01:39 Integrated Voltage Measurement... 11:01:58 Voltage Offset Correction: v_off_ini = 0.000005536 V, v_off_fin = 0.000002000 V 11:01:58 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170957895 Vs 11:02:01 Temperature Measurement, Probe Number = 0, T = 20.108000 C 11:02:02 Temperature Measurement, Probe Number = 1, T = 20.037000 C 11:02:02 Temperature Measurement, Probe Number = 2, T = 20.100000 C 11:02:03 Temperature Measurement, Probe Number = 3, T = 20.046000 C 11:02:04 Temperature Measurement, Probe Number = 4, T = 20.389000 C 11:02:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.39 11:02:04 Integrated Voltage Measurement... 11:02:23 Voltage Offset Correction: v_off_ini = 0.000003727 V, v_off_fin = 0.000006564 V 11:02:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171026123 Vs 11:02:24 Integrated Voltage Measurement... 11:02:43 Voltage Offset Correction: v_off_ini = 0.000006140 V, v_off_fin = 0.000003030 V 11:02:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954009 Vs 11:02:46 Temperature Measurement, Probe Number = 0, T = 20.114000 C 11:02:46 Temperature Measurement, Probe Number = 1, T = 20.042000 C 11:02:47 Temperature Measurement, Probe Number = 2, T = 20.105000 C 11:02:48 Temperature Measurement, Probe Number = 3, T = 20.050000 C 11:02:48 Temperature Measurement, Probe Number = 4, T = 20.440000 C 11:02:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.44 11:02:49 Integrated Voltage Measurement... 11:03:08 Voltage Offset Correction: v_off_ini = 0.000003917 V, v_off_fin = 0.000007282 V 11:03:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171026908 Vs 11:03:08 Integrated Voltage Measurement... 11:03:27 Voltage Offset Correction: v_off_ini = 0.000006470 V, v_off_fin = 0.000003253 V 11:03:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170946830 Vs 11:03:30 Temperature Measurement, Probe Number = 0, T = 20.119000 C 11:03:31 Temperature Measurement, Probe Number = 1, T = 20.045000 C 11:03:32 Temperature Measurement, Probe Number = 2, T = 20.110000 C 11:03:32 Temperature Measurement, Probe Number = 3, T = 20.055000 C 11:03:33 Temperature Measurement, Probe Number = 4, T = 20.550000 C 11:03:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.55 11:03:33 Integrated Voltage Measurement... 11:03:54 Voltage Offset Correction: v_off_ini = 0.000004199 V, v_off_fin = 0.000005849 V 11:03:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028969 Vs 11:03:54 Integrated Voltage Measurement... 11:04:13 Voltage Offset Correction: v_off_ini = 0.000005633 V, v_off_fin = 0.000003056 V 11:04:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953987 Vs 11:04:16 Temperature Measurement, Probe Number = 0, T = 20.120000 C 11:04:17 Temperature Measurement, Probe Number = 1, T = 20.045000 C 11:04:18 Temperature Measurement, Probe Number = 2, T = 20.111000 C 11:04:18 Temperature Measurement, Probe Number = 3, T = 20.055000 C 11:04:19 Temperature Measurement, Probe Number = 4, T = 20.610000 C 11:04:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.61 11:04:19 Integrated Voltage Measurement... 11:04:38 Voltage Offset Correction: v_off_ini = 0.000003746 V, v_off_fin = 0.000006621 V 11:04:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171026197 Vs 11:04:39 Integrated Voltage Measurement... 11:04:58 Voltage Offset Correction: v_off_ini = 0.000005839 V, v_off_fin = 0.000003134 V 11:04:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957465 Vs 11:05:01 Temperature Measurement, Probe Number = 0, T = 20.114000 C 11:05:02 Temperature Measurement, Probe Number = 1, T = 20.041000 C 11:05:02 Temperature Measurement, Probe Number = 2, T = 20.105000 C 11:05:03 Temperature Measurement, Probe Number = 3, T = 20.050000 C 11:05:04 Temperature Measurement, Probe Number = 4, T = 20.519000 C 11:05:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.52 11:05:04 Integrated Voltage Measurement... 11:05:23 Voltage Offset Correction: v_off_ini = 0.000004239 V, v_off_fin = 0.000006309 V 11:05:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171026087 Vs 11:05:24 Integrated Voltage Measurement... 11:05:43 Voltage Offset Correction: v_off_ini = 0.000006392 V, v_off_fin = 0.000003216 V 11:05:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948651 Vs 11:05:46 Temperature Measurement, Probe Number = 0, T = 20.111000 C 11:05:46 Temperature Measurement, Probe Number = 1, T = 20.036000 C 11:05:47 Temperature Measurement, Probe Number = 2, T = 20.103000 C 11:05:47 Temperature Measurement, Probe Number = 3, T = 20.046000 C 11:05:48 Temperature Measurement, Probe Number = 4, T = 20.390000 C 11:05:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.39 11:05:48 Integrated Voltage Measurement... 11:06:08 Voltage Offset Correction: v_off_ini = 0.000004057 V, v_off_fin = 0.000006907 V 11:06:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171031032 Vs 11:06:08 Integrated Voltage Measurement... 11:06:27 Voltage Offset Correction: v_off_ini = 0.000006222 V, v_off_fin = 0.000003313 V 11:06:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951146 Vs 11:36:30 Temperature Measurement, Probe Number = 0, T = 20.119000 C 11:36:31 Temperature Measurement, Probe Number = 1, T = 20.045000 C 11:36:32 Temperature Measurement, Probe Number = 2, T = 20.110000 C 11:36:32 Temperature Measurement, Probe Number = 3, T = 20.056000 C 11:36:33 Temperature Measurement, Probe Number = 4, T = 20.423000 C 11:36:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.42 11:36:33 Integrated Voltage Measurement... 11:36:52 Voltage Offset Correction: v_off_ini = 0.000005267 V, v_off_fin = 0.000006715 V 11:36:53 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171085455 Vs 11:36:53 Integrated Voltage Measurement... 11:37:12 Voltage Offset Correction: v_off_ini = 0.000006633 V, v_off_fin = 0.000002870 V 11:37:12 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170954830 Vs 11:37:15 Temperature Measurement, Probe Number = 0, T = 20.119000 C 11:37:16 Temperature Measurement, Probe Number = 1, T = 20.047000 C 11:37:16 Temperature Measurement, Probe Number = 2, T = 20.110000 C 11:37:17 Temperature Measurement, Probe Number = 3, T = 20.057000 C 11:37:18 Temperature Measurement, Probe Number = 4, T = 20.480000 C 11:37:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.48 11:37:18 Integrated Voltage Measurement... 11:37:37 Voltage Offset Correction: v_off_ini = 0.000003459 V, v_off_fin = 0.000006334 V 11:37:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017164 Vs 11:37:37 Integrated Voltage Measurement... 11:37:57 Voltage Offset Correction: v_off_ini = 0.000005937 V, v_off_fin = 0.000003060 V 11:37:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953928 Vs 11:37:59 Temperature Measurement, Probe Number = 0, T = 20.119000 C 11:38:00 Temperature Measurement, Probe Number = 1, T = 20.045000 C 11:38:01 Temperature Measurement, Probe Number = 2, T = 20.112000 C 11:38:01 Temperature Measurement, Probe Number = 3, T = 20.056000 C 11:38:02 Temperature Measurement, Probe Number = 4, T = 20.507000 C 11:38:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.51 11:38:02 Integrated Voltage Measurement... 11:38:22 Voltage Offset Correction: v_off_ini = 0.000004265 V, v_off_fin = 0.000005601 V 11:38:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171022190 Vs 11:38:22 Integrated Voltage Measurement... 11:38:41 Voltage Offset Correction: v_off_ini = 0.000005598 V, v_off_fin = 0.000002601 V 11:38:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961402 Vs 11:38:44 Temperature Measurement, Probe Number = 0, T = 20.116000 C 11:38:45 Temperature Measurement, Probe Number = 1, T = 20.040000 C 11:38:45 Temperature Measurement, Probe Number = 2, T = 20.108000 C 11:38:46 Temperature Measurement, Probe Number = 3, T = 20.052000 C 11:38:47 Temperature Measurement, Probe Number = 4, T = 20.479000 C 11:38:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.48 11:38:47 Integrated Voltage Measurement... 11:39:07 Voltage Offset Correction: v_off_ini = 0.000004350 V, v_off_fin = 0.000006385 V 11:39:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024720 Vs 11:39:07 Integrated Voltage Measurement... 11:39:26 Voltage Offset Correction: v_off_ini = 0.000005879 V, v_off_fin = 0.000002674 V 11:39:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170946443 Vs 11:39:29 Temperature Measurement, Probe Number = 0, T = 20.114000 C 11:39:29 Temperature Measurement, Probe Number = 1, T = 20.042000 C 11:39:30 Temperature Measurement, Probe Number = 2, T = 20.107000 C 11:39:31 Temperature Measurement, Probe Number = 3, T = 20.053000 C 11:39:31 Temperature Measurement, Probe Number = 4, T = 20.384000 C 11:39:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.38 11:39:32 Integrated Voltage Measurement... 11:39:51 Voltage Offset Correction: v_off_ini = 0.000004556 V, v_off_fin = 0.000007132 V 11:39:51 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171028957 Vs 11:39:51 Integrated Voltage Measurement... 11:40:11 Voltage Offset Correction: v_off_ini = 0.000006515 V, v_off_fin = 0.000003551 V 11:40:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170946432 Vs 11:40:14 Temperature Measurement, Probe Number = 0, T = 20.117000 C 11:40:14 Temperature Measurement, Probe Number = 1, T = 20.044000 C 11:40:15 Temperature Measurement, Probe Number = 2, T = 20.109000 C 11:40:15 Temperature Measurement, Probe Number = 3, T = 20.054000 C 11:40:16 Temperature Measurement, Probe Number = 4, T = 20.401000 C 11:40:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.40 11:40:16 Integrated Voltage Measurement... 11:40:35 Voltage Offset Correction: v_off_ini = 0.000004402 V, v_off_fin = 0.000006333 V 11:40:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171022235 Vs 11:40:36 Integrated Voltage Measurement... 11:40:55 Voltage Offset Correction: v_off_ini = 0.000006059 V, v_off_fin = 0.000002713 V 11:40:55 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170949947 Vs 11:40:58 Temperature Measurement, Probe Number = 0, T = 20.124000 C 11:40:58 Temperature Measurement, Probe Number = 1, T = 20.048000 C 11:40:59 Temperature Measurement, Probe Number = 2, T = 20.115000 C 11:41:00 Temperature Measurement, Probe Number = 3, T = 20.061000 C 11:41:00 Temperature Measurement, Probe Number = 4, T = 20.465000 C 11:41:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.46 11:41:01 Integrated Voltage Measurement... 11:41:20 Voltage Offset Correction: v_off_ini = 0.000004000 V, v_off_fin = 0.000006808 V 11:41:20 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171028281 Vs 11:41:20 Integrated Voltage Measurement... 11:41:39 Voltage Offset Correction: v_off_ini = 0.000005946 V, v_off_fin = 0.000003495 V 11:41:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950891 Vs 11:41:42 Temperature Measurement, Probe Number = 0, T = 20.118000 C 11:41:43 Temperature Measurement, Probe Number = 1, T = 20.042000 C 11:41:44 Temperature Measurement, Probe Number = 2, T = 20.109000 C 11:41:44 Temperature Measurement, Probe Number = 3, T = 20.055000 C 11:41:45 Temperature Measurement, Probe Number = 4, T = 20.490000 C 11:41:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.49 11:41:45 Integrated Voltage Measurement... 11:42:05 Voltage Offset Correction: v_off_ini = 0.000004413 V, v_off_fin = 0.000006924 V 11:42:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171026381 Vs 11:42:05 Integrated Voltage Measurement... 11:42:24 Voltage Offset Correction: v_off_ini = 0.000006195 V, v_off_fin = 0.000002653 V 11:42:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955415 Vs 11:42:27 Temperature Measurement, Probe Number = 0, T = 20.116000 C 11:42:27 Temperature Measurement, Probe Number = 1, T = 20.042000 C 11:42:28 Temperature Measurement, Probe Number = 2, T = 20.107000 C 11:42:29 Temperature Measurement, Probe Number = 3, T = 20.052000 C 11:42:29 Temperature Measurement, Probe Number = 4, T = 20.447000 C 11:42:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.45 11:42:30 Integrated Voltage Measurement... 11:42:49 Voltage Offset Correction: v_off_ini = 0.000003493 V, v_off_fin = 0.000005488 V 11:42:49 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171020340 Vs 11:42:49 Integrated Voltage Measurement... 11:43:08 Voltage Offset Correction: v_off_ini = 0.000005859 V, v_off_fin = 0.000003028 V 11:43:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954283 Vs 11:43:11 Temperature Measurement, Probe Number = 0, T = 20.115000 C 11:43:11 Temperature Measurement, Probe Number = 1, T = 20.043000 C 11:43:12 Temperature Measurement, Probe Number = 2, T = 20.106000 C 11:43:13 Temperature Measurement, Probe Number = 3, T = 20.052000 C 11:43:13 Temperature Measurement, Probe Number = 4, T = 20.360000 C 11:43:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.36 11:43:14 Integrated Voltage Measurement... 11:43:33 Voltage Offset Correction: v_off_ini = 0.000003907 V, v_off_fin = 0.000006501 V 11:43:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171026053 Vs 11:43:33 Integrated Voltage Measurement... 11:43:53 Voltage Offset Correction: v_off_ini = 0.000005699 V, v_off_fin = 0.000002973 V 11:43:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953248 Vs 12:13:56 Temperature Measurement, Probe Number = 0, T = 20.121000 C 12:13:56 Temperature Measurement, Probe Number = 1, T = 20.043000 C 12:13:57 Temperature Measurement, Probe Number = 2, T = 20.112000 C 12:13:58 Temperature Measurement, Probe Number = 3, T = 20.056000 C 12:13:58 Temperature Measurement, Probe Number = 4, T = 20.488000 C 12:13:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.49 12:13:59 Integrated Voltage Measurement... 12:14:18 Voltage Offset Correction: v_off_ini = 0.000004558 V, v_off_fin = 0.000005805 V 12:14:18 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171069749 Vs 12:14:18 Integrated Voltage Measurement... 12:14:38 Voltage Offset Correction: v_off_ini = 0.000005322 V, v_off_fin = 0.000002404 V 12:14:38 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170953494 Vs 12:14:40 Temperature Measurement, Probe Number = 0, T = 20.125000 C 12:14:41 Temperature Measurement, Probe Number = 1, T = 20.050000 C 12:14:42 Temperature Measurement, Probe Number = 2, T = 20.114000 C 12:14:42 Temperature Measurement, Probe Number = 3, T = 20.060000 C 12:14:43 Temperature Measurement, Probe Number = 4, T = 20.535000 C 12:14:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.54 12:14:43 Integrated Voltage Measurement... 12:15:03 Voltage Offset Correction: v_off_ini = 0.000003736 V, v_off_fin = 0.000006298 V 12:15:03 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171018481 Vs 12:15:03 Integrated Voltage Measurement... 12:15:22 Voltage Offset Correction: v_off_ini = 0.000005912 V, v_off_fin = 0.000002844 V 12:15:22 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170949636 Vs 12:15:25 Temperature Measurement, Probe Number = 0, T = 20.128000 C 12:15:26 Temperature Measurement, Probe Number = 1, T = 20.053000 C 12:15:26 Temperature Measurement, Probe Number = 2, T = 20.120000 C 12:15:27 Temperature Measurement, Probe Number = 3, T = 20.064000 C 12:15:27 Temperature Measurement, Probe Number = 4, T = 20.556000 C 12:15:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.56 12:15:28 Integrated Voltage Measurement... 12:15:47 Voltage Offset Correction: v_off_ini = 0.000003920 V, v_off_fin = 0.000006797 V 12:15:47 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171021381 Vs 12:15:47 Integrated Voltage Measurement... 12:16:07 Voltage Offset Correction: v_off_ini = 0.000005941 V, v_off_fin = 0.000003144 V 12:16:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954175 Vs 12:16:10 Temperature Measurement, Probe Number = 0, T = 20.124000 C 12:16:10 Temperature Measurement, Probe Number = 1, T = 20.048000 C 12:16:11 Temperature Measurement, Probe Number = 2, T = 20.114000 C 12:16:12 Temperature Measurement, Probe Number = 3, T = 20.058000 C 12:16:12 Temperature Measurement, Probe Number = 4, T = 20.519000 C 12:16:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.52 12:16:12 Integrated Voltage Measurement... 12:16:33 Voltage Offset Correction: v_off_ini = 0.000004319 V, v_off_fin = 0.000006150 V 12:16:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171019342 Vs 12:16:33 Integrated Voltage Measurement... 12:16:52 Voltage Offset Correction: v_off_ini = 0.000005852 V, v_off_fin = 0.000002447 V 12:16:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949644 Vs 12:16:55 Temperature Measurement, Probe Number = 0, T = 20.123000 C 12:16:55 Temperature Measurement, Probe Number = 1, T = 20.050000 C 12:16:56 Temperature Measurement, Probe Number = 2, T = 20.113000 C 12:16:57 Temperature Measurement, Probe Number = 3, T = 20.059000 C 12:16:57 Temperature Measurement, Probe Number = 4, T = 20.414000 C 12:16:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.41 12:16:58 Integrated Voltage Measurement... 12:17:17 Voltage Offset Correction: v_off_ini = 0.000004207 V, v_off_fin = 0.000006169 V 12:17:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171020242 Vs 12:17:17 Integrated Voltage Measurement... 12:17:36 Voltage Offset Correction: v_off_ini = 0.000005822 V, v_off_fin = 0.000002614 V 12:17:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948460 Vs 12:17:39 Temperature Measurement, Probe Number = 0, T = 20.129000 C 12:17:40 Temperature Measurement, Probe Number = 1, T = 20.054000 C 12:17:40 Temperature Measurement, Probe Number = 2, T = 20.119000 C 12:17:41 Temperature Measurement, Probe Number = 3, T = 20.064000 C 12:17:42 Temperature Measurement, Probe Number = 4, T = 20.476000 C 12:17:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.48 12:17:42 Integrated Voltage Measurement... 12:18:01 Voltage Offset Correction: v_off_ini = 0.000004019 V, v_off_fin = 0.000005765 V 12:18:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171018624 Vs 12:18:02 Integrated Voltage Measurement... 12:18:21 Voltage Offset Correction: v_off_ini = 0.000005258 V, v_off_fin = 0.000002083 V 12:18:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954920 Vs 12:18:24 Temperature Measurement, Probe Number = 0, T = 20.129000 C 12:18:24 Temperature Measurement, Probe Number = 1, T = 20.054000 C 12:18:25 Temperature Measurement, Probe Number = 2, T = 20.120000 C 12:18:26 Temperature Measurement, Probe Number = 3, T = 20.065000 C 12:18:26 Temperature Measurement, Probe Number = 4, T = 20.539000 C 12:18:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.54 12:18:27 Integrated Voltage Measurement... 12:18:46 Voltage Offset Correction: v_off_ini = 0.000004063 V, v_off_fin = 0.000006515 V 12:18:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171022295 Vs 12:18:46 Integrated Voltage Measurement... 12:19:05 Voltage Offset Correction: v_off_ini = 0.000006411 V, v_off_fin = 0.000003053 V 12:19:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948924 Vs 12:19:08 Temperature Measurement, Probe Number = 0, T = 20.133000 C 12:19:09 Temperature Measurement, Probe Number = 1, T = 20.060000 C 12:19:10 Temperature Measurement, Probe Number = 2, T = 20.121000 C 12:19:10 Temperature Measurement, Probe Number = 3, T = 20.067000 C 12:19:11 Temperature Measurement, Probe Number = 4, T = 20.539000 C 12:19:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.54 12:19:11 Integrated Voltage Measurement... 12:19:30 Voltage Offset Correction: v_off_ini = 0.000003812 V, v_off_fin = 0.000006768 V 12:19:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171022887 Vs 12:19:31 Integrated Voltage Measurement... 12:19:50 Voltage Offset Correction: v_off_ini = 0.000005873 V, v_off_fin = 0.000003283 V 12:19:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950836 Vs 12:19:53 Temperature Measurement, Probe Number = 0, T = 20.135000 C 12:19:54 Temperature Measurement, Probe Number = 1, T = 20.061000 C 12:19:54 Temperature Measurement, Probe Number = 2, T = 20.123000 C 12:19:55 Temperature Measurement, Probe Number = 3, T = 20.070000 C 12:19:56 Temperature Measurement, Probe Number = 4, T = 20.587000 C 12:19:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.59 12:19:56 Integrated Voltage Measurement... 12:20:15 Voltage Offset Correction: v_off_ini = 0.000003986 V, v_off_fin = 0.000006240 V 12:20:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171019112 Vs 12:20:16 Integrated Voltage Measurement... 12:20:35 Voltage Offset Correction: v_off_ini = 0.000005829 V, v_off_fin = 0.000002942 V 12:20:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953088 Vs 12:20:38 Temperature Measurement, Probe Number = 0, T = 20.137000 C 12:20:39 Temperature Measurement, Probe Number = 1, T = 20.060000 C 12:20:39 Temperature Measurement, Probe Number = 2, T = 20.126000 C 12:20:40 Temperature Measurement, Probe Number = 3, T = 20.069000 C 12:20:41 Temperature Measurement, Probe Number = 4, T = 20.604000 C 12:20:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.60 12:20:41 Integrated Voltage Measurement... 12:21:00 Voltage Offset Correction: v_off_ini = 0.000004041 V, v_off_fin = 0.000006264 V 12:21:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171021710 Vs 12:21:01 Integrated Voltage Measurement... 12:21:20 Voltage Offset Correction: v_off_ini = 0.000006168 V, v_off_fin = 0.000002977 V 12:21:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948491 Vs 12:51:23 Temperature Measurement, Probe Number = 0, T = 20.130000 C 12:51:24 Temperature Measurement, Probe Number = 1, T = 20.055000 C 12:51:24 Temperature Measurement, Probe Number = 2, T = 20.120000 C 12:51:25 Temperature Measurement, Probe Number = 3, T = 20.065000 C 12:51:26 Temperature Measurement, Probe Number = 4, T = 20.418000 C 12:51:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.42 12:51:26 Integrated Voltage Measurement... 12:51:45 Voltage Offset Correction: v_off_ini = 0.000004880 V, v_off_fin = 0.000006370 V 12:51:45 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171064372 Vs 12:51:45 Integrated Voltage Measurement... 12:52:05 Voltage Offset Correction: v_off_ini = 0.000006044 V, v_off_fin = 0.000002943 V 12:52:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948955 Vs 12:52:07 Temperature Measurement, Probe Number = 0, T = 20.135000 C 12:52:08 Temperature Measurement, Probe Number = 1, T = 20.059000 C 12:52:09 Temperature Measurement, Probe Number = 2, T = 20.122000 C 12:52:09 Temperature Measurement, Probe Number = 3, T = 20.066000 C 12:52:10 Temperature Measurement, Probe Number = 4, T = 20.492000 C 12:52:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.49 12:52:10 Integrated Voltage Measurement... 12:52:29 Voltage Offset Correction: v_off_ini = 0.000003584 V, v_off_fin = 0.000006291 V 12:52:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020204 Vs 12:52:30 Integrated Voltage Measurement... 12:52:49 Voltage Offset Correction: v_off_ini = 0.000006176 V, v_off_fin = 0.000003146 V 12:52:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949442 Vs 12:52:52 Temperature Measurement, Probe Number = 0, T = 20.137000 C 12:52:53 Temperature Measurement, Probe Number = 1, T = 20.061000 C 12:52:53 Temperature Measurement, Probe Number = 2, T = 20.125000 C 12:52:54 Temperature Measurement, Probe Number = 3, T = 20.070000 C 12:52:55 Temperature Measurement, Probe Number = 4, T = 20.609000 C 12:52:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.61 12:52:55 Integrated Voltage Measurement... 12:53:14 Voltage Offset Correction: v_off_ini = 0.000003293 V, v_off_fin = 0.000007025 V 12:53:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025130 Vs 12:53:14 Integrated Voltage Measurement... 12:53:34 Voltage Offset Correction: v_off_ini = 0.000006267 V, v_off_fin = 0.000003471 V 12:53:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170943069 Vs 12:53:36 Temperature Measurement, Probe Number = 0, T = 20.138000 C 12:53:37 Temperature Measurement, Probe Number = 1, T = 20.060000 C 12:53:38 Temperature Measurement, Probe Number = 2, T = 20.129000 C 12:53:38 Temperature Measurement, Probe Number = 3, T = 20.071000 C 12:53:39 Temperature Measurement, Probe Number = 4, T = 20.661000 C 12:53:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.66 12:53:39 Integrated Voltage Measurement... 12:53:59 Voltage Offset Correction: v_off_ini = 0.000004249 V, v_off_fin = 0.000006417 V 12:53:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171022600 Vs 12:53:59 Integrated Voltage Measurement... 12:54:18 Voltage Offset Correction: v_off_ini = 0.000005962 V, v_off_fin = 0.000002660 V 12:54:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949870 Vs 12:54:21 Temperature Measurement, Probe Number = 0, T = 20.134000 C 12:54:22 Temperature Measurement, Probe Number = 1, T = 20.057000 C 12:54:22 Temperature Measurement, Probe Number = 2, T = 20.125000 C 12:54:23 Temperature Measurement, Probe Number = 3, T = 20.065000 C 12:54:24 Temperature Measurement, Probe Number = 4, T = 20.609000 C 12:54:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.61 12:54:24 Integrated Voltage Measurement... 12:54:43 Voltage Offset Correction: v_off_ini = 0.000004388 V, v_off_fin = 0.000005811 V 12:54:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020337 Vs 12:54:44 Integrated Voltage Measurement... 12:55:03 Voltage Offset Correction: v_off_ini = 0.000005821 V, v_off_fin = 0.000003317 V 12:55:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170947486 Vs 12:55:05 Temperature Measurement, Probe Number = 0, T = 20.131000 C 12:55:06 Temperature Measurement, Probe Number = 1, T = 20.053000 C 12:55:07 Temperature Measurement, Probe Number = 2, T = 20.121000 C 12:55:07 Temperature Measurement, Probe Number = 3, T = 20.063000 C 12:55:08 Temperature Measurement, Probe Number = 4, T = 20.605000 C 12:55:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.61 12:55:08 Integrated Voltage Measurement... 12:55:28 Voltage Offset Correction: v_off_ini = 0.000004029 V, v_off_fin = 0.000006617 V 12:55:28 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171026464 Vs 12:55:28 Integrated Voltage Measurement... 12:55:48 Voltage Offset Correction: v_off_ini = 0.000005983 V, v_off_fin = 0.000002947 V 12:55:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170946875 Vs 12:55:51 Temperature Measurement, Probe Number = 0, T = 20.137000 C 12:55:51 Temperature Measurement, Probe Number = 1, T = 20.059000 C 12:55:52 Temperature Measurement, Probe Number = 2, T = 20.123000 C 12:55:53 Temperature Measurement, Probe Number = 3, T = 20.066000 C 12:55:53 Temperature Measurement, Probe Number = 4, T = 20.568000 C 12:55:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.57 12:55:53 Integrated Voltage Measurement... 12:56:13 Voltage Offset Correction: v_off_ini = 0.000004219 V, v_off_fin = 0.000006249 V 12:56:13 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171019731 Vs 12:56:13 Integrated Voltage Measurement... 12:56:32 Voltage Offset Correction: v_off_ini = 0.000006061 V, v_off_fin = 0.000003157 V 12:56:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952223 Vs 12:56:35 Temperature Measurement, Probe Number = 0, T = 20.139000 C 12:56:36 Temperature Measurement, Probe Number = 1, T = 20.061000 C 12:56:37 Temperature Measurement, Probe Number = 2, T = 20.126000 C 12:56:37 Temperature Measurement, Probe Number = 3, T = 20.069000 C 12:56:38 Temperature Measurement, Probe Number = 4, T = 20.543000 C 12:56:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.54 12:56:38 Integrated Voltage Measurement... 12:56:57 Voltage Offset Correction: v_off_ini = 0.000004058 V, v_off_fin = 0.000005546 V 12:56:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171016446 Vs 12:56:58 Integrated Voltage Measurement... 12:57:17 Voltage Offset Correction: v_off_ini = 0.000005204 V, v_off_fin = 0.000002286 V 12:57:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958177 Vs 12:57:20 Temperature Measurement, Probe Number = 0, T = 20.139000 C 12:57:20 Temperature Measurement, Probe Number = 1, T = 20.061000 C 12:57:21 Temperature Measurement, Probe Number = 2, T = 20.127000 C 12:57:22 Temperature Measurement, Probe Number = 3, T = 20.069000 C 12:57:22 Temperature Measurement, Probe Number = 4, T = 20.579000 C 12:57:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.58 12:57:23 Integrated Voltage Measurement... 12:57:42 Voltage Offset Correction: v_off_ini = 0.000003517 V, v_off_fin = 0.000006069 V 12:57:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017248 Vs 12:57:42 Integrated Voltage Measurement... 12:58:01 Voltage Offset Correction: v_off_ini = 0.000005606 V, v_off_fin = 0.000002416 V 12:58:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956377 Vs 12:58:04 Temperature Measurement, Probe Number = 0, T = 20.136000 C 12:58:05 Temperature Measurement, Probe Number = 1, T = 20.057000 C 12:58:06 Temperature Measurement, Probe Number = 2, T = 20.124000 C 12:58:06 Temperature Measurement, Probe Number = 3, T = 20.066000 C 12:58:07 Temperature Measurement, Probe Number = 4, T = 20.457000 C 12:58:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.46 12:58:07 Integrated Voltage Measurement... 12:58:27 Voltage Offset Correction: v_off_ini = 0.000003374 V, v_off_fin = 0.000005904 V 12:58:27 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171012610 Vs 12:58:27 Integrated Voltage Measurement... 12:58:46 Voltage Offset Correction: v_off_ini = 0.000006184 V, v_off_fin = 0.000002538 V 12:58:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951760 Vs 13:28:49 Temperature Measurement, Probe Number = 0, T = 20.136000 C 13:28:50 Temperature Measurement, Probe Number = 1, T = 20.060000 C 13:28:50 Temperature Measurement, Probe Number = 2, T = 20.126000 C 13:28:51 Temperature Measurement, Probe Number = 3, T = 20.070000 C 13:28:52 Temperature Measurement, Probe Number = 4, T = 20.469000 C 13:28:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.47 13:28:52 Integrated Voltage Measurement... 13:29:11 Voltage Offset Correction: v_off_ini = 0.000004952 V, v_off_fin = 0.000005589 V 13:29:12 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171069169 Vs 13:29:12 Integrated Voltage Measurement... 13:29:31 Voltage Offset Correction: v_off_ini = 0.000005433 V, v_off_fin = 0.000003457 V 13:29:31 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170943157 Vs 13:29:34 Temperature Measurement, Probe Number = 0, T = 20.139000 C 13:29:35 Temperature Measurement, Probe Number = 1, T = 20.067000 C 13:29:35 Temperature Measurement, Probe Number = 2, T = 20.128000 C 13:29:36 Temperature Measurement, Probe Number = 3, T = 20.074000 C 13:29:36 Temperature Measurement, Probe Number = 4, T = 20.493000 C 13:29:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.49 13:29:37 Integrated Voltage Measurement... 13:29:56 Voltage Offset Correction: v_off_ini = 0.000004329 V, v_off_fin = 0.000006729 V 13:29:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171018768 Vs 13:29:56 Integrated Voltage Measurement... 13:30:16 Voltage Offset Correction: v_off_ini = 0.000005989 V, v_off_fin = 0.000002590 V 13:30:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952840 Vs 13:30:18 Temperature Measurement, Probe Number = 0, T = 20.142000 C 13:30:19 Temperature Measurement, Probe Number = 1, T = 20.068000 C 13:30:20 Temperature Measurement, Probe Number = 2, T = 20.132000 C 13:30:20 Temperature Measurement, Probe Number = 3, T = 20.076000 C 13:30:21 Temperature Measurement, Probe Number = 4, T = 20.538000 C 13:30:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.54 13:30:21 Integrated Voltage Measurement... 13:30:41 Voltage Offset Correction: v_off_ini = 0.000004074 V, v_off_fin = 0.000006299 V 13:30:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171021416 Vs 13:30:41 Integrated Voltage Measurement... 13:31:00 Voltage Offset Correction: v_off_ini = 0.000005503 V, v_off_fin = 0.000003120 V 13:31:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951728 Vs 13:31:03 Temperature Measurement, Probe Number = 0, T = 20.140000 C 13:31:03 Temperature Measurement, Probe Number = 1, T = 20.068000 C 13:31:04 Temperature Measurement, Probe Number = 2, T = 20.130000 C 13:31:05 Temperature Measurement, Probe Number = 3, T = 20.075000 C 13:31:05 Temperature Measurement, Probe Number = 4, T = 20.571000 C 13:31:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.57 13:31:06 Integrated Voltage Measurement... 13:31:25 Voltage Offset Correction: v_off_ini = 0.000003807 V, v_off_fin = 0.000005928 V 13:31:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171021613 Vs 13:31:25 Integrated Voltage Measurement... 13:31:45 Voltage Offset Correction: v_off_ini = 0.000005671 V, v_off_fin = 0.000002098 V 13:31:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955408 Vs 13:31:47 Temperature Measurement, Probe Number = 0, T = 20.141000 C 13:31:48 Temperature Measurement, Probe Number = 1, T = 20.067000 C 13:31:49 Temperature Measurement, Probe Number = 2, T = 20.129000 C 13:31:49 Temperature Measurement, Probe Number = 3, T = 20.074000 C 13:31:50 Temperature Measurement, Probe Number = 4, T = 20.564000 C 13:31:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.56 13:31:50 Integrated Voltage Measurement... 13:32:11 Voltage Offset Correction: v_off_ini = 0.000003341 V, v_off_fin = 0.000005715 V 13:32:11 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171015174 Vs 13:32:11 Integrated Voltage Measurement... 13:32:30 Voltage Offset Correction: v_off_ini = 0.000005147 V, v_off_fin = 0.000002477 V 13:32:30 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170951028 Vs 13:32:33 Temperature Measurement, Probe Number = 0, T = 20.139000 C 13:32:34 Temperature Measurement, Probe Number = 1, T = 20.067000 C 13:32:35 Temperature Measurement, Probe Number = 2, T = 20.126000 C 13:32:35 Temperature Measurement, Probe Number = 3, T = 20.073000 C 13:32:36 Temperature Measurement, Probe Number = 4, T = 20.528000 C 13:32:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.53 13:32:36 Integrated Voltage Measurement... 13:32:56 Voltage Offset Correction: v_off_ini = 0.000003964 V, v_off_fin = 0.000005856 V 13:32:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171018465 Vs 13:32:56 Integrated Voltage Measurement... 13:33:15 Voltage Offset Correction: v_off_ini = 0.000005354 V, v_off_fin = 0.000002695 V 13:33:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170947684 Vs 13:33:18 Temperature Measurement, Probe Number = 0, T = 20.140000 C 13:33:19 Temperature Measurement, Probe Number = 1, T = 20.069000 C 13:33:19 Temperature Measurement, Probe Number = 2, T = 20.128000 C 13:33:20 Temperature Measurement, Probe Number = 3, T = 20.075000 C 13:33:21 Temperature Measurement, Probe Number = 4, T = 20.493000 C 13:33:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.49 13:33:21 Integrated Voltage Measurement... 13:33:40 Voltage Offset Correction: v_off_ini = 0.000003453 V, v_off_fin = 0.000005836 V 13:33:40 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171017518 Vs 13:33:40 Integrated Voltage Measurement... 13:33:59 Voltage Offset Correction: v_off_ini = 0.000005434 V, v_off_fin = 0.000002524 V 13:33:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949855 Vs 13:34:02 Temperature Measurement, Probe Number = 0, T = 20.144000 C 13:34:03 Temperature Measurement, Probe Number = 1, T = 20.069000 C 13:34:03 Temperature Measurement, Probe Number = 2, T = 20.132000 C 13:34:04 Temperature Measurement, Probe Number = 3, T = 20.077000 C 13:34:05 Temperature Measurement, Probe Number = 4, T = 20.562000 C 13:34:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.56 13:34:05 Integrated Voltage Measurement... 13:34:24 Voltage Offset Correction: v_off_ini = 0.000003880 V, v_off_fin = 0.000005896 V 13:34:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171021791 Vs 13:34:25 Integrated Voltage Measurement... 13:34:44 Voltage Offset Correction: v_off_ini = 0.000005285 V, v_off_fin = 0.000002742 V 13:34:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170947361 Vs 13:34:46 Temperature Measurement, Probe Number = 0, T = 20.141000 C 13:34:47 Temperature Measurement, Probe Number = 1, T = 20.066000 C 13:34:48 Temperature Measurement, Probe Number = 2, T = 20.130000 C 13:34:48 Temperature Measurement, Probe Number = 3, T = 20.076000 C 13:34:49 Temperature Measurement, Probe Number = 4, T = 20.575000 C 13:34:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.57 13:34:49 Integrated Voltage Measurement... 13:35:08 Voltage Offset Correction: v_off_ini = 0.000004427 V, v_off_fin = 0.000006375 V 13:35:08 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171022334 Vs 13:35:09 Integrated Voltage Measurement... 13:35:28 Voltage Offset Correction: v_off_ini = 0.000005486 V, v_off_fin = 0.000002852 V 13:35:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953752 Vs 13:35:31 Temperature Measurement, Probe Number = 0, T = 20.139000 C 13:35:32 Temperature Measurement, Probe Number = 1, T = 20.067000 C 13:35:32 Temperature Measurement, Probe Number = 2, T = 20.128000 C 13:35:33 Temperature Measurement, Probe Number = 3, T = 20.075000 C 13:35:33 Temperature Measurement, Probe Number = 4, T = 20.513000 C 13:35:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.51 13:35:34 Integrated Voltage Measurement... 13:35:54 Voltage Offset Correction: v_off_ini = 0.000003529 V, v_off_fin = 0.000006145 V 13:35:54 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171019860 Vs 13:35:54 Integrated Voltage Measurement... 13:36:13 Voltage Offset Correction: v_off_ini = 0.000005800 V, v_off_fin = 0.000003221 V 13:36:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953336 Vs 14:06:16 Temperature Measurement, Probe Number = 0, T = 20.145000 C 14:06:17 Temperature Measurement, Probe Number = 1, T = 20.073000 C 14:06:18 Temperature Measurement, Probe Number = 2, T = 20.134000 C 14:06:18 Temperature Measurement, Probe Number = 3, T = 20.081000 C 14:06:19 Temperature Measurement, Probe Number = 4, T = 20.474000 C 14:06:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.47 14:06:19 Integrated Voltage Measurement... 14:06:38 Voltage Offset Correction: v_off_ini = 0.000005247 V, v_off_fin = 0.000006363 V 14:06:38 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171071600 Vs 14:06:39 Integrated Voltage Measurement... 14:06:58 Voltage Offset Correction: v_off_ini = 0.000005441 V, v_off_fin = 0.000003187 V 14:06:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957233 Vs 14:07:01 Temperature Measurement, Probe Number = 0, T = 20.143000 C 14:07:02 Temperature Measurement, Probe Number = 1, T = 20.072000 C 14:07:02 Temperature Measurement, Probe Number = 2, T = 20.131000 C 14:07:03 Temperature Measurement, Probe Number = 3, T = 20.079000 C 14:07:04 Temperature Measurement, Probe Number = 4, T = 20.425000 C 14:07:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.43 14:07:04 Integrated Voltage Measurement... 14:07:23 Voltage Offset Correction: v_off_ini = 0.000003431 V, v_off_fin = 0.000006428 V 14:07:23 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171020952 Vs 14:07:24 Integrated Voltage Measurement... 14:07:43 Voltage Offset Correction: v_off_ini = 0.000006005 V, v_off_fin = 0.000002831 V 14:07:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953344 Vs 14:07:46 Temperature Measurement, Probe Number = 0, T = 20.143000 C 14:07:46 Temperature Measurement, Probe Number = 1, T = 20.072000 C 14:07:47 Temperature Measurement, Probe Number = 2, T = 20.131000 C 14:07:48 Temperature Measurement, Probe Number = 3, T = 20.077000 C 14:07:48 Temperature Measurement, Probe Number = 4, T = 20.337000 C 14:07:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.34 14:07:49 Integrated Voltage Measurement... 14:08:08 Voltage Offset Correction: v_off_ini = 0.000003835 V, v_off_fin = 0.000006329 V 14:08:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171022038 Vs 14:08:08 Integrated Voltage Measurement... 14:08:27 Voltage Offset Correction: v_off_ini = 0.000005663 V, v_off_fin = 0.000003183 V 14:08:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949544 Vs 14:08:30 Temperature Measurement, Probe Number = 0, T = 20.143000 C 14:08:31 Temperature Measurement, Probe Number = 1, T = 20.068000 C 14:08:32 Temperature Measurement, Probe Number = 2, T = 20.131000 C 14:08:32 Temperature Measurement, Probe Number = 3, T = 20.075000 C 14:08:33 Temperature Measurement, Probe Number = 4, T = 20.284000 C 14:08:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.28 14:08:33 Integrated Voltage Measurement... 14:08:52 Voltage Offset Correction: v_off_ini = 0.000004203 V, v_off_fin = 0.000006417 V 14:08:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025115 Vs 14:08:53 Integrated Voltage Measurement... 14:09:13 Voltage Offset Correction: v_off_ini = 0.000005820 V, v_off_fin = 0.000003549 V 14:09:13 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170949199 Vs 14:09:15 Temperature Measurement, Probe Number = 0, T = 20.144000 C 14:09:16 Temperature Measurement, Probe Number = 1, T = 20.072000 C 14:09:17 Temperature Measurement, Probe Number = 2, T = 20.131000 C 14:09:17 Temperature Measurement, Probe Number = 3, T = 20.076000 C 14:09:18 Temperature Measurement, Probe Number = 4, T = 20.266000 C 14:09:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.27 14:09:18 Integrated Voltage Measurement... 14:09:37 Voltage Offset Correction: v_off_ini = 0.000004342 V, v_off_fin = 0.000006021 V 14:09:38 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171015893 Vs 14:09:38 Integrated Voltage Measurement... 14:09:57 Voltage Offset Correction: v_off_ini = 0.000005591 V, v_off_fin = 0.000003321 V 14:09:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951945 Vs 14:10:00 Temperature Measurement, Probe Number = 0, T = 20.142000 C 14:10:01 Temperature Measurement, Probe Number = 1, T = 20.069000 C 14:10:01 Temperature Measurement, Probe Number = 2, T = 20.130000 C 14:10:02 Temperature Measurement, Probe Number = 3, T = 20.075000 C 14:10:02 Temperature Measurement, Probe Number = 4, T = 20.218000 C 14:10:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.22 14:10:03 Integrated Voltage Measurement... 14:10:22 Voltage Offset Correction: v_off_ini = 0.000004382 V, v_off_fin = 0.000006408 V 14:10:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020866 Vs 14:10:22 Integrated Voltage Measurement... 14:10:41 Voltage Offset Correction: v_off_ini = 0.000005863 V, v_off_fin = 0.000003162 V 14:10:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952022 Vs 14:10:44 Temperature Measurement, Probe Number = 0, T = 20.137000 C 14:10:45 Temperature Measurement, Probe Number = 1, T = 20.065000 C 14:10:46 Temperature Measurement, Probe Number = 2, T = 20.126000 C 14:10:46 Temperature Measurement, Probe Number = 3, T = 20.073000 C 14:10:47 Temperature Measurement, Probe Number = 4, T = 20.134000 C 14:10:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.13 14:10:47 Integrated Voltage Measurement... 14:11:06 Voltage Offset Correction: v_off_ini = 0.000003984 V, v_off_fin = 0.000005754 V 14:11:06 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171015783 Vs 14:11:07 Integrated Voltage Measurement... 14:11:26 Voltage Offset Correction: v_off_ini = 0.000005595 V, v_off_fin = 0.000002525 V 14:11:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952177 Vs 14:11:28 Temperature Measurement, Probe Number = 0, T = 20.137000 C 14:11:29 Temperature Measurement, Probe Number = 1, T = 20.069000 C 14:11:30 Temperature Measurement, Probe Number = 2, T = 20.126000 C 14:11:30 Temperature Measurement, Probe Number = 3, T = 20.074000 C 14:11:31 Temperature Measurement, Probe Number = 4, T = 20.265000 C 14:11:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.27 14:11:31 Integrated Voltage Measurement... 14:11:50 Voltage Offset Correction: v_off_ini = 0.000003487 V, v_off_fin = 0.000006317 V 14:11:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020402 Vs 14:11:51 Integrated Voltage Measurement... 14:12:10 Voltage Offset Correction: v_off_ini = 0.000005663 V, v_off_fin = 0.000002723 V 14:12:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950109 Vs 14:12:13 Temperature Measurement, Probe Number = 0, T = 20.143000 C 14:12:13 Temperature Measurement, Probe Number = 1, T = 20.072000 C 14:12:14 Temperature Measurement, Probe Number = 2, T = 20.132000 C 14:12:15 Temperature Measurement, Probe Number = 3, T = 20.076000 C 14:12:15 Temperature Measurement, Probe Number = 4, T = 20.279000 C 14:12:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.28 14:12:15 Integrated Voltage Measurement... 14:12:35 Voltage Offset Correction: v_off_ini = 0.000003618 V, v_off_fin = 0.000006397 V 14:12:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023308 Vs 14:12:35 Integrated Voltage Measurement... 14:12:54 Voltage Offset Correction: v_off_ini = 0.000006023 V, v_off_fin = 0.000002813 V 14:12:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951018 Vs 14:12:57 Temperature Measurement, Probe Number = 0, T = 20.146000 C 14:12:58 Temperature Measurement, Probe Number = 1, T = 20.072000 C 14:12:58 Temperature Measurement, Probe Number = 2, T = 20.132000 C 14:12:59 Temperature Measurement, Probe Number = 3, T = 20.077000 C 14:13:00 Temperature Measurement, Probe Number = 4, T = 20.225000 C 14:13:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.23 14:13:00 Integrated Voltage Measurement... 14:13:19 Voltage Offset Correction: v_off_ini = 0.000003922 V, v_off_fin = 0.000005989 V 14:13:19 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171018231 Vs 14:13:19 Integrated Voltage Measurement... 14:13:38 Voltage Offset Correction: v_off_ini = 0.000005768 V, v_off_fin = 0.000003653 V 14:13:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948576 Vs 14:43:41 Temperature Measurement, Probe Number = 0, T = 20.142000 C 14:43:42 Temperature Measurement, Probe Number = 1, T = 20.072000 C 14:43:43 Temperature Measurement, Probe Number = 2, T = 20.131000 C 14:43:44 Temperature Measurement, Probe Number = 3, T = 20.079000 C 14:43:44 Temperature Measurement, Probe Number = 4, T = 20.337000 C 14:43:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.34 14:43:44 Integrated Voltage Measurement... 14:44:04 Voltage Offset Correction: v_off_ini = 0.000005078 V, v_off_fin = 0.000006611 V 14:44:04 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171074111 Vs 14:44:04 Integrated Voltage Measurement... 14:44:23 Voltage Offset Correction: v_off_ini = 0.000006030 V, v_off_fin = 0.000003107 V 14:44:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170947564 Vs 14:44:26 Temperature Measurement, Probe Number = 0, T = 20.145000 C 14:44:27 Temperature Measurement, Probe Number = 1, T = 20.069000 C 14:44:28 Temperature Measurement, Probe Number = 2, T = 20.133000 C 14:44:28 Temperature Measurement, Probe Number = 3, T = 20.078000 C 14:44:29 Temperature Measurement, Probe Number = 4, T = 20.262000 C 14:44:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.26 14:44:29 Integrated Voltage Measurement... 14:44:48 Voltage Offset Correction: v_off_ini = 0.000004598 V, v_off_fin = 0.000006474 V 14:44:49 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171023542 Vs 14:44:49 Integrated Voltage Measurement... 14:45:08 Voltage Offset Correction: v_off_ini = 0.000006088 V, v_off_fin = 0.000003396 V 14:45:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170945485 Vs 14:45:11 Temperature Measurement, Probe Number = 0, T = 20.152000 C 14:45:11 Temperature Measurement, Probe Number = 1, T = 20.078000 C 14:45:12 Temperature Measurement, Probe Number = 2, T = 20.137000 C 14:45:13 Temperature Measurement, Probe Number = 3, T = 20.082000 C 14:45:13 Temperature Measurement, Probe Number = 4, T = 20.329000 C 14:45:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.33 14:45:14 Integrated Voltage Measurement... 14:45:33 Voltage Offset Correction: v_off_ini = 0.000004615 V, v_off_fin = 0.000006249 V 14:45:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171021704 Vs 14:45:33 Integrated Voltage Measurement... 14:45:53 Voltage Offset Correction: v_off_ini = 0.000005892 V, v_off_fin = 0.000003556 V 14:45:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170947681 Vs 14:45:55 Temperature Measurement, Probe Number = 0, T = 20.152000 C 14:45:56 Temperature Measurement, Probe Number = 1, T = 20.077000 C 14:45:57 Temperature Measurement, Probe Number = 2, T = 20.135000 C 14:45:57 Temperature Measurement, Probe Number = 3, T = 20.080000 C 14:45:58 Temperature Measurement, Probe Number = 4, T = 20.353000 C 14:45:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.35 14:45:58 Integrated Voltage Measurement... 14:46:18 Voltage Offset Correction: v_off_ini = 0.000004380 V, v_off_fin = 0.000006202 V 14:46:18 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171016216 Vs 14:46:18 Integrated Voltage Measurement... 14:46:37 Voltage Offset Correction: v_off_ini = 0.000005422 V, v_off_fin = 0.000002928 V 14:46:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170947902 Vs 14:46:40 Temperature Measurement, Probe Number = 0, T = 20.154000 C 14:46:41 Temperature Measurement, Probe Number = 1, T = 20.080000 C 14:46:41 Temperature Measurement, Probe Number = 2, T = 20.139000 C 14:46:42 Temperature Measurement, Probe Number = 3, T = 20.083000 C 14:46:43 Temperature Measurement, Probe Number = 4, T = 20.382000 C 14:46:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.38 14:46:43 Integrated Voltage Measurement... 14:47:02 Voltage Offset Correction: v_off_ini = 0.000003725 V, v_off_fin = 0.000006368 V 14:47:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017066 Vs 14:47:02 Integrated Voltage Measurement... 14:47:22 Voltage Offset Correction: v_off_ini = 0.000005799 V, v_off_fin = 0.000003646 V 14:47:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170945156 Vs 14:47:25 Temperature Measurement, Probe Number = 0, T = 20.150000 C 14:47:25 Temperature Measurement, Probe Number = 1, T = 20.078000 C 14:47:26 Temperature Measurement, Probe Number = 2, T = 20.136000 C 14:47:27 Temperature Measurement, Probe Number = 3, T = 20.082000 C 14:47:27 Temperature Measurement, Probe Number = 4, T = 20.368000 C 14:47:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.37 14:47:27 Integrated Voltage Measurement... 14:47:47 Voltage Offset Correction: v_off_ini = 0.000004009 V, v_off_fin = 0.000006404 V 14:47:47 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171020019 Vs 14:47:47 Integrated Voltage Measurement... 14:48:06 Voltage Offset Correction: v_off_ini = 0.000006259 V, v_off_fin = 0.000003401 V 14:48:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170942284 Vs 14:48:09 Temperature Measurement, Probe Number = 0, T = 20.155000 C 14:48:10 Temperature Measurement, Probe Number = 1, T = 20.079000 C 14:48:10 Temperature Measurement, Probe Number = 2, T = 20.140000 C 14:48:11 Temperature Measurement, Probe Number = 3, T = 20.085000 C 14:48:12 Temperature Measurement, Probe Number = 4, T = 20.420000 C 14:48:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.42 14:48:12 Integrated Voltage Measurement... 14:48:31 Voltage Offset Correction: v_off_ini = 0.000004627 V, v_off_fin = 0.000006451 V 14:48:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171022517 Vs 14:48:31 Integrated Voltage Measurement... 14:48:51 Voltage Offset Correction: v_off_ini = 0.000006752 V, v_off_fin = 0.000003208 V 14:48:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170942289 Vs 14:48:54 Temperature Measurement, Probe Number = 0, T = 20.155000 C 14:48:54 Temperature Measurement, Probe Number = 1, T = 20.079000 C 14:48:55 Temperature Measurement, Probe Number = 2, T = 20.140000 C 14:48:56 Temperature Measurement, Probe Number = 3, T = 20.083000 C 14:48:56 Temperature Measurement, Probe Number = 4, T = 20.480000 C 14:48:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.48 14:48:56 Integrated Voltage Measurement... 14:49:16 Voltage Offset Correction: v_off_ini = 0.000004475 V, v_off_fin = 0.000006459 V 14:49:17 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171018503 Vs 14:49:17 Integrated Voltage Measurement... 14:49:36 Voltage Offset Correction: v_off_ini = 0.000006499 V, v_off_fin = 0.000003240 V 14:49:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170939104 Vs 14:49:39 Temperature Measurement, Probe Number = 0, T = 20.154000 C 14:49:39 Temperature Measurement, Probe Number = 1, T = 20.080000 C 14:49:40 Temperature Measurement, Probe Number = 2, T = 20.140000 C 14:49:41 Temperature Measurement, Probe Number = 3, T = 20.085000 C 14:49:41 Temperature Measurement, Probe Number = 4, T = 20.457000 C 14:49:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.46 14:49:42 Integrated Voltage Measurement... 14:50:01 Voltage Offset Correction: v_off_ini = 0.000004315 V, v_off_fin = 0.000006586 V 14:50:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171019880 Vs 14:50:01 Integrated Voltage Measurement... 14:50:20 Voltage Offset Correction: v_off_ini = 0.000006050 V, v_off_fin = 0.000003813 V 14:50:20 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170938136 Vs 14:50:23 Temperature Measurement, Probe Number = 0, T = 20.156000 C 14:50:24 Temperature Measurement, Probe Number = 1, T = 20.082000 C 14:50:24 Temperature Measurement, Probe Number = 2, T = 20.141000 C 14:50:25 Temperature Measurement, Probe Number = 3, T = 20.088000 C 14:50:26 Temperature Measurement, Probe Number = 4, T = 20.473000 C 14:50:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.47 14:50:26 Integrated Voltage Measurement... 14:50:45 Voltage Offset Correction: v_off_ini = 0.000004311 V, v_off_fin = 0.000006897 V 14:50:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020790 Vs 14:50:46 Integrated Voltage Measurement... 14:51:05 Voltage Offset Correction: v_off_ini = 0.000005954 V, v_off_fin = 0.000003221 V 14:51:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170941255 Vs 15:21:08 Temperature Measurement, Probe Number = 0, T = 20.159000 C 15:21:09 Temperature Measurement, Probe Number = 1, T = 20.083000 C 15:21:09 Temperature Measurement, Probe Number = 2, T = 20.148000 C 15:21:10 Temperature Measurement, Probe Number = 3, T = 20.092000 C 15:21:11 Temperature Measurement, Probe Number = 4, T = 20.595000 C 15:21:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.59 15:21:11 Integrated Voltage Measurement... 15:21:30 Voltage Offset Correction: v_off_ini = 0.000005579 V, v_off_fin = 0.000007011 V 15:21:30 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171072969 Vs 15:21:30 Integrated Voltage Measurement... 15:21:50 Voltage Offset Correction: v_off_ini = 0.000006047 V, v_off_fin = 0.000003812 V 15:21:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170940122 Vs 15:21:53 Temperature Measurement, Probe Number = 0, T = 20.158000 C 15:21:53 Temperature Measurement, Probe Number = 1, T = 20.084000 C 15:21:54 Temperature Measurement, Probe Number = 2, T = 20.146000 C 15:21:55 Temperature Measurement, Probe Number = 3, T = 20.092000 C 15:21:55 Temperature Measurement, Probe Number = 4, T = 20.565000 C 15:21:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.57 15:21:56 Integrated Voltage Measurement... 15:22:15 Voltage Offset Correction: v_off_ini = 0.000004671 V, v_off_fin = 0.000006632 V 15:22:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017344 Vs 15:22:16 Integrated Voltage Measurement... 15:22:35 Voltage Offset Correction: v_off_ini = 0.000006070 V, v_off_fin = 0.000003414 V 15:22:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170940634 Vs 15:22:38 Temperature Measurement, Probe Number = 0, T = 20.159000 C 15:22:38 Temperature Measurement, Probe Number = 1, T = 20.086000 C 15:22:39 Temperature Measurement, Probe Number = 2, T = 20.147000 C 15:22:40 Temperature Measurement, Probe Number = 3, T = 20.094000 C 15:22:40 Temperature Measurement, Probe Number = 4, T = 20.562000 C 15:22:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.56 15:22:40 Integrated Voltage Measurement... 15:23:00 Voltage Offset Correction: v_off_ini = 0.000004357 V, v_off_fin = 0.000006915 V 15:23:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171019909 Vs 15:23:01 Integrated Voltage Measurement... 15:23:20 Voltage Offset Correction: v_off_ini = 0.000006256 V, v_off_fin = 0.000003430 V 15:23:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170937957 Vs 15:23:23 Temperature Measurement, Probe Number = 0, T = 20.158000 C 15:23:23 Temperature Measurement, Probe Number = 1, T = 20.084000 C 15:23:24 Temperature Measurement, Probe Number = 2, T = 20.146000 C 15:23:25 Temperature Measurement, Probe Number = 3, T = 20.091000 C 15:23:25 Temperature Measurement, Probe Number = 4, T = 20.610000 C 15:23:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.61 15:23:26 Integrated Voltage Measurement... 15:23:45 Voltage Offset Correction: v_off_ini = 0.000003944 V, v_off_fin = 0.000006700 V 15:23:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017944 Vs 15:23:45 Integrated Voltage Measurement... 15:24:04 Voltage Offset Correction: v_off_ini = 0.000006103 V, v_off_fin = 0.000003009 V 15:24:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170936734 Vs 15:24:07 Temperature Measurement, Probe Number = 0, T = 20.160000 C 15:24:08 Temperature Measurement, Probe Number = 1, T = 20.085000 C 15:24:09 Temperature Measurement, Probe Number = 2, T = 20.148000 C 15:24:09 Temperature Measurement, Probe Number = 3, T = 20.092000 C 15:24:10 Temperature Measurement, Probe Number = 4, T = 20.684000 C 15:24:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.68 15:24:10 Integrated Voltage Measurement... 15:24:29 Voltage Offset Correction: v_off_ini = 0.000003787 V, v_off_fin = 0.000006052 V 15:24:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017333 Vs 15:24:30 Integrated Voltage Measurement... 15:24:49 Voltage Offset Correction: v_off_ini = 0.000006235 V, v_off_fin = 0.000003033 V 15:24:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170941710 Vs 15:24:51 Temperature Measurement, Probe Number = 0, T = 20.155000 C 15:24:52 Temperature Measurement, Probe Number = 1, T = 20.085000 C 15:24:53 Temperature Measurement, Probe Number = 2, T = 20.141000 C 15:24:53 Temperature Measurement, Probe Number = 3, T = 20.089000 C 15:24:54 Temperature Measurement, Probe Number = 4, T = 20.672000 C 15:24:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.67 15:24:54 Integrated Voltage Measurement... 15:25:13 Voltage Offset Correction: v_off_ini = 0.000003853 V, v_off_fin = 0.000006687 V 15:25:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171009451 Vs 15:25:14 Integrated Voltage Measurement... 15:25:33 Voltage Offset Correction: v_off_ini = 0.000005438 V, v_off_fin = 0.000002204 V 15:25:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170947373 Vs 15:25:35 Temperature Measurement, Probe Number = 0, T = 20.152000 C 15:25:36 Temperature Measurement, Probe Number = 1, T = 20.081000 C 15:25:37 Temperature Measurement, Probe Number = 2, T = 20.141000 C 15:25:37 Temperature Measurement, Probe Number = 3, T = 20.087000 C 15:25:38 Temperature Measurement, Probe Number = 4, T = 20.605000 C 15:25:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.61 15:25:38 Integrated Voltage Measurement... 15:25:57 Voltage Offset Correction: v_off_ini = 0.000003701 V, v_off_fin = 0.000005769 V 15:25:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171009498 Vs 15:25:58 Integrated Voltage Measurement... 15:26:17 Voltage Offset Correction: v_off_ini = 0.000005477 V, v_off_fin = 0.000002592 V 15:26:17 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170944370 Vs 15:26:20 Temperature Measurement, Probe Number = 0, T = 20.158000 C 15:26:20 Temperature Measurement, Probe Number = 1, T = 20.086000 C 15:26:21 Temperature Measurement, Probe Number = 2, T = 20.146000 C 15:26:21 Temperature Measurement, Probe Number = 3, T = 20.092000 C 15:26:22 Temperature Measurement, Probe Number = 4, T = 20.621000 C 15:26:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.62 15:26:22 Integrated Voltage Measurement... 15:26:42 Voltage Offset Correction: v_off_ini = 0.000004030 V, v_off_fin = 0.000006552 V 15:26:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023003 Vs 15:26:42 Integrated Voltage Measurement... 15:27:01 Voltage Offset Correction: v_off_ini = 0.000006043 V, v_off_fin = 0.000002811 V 15:27:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170941101 Vs 15:27:04 Temperature Measurement, Probe Number = 0, T = 20.160000 C 15:27:05 Temperature Measurement, Probe Number = 1, T = 20.087000 C 15:27:06 Temperature Measurement, Probe Number = 2, T = 20.149000 C 15:27:06 Temperature Measurement, Probe Number = 3, T = 20.095000 C 15:27:07 Temperature Measurement, Probe Number = 4, T = 20.681000 C 15:27:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.68 15:27:07 Integrated Voltage Measurement... 15:27:27 Voltage Offset Correction: v_off_ini = 0.000003965 V, v_off_fin = 0.000006443 V 15:27:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171016128 Vs 15:27:27 Integrated Voltage Measurement... 15:27:46 Voltage Offset Correction: v_off_ini = 0.000006019 V, v_off_fin = 0.000002477 V 15:27:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170943539 Vs 15:27:49 Temperature Measurement, Probe Number = 0, T = 20.163000 C 15:27:50 Temperature Measurement, Probe Number = 1, T = 20.088000 C 15:27:51 Temperature Measurement, Probe Number = 2, T = 20.151000 C 15:27:51 Temperature Measurement, Probe Number = 3, T = 20.094000 C 15:27:52 Temperature Measurement, Probe Number = 4, T = 20.712000 C 15:27:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.71 15:27:52 Integrated Voltage Measurement... 15:28:11 Voltage Offset Correction: v_off_ini = 0.000004219 V, v_off_fin = 0.000006472 V 15:28:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171021068 Vs 15:28:12 Integrated Voltage Measurement... 15:28:31 Voltage Offset Correction: v_off_ini = 0.000005937 V, v_off_fin = 0.000003236 V 15:28:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170939422 Vs 15:58:34 Temperature Measurement, Probe Number = 0, T = 20.156000 C 15:58:35 Temperature Measurement, Probe Number = 1, T = 20.084000 C 15:58:35 Temperature Measurement, Probe Number = 2, T = 20.145000 C 15:58:36 Temperature Measurement, Probe Number = 3, T = 20.092000 C 15:58:37 Temperature Measurement, Probe Number = 4, T = 20.345000 C 15:58:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.34 15:58:37 Integrated Voltage Measurement... 15:58:56 Voltage Offset Correction: v_off_ini = 0.000004610 V, v_off_fin = 0.000006057 V 15:58:56 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171066474 Vs 15:58:56 Integrated Voltage Measurement... 15:59:15 Voltage Offset Correction: v_off_ini = 0.000005358 V, v_off_fin = 0.000002857 V 15:59:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948457 Vs 15:59:18 Temperature Measurement, Probe Number = 0, T = 20.161000 C 15:59:19 Temperature Measurement, Probe Number = 1, T = 20.088000 C 15:59:19 Temperature Measurement, Probe Number = 2, T = 20.150000 C 15:59:20 Temperature Measurement, Probe Number = 3, T = 20.097000 C 15:59:21 Temperature Measurement, Probe Number = 4, T = 20.444000 C 15:59:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.44 15:59:21 Integrated Voltage Measurement... 15:59:40 Voltage Offset Correction: v_off_ini = 0.000003773 V, v_off_fin = 0.000006065 V 15:59:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171012201 Vs 15:59:40 Integrated Voltage Measurement... 15:59:59 Voltage Offset Correction: v_off_ini = 0.000005834 V, v_off_fin = 0.000002677 V 15:59:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950104 Vs 16:00:02 Temperature Measurement, Probe Number = 0, T = 20.164000 C 16:00:03 Temperature Measurement, Probe Number = 1, T = 20.091000 C 16:00:04 Temperature Measurement, Probe Number = 2, T = 20.151000 C 16:00:04 Temperature Measurement, Probe Number = 3, T = 20.097000 C 16:00:05 Temperature Measurement, Probe Number = 4, T = 20.496000 C 16:00:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.50 16:00:05 Integrated Voltage Measurement... 16:00:24 Voltage Offset Correction: v_off_ini = 0.000003887 V, v_off_fin = 0.000006291 V 16:00:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171019198 Vs 16:00:25 Integrated Voltage Measurement... 16:00:44 Voltage Offset Correction: v_off_ini = 0.000005398 V, v_off_fin = 0.000002516 V 16:00:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952482 Vs 16:00:47 Temperature Measurement, Probe Number = 0, T = 20.160000 C 16:00:47 Temperature Measurement, Probe Number = 1, T = 20.090000 C 16:00:48 Temperature Measurement, Probe Number = 2, T = 20.149000 C 16:00:49 Temperature Measurement, Probe Number = 3, T = 20.096000 C 16:00:49 Temperature Measurement, Probe Number = 4, T = 20.474000 C 16:00:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.47 16:00:49 Integrated Voltage Measurement... 16:01:09 Voltage Offset Correction: v_off_ini = 0.000003439 V, v_off_fin = 0.000006429 V 16:01:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017420 Vs 16:01:09 Integrated Voltage Measurement... 16:01:28 Voltage Offset Correction: v_off_ini = 0.000005452 V, v_off_fin = 0.000002424 V 16:01:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948684 Vs 16:01:31 Temperature Measurement, Probe Number = 0, T = 20.158000 C 16:01:32 Temperature Measurement, Probe Number = 1, T = 20.085000 C 16:01:32 Temperature Measurement, Probe Number = 2, T = 20.146000 C 16:01:33 Temperature Measurement, Probe Number = 3, T = 20.091000 C 16:01:34 Temperature Measurement, Probe Number = 4, T = 20.395000 C 16:01:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.39 16:01:34 Integrated Voltage Measurement... 16:01:53 Voltage Offset Correction: v_off_ini = 0.000003530 V, v_off_fin = 0.000006091 V 16:01:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171009450 Vs 16:01:53 Integrated Voltage Measurement... 16:02:13 Voltage Offset Correction: v_off_ini = 0.000004978 V, v_off_fin = 0.000002949 V 16:02:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951192 Vs 16:02:15 Temperature Measurement, Probe Number = 0, T = 20.155000 C 16:02:16 Temperature Measurement, Probe Number = 1, T = 20.083000 C 16:02:17 Temperature Measurement, Probe Number = 2, T = 20.144000 C 16:02:17 Temperature Measurement, Probe Number = 3, T = 20.091000 C 16:02:18 Temperature Measurement, Probe Number = 4, T = 20.284000 C 16:02:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.28 16:02:18 Integrated Voltage Measurement... 16:02:38 Voltage Offset Correction: v_off_ini = 0.000003630 V, v_off_fin = 0.000006996 V 16:02:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017179 Vs 16:02:38 Integrated Voltage Measurement... 16:02:57 Voltage Offset Correction: v_off_ini = 0.000005834 V, v_off_fin = 0.000003243 V 16:02:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170941684 Vs 16:03:00 Temperature Measurement, Probe Number = 0, T = 20.159000 C 16:03:01 Temperature Measurement, Probe Number = 1, T = 20.086000 C 16:03:01 Temperature Measurement, Probe Number = 2, T = 20.146000 C 16:03:02 Temperature Measurement, Probe Number = 3, T = 20.092000 C 16:03:02 Temperature Measurement, Probe Number = 4, T = 20.315000 C 16:03:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.32 16:03:03 Integrated Voltage Measurement... 16:03:23 Voltage Offset Correction: v_off_ini = 0.000004325 V, v_off_fin = 0.000006511 V 16:03:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171025900 Vs 16:03:23 Integrated Voltage Measurement... 16:03:43 Voltage Offset Correction: v_off_ini = 0.000006292 V, v_off_fin = 0.000003695 V 16:03:43 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170938502 Vs 16:03:45 Temperature Measurement, Probe Number = 0, T = 20.160000 C 16:03:46 Temperature Measurement, Probe Number = 1, T = 20.087000 C 16:03:47 Temperature Measurement, Probe Number = 2, T = 20.148000 C 16:03:47 Temperature Measurement, Probe Number = 3, T = 20.094000 C 16:03:48 Temperature Measurement, Probe Number = 4, T = 20.337000 C 16:03:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.34 16:03:48 Integrated Voltage Measurement... 16:04:07 Voltage Offset Correction: v_off_ini = 0.000004194 V, v_off_fin = 0.000006768 V 16:04:07 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171019999 Vs 16:04:07 Integrated Voltage Measurement... 16:04:27 Voltage Offset Correction: v_off_ini = 0.000006313 V, v_off_fin = 0.000003122 V 16:04:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170945462 Vs 16:04:30 Temperature Measurement, Probe Number = 0, T = 20.163000 C 16:04:30 Temperature Measurement, Probe Number = 1, T = 20.090000 C 16:04:31 Temperature Measurement, Probe Number = 2, T = 20.149000 C 16:04:32 Temperature Measurement, Probe Number = 3, T = 20.096000 C 16:04:32 Temperature Measurement, Probe Number = 4, T = 20.344000 C 16:04:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.34 16:04:32 Integrated Voltage Measurement... 16:04:52 Voltage Offset Correction: v_off_ini = 0.000003820 V, v_off_fin = 0.000006254 V 16:04:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171022987 Vs 16:04:52 Integrated Voltage Measurement... 16:05:11 Voltage Offset Correction: v_off_ini = 0.000005778 V, v_off_fin = 0.000002538 V 16:05:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950666 Vs 16:05:14 Temperature Measurement, Probe Number = 0, T = 20.163000 C 16:05:15 Temperature Measurement, Probe Number = 1, T = 20.089000 C 16:05:15 Temperature Measurement, Probe Number = 2, T = 20.149000 C 16:05:16 Temperature Measurement, Probe Number = 3, T = 20.095000 C 16:05:17 Temperature Measurement, Probe Number = 4, T = 20.395000 C 16:05:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.39 16:05:17 Integrated Voltage Measurement... 16:05:36 Voltage Offset Correction: v_off_ini = 0.000003642 V, v_off_fin = 0.000006079 V 16:05:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171015585 Vs 16:05:36 Integrated Voltage Measurement... 16:05:55 Voltage Offset Correction: v_off_ini = 0.000005390 V, v_off_fin = 0.000002044 V 16:05:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949814 Vs 16:35:58 Temperature Measurement, Probe Number = 0, T = 20.163000 C 16:35:59 Temperature Measurement, Probe Number = 1, T = 20.088000 C 16:36:00 Temperature Measurement, Probe Number = 2, T = 20.152000 C 16:36:00 Temperature Measurement, Probe Number = 3, T = 20.096000 C 16:36:01 Temperature Measurement, Probe Number = 4, T = 20.423000 C 16:36:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.42 16:36:01 Integrated Voltage Measurement... 16:36:21 Voltage Offset Correction: v_off_ini = 0.000004833 V, v_off_fin = 0.000006038 V 16:36:21 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171074550 Vs 16:36:21 Integrated Voltage Measurement... 16:36:41 Voltage Offset Correction: v_off_ini = 0.000005867 V, v_off_fin = 0.000003355 V 16:36:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170947180 Vs 16:36:44 Temperature Measurement, Probe Number = 0, T = 20.159000 C 16:36:44 Temperature Measurement, Probe Number = 1, T = 20.089000 C 16:36:45 Temperature Measurement, Probe Number = 2, T = 20.147000 C 16:36:46 Temperature Measurement, Probe Number = 3, T = 20.096000 C 16:36:46 Temperature Measurement, Probe Number = 4, T = 20.373000 C 16:36:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.37 16:36:46 Integrated Voltage Measurement... 16:37:06 Voltage Offset Correction: v_off_ini = 0.000004144 V, v_off_fin = 0.000006081 V 16:37:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024435 Vs 16:37:06 Integrated Voltage Measurement... 16:37:26 Voltage Offset Correction: v_off_ini = 0.000005651 V, v_off_fin = 0.000002890 V 16:37:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950229 Vs 16:37:29 Temperature Measurement, Probe Number = 0, T = 20.165000 C 16:37:29 Temperature Measurement, Probe Number = 1, T = 20.093000 C 16:37:30 Temperature Measurement, Probe Number = 2, T = 20.153000 C 16:37:31 Temperature Measurement, Probe Number = 3, T = 20.098000 C 16:37:31 Temperature Measurement, Probe Number = 4, T = 20.357000 C 16:37:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.36 16:37:31 Integrated Voltage Measurement... 16:37:50 Voltage Offset Correction: v_off_ini = 0.000003732 V, v_off_fin = 0.000006524 V 16:37:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171018547 Vs 16:37:51 Integrated Voltage Measurement... 16:38:10 Voltage Offset Correction: v_off_ini = 0.000005932 V, v_off_fin = 0.000002776 V 16:38:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950311 Vs 16:38:13 Temperature Measurement, Probe Number = 0, T = 20.168000 C 16:38:14 Temperature Measurement, Probe Number = 1, T = 20.093000 C 16:38:14 Temperature Measurement, Probe Number = 2, T = 20.153000 C 16:38:15 Temperature Measurement, Probe Number = 3, T = 20.098000 C 16:38:16 Temperature Measurement, Probe Number = 4, T = 20.257000 C 16:38:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.26 16:38:16 Integrated Voltage Measurement... 16:38:35 Voltage Offset Correction: v_off_ini = 0.000003584 V, v_off_fin = 0.000005988 V 16:38:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017118 Vs 16:38:36 Integrated Voltage Measurement... 16:38:55 Voltage Offset Correction: v_off_ini = 0.000005273 V, v_off_fin = 0.000002596 V 16:38:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958036 Vs 16:38:58 Temperature Measurement, Probe Number = 0, T = 20.167000 C 16:38:58 Temperature Measurement, Probe Number = 1, T = 20.091000 C 16:38:59 Temperature Measurement, Probe Number = 2, T = 20.154000 C 16:39:00 Temperature Measurement, Probe Number = 3, T = 20.099000 C 16:39:00 Temperature Measurement, Probe Number = 4, T = 20.251000 C 16:39:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.25 16:39:00 Integrated Voltage Measurement... 16:39:19 Voltage Offset Correction: v_off_ini = 0.000003774 V, v_off_fin = 0.000006026 V 16:39:20 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171019395 Vs 16:39:20 Integrated Voltage Measurement... 16:39:39 Voltage Offset Correction: v_off_ini = 0.000005804 V, v_off_fin = 0.000003058 V 16:39:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949905 Vs 16:39:42 Temperature Measurement, Probe Number = 0, T = 20.168000 C 16:39:43 Temperature Measurement, Probe Number = 1, T = 20.091000 C 16:39:43 Temperature Measurement, Probe Number = 2, T = 20.152000 C 16:39:44 Temperature Measurement, Probe Number = 3, T = 20.098000 C 16:39:45 Temperature Measurement, Probe Number = 4, T = 20.271000 C 16:39:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.27 16:39:45 Integrated Voltage Measurement... 16:40:04 Voltage Offset Correction: v_off_ini = 0.000003512 V, v_off_fin = 0.000006352 V 16:40:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020607 Vs 16:40:04 Integrated Voltage Measurement... 16:40:23 Voltage Offset Correction: v_off_ini = 0.000005735 V, v_off_fin = 0.000002996 V 16:40:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949624 Vs 16:40:26 Temperature Measurement, Probe Number = 0, T = 20.168000 C 16:40:27 Temperature Measurement, Probe Number = 1, T = 20.093000 C 16:40:28 Temperature Measurement, Probe Number = 2, T = 20.155000 C 16:40:28 Temperature Measurement, Probe Number = 3, T = 20.100000 C 16:40:29 Temperature Measurement, Probe Number = 4, T = 20.326000 C 16:40:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.33 16:40:29 Integrated Voltage Measurement... 16:40:48 Voltage Offset Correction: v_off_ini = 0.000003977 V, v_off_fin = 0.000005924 V 16:40:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171023043 Vs 16:40:49 Integrated Voltage Measurement... 16:41:08 Voltage Offset Correction: v_off_ini = 0.000005932 V, v_off_fin = 0.000003377 V 16:41:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170946954 Vs 16:41:10 Temperature Measurement, Probe Number = 0, T = 20.165000 C 16:41:11 Temperature Measurement, Probe Number = 1, T = 20.091000 C 16:41:12 Temperature Measurement, Probe Number = 2, T = 20.153000 C 16:41:12 Temperature Measurement, Probe Number = 3, T = 20.098000 C 16:41:13 Temperature Measurement, Probe Number = 4, T = 20.309000 C 16:41:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.31 16:41:13 Integrated Voltage Measurement... 16:41:33 Voltage Offset Correction: v_off_ini = 0.000004399 V, v_off_fin = 0.000006429 V 16:41:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171029959 Vs 16:41:33 Integrated Voltage Measurement... 16:41:53 Voltage Offset Correction: v_off_ini = 0.000005836 V, v_off_fin = 0.000003283 V 16:41:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170947516 Vs 16:41:56 Temperature Measurement, Probe Number = 0, T = 20.163000 C 16:41:56 Temperature Measurement, Probe Number = 1, T = 20.093000 C 16:41:57 Temperature Measurement, Probe Number = 2, T = 20.152000 C 16:41:58 Temperature Measurement, Probe Number = 3, T = 20.099000 C 16:41:58 Temperature Measurement, Probe Number = 4, T = 20.350000 C 16:41:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.35 16:41:58 Integrated Voltage Measurement... 16:42:18 Voltage Offset Correction: v_off_ini = 0.000004010 V, v_off_fin = 0.000006561 V 16:42:18 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171019335 Vs 16:42:19 Integrated Voltage Measurement... 16:42:38 Voltage Offset Correction: v_off_ini = 0.000006050 V, v_off_fin = 0.000002757 V 16:42:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170944514 Vs 16:42:40 Temperature Measurement, Probe Number = 0, T = 20.169000 C 16:42:41 Temperature Measurement, Probe Number = 1, T = 20.096000 C 16:42:42 Temperature Measurement, Probe Number = 2, T = 20.155000 C 16:42:42 Temperature Measurement, Probe Number = 3, T = 20.100000 C 16:42:43 Temperature Measurement, Probe Number = 4, T = 20.413000 C 16:42:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 16:42:43 Integrated Voltage Measurement... 16:43:03 Voltage Offset Correction: v_off_ini = 0.000004273 V, v_off_fin = 0.000006622 V 16:43:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171022329 Vs 16:43:03 Integrated Voltage Measurement... 16:43:22 Voltage Offset Correction: v_off_ini = 0.000005797 V, v_off_fin = 0.000003269 V 16:43:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948086 Vs 17:13:25 Temperature Measurement, Probe Number = 0, T = 20.161000 C 17:13:26 Temperature Measurement, Probe Number = 1, T = 20.083000 C 17:13:27 Temperature Measurement, Probe Number = 2, T = 20.149000 C 17:13:27 Temperature Measurement, Probe Number = 3, T = 20.093000 C 17:13:28 Temperature Measurement, Probe Number = 4, T = 20.268000 C 17:13:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.27 17:13:28 Integrated Voltage Measurement... 17:13:48 Voltage Offset Correction: v_off_ini = 0.000005046 V, v_off_fin = 0.000006520 V 17:13:48 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171068074 Vs 17:13:48 Integrated Voltage Measurement... 17:14:07 Voltage Offset Correction: v_off_ini = 0.000006283 V, v_off_fin = 0.000002368 V 17:14:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952445 Vs 17:14:10 Temperature Measurement, Probe Number = 0, T = 20.166000 C 17:14:11 Temperature Measurement, Probe Number = 1, T = 20.088000 C 17:14:12 Temperature Measurement, Probe Number = 2, T = 20.152000 C 17:14:12 Temperature Measurement, Probe Number = 3, T = 20.096000 C 17:14:13 Temperature Measurement, Probe Number = 4, T = 20.348000 C 17:14:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.35 17:14:13 Integrated Voltage Measurement... 17:14:32 Voltage Offset Correction: v_off_ini = 0.000003779 V, v_off_fin = 0.000006176 V 17:14:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171021371 Vs 17:14:33 Integrated Voltage Measurement... 17:14:53 Voltage Offset Correction: v_off_ini = 0.000005702 V, v_off_fin = 0.000002753 V 17:14:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955613 Vs 17:14:55 Temperature Measurement, Probe Number = 0, T = 20.165000 C 17:14:56 Temperature Measurement, Probe Number = 1, T = 20.090000 C 17:14:57 Temperature Measurement, Probe Number = 2, T = 20.154000 C 17:14:57 Temperature Measurement, Probe Number = 3, T = 20.099000 C 17:14:58 Temperature Measurement, Probe Number = 4, T = 20.344000 C 17:14:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.34 17:14:58 Integrated Voltage Measurement... 17:15:18 Voltage Offset Correction: v_off_ini = 0.000004173 V, v_off_fin = 0.000006501 V 17:15:18 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171021348 Vs 17:15:18 Integrated Voltage Measurement... 17:15:37 Voltage Offset Correction: v_off_ini = 0.000005969 V, v_off_fin = 0.000003107 V 17:15:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949627 Vs 17:15:40 Temperature Measurement, Probe Number = 0, T = 20.166000 C 17:15:41 Temperature Measurement, Probe Number = 1, T = 20.095000 C 17:15:41 Temperature Measurement, Probe Number = 2, T = 20.151000 C 17:15:42 Temperature Measurement, Probe Number = 3, T = 20.099000 C 17:15:43 Temperature Measurement, Probe Number = 4, T = 20.292000 C 17:15:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.29 17:15:43 Integrated Voltage Measurement... 17:16:02 Voltage Offset Correction: v_off_ini = 0.000003607 V, v_off_fin = 0.000006199 V 17:16:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171026688 Vs 17:16:03 Integrated Voltage Measurement... 17:16:22 Voltage Offset Correction: v_off_ini = 0.000005951 V, v_off_fin = 0.000002757 V 17:16:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956964 Vs 17:16:25 Temperature Measurement, Probe Number = 0, T = 20.166000 C 17:16:26 Temperature Measurement, Probe Number = 1, T = 20.091000 C 17:16:27 Temperature Measurement, Probe Number = 2, T = 20.155000 C 17:16:27 Temperature Measurement, Probe Number = 3, T = 20.100000 C 17:16:28 Temperature Measurement, Probe Number = 4, T = 20.319000 C 17:16:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.32 17:16:28 Integrated Voltage Measurement... 17:16:47 Voltage Offset Correction: v_off_ini = 0.000003805 V, v_off_fin = 0.000006233 V 17:16:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028564 Vs 17:16:48 Integrated Voltage Measurement... 17:17:07 Voltage Offset Correction: v_off_ini = 0.000005684 V, v_off_fin = 0.000002414 V 17:17:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955178 Vs 17:17:10 Temperature Measurement, Probe Number = 0, T = 20.167000 C 17:17:10 Temperature Measurement, Probe Number = 1, T = 20.090000 C 17:17:11 Temperature Measurement, Probe Number = 2, T = 20.154000 C 17:17:12 Temperature Measurement, Probe Number = 3, T = 20.099000 C 17:17:12 Temperature Measurement, Probe Number = 4, T = 20.347000 C 17:17:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.35 17:17:13 Integrated Voltage Measurement... 17:17:32 Voltage Offset Correction: v_off_ini = 0.000003982 V, v_off_fin = 0.000006491 V 17:17:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171031900 Vs 17:17:32 Integrated Voltage Measurement... 17:17:51 Voltage Offset Correction: v_off_ini = 0.000005744 V, v_off_fin = 0.000002892 V 17:17:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954033 Vs 17:17:54 Temperature Measurement, Probe Number = 0, T = 20.165000 C 17:17:55 Temperature Measurement, Probe Number = 1, T = 20.091000 C 17:17:56 Temperature Measurement, Probe Number = 2, T = 20.153000 C 17:17:56 Temperature Measurement, Probe Number = 3, T = 20.096000 C 17:17:57 Temperature Measurement, Probe Number = 4, T = 20.378000 C 17:17:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.38 17:17:57 Integrated Voltage Measurement... 17:18:16 Voltage Offset Correction: v_off_ini = 0.000003991 V, v_off_fin = 0.000006585 V 17:18:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171033644 Vs 17:18:17 Integrated Voltage Measurement... 17:18:36 Voltage Offset Correction: v_off_ini = 0.000006351 V, v_off_fin = 0.000002792 V 17:18:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170951305 Vs 17:18:39 Temperature Measurement, Probe Number = 0, T = 20.165000 C 17:18:39 Temperature Measurement, Probe Number = 1, T = 20.090000 C 17:18:40 Temperature Measurement, Probe Number = 2, T = 20.153000 C 17:18:41 Temperature Measurement, Probe Number = 3, T = 20.095000 C 17:18:41 Temperature Measurement, Probe Number = 4, T = 20.434000 C 17:18:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.43 17:18:41 Integrated Voltage Measurement... 17:19:01 Voltage Offset Correction: v_off_ini = 0.000003379 V, v_off_fin = 0.000006426 V 17:19:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171034430 Vs 17:19:01 Integrated Voltage Measurement... 17:19:21 Voltage Offset Correction: v_off_ini = 0.000006221 V, v_off_fin = 0.000003900 V 17:19:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170946508 Vs 17:19:24 Temperature Measurement, Probe Number = 0, T = 20.163000 C 17:19:24 Temperature Measurement, Probe Number = 1, T = 20.091000 C 17:19:25 Temperature Measurement, Probe Number = 2, T = 20.150000 C 17:19:26 Temperature Measurement, Probe Number = 3, T = 20.097000 C 17:19:26 Temperature Measurement, Probe Number = 4, T = 20.448000 C 17:19:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.45 17:19:27 Integrated Voltage Measurement... 17:19:46 Voltage Offset Correction: v_off_ini = 0.000003547 V, v_off_fin = 0.000006371 V 17:19:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023350 Vs 17:19:46 Integrated Voltage Measurement... 17:20:05 Voltage Offset Correction: v_off_ini = 0.000005957 V, v_off_fin = 0.000002778 V 17:20:05 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170955929 Vs 17:20:08 Temperature Measurement, Probe Number = 0, T = 20.163000 C 17:20:08 Temperature Measurement, Probe Number = 1, T = 20.089000 C 17:20:09 Temperature Measurement, Probe Number = 2, T = 20.150000 C 17:20:10 Temperature Measurement, Probe Number = 3, T = 20.094000 C 17:20:10 Temperature Measurement, Probe Number = 4, T = 20.369000 C 17:20:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.37 17:20:11 Integrated Voltage Measurement... 17:20:30 Voltage Offset Correction: v_off_ini = 0.000004475 V, v_off_fin = 0.000006450 V 17:20:30 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171032305 Vs 17:20:31 Integrated Voltage Measurement... 17:20:50 Voltage Offset Correction: v_off_ini = 0.000006038 V, v_off_fin = 0.000002451 V 17:20:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949976 Vs 17:50:53 Temperature Measurement, Probe Number = 0, T = 20.167000 C 17:50:53 Temperature Measurement, Probe Number = 1, T = 20.092000 C 17:50:54 Temperature Measurement, Probe Number = 2, T = 20.155000 C 17:50:55 Temperature Measurement, Probe Number = 3, T = 20.097000 C 17:50:55 Temperature Measurement, Probe Number = 4, T = 20.137000 C 17:50:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.14 17:50:56 Integrated Voltage Measurement... 17:51:15 Voltage Offset Correction: v_off_ini = 0.000004911 V, v_off_fin = 0.000006817 V 17:51:15 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171074653 Vs 17:51:15 Integrated Voltage Measurement... 17:51:35 Voltage Offset Correction: v_off_ini = 0.000006361 V, v_off_fin = 0.000003103 V 17:51:35 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170956930 Vs 17:51:38 Temperature Measurement, Probe Number = 0, T = 20.166000 C 17:51:38 Temperature Measurement, Probe Number = 1, T = 20.093000 C 17:51:39 Temperature Measurement, Probe Number = 2, T = 20.151000 C 17:51:40 Temperature Measurement, Probe Number = 3, T = 20.097000 C 17:51:40 Temperature Measurement, Probe Number = 4, T = 20.208000 C 17:51:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.21 17:51:40 Integrated Voltage Measurement... 17:52:00 Voltage Offset Correction: v_off_ini = 0.000003885 V, v_off_fin = 0.000007267 V 17:52:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034221 Vs 17:52:00 Integrated Voltage Measurement... 17:52:20 Voltage Offset Correction: v_off_ini = 0.000006531 V, v_off_fin = 0.000003524 V 17:52:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958065 Vs 17:52:22 Temperature Measurement, Probe Number = 0, T = 20.166000 C 17:52:23 Temperature Measurement, Probe Number = 1, T = 20.094000 C 17:52:24 Temperature Measurement, Probe Number = 2, T = 20.155000 C 17:52:24 Temperature Measurement, Probe Number = 3, T = 20.100000 C 17:52:25 Temperature Measurement, Probe Number = 4, T = 20.236000 C 17:52:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.24 17:52:25 Integrated Voltage Measurement... 17:52:44 Voltage Offset Correction: v_off_ini = 0.000004715 V, v_off_fin = 0.000007260 V 17:52:44 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171038322 Vs 17:52:44 Integrated Voltage Measurement... 17:53:04 Voltage Offset Correction: v_off_ini = 0.000006656 V, v_off_fin = 0.000003779 V 17:53:04 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170953339 Vs 17:53:07 Temperature Measurement, Probe Number = 0, T = 20.167000 C 17:53:07 Temperature Measurement, Probe Number = 1, T = 20.090000 C 17:53:08 Temperature Measurement, Probe Number = 2, T = 20.154000 C 17:53:09 Temperature Measurement, Probe Number = 3, T = 20.097000 C 17:53:09 Temperature Measurement, Probe Number = 4, T = 20.266000 C 17:53:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.27 17:53:10 Integrated Voltage Measurement... 17:53:29 Voltage Offset Correction: v_off_ini = 0.000004763 V, v_off_fin = 0.000006995 V 17:53:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037038 Vs 17:53:29 Integrated Voltage Measurement... 17:53:48 Voltage Offset Correction: v_off_ini = 0.000006334 V, v_off_fin = 0.000003192 V 17:53:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952668 Vs 17:53:51 Temperature Measurement, Probe Number = 0, T = 20.169000 C 17:53:52 Temperature Measurement, Probe Number = 1, T = 20.094000 C 17:53:52 Temperature Measurement, Probe Number = 2, T = 20.157000 C 17:53:53 Temperature Measurement, Probe Number = 3, T = 20.100000 C 17:53:54 Temperature Measurement, Probe Number = 4, T = 20.275000 C 17:53:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.27 17:53:54 Integrated Voltage Measurement... 17:54:13 Voltage Offset Correction: v_off_ini = 0.000004533 V, v_off_fin = 0.000006695 V 17:54:13 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171038736 Vs 17:54:14 Integrated Voltage Measurement... 17:54:33 Voltage Offset Correction: v_off_ini = 0.000005808 V, v_off_fin = 0.000002800 V 17:54:33 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170958846 Vs 17:54:36 Temperature Measurement, Probe Number = 0, T = 20.164000 C 17:54:36 Temperature Measurement, Probe Number = 1, T = 20.094000 C 17:54:37 Temperature Measurement, Probe Number = 2, T = 20.153000 C 17:54:38 Temperature Measurement, Probe Number = 3, T = 20.099000 C 17:54:38 Temperature Measurement, Probe Number = 4, T = 20.191000 C 17:54:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.19 17:54:39 Integrated Voltage Measurement... 17:54:58 Voltage Offset Correction: v_off_ini = 0.000004274 V, v_off_fin = 0.000006594 V 17:54:58 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171036359 Vs 17:54:59 Integrated Voltage Measurement... 17:55:18 Voltage Offset Correction: v_off_ini = 0.000006279 V, v_off_fin = 0.000003298 V 17:55:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957024 Vs 17:55:21 Temperature Measurement, Probe Number = 0, T = 20.164000 C 17:55:22 Temperature Measurement, Probe Number = 1, T = 20.090000 C 17:55:22 Temperature Measurement, Probe Number = 2, T = 20.154000 C 17:55:23 Temperature Measurement, Probe Number = 3, T = 20.098000 C 17:55:23 Temperature Measurement, Probe Number = 4, T = 20.183000 C 17:55:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.18 17:55:24 Integrated Voltage Measurement... 17:55:43 Voltage Offset Correction: v_off_ini = 0.000004678 V, v_off_fin = 0.000006333 V 17:55:43 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171032082 Vs 17:55:43 Integrated Voltage Measurement... 17:56:02 Voltage Offset Correction: v_off_ini = 0.000005754 V, v_off_fin = 0.000002737 V 17:56:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170958996 Vs 17:56:05 Temperature Measurement, Probe Number = 0, T = 20.166000 C 17:56:06 Temperature Measurement, Probe Number = 1, T = 20.093000 C 17:56:07 Temperature Measurement, Probe Number = 2, T = 20.152000 C 17:56:07 Temperature Measurement, Probe Number = 3, T = 20.100000 C 17:56:08 Temperature Measurement, Probe Number = 4, T = 20.339000 C 17:56:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.34 17:56:08 Integrated Voltage Measurement... 17:56:29 Voltage Offset Correction: v_off_ini = 0.000003801 V, v_off_fin = 0.000006113 V 17:56:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030339 Vs 17:56:29 Integrated Voltage Measurement... 17:56:48 Voltage Offset Correction: v_off_ini = 0.000004845 V, v_off_fin = 0.000001686 V 17:56:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962333 Vs 17:56:51 Temperature Measurement, Probe Number = 0, T = 20.164000 C 17:56:52 Temperature Measurement, Probe Number = 1, T = 20.093000 C 17:56:52 Temperature Measurement, Probe Number = 2, T = 20.153000 C 17:56:53 Temperature Measurement, Probe Number = 3, T = 20.100000 C 17:56:53 Temperature Measurement, Probe Number = 4, T = 20.447000 C 17:56:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.45 17:56:54 Integrated Voltage Measurement... 17:57:13 Voltage Offset Correction: v_off_ini = 0.000003429 V, v_off_fin = 0.000006188 V 17:57:13 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171033404 Vs 17:57:13 Integrated Voltage Measurement... 17:57:32 Voltage Offset Correction: v_off_ini = 0.000005583 V, v_off_fin = 0.000002608 V 17:57:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170961683 Vs 17:57:35 Temperature Measurement, Probe Number = 0, T = 20.170000 C 17:57:36 Temperature Measurement, Probe Number = 1, T = 20.096000 C 17:57:36 Temperature Measurement, Probe Number = 2, T = 20.157000 C 17:57:37 Temperature Measurement, Probe Number = 3, T = 20.104000 C 17:57:38 Temperature Measurement, Probe Number = 4, T = 20.477000 C 17:57:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.48 17:57:38 Integrated Voltage Measurement... 17:57:57 Voltage Offset Correction: v_off_ini = 0.000003901 V, v_off_fin = 0.000006427 V 17:57:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171036159 Vs 17:57:58 Integrated Voltage Measurement... 17:58:17 Voltage Offset Correction: v_off_ini = 0.000006091 V, v_off_fin = 0.000002972 V 17:58:17 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170955916 Vs 18:28:20 Temperature Measurement, Probe Number = 0, T = 20.170000 C 18:28:21 Temperature Measurement, Probe Number = 1, T = 20.098000 C 18:28:21 Temperature Measurement, Probe Number = 2, T = 20.160000 C 18:28:22 Temperature Measurement, Probe Number = 3, T = 20.107000 C 18:28:23 Temperature Measurement, Probe Number = 4, T = 20.449000 C 18:28:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.45 18:28:23 Integrated Voltage Measurement... 18:28:42 Voltage Offset Correction: v_off_ini = 0.000004742 V, v_off_fin = 0.000006004 V 18:28:42 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171085765 Vs 18:28:43 Integrated Voltage Measurement... 18:29:02 Voltage Offset Correction: v_off_ini = 0.000005778 V, v_off_fin = 0.000002321 V 18:29:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957729 Vs 18:29:05 Temperature Measurement, Probe Number = 0, T = 20.176000 C 18:29:05 Temperature Measurement, Probe Number = 1, T = 20.104000 C 18:29:06 Temperature Measurement, Probe Number = 2, T = 20.165000 C 18:29:06 Temperature Measurement, Probe Number = 3, T = 20.111000 C 18:29:07 Temperature Measurement, Probe Number = 4, T = 20.434000 C 18:29:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.43 18:29:07 Integrated Voltage Measurement... 18:29:27 Voltage Offset Correction: v_off_ini = 0.000003601 V, v_off_fin = 0.000006280 V 18:29:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171024173 Vs 18:29:27 Integrated Voltage Measurement... 18:29:46 Voltage Offset Correction: v_off_ini = 0.000006242 V, v_off_fin = 0.000002987 V 18:29:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957085 Vs 18:29:49 Temperature Measurement, Probe Number = 0, T = 20.178000 C 18:29:50 Temperature Measurement, Probe Number = 1, T = 20.103000 C 18:29:50 Temperature Measurement, Probe Number = 2, T = 20.165000 C 18:29:51 Temperature Measurement, Probe Number = 3, T = 20.111000 C 18:29:52 Temperature Measurement, Probe Number = 4, T = 20.535000 C 18:29:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.54 18:29:52 Integrated Voltage Measurement... 18:30:11 Voltage Offset Correction: v_off_ini = 0.000004126 V, v_off_fin = 0.000006327 V 18:30:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028073 Vs 18:30:12 Integrated Voltage Measurement... 18:30:31 Voltage Offset Correction: v_off_ini = 0.000005817 V, v_off_fin = 0.000002588 V 18:30:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956816 Vs 18:30:34 Temperature Measurement, Probe Number = 0, T = 20.176000 C 18:30:35 Temperature Measurement, Probe Number = 1, T = 20.102000 C 18:30:35 Temperature Measurement, Probe Number = 2, T = 20.162000 C 18:30:36 Temperature Measurement, Probe Number = 3, T = 20.107000 C 18:30:37 Temperature Measurement, Probe Number = 4, T = 20.522000 C 18:30:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.52 18:30:37 Integrated Voltage Measurement... 18:30:56 Voltage Offset Correction: v_off_ini = 0.000003908 V, v_off_fin = 0.000006204 V 18:30:56 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171029794 Vs 18:30:57 Integrated Voltage Measurement... 18:31:16 Voltage Offset Correction: v_off_ini = 0.000005780 V, v_off_fin = 0.000003023 V 18:31:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949953 Vs 18:31:18 Temperature Measurement, Probe Number = 0, T = 20.179000 C 18:31:19 Temperature Measurement, Probe Number = 1, T = 20.102000 C 18:31:20 Temperature Measurement, Probe Number = 2, T = 20.166000 C 18:31:20 Temperature Measurement, Probe Number = 3, T = 20.110000 C 18:31:21 Temperature Measurement, Probe Number = 4, T = 20.536000 C 18:31:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.54 18:31:21 Integrated Voltage Measurement... 18:31:41 Voltage Offset Correction: v_off_ini = 0.000003843 V, v_off_fin = 0.000006316 V 18:31:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031597 Vs 18:31:41 Integrated Voltage Measurement... 18:32:00 Voltage Offset Correction: v_off_ini = 0.000006285 V, v_off_fin = 0.000002779 V 18:32:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951973 Vs 18:32:03 Temperature Measurement, Probe Number = 0, T = 20.178000 C 18:32:04 Temperature Measurement, Probe Number = 1, T = 20.102000 C 18:32:05 Temperature Measurement, Probe Number = 2, T = 20.166000 C 18:32:05 Temperature Measurement, Probe Number = 3, T = 20.111000 C 18:32:06 Temperature Measurement, Probe Number = 4, T = 20.596000 C 18:32:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.60 18:32:06 Integrated Voltage Measurement... 18:32:26 Voltage Offset Correction: v_off_ini = 0.000004065 V, v_off_fin = 0.000006818 V 18:32:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028942 Vs 18:32:26 Integrated Voltage Measurement... 18:32:45 Voltage Offset Correction: v_off_ini = 0.000005966 V, v_off_fin = 0.000003153 V 18:32:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952631 Vs 18:32:48 Temperature Measurement, Probe Number = 0, T = 20.177000 C 18:32:49 Temperature Measurement, Probe Number = 1, T = 20.103000 C 18:32:50 Temperature Measurement, Probe Number = 2, T = 20.163000 C 18:32:50 Temperature Measurement, Probe Number = 3, T = 20.110000 C 18:32:51 Temperature Measurement, Probe Number = 4, T = 20.539000 C 18:32:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.54 18:32:51 Integrated Voltage Measurement... 18:33:10 Voltage Offset Correction: v_off_ini = 0.000004150 V, v_off_fin = 0.000006236 V 18:33:11 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171030648 Vs 18:33:11 Integrated Voltage Measurement... 18:33:31 Voltage Offset Correction: v_off_ini = 0.000006212 V, v_off_fin = 0.000003666 V 18:33:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949575 Vs 18:33:34 Temperature Measurement, Probe Number = 0, T = 20.175000 C 18:33:34 Temperature Measurement, Probe Number = 1, T = 20.100000 C 18:33:35 Temperature Measurement, Probe Number = 2, T = 20.164000 C 18:33:36 Temperature Measurement, Probe Number = 3, T = 20.109000 C 18:33:36 Temperature Measurement, Probe Number = 4, T = 20.547000 C 18:33:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.55 18:33:37 Integrated Voltage Measurement... 18:33:56 Voltage Offset Correction: v_off_ini = 0.000004737 V, v_off_fin = 0.000006763 V 18:33:56 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171029902 Vs 18:33:56 Integrated Voltage Measurement... 18:34:16 Voltage Offset Correction: v_off_ini = 0.000006529 V, v_off_fin = 0.000003161 V 18:34:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956020 Vs 18:34:18 Temperature Measurement, Probe Number = 0, T = 20.178000 C 18:34:19 Temperature Measurement, Probe Number = 1, T = 20.101000 C 18:34:20 Temperature Measurement, Probe Number = 2, T = 20.163000 C 18:34:20 Temperature Measurement, Probe Number = 3, T = 20.109000 C 18:34:21 Temperature Measurement, Probe Number = 4, T = 20.562000 C 18:34:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.56 18:34:21 Integrated Voltage Measurement... 18:34:41 Voltage Offset Correction: v_off_ini = 0.000004749 V, v_off_fin = 0.000006277 V 18:34:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028637 Vs 18:34:41 Integrated Voltage Measurement... 18:35:01 Voltage Offset Correction: v_off_ini = 0.000005560 V, v_off_fin = 0.000002448 V 18:35:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960057 Vs 18:35:03 Temperature Measurement, Probe Number = 0, T = 20.175000 C 18:35:04 Temperature Measurement, Probe Number = 1, T = 20.103000 C 18:35:05 Temperature Measurement, Probe Number = 2, T = 20.162000 C 18:35:05 Temperature Measurement, Probe Number = 3, T = 20.109000 C 18:35:06 Temperature Measurement, Probe Number = 4, T = 20.513000 C 18:35:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.51 18:35:06 Integrated Voltage Measurement... 18:35:26 Voltage Offset Correction: v_off_ini = 0.000004118 V, v_off_fin = 0.000006359 V 18:35:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171026759 Vs 18:35:26 Integrated Voltage Measurement... 18:35:45 Voltage Offset Correction: v_off_ini = 0.000006054 V, v_off_fin = 0.000002740 V 18:35:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951439 Vs 19:05:48 Temperature Measurement, Probe Number = 0, T = 20.167000 C 19:05:49 Temperature Measurement, Probe Number = 1, T = 20.090000 C 19:05:50 Temperature Measurement, Probe Number = 2, T = 20.157000 C 19:05:50 Temperature Measurement, Probe Number = 3, T = 20.102000 C 19:05:51 Temperature Measurement, Probe Number = 4, T = 20.148000 C 19:05:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.15 19:05:51 Integrated Voltage Measurement... 19:06:11 Voltage Offset Correction: v_off_ini = 0.000004580 V, v_off_fin = 0.000006400 V 19:06:11 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171081607 Vs 19:06:11 Integrated Voltage Measurement... 19:06:30 Voltage Offset Correction: v_off_ini = 0.000005863 V, v_off_fin = 0.000002751 V 19:06:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960167 Vs 19:06:33 Temperature Measurement, Probe Number = 0, T = 20.171000 C 19:06:33 Temperature Measurement, Probe Number = 1, T = 20.096000 C 19:06:34 Temperature Measurement, Probe Number = 2, T = 20.159000 C 19:06:35 Temperature Measurement, Probe Number = 3, T = 20.102000 C 19:06:35 Temperature Measurement, Probe Number = 4, T = 20.216000 C 19:06:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.22 19:06:36 Integrated Voltage Measurement... 19:06:55 Voltage Offset Correction: v_off_ini = 0.000003675 V, v_off_fin = 0.000006371 V 19:06:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028545 Vs 19:06:55 Integrated Voltage Measurement... 19:07:15 Voltage Offset Correction: v_off_ini = 0.000005924 V, v_off_fin = 0.000002410 V 19:07:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957417 Vs 19:07:18 Temperature Measurement, Probe Number = 0, T = 20.178000 C 19:07:18 Temperature Measurement, Probe Number = 1, T = 20.103000 C 19:07:19 Temperature Measurement, Probe Number = 2, T = 20.164000 C 19:07:19 Temperature Measurement, Probe Number = 3, T = 20.104000 C 19:07:20 Temperature Measurement, Probe Number = 4, T = 20.330000 C 19:07:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.33 19:07:20 Integrated Voltage Measurement... 19:07:40 Voltage Offset Correction: v_off_ini = 0.000003252 V, v_off_fin = 0.000006233 V 19:07:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023752 Vs 19:07:40 Integrated Voltage Measurement... 19:07:59 Voltage Offset Correction: v_off_ini = 0.000005335 V, v_off_fin = 0.000003089 V 19:08:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958491 Vs 19:08:02 Temperature Measurement, Probe Number = 0, T = 20.173000 C 19:08:03 Temperature Measurement, Probe Number = 1, T = 20.097000 C 19:08:04 Temperature Measurement, Probe Number = 2, T = 20.162000 C 19:08:04 Temperature Measurement, Probe Number = 3, T = 20.101000 C 19:08:05 Temperature Measurement, Probe Number = 4, T = 20.346000 C 19:08:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.35 19:08:05 Integrated Voltage Measurement... 19:08:24 Voltage Offset Correction: v_off_ini = 0.000003283 V, v_off_fin = 0.000005929 V 19:08:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171018155 Vs 19:08:25 Integrated Voltage Measurement... 19:08:44 Voltage Offset Correction: v_off_ini = 0.000004844 V, v_off_fin = 0.000002305 V 19:08:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965549 Vs 19:08:47 Temperature Measurement, Probe Number = 0, T = 20.168000 C 19:08:48 Temperature Measurement, Probe Number = 1, T = 20.089000 C 19:08:48 Temperature Measurement, Probe Number = 2, T = 20.156000 C 19:08:49 Temperature Measurement, Probe Number = 3, T = 20.096000 C 19:08:50 Temperature Measurement, Probe Number = 4, T = 20.214000 C 19:08:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.21 19:08:50 Integrated Voltage Measurement... 19:09:09 Voltage Offset Correction: v_off_ini = 0.000003780 V, v_off_fin = 0.000006471 V 19:09:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171021204 Vs 19:09:10 Integrated Voltage Measurement... 19:09:29 Voltage Offset Correction: v_off_ini = 0.000005801 V, v_off_fin = 0.000002656 V 19:09:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956666 Vs 19:09:32 Temperature Measurement, Probe Number = 0, T = 20.169000 C 19:09:32 Temperature Measurement, Probe Number = 1, T = 20.089000 C 19:09:33 Temperature Measurement, Probe Number = 2, T = 20.155000 C 19:09:34 Temperature Measurement, Probe Number = 3, T = 20.097000 C 19:09:34 Temperature Measurement, Probe Number = 4, T = 20.105000 C 19:09:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.11 19:09:35 Integrated Voltage Measurement... 19:09:54 Voltage Offset Correction: v_off_ini = 0.000003876 V, v_off_fin = 0.000006282 V 19:09:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028721 Vs 19:09:54 Integrated Voltage Measurement... 19:10:13 Voltage Offset Correction: v_off_ini = 0.000006210 V, v_off_fin = 0.000003412 V 19:10:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950885 Vs 19:10:16 Temperature Measurement, Probe Number = 0, T = 20.169000 C 19:10:17 Temperature Measurement, Probe Number = 1, T = 20.092000 C 19:10:18 Temperature Measurement, Probe Number = 2, T = 20.153000 C 19:10:18 Temperature Measurement, Probe Number = 3, T = 20.097000 C 19:10:19 Temperature Measurement, Probe Number = 4, T = 19.986000 C 19:10:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 19.99 19:10:19 Integrated Voltage Measurement... 19:10:38 Voltage Offset Correction: v_off_ini = 0.000004649 V, v_off_fin = 0.000006440 V 19:10:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037160 Vs 19:10:39 Integrated Voltage Measurement... 19:10:58 Voltage Offset Correction: v_off_ini = 0.000006320 V, v_off_fin = 0.000003050 V 19:10:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953682 Vs 19:11:01 Temperature Measurement, Probe Number = 0, T = 20.170000 C 19:11:01 Temperature Measurement, Probe Number = 1, T = 20.092000 C 19:11:02 Temperature Measurement, Probe Number = 2, T = 20.155000 C 19:11:03 Temperature Measurement, Probe Number = 3, T = 20.098000 C 19:11:03 Temperature Measurement, Probe Number = 4, T = 19.977000 C 19:11:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 19.98 19:11:04 Integrated Voltage Measurement... 19:11:23 Voltage Offset Correction: v_off_ini = 0.000004204 V, v_off_fin = 0.000006544 V 19:11:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031676 Vs 19:11:23 Integrated Voltage Measurement... 19:11:42 Voltage Offset Correction: v_off_ini = 0.000005992 V, v_off_fin = 0.000003153 V 19:11:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959479 Vs 19:11:45 Temperature Measurement, Probe Number = 0, T = 20.172000 C 19:11:46 Temperature Measurement, Probe Number = 1, T = 20.092000 C 19:11:47 Temperature Measurement, Probe Number = 2, T = 20.156000 C 19:11:47 Temperature Measurement, Probe Number = 3, T = 20.100000 C 19:11:48 Temperature Measurement, Probe Number = 4, T = 20.006000 C 19:11:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.01 19:11:48 Integrated Voltage Measurement... 19:12:07 Voltage Offset Correction: v_off_ini = 0.000003867 V, v_off_fin = 0.000006466 V 19:12:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171027911 Vs 19:12:08 Integrated Voltage Measurement... 19:12:27 Voltage Offset Correction: v_off_ini = 0.000005740 V, v_off_fin = 0.000002997 V 19:12:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967176 Vs 19:12:30 Temperature Measurement, Probe Number = 0, T = 20.170000 C 19:12:31 Temperature Measurement, Probe Number = 1, T = 20.090000 C 19:12:31 Temperature Measurement, Probe Number = 2, T = 20.154000 C 19:12:32 Temperature Measurement, Probe Number = 3, T = 20.096000 C 19:12:33 Temperature Measurement, Probe Number = 4, T = 20.101000 C 19:12:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.10 19:12:33 Integrated Voltage Measurement... 19:12:53 Voltage Offset Correction: v_off_ini = 0.000004322 V, v_off_fin = 0.000006294 V 19:12:53 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171031304 Vs 19:12:53 Integrated Voltage Measurement... 19:13:12 Voltage Offset Correction: v_off_ini = 0.000005459 V, v_off_fin = 0.000003089 V 19:13:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961581 Vs 19:43:15 Temperature Measurement, Probe Number = 0, T = 20.171000 C 19:43:16 Temperature Measurement, Probe Number = 1, T = 20.098000 C 19:43:17 Temperature Measurement, Probe Number = 2, T = 20.159000 C 19:43:18 Temperature Measurement, Probe Number = 3, T = 20.105000 C 19:43:18 Temperature Measurement, Probe Number = 4, T = 20.337000 C 19:43:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.34 19:43:18 Integrated Voltage Measurement... 19:43:38 Voltage Offset Correction: v_off_ini = 0.000004599 V, v_off_fin = 0.000005643 V 19:43:38 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171063937 Vs 19:43:38 Integrated Voltage Measurement... 19:43:57 Voltage Offset Correction: v_off_ini = 0.000005288 V, v_off_fin = 0.000002533 V 19:43:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968806 Vs 19:44:00 Temperature Measurement, Probe Number = 0, T = 20.174000 C 19:44:01 Temperature Measurement, Probe Number = 1, T = 20.097000 C 19:44:01 Temperature Measurement, Probe Number = 2, T = 20.163000 C 19:44:02 Temperature Measurement, Probe Number = 3, T = 20.107000 C 19:44:03 Temperature Measurement, Probe Number = 4, T = 20.442000 C 19:44:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.44 19:44:03 Integrated Voltage Measurement... 19:44:22 Voltage Offset Correction: v_off_ini = 0.000003258 V, v_off_fin = 0.000005730 V 19:44:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028969 Vs 19:44:22 Integrated Voltage Measurement... 19:44:41 Voltage Offset Correction: v_off_ini = 0.000005689 V, v_off_fin = 0.000002875 V 19:44:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962674 Vs 19:44:44 Temperature Measurement, Probe Number = 0, T = 20.177000 C 19:44:45 Temperature Measurement, Probe Number = 1, T = 20.101000 C 19:44:46 Temperature Measurement, Probe Number = 2, T = 20.164000 C 19:44:46 Temperature Measurement, Probe Number = 3, T = 20.108000 C 19:44:47 Temperature Measurement, Probe Number = 4, T = 20.430000 C 19:44:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.43 19:44:47 Integrated Voltage Measurement... 19:45:07 Voltage Offset Correction: v_off_ini = 0.000003780 V, v_off_fin = 0.000006222 V 19:45:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029918 Vs 19:45:07 Integrated Voltage Measurement... 19:45:27 Voltage Offset Correction: v_off_ini = 0.000005914 V, v_off_fin = 0.000002957 V 19:45:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959475 Vs 19:45:29 Temperature Measurement, Probe Number = 0, T = 20.178000 C 19:45:30 Temperature Measurement, Probe Number = 1, T = 20.103000 C 19:45:31 Temperature Measurement, Probe Number = 2, T = 20.165000 C 19:45:31 Temperature Measurement, Probe Number = 3, T = 20.110000 C 19:45:32 Temperature Measurement, Probe Number = 4, T = 20.483000 C 19:45:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.48 19:45:32 Integrated Voltage Measurement... 19:45:51 Voltage Offset Correction: v_off_ini = 0.000003868 V, v_off_fin = 0.000006559 V 19:45:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171027999 Vs 19:45:52 Integrated Voltage Measurement... 19:46:11 Voltage Offset Correction: v_off_ini = 0.000005728 V, v_off_fin = 0.000002784 V 19:46:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967736 Vs 19:46:14 Temperature Measurement, Probe Number = 0, T = 20.182000 C 19:46:15 Temperature Measurement, Probe Number = 1, T = 20.102000 C 19:46:16 Temperature Measurement, Probe Number = 2, T = 20.165000 C 19:46:16 Temperature Measurement, Probe Number = 3, T = 20.107000 C 19:46:17 Temperature Measurement, Probe Number = 4, T = 20.499000 C 19:46:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.50 19:46:17 Integrated Voltage Measurement... 19:46:37 Voltage Offset Correction: v_off_ini = 0.000004167 V, v_off_fin = 0.000006037 V 19:46:37 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171030344 Vs 19:46:37 Integrated Voltage Measurement... 19:46:57 Voltage Offset Correction: v_off_ini = 0.000005784 V, v_off_fin = 0.000003524 V 19:46:57 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170967653 Vs 19:46:59 Temperature Measurement, Probe Number = 0, T = 20.183000 C 19:47:00 Temperature Measurement, Probe Number = 1, T = 20.101000 C 19:47:01 Temperature Measurement, Probe Number = 2, T = 20.166000 C 19:47:01 Temperature Measurement, Probe Number = 3, T = 20.109000 C 19:47:02 Temperature Measurement, Probe Number = 4, T = 20.488000 C 19:47:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.49 19:47:02 Integrated Voltage Measurement... 19:47:23 Voltage Offset Correction: v_off_ini = 0.000003560 V, v_off_fin = 0.000006266 V 19:47:23 Integrated Voltage Measurement Delta Gap = 0.0040002 m VT = 0.171027423 Vs 19:47:23 Integrated Voltage Measurement... 19:47:43 Voltage Offset Correction: v_off_ini = 0.000005616 V, v_off_fin = 0.000003317 V 19:47:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965498 Vs 19:47:45 Temperature Measurement, Probe Number = 0, T = 20.173000 C 19:47:46 Temperature Measurement, Probe Number = 1, T = 20.095000 C 19:47:47 Temperature Measurement, Probe Number = 2, T = 20.159000 C 19:47:47 Temperature Measurement, Probe Number = 3, T = 20.105000 C 19:47:48 Temperature Measurement, Probe Number = 4, T = 20.389000 C 19:47:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.39 19:47:48 Integrated Voltage Measurement... 19:48:08 Voltage Offset Correction: v_off_ini = 0.000004402 V, v_off_fin = 0.000006569 V 19:48:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037795 Vs 19:48:08 Integrated Voltage Measurement... 19:48:27 Voltage Offset Correction: v_off_ini = 0.000006450 V, v_off_fin = 0.000003010 V 19:48:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965032 Vs 19:48:30 Temperature Measurement, Probe Number = 0, T = 20.171000 C 19:48:31 Temperature Measurement, Probe Number = 1, T = 20.095000 C 19:48:32 Temperature Measurement, Probe Number = 2, T = 20.157000 C 19:48:32 Temperature Measurement, Probe Number = 3, T = 20.101000 C 19:48:33 Temperature Measurement, Probe Number = 4, T = 20.360000 C 19:48:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.36 19:48:33 Integrated Voltage Measurement... 19:48:52 Voltage Offset Correction: v_off_ini = 0.000003652 V, v_off_fin = 0.000006513 V 19:48:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028396 Vs 19:48:53 Integrated Voltage Measurement... 19:49:12 Voltage Offset Correction: v_off_ini = 0.000005650 V, v_off_fin = 0.000002920 V 19:49:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963637 Vs 19:49:15 Temperature Measurement, Probe Number = 0, T = 20.181000 C 19:49:15 Temperature Measurement, Probe Number = 1, T = 20.100000 C 19:49:16 Temperature Measurement, Probe Number = 2, T = 20.164000 C 19:49:17 Temperature Measurement, Probe Number = 3, T = 20.107000 C 19:49:17 Temperature Measurement, Probe Number = 4, T = 20.319000 C 19:49:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.32 19:49:18 Integrated Voltage Measurement... 19:49:37 Voltage Offset Correction: v_off_ini = 0.000003589 V, v_off_fin = 0.000006228 V 19:49:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033000 Vs 19:49:37 Integrated Voltage Measurement... 19:49:57 Voltage Offset Correction: v_off_ini = 0.000005780 V, v_off_fin = 0.000002596 V 19:49:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968385 Vs 19:50:00 Temperature Measurement, Probe Number = 0, T = 20.173000 C 19:50:00 Temperature Measurement, Probe Number = 1, T = 20.100000 C 19:50:01 Temperature Measurement, Probe Number = 2, T = 20.162000 C 19:50:02 Temperature Measurement, Probe Number = 3, T = 20.108000 C 19:50:02 Temperature Measurement, Probe Number = 4, T = 20.340000 C 19:50:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.34 19:50:02 Integrated Voltage Measurement... 19:50:22 Voltage Offset Correction: v_off_ini = 0.000003652 V, v_off_fin = 0.000006560 V 19:50:23 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171029011 Vs 19:50:23 Integrated Voltage Measurement... 19:50:42 Voltage Offset Correction: v_off_ini = 0.000005735 V, v_off_fin = 0.000003306 V 19:50:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959897 Vs 20:20:45 Temperature Measurement, Probe Number = 0, T = 20.174000 C 20:20:46 Temperature Measurement, Probe Number = 1, T = 20.102000 C 20:20:46 Temperature Measurement, Probe Number = 2, T = 20.160000 C 20:20:47 Temperature Measurement, Probe Number = 3, T = 20.108000 C 20:20:48 Temperature Measurement, Probe Number = 4, T = 20.381000 C 20:20:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.38 20:20:48 Integrated Voltage Measurement... 20:21:07 Voltage Offset Correction: v_off_ini = 0.000004991 V, v_off_fin = 0.000006747 V 20:21:07 Integrated Voltage Measurement Delta Gap = 0.0040010 m VT = 0.171077482 Vs 20:21:07 Integrated Voltage Measurement... 20:21:26 Voltage Offset Correction: v_off_ini = 0.000006447 V, v_off_fin = 0.000003527 V 20:21:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964302 Vs 20:21:29 Temperature Measurement, Probe Number = 0, T = 20.173000 C 20:21:30 Temperature Measurement, Probe Number = 1, T = 20.098000 C 20:21:31 Temperature Measurement, Probe Number = 2, T = 20.159000 C 20:21:31 Temperature Measurement, Probe Number = 3, T = 20.104000 C 20:21:32 Temperature Measurement, Probe Number = 4, T = 20.319000 C 20:21:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.32 20:21:32 Integrated Voltage Measurement... 20:21:52 Voltage Offset Correction: v_off_ini = 0.000004472 V, v_off_fin = 0.000006803 V 20:21:52 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171034829 Vs 20:21:52 Integrated Voltage Measurement... 20:22:12 Voltage Offset Correction: v_off_ini = 0.000006455 V, v_off_fin = 0.000003139 V 20:22:12 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170961967 Vs 20:22:15 Temperature Measurement, Probe Number = 0, T = 20.178000 C 20:22:15 Temperature Measurement, Probe Number = 1, T = 20.104000 C 20:22:16 Temperature Measurement, Probe Number = 2, T = 20.162000 C 20:22:17 Temperature Measurement, Probe Number = 3, T = 20.107000 C 20:22:17 Temperature Measurement, Probe Number = 4, T = 20.279000 C 20:22:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.28 20:22:18 Integrated Voltage Measurement... 20:22:37 Voltage Offset Correction: v_off_ini = 0.000003986 V, v_off_fin = 0.000006944 V 20:22:37 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171034235 Vs 20:22:37 Integrated Voltage Measurement... 20:22:57 Voltage Offset Correction: v_off_ini = 0.000006173 V, v_off_fin = 0.000003389 V 20:22:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963321 Vs 20:23:00 Temperature Measurement, Probe Number = 0, T = 20.180000 C 20:23:00 Temperature Measurement, Probe Number = 1, T = 20.103000 C 20:23:01 Temperature Measurement, Probe Number = 2, T = 20.167000 C 20:23:02 Temperature Measurement, Probe Number = 3, T = 20.110000 C 20:23:02 Temperature Measurement, Probe Number = 4, T = 20.402000 C 20:23:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.40 20:23:03 Integrated Voltage Measurement... 20:23:22 Voltage Offset Correction: v_off_ini = 0.000004120 V, v_off_fin = 0.000006140 V 20:23:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035907 Vs 20:23:23 Integrated Voltage Measurement... 20:23:42 Voltage Offset Correction: v_off_ini = 0.000005616 V, v_off_fin = 0.000003605 V 20:23:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967017 Vs 20:23:45 Temperature Measurement, Probe Number = 0, T = 20.176000 C 20:23:46 Temperature Measurement, Probe Number = 1, T = 20.100000 C 20:23:46 Temperature Measurement, Probe Number = 2, T = 20.165000 C 20:23:47 Temperature Measurement, Probe Number = 3, T = 20.110000 C 20:23:47 Temperature Measurement, Probe Number = 4, T = 20.478000 C 20:23:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.48 20:23:48 Integrated Voltage Measurement... 20:24:07 Voltage Offset Correction: v_off_ini = 0.000004329 V, v_off_fin = 0.000006439 V 20:24:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036359 Vs 20:24:07 Integrated Voltage Measurement... 20:24:27 Voltage Offset Correction: v_off_ini = 0.000005838 V, v_off_fin = 0.000003088 V 20:24:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967951 Vs 20:24:30 Temperature Measurement, Probe Number = 0, T = 20.176000 C 20:24:30 Temperature Measurement, Probe Number = 1, T = 20.101000 C 20:24:31 Temperature Measurement, Probe Number = 2, T = 20.159000 C 20:24:32 Temperature Measurement, Probe Number = 3, T = 20.105000 C 20:24:32 Temperature Measurement, Probe Number = 4, T = 20.429000 C 20:24:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.43 20:24:33 Integrated Voltage Measurement... 20:24:52 Voltage Offset Correction: v_off_ini = 0.000003923 V, v_off_fin = 0.000006460 V 20:24:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036868 Vs 20:24:52 Integrated Voltage Measurement... 20:25:11 Voltage Offset Correction: v_off_ini = 0.000005704 V, v_off_fin = 0.000002958 V 20:25:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966640 Vs 20:25:14 Temperature Measurement, Probe Number = 0, T = 20.178000 C 20:25:15 Temperature Measurement, Probe Number = 1, T = 20.102000 C 20:25:15 Temperature Measurement, Probe Number = 2, T = 20.162000 C 20:25:16 Temperature Measurement, Probe Number = 3, T = 20.104000 C 20:25:17 Temperature Measurement, Probe Number = 4, T = 20.375000 C 20:25:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.38 20:25:17 Integrated Voltage Measurement... 20:25:36 Voltage Offset Correction: v_off_ini = 0.000003859 V, v_off_fin = 0.000006240 V 20:25:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039393 Vs 20:25:36 Integrated Voltage Measurement... 20:25:56 Voltage Offset Correction: v_off_ini = 0.000006071 V, v_off_fin = 0.000003062 V 20:25:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966096 Vs 20:25:59 Temperature Measurement, Probe Number = 0, T = 20.178000 C 20:25:59 Temperature Measurement, Probe Number = 1, T = 20.100000 C 20:26:00 Temperature Measurement, Probe Number = 2, T = 20.163000 C 20:26:01 Temperature Measurement, Probe Number = 3, T = 20.106000 C 20:26:01 Temperature Measurement, Probe Number = 4, T = 20.306000 C 20:26:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.31 20:26:02 Integrated Voltage Measurement... 20:26:21 Voltage Offset Correction: v_off_ini = 0.000003617 V, v_off_fin = 0.000006261 V 20:26:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031609 Vs 20:26:21 Integrated Voltage Measurement... 20:26:40 Voltage Offset Correction: v_off_ini = 0.000005343 V, v_off_fin = 0.000002807 V 20:26:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967860 Vs 20:26:43 Temperature Measurement, Probe Number = 0, T = 20.178000 C 20:26:44 Temperature Measurement, Probe Number = 1, T = 20.104000 C 20:26:45 Temperature Measurement, Probe Number = 2, T = 20.162000 C 20:26:45 Temperature Measurement, Probe Number = 3, T = 20.107000 C 20:26:46 Temperature Measurement, Probe Number = 4, T = 20.244000 C 20:26:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.24 20:26:46 Integrated Voltage Measurement... 20:27:05 Voltage Offset Correction: v_off_ini = 0.000004019 V, v_off_fin = 0.000005691 V 20:27:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031252 Vs 20:27:06 Integrated Voltage Measurement... 20:27:25 Voltage Offset Correction: v_off_ini = 0.000006113 V, v_off_fin = 0.000003098 V 20:27:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969194 Vs 20:27:28 Temperature Measurement, Probe Number = 0, T = 20.178000 C 20:27:28 Temperature Measurement, Probe Number = 1, T = 20.103000 C 20:27:29 Temperature Measurement, Probe Number = 2, T = 20.163000 C 20:27:30 Temperature Measurement, Probe Number = 3, T = 20.106000 C 20:27:30 Temperature Measurement, Probe Number = 4, T = 20.222000 C 20:27:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.22 20:27:31 Integrated Voltage Measurement... 20:27:50 Voltage Offset Correction: v_off_ini = 0.000003737 V, v_off_fin = 0.000006253 V 20:27:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037358 Vs 20:27:51 Integrated Voltage Measurement... 20:28:09 Voltage Offset Correction: v_off_ini = 0.000005687 V, v_off_fin = 0.000002993 V 20:28:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964400 Vs 20:58:12 Temperature Measurement, Probe Number = 0, T = 20.169000 C 20:58:13 Temperature Measurement, Probe Number = 1, T = 20.093000 C 20:58:14 Temperature Measurement, Probe Number = 2, T = 20.158000 C 20:58:15 Temperature Measurement, Probe Number = 3, T = 20.103000 C 20:58:15 Temperature Measurement, Probe Number = 4, T = 20.280000 C 20:58:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.28 20:58:15 Integrated Voltage Measurement... 20:58:34 Voltage Offset Correction: v_off_ini = 0.000004662 V, v_off_fin = 0.000006351 V 20:58:35 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171078733 Vs 20:58:35 Integrated Voltage Measurement... 20:58:54 Voltage Offset Correction: v_off_ini = 0.000005615 V, v_off_fin = 0.000003669 V 20:58:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968141 Vs 20:58:57 Temperature Measurement, Probe Number = 0, T = 20.171000 C 20:58:57 Temperature Measurement, Probe Number = 1, T = 20.094000 C 20:58:58 Temperature Measurement, Probe Number = 2, T = 20.159000 C 20:58:59 Temperature Measurement, Probe Number = 3, T = 20.103000 C 20:59:00 Temperature Measurement, Probe Number = 4, T = 20.295000 C 20:59:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.30 20:59:00 Integrated Voltage Measurement... 20:59:19 Voltage Offset Correction: v_off_ini = 0.000003775 V, v_off_fin = 0.000006086 V 20:59:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171027783 Vs 20:59:19 Integrated Voltage Measurement... 20:59:38 Voltage Offset Correction: v_off_ini = 0.000005427 V, v_off_fin = 0.000002732 V 20:59:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969215 Vs 20:59:41 Temperature Measurement, Probe Number = 0, T = 20.176000 C 20:59:42 Temperature Measurement, Probe Number = 1, T = 20.099000 C 20:59:43 Temperature Measurement, Probe Number = 2, T = 20.161000 C 20:59:43 Temperature Measurement, Probe Number = 3, T = 20.108000 C 20:59:44 Temperature Measurement, Probe Number = 4, T = 20.249000 C 20:59:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.25 20:59:44 Integrated Voltage Measurement... 21:00:03 Voltage Offset Correction: v_off_ini = 0.000003882 V, v_off_fin = 0.000005647 V 21:00:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030305 Vs 21:00:04 Integrated Voltage Measurement... 21:00:23 Voltage Offset Correction: v_off_ini = 0.000005628 V, v_off_fin = 0.000003010 V 21:00:23 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170970232 Vs 21:00:26 Temperature Measurement, Probe Number = 0, T = 20.177000 C 21:00:27 Temperature Measurement, Probe Number = 1, T = 20.095000 C 21:00:27 Temperature Measurement, Probe Number = 2, T = 20.164000 C 21:00:28 Temperature Measurement, Probe Number = 3, T = 20.105000 C 21:00:29 Temperature Measurement, Probe Number = 4, T = 20.333000 C 21:00:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.33 21:00:29 Integrated Voltage Measurement... 21:00:48 Voltage Offset Correction: v_off_ini = 0.000003948 V, v_off_fin = 0.000006325 V 21:00:49 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171030517 Vs 21:00:49 Integrated Voltage Measurement... 21:01:08 Voltage Offset Correction: v_off_ini = 0.000006060 V, v_off_fin = 0.000003367 V 21:01:09 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170965305 Vs 21:01:11 Temperature Measurement, Probe Number = 0, T = 20.174000 C 21:01:12 Temperature Measurement, Probe Number = 1, T = 20.096000 C 21:01:13 Temperature Measurement, Probe Number = 2, T = 20.160000 C 21:01:13 Temperature Measurement, Probe Number = 3, T = 20.103000 C 21:01:14 Temperature Measurement, Probe Number = 4, T = 20.279000 C 21:01:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.28 21:01:14 Integrated Voltage Measurement... 21:01:33 Voltage Offset Correction: v_off_ini = 0.000004394 V, v_off_fin = 0.000006712 V 21:01:34 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171032126 Vs 21:01:34 Integrated Voltage Measurement... 21:01:53 Voltage Offset Correction: v_off_ini = 0.000006179 V, v_off_fin = 0.000002900 V 21:01:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964515 Vs 21:01:56 Temperature Measurement, Probe Number = 0, T = 20.177000 C 21:01:57 Temperature Measurement, Probe Number = 1, T = 20.099000 C 21:01:57 Temperature Measurement, Probe Number = 2, T = 20.163000 C 21:01:58 Temperature Measurement, Probe Number = 3, T = 20.107000 C 21:01:59 Temperature Measurement, Probe Number = 4, T = 20.398000 C 21:01:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.40 21:01:59 Integrated Voltage Measurement... 21:02:18 Voltage Offset Correction: v_off_ini = 0.000004582 V, v_off_fin = 0.000006776 V 21:02:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039317 Vs 21:02:18 Integrated Voltage Measurement... 21:02:37 Voltage Offset Correction: v_off_ini = 0.000006199 V, v_off_fin = 0.000003272 V 21:02:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962296 Vs 21:02:40 Temperature Measurement, Probe Number = 0, T = 20.175000 C 21:02:41 Temperature Measurement, Probe Number = 1, T = 20.096000 C 21:02:42 Temperature Measurement, Probe Number = 2, T = 20.162000 C 21:02:42 Temperature Measurement, Probe Number = 3, T = 20.104000 C 21:02:43 Temperature Measurement, Probe Number = 4, T = 20.425000 C 21:02:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.43 21:02:43 Integrated Voltage Measurement... 21:03:02 Voltage Offset Correction: v_off_ini = 0.000005319 V, v_off_fin = 0.000007267 V 21:03:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041394 Vs 21:03:03 Integrated Voltage Measurement... 21:03:22 Voltage Offset Correction: v_off_ini = 0.000006342 V, v_off_fin = 0.000003593 V 21:03:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956503 Vs 21:03:25 Temperature Measurement, Probe Number = 0, T = 20.179000 C 21:03:25 Temperature Measurement, Probe Number = 1, T = 20.100000 C 21:03:26 Temperature Measurement, Probe Number = 2, T = 20.163000 C 21:03:27 Temperature Measurement, Probe Number = 3, T = 20.107000 C 21:03:27 Temperature Measurement, Probe Number = 4, T = 20.410000 C 21:03:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.41 21:03:27 Integrated Voltage Measurement... 21:03:47 Voltage Offset Correction: v_off_ini = 0.000004330 V, v_off_fin = 0.000006564 V 21:03:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038074 Vs 21:03:48 Integrated Voltage Measurement... 21:04:07 Voltage Offset Correction: v_off_ini = 0.000006198 V, v_off_fin = 0.000003008 V 21:04:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960970 Vs 21:04:10 Temperature Measurement, Probe Number = 0, T = 20.181000 C 21:04:10 Temperature Measurement, Probe Number = 1, T = 20.103000 C 21:04:11 Temperature Measurement, Probe Number = 2, T = 20.166000 C 21:04:12 Temperature Measurement, Probe Number = 3, T = 20.110000 C 21:04:12 Temperature Measurement, Probe Number = 4, T = 20.445000 C 21:04:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.45 21:04:13 Integrated Voltage Measurement... 21:04:32 Voltage Offset Correction: v_off_ini = 0.000004340 V, v_off_fin = 0.000006649 V 21:04:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037505 Vs 21:04:32 Integrated Voltage Measurement... 21:04:52 Voltage Offset Correction: v_off_ini = 0.000005996 V, v_off_fin = 0.000002685 V 21:04:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965947 Vs 21:04:54 Temperature Measurement, Probe Number = 0, T = 20.175000 C 21:04:55 Temperature Measurement, Probe Number = 1, T = 20.100000 C 21:04:56 Temperature Measurement, Probe Number = 2, T = 20.160000 C 21:04:56 Temperature Measurement, Probe Number = 3, T = 20.105000 C 21:04:57 Temperature Measurement, Probe Number = 4, T = 20.399000 C 21:04:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.40 21:04:57 Integrated Voltage Measurement... 21:05:17 Voltage Offset Correction: v_off_ini = 0.000004483 V, v_off_fin = 0.000006358 V 21:05:17 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171037814 Vs 21:05:17 Integrated Voltage Measurement... 21:05:36 Voltage Offset Correction: v_off_ini = 0.000006096 V, v_off_fin = 0.000002566 V 21:05:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961987 Vs 21:35:39 Temperature Measurement, Probe Number = 0, T = 20.168000 C 21:35:40 Temperature Measurement, Probe Number = 1, T = 20.088000 C 21:35:40 Temperature Measurement, Probe Number = 2, T = 20.156000 C 21:35:41 Temperature Measurement, Probe Number = 3, T = 20.099000 C 21:35:42 Temperature Measurement, Probe Number = 4, T = 20.315000 C 21:35:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.32 21:35:42 Integrated Voltage Measurement... 21:36:02 Voltage Offset Correction: v_off_ini = 0.000004499 V, v_off_fin = 0.000006039 V 21:36:02 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171077909 Vs 21:36:02 Integrated Voltage Measurement... 21:36:21 Voltage Offset Correction: v_off_ini = 0.000005452 V, v_off_fin = 0.000003014 V 21:36:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969915 Vs 21:36:24 Temperature Measurement, Probe Number = 0, T = 20.173000 C 21:36:25 Temperature Measurement, Probe Number = 1, T = 20.094000 C 21:36:26 Temperature Measurement, Probe Number = 2, T = 20.159000 C 21:36:26 Temperature Measurement, Probe Number = 3, T = 20.101000 C 21:36:27 Temperature Measurement, Probe Number = 4, T = 20.350000 C 21:36:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.35 21:36:27 Integrated Voltage Measurement... 21:36:46 Voltage Offset Correction: v_off_ini = 0.000004228 V, v_off_fin = 0.000006518 V 21:36:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037125 Vs 21:36:46 Integrated Voltage Measurement... 21:37:06 Voltage Offset Correction: v_off_ini = 0.000005959 V, v_off_fin = 0.000003587 V 21:37:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964214 Vs 21:37:09 Temperature Measurement, Probe Number = 0, T = 20.175000 C 21:37:09 Temperature Measurement, Probe Number = 1, T = 20.099000 C 21:37:10 Temperature Measurement, Probe Number = 2, T = 20.160000 C 21:37:11 Temperature Measurement, Probe Number = 3, T = 20.103000 C 21:37:11 Temperature Measurement, Probe Number = 4, T = 20.291000 C 21:37:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.29 21:37:11 Integrated Voltage Measurement... 21:37:31 Voltage Offset Correction: v_off_ini = 0.000004841 V, v_off_fin = 0.000006017 V 21:37:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041308 Vs 21:37:31 Integrated Voltage Measurement... 21:37:51 Voltage Offset Correction: v_off_ini = 0.000005844 V, v_off_fin = 0.000002890 V 21:37:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966339 Vs 21:37:53 Temperature Measurement, Probe Number = 0, T = 20.174000 C 21:37:54 Temperature Measurement, Probe Number = 1, T = 20.098000 C 21:37:55 Temperature Measurement, Probe Number = 2, T = 20.160000 C 21:37:55 Temperature Measurement, Probe Number = 3, T = 20.106000 C 21:37:56 Temperature Measurement, Probe Number = 4, T = 20.269000 C 21:37:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.27 21:37:56 Integrated Voltage Measurement... 21:38:16 Voltage Offset Correction: v_off_ini = 0.000004472 V, v_off_fin = 0.000006059 V 21:38:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037850 Vs 21:38:16 Integrated Voltage Measurement... 21:38:36 Voltage Offset Correction: v_off_ini = 0.000005908 V, v_off_fin = 0.000002960 V 21:38:36 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170968036 Vs 21:38:39 Temperature Measurement, Probe Number = 0, T = 20.172000 C 21:38:40 Temperature Measurement, Probe Number = 1, T = 20.095000 C 21:38:40 Temperature Measurement, Probe Number = 2, T = 20.158000 C 21:38:41 Temperature Measurement, Probe Number = 3, T = 20.104000 C 21:38:41 Temperature Measurement, Probe Number = 4, T = 20.333000 C 21:38:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.33 21:38:42 Integrated Voltage Measurement... 21:39:01 Voltage Offset Correction: v_off_ini = 0.000003995 V, v_off_fin = 0.000006214 V 21:39:01 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171036458 Vs 21:39:01 Integrated Voltage Measurement... 21:39:21 Voltage Offset Correction: v_off_ini = 0.000006070 V, v_off_fin = 0.000002867 V 21:39:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968296 Vs 21:39:24 Temperature Measurement, Probe Number = 0, T = 20.176000 C 21:39:24 Temperature Measurement, Probe Number = 1, T = 20.096000 C 21:39:25 Temperature Measurement, Probe Number = 2, T = 20.161000 C 21:39:26 Temperature Measurement, Probe Number = 3, T = 20.104000 C 21:39:26 Temperature Measurement, Probe Number = 4, T = 20.303000 C 21:39:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.30 21:39:26 Integrated Voltage Measurement... 21:39:46 Voltage Offset Correction: v_off_ini = 0.000003440 V, v_off_fin = 0.000006077 V 21:39:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036421 Vs 21:39:46 Integrated Voltage Measurement... 21:40:05 Voltage Offset Correction: v_off_ini = 0.000005914 V, v_off_fin = 0.000003027 V 21:40:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968074 Vs 21:40:08 Temperature Measurement, Probe Number = 0, T = 20.176000 C 21:40:09 Temperature Measurement, Probe Number = 1, T = 20.098000 C 21:40:09 Temperature Measurement, Probe Number = 2, T = 20.162000 C 21:40:10 Temperature Measurement, Probe Number = 3, T = 20.107000 C 21:40:11 Temperature Measurement, Probe Number = 4, T = 20.384000 C 21:40:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.38 21:40:11 Integrated Voltage Measurement... 21:40:30 Voltage Offset Correction: v_off_ini = 0.000004104 V, v_off_fin = 0.000006240 V 21:40:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042190 Vs 21:40:30 Integrated Voltage Measurement... 21:40:50 Voltage Offset Correction: v_off_ini = 0.000006027 V, v_off_fin = 0.000002501 V 21:40:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968517 Vs 21:40:53 Temperature Measurement, Probe Number = 0, T = 20.176000 C 21:40:54 Temperature Measurement, Probe Number = 1, T = 20.097000 C 21:40:54 Temperature Measurement, Probe Number = 2, T = 20.162000 C 21:40:55 Temperature Measurement, Probe Number = 3, T = 20.107000 C 21:40:56 Temperature Measurement, Probe Number = 4, T = 20.338000 C 21:40:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.34 21:40:56 Integrated Voltage Measurement... 21:41:15 Voltage Offset Correction: v_off_ini = 0.000004748 V, v_off_fin = 0.000006435 V 21:41:15 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171037757 Vs 21:41:15 Integrated Voltage Measurement... 21:41:35 Voltage Offset Correction: v_off_ini = 0.000006232 V, v_off_fin = 0.000003113 V 21:41:35 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170965477 Vs 21:41:38 Temperature Measurement, Probe Number = 0, T = 20.178000 C 21:41:39 Temperature Measurement, Probe Number = 1, T = 20.099000 C 21:41:40 Temperature Measurement, Probe Number = 2, T = 20.164000 C 21:41:40 Temperature Measurement, Probe Number = 3, T = 20.109000 C 21:41:41 Temperature Measurement, Probe Number = 4, T = 20.357000 C 21:41:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.36 21:41:41 Integrated Voltage Measurement... 21:42:00 Voltage Offset Correction: v_off_ini = 0.000004418 V, v_off_fin = 0.000005805 V 21:42:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034668 Vs 21:42:01 Integrated Voltage Measurement... 21:42:20 Voltage Offset Correction: v_off_ini = 0.000005469 V, v_off_fin = 0.000003928 V 21:42:20 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170970366 Vs 21:42:23 Temperature Measurement, Probe Number = 0, T = 20.174000 C 21:42:24 Temperature Measurement, Probe Number = 1, T = 20.093000 C 21:42:25 Temperature Measurement, Probe Number = 2, T = 20.164000 C 21:42:25 Temperature Measurement, Probe Number = 3, T = 20.105000 C 21:42:26 Temperature Measurement, Probe Number = 4, T = 20.408000 C 21:42:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.41 21:42:26 Integrated Voltage Measurement... 21:42:45 Voltage Offset Correction: v_off_ini = 0.000004252 V, v_off_fin = 0.000006352 V 21:42:46 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171041749 Vs 21:42:46 Integrated Voltage Measurement... 21:43:05 Voltage Offset Correction: v_off_ini = 0.000006053 V, v_off_fin = 0.000002887 V 21:43:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969191 Vs 22:13:08 Temperature Measurement, Probe Number = 0, T = 20.169000 C 22:13:09 Temperature Measurement, Probe Number = 1, T = 20.092000 C 22:13:10 Temperature Measurement, Probe Number = 2, T = 20.159000 C 22:13:10 Temperature Measurement, Probe Number = 3, T = 20.104000 C 22:13:11 Temperature Measurement, Probe Number = 4, T = 20.247000 C 22:13:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.25 22:13:11 Integrated Voltage Measurement... 22:13:30 Voltage Offset Correction: v_off_ini = 0.000005033 V, v_off_fin = 0.000006132 V 22:13:31 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171082883 Vs 22:13:31 Integrated Voltage Measurement... 22:13:50 Voltage Offset Correction: v_off_ini = 0.000005681 V, v_off_fin = 0.000003257 V 22:13:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975580 Vs 22:13:53 Temperature Measurement, Probe Number = 0, T = 20.166000 C 22:13:54 Temperature Measurement, Probe Number = 1, T = 20.091000 C 22:13:54 Temperature Measurement, Probe Number = 2, T = 20.155000 C 22:13:55 Temperature Measurement, Probe Number = 3, T = 20.101000 C 22:13:56 Temperature Measurement, Probe Number = 4, T = 20.247000 C 22:13:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.25 22:13:56 Integrated Voltage Measurement... 22:14:15 Voltage Offset Correction: v_off_ini = 0.000004155 V, v_off_fin = 0.000006272 V 22:14:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041981 Vs 22:14:16 Integrated Voltage Measurement... 22:14:34 Voltage Offset Correction: v_off_ini = 0.000005815 V, v_off_fin = 0.000002251 V 22:14:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973035 Vs 22:14:37 Temperature Measurement, Probe Number = 0, T = 20.172000 C 22:14:38 Temperature Measurement, Probe Number = 1, T = 20.093000 C 22:14:39 Temperature Measurement, Probe Number = 2, T = 20.156000 C 22:14:39 Temperature Measurement, Probe Number = 3, T = 20.100000 C 22:14:40 Temperature Measurement, Probe Number = 4, T = 20.242000 C 22:14:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.24 22:14:40 Integrated Voltage Measurement... 22:14:59 Voltage Offset Correction: v_off_ini = 0.000004039 V, v_off_fin = 0.000006361 V 22:15:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044375 Vs 22:15:00 Integrated Voltage Measurement... 22:15:19 Voltage Offset Correction: v_off_ini = 0.000006011 V, v_off_fin = 0.000002546 V 22:15:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973953 Vs 22:15:22 Temperature Measurement, Probe Number = 0, T = 20.172000 C 22:15:23 Temperature Measurement, Probe Number = 1, T = 20.092000 C 22:15:23 Temperature Measurement, Probe Number = 2, T = 20.158000 C 22:15:24 Temperature Measurement, Probe Number = 3, T = 20.102000 C 22:15:25 Temperature Measurement, Probe Number = 4, T = 20.294000 C 22:15:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.29 22:15:25 Integrated Voltage Measurement... 22:15:45 Voltage Offset Correction: v_off_ini = 0.000003946 V, v_off_fin = 0.000005967 V 22:15:45 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171042881 Vs 22:15:45 Integrated Voltage Measurement... 22:16:04 Voltage Offset Correction: v_off_ini = 0.000005610 V, v_off_fin = 0.000002404 V 22:16:05 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170973020 Vs 22:16:07 Temperature Measurement, Probe Number = 0, T = 20.173000 C 22:16:08 Temperature Measurement, Probe Number = 1, T = 20.095000 C 22:16:09 Temperature Measurement, Probe Number = 2, T = 20.158000 C 22:16:09 Temperature Measurement, Probe Number = 3, T = 20.105000 C 22:16:10 Temperature Measurement, Probe Number = 4, T = 20.393000 C 22:16:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.39 22:16:10 Integrated Voltage Measurement... 22:16:30 Voltage Offset Correction: v_off_ini = 0.000003984 V, v_off_fin = 0.000007183 V 22:16:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044492 Vs 22:16:30 Integrated Voltage Measurement... 22:16:50 Voltage Offset Correction: v_off_ini = 0.000006091 V, v_off_fin = 0.000003128 V 22:16:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969350 Vs 22:16:52 Temperature Measurement, Probe Number = 0, T = 20.171000 C 22:16:53 Temperature Measurement, Probe Number = 1, T = 20.093000 C 22:16:54 Temperature Measurement, Probe Number = 2, T = 20.157000 C 22:16:54 Temperature Measurement, Probe Number = 3, T = 20.101000 C 22:16:55 Temperature Measurement, Probe Number = 4, T = 20.372000 C 22:16:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.37 22:16:55 Integrated Voltage Measurement... 22:17:14 Voltage Offset Correction: v_off_ini = 0.000004586 V, v_off_fin = 0.000006200 V 22:17:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049961 Vs 22:17:15 Integrated Voltage Measurement... 22:17:34 Voltage Offset Correction: v_off_ini = 0.000005958 V, v_off_fin = 0.000002295 V 22:17:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975639 Vs 22:17:37 Temperature Measurement, Probe Number = 0, T = 20.169000 C 22:17:38 Temperature Measurement, Probe Number = 1, T = 20.093000 C 22:17:38 Temperature Measurement, Probe Number = 2, T = 20.158000 C 22:17:39 Temperature Measurement, Probe Number = 3, T = 20.104000 C 22:17:40 Temperature Measurement, Probe Number = 4, T = 20.432000 C 22:17:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.43 22:17:40 Integrated Voltage Measurement... 22:17:59 Voltage Offset Correction: v_off_ini = 0.000004129 V, v_off_fin = 0.000006211 V 22:17:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045554 Vs 22:17:59 Integrated Voltage Measurement... 22:18:19 Voltage Offset Correction: v_off_ini = 0.000006079 V, v_off_fin = 0.000003286 V 22:18:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971282 Vs 22:18:21 Temperature Measurement, Probe Number = 0, T = 20.171000 C 22:18:22 Temperature Measurement, Probe Number = 1, T = 20.091000 C 22:18:23 Temperature Measurement, Probe Number = 2, T = 20.160000 C 22:18:23 Temperature Measurement, Probe Number = 3, T = 20.104000 C 22:18:24 Temperature Measurement, Probe Number = 4, T = 20.487000 C 22:18:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.49 22:18:24 Integrated Voltage Measurement... 22:18:44 Voltage Offset Correction: v_off_ini = 0.000004267 V, v_off_fin = 0.000006436 V 22:18:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046792 Vs 22:18:44 Integrated Voltage Measurement... 22:19:03 Voltage Offset Correction: v_off_ini = 0.000006175 V, v_off_fin = 0.000003483 V 22:19:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972513 Vs 22:19:06 Temperature Measurement, Probe Number = 0, T = 20.171000 C 22:19:07 Temperature Measurement, Probe Number = 1, T = 20.090000 C 22:19:08 Temperature Measurement, Probe Number = 2, T = 20.159000 C 22:19:08 Temperature Measurement, Probe Number = 3, T = 20.101000 C 22:19:09 Temperature Measurement, Probe Number = 4, T = 20.466000 C 22:19:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.47 22:19:09 Integrated Voltage Measurement... 22:19:28 Voltage Offset Correction: v_off_ini = 0.000004852 V, v_off_fin = 0.000006457 V 22:19:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052138 Vs 22:19:29 Integrated Voltage Measurement... 22:19:48 Voltage Offset Correction: v_off_ini = 0.000006408 V, v_off_fin = 0.000003137 V 22:19:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969586 Vs 22:19:51 Temperature Measurement, Probe Number = 0, T = 20.174000 C 22:19:52 Temperature Measurement, Probe Number = 1, T = 20.092000 C 22:19:52 Temperature Measurement, Probe Number = 2, T = 20.163000 C 22:19:53 Temperature Measurement, Probe Number = 3, T = 20.104000 C 22:19:54 Temperature Measurement, Probe Number = 4, T = 20.507000 C 22:19:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.51 22:19:54 Integrated Voltage Measurement... 22:20:13 Voltage Offset Correction: v_off_ini = 0.000004140 V, v_off_fin = 0.000006445 V 22:20:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046592 Vs 22:20:13 Integrated Voltage Measurement... 22:20:32 Voltage Offset Correction: v_off_ini = 0.000006556 V, v_off_fin = 0.000003445 V 22:20:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966944 Vs 22:50:35 Temperature Measurement, Probe Number = 0, T = 20.163000 C 22:50:36 Temperature Measurement, Probe Number = 1, T = 20.086000 C 22:50:37 Temperature Measurement, Probe Number = 2, T = 20.152000 C 22:50:37 Temperature Measurement, Probe Number = 3, T = 20.096000 C 22:50:38 Temperature Measurement, Probe Number = 4, T = 20.214000 C 22:50:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.21 22:50:38 Integrated Voltage Measurement... 22:50:57 Voltage Offset Correction: v_off_ini = 0.000005282 V, v_off_fin = 0.000006916 V 22:50:58 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171083426 Vs 22:50:58 Integrated Voltage Measurement... 22:51:17 Voltage Offset Correction: v_off_ini = 0.000006364 V, v_off_fin = 0.000002847 V 22:51:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973034 Vs 22:51:20 Temperature Measurement, Probe Number = 0, T = 20.163000 C 22:51:20 Temperature Measurement, Probe Number = 1, T = 20.081000 C 22:51:21 Temperature Measurement, Probe Number = 2, T = 20.153000 C 22:51:22 Temperature Measurement, Probe Number = 3, T = 20.093000 C 22:51:22 Temperature Measurement, Probe Number = 4, T = 20.215000 C 22:51:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.21 22:51:23 Integrated Voltage Measurement... 22:51:42 Voltage Offset Correction: v_off_ini = 0.000004493 V, v_off_fin = 0.000007451 V 22:51:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048522 Vs 22:51:42 Integrated Voltage Measurement... 22:52:01 Voltage Offset Correction: v_off_ini = 0.000006587 V, v_off_fin = 0.000003406 V 22:52:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973307 Vs 22:52:04 Temperature Measurement, Probe Number = 0, T = 20.162000 C 22:52:05 Temperature Measurement, Probe Number = 1, T = 20.080000 C 22:52:06 Temperature Measurement, Probe Number = 2, T = 20.149000 C 22:52:06 Temperature Measurement, Probe Number = 3, T = 20.091000 C 22:52:07 Temperature Measurement, Probe Number = 4, T = 20.209000 C 22:52:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.21 22:52:07 Integrated Voltage Measurement... 22:52:26 Voltage Offset Correction: v_off_ini = 0.000004494 V, v_off_fin = 0.000006593 V 22:52:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050646 Vs 22:52:27 Integrated Voltage Measurement... 22:52:46 Voltage Offset Correction: v_off_ini = 0.000005947 V, v_off_fin = 0.000003362 V 22:52:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974179 Vs 22:52:49 Temperature Measurement, Probe Number = 0, T = 20.157000 C 22:52:49 Temperature Measurement, Probe Number = 1, T = 20.080000 C 22:52:50 Temperature Measurement, Probe Number = 2, T = 20.146000 C 22:52:51 Temperature Measurement, Probe Number = 3, T = 20.090000 C 22:52:51 Temperature Measurement, Probe Number = 4, T = 20.176000 C 22:52:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.18 22:52:52 Integrated Voltage Measurement... 22:53:11 Voltage Offset Correction: v_off_ini = 0.000004043 V, v_off_fin = 0.000005519 V 22:53:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044170 Vs 22:53:11 Integrated Voltage Measurement... 22:53:30 Voltage Offset Correction: v_off_ini = 0.000005438 V, v_off_fin = 0.000002291 V 22:53:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981955 Vs 22:53:33 Temperature Measurement, Probe Number = 0, T = 20.166000 C 22:53:34 Temperature Measurement, Probe Number = 1, T = 20.090000 C 22:53:35 Temperature Measurement, Probe Number = 2, T = 20.153000 C 22:53:35 Temperature Measurement, Probe Number = 3, T = 20.098000 C 22:53:36 Temperature Measurement, Probe Number = 4, T = 20.207000 C 22:53:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.21 22:53:36 Integrated Voltage Measurement... 22:53:56 Voltage Offset Correction: v_off_ini = 0.000004015 V, v_off_fin = 0.000006515 V 22:53:56 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171048285 Vs 22:53:56 Integrated Voltage Measurement... 22:54:15 Voltage Offset Correction: v_off_ini = 0.000005936 V, v_off_fin = 0.000002828 V 22:54:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973918 Vs 22:54:18 Temperature Measurement, Probe Number = 0, T = 20.171000 C 22:54:19 Temperature Measurement, Probe Number = 1, T = 20.094000 C 22:54:19 Temperature Measurement, Probe Number = 2, T = 20.159000 C 22:54:20 Temperature Measurement, Probe Number = 3, T = 20.102000 C 22:54:21 Temperature Measurement, Probe Number = 4, T = 20.264000 C 22:54:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.26 22:54:21 Integrated Voltage Measurement... 22:54:40 Voltage Offset Correction: v_off_ini = 0.000003712 V, v_off_fin = 0.000006313 V 22:54:40 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171048323 Vs 22:54:40 Integrated Voltage Measurement... 22:54:59 Voltage Offset Correction: v_off_ini = 0.000005833 V, v_off_fin = 0.000002996 V 22:55:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976321 Vs 22:55:02 Temperature Measurement, Probe Number = 0, T = 20.166000 C 22:55:03 Temperature Measurement, Probe Number = 1, T = 20.088000 C 22:55:04 Temperature Measurement, Probe Number = 2, T = 20.155000 C 22:55:04 Temperature Measurement, Probe Number = 3, T = 20.097000 C 22:55:05 Temperature Measurement, Probe Number = 4, T = 20.275000 C 22:55:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.27 22:55:05 Integrated Voltage Measurement... 22:55:24 Voltage Offset Correction: v_off_ini = 0.000004564 V, v_off_fin = 0.000007005 V 22:55:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049701 Vs 22:55:25 Integrated Voltage Measurement... 22:55:44 Voltage Offset Correction: v_off_ini = 0.000006452 V, v_off_fin = 0.000002746 V 22:55:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975121 Vs 22:55:47 Temperature Measurement, Probe Number = 0, T = 20.166000 C 22:55:47 Temperature Measurement, Probe Number = 1, T = 20.089000 C 22:55:48 Temperature Measurement, Probe Number = 2, T = 20.156000 C 22:55:49 Temperature Measurement, Probe Number = 3, T = 20.096000 C 22:55:49 Temperature Measurement, Probe Number = 4, T = 20.250000 C 22:55:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.25 22:55:49 Integrated Voltage Measurement... 22:56:09 Voltage Offset Correction: v_off_ini = 0.000004132 V, v_off_fin = 0.000006682 V 22:56:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053445 Vs 22:56:10 Integrated Voltage Measurement... 22:56:29 Voltage Offset Correction: v_off_ini = 0.000006218 V, v_off_fin = 0.000002615 V 22:56:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974897 Vs 22:56:32 Temperature Measurement, Probe Number = 0, T = 20.167000 C 22:56:32 Temperature Measurement, Probe Number = 1, T = 20.085000 C 22:56:33 Temperature Measurement, Probe Number = 2, T = 20.155000 C 22:56:34 Temperature Measurement, Probe Number = 3, T = 20.095000 C 22:56:34 Temperature Measurement, Probe Number = 4, T = 20.248000 C 22:56:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.25 22:56:35 Integrated Voltage Measurement... 22:56:54 Voltage Offset Correction: v_off_ini = 0.000003492 V, v_off_fin = 0.000006453 V 22:56:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048668 Vs 22:56:54 Integrated Voltage Measurement... 22:57:13 Voltage Offset Correction: v_off_ini = 0.000005740 V, v_off_fin = 0.000002432 V 22:57:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978348 Vs 22:57:16 Temperature Measurement, Probe Number = 0, T = 20.160000 C 22:57:17 Temperature Measurement, Probe Number = 1, T = 20.082000 C 22:57:18 Temperature Measurement, Probe Number = 2, T = 20.150000 C 22:57:18 Temperature Measurement, Probe Number = 3, T = 20.093000 C 22:57:19 Temperature Measurement, Probe Number = 4, T = 20.253000 C 22:57:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.25 22:57:19 Integrated Voltage Measurement... 22:57:38 Voltage Offset Correction: v_off_ini = 0.000003926 V, v_off_fin = 0.000006400 V 22:57:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050651 Vs 22:57:39 Integrated Voltage Measurement... 22:57:58 Voltage Offset Correction: v_off_ini = 0.000006079 V, v_off_fin = 0.000002982 V 22:57:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975207 Vs 23:28:01 Temperature Measurement, Probe Number = 0, T = 20.156000 C 23:28:02 Temperature Measurement, Probe Number = 1, T = 20.078000 C 23:28:03 Temperature Measurement, Probe Number = 2, T = 20.147000 C 23:28:03 Temperature Measurement, Probe Number = 3, T = 20.091000 C 23:28:04 Temperature Measurement, Probe Number = 4, T = 20.267000 C 23:28:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.27 23:28:04 Integrated Voltage Measurement... 23:28:23 Voltage Offset Correction: v_off_ini = 0.000005104 V, v_off_fin = 0.000006572 V 23:28:23 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171093084 Vs 23:28:23 Integrated Voltage Measurement... 23:28:43 Voltage Offset Correction: v_off_ini = 0.000006451 V, v_off_fin = 0.000003537 V 23:28:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979321 Vs 23:28:46 Temperature Measurement, Probe Number = 0, T = 20.164000 C 23:28:46 Temperature Measurement, Probe Number = 1, T = 20.083000 C 23:28:47 Temperature Measurement, Probe Number = 2, T = 20.152000 C 23:28:48 Temperature Measurement, Probe Number = 3, T = 20.095000 C 23:28:48 Temperature Measurement, Probe Number = 4, T = 20.303000 C 23:28:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.30 23:28:48 Integrated Voltage Measurement... 23:29:08 Voltage Offset Correction: v_off_ini = 0.000004214 V, v_off_fin = 0.000006599 V 23:29:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053715 Vs 23:29:08 Integrated Voltage Measurement... 23:29:27 Voltage Offset Correction: v_off_ini = 0.000006069 V, v_off_fin = 0.000002453 V 23:29:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978039 Vs 23:29:30 Temperature Measurement, Probe Number = 0, T = 20.164000 C 23:29:31 Temperature Measurement, Probe Number = 1, T = 20.081000 C 23:29:31 Temperature Measurement, Probe Number = 2, T = 20.155000 C 23:29:32 Temperature Measurement, Probe Number = 3, T = 20.095000 C 23:29:33 Temperature Measurement, Probe Number = 4, T = 20.415000 C 23:29:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.41 23:29:33 Integrated Voltage Measurement... 23:29:52 Voltage Offset Correction: v_off_ini = 0.000004334 V, v_off_fin = 0.000007052 V 23:29:52 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171060254 Vs 23:29:53 Integrated Voltage Measurement... 23:30:12 Voltage Offset Correction: v_off_ini = 0.000006808 V, v_off_fin = 0.000004001 V 23:30:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975164 Vs 23:30:15 Temperature Measurement, Probe Number = 0, T = 20.162000 C 23:30:15 Temperature Measurement, Probe Number = 1, T = 20.080000 C 23:30:16 Temperature Measurement, Probe Number = 2, T = 20.151000 C 23:30:17 Temperature Measurement, Probe Number = 3, T = 20.093000 C 23:30:17 Temperature Measurement, Probe Number = 4, T = 20.394000 C 23:30:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.39 23:30:18 Integrated Voltage Measurement... 23:30:37 Voltage Offset Correction: v_off_ini = 0.000004829 V, v_off_fin = 0.000006644 V 23:30:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058047 Vs 23:30:38 Integrated Voltage Measurement... 23:30:57 Voltage Offset Correction: v_off_ini = 0.000005899 V, v_off_fin = 0.000003623 V 23:30:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974354 Vs 23:31:00 Temperature Measurement, Probe Number = 0, T = 20.163000 C 23:31:00 Temperature Measurement, Probe Number = 1, T = 20.080000 C 23:31:01 Temperature Measurement, Probe Number = 2, T = 20.147000 C 23:31:02 Temperature Measurement, Probe Number = 3, T = 20.090000 C 23:31:02 Temperature Measurement, Probe Number = 4, T = 20.346000 C 23:31:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.35 23:31:03 Integrated Voltage Measurement... 23:31:22 Voltage Offset Correction: v_off_ini = 0.000004525 V, v_off_fin = 0.000006689 V 23:31:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055762 Vs 23:31:22 Integrated Voltage Measurement... 23:31:41 Voltage Offset Correction: v_off_ini = 0.000006260 V, v_off_fin = 0.000003817 V 23:31:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972280 Vs 23:31:44 Temperature Measurement, Probe Number = 0, T = 20.163000 C 23:31:45 Temperature Measurement, Probe Number = 1, T = 20.083000 C 23:31:46 Temperature Measurement, Probe Number = 2, T = 20.152000 C 23:31:46 Temperature Measurement, Probe Number = 3, T = 20.095000 C 23:31:47 Temperature Measurement, Probe Number = 4, T = 20.342000 C 23:31:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.34 23:31:47 Integrated Voltage Measurement... 23:32:06 Voltage Offset Correction: v_off_ini = 0.000004582 V, v_off_fin = 0.000007114 V 23:32:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061660 Vs 23:32:07 Integrated Voltage Measurement... 23:32:26 Voltage Offset Correction: v_off_ini = 0.000006355 V, v_off_fin = 0.000003948 V 23:32:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972328 Vs 23:32:29 Temperature Measurement, Probe Number = 0, T = 20.156000 C 23:32:30 Temperature Measurement, Probe Number = 1, T = 20.075000 C 23:32:30 Temperature Measurement, Probe Number = 2, T = 20.146000 C 23:32:31 Temperature Measurement, Probe Number = 3, T = 20.090000 C 23:32:32 Temperature Measurement, Probe Number = 4, T = 20.384000 C 23:32:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.38 23:32:32 Integrated Voltage Measurement... 23:32:51 Voltage Offset Correction: v_off_ini = 0.000004569 V, v_off_fin = 0.000007177 V 23:32:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058643 Vs 23:32:51 Integrated Voltage Measurement... 23:33:10 Voltage Offset Correction: v_off_ini = 0.000006732 V, v_off_fin = 0.000003823 V 23:33:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968669 Vs 23:33:13 Temperature Measurement, Probe Number = 0, T = 20.158000 C 23:33:14 Temperature Measurement, Probe Number = 1, T = 20.077000 C 23:33:15 Temperature Measurement, Probe Number = 2, T = 20.146000 C 23:33:15 Temperature Measurement, Probe Number = 3, T = 20.088000 C 23:33:16 Temperature Measurement, Probe Number = 4, T = 20.337000 C 23:33:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.34 23:33:16 Integrated Voltage Measurement... 23:33:36 Voltage Offset Correction: v_off_ini = 0.000004764 V, v_off_fin = 0.000006691 V 23:33:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060654 Vs 23:33:36 Integrated Voltage Measurement... 23:33:55 Voltage Offset Correction: v_off_ini = 0.000006339 V, v_off_fin = 0.000003827 V 23:33:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972204 Vs 23:33:58 Temperature Measurement, Probe Number = 0, T = 20.157000 C 23:33:59 Temperature Measurement, Probe Number = 1, T = 20.077000 C 23:33:59 Temperature Measurement, Probe Number = 2, T = 20.146000 C 23:34:00 Temperature Measurement, Probe Number = 3, T = 20.089000 C 23:34:01 Temperature Measurement, Probe Number = 4, T = 20.364000 C 23:34:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.36 23:34:01 Integrated Voltage Measurement... 23:34:20 Voltage Offset Correction: v_off_ini = 0.000004898 V, v_off_fin = 0.000006415 V 23:34:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051144 Vs 23:34:20 Integrated Voltage Measurement... 23:34:39 Voltage Offset Correction: v_off_ini = 0.000006485 V, v_off_fin = 0.000003426 V 23:34:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974656 Vs 23:34:42 Temperature Measurement, Probe Number = 0, T = 20.163000 C 23:34:43 Temperature Measurement, Probe Number = 1, T = 20.081000 C 23:34:44 Temperature Measurement, Probe Number = 2, T = 20.149000 C 23:34:44 Temperature Measurement, Probe Number = 3, T = 20.088000 C 23:34:45 Temperature Measurement, Probe Number = 4, T = 20.261000 C 23:34:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.26 23:34:45 Integrated Voltage Measurement... 23:35:05 Voltage Offset Correction: v_off_ini = 0.000004355 V, v_off_fin = 0.000006786 V 23:35:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049472 Vs 23:35:06 Integrated Voltage Measurement... 23:35:25 Voltage Offset Correction: v_off_ini = 0.000006213 V, v_off_fin = 0.000003614 V 23:35:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970642 Vs 00:05:28 Temperature Measurement, Probe Number = 0, T = 20.153000 C 00:05:29 Temperature Measurement, Probe Number = 1, T = 20.074000 C 00:05:29 Temperature Measurement, Probe Number = 2, T = 20.142000 C 00:05:30 Temperature Measurement, Probe Number = 3, T = 20.084000 C 00:05:31 Temperature Measurement, Probe Number = 4, T = 20.078000 C 00:05:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.08 00:05:31 Integrated Voltage Measurement... 00:05:50 Voltage Offset Correction: v_off_ini = 0.000004910 V, v_off_fin = 0.000006585 V 00:05:50 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171089864 Vs 00:05:51 Integrated Voltage Measurement... 00:06:10 Voltage Offset Correction: v_off_ini = 0.000006297 V, v_off_fin = 0.000002469 V 00:06:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973899 Vs 00:06:12 Temperature Measurement, Probe Number = 0, T = 20.153000 C 00:06:13 Temperature Measurement, Probe Number = 1, T = 20.073000 C 00:06:14 Temperature Measurement, Probe Number = 2, T = 20.141000 C 00:06:14 Temperature Measurement, Probe Number = 3, T = 20.083000 C 00:06:15 Temperature Measurement, Probe Number = 4, T = 20.139000 C 00:06:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.14 00:06:15 Integrated Voltage Measurement... 00:06:34 Voltage Offset Correction: v_off_ini = 0.000004123 V, v_off_fin = 0.000006605 V 00:06:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052883 Vs 00:06:35 Integrated Voltage Measurement... 00:06:54 Voltage Offset Correction: v_off_ini = 0.000006148 V, v_off_fin = 0.000003573 V 00:06:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976032 Vs 00:06:57 Temperature Measurement, Probe Number = 0, T = 20.153000 C 00:06:57 Temperature Measurement, Probe Number = 1, T = 20.074000 C 00:06:58 Temperature Measurement, Probe Number = 2, T = 20.143000 C 00:06:59 Temperature Measurement, Probe Number = 3, T = 20.086000 C 00:06:59 Temperature Measurement, Probe Number = 4, T = 20.236000 C 00:06:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.24 00:06:59 Integrated Voltage Measurement... 00:07:19 Voltage Offset Correction: v_off_ini = 0.000004254 V, v_off_fin = 0.000006944 V 00:07:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053441 Vs 00:07:19 Integrated Voltage Measurement... 00:07:38 Voltage Offset Correction: v_off_ini = 0.000006230 V, v_off_fin = 0.000003336 V 00:07:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977223 Vs 00:07:41 Temperature Measurement, Probe Number = 0, T = 20.152000 C 00:07:42 Temperature Measurement, Probe Number = 1, T = 20.072000 C 00:07:43 Temperature Measurement, Probe Number = 2, T = 20.146000 C 00:07:43 Temperature Measurement, Probe Number = 3, T = 20.086000 C 00:07:44 Temperature Measurement, Probe Number = 4, T = 20.251000 C 00:07:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.25 00:07:44 Integrated Voltage Measurement... 00:08:04 Voltage Offset Correction: v_off_ini = 0.000004243 V, v_off_fin = 0.000006828 V 00:08:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051642 Vs 00:08:04 Integrated Voltage Measurement... 00:08:23 Voltage Offset Correction: v_off_ini = 0.000006090 V, v_off_fin = 0.000003706 V 00:08:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981558 Vs 00:08:26 Temperature Measurement, Probe Number = 0, T = 20.151000 C 00:08:27 Temperature Measurement, Probe Number = 1, T = 20.069000 C 00:08:28 Temperature Measurement, Probe Number = 2, T = 20.142000 C 00:08:28 Temperature Measurement, Probe Number = 3, T = 20.083000 C 00:08:29 Temperature Measurement, Probe Number = 4, T = 20.184000 C 00:08:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.18 00:08:29 Integrated Voltage Measurement... 00:08:48 Voltage Offset Correction: v_off_ini = 0.000004576 V, v_off_fin = 0.000006978 V 00:08:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052545 Vs 00:08:49 Integrated Voltage Measurement... 00:09:08 Voltage Offset Correction: v_off_ini = 0.000006399 V, v_off_fin = 0.000003475 V 00:09:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976579 Vs 00:09:11 Temperature Measurement, Probe Number = 0, T = 20.152000 C 00:09:11 Temperature Measurement, Probe Number = 1, T = 20.073000 C 00:09:12 Temperature Measurement, Probe Number = 2, T = 20.141000 C 00:09:13 Temperature Measurement, Probe Number = 3, T = 20.084000 C 00:09:13 Temperature Measurement, Probe Number = 4, T = 20.180000 C 00:09:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.18 00:09:14 Integrated Voltage Measurement... 00:09:33 Voltage Offset Correction: v_off_ini = 0.000004859 V, v_off_fin = 0.000006828 V 00:09:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055663 Vs 00:09:33 Integrated Voltage Measurement... 00:09:53 Voltage Offset Correction: v_off_ini = 0.000006392 V, v_off_fin = 0.000003405 V 00:09:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978694 Vs 00:09:56 Temperature Measurement, Probe Number = 0, T = 20.156000 C 00:09:56 Temperature Measurement, Probe Number = 1, T = 20.076000 C 00:09:57 Temperature Measurement, Probe Number = 2, T = 20.144000 C 00:09:58 Temperature Measurement, Probe Number = 3, T = 20.086000 C 00:09:58 Temperature Measurement, Probe Number = 4, T = 20.309000 C 00:09:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.31 00:09:59 Integrated Voltage Measurement... 00:10:18 Voltage Offset Correction: v_off_ini = 0.000004477 V, v_off_fin = 0.000006795 V 00:10:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171057938 Vs 00:10:18 Integrated Voltage Measurement... 00:10:38 Voltage Offset Correction: v_off_ini = 0.000005884 V, v_off_fin = 0.000003915 V 00:10:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976990 Vs 00:10:41 Temperature Measurement, Probe Number = 0, T = 20.153000 C 00:10:41 Temperature Measurement, Probe Number = 1, T = 20.073000 C 00:10:42 Temperature Measurement, Probe Number = 2, T = 20.143000 C 00:10:43 Temperature Measurement, Probe Number = 3, T = 20.084000 C 00:10:43 Temperature Measurement, Probe Number = 4, T = 20.314000 C 00:10:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.31 00:10:44 Integrated Voltage Measurement... 00:11:03 Voltage Offset Correction: v_off_ini = 0.000004487 V, v_off_fin = 0.000007174 V 00:11:03 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171057512 Vs 00:11:03 Integrated Voltage Measurement... 00:11:23 Voltage Offset Correction: v_off_ini = 0.000006393 V, v_off_fin = 0.000003519 V 00:11:24 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170980375 Vs 00:11:26 Temperature Measurement, Probe Number = 0, T = 20.154000 C 00:11:27 Temperature Measurement, Probe Number = 1, T = 20.071000 C 00:11:28 Temperature Measurement, Probe Number = 2, T = 20.145000 C 00:11:28 Temperature Measurement, Probe Number = 3, T = 20.081000 C 00:11:29 Temperature Measurement, Probe Number = 4, T = 20.310000 C 00:11:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.31 00:11:29 Integrated Voltage Measurement... 00:11:48 Voltage Offset Correction: v_off_ini = 0.000004603 V, v_off_fin = 0.000006969 V 00:11:48 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171057853 Vs 00:11:49 Integrated Voltage Measurement... 00:12:08 Voltage Offset Correction: v_off_ini = 0.000006734 V, v_off_fin = 0.000003449 V 00:12:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972759 Vs 00:12:11 Temperature Measurement, Probe Number = 0, T = 20.155000 C 00:12:11 Temperature Measurement, Probe Number = 1, T = 20.072000 C 00:12:12 Temperature Measurement, Probe Number = 2, T = 20.143000 C 00:12:13 Temperature Measurement, Probe Number = 3, T = 20.080000 C 00:12:13 Temperature Measurement, Probe Number = 4, T = 20.272000 C 00:12:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.27 00:12:14 Integrated Voltage Measurement... 00:12:33 Voltage Offset Correction: v_off_ini = 0.000004979 V, v_off_fin = 0.000006910 V 00:12:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060936 Vs 00:12:33 Integrated Voltage Measurement... 00:12:52 Voltage Offset Correction: v_off_ini = 0.000006336 V, v_off_fin = 0.000003729 V 00:12:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972196 Vs 00:42:55 Temperature Measurement, Probe Number = 0, T = 20.142000 C 00:42:56 Temperature Measurement, Probe Number = 1, T = 20.065000 C 00:42:57 Temperature Measurement, Probe Number = 2, T = 20.136000 C 00:42:57 Temperature Measurement, Probe Number = 3, T = 20.080000 C 00:42:58 Temperature Measurement, Probe Number = 4, T = 20.194000 C 00:42:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.19 00:42:58 Integrated Voltage Measurement... 00:43:18 Voltage Offset Correction: v_off_ini = 0.000005506 V, v_off_fin = 0.000006865 V 00:43:18 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171096220 Vs 00:43:18 Integrated Voltage Measurement... 00:43:37 Voltage Offset Correction: v_off_ini = 0.000006289 V, v_off_fin = 0.000003272 V 00:43:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981895 Vs 00:43:40 Temperature Measurement, Probe Number = 0, T = 20.150000 C 00:43:41 Temperature Measurement, Probe Number = 1, T = 20.072000 C 00:43:41 Temperature Measurement, Probe Number = 2, T = 20.140000 C 00:43:42 Temperature Measurement, Probe Number = 3, T = 20.085000 C 00:43:43 Temperature Measurement, Probe Number = 4, T = 20.250000 C 00:43:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.25 00:43:43 Integrated Voltage Measurement... 00:44:02 Voltage Offset Correction: v_off_ini = 0.000004401 V, v_off_fin = 0.000007178 V 00:44:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059212 Vs 00:44:02 Integrated Voltage Measurement... 00:44:22 Voltage Offset Correction: v_off_ini = 0.000006465 V, v_off_fin = 0.000003631 V 00:44:22 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170983357 Vs 00:44:25 Temperature Measurement, Probe Number = 0, T = 20.149000 C 00:44:26 Temperature Measurement, Probe Number = 1, T = 20.067000 C 00:44:26 Temperature Measurement, Probe Number = 2, T = 20.140000 C 00:44:27 Temperature Measurement, Probe Number = 3, T = 20.083000 C 00:44:28 Temperature Measurement, Probe Number = 4, T = 20.325000 C 00:44:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.32 00:44:28 Integrated Voltage Measurement... 00:44:47 Voltage Offset Correction: v_off_ini = 0.000004937 V, v_off_fin = 0.000007098 V 00:44:47 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171058007 Vs 00:44:47 Integrated Voltage Measurement... 00:45:07 Voltage Offset Correction: v_off_ini = 0.000006483 V, v_off_fin = 0.000004338 V 00:45:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979606 Vs 00:45:10 Temperature Measurement, Probe Number = 0, T = 20.143000 C 00:45:11 Temperature Measurement, Probe Number = 1, T = 20.062000 C 00:45:11 Temperature Measurement, Probe Number = 2, T = 20.135000 C 00:45:12 Temperature Measurement, Probe Number = 3, T = 20.077000 C 00:45:12 Temperature Measurement, Probe Number = 4, T = 20.200000 C 00:45:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.20 00:45:13 Integrated Voltage Measurement... 00:45:32 Voltage Offset Correction: v_off_ini = 0.000005227 V, v_off_fin = 0.000007154 V 00:45:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061962 Vs 00:45:33 Integrated Voltage Measurement... 00:45:52 Voltage Offset Correction: v_off_ini = 0.000006621 V, v_off_fin = 0.000003604 V 00:45:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979978 Vs 00:45:55 Temperature Measurement, Probe Number = 0, T = 20.142000 C 00:45:55 Temperature Measurement, Probe Number = 1, T = 20.062000 C 00:45:56 Temperature Measurement, Probe Number = 2, T = 20.133000 C 00:45:57 Temperature Measurement, Probe Number = 3, T = 20.073000 C 00:45:57 Temperature Measurement, Probe Number = 4, T = 20.144000 C 00:45:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.14 00:45:58 Integrated Voltage Measurement... 00:46:17 Voltage Offset Correction: v_off_ini = 0.000004873 V, v_off_fin = 0.000007089 V 00:46:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060160 Vs 00:46:18 Integrated Voltage Measurement... 00:46:37 Voltage Offset Correction: v_off_ini = 0.000006335 V, v_off_fin = 0.000003735 V 00:46:38 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170983544 Vs 00:46:40 Temperature Measurement, Probe Number = 0, T = 20.144000 C 00:46:41 Temperature Measurement, Probe Number = 1, T = 20.062000 C 00:46:42 Temperature Measurement, Probe Number = 2, T = 20.136000 C 00:46:42 Temperature Measurement, Probe Number = 3, T = 20.074000 C 00:46:43 Temperature Measurement, Probe Number = 4, T = 20.168000 C 00:46:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.17 00:46:43 Integrated Voltage Measurement... 00:47:02 Voltage Offset Correction: v_off_ini = 0.000004313 V, v_off_fin = 0.000007081 V 00:47:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058091 Vs 00:47:03 Integrated Voltage Measurement... 00:47:22 Voltage Offset Correction: v_off_ini = 0.000006692 V, v_off_fin = 0.000004527 V 00:47:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973406 Vs 00:47:25 Temperature Measurement, Probe Number = 0, T = 20.144000 C 00:47:26 Temperature Measurement, Probe Number = 1, T = 20.066000 C 00:47:26 Temperature Measurement, Probe Number = 2, T = 20.134000 C 00:47:27 Temperature Measurement, Probe Number = 3, T = 20.077000 C 00:47:28 Temperature Measurement, Probe Number = 4, T = 20.202000 C 00:47:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.20 00:47:28 Integrated Voltage Measurement... 00:47:47 Voltage Offset Correction: v_off_ini = 0.000005708 V, v_off_fin = 0.000006746 V 00:47:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065667 Vs 00:47:48 Integrated Voltage Measurement... 00:48:06 Voltage Offset Correction: v_off_ini = 0.000006810 V, v_off_fin = 0.000003556 V 00:48:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976170 Vs 00:48:09 Temperature Measurement, Probe Number = 0, T = 20.144000 C 00:48:10 Temperature Measurement, Probe Number = 1, T = 20.065000 C 00:48:11 Temperature Measurement, Probe Number = 2, T = 20.134000 C 00:48:11 Temperature Measurement, Probe Number = 3, T = 20.077000 C 00:48:12 Temperature Measurement, Probe Number = 4, T = 20.177000 C 00:48:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.18 00:48:12 Integrated Voltage Measurement... 00:48:32 Voltage Offset Correction: v_off_ini = 0.000005005 V, v_off_fin = 0.000007440 V 00:48:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171068071 Vs 00:48:32 Integrated Voltage Measurement... 00:48:51 Voltage Offset Correction: v_off_ini = 0.000006998 V, v_off_fin = 0.000003706 V 00:48:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974595 Vs 00:48:54 Temperature Measurement, Probe Number = 0, T = 20.145000 C 00:48:55 Temperature Measurement, Probe Number = 1, T = 20.063000 C 00:48:55 Temperature Measurement, Probe Number = 2, T = 20.133000 C 00:48:56 Temperature Measurement, Probe Number = 3, T = 20.073000 C 00:48:57 Temperature Measurement, Probe Number = 4, T = 20.059000 C 00:48:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.06 00:48:57 Integrated Voltage Measurement... 00:49:17 Voltage Offset Correction: v_off_ini = 0.000004785 V, v_off_fin = 0.000006878 V 00:49:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059413 Vs 00:49:17 Integrated Voltage Measurement... 00:49:36 Voltage Offset Correction: v_off_ini = 0.000006375 V, v_off_fin = 0.000003551 V 00:49:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982666 Vs 00:49:39 Temperature Measurement, Probe Number = 0, T = 20.141000 C 00:49:40 Temperature Measurement, Probe Number = 1, T = 20.060000 C 00:49:41 Temperature Measurement, Probe Number = 2, T = 20.132000 C 00:49:41 Temperature Measurement, Probe Number = 3, T = 20.072000 C 00:49:42 Temperature Measurement, Probe Number = 4, T = 20.054000 C 00:49:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.05 00:49:42 Integrated Voltage Measurement... 00:50:02 Voltage Offset Correction: v_off_ini = 0.000004414 V, v_off_fin = 0.000006995 V 00:50:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058992 Vs 00:50:02 Integrated Voltage Measurement... 00:50:21 Voltage Offset Correction: v_off_ini = 0.000006153 V, v_off_fin = 0.000002907 V 00:50:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985992 Vs 01:20:24 Temperature Measurement, Probe Number = 0, T = 20.131000 C 01:20:25 Temperature Measurement, Probe Number = 1, T = 20.051000 C 01:20:26 Temperature Measurement, Probe Number = 2, T = 20.127000 C 01:20:26 Temperature Measurement, Probe Number = 3, T = 20.069000 C 01:20:27 Temperature Measurement, Probe Number = 4, T = 20.367000 C 01:20:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.37 01:20:27 Integrated Voltage Measurement... 01:20:47 Voltage Offset Correction: v_off_ini = 0.000005933 V, v_off_fin = 0.000007090 V 01:20:47 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171106244 Vs 01:20:47 Integrated Voltage Measurement... 01:21:07 Voltage Offset Correction: v_off_ini = 0.000006518 V, v_off_fin = 0.000003975 V 01:21:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976024 Vs 01:21:09 Temperature Measurement, Probe Number = 0, T = 20.139000 C 01:21:10 Temperature Measurement, Probe Number = 1, T = 20.058000 C 01:21:11 Temperature Measurement, Probe Number = 2, T = 20.137000 C 01:21:11 Temperature Measurement, Probe Number = 3, T = 20.077000 C 01:21:12 Temperature Measurement, Probe Number = 4, T = 20.439000 C 01:21:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.44 01:21:12 Integrated Voltage Measurement... 01:21:31 Voltage Offset Correction: v_off_ini = 0.000005370 V, v_off_fin = 0.000007503 V 01:21:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065989 Vs 01:21:32 Integrated Voltage Measurement... 01:21:51 Voltage Offset Correction: v_off_ini = 0.000007068 V, v_off_fin = 0.000004641 V 01:21:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969351 Vs 01:21:54 Temperature Measurement, Probe Number = 0, T = 20.137000 C 01:21:55 Temperature Measurement, Probe Number = 1, T = 20.057000 C 01:21:55 Temperature Measurement, Probe Number = 2, T = 20.131000 C 01:21:56 Temperature Measurement, Probe Number = 3, T = 20.072000 C 01:21:57 Temperature Measurement, Probe Number = 4, T = 20.476000 C 01:21:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.48 01:21:57 Integrated Voltage Measurement... 01:22:16 Voltage Offset Correction: v_off_ini = 0.000005152 V, v_off_fin = 0.000007081 V 01:22:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064132 Vs 01:22:17 Integrated Voltage Measurement... 01:22:36 Voltage Offset Correction: v_off_ini = 0.000006523 V, v_off_fin = 0.000003429 V 01:22:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974985 Vs 01:22:39 Temperature Measurement, Probe Number = 0, T = 20.135000 C 01:22:39 Temperature Measurement, Probe Number = 1, T = 20.053000 C 01:22:40 Temperature Measurement, Probe Number = 2, T = 20.126000 C 01:22:41 Temperature Measurement, Probe Number = 3, T = 20.068000 C 01:22:41 Temperature Measurement, Probe Number = 4, T = 20.480000 C 01:22:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.48 01:22:42 Integrated Voltage Measurement... 01:23:01 Voltage Offset Correction: v_off_ini = 0.000004553 V, v_off_fin = 0.000006980 V 01:23:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053657 Vs 01:23:01 Integrated Voltage Measurement... 01:23:21 Voltage Offset Correction: v_off_ini = 0.000006255 V, v_off_fin = 0.000003265 V 01:23:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981314 Vs 01:23:24 Temperature Measurement, Probe Number = 0, T = 20.136000 C 01:23:24 Temperature Measurement, Probe Number = 1, T = 20.057000 C 01:23:25 Temperature Measurement, Probe Number = 2, T = 20.128000 C 01:23:26 Temperature Measurement, Probe Number = 3, T = 20.068000 C 01:23:26 Temperature Measurement, Probe Number = 4, T = 20.405000 C 01:23:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.41 01:23:27 Integrated Voltage Measurement... 01:23:46 Voltage Offset Correction: v_off_ini = 0.000004110 V, v_off_fin = 0.000006949 V 01:23:47 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171052836 Vs 01:23:47 Integrated Voltage Measurement... 01:24:06 Voltage Offset Correction: v_off_ini = 0.000006237 V, v_off_fin = 0.000003331 V 01:24:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976430 Vs 01:24:09 Temperature Measurement, Probe Number = 0, T = 20.136000 C 01:24:09 Temperature Measurement, Probe Number = 1, T = 20.059000 C 01:24:10 Temperature Measurement, Probe Number = 2, T = 20.130000 C 01:24:11 Temperature Measurement, Probe Number = 3, T = 20.072000 C 01:24:11 Temperature Measurement, Probe Number = 4, T = 20.326000 C 01:24:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.33 01:24:12 Integrated Voltage Measurement... 01:24:31 Voltage Offset Correction: v_off_ini = 0.000004594 V, v_off_fin = 0.000007007 V 01:24:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171057138 Vs 01:24:31 Integrated Voltage Measurement... 01:24:51 Voltage Offset Correction: v_off_ini = 0.000006097 V, v_off_fin = 0.000003335 V 01:24:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979052 Vs 01:24:54 Temperature Measurement, Probe Number = 0, T = 20.136000 C 01:24:54 Temperature Measurement, Probe Number = 1, T = 20.056000 C 01:24:55 Temperature Measurement, Probe Number = 2, T = 20.129000 C 01:24:56 Temperature Measurement, Probe Number = 3, T = 20.068000 C 01:24:56 Temperature Measurement, Probe Number = 4, T = 20.318000 C 01:24:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.32 01:24:56 Integrated Voltage Measurement... 01:25:16 Voltage Offset Correction: v_off_ini = 0.000003990 V, v_off_fin = 0.000007208 V 01:25:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053522 Vs 01:25:16 Integrated Voltage Measurement... 01:25:35 Voltage Offset Correction: v_off_ini = 0.000006455 V, v_off_fin = 0.000003175 V 01:25:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978025 Vs 01:25:38 Temperature Measurement, Probe Number = 0, T = 20.138000 C 01:25:38 Temperature Measurement, Probe Number = 1, T = 20.058000 C 01:25:39 Temperature Measurement, Probe Number = 2, T = 20.134000 C 01:25:40 Temperature Measurement, Probe Number = 3, T = 20.073000 C 01:25:40 Temperature Measurement, Probe Number = 4, T = 20.403000 C 01:25:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.40 01:25:41 Integrated Voltage Measurement... 01:26:00 Voltage Offset Correction: v_off_ini = 0.000003677 V, v_off_fin = 0.000006548 V 01:26:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055179 Vs 01:26:00 Integrated Voltage Measurement... 01:26:20 Voltage Offset Correction: v_off_ini = 0.000006329 V, v_off_fin = 0.000003636 V 01:26:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984526 Vs 01:26:22 Temperature Measurement, Probe Number = 0, T = 20.139000 C 01:26:23 Temperature Measurement, Probe Number = 1, T = 20.058000 C 01:26:24 Temperature Measurement, Probe Number = 2, T = 20.134000 C 01:26:24 Temperature Measurement, Probe Number = 3, T = 20.074000 C 01:26:25 Temperature Measurement, Probe Number = 4, T = 20.443000 C 01:26:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.44 01:26:25 Integrated Voltage Measurement... 01:26:44 Voltage Offset Correction: v_off_ini = 0.000004930 V, v_off_fin = 0.000006696 V 01:26:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059231 Vs 01:26:45 Integrated Voltage Measurement... 01:27:04 Voltage Offset Correction: v_off_ini = 0.000006227 V, v_off_fin = 0.000003056 V 01:27:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982633 Vs 01:27:07 Temperature Measurement, Probe Number = 0, T = 20.133000 C 01:27:07 Temperature Measurement, Probe Number = 1, T = 20.056000 C 01:27:08 Temperature Measurement, Probe Number = 2, T = 20.128000 C 01:27:09 Temperature Measurement, Probe Number = 3, T = 20.072000 C 01:27:09 Temperature Measurement, Probe Number = 4, T = 20.417000 C 01:27:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.42 01:27:09 Integrated Voltage Measurement... 01:27:29 Voltage Offset Correction: v_off_ini = 0.000003830 V, v_off_fin = 0.000006608 V 01:27:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052859 Vs 01:27:29 Integrated Voltage Measurement... 01:27:48 Voltage Offset Correction: v_off_ini = 0.000005742 V, v_off_fin = 0.000003154 V 01:27:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982157 Vs 01:57:51 Temperature Measurement, Probe Number = 0, T = 20.135000 C 01:57:52 Temperature Measurement, Probe Number = 1, T = 20.056000 C 01:57:53 Temperature Measurement, Probe Number = 2, T = 20.130000 C 01:57:53 Temperature Measurement, Probe Number = 3, T = 20.071000 C 01:57:54 Temperature Measurement, Probe Number = 4, T = 20.365000 C 01:57:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.36 01:57:54 Integrated Voltage Measurement... 01:58:13 Voltage Offset Correction: v_off_ini = 0.000004905 V, v_off_fin = 0.000006558 V 01:58:13 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171099773 Vs 01:58:13 Integrated Voltage Measurement... 01:58:33 Voltage Offset Correction: v_off_ini = 0.000005779 V, v_off_fin = 0.000002995 V 01:58:33 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170981813 Vs 01:58:36 Temperature Measurement, Probe Number = 0, T = 20.136000 C 01:58:37 Temperature Measurement, Probe Number = 1, T = 20.058000 C 01:58:37 Temperature Measurement, Probe Number = 2, T = 20.131000 C 01:58:38 Temperature Measurement, Probe Number = 3, T = 20.073000 C 01:58:38 Temperature Measurement, Probe Number = 4, T = 20.326000 C 01:58:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.33 01:58:39 Integrated Voltage Measurement... 01:58:58 Voltage Offset Correction: v_off_ini = 0.000004276 V, v_off_fin = 0.000006726 V 01:58:58 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171040047 Vs 01:58:58 Integrated Voltage Measurement... 01:59:18 Voltage Offset Correction: v_off_ini = 0.000006169 V, v_off_fin = 0.000002865 V 01:59:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976309 Vs 01:59:21 Temperature Measurement, Probe Number = 0, T = 20.138000 C 01:59:21 Temperature Measurement, Probe Number = 1, T = 20.062000 C 01:59:22 Temperature Measurement, Probe Number = 2, T = 20.132000 C 01:59:23 Temperature Measurement, Probe Number = 3, T = 20.076000 C 01:59:23 Temperature Measurement, Probe Number = 4, T = 20.406000 C 01:59:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.41 01:59:24 Integrated Voltage Measurement... 01:59:43 Voltage Offset Correction: v_off_ini = 0.000003946 V, v_off_fin = 0.000006873 V 01:59:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044573 Vs 01:59:44 Integrated Voltage Measurement... 02:00:03 Voltage Offset Correction: v_off_ini = 0.000006114 V, v_off_fin = 0.000003793 V 02:00:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974285 Vs 02:00:06 Temperature Measurement, Probe Number = 0, T = 20.143000 C 02:00:06 Temperature Measurement, Probe Number = 1, T = 20.063000 C 02:00:07 Temperature Measurement, Probe Number = 2, T = 20.136000 C 02:00:08 Temperature Measurement, Probe Number = 3, T = 20.076000 C 02:00:08 Temperature Measurement, Probe Number = 4, T = 20.476000 C 02:00:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.48 02:00:09 Integrated Voltage Measurement... 02:00:28 Voltage Offset Correction: v_off_ini = 0.000004816 V, v_off_fin = 0.000006481 V 02:00:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050035 Vs 02:00:28 Integrated Voltage Measurement... 02:00:47 Voltage Offset Correction: v_off_ini = 0.000006070 V, v_off_fin = 0.000003159 V 02:00:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977144 Vs 02:00:50 Temperature Measurement, Probe Number = 0, T = 20.141000 C 02:00:51 Temperature Measurement, Probe Number = 1, T = 20.059000 C 02:00:51 Temperature Measurement, Probe Number = 2, T = 20.133000 C 02:00:52 Temperature Measurement, Probe Number = 3, T = 20.074000 C 02:00:53 Temperature Measurement, Probe Number = 4, T = 20.508000 C 02:00:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.51 02:00:53 Integrated Voltage Measurement... 02:01:12 Voltage Offset Correction: v_off_ini = 0.000004649 V, v_off_fin = 0.000006450 V 02:01:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049969 Vs 02:01:12 Integrated Voltage Measurement... 02:01:32 Voltage Offset Correction: v_off_ini = 0.000006115 V, v_off_fin = 0.000003078 V 02:01:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974906 Vs 02:01:34 Temperature Measurement, Probe Number = 0, T = 20.135000 C 02:01:35 Temperature Measurement, Probe Number = 1, T = 20.055000 C 02:01:36 Temperature Measurement, Probe Number = 2, T = 20.128000 C 02:01:36 Temperature Measurement, Probe Number = 3, T = 20.070000 C 02:01:37 Temperature Measurement, Probe Number = 4, T = 20.429000 C 02:01:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.43 02:01:37 Integrated Voltage Measurement... 02:01:56 Voltage Offset Correction: v_off_ini = 0.000004577 V, v_off_fin = 0.000006387 V 02:01:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048805 Vs 02:01:57 Integrated Voltage Measurement... 02:02:16 Voltage Offset Correction: v_off_ini = 0.000005904 V, v_off_fin = 0.000002814 V 02:02:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978874 Vs 02:02:19 Temperature Measurement, Probe Number = 0, T = 20.139000 C 02:02:20 Temperature Measurement, Probe Number = 1, T = 20.059000 C 02:02:20 Temperature Measurement, Probe Number = 2, T = 20.130000 C 02:02:21 Temperature Measurement, Probe Number = 3, T = 20.071000 C 02:02:22 Temperature Measurement, Probe Number = 4, T = 20.421000 C 02:02:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.42 02:02:22 Integrated Voltage Measurement... 02:02:41 Voltage Offset Correction: v_off_ini = 0.000003717 V, v_off_fin = 0.000005910 V 02:02:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043054 Vs 02:02:41 Integrated Voltage Measurement... 02:03:00 Voltage Offset Correction: v_off_ini = 0.000005708 V, v_off_fin = 0.000002345 V 02:03:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975643 Vs 02:03:03 Temperature Measurement, Probe Number = 0, T = 20.134000 C 02:03:04 Temperature Measurement, Probe Number = 1, T = 20.053000 C 02:03:05 Temperature Measurement, Probe Number = 2, T = 20.128000 C 02:03:05 Temperature Measurement, Probe Number = 3, T = 20.067000 C 02:03:06 Temperature Measurement, Probe Number = 4, T = 20.399000 C 02:03:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.40 02:03:06 Integrated Voltage Measurement... 02:03:26 Voltage Offset Correction: v_off_ini = 0.000003395 V, v_off_fin = 0.000006460 V 02:03:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045477 Vs 02:03:26 Integrated Voltage Measurement... 02:03:45 Voltage Offset Correction: v_off_ini = 0.000005853 V, v_off_fin = 0.000003069 V 02:03:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972241 Vs 02:03:48 Temperature Measurement, Probe Number = 0, T = 20.138000 C 02:03:49 Temperature Measurement, Probe Number = 1, T = 20.057000 C 02:03:50 Temperature Measurement, Probe Number = 2, T = 20.129000 C 02:03:50 Temperature Measurement, Probe Number = 3, T = 20.070000 C 02:03:51 Temperature Measurement, Probe Number = 4, T = 20.339000 C 02:03:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.34 02:03:51 Integrated Voltage Measurement... 02:04:11 Voltage Offset Correction: v_off_ini = 0.000003870 V, v_off_fin = 0.000006521 V 02:04:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049333 Vs 02:04:11 Integrated Voltage Measurement... 02:04:30 Voltage Offset Correction: v_off_ini = 0.000005936 V, v_off_fin = 0.000003120 V 02:04:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975924 Vs 02:04:33 Temperature Measurement, Probe Number = 0, T = 20.131000 C 02:04:34 Temperature Measurement, Probe Number = 1, T = 20.056000 C 02:04:35 Temperature Measurement, Probe Number = 2, T = 20.125000 C 02:04:35 Temperature Measurement, Probe Number = 3, T = 20.068000 C 02:04:36 Temperature Measurement, Probe Number = 4, T = 20.384000 C 02:04:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.38 02:04:36 Integrated Voltage Measurement... 02:04:56 Voltage Offset Correction: v_off_ini = 0.000004391 V, v_off_fin = 0.000006426 V 02:04:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047379 Vs 02:04:56 Integrated Voltage Measurement... 02:05:15 Voltage Offset Correction: v_off_ini = 0.000006155 V, v_off_fin = 0.000003008 V 02:05:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973064 Vs 02:35:18 Temperature Measurement, Probe Number = 0, T = 20.129000 C 02:35:19 Temperature Measurement, Probe Number = 1, T = 20.050000 C 02:35:20 Temperature Measurement, Probe Number = 2, T = 20.123000 C 02:35:20 Temperature Measurement, Probe Number = 3, T = 20.065000 C 02:35:21 Temperature Measurement, Probe Number = 4, T = 20.335000 C 02:35:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.34 02:35:21 Integrated Voltage Measurement... 02:35:40 Voltage Offset Correction: v_off_ini = 0.000004840 V, v_off_fin = 0.000006707 V 02:35:40 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171095688 Vs 02:35:41 Integrated Voltage Measurement... 02:36:00 Voltage Offset Correction: v_off_ini = 0.000005783 V, v_off_fin = 0.000002511 V 02:36:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978712 Vs 02:36:03 Temperature Measurement, Probe Number = 0, T = 20.131000 C 02:36:04 Temperature Measurement, Probe Number = 1, T = 20.053000 C 02:36:04 Temperature Measurement, Probe Number = 2, T = 20.127000 C 02:36:05 Temperature Measurement, Probe Number = 3, T = 20.069000 C 02:36:05 Temperature Measurement, Probe Number = 4, T = 20.291000 C 02:36:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.29 02:36:06 Integrated Voltage Measurement... 02:36:25 Voltage Offset Correction: v_off_ini = 0.000004232 V, v_off_fin = 0.000005786 V 02:36:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042585 Vs 02:36:26 Integrated Voltage Measurement... 02:36:45 Voltage Offset Correction: v_off_ini = 0.000005126 V, v_off_fin = 0.000002510 V 02:36:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985552 Vs 02:36:48 Temperature Measurement, Probe Number = 0, T = 20.138000 C 02:36:49 Temperature Measurement, Probe Number = 1, T = 20.057000 C 02:36:50 Temperature Measurement, Probe Number = 2, T = 20.131000 C 02:36:50 Temperature Measurement, Probe Number = 3, T = 20.074000 C 02:36:51 Temperature Measurement, Probe Number = 4, T = 20.391000 C 02:36:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.39 02:36:51 Integrated Voltage Measurement... 02:37:10 Voltage Offset Correction: v_off_ini = 0.000003976 V, v_off_fin = 0.000005760 V 02:37:11 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171038880 Vs 02:37:11 Integrated Voltage Measurement... 02:37:30 Voltage Offset Correction: v_off_ini = 0.000005253 V, v_off_fin = 0.000002930 V 02:37:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980673 Vs 02:37:33 Temperature Measurement, Probe Number = 0, T = 20.139000 C 02:37:34 Temperature Measurement, Probe Number = 1, T = 20.059000 C 02:37:34 Temperature Measurement, Probe Number = 2, T = 20.131000 C 02:37:35 Temperature Measurement, Probe Number = 3, T = 20.073000 C 02:37:36 Temperature Measurement, Probe Number = 4, T = 20.381000 C 02:37:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.38 02:37:36 Integrated Voltage Measurement... 02:37:55 Voltage Offset Correction: v_off_ini = 0.000004121 V, v_off_fin = 0.000006729 V 02:37:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040566 Vs 02:37:56 Integrated Voltage Measurement... 02:38:15 Voltage Offset Correction: v_off_ini = 0.000005348 V, v_off_fin = 0.000002347 V 02:38:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979969 Vs 02:38:17 Temperature Measurement, Probe Number = 0, T = 20.132000 C 02:38:18 Temperature Measurement, Probe Number = 1, T = 20.053000 C 02:38:19 Temperature Measurement, Probe Number = 2, T = 20.126000 C 02:38:19 Temperature Measurement, Probe Number = 3, T = 20.069000 C 02:38:20 Temperature Measurement, Probe Number = 4, T = 20.383000 C 02:38:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.38 02:38:20 Integrated Voltage Measurement... 02:38:39 Voltage Offset Correction: v_off_ini = 0.000004233 V, v_off_fin = 0.000005864 V 02:38:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044046 Vs 02:38:40 Integrated Voltage Measurement... 02:38:59 Voltage Offset Correction: v_off_ini = 0.000005611 V, v_off_fin = 0.000003201 V 02:38:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974101 Vs 02:39:02 Temperature Measurement, Probe Number = 0, T = 20.129000 C 02:39:03 Temperature Measurement, Probe Number = 1, T = 20.048000 C 02:39:03 Temperature Measurement, Probe Number = 2, T = 20.124000 C 02:39:04 Temperature Measurement, Probe Number = 3, T = 20.064000 C 02:39:05 Temperature Measurement, Probe Number = 4, T = 20.328000 C 02:39:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.33 02:39:05 Integrated Voltage Measurement... 02:39:24 Voltage Offset Correction: v_off_ini = 0.000004050 V, v_off_fin = 0.000005864 V 02:39:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041974 Vs 02:39:24 Integrated Voltage Measurement... 02:39:43 Voltage Offset Correction: v_off_ini = 0.000005508 V, v_off_fin = 0.000002964 V 02:39:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977678 Vs 02:39:46 Temperature Measurement, Probe Number = 0, T = 20.133000 C 02:39:47 Temperature Measurement, Probe Number = 1, T = 20.052000 C 02:39:48 Temperature Measurement, Probe Number = 2, T = 20.124000 C 02:39:48 Temperature Measurement, Probe Number = 3, T = 20.067000 C 02:39:49 Temperature Measurement, Probe Number = 4, T = 20.315000 C 02:39:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.32 02:39:49 Integrated Voltage Measurement... 02:40:08 Voltage Offset Correction: v_off_ini = 0.000003999 V, v_off_fin = 0.000006285 V 02:40:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041581 Vs 02:40:09 Integrated Voltage Measurement... 02:40:28 Voltage Offset Correction: v_off_ini = 0.000005651 V, v_off_fin = 0.000002515 V 02:40:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977468 Vs 02:40:31 Temperature Measurement, Probe Number = 0, T = 20.138000 C 02:40:31 Temperature Measurement, Probe Number = 1, T = 20.058000 C 02:40:32 Temperature Measurement, Probe Number = 2, T = 20.128000 C 02:40:33 Temperature Measurement, Probe Number = 3, T = 20.069000 C 02:40:33 Temperature Measurement, Probe Number = 4, T = 20.236000 C 02:40:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.24 02:40:33 Integrated Voltage Measurement... 02:40:53 Voltage Offset Correction: v_off_ini = 0.000004200 V, v_off_fin = 0.000006815 V 02:40:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049978 Vs 02:40:53 Integrated Voltage Measurement... 02:41:12 Voltage Offset Correction: v_off_ini = 0.000006351 V, v_off_fin = 0.000002406 V 02:41:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968501 Vs 02:41:15 Temperature Measurement, Probe Number = 0, T = 20.136000 C 02:41:15 Temperature Measurement, Probe Number = 1, T = 20.053000 C 02:41:16 Temperature Measurement, Probe Number = 2, T = 20.127000 C 02:41:17 Temperature Measurement, Probe Number = 3, T = 20.067000 C 02:41:17 Temperature Measurement, Probe Number = 4, T = 20.197000 C 02:41:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.20 02:41:18 Integrated Voltage Measurement... 02:41:37 Voltage Offset Correction: v_off_ini = 0.000004251 V, v_off_fin = 0.000006137 V 02:41:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053062 Vs 02:41:38 Integrated Voltage Measurement... 02:41:57 Voltage Offset Correction: v_off_ini = 0.000005498 V, v_off_fin = 0.000002392 V 02:41:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973490 Vs 02:42:00 Temperature Measurement, Probe Number = 0, T = 20.135000 C 02:42:00 Temperature Measurement, Probe Number = 1, T = 20.053000 C 02:42:01 Temperature Measurement, Probe Number = 2, T = 20.128000 C 02:42:02 Temperature Measurement, Probe Number = 3, T = 20.068000 C 02:42:02 Temperature Measurement, Probe Number = 4, T = 20.239000 C 02:42:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.24 02:42:03 Integrated Voltage Measurement... 02:42:22 Voltage Offset Correction: v_off_ini = 0.000003995 V, v_off_fin = 0.000006524 V 02:42:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046573 Vs 02:42:22 Integrated Voltage Measurement... 02:42:42 Voltage Offset Correction: v_off_ini = 0.000005262 V, v_off_fin = 0.000002649 V 02:42:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977492 Vs 03:12:44 Temperature Measurement, Probe Number = 0, T = 20.126000 C 03:12:45 Temperature Measurement, Probe Number = 1, T = 20.044000 C 03:12:46 Temperature Measurement, Probe Number = 2, T = 20.121000 C 03:12:47 Temperature Measurement, Probe Number = 3, T = 20.061000 C 03:12:47 Temperature Measurement, Probe Number = 4, T = 20.161000 C 03:12:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.16 03:12:48 Integrated Voltage Measurement... 03:13:07 Voltage Offset Correction: v_off_ini = 0.000005227 V, v_off_fin = 0.000006735 V 03:13:08 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171099344 Vs 03:13:08 Integrated Voltage Measurement... 03:13:27 Voltage Offset Correction: v_off_ini = 0.000006113 V, v_off_fin = 0.000002769 V 03:13:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974011 Vs 03:13:30 Temperature Measurement, Probe Number = 0, T = 20.132000 C 03:13:30 Temperature Measurement, Probe Number = 1, T = 20.050000 C 03:13:31 Temperature Measurement, Probe Number = 2, T = 20.124000 C 03:13:32 Temperature Measurement, Probe Number = 3, T = 20.063000 C 03:13:32 Temperature Measurement, Probe Number = 4, T = 20.089000 C 03:13:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.09 03:13:32 Integrated Voltage Measurement... 03:13:52 Voltage Offset Correction: v_off_ini = 0.000003664 V, v_off_fin = 0.000006595 V 03:13:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048540 Vs 03:13:52 Integrated Voltage Measurement... 03:14:11 Voltage Offset Correction: v_off_ini = 0.000006192 V, v_off_fin = 0.000002589 V 03:14:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971224 Vs 03:14:14 Temperature Measurement, Probe Number = 0, T = 20.135000 C 03:14:15 Temperature Measurement, Probe Number = 1, T = 20.053000 C 03:14:15 Temperature Measurement, Probe Number = 2, T = 20.129000 C 03:14:16 Temperature Measurement, Probe Number = 3, T = 20.067000 C 03:14:17 Temperature Measurement, Probe Number = 4, T = 20.107000 C 03:14:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.11 03:14:17 Integrated Voltage Measurement... 03:14:36 Voltage Offset Correction: v_off_ini = 0.000003456 V, v_off_fin = 0.000006488 V 03:14:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045435 Vs 03:14:36 Integrated Voltage Measurement... 03:14:56 Voltage Offset Correction: v_off_ini = 0.000006316 V, v_off_fin = 0.000002986 V 03:14:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976850 Vs 03:14:58 Temperature Measurement, Probe Number = 0, T = 20.133000 C 03:14:59 Temperature Measurement, Probe Number = 1, T = 20.051000 C 03:15:00 Temperature Measurement, Probe Number = 2, T = 20.125000 C 03:15:00 Temperature Measurement, Probe Number = 3, T = 20.067000 C 03:15:01 Temperature Measurement, Probe Number = 4, T = 20.256000 C 03:15:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.26 03:15:01 Integrated Voltage Measurement... 03:15:21 Voltage Offset Correction: v_off_ini = 0.000003933 V, v_off_fin = 0.000006240 V 03:15:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050951 Vs 03:15:21 Integrated Voltage Measurement... 03:15:41 Voltage Offset Correction: v_off_ini = 0.000005953 V, v_off_fin = 0.000003477 V 03:15:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972514 Vs 03:15:44 Temperature Measurement, Probe Number = 0, T = 20.137000 C 03:15:44 Temperature Measurement, Probe Number = 1, T = 20.054000 C 03:15:45 Temperature Measurement, Probe Number = 2, T = 20.123000 C 03:15:46 Temperature Measurement, Probe Number = 3, T = 20.063000 C 03:15:46 Temperature Measurement, Probe Number = 4, T = 20.239000 C 03:15:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.24 03:15:47 Integrated Voltage Measurement... 03:16:06 Voltage Offset Correction: v_off_ini = 0.000004451 V, v_off_fin = 0.000006854 V 03:16:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047087 Vs 03:16:06 Integrated Voltage Measurement... 03:16:26 Voltage Offset Correction: v_off_ini = 0.000006285 V, v_off_fin = 0.000002912 V 03:16:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975716 Vs 03:16:29 Temperature Measurement, Probe Number = 0, T = 20.131000 C 03:16:29 Temperature Measurement, Probe Number = 1, T = 20.049000 C 03:16:30 Temperature Measurement, Probe Number = 2, T = 20.121000 C 03:16:31 Temperature Measurement, Probe Number = 3, T = 20.059000 C 03:16:31 Temperature Measurement, Probe Number = 4, T = 20.307000 C 03:16:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.31 03:16:31 Integrated Voltage Measurement... 03:16:51 Voltage Offset Correction: v_off_ini = 0.000004235 V, v_off_fin = 0.000006384 V 03:16:51 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050255 Vs 03:16:51 Integrated Voltage Measurement... 03:17:10 Voltage Offset Correction: v_off_ini = 0.000005898 V, v_off_fin = 0.000002754 V 03:17:10 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170974505 Vs 03:17:13 Temperature Measurement, Probe Number = 0, T = 20.125000 C 03:17:14 Temperature Measurement, Probe Number = 1, T = 20.044000 C 03:17:14 Temperature Measurement, Probe Number = 2, T = 20.117000 C 03:17:15 Temperature Measurement, Probe Number = 3, T = 20.057000 C 03:17:16 Temperature Measurement, Probe Number = 4, T = 20.275000 C 03:17:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.27 03:17:16 Integrated Voltage Measurement... 03:17:36 Voltage Offset Correction: v_off_ini = 0.000003960 V, v_off_fin = 0.000006852 V 03:17:36 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050581 Vs 03:17:36 Integrated Voltage Measurement... 03:17:55 Voltage Offset Correction: v_off_ini = 0.000006451 V, v_off_fin = 0.000003501 V 03:17:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964399 Vs 03:17:58 Temperature Measurement, Probe Number = 0, T = 20.132000 C 03:17:59 Temperature Measurement, Probe Number = 1, T = 20.050000 C 03:18:00 Temperature Measurement, Probe Number = 2, T = 20.123000 C 03:18:00 Temperature Measurement, Probe Number = 3, T = 20.062000 C 03:18:01 Temperature Measurement, Probe Number = 4, T = 20.301000 C 03:18:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.30 03:18:01 Integrated Voltage Measurement... 03:18:20 Voltage Offset Correction: v_off_ini = 0.000004399 V, v_off_fin = 0.000006590 V 03:18:21 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050829 Vs 03:18:21 Integrated Voltage Measurement... 03:18:40 Voltage Offset Correction: v_off_ini = 0.000005666 V, v_off_fin = 0.000002534 V 03:18:40 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170976198 Vs 03:18:43 Temperature Measurement, Probe Number = 0, T = 20.136000 C 03:18:44 Temperature Measurement, Probe Number = 1, T = 20.055000 C 03:18:44 Temperature Measurement, Probe Number = 2, T = 20.125000 C 03:18:45 Temperature Measurement, Probe Number = 3, T = 20.066000 C 03:18:45 Temperature Measurement, Probe Number = 4, T = 20.308000 C 03:18:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.31 03:18:46 Integrated Voltage Measurement... 03:19:05 Voltage Offset Correction: v_off_ini = 0.000004282 V, v_off_fin = 0.000006474 V 03:19:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048398 Vs 03:19:05 Integrated Voltage Measurement... 03:19:24 Voltage Offset Correction: v_off_ini = 0.000005451 V, v_off_fin = 0.000002488 V 03:19:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974591 Vs 03:19:27 Temperature Measurement, Probe Number = 0, T = 20.138000 C 03:19:28 Temperature Measurement, Probe Number = 1, T = 20.054000 C 03:19:29 Temperature Measurement, Probe Number = 2, T = 20.129000 C 03:19:29 Temperature Measurement, Probe Number = 3, T = 20.067000 C 03:19:30 Temperature Measurement, Probe Number = 4, T = 20.332000 C 03:19:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.33 03:19:30 Integrated Voltage Measurement... 03:19:49 Voltage Offset Correction: v_off_ini = 0.000003649 V, v_off_fin = 0.000006416 V 03:19:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049317 Vs 03:19:50 Integrated Voltage Measurement... 03:20:09 Voltage Offset Correction: v_off_ini = 0.000005634 V, v_off_fin = 0.000002805 V 03:20:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170976458 Vs 03:50:12 Temperature Measurement, Probe Number = 0, T = 20.129000 C 03:50:13 Temperature Measurement, Probe Number = 1, T = 20.049000 C 03:50:13 Temperature Measurement, Probe Number = 2, T = 20.123000 C 03:50:14 Temperature Measurement, Probe Number = 3, T = 20.064000 C 03:50:15 Temperature Measurement, Probe Number = 4, T = 20.317000 C 03:50:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.32 03:50:15 Integrated Voltage Measurement... 03:50:34 Voltage Offset Correction: v_off_ini = 0.000005045 V, v_off_fin = 0.000006035 V 03:50:34 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171095805 Vs 03:50:35 Integrated Voltage Measurement... 03:50:54 Voltage Offset Correction: v_off_ini = 0.000005692 V, v_off_fin = 0.000002888 V 03:50:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981114 Vs 03:50:57 Temperature Measurement, Probe Number = 0, T = 20.123000 C 03:50:57 Temperature Measurement, Probe Number = 1, T = 20.047000 C 03:50:58 Temperature Measurement, Probe Number = 2, T = 20.116000 C 03:50:59 Temperature Measurement, Probe Number = 3, T = 20.060000 C 03:50:59 Temperature Measurement, Probe Number = 4, T = 20.303000 C 03:50:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.30 03:51:00 Integrated Voltage Measurement... 03:51:19 Voltage Offset Correction: v_off_ini = 0.000003751 V, v_off_fin = 0.000006592 V 03:51:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045108 Vs 03:51:19 Integrated Voltage Measurement... 03:51:38 Voltage Offset Correction: v_off_ini = 0.000006139 V, v_off_fin = 0.000002727 V 03:51:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973056 Vs 03:51:41 Temperature Measurement, Probe Number = 0, T = 20.126000 C 03:51:42 Temperature Measurement, Probe Number = 1, T = 20.049000 C 03:51:43 Temperature Measurement, Probe Number = 2, T = 20.117000 C 03:51:43 Temperature Measurement, Probe Number = 3, T = 20.060000 C 03:51:44 Temperature Measurement, Probe Number = 4, T = 20.365000 C 03:51:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.36 03:51:44 Integrated Voltage Measurement... 03:52:03 Voltage Offset Correction: v_off_ini = 0.000003756 V, v_off_fin = 0.000006052 V 03:52:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050191 Vs 03:52:04 Integrated Voltage Measurement... 03:52:23 Voltage Offset Correction: v_off_ini = 0.000005605 V, v_off_fin = 0.000002752 V 03:52:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977800 Vs 03:52:26 Temperature Measurement, Probe Number = 0, T = 20.129000 C 03:52:27 Temperature Measurement, Probe Number = 1, T = 20.048000 C 03:52:28 Temperature Measurement, Probe Number = 2, T = 20.121000 C 03:52:28 Temperature Measurement, Probe Number = 3, T = 20.063000 C 03:52:29 Temperature Measurement, Probe Number = 4, T = 20.364000 C 03:52:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.36 03:52:29 Integrated Voltage Measurement... 03:52:49 Voltage Offset Correction: v_off_ini = 0.000003652 V, v_off_fin = 0.000006214 V 03:52:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042898 Vs 03:52:49 Integrated Voltage Measurement... 03:53:09 Voltage Offset Correction: v_off_ini = 0.000006019 V, v_off_fin = 0.000002071 V 03:53:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975743 Vs 03:53:11 Temperature Measurement, Probe Number = 0, T = 20.124000 C 03:53:12 Temperature Measurement, Probe Number = 1, T = 20.046000 C 03:53:13 Temperature Measurement, Probe Number = 2, T = 20.117000 C 03:53:13 Temperature Measurement, Probe Number = 3, T = 20.060000 C 03:53:14 Temperature Measurement, Probe Number = 4, T = 20.331000 C 03:53:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.33 03:53:14 Integrated Voltage Measurement... 03:53:34 Voltage Offset Correction: v_off_ini = 0.000003183 V, v_off_fin = 0.000006094 V 03:53:34 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044394 Vs 03:53:34 Integrated Voltage Measurement... 03:53:54 Voltage Offset Correction: v_off_ini = 0.000005368 V, v_off_fin = 0.000003149 V 03:53:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981170 Vs 03:53:57 Temperature Measurement, Probe Number = 0, T = 20.134000 C 03:53:57 Temperature Measurement, Probe Number = 1, T = 20.052000 C 03:53:58 Temperature Measurement, Probe Number = 2, T = 20.123000 C 03:53:59 Temperature Measurement, Probe Number = 3, T = 20.066000 C 03:53:59 Temperature Measurement, Probe Number = 4, T = 20.313000 C 03:53:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.31 03:54:00 Integrated Voltage Measurement... 03:54:19 Voltage Offset Correction: v_off_ini = 0.000004127 V, v_off_fin = 0.000006658 V 03:54:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040971 Vs 03:54:19 Integrated Voltage Measurement... 03:54:38 Voltage Offset Correction: v_off_ini = 0.000005810 V, v_off_fin = 0.000003054 V 03:54:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977332 Vs 03:54:41 Temperature Measurement, Probe Number = 0, T = 20.138000 C 03:54:42 Temperature Measurement, Probe Number = 1, T = 20.053000 C 03:54:43 Temperature Measurement, Probe Number = 2, T = 20.128000 C 03:54:43 Temperature Measurement, Probe Number = 3, T = 20.068000 C 03:54:44 Temperature Measurement, Probe Number = 4, T = 20.392000 C 03:54:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.39 03:54:44 Integrated Voltage Measurement... 03:55:04 Voltage Offset Correction: v_off_ini = 0.000004784 V, v_off_fin = 0.000006703 V 03:55:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054802 Vs 03:55:05 Integrated Voltage Measurement... 03:55:24 Voltage Offset Correction: v_off_ini = 0.000006168 V, v_off_fin = 0.000003066 V 03:55:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966785 Vs 03:55:27 Temperature Measurement, Probe Number = 0, T = 20.128000 C 03:55:27 Temperature Measurement, Probe Number = 1, T = 20.046000 C 03:55:28 Temperature Measurement, Probe Number = 2, T = 20.120000 C 03:55:29 Temperature Measurement, Probe Number = 3, T = 20.061000 C 03:55:29 Temperature Measurement, Probe Number = 4, T = 20.379000 C 03:55:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.38 03:55:29 Integrated Voltage Measurement... 03:55:49 Voltage Offset Correction: v_off_ini = 0.000003982 V, v_off_fin = 0.000006421 V 03:55:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049069 Vs 03:55:49 Integrated Voltage Measurement... 03:56:08 Voltage Offset Correction: v_off_ini = 0.000005971 V, v_off_fin = 0.000003334 V 03:56:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976596 Vs 03:56:11 Temperature Measurement, Probe Number = 0, T = 20.130000 C 03:56:12 Temperature Measurement, Probe Number = 1, T = 20.051000 C 03:56:13 Temperature Measurement, Probe Number = 2, T = 20.121000 C 03:56:13 Temperature Measurement, Probe Number = 3, T = 20.063000 C 03:56:14 Temperature Measurement, Probe Number = 4, T = 20.375000 C 03:56:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.38 03:56:14 Integrated Voltage Measurement... 03:56:34 Voltage Offset Correction: v_off_ini = 0.000004632 V, v_off_fin = 0.000006181 V 03:56:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052788 Vs 03:56:34 Integrated Voltage Measurement... 03:56:54 Voltage Offset Correction: v_off_ini = 0.000005831 V, v_off_fin = 0.000002957 V 03:56:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978106 Vs 03:56:56 Temperature Measurement, Probe Number = 0, T = 20.130000 C 03:56:57 Temperature Measurement, Probe Number = 1, T = 20.049000 C 03:56:58 Temperature Measurement, Probe Number = 2, T = 20.122000 C 03:56:58 Temperature Measurement, Probe Number = 3, T = 20.062000 C 03:56:59 Temperature Measurement, Probe Number = 4, T = 20.453000 C 03:56:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.45 03:56:59 Integrated Voltage Measurement... 03:57:18 Voltage Offset Correction: v_off_ini = 0.000003946 V, v_off_fin = 0.000006553 V 03:57:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048240 Vs 03:57:19 Integrated Voltage Measurement... 03:57:38 Voltage Offset Correction: v_off_ini = 0.000005780 V, v_off_fin = 0.000002705 V 03:57:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975289 Vs 04:27:41 Temperature Measurement, Probe Number = 0, T = 20.123000 C 04:27:42 Temperature Measurement, Probe Number = 1, T = 20.044000 C 04:27:42 Temperature Measurement, Probe Number = 2, T = 20.116000 C 04:27:43 Temperature Measurement, Probe Number = 3, T = 20.057000 C 04:27:44 Temperature Measurement, Probe Number = 4, T = 20.334000 C 04:27:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.33 04:27:44 Integrated Voltage Measurement... 04:28:03 Voltage Offset Correction: v_off_ini = 0.000004916 V, v_off_fin = 0.000005998 V 04:28:03 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171092324 Vs 04:28:03 Integrated Voltage Measurement... 04:28:22 Voltage Offset Correction: v_off_ini = 0.000005802 V, v_off_fin = 0.000002536 V 04:28:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971971 Vs 04:28:25 Temperature Measurement, Probe Number = 0, T = 20.132000 C 04:28:26 Temperature Measurement, Probe Number = 1, T = 20.047000 C 04:28:27 Temperature Measurement, Probe Number = 2, T = 20.122000 C 04:28:27 Temperature Measurement, Probe Number = 3, T = 20.061000 C 04:28:28 Temperature Measurement, Probe Number = 4, T = 20.388000 C 04:28:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.39 04:28:28 Integrated Voltage Measurement... 04:28:47 Voltage Offset Correction: v_off_ini = 0.000003837 V, v_off_fin = 0.000006385 V 04:28:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047028 Vs 04:28:48 Integrated Voltage Measurement... 04:29:07 Voltage Offset Correction: v_off_ini = 0.000005841 V, v_off_fin = 0.000002375 V 04:29:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970525 Vs 04:29:10 Temperature Measurement, Probe Number = 0, T = 20.129000 C 04:29:11 Temperature Measurement, Probe Number = 1, T = 20.049000 C 04:29:11 Temperature Measurement, Probe Number = 2, T = 20.118000 C 04:29:12 Temperature Measurement, Probe Number = 3, T = 20.061000 C 04:29:13 Temperature Measurement, Probe Number = 4, T = 20.389000 C 04:29:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.39 04:29:13 Integrated Voltage Measurement... 04:29:32 Voltage Offset Correction: v_off_ini = 0.000003946 V, v_off_fin = 0.000006408 V 04:29:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049171 Vs 04:29:32 Integrated Voltage Measurement... 04:29:52 Voltage Offset Correction: v_off_ini = 0.000005884 V, v_off_fin = 0.000002980 V 04:29:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974403 Vs 04:29:55 Temperature Measurement, Probe Number = 0, T = 20.126000 C 04:29:55 Temperature Measurement, Probe Number = 1, T = 20.049000 C 04:29:56 Temperature Measurement, Probe Number = 2, T = 20.118000 C 04:29:57 Temperature Measurement, Probe Number = 3, T = 20.060000 C 04:29:57 Temperature Measurement, Probe Number = 4, T = 20.396000 C 04:29:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.40 04:29:57 Integrated Voltage Measurement... 04:30:17 Voltage Offset Correction: v_off_ini = 0.000003862 V, v_off_fin = 0.000006282 V 04:30:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042840 Vs 04:30:17 Integrated Voltage Measurement... 04:30:36 Voltage Offset Correction: v_off_ini = 0.000005517 V, v_off_fin = 0.000002842 V 04:30:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972250 Vs 04:30:39 Temperature Measurement, Probe Number = 0, T = 20.124000 C 04:30:40 Temperature Measurement, Probe Number = 1, T = 20.042000 C 04:30:41 Temperature Measurement, Probe Number = 2, T = 20.116000 C 04:30:41 Temperature Measurement, Probe Number = 3, T = 20.056000 C 04:30:42 Temperature Measurement, Probe Number = 4, T = 20.383000 C 04:30:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.38 04:30:42 Integrated Voltage Measurement... 04:31:02 Voltage Offset Correction: v_off_ini = 0.000004273 V, v_off_fin = 0.000005879 V 04:31:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045615 Vs 04:31:02 Integrated Voltage Measurement... 04:31:22 Voltage Offset Correction: v_off_ini = 0.000006248 V, v_off_fin = 0.000002790 V 04:31:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969640 Vs 04:31:25 Temperature Measurement, Probe Number = 0, T = 20.126000 C 04:31:25 Temperature Measurement, Probe Number = 1, T = 20.044000 C 04:31:26 Temperature Measurement, Probe Number = 2, T = 20.118000 C 04:31:26 Temperature Measurement, Probe Number = 3, T = 20.059000 C 04:31:27 Temperature Measurement, Probe Number = 4, T = 20.508000 C 04:31:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.51 04:31:27 Integrated Voltage Measurement... 04:31:47 Voltage Offset Correction: v_off_ini = 0.000003244 V, v_off_fin = 0.000006298 V 04:31:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037427 Vs 04:31:47 Integrated Voltage Measurement... 04:32:06 Voltage Offset Correction: v_off_ini = 0.000005723 V, v_off_fin = 0.000002625 V 04:32:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971426 Vs 04:32:09 Temperature Measurement, Probe Number = 0, T = 20.122000 C 04:32:10 Temperature Measurement, Probe Number = 1, T = 20.046000 C 04:32:10 Temperature Measurement, Probe Number = 2, T = 20.116000 C 04:32:11 Temperature Measurement, Probe Number = 3, T = 20.060000 C 04:32:11 Temperature Measurement, Probe Number = 4, T = 20.520000 C 04:32:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.52 04:32:12 Integrated Voltage Measurement... 04:32:31 Voltage Offset Correction: v_off_ini = 0.000004029 V, v_off_fin = 0.000006211 V 04:32:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171048471 Vs 04:32:32 Integrated Voltage Measurement... 04:32:51 Voltage Offset Correction: v_off_ini = 0.000005938 V, v_off_fin = 0.000002964 V 04:32:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969177 Vs 04:32:54 Temperature Measurement, Probe Number = 0, T = 20.120000 C 04:32:55 Temperature Measurement, Probe Number = 1, T = 20.040000 C 04:32:55 Temperature Measurement, Probe Number = 2, T = 20.114000 C 04:32:56 Temperature Measurement, Probe Number = 3, T = 20.055000 C 04:32:57 Temperature Measurement, Probe Number = 4, T = 20.563000 C 04:32:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.56 04:32:57 Integrated Voltage Measurement... 04:33:16 Voltage Offset Correction: v_off_ini = 0.000004481 V, v_off_fin = 0.000006378 V 04:33:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049905 Vs 04:33:17 Integrated Voltage Measurement... 04:33:36 Voltage Offset Correction: v_off_ini = 0.000005918 V, v_off_fin = 0.000002835 V 04:33:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977261 Vs 04:33:39 Temperature Measurement, Probe Number = 0, T = 20.121000 C 04:33:40 Temperature Measurement, Probe Number = 1, T = 20.039000 C 04:33:40 Temperature Measurement, Probe Number = 2, T = 20.112000 C 04:33:41 Temperature Measurement, Probe Number = 3, T = 20.052000 C 04:33:42 Temperature Measurement, Probe Number = 4, T = 20.385000 C 04:33:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.39 04:33:42 Integrated Voltage Measurement... 04:34:01 Voltage Offset Correction: v_off_ini = 0.000003757 V, v_off_fin = 0.000006348 V 04:34:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038256 Vs 04:34:02 Integrated Voltage Measurement... 04:34:21 Voltage Offset Correction: v_off_ini = 0.000005798 V, v_off_fin = 0.000002557 V 04:34:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969487 Vs 04:34:24 Temperature Measurement, Probe Number = 0, T = 20.124000 C 04:34:24 Temperature Measurement, Probe Number = 1, T = 20.044000 C 04:34:25 Temperature Measurement, Probe Number = 2, T = 20.116000 C 04:34:26 Temperature Measurement, Probe Number = 3, T = 20.056000 C 04:34:26 Temperature Measurement, Probe Number = 4, T = 20.365000 C 04:34:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.36 04:34:27 Integrated Voltage Measurement... 04:34:46 Voltage Offset Correction: v_off_ini = 0.000003969 V, v_off_fin = 0.000006581 V 04:34:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045832 Vs 04:34:46 Integrated Voltage Measurement... 04:35:05 Voltage Offset Correction: v_off_ini = 0.000006392 V, v_off_fin = 0.000003150 V 04:35:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966278 Vs 05:05:08 Temperature Measurement, Probe Number = 0, T = 20.118000 C 05:05:09 Temperature Measurement, Probe Number = 1, T = 20.038000 C 05:05:10 Temperature Measurement, Probe Number = 2, T = 20.112000 C 05:05:10 Temperature Measurement, Probe Number = 3, T = 20.052000 C 05:05:11 Temperature Measurement, Probe Number = 4, T = 20.449000 C 05:05:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.45 05:05:11 Integrated Voltage Measurement... 05:05:30 Voltage Offset Correction: v_off_ini = 0.000005135 V, v_off_fin = 0.000006509 V 05:05:30 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171095544 Vs 05:05:31 Integrated Voltage Measurement... 05:05:50 Voltage Offset Correction: v_off_ini = 0.000006201 V, v_off_fin = 0.000003025 V 05:05:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966251 Vs 05:05:53 Temperature Measurement, Probe Number = 0, T = 20.120000 C 05:05:53 Temperature Measurement, Probe Number = 1, T = 20.043000 C 05:05:54 Temperature Measurement, Probe Number = 2, T = 20.111000 C 05:05:55 Temperature Measurement, Probe Number = 3, T = 20.053000 C 05:05:55 Temperature Measurement, Probe Number = 4, T = 20.346000 C 05:05:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.35 05:05:56 Integrated Voltage Measurement... 05:06:15 Voltage Offset Correction: v_off_ini = 0.000004160 V, v_off_fin = 0.000006512 V 05:06:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042003 Vs 05:06:15 Integrated Voltage Measurement... 05:06:34 Voltage Offset Correction: v_off_ini = 0.000005885 V, v_off_fin = 0.000002282 V 05:06:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966181 Vs 05:06:37 Temperature Measurement, Probe Number = 0, T = 20.128000 C 05:06:38 Temperature Measurement, Probe Number = 1, T = 20.048000 C 05:06:39 Temperature Measurement, Probe Number = 2, T = 20.117000 C 05:06:39 Temperature Measurement, Probe Number = 3, T = 20.059000 C 05:06:40 Temperature Measurement, Probe Number = 4, T = 20.289000 C 05:06:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.29 05:06:40 Integrated Voltage Measurement... 05:06:59 Voltage Offset Correction: v_off_ini = 0.000003533 V, v_off_fin = 0.000006475 V 05:07:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171040466 Vs 05:07:00 Integrated Voltage Measurement... 05:07:19 Voltage Offset Correction: v_off_ini = 0.000005795 V, v_off_fin = 0.000002940 V 05:07:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966924 Vs 05:07:22 Temperature Measurement, Probe Number = 0, T = 20.131000 C 05:07:23 Temperature Measurement, Probe Number = 1, T = 20.048000 C 05:07:23 Temperature Measurement, Probe Number = 2, T = 20.122000 C 05:07:24 Temperature Measurement, Probe Number = 3, T = 20.063000 C 05:07:25 Temperature Measurement, Probe Number = 4, T = 20.358000 C 05:07:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.36 05:07:25 Integrated Voltage Measurement... 05:07:44 Voltage Offset Correction: v_off_ini = 0.000004108 V, v_off_fin = 0.000006180 V 05:07:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041271 Vs 05:07:44 Integrated Voltage Measurement... 05:08:03 Voltage Offset Correction: v_off_ini = 0.000006310 V, v_off_fin = 0.000003408 V 05:08:04 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170963979 Vs 05:08:06 Temperature Measurement, Probe Number = 0, T = 20.123000 C 05:08:07 Temperature Measurement, Probe Number = 1, T = 20.042000 C 05:08:08 Temperature Measurement, Probe Number = 2, T = 20.115000 C 05:08:08 Temperature Measurement, Probe Number = 3, T = 20.057000 C 05:08:09 Temperature Measurement, Probe Number = 4, T = 20.312000 C 05:08:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.31 05:08:09 Integrated Voltage Measurement... 05:08:28 Voltage Offset Correction: v_off_ini = 0.000004501 V, v_off_fin = 0.000006470 V 05:08:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048037 Vs 05:08:29 Integrated Voltage Measurement... 05:08:48 Voltage Offset Correction: v_off_ini = 0.000006315 V, v_off_fin = 0.000003161 V 05:08:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967808 Vs 05:08:51 Temperature Measurement, Probe Number = 0, T = 20.119000 C 05:08:52 Temperature Measurement, Probe Number = 1, T = 20.040000 C 05:08:53 Temperature Measurement, Probe Number = 2, T = 20.112000 C 05:08:53 Temperature Measurement, Probe Number = 3, T = 20.054000 C 05:08:54 Temperature Measurement, Probe Number = 4, T = 20.236000 C 05:08:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.24 05:08:54 Integrated Voltage Measurement... 05:09:14 Voltage Offset Correction: v_off_ini = 0.000004492 V, v_off_fin = 0.000006554 V 05:09:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039900 Vs 05:09:14 Integrated Voltage Measurement... 05:09:33 Voltage Offset Correction: v_off_ini = 0.000005969 V, v_off_fin = 0.000003203 V 05:09:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965662 Vs 05:09:36 Temperature Measurement, Probe Number = 0, T = 20.122000 C 05:09:37 Temperature Measurement, Probe Number = 1, T = 20.041000 C 05:09:37 Temperature Measurement, Probe Number = 2, T = 20.114000 C 05:09:38 Temperature Measurement, Probe Number = 3, T = 20.054000 C 05:09:39 Temperature Measurement, Probe Number = 4, T = 20.210000 C 05:09:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.21 05:09:39 Integrated Voltage Measurement... 05:09:59 Voltage Offset Correction: v_off_ini = 0.000004541 V, v_off_fin = 0.000006085 V 05:09:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043352 Vs 05:09:59 Integrated Voltage Measurement... 05:10:18 Voltage Offset Correction: v_off_ini = 0.000005752 V, v_off_fin = 0.000003150 V 05:10:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967310 Vs 05:10:21 Temperature Measurement, Probe Number = 0, T = 20.126000 C 05:10:22 Temperature Measurement, Probe Number = 1, T = 20.048000 C 05:10:22 Temperature Measurement, Probe Number = 2, T = 20.116000 C 05:10:23 Temperature Measurement, Probe Number = 3, T = 20.059000 C 05:10:24 Temperature Measurement, Probe Number = 4, T = 20.327000 C 05:10:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.33 05:10:24 Integrated Voltage Measurement... 05:10:43 Voltage Offset Correction: v_off_ini = 0.000003609 V, v_off_fin = 0.000006685 V 05:10:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040945 Vs 05:10:44 Integrated Voltage Measurement... 05:11:03 Voltage Offset Correction: v_off_ini = 0.000005739 V, v_off_fin = 0.000002812 V 05:11:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967829 Vs 05:11:06 Temperature Measurement, Probe Number = 0, T = 20.129000 C 05:11:06 Temperature Measurement, Probe Number = 1, T = 20.050000 C 05:11:07 Temperature Measurement, Probe Number = 2, T = 20.121000 C 05:11:08 Temperature Measurement, Probe Number = 3, T = 20.064000 C 05:11:08 Temperature Measurement, Probe Number = 4, T = 20.390000 C 05:11:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.39 05:11:09 Integrated Voltage Measurement... 05:11:28 Voltage Offset Correction: v_off_ini = 0.000003867 V, v_off_fin = 0.000006066 V 05:11:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171041210 Vs 05:11:28 Integrated Voltage Measurement... 05:11:47 Voltage Offset Correction: v_off_ini = 0.000005639 V, v_off_fin = 0.000003133 V 05:11:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969360 Vs 05:11:50 Temperature Measurement, Probe Number = 0, T = 20.125000 C 05:11:51 Temperature Measurement, Probe Number = 1, T = 20.044000 C 05:11:52 Temperature Measurement, Probe Number = 2, T = 20.118000 C 05:11:52 Temperature Measurement, Probe Number = 3, T = 20.059000 C 05:11:53 Temperature Measurement, Probe Number = 4, T = 20.406000 C 05:11:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.41 05:11:53 Integrated Voltage Measurement... 05:12:12 Voltage Offset Correction: v_off_ini = 0.000004309 V, v_off_fin = 0.000006893 V 05:12:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039275 Vs 05:12:13 Integrated Voltage Measurement... 05:12:32 Voltage Offset Correction: v_off_ini = 0.000005759 V, v_off_fin = 0.000002340 V 05:12:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969028 Vs 05:42:35 Temperature Measurement, Probe Number = 0, T = 20.121000 C 05:42:36 Temperature Measurement, Probe Number = 1, T = 20.043000 C 05:42:36 Temperature Measurement, Probe Number = 2, T = 20.114000 C 05:42:37 Temperature Measurement, Probe Number = 3, T = 20.057000 C 05:42:38 Temperature Measurement, Probe Number = 4, T = 20.359000 C 05:42:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.36 05:42:38 Integrated Voltage Measurement... 05:42:57 Voltage Offset Correction: v_off_ini = 0.000005074 V, v_off_fin = 0.000006779 V 05:42:57 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171089563 Vs 05:42:57 Integrated Voltage Measurement... 05:43:16 Voltage Offset Correction: v_off_ini = 0.000005759 V, v_off_fin = 0.000002735 V 05:43:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970318 Vs 05:43:19 Temperature Measurement, Probe Number = 0, T = 20.118000 C 05:43:20 Temperature Measurement, Probe Number = 1, T = 20.038000 C 05:43:21 Temperature Measurement, Probe Number = 2, T = 20.111000 C 05:43:21 Temperature Measurement, Probe Number = 3, T = 20.053000 C 05:43:22 Temperature Measurement, Probe Number = 4, T = 20.358000 C 05:43:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.36 05:43:22 Integrated Voltage Measurement... 05:43:41 Voltage Offset Correction: v_off_ini = 0.000003786 V, v_off_fin = 0.000006117 V 05:43:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038709 Vs 05:43:42 Integrated Voltage Measurement... 05:44:01 Voltage Offset Correction: v_off_ini = 0.000005821 V, v_off_fin = 0.000002242 V 05:44:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970803 Vs 05:44:04 Temperature Measurement, Probe Number = 0, T = 20.114000 C 05:44:04 Temperature Measurement, Probe Number = 1, T = 20.038000 C 05:44:05 Temperature Measurement, Probe Number = 2, T = 20.108000 C 05:44:05 Temperature Measurement, Probe Number = 3, T = 20.052000 C 05:44:06 Temperature Measurement, Probe Number = 4, T = 20.333000 C 05:44:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.33 05:44:06 Integrated Voltage Measurement... 05:44:25 Voltage Offset Correction: v_off_ini = 0.000004559 V, v_off_fin = 0.000006497 V 05:44:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041301 Vs 05:44:26 Integrated Voltage Measurement... 05:44:45 Voltage Offset Correction: v_off_ini = 0.000005868 V, v_off_fin = 0.000002893 V 05:44:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971750 Vs 05:44:48 Temperature Measurement, Probe Number = 0, T = 20.124000 C 05:44:48 Temperature Measurement, Probe Number = 1, T = 20.049000 C 05:44:49 Temperature Measurement, Probe Number = 2, T = 20.114000 C 05:44:50 Temperature Measurement, Probe Number = 3, T = 20.060000 C 05:44:50 Temperature Measurement, Probe Number = 4, T = 20.414000 C 05:44:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.41 05:44:51 Integrated Voltage Measurement... 05:45:10 Voltage Offset Correction: v_off_ini = 0.000004269 V, v_off_fin = 0.000006259 V 05:45:10 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047948 Vs 05:45:10 Integrated Voltage Measurement... 05:45:30 Voltage Offset Correction: v_off_ini = 0.000006157 V, v_off_fin = 0.000003040 V 05:45:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972368 Vs 05:45:32 Temperature Measurement, Probe Number = 0, T = 20.126000 C 05:45:33 Temperature Measurement, Probe Number = 1, T = 20.046000 C 05:45:34 Temperature Measurement, Probe Number = 2, T = 20.119000 C 05:45:34 Temperature Measurement, Probe Number = 3, T = 20.062000 C 05:45:35 Temperature Measurement, Probe Number = 4, T = 20.440000 C 05:45:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.44 05:45:35 Integrated Voltage Measurement... 05:45:55 Voltage Offset Correction: v_off_ini = 0.000003831 V, v_off_fin = 0.000006549 V 05:45:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039868 Vs 05:45:55 Integrated Voltage Measurement... 05:46:14 Voltage Offset Correction: v_off_ini = 0.000005986 V, v_off_fin = 0.000002668 V 05:46:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971485 Vs 05:46:17 Temperature Measurement, Probe Number = 0, T = 20.124000 C 05:46:17 Temperature Measurement, Probe Number = 1, T = 20.044000 C 05:46:18 Temperature Measurement, Probe Number = 2, T = 20.115000 C 05:46:19 Temperature Measurement, Probe Number = 3, T = 20.058000 C 05:46:19 Temperature Measurement, Probe Number = 4, T = 20.429000 C 05:46:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.43 05:46:20 Integrated Voltage Measurement... 05:46:39 Voltage Offset Correction: v_off_ini = 0.000003345 V, v_off_fin = 0.000006176 V 05:46:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171039481 Vs 05:46:39 Integrated Voltage Measurement... 05:46:59 Voltage Offset Correction: v_off_ini = 0.000005471 V, v_off_fin = 0.000002825 V 05:46:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978620 Vs 05:47:02 Temperature Measurement, Probe Number = 0, T = 20.120000 C 05:47:03 Temperature Measurement, Probe Number = 1, T = 20.044000 C 05:47:03 Temperature Measurement, Probe Number = 2, T = 20.111000 C 05:47:04 Temperature Measurement, Probe Number = 3, T = 20.054000 C 05:47:05 Temperature Measurement, Probe Number = 4, T = 20.322000 C 05:47:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.32 05:47:05 Integrated Voltage Measurement... 05:47:24 Voltage Offset Correction: v_off_ini = 0.000003756 V, v_off_fin = 0.000006157 V 05:47:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036401 Vs 05:47:24 Integrated Voltage Measurement... 05:47:44 Voltage Offset Correction: v_off_ini = 0.000005437 V, v_off_fin = 0.000002440 V 05:47:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975898 Vs 05:47:47 Temperature Measurement, Probe Number = 0, T = 20.122000 C 05:47:47 Temperature Measurement, Probe Number = 1, T = 20.041000 C 05:47:48 Temperature Measurement, Probe Number = 2, T = 20.112000 C 05:47:49 Temperature Measurement, Probe Number = 3, T = 20.054000 C 05:47:49 Temperature Measurement, Probe Number = 4, T = 20.276000 C 05:47:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.28 05:47:50 Integrated Voltage Measurement... 05:48:09 Voltage Offset Correction: v_off_ini = 0.000003763 V, v_off_fin = 0.000006502 V 05:48:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044500 Vs 05:48:09 Integrated Voltage Measurement... 05:48:28 Voltage Offset Correction: v_off_ini = 0.000005902 V, v_off_fin = 0.000003074 V 05:48:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170968121 Vs 05:48:31 Temperature Measurement, Probe Number = 0, T = 20.120000 C 05:48:32 Temperature Measurement, Probe Number = 1, T = 20.039000 C 05:48:32 Temperature Measurement, Probe Number = 2, T = 20.111000 C 05:48:33 Temperature Measurement, Probe Number = 3, T = 20.053000 C 05:48:34 Temperature Measurement, Probe Number = 4, T = 20.271000 C 05:48:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.27 05:48:34 Integrated Voltage Measurement... 05:48:53 Voltage Offset Correction: v_off_ini = 0.000003613 V, v_off_fin = 0.000006444 V 05:48:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171043853 Vs 05:48:54 Integrated Voltage Measurement... 05:49:13 Voltage Offset Correction: v_off_ini = 0.000005646 V, v_off_fin = 0.000002998 V 05:49:13 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170973687 Vs 05:49:16 Temperature Measurement, Probe Number = 0, T = 20.122000 C 05:49:16 Temperature Measurement, Probe Number = 1, T = 20.041000 C 05:49:17 Temperature Measurement, Probe Number = 2, T = 20.113000 C 05:49:18 Temperature Measurement, Probe Number = 3, T = 20.056000 C 05:49:18 Temperature Measurement, Probe Number = 4, T = 20.234000 C 05:49:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.23 05:49:19 Integrated Voltage Measurement... 05:49:38 Voltage Offset Correction: v_off_ini = 0.000004142 V, v_off_fin = 0.000006134 V 05:49:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040625 Vs 05:49:38 Integrated Voltage Measurement... 05:49:57 Voltage Offset Correction: v_off_ini = 0.000006397 V, v_off_fin = 0.000003070 V 05:49:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965619 Vs 06:20:00 Temperature Measurement, Probe Number = 0, T = 20.119000 C 06:20:01 Temperature Measurement, Probe Number = 1, T = 20.043000 C 06:20:02 Temperature Measurement, Probe Number = 2, T = 20.110000 C 06:20:02 Temperature Measurement, Probe Number = 3, T = 20.054000 C 06:20:03 Temperature Measurement, Probe Number = 4, T = 20.330000 C 06:20:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.33 06:20:03 Integrated Voltage Measurement... 06:20:23 Voltage Offset Correction: v_off_ini = 0.000004981 V, v_off_fin = 0.000006623 V 06:20:23 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171090845 Vs 06:20:23 Integrated Voltage Measurement... 06:20:42 Voltage Offset Correction: v_off_ini = 0.000006404 V, v_off_fin = 0.000003014 V 06:20:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968823 Vs 06:20:45 Temperature Measurement, Probe Number = 0, T = 20.124000 C 06:20:46 Temperature Measurement, Probe Number = 1, T = 20.045000 C 06:20:46 Temperature Measurement, Probe Number = 2, T = 20.116000 C 06:20:47 Temperature Measurement, Probe Number = 3, T = 20.058000 C 06:20:48 Temperature Measurement, Probe Number = 4, T = 20.410000 C 06:20:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.41 06:20:48 Integrated Voltage Measurement... 06:21:07 Voltage Offset Correction: v_off_ini = 0.000003877 V, v_off_fin = 0.000007012 V 06:21:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047348 Vs 06:21:07 Integrated Voltage Measurement... 06:21:27 Voltage Offset Correction: v_off_ini = 0.000005643 V, v_off_fin = 0.000003328 V 06:21:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975767 Vs 06:21:30 Temperature Measurement, Probe Number = 0, T = 20.123000 C 06:21:30 Temperature Measurement, Probe Number = 1, T = 20.042000 C 06:21:31 Temperature Measurement, Probe Number = 2, T = 20.115000 C 06:21:32 Temperature Measurement, Probe Number = 3, T = 20.055000 C 06:21:32 Temperature Measurement, Probe Number = 4, T = 20.412000 C 06:21:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 06:21:32 Integrated Voltage Measurement... 06:21:52 Voltage Offset Correction: v_off_ini = 0.000004187 V, v_off_fin = 0.000006715 V 06:21:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048148 Vs 06:21:52 Integrated Voltage Measurement... 06:22:11 Voltage Offset Correction: v_off_ini = 0.000006354 V, v_off_fin = 0.000002713 V 06:22:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969122 Vs 06:22:14 Temperature Measurement, Probe Number = 0, T = 20.113000 C 06:22:15 Temperature Measurement, Probe Number = 1, T = 20.036000 C 06:22:15 Temperature Measurement, Probe Number = 2, T = 20.107000 C 06:22:16 Temperature Measurement, Probe Number = 3, T = 20.051000 C 06:22:17 Temperature Measurement, Probe Number = 4, T = 20.348000 C 06:22:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.35 06:22:17 Integrated Voltage Measurement... 06:22:36 Voltage Offset Correction: v_off_ini = 0.000003929 V, v_off_fin = 0.000006732 V 06:22:36 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045657 Vs 06:22:37 Integrated Voltage Measurement... 06:22:56 Voltage Offset Correction: v_off_ini = 0.000005718 V, v_off_fin = 0.000002908 V 06:22:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978404 Vs 06:22:59 Temperature Measurement, Probe Number = 0, T = 20.121000 C 06:22:59 Temperature Measurement, Probe Number = 1, T = 20.042000 C 06:23:00 Temperature Measurement, Probe Number = 2, T = 20.111000 C 06:23:01 Temperature Measurement, Probe Number = 3, T = 20.055000 C 06:23:01 Temperature Measurement, Probe Number = 4, T = 20.257000 C 06:23:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.26 06:23:02 Integrated Voltage Measurement... 06:23:21 Voltage Offset Correction: v_off_ini = 0.000003994 V, v_off_fin = 0.000005763 V 06:23:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041387 Vs 06:23:21 Integrated Voltage Measurement... 06:23:40 Voltage Offset Correction: v_off_ini = 0.000005377 V, v_off_fin = 0.000002621 V 06:23:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971534 Vs 06:23:43 Temperature Measurement, Probe Number = 0, T = 20.119000 C 06:23:44 Temperature Measurement, Probe Number = 1, T = 20.037000 C 06:23:45 Temperature Measurement, Probe Number = 2, T = 20.111000 C 06:23:45 Temperature Measurement, Probe Number = 3, T = 20.052000 C 06:23:46 Temperature Measurement, Probe Number = 4, T = 20.284000 C 06:23:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.28 06:23:46 Integrated Voltage Measurement... 06:24:05 Voltage Offset Correction: v_off_ini = 0.000003619 V, v_off_fin = 0.000005825 V 06:24:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038846 Vs 06:24:05 Integrated Voltage Measurement... 06:24:25 Voltage Offset Correction: v_off_ini = 0.000005641 V, v_off_fin = 0.000003019 V 06:24:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968125 Vs 06:24:27 Temperature Measurement, Probe Number = 0, T = 20.115000 C 06:24:28 Temperature Measurement, Probe Number = 1, T = 20.039000 C 06:24:29 Temperature Measurement, Probe Number = 2, T = 20.107000 C 06:24:29 Temperature Measurement, Probe Number = 3, T = 20.052000 C 06:24:30 Temperature Measurement, Probe Number = 4, T = 20.209000 C 06:24:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.21 06:24:30 Integrated Voltage Measurement... 06:24:49 Voltage Offset Correction: v_off_ini = 0.000004147 V, v_off_fin = 0.000006559 V 06:24:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043870 Vs 06:24:50 Integrated Voltage Measurement... 06:25:09 Voltage Offset Correction: v_off_ini = 0.000006114 V, v_off_fin = 0.000002690 V 06:25:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973508 Vs 06:25:12 Temperature Measurement, Probe Number = 0, T = 20.113000 C 06:25:13 Temperature Measurement, Probe Number = 1, T = 20.033000 C 06:25:13 Temperature Measurement, Probe Number = 2, T = 20.105000 C 06:25:14 Temperature Measurement, Probe Number = 3, T = 20.047000 C 06:25:14 Temperature Measurement, Probe Number = 4, T = 20.207000 C 06:25:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.21 06:25:15 Integrated Voltage Measurement... 06:25:34 Voltage Offset Correction: v_off_ini = 0.000003690 V, v_off_fin = 0.000005966 V 06:25:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039088 Vs 06:25:35 Integrated Voltage Measurement... 06:25:54 Voltage Offset Correction: v_off_ini = 0.000005623 V, v_off_fin = 0.000002633 V 06:25:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968807 Vs 06:25:56 Temperature Measurement, Probe Number = 0, T = 20.111000 C 06:25:57 Temperature Measurement, Probe Number = 1, T = 20.035000 C 06:25:58 Temperature Measurement, Probe Number = 2, T = 20.104000 C 06:25:58 Temperature Measurement, Probe Number = 3, T = 20.047000 C 06:25:59 Temperature Measurement, Probe Number = 4, T = 20.134000 C 06:25:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.13 06:25:59 Integrated Voltage Measurement... 06:26:19 Voltage Offset Correction: v_off_ini = 0.000003976 V, v_off_fin = 0.000006245 V 06:26:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042100 Vs 06:26:20 Integrated Voltage Measurement... 06:26:39 Voltage Offset Correction: v_off_ini = 0.000005873 V, v_off_fin = 0.000002840 V 06:26:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970504 Vs 06:26:42 Temperature Measurement, Probe Number = 0, T = 20.113000 C 06:26:42 Temperature Measurement, Probe Number = 1, T = 20.038000 C 06:26:43 Temperature Measurement, Probe Number = 2, T = 20.105000 C 06:26:43 Temperature Measurement, Probe Number = 3, T = 20.048000 C 06:26:44 Temperature Measurement, Probe Number = 4, T = 20.069000 C 06:26:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.07 06:26:44 Integrated Voltage Measurement... 06:27:04 Voltage Offset Correction: v_off_ini = 0.000003954 V, v_off_fin = 0.000006619 V 06:27:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042708 Vs 06:27:04 Integrated Voltage Measurement... 06:27:23 Voltage Offset Correction: v_off_ini = 0.000006155 V, v_off_fin = 0.000003698 V 06:27:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971642 Vs 06:57:26 Temperature Measurement, Probe Number = 0, T = 20.122000 C 06:57:27 Temperature Measurement, Probe Number = 1, T = 20.042000 C 06:57:28 Temperature Measurement, Probe Number = 2, T = 20.115000 C 06:57:28 Temperature Measurement, Probe Number = 3, T = 20.056000 C 06:57:29 Temperature Measurement, Probe Number = 4, T = 20.472000 C 06:57:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.47 06:57:29 Integrated Voltage Measurement... 06:57:48 Voltage Offset Correction: v_off_ini = 0.000005065 V, v_off_fin = 0.000006365 V 06:57:49 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171088253 Vs 06:57:49 Integrated Voltage Measurement... 06:58:08 Voltage Offset Correction: v_off_ini = 0.000005559 V, v_off_fin = 0.000002998 V 06:58:09 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170968473 Vs 06:58:11 Temperature Measurement, Probe Number = 0, T = 20.119000 C 06:58:12 Temperature Measurement, Probe Number = 1, T = 20.039000 C 06:58:13 Temperature Measurement, Probe Number = 2, T = 20.110000 C 06:58:13 Temperature Measurement, Probe Number = 3, T = 20.050000 C 06:58:14 Temperature Measurement, Probe Number = 4, T = 20.409000 C 06:58:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 06:58:14 Integrated Voltage Measurement... 06:58:33 Voltage Offset Correction: v_off_ini = 0.000003744 V, v_off_fin = 0.000006596 V 06:58:33 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171033335 Vs 06:58:34 Integrated Voltage Measurement... 06:58:53 Voltage Offset Correction: v_off_ini = 0.000005926 V, v_off_fin = 0.000003069 V 06:58:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970817 Vs 06:58:55 Temperature Measurement, Probe Number = 0, T = 20.121000 C 06:58:56 Temperature Measurement, Probe Number = 1, T = 20.039000 C 06:58:57 Temperature Measurement, Probe Number = 2, T = 20.113000 C 06:58:57 Temperature Measurement, Probe Number = 3, T = 20.051000 C 06:58:58 Temperature Measurement, Probe Number = 4, T = 20.413000 C 06:58:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 06:58:58 Integrated Voltage Measurement... 06:59:18 Voltage Offset Correction: v_off_ini = 0.000003794 V, v_off_fin = 0.000006640 V 06:59:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049070 Vs 06:59:18 Integrated Voltage Measurement... 06:59:37 Voltage Offset Correction: v_off_ini = 0.000006229 V, v_off_fin = 0.000003530 V 06:59:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966576 Vs 06:59:40 Temperature Measurement, Probe Number = 0, T = 20.115000 C 06:59:41 Temperature Measurement, Probe Number = 1, T = 20.038000 C 06:59:41 Temperature Measurement, Probe Number = 2, T = 20.106000 C 06:59:42 Temperature Measurement, Probe Number = 3, T = 20.049000 C 06:59:43 Temperature Measurement, Probe Number = 4, T = 20.372000 C 06:59:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.37 06:59:43 Integrated Voltage Measurement... 07:00:02 Voltage Offset Correction: v_off_ini = 0.000003903 V, v_off_fin = 0.000006327 V 07:00:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042869 Vs 07:00:02 Integrated Voltage Measurement... 07:00:22 Voltage Offset Correction: v_off_ini = 0.000005932 V, v_off_fin = 0.000002266 V 07:00:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975336 Vs 07:00:24 Temperature Measurement, Probe Number = 0, T = 20.120000 C 07:00:25 Temperature Measurement, Probe Number = 1, T = 20.041000 C 07:00:26 Temperature Measurement, Probe Number = 2, T = 20.108000 C 07:00:26 Temperature Measurement, Probe Number = 3, T = 20.051000 C 07:00:27 Temperature Measurement, Probe Number = 4, T = 20.356000 C 07:00:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.36 07:00:27 Integrated Voltage Measurement... 07:00:46 Voltage Offset Correction: v_off_ini = 0.000003313 V, v_off_fin = 0.000006310 V 07:00:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040589 Vs 07:00:47 Integrated Voltage Measurement... 07:01:07 Voltage Offset Correction: v_off_ini = 0.000006229 V, v_off_fin = 0.000003022 V 07:01:07 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170966999 Vs 07:01:10 Temperature Measurement, Probe Number = 0, T = 20.119000 C 07:01:10 Temperature Measurement, Probe Number = 1, T = 20.039000 C 07:01:11 Temperature Measurement, Probe Number = 2, T = 20.111000 C 07:01:12 Temperature Measurement, Probe Number = 3, T = 20.054000 C 07:01:12 Temperature Measurement, Probe Number = 4, T = 20.392000 C 07:01:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.39 07:01:13 Integrated Voltage Measurement... 07:01:32 Voltage Offset Correction: v_off_ini = 0.000004397 V, v_off_fin = 0.000006130 V 07:01:33 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171036994 Vs 07:01:33 Integrated Voltage Measurement... 07:01:52 Voltage Offset Correction: v_off_ini = 0.000005324 V, v_off_fin = 0.000003096 V 07:01:53 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170970811 Vs 07:01:55 Temperature Measurement, Probe Number = 0, T = 20.115000 C 07:01:56 Temperature Measurement, Probe Number = 1, T = 20.037000 C 07:01:57 Temperature Measurement, Probe Number = 2, T = 20.107000 C 07:01:57 Temperature Measurement, Probe Number = 3, T = 20.050000 C 07:01:58 Temperature Measurement, Probe Number = 4, T = 20.423000 C 07:01:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.42 07:01:58 Integrated Voltage Measurement... 07:02:18 Voltage Offset Correction: v_off_ini = 0.000003956 V, v_off_fin = 0.000006521 V 07:02:18 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171033184 Vs 07:02:18 Integrated Voltage Measurement... 07:02:37 Voltage Offset Correction: v_off_ini = 0.000005553 V, v_off_fin = 0.000002552 V 07:02:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969702 Vs 07:02:40 Temperature Measurement, Probe Number = 0, T = 20.117000 C 07:02:40 Temperature Measurement, Probe Number = 1, T = 20.041000 C 07:02:41 Temperature Measurement, Probe Number = 2, T = 20.108000 C 07:02:42 Temperature Measurement, Probe Number = 3, T = 20.054000 C 07:02:42 Temperature Measurement, Probe Number = 4, T = 20.484000 C 07:02:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.48 07:02:43 Integrated Voltage Measurement... 07:03:02 Voltage Offset Correction: v_off_ini = 0.000003596 V, v_off_fin = 0.000006510 V 07:03:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043902 Vs 07:03:02 Integrated Voltage Measurement... 07:03:21 Voltage Offset Correction: v_off_ini = 0.000006000 V, v_off_fin = 0.000003189 V 07:03:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962175 Vs 07:03:24 Temperature Measurement, Probe Number = 0, T = 20.116000 C 07:03:25 Temperature Measurement, Probe Number = 1, T = 20.041000 C 07:03:25 Temperature Measurement, Probe Number = 2, T = 20.107000 C 07:03:26 Temperature Measurement, Probe Number = 3, T = 20.053000 C 07:03:27 Temperature Measurement, Probe Number = 4, T = 20.516000 C 07:03:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.52 07:03:27 Integrated Voltage Measurement... 07:03:46 Voltage Offset Correction: v_off_ini = 0.000004165 V, v_off_fin = 0.000006726 V 07:03:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042936 Vs 07:03:46 Integrated Voltage Measurement... 07:04:06 Voltage Offset Correction: v_off_ini = 0.000006050 V, v_off_fin = 0.000002853 V 07:04:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965899 Vs 07:04:09 Temperature Measurement, Probe Number = 0, T = 20.114000 C 07:04:09 Temperature Measurement, Probe Number = 1, T = 20.038000 C 07:04:10 Temperature Measurement, Probe Number = 2, T = 20.107000 C 07:04:11 Temperature Measurement, Probe Number = 3, T = 20.050000 C 07:04:11 Temperature Measurement, Probe Number = 4, T = 20.531000 C 07:04:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.53 07:04:12 Integrated Voltage Measurement... 07:04:31 Voltage Offset Correction: v_off_ini = 0.000003655 V, v_off_fin = 0.000006230 V 07:04:31 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171033629 Vs 07:04:32 Integrated Voltage Measurement... 07:04:51 Voltage Offset Correction: v_off_ini = 0.000005446 V, v_off_fin = 0.000002840 V 07:04:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969288 Vs 07:34:54 Temperature Measurement, Probe Number = 0, T = 20.115000 C 07:34:55 Temperature Measurement, Probe Number = 1, T = 20.037000 C 07:34:55 Temperature Measurement, Probe Number = 2, T = 20.108000 C 07:34:56 Temperature Measurement, Probe Number = 3, T = 20.051000 C 07:34:57 Temperature Measurement, Probe Number = 4, T = 20.226000 C 07:34:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.23 07:34:57 Integrated Voltage Measurement... 07:35:16 Voltage Offset Correction: v_off_ini = 0.000004724 V, v_off_fin = 0.000006761 V 07:35:16 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171085053 Vs 07:35:16 Integrated Voltage Measurement... 07:35:36 Voltage Offset Correction: v_off_ini = 0.000006079 V, v_off_fin = 0.000003515 V 07:35:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967500 Vs 07:35:38 Temperature Measurement, Probe Number = 0, T = 20.116000 C 07:35:39 Temperature Measurement, Probe Number = 1, T = 20.034000 C 07:35:40 Temperature Measurement, Probe Number = 2, T = 20.105000 C 07:35:40 Temperature Measurement, Probe Number = 3, T = 20.046000 C 07:35:41 Temperature Measurement, Probe Number = 4, T = 20.142000 C 07:35:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.14 07:35:41 Integrated Voltage Measurement... 07:36:01 Voltage Offset Correction: v_off_ini = 0.000004534 V, v_off_fin = 0.000006504 V 07:36:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039973 Vs 07:36:01 Integrated Voltage Measurement... 07:36:20 Voltage Offset Correction: v_off_ini = 0.000006182 V, v_off_fin = 0.000003356 V 07:36:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968872 Vs 07:36:23 Temperature Measurement, Probe Number = 0, T = 20.118000 C 07:36:23 Temperature Measurement, Probe Number = 1, T = 20.036000 C 07:36:24 Temperature Measurement, Probe Number = 2, T = 20.107000 C 07:36:25 Temperature Measurement, Probe Number = 3, T = 20.046000 C 07:36:25 Temperature Measurement, Probe Number = 4, T = 20.150000 C 07:36:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.15 07:36:26 Integrated Voltage Measurement... 07:36:45 Voltage Offset Correction: v_off_ini = 0.000004065 V, v_off_fin = 0.000006471 V 07:36:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041795 Vs 07:36:45 Integrated Voltage Measurement... 07:37:05 Voltage Offset Correction: v_off_ini = 0.000005827 V, v_off_fin = 0.000002634 V 07:37:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970841 Vs 07:37:08 Temperature Measurement, Probe Number = 0, T = 20.111000 C 07:37:08 Temperature Measurement, Probe Number = 1, T = 20.035000 C 07:37:09 Temperature Measurement, Probe Number = 2, T = 20.101000 C 07:37:10 Temperature Measurement, Probe Number = 3, T = 20.044000 C 07:37:10 Temperature Measurement, Probe Number = 4, T = 20.137000 C 07:37:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.14 07:37:10 Integrated Voltage Measurement... 07:37:30 Voltage Offset Correction: v_off_ini = 0.000004171 V, v_off_fin = 0.000006324 V 07:37:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039259 Vs 07:37:30 Integrated Voltage Measurement... 07:37:49 Voltage Offset Correction: v_off_ini = 0.000005881 V, v_off_fin = 0.000003382 V 07:37:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966120 Vs 07:37:52 Temperature Measurement, Probe Number = 0, T = 20.113000 C 07:37:53 Temperature Measurement, Probe Number = 1, T = 20.038000 C 07:37:53 Temperature Measurement, Probe Number = 2, T = 20.103000 C 07:37:54 Temperature Measurement, Probe Number = 3, T = 20.048000 C 07:37:55 Temperature Measurement, Probe Number = 4, T = 20.223000 C 07:37:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.22 07:37:55 Integrated Voltage Measurement... 07:38:14 Voltage Offset Correction: v_off_ini = 0.000005036 V, v_off_fin = 0.000007437 V 07:38:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049699 Vs 07:38:15 Integrated Voltage Measurement... 07:38:34 Voltage Offset Correction: v_off_ini = 0.000006552 V, v_off_fin = 0.000003246 V 07:38:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960932 Vs 07:38:37 Temperature Measurement, Probe Number = 0, T = 20.115000 C 07:38:37 Temperature Measurement, Probe Number = 1, T = 20.040000 C 07:38:38 Temperature Measurement, Probe Number = 2, T = 20.106000 C 07:38:39 Temperature Measurement, Probe Number = 3, T = 20.051000 C 07:38:39 Temperature Measurement, Probe Number = 4, T = 20.217000 C 07:38:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.22 07:38:40 Integrated Voltage Measurement... 07:38:59 Voltage Offset Correction: v_off_ini = 0.000004031 V, v_off_fin = 0.000006411 V 07:38:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042848 Vs 07:38:59 Integrated Voltage Measurement... 07:39:18 Voltage Offset Correction: v_off_ini = 0.000006085 V, v_off_fin = 0.000003051 V 07:39:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963872 Vs 07:39:21 Temperature Measurement, Probe Number = 0, T = 20.119000 C 07:39:22 Temperature Measurement, Probe Number = 1, T = 20.041000 C 07:39:23 Temperature Measurement, Probe Number = 2, T = 20.108000 C 07:39:23 Temperature Measurement, Probe Number = 3, T = 20.051000 C 07:39:24 Temperature Measurement, Probe Number = 4, T = 20.251000 C 07:39:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.25 07:39:24 Integrated Voltage Measurement... 07:39:43 Voltage Offset Correction: v_off_ini = 0.000003621 V, v_off_fin = 0.000006124 V 07:39:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035921 Vs 07:39:44 Integrated Voltage Measurement... 07:40:03 Voltage Offset Correction: v_off_ini = 0.000005910 V, v_off_fin = 0.000003144 V 07:40:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971052 Vs 07:40:06 Temperature Measurement, Probe Number = 0, T = 20.110000 C 07:40:06 Temperature Measurement, Probe Number = 1, T = 20.033000 C 07:40:07 Temperature Measurement, Probe Number = 2, T = 20.101000 C 07:40:08 Temperature Measurement, Probe Number = 3, T = 20.045000 C 07:40:08 Temperature Measurement, Probe Number = 4, T = 20.289000 C 07:40:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.29 07:40:09 Integrated Voltage Measurement... 07:40:28 Voltage Offset Correction: v_off_ini = 0.000003776 V, v_off_fin = 0.000006269 V 07:40:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171035685 Vs 07:40:28 Integrated Voltage Measurement... 07:40:47 Voltage Offset Correction: v_off_ini = 0.000005805 V, v_off_fin = 0.000002260 V 07:40:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967276 Vs 07:40:50 Temperature Measurement, Probe Number = 0, T = 20.119000 C 07:40:51 Temperature Measurement, Probe Number = 1, T = 20.037000 C 07:40:51 Temperature Measurement, Probe Number = 2, T = 20.106000 C 07:40:52 Temperature Measurement, Probe Number = 3, T = 20.048000 C 07:40:53 Temperature Measurement, Probe Number = 4, T = 20.253000 C 07:40:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.25 07:40:53 Integrated Voltage Measurement... 07:41:12 Voltage Offset Correction: v_off_ini = 0.000003583 V, v_off_fin = 0.000006602 V 07:41:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040356 Vs 07:41:13 Integrated Voltage Measurement... 07:41:32 Voltage Offset Correction: v_off_ini = 0.000005876 V, v_off_fin = 0.000003004 V 07:41:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965406 Vs 07:41:35 Temperature Measurement, Probe Number = 0, T = 20.117000 C 07:41:35 Temperature Measurement, Probe Number = 1, T = 20.036000 C 07:41:36 Temperature Measurement, Probe Number = 2, T = 20.108000 C 07:41:37 Temperature Measurement, Probe Number = 3, T = 20.048000 C 07:41:37 Temperature Measurement, Probe Number = 4, T = 20.213000 C 07:41:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.21 07:41:38 Integrated Voltage Measurement... 07:41:57 Voltage Offset Correction: v_off_ini = 0.000003976 V, v_off_fin = 0.000006056 V 07:41:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038073 Vs 07:41:57 Integrated Voltage Measurement... 07:42:16 Voltage Offset Correction: v_off_ini = 0.000005846 V, v_off_fin = 0.000002528 V 07:42:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968547 Vs 08:12:19 Temperature Measurement, Probe Number = 0, T = 20.118000 C 08:12:20 Temperature Measurement, Probe Number = 1, T = 20.038000 C 08:12:21 Temperature Measurement, Probe Number = 2, T = 20.109000 C 08:12:21 Temperature Measurement, Probe Number = 3, T = 20.052000 C 08:12:22 Temperature Measurement, Probe Number = 4, T = 20.410000 C 08:12:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 08:12:22 Integrated Voltage Measurement... 08:12:41 Voltage Offset Correction: v_off_ini = 0.000005163 V, v_off_fin = 0.000006546 V 08:12:42 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171086748 Vs 08:12:42 Integrated Voltage Measurement... 08:13:01 Voltage Offset Correction: v_off_ini = 0.000006086 V, v_off_fin = 0.000003342 V 08:13:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963957 Vs 08:13:04 Temperature Measurement, Probe Number = 0, T = 20.117000 C 08:13:04 Temperature Measurement, Probe Number = 1, T = 20.037000 C 08:13:05 Temperature Measurement, Probe Number = 2, T = 20.105000 C 08:13:06 Temperature Measurement, Probe Number = 3, T = 20.046000 C 08:13:06 Temperature Measurement, Probe Number = 4, T = 20.368000 C 08:13:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.37 08:13:07 Integrated Voltage Measurement... 08:13:26 Voltage Offset Correction: v_off_ini = 0.000003933 V, v_off_fin = 0.000006204 V 08:13:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038121 Vs 08:13:26 Integrated Voltage Measurement... 08:13:45 Voltage Offset Correction: v_off_ini = 0.000005936 V, v_off_fin = 0.000002938 V 08:13:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969752 Vs 08:13:48 Temperature Measurement, Probe Number = 0, T = 20.113000 C 08:13:49 Temperature Measurement, Probe Number = 1, T = 20.036000 C 08:13:49 Temperature Measurement, Probe Number = 2, T = 20.102000 C 08:13:50 Temperature Measurement, Probe Number = 3, T = 20.045000 C 08:13:51 Temperature Measurement, Probe Number = 4, T = 20.359000 C 08:13:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.36 08:13:51 Integrated Voltage Measurement... 08:14:10 Voltage Offset Correction: v_off_ini = 0.000004042 V, v_off_fin = 0.000006528 V 08:14:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035546 Vs 08:14:11 Integrated Voltage Measurement... 08:14:30 Voltage Offset Correction: v_off_ini = 0.000005930 V, v_off_fin = 0.000003485 V 08:14:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965069 Vs 08:14:33 Temperature Measurement, Probe Number = 0, T = 20.118000 C 08:14:33 Temperature Measurement, Probe Number = 1, T = 20.040000 C 08:14:34 Temperature Measurement, Probe Number = 2, T = 20.105000 C 08:14:34 Temperature Measurement, Probe Number = 3, T = 20.047000 C 08:14:35 Temperature Measurement, Probe Number = 4, T = 20.400000 C 08:14:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.40 08:14:35 Integrated Voltage Measurement... 08:14:55 Voltage Offset Correction: v_off_ini = 0.000004190 V, v_off_fin = 0.000006673 V 08:14:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043921 Vs 08:14:55 Integrated Voltage Measurement... 08:15:15 Voltage Offset Correction: v_off_ini = 0.000006248 V, v_off_fin = 0.000002846 V 08:15:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963082 Vs 08:15:18 Temperature Measurement, Probe Number = 0, T = 20.114000 C 08:15:18 Temperature Measurement, Probe Number = 1, T = 20.035000 C 08:15:19 Temperature Measurement, Probe Number = 2, T = 20.103000 C 08:15:20 Temperature Measurement, Probe Number = 3, T = 20.046000 C 08:15:20 Temperature Measurement, Probe Number = 4, T = 20.409000 C 08:15:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 08:15:20 Integrated Voltage Measurement... 08:15:40 Voltage Offset Correction: v_off_ini = 0.000004196 V, v_off_fin = 0.000006603 V 08:15:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044021 Vs 08:15:40 Integrated Voltage Measurement... 08:15:59 Voltage Offset Correction: v_off_ini = 0.000006178 V, v_off_fin = 0.000003229 V 08:15:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968618 Vs 08:16:02 Temperature Measurement, Probe Number = 0, T = 20.115000 C 08:16:03 Temperature Measurement, Probe Number = 1, T = 20.036000 C 08:16:03 Temperature Measurement, Probe Number = 2, T = 20.104000 C 08:16:04 Temperature Measurement, Probe Number = 3, T = 20.048000 C 08:16:05 Temperature Measurement, Probe Number = 4, T = 20.350000 C 08:16:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.35 08:16:05 Integrated Voltage Measurement... 08:16:24 Voltage Offset Correction: v_off_ini = 0.000004042 V, v_off_fin = 0.000006587 V 08:16:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043654 Vs 08:16:25 Integrated Voltage Measurement... 08:16:45 Voltage Offset Correction: v_off_ini = 0.000005801 V, v_off_fin = 0.000003081 V 08:16:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966104 Vs 08:16:48 Temperature Measurement, Probe Number = 0, T = 20.114000 C 08:16:48 Temperature Measurement, Probe Number = 1, T = 20.035000 C 08:16:49 Temperature Measurement, Probe Number = 2, T = 20.103000 C 08:16:50 Temperature Measurement, Probe Number = 3, T = 20.047000 C 08:16:50 Temperature Measurement, Probe Number = 4, T = 20.375000 C 08:16:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.38 08:16:50 Integrated Voltage Measurement... 08:17:10 Voltage Offset Correction: v_off_ini = 0.000004569 V, v_off_fin = 0.000006570 V 08:17:10 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171036427 Vs 08:17:10 Integrated Voltage Measurement... 08:17:29 Voltage Offset Correction: v_off_ini = 0.000005646 V, v_off_fin = 0.000003209 V 08:17:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970010 Vs 08:17:32 Temperature Measurement, Probe Number = 0, T = 20.115000 C 08:17:33 Temperature Measurement, Probe Number = 1, T = 20.036000 C 08:17:34 Temperature Measurement, Probe Number = 2, T = 20.106000 C 08:17:34 Temperature Measurement, Probe Number = 3, T = 20.049000 C 08:17:35 Temperature Measurement, Probe Number = 4, T = 20.376000 C 08:17:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.38 08:17:35 Integrated Voltage Measurement... 08:17:55 Voltage Offset Correction: v_off_ini = 0.000004135 V, v_off_fin = 0.000006886 V 08:17:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043022 Vs 08:17:55 Integrated Voltage Measurement... 08:18:14 Voltage Offset Correction: v_off_ini = 0.000005895 V, v_off_fin = 0.000003201 V 08:18:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965476 Vs 08:18:17 Temperature Measurement, Probe Number = 0, T = 20.118000 C 08:18:18 Temperature Measurement, Probe Number = 1, T = 20.037000 C 08:18:19 Temperature Measurement, Probe Number = 2, T = 20.108000 C 08:18:19 Temperature Measurement, Probe Number = 3, T = 20.050000 C 08:18:20 Temperature Measurement, Probe Number = 4, T = 20.414000 C 08:18:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 08:18:20 Integrated Voltage Measurement... 08:18:40 Voltage Offset Correction: v_off_ini = 0.000004083 V, v_off_fin = 0.000006659 V 08:18:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044570 Vs 08:18:40 Integrated Voltage Measurement... 08:19:00 Voltage Offset Correction: v_off_ini = 0.000006340 V, v_off_fin = 0.000002818 V 08:19:00 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170967409 Vs 08:19:03 Temperature Measurement, Probe Number = 0, T = 20.116000 C 08:19:04 Temperature Measurement, Probe Number = 1, T = 20.034000 C 08:19:04 Temperature Measurement, Probe Number = 2, T = 20.107000 C 08:19:05 Temperature Measurement, Probe Number = 3, T = 20.046000 C 08:19:05 Temperature Measurement, Probe Number = 4, T = 20.391000 C 08:19:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.39 08:19:06 Integrated Voltage Measurement... 08:19:25 Voltage Offset Correction: v_off_ini = 0.000003789 V, v_off_fin = 0.000006522 V 08:19:25 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171035676 Vs 08:19:25 Integrated Voltage Measurement... 08:19:45 Voltage Offset Correction: v_off_ini = 0.000006148 V, v_off_fin = 0.000003053 V 08:19:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969455 Vs 08:49:48 Temperature Measurement, Probe Number = 0, T = 20.114000 C 08:49:48 Temperature Measurement, Probe Number = 1, T = 20.035000 C 08:49:49 Temperature Measurement, Probe Number = 2, T = 20.106000 C 08:49:50 Temperature Measurement, Probe Number = 3, T = 20.047000 C 08:49:50 Temperature Measurement, Probe Number = 4, T = 20.457000 C 08:49:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.46 08:49:51 Integrated Voltage Measurement... 08:50:10 Voltage Offset Correction: v_off_ini = 0.000004946 V, v_off_fin = 0.000006864 V 08:50:10 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171090141 Vs 08:50:10 Integrated Voltage Measurement... 08:50:30 Voltage Offset Correction: v_off_ini = 0.000006138 V, v_off_fin = 0.000002927 V 08:50:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971001 Vs 08:50:32 Temperature Measurement, Probe Number = 0, T = 20.117000 C 08:50:33 Temperature Measurement, Probe Number = 1, T = 20.037000 C 08:50:34 Temperature Measurement, Probe Number = 2, T = 20.107000 C 08:50:34 Temperature Measurement, Probe Number = 3, T = 20.047000 C 08:50:35 Temperature Measurement, Probe Number = 4, T = 20.484000 C 08:50:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.48 08:50:35 Integrated Voltage Measurement... 08:50:55 Voltage Offset Correction: v_off_ini = 0.000004666 V, v_off_fin = 0.000006857 V 08:50:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042553 Vs 08:50:55 Integrated Voltage Measurement... 08:51:14 Voltage Offset Correction: v_off_ini = 0.000006298 V, v_off_fin = 0.000002812 V 08:51:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964331 Vs 08:51:17 Temperature Measurement, Probe Number = 0, T = 20.119000 C 08:51:17 Temperature Measurement, Probe Number = 1, T = 20.036000 C 08:51:18 Temperature Measurement, Probe Number = 2, T = 20.109000 C 08:51:19 Temperature Measurement, Probe Number = 3, T = 20.048000 C 08:51:19 Temperature Measurement, Probe Number = 4, T = 20.476000 C 08:51:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.48 08:51:20 Integrated Voltage Measurement... 08:51:39 Voltage Offset Correction: v_off_ini = 0.000003847 V, v_off_fin = 0.000006104 V 08:51:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040278 Vs 08:51:40 Integrated Voltage Measurement... 08:51:59 Voltage Offset Correction: v_off_ini = 0.000005670 V, v_off_fin = 0.000003271 V 08:51:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966379 Vs 08:52:02 Temperature Measurement, Probe Number = 0, T = 20.115000 C 08:52:02 Temperature Measurement, Probe Number = 1, T = 20.036000 C 08:52:03 Temperature Measurement, Probe Number = 2, T = 20.104000 C 08:52:04 Temperature Measurement, Probe Number = 3, T = 20.047000 C 08:52:04 Temperature Measurement, Probe Number = 4, T = 20.368000 C 08:52:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.37 08:52:05 Integrated Voltage Measurement... 08:52:24 Voltage Offset Correction: v_off_ini = 0.000005317 V, v_off_fin = 0.000006875 V 08:52:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045473 Vs 08:52:24 Integrated Voltage Measurement... 08:52:43 Voltage Offset Correction: v_off_ini = 0.000006117 V, v_off_fin = 0.000003380 V 08:52:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963868 Vs 08:52:46 Temperature Measurement, Probe Number = 0, T = 20.116000 C 08:52:47 Temperature Measurement, Probe Number = 1, T = 20.038000 C 08:52:47 Temperature Measurement, Probe Number = 2, T = 20.107000 C 08:52:48 Temperature Measurement, Probe Number = 3, T = 20.049000 C 08:52:49 Temperature Measurement, Probe Number = 4, T = 20.361000 C 08:52:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.36 08:52:49 Integrated Voltage Measurement... 08:53:08 Voltage Offset Correction: v_off_ini = 0.000003869 V, v_off_fin = 0.000006503 V 08:53:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046840 Vs 08:53:08 Integrated Voltage Measurement... 08:53:28 Voltage Offset Correction: v_off_ini = 0.000006257 V, v_off_fin = 0.000003556 V 08:53:28 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170962850 Vs 08:53:31 Temperature Measurement, Probe Number = 0, T = 20.120000 C 08:53:32 Temperature Measurement, Probe Number = 1, T = 20.040000 C 08:53:32 Temperature Measurement, Probe Number = 2, T = 20.109000 C 08:53:33 Temperature Measurement, Probe Number = 3, T = 20.051000 C 08:53:34 Temperature Measurement, Probe Number = 4, T = 20.393000 C 08:53:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.39 08:53:34 Integrated Voltage Measurement... 08:53:53 Voltage Offset Correction: v_off_ini = 0.000004207 V, v_off_fin = 0.000007177 V 08:53:53 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171041260 Vs 08:53:54 Integrated Voltage Measurement... 08:54:13 Voltage Offset Correction: v_off_ini = 0.000006538 V, v_off_fin = 0.000003240 V 08:54:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962766 Vs 08:54:16 Temperature Measurement, Probe Number = 0, T = 20.119000 C 08:54:17 Temperature Measurement, Probe Number = 1, T = 20.041000 C 08:54:17 Temperature Measurement, Probe Number = 2, T = 20.109000 C 08:54:18 Temperature Measurement, Probe Number = 3, T = 20.052000 C 08:54:19 Temperature Measurement, Probe Number = 4, T = 20.401000 C 08:54:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.40 08:54:19 Integrated Voltage Measurement... 08:54:38 Voltage Offset Correction: v_off_ini = 0.000004604 V, v_off_fin = 0.000007275 V 08:54:38 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171045973 Vs 08:54:39 Integrated Voltage Measurement... 08:54:58 Voltage Offset Correction: v_off_ini = 0.000006385 V, v_off_fin = 0.000003802 V 08:54:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963397 Vs 08:55:01 Temperature Measurement, Probe Number = 0, T = 20.121000 C 08:55:01 Temperature Measurement, Probe Number = 1, T = 20.044000 C 08:55:02 Temperature Measurement, Probe Number = 2, T = 20.109000 C 08:55:03 Temperature Measurement, Probe Number = 3, T = 20.053000 C 08:55:03 Temperature Measurement, Probe Number = 4, T = 20.520000 C 08:55:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.52 08:55:04 Integrated Voltage Measurement... 08:55:23 Voltage Offset Correction: v_off_ini = 0.000004267 V, v_off_fin = 0.000007057 V 08:55:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044558 Vs 08:55:23 Integrated Voltage Measurement... 08:55:42 Voltage Offset Correction: v_off_ini = 0.000005900 V, v_off_fin = 0.000002936 V 08:55:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965248 Vs 08:55:45 Temperature Measurement, Probe Number = 0, T = 20.115000 C 08:55:46 Temperature Measurement, Probe Number = 1, T = 20.035000 C 08:55:46 Temperature Measurement, Probe Number = 2, T = 20.106000 C 08:55:47 Temperature Measurement, Probe Number = 3, T = 20.048000 C 08:55:48 Temperature Measurement, Probe Number = 4, T = 20.438000 C 08:55:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.44 08:55:48 Integrated Voltage Measurement... 08:56:07 Voltage Offset Correction: v_off_ini = 0.000003698 V, v_off_fin = 0.000006297 V 08:56:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037108 Vs 08:56:07 Integrated Voltage Measurement... 08:56:26 Voltage Offset Correction: v_off_ini = 0.000005781 V, v_off_fin = 0.000003706 V 08:56:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965002 Vs 08:56:29 Temperature Measurement, Probe Number = 0, T = 20.116000 C 08:56:30 Temperature Measurement, Probe Number = 1, T = 20.036000 C 08:56:31 Temperature Measurement, Probe Number = 2, T = 20.104000 C 08:56:31 Temperature Measurement, Probe Number = 3, T = 20.046000 C 08:56:32 Temperature Measurement, Probe Number = 4, T = 20.401000 C 08:56:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.40 08:56:32 Integrated Voltage Measurement... 08:56:51 Voltage Offset Correction: v_off_ini = 0.000004296 V, v_off_fin = 0.000006875 V 08:56:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044940 Vs 08:56:52 Integrated Voltage Measurement... 08:57:11 Voltage Offset Correction: v_off_ini = 0.000006596 V, v_off_fin = 0.000003382 V 08:57:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967158 Vs 09:27:14 Temperature Measurement, Probe Number = 0, T = 20.118000 C 09:27:15 Temperature Measurement, Probe Number = 1, T = 20.042000 C 09:27:16 Temperature Measurement, Probe Number = 2, T = 20.109000 C 09:27:16 Temperature Measurement, Probe Number = 3, T = 20.054000 C 09:27:17 Temperature Measurement, Probe Number = 4, T = 20.421000 C 09:27:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.42 09:27:17 Integrated Voltage Measurement... 09:27:37 Voltage Offset Correction: v_off_ini = 0.000004703 V, v_off_fin = 0.000006624 V 09:27:37 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171088980 Vs 09:27:37 Integrated Voltage Measurement... 09:27:56 Voltage Offset Correction: v_off_ini = 0.000005853 V, v_off_fin = 0.000002811 V 09:27:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970025 Vs 09:27:59 Temperature Measurement, Probe Number = 0, T = 20.117000 C 09:27:59 Temperature Measurement, Probe Number = 1, T = 20.040000 C 09:28:00 Temperature Measurement, Probe Number = 2, T = 20.109000 C 09:28:01 Temperature Measurement, Probe Number = 3, T = 20.054000 C 09:28:01 Temperature Measurement, Probe Number = 4, T = 20.473000 C 09:28:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.47 09:28:02 Integrated Voltage Measurement... 09:28:21 Voltage Offset Correction: v_off_ini = 0.000003843 V, v_off_fin = 0.000006901 V 09:28:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042846 Vs 09:28:21 Integrated Voltage Measurement... 09:28:40 Voltage Offset Correction: v_off_ini = 0.000006211 V, v_off_fin = 0.000003128 V 09:28:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964947 Vs 09:28:43 Temperature Measurement, Probe Number = 0, T = 20.117000 C 09:28:44 Temperature Measurement, Probe Number = 1, T = 20.042000 C 09:28:45 Temperature Measurement, Probe Number = 2, T = 20.107000 C 09:28:45 Temperature Measurement, Probe Number = 3, T = 20.054000 C 09:28:46 Temperature Measurement, Probe Number = 4, T = 20.503000 C 09:28:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.50 09:28:46 Integrated Voltage Measurement... 09:29:05 Voltage Offset Correction: v_off_ini = 0.000004066 V, v_off_fin = 0.000006968 V 09:29:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042155 Vs 09:29:06 Integrated Voltage Measurement... 09:29:25 Voltage Offset Correction: v_off_ini = 0.000006351 V, v_off_fin = 0.000002912 V 09:29:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963159 Vs 09:29:28 Temperature Measurement, Probe Number = 0, T = 20.117000 C 09:29:29 Temperature Measurement, Probe Number = 1, T = 20.041000 C 09:29:29 Temperature Measurement, Probe Number = 2, T = 20.108000 C 09:29:30 Temperature Measurement, Probe Number = 3, T = 20.054000 C 09:29:31 Temperature Measurement, Probe Number = 4, T = 20.527000 C 09:29:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.53 09:29:31 Integrated Voltage Measurement... 09:29:50 Voltage Offset Correction: v_off_ini = 0.000004358 V, v_off_fin = 0.000006674 V 09:29:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039111 Vs 09:29:50 Integrated Voltage Measurement... 09:30:10 Voltage Offset Correction: v_off_ini = 0.000006306 V, v_off_fin = 0.000003053 V 09:30:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963285 Vs 09:30:12 Temperature Measurement, Probe Number = 0, T = 20.120000 C 09:30:13 Temperature Measurement, Probe Number = 1, T = 20.044000 C 09:30:14 Temperature Measurement, Probe Number = 2, T = 20.108000 C 09:30:14 Temperature Measurement, Probe Number = 3, T = 20.055000 C 09:30:15 Temperature Measurement, Probe Number = 4, T = 20.581000 C 09:30:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.58 09:30:15 Integrated Voltage Measurement... 09:30:34 Voltage Offset Correction: v_off_ini = 0.000003967 V, v_off_fin = 0.000007056 V 09:30:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041147 Vs 09:30:35 Integrated Voltage Measurement... 09:30:54 Voltage Offset Correction: v_off_ini = 0.000006545 V, v_off_fin = 0.000003726 V 09:30:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958596 Vs 09:30:57 Temperature Measurement, Probe Number = 0, T = 20.118000 C 09:30:58 Temperature Measurement, Probe Number = 1, T = 20.041000 C 09:30:58 Temperature Measurement, Probe Number = 2, T = 20.109000 C 09:30:59 Temperature Measurement, Probe Number = 3, T = 20.054000 C 09:31:00 Temperature Measurement, Probe Number = 4, T = 20.592000 C 09:31:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.59 09:31:00 Integrated Voltage Measurement... 09:31:19 Voltage Offset Correction: v_off_ini = 0.000004742 V, v_off_fin = 0.000006869 V 09:31:19 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171043496 Vs 09:31:20 Integrated Voltage Measurement... 09:31:39 Voltage Offset Correction: v_off_ini = 0.000006293 V, v_off_fin = 0.000002894 V 09:31:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958814 Vs 09:31:41 Temperature Measurement, Probe Number = 0, T = 20.117000 C 09:31:42 Temperature Measurement, Probe Number = 1, T = 20.039000 C 09:31:43 Temperature Measurement, Probe Number = 2, T = 20.107000 C 09:31:43 Temperature Measurement, Probe Number = 3, T = 20.050000 C 09:31:44 Temperature Measurement, Probe Number = 4, T = 20.516000 C 09:31:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.52 09:31:44 Integrated Voltage Measurement... 09:32:04 Voltage Offset Correction: v_off_ini = 0.000004183 V, v_off_fin = 0.000006218 V 09:32:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034884 Vs 09:32:04 Integrated Voltage Measurement... 09:32:23 Voltage Offset Correction: v_off_ini = 0.000005567 V, v_off_fin = 0.000003045 V 09:32:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969404 Vs 09:32:26 Temperature Measurement, Probe Number = 0, T = 20.114000 C 09:32:27 Temperature Measurement, Probe Number = 1, T = 20.039000 C 09:32:28 Temperature Measurement, Probe Number = 2, T = 20.106000 C 09:32:28 Temperature Measurement, Probe Number = 3, T = 20.050000 C 09:32:29 Temperature Measurement, Probe Number = 4, T = 20.460000 C 09:32:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.46 09:32:29 Integrated Voltage Measurement... 09:32:48 Voltage Offset Correction: v_off_ini = 0.000004301 V, v_off_fin = 0.000006319 V 09:32:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040128 Vs 09:32:49 Integrated Voltage Measurement... 09:33:08 Voltage Offset Correction: v_off_ini = 0.000005794 V, v_off_fin = 0.000002216 V 09:33:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964836 Vs 09:33:11 Temperature Measurement, Probe Number = 0, T = 20.119000 C 09:33:11 Temperature Measurement, Probe Number = 1, T = 20.042000 C 09:33:12 Temperature Measurement, Probe Number = 2, T = 20.108000 C 09:33:13 Temperature Measurement, Probe Number = 3, T = 20.053000 C 09:33:13 Temperature Measurement, Probe Number = 4, T = 20.555000 C 09:33:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.55 09:33:13 Integrated Voltage Measurement... 09:33:33 Voltage Offset Correction: v_off_ini = 0.000003790 V, v_off_fin = 0.000006440 V 09:33:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040020 Vs 09:33:33 Integrated Voltage Measurement... 09:33:52 Voltage Offset Correction: v_off_ini = 0.000005354 V, v_off_fin = 0.000002612 V 09:33:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970117 Vs 09:33:56 Temperature Measurement, Probe Number = 0, T = 20.119000 C 09:33:56 Temperature Measurement, Probe Number = 1, T = 20.041000 C 09:33:57 Temperature Measurement, Probe Number = 2, T = 20.110000 C 09:33:58 Temperature Measurement, Probe Number = 3, T = 20.052000 C 09:33:58 Temperature Measurement, Probe Number = 4, T = 20.559000 C 09:33:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.56 09:33:58 Integrated Voltage Measurement... 09:34:18 Voltage Offset Correction: v_off_ini = 0.000003965 V, v_off_fin = 0.000007884 V 09:34:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040128 Vs 09:34:18 Integrated Voltage Measurement... 09:34:37 Voltage Offset Correction: v_off_ini = 0.000005923 V, v_off_fin = 0.000002869 V 09:34:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966980 Vs 10:04:40 Temperature Measurement, Probe Number = 0, T = 20.122000 C 10:04:41 Temperature Measurement, Probe Number = 1, T = 20.046000 C 10:04:42 Temperature Measurement, Probe Number = 2, T = 20.113000 C 10:04:43 Temperature Measurement, Probe Number = 3, T = 20.058000 C 10:04:43 Temperature Measurement, Probe Number = 4, T = 20.335000 C 10:04:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.34 10:04:43 Integrated Voltage Measurement... 10:05:03 Voltage Offset Correction: v_off_ini = 0.000003923 V, v_off_fin = 0.000006327 V 10:05:03 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171084801 Vs 10:05:03 Integrated Voltage Measurement... 10:05:23 Voltage Offset Correction: v_off_ini = 0.000005615 V, v_off_fin = 0.000003858 V 10:05:23 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170968414 Vs 10:05:25 Temperature Measurement, Probe Number = 0, T = 20.121000 C 10:05:26 Temperature Measurement, Probe Number = 1, T = 20.045000 C 10:05:27 Temperature Measurement, Probe Number = 2, T = 20.110000 C 10:05:27 Temperature Measurement, Probe Number = 3, T = 20.055000 C 10:05:28 Temperature Measurement, Probe Number = 4, T = 20.367000 C 10:05:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.37 10:05:28 Integrated Voltage Measurement... 10:05:47 Voltage Offset Correction: v_off_ini = 0.000004743 V, v_off_fin = 0.000006602 V 10:05:48 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171036275 Vs 10:05:48 Integrated Voltage Measurement... 10:06:07 Voltage Offset Correction: v_off_ini = 0.000006271 V, v_off_fin = 0.000003979 V 10:06:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957379 Vs 10:06:10 Temperature Measurement, Probe Number = 0, T = 20.123000 C 10:06:10 Temperature Measurement, Probe Number = 1, T = 20.045000 C 10:06:11 Temperature Measurement, Probe Number = 2, T = 20.111000 C 10:06:12 Temperature Measurement, Probe Number = 3, T = 20.053000 C 10:06:12 Temperature Measurement, Probe Number = 4, T = 20.407000 C 10:06:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 10:06:13 Integrated Voltage Measurement... 10:06:32 Voltage Offset Correction: v_off_ini = 0.000004481 V, v_off_fin = 0.000006564 V 10:06:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041640 Vs 10:06:32 Integrated Voltage Measurement... 10:06:51 Voltage Offset Correction: v_off_ini = 0.000005964 V, v_off_fin = 0.000003323 V 10:06:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962808 Vs 10:06:54 Temperature Measurement, Probe Number = 0, T = 20.114000 C 10:06:55 Temperature Measurement, Probe Number = 1, T = 20.038000 C 10:06:56 Temperature Measurement, Probe Number = 2, T = 20.107000 C 10:06:56 Temperature Measurement, Probe Number = 3, T = 20.049000 C 10:06:57 Temperature Measurement, Probe Number = 4, T = 20.415000 C 10:06:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 10:06:57 Integrated Voltage Measurement... 10:07:17 Voltage Offset Correction: v_off_ini = 0.000003923 V, v_off_fin = 0.000005832 V 10:07:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035661 Vs 10:07:17 Integrated Voltage Measurement... 10:07:37 Voltage Offset Correction: v_off_ini = 0.000005729 V, v_off_fin = 0.000002576 V 10:07:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969313 Vs 10:07:40 Temperature Measurement, Probe Number = 0, T = 20.116000 C 10:07:40 Temperature Measurement, Probe Number = 1, T = 20.041000 C 10:07:41 Temperature Measurement, Probe Number = 2, T = 20.107000 C 10:07:42 Temperature Measurement, Probe Number = 3, T = 20.050000 C 10:07:42 Temperature Measurement, Probe Number = 4, T = 20.386000 C 10:07:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.39 10:07:42 Integrated Voltage Measurement... 10:08:02 Voltage Offset Correction: v_off_ini = 0.000003692 V, v_off_fin = 0.000006184 V 10:08:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035572 Vs 10:08:02 Integrated Voltage Measurement... 10:08:22 Voltage Offset Correction: v_off_ini = 0.000005495 V, v_off_fin = 0.000002776 V 10:08:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963727 Vs 10:08:24 Temperature Measurement, Probe Number = 0, T = 20.120000 C 10:08:25 Temperature Measurement, Probe Number = 1, T = 20.044000 C 10:08:26 Temperature Measurement, Probe Number = 2, T = 20.111000 C 10:08:26 Temperature Measurement, Probe Number = 3, T = 20.056000 C 10:08:27 Temperature Measurement, Probe Number = 4, T = 20.377000 C 10:08:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.38 10:08:27 Integrated Voltage Measurement... 10:08:47 Voltage Offset Correction: v_off_ini = 0.000003775 V, v_off_fin = 0.000006555 V 10:08:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040176 Vs 10:08:47 Integrated Voltage Measurement... 10:09:06 Voltage Offset Correction: v_off_ini = 0.000006165 V, v_off_fin = 0.000003003 V 10:09:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957354 Vs 10:09:09 Temperature Measurement, Probe Number = 0, T = 20.120000 C 10:09:10 Temperature Measurement, Probe Number = 1, T = 20.048000 C 10:09:10 Temperature Measurement, Probe Number = 2, T = 20.111000 C 10:09:11 Temperature Measurement, Probe Number = 3, T = 20.057000 C 10:09:12 Temperature Measurement, Probe Number = 4, T = 20.437000 C 10:09:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.44 10:09:12 Integrated Voltage Measurement... 10:09:31 Voltage Offset Correction: v_off_ini = 0.000004557 V, v_off_fin = 0.000006863 V 10:09:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042898 Vs 10:09:31 Integrated Voltage Measurement... 10:09:51 Voltage Offset Correction: v_off_ini = 0.000006483 V, v_off_fin = 0.000002676 V 10:09:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960746 Vs 10:09:54 Temperature Measurement, Probe Number = 0, T = 20.120000 C 10:09:54 Temperature Measurement, Probe Number = 1, T = 20.044000 C 10:09:55 Temperature Measurement, Probe Number = 2, T = 20.109000 C 10:09:56 Temperature Measurement, Probe Number = 3, T = 20.054000 C 10:09:56 Temperature Measurement, Probe Number = 4, T = 20.483000 C 10:09:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.48 10:09:57 Integrated Voltage Measurement... 10:10:16 Voltage Offset Correction: v_off_ini = 0.000003862 V, v_off_fin = 0.000006966 V 10:10:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041057 Vs 10:10:16 Integrated Voltage Measurement... 10:10:35 Voltage Offset Correction: v_off_ini = 0.000006454 V, v_off_fin = 0.000002824 V 10:10:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956600 Vs 10:10:38 Temperature Measurement, Probe Number = 0, T = 20.121000 C 10:10:39 Temperature Measurement, Probe Number = 1, T = 20.043000 C 10:10:40 Temperature Measurement, Probe Number = 2, T = 20.111000 C 10:10:40 Temperature Measurement, Probe Number = 3, T = 20.054000 C 10:10:41 Temperature Measurement, Probe Number = 4, T = 20.501000 C 10:10:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.50 10:10:41 Integrated Voltage Measurement... 10:11:00 Voltage Offset Correction: v_off_ini = 0.000004420 V, v_off_fin = 0.000006398 V 10:11:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038925 Vs 10:11:00 Integrated Voltage Measurement... 10:11:20 Voltage Offset Correction: v_off_ini = 0.000006349 V, v_off_fin = 0.000002623 V 10:11:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960536 Vs 10:11:22 Temperature Measurement, Probe Number = 0, T = 20.122000 C 10:11:23 Temperature Measurement, Probe Number = 1, T = 20.044000 C 10:11:24 Temperature Measurement, Probe Number = 2, T = 20.111000 C 10:11:24 Temperature Measurement, Probe Number = 3, T = 20.053000 C 10:11:25 Temperature Measurement, Probe Number = 4, T = 20.474000 C 10:11:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.47 10:11:25 Integrated Voltage Measurement... 10:11:44 Voltage Offset Correction: v_off_ini = 0.000003907 V, v_off_fin = 0.000006536 V 10:11:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042751 Vs 10:11:45 Integrated Voltage Measurement... 10:12:04 Voltage Offset Correction: v_off_ini = 0.000006627 V, v_off_fin = 0.000002802 V 10:12:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960192 Vs 10:42:07 Temperature Measurement, Probe Number = 0, T = 20.117000 C 10:42:08 Temperature Measurement, Probe Number = 1, T = 20.043000 C 10:42:09 Temperature Measurement, Probe Number = 2, T = 20.110000 C 10:42:09 Temperature Measurement, Probe Number = 3, T = 20.054000 C 10:42:10 Temperature Measurement, Probe Number = 4, T = 20.350000 C 10:42:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.35 10:42:10 Integrated Voltage Measurement... 10:42:29 Voltage Offset Correction: v_off_ini = 0.000004892 V, v_off_fin = 0.000006470 V 10:42:29 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171088747 Vs 10:42:30 Integrated Voltage Measurement... 10:42:49 Voltage Offset Correction: v_off_ini = 0.000005833 V, v_off_fin = 0.000002546 V 10:42:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962757 Vs 10:42:52 Temperature Measurement, Probe Number = 0, T = 20.125000 C 10:42:52 Temperature Measurement, Probe Number = 1, T = 20.049000 C 10:42:53 Temperature Measurement, Probe Number = 2, T = 20.114000 C 10:42:54 Temperature Measurement, Probe Number = 3, T = 20.058000 C 10:42:54 Temperature Measurement, Probe Number = 4, T = 20.405000 C 10:42:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.41 10:42:55 Integrated Voltage Measurement... 10:43:14 Voltage Offset Correction: v_off_ini = 0.000003653 V, v_off_fin = 0.000005878 V 10:43:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171032540 Vs 10:43:15 Integrated Voltage Measurement... 10:43:34 Voltage Offset Correction: v_off_ini = 0.000005491 V, v_off_fin = 0.000002614 V 10:43:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967291 Vs 10:43:37 Temperature Measurement, Probe Number = 0, T = 20.124000 C 10:43:37 Temperature Measurement, Probe Number = 1, T = 20.048000 C 10:43:38 Temperature Measurement, Probe Number = 2, T = 20.111000 C 10:43:39 Temperature Measurement, Probe Number = 3, T = 20.056000 C 10:43:39 Temperature Measurement, Probe Number = 4, T = 20.412000 C 10:43:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.41 10:43:40 Integrated Voltage Measurement... 10:43:59 Voltage Offset Correction: v_off_ini = 0.000003457 V, v_off_fin = 0.000005886 V 10:43:59 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171029642 Vs 10:43:59 Integrated Voltage Measurement... 10:44:18 Voltage Offset Correction: v_off_ini = 0.000005549 V, v_off_fin = 0.000002376 V 10:44:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961926 Vs 10:44:21 Temperature Measurement, Probe Number = 0, T = 20.124000 C 10:44:22 Temperature Measurement, Probe Number = 1, T = 20.047000 C 10:44:22 Temperature Measurement, Probe Number = 2, T = 20.111000 C 10:44:23 Temperature Measurement, Probe Number = 3, T = 20.055000 C 10:44:24 Temperature Measurement, Probe Number = 4, T = 20.376000 C 10:44:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.38 10:44:24 Integrated Voltage Measurement... 10:44:43 Voltage Offset Correction: v_off_ini = 0.000004158 V, v_off_fin = 0.000006135 V 10:44:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036426 Vs 10:44:44 Integrated Voltage Measurement... 10:45:03 Voltage Offset Correction: v_off_ini = 0.000005576 V, v_off_fin = 0.000002985 V 10:45:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960976 Vs 10:45:06 Temperature Measurement, Probe Number = 0, T = 20.124000 C 10:45:07 Temperature Measurement, Probe Number = 1, T = 20.045000 C 10:45:07 Temperature Measurement, Probe Number = 2, T = 20.111000 C 10:45:08 Temperature Measurement, Probe Number = 3, T = 20.053000 C 10:45:09 Temperature Measurement, Probe Number = 4, T = 20.370000 C 10:45:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.37 10:45:09 Integrated Voltage Measurement... 10:45:28 Voltage Offset Correction: v_off_ini = 0.000003537 V, v_off_fin = 0.000005838 V 10:45:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029244 Vs 10:45:29 Integrated Voltage Measurement... 10:45:48 Voltage Offset Correction: v_off_ini = 0.000005132 V, v_off_fin = 0.000002002 V 10:45:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960878 Vs 10:45:51 Temperature Measurement, Probe Number = 0, T = 20.124000 C 10:45:51 Temperature Measurement, Probe Number = 1, T = 20.047000 C 10:45:52 Temperature Measurement, Probe Number = 2, T = 20.113000 C 10:45:53 Temperature Measurement, Probe Number = 3, T = 20.057000 C 10:45:53 Temperature Measurement, Probe Number = 4, T = 20.310000 C 10:45:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.31 10:45:53 Integrated Voltage Measurement... 10:46:13 Voltage Offset Correction: v_off_ini = 0.000003592 V, v_off_fin = 0.000006009 V 10:46:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030216 Vs 10:46:13 Integrated Voltage Measurement... 10:46:32 Voltage Offset Correction: v_off_ini = 0.000005412 V, v_off_fin = 0.000002600 V 10:46:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964646 Vs 10:46:35 Temperature Measurement, Probe Number = 0, T = 20.127000 C 10:46:36 Temperature Measurement, Probe Number = 1, T = 20.048000 C 10:46:36 Temperature Measurement, Probe Number = 2, T = 20.117000 C 10:46:37 Temperature Measurement, Probe Number = 3, T = 20.060000 C 10:46:38 Temperature Measurement, Probe Number = 4, T = 20.382000 C 10:46:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.38 10:46:38 Integrated Voltage Measurement... 10:46:57 Voltage Offset Correction: v_off_ini = 0.000003726 V, v_off_fin = 0.000006275 V 10:46:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031682 Vs 10:46:58 Integrated Voltage Measurement... 10:47:17 Voltage Offset Correction: v_off_ini = 0.000005591 V, v_off_fin = 0.000002857 V 10:47:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958660 Vs 10:47:20 Temperature Measurement, Probe Number = 0, T = 20.129000 C 10:47:20 Temperature Measurement, Probe Number = 1, T = 20.052000 C 10:47:21 Temperature Measurement, Probe Number = 2, T = 20.116000 C 10:47:22 Temperature Measurement, Probe Number = 3, T = 20.061000 C 10:47:22 Temperature Measurement, Probe Number = 4, T = 20.449000 C 10:47:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.45 10:47:22 Integrated Voltage Measurement... 10:47:43 Voltage Offset Correction: v_off_ini = 0.000003698 V, v_off_fin = 0.000006221 V 10:47:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035349 Vs 10:47:43 Integrated Voltage Measurement... 10:48:02 Voltage Offset Correction: v_off_ini = 0.000005696 V, v_off_fin = 0.000003192 V 10:48:03 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170964832 Vs 10:48:05 Temperature Measurement, Probe Number = 0, T = 20.128000 C 10:48:06 Temperature Measurement, Probe Number = 1, T = 20.051000 C 10:48:07 Temperature Measurement, Probe Number = 2, T = 20.118000 C 10:48:07 Temperature Measurement, Probe Number = 3, T = 20.062000 C 10:48:08 Temperature Measurement, Probe Number = 4, T = 20.505000 C 10:48:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.50 10:48:08 Integrated Voltage Measurement... 10:48:27 Voltage Offset Correction: v_off_ini = 0.000003613 V, v_off_fin = 0.000005565 V 10:48:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171032690 Vs 10:48:28 Integrated Voltage Measurement... 10:48:47 Voltage Offset Correction: v_off_ini = 0.000005433 V, v_off_fin = 0.000002722 V 10:48:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960696 Vs 10:48:49 Temperature Measurement, Probe Number = 0, T = 20.126000 C 10:48:50 Temperature Measurement, Probe Number = 1, T = 20.050000 C 10:48:51 Temperature Measurement, Probe Number = 2, T = 20.117000 C 10:48:51 Temperature Measurement, Probe Number = 3, T = 20.060000 C 10:48:52 Temperature Measurement, Probe Number = 4, T = 20.599000 C 10:48:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.60 10:48:52 Integrated Voltage Measurement... 10:49:12 Voltage Offset Correction: v_off_ini = 0.000004095 V, v_off_fin = 0.000006476 V 10:49:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039080 Vs 10:49:12 Integrated Voltage Measurement... 10:49:31 Voltage Offset Correction: v_off_ini = 0.000005967 V, v_off_fin = 0.000003470 V 10:49:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956112 Vs 11:19:34 Temperature Measurement, Probe Number = 0, T = 20.132000 C 11:19:35 Temperature Measurement, Probe Number = 1, T = 20.057000 C 11:19:35 Temperature Measurement, Probe Number = 2, T = 20.123000 C 11:19:36 Temperature Measurement, Probe Number = 3, T = 20.067000 C 11:19:37 Temperature Measurement, Probe Number = 4, T = 20.519000 C 11:19:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.52 11:19:37 Integrated Voltage Measurement... 11:19:56 Voltage Offset Correction: v_off_ini = 0.000005022 V, v_off_fin = 0.000006467 V 11:19:56 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171092736 Vs 11:19:56 Integrated Voltage Measurement... 11:20:16 Voltage Offset Correction: v_off_ini = 0.000005891 V, v_off_fin = 0.000002874 V 11:20:16 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170957278 Vs 11:20:19 Temperature Measurement, Probe Number = 0, T = 20.129000 C 11:20:19 Temperature Measurement, Probe Number = 1, T = 20.055000 C 11:20:20 Temperature Measurement, Probe Number = 2, T = 20.118000 C 11:20:21 Temperature Measurement, Probe Number = 3, T = 20.063000 C 11:20:21 Temperature Measurement, Probe Number = 4, T = 20.492000 C 11:20:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.49 11:20:21 Integrated Voltage Measurement... 11:20:41 Voltage Offset Correction: v_off_ini = 0.000004225 V, v_off_fin = 0.000006266 V 11:20:41 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171031655 Vs 11:20:42 Integrated Voltage Measurement... 11:21:01 Voltage Offset Correction: v_off_ini = 0.000005732 V, v_off_fin = 0.000002375 V 11:21:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955797 Vs 11:21:04 Temperature Measurement, Probe Number = 0, T = 20.127000 C 11:21:04 Temperature Measurement, Probe Number = 1, T = 20.053000 C 11:21:05 Temperature Measurement, Probe Number = 2, T = 20.117000 C 11:21:06 Temperature Measurement, Probe Number = 3, T = 20.062000 C 11:21:06 Temperature Measurement, Probe Number = 4, T = 20.374000 C 11:21:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.37 11:21:06 Integrated Voltage Measurement... 11:21:26 Voltage Offset Correction: v_off_ini = 0.000003630 V, v_off_fin = 0.000006249 V 11:21:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171032477 Vs 11:21:26 Integrated Voltage Measurement... 11:21:45 Voltage Offset Correction: v_off_ini = 0.000005738 V, v_off_fin = 0.000002928 V 11:21:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953734 Vs 11:21:48 Temperature Measurement, Probe Number = 0, T = 20.127000 C 11:21:48 Temperature Measurement, Probe Number = 1, T = 20.053000 C 11:21:49 Temperature Measurement, Probe Number = 2, T = 20.116000 C 11:21:50 Temperature Measurement, Probe Number = 3, T = 20.062000 C 11:21:50 Temperature Measurement, Probe Number = 4, T = 20.284000 C 11:21:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.28 11:21:51 Integrated Voltage Measurement... 11:22:10 Voltage Offset Correction: v_off_ini = 0.000004277 V, v_off_fin = 0.000006390 V 11:22:10 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171040965 Vs 11:22:10 Integrated Voltage Measurement... 11:22:29 Voltage Offset Correction: v_off_ini = 0.000006369 V, v_off_fin = 0.000002810 V 11:22:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954612 Vs 11:22:32 Temperature Measurement, Probe Number = 0, T = 20.131000 C 11:22:33 Temperature Measurement, Probe Number = 1, T = 20.057000 C 11:22:34 Temperature Measurement, Probe Number = 2, T = 20.119000 C 11:22:34 Temperature Measurement, Probe Number = 3, T = 20.065000 C 11:22:35 Temperature Measurement, Probe Number = 4, T = 20.298000 C 11:22:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.30 11:22:35 Integrated Voltage Measurement... 11:22:54 Voltage Offset Correction: v_off_ini = 0.000003551 V, v_off_fin = 0.000005983 V 11:22:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030407 Vs 11:22:55 Integrated Voltage Measurement... 11:23:14 Voltage Offset Correction: v_off_ini = 0.000005763 V, v_off_fin = 0.000002128 V 11:23:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962328 Vs 11:23:17 Temperature Measurement, Probe Number = 0, T = 20.136000 C 11:23:17 Temperature Measurement, Probe Number = 1, T = 20.062000 C 11:23:18 Temperature Measurement, Probe Number = 2, T = 20.124000 C 11:23:19 Temperature Measurement, Probe Number = 3, T = 20.071000 C 11:23:19 Temperature Measurement, Probe Number = 4, T = 20.348000 C 11:23:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.35 11:23:19 Integrated Voltage Measurement... 11:23:39 Voltage Offset Correction: v_off_ini = 0.000003883 V, v_off_fin = 0.000005651 V 11:23:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030293 Vs 11:23:39 Integrated Voltage Measurement... 11:23:59 Voltage Offset Correction: v_off_ini = 0.000005426 V, v_off_fin = 0.000002986 V 11:23:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965711 Vs 11:24:02 Temperature Measurement, Probe Number = 0, T = 20.138000 C 11:24:02 Temperature Measurement, Probe Number = 1, T = 20.064000 C 11:24:03 Temperature Measurement, Probe Number = 2, T = 20.127000 C 11:24:03 Temperature Measurement, Probe Number = 3, T = 20.073000 C 11:24:04 Temperature Measurement, Probe Number = 4, T = 20.393000 C 11:24:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.39 11:24:04 Integrated Voltage Measurement... 11:24:24 Voltage Offset Correction: v_off_ini = 0.000003886 V, v_off_fin = 0.000006004 V 11:24:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036565 Vs 11:24:24 Integrated Voltage Measurement... 11:24:43 Voltage Offset Correction: v_off_ini = 0.000005488 V, v_off_fin = 0.000002898 V 11:24:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957175 Vs 11:24:46 Temperature Measurement, Probe Number = 0, T = 20.137000 C 11:24:46 Temperature Measurement, Probe Number = 1, T = 20.063000 C 11:24:47 Temperature Measurement, Probe Number = 2, T = 20.127000 C 11:24:48 Temperature Measurement, Probe Number = 3, T = 20.073000 C 11:24:48 Temperature Measurement, Probe Number = 4, T = 20.504000 C 11:24:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.50 11:24:49 Integrated Voltage Measurement... 11:25:08 Voltage Offset Correction: v_off_ini = 0.000004185 V, v_off_fin = 0.000005930 V 11:25:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034621 Vs 11:25:08 Integrated Voltage Measurement... 11:25:27 Voltage Offset Correction: v_off_ini = 0.000005554 V, v_off_fin = 0.000002549 V 11:25:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958802 Vs 11:25:30 Temperature Measurement, Probe Number = 0, T = 20.137000 C 11:25:31 Temperature Measurement, Probe Number = 1, T = 20.059000 C 11:25:31 Temperature Measurement, Probe Number = 2, T = 20.129000 C 11:25:32 Temperature Measurement, Probe Number = 3, T = 20.071000 C 11:25:33 Temperature Measurement, Probe Number = 4, T = 20.577000 C 11:25:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.58 11:25:33 Integrated Voltage Measurement... 11:25:52 Voltage Offset Correction: v_off_ini = 0.000003951 V, v_off_fin = 0.000006271 V 11:25:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037683 Vs 11:25:53 Integrated Voltage Measurement... 11:26:12 Voltage Offset Correction: v_off_ini = 0.000005841 V, v_off_fin = 0.000003320 V 11:26:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963755 Vs 11:26:15 Temperature Measurement, Probe Number = 0, T = 20.139000 C 11:26:15 Temperature Measurement, Probe Number = 1, T = 20.060000 C 11:26:16 Temperature Measurement, Probe Number = 2, T = 20.126000 C 11:26:17 Temperature Measurement, Probe Number = 3, T = 20.069000 C 11:26:17 Temperature Measurement, Probe Number = 4, T = 20.601000 C 11:26:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.60 11:26:18 Integrated Voltage Measurement... 11:26:37 Voltage Offset Correction: v_off_ini = 0.000004030 V, v_off_fin = 0.000006282 V 11:26:37 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171035449 Vs 11:26:37 Integrated Voltage Measurement... 11:26:56 Voltage Offset Correction: v_off_ini = 0.000005576 V, v_off_fin = 0.000002948 V 11:26:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961301 Vs 11:56:59 Temperature Measurement, Probe Number = 0, T = 20.135000 C 11:57:00 Temperature Measurement, Probe Number = 1, T = 20.062000 C 11:57:01 Temperature Measurement, Probe Number = 2, T = 20.125000 C 11:57:01 Temperature Measurement, Probe Number = 3, T = 20.070000 C 11:57:02 Temperature Measurement, Probe Number = 4, T = 20.482000 C 11:57:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.48 11:57:02 Integrated Voltage Measurement... 11:57:21 Voltage Offset Correction: v_off_ini = 0.000005326 V, v_off_fin = 0.000006930 V 11:57:22 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171098902 Vs 11:57:22 Integrated Voltage Measurement... 11:57:41 Voltage Offset Correction: v_off_ini = 0.000006192 V, v_off_fin = 0.000003102 V 11:57:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961566 Vs 11:57:44 Temperature Measurement, Probe Number = 0, T = 20.141000 C 11:57:45 Temperature Measurement, Probe Number = 1, T = 20.065000 C 11:57:45 Temperature Measurement, Probe Number = 2, T = 20.129000 C 11:57:46 Temperature Measurement, Probe Number = 3, T = 20.074000 C 11:57:47 Temperature Measurement, Probe Number = 4, T = 20.525000 C 11:57:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.52 11:57:47 Integrated Voltage Measurement... 11:58:06 Voltage Offset Correction: v_off_ini = 0.000003785 V, v_off_fin = 0.000006193 V 11:58:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034805 Vs 11:58:06 Integrated Voltage Measurement... 11:58:25 Voltage Offset Correction: v_off_ini = 0.000006112 V, v_off_fin = 0.000003109 V 11:58:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955193 Vs 11:58:28 Temperature Measurement, Probe Number = 0, T = 20.135000 C 11:58:29 Temperature Measurement, Probe Number = 1, T = 20.061000 C 11:58:29 Temperature Measurement, Probe Number = 2, T = 20.124000 C 11:58:30 Temperature Measurement, Probe Number = 3, T = 20.070000 C 11:58:31 Temperature Measurement, Probe Number = 4, T = 20.568000 C 11:58:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.57 11:58:31 Integrated Voltage Measurement... 11:58:50 Voltage Offset Correction: v_off_ini = 0.000004040 V, v_off_fin = 0.000006486 V 11:58:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034204 Vs 11:58:51 Integrated Voltage Measurement... 11:59:10 Voltage Offset Correction: v_off_ini = 0.000005615 V, v_off_fin = 0.000002944 V 11:59:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961981 Vs 11:59:13 Temperature Measurement, Probe Number = 0, T = 20.131000 C 11:59:13 Temperature Measurement, Probe Number = 1, T = 20.057000 C 11:59:14 Temperature Measurement, Probe Number = 2, T = 20.121000 C 11:59:15 Temperature Measurement, Probe Number = 3, T = 20.067000 C 11:59:15 Temperature Measurement, Probe Number = 4, T = 20.572000 C 11:59:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.57 11:59:15 Integrated Voltage Measurement... 11:59:34 Voltage Offset Correction: v_off_ini = 0.000004051 V, v_off_fin = 0.000006154 V 11:59:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031873 Vs 11:59:35 Integrated Voltage Measurement... 11:59:54 Voltage Offset Correction: v_off_ini = 0.000006168 V, v_off_fin = 0.000002985 V 11:59:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963944 Vs 11:59:57 Temperature Measurement, Probe Number = 0, T = 20.131000 C 11:59:57 Temperature Measurement, Probe Number = 1, T = 20.060000 C 11:59:58 Temperature Measurement, Probe Number = 2, T = 20.121000 C 11:59:59 Temperature Measurement, Probe Number = 3, T = 20.068000 C 11:59:59 Temperature Measurement, Probe Number = 4, T = 20.510000 C 11:59:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.51 12:00:00 Integrated Voltage Measurement... 12:00:19 Voltage Offset Correction: v_off_ini = 0.000003548 V, v_off_fin = 0.000005722 V 12:00:19 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171031271 Vs 12:00:19 Integrated Voltage Measurement... 12:00:38 Voltage Offset Correction: v_off_ini = 0.000005582 V, v_off_fin = 0.000003331 V 12:00:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952251 Vs 12:00:41 Temperature Measurement, Probe Number = 0, T = 20.137000 C 12:00:42 Temperature Measurement, Probe Number = 1, T = 20.060000 C 12:00:43 Temperature Measurement, Probe Number = 2, T = 20.125000 C 12:00:43 Temperature Measurement, Probe Number = 3, T = 20.069000 C 12:00:44 Temperature Measurement, Probe Number = 4, T = 20.588000 C 12:00:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.59 12:00:44 Integrated Voltage Measurement... 12:01:03 Voltage Offset Correction: v_off_ini = 0.000003951 V, v_off_fin = 0.000006112 V 12:01:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034215 Vs 12:01:04 Integrated Voltage Measurement... 12:01:23 Voltage Offset Correction: v_off_ini = 0.000005954 V, v_off_fin = 0.000003001 V 12:01:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956247 Vs 12:01:26 Temperature Measurement, Probe Number = 0, T = 20.138000 C 12:01:27 Temperature Measurement, Probe Number = 1, T = 20.061000 C 12:01:27 Temperature Measurement, Probe Number = 2, T = 20.126000 C 12:01:28 Temperature Measurement, Probe Number = 3, T = 20.072000 C 12:01:29 Temperature Measurement, Probe Number = 4, T = 20.610000 C 12:01:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.61 12:01:29 Integrated Voltage Measurement... 12:01:48 Voltage Offset Correction: v_off_ini = 0.000004276 V, v_off_fin = 0.000006468 V 12:01:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033519 Vs 12:01:49 Integrated Voltage Measurement... 12:02:08 Voltage Offset Correction: v_off_ini = 0.000006190 V, v_off_fin = 0.000002719 V 12:02:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953914 Vs 12:02:10 Temperature Measurement, Probe Number = 0, T = 20.130000 C 12:02:11 Temperature Measurement, Probe Number = 1, T = 20.058000 C 12:02:12 Temperature Measurement, Probe Number = 2, T = 20.121000 C 12:02:12 Temperature Measurement, Probe Number = 3, T = 20.068000 C 12:02:13 Temperature Measurement, Probe Number = 4, T = 20.561000 C 12:02:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.56 12:02:13 Integrated Voltage Measurement... 12:02:33 Voltage Offset Correction: v_off_ini = 0.000004048 V, v_off_fin = 0.000006127 V 12:02:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171032744 Vs 12:02:33 Integrated Voltage Measurement... 12:02:52 Voltage Offset Correction: v_off_ini = 0.000005534 V, v_off_fin = 0.000003040 V 12:02:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960132 Vs 12:02:55 Temperature Measurement, Probe Number = 0, T = 20.134000 C 12:02:56 Temperature Measurement, Probe Number = 1, T = 20.064000 C 12:02:57 Temperature Measurement, Probe Number = 2, T = 20.123000 C 12:02:57 Temperature Measurement, Probe Number = 3, T = 20.070000 C 12:02:58 Temperature Measurement, Probe Number = 4, T = 20.512000 C 12:02:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.51 12:02:58 Integrated Voltage Measurement... 12:03:18 Voltage Offset Correction: v_off_ini = 0.000003930 V, v_off_fin = 0.000005911 V 12:03:18 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171030367 Vs 12:03:18 Integrated Voltage Measurement... 12:03:37 Voltage Offset Correction: v_off_ini = 0.000005908 V, v_off_fin = 0.000003027 V 12:03:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955067 Vs 12:03:40 Temperature Measurement, Probe Number = 0, T = 20.138000 C 12:03:40 Temperature Measurement, Probe Number = 1, T = 20.064000 C 12:03:41 Temperature Measurement, Probe Number = 2, T = 20.127000 C 12:03:42 Temperature Measurement, Probe Number = 3, T = 20.073000 C 12:03:42 Temperature Measurement, Probe Number = 4, T = 20.502000 C 12:03:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.50 12:03:43 Integrated Voltage Measurement... 12:04:02 Voltage Offset Correction: v_off_ini = 0.000003967 V, v_off_fin = 0.000006580 V 12:04:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033472 Vs 12:04:02 Integrated Voltage Measurement... 12:04:21 Voltage Offset Correction: v_off_ini = 0.000006183 V, v_off_fin = 0.000002475 V 12:04:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958462 Vs 12:34:24 Temperature Measurement, Probe Number = 0, T = 20.142000 C 12:34:25 Temperature Measurement, Probe Number = 1, T = 20.071000 C 12:34:26 Temperature Measurement, Probe Number = 2, T = 20.132000 C 12:34:27 Temperature Measurement, Probe Number = 3, T = 20.078000 C 12:34:27 Temperature Measurement, Probe Number = 4, T = 20.559000 C 12:34:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.56 12:34:28 Integrated Voltage Measurement... 12:34:47 Voltage Offset Correction: v_off_ini = 0.000005087 V, v_off_fin = 0.000006454 V 12:34:47 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171085680 Vs 12:34:47 Integrated Voltage Measurement... 12:35:06 Voltage Offset Correction: v_off_ini = 0.000005759 V, v_off_fin = 0.000003061 V 12:35:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960730 Vs 12:35:09 Temperature Measurement, Probe Number = 0, T = 20.144000 C 12:35:10 Temperature Measurement, Probe Number = 1, T = 20.071000 C 12:35:10 Temperature Measurement, Probe Number = 2, T = 20.133000 C 12:35:11 Temperature Measurement, Probe Number = 3, T = 20.079000 C 12:35:12 Temperature Measurement, Probe Number = 4, T = 20.672000 C 12:35:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.67 12:35:12 Integrated Voltage Measurement... 12:35:32 Voltage Offset Correction: v_off_ini = 0.000004184 V, v_off_fin = 0.000005997 V 12:35:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023999 Vs 12:35:32 Integrated Voltage Measurement... 12:35:51 Voltage Offset Correction: v_off_ini = 0.000005287 V, v_off_fin = 0.000002289 V 12:35:51 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170965412 Vs 12:35:54 Temperature Measurement, Probe Number = 0, T = 20.145000 C 12:35:55 Temperature Measurement, Probe Number = 1, T = 20.071000 C 12:35:55 Temperature Measurement, Probe Number = 2, T = 20.134000 C 12:35:56 Temperature Measurement, Probe Number = 3, T = 20.079000 C 12:35:57 Temperature Measurement, Probe Number = 4, T = 20.635000 C 12:35:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.64 12:35:57 Integrated Voltage Measurement... 12:36:16 Voltage Offset Correction: v_off_ini = 0.000004036 V, v_off_fin = 0.000005970 V 12:36:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024012 Vs 12:36:17 Integrated Voltage Measurement... 12:36:36 Voltage Offset Correction: v_off_ini = 0.000005452 V, v_off_fin = 0.000002105 V 12:36:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960656 Vs 12:36:39 Temperature Measurement, Probe Number = 0, T = 20.146000 C 12:36:39 Temperature Measurement, Probe Number = 1, T = 20.070000 C 12:36:40 Temperature Measurement, Probe Number = 2, T = 20.134000 C 12:36:41 Temperature Measurement, Probe Number = 3, T = 20.079000 C 12:36:41 Temperature Measurement, Probe Number = 4, T = 20.590000 C 12:36:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.59 12:36:41 Integrated Voltage Measurement... 12:37:01 Voltage Offset Correction: v_off_ini = 0.000003101 V, v_off_fin = 0.000005941 V 12:37:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025951 Vs 12:37:01 Integrated Voltage Measurement... 12:37:20 Voltage Offset Correction: v_off_ini = 0.000005435 V, v_off_fin = 0.000002883 V 12:37:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963356 Vs 12:37:23 Temperature Measurement, Probe Number = 0, T = 20.138000 C 12:37:24 Temperature Measurement, Probe Number = 1, T = 20.068000 C 12:37:25 Temperature Measurement, Probe Number = 2, T = 20.127000 C 12:37:25 Temperature Measurement, Probe Number = 3, T = 20.075000 C 12:37:26 Temperature Measurement, Probe Number = 4, T = 20.569000 C 12:37:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.57 12:37:26 Integrated Voltage Measurement... 12:37:46 Voltage Offset Correction: v_off_ini = 0.000004053 V, v_off_fin = 0.000006228 V 12:37:46 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171025944 Vs 12:37:46 Integrated Voltage Measurement... 12:38:06 Voltage Offset Correction: v_off_ini = 0.000005486 V, v_off_fin = 0.000003543 V 12:38:06 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170963289 Vs 12:38:09 Temperature Measurement, Probe Number = 0, T = 20.142000 C 12:38:09 Temperature Measurement, Probe Number = 1, T = 20.071000 C 12:38:10 Temperature Measurement, Probe Number = 2, T = 20.130000 C 12:38:11 Temperature Measurement, Probe Number = 3, T = 20.079000 C 12:38:12 Temperature Measurement, Probe Number = 4, T = 20.560000 C 12:38:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.56 12:38:12 Integrated Voltage Measurement... 12:38:31 Voltage Offset Correction: v_off_ini = 0.000004037 V, v_off_fin = 0.000006436 V 12:38:31 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171021652 Vs 12:38:31 Integrated Voltage Measurement... 12:38:51 Voltage Offset Correction: v_off_ini = 0.000005805 V, v_off_fin = 0.000003699 V 12:38:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956324 Vs 12:38:54 Temperature Measurement, Probe Number = 0, T = 20.144000 C 12:38:55 Temperature Measurement, Probe Number = 1, T = 20.069000 C 12:38:55 Temperature Measurement, Probe Number = 2, T = 20.132000 C 12:38:56 Temperature Measurement, Probe Number = 3, T = 20.078000 C 12:38:57 Temperature Measurement, Probe Number = 4, T = 20.574000 C 12:38:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.57 12:38:57 Integrated Voltage Measurement... 12:39:16 Voltage Offset Correction: v_off_ini = 0.000004374 V, v_off_fin = 0.000006657 V 12:39:16 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171028619 Vs 12:39:16 Integrated Voltage Measurement... 12:39:36 Voltage Offset Correction: v_off_ini = 0.000006180 V, v_off_fin = 0.000003716 V 12:39:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956258 Vs 12:39:39 Temperature Measurement, Probe Number = 0, T = 20.140000 C 12:39:39 Temperature Measurement, Probe Number = 1, T = 20.068000 C 12:39:40 Temperature Measurement, Probe Number = 2, T = 20.127000 C 12:39:41 Temperature Measurement, Probe Number = 3, T = 20.076000 C 12:39:41 Temperature Measurement, Probe Number = 4, T = 20.576000 C 12:39:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.58 12:39:41 Integrated Voltage Measurement... 12:40:01 Voltage Offset Correction: v_off_ini = 0.000003911 V, v_off_fin = 0.000005847 V 12:40:01 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171026116 Vs 12:40:01 Integrated Voltage Measurement... 12:40:20 Voltage Offset Correction: v_off_ini = 0.000005658 V, v_off_fin = 0.000002660 V 12:40:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960439 Vs 12:40:23 Temperature Measurement, Probe Number = 0, T = 20.142000 C 12:40:24 Temperature Measurement, Probe Number = 1, T = 20.070000 C 12:40:24 Temperature Measurement, Probe Number = 2, T = 20.130000 C 12:40:25 Temperature Measurement, Probe Number = 3, T = 20.077000 C 12:40:26 Temperature Measurement, Probe Number = 4, T = 20.562000 C 12:40:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.56 12:40:26 Integrated Voltage Measurement... 12:40:45 Voltage Offset Correction: v_off_ini = 0.000004040 V, v_off_fin = 0.000006006 V 12:40:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171027016 Vs 12:40:45 Integrated Voltage Measurement... 12:41:04 Voltage Offset Correction: v_off_ini = 0.000005691 V, v_off_fin = 0.000003050 V 12:41:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959631 Vs 12:41:07 Temperature Measurement, Probe Number = 0, T = 20.144000 C 12:41:08 Temperature Measurement, Probe Number = 1, T = 20.071000 C 12:41:09 Temperature Measurement, Probe Number = 2, T = 20.133000 C 12:41:09 Temperature Measurement, Probe Number = 3, T = 20.078000 C 12:41:10 Temperature Measurement, Probe Number = 4, T = 20.635000 C 12:41:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.64 12:41:10 Integrated Voltage Measurement... 12:41:29 Voltage Offset Correction: v_off_ini = 0.000004508 V, v_off_fin = 0.000006080 V 12:41:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031793 Vs 12:41:30 Integrated Voltage Measurement... 12:41:49 Voltage Offset Correction: v_off_ini = 0.000005829 V, v_off_fin = 0.000002927 V 12:41:49 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170956964 Vs 13:11:52 Temperature Measurement, Probe Number = 0, T = 20.145000 C 13:11:52 Temperature Measurement, Probe Number = 1, T = 20.072000 C 13:11:53 Temperature Measurement, Probe Number = 2, T = 20.134000 C 13:11:54 Temperature Measurement, Probe Number = 3, T = 20.079000 C 13:11:54 Temperature Measurement, Probe Number = 4, T = 20.432000 C 13:11:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.43 13:11:55 Integrated Voltage Measurement... 13:12:14 Voltage Offset Correction: v_off_ini = 0.000004782 V, v_off_fin = 0.000006117 V 13:12:14 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171077048 Vs 13:12:14 Integrated Voltage Measurement... 13:12:34 Voltage Offset Correction: v_off_ini = 0.000005220 V, v_off_fin = 0.000002588 V 13:12:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961828 Vs 13:12:37 Temperature Measurement, Probe Number = 0, T = 20.151000 C 13:12:37 Temperature Measurement, Probe Number = 1, T = 20.077000 C 13:12:38 Temperature Measurement, Probe Number = 2, T = 20.142000 C 13:12:39 Temperature Measurement, Probe Number = 3, T = 20.085000 C 13:12:39 Temperature Measurement, Probe Number = 4, T = 20.470000 C 13:12:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.47 13:12:39 Integrated Voltage Measurement... 13:12:59 Voltage Offset Correction: v_off_ini = 0.000003773 V, v_off_fin = 0.000005674 V 13:12:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020467 Vs 13:12:59 Integrated Voltage Measurement... 13:13:18 Voltage Offset Correction: v_off_ini = 0.000005621 V, v_off_fin = 0.000002489 V 13:13:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953362 Vs 13:13:21 Temperature Measurement, Probe Number = 0, T = 20.147000 C 13:13:22 Temperature Measurement, Probe Number = 1, T = 20.075000 C 13:13:22 Temperature Measurement, Probe Number = 2, T = 20.137000 C 13:13:23 Temperature Measurement, Probe Number = 3, T = 20.082000 C 13:13:24 Temperature Measurement, Probe Number = 4, T = 20.571000 C 13:13:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.57 13:13:24 Integrated Voltage Measurement... 13:13:44 Voltage Offset Correction: v_off_ini = 0.000004143 V, v_off_fin = 0.000006414 V 13:13:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033153 Vs 13:13:44 Integrated Voltage Measurement... 13:14:03 Voltage Offset Correction: v_off_ini = 0.000006098 V, v_off_fin = 0.000003414 V 13:14:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948501 Vs 13:14:06 Temperature Measurement, Probe Number = 0, T = 20.150000 C 13:14:07 Temperature Measurement, Probe Number = 1, T = 20.075000 C 13:14:07 Temperature Measurement, Probe Number = 2, T = 20.137000 C 13:14:08 Temperature Measurement, Probe Number = 3, T = 20.081000 C 13:14:09 Temperature Measurement, Probe Number = 4, T = 20.623000 C 13:14:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.62 13:14:09 Integrated Voltage Measurement... 13:14:28 Voltage Offset Correction: v_off_ini = 0.000003837 V, v_off_fin = 0.000006088 V 13:14:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028427 Vs 13:14:28 Integrated Voltage Measurement... 13:14:47 Voltage Offset Correction: v_off_ini = 0.000005696 V, v_off_fin = 0.000002693 V 13:14:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951006 Vs 13:14:50 Temperature Measurement, Probe Number = 0, T = 20.148000 C 13:14:51 Temperature Measurement, Probe Number = 1, T = 20.076000 C 13:14:51 Temperature Measurement, Probe Number = 2, T = 20.138000 C 13:14:52 Temperature Measurement, Probe Number = 3, T = 20.082000 C 13:14:53 Temperature Measurement, Probe Number = 4, T = 20.516000 C 13:14:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.52 13:14:53 Integrated Voltage Measurement... 13:15:12 Voltage Offset Correction: v_off_ini = 0.000003583 V, v_off_fin = 0.000006576 V 13:15:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023747 Vs 13:15:12 Integrated Voltage Measurement... 13:15:31 Voltage Offset Correction: v_off_ini = 0.000005705 V, v_off_fin = 0.000002945 V 13:15:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954350 Vs 13:15:34 Temperature Measurement, Probe Number = 0, T = 20.151000 C 13:15:35 Temperature Measurement, Probe Number = 1, T = 20.077000 C 13:15:35 Temperature Measurement, Probe Number = 2, T = 20.140000 C 13:15:36 Temperature Measurement, Probe Number = 3, T = 20.084000 C 13:15:37 Temperature Measurement, Probe Number = 4, T = 20.574000 C 13:15:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.57 13:15:37 Integrated Voltage Measurement... 13:15:57 Voltage Offset Correction: v_off_ini = 0.000003659 V, v_off_fin = 0.000006095 V 13:15:57 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171025340 Vs 13:15:57 Integrated Voltage Measurement... 13:16:16 Voltage Offset Correction: v_off_ini = 0.000005601 V, v_off_fin = 0.000003338 V 13:16:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951624 Vs 13:16:19 Temperature Measurement, Probe Number = 0, T = 20.148000 C 13:16:20 Temperature Measurement, Probe Number = 1, T = 20.073000 C 13:16:21 Temperature Measurement, Probe Number = 2, T = 20.137000 C 13:16:21 Temperature Measurement, Probe Number = 3, T = 20.081000 C 13:16:22 Temperature Measurement, Probe Number = 4, T = 20.616000 C 13:16:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.62 13:16:22 Integrated Voltage Measurement... 13:16:41 Voltage Offset Correction: v_off_ini = 0.000004132 V, v_off_fin = 0.000006613 V 13:16:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171032429 Vs 13:16:42 Integrated Voltage Measurement... 13:17:01 Voltage Offset Correction: v_off_ini = 0.000005860 V, v_off_fin = 0.000002734 V 13:17:01 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170951743 Vs 13:17:04 Temperature Measurement, Probe Number = 0, T = 20.152000 C 13:17:05 Temperature Measurement, Probe Number = 1, T = 20.079000 C 13:17:05 Temperature Measurement, Probe Number = 2, T = 20.140000 C 13:17:06 Temperature Measurement, Probe Number = 3, T = 20.085000 C 13:17:07 Temperature Measurement, Probe Number = 4, T = 20.602000 C 13:17:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.60 13:17:07 Integrated Voltage Measurement... 13:17:26 Voltage Offset Correction: v_off_ini = 0.000003956 V, v_off_fin = 0.000006260 V 13:17:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025708 Vs 13:17:26 Integrated Voltage Measurement... 13:17:45 Voltage Offset Correction: v_off_ini = 0.000005830 V, v_off_fin = 0.000003283 V 13:17:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954244 Vs 13:17:48 Temperature Measurement, Probe Number = 0, T = 20.150000 C 13:17:49 Temperature Measurement, Probe Number = 1, T = 20.078000 C 13:17:50 Temperature Measurement, Probe Number = 2, T = 20.138000 C 13:17:50 Temperature Measurement, Probe Number = 3, T = 20.084000 C 13:17:51 Temperature Measurement, Probe Number = 4, T = 20.571000 C 13:17:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.57 13:17:51 Integrated Voltage Measurement... 13:18:10 Voltage Offset Correction: v_off_ini = 0.000003763 V, v_off_fin = 0.000005745 V 13:18:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171021340 Vs 13:18:11 Integrated Voltage Measurement... 13:18:30 Voltage Offset Correction: v_off_ini = 0.000005685 V, v_off_fin = 0.000002068 V 13:18:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956310 Vs 13:18:33 Temperature Measurement, Probe Number = 0, T = 20.150000 C 13:18:33 Temperature Measurement, Probe Number = 1, T = 20.075000 C 13:18:34 Temperature Measurement, Probe Number = 2, T = 20.137000 C 13:18:34 Temperature Measurement, Probe Number = 3, T = 20.082000 C 13:18:35 Temperature Measurement, Probe Number = 4, T = 20.519000 C 13:18:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.52 13:18:35 Integrated Voltage Measurement... 13:18:55 Voltage Offset Correction: v_off_ini = 0.000003219 V, v_off_fin = 0.000005463 V 13:18:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171021746 Vs 13:18:55 Integrated Voltage Measurement... 13:19:14 Voltage Offset Correction: v_off_ini = 0.000005347 V, v_off_fin = 0.000002889 V 13:19:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955471 Vs 13:49:17 Temperature Measurement, Probe Number = 0, T = 20.153000 C 13:49:18 Temperature Measurement, Probe Number = 1, T = 20.079000 C 13:49:19 Temperature Measurement, Probe Number = 2, T = 20.141000 C 13:49:19 Temperature Measurement, Probe Number = 3, T = 20.086000 C 13:49:20 Temperature Measurement, Probe Number = 4, T = 20.522000 C 13:49:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.52 13:49:20 Integrated Voltage Measurement... 13:49:39 Voltage Offset Correction: v_off_ini = 0.000005026 V, v_off_fin = 0.000007052 V 13:49:40 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171078968 Vs 13:49:40 Integrated Voltage Measurement... 13:49:59 Voltage Offset Correction: v_off_ini = 0.000005796 V, v_off_fin = 0.000002864 V 13:49:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952892 Vs 13:50:02 Temperature Measurement, Probe Number = 0, T = 20.158000 C 13:50:03 Temperature Measurement, Probe Number = 1, T = 20.083000 C 13:50:03 Temperature Measurement, Probe Number = 2, T = 20.145000 C 13:50:04 Temperature Measurement, Probe Number = 3, T = 20.090000 C 13:50:05 Temperature Measurement, Probe Number = 4, T = 20.557000 C 13:50:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.56 13:50:05 Integrated Voltage Measurement... 13:50:24 Voltage Offset Correction: v_off_ini = 0.000003709 V, v_off_fin = 0.000006032 V 13:50:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020992 Vs 13:50:25 Integrated Voltage Measurement... 13:50:44 Voltage Offset Correction: v_off_ini = 0.000005909 V, v_off_fin = 0.000003217 V 13:50:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170947633 Vs 13:50:46 Temperature Measurement, Probe Number = 0, T = 20.154000 C 13:50:47 Temperature Measurement, Probe Number = 1, T = 20.081000 C 13:50:48 Temperature Measurement, Probe Number = 2, T = 20.142000 C 13:50:48 Temperature Measurement, Probe Number = 3, T = 20.088000 C 13:50:49 Temperature Measurement, Probe Number = 4, T = 20.591000 C 13:50:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.59 13:50:49 Integrated Voltage Measurement... 13:51:09 Voltage Offset Correction: v_off_ini = 0.000004202 V, v_off_fin = 0.000006522 V 13:51:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025054 Vs 13:51:09 Integrated Voltage Measurement... 13:51:28 Voltage Offset Correction: v_off_ini = 0.000006188 V, v_off_fin = 0.000003558 V 13:51:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953934 Vs 13:51:31 Temperature Measurement, Probe Number = 0, T = 20.151000 C 13:51:32 Temperature Measurement, Probe Number = 1, T = 20.078000 C 13:51:32 Temperature Measurement, Probe Number = 2, T = 20.140000 C 13:51:33 Temperature Measurement, Probe Number = 3, T = 20.086000 C 13:51:34 Temperature Measurement, Probe Number = 4, T = 20.584000 C 13:51:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.58 13:51:34 Integrated Voltage Measurement... 13:51:53 Voltage Offset Correction: v_off_ini = 0.000004217 V, v_off_fin = 0.000006022 V 13:51:54 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171023154 Vs 13:51:54 Integrated Voltage Measurement... 13:52:13 Voltage Offset Correction: v_off_ini = 0.000005688 V, v_off_fin = 0.000002204 V 13:52:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951894 Vs 13:52:16 Temperature Measurement, Probe Number = 0, T = 20.152000 C 13:52:16 Temperature Measurement, Probe Number = 1, T = 20.079000 C 13:52:17 Temperature Measurement, Probe Number = 2, T = 20.139000 C 13:52:17 Temperature Measurement, Probe Number = 3, T = 20.085000 C 13:52:18 Temperature Measurement, Probe Number = 4, T = 20.597000 C 13:52:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.60 13:52:18 Integrated Voltage Measurement... 13:52:37 Voltage Offset Correction: v_off_ini = 0.000003377 V, v_off_fin = 0.000006936 V 13:52:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029344 Vs 13:52:38 Integrated Voltage Measurement... 13:52:57 Voltage Offset Correction: v_off_ini = 0.000006786 V, v_off_fin = 0.000003251 V 13:52:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170942444 Vs 13:53:00 Temperature Measurement, Probe Number = 0, T = 20.158000 C 13:53:00 Temperature Measurement, Probe Number = 1, T = 20.086000 C 13:53:01 Temperature Measurement, Probe Number = 2, T = 20.144000 C 13:53:02 Temperature Measurement, Probe Number = 3, T = 20.091000 C 13:53:02 Temperature Measurement, Probe Number = 4, T = 20.629000 C 13:53:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.63 13:53:02 Integrated Voltage Measurement... 13:53:22 Voltage Offset Correction: v_off_ini = 0.000004282 V, v_off_fin = 0.000006885 V 13:53:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033402 Vs 13:53:22 Integrated Voltage Measurement... 13:53:41 Voltage Offset Correction: v_off_ini = 0.000006488 V, v_off_fin = 0.000003967 V 13:53:42 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170946998 Vs 13:53:44 Temperature Measurement, Probe Number = 0, T = 20.164000 C 13:53:45 Temperature Measurement, Probe Number = 1, T = 20.091000 C 13:53:46 Temperature Measurement, Probe Number = 2, T = 20.149000 C 13:53:46 Temperature Measurement, Probe Number = 3, T = 20.095000 C 13:53:47 Temperature Measurement, Probe Number = 4, T = 20.662000 C 13:53:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.66 13:53:47 Integrated Voltage Measurement... 13:54:06 Voltage Offset Correction: v_off_ini = 0.000004815 V, v_off_fin = 0.000006916 V 13:54:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030586 Vs 13:54:06 Integrated Voltage Measurement... 13:54:25 Voltage Offset Correction: v_off_ini = 0.000006513 V, v_off_fin = 0.000003429 V 13:54:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170945607 Vs 13:54:28 Temperature Measurement, Probe Number = 0, T = 20.165000 C 13:54:29 Temperature Measurement, Probe Number = 1, T = 20.088000 C 13:54:30 Temperature Measurement, Probe Number = 2, T = 20.150000 C 13:54:30 Temperature Measurement, Probe Number = 3, T = 20.094000 C 13:54:31 Temperature Measurement, Probe Number = 4, T = 20.690000 C 13:54:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.69 13:54:31 Integrated Voltage Measurement... 13:54:51 Voltage Offset Correction: v_off_ini = 0.000003920 V, v_off_fin = 0.000006446 V 13:54:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025380 Vs 13:54:51 Integrated Voltage Measurement... 13:55:10 Voltage Offset Correction: v_off_ini = 0.000006382 V, v_off_fin = 0.000002885 V 13:55:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948017 Vs 13:55:13 Temperature Measurement, Probe Number = 0, T = 20.157000 C 13:55:14 Temperature Measurement, Probe Number = 1, T = 20.081000 C 13:55:14 Temperature Measurement, Probe Number = 2, T = 20.143000 C 13:55:15 Temperature Measurement, Probe Number = 3, T = 20.086000 C 13:55:16 Temperature Measurement, Probe Number = 4, T = 20.641000 C 13:55:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.64 13:55:16 Integrated Voltage Measurement... 13:55:36 Voltage Offset Correction: v_off_ini = 0.000003750 V, v_off_fin = 0.000006432 V 13:55:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024427 Vs 13:55:36 Integrated Voltage Measurement... 13:55:55 Voltage Offset Correction: v_off_ini = 0.000005978 V, v_off_fin = 0.000003234 V 13:55:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948874 Vs 13:55:58 Temperature Measurement, Probe Number = 0, T = 20.157000 C 13:55:59 Temperature Measurement, Probe Number = 1, T = 20.084000 C 13:55:59 Temperature Measurement, Probe Number = 2, T = 20.145000 C 13:56:00 Temperature Measurement, Probe Number = 3, T = 20.089000 C 13:56:01 Temperature Measurement, Probe Number = 4, T = 20.569000 C 13:56:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.57 13:56:01 Integrated Voltage Measurement... 13:56:20 Voltage Offset Correction: v_off_ini = 0.000003377 V, v_off_fin = 0.000006643 V 13:56:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171027923 Vs 13:56:20 Integrated Voltage Measurement... 13:56:40 Voltage Offset Correction: v_off_ini = 0.000006096 V, v_off_fin = 0.000002966 V 13:56:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954041 Vs 14:26:43 Temperature Measurement, Probe Number = 0, T = 20.160000 C 14:26:44 Temperature Measurement, Probe Number = 1, T = 20.086000 C 14:26:44 Temperature Measurement, Probe Number = 2, T = 20.146000 C 14:26:45 Temperature Measurement, Probe Number = 3, T = 20.090000 C 14:26:45 Temperature Measurement, Probe Number = 4, T = 20.251000 C 14:26:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.25 14:26:46 Integrated Voltage Measurement... 14:27:05 Voltage Offset Correction: v_off_ini = 0.000005366 V, v_off_fin = 0.000006967 V 14:27:05 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171080033 Vs 14:27:05 Integrated Voltage Measurement... 14:27:25 Voltage Offset Correction: v_off_ini = 0.000006462 V, v_off_fin = 0.000003055 V 14:27:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954852 Vs 14:27:28 Temperature Measurement, Probe Number = 0, T = 20.164000 C 14:27:28 Temperature Measurement, Probe Number = 1, T = 20.092000 C 14:27:29 Temperature Measurement, Probe Number = 2, T = 20.149000 C 14:27:29 Temperature Measurement, Probe Number = 3, T = 20.092000 C 14:27:30 Temperature Measurement, Probe Number = 4, T = 20.204000 C 14:27:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.20 14:27:30 Integrated Voltage Measurement... 14:27:50 Voltage Offset Correction: v_off_ini = 0.000004209 V, v_off_fin = 0.000006379 V 14:27:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028289 Vs 14:27:50 Integrated Voltage Measurement... 14:28:09 Voltage Offset Correction: v_off_ini = 0.000006057 V, v_off_fin = 0.000002835 V 14:28:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948294 Vs 14:28:12 Temperature Measurement, Probe Number = 0, T = 20.165000 C 14:28:13 Temperature Measurement, Probe Number = 1, T = 20.092000 C 14:28:13 Temperature Measurement, Probe Number = 2, T = 20.148000 C 14:28:14 Temperature Measurement, Probe Number = 3, T = 20.093000 C 14:28:15 Temperature Measurement, Probe Number = 4, T = 20.252000 C 14:28:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.25 14:28:15 Integrated Voltage Measurement... 14:28:34 Voltage Offset Correction: v_off_ini = 0.000004486 V, v_off_fin = 0.000006277 V 14:28:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028861 Vs 14:28:34 Integrated Voltage Measurement... 14:28:53 Voltage Offset Correction: v_off_ini = 0.000006082 V, v_off_fin = 0.000002677 V 14:28:54 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170948989 Vs 14:28:56 Temperature Measurement, Probe Number = 0, T = 20.166000 C 14:28:57 Temperature Measurement, Probe Number = 1, T = 20.095000 C 14:28:58 Temperature Measurement, Probe Number = 2, T = 20.150000 C 14:28:58 Temperature Measurement, Probe Number = 3, T = 20.095000 C 14:28:59 Temperature Measurement, Probe Number = 4, T = 20.326000 C 14:28:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.33 14:28:59 Integrated Voltage Measurement... 14:29:18 Voltage Offset Correction: v_off_ini = 0.000004290 V, v_off_fin = 0.000006399 V 14:29:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030514 Vs 14:29:19 Integrated Voltage Measurement... 14:29:38 Voltage Offset Correction: v_off_ini = 0.000005835 V, v_off_fin = 0.000002470 V 14:29:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953800 Vs 14:29:41 Temperature Measurement, Probe Number = 0, T = 20.170000 C 14:29:41 Temperature Measurement, Probe Number = 1, T = 20.097000 C 14:29:42 Temperature Measurement, Probe Number = 2, T = 20.153000 C 14:29:43 Temperature Measurement, Probe Number = 3, T = 20.097000 C 14:29:43 Temperature Measurement, Probe Number = 4, T = 20.411000 C 14:29:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 14:29:43 Integrated Voltage Measurement... 14:30:03 Voltage Offset Correction: v_off_ini = 0.000003380 V, v_off_fin = 0.000006298 V 14:30:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029238 Vs 14:30:03 Integrated Voltage Measurement... 14:30:22 Voltage Offset Correction: v_off_ini = 0.000006234 V, v_off_fin = 0.000002881 V 14:30:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949465 Vs 14:30:25 Temperature Measurement, Probe Number = 0, T = 20.169000 C 14:30:26 Temperature Measurement, Probe Number = 1, T = 20.095000 C 14:30:26 Temperature Measurement, Probe Number = 2, T = 20.153000 C 14:30:27 Temperature Measurement, Probe Number = 3, T = 20.097000 C 14:30:28 Temperature Measurement, Probe Number = 4, T = 20.474000 C 14:30:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.47 14:30:28 Integrated Voltage Measurement... 14:30:47 Voltage Offset Correction: v_off_ini = 0.000003763 V, v_off_fin = 0.000006505 V 14:30:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171027233 Vs 14:30:48 Integrated Voltage Measurement... 14:31:07 Voltage Offset Correction: v_off_ini = 0.000005985 V, v_off_fin = 0.000002840 V 14:31:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952816 Vs 14:31:09 Temperature Measurement, Probe Number = 0, T = 20.168000 C 14:31:10 Temperature Measurement, Probe Number = 1, T = 20.093000 C 14:31:11 Temperature Measurement, Probe Number = 2, T = 20.152000 C 14:31:11 Temperature Measurement, Probe Number = 3, T = 20.097000 C 14:31:12 Temperature Measurement, Probe Number = 4, T = 20.463000 C 14:31:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.46 14:31:12 Integrated Voltage Measurement... 14:31:31 Voltage Offset Correction: v_off_ini = 0.000004422 V, v_off_fin = 0.000006932 V 14:31:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171033711 Vs 14:31:32 Integrated Voltage Measurement... 14:31:51 Voltage Offset Correction: v_off_ini = 0.000006705 V, v_off_fin = 0.000003382 V 14:31:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951064 Vs 14:31:54 Temperature Measurement, Probe Number = 0, T = 20.166000 C 14:31:55 Temperature Measurement, Probe Number = 1, T = 20.093000 C 14:31:55 Temperature Measurement, Probe Number = 2, T = 20.150000 C 14:31:56 Temperature Measurement, Probe Number = 3, T = 20.096000 C 14:31:57 Temperature Measurement, Probe Number = 4, T = 20.527000 C 14:31:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.53 14:31:57 Integrated Voltage Measurement... 14:32:16 Voltage Offset Correction: v_off_ini = 0.000004241 V, v_off_fin = 0.000006726 V 14:32:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171033651 Vs 14:32:17 Integrated Voltage Measurement... 14:32:36 Voltage Offset Correction: v_off_ini = 0.000006296 V, v_off_fin = 0.000003506 V 14:32:37 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170947979 Vs 14:32:39 Temperature Measurement, Probe Number = 0, T = 20.166000 C 14:32:40 Temperature Measurement, Probe Number = 1, T = 20.094000 C 14:32:41 Temperature Measurement, Probe Number = 2, T = 20.150000 C 14:32:41 Temperature Measurement, Probe Number = 3, T = 20.095000 C 14:32:42 Temperature Measurement, Probe Number = 4, T = 20.551000 C 14:32:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.55 14:32:42 Integrated Voltage Measurement... 14:33:01 Voltage Offset Correction: v_off_ini = 0.000004493 V, v_off_fin = 0.000006596 V 14:33:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025646 Vs 14:33:02 Integrated Voltage Measurement... 14:33:21 Voltage Offset Correction: v_off_ini = 0.000006265 V, v_off_fin = 0.000002872 V 14:33:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950979 Vs 14:33:24 Temperature Measurement, Probe Number = 0, T = 20.166000 C 14:33:25 Temperature Measurement, Probe Number = 1, T = 20.091000 C 14:33:25 Temperature Measurement, Probe Number = 2, T = 20.151000 C 14:33:26 Temperature Measurement, Probe Number = 3, T = 20.097000 C 14:33:27 Temperature Measurement, Probe Number = 4, T = 20.432000 C 14:33:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.43 14:33:27 Integrated Voltage Measurement... 14:33:47 Voltage Offset Correction: v_off_ini = 0.000004520 V, v_off_fin = 0.000007090 V 14:33:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034601 Vs 14:33:47 Integrated Voltage Measurement... 14:34:06 Voltage Offset Correction: v_off_ini = 0.000006367 V, v_off_fin = 0.000003160 V 14:34:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170947185 Vs 15:04:09 Temperature Measurement, Probe Number = 0, T = 20.165000 C 15:04:10 Temperature Measurement, Probe Number = 1, T = 20.094000 C 15:04:11 Temperature Measurement, Probe Number = 2, T = 20.151000 C 15:04:11 Temperature Measurement, Probe Number = 3, T = 20.099000 C 15:04:12 Temperature Measurement, Probe Number = 4, T = 20.312000 C 15:04:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.31 15:04:12 Integrated Voltage Measurement... 15:04:31 Voltage Offset Correction: v_off_ini = 0.000004406 V, v_off_fin = 0.000006359 V 15:04:32 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171077032 Vs 15:04:32 Integrated Voltage Measurement... 15:04:51 Voltage Offset Correction: v_off_ini = 0.000005870 V, v_off_fin = 0.000002734 V 15:04:51 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170949198 Vs 15:04:54 Temperature Measurement, Probe Number = 0, T = 20.172000 C 15:04:55 Temperature Measurement, Probe Number = 1, T = 20.100000 C 15:04:55 Temperature Measurement, Probe Number = 2, T = 20.157000 C 15:04:56 Temperature Measurement, Probe Number = 3, T = 20.106000 C 15:04:57 Temperature Measurement, Probe Number = 4, T = 20.460000 C 15:04:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.46 15:04:57 Integrated Voltage Measurement... 15:05:16 Voltage Offset Correction: v_off_ini = 0.000004129 V, v_off_fin = 0.000006966 V 15:05:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025337 Vs 15:05:17 Integrated Voltage Measurement... 15:05:36 Voltage Offset Correction: v_off_ini = 0.000006502 V, v_off_fin = 0.000002191 V 15:05:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170945171 Vs 15:05:39 Temperature Measurement, Probe Number = 0, T = 20.171000 C 15:05:40 Temperature Measurement, Probe Number = 1, T = 20.099000 C 15:05:40 Temperature Measurement, Probe Number = 2, T = 20.158000 C 15:05:41 Temperature Measurement, Probe Number = 3, T = 20.103000 C 15:05:42 Temperature Measurement, Probe Number = 4, T = 20.534000 C 15:05:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.53 15:05:42 Integrated Voltage Measurement... 15:06:01 Voltage Offset Correction: v_off_ini = 0.000004397 V, v_off_fin = 0.000006396 V 15:06:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030654 Vs 15:06:02 Integrated Voltage Measurement... 15:06:21 Voltage Offset Correction: v_off_ini = 0.000006061 V, v_off_fin = 0.000002925 V 15:06:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170946847 Vs 15:06:23 Temperature Measurement, Probe Number = 0, T = 20.167000 C 15:06:24 Temperature Measurement, Probe Number = 1, T = 20.098000 C 15:06:25 Temperature Measurement, Probe Number = 2, T = 20.153000 C 15:06:25 Temperature Measurement, Probe Number = 3, T = 20.101000 C 15:06:26 Temperature Measurement, Probe Number = 4, T = 20.552000 C 15:06:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.55 15:06:26 Integrated Voltage Measurement... 15:06:45 Voltage Offset Correction: v_off_ini = 0.000004112 V, v_off_fin = 0.000007072 V 15:06:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171031329 Vs 15:06:46 Integrated Voltage Measurement... 15:07:05 Voltage Offset Correction: v_off_ini = 0.000006711 V, v_off_fin = 0.000002969 V 15:07:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948636 Vs 15:07:08 Temperature Measurement, Probe Number = 0, T = 20.170000 C 15:07:08 Temperature Measurement, Probe Number = 1, T = 20.099000 C 15:07:09 Temperature Measurement, Probe Number = 2, T = 20.155000 C 15:07:10 Temperature Measurement, Probe Number = 3, T = 20.102000 C 15:07:10 Temperature Measurement, Probe Number = 4, T = 20.551000 C 15:07:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.55 15:07:11 Integrated Voltage Measurement... 15:07:30 Voltage Offset Correction: v_off_ini = 0.000003720 V, v_off_fin = 0.000006430 V 15:07:30 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171029468 Vs 15:07:30 Integrated Voltage Measurement... 15:07:49 Voltage Offset Correction: v_off_ini = 0.000005913 V, v_off_fin = 0.000002378 V 15:07:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949797 Vs 15:07:52 Temperature Measurement, Probe Number = 0, T = 20.172000 C 15:07:53 Temperature Measurement, Probe Number = 1, T = 20.101000 C 15:07:54 Temperature Measurement, Probe Number = 2, T = 20.158000 C 15:07:54 Temperature Measurement, Probe Number = 3, T = 20.105000 C 15:07:55 Temperature Measurement, Probe Number = 4, T = 20.609000 C 15:07:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.61 15:07:55 Integrated Voltage Measurement... 15:08:15 Voltage Offset Correction: v_off_ini = 0.000003766 V, v_off_fin = 0.000006559 V 15:08:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171023857 Vs 15:08:15 Integrated Voltage Measurement... 15:08:34 Voltage Offset Correction: v_off_ini = 0.000005518 V, v_off_fin = 0.000002164 V 15:08:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953792 Vs 15:08:37 Temperature Measurement, Probe Number = 0, T = 20.176000 C 15:08:37 Temperature Measurement, Probe Number = 1, T = 20.103000 C 15:08:38 Temperature Measurement, Probe Number = 2, T = 20.162000 C 15:08:39 Temperature Measurement, Probe Number = 3, T = 20.108000 C 15:08:39 Temperature Measurement, Probe Number = 4, T = 20.623000 C 15:08:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.62 15:08:39 Integrated Voltage Measurement... 15:08:59 Voltage Offset Correction: v_off_ini = 0.000003809 V, v_off_fin = 0.000006520 V 15:08:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171030522 Vs 15:08:59 Integrated Voltage Measurement... 15:09:18 Voltage Offset Correction: v_off_ini = 0.000005782 V, v_off_fin = 0.000002485 V 15:09:18 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170952489 Vs 15:09:21 Temperature Measurement, Probe Number = 0, T = 20.176000 C 15:09:21 Temperature Measurement, Probe Number = 1, T = 20.100000 C 15:09:22 Temperature Measurement, Probe Number = 2, T = 20.160000 C 15:09:23 Temperature Measurement, Probe Number = 3, T = 20.105000 C 15:09:23 Temperature Measurement, Probe Number = 4, T = 20.674000 C 15:09:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.67 15:09:24 Integrated Voltage Measurement... 15:09:43 Voltage Offset Correction: v_off_ini = 0.000003774 V, v_off_fin = 0.000006329 V 15:09:43 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171029235 Vs 15:09:43 Integrated Voltage Measurement... 15:10:02 Voltage Offset Correction: v_off_ini = 0.000006057 V, v_off_fin = 0.000002471 V 15:10:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949007 Vs 15:10:05 Temperature Measurement, Probe Number = 0, T = 20.173000 C 15:10:06 Temperature Measurement, Probe Number = 1, T = 20.100000 C 15:10:06 Temperature Measurement, Probe Number = 2, T = 20.157000 C 15:10:07 Temperature Measurement, Probe Number = 3, T = 20.102000 C 15:10:08 Temperature Measurement, Probe Number = 4, T = 20.698000 C 15:10:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.70 15:10:08 Integrated Voltage Measurement... 15:10:27 Voltage Offset Correction: v_off_ini = 0.000003552 V, v_off_fin = 0.000007216 V 15:10:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171034191 Vs 15:10:27 Integrated Voltage Measurement... 15:10:47 Voltage Offset Correction: v_off_ini = 0.000006221 V, v_off_fin = 0.000003563 V 15:10:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170945049 Vs 15:10:50 Temperature Measurement, Probe Number = 0, T = 20.168000 C 15:10:50 Temperature Measurement, Probe Number = 1, T = 20.095000 C 15:10:51 Temperature Measurement, Probe Number = 2, T = 20.155000 C 15:10:51 Temperature Measurement, Probe Number = 3, T = 20.099000 C 15:10:52 Temperature Measurement, Probe Number = 4, T = 20.596000 C 15:10:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.60 15:10:52 Integrated Voltage Measurement... 15:11:12 Voltage Offset Correction: v_off_ini = 0.000004332 V, v_off_fin = 0.000006681 V 15:11:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029986 Vs 15:11:12 Integrated Voltage Measurement... 15:11:31 Voltage Offset Correction: v_off_ini = 0.000005960 V, v_off_fin = 0.000002377 V 15:11:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951447 Vs 15:41:34 Temperature Measurement, Probe Number = 0, T = 20.167000 C 15:41:35 Temperature Measurement, Probe Number = 1, T = 20.091000 C 15:41:36 Temperature Measurement, Probe Number = 2, T = 20.154000 C 15:41:36 Temperature Measurement, Probe Number = 3, T = 20.098000 C 15:41:37 Temperature Measurement, Probe Number = 4, T = 20.370000 C 15:41:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.37 15:41:37 Integrated Voltage Measurement... 15:41:56 Voltage Offset Correction: v_off_ini = 0.000006037 V, v_off_fin = 0.000007152 V 15:41:57 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171091276 Vs 15:41:57 Integrated Voltage Measurement... 15:42:16 Voltage Offset Correction: v_off_ini = 0.000006435 V, v_off_fin = 0.000003105 V 15:42:16 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170951031 Vs 15:42:19 Temperature Measurement, Probe Number = 0, T = 20.169000 C 15:42:19 Temperature Measurement, Probe Number = 1, T = 20.092000 C 15:42:20 Temperature Measurement, Probe Number = 2, T = 20.153000 C 15:42:21 Temperature Measurement, Probe Number = 3, T = 20.095000 C 15:42:21 Temperature Measurement, Probe Number = 4, T = 20.284000 C 15:42:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.28 15:42:21 Integrated Voltage Measurement... 15:42:41 Voltage Offset Correction: v_off_ini = 0.000004334 V, v_off_fin = 0.000007195 V 15:42:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171028256 Vs 15:42:41 Integrated Voltage Measurement... 15:43:00 Voltage Offset Correction: v_off_ini = 0.000006484 V, v_off_fin = 0.000003163 V 15:43:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170945158 Vs 15:43:03 Temperature Measurement, Probe Number = 0, T = 20.171000 C 15:43:03 Temperature Measurement, Probe Number = 1, T = 20.094000 C 15:43:04 Temperature Measurement, Probe Number = 2, T = 20.153000 C 15:43:05 Temperature Measurement, Probe Number = 3, T = 20.096000 C 15:43:05 Temperature Measurement, Probe Number = 4, T = 20.230000 C 15:43:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.23 15:43:06 Integrated Voltage Measurement... 15:43:25 Voltage Offset Correction: v_off_ini = 0.000004345 V, v_off_fin = 0.000007425 V 15:43:25 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171036873 Vs 15:43:25 Integrated Voltage Measurement... 15:43:44 Voltage Offset Correction: v_off_ini = 0.000006736 V, v_off_fin = 0.000002989 V 15:43:44 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170946800 Vs 15:43:47 Temperature Measurement, Probe Number = 0, T = 20.170000 C 15:43:47 Temperature Measurement, Probe Number = 1, T = 20.092000 C 15:43:48 Temperature Measurement, Probe Number = 2, T = 20.154000 C 15:43:49 Temperature Measurement, Probe Number = 3, T = 20.097000 C 15:43:49 Temperature Measurement, Probe Number = 4, T = 20.181000 C 15:43:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.18 15:43:50 Integrated Voltage Measurement... 15:44:09 Voltage Offset Correction: v_off_ini = 0.000004359 V, v_off_fin = 0.000007077 V 15:44:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171038814 Vs 15:44:09 Integrated Voltage Measurement... 15:44:28 Voltage Offset Correction: v_off_ini = 0.000006480 V, v_off_fin = 0.000003046 V 15:44:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170947765 Vs 15:44:31 Temperature Measurement, Probe Number = 0, T = 20.173000 C 15:44:32 Temperature Measurement, Probe Number = 1, T = 20.093000 C 15:44:32 Temperature Measurement, Probe Number = 2, T = 20.158000 C 15:44:33 Temperature Measurement, Probe Number = 3, T = 20.102000 C 15:44:34 Temperature Measurement, Probe Number = 4, T = 20.324000 C 15:44:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.32 15:44:34 Integrated Voltage Measurement... 15:44:53 Voltage Offset Correction: v_off_ini = 0.000004012 V, v_off_fin = 0.000006862 V 15:44:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171038598 Vs 15:44:53 Integrated Voltage Measurement... 15:45:13 Voltage Offset Correction: v_off_ini = 0.000006541 V, v_off_fin = 0.000003139 V 15:45:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956700 Vs 15:45:16 Temperature Measurement, Probe Number = 0, T = 20.170000 C 15:45:16 Temperature Measurement, Probe Number = 1, T = 20.095000 C 15:45:17 Temperature Measurement, Probe Number = 2, T = 20.155000 C 15:45:18 Temperature Measurement, Probe Number = 3, T = 20.099000 C 15:45:18 Temperature Measurement, Probe Number = 4, T = 20.320000 C 15:45:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.32 15:45:18 Integrated Voltage Measurement... 15:45:38 Voltage Offset Correction: v_off_ini = 0.000004682 V, v_off_fin = 0.000006918 V 15:45:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171032173 Vs 15:45:38 Integrated Voltage Measurement... 15:45:58 Voltage Offset Correction: v_off_ini = 0.000006263 V, v_off_fin = 0.000003239 V 15:45:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950339 Vs 15:46:01 Temperature Measurement, Probe Number = 0, T = 20.170000 C 15:46:01 Temperature Measurement, Probe Number = 1, T = 20.097000 C 15:46:02 Temperature Measurement, Probe Number = 2, T = 20.154000 C 15:46:03 Temperature Measurement, Probe Number = 3, T = 20.099000 C 15:46:03 Temperature Measurement, Probe Number = 4, T = 20.327000 C 15:46:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.33 15:46:03 Integrated Voltage Measurement... 15:46:22 Voltage Offset Correction: v_off_ini = 0.000003579 V, v_off_fin = 0.000007356 V 15:46:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171034896 Vs 15:46:23 Integrated Voltage Measurement... 15:46:42 Voltage Offset Correction: v_off_ini = 0.000006562 V, v_off_fin = 0.000002928 V 15:46:42 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170951048 Vs 15:46:45 Temperature Measurement, Probe Number = 0, T = 20.171000 C 15:46:45 Temperature Measurement, Probe Number = 1, T = 20.097000 C 15:46:46 Temperature Measurement, Probe Number = 2, T = 20.153000 C 15:46:47 Temperature Measurement, Probe Number = 3, T = 20.099000 C 15:46:47 Temperature Measurement, Probe Number = 4, T = 20.326000 C 15:46:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.33 15:46:48 Integrated Voltage Measurement... 15:47:07 Voltage Offset Correction: v_off_ini = 0.000004311 V, v_off_fin = 0.000006533 V 15:47:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034679 Vs 15:47:07 Integrated Voltage Measurement... 15:47:26 Voltage Offset Correction: v_off_ini = 0.000006504 V, v_off_fin = 0.000002756 V 15:47:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954260 Vs 15:47:29 Temperature Measurement, Probe Number = 0, T = 20.168000 C 15:47:30 Temperature Measurement, Probe Number = 1, T = 20.095000 C 15:47:31 Temperature Measurement, Probe Number = 2, T = 20.152000 C 15:47:31 Temperature Measurement, Probe Number = 3, T = 20.097000 C 15:47:32 Temperature Measurement, Probe Number = 4, T = 20.329000 C 15:47:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.33 15:47:32 Integrated Voltage Measurement... 15:47:51 Voltage Offset Correction: v_off_ini = 0.000004241 V, v_off_fin = 0.000006553 V 15:47:52 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171039450 Vs 15:47:52 Integrated Voltage Measurement... 15:48:11 Voltage Offset Correction: v_off_ini = 0.000006143 V, v_off_fin = 0.000002695 V 15:48:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957339 Vs 15:48:14 Temperature Measurement, Probe Number = 0, T = 20.167000 C 15:48:15 Temperature Measurement, Probe Number = 1, T = 20.092000 C 15:48:15 Temperature Measurement, Probe Number = 2, T = 20.154000 C 15:48:16 Temperature Measurement, Probe Number = 3, T = 20.097000 C 15:48:17 Temperature Measurement, Probe Number = 4, T = 20.262000 C 15:48:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.26 15:48:17 Integrated Voltage Measurement... 15:48:36 Voltage Offset Correction: v_off_ini = 0.000004422 V, v_off_fin = 0.000006632 V 15:48:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041113 Vs 15:48:37 Integrated Voltage Measurement... 15:48:56 Voltage Offset Correction: v_off_ini = 0.000006570 V, v_off_fin = 0.000003179 V 15:48:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948276 Vs 16:18:59 Temperature Measurement, Probe Number = 0, T = 20.172000 C 16:18:59 Temperature Measurement, Probe Number = 1, T = 20.099000 C 16:19:00 Temperature Measurement, Probe Number = 2, T = 20.157000 C 16:19:01 Temperature Measurement, Probe Number = 3, T = 20.102000 C 16:19:01 Temperature Measurement, Probe Number = 4, T = 20.361000 C 16:19:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.36 16:19:02 Integrated Voltage Measurement... 16:19:21 Voltage Offset Correction: v_off_ini = 0.000004508 V, v_off_fin = 0.000006273 V 16:19:21 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171085142 Vs 16:19:21 Integrated Voltage Measurement... 16:19:40 Voltage Offset Correction: v_off_ini = 0.000006005 V, v_off_fin = 0.000002788 V 16:19:40 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170958270 Vs 16:19:43 Temperature Measurement, Probe Number = 0, T = 20.172000 C 16:19:44 Temperature Measurement, Probe Number = 1, T = 20.096000 C 16:19:44 Temperature Measurement, Probe Number = 2, T = 20.157000 C 16:19:45 Temperature Measurement, Probe Number = 3, T = 20.101000 C 16:19:46 Temperature Measurement, Probe Number = 4, T = 20.423000 C 16:19:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.42 16:19:46 Integrated Voltage Measurement... 16:20:05 Voltage Offset Correction: v_off_ini = 0.000004074 V, v_off_fin = 0.000006584 V 16:20:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171037157 Vs 16:20:05 Integrated Voltage Measurement... 16:20:24 Voltage Offset Correction: v_off_ini = 0.000005797 V, v_off_fin = 0.000002819 V 16:20:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952159 Vs 16:20:27 Temperature Measurement, Probe Number = 0, T = 20.174000 C 16:20:28 Temperature Measurement, Probe Number = 1, T = 20.096000 C 16:20:28 Temperature Measurement, Probe Number = 2, T = 20.158000 C 16:20:29 Temperature Measurement, Probe Number = 3, T = 20.102000 C 16:20:30 Temperature Measurement, Probe Number = 4, T = 20.404000 C 16:20:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.40 16:20:30 Integrated Voltage Measurement... 16:20:49 Voltage Offset Correction: v_off_ini = 0.000004163 V, v_off_fin = 0.000006587 V 16:20:49 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171036541 Vs 16:20:49 Integrated Voltage Measurement... 16:21:08 Voltage Offset Correction: v_off_ini = 0.000005859 V, v_off_fin = 0.000002726 V 16:21:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952582 Vs 16:21:11 Temperature Measurement, Probe Number = 0, T = 20.176000 C 16:21:12 Temperature Measurement, Probe Number = 1, T = 20.099000 C 16:21:13 Temperature Measurement, Probe Number = 2, T = 20.161000 C 16:21:13 Temperature Measurement, Probe Number = 3, T = 20.104000 C 16:21:14 Temperature Measurement, Probe Number = 4, T = 20.414000 C 16:21:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 16:21:14 Integrated Voltage Measurement... 16:21:33 Voltage Offset Correction: v_off_ini = 0.000004272 V, v_off_fin = 0.000006125 V 16:21:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171029968 Vs 16:21:33 Integrated Voltage Measurement... 16:21:52 Voltage Offset Correction: v_off_ini = 0.000005699 V, v_off_fin = 0.000002544 V 16:21:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957218 Vs 16:21:55 Temperature Measurement, Probe Number = 0, T = 20.175000 C 16:21:56 Temperature Measurement, Probe Number = 1, T = 20.097000 C 16:21:57 Temperature Measurement, Probe Number = 2, T = 20.158000 C 16:21:57 Temperature Measurement, Probe Number = 3, T = 20.101000 C 16:21:58 Temperature Measurement, Probe Number = 4, T = 20.324000 C 16:21:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.32 16:21:58 Integrated Voltage Measurement... 16:22:18 Voltage Offset Correction: v_off_ini = 0.000003365 V, v_off_fin = 0.000006604 V 16:22:18 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171031377 Vs 16:22:18 Integrated Voltage Measurement... 16:22:37 Voltage Offset Correction: v_off_ini = 0.000006268 V, v_off_fin = 0.000003493 V 16:22:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952515 Vs 16:22:40 Temperature Measurement, Probe Number = 0, T = 20.174000 C 16:22:41 Temperature Measurement, Probe Number = 1, T = 20.096000 C 16:22:41 Temperature Measurement, Probe Number = 2, T = 20.158000 C 16:22:42 Temperature Measurement, Probe Number = 3, T = 20.099000 C 16:22:43 Temperature Measurement, Probe Number = 4, T = 20.340000 C 16:22:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.34 16:22:43 Integrated Voltage Measurement... 16:23:02 Voltage Offset Correction: v_off_ini = 0.000004031 V, v_off_fin = 0.000006391 V 16:23:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030905 Vs 16:23:03 Integrated Voltage Measurement... 16:23:22 Voltage Offset Correction: v_off_ini = 0.000005206 V, v_off_fin = 0.000002897 V 16:23:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956705 Vs 16:23:24 Temperature Measurement, Probe Number = 0, T = 20.178000 C 16:23:25 Temperature Measurement, Probe Number = 1, T = 20.102000 C 16:23:26 Temperature Measurement, Probe Number = 2, T = 20.162000 C 16:23:26 Temperature Measurement, Probe Number = 3, T = 20.103000 C 16:23:27 Temperature Measurement, Probe Number = 4, T = 20.301000 C 16:23:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.30 16:23:27 Integrated Voltage Measurement... 16:23:46 Voltage Offset Correction: v_off_ini = 0.000004361 V, v_off_fin = 0.000006619 V 16:23:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036008 Vs 16:23:47 Integrated Voltage Measurement... 16:24:06 Voltage Offset Correction: v_off_ini = 0.000006081 V, v_off_fin = 0.000002928 V 16:24:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953981 Vs 16:24:09 Temperature Measurement, Probe Number = 0, T = 20.181000 C 16:24:09 Temperature Measurement, Probe Number = 1, T = 20.105000 C 16:24:10 Temperature Measurement, Probe Number = 2, T = 20.166000 C 16:24:10 Temperature Measurement, Probe Number = 3, T = 20.109000 C 16:24:11 Temperature Measurement, Probe Number = 4, T = 20.320000 C 16:24:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.32 16:24:11 Integrated Voltage Measurement... 16:24:31 Voltage Offset Correction: v_off_ini = 0.000004233 V, v_off_fin = 0.000006206 V 16:24:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033554 Vs 16:24:31 Integrated Voltage Measurement... 16:24:50 Voltage Offset Correction: v_off_ini = 0.000006285 V, v_off_fin = 0.000003463 V 16:24:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957272 Vs 16:24:53 Temperature Measurement, Probe Number = 0, T = 20.175000 C 16:24:54 Temperature Measurement, Probe Number = 1, T = 20.100000 C 16:24:55 Temperature Measurement, Probe Number = 2, T = 20.159000 C 16:24:55 Temperature Measurement, Probe Number = 3, T = 20.103000 C 16:24:56 Temperature Measurement, Probe Number = 4, T = 20.316000 C 16:24:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.32 16:24:56 Integrated Voltage Measurement... 16:25:15 Voltage Offset Correction: v_off_ini = 0.000004059 V, v_off_fin = 0.000006785 V 16:25:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036078 Vs 16:25:16 Integrated Voltage Measurement... 16:25:35 Voltage Offset Correction: v_off_ini = 0.000006337 V, v_off_fin = 0.000002829 V 16:25:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955471 Vs 16:25:38 Temperature Measurement, Probe Number = 0, T = 20.176000 C 16:25:38 Temperature Measurement, Probe Number = 1, T = 20.099000 C 16:25:39 Temperature Measurement, Probe Number = 2, T = 20.160000 C 16:25:40 Temperature Measurement, Probe Number = 3, T = 20.102000 C 16:25:40 Temperature Measurement, Probe Number = 4, T = 20.295000 C 16:25:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.30 16:25:40 Integrated Voltage Measurement... 16:26:00 Voltage Offset Correction: v_off_ini = 0.000003656 V, v_off_fin = 0.000006721 V 16:26:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034692 Vs 16:26:00 Integrated Voltage Measurement... 16:26:19 Voltage Offset Correction: v_off_ini = 0.000006623 V, v_off_fin = 0.000003003 V 16:26:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950858 Vs 16:56:22 Temperature Measurement, Probe Number = 0, T = 20.173000 C 16:56:23 Temperature Measurement, Probe Number = 1, T = 20.096000 C 16:56:23 Temperature Measurement, Probe Number = 2, T = 20.160000 C 16:56:24 Temperature Measurement, Probe Number = 3, T = 20.102000 C 16:56:25 Temperature Measurement, Probe Number = 4, T = 20.272000 C 16:56:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.27 16:56:25 Integrated Voltage Measurement... 16:56:45 Voltage Offset Correction: v_off_ini = 0.000005397 V, v_off_fin = 0.000006874 V 16:56:45 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171089315 Vs 16:56:45 Integrated Voltage Measurement... 16:57:04 Voltage Offset Correction: v_off_ini = 0.000006426 V, v_off_fin = 0.000003598 V 16:57:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950636 Vs 16:57:07 Temperature Measurement, Probe Number = 0, T = 20.179000 C 16:57:08 Temperature Measurement, Probe Number = 1, T = 20.106000 C 16:57:09 Temperature Measurement, Probe Number = 2, T = 20.162000 C 16:57:09 Temperature Measurement, Probe Number = 3, T = 20.107000 C 16:57:10 Temperature Measurement, Probe Number = 4, T = 20.277000 C 16:57:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.28 16:57:10 Integrated Voltage Measurement... 16:57:30 Voltage Offset Correction: v_off_ini = 0.000004605 V, v_off_fin = 0.000006780 V 16:57:30 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171036194 Vs 16:57:30 Integrated Voltage Measurement... 16:57:49 Voltage Offset Correction: v_off_ini = 0.000006416 V, v_off_fin = 0.000002867 V 16:57:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951682 Vs 16:57:52 Temperature Measurement, Probe Number = 0, T = 20.179000 C 16:57:52 Temperature Measurement, Probe Number = 1, T = 20.105000 C 16:57:53 Temperature Measurement, Probe Number = 2, T = 20.163000 C 16:57:54 Temperature Measurement, Probe Number = 3, T = 20.106000 C 16:57:54 Temperature Measurement, Probe Number = 4, T = 20.334000 C 16:57:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.33 16:57:54 Integrated Voltage Measurement... 16:58:14 Voltage Offset Correction: v_off_ini = 0.000004000 V, v_off_fin = 0.000006771 V 16:58:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031832 Vs 16:58:14 Integrated Voltage Measurement... 16:58:33 Voltage Offset Correction: v_off_ini = 0.000006211 V, v_off_fin = 0.000003099 V 16:58:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954474 Vs 16:58:36 Temperature Measurement, Probe Number = 0, T = 20.182000 C 16:58:36 Temperature Measurement, Probe Number = 1, T = 20.107000 C 16:58:37 Temperature Measurement, Probe Number = 2, T = 20.167000 C 16:58:38 Temperature Measurement, Probe Number = 3, T = 20.109000 C 16:58:38 Temperature Measurement, Probe Number = 4, T = 20.389000 C 16:58:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.39 16:58:39 Integrated Voltage Measurement... 16:58:58 Voltage Offset Correction: v_off_ini = 0.000004028 V, v_off_fin = 0.000006780 V 16:58:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033387 Vs 16:58:58 Integrated Voltage Measurement... 16:59:17 Voltage Offset Correction: v_off_ini = 0.000006034 V, v_off_fin = 0.000002666 V 16:59:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955389 Vs 16:59:20 Temperature Measurement, Probe Number = 0, T = 20.182000 C 16:59:21 Temperature Measurement, Probe Number = 1, T = 20.107000 C 16:59:21 Temperature Measurement, Probe Number = 2, T = 20.167000 C 16:59:22 Temperature Measurement, Probe Number = 3, T = 20.108000 C 16:59:23 Temperature Measurement, Probe Number = 4, T = 20.375000 C 16:59:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.38 16:59:23 Integrated Voltage Measurement... 16:59:43 Voltage Offset Correction: v_off_ini = 0.000004167 V, v_off_fin = 0.000006601 V 16:59:43 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171041294 Vs 16:59:43 Integrated Voltage Measurement... 17:00:02 Voltage Offset Correction: v_off_ini = 0.000006479 V, v_off_fin = 0.000003797 V 17:00:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949620 Vs 17:00:05 Temperature Measurement, Probe Number = 0, T = 20.183000 C 17:00:05 Temperature Measurement, Probe Number = 1, T = 20.109000 C 17:00:06 Temperature Measurement, Probe Number = 2, T = 20.166000 C 17:00:07 Temperature Measurement, Probe Number = 3, T = 20.110000 C 17:00:07 Temperature Measurement, Probe Number = 4, T = 20.429000 C 17:00:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.43 17:00:08 Integrated Voltage Measurement... 17:00:27 Voltage Offset Correction: v_off_ini = 0.000003963 V, v_off_fin = 0.000006655 V 17:00:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039623 Vs 17:00:27 Integrated Voltage Measurement... 17:00:47 Voltage Offset Correction: v_off_ini = 0.000006194 V, v_off_fin = 0.000003172 V 17:00:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955825 Vs 17:00:49 Temperature Measurement, Probe Number = 0, T = 20.179000 C 17:00:50 Temperature Measurement, Probe Number = 1, T = 20.104000 C 17:00:51 Temperature Measurement, Probe Number = 2, T = 20.162000 C 17:00:51 Temperature Measurement, Probe Number = 3, T = 20.106000 C 17:00:52 Temperature Measurement, Probe Number = 4, T = 20.430000 C 17:00:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.43 17:00:52 Integrated Voltage Measurement... 17:01:12 Voltage Offset Correction: v_off_ini = 0.000004866 V, v_off_fin = 0.000006933 V 17:01:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041802 Vs 17:01:12 Integrated Voltage Measurement... 17:01:31 Voltage Offset Correction: v_off_ini = 0.000006434 V, v_off_fin = 0.000003508 V 17:01:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954775 Vs 17:01:34 Temperature Measurement, Probe Number = 0, T = 20.177000 C 17:01:35 Temperature Measurement, Probe Number = 1, T = 20.106000 C 17:01:35 Temperature Measurement, Probe Number = 2, T = 20.162000 C 17:01:36 Temperature Measurement, Probe Number = 3, T = 20.108000 C 17:01:37 Temperature Measurement, Probe Number = 4, T = 20.480000 C 17:01:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.48 17:01:37 Integrated Voltage Measurement... 17:01:56 Voltage Offset Correction: v_off_ini = 0.000004821 V, v_off_fin = 0.000006986 V 17:01:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039558 Vs 17:01:56 Integrated Voltage Measurement... 17:02:15 Voltage Offset Correction: v_off_ini = 0.000006271 V, v_off_fin = 0.000003529 V 17:02:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952640 Vs 17:02:18 Temperature Measurement, Probe Number = 0, T = 20.180000 C 17:02:19 Temperature Measurement, Probe Number = 1, T = 20.103000 C 17:02:20 Temperature Measurement, Probe Number = 2, T = 20.163000 C 17:02:20 Temperature Measurement, Probe Number = 3, T = 20.107000 C 17:02:21 Temperature Measurement, Probe Number = 4, T = 20.566000 C 17:02:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.57 17:02:21 Integrated Voltage Measurement... 17:02:40 Voltage Offset Correction: v_off_ini = 0.000005074 V, v_off_fin = 0.000006602 V 17:02:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042098 Vs 17:02:40 Integrated Voltage Measurement... 17:02:59 Voltage Offset Correction: v_off_ini = 0.000006650 V, v_off_fin = 0.000003361 V 17:03:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952205 Vs 17:03:02 Temperature Measurement, Probe Number = 0, T = 20.182000 C 17:03:03 Temperature Measurement, Probe Number = 1, T = 20.104000 C 17:03:04 Temperature Measurement, Probe Number = 2, T = 20.165000 C 17:03:04 Temperature Measurement, Probe Number = 3, T = 20.107000 C 17:03:05 Temperature Measurement, Probe Number = 4, T = 20.523000 C 17:03:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.52 17:03:05 Integrated Voltage Measurement... 17:03:24 Voltage Offset Correction: v_off_ini = 0.000004486 V, v_off_fin = 0.000006806 V 17:03:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041347 Vs 17:03:25 Integrated Voltage Measurement... 17:03:44 Voltage Offset Correction: v_off_ini = 0.000006504 V, v_off_fin = 0.000003624 V 17:03:44 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170957178 Vs 17:33:47 Temperature Measurement, Probe Number = 0, T = 20.175000 C 17:33:48 Temperature Measurement, Probe Number = 1, T = 20.102000 C 17:33:49 Temperature Measurement, Probe Number = 2, T = 20.162000 C 17:33:49 Temperature Measurement, Probe Number = 3, T = 20.106000 C 17:33:50 Temperature Measurement, Probe Number = 4, T = 20.302000 C 17:33:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.30 17:33:50 Integrated Voltage Measurement... 17:34:09 Voltage Offset Correction: v_off_ini = 0.000005210 V, v_off_fin = 0.000006243 V 17:34:10 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171084412 Vs 17:34:10 Integrated Voltage Measurement... 17:34:29 Voltage Offset Correction: v_off_ini = 0.000005834 V, v_off_fin = 0.000002791 V 17:34:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952983 Vs 17:34:32 Temperature Measurement, Probe Number = 0, T = 20.176000 C 17:34:32 Temperature Measurement, Probe Number = 1, T = 20.105000 C 17:34:33 Temperature Measurement, Probe Number = 2, T = 20.161000 C 17:34:34 Temperature Measurement, Probe Number = 3, T = 20.107000 C 17:34:34 Temperature Measurement, Probe Number = 4, T = 20.240000 C 17:34:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.24 17:34:35 Integrated Voltage Measurement... 17:34:54 Voltage Offset Correction: v_off_ini = 0.000003783 V, v_off_fin = 0.000005808 V 17:34:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024651 Vs 17:34:54 Integrated Voltage Measurement... 17:35:13 Voltage Offset Correction: v_off_ini = 0.000005434 V, v_off_fin = 0.000002823 V 17:35:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957828 Vs 17:35:16 Temperature Measurement, Probe Number = 0, T = 20.182000 C 17:35:17 Temperature Measurement, Probe Number = 1, T = 20.107000 C 17:35:18 Temperature Measurement, Probe Number = 2, T = 20.168000 C 17:35:18 Temperature Measurement, Probe Number = 3, T = 20.113000 C 17:35:19 Temperature Measurement, Probe Number = 4, T = 20.361000 C 17:35:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.36 17:35:19 Integrated Voltage Measurement... 17:35:38 Voltage Offset Correction: v_off_ini = 0.000003078 V, v_off_fin = 0.000006402 V 17:35:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025768 Vs 17:35:39 Integrated Voltage Measurement... 17:35:58 Voltage Offset Correction: v_off_ini = 0.000005817 V, v_off_fin = 0.000003127 V 17:35:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951901 Vs 17:36:00 Temperature Measurement, Probe Number = 0, T = 20.181000 C 17:36:01 Temperature Measurement, Probe Number = 1, T = 20.107000 C 17:36:02 Temperature Measurement, Probe Number = 2, T = 20.168000 C 17:36:02 Temperature Measurement, Probe Number = 3, T = 20.110000 C 17:36:03 Temperature Measurement, Probe Number = 4, T = 20.399000 C 17:36:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.40 17:36:03 Integrated Voltage Measurement... 17:36:22 Voltage Offset Correction: v_off_ini = 0.000004451 V, v_off_fin = 0.000006411 V 17:36:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030638 Vs 17:36:22 Integrated Voltage Measurement... 17:36:41 Voltage Offset Correction: v_off_ini = 0.000006031 V, v_off_fin = 0.000002602 V 17:36:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956112 Vs 17:36:44 Temperature Measurement, Probe Number = 0, T = 20.186000 C 17:36:45 Temperature Measurement, Probe Number = 1, T = 20.108000 C 17:36:46 Temperature Measurement, Probe Number = 2, T = 20.169000 C 17:36:46 Temperature Measurement, Probe Number = 3, T = 20.113000 C 17:36:47 Temperature Measurement, Probe Number = 4, T = 20.398000 C 17:36:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.40 17:36:47 Integrated Voltage Measurement... 17:37:06 Voltage Offset Correction: v_off_ini = 0.000003956 V, v_off_fin = 0.000006182 V 17:37:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171027654 Vs 17:37:06 Integrated Voltage Measurement... 17:37:25 Voltage Offset Correction: v_off_ini = 0.000005543 V, v_off_fin = 0.000002669 V 17:37:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954322 Vs 17:37:28 Temperature Measurement, Probe Number = 0, T = 20.188000 C 17:37:29 Temperature Measurement, Probe Number = 1, T = 20.109000 C 17:37:30 Temperature Measurement, Probe Number = 2, T = 20.172000 C 17:37:30 Temperature Measurement, Probe Number = 3, T = 20.112000 C 17:37:31 Temperature Measurement, Probe Number = 4, T = 20.456000 C 17:37:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.46 17:37:31 Integrated Voltage Measurement... 17:37:50 Voltage Offset Correction: v_off_ini = 0.000004695 V, v_off_fin = 0.000006306 V 17:37:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171031524 Vs 17:37:51 Integrated Voltage Measurement... 17:38:10 Voltage Offset Correction: v_off_ini = 0.000005867 V, v_off_fin = 0.000003143 V 17:38:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952985 Vs 17:38:12 Temperature Measurement, Probe Number = 0, T = 20.187000 C 17:38:13 Temperature Measurement, Probe Number = 1, T = 20.109000 C 17:38:14 Temperature Measurement, Probe Number = 2, T = 20.170000 C 17:38:15 Temperature Measurement, Probe Number = 3, T = 20.114000 C 17:38:15 Temperature Measurement, Probe Number = 4, T = 20.407000 C 17:38:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.41 17:38:15 Integrated Voltage Measurement... 17:38:35 Voltage Offset Correction: v_off_ini = 0.000003930 V, v_off_fin = 0.000006712 V 17:38:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029695 Vs 17:38:35 Integrated Voltage Measurement... 17:38:55 Voltage Offset Correction: v_off_ini = 0.000006071 V, v_off_fin = 0.000002729 V 17:38:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960117 Vs 17:38:57 Temperature Measurement, Probe Number = 0, T = 20.188000 C 17:38:58 Temperature Measurement, Probe Number = 1, T = 20.112000 C 17:38:59 Temperature Measurement, Probe Number = 2, T = 20.173000 C 17:38:59 Temperature Measurement, Probe Number = 3, T = 20.117000 C 17:39:00 Temperature Measurement, Probe Number = 4, T = 20.517000 C 17:39:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.52 17:39:00 Integrated Voltage Measurement... 17:39:20 Voltage Offset Correction: v_off_ini = 0.000003942 V, v_off_fin = 0.000006327 V 17:39:20 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171026284 Vs 17:39:20 Integrated Voltage Measurement... 17:39:39 Voltage Offset Correction: v_off_ini = 0.000005656 V, v_off_fin = 0.000002698 V 17:39:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963146 Vs 17:39:42 Temperature Measurement, Probe Number = 0, T = 20.186000 C 17:39:43 Temperature Measurement, Probe Number = 1, T = 20.110000 C 17:39:44 Temperature Measurement, Probe Number = 2, T = 20.172000 C 17:39:44 Temperature Measurement, Probe Number = 3, T = 20.116000 C 17:39:45 Temperature Measurement, Probe Number = 4, T = 20.542000 C 17:39:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.54 17:39:45 Integrated Voltage Measurement... 17:40:04 Voltage Offset Correction: v_off_ini = 0.000004195 V, v_off_fin = 0.000005972 V 17:40:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024304 Vs 17:40:05 Integrated Voltage Measurement... 17:40:24 Voltage Offset Correction: v_off_ini = 0.000005775 V, v_off_fin = 0.000002531 V 17:40:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957840 Vs 17:40:26 Temperature Measurement, Probe Number = 0, T = 20.182000 C 17:40:27 Temperature Measurement, Probe Number = 1, T = 20.107000 C 17:40:28 Temperature Measurement, Probe Number = 2, T = 20.170000 C 17:40:28 Temperature Measurement, Probe Number = 3, T = 20.114000 C 17:40:29 Temperature Measurement, Probe Number = 4, T = 20.476000 C 17:40:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.48 17:40:29 Integrated Voltage Measurement... 17:40:48 Voltage Offset Correction: v_off_ini = 0.000003268 V, v_off_fin = 0.000006422 V 17:40:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171026353 Vs 17:40:49 Integrated Voltage Measurement... 17:41:08 Voltage Offset Correction: v_off_ini = 0.000005932 V, v_off_fin = 0.000002904 V 17:41:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955559 Vs 18:11:11 Temperature Measurement, Probe Number = 0, T = 20.172000 C 18:11:12 Temperature Measurement, Probe Number = 1, T = 20.098000 C 18:11:12 Temperature Measurement, Probe Number = 2, T = 20.160000 C 18:11:13 Temperature Measurement, Probe Number = 3, T = 20.106000 C 18:11:13 Temperature Measurement, Probe Number = 4, T = 20.377000 C 18:11:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.38 18:11:14 Integrated Voltage Measurement... 18:11:33 Voltage Offset Correction: v_off_ini = 0.000005085 V, v_off_fin = 0.000006680 V 18:11:33 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171071787 Vs 18:11:34 Integrated Voltage Measurement... 18:11:53 Voltage Offset Correction: v_off_ini = 0.000005896 V, v_off_fin = 0.000003359 V 18:11:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962133 Vs 18:11:56 Temperature Measurement, Probe Number = 0, T = 20.183000 C 18:11:56 Temperature Measurement, Probe Number = 1, T = 20.107000 C 18:11:57 Temperature Measurement, Probe Number = 2, T = 20.168000 C 18:11:58 Temperature Measurement, Probe Number = 3, T = 20.114000 C 18:11:58 Temperature Measurement, Probe Number = 4, T = 20.457000 C 18:11:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.46 18:11:58 Integrated Voltage Measurement... 18:12:19 Voltage Offset Correction: v_off_ini = 0.000004004 V, v_off_fin = 0.000006415 V 18:12:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036241 Vs 18:12:19 Integrated Voltage Measurement... 18:12:38 Voltage Offset Correction: v_off_ini = 0.000006131 V, v_off_fin = 0.000003602 V 18:12:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960729 Vs 18:12:41 Temperature Measurement, Probe Number = 0, T = 20.187000 C 18:12:42 Temperature Measurement, Probe Number = 1, T = 20.104000 C 18:12:43 Temperature Measurement, Probe Number = 2, T = 20.171000 C 18:12:43 Temperature Measurement, Probe Number = 3, T = 20.112000 C 18:12:44 Temperature Measurement, Probe Number = 4, T = 20.473000 C 18:12:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.47 18:12:44 Integrated Voltage Measurement... 18:13:04 Voltage Offset Correction: v_off_ini = 0.000004823 V, v_off_fin = 0.000007251 V 18:13:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037591 Vs 18:13:04 Integrated Voltage Measurement... 18:13:23 Voltage Offset Correction: v_off_ini = 0.000006817 V, v_off_fin = 0.000003316 V 18:13:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955012 Vs 18:13:26 Temperature Measurement, Probe Number = 0, T = 20.184000 C 18:13:26 Temperature Measurement, Probe Number = 1, T = 20.105000 C 18:13:27 Temperature Measurement, Probe Number = 2, T = 20.168000 C 18:13:28 Temperature Measurement, Probe Number = 3, T = 20.110000 C 18:13:28 Temperature Measurement, Probe Number = 4, T = 20.519000 C 18:13:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.52 18:13:29 Integrated Voltage Measurement... 18:13:48 Voltage Offset Correction: v_off_ini = 0.000004346 V, v_off_fin = 0.000006538 V 18:13:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041818 Vs 18:13:49 Integrated Voltage Measurement... 18:14:08 Voltage Offset Correction: v_off_ini = 0.000006320 V, v_off_fin = 0.000003329 V 18:14:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958313 Vs 18:14:11 Temperature Measurement, Probe Number = 0, T = 20.186000 C 18:14:11 Temperature Measurement, Probe Number = 1, T = 20.105000 C 18:14:12 Temperature Measurement, Probe Number = 2, T = 20.167000 C 18:14:13 Temperature Measurement, Probe Number = 3, T = 20.108000 C 18:14:13 Temperature Measurement, Probe Number = 4, T = 20.486000 C 18:14:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.49 18:14:14 Integrated Voltage Measurement... 18:14:33 Voltage Offset Correction: v_off_ini = 0.000003948 V, v_off_fin = 0.000007127 V 18:14:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036538 Vs 18:14:33 Integrated Voltage Measurement... 18:14:52 Voltage Offset Correction: v_off_ini = 0.000007030 V, v_off_fin = 0.000003557 V 18:14:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959263 Vs 18:14:55 Temperature Measurement, Probe Number = 0, T = 20.185000 C 18:14:56 Temperature Measurement, Probe Number = 1, T = 20.105000 C 18:14:57 Temperature Measurement, Probe Number = 2, T = 20.169000 C 18:14:57 Temperature Measurement, Probe Number = 3, T = 20.111000 C 18:14:58 Temperature Measurement, Probe Number = 4, T = 20.496000 C 18:14:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.50 18:14:58 Integrated Voltage Measurement... 18:15:18 Voltage Offset Correction: v_off_ini = 0.000004458 V, v_off_fin = 0.000006596 V 18:15:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037821 Vs 18:15:18 Integrated Voltage Measurement... 18:15:37 Voltage Offset Correction: v_off_ini = 0.000006127 V, v_off_fin = 0.000003718 V 18:15:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958957 Vs 18:15:40 Temperature Measurement, Probe Number = 0, T = 20.182000 C 18:15:40 Temperature Measurement, Probe Number = 1, T = 20.100000 C 18:15:41 Temperature Measurement, Probe Number = 2, T = 20.163000 C 18:15:42 Temperature Measurement, Probe Number = 3, T = 20.104000 C 18:15:42 Temperature Measurement, Probe Number = 4, T = 20.408000 C 18:15:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 18:15:43 Integrated Voltage Measurement... 18:16:02 Voltage Offset Correction: v_off_ini = 0.000004755 V, v_off_fin = 0.000006149 V 18:16:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038351 Vs 18:16:02 Integrated Voltage Measurement... 18:16:22 Voltage Offset Correction: v_off_ini = 0.000006125 V, v_off_fin = 0.000003461 V 18:16:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961559 Vs 18:16:25 Temperature Measurement, Probe Number = 0, T = 20.177000 C 18:16:25 Temperature Measurement, Probe Number = 1, T = 20.102000 C 18:16:26 Temperature Measurement, Probe Number = 2, T = 20.160000 C 18:16:27 Temperature Measurement, Probe Number = 3, T = 20.103000 C 18:16:27 Temperature Measurement, Probe Number = 4, T = 20.269000 C 18:16:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.27 18:16:27 Integrated Voltage Measurement... 18:16:47 Voltage Offset Correction: v_off_ini = 0.000004114 V, v_off_fin = 0.000006539 V 18:16:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035651 Vs 18:16:47 Integrated Voltage Measurement... 18:17:06 Voltage Offset Correction: v_off_ini = 0.000005917 V, v_off_fin = 0.000003061 V 18:17:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961369 Vs 18:17:09 Temperature Measurement, Probe Number = 0, T = 20.184000 C 18:17:10 Temperature Measurement, Probe Number = 1, T = 20.104000 C 18:17:10 Temperature Measurement, Probe Number = 2, T = 20.161000 C 18:17:11 Temperature Measurement, Probe Number = 3, T = 20.102000 C 18:17:12 Temperature Measurement, Probe Number = 4, T = 20.306000 C 18:17:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.31 18:17:12 Integrated Voltage Measurement... 18:17:31 Voltage Offset Correction: v_off_ini = 0.000004429 V, v_off_fin = 0.000006599 V 18:17:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171035163 Vs 18:17:32 Integrated Voltage Measurement... 18:17:51 Voltage Offset Correction: v_off_ini = 0.000006023 V, v_off_fin = 0.000002716 V 18:17:51 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170965230 Vs 18:17:54 Temperature Measurement, Probe Number = 0, T = 20.181000 C 18:17:54 Temperature Measurement, Probe Number = 1, T = 20.105000 C 18:17:55 Temperature Measurement, Probe Number = 2, T = 20.162000 C 18:17:56 Temperature Measurement, Probe Number = 3, T = 20.104000 C 18:17:56 Temperature Measurement, Probe Number = 4, T = 20.280000 C 18:17:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.28 18:17:56 Integrated Voltage Measurement... 18:18:16 Voltage Offset Correction: v_off_ini = 0.000004020 V, v_off_fin = 0.000006385 V 18:18:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037121 Vs 18:18:16 Integrated Voltage Measurement... 18:18:35 Voltage Offset Correction: v_off_ini = 0.000006058 V, v_off_fin = 0.000003395 V 18:18:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960601 Vs 18:48:38 Temperature Measurement, Probe Number = 0, T = 20.172000 C 18:48:39 Temperature Measurement, Probe Number = 1, T = 20.095000 C 18:48:40 Temperature Measurement, Probe Number = 2, T = 20.157000 C 18:48:40 Temperature Measurement, Probe Number = 3, T = 20.101000 C 18:48:41 Temperature Measurement, Probe Number = 4, T = 20.178000 C 18:48:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.18 18:48:41 Integrated Voltage Measurement... 18:49:00 Voltage Offset Correction: v_off_ini = 0.000004641 V, v_off_fin = 0.000006722 V 18:49:00 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171080377 Vs 18:49:00 Integrated Voltage Measurement... 18:49:20 Voltage Offset Correction: v_off_ini = 0.000005954 V, v_off_fin = 0.000002860 V 18:49:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967552 Vs 18:49:23 Temperature Measurement, Probe Number = 0, T = 20.172000 C 18:49:23 Temperature Measurement, Probe Number = 1, T = 20.097000 C 18:49:24 Temperature Measurement, Probe Number = 2, T = 20.154000 C 18:49:25 Temperature Measurement, Probe Number = 3, T = 20.099000 C 18:49:25 Temperature Measurement, Probe Number = 4, T = 20.229000 C 18:49:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.23 18:49:25 Integrated Voltage Measurement... 18:49:45 Voltage Offset Correction: v_off_ini = 0.000003843 V, v_off_fin = 0.000006426 V 18:49:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041053 Vs 18:49:45 Integrated Voltage Measurement... 18:50:04 Voltage Offset Correction: v_off_ini = 0.000005887 V, v_off_fin = 0.000002986 V 18:50:04 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170967703 Vs 18:50:07 Temperature Measurement, Probe Number = 0, T = 20.172000 C 18:50:08 Temperature Measurement, Probe Number = 1, T = 20.097000 C 18:50:09 Temperature Measurement, Probe Number = 2, T = 20.158000 C 18:50:09 Temperature Measurement, Probe Number = 3, T = 20.101000 C 18:50:10 Temperature Measurement, Probe Number = 4, T = 20.165000 C 18:50:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.16 18:50:10 Integrated Voltage Measurement... 18:50:29 Voltage Offset Correction: v_off_ini = 0.000004447 V, v_off_fin = 0.000007080 V 18:50:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038962 Vs 18:50:30 Integrated Voltage Measurement... 18:50:49 Voltage Offset Correction: v_off_ini = 0.000006235 V, v_off_fin = 0.000003665 V 18:50:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961615 Vs 18:50:52 Temperature Measurement, Probe Number = 0, T = 20.176000 C 18:50:53 Temperature Measurement, Probe Number = 1, T = 20.096000 C 18:50:53 Temperature Measurement, Probe Number = 2, T = 20.159000 C 18:50:54 Temperature Measurement, Probe Number = 3, T = 20.099000 C 18:50:54 Temperature Measurement, Probe Number = 4, T = 20.210000 C 18:50:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.21 18:50:55 Integrated Voltage Measurement... 18:51:14 Voltage Offset Correction: v_off_ini = 0.000003800 V, v_off_fin = 0.000006480 V 18:51:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037361 Vs 18:51:15 Integrated Voltage Measurement... 18:51:34 Voltage Offset Correction: v_off_ini = 0.000006008 V, v_off_fin = 0.000002553 V 18:51:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965488 Vs 18:51:36 Temperature Measurement, Probe Number = 0, T = 20.173000 C 18:51:37 Temperature Measurement, Probe Number = 1, T = 20.096000 C 18:51:38 Temperature Measurement, Probe Number = 2, T = 20.158000 C 18:51:38 Temperature Measurement, Probe Number = 3, T = 20.100000 C 18:51:39 Temperature Measurement, Probe Number = 4, T = 20.228000 C 18:51:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.23 18:51:39 Integrated Voltage Measurement... 18:51:58 Voltage Offset Correction: v_off_ini = 0.000004075 V, v_off_fin = 0.000006459 V 18:51:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171040640 Vs 18:51:59 Integrated Voltage Measurement... 18:52:18 Voltage Offset Correction: v_off_ini = 0.000006171 V, v_off_fin = 0.000003720 V 18:52:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963867 Vs 18:52:21 Temperature Measurement, Probe Number = 0, T = 20.182000 C 18:52:21 Temperature Measurement, Probe Number = 1, T = 20.099000 C 18:52:22 Temperature Measurement, Probe Number = 2, T = 20.162000 C 18:52:23 Temperature Measurement, Probe Number = 3, T = 20.103000 C 18:52:23 Temperature Measurement, Probe Number = 4, T = 20.356000 C 18:52:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.36 18:52:24 Integrated Voltage Measurement... 18:52:43 Voltage Offset Correction: v_off_ini = 0.000005093 V, v_off_fin = 0.000007364 V 18:52:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043560 Vs 18:52:43 Integrated Voltage Measurement... 18:53:02 Voltage Offset Correction: v_off_ini = 0.000006388 V, v_off_fin = 0.000004157 V 18:53:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960134 Vs 18:53:05 Temperature Measurement, Probe Number = 0, T = 20.177000 C 18:53:06 Temperature Measurement, Probe Number = 1, T = 20.096000 C 18:53:07 Temperature Measurement, Probe Number = 2, T = 20.160000 C 18:53:07 Temperature Measurement, Probe Number = 3, T = 20.101000 C 18:53:08 Temperature Measurement, Probe Number = 4, T = 20.428000 C 18:53:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.43 18:53:08 Integrated Voltage Measurement... 18:53:27 Voltage Offset Correction: v_off_ini = 0.000004728 V, v_off_fin = 0.000007016 V 18:53:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043477 Vs 18:53:28 Integrated Voltage Measurement... 18:53:47 Voltage Offset Correction: v_off_ini = 0.000006883 V, v_off_fin = 0.000003491 V 18:53:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958568 Vs 18:53:49 Temperature Measurement, Probe Number = 0, T = 20.178000 C 18:53:50 Temperature Measurement, Probe Number = 1, T = 20.096000 C 18:53:51 Temperature Measurement, Probe Number = 2, T = 20.162000 C 18:53:51 Temperature Measurement, Probe Number = 3, T = 20.102000 C 18:53:52 Temperature Measurement, Probe Number = 4, T = 20.353000 C 18:53:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.35 18:53:52 Integrated Voltage Measurement... 18:54:12 Voltage Offset Correction: v_off_ini = 0.000004976 V, v_off_fin = 0.000006697 V 18:54:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045884 Vs 18:54:12 Integrated Voltage Measurement... 18:54:31 Voltage Offset Correction: v_off_ini = 0.000006185 V, v_off_fin = 0.000003182 V 18:54:31 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170966736 Vs 18:54:34 Temperature Measurement, Probe Number = 0, T = 20.171000 C 18:54:35 Temperature Measurement, Probe Number = 1, T = 20.094000 C 18:54:35 Temperature Measurement, Probe Number = 2, T = 20.156000 C 18:54:36 Temperature Measurement, Probe Number = 3, T = 20.098000 C 18:54:37 Temperature Measurement, Probe Number = 4, T = 20.259000 C 18:54:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.26 18:54:37 Integrated Voltage Measurement... 18:54:56 Voltage Offset Correction: v_off_ini = 0.000004258 V, v_off_fin = 0.000007025 V 18:54:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049376 Vs 18:54:57 Integrated Voltage Measurement... 18:55:16 Voltage Offset Correction: v_off_ini = 0.000006526 V, v_off_fin = 0.000002975 V 18:55:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960923 Vs 18:55:19 Temperature Measurement, Probe Number = 0, T = 20.180000 C 18:55:19 Temperature Measurement, Probe Number = 1, T = 20.098000 C 18:55:20 Temperature Measurement, Probe Number = 2, T = 20.161000 C 18:55:21 Temperature Measurement, Probe Number = 3, T = 20.103000 C 18:55:21 Temperature Measurement, Probe Number = 4, T = 20.174000 C 18:55:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.17 18:55:22 Integrated Voltage Measurement... 18:55:41 Voltage Offset Correction: v_off_ini = 0.000003910 V, v_off_fin = 0.000006292 V 18:55:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042649 Vs 18:55:41 Integrated Voltage Measurement... 18:56:01 Voltage Offset Correction: v_off_ini = 0.000006127 V, v_off_fin = 0.000002742 V 18:56:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968680 Vs 19:26:04 Temperature Measurement, Probe Number = 0, T = 20.177000 C 19:26:04 Temperature Measurement, Probe Number = 1, T = 20.103000 C 19:26:05 Temperature Measurement, Probe Number = 2, T = 20.160000 C 19:26:06 Temperature Measurement, Probe Number = 3, T = 20.107000 C 19:26:06 Temperature Measurement, Probe Number = 4, T = 20.377000 C 19:26:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.38 19:26:07 Integrated Voltage Measurement... 19:26:26 Voltage Offset Correction: v_off_ini = 0.000005514 V, v_off_fin = 0.000007136 V 19:26:26 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171092393 Vs 19:26:26 Integrated Voltage Measurement... 19:26:45 Voltage Offset Correction: v_off_ini = 0.000006420 V, v_off_fin = 0.000002512 V 19:26:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958661 Vs 19:26:48 Temperature Measurement, Probe Number = 0, T = 20.182000 C 19:26:49 Temperature Measurement, Probe Number = 1, T = 20.104000 C 19:26:49 Temperature Measurement, Probe Number = 2, T = 20.160000 C 19:26:50 Temperature Measurement, Probe Number = 3, T = 20.104000 C 19:26:51 Temperature Measurement, Probe Number = 4, T = 20.327000 C 19:26:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.33 19:26:51 Integrated Voltage Measurement... 19:27:11 Voltage Offset Correction: v_off_ini = 0.000004030 V, v_off_fin = 0.000006479 V 19:27:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038358 Vs 19:27:11 Integrated Voltage Measurement... 19:27:31 Voltage Offset Correction: v_off_ini = 0.000006344 V, v_off_fin = 0.000003047 V 19:27:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963542 Vs 19:27:33 Temperature Measurement, Probe Number = 0, T = 20.178000 C 19:27:34 Temperature Measurement, Probe Number = 1, T = 20.099000 C 19:27:35 Temperature Measurement, Probe Number = 2, T = 20.159000 C 19:27:35 Temperature Measurement, Probe Number = 3, T = 20.101000 C 19:27:36 Temperature Measurement, Probe Number = 4, T = 20.331000 C 19:27:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.33 19:27:36 Integrated Voltage Measurement... 19:27:56 Voltage Offset Correction: v_off_ini = 0.000003856 V, v_off_fin = 0.000006233 V 19:27:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171026952 Vs 19:27:56 Integrated Voltage Measurement... 19:28:15 Voltage Offset Correction: v_off_ini = 0.000005545 V, v_off_fin = 0.000003161 V 19:28:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963571 Vs 19:28:18 Temperature Measurement, Probe Number = 0, T = 20.178000 C 19:28:19 Temperature Measurement, Probe Number = 1, T = 20.099000 C 19:28:20 Temperature Measurement, Probe Number = 2, T = 20.160000 C 19:28:20 Temperature Measurement, Probe Number = 3, T = 20.102000 C 19:28:21 Temperature Measurement, Probe Number = 4, T = 20.255000 C 19:28:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.25 19:28:21 Integrated Voltage Measurement... 19:28:40 Voltage Offset Correction: v_off_ini = 0.000003954 V, v_off_fin = 0.000006308 V 19:28:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033043 Vs 19:28:41 Integrated Voltage Measurement... 19:29:00 Voltage Offset Correction: v_off_ini = 0.000005485 V, v_off_fin = 0.000002876 V 19:29:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962015 Vs 19:29:03 Temperature Measurement, Probe Number = 0, T = 20.180000 C 19:29:03 Temperature Measurement, Probe Number = 1, T = 20.104000 C 19:29:04 Temperature Measurement, Probe Number = 2, T = 20.161000 C 19:29:05 Temperature Measurement, Probe Number = 3, T = 20.105000 C 19:29:05 Temperature Measurement, Probe Number = 4, T = 20.297000 C 19:29:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.30 19:29:06 Integrated Voltage Measurement... 19:29:25 Voltage Offset Correction: v_off_ini = 0.000004391 V, v_off_fin = 0.000006898 V 19:29:25 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171040311 Vs 19:29:25 Integrated Voltage Measurement... 19:29:44 Voltage Offset Correction: v_off_ini = 0.000006110 V, v_off_fin = 0.000003194 V 19:29:44 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170958225 Vs 19:29:47 Temperature Measurement, Probe Number = 0, T = 20.185000 C 19:29:48 Temperature Measurement, Probe Number = 1, T = 20.110000 C 19:29:48 Temperature Measurement, Probe Number = 2, T = 20.169000 C 19:29:49 Temperature Measurement, Probe Number = 3, T = 20.112000 C 19:29:49 Temperature Measurement, Probe Number = 4, T = 20.512000 C 19:29:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.51 19:29:50 Integrated Voltage Measurement... 19:30:09 Voltage Offset Correction: v_off_ini = 0.000004178 V, v_off_fin = 0.000006939 V 19:30:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171039128 Vs 19:30:09 Integrated Voltage Measurement... 19:30:29 Voltage Offset Correction: v_off_ini = 0.000006338 V, v_off_fin = 0.000002780 V 19:30:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961660 Vs 19:30:31 Temperature Measurement, Probe Number = 0, T = 20.186000 C 19:30:32 Temperature Measurement, Probe Number = 1, T = 20.105000 C 19:30:33 Temperature Measurement, Probe Number = 2, T = 20.169000 C 19:30:33 Temperature Measurement, Probe Number = 3, T = 20.110000 C 19:30:34 Temperature Measurement, Probe Number = 4, T = 20.584000 C 19:30:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.58 19:30:34 Integrated Voltage Measurement... 19:30:54 Voltage Offset Correction: v_off_ini = 0.000004819 V, v_off_fin = 0.000006337 V 19:30:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171041844 Vs 19:30:54 Integrated Voltage Measurement... 19:31:13 Voltage Offset Correction: v_off_ini = 0.000005471 V, v_off_fin = 0.000003322 V 19:31:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957111 Vs 19:31:16 Temperature Measurement, Probe Number = 0, T = 20.181000 C 19:31:16 Temperature Measurement, Probe Number = 1, T = 20.102000 C 19:31:17 Temperature Measurement, Probe Number = 2, T = 20.164000 C 19:31:18 Temperature Measurement, Probe Number = 3, T = 20.106000 C 19:31:18 Temperature Measurement, Probe Number = 4, T = 20.553000 C 19:31:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.55 19:31:19 Integrated Voltage Measurement... 19:31:38 Voltage Offset Correction: v_off_ini = 0.000005089 V, v_off_fin = 0.000007122 V 19:31:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171043591 Vs 19:31:38 Integrated Voltage Measurement... 19:31:57 Voltage Offset Correction: v_off_ini = 0.000006813 V, v_off_fin = 0.000003140 V 19:31:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170956590 Vs 19:32:00 Temperature Measurement, Probe Number = 0, T = 20.181000 C 19:32:01 Temperature Measurement, Probe Number = 1, T = 20.101000 C 19:32:01 Temperature Measurement, Probe Number = 2, T = 20.163000 C 19:32:02 Temperature Measurement, Probe Number = 3, T = 20.106000 C 19:32:03 Temperature Measurement, Probe Number = 4, T = 20.401000 C 19:32:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.40 19:32:03 Integrated Voltage Measurement... 19:32:22 Voltage Offset Correction: v_off_ini = 0.000004898 V, v_off_fin = 0.000006667 V 19:32:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044432 Vs 19:32:23 Integrated Voltage Measurement... 19:32:42 Voltage Offset Correction: v_off_ini = 0.000006461 V, v_off_fin = 0.000003474 V 19:32:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958349 Vs 19:32:45 Temperature Measurement, Probe Number = 0, T = 20.179000 C 19:32:45 Temperature Measurement, Probe Number = 1, T = 20.103000 C 19:32:46 Temperature Measurement, Probe Number = 2, T = 20.162000 C 19:32:47 Temperature Measurement, Probe Number = 3, T = 20.107000 C 19:32:47 Temperature Measurement, Probe Number = 4, T = 20.399000 C 19:32:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.40 19:32:48 Integrated Voltage Measurement... 19:33:07 Voltage Offset Correction: v_off_ini = 0.000004219 V, v_off_fin = 0.000006790 V 19:33:07 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171038939 Vs 19:33:07 Integrated Voltage Measurement... 19:33:26 Voltage Offset Correction: v_off_ini = 0.000005739 V, v_off_fin = 0.000002796 V 19:33:26 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170959074 Vs 20:03:29 Temperature Measurement, Probe Number = 0, T = 20.179000 C 20:03:30 Temperature Measurement, Probe Number = 1, T = 20.102000 C 20:03:30 Temperature Measurement, Probe Number = 2, T = 20.164000 C 20:03:31 Temperature Measurement, Probe Number = 3, T = 20.107000 C 20:03:32 Temperature Measurement, Probe Number = 4, T = 20.408000 C 20:03:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.41 20:03:32 Integrated Voltage Measurement... 20:03:51 Voltage Offset Correction: v_off_ini = 0.000005357 V, v_off_fin = 0.000006846 V 20:03:51 Integrated Voltage Measurement Delta Gap = 0.0040017 m VT = 0.171099229 Vs 20:03:51 Integrated Voltage Measurement... 20:04:11 Voltage Offset Correction: v_off_ini = 0.000006265 V, v_off_fin = 0.000002434 V 20:04:11 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170961735 Vs 20:04:14 Temperature Measurement, Probe Number = 0, T = 20.178000 C 20:04:14 Temperature Measurement, Probe Number = 1, T = 20.101000 C 20:04:15 Temperature Measurement, Probe Number = 2, T = 20.162000 C 20:04:16 Temperature Measurement, Probe Number = 3, T = 20.105000 C 20:04:16 Temperature Measurement, Probe Number = 4, T = 20.360000 C 20:04:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.36 20:04:16 Integrated Voltage Measurement... 20:04:36 Voltage Offset Correction: v_off_ini = 0.000004122 V, v_off_fin = 0.000005742 V 20:04:36 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171033687 Vs 20:04:36 Integrated Voltage Measurement... 20:04:55 Voltage Offset Correction: v_off_ini = 0.000005369 V, v_off_fin = 0.000002314 V 20:04:55 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170964679 Vs 20:04:58 Temperature Measurement, Probe Number = 0, T = 20.181000 C 20:04:59 Temperature Measurement, Probe Number = 1, T = 20.105000 C 20:04:59 Temperature Measurement, Probe Number = 2, T = 20.165000 C 20:05:00 Temperature Measurement, Probe Number = 3, T = 20.110000 C 20:05:01 Temperature Measurement, Probe Number = 4, T = 20.379000 C 20:05:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.38 20:05:01 Integrated Voltage Measurement... 20:05:20 Voltage Offset Correction: v_off_ini = 0.000003588 V, v_off_fin = 0.000005912 V 20:05:20 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171033738 Vs 20:05:21 Integrated Voltage Measurement... 20:05:40 Voltage Offset Correction: v_off_ini = 0.000005446 V, v_off_fin = 0.000002606 V 20:05:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966042 Vs 20:05:43 Temperature Measurement, Probe Number = 0, T = 20.188000 C 20:05:43 Temperature Measurement, Probe Number = 1, T = 20.109000 C 20:05:44 Temperature Measurement, Probe Number = 2, T = 20.168000 C 20:05:45 Temperature Measurement, Probe Number = 3, T = 20.114000 C 20:05:45 Temperature Measurement, Probe Number = 4, T = 20.499000 C 20:05:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.50 20:05:46 Integrated Voltage Measurement... 20:06:05 Voltage Offset Correction: v_off_ini = 0.000003667 V, v_off_fin = 0.000006083 V 20:06:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171030752 Vs 20:06:05 Integrated Voltage Measurement... 20:06:24 Voltage Offset Correction: v_off_ini = 0.000005569 V, v_off_fin = 0.000002144 V 20:06:24 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170967798 Vs 20:06:27 Temperature Measurement, Probe Number = 0, T = 20.185000 C 20:06:28 Temperature Measurement, Probe Number = 1, T = 20.109000 C 20:06:28 Temperature Measurement, Probe Number = 2, T = 20.169000 C 20:06:29 Temperature Measurement, Probe Number = 3, T = 20.112000 C 20:06:30 Temperature Measurement, Probe Number = 4, T = 20.504000 C 20:06:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.50 20:06:30 Integrated Voltage Measurement... 20:06:49 Voltage Offset Correction: v_off_ini = 0.000003356 V, v_off_fin = 0.000006551 V 20:06:49 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171036550 Vs 20:06:49 Integrated Voltage Measurement... 20:07:08 Voltage Offset Correction: v_off_ini = 0.000005798 V, v_off_fin = 0.000002729 V 20:07:08 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170966003 Vs 20:07:11 Temperature Measurement, Probe Number = 0, T = 20.184000 C 20:07:12 Temperature Measurement, Probe Number = 1, T = 20.104000 C 20:07:12 Temperature Measurement, Probe Number = 2, T = 20.167000 C 20:07:13 Temperature Measurement, Probe Number = 3, T = 20.108000 C 20:07:14 Temperature Measurement, Probe Number = 4, T = 20.526000 C 20:07:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.53 20:07:14 Integrated Voltage Measurement... 20:07:33 Voltage Offset Correction: v_off_ini = 0.000004204 V, v_off_fin = 0.000006554 V 20:07:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171037832 Vs 20:07:33 Integrated Voltage Measurement... 20:07:52 Voltage Offset Correction: v_off_ini = 0.000006000 V, v_off_fin = 0.000003185 V 20:07:53 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170961193 Vs 20:07:55 Temperature Measurement, Probe Number = 0, T = 20.179000 C 20:07:56 Temperature Measurement, Probe Number = 1, T = 20.102000 C 20:07:57 Temperature Measurement, Probe Number = 2, T = 20.162000 C 20:07:57 Temperature Measurement, Probe Number = 3, T = 20.104000 C 20:07:58 Temperature Measurement, Probe Number = 4, T = 20.475000 C 20:07:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.48 20:07:58 Integrated Voltage Measurement... 20:08:17 Voltage Offset Correction: v_off_ini = 0.000003322 V, v_off_fin = 0.000006653 V 20:08:18 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171038810 Vs 20:08:18 Integrated Voltage Measurement... 20:08:37 Voltage Offset Correction: v_off_ini = 0.000005904 V, v_off_fin = 0.000002843 V 20:08:37 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170965011 Vs 20:08:40 Temperature Measurement, Probe Number = 0, T = 20.180000 C 20:08:41 Temperature Measurement, Probe Number = 1, T = 20.105000 C 20:08:41 Temperature Measurement, Probe Number = 2, T = 20.164000 C 20:08:42 Temperature Measurement, Probe Number = 3, T = 20.106000 C 20:08:42 Temperature Measurement, Probe Number = 4, T = 20.376000 C 20:08:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.38 20:08:43 Integrated Voltage Measurement... 20:09:02 Voltage Offset Correction: v_off_ini = 0.000004101 V, v_off_fin = 0.000007269 V 20:09:02 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171037646 Vs 20:09:03 Integrated Voltage Measurement... 20:09:22 Voltage Offset Correction: v_off_ini = 0.000006300 V, v_off_fin = 0.000002888 V 20:09:22 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170959506 Vs 20:09:24 Temperature Measurement, Probe Number = 0, T = 20.185000 C 20:09:25 Temperature Measurement, Probe Number = 1, T = 20.109000 C 20:09:26 Temperature Measurement, Probe Number = 2, T = 20.165000 C 20:09:26 Temperature Measurement, Probe Number = 3, T = 20.110000 C 20:09:27 Temperature Measurement, Probe Number = 4, T = 20.450000 C 20:09:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.45 20:09:27 Integrated Voltage Measurement... 20:09:47 Voltage Offset Correction: v_off_ini = 0.000004492 V, v_off_fin = 0.000007214 V 20:09:47 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171046814 Vs 20:09:47 Integrated Voltage Measurement... 20:10:07 Voltage Offset Correction: v_off_ini = 0.000006048 V, v_off_fin = 0.000002321 V 20:10:07 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170962449 Vs 20:10:09 Temperature Measurement, Probe Number = 0, T = 20.188000 C 20:10:10 Temperature Measurement, Probe Number = 1, T = 20.107000 C 20:10:11 Temperature Measurement, Probe Number = 2, T = 20.172000 C 20:10:11 Temperature Measurement, Probe Number = 3, T = 20.114000 C 20:10:12 Temperature Measurement, Probe Number = 4, T = 20.546000 C 20:10:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.55 20:10:12 Integrated Voltage Measurement... 20:10:31 Voltage Offset Correction: v_off_ini = 0.000003602 V, v_off_fin = 0.000006082 V 20:10:31 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171036370 Vs 20:10:32 Integrated Voltage Measurement... 20:10:51 Voltage Offset Correction: v_off_ini = 0.000005655 V, v_off_fin = 0.000002938 V 20:10:51 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170962760 Vs 20:40:53 Temperature Measurement, Probe Number = 0, T = 20.175000 C 20:40:54 Temperature Measurement, Probe Number = 1, T = 20.094000 C 20:40:55 Temperature Measurement, Probe Number = 2, T = 20.159000 C 20:40:56 Temperature Measurement, Probe Number = 3, T = 20.100000 C 20:40:56 Temperature Measurement, Probe Number = 4, T = 20.267000 C 20:40:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.27 20:40:57 Integrated Voltage Measurement... 20:41:16 Voltage Offset Correction: v_off_ini = 0.000005442 V, v_off_fin = 0.000007046 V 20:41:16 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171094238 Vs 20:41:16 Integrated Voltage Measurement... 20:41:35 Voltage Offset Correction: v_off_ini = 0.000006544 V, v_off_fin = 0.000003092 V 20:41:35 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170964963 Vs 20:41:38 Temperature Measurement, Probe Number = 0, T = 20.175000 C 20:41:39 Temperature Measurement, Probe Number = 1, T = 20.093000 C 20:41:39 Temperature Measurement, Probe Number = 2, T = 20.160000 C 20:41:40 Temperature Measurement, Probe Number = 3, T = 20.101000 C 20:41:41 Temperature Measurement, Probe Number = 4, T = 20.315000 C 20:41:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.32 20:41:41 Integrated Voltage Measurement... 20:42:00 Voltage Offset Correction: v_off_ini = 0.000003682 V, v_off_fin = 0.000006470 V 20:42:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171036760 Vs 20:42:01 Integrated Voltage Measurement... 20:42:20 Voltage Offset Correction: v_off_ini = 0.000005975 V, v_off_fin = 0.000002063 V 20:42:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968690 Vs 20:42:22 Temperature Measurement, Probe Number = 0, T = 20.174000 C 20:42:23 Temperature Measurement, Probe Number = 1, T = 20.094000 C 20:42:24 Temperature Measurement, Probe Number = 2, T = 20.158000 C 20:42:24 Temperature Measurement, Probe Number = 3, T = 20.099000 C 20:42:25 Temperature Measurement, Probe Number = 4, T = 20.309000 C 20:42:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.31 20:42:25 Integrated Voltage Measurement... 20:42:45 Voltage Offset Correction: v_off_ini = 0.000003679 V, v_off_fin = 0.000006542 V 20:42:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171035833 Vs 20:42:45 Integrated Voltage Measurement... 20:43:05 Voltage Offset Correction: v_off_ini = 0.000006386 V, v_off_fin = 0.000003063 V 20:43:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963021 Vs 20:43:08 Temperature Measurement, Probe Number = 0, T = 20.177000 C 20:43:08 Temperature Measurement, Probe Number = 1, T = 20.096000 C 20:43:09 Temperature Measurement, Probe Number = 2, T = 20.163000 C 20:43:10 Temperature Measurement, Probe Number = 3, T = 20.103000 C 20:43:10 Temperature Measurement, Probe Number = 4, T = 20.355000 C 20:43:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.36 20:43:11 Integrated Voltage Measurement... 20:43:30 Voltage Offset Correction: v_off_ini = 0.000004088 V, v_off_fin = 0.000007102 V 20:43:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031206 Vs 20:43:30 Integrated Voltage Measurement... 20:43:49 Voltage Offset Correction: v_off_ini = 0.000006012 V, v_off_fin = 0.000002909 V 20:43:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967275 Vs 20:43:52 Temperature Measurement, Probe Number = 0, T = 20.183000 C 20:43:53 Temperature Measurement, Probe Number = 1, T = 20.101000 C 20:43:54 Temperature Measurement, Probe Number = 2, T = 20.167000 C 20:43:54 Temperature Measurement, Probe Number = 3, T = 20.107000 C 20:43:55 Temperature Measurement, Probe Number = 4, T = 20.410000 C 20:43:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.41 20:43:55 Integrated Voltage Measurement... 20:44:14 Voltage Offset Correction: v_off_ini = 0.000003821 V, v_off_fin = 0.000006758 V 20:44:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171036956 Vs 20:44:15 Integrated Voltage Measurement... 20:44:34 Voltage Offset Correction: v_off_ini = 0.000006089 V, v_off_fin = 0.000002917 V 20:44:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965720 Vs 20:44:37 Temperature Measurement, Probe Number = 0, T = 20.180000 C 20:44:37 Temperature Measurement, Probe Number = 1, T = 20.099000 C 20:44:38 Temperature Measurement, Probe Number = 2, T = 20.165000 C 20:44:39 Temperature Measurement, Probe Number = 3, T = 20.105000 C 20:44:39 Temperature Measurement, Probe Number = 4, T = 20.463000 C 20:44:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.46 20:44:39 Integrated Voltage Measurement... 20:44:59 Voltage Offset Correction: v_off_ini = 0.000003581 V, v_off_fin = 0.000006589 V 20:44:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171043029 Vs 20:44:59 Integrated Voltage Measurement... 20:45:18 Voltage Offset Correction: v_off_ini = 0.000005969 V, v_off_fin = 0.000003088 V 20:45:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964281 Vs 20:45:21 Temperature Measurement, Probe Number = 0, T = 20.181000 C 20:45:22 Temperature Measurement, Probe Number = 1, T = 20.100000 C 20:45:22 Temperature Measurement, Probe Number = 2, T = 20.164000 C 20:45:23 Temperature Measurement, Probe Number = 3, T = 20.106000 C 20:45:24 Temperature Measurement, Probe Number = 4, T = 20.471000 C 20:45:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.47 20:45:24 Integrated Voltage Measurement... 20:45:43 Voltage Offset Correction: v_off_ini = 0.000003621 V, v_off_fin = 0.000007031 V 20:45:43 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171041381 Vs 20:45:43 Integrated Voltage Measurement... 20:46:03 Voltage Offset Correction: v_off_ini = 0.000006273 V, v_off_fin = 0.000003020 V 20:46:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967383 Vs 20:46:05 Temperature Measurement, Probe Number = 0, T = 20.179000 C 20:46:06 Temperature Measurement, Probe Number = 1, T = 20.099000 C 20:46:07 Temperature Measurement, Probe Number = 2, T = 20.166000 C 20:46:07 Temperature Measurement, Probe Number = 3, T = 20.108000 C 20:46:08 Temperature Measurement, Probe Number = 4, T = 20.507000 C 20:46:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.51 20:46:08 Integrated Voltage Measurement... 20:46:28 Voltage Offset Correction: v_off_ini = 0.000004129 V, v_off_fin = 0.000006803 V 20:46:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043479 Vs 20:46:28 Integrated Voltage Measurement... 20:46:47 Voltage Offset Correction: v_off_ini = 0.000006384 V, v_off_fin = 0.000002711 V 20:46:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960622 Vs 20:46:50 Temperature Measurement, Probe Number = 0, T = 20.182000 C 20:46:51 Temperature Measurement, Probe Number = 1, T = 20.099000 C 20:46:51 Temperature Measurement, Probe Number = 2, T = 20.165000 C 20:46:52 Temperature Measurement, Probe Number = 3, T = 20.103000 C 20:46:53 Temperature Measurement, Probe Number = 4, T = 20.435000 C 20:46:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.43 20:46:53 Integrated Voltage Measurement... 20:47:12 Voltage Offset Correction: v_off_ini = 0.000004472 V, v_off_fin = 0.000006762 V 20:47:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171040601 Vs 20:47:12 Integrated Voltage Measurement... 20:47:32 Voltage Offset Correction: v_off_ini = 0.000006282 V, v_off_fin = 0.000003208 V 20:47:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968099 Vs 20:47:35 Temperature Measurement, Probe Number = 0, T = 20.178000 C 20:47:35 Temperature Measurement, Probe Number = 1, T = 20.102000 C 20:47:36 Temperature Measurement, Probe Number = 2, T = 20.162000 C 20:47:37 Temperature Measurement, Probe Number = 3, T = 20.105000 C 20:47:37 Temperature Measurement, Probe Number = 4, T = 20.399000 C 20:47:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.40 20:47:37 Integrated Voltage Measurement... 20:47:57 Voltage Offset Correction: v_off_ini = 0.000003742 V, v_off_fin = 0.000007249 V 20:47:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043700 Vs 20:47:58 Integrated Voltage Measurement... 20:48:17 Voltage Offset Correction: v_off_ini = 0.000006860 V, v_off_fin = 0.000003044 V 20:48:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960740 Vs 21:18:20 Temperature Measurement, Probe Number = 0, T = 20.171000 C 21:18:21 Temperature Measurement, Probe Number = 1, T = 20.090000 C 21:18:21 Temperature Measurement, Probe Number = 2, T = 20.158000 C 21:18:22 Temperature Measurement, Probe Number = 3, T = 20.098000 C 21:18:23 Temperature Measurement, Probe Number = 4, T = 20.288000 C 21:18:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.29 21:18:23 Integrated Voltage Measurement... 21:18:42 Voltage Offset Correction: v_off_ini = 0.000004996 V, v_off_fin = 0.000006703 V 21:18:42 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171083704 Vs 21:18:42 Integrated Voltage Measurement... 21:19:02 Voltage Offset Correction: v_off_ini = 0.000006331 V, v_off_fin = 0.000003202 V 21:19:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966420 Vs 21:19:04 Temperature Measurement, Probe Number = 0, T = 20.171000 C 21:19:05 Temperature Measurement, Probe Number = 1, T = 20.094000 C 21:19:06 Temperature Measurement, Probe Number = 2, T = 20.158000 C 21:19:06 Temperature Measurement, Probe Number = 3, T = 20.101000 C 21:19:07 Temperature Measurement, Probe Number = 4, T = 20.247000 C 21:19:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.25 21:19:07 Integrated Voltage Measurement... 21:19:27 Voltage Offset Correction: v_off_ini = 0.000003746 V, v_off_fin = 0.000007083 V 21:19:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043252 Vs 21:19:28 Integrated Voltage Measurement... 21:19:48 Voltage Offset Correction: v_off_ini = 0.000006189 V, v_off_fin = 0.000003331 V 21:19:48 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170960172 Vs 21:19:50 Temperature Measurement, Probe Number = 0, T = 20.174000 C 21:19:51 Temperature Measurement, Probe Number = 1, T = 20.098000 C 21:19:52 Temperature Measurement, Probe Number = 2, T = 20.159000 C 21:19:53 Temperature Measurement, Probe Number = 3, T = 20.102000 C 21:19:53 Temperature Measurement, Probe Number = 4, T = 20.243000 C 21:19:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.24 21:19:53 Integrated Voltage Measurement... 21:20:13 Voltage Offset Correction: v_off_ini = 0.000004544 V, v_off_fin = 0.000007028 V 21:20:13 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171035607 Vs 21:20:13 Integrated Voltage Measurement... 21:20:32 Voltage Offset Correction: v_off_ini = 0.000006259 V, v_off_fin = 0.000003188 V 21:20:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961390 Vs 21:20:35 Temperature Measurement, Probe Number = 0, T = 20.177000 C 21:20:36 Temperature Measurement, Probe Number = 1, T = 20.097000 C 21:20:36 Temperature Measurement, Probe Number = 2, T = 20.161000 C 21:20:37 Temperature Measurement, Probe Number = 3, T = 20.104000 C 21:20:38 Temperature Measurement, Probe Number = 4, T = 20.245000 C 21:20:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.25 21:20:38 Integrated Voltage Measurement... 21:20:57 Voltage Offset Correction: v_off_ini = 0.000004625 V, v_off_fin = 0.000006726 V 21:20:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043282 Vs 21:20:58 Integrated Voltage Measurement... 21:21:17 Voltage Offset Correction: v_off_ini = 0.000005868 V, v_off_fin = 0.000004192 V 21:21:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962973 Vs 21:21:20 Temperature Measurement, Probe Number = 0, T = 20.173000 C 21:21:21 Temperature Measurement, Probe Number = 1, T = 20.094000 C 21:21:21 Temperature Measurement, Probe Number = 2, T = 20.158000 C 21:21:22 Temperature Measurement, Probe Number = 3, T = 20.101000 C 21:21:23 Temperature Measurement, Probe Number = 4, T = 20.241000 C 21:21:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.24 21:21:23 Integrated Voltage Measurement... 21:21:42 Voltage Offset Correction: v_off_ini = 0.000004543 V, v_off_fin = 0.000006985 V 21:21:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043859 Vs 21:21:42 Integrated Voltage Measurement... 21:22:01 Voltage Offset Correction: v_off_ini = 0.000006327 V, v_off_fin = 0.000003508 V 21:22:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958966 Vs 21:22:04 Temperature Measurement, Probe Number = 0, T = 20.177000 C 21:22:05 Temperature Measurement, Probe Number = 1, T = 20.099000 C 21:22:05 Temperature Measurement, Probe Number = 2, T = 20.160000 C 21:22:06 Temperature Measurement, Probe Number = 3, T = 20.105000 C 21:22:07 Temperature Measurement, Probe Number = 4, T = 20.266000 C 21:22:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.27 21:22:07 Integrated Voltage Measurement... 21:22:26 Voltage Offset Correction: v_off_ini = 0.000004601 V, v_off_fin = 0.000007014 V 21:22:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045810 Vs 21:22:26 Integrated Voltage Measurement... 21:22:45 Voltage Offset Correction: v_off_ini = 0.000006391 V, v_off_fin = 0.000002237 V 21:22:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964603 Vs 21:22:48 Temperature Measurement, Probe Number = 0, T = 20.179000 C 21:22:49 Temperature Measurement, Probe Number = 1, T = 20.100000 C 21:22:49 Temperature Measurement, Probe Number = 2, T = 20.164000 C 21:22:50 Temperature Measurement, Probe Number = 3, T = 20.106000 C 21:22:51 Temperature Measurement, Probe Number = 4, T = 20.381000 C 21:22:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.38 21:22:51 Integrated Voltage Measurement... 21:23:10 Voltage Offset Correction: v_off_ini = 0.000003509 V, v_off_fin = 0.000006356 V 21:23:10 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171039852 Vs 21:23:10 Integrated Voltage Measurement... 21:23:29 Voltage Offset Correction: v_off_ini = 0.000005746 V, v_off_fin = 0.000002543 V 21:23:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170972251 Vs 21:23:32 Temperature Measurement, Probe Number = 0, T = 20.176000 C 21:23:33 Temperature Measurement, Probe Number = 1, T = 20.095000 C 21:23:34 Temperature Measurement, Probe Number = 2, T = 20.160000 C 21:23:34 Temperature Measurement, Probe Number = 3, T = 20.102000 C 21:23:35 Temperature Measurement, Probe Number = 4, T = 20.398000 C 21:23:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.40 21:23:35 Integrated Voltage Measurement... 21:23:54 Voltage Offset Correction: v_off_ini = 0.000004276 V, v_off_fin = 0.000006515 V 21:23:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171039232 Vs 21:23:55 Integrated Voltage Measurement... 21:24:14 Voltage Offset Correction: v_off_ini = 0.000005921 V, v_off_fin = 0.000002816 V 21:24:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972246 Vs 21:24:17 Temperature Measurement, Probe Number = 0, T = 20.170000 C 21:24:17 Temperature Measurement, Probe Number = 1, T = 20.090000 C 21:24:18 Temperature Measurement, Probe Number = 2, T = 20.156000 C 21:24:19 Temperature Measurement, Probe Number = 3, T = 20.097000 C 21:24:19 Temperature Measurement, Probe Number = 4, T = 20.341000 C 21:24:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.34 21:24:20 Integrated Voltage Measurement... 21:24:39 Voltage Offset Correction: v_off_ini = 0.000004312 V, v_off_fin = 0.000006387 V 21:24:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171039335 Vs 21:24:40 Integrated Voltage Measurement... 21:24:59 Voltage Offset Correction: v_off_ini = 0.000005517 V, v_off_fin = 0.000003003 V 21:24:59 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170966860 Vs 21:25:01 Temperature Measurement, Probe Number = 0, T = 20.171000 C 21:25:02 Temperature Measurement, Probe Number = 1, T = 20.087000 C 21:25:03 Temperature Measurement, Probe Number = 2, T = 20.157000 C 21:25:03 Temperature Measurement, Probe Number = 3, T = 20.096000 C 21:25:04 Temperature Measurement, Probe Number = 4, T = 20.292000 C 21:25:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.29 21:25:04 Integrated Voltage Measurement... 21:25:24 Voltage Offset Correction: v_off_ini = 0.000003682 V, v_off_fin = 0.000006058 V 21:25:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171034324 Vs 21:25:24 Integrated Voltage Measurement... 21:25:43 Voltage Offset Correction: v_off_ini = 0.000005932 V, v_off_fin = 0.000003122 V 21:25:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970640 Vs 21:55:46 Temperature Measurement, Probe Number = 0, T = 20.167000 C 21:55:47 Temperature Measurement, Probe Number = 1, T = 20.087000 C 21:55:48 Temperature Measurement, Probe Number = 2, T = 20.155000 C 21:55:48 Temperature Measurement, Probe Number = 3, T = 20.098000 C 21:55:49 Temperature Measurement, Probe Number = 4, T = 20.335000 C 21:55:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.34 21:55:49 Integrated Voltage Measurement... 21:56:08 Voltage Offset Correction: v_off_ini = 0.000005481 V, v_off_fin = 0.000006931 V 21:56:09 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171088481 Vs 21:56:09 Integrated Voltage Measurement... 21:56:28 Voltage Offset Correction: v_off_ini = 0.000006293 V, v_off_fin = 0.000002453 V 21:56:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969600 Vs 21:56:31 Temperature Measurement, Probe Number = 0, T = 20.176000 C 21:56:31 Temperature Measurement, Probe Number = 1, T = 20.092000 C 21:56:32 Temperature Measurement, Probe Number = 2, T = 20.159000 C 21:56:33 Temperature Measurement, Probe Number = 3, T = 20.100000 C 21:56:33 Temperature Measurement, Probe Number = 4, T = 20.247000 C 21:56:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.25 21:56:34 Integrated Voltage Measurement... 21:56:53 Voltage Offset Correction: v_off_ini = 0.000003969 V, v_off_fin = 0.000007198 V 21:56:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171040971 Vs 21:56:53 Integrated Voltage Measurement... 21:57:12 Voltage Offset Correction: v_off_ini = 0.000006240 V, v_off_fin = 0.000003601 V 21:57:13 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170963522 Vs 21:57:15 Temperature Measurement, Probe Number = 0, T = 20.174000 C 21:57:16 Temperature Measurement, Probe Number = 1, T = 20.094000 C 21:57:17 Temperature Measurement, Probe Number = 2, T = 20.159000 C 21:57:17 Temperature Measurement, Probe Number = 3, T = 20.101000 C 21:57:18 Temperature Measurement, Probe Number = 4, T = 20.292000 C 21:57:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.29 21:57:18 Integrated Voltage Measurement... 21:57:39 Voltage Offset Correction: v_off_ini = 0.000004711 V, v_off_fin = 0.000006705 V 21:57:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044445 Vs 21:57:39 Integrated Voltage Measurement... 21:57:58 Voltage Offset Correction: v_off_ini = 0.000006287 V, v_off_fin = 0.000003182 V 21:57:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961983 Vs 21:58:01 Temperature Measurement, Probe Number = 0, T = 20.171000 C 21:58:02 Temperature Measurement, Probe Number = 1, T = 20.091000 C 21:58:03 Temperature Measurement, Probe Number = 2, T = 20.157000 C 21:58:03 Temperature Measurement, Probe Number = 3, T = 20.098000 C 21:58:04 Temperature Measurement, Probe Number = 4, T = 20.209000 C 21:58:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.21 21:58:04 Integrated Voltage Measurement... 21:58:24 Voltage Offset Correction: v_off_ini = 0.000004490 V, v_off_fin = 0.000007061 V 21:58:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043070 Vs 21:58:24 Integrated Voltage Measurement... 21:58:44 Voltage Offset Correction: v_off_ini = 0.000006030 V, v_off_fin = 0.000002729 V 21:58:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967093 Vs 21:58:46 Temperature Measurement, Probe Number = 0, T = 20.168000 C 21:58:47 Temperature Measurement, Probe Number = 1, T = 20.090000 C 21:58:48 Temperature Measurement, Probe Number = 2, T = 20.155000 C 21:58:48 Temperature Measurement, Probe Number = 3, T = 20.098000 C 21:58:49 Temperature Measurement, Probe Number = 4, T = 20.233000 C 21:58:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.23 21:58:49 Integrated Voltage Measurement... 21:59:09 Voltage Offset Correction: v_off_ini = 0.000004283 V, v_off_fin = 0.000006478 V 21:59:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042508 Vs 21:59:09 Integrated Voltage Measurement... 21:59:29 Voltage Offset Correction: v_off_ini = 0.000006078 V, v_off_fin = 0.000003684 V 21:59:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967957 Vs 21:59:32 Temperature Measurement, Probe Number = 0, T = 20.173000 C 21:59:32 Temperature Measurement, Probe Number = 1, T = 20.091000 C 21:59:33 Temperature Measurement, Probe Number = 2, T = 20.158000 C 21:59:34 Temperature Measurement, Probe Number = 3, T = 20.100000 C 21:59:34 Temperature Measurement, Probe Number = 4, T = 20.295000 C 21:59:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.30 21:59:35 Integrated Voltage Measurement... 21:59:54 Voltage Offset Correction: v_off_ini = 0.000004249 V, v_off_fin = 0.000006897 V 21:59:54 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171038886 Vs 21:59:54 Integrated Voltage Measurement... 22:00:13 Voltage Offset Correction: v_off_ini = 0.000006246 V, v_off_fin = 0.000003559 V 22:00:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969912 Vs 22:00:16 Temperature Measurement, Probe Number = 0, T = 20.177000 C 22:00:17 Temperature Measurement, Probe Number = 1, T = 20.094000 C 22:00:18 Temperature Measurement, Probe Number = 2, T = 20.163000 C 22:00:18 Temperature Measurement, Probe Number = 3, T = 20.105000 C 22:00:19 Temperature Measurement, Probe Number = 4, T = 20.335000 C 22:00:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.34 22:00:19 Integrated Voltage Measurement... 22:00:39 Voltage Offset Correction: v_off_ini = 0.000004176 V, v_off_fin = 0.000006973 V 22:00:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043281 Vs 22:00:39 Integrated Voltage Measurement... 22:00:59 Voltage Offset Correction: v_off_ini = 0.000006591 V, v_off_fin = 0.000003379 V 22:00:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962705 Vs 22:01:02 Temperature Measurement, Probe Number = 0, T = 20.174000 C 22:01:02 Temperature Measurement, Probe Number = 1, T = 20.094000 C 22:01:03 Temperature Measurement, Probe Number = 2, T = 20.161000 C 22:01:04 Temperature Measurement, Probe Number = 3, T = 20.103000 C 22:01:04 Temperature Measurement, Probe Number = 4, T = 20.375000 C 22:01:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.38 22:01:04 Integrated Voltage Measurement... 22:01:24 Voltage Offset Correction: v_off_ini = 0.000004492 V, v_off_fin = 0.000007307 V 22:01:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047937 Vs 22:01:24 Integrated Voltage Measurement... 22:01:44 Voltage Offset Correction: v_off_ini = 0.000006206 V, v_off_fin = 0.000003493 V 22:01:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965658 Vs 22:01:46 Temperature Measurement, Probe Number = 0, T = 20.169000 C 22:01:47 Temperature Measurement, Probe Number = 1, T = 20.089000 C 22:01:48 Temperature Measurement, Probe Number = 2, T = 20.157000 C 22:01:48 Temperature Measurement, Probe Number = 3, T = 20.099000 C 22:01:49 Temperature Measurement, Probe Number = 4, T = 20.370000 C 22:01:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.37 22:01:49 Integrated Voltage Measurement... 22:02:09 Voltage Offset Correction: v_off_ini = 0.000004617 V, v_off_fin = 0.000006518 V 22:02:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041747 Vs 22:02:09 Integrated Voltage Measurement... 22:02:28 Voltage Offset Correction: v_off_ini = 0.000006055 V, v_off_fin = 0.000003696 V 22:02:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963296 Vs 22:02:31 Temperature Measurement, Probe Number = 0, T = 20.170000 C 22:02:32 Temperature Measurement, Probe Number = 1, T = 20.088000 C 22:02:33 Temperature Measurement, Probe Number = 2, T = 20.156000 C 22:02:33 Temperature Measurement, Probe Number = 3, T = 20.096000 C 22:02:34 Temperature Measurement, Probe Number = 4, T = 20.338000 C 22:02:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.34 22:02:34 Integrated Voltage Measurement... 22:02:53 Voltage Offset Correction: v_off_ini = 0.000004677 V, v_off_fin = 0.000007136 V 22:02:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048362 Vs 22:02:54 Integrated Voltage Measurement... 22:03:13 Voltage Offset Correction: v_off_ini = 0.000006178 V, v_off_fin = 0.000003815 V 22:03:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960561 Vs 22:33:16 Temperature Measurement, Probe Number = 0, T = 20.176000 C 22:33:17 Temperature Measurement, Probe Number = 1, T = 20.101000 C 22:33:17 Temperature Measurement, Probe Number = 2, T = 20.166000 C 22:33:18 Temperature Measurement, Probe Number = 3, T = 20.109000 C 22:33:19 Temperature Measurement, Probe Number = 4, T = 20.495000 C 22:33:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.50 22:33:19 Integrated Voltage Measurement... 22:33:38 Voltage Offset Correction: v_off_ini = 0.000005666 V, v_off_fin = 0.000006842 V 22:33:38 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171092658 Vs 22:33:38 Integrated Voltage Measurement... 22:33:57 Voltage Offset Correction: v_off_ini = 0.000006127 V, v_off_fin = 0.000003224 V 22:33:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963466 Vs 22:34:00 Temperature Measurement, Probe Number = 0, T = 20.181000 C 22:34:01 Temperature Measurement, Probe Number = 1, T = 20.106000 C 22:34:02 Temperature Measurement, Probe Number = 2, T = 20.169000 C 22:34:02 Temperature Measurement, Probe Number = 3, T = 20.113000 C 22:34:03 Temperature Measurement, Probe Number = 4, T = 20.544000 C 22:34:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.54 22:34:03 Integrated Voltage Measurement... 22:34:22 Voltage Offset Correction: v_off_ini = 0.000004575 V, v_off_fin = 0.000007551 V 22:34:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047422 Vs 22:34:22 Integrated Voltage Measurement... 22:34:42 Voltage Offset Correction: v_off_ini = 0.000007045 V, v_off_fin = 0.000003611 V 22:34:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952995 Vs 22:34:44 Temperature Measurement, Probe Number = 0, T = 20.183000 C 22:34:45 Temperature Measurement, Probe Number = 1, T = 20.108000 C 22:34:46 Temperature Measurement, Probe Number = 2, T = 20.170000 C 22:34:46 Temperature Measurement, Probe Number = 3, T = 20.115000 C 22:34:47 Temperature Measurement, Probe Number = 4, T = 20.569000 C 22:34:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.57 22:34:47 Integrated Voltage Measurement... 22:35:07 Voltage Offset Correction: v_off_ini = 0.000004932 V, v_off_fin = 0.000006768 V 22:35:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048173 Vs 22:35:07 Integrated Voltage Measurement... 22:35:27 Voltage Offset Correction: v_off_ini = 0.000006254 V, v_off_fin = 0.000003122 V 22:35:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959118 Vs 22:35:30 Temperature Measurement, Probe Number = 0, T = 20.183000 C 22:35:30 Temperature Measurement, Probe Number = 1, T = 20.108000 C 22:35:31 Temperature Measurement, Probe Number = 2, T = 20.171000 C 22:35:32 Temperature Measurement, Probe Number = 3, T = 20.115000 C 22:35:32 Temperature Measurement, Probe Number = 4, T = 20.628000 C 22:35:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.63 22:35:33 Integrated Voltage Measurement... 22:35:52 Voltage Offset Correction: v_off_ini = 0.000004198 V, v_off_fin = 0.000007076 V 22:35:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036856 Vs 22:35:52 Integrated Voltage Measurement... 22:36:11 Voltage Offset Correction: v_off_ini = 0.000006811 V, v_off_fin = 0.000003820 V 22:36:11 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170955114 Vs 22:36:14 Temperature Measurement, Probe Number = 0, T = 20.181000 C 22:36:15 Temperature Measurement, Probe Number = 1, T = 20.107000 C 22:36:15 Temperature Measurement, Probe Number = 2, T = 20.170000 C 22:36:16 Temperature Measurement, Probe Number = 3, T = 20.114000 C 22:36:17 Temperature Measurement, Probe Number = 4, T = 20.607000 C 22:36:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.61 22:36:17 Integrated Voltage Measurement... 22:36:37 Voltage Offset Correction: v_off_ini = 0.000004263 V, v_off_fin = 0.000006925 V 22:36:37 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042861 Vs 22:36:37 Integrated Voltage Measurement... 22:36:56 Voltage Offset Correction: v_off_ini = 0.000006309 V, v_off_fin = 0.000003339 V 22:36:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956297 Vs 22:36:59 Temperature Measurement, Probe Number = 0, T = 20.180000 C 22:37:00 Temperature Measurement, Probe Number = 1, T = 20.105000 C 22:37:00 Temperature Measurement, Probe Number = 2, T = 20.169000 C 22:37:01 Temperature Measurement, Probe Number = 3, T = 20.113000 C 22:37:01 Temperature Measurement, Probe Number = 4, T = 20.634000 C 22:37:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.63 22:37:02 Integrated Voltage Measurement... 22:37:21 Voltage Offset Correction: v_off_ini = 0.000004191 V, v_off_fin = 0.000006733 V 22:37:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036797 Vs 22:37:21 Integrated Voltage Measurement... 22:37:41 Voltage Offset Correction: v_off_ini = 0.000006684 V, v_off_fin = 0.000003970 V 22:37:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959189 Vs 22:37:44 Temperature Measurement, Probe Number = 0, T = 20.180000 C 22:37:44 Temperature Measurement, Probe Number = 1, T = 20.108000 C 22:37:45 Temperature Measurement, Probe Number = 2, T = 20.168000 C 22:37:46 Temperature Measurement, Probe Number = 3, T = 20.113000 C 22:37:46 Temperature Measurement, Probe Number = 4, T = 20.598000 C 22:37:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.60 22:37:46 Integrated Voltage Measurement... 22:38:06 Voltage Offset Correction: v_off_ini = 0.000004743 V, v_off_fin = 0.000007018 V 22:38:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038171 Vs 22:38:06 Integrated Voltage Measurement... 22:38:25 Voltage Offset Correction: v_off_ini = 0.000006731 V, v_off_fin = 0.000003352 V 22:38:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954216 Vs 22:38:28 Temperature Measurement, Probe Number = 0, T = 20.179000 C 22:38:29 Temperature Measurement, Probe Number = 1, T = 20.106000 C 22:38:29 Temperature Measurement, Probe Number = 2, T = 20.166000 C 22:38:30 Temperature Measurement, Probe Number = 3, T = 20.113000 C 22:38:31 Temperature Measurement, Probe Number = 4, T = 20.591000 C 22:38:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.59 22:38:31 Integrated Voltage Measurement... 22:38:50 Voltage Offset Correction: v_off_ini = 0.000004428 V, v_off_fin = 0.000006946 V 22:38:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039962 Vs 22:38:50 Integrated Voltage Measurement... 22:39:09 Voltage Offset Correction: v_off_ini = 0.000006671 V, v_off_fin = 0.000003014 V 22:39:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953462 Vs 22:39:12 Temperature Measurement, Probe Number = 0, T = 20.181000 C 22:39:13 Temperature Measurement, Probe Number = 1, T = 20.108000 C 22:39:13 Temperature Measurement, Probe Number = 2, T = 20.169000 C 22:39:14 Temperature Measurement, Probe Number = 3, T = 20.114000 C 22:39:15 Temperature Measurement, Probe Number = 4, T = 20.612000 C 22:39:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.61 22:39:15 Integrated Voltage Measurement... 22:39:34 Voltage Offset Correction: v_off_ini = 0.000003970 V, v_off_fin = 0.000006467 V 22:39:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036754 Vs 22:39:34 Integrated Voltage Measurement... 22:39:53 Voltage Offset Correction: v_off_ini = 0.000006012 V, v_off_fin = 0.000003195 V 22:39:54 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170961568 Vs 22:39:56 Temperature Measurement, Probe Number = 0, T = 20.180000 C 22:39:57 Temperature Measurement, Probe Number = 1, T = 20.106000 C 22:39:58 Temperature Measurement, Probe Number = 2, T = 20.169000 C 22:39:58 Temperature Measurement, Probe Number = 3, T = 20.113000 C 22:39:59 Temperature Measurement, Probe Number = 4, T = 20.578000 C 22:39:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.58 22:39:59 Integrated Voltage Measurement... 22:40:18 Voltage Offset Correction: v_off_ini = 0.000004047 V, v_off_fin = 0.000006745 V 22:40:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171037877 Vs 22:40:19 Integrated Voltage Measurement... 22:40:38 Voltage Offset Correction: v_off_ini = 0.000006016 V, v_off_fin = 0.000002744 V 22:40:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963376 Vs 23:10:41 Temperature Measurement, Probe Number = 0, T = 20.162000 C 23:10:42 Temperature Measurement, Probe Number = 1, T = 20.088000 C 23:10:43 Temperature Measurement, Probe Number = 2, T = 20.152000 C 23:10:43 Temperature Measurement, Probe Number = 3, T = 20.098000 C 23:10:44 Temperature Measurement, Probe Number = 4, T = 20.160000 C 23:10:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.16 23:10:44 Integrated Voltage Measurement... 23:11:03 Voltage Offset Correction: v_off_ini = 0.000004595 V, v_off_fin = 0.000006063 V 23:11:03 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171076302 Vs 23:11:03 Integrated Voltage Measurement... 23:11:23 Voltage Offset Correction: v_off_ini = 0.000005396 V, v_off_fin = 0.000002470 V 23:11:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972184 Vs 23:11:26 Temperature Measurement, Probe Number = 0, T = 20.160000 C 23:11:26 Temperature Measurement, Probe Number = 1, T = 20.082000 C 23:11:27 Temperature Measurement, Probe Number = 2, T = 20.151000 C 23:11:28 Temperature Measurement, Probe Number = 3, T = 20.095000 C 23:11:28 Temperature Measurement, Probe Number = 4, T = 20.187000 C 23:11:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.19 23:11:28 Integrated Voltage Measurement... 23:11:49 Voltage Offset Correction: v_off_ini = 0.000003701 V, v_off_fin = 0.000006542 V 23:11:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034834 Vs 23:11:49 Integrated Voltage Measurement... 23:12:08 Voltage Offset Correction: v_off_ini = 0.000006034 V, v_off_fin = 0.000003152 V 23:12:08 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170960651 Vs 23:12:11 Temperature Measurement, Probe Number = 0, T = 20.164000 C 23:12:12 Temperature Measurement, Probe Number = 1, T = 20.084000 C 23:12:12 Temperature Measurement, Probe Number = 2, T = 20.153000 C 23:12:13 Temperature Measurement, Probe Number = 3, T = 20.097000 C 23:12:14 Temperature Measurement, Probe Number = 4, T = 20.106000 C 23:12:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.11 23:12:14 Integrated Voltage Measurement... 23:12:33 Voltage Offset Correction: v_off_ini = 0.000004137 V, v_off_fin = 0.000006576 V 23:12:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035804 Vs 23:12:34 Integrated Voltage Measurement... 23:12:52 Voltage Offset Correction: v_off_ini = 0.000006304 V, v_off_fin = 0.000003430 V 23:12:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963828 Vs 23:12:55 Temperature Measurement, Probe Number = 0, T = 20.164000 C 23:12:56 Temperature Measurement, Probe Number = 1, T = 20.084000 C 23:12:57 Temperature Measurement, Probe Number = 2, T = 20.154000 C 23:12:57 Temperature Measurement, Probe Number = 3, T = 20.096000 C 23:12:58 Temperature Measurement, Probe Number = 4, T = 20.132000 C 23:12:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.13 23:12:58 Integrated Voltage Measurement... 23:13:17 Voltage Offset Correction: v_off_ini = 0.000003841 V, v_off_fin = 0.000007287 V 23:13:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171040558 Vs 23:13:18 Integrated Voltage Measurement... 23:13:37 Voltage Offset Correction: v_off_ini = 0.000006409 V, v_off_fin = 0.000002801 V 23:13:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968952 Vs 23:13:40 Temperature Measurement, Probe Number = 0, T = 20.166000 C 23:13:41 Temperature Measurement, Probe Number = 1, T = 20.087000 C 23:13:41 Temperature Measurement, Probe Number = 2, T = 20.158000 C 23:13:42 Temperature Measurement, Probe Number = 3, T = 20.098000 C 23:13:43 Temperature Measurement, Probe Number = 4, T = 20.188000 C 23:13:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.19 23:13:43 Integrated Voltage Measurement... 23:14:02 Voltage Offset Correction: v_off_ini = 0.000004499 V, v_off_fin = 0.000006617 V 23:14:02 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171034738 Vs 23:14:02 Integrated Voltage Measurement... 23:14:21 Voltage Offset Correction: v_off_ini = 0.000005864 V, v_off_fin = 0.000003145 V 23:14:22 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170967094 Vs 23:14:24 Temperature Measurement, Probe Number = 0, T = 20.167000 C 23:14:25 Temperature Measurement, Probe Number = 1, T = 20.087000 C 23:14:26 Temperature Measurement, Probe Number = 2, T = 20.156000 C 23:14:26 Temperature Measurement, Probe Number = 3, T = 20.099000 C 23:14:27 Temperature Measurement, Probe Number = 4, T = 20.155000 C 23:14:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.16 23:14:27 Integrated Voltage Measurement... 23:14:46 Voltage Offset Correction: v_off_ini = 0.000004822 V, v_off_fin = 0.000006872 V 23:14:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040105 Vs 23:14:47 Integrated Voltage Measurement... 23:15:06 Voltage Offset Correction: v_off_ini = 0.000006112 V, v_off_fin = 0.000003750 V 23:15:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965221 Vs 23:15:08 Temperature Measurement, Probe Number = 0, T = 20.167000 C 23:15:09 Temperature Measurement, Probe Number = 1, T = 20.088000 C 23:15:10 Temperature Measurement, Probe Number = 2, T = 20.154000 C 23:15:10 Temperature Measurement, Probe Number = 3, T = 20.098000 C 23:15:11 Temperature Measurement, Probe Number = 4, T = 20.186000 C 23:15:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.19 23:15:11 Integrated Voltage Measurement... 23:15:31 Voltage Offset Correction: v_off_ini = 0.000004281 V, v_off_fin = 0.000006312 V 23:15:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171037093 Vs 23:15:31 Integrated Voltage Measurement... 23:15:51 Voltage Offset Correction: v_off_ini = 0.000006238 V, v_off_fin = 0.000003449 V 23:15:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970716 Vs 23:15:54 Temperature Measurement, Probe Number = 0, T = 20.166000 C 23:15:54 Temperature Measurement, Probe Number = 1, T = 20.087000 C 23:15:55 Temperature Measurement, Probe Number = 2, T = 20.152000 C 23:15:56 Temperature Measurement, Probe Number = 3, T = 20.096000 C 23:15:56 Temperature Measurement, Probe Number = 4, T = 20.171000 C 23:15:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.17 23:15:56 Integrated Voltage Measurement... 23:16:16 Voltage Offset Correction: v_off_ini = 0.000004585 V, v_off_fin = 0.000007107 V 23:16:16 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171036075 Vs 23:16:16 Integrated Voltage Measurement... 23:16:36 Voltage Offset Correction: v_off_ini = 0.000006892 V, v_off_fin = 0.000003061 V 23:16:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967361 Vs 23:16:39 Temperature Measurement, Probe Number = 0, T = 20.167000 C 23:16:39 Temperature Measurement, Probe Number = 1, T = 20.086000 C 23:16:40 Temperature Measurement, Probe Number = 2, T = 20.155000 C 23:16:41 Temperature Measurement, Probe Number = 3, T = 20.097000 C 23:16:41 Temperature Measurement, Probe Number = 4, T = 20.245000 C 23:16:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.25 23:16:41 Integrated Voltage Measurement... 23:17:01 Voltage Offset Correction: v_off_ini = 0.000004275 V, v_off_fin = 0.000007181 V 23:17:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036697 Vs 23:17:01 Integrated Voltage Measurement... 23:17:20 Voltage Offset Correction: v_off_ini = 0.000006284 V, v_off_fin = 0.000003309 V 23:17:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967620 Vs 23:17:23 Temperature Measurement, Probe Number = 0, T = 20.167000 C 23:17:24 Temperature Measurement, Probe Number = 1, T = 20.085000 C 23:17:25 Temperature Measurement, Probe Number = 2, T = 20.156000 C 23:17:25 Temperature Measurement, Probe Number = 3, T = 20.098000 C 23:17:26 Temperature Measurement, Probe Number = 4, T = 20.312000 C 23:17:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.31 23:17:26 Integrated Voltage Measurement... 23:17:46 Voltage Offset Correction: v_off_ini = 0.000004750 V, v_off_fin = 0.000007188 V 23:17:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045367 Vs 23:17:46 Integrated Voltage Measurement... 23:18:05 Voltage Offset Correction: v_off_ini = 0.000006781 V, v_off_fin = 0.000003232 V 23:18:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957665 Vs 23:48:08 Temperature Measurement, Probe Number = 0, T = 20.156000 C 23:48:09 Temperature Measurement, Probe Number = 1, T = 20.081000 C 23:48:09 Temperature Measurement, Probe Number = 2, T = 20.148000 C 23:48:10 Temperature Measurement, Probe Number = 3, T = 20.093000 C 23:48:11 Temperature Measurement, Probe Number = 4, T = 20.179000 C 23:48:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.18 23:48:11 Integrated Voltage Measurement... 23:48:30 Voltage Offset Correction: v_off_ini = 0.000005453 V, v_off_fin = 0.000007176 V 23:48:30 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171083023 Vs 23:48:30 Integrated Voltage Measurement... 23:48:49 Voltage Offset Correction: v_off_ini = 0.000006355 V, v_off_fin = 0.000003584 V 23:48:50 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170966305 Vs 23:48:52 Temperature Measurement, Probe Number = 0, T = 20.159000 C 23:48:53 Temperature Measurement, Probe Number = 1, T = 20.080000 C 23:48:54 Temperature Measurement, Probe Number = 2, T = 20.152000 C 23:48:54 Temperature Measurement, Probe Number = 3, T = 20.095000 C 23:48:55 Temperature Measurement, Probe Number = 4, T = 20.232000 C 23:48:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.23 23:48:55 Integrated Voltage Measurement... 23:49:14 Voltage Offset Correction: v_off_ini = 0.000004845 V, v_off_fin = 0.000007091 V 23:49:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050351 Vs 23:49:15 Integrated Voltage Measurement... 23:49:34 Voltage Offset Correction: v_off_ini = 0.000006597 V, v_off_fin = 0.000003184 V 23:49:34 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170964482 Vs 23:49:37 Temperature Measurement, Probe Number = 0, T = 20.155000 C 23:49:37 Temperature Measurement, Probe Number = 1, T = 20.075000 C 23:49:38 Temperature Measurement, Probe Number = 2, T = 20.145000 C 23:49:39 Temperature Measurement, Probe Number = 3, T = 20.089000 C 23:49:39 Temperature Measurement, Probe Number = 4, T = 20.183000 C 23:49:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.18 23:49:40 Integrated Voltage Measurement... 23:49:59 Voltage Offset Correction: v_off_ini = 0.000005027 V, v_off_fin = 0.000006520 V 23:49:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052216 Vs 23:49:59 Integrated Voltage Measurement... 23:50:18 Voltage Offset Correction: v_off_ini = 0.000006748 V, v_off_fin = 0.000003433 V 23:50:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170963295 Vs 23:50:21 Temperature Measurement, Probe Number = 0, T = 20.158000 C 23:50:22 Temperature Measurement, Probe Number = 1, T = 20.079000 C 23:50:23 Temperature Measurement, Probe Number = 2, T = 20.145000 C 23:50:23 Temperature Measurement, Probe Number = 3, T = 20.090000 C 23:50:24 Temperature Measurement, Probe Number = 4, T = 20.197000 C 23:50:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.20 23:50:24 Integrated Voltage Measurement... 23:50:44 Voltage Offset Correction: v_off_ini = 0.000004252 V, v_off_fin = 0.000007155 V 23:50:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045942 Vs 23:50:44 Integrated Voltage Measurement... 23:51:03 Voltage Offset Correction: v_off_ini = 0.000006444 V, v_off_fin = 0.000003241 V 23:51:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964963 Vs 23:51:06 Temperature Measurement, Probe Number = 0, T = 20.159000 C 23:51:06 Temperature Measurement, Probe Number = 1, T = 20.079000 C 23:51:07 Temperature Measurement, Probe Number = 2, T = 20.151000 C 23:51:08 Temperature Measurement, Probe Number = 3, T = 20.092000 C 23:51:08 Temperature Measurement, Probe Number = 4, T = 20.220000 C 23:51:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.22 23:51:09 Integrated Voltage Measurement... 23:51:28 Voltage Offset Correction: v_off_ini = 0.000005038 V, v_off_fin = 0.000007354 V 23:51:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052579 Vs 23:51:28 Integrated Voltage Measurement... 23:51:48 Voltage Offset Correction: v_off_ini = 0.000006643 V, v_off_fin = 0.000003773 V 23:51:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964765 Vs 23:51:50 Temperature Measurement, Probe Number = 0, T = 20.157000 C 23:51:51 Temperature Measurement, Probe Number = 1, T = 20.079000 C 23:51:52 Temperature Measurement, Probe Number = 2, T = 20.149000 C 23:51:52 Temperature Measurement, Probe Number = 3, T = 20.092000 C 23:51:53 Temperature Measurement, Probe Number = 4, T = 20.127000 C 23:51:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.13 23:51:53 Integrated Voltage Measurement... 23:52:13 Voltage Offset Correction: v_off_ini = 0.000004867 V, v_off_fin = 0.000007701 V 23:52:13 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051130 Vs 23:52:13 Integrated Voltage Measurement... 23:52:32 Voltage Offset Correction: v_off_ini = 0.000006738 V, v_off_fin = 0.000003798 V 23:52:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170961300 Vs 23:52:35 Temperature Measurement, Probe Number = 0, T = 20.159000 C 23:52:35 Temperature Measurement, Probe Number = 1, T = 20.082000 C 23:52:36 Temperature Measurement, Probe Number = 2, T = 20.149000 C 23:52:37 Temperature Measurement, Probe Number = 3, T = 20.092000 C 23:52:37 Temperature Measurement, Probe Number = 4, T = 20.166000 C 23:52:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.17 23:52:38 Integrated Voltage Measurement... 23:52:57 Voltage Offset Correction: v_off_ini = 0.000004738 V, v_off_fin = 0.000007077 V 23:52:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053428 Vs 23:52:57 Integrated Voltage Measurement... 23:53:17 Voltage Offset Correction: v_off_ini = 0.000006423 V, v_off_fin = 0.000003670 V 23:53:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968671 Vs 23:53:19 Temperature Measurement, Probe Number = 0, T = 20.160000 C 23:53:20 Temperature Measurement, Probe Number = 1, T = 20.082000 C 23:53:21 Temperature Measurement, Probe Number = 2, T = 20.150000 C 23:53:21 Temperature Measurement, Probe Number = 3, T = 20.091000 C 23:53:22 Temperature Measurement, Probe Number = 4, T = 20.205000 C 23:53:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.20 23:53:22 Integrated Voltage Measurement... 23:53:41 Voltage Offset Correction: v_off_ini = 0.000004867 V, v_off_fin = 0.000007407 V 23:53:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054541 Vs 23:53:42 Integrated Voltage Measurement... 23:54:01 Voltage Offset Correction: v_off_ini = 0.000006719 V, v_off_fin = 0.000003648 V 23:54:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965486 Vs 23:54:04 Temperature Measurement, Probe Number = 0, T = 20.158000 C 23:54:04 Temperature Measurement, Probe Number = 1, T = 20.077000 C 23:54:05 Temperature Measurement, Probe Number = 2, T = 20.153000 C 23:54:06 Temperature Measurement, Probe Number = 3, T = 20.092000 C 23:54:06 Temperature Measurement, Probe Number = 4, T = 20.254000 C 23:54:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.25 23:54:07 Integrated Voltage Measurement... 23:54:26 Voltage Offset Correction: v_off_ini = 0.000004370 V, v_off_fin = 0.000007466 V 23:54:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055149 Vs 23:54:26 Integrated Voltage Measurement... 23:54:45 Voltage Offset Correction: v_off_ini = 0.000006934 V, v_off_fin = 0.000004063 V 23:54:45 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170959546 Vs 23:54:48 Temperature Measurement, Probe Number = 0, T = 20.153000 C 23:54:49 Temperature Measurement, Probe Number = 1, T = 20.072000 C 23:54:49 Temperature Measurement, Probe Number = 2, T = 20.148000 C 23:54:50 Temperature Measurement, Probe Number = 3, T = 20.088000 C 23:54:51 Temperature Measurement, Probe Number = 4, T = 20.199000 C 23:54:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.20 23:54:51 Integrated Voltage Measurement... 23:55:10 Voltage Offset Correction: v_off_ini = 0.000005021 V, v_off_fin = 0.000007434 V 23:55:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171056604 Vs 23:55:11 Integrated Voltage Measurement... 23:55:29 Voltage Offset Correction: v_off_ini = 0.000006924 V, v_off_fin = 0.000003447 V 23:55:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170960022 Vs 00:25:32 Temperature Measurement, Probe Number = 0, T = 20.149000 C 00:25:33 Temperature Measurement, Probe Number = 1, T = 20.067000 C 00:25:34 Temperature Measurement, Probe Number = 2, T = 20.143000 C 00:25:34 Temperature Measurement, Probe Number = 3, T = 20.084000 C 00:25:35 Temperature Measurement, Probe Number = 4, T = 20.294000 C 00:25:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.29 00:25:35 Integrated Voltage Measurement... 00:25:54 Voltage Offset Correction: v_off_ini = 0.000005558 V, v_off_fin = 0.000006888 V 00:25:54 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171097220 Vs 00:25:54 Integrated Voltage Measurement... 00:26:14 Voltage Offset Correction: v_off_ini = 0.000006755 V, v_off_fin = 0.000003151 V 00:26:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967838 Vs 00:26:17 Temperature Measurement, Probe Number = 0, T = 20.150000 C 00:26:17 Temperature Measurement, Probe Number = 1, T = 20.070000 C 00:26:18 Temperature Measurement, Probe Number = 2, T = 20.145000 C 00:26:19 Temperature Measurement, Probe Number = 3, T = 20.083000 C 00:26:19 Temperature Measurement, Probe Number = 4, T = 20.300000 C 00:26:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.30 00:26:20 Integrated Voltage Measurement... 00:26:39 Voltage Offset Correction: v_off_ini = 0.000004998 V, v_off_fin = 0.000007010 V 00:26:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051347 Vs 00:26:39 Integrated Voltage Measurement... 00:26:58 Voltage Offset Correction: v_off_ini = 0.000006662 V, v_off_fin = 0.000003099 V 00:26:58 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170964644 Vs 00:27:01 Temperature Measurement, Probe Number = 0, T = 20.151000 C 00:27:02 Temperature Measurement, Probe Number = 1, T = 20.070000 C 00:27:02 Temperature Measurement, Probe Number = 2, T = 20.145000 C 00:27:03 Temperature Measurement, Probe Number = 3, T = 20.084000 C 00:27:04 Temperature Measurement, Probe Number = 4, T = 20.315000 C 00:27:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.32 00:27:04 Integrated Voltage Measurement... 00:27:24 Voltage Offset Correction: v_off_ini = 0.000004534 V, v_off_fin = 0.000007054 V 00:27:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051823 Vs 00:27:24 Integrated Voltage Measurement... 00:27:43 Voltage Offset Correction: v_off_ini = 0.000006567 V, v_off_fin = 0.000003474 V 00:27:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964567 Vs 00:27:46 Temperature Measurement, Probe Number = 0, T = 20.147000 C 00:27:47 Temperature Measurement, Probe Number = 1, T = 20.065000 C 00:27:47 Temperature Measurement, Probe Number = 2, T = 20.141000 C 00:27:48 Temperature Measurement, Probe Number = 3, T = 20.083000 C 00:27:49 Temperature Measurement, Probe Number = 4, T = 20.353000 C 00:27:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.35 00:27:49 Integrated Voltage Measurement... 00:28:08 Voltage Offset Correction: v_off_ini = 0.000004589 V, v_off_fin = 0.000006782 V 00:28:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057322 Vs 00:28:09 Integrated Voltage Measurement... 00:28:28 Voltage Offset Correction: v_off_ini = 0.000005898 V, v_off_fin = 0.000003550 V 00:28:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969639 Vs 00:28:31 Temperature Measurement, Probe Number = 0, T = 20.148000 C 00:28:32 Temperature Measurement, Probe Number = 1, T = 20.068000 C 00:28:33 Temperature Measurement, Probe Number = 2, T = 20.143000 C 00:28:33 Temperature Measurement, Probe Number = 3, T = 20.085000 C 00:28:34 Temperature Measurement, Probe Number = 4, T = 20.425000 C 00:28:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.43 00:28:34 Integrated Voltage Measurement... 00:28:53 Voltage Offset Correction: v_off_ini = 0.000004224 V, v_off_fin = 0.000006768 V 00:28:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045814 Vs 00:28:54 Integrated Voltage Measurement... 00:29:13 Voltage Offset Correction: v_off_ini = 0.000006218 V, v_off_fin = 0.000003425 V 00:29:13 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170968561 Vs 00:29:16 Temperature Measurement, Probe Number = 0, T = 20.152000 C 00:29:17 Temperature Measurement, Probe Number = 1, T = 20.069000 C 00:29:17 Temperature Measurement, Probe Number = 2, T = 20.148000 C 00:29:18 Temperature Measurement, Probe Number = 3, T = 20.089000 C 00:29:18 Temperature Measurement, Probe Number = 4, T = 20.515000 C 00:29:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.52 00:29:19 Integrated Voltage Measurement... 00:29:39 Voltage Offset Correction: v_off_ini = 0.000004874 V, v_off_fin = 0.000007128 V 00:29:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054920 Vs 00:29:39 Integrated Voltage Measurement... 00:29:58 Voltage Offset Correction: v_off_ini = 0.000006261 V, v_off_fin = 0.000002842 V 00:29:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970036 Vs 00:30:01 Temperature Measurement, Probe Number = 0, T = 20.150000 C 00:30:02 Temperature Measurement, Probe Number = 1, T = 20.067000 C 00:30:03 Temperature Measurement, Probe Number = 2, T = 20.148000 C 00:30:03 Temperature Measurement, Probe Number = 3, T = 20.087000 C 00:30:04 Temperature Measurement, Probe Number = 4, T = 20.509000 C 00:30:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.51 00:30:04 Integrated Voltage Measurement... 00:30:23 Voltage Offset Correction: v_off_ini = 0.000004433 V, v_off_fin = 0.000007188 V 00:30:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052464 Vs 00:30:24 Integrated Voltage Measurement... 00:30:43 Voltage Offset Correction: v_off_ini = 0.000005999 V, v_off_fin = 0.000003766 V 00:30:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967608 Vs 00:30:46 Temperature Measurement, Probe Number = 0, T = 20.149000 C 00:30:47 Temperature Measurement, Probe Number = 1, T = 20.066000 C 00:30:47 Temperature Measurement, Probe Number = 2, T = 20.147000 C 00:30:48 Temperature Measurement, Probe Number = 3, T = 20.086000 C 00:30:49 Temperature Measurement, Probe Number = 4, T = 20.494000 C 00:30:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.49 00:30:49 Integrated Voltage Measurement... 00:31:09 Voltage Offset Correction: v_off_ini = 0.000004863 V, v_off_fin = 0.000007328 V 00:31:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057792 Vs 00:31:09 Integrated Voltage Measurement... 00:31:29 Voltage Offset Correction: v_off_ini = 0.000006437 V, v_off_fin = 0.000003605 V 00:31:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966120 Vs 00:31:31 Temperature Measurement, Probe Number = 0, T = 20.149000 C 00:31:32 Temperature Measurement, Probe Number = 1, T = 20.068000 C 00:31:33 Temperature Measurement, Probe Number = 2, T = 20.140000 C 00:31:33 Temperature Measurement, Probe Number = 3, T = 20.082000 C 00:31:34 Temperature Measurement, Probe Number = 4, T = 20.472000 C 00:31:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.47 00:31:34 Integrated Voltage Measurement... 00:31:54 Voltage Offset Correction: v_off_ini = 0.000004774 V, v_off_fin = 0.000007272 V 00:31:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052625 Vs 00:31:54 Integrated Voltage Measurement... 00:32:13 Voltage Offset Correction: v_off_ini = 0.000006955 V, v_off_fin = 0.000004395 V 00:32:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965515 Vs 00:32:16 Temperature Measurement, Probe Number = 0, T = 20.151000 C 00:32:17 Temperature Measurement, Probe Number = 1, T = 20.070000 C 00:32:17 Temperature Measurement, Probe Number = 2, T = 20.143000 C 00:32:18 Temperature Measurement, Probe Number = 3, T = 20.086000 C 00:32:19 Temperature Measurement, Probe Number = 4, T = 20.433000 C 00:32:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.43 00:32:19 Integrated Voltage Measurement... 00:32:38 Voltage Offset Correction: v_off_ini = 0.000004643 V, v_off_fin = 0.000007095 V 00:32:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054384 Vs 00:32:39 Integrated Voltage Measurement... 00:32:58 Voltage Offset Correction: v_off_ini = 0.000006834 V, v_off_fin = 0.000003692 V 00:32:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960368 Vs 01:03:01 Temperature Measurement, Probe Number = 0, T = 20.146000 C 01:03:01 Temperature Measurement, Probe Number = 1, T = 20.064000 C 01:03:02 Temperature Measurement, Probe Number = 2, T = 20.140000 C 01:03:03 Temperature Measurement, Probe Number = 3, T = 20.079000 C 01:03:03 Temperature Measurement, Probe Number = 4, T = 20.401000 C 01:03:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.40 01:03:04 Integrated Voltage Measurement... 01:03:23 Voltage Offset Correction: v_off_ini = 0.000005389 V, v_off_fin = 0.000007082 V 01:03:23 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171106392 Vs 01:03:24 Integrated Voltage Measurement... 01:03:43 Voltage Offset Correction: v_off_ini = 0.000006018 V, v_off_fin = 0.000003162 V 01:03:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964778 Vs 01:03:46 Temperature Measurement, Probe Number = 0, T = 20.142000 C 01:03:46 Temperature Measurement, Probe Number = 1, T = 20.063000 C 01:03:47 Temperature Measurement, Probe Number = 2, T = 20.137000 C 01:03:48 Temperature Measurement, Probe Number = 3, T = 20.079000 C 01:03:48 Temperature Measurement, Probe Number = 4, T = 20.300000 C 01:03:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.30 01:03:48 Integrated Voltage Measurement... 01:04:08 Voltage Offset Correction: v_off_ini = 0.000003301 V, v_off_fin = 0.000006245 V 01:04:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171039272 Vs 01:04:08 Integrated Voltage Measurement... 01:04:28 Voltage Offset Correction: v_off_ini = 0.000005866 V, v_off_fin = 0.000002723 V 01:04:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973466 Vs 01:04:31 Temperature Measurement, Probe Number = 0, T = 20.149000 C 01:04:31 Temperature Measurement, Probe Number = 1, T = 20.069000 C 01:04:32 Temperature Measurement, Probe Number = 2, T = 20.145000 C 01:04:33 Temperature Measurement, Probe Number = 3, T = 20.084000 C 01:04:33 Temperature Measurement, Probe Number = 4, T = 20.306000 C 01:04:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.31 01:04:33 Integrated Voltage Measurement... 01:04:53 Voltage Offset Correction: v_off_ini = 0.000003914 V, v_off_fin = 0.000006405 V 01:04:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039888 Vs 01:04:53 Integrated Voltage Measurement... 01:05:12 Voltage Offset Correction: v_off_ini = 0.000005685 V, v_off_fin = 0.000003100 V 01:05:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972967 Vs 01:05:15 Temperature Measurement, Probe Number = 0, T = 20.149000 C 01:05:16 Temperature Measurement, Probe Number = 1, T = 20.070000 C 01:05:17 Temperature Measurement, Probe Number = 2, T = 20.144000 C 01:05:17 Temperature Measurement, Probe Number = 3, T = 20.085000 C 01:05:18 Temperature Measurement, Probe Number = 4, T = 20.409000 C 01:05:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.41 01:05:18 Integrated Voltage Measurement... 01:05:37 Voltage Offset Correction: v_off_ini = 0.000004343 V, v_off_fin = 0.000006865 V 01:05:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046968 Vs 01:05:38 Integrated Voltage Measurement... 01:05:57 Voltage Offset Correction: v_off_ini = 0.000006033 V, v_off_fin = 0.000003326 V 01:05:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170963346 Vs 01:06:00 Temperature Measurement, Probe Number = 0, T = 20.150000 C 01:06:00 Temperature Measurement, Probe Number = 1, T = 20.067000 C 01:06:01 Temperature Measurement, Probe Number = 2, T = 20.147000 C 01:06:02 Temperature Measurement, Probe Number = 3, T = 20.085000 C 01:06:02 Temperature Measurement, Probe Number = 4, T = 20.453000 C 01:06:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.45 01:06:02 Integrated Voltage Measurement... 01:06:22 Voltage Offset Correction: v_off_ini = 0.000004681 V, v_off_fin = 0.000006877 V 01:06:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050573 Vs 01:06:22 Integrated Voltage Measurement... 01:06:41 Voltage Offset Correction: v_off_ini = 0.000006067 V, v_off_fin = 0.000002930 V 01:06:41 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170968140 Vs 01:06:44 Temperature Measurement, Probe Number = 0, T = 20.146000 C 01:06:45 Temperature Measurement, Probe Number = 1, T = 20.061000 C 01:06:45 Temperature Measurement, Probe Number = 2, T = 20.142000 C 01:06:46 Temperature Measurement, Probe Number = 3, T = 20.079000 C 01:06:46 Temperature Measurement, Probe Number = 4, T = 20.433000 C 01:06:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.43 01:06:47 Integrated Voltage Measurement... 01:07:06 Voltage Offset Correction: v_off_ini = 0.000004386 V, v_off_fin = 0.000006660 V 01:07:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047920 Vs 01:07:06 Integrated Voltage Measurement... 01:07:25 Voltage Offset Correction: v_off_ini = 0.000006289 V, v_off_fin = 0.000003074 V 01:07:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969258 Vs 01:07:28 Temperature Measurement, Probe Number = 0, T = 20.142000 C 01:07:29 Temperature Measurement, Probe Number = 1, T = 20.061000 C 01:07:30 Temperature Measurement, Probe Number = 2, T = 20.137000 C 01:07:30 Temperature Measurement, Probe Number = 3, T = 20.077000 C 01:07:31 Temperature Measurement, Probe Number = 4, T = 20.427000 C 01:07:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.43 01:07:31 Integrated Voltage Measurement... 01:07:51 Voltage Offset Correction: v_off_ini = 0.000004450 V, v_off_fin = 0.000006725 V 01:07:51 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171046398 Vs 01:07:51 Integrated Voltage Measurement... 01:08:10 Voltage Offset Correction: v_off_ini = 0.000006429 V, v_off_fin = 0.000002925 V 01:08:10 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170965687 Vs 01:08:13 Temperature Measurement, Probe Number = 0, T = 20.146000 C 01:08:14 Temperature Measurement, Probe Number = 1, T = 20.063000 C 01:08:14 Temperature Measurement, Probe Number = 2, T = 20.141000 C 01:08:15 Temperature Measurement, Probe Number = 3, T = 20.080000 C 01:08:16 Temperature Measurement, Probe Number = 4, T = 20.439000 C 01:08:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.44 01:08:16 Integrated Voltage Measurement... 01:08:35 Voltage Offset Correction: v_off_ini = 0.000004019 V, v_off_fin = 0.000007080 V 01:08:35 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045363 Vs 01:08:35 Integrated Voltage Measurement... 01:08:55 Voltage Offset Correction: v_off_ini = 0.000006230 V, v_off_fin = 0.000003335 V 01:08:55 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170969910 Vs 01:08:57 Temperature Measurement, Probe Number = 0, T = 20.148000 C 01:08:58 Temperature Measurement, Probe Number = 1, T = 20.065000 C 01:08:59 Temperature Measurement, Probe Number = 2, T = 20.141000 C 01:08:59 Temperature Measurement, Probe Number = 3, T = 20.082000 C 01:09:00 Temperature Measurement, Probe Number = 4, T = 20.474000 C 01:09:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.47 01:09:00 Integrated Voltage Measurement... 01:09:19 Voltage Offset Correction: v_off_ini = 0.000004063 V, v_off_fin = 0.000006566 V 01:09:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171046132 Vs 01:09:20 Integrated Voltage Measurement... 01:09:39 Voltage Offset Correction: v_off_ini = 0.000006063 V, v_off_fin = 0.000002686 V 01:09:39 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170967832 Vs 01:09:42 Temperature Measurement, Probe Number = 0, T = 20.143000 C 01:09:42 Temperature Measurement, Probe Number = 1, T = 20.059000 C 01:09:43 Temperature Measurement, Probe Number = 2, T = 20.137000 C 01:09:44 Temperature Measurement, Probe Number = 3, T = 20.075000 C 01:09:44 Temperature Measurement, Probe Number = 4, T = 20.463000 C 01:09:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.46 01:09:45 Integrated Voltage Measurement... 01:10:04 Voltage Offset Correction: v_off_ini = 0.000004052 V, v_off_fin = 0.000006519 V 01:10:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042849 Vs 01:10:04 Integrated Voltage Measurement... 01:10:24 Voltage Offset Correction: v_off_ini = 0.000006021 V, v_off_fin = 0.000002962 V 01:10:24 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971324 Vs 01:40:27 Temperature Measurement, Probe Number = 0, T = 20.132000 C 01:40:28 Temperature Measurement, Probe Number = 1, T = 20.051000 C 01:40:28 Temperature Measurement, Probe Number = 2, T = 20.128000 C 01:40:29 Temperature Measurement, Probe Number = 3, T = 20.068000 C 01:40:30 Temperature Measurement, Probe Number = 4, T = 20.276000 C 01:40:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.28 01:40:30 Integrated Voltage Measurement... 01:40:49 Voltage Offset Correction: v_off_ini = 0.000005447 V, v_off_fin = 0.000006717 V 01:40:49 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171097688 Vs 01:40:49 Integrated Voltage Measurement... 01:41:09 Voltage Offset Correction: v_off_ini = 0.000005814 V, v_off_fin = 0.000002926 V 01:41:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170972315 Vs 01:41:12 Temperature Measurement, Probe Number = 0, T = 20.135000 C 01:41:12 Temperature Measurement, Probe Number = 1, T = 20.053000 C 01:41:13 Temperature Measurement, Probe Number = 2, T = 20.130000 C 01:41:14 Temperature Measurement, Probe Number = 3, T = 20.070000 C 01:41:14 Temperature Measurement, Probe Number = 4, T = 20.227000 C 01:41:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.23 01:41:15 Integrated Voltage Measurement... 01:41:34 Voltage Offset Correction: v_off_ini = 0.000004695 V, v_off_fin = 0.000007688 V 01:41:34 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052014 Vs 01:41:34 Integrated Voltage Measurement... 01:41:54 Voltage Offset Correction: v_off_ini = 0.000006585 V, v_off_fin = 0.000002701 V 01:41:54 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170964021 Vs 01:41:57 Temperature Measurement, Probe Number = 0, T = 20.132000 C 01:41:57 Temperature Measurement, Probe Number = 1, T = 20.053000 C 01:41:58 Temperature Measurement, Probe Number = 2, T = 20.127000 C 01:41:59 Temperature Measurement, Probe Number = 3, T = 20.068000 C 01:41:59 Temperature Measurement, Probe Number = 4, T = 20.193000 C 01:41:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.19 01:41:59 Integrated Voltage Measurement... 01:42:19 Voltage Offset Correction: v_off_ini = 0.000004611 V, v_off_fin = 0.000007015 V 01:42:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054076 Vs 01:42:19 Integrated Voltage Measurement... 01:42:38 Voltage Offset Correction: v_off_ini = 0.000006358 V, v_off_fin = 0.000002212 V 01:42:38 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170967562 Vs 01:42:41 Temperature Measurement, Probe Number = 0, T = 20.134000 C 01:42:42 Temperature Measurement, Probe Number = 1, T = 20.055000 C 01:42:42 Temperature Measurement, Probe Number = 2, T = 20.127000 C 01:42:43 Temperature Measurement, Probe Number = 3, T = 20.070000 C 01:42:44 Temperature Measurement, Probe Number = 4, T = 20.153000 C 01:42:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.15 01:42:44 Integrated Voltage Measurement... 01:43:03 Voltage Offset Correction: v_off_ini = 0.000003895 V, v_off_fin = 0.000006792 V 01:43:03 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171049598 Vs 01:43:04 Integrated Voltage Measurement... 01:43:23 Voltage Offset Correction: v_off_ini = 0.000006179 V, v_off_fin = 0.000002507 V 01:43:23 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170968902 Vs 01:43:26 Temperature Measurement, Probe Number = 0, T = 20.139000 C 01:43:26 Temperature Measurement, Probe Number = 1, T = 20.060000 C 01:43:27 Temperature Measurement, Probe Number = 2, T = 20.130000 C 01:43:28 Temperature Measurement, Probe Number = 3, T = 20.072000 C 01:43:28 Temperature Measurement, Probe Number = 4, T = 20.288000 C 01:43:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.29 01:43:29 Integrated Voltage Measurement... 01:43:48 Voltage Offset Correction: v_off_ini = 0.000004576 V, v_off_fin = 0.000006764 V 01:43:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050511 Vs 01:43:48 Integrated Voltage Measurement... 01:44:07 Voltage Offset Correction: v_off_ini = 0.000006348 V, v_off_fin = 0.000002661 V 01:44:07 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170964047 Vs 01:44:10 Temperature Measurement, Probe Number = 0, T = 20.142000 C 01:44:11 Temperature Measurement, Probe Number = 1, T = 20.062000 C 01:44:12 Temperature Measurement, Probe Number = 2, T = 20.136000 C 01:44:12 Temperature Measurement, Probe Number = 3, T = 20.077000 C 01:44:13 Temperature Measurement, Probe Number = 4, T = 20.377000 C 01:44:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.38 01:44:13 Integrated Voltage Measurement... 01:44:32 Voltage Offset Correction: v_off_ini = 0.000004072 V, v_off_fin = 0.000006547 V 01:44:32 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171052630 Vs 01:44:32 Integrated Voltage Measurement... 01:44:52 Voltage Offset Correction: v_off_ini = 0.000006265 V, v_off_fin = 0.000002773 V 01:44:52 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170970639 Vs 01:44:54 Temperature Measurement, Probe Number = 0, T = 20.143000 C 01:44:55 Temperature Measurement, Probe Number = 1, T = 20.060000 C 01:44:56 Temperature Measurement, Probe Number = 2, T = 20.138000 C 01:44:56 Temperature Measurement, Probe Number = 3, T = 20.077000 C 01:44:57 Temperature Measurement, Probe Number = 4, T = 20.438000 C 01:44:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.44 01:44:57 Integrated Voltage Measurement... 01:45:17 Voltage Offset Correction: v_off_ini = 0.000004119 V, v_off_fin = 0.000006813 V 01:45:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049831 Vs 01:45:17 Integrated Voltage Measurement... 01:45:36 Voltage Offset Correction: v_off_ini = 0.000005821 V, v_off_fin = 0.000002957 V 01:45:37 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170969182 Vs 01:45:39 Temperature Measurement, Probe Number = 0, T = 20.140000 C 01:45:40 Temperature Measurement, Probe Number = 1, T = 20.059000 C 01:45:41 Temperature Measurement, Probe Number = 2, T = 20.132000 C 01:45:41 Temperature Measurement, Probe Number = 3, T = 20.070000 C 01:45:42 Temperature Measurement, Probe Number = 4, T = 20.416000 C 01:45:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.42 01:45:42 Integrated Voltage Measurement... 01:46:02 Voltage Offset Correction: v_off_ini = 0.000004334 V, v_off_fin = 0.000006723 V 01:46:02 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171048784 Vs 01:46:02 Integrated Voltage Measurement... 01:46:21 Voltage Offset Correction: v_off_ini = 0.000006088 V, v_off_fin = 0.000002486 V 01:46:21 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971976 Vs 01:46:24 Temperature Measurement, Probe Number = 0, T = 20.137000 C 01:46:25 Temperature Measurement, Probe Number = 1, T = 20.056000 C 01:46:25 Temperature Measurement, Probe Number = 2, T = 20.131000 C 01:46:26 Temperature Measurement, Probe Number = 3, T = 20.070000 C 01:46:27 Temperature Measurement, Probe Number = 4, T = 20.429000 C 01:46:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.43 01:46:27 Integrated Voltage Measurement... 01:46:46 Voltage Offset Correction: v_off_ini = 0.000003440 V, v_off_fin = 0.000005949 V 01:46:46 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044263 Vs 01:46:47 Integrated Voltage Measurement... 01:47:06 Voltage Offset Correction: v_off_ini = 0.000005508 V, v_off_fin = 0.000002853 V 01:47:06 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170972622 Vs 01:47:08 Temperature Measurement, Probe Number = 0, T = 20.137000 C 01:47:09 Temperature Measurement, Probe Number = 1, T = 20.054000 C 01:47:10 Temperature Measurement, Probe Number = 2, T = 20.133000 C 01:47:10 Temperature Measurement, Probe Number = 3, T = 20.071000 C 01:47:11 Temperature Measurement, Probe Number = 4, T = 20.415000 C 01:47:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.41 01:47:11 Integrated Voltage Measurement... 01:47:31 Voltage Offset Correction: v_off_ini = 0.000004276 V, v_off_fin = 0.000006725 V 01:47:31 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171052164 Vs 01:47:31 Integrated Voltage Measurement... 01:47:51 Voltage Offset Correction: v_off_ini = 0.000006430 V, v_off_fin = 0.000003179 V 01:47:51 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170972464 Vs 02:17:53 Temperature Measurement, Probe Number = 0, T = 20.150000 C 02:17:54 Temperature Measurement, Probe Number = 1, T = 20.074000 C 02:17:55 Temperature Measurement, Probe Number = 2, T = 20.144000 C 02:17:56 Temperature Measurement, Probe Number = 3, T = 20.088000 C 02:17:56 Temperature Measurement, Probe Number = 4, T = 20.556000 C 02:17:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.56 02:17:57 Integrated Voltage Measurement... 02:18:16 Voltage Offset Correction: v_off_ini = 0.000005228 V, v_off_fin = 0.000006546 V 02:18:16 Integrated Voltage Measurement Delta Gap = 0.0040017 m VT = 0.171101618 Vs 02:18:16 Integrated Voltage Measurement... 02:18:35 Voltage Offset Correction: v_off_ini = 0.000006121 V, v_off_fin = 0.000003088 V 02:18:35 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170958114 Vs 02:18:38 Temperature Measurement, Probe Number = 0, T = 20.149000 C 02:18:39 Temperature Measurement, Probe Number = 1, T = 20.073000 C 02:18:39 Temperature Measurement, Probe Number = 2, T = 20.144000 C 02:18:40 Temperature Measurement, Probe Number = 3, T = 20.087000 C 02:18:41 Temperature Measurement, Probe Number = 4, T = 20.543000 C 02:18:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.54 02:18:41 Integrated Voltage Measurement... 02:19:01 Voltage Offset Correction: v_off_ini = 0.000004764 V, v_off_fin = 0.000007264 V 02:19:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044937 Vs 02:19:01 Integrated Voltage Measurement... 02:19:20 Voltage Offset Correction: v_off_ini = 0.000006407 V, v_off_fin = 0.000003122 V 02:19:20 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170961308 Vs 02:19:23 Temperature Measurement, Probe Number = 0, T = 20.141000 C 02:19:24 Temperature Measurement, Probe Number = 1, T = 20.064000 C 02:19:24 Temperature Measurement, Probe Number = 2, T = 20.136000 C 02:19:25 Temperature Measurement, Probe Number = 3, T = 20.080000 C 02:19:26 Temperature Measurement, Probe Number = 4, T = 20.539000 C 02:19:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.54 02:19:26 Integrated Voltage Measurement... 02:19:45 Voltage Offset Correction: v_off_ini = 0.000004700 V, v_off_fin = 0.000007414 V 02:19:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171043689 Vs 02:19:46 Integrated Voltage Measurement... 02:20:05 Voltage Offset Correction: v_off_ini = 0.000006620 V, v_off_fin = 0.000003315 V 02:20:05 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170956394 Vs 02:20:08 Temperature Measurement, Probe Number = 0, T = 20.138000 C 02:20:08 Temperature Measurement, Probe Number = 1, T = 20.062000 C 02:20:09 Temperature Measurement, Probe Number = 2, T = 20.134000 C 02:20:10 Temperature Measurement, Probe Number = 3, T = 20.078000 C 02:20:10 Temperature Measurement, Probe Number = 4, T = 20.418000 C 02:20:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.42 02:20:10 Integrated Voltage Measurement... 02:20:31 Voltage Offset Correction: v_off_ini = 0.000004498 V, v_off_fin = 0.000006809 V 02:20:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049055 Vs 02:20:32 Integrated Voltage Measurement... 02:20:51 Voltage Offset Correction: v_off_ini = 0.000006754 V, v_off_fin = 0.000003677 V 02:20:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949057 Vs 02:20:54 Temperature Measurement, Probe Number = 0, T = 20.139000 C 02:20:55 Temperature Measurement, Probe Number = 1, T = 20.063000 C 02:20:55 Temperature Measurement, Probe Number = 2, T = 20.133000 C 02:20:56 Temperature Measurement, Probe Number = 3, T = 20.077000 C 02:20:57 Temperature Measurement, Probe Number = 4, T = 20.401000 C 02:20:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.40 02:20:57 Integrated Voltage Measurement... 02:21:16 Voltage Offset Correction: v_off_ini = 0.000004719 V, v_off_fin = 0.000007424 V 02:21:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044867 Vs 02:21:16 Integrated Voltage Measurement... 02:21:36 Voltage Offset Correction: v_off_ini = 0.000006909 V, v_off_fin = 0.000003884 V 02:21:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170950782 Vs 02:21:38 Temperature Measurement, Probe Number = 0, T = 20.145000 C 02:21:39 Temperature Measurement, Probe Number = 1, T = 20.069000 C 02:21:40 Temperature Measurement, Probe Number = 2, T = 20.138000 C 02:21:40 Temperature Measurement, Probe Number = 3, T = 20.082000 C 02:21:41 Temperature Measurement, Probe Number = 4, T = 20.515000 C 02:21:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.52 02:21:41 Integrated Voltage Measurement... 02:22:00 Voltage Offset Correction: v_off_ini = 0.000004358 V, v_off_fin = 0.000006800 V 02:22:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047216 Vs 02:22:01 Integrated Voltage Measurement... 02:22:20 Voltage Offset Correction: v_off_ini = 0.000006133 V, v_off_fin = 0.000002939 V 02:22:20 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170957180 Vs 02:22:23 Temperature Measurement, Probe Number = 0, T = 20.148000 C 02:22:23 Temperature Measurement, Probe Number = 1, T = 20.070000 C 02:22:24 Temperature Measurement, Probe Number = 2, T = 20.141000 C 02:22:25 Temperature Measurement, Probe Number = 3, T = 20.083000 C 02:22:25 Temperature Measurement, Probe Number = 4, T = 20.517000 C 02:22:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.52 02:22:26 Integrated Voltage Measurement... 02:22:45 Voltage Offset Correction: v_off_ini = 0.000004092 V, v_off_fin = 0.000006653 V 02:22:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171046844 Vs 02:22:45 Integrated Voltage Measurement... 02:23:05 Voltage Offset Correction: v_off_ini = 0.000005980 V, v_off_fin = 0.000002694 V 02:23:05 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170960479 Vs 02:23:08 Temperature Measurement, Probe Number = 0, T = 20.148000 C 02:23:08 Temperature Measurement, Probe Number = 1, T = 20.070000 C 02:23:09 Temperature Measurement, Probe Number = 2, T = 20.141000 C 02:23:09 Temperature Measurement, Probe Number = 3, T = 20.084000 C 02:23:10 Temperature Measurement, Probe Number = 4, T = 20.519000 C 02:23:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.52 02:23:10 Integrated Voltage Measurement... 02:23:30 Voltage Offset Correction: v_off_ini = 0.000004811 V, v_off_fin = 0.000007677 V 02:23:30 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050855 Vs 02:23:30 Integrated Voltage Measurement... 02:23:49 Voltage Offset Correction: v_off_ini = 0.000007189 V, v_off_fin = 0.000003186 V 02:23:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170947216 Vs 02:23:52 Temperature Measurement, Probe Number = 0, T = 20.143000 C 02:23:53 Temperature Measurement, Probe Number = 1, T = 20.061000 C 02:23:54 Temperature Measurement, Probe Number = 2, T = 20.138000 C 02:23:54 Temperature Measurement, Probe Number = 3, T = 20.079000 C 02:23:55 Temperature Measurement, Probe Number = 4, T = 20.577000 C 02:23:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.58 02:23:55 Integrated Voltage Measurement... 02:24:14 Voltage Offset Correction: v_off_ini = 0.000004383 V, v_off_fin = 0.000007340 V 02:24:14 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052385 Vs 02:24:14 Integrated Voltage Measurement... 02:24:34 Voltage Offset Correction: v_off_ini = 0.000006700 V, v_off_fin = 0.000003442 V 02:24:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952991 Vs 02:24:37 Temperature Measurement, Probe Number = 0, T = 20.133000 C 02:24:37 Temperature Measurement, Probe Number = 1, T = 20.060000 C 02:24:38 Temperature Measurement, Probe Number = 2, T = 20.130000 C 02:24:39 Temperature Measurement, Probe Number = 3, T = 20.076000 C 02:24:39 Temperature Measurement, Probe Number = 4, T = 20.542000 C 02:24:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.54 02:24:39 Integrated Voltage Measurement... 02:24:59 Voltage Offset Correction: v_off_ini = 0.000004493 V, v_off_fin = 0.000007128 V 02:24:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171046642 Vs 02:24:59 Integrated Voltage Measurement... 02:25:18 Voltage Offset Correction: v_off_ini = 0.000006465 V, v_off_fin = 0.000003164 V 02:25:18 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170956297 Vs 02:55:21 Temperature Measurement, Probe Number = 0, T = 20.132000 C 02:55:22 Temperature Measurement, Probe Number = 1, T = 20.054000 C 02:55:22 Temperature Measurement, Probe Number = 2, T = 20.128000 C 02:55:23 Temperature Measurement, Probe Number = 3, T = 20.071000 C 02:55:24 Temperature Measurement, Probe Number = 4, T = 20.314000 C 02:55:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.31 02:55:24 Integrated Voltage Measurement... 02:55:43 Voltage Offset Correction: v_off_ini = 0.000005416 V, v_off_fin = 0.000006705 V 02:55:43 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171097940 Vs 02:55:43 Integrated Voltage Measurement... 02:56:03 Voltage Offset Correction: v_off_ini = 0.000006029 V, v_off_fin = 0.000002774 V 02:56:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964858 Vs 02:56:05 Temperature Measurement, Probe Number = 0, T = 20.133000 C 02:56:06 Temperature Measurement, Probe Number = 1, T = 20.051000 C 02:56:07 Temperature Measurement, Probe Number = 2, T = 20.128000 C 02:56:07 Temperature Measurement, Probe Number = 3, T = 20.070000 C 02:56:08 Temperature Measurement, Probe Number = 4, T = 20.340000 C 02:56:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.34 02:56:08 Integrated Voltage Measurement... 02:56:28 Voltage Offset Correction: v_off_ini = 0.000003787 V, v_off_fin = 0.000006156 V 02:56:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044339 Vs 02:56:28 Integrated Voltage Measurement... 02:56:47 Voltage Offset Correction: v_off_ini = 0.000005818 V, v_off_fin = 0.000002695 V 02:56:47 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170966157 Vs 02:56:50 Temperature Measurement, Probe Number = 0, T = 20.132000 C 02:56:51 Temperature Measurement, Probe Number = 1, T = 20.055000 C 02:56:51 Temperature Measurement, Probe Number = 2, T = 20.128000 C 02:56:52 Temperature Measurement, Probe Number = 3, T = 20.070000 C 02:56:53 Temperature Measurement, Probe Number = 4, T = 20.338000 C 02:56:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.34 02:56:53 Integrated Voltage Measurement... 02:57:13 Voltage Offset Correction: v_off_ini = 0.000003988 V, v_off_fin = 0.000006134 V 02:57:13 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171046512 Vs 02:57:13 Integrated Voltage Measurement... 02:57:32 Voltage Offset Correction: v_off_ini = 0.000005673 V, v_off_fin = 0.000002569 V 02:57:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170965400 Vs 02:57:35 Temperature Measurement, Probe Number = 0, T = 20.136000 C 02:57:36 Temperature Measurement, Probe Number = 1, T = 20.057000 C 02:57:36 Temperature Measurement, Probe Number = 2, T = 20.127000 C 02:57:37 Temperature Measurement, Probe Number = 3, T = 20.069000 C 02:57:38 Temperature Measurement, Probe Number = 4, T = 20.332000 C 02:57:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.33 02:57:38 Integrated Voltage Measurement... 02:57:58 Voltage Offset Correction: v_off_ini = 0.000004874 V, v_off_fin = 0.000007463 V 02:57:58 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053877 Vs 02:57:58 Integrated Voltage Measurement... 02:58:17 Voltage Offset Correction: v_off_ini = 0.000007216 V, v_off_fin = 0.000003668 V 02:58:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955022 Vs 02:58:20 Temperature Measurement, Probe Number = 0, T = 20.136000 C 02:58:21 Temperature Measurement, Probe Number = 1, T = 20.057000 C 02:58:22 Temperature Measurement, Probe Number = 2, T = 20.128000 C 02:58:22 Temperature Measurement, Probe Number = 3, T = 20.069000 C 02:58:23 Temperature Measurement, Probe Number = 4, T = 20.360000 C 02:58:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.36 02:58:23 Integrated Voltage Measurement... 02:58:42 Voltage Offset Correction: v_off_ini = 0.000004732 V, v_off_fin = 0.000006676 V 02:58:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047403 Vs 02:58:42 Integrated Voltage Measurement... 02:59:01 Voltage Offset Correction: v_off_ini = 0.000006148 V, v_off_fin = 0.000002471 V 02:59:02 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170964979 Vs 02:59:04 Temperature Measurement, Probe Number = 0, T = 20.134000 C 02:59:05 Temperature Measurement, Probe Number = 1, T = 20.054000 C 02:59:06 Temperature Measurement, Probe Number = 2, T = 20.126000 C 02:59:06 Temperature Measurement, Probe Number = 3, T = 20.068000 C 02:59:07 Temperature Measurement, Probe Number = 4, T = 20.272000 C 02:59:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.27 02:59:07 Integrated Voltage Measurement... 02:59:26 Voltage Offset Correction: v_off_ini = 0.000003780 V, v_off_fin = 0.000006738 V 02:59:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045422 Vs 02:59:26 Integrated Voltage Measurement... 02:59:45 Voltage Offset Correction: v_off_ini = 0.000005705 V, v_off_fin = 0.000002484 V 02:59:45 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170965253 Vs 02:59:48 Temperature Measurement, Probe Number = 0, T = 20.135000 C 02:59:49 Temperature Measurement, Probe Number = 1, T = 20.054000 C 02:59:49 Temperature Measurement, Probe Number = 2, T = 20.125000 C 02:59:50 Temperature Measurement, Probe Number = 3, T = 20.069000 C 02:59:51 Temperature Measurement, Probe Number = 4, T = 20.256000 C 02:59:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.26 02:59:51 Integrated Voltage Measurement... 03:00:10 Voltage Offset Correction: v_off_ini = 0.000003706 V, v_off_fin = 0.000006893 V 03:00:10 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045505 Vs 03:00:10 Integrated Voltage Measurement... 03:00:29 Voltage Offset Correction: v_off_ini = 0.000006254 V, v_off_fin = 0.000002663 V 03:00:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170963819 Vs 03:00:32 Temperature Measurement, Probe Number = 0, T = 20.138000 C 03:00:33 Temperature Measurement, Probe Number = 1, T = 20.059000 C 03:00:34 Temperature Measurement, Probe Number = 2, T = 20.132000 C 03:00:34 Temperature Measurement, Probe Number = 3, T = 20.075000 C 03:00:35 Temperature Measurement, Probe Number = 4, T = 20.365000 C 03:00:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.36 03:00:35 Integrated Voltage Measurement... 03:00:54 Voltage Offset Correction: v_off_ini = 0.000004141 V, v_off_fin = 0.000006875 V 03:00:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049042 Vs 03:00:54 Integrated Voltage Measurement... 03:01:13 Voltage Offset Correction: v_off_ini = 0.000006029 V, v_off_fin = 0.000003267 V 03:01:14 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170966224 Vs 03:01:16 Temperature Measurement, Probe Number = 0, T = 20.136000 C 03:01:17 Temperature Measurement, Probe Number = 1, T = 20.054000 C 03:01:18 Temperature Measurement, Probe Number = 2, T = 20.132000 C 03:01:18 Temperature Measurement, Probe Number = 3, T = 20.073000 C 03:01:19 Temperature Measurement, Probe Number = 4, T = 20.424000 C 03:01:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.42 03:01:19 Integrated Voltage Measurement... 03:01:38 Voltage Offset Correction: v_off_ini = 0.000004334 V, v_off_fin = 0.000006720 V 03:01:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171048532 Vs 03:01:39 Integrated Voltage Measurement... 03:01:58 Voltage Offset Correction: v_off_ini = 0.000005811 V, v_off_fin = 0.000002926 V 03:01:58 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170970149 Vs 03:02:01 Temperature Measurement, Probe Number = 0, T = 20.133000 C 03:02:02 Temperature Measurement, Probe Number = 1, T = 20.052000 C 03:02:02 Temperature Measurement, Probe Number = 2, T = 20.127000 C 03:02:03 Temperature Measurement, Probe Number = 3, T = 20.067000 C 03:02:04 Temperature Measurement, Probe Number = 4, T = 20.402000 C 03:02:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.40 03:02:04 Integrated Voltage Measurement... 03:02:23 Voltage Offset Correction: v_off_ini = 0.000004398 V, v_off_fin = 0.000007333 V 03:02:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055794 Vs 03:02:24 Integrated Voltage Measurement... 03:02:43 Voltage Offset Correction: v_off_ini = 0.000006511 V, v_off_fin = 0.000003085 V 03:02:43 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170959754 Vs 03:32:46 Temperature Measurement, Probe Number = 0, T = 20.125000 C 03:32:47 Temperature Measurement, Probe Number = 1, T = 20.043000 C 03:32:47 Temperature Measurement, Probe Number = 2, T = 20.118000 C 03:32:48 Temperature Measurement, Probe Number = 3, T = 20.057000 C 03:32:48 Temperature Measurement, Probe Number = 4, T = 20.340000 C 03:32:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.34 03:32:49 Integrated Voltage Measurement... 03:33:08 Voltage Offset Correction: v_off_ini = 0.000005912 V, v_off_fin = 0.000007525 V 03:33:08 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171101171 Vs 03:33:08 Integrated Voltage Measurement... 03:33:28 Voltage Offset Correction: v_off_ini = 0.000006627 V, v_off_fin = 0.000004230 V 03:33:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959945 Vs 03:33:31 Temperature Measurement, Probe Number = 0, T = 20.124000 C 03:33:31 Temperature Measurement, Probe Number = 1, T = 20.041000 C 03:33:32 Temperature Measurement, Probe Number = 2, T = 20.112000 C 03:33:33 Temperature Measurement, Probe Number = 3, T = 20.054000 C 03:33:33 Temperature Measurement, Probe Number = 4, T = 20.202000 C 03:33:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.20 03:33:34 Integrated Voltage Measurement... 03:33:53 Voltage Offset Correction: v_off_ini = 0.000005028 V, v_off_fin = 0.000007454 V 03:33:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045126 Vs 03:33:53 Integrated Voltage Measurement... 03:34:12 Voltage Offset Correction: v_off_ini = 0.000007212 V, v_off_fin = 0.000003611 V 03:34:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958473 Vs 03:34:15 Temperature Measurement, Probe Number = 0, T = 20.122000 C 03:34:16 Temperature Measurement, Probe Number = 1, T = 20.044000 C 03:34:17 Temperature Measurement, Probe Number = 2, T = 20.114000 C 03:34:17 Temperature Measurement, Probe Number = 3, T = 20.056000 C 03:34:18 Temperature Measurement, Probe Number = 4, T = 20.094000 C 03:34:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.09 03:34:18 Integrated Voltage Measurement... 03:34:38 Voltage Offset Correction: v_off_ini = 0.000005182 V, v_off_fin = 0.000006822 V 03:34:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052329 Vs 03:34:38 Integrated Voltage Measurement... 03:34:57 Voltage Offset Correction: v_off_ini = 0.000006490 V, v_off_fin = 0.000003420 V 03:34:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170965872 Vs 03:35:00 Temperature Measurement, Probe Number = 0, T = 20.124000 C 03:35:01 Temperature Measurement, Probe Number = 1, T = 20.041000 C 03:35:01 Temperature Measurement, Probe Number = 2, T = 20.116000 C 03:35:02 Temperature Measurement, Probe Number = 3, T = 20.056000 C 03:35:03 Temperature Measurement, Probe Number = 4, T = 20.080000 C 03:35:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.08 03:35:03 Integrated Voltage Measurement... 03:35:22 Voltage Offset Correction: v_off_ini = 0.000004655 V, v_off_fin = 0.000006752 V 03:35:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053275 Vs 03:35:23 Integrated Voltage Measurement... 03:35:42 Voltage Offset Correction: v_off_ini = 0.000006345 V, v_off_fin = 0.000003141 V 03:35:42 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170964185 Vs 03:35:45 Temperature Measurement, Probe Number = 0, T = 20.125000 C 03:35:45 Temperature Measurement, Probe Number = 1, T = 20.044000 C 03:35:46 Temperature Measurement, Probe Number = 2, T = 20.117000 C 03:35:46 Temperature Measurement, Probe Number = 3, T = 20.058000 C 03:35:47 Temperature Measurement, Probe Number = 4, T = 20.122000 C 03:35:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.12 03:35:47 Integrated Voltage Measurement... 03:36:07 Voltage Offset Correction: v_off_ini = 0.000004435 V, v_off_fin = 0.000006690 V 03:36:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047157 Vs 03:36:07 Integrated Voltage Measurement... 03:36:26 Voltage Offset Correction: v_off_ini = 0.000006319 V, v_off_fin = 0.000002938 V 03:36:27 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170969194 Vs 03:36:29 Temperature Measurement, Probe Number = 0, T = 20.122000 C 03:36:30 Temperature Measurement, Probe Number = 1, T = 20.039000 C 03:36:31 Temperature Measurement, Probe Number = 2, T = 20.118000 C 03:36:31 Temperature Measurement, Probe Number = 3, T = 20.057000 C 03:36:32 Temperature Measurement, Probe Number = 4, T = 20.191000 C 03:36:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.19 03:36:32 Integrated Voltage Measurement... 03:36:51 Voltage Offset Correction: v_off_ini = 0.000004641 V, v_off_fin = 0.000006437 V 03:36:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047148 Vs 03:36:52 Integrated Voltage Measurement... 03:37:11 Voltage Offset Correction: v_off_ini = 0.000005987 V, v_off_fin = 0.000002767 V 03:37:11 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170962979 Vs 03:37:14 Temperature Measurement, Probe Number = 0, T = 20.121000 C 03:37:14 Temperature Measurement, Probe Number = 1, T = 20.038000 C 03:37:15 Temperature Measurement, Probe Number = 2, T = 20.117000 C 03:37:16 Temperature Measurement, Probe Number = 3, T = 20.056000 C 03:37:16 Temperature Measurement, Probe Number = 4, T = 20.179000 C 03:37:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.18 03:37:17 Integrated Voltage Measurement... 03:37:36 Voltage Offset Correction: v_off_ini = 0.000004114 V, v_off_fin = 0.000006591 V 03:37:36 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049259 Vs 03:37:36 Integrated Voltage Measurement... 03:37:55 Voltage Offset Correction: v_off_ini = 0.000005876 V, v_off_fin = 0.000003357 V 03:37:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975966 Vs 03:37:58 Temperature Measurement, Probe Number = 0, T = 20.122000 C 03:37:59 Temperature Measurement, Probe Number = 1, T = 20.038000 C 03:38:00 Temperature Measurement, Probe Number = 2, T = 20.115000 C 03:38:00 Temperature Measurement, Probe Number = 3, T = 20.052000 C 03:38:01 Temperature Measurement, Probe Number = 4, T = 20.215000 C 03:38:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.21 03:38:01 Integrated Voltage Measurement... 03:38:21 Voltage Offset Correction: v_off_ini = 0.000004335 V, v_off_fin = 0.000006785 V 03:38:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045915 Vs 03:38:21 Integrated Voltage Measurement... 03:38:40 Voltage Offset Correction: v_off_ini = 0.000005939 V, v_off_fin = 0.000003145 V 03:38:40 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170969214 Vs 03:38:43 Temperature Measurement, Probe Number = 0, T = 20.114000 C 03:38:44 Temperature Measurement, Probe Number = 1, T = 20.033000 C 03:38:44 Temperature Measurement, Probe Number = 2, T = 20.110000 C 03:38:45 Temperature Measurement, Probe Number = 3, T = 20.049000 C 03:38:46 Temperature Measurement, Probe Number = 4, T = 20.238000 C 03:38:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.24 03:38:46 Integrated Voltage Measurement... 03:39:05 Voltage Offset Correction: v_off_ini = 0.000004399 V, v_off_fin = 0.000006666 V 03:39:05 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171053127 Vs 03:39:05 Integrated Voltage Measurement... 03:39:25 Voltage Offset Correction: v_off_ini = 0.000006100 V, v_off_fin = 0.000002633 V 03:39:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170974730 Vs 03:39:28 Temperature Measurement, Probe Number = 0, T = 20.120000 C 03:39:28 Temperature Measurement, Probe Number = 1, T = 20.038000 C 03:39:29 Temperature Measurement, Probe Number = 2, T = 20.116000 C 03:39:30 Temperature Measurement, Probe Number = 3, T = 20.055000 C 03:39:30 Temperature Measurement, Probe Number = 4, T = 20.293000 C 03:39:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.29 03:39:30 Integrated Voltage Measurement... 03:39:50 Voltage Offset Correction: v_off_ini = 0.000004051 V, v_off_fin = 0.000006688 V 03:39:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047829 Vs 03:39:50 Integrated Voltage Measurement... 03:40:09 Voltage Offset Correction: v_off_ini = 0.000006102 V, v_off_fin = 0.000002971 V 03:40:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972053 Vs 04:10:12 Temperature Measurement, Probe Number = 0, T = 20.117000 C 04:10:13 Temperature Measurement, Probe Number = 1, T = 20.032000 C 04:10:13 Temperature Measurement, Probe Number = 2, T = 20.111000 C 04:10:14 Temperature Measurement, Probe Number = 3, T = 20.048000 C 04:10:15 Temperature Measurement, Probe Number = 4, T = 20.166000 C 04:10:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.17 04:10:15 Integrated Voltage Measurement... 04:10:34 Voltage Offset Correction: v_off_ini = 0.000005207 V, v_off_fin = 0.000006408 V 04:10:34 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171094009 Vs 04:10:34 Integrated Voltage Measurement... 04:10:54 Voltage Offset Correction: v_off_ini = 0.000006497 V, v_off_fin = 0.000003492 V 04:10:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972775 Vs 04:10:57 Temperature Measurement, Probe Number = 0, T = 20.122000 C 04:10:57 Temperature Measurement, Probe Number = 1, T = 20.038000 C 04:10:58 Temperature Measurement, Probe Number = 2, T = 20.117000 C 04:10:58 Temperature Measurement, Probe Number = 3, T = 20.054000 C 04:10:59 Temperature Measurement, Probe Number = 4, T = 20.228000 C 04:10:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.23 04:10:59 Integrated Voltage Measurement... 04:11:19 Voltage Offset Correction: v_off_ini = 0.000004018 V, v_off_fin = 0.000007022 V 04:11:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046949 Vs 04:11:19 Integrated Voltage Measurement... 04:11:39 Voltage Offset Correction: v_off_ini = 0.000005906 V, v_off_fin = 0.000002857 V 04:11:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973730 Vs 04:11:42 Temperature Measurement, Probe Number = 0, T = 20.119000 C 04:11:42 Temperature Measurement, Probe Number = 1, T = 20.034000 C 04:11:43 Temperature Measurement, Probe Number = 2, T = 20.112000 C 04:11:44 Temperature Measurement, Probe Number = 3, T = 20.049000 C 04:11:44 Temperature Measurement, Probe Number = 4, T = 20.234000 C 04:11:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.23 04:11:45 Integrated Voltage Measurement... 04:12:04 Voltage Offset Correction: v_off_ini = 0.000004679 V, v_off_fin = 0.000006898 V 04:12:04 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171049503 Vs 04:12:04 Integrated Voltage Measurement... 04:12:24 Voltage Offset Correction: v_off_ini = 0.000006709 V, v_off_fin = 0.000003630 V 04:12:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972949 Vs 04:12:27 Temperature Measurement, Probe Number = 0, T = 20.120000 C 04:12:27 Temperature Measurement, Probe Number = 1, T = 20.037000 C 04:12:28 Temperature Measurement, Probe Number = 2, T = 20.111000 C 04:12:29 Temperature Measurement, Probe Number = 3, T = 20.049000 C 04:12:29 Temperature Measurement, Probe Number = 4, T = 20.202000 C 04:12:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.20 04:12:29 Integrated Voltage Measurement... 04:12:49 Voltage Offset Correction: v_off_ini = 0.000004124 V, v_off_fin = 0.000006669 V 04:12:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052070 Vs 04:12:49 Integrated Voltage Measurement... 04:13:08 Voltage Offset Correction: v_off_ini = 0.000006467 V, v_off_fin = 0.000003447 V 04:13:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971762 Vs 04:13:11 Temperature Measurement, Probe Number = 0, T = 20.120000 C 04:13:12 Temperature Measurement, Probe Number = 1, T = 20.036000 C 04:13:12 Temperature Measurement, Probe Number = 2, T = 20.110000 C 04:13:13 Temperature Measurement, Probe Number = 3, T = 20.049000 C 04:13:13 Temperature Measurement, Probe Number = 4, T = 20.124000 C 04:13:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.12 04:13:14 Integrated Voltage Measurement... 04:13:33 Voltage Offset Correction: v_off_ini = 0.000004405 V, v_off_fin = 0.000006638 V 04:13:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171048702 Vs 04:13:33 Integrated Voltage Measurement... 04:13:52 Voltage Offset Correction: v_off_ini = 0.000006037 V, v_off_fin = 0.000002533 V 04:13:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972884 Vs 04:13:55 Temperature Measurement, Probe Number = 0, T = 20.121000 C 04:13:56 Temperature Measurement, Probe Number = 1, T = 20.039000 C 04:13:56 Temperature Measurement, Probe Number = 2, T = 20.111000 C 04:13:57 Temperature Measurement, Probe Number = 3, T = 20.051000 C 04:13:58 Temperature Measurement, Probe Number = 4, T = 20.164000 C 04:13:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.16 04:13:58 Integrated Voltage Measurement... 04:14:17 Voltage Offset Correction: v_off_ini = 0.000003966 V, v_off_fin = 0.000006651 V 04:14:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051974 Vs 04:14:18 Integrated Voltage Measurement... 04:14:37 Voltage Offset Correction: v_off_ini = 0.000006034 V, v_off_fin = 0.000003978 V 04:14:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971273 Vs 04:14:40 Temperature Measurement, Probe Number = 0, T = 20.122000 C 04:14:41 Temperature Measurement, Probe Number = 1, T = 20.040000 C 04:14:41 Temperature Measurement, Probe Number = 2, T = 20.115000 C 04:14:42 Temperature Measurement, Probe Number = 3, T = 20.054000 C 04:14:43 Temperature Measurement, Probe Number = 4, T = 20.316000 C 04:14:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.32 04:14:43 Integrated Voltage Measurement... 04:15:02 Voltage Offset Correction: v_off_ini = 0.000004390 V, v_off_fin = 0.000006746 V 04:15:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050890 Vs 04:15:03 Integrated Voltage Measurement... 04:15:22 Voltage Offset Correction: v_off_ini = 0.000006135 V, v_off_fin = 0.000002792 V 04:15:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976068 Vs 04:15:25 Temperature Measurement, Probe Number = 0, T = 20.113000 C 04:15:25 Temperature Measurement, Probe Number = 1, T = 20.028000 C 04:15:26 Temperature Measurement, Probe Number = 2, T = 20.108000 C 04:15:27 Temperature Measurement, Probe Number = 3, T = 20.046000 C 04:15:27 Temperature Measurement, Probe Number = 4, T = 20.312000 C 04:15:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.31 04:15:28 Integrated Voltage Measurement... 04:15:47 Voltage Offset Correction: v_off_ini = 0.000004178 V, v_off_fin = 0.000006306 V 04:15:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050028 Vs 04:15:47 Integrated Voltage Measurement... 04:16:06 Voltage Offset Correction: v_off_ini = 0.000005700 V, v_off_fin = 0.000002380 V 04:16:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977048 Vs 04:16:09 Temperature Measurement, Probe Number = 0, T = 20.117000 C 04:16:10 Temperature Measurement, Probe Number = 1, T = 20.038000 C 04:16:11 Temperature Measurement, Probe Number = 2, T = 20.110000 C 04:16:11 Temperature Measurement, Probe Number = 3, T = 20.052000 C 04:16:12 Temperature Measurement, Probe Number = 4, T = 20.345000 C 04:16:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.34 04:16:12 Integrated Voltage Measurement... 04:16:31 Voltage Offset Correction: v_off_ini = 0.000003686 V, v_off_fin = 0.000006516 V 04:16:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047434 Vs 04:16:32 Integrated Voltage Measurement... 04:16:51 Voltage Offset Correction: v_off_ini = 0.000006046 V, v_off_fin = 0.000003115 V 04:16:52 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170972993 Vs 04:16:54 Temperature Measurement, Probe Number = 0, T = 20.120000 C 04:16:55 Temperature Measurement, Probe Number = 1, T = 20.037000 C 04:16:56 Temperature Measurement, Probe Number = 2, T = 20.113000 C 04:16:56 Temperature Measurement, Probe Number = 3, T = 20.051000 C 04:16:57 Temperature Measurement, Probe Number = 4, T = 20.399000 C 04:16:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.40 04:16:57 Integrated Voltage Measurement... 04:17:17 Voltage Offset Correction: v_off_ini = 0.000004404 V, v_off_fin = 0.000006272 V 04:17:17 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171041639 Vs 04:17:17 Integrated Voltage Measurement... 04:17:36 Voltage Offset Correction: v_off_ini = 0.000005828 V, v_off_fin = 0.000003235 V 04:17:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974594 Vs 04:47:39 Temperature Measurement, Probe Number = 0, T = 20.110000 C 04:47:40 Temperature Measurement, Probe Number = 1, T = 20.029000 C 04:47:41 Temperature Measurement, Probe Number = 2, T = 20.105000 C 04:47:41 Temperature Measurement, Probe Number = 3, T = 20.045000 C 04:47:42 Temperature Measurement, Probe Number = 4, T = 20.180000 C 04:47:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.18 04:47:42 Integrated Voltage Measurement... 04:48:01 Voltage Offset Correction: v_off_ini = 0.000005977 V, v_off_fin = 0.000007549 V 04:48:01 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171104716 Vs 04:48:02 Integrated Voltage Measurement... 04:48:21 Voltage Offset Correction: v_off_ini = 0.000007158 V, v_off_fin = 0.000003780 V 04:48:21 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170968860 Vs 04:48:24 Temperature Measurement, Probe Number = 0, T = 20.111000 C 04:48:25 Temperature Measurement, Probe Number = 1, T = 20.029000 C 04:48:26 Temperature Measurement, Probe Number = 2, T = 20.105000 C 04:48:26 Temperature Measurement, Probe Number = 3, T = 20.044000 C 04:48:27 Temperature Measurement, Probe Number = 4, T = 20.170000 C 04:48:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.17 04:48:27 Integrated Voltage Measurement... 04:48:46 Voltage Offset Correction: v_off_ini = 0.000004871 V, v_off_fin = 0.000007220 V 04:48:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052699 Vs 04:48:47 Integrated Voltage Measurement... 04:49:06 Voltage Offset Correction: v_off_ini = 0.000006772 V, v_off_fin = 0.000003394 V 04:49:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973802 Vs 04:49:09 Temperature Measurement, Probe Number = 0, T = 20.115000 C 04:49:09 Temperature Measurement, Probe Number = 1, T = 20.033000 C 04:49:10 Temperature Measurement, Probe Number = 2, T = 20.108000 C 04:49:11 Temperature Measurement, Probe Number = 3, T = 20.048000 C 04:49:11 Temperature Measurement, Probe Number = 4, T = 20.146000 C 04:49:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.15 04:49:12 Integrated Voltage Measurement... 04:49:31 Voltage Offset Correction: v_off_ini = 0.000004610 V, v_off_fin = 0.000006926 V 04:49:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053934 Vs 04:49:31 Integrated Voltage Measurement... 04:49:50 Voltage Offset Correction: v_off_ini = 0.000006450 V, v_off_fin = 0.000003736 V 04:49:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971527 Vs 04:49:53 Temperature Measurement, Probe Number = 0, T = 20.113000 C 04:49:54 Temperature Measurement, Probe Number = 1, T = 20.030000 C 04:49:55 Temperature Measurement, Probe Number = 2, T = 20.107000 C 04:49:55 Temperature Measurement, Probe Number = 3, T = 20.045000 C 04:49:56 Temperature Measurement, Probe Number = 4, T = 20.207000 C 04:49:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.21 04:49:56 Integrated Voltage Measurement... 04:50:15 Voltage Offset Correction: v_off_ini = 0.000004861 V, v_off_fin = 0.000006949 V 04:50:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059078 Vs 04:50:16 Integrated Voltage Measurement... 04:50:35 Voltage Offset Correction: v_off_ini = 0.000006789 V, v_off_fin = 0.000003861 V 04:50:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969795 Vs 04:50:38 Temperature Measurement, Probe Number = 0, T = 20.106000 C 04:50:39 Temperature Measurement, Probe Number = 1, T = 20.027000 C 04:50:39 Temperature Measurement, Probe Number = 2, T = 20.101000 C 04:50:40 Temperature Measurement, Probe Number = 3, T = 20.044000 C 04:50:41 Temperature Measurement, Probe Number = 4, T = 20.182000 C 04:50:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.18 04:50:41 Integrated Voltage Measurement... 04:51:00 Voltage Offset Correction: v_off_ini = 0.000004886 V, v_off_fin = 0.000006445 V 04:51:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054644 Vs 04:51:00 Integrated Voltage Measurement... 04:51:19 Voltage Offset Correction: v_off_ini = 0.000006881 V, v_off_fin = 0.000003525 V 04:51:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972747 Vs 04:51:22 Temperature Measurement, Probe Number = 0, T = 20.105000 C 04:51:23 Temperature Measurement, Probe Number = 1, T = 20.024000 C 04:51:24 Temperature Measurement, Probe Number = 2, T = 20.098000 C 04:51:24 Temperature Measurement, Probe Number = 3, T = 20.041000 C 04:51:25 Temperature Measurement, Probe Number = 4, T = 20.215000 C 04:51:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.21 04:51:25 Integrated Voltage Measurement... 04:51:44 Voltage Offset Correction: v_off_ini = 0.000003986 V, v_off_fin = 0.000007163 V 04:51:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048168 Vs 04:51:45 Integrated Voltage Measurement... 04:52:04 Voltage Offset Correction: v_off_ini = 0.000006739 V, v_off_fin = 0.000004212 V 04:52:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969155 Vs 04:52:07 Temperature Measurement, Probe Number = 0, T = 20.109000 C 04:52:07 Temperature Measurement, Probe Number = 1, T = 20.023000 C 04:52:08 Temperature Measurement, Probe Number = 2, T = 20.102000 C 04:52:09 Temperature Measurement, Probe Number = 3, T = 20.039000 C 04:52:09 Temperature Measurement, Probe Number = 4, T = 20.111000 C 04:52:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.11 04:52:10 Integrated Voltage Measurement... 04:52:30 Voltage Offset Correction: v_off_ini = 0.000004554 V, v_off_fin = 0.000006377 V 04:52:31 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171046732 Vs 04:52:31 Integrated Voltage Measurement... 04:52:50 Voltage Offset Correction: v_off_ini = 0.000006157 V, v_off_fin = 0.000003891 V 04:52:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968044 Vs 04:52:53 Temperature Measurement, Probe Number = 0, T = 20.105000 C 04:52:53 Temperature Measurement, Probe Number = 1, T = 20.020000 C 04:52:54 Temperature Measurement, Probe Number = 2, T = 20.102000 C 04:52:55 Temperature Measurement, Probe Number = 3, T = 20.038000 C 04:52:55 Temperature Measurement, Probe Number = 4, T = 20.089000 C 04:52:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.09 04:52:55 Integrated Voltage Measurement... 04:53:15 Voltage Offset Correction: v_off_ini = 0.000004864 V, v_off_fin = 0.000006894 V 04:53:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052176 Vs 04:53:15 Integrated Voltage Measurement... 04:53:34 Voltage Offset Correction: v_off_ini = 0.000006434 V, v_off_fin = 0.000003316 V 04:53:34 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971170 Vs 04:53:37 Temperature Measurement, Probe Number = 0, T = 20.108000 C 04:53:38 Temperature Measurement, Probe Number = 1, T = 20.027000 C 04:53:38 Temperature Measurement, Probe Number = 2, T = 20.100000 C 04:53:39 Temperature Measurement, Probe Number = 3, T = 20.041000 C 04:53:40 Temperature Measurement, Probe Number = 4, T = 20.145000 C 04:53:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.14 04:53:40 Integrated Voltage Measurement... 04:53:59 Voltage Offset Correction: v_off_ini = 0.000004406 V, v_off_fin = 0.000006837 V 04:53:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052732 Vs 04:53:59 Integrated Voltage Measurement... 04:54:19 Voltage Offset Correction: v_off_ini = 0.000006521 V, v_off_fin = 0.000003724 V 04:54:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970752 Vs 04:54:21 Temperature Measurement, Probe Number = 0, T = 20.115000 C 04:54:22 Temperature Measurement, Probe Number = 1, T = 20.034000 C 04:54:23 Temperature Measurement, Probe Number = 2, T = 20.107000 C 04:54:23 Temperature Measurement, Probe Number = 3, T = 20.047000 C 04:54:24 Temperature Measurement, Probe Number = 4, T = 20.288000 C 04:54:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.29 04:54:24 Integrated Voltage Measurement... 04:54:44 Voltage Offset Correction: v_off_ini = 0.000005283 V, v_off_fin = 0.000006754 V 04:54:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054930 Vs 04:54:44 Integrated Voltage Measurement... 04:55:03 Voltage Offset Correction: v_off_ini = 0.000006768 V, v_off_fin = 0.000002590 V 04:55:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170970504 Vs 05:25:06 Temperature Measurement, Probe Number = 0, T = 20.101000 C 05:25:07 Temperature Measurement, Probe Number = 1, T = 20.022000 C 05:25:07 Temperature Measurement, Probe Number = 2, T = 20.093000 C 05:25:08 Temperature Measurement, Probe Number = 3, T = 20.035000 C 05:25:09 Temperature Measurement, Probe Number = 4, T = 20.249000 C 05:25:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.25 05:25:09 Integrated Voltage Measurement... 05:25:28 Voltage Offset Correction: v_off_ini = 0.000005168 V, v_off_fin = 0.000007067 V 05:25:28 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171098938 Vs 05:25:28 Integrated Voltage Measurement... 05:25:48 Voltage Offset Correction: v_off_ini = 0.000006201 V, v_off_fin = 0.000003591 V 05:25:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967017 Vs 05:25:50 Temperature Measurement, Probe Number = 0, T = 20.108000 C 05:25:51 Temperature Measurement, Probe Number = 1, T = 20.026000 C 05:25:52 Temperature Measurement, Probe Number = 2, T = 20.102000 C 05:25:52 Temperature Measurement, Probe Number = 3, T = 20.042000 C 05:25:53 Temperature Measurement, Probe Number = 4, T = 20.338000 C 05:25:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.34 05:25:53 Integrated Voltage Measurement... 05:26:13 Voltage Offset Correction: v_off_ini = 0.000004711 V, v_off_fin = 0.000007340 V 05:26:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055452 Vs 05:26:13 Integrated Voltage Measurement... 05:26:32 Voltage Offset Correction: v_off_ini = 0.000006666 V, v_off_fin = 0.000003444 V 05:26:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963501 Vs 05:26:35 Temperature Measurement, Probe Number = 0, T = 20.110000 C 05:26:35 Temperature Measurement, Probe Number = 1, T = 20.025000 C 05:26:36 Temperature Measurement, Probe Number = 2, T = 20.103000 C 05:26:37 Temperature Measurement, Probe Number = 3, T = 20.042000 C 05:26:37 Temperature Measurement, Probe Number = 4, T = 20.398000 C 05:26:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.40 05:26:38 Integrated Voltage Measurement... 05:26:57 Voltage Offset Correction: v_off_ini = 0.000004699 V, v_off_fin = 0.000007360 V 05:26:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058080 Vs 05:26:57 Integrated Voltage Measurement... 05:27:17 Voltage Offset Correction: v_off_ini = 0.000006687 V, v_off_fin = 0.000003656 V 05:27:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968613 Vs 05:27:19 Temperature Measurement, Probe Number = 0, T = 20.108000 C 05:27:20 Temperature Measurement, Probe Number = 1, T = 20.024000 C 05:27:21 Temperature Measurement, Probe Number = 2, T = 20.101000 C 05:27:21 Temperature Measurement, Probe Number = 3, T = 20.039000 C 05:27:22 Temperature Measurement, Probe Number = 4, T = 20.374000 C 05:27:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.37 05:27:22 Integrated Voltage Measurement... 05:27:42 Voltage Offset Correction: v_off_ini = 0.000004585 V, v_off_fin = 0.000006810 V 05:27:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048962 Vs 05:27:42 Integrated Voltage Measurement... 05:28:01 Voltage Offset Correction: v_off_ini = 0.000006321 V, v_off_fin = 0.000003641 V 05:28:01 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170966233 Vs 05:28:04 Temperature Measurement, Probe Number = 0, T = 20.106000 C 05:28:05 Temperature Measurement, Probe Number = 1, T = 20.026000 C 05:28:05 Temperature Measurement, Probe Number = 2, T = 20.097000 C 05:28:06 Temperature Measurement, Probe Number = 3, T = 20.036000 C 05:28:07 Temperature Measurement, Probe Number = 4, T = 20.323000 C 05:28:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.32 05:28:07 Integrated Voltage Measurement... 05:28:26 Voltage Offset Correction: v_off_ini = 0.000004351 V, v_off_fin = 0.000007149 V 05:28:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055131 Vs 05:28:26 Integrated Voltage Measurement... 05:28:46 Voltage Offset Correction: v_off_ini = 0.000006230 V, v_off_fin = 0.000004556 V 05:28:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966043 Vs 05:28:49 Temperature Measurement, Probe Number = 0, T = 20.097000 C 05:28:49 Temperature Measurement, Probe Number = 1, T = 20.017000 C 05:28:50 Temperature Measurement, Probe Number = 2, T = 20.091000 C 05:28:51 Temperature Measurement, Probe Number = 3, T = 20.033000 C 05:28:51 Temperature Measurement, Probe Number = 4, T = 20.234000 C 05:28:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.23 05:28:52 Integrated Voltage Measurement... 05:29:11 Voltage Offset Correction: v_off_ini = 0.000004764 V, v_off_fin = 0.000006719 V 05:29:11 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171043042 Vs 05:29:11 Integrated Voltage Measurement... 05:29:30 Voltage Offset Correction: v_off_ini = 0.000006795 V, v_off_fin = 0.000003065 V 05:29:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969476 Vs 05:29:33 Temperature Measurement, Probe Number = 0, T = 20.098000 C 05:29:34 Temperature Measurement, Probe Number = 1, T = 20.020000 C 05:29:34 Temperature Measurement, Probe Number = 2, T = 20.092000 C 05:29:35 Temperature Measurement, Probe Number = 3, T = 20.034000 C 05:29:36 Temperature Measurement, Probe Number = 4, T = 20.210000 C 05:29:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.21 05:29:36 Integrated Voltage Measurement... 05:29:56 Voltage Offset Correction: v_off_ini = 0.000003903 V, v_off_fin = 0.000006520 V 05:29:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051279 Vs 05:29:56 Integrated Voltage Measurement... 05:30:15 Voltage Offset Correction: v_off_ini = 0.000005639 V, v_off_fin = 0.000003004 V 05:30:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974298 Vs 05:30:18 Temperature Measurement, Probe Number = 0, T = 20.102000 C 05:30:19 Temperature Measurement, Probe Number = 1, T = 20.022000 C 05:30:19 Temperature Measurement, Probe Number = 2, T = 20.096000 C 05:30:20 Temperature Measurement, Probe Number = 3, T = 20.035000 C 05:30:21 Temperature Measurement, Probe Number = 4, T = 20.225000 C 05:30:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.23 05:30:21 Integrated Voltage Measurement... 05:30:40 Voltage Offset Correction: v_off_ini = 0.000004598 V, v_off_fin = 0.000006836 V 05:30:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053810 Vs 05:30:41 Integrated Voltage Measurement... 05:31:00 Voltage Offset Correction: v_off_ini = 0.000006062 V, v_off_fin = 0.000003614 V 05:31:00 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170966523 Vs 05:31:02 Temperature Measurement, Probe Number = 0, T = 20.106000 C 05:31:03 Temperature Measurement, Probe Number = 1, T = 20.025000 C 05:31:04 Temperature Measurement, Probe Number = 2, T = 20.102000 C 05:31:04 Temperature Measurement, Probe Number = 3, T = 20.041000 C 05:31:05 Temperature Measurement, Probe Number = 4, T = 20.317000 C 05:31:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.32 05:31:05 Integrated Voltage Measurement... 05:31:24 Voltage Offset Correction: v_off_ini = 0.000004552 V, v_off_fin = 0.000006932 V 05:31:25 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052543 Vs 05:31:25 Integrated Voltage Measurement... 05:31:44 Voltage Offset Correction: v_off_ini = 0.000005459 V, v_off_fin = 0.000003739 V 05:31:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968211 Vs 05:31:47 Temperature Measurement, Probe Number = 0, T = 20.106000 C 05:31:48 Temperature Measurement, Probe Number = 1, T = 20.025000 C 05:31:48 Temperature Measurement, Probe Number = 2, T = 20.100000 C 05:31:49 Temperature Measurement, Probe Number = 3, T = 20.038000 C 05:31:50 Temperature Measurement, Probe Number = 4, T = 20.290000 C 05:31:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.29 05:31:50 Integrated Voltage Measurement... 05:32:09 Voltage Offset Correction: v_off_ini = 0.000004193 V, v_off_fin = 0.000007345 V 05:32:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052618 Vs 05:32:10 Integrated Voltage Measurement... 05:32:29 Voltage Offset Correction: v_off_ini = 0.000006370 V, v_off_fin = 0.000003424 V 05:32:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975692 Vs 06:02:32 Temperature Measurement, Probe Number = 0, T = 20.103000 C 06:02:33 Temperature Measurement, Probe Number = 1, T = 20.026000 C 06:02:34 Temperature Measurement, Probe Number = 2, T = 20.098000 C 06:02:34 Temperature Measurement, Probe Number = 3, T = 20.041000 C 06:02:35 Temperature Measurement, Probe Number = 4, T = 20.219000 C 06:02:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.22 06:02:35 Integrated Voltage Measurement... 06:02:55 Voltage Offset Correction: v_off_ini = 0.000006042 V, v_off_fin = 0.000007431 V 06:02:55 Integrated Voltage Measurement Delta Gap = 0.0040017 m VT = 0.171113318 Vs 06:02:55 Integrated Voltage Measurement... 06:03:14 Voltage Offset Correction: v_off_ini = 0.000006261 V, v_off_fin = 0.000004124 V 06:03:14 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170958312 Vs 06:03:17 Temperature Measurement, Probe Number = 0, T = 20.105000 C 06:03:18 Temperature Measurement, Probe Number = 1, T = 20.024000 C 06:03:19 Temperature Measurement, Probe Number = 2, T = 20.099000 C 06:03:19 Temperature Measurement, Probe Number = 3, T = 20.041000 C 06:03:20 Temperature Measurement, Probe Number = 4, T = 20.285000 C 06:03:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.29 06:03:20 Integrated Voltage Measurement... 06:03:39 Voltage Offset Correction: v_off_ini = 0.000004682 V, v_off_fin = 0.000007330 V 06:03:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046392 Vs 06:03:40 Integrated Voltage Measurement... 06:03:59 Voltage Offset Correction: v_off_ini = 0.000006222 V, v_off_fin = 0.000003721 V 06:03:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964407 Vs 06:04:02 Temperature Measurement, Probe Number = 0, T = 20.103000 C 06:04:02 Temperature Measurement, Probe Number = 1, T = 20.024000 C 06:04:03 Temperature Measurement, Probe Number = 2, T = 20.098000 C 06:04:04 Temperature Measurement, Probe Number = 3, T = 20.043000 C 06:04:04 Temperature Measurement, Probe Number = 4, T = 20.374000 C 06:04:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.37 06:04:05 Integrated Voltage Measurement... 06:04:24 Voltage Offset Correction: v_off_ini = 0.000004545 V, v_off_fin = 0.000006938 V 06:04:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043599 Vs 06:04:25 Integrated Voltage Measurement... 06:04:43 Voltage Offset Correction: v_off_ini = 0.000006543 V, v_off_fin = 0.000003361 V 06:04:44 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170959115 Vs 06:04:46 Temperature Measurement, Probe Number = 0, T = 20.102000 C 06:04:47 Temperature Measurement, Probe Number = 1, T = 20.023000 C 06:04:48 Temperature Measurement, Probe Number = 2, T = 20.098000 C 06:04:48 Temperature Measurement, Probe Number = 3, T = 20.042000 C 06:04:49 Temperature Measurement, Probe Number = 4, T = 20.415000 C 06:04:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.41 06:04:49 Integrated Voltage Measurement... 06:05:08 Voltage Offset Correction: v_off_ini = 0.000004220 V, v_off_fin = 0.000007423 V 06:05:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171048161 Vs 06:05:09 Integrated Voltage Measurement... 06:05:28 Voltage Offset Correction: v_off_ini = 0.000006525 V, v_off_fin = 0.000003469 V 06:05:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965017 Vs 06:05:31 Temperature Measurement, Probe Number = 0, T = 20.106000 C 06:05:31 Temperature Measurement, Probe Number = 1, T = 20.024000 C 06:05:32 Temperature Measurement, Probe Number = 2, T = 20.103000 C 06:05:33 Temperature Measurement, Probe Number = 3, T = 20.043000 C 06:05:33 Temperature Measurement, Probe Number = 4, T = 20.459000 C 06:05:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.46 06:05:34 Integrated Voltage Measurement... 06:05:53 Voltage Offset Correction: v_off_ini = 0.000004235 V, v_off_fin = 0.000007151 V 06:05:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047217 Vs 06:05:53 Integrated Voltage Measurement... 06:06:12 Voltage Offset Correction: v_off_ini = 0.000006436 V, v_off_fin = 0.000003405 V 06:06:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963824 Vs 06:06:15 Temperature Measurement, Probe Number = 0, T = 20.105000 C 06:06:16 Temperature Measurement, Probe Number = 1, T = 20.024000 C 06:06:16 Temperature Measurement, Probe Number = 2, T = 20.097000 C 06:06:17 Temperature Measurement, Probe Number = 3, T = 20.039000 C 06:06:18 Temperature Measurement, Probe Number = 4, T = 20.431000 C 06:06:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.43 06:06:18 Integrated Voltage Measurement... 06:06:37 Voltage Offset Correction: v_off_ini = 0.000005156 V, v_off_fin = 0.000006955 V 06:06:37 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044991 Vs 06:06:37 Integrated Voltage Measurement... 06:06:56 Voltage Offset Correction: v_off_ini = 0.000006403 V, v_off_fin = 0.000003165 V 06:06:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965240 Vs 06:06:59 Temperature Measurement, Probe Number = 0, T = 20.103000 C 06:07:00 Temperature Measurement, Probe Number = 1, T = 20.020000 C 06:07:00 Temperature Measurement, Probe Number = 2, T = 20.100000 C 06:07:01 Temperature Measurement, Probe Number = 3, T = 20.039000 C 06:07:02 Temperature Measurement, Probe Number = 4, T = 20.391000 C 06:07:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.39 06:07:02 Integrated Voltage Measurement... 06:07:21 Voltage Offset Correction: v_off_ini = 0.000004193 V, v_off_fin = 0.000007008 V 06:07:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045612 Vs 06:07:22 Integrated Voltage Measurement... 06:07:41 Voltage Offset Correction: v_off_ini = 0.000006531 V, v_off_fin = 0.000003418 V 06:07:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961536 Vs 06:07:44 Temperature Measurement, Probe Number = 0, T = 20.099000 C 06:07:44 Temperature Measurement, Probe Number = 1, T = 20.020000 C 06:07:45 Temperature Measurement, Probe Number = 2, T = 20.094000 C 06:07:46 Temperature Measurement, Probe Number = 3, T = 20.035000 C 06:07:46 Temperature Measurement, Probe Number = 4, T = 20.415000 C 06:07:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.41 06:07:46 Integrated Voltage Measurement... 06:08:05 Voltage Offset Correction: v_off_ini = 0.000004570 V, v_off_fin = 0.000006539 V 06:08:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050833 Vs 06:08:06 Integrated Voltage Measurement... 06:08:25 Voltage Offset Correction: v_off_ini = 0.000006131 V, v_off_fin = 0.000003093 V 06:08:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170969685 Vs 06:08:28 Temperature Measurement, Probe Number = 0, T = 20.103000 C 06:08:28 Temperature Measurement, Probe Number = 1, T = 20.022000 C 06:08:29 Temperature Measurement, Probe Number = 2, T = 20.095000 C 06:08:30 Temperature Measurement, Probe Number = 3, T = 20.037000 C 06:08:30 Temperature Measurement, Probe Number = 4, T = 20.375000 C 06:08:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.38 06:08:31 Integrated Voltage Measurement... 06:08:50 Voltage Offset Correction: v_off_ini = 0.000003999 V, v_off_fin = 0.000006825 V 06:08:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171046394 Vs 06:08:50 Integrated Voltage Measurement... 06:09:10 Voltage Offset Correction: v_off_ini = 0.000006270 V, v_off_fin = 0.000003987 V 06:09:10 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170961871 Vs 06:09:13 Temperature Measurement, Probe Number = 0, T = 20.100000 C 06:09:13 Temperature Measurement, Probe Number = 1, T = 20.020000 C 06:09:14 Temperature Measurement, Probe Number = 2, T = 20.096000 C 06:09:14 Temperature Measurement, Probe Number = 3, T = 20.036000 C 06:09:15 Temperature Measurement, Probe Number = 4, T = 20.369000 C 06:09:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.37 06:09:15 Integrated Voltage Measurement... 06:09:35 Voltage Offset Correction: v_off_ini = 0.000004364 V, v_off_fin = 0.000006670 V 06:09:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043672 Vs 06:09:35 Integrated Voltage Measurement... 06:09:54 Voltage Offset Correction: v_off_ini = 0.000006059 V, v_off_fin = 0.000003506 V 06:09:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967655 Vs 06:39:57 Temperature Measurement, Probe Number = 0, T = 20.102000 C 06:39:58 Temperature Measurement, Probe Number = 1, T = 20.022000 C 06:39:59 Temperature Measurement, Probe Number = 2, T = 20.095000 C 06:40:00 Temperature Measurement, Probe Number = 3, T = 20.037000 C 06:40:00 Temperature Measurement, Probe Number = 4, T = 20.367000 C 06:40:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.37 06:40:00 Integrated Voltage Measurement... 06:40:20 Voltage Offset Correction: v_off_ini = 0.000005527 V, v_off_fin = 0.000006692 V 06:40:20 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171091736 Vs 06:40:21 Integrated Voltage Measurement... 06:40:40 Voltage Offset Correction: v_off_ini = 0.000005839 V, v_off_fin = 0.000003690 V 06:40:40 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170964795 Vs 06:40:43 Temperature Measurement, Probe Number = 0, T = 20.095000 C 06:40:43 Temperature Measurement, Probe Number = 1, T = 20.015000 C 06:40:44 Temperature Measurement, Probe Number = 2, T = 20.090000 C 06:40:45 Temperature Measurement, Probe Number = 3, T = 20.032000 C 06:40:45 Temperature Measurement, Probe Number = 4, T = 20.369000 C 06:40:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.37 06:40:45 Integrated Voltage Measurement... 06:41:05 Voltage Offset Correction: v_off_ini = 0.000004502 V, v_off_fin = 0.000006684 V 06:41:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044265 Vs 06:41:06 Integrated Voltage Measurement... 06:41:25 Voltage Offset Correction: v_off_ini = 0.000006052 V, v_off_fin = 0.000002984 V 06:41:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968054 Vs 06:41:28 Temperature Measurement, Probe Number = 0, T = 20.094000 C 06:41:28 Temperature Measurement, Probe Number = 1, T = 20.011000 C 06:41:29 Temperature Measurement, Probe Number = 2, T = 20.087000 C 06:41:30 Temperature Measurement, Probe Number = 3, T = 20.027000 C 06:41:30 Temperature Measurement, Probe Number = 4, T = 20.316000 C 06:41:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.32 06:41:31 Integrated Voltage Measurement... 06:41:50 Voltage Offset Correction: v_off_ini = 0.000003883 V, v_off_fin = 0.000006650 V 06:41:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046531 Vs 06:41:50 Integrated Voltage Measurement... 06:42:10 Voltage Offset Correction: v_off_ini = 0.000005839 V, v_off_fin = 0.000003978 V 06:42:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965767 Vs 06:42:12 Temperature Measurement, Probe Number = 0, T = 20.095000 C 06:42:13 Temperature Measurement, Probe Number = 1, T = 20.016000 C 06:42:14 Temperature Measurement, Probe Number = 2, T = 20.088000 C 06:42:14 Temperature Measurement, Probe Number = 3, T = 20.029000 C 06:42:15 Temperature Measurement, Probe Number = 4, T = 20.316000 C 06:42:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.32 06:42:15 Integrated Voltage Measurement... 06:42:35 Voltage Offset Correction: v_off_ini = 0.000004802 V, v_off_fin = 0.000006619 V 06:42:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044169 Vs 06:42:35 Integrated Voltage Measurement... 06:42:54 Voltage Offset Correction: v_off_ini = 0.000006309 V, v_off_fin = 0.000003314 V 06:42:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962607 Vs 06:42:57 Temperature Measurement, Probe Number = 0, T = 20.100000 C 06:42:58 Temperature Measurement, Probe Number = 1, T = 20.021000 C 06:42:58 Temperature Measurement, Probe Number = 2, T = 20.093000 C 06:42:59 Temperature Measurement, Probe Number = 3, T = 20.035000 C 06:43:00 Temperature Measurement, Probe Number = 4, T = 20.313000 C 06:43:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.31 06:43:00 Integrated Voltage Measurement... 06:43:19 Voltage Offset Correction: v_off_ini = 0.000004811 V, v_off_fin = 0.000006207 V 06:43:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049206 Vs 06:43:19 Integrated Voltage Measurement... 06:43:39 Voltage Offset Correction: v_off_ini = 0.000006108 V, v_off_fin = 0.000003467 V 06:43:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968364 Vs 06:43:42 Temperature Measurement, Probe Number = 0, T = 20.106000 C 06:43:42 Temperature Measurement, Probe Number = 1, T = 20.025000 C 06:43:43 Temperature Measurement, Probe Number = 2, T = 20.097000 C 06:43:44 Temperature Measurement, Probe Number = 3, T = 20.040000 C 06:43:44 Temperature Measurement, Probe Number = 4, T = 20.304000 C 06:43:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.30 06:43:45 Integrated Voltage Measurement... 06:44:04 Voltage Offset Correction: v_off_ini = 0.000004286 V, v_off_fin = 0.000006996 V 06:44:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040258 Vs 06:44:04 Integrated Voltage Measurement... 06:44:24 Voltage Offset Correction: v_off_ini = 0.000006068 V, v_off_fin = 0.000003684 V 06:44:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972090 Vs 06:44:26 Temperature Measurement, Probe Number = 0, T = 20.105000 C 06:44:27 Temperature Measurement, Probe Number = 1, T = 20.022000 C 06:44:28 Temperature Measurement, Probe Number = 2, T = 20.098000 C 06:44:28 Temperature Measurement, Probe Number = 3, T = 20.039000 C 06:44:29 Temperature Measurement, Probe Number = 4, T = 20.361000 C 06:44:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.36 06:44:29 Integrated Voltage Measurement... 06:44:48 Voltage Offset Correction: v_off_ini = 0.000004794 V, v_off_fin = 0.000007120 V 06:44:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047860 Vs 06:44:49 Integrated Voltage Measurement... 06:45:08 Voltage Offset Correction: v_off_ini = 0.000006526 V, v_off_fin = 0.000003917 V 06:45:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963610 Vs 06:45:11 Temperature Measurement, Probe Number = 0, T = 20.101000 C 06:45:11 Temperature Measurement, Probe Number = 1, T = 20.019000 C 06:45:12 Temperature Measurement, Probe Number = 2, T = 20.091000 C 06:45:13 Temperature Measurement, Probe Number = 3, T = 20.031000 C 06:45:13 Temperature Measurement, Probe Number = 4, T = 20.374000 C 06:45:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.37 06:45:14 Integrated Voltage Measurement... 06:45:33 Voltage Offset Correction: v_off_ini = 0.000004941 V, v_off_fin = 0.000006672 V 06:45:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047817 Vs 06:45:34 Integrated Voltage Measurement... 06:45:53 Voltage Offset Correction: v_off_ini = 0.000006399 V, v_off_fin = 0.000002788 V 06:45:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968057 Vs 06:45:56 Temperature Measurement, Probe Number = 0, T = 20.088000 C 06:45:56 Temperature Measurement, Probe Number = 1, T = 20.009000 C 06:45:57 Temperature Measurement, Probe Number = 2, T = 20.082000 C 06:45:58 Temperature Measurement, Probe Number = 3, T = 20.024000 C 06:45:58 Temperature Measurement, Probe Number = 4, T = 20.290000 C 06:45:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.29 06:45:59 Integrated Voltage Measurement... 06:46:18 Voltage Offset Correction: v_off_ini = 0.000004394 V, v_off_fin = 0.000006587 V 06:46:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047216 Vs 06:46:18 Integrated Voltage Measurement... 06:46:37 Voltage Offset Correction: v_off_ini = 0.000006738 V, v_off_fin = 0.000003164 V 06:46:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962973 Vs 06:46:40 Temperature Measurement, Probe Number = 0, T = 20.095000 C 06:46:41 Temperature Measurement, Probe Number = 1, T = 20.016000 C 06:46:42 Temperature Measurement, Probe Number = 2, T = 20.087000 C 06:46:42 Temperature Measurement, Probe Number = 3, T = 20.030000 C 06:46:43 Temperature Measurement, Probe Number = 4, T = 20.193000 C 06:46:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.19 06:46:43 Integrated Voltage Measurement... 06:47:02 Voltage Offset Correction: v_off_ini = 0.000004977 V, v_off_fin = 0.000007335 V 06:47:03 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057520 Vs 06:47:03 Integrated Voltage Measurement... 06:47:23 Voltage Offset Correction: v_off_ini = 0.000006778 V, v_off_fin = 0.000003518 V 06:47:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963203 Vs 07:17:26 Temperature Measurement, Probe Number = 0, T = 20.096000 C 07:17:26 Temperature Measurement, Probe Number = 1, T = 20.015000 C 07:17:27 Temperature Measurement, Probe Number = 2, T = 20.088000 C 07:17:28 Temperature Measurement, Probe Number = 3, T = 20.030000 C 07:17:28 Temperature Measurement, Probe Number = 4, T = 20.279000 C 07:17:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.28 07:17:29 Integrated Voltage Measurement... 07:17:48 Voltage Offset Correction: v_off_ini = 0.000004890 V, v_off_fin = 0.000006473 V 07:17:48 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171086466 Vs 07:17:48 Integrated Voltage Measurement... 07:18:07 Voltage Offset Correction: v_off_ini = 0.000006524 V, v_off_fin = 0.000002707 V 07:18:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970900 Vs 07:18:10 Temperature Measurement, Probe Number = 0, T = 20.098000 C 07:18:11 Temperature Measurement, Probe Number = 1, T = 20.014000 C 07:18:11 Temperature Measurement, Probe Number = 2, T = 20.090000 C 07:18:12 Temperature Measurement, Probe Number = 3, T = 20.028000 C 07:18:13 Temperature Measurement, Probe Number = 4, T = 20.337000 C 07:18:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.34 07:18:13 Integrated Voltage Measurement... 07:18:32 Voltage Offset Correction: v_off_ini = 0.000004832 V, v_off_fin = 0.000006924 V 07:18:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050436 Vs 07:18:32 Integrated Voltage Measurement... 07:18:51 Voltage Offset Correction: v_off_ini = 0.000006188 V, v_off_fin = 0.000003268 V 07:18:51 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170969473 Vs 07:18:54 Temperature Measurement, Probe Number = 0, T = 20.091000 C 07:18:55 Temperature Measurement, Probe Number = 1, T = 20.010000 C 07:18:56 Temperature Measurement, Probe Number = 2, T = 20.084000 C 07:18:56 Temperature Measurement, Probe Number = 3, T = 20.023000 C 07:18:57 Temperature Measurement, Probe Number = 4, T = 20.254000 C 07:18:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.25 07:18:57 Integrated Voltage Measurement... 07:19:17 Voltage Offset Correction: v_off_ini = 0.000004035 V, v_off_fin = 0.000007390 V 07:19:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053470 Vs 07:19:17 Integrated Voltage Measurement... 07:19:36 Voltage Offset Correction: v_off_ini = 0.000006383 V, v_off_fin = 0.000003406 V 07:19:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961172 Vs 07:19:39 Temperature Measurement, Probe Number = 0, T = 20.091000 C 07:19:40 Temperature Measurement, Probe Number = 1, T = 20.007000 C 07:19:41 Temperature Measurement, Probe Number = 2, T = 20.084000 C 07:19:41 Temperature Measurement, Probe Number = 3, T = 20.022000 C 07:19:42 Temperature Measurement, Probe Number = 4, T = 20.279000 C 07:19:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.28 07:19:42 Integrated Voltage Measurement... 07:20:01 Voltage Offset Correction: v_off_ini = 0.000003682 V, v_off_fin = 0.000006232 V 07:20:02 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051081 Vs 07:20:02 Integrated Voltage Measurement... 07:20:21 Voltage Offset Correction: v_off_ini = 0.000006136 V, v_off_fin = 0.000003448 V 07:20:21 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170969180 Vs 07:20:24 Temperature Measurement, Probe Number = 0, T = 20.091000 C 07:20:25 Temperature Measurement, Probe Number = 1, T = 20.004000 C 07:20:25 Temperature Measurement, Probe Number = 2, T = 20.083000 C 07:20:26 Temperature Measurement, Probe Number = 3, T = 20.021000 C 07:20:27 Temperature Measurement, Probe Number = 4, T = 20.314000 C 07:20:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.31 07:20:27 Integrated Voltage Measurement... 07:20:46 Voltage Offset Correction: v_off_ini = 0.000005270 V, v_off_fin = 0.000006903 V 07:20:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059341 Vs 07:20:46 Integrated Voltage Measurement... 07:21:05 Voltage Offset Correction: v_off_ini = 0.000007297 V, v_off_fin = 0.000003766 V 07:21:06 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170962994 Vs 07:21:08 Temperature Measurement, Probe Number = 0, T = 20.090000 C 07:21:09 Temperature Measurement, Probe Number = 1, T = 20.005000 C 07:21:10 Temperature Measurement, Probe Number = 2, T = 20.081000 C 07:21:10 Temperature Measurement, Probe Number = 3, T = 20.019000 C 07:21:11 Temperature Measurement, Probe Number = 4, T = 20.327000 C 07:21:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.33 07:21:11 Integrated Voltage Measurement... 07:21:30 Voltage Offset Correction: v_off_ini = 0.000004381 V, v_off_fin = 0.000007404 V 07:21:30 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054051 Vs 07:21:31 Integrated Voltage Measurement... 07:21:50 Voltage Offset Correction: v_off_ini = 0.000006754 V, v_off_fin = 0.000003759 V 07:21:50 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170960352 Vs 07:21:52 Temperature Measurement, Probe Number = 0, T = 20.098000 C 07:21:53 Temperature Measurement, Probe Number = 1, T = 20.012000 C 07:21:54 Temperature Measurement, Probe Number = 2, T = 20.090000 C 07:21:54 Temperature Measurement, Probe Number = 3, T = 20.026000 C 07:21:55 Temperature Measurement, Probe Number = 4, T = 20.371000 C 07:21:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.37 07:21:55 Integrated Voltage Measurement... 07:22:15 Voltage Offset Correction: v_off_ini = 0.000004617 V, v_off_fin = 0.000007318 V 07:22:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058860 Vs 07:22:15 Integrated Voltage Measurement... 07:22:34 Voltage Offset Correction: v_off_ini = 0.000006752 V, v_off_fin = 0.000004342 V 07:22:34 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170965556 Vs 07:22:37 Temperature Measurement, Probe Number = 0, T = 20.096000 C 07:22:38 Temperature Measurement, Probe Number = 1, T = 20.011000 C 07:22:38 Temperature Measurement, Probe Number = 2, T = 20.089000 C 07:22:39 Temperature Measurement, Probe Number = 3, T = 20.025000 C 07:22:40 Temperature Measurement, Probe Number = 4, T = 20.333000 C 07:22:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.33 07:22:40 Integrated Voltage Measurement... 07:22:59 Voltage Offset Correction: v_off_ini = 0.000005283 V, v_off_fin = 0.000007431 V 07:22:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059708 Vs 07:22:59 Integrated Voltage Measurement... 07:23:19 Voltage Offset Correction: v_off_ini = 0.000006360 V, v_off_fin = 0.000003395 V 07:23:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170968471 Vs 07:23:21 Temperature Measurement, Probe Number = 0, T = 20.091000 C 07:23:22 Temperature Measurement, Probe Number = 1, T = 20.005000 C 07:23:23 Temperature Measurement, Probe Number = 2, T = 20.085000 C 07:23:23 Temperature Measurement, Probe Number = 3, T = 20.020000 C 07:23:24 Temperature Measurement, Probe Number = 4, T = 20.221000 C 07:23:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.22 07:23:24 Integrated Voltage Measurement... 07:23:43 Voltage Offset Correction: v_off_ini = 0.000003954 V, v_off_fin = 0.000006906 V 07:23:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053219 Vs 07:23:44 Integrated Voltage Measurement... 07:24:03 Voltage Offset Correction: v_off_ini = 0.000006479 V, v_off_fin = 0.000002592 V 07:24:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971271 Vs 07:24:06 Temperature Measurement, Probe Number = 0, T = 20.097000 C 07:24:06 Temperature Measurement, Probe Number = 1, T = 20.013000 C 07:24:07 Temperature Measurement, Probe Number = 2, T = 20.088000 C 07:24:08 Temperature Measurement, Probe Number = 3, T = 20.025000 C 07:24:08 Temperature Measurement, Probe Number = 4, T = 20.245000 C 07:24:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.25 07:24:08 Integrated Voltage Measurement... 07:24:28 Voltage Offset Correction: v_off_ini = 0.000004335 V, v_off_fin = 0.000007093 V 07:24:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052692 Vs 07:24:28 Integrated Voltage Measurement... 07:24:48 Voltage Offset Correction: v_off_ini = 0.000007121 V, v_off_fin = 0.000003896 V 07:24:48 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170971962 Vs 07:54:51 Temperature Measurement, Probe Number = 0, T = 20.083000 C 07:54:52 Temperature Measurement, Probe Number = 1, T = 20.000000 C 07:54:53 Temperature Measurement, Probe Number = 2, T = 20.076000 C 07:54:53 Temperature Measurement, Probe Number = 3, T = 20.013000 C 07:54:54 Temperature Measurement, Probe Number = 4, T = 20.219000 C 07:54:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.22 07:54:54 Integrated Voltage Measurement... 07:55:13 Voltage Offset Correction: v_off_ini = 0.000004771 V, v_off_fin = 0.000006535 V 07:55:14 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171083674 Vs 07:55:14 Integrated Voltage Measurement... 07:55:33 Voltage Offset Correction: v_off_ini = 0.000006153 V, v_off_fin = 0.000002966 V 07:55:33 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170973607 Vs 07:55:36 Temperature Measurement, Probe Number = 0, T = 20.085000 C 07:55:36 Temperature Measurement, Probe Number = 1, T = 20.005000 C 07:55:37 Temperature Measurement, Probe Number = 2, T = 20.076000 C 07:55:38 Temperature Measurement, Probe Number = 3, T = 20.018000 C 07:55:38 Temperature Measurement, Probe Number = 4, T = 20.133000 C 07:55:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.13 07:55:38 Integrated Voltage Measurement... 07:55:58 Voltage Offset Correction: v_off_ini = 0.000004668 V, v_off_fin = 0.000008241 V 07:55:58 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057749 Vs 07:55:58 Integrated Voltage Measurement... 07:56:17 Voltage Offset Correction: v_off_ini = 0.000006492 V, v_off_fin = 0.000002919 V 07:56:17 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971232 Vs 07:56:20 Temperature Measurement, Probe Number = 0, T = 20.089000 C 07:56:20 Temperature Measurement, Probe Number = 1, T = 20.003000 C 07:56:21 Temperature Measurement, Probe Number = 2, T = 20.077000 C 07:56:22 Temperature Measurement, Probe Number = 3, T = 20.014000 C 07:56:22 Temperature Measurement, Probe Number = 4, T = 20.179000 C 07:56:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.18 07:56:23 Integrated Voltage Measurement... 07:56:42 Voltage Offset Correction: v_off_ini = 0.000004405 V, v_off_fin = 0.000007050 V 07:56:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054949 Vs 07:56:42 Integrated Voltage Measurement... 07:57:02 Voltage Offset Correction: v_off_ini = 0.000006185 V, v_off_fin = 0.000003537 V 07:57:02 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975191 Vs 07:57:04 Temperature Measurement, Probe Number = 0, T = 20.086000 C 07:57:05 Temperature Measurement, Probe Number = 1, T = 20.004000 C 07:57:06 Temperature Measurement, Probe Number = 2, T = 20.075000 C 07:57:06 Temperature Measurement, Probe Number = 3, T = 20.013000 C 07:57:07 Temperature Measurement, Probe Number = 4, T = 20.206000 C 07:57:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.21 07:57:07 Integrated Voltage Measurement... 07:57:27 Voltage Offset Correction: v_off_ini = 0.000004063 V, v_off_fin = 0.000006598 V 07:57:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054196 Vs 07:57:27 Integrated Voltage Measurement... 07:57:46 Voltage Offset Correction: v_off_ini = 0.000006680 V, v_off_fin = 0.000003203 V 07:57:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974905 Vs 07:57:49 Temperature Measurement, Probe Number = 0, T = 20.085000 C 07:57:49 Temperature Measurement, Probe Number = 1, T = 20.001000 C 07:57:50 Temperature Measurement, Probe Number = 2, T = 20.076000 C 07:57:51 Temperature Measurement, Probe Number = 3, T = 20.014000 C 07:57:51 Temperature Measurement, Probe Number = 4, T = 20.220000 C 07:57:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.22 07:57:52 Integrated Voltage Measurement... 07:58:12 Voltage Offset Correction: v_off_ini = 0.000004142 V, v_off_fin = 0.000006789 V 07:58:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054347 Vs 07:58:13 Integrated Voltage Measurement... 07:58:32 Voltage Offset Correction: v_off_ini = 0.000005794 V, v_off_fin = 0.000003713 V 07:58:32 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170968178 Vs 07:58:35 Temperature Measurement, Probe Number = 0, T = 20.089000 C 07:58:35 Temperature Measurement, Probe Number = 1, T = 20.001000 C 07:58:36 Temperature Measurement, Probe Number = 2, T = 20.078000 C 07:58:37 Temperature Measurement, Probe Number = 3, T = 20.016000 C 07:58:37 Temperature Measurement, Probe Number = 4, T = 20.219000 C 07:58:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.22 07:58:38 Integrated Voltage Measurement... 07:58:57 Voltage Offset Correction: v_off_ini = 0.000005119 V, v_off_fin = 0.000007317 V 07:58:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060296 Vs 07:58:58 Integrated Voltage Measurement... 07:59:17 Voltage Offset Correction: v_off_ini = 0.000006516 V, v_off_fin = 0.000003116 V 07:59:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970580 Vs 07:59:20 Temperature Measurement, Probe Number = 0, T = 20.089000 C 07:59:20 Temperature Measurement, Probe Number = 1, T = 20.002000 C 07:59:21 Temperature Measurement, Probe Number = 2, T = 20.078000 C 07:59:22 Temperature Measurement, Probe Number = 3, T = 20.015000 C 07:59:22 Temperature Measurement, Probe Number = 4, T = 20.173000 C 07:59:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.17 07:59:22 Integrated Voltage Measurement... 07:59:42 Voltage Offset Correction: v_off_ini = 0.000004480 V, v_off_fin = 0.000006447 V 07:59:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054656 Vs 07:59:42 Integrated Voltage Measurement... 08:00:02 Voltage Offset Correction: v_off_ini = 0.000006007 V, v_off_fin = 0.000003120 V 08:00:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974124 Vs 08:00:05 Temperature Measurement, Probe Number = 0, T = 20.093000 C 08:00:05 Temperature Measurement, Probe Number = 1, T = 20.007000 C 08:00:06 Temperature Measurement, Probe Number = 2, T = 20.081000 C 08:00:07 Temperature Measurement, Probe Number = 3, T = 20.017000 C 08:00:07 Temperature Measurement, Probe Number = 4, T = 20.099000 C 08:00:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.10 08:00:07 Integrated Voltage Measurement... 08:00:27 Voltage Offset Correction: v_off_ini = 0.000004263 V, v_off_fin = 0.000006539 V 08:00:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051281 Vs 08:00:27 Integrated Voltage Measurement... 08:00:47 Voltage Offset Correction: v_off_ini = 0.000006044 V, v_off_fin = 0.000001840 V 08:00:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975748 Vs 08:00:50 Temperature Measurement, Probe Number = 0, T = 20.095000 C 08:00:50 Temperature Measurement, Probe Number = 1, T = 20.010000 C 08:00:51 Temperature Measurement, Probe Number = 2, T = 20.085000 C 08:00:52 Temperature Measurement, Probe Number = 3, T = 20.022000 C 08:00:52 Temperature Measurement, Probe Number = 4, T = 20.181000 C 08:00:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.18 08:00:53 Integrated Voltage Measurement... 08:01:12 Voltage Offset Correction: v_off_ini = 0.000003548 V, v_off_fin = 0.000006351 V 08:01:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051431 Vs 08:01:12 Integrated Voltage Measurement... 08:01:31 Voltage Offset Correction: v_off_ini = 0.000006063 V, v_off_fin = 0.000002953 V 08:01:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972119 Vs 08:01:34 Temperature Measurement, Probe Number = 0, T = 20.092000 C 08:01:35 Temperature Measurement, Probe Number = 1, T = 20.007000 C 08:01:35 Temperature Measurement, Probe Number = 2, T = 20.082000 C 08:01:36 Temperature Measurement, Probe Number = 3, T = 20.021000 C 08:01:37 Temperature Measurement, Probe Number = 4, T = 20.281000 C 08:01:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.28 08:01:37 Integrated Voltage Measurement... 08:01:56 Voltage Offset Correction: v_off_ini = 0.000003914 V, v_off_fin = 0.000006774 V 08:01:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052040 Vs 08:01:56 Integrated Voltage Measurement... 08:02:16 Voltage Offset Correction: v_off_ini = 0.000006610 V, v_off_fin = 0.000002971 V 08:02:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969676 Vs 08:32:18 Temperature Measurement, Probe Number = 0, T = 20.081000 C 08:32:19 Temperature Measurement, Probe Number = 1, T = 20.001000 C 08:32:20 Temperature Measurement, Probe Number = 2, T = 20.072000 C 08:32:21 Temperature Measurement, Probe Number = 3, T = 20.013000 C 08:32:21 Temperature Measurement, Probe Number = 4, T = 20.233000 C 08:32:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.23 08:32:21 Integrated Voltage Measurement... 08:32:41 Voltage Offset Correction: v_off_ini = 0.000005799 V, v_off_fin = 0.000006621 V 08:32:41 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171105248 Vs 08:32:41 Integrated Voltage Measurement... 08:33:00 Voltage Offset Correction: v_off_ini = 0.000006189 V, v_off_fin = 0.000003797 V 08:33:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962443 Vs 08:33:03 Temperature Measurement, Probe Number = 0, T = 20.086000 C 08:33:04 Temperature Measurement, Probe Number = 1, T = 20.005000 C 08:33:04 Temperature Measurement, Probe Number = 2, T = 20.078000 C 08:33:05 Temperature Measurement, Probe Number = 3, T = 20.017000 C 08:33:06 Temperature Measurement, Probe Number = 4, T = 20.287000 C 08:33:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.29 08:33:06 Integrated Voltage Measurement... 08:33:25 Voltage Offset Correction: v_off_ini = 0.000004566 V, v_off_fin = 0.000007092 V 08:33:25 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057115 Vs 08:33:25 Integrated Voltage Measurement... 08:33:45 Voltage Offset Correction: v_off_ini = 0.000006794 V, v_off_fin = 0.000003330 V 08:33:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969106 Vs 08:33:47 Temperature Measurement, Probe Number = 0, T = 20.091000 C 08:33:48 Temperature Measurement, Probe Number = 1, T = 20.009000 C 08:33:49 Temperature Measurement, Probe Number = 2, T = 20.082000 C 08:33:49 Temperature Measurement, Probe Number = 3, T = 20.021000 C 08:33:50 Temperature Measurement, Probe Number = 4, T = 20.291000 C 08:33:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.29 08:33:50 Integrated Voltage Measurement... 08:34:09 Voltage Offset Correction: v_off_ini = 0.000003626 V, v_off_fin = 0.000006713 V 08:34:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052124 Vs 08:34:10 Integrated Voltage Measurement... 08:34:28 Voltage Offset Correction: v_off_ini = 0.000006384 V, v_off_fin = 0.000003347 V 08:34:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966300 Vs 08:34:31 Temperature Measurement, Probe Number = 0, T = 20.092000 C 08:34:32 Temperature Measurement, Probe Number = 1, T = 20.010000 C 08:34:33 Temperature Measurement, Probe Number = 2, T = 20.081000 C 08:34:33 Temperature Measurement, Probe Number = 3, T = 20.020000 C 08:34:34 Temperature Measurement, Probe Number = 4, T = 20.357000 C 08:34:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.36 08:34:34 Integrated Voltage Measurement... 08:34:53 Voltage Offset Correction: v_off_ini = 0.000004780 V, v_off_fin = 0.000006991 V 08:34:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171057214 Vs 08:34:54 Integrated Voltage Measurement... 08:35:12 Voltage Offset Correction: v_off_ini = 0.000006379 V, v_off_fin = 0.000003196 V 08:35:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966611 Vs 08:35:15 Temperature Measurement, Probe Number = 0, T = 20.089000 C 08:35:16 Temperature Measurement, Probe Number = 1, T = 20.007000 C 08:35:17 Temperature Measurement, Probe Number = 2, T = 20.076000 C 08:35:17 Temperature Measurement, Probe Number = 3, T = 20.015000 C 08:35:18 Temperature Measurement, Probe Number = 4, T = 20.340000 C 08:35:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.34 08:35:18 Integrated Voltage Measurement... 08:35:37 Voltage Offset Correction: v_off_ini = 0.000004084 V, v_off_fin = 0.000006839 V 08:35:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051862 Vs 08:35:38 Integrated Voltage Measurement... 08:35:57 Voltage Offset Correction: v_off_ini = 0.000006067 V, v_off_fin = 0.000003318 V 08:35:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972020 Vs 08:36:00 Temperature Measurement, Probe Number = 0, T = 20.081000 C 08:36:01 Temperature Measurement, Probe Number = 1, T = 20.001000 C 08:36:01 Temperature Measurement, Probe Number = 2, T = 20.072000 C 08:36:02 Temperature Measurement, Probe Number = 3, T = 20.011000 C 08:36:03 Temperature Measurement, Probe Number = 4, T = 20.330000 C 08:36:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.33 08:36:03 Integrated Voltage Measurement... 08:36:22 Voltage Offset Correction: v_off_ini = 0.000004319 V, v_off_fin = 0.000006269 V 08:36:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049018 Vs 08:36:22 Integrated Voltage Measurement... 08:36:41 Voltage Offset Correction: v_off_ini = 0.000006038 V, v_off_fin = 0.000002677 V 08:36:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973138 Vs 08:36:44 Temperature Measurement, Probe Number = 0, T = 20.083000 C 08:36:45 Temperature Measurement, Probe Number = 1, T = 20.003000 C 08:36:46 Temperature Measurement, Probe Number = 2, T = 20.073000 C 08:36:46 Temperature Measurement, Probe Number = 3, T = 20.014000 C 08:36:47 Temperature Measurement, Probe Number = 4, T = 20.300000 C 08:36:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.30 08:36:47 Integrated Voltage Measurement... 08:37:07 Voltage Offset Correction: v_off_ini = 0.000003957 V, v_off_fin = 0.000006720 V 08:37:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051535 Vs 08:37:07 Integrated Voltage Measurement... 08:37:26 Voltage Offset Correction: v_off_ini = 0.000006143 V, v_off_fin = 0.000002762 V 08:37:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977934 Vs 08:37:29 Temperature Measurement, Probe Number = 0, T = 20.086000 C 08:37:30 Temperature Measurement, Probe Number = 1, T = 20.005000 C 08:37:30 Temperature Measurement, Probe Number = 2, T = 20.077000 C 08:37:31 Temperature Measurement, Probe Number = 3, T = 20.018000 C 08:37:32 Temperature Measurement, Probe Number = 4, T = 20.432000 C 08:37:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.43 08:37:32 Integrated Voltage Measurement... 08:37:51 Voltage Offset Correction: v_off_ini = 0.000004347 V, v_off_fin = 0.000006672 V 08:37:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055181 Vs 08:37:52 Integrated Voltage Measurement... 08:38:11 Voltage Offset Correction: v_off_ini = 0.000005911 V, v_off_fin = 0.000002544 V 08:38:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975243 Vs 08:38:14 Temperature Measurement, Probe Number = 0, T = 20.089000 C 08:38:14 Temperature Measurement, Probe Number = 1, T = 20.005000 C 08:38:15 Temperature Measurement, Probe Number = 2, T = 20.079000 C 08:38:16 Temperature Measurement, Probe Number = 3, T = 20.018000 C 08:38:16 Temperature Measurement, Probe Number = 4, T = 20.487000 C 08:38:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.49 08:38:16 Integrated Voltage Measurement... 08:38:36 Voltage Offset Correction: v_off_ini = 0.000003795 V, v_off_fin = 0.000006421 V 08:38:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052352 Vs 08:38:36 Integrated Voltage Measurement... 08:38:55 Voltage Offset Correction: v_off_ini = 0.000006160 V, v_off_fin = 0.000003045 V 08:38:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974588 Vs 08:38:58 Temperature Measurement, Probe Number = 0, T = 20.084000 C 08:38:58 Temperature Measurement, Probe Number = 1, T = 20.003000 C 08:38:59 Temperature Measurement, Probe Number = 2, T = 20.076000 C 08:39:00 Temperature Measurement, Probe Number = 3, T = 20.016000 C 08:39:00 Temperature Measurement, Probe Number = 4, T = 20.513000 C 08:39:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.51 08:39:01 Integrated Voltage Measurement... 08:39:20 Voltage Offset Correction: v_off_ini = 0.000003644 V, v_off_fin = 0.000006557 V 08:39:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048837 Vs 08:39:20 Integrated Voltage Measurement... 08:39:40 Voltage Offset Correction: v_off_ini = 0.000006103 V, v_off_fin = 0.000002985 V 08:39:40 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170975404 Vs 09:09:42 Temperature Measurement, Probe Number = 0, T = 20.083000 C 09:09:43 Temperature Measurement, Probe Number = 1, T = 20.001000 C 09:09:44 Temperature Measurement, Probe Number = 2, T = 20.075000 C 09:09:44 Temperature Measurement, Probe Number = 3, T = 20.014000 C 09:09:45 Temperature Measurement, Probe Number = 4, T = 20.335000 C 09:09:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.34 09:09:45 Integrated Voltage Measurement... 09:10:04 Voltage Offset Correction: v_off_ini = 0.000005270 V, v_off_fin = 0.000006986 V 09:10:05 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171105889 Vs 09:10:05 Integrated Voltage Measurement... 09:10:24 Voltage Offset Correction: v_off_ini = 0.000006538 V, v_off_fin = 0.000003609 V 09:10:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964229 Vs 09:10:27 Temperature Measurement, Probe Number = 0, T = 20.083000 C 09:10:27 Temperature Measurement, Probe Number = 1, T = 20.004000 C 09:10:28 Temperature Measurement, Probe Number = 2, T = 20.071000 C 09:10:29 Temperature Measurement, Probe Number = 3, T = 20.014000 C 09:10:29 Temperature Measurement, Probe Number = 4, T = 20.348000 C 09:10:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.35 09:10:29 Integrated Voltage Measurement... 09:10:49 Voltage Offset Correction: v_off_ini = 0.000005040 V, v_off_fin = 0.000006728 V 09:10:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171057493 Vs 09:10:49 Integrated Voltage Measurement... 09:11:08 Voltage Offset Correction: v_off_ini = 0.000006512 V, v_off_fin = 0.000004292 V 09:11:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967807 Vs 09:11:11 Temperature Measurement, Probe Number = 0, T = 20.083000 C 09:11:12 Temperature Measurement, Probe Number = 1, T = 20.004000 C 09:11:13 Temperature Measurement, Probe Number = 2, T = 20.075000 C 09:11:13 Temperature Measurement, Probe Number = 3, T = 20.018000 C 09:11:14 Temperature Measurement, Probe Number = 4, T = 20.380000 C 09:11:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.38 09:11:14 Integrated Voltage Measurement... 09:11:34 Voltage Offset Correction: v_off_ini = 0.000004630 V, v_off_fin = 0.000006695 V 09:11:34 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171053192 Vs 09:11:34 Integrated Voltage Measurement... 09:11:53 Voltage Offset Correction: v_off_ini = 0.000006005 V, v_off_fin = 0.000002941 V 09:11:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969374 Vs 09:11:56 Temperature Measurement, Probe Number = 0, T = 20.080000 C 09:11:57 Temperature Measurement, Probe Number = 1, T = 19.997000 C 09:11:58 Temperature Measurement, Probe Number = 2, T = 20.073000 C 09:11:58 Temperature Measurement, Probe Number = 3, T = 20.011000 C 09:11:59 Temperature Measurement, Probe Number = 4, T = 20.387000 C 09:11:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.39 09:11:59 Integrated Voltage Measurement... 09:12:18 Voltage Offset Correction: v_off_ini = 0.000003339 V, v_off_fin = 0.000006611 V 09:12:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050195 Vs 09:12:19 Integrated Voltage Measurement... 09:12:38 Voltage Offset Correction: v_off_ini = 0.000006229 V, v_off_fin = 0.000003337 V 09:12:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970444 Vs 09:12:41 Temperature Measurement, Probe Number = 0, T = 20.082000 C 09:12:41 Temperature Measurement, Probe Number = 1, T = 20.003000 C 09:12:42 Temperature Measurement, Probe Number = 2, T = 20.073000 C 09:12:43 Temperature Measurement, Probe Number = 3, T = 20.015000 C 09:12:43 Temperature Measurement, Probe Number = 4, T = 20.427000 C 09:12:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.43 09:12:44 Integrated Voltage Measurement... 09:13:03 Voltage Offset Correction: v_off_ini = 0.000004281 V, v_off_fin = 0.000006719 V 09:13:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053277 Vs 09:13:03 Integrated Voltage Measurement... 09:13:23 Voltage Offset Correction: v_off_ini = 0.000006224 V, v_off_fin = 0.000003705 V 09:13:23 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170967820 Vs 09:13:26 Temperature Measurement, Probe Number = 0, T = 20.079000 C 09:13:26 Temperature Measurement, Probe Number = 1, T = 20.001000 C 09:13:27 Temperature Measurement, Probe Number = 2, T = 20.070000 C 09:13:28 Temperature Measurement, Probe Number = 3, T = 20.013000 C 09:13:28 Temperature Measurement, Probe Number = 4, T = 20.416000 C 09:13:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.42 09:13:29 Integrated Voltage Measurement... 09:13:48 Voltage Offset Correction: v_off_ini = 0.000004753 V, v_off_fin = 0.000005869 V 09:13:48 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171043994 Vs 09:13:48 Integrated Voltage Measurement... 09:14:07 Voltage Offset Correction: v_off_ini = 0.000005783 V, v_off_fin = 0.000003290 V 09:14:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974440 Vs 09:14:10 Temperature Measurement, Probe Number = 0, T = 20.082000 C 09:14:11 Temperature Measurement, Probe Number = 1, T = 20.001000 C 09:14:11 Temperature Measurement, Probe Number = 2, T = 20.074000 C 09:14:12 Temperature Measurement, Probe Number = 3, T = 20.014000 C 09:14:13 Temperature Measurement, Probe Number = 4, T = 20.412000 C 09:14:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.41 09:14:13 Integrated Voltage Measurement... 09:14:32 Voltage Offset Correction: v_off_ini = 0.000003861 V, v_off_fin = 0.000006774 V 09:14:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049934 Vs 09:14:32 Integrated Voltage Measurement... 09:14:51 Voltage Offset Correction: v_off_ini = 0.000006255 V, v_off_fin = 0.000002278 V 09:14:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971430 Vs 09:14:54 Temperature Measurement, Probe Number = 0, T = 20.083000 C 09:14:55 Temperature Measurement, Probe Number = 1, T = 20.004000 C 09:14:55 Temperature Measurement, Probe Number = 2, T = 20.074000 C 09:14:56 Temperature Measurement, Probe Number = 3, T = 20.013000 C 09:14:57 Temperature Measurement, Probe Number = 4, T = 20.368000 C 09:14:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.37 09:14:57 Integrated Voltage Measurement... 09:15:16 Voltage Offset Correction: v_off_ini = 0.000003800 V, v_off_fin = 0.000006648 V 09:15:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054368 Vs 09:15:16 Integrated Voltage Measurement... 09:15:35 Voltage Offset Correction: v_off_ini = 0.000006432 V, v_off_fin = 0.000002830 V 09:15:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968380 Vs 09:15:38 Temperature Measurement, Probe Number = 0, T = 20.081000 C 09:15:39 Temperature Measurement, Probe Number = 1, T = 20.002000 C 09:15:40 Temperature Measurement, Probe Number = 2, T = 20.072000 C 09:15:40 Temperature Measurement, Probe Number = 3, T = 20.015000 C 09:15:41 Temperature Measurement, Probe Number = 4, T = 20.390000 C 09:15:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.39 09:15:41 Integrated Voltage Measurement... 09:16:00 Voltage Offset Correction: v_off_ini = 0.000004156 V, v_off_fin = 0.000005981 V 09:16:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047844 Vs 09:16:00 Integrated Voltage Measurement... 09:16:20 Voltage Offset Correction: v_off_ini = 0.000005676 V, v_off_fin = 0.000002949 V 09:16:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976103 Vs 09:16:23 Temperature Measurement, Probe Number = 0, T = 20.083000 C 09:16:23 Temperature Measurement, Probe Number = 1, T = 20.002000 C 09:16:24 Temperature Measurement, Probe Number = 2, T = 20.074000 C 09:16:25 Temperature Measurement, Probe Number = 3, T = 20.015000 C 09:16:25 Temperature Measurement, Probe Number = 4, T = 20.381000 C 09:16:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.38 09:16:25 Integrated Voltage Measurement... 09:16:46 Voltage Offset Correction: v_off_ini = 0.000004079 V, v_off_fin = 0.000006368 V 09:16:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051738 Vs 09:16:47 Integrated Voltage Measurement... 09:17:06 Voltage Offset Correction: v_off_ini = 0.000006149 V, v_off_fin = 0.000002357 V 09:17:06 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170973220 Vs 09:47:09 Temperature Measurement, Probe Number = 0, T = 20.076000 C 09:47:10 Temperature Measurement, Probe Number = 1, T = 19.995000 C 09:47:10 Temperature Measurement, Probe Number = 2, T = 20.066000 C 09:47:11 Temperature Measurement, Probe Number = 3, T = 20.006000 C 09:47:12 Temperature Measurement, Probe Number = 4, T = 20.180000 C 09:47:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.18 09:47:12 Integrated Voltage Measurement... 09:47:31 Voltage Offset Correction: v_off_ini = 0.000004849 V, v_off_fin = 0.000006000 V 09:47:31 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171095494 Vs 09:47:31 Integrated Voltage Measurement... 09:47:51 Voltage Offset Correction: v_off_ini = 0.000005103 V, v_off_fin = 0.000003036 V 09:47:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974896 Vs 09:47:54 Temperature Measurement, Probe Number = 0, T = 20.082000 C 09:47:54 Temperature Measurement, Probe Number = 1, T = 20.000000 C 09:47:55 Temperature Measurement, Probe Number = 2, T = 20.067000 C 09:47:56 Temperature Measurement, Probe Number = 3, T = 20.008000 C 09:47:56 Temperature Measurement, Probe Number = 4, T = 20.176000 C 09:47:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.18 09:47:56 Integrated Voltage Measurement... 09:48:16 Voltage Offset Correction: v_off_ini = 0.000004176 V, v_off_fin = 0.000006158 V 09:48:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040607 Vs 09:48:16 Integrated Voltage Measurement... 09:48:35 Voltage Offset Correction: v_off_ini = 0.000005838 V, v_off_fin = 0.000002878 V 09:48:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967362 Vs 09:48:38 Temperature Measurement, Probe Number = 0, T = 20.081000 C 09:48:39 Temperature Measurement, Probe Number = 1, T = 20.001000 C 09:48:39 Temperature Measurement, Probe Number = 2, T = 20.069000 C 09:48:40 Temperature Measurement, Probe Number = 3, T = 20.010000 C 09:48:41 Temperature Measurement, Probe Number = 4, T = 20.252000 C 09:48:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.25 09:48:41 Integrated Voltage Measurement... 09:49:00 Voltage Offset Correction: v_off_ini = 0.000003846 V, v_off_fin = 0.000007392 V 09:49:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045216 Vs 09:49:01 Integrated Voltage Measurement... 09:49:20 Voltage Offset Correction: v_off_ini = 0.000006066 V, v_off_fin = 0.000003155 V 09:49:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962062 Vs 09:49:23 Temperature Measurement, Probe Number = 0, T = 20.085000 C 09:49:23 Temperature Measurement, Probe Number = 1, T = 20.005000 C 09:49:24 Temperature Measurement, Probe Number = 2, T = 20.074000 C 09:49:25 Temperature Measurement, Probe Number = 3, T = 20.014000 C 09:49:25 Temperature Measurement, Probe Number = 4, T = 20.259000 C 09:49:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.26 09:49:26 Integrated Voltage Measurement... 09:49:45 Voltage Offset Correction: v_off_ini = 0.000004216 V, v_off_fin = 0.000006297 V 09:49:45 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171042692 Vs 09:49:45 Integrated Voltage Measurement... 09:50:04 Voltage Offset Correction: v_off_ini = 0.000005648 V, v_off_fin = 0.000002860 V 09:50:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963291 Vs 09:50:07 Temperature Measurement, Probe Number = 0, T = 20.086000 C 09:50:08 Temperature Measurement, Probe Number = 1, T = 20.004000 C 09:50:09 Temperature Measurement, Probe Number = 2, T = 20.076000 C 09:50:09 Temperature Measurement, Probe Number = 3, T = 20.016000 C 09:50:10 Temperature Measurement, Probe Number = 4, T = 20.275000 C 09:50:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.27 09:50:10 Integrated Voltage Measurement... 09:50:29 Voltage Offset Correction: v_off_ini = 0.000004551 V, v_off_fin = 0.000006407 V 09:50:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044893 Vs 09:50:30 Integrated Voltage Measurement... 09:50:50 Voltage Offset Correction: v_off_ini = 0.000006231 V, v_off_fin = 0.000003262 V 09:50:50 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170969909 Vs 09:50:53 Temperature Measurement, Probe Number = 0, T = 20.085000 C 09:50:53 Temperature Measurement, Probe Number = 1, T = 20.003000 C 09:50:54 Temperature Measurement, Probe Number = 2, T = 20.077000 C 09:50:55 Temperature Measurement, Probe Number = 3, T = 20.015000 C 09:50:55 Temperature Measurement, Probe Number = 4, T = 20.367000 C 09:50:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.37 09:50:55 Integrated Voltage Measurement... 09:51:14 Voltage Offset Correction: v_off_ini = 0.000004701 V, v_off_fin = 0.000006317 V 09:51:15 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171036387 Vs 09:51:15 Integrated Voltage Measurement... 09:51:34 Voltage Offset Correction: v_off_ini = 0.000005858 V, v_off_fin = 0.000002787 V 09:51:34 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170970989 Vs 09:51:37 Temperature Measurement, Probe Number = 0, T = 20.078000 C 09:51:38 Temperature Measurement, Probe Number = 1, T = 19.994000 C 09:51:38 Temperature Measurement, Probe Number = 2, T = 20.068000 C 09:51:39 Temperature Measurement, Probe Number = 3, T = 20.006000 C 09:51:39 Temperature Measurement, Probe Number = 4, T = 20.390000 C 09:51:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 19.99 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.39 09:51:40 Integrated Voltage Measurement... 09:51:59 Voltage Offset Correction: v_off_ini = 0.000004614 V, v_off_fin = 0.000006157 V 09:51:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171048301 Vs 09:51:59 Integrated Voltage Measurement... 09:52:19 Voltage Offset Correction: v_off_ini = 0.000006453 V, v_off_fin = 0.000003267 V 09:52:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965029 Vs 09:52:21 Temperature Measurement, Probe Number = 0, T = 20.075000 C 09:52:22 Temperature Measurement, Probe Number = 1, T = 19.994000 C 09:52:23 Temperature Measurement, Probe Number = 2, T = 20.065000 C 09:52:23 Temperature Measurement, Probe Number = 3, T = 20.005000 C 09:52:24 Temperature Measurement, Probe Number = 4, T = 20.405000 C 09:52:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.07 P1 = Bottom 2, Value = 19.99 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.00 P4 = Room, Value = 20.41 09:52:24 Integrated Voltage Measurement... 09:52:43 Voltage Offset Correction: v_off_ini = 0.000004672 V, v_off_fin = 0.000006950 V 09:52:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048588 Vs 09:52:44 Integrated Voltage Measurement... 09:53:03 Voltage Offset Correction: v_off_ini = 0.000006339 V, v_off_fin = 0.000003333 V 09:53:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960763 Vs 09:53:05 Temperature Measurement, Probe Number = 0, T = 20.077000 C 09:53:06 Temperature Measurement, Probe Number = 1, T = 19.996000 C 09:53:07 Temperature Measurement, Probe Number = 2, T = 20.070000 C 09:53:07 Temperature Measurement, Probe Number = 3, T = 20.011000 C 09:53:08 Temperature Measurement, Probe Number = 4, T = 20.443000 C 09:53:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.44 09:53:08 Integrated Voltage Measurement... 09:53:28 Voltage Offset Correction: v_off_ini = 0.000004429 V, v_off_fin = 0.000006557 V 09:53:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049381 Vs 09:53:28 Integrated Voltage Measurement... 09:53:47 Voltage Offset Correction: v_off_ini = 0.000006340 V, v_off_fin = 0.000003183 V 09:53:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960355 Vs 09:53:50 Temperature Measurement, Probe Number = 0, T = 20.083000 C 09:53:51 Temperature Measurement, Probe Number = 1, T = 19.998000 C 09:53:52 Temperature Measurement, Probe Number = 2, T = 20.074000 C 09:53:52 Temperature Measurement, Probe Number = 3, T = 20.013000 C 09:53:53 Temperature Measurement, Probe Number = 4, T = 20.383000 C 09:53:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.38 09:53:53 Integrated Voltage Measurement... 09:54:12 Voltage Offset Correction: v_off_ini = 0.000004474 V, v_off_fin = 0.000007107 V 09:54:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046117 Vs 09:54:13 Integrated Voltage Measurement... 09:54:31 Voltage Offset Correction: v_off_ini = 0.000006672 V, v_off_fin = 0.000003408 V 09:54:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955985 Vs 10:24:34 Temperature Measurement, Probe Number = 0, T = 20.084000 C 10:24:35 Temperature Measurement, Probe Number = 1, T = 20.002000 C 10:24:36 Temperature Measurement, Probe Number = 2, T = 20.074000 C 10:24:36 Temperature Measurement, Probe Number = 3, T = 20.014000 C 10:24:37 Temperature Measurement, Probe Number = 4, T = 20.439000 C 10:24:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.44 10:24:37 Integrated Voltage Measurement... 10:24:56 Voltage Offset Correction: v_off_ini = 0.000005279 V, v_off_fin = 0.000006375 V 10:24:56 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171101036 Vs 10:24:57 Integrated Voltage Measurement... 10:25:16 Voltage Offset Correction: v_off_ini = 0.000006138 V, v_off_fin = 0.000002706 V 10:25:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956769 Vs 10:25:18 Temperature Measurement, Probe Number = 0, T = 20.077000 C 10:25:19 Temperature Measurement, Probe Number = 1, T = 19.998000 C 10:25:20 Temperature Measurement, Probe Number = 2, T = 20.069000 C 10:25:20 Temperature Measurement, Probe Number = 3, T = 20.010000 C 10:25:21 Temperature Measurement, Probe Number = 4, T = 20.433000 C 10:25:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.43 10:25:21 Integrated Voltage Measurement... 10:25:40 Voltage Offset Correction: v_off_ini = 0.000004149 V, v_off_fin = 0.000006356 V 10:25:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033768 Vs 10:25:41 Integrated Voltage Measurement... 10:26:00 Voltage Offset Correction: v_off_ini = 0.000006099 V, v_off_fin = 0.000003225 V 10:26:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960874 Vs 10:26:03 Temperature Measurement, Probe Number = 0, T = 20.079000 C 10:26:04 Temperature Measurement, Probe Number = 1, T = 19.998000 C 10:26:04 Temperature Measurement, Probe Number = 2, T = 20.071000 C 10:26:05 Temperature Measurement, Probe Number = 3, T = 20.013000 C 10:26:06 Temperature Measurement, Probe Number = 4, T = 20.460000 C 10:26:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.46 10:26:06 Integrated Voltage Measurement... 10:26:25 Voltage Offset Correction: v_off_ini = 0.000004329 V, v_off_fin = 0.000006377 V 10:26:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035859 Vs 10:26:26 Integrated Voltage Measurement... 10:26:45 Voltage Offset Correction: v_off_ini = 0.000006518 V, v_off_fin = 0.000002622 V 10:26:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956797 Vs 10:26:48 Temperature Measurement, Probe Number = 0, T = 20.077000 C 10:26:48 Temperature Measurement, Probe Number = 1, T = 19.995000 C 10:26:49 Temperature Measurement, Probe Number = 2, T = 20.069000 C 10:26:50 Temperature Measurement, Probe Number = 3, T = 20.009000 C 10:26:50 Temperature Measurement, Probe Number = 4, T = 20.406000 C 10:26:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.41 10:26:51 Integrated Voltage Measurement... 10:27:10 Voltage Offset Correction: v_off_ini = 0.000003951 V, v_off_fin = 0.000006066 V 10:27:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171032178 Vs 10:27:11 Integrated Voltage Measurement... 10:27:30 Voltage Offset Correction: v_off_ini = 0.000006031 V, v_off_fin = 0.000002388 V 10:27:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961107 Vs 10:27:33 Temperature Measurement, Probe Number = 0, T = 20.082000 C 10:27:33 Temperature Measurement, Probe Number = 1, T = 20.003000 C 10:27:34 Temperature Measurement, Probe Number = 2, T = 20.071000 C 10:27:35 Temperature Measurement, Probe Number = 3, T = 20.014000 C 10:27:35 Temperature Measurement, Probe Number = 4, T = 20.448000 C 10:27:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.45 10:27:35 Integrated Voltage Measurement... 10:27:55 Voltage Offset Correction: v_off_ini = 0.000002539 V, v_off_fin = 0.000005953 V 10:27:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023761 Vs 10:27:55 Integrated Voltage Measurement... 10:28:14 Voltage Offset Correction: v_off_ini = 0.000005574 V, v_off_fin = 0.000002614 V 10:28:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961539 Vs 10:28:17 Temperature Measurement, Probe Number = 0, T = 20.075000 C 10:28:17 Temperature Measurement, Probe Number = 1, T = 19.993000 C 10:28:18 Temperature Measurement, Probe Number = 2, T = 20.066000 C 10:28:19 Temperature Measurement, Probe Number = 3, T = 20.006000 C 10:28:19 Temperature Measurement, Probe Number = 4, T = 20.481000 C 10:28:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.07 P1 = Bottom 2, Value = 19.99 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.48 10:28:20 Integrated Voltage Measurement... 10:28:39 Voltage Offset Correction: v_off_ini = 0.000003651 V, v_off_fin = 0.000006349 V 10:28:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028200 Vs 10:28:39 Integrated Voltage Measurement... 10:28:59 Voltage Offset Correction: v_off_ini = 0.000005752 V, v_off_fin = 0.000003197 V 10:28:59 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170957706 Vs 10:29:02 Temperature Measurement, Probe Number = 0, T = 20.078000 C 10:29:02 Temperature Measurement, Probe Number = 1, T = 19.999000 C 10:29:03 Temperature Measurement, Probe Number = 2, T = 20.068000 C 10:29:04 Temperature Measurement, Probe Number = 3, T = 20.010000 C 10:29:04 Temperature Measurement, Probe Number = 4, T = 20.448000 C 10:29:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.45 10:29:05 Integrated Voltage Measurement... 10:29:24 Voltage Offset Correction: v_off_ini = 0.000004125 V, v_off_fin = 0.000006737 V 10:29:24 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171028509 Vs 10:29:24 Integrated Voltage Measurement... 10:29:43 Voltage Offset Correction: v_off_ini = 0.000006489 V, v_off_fin = 0.000003366 V 10:29:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953325 Vs 10:29:46 Temperature Measurement, Probe Number = 0, T = 20.079000 C 10:29:47 Temperature Measurement, Probe Number = 1, T = 19.998000 C 10:29:47 Temperature Measurement, Probe Number = 2, T = 20.069000 C 10:29:48 Temperature Measurement, Probe Number = 3, T = 20.010000 C 10:29:49 Temperature Measurement, Probe Number = 4, T = 20.410000 C 10:29:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.41 10:29:49 Integrated Voltage Measurement... 10:30:08 Voltage Offset Correction: v_off_ini = 0.000003620 V, v_off_fin = 0.000006290 V 10:30:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171040012 Vs 10:30:08 Integrated Voltage Measurement... 10:30:28 Voltage Offset Correction: v_off_ini = 0.000005935 V, v_off_fin = 0.000002846 V 10:30:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170954009 Vs 10:30:30 Temperature Measurement, Probe Number = 0, T = 20.080000 C 10:30:31 Temperature Measurement, Probe Number = 1, T = 20.002000 C 10:30:32 Temperature Measurement, Probe Number = 2, T = 20.070000 C 10:30:32 Temperature Measurement, Probe Number = 3, T = 20.012000 C 10:30:33 Temperature Measurement, Probe Number = 4, T = 20.394000 C 10:30:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.39 10:30:33 Integrated Voltage Measurement... 10:30:53 Voltage Offset Correction: v_off_ini = 0.000003893 V, v_off_fin = 0.000006383 V 10:30:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171032853 Vs 10:30:54 Integrated Voltage Measurement... 10:31:13 Voltage Offset Correction: v_off_ini = 0.000005844 V, v_off_fin = 0.000002962 V 10:31:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951867 Vs 10:31:16 Temperature Measurement, Probe Number = 0, T = 20.080000 C 10:31:16 Temperature Measurement, Probe Number = 1, T = 20.001000 C 10:31:17 Temperature Measurement, Probe Number = 2, T = 20.071000 C 10:31:18 Temperature Measurement, Probe Number = 3, T = 20.012000 C 10:31:18 Temperature Measurement, Probe Number = 4, T = 20.376000 C 10:31:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.38 10:31:19 Integrated Voltage Measurement... 10:31:38 Voltage Offset Correction: v_off_ini = 0.000004645 V, v_off_fin = 0.000007133 V 10:31:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037189 Vs 10:31:38 Integrated Voltage Measurement... 10:31:57 Voltage Offset Correction: v_off_ini = 0.000006229 V, v_off_fin = 0.000002627 V 10:31:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951624 Vs 11:02:00 Temperature Measurement, Probe Number = 0, T = 20.089000 C 11:02:01 Temperature Measurement, Probe Number = 1, T = 20.013000 C 11:02:01 Temperature Measurement, Probe Number = 2, T = 20.080000 C 11:02:02 Temperature Measurement, Probe Number = 3, T = 20.022000 C 11:02:03 Temperature Measurement, Probe Number = 4, T = 20.429000 C 11:02:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.43 11:02:03 Integrated Voltage Measurement... 11:02:22 Voltage Offset Correction: v_off_ini = 0.000004941 V, v_off_fin = 0.000006073 V 11:02:22 Integrated Voltage Measurement Delta Gap = 0.0040018 m VT = 0.171090323 Vs 11:02:22 Integrated Voltage Measurement... 11:02:42 Voltage Offset Correction: v_off_ini = 0.000005254 V, v_off_fin = 0.000003172 V 11:02:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955650 Vs 11:02:45 Temperature Measurement, Probe Number = 0, T = 20.092000 C 11:02:45 Temperature Measurement, Probe Number = 1, T = 20.014000 C 11:02:46 Temperature Measurement, Probe Number = 2, T = 20.082000 C 11:02:46 Temperature Measurement, Probe Number = 3, T = 20.024000 C 11:02:47 Temperature Measurement, Probe Number = 4, T = 20.511000 C 11:02:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.51 11:02:47 Integrated Voltage Measurement... 11:03:07 Voltage Offset Correction: v_off_ini = 0.000003968 V, v_off_fin = 0.000006396 V 11:03:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028463 Vs 11:03:07 Integrated Voltage Measurement... 11:03:26 Voltage Offset Correction: v_off_ini = 0.000005515 V, v_off_fin = 0.000002347 V 11:03:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958941 Vs 11:03:29 Temperature Measurement, Probe Number = 0, T = 20.089000 C 11:03:30 Temperature Measurement, Probe Number = 1, T = 20.014000 C 11:03:30 Temperature Measurement, Probe Number = 2, T = 20.078000 C 11:03:31 Temperature Measurement, Probe Number = 3, T = 20.021000 C 11:03:32 Temperature Measurement, Probe Number = 4, T = 20.461000 C 11:03:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.46 11:03:32 Integrated Voltage Measurement... 11:03:52 Voltage Offset Correction: v_off_ini = 0.000003103 V, v_off_fin = 0.000005903 V 11:03:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024226 Vs 11:03:52 Integrated Voltage Measurement... 11:04:11 Voltage Offset Correction: v_off_ini = 0.000006016 V, v_off_fin = 0.000003668 V 11:04:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958676 Vs 11:04:14 Temperature Measurement, Probe Number = 0, T = 20.090000 C 11:04:15 Temperature Measurement, Probe Number = 1, T = 20.014000 C 11:04:15 Temperature Measurement, Probe Number = 2, T = 20.079000 C 11:04:16 Temperature Measurement, Probe Number = 3, T = 20.022000 C 11:04:17 Temperature Measurement, Probe Number = 4, T = 20.447000 C 11:04:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.45 11:04:17 Integrated Voltage Measurement... 11:04:36 Voltage Offset Correction: v_off_ini = 0.000004461 V, v_off_fin = 0.000007399 V 11:04:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038764 Vs 11:04:36 Integrated Voltage Measurement... 11:04:56 Voltage Offset Correction: v_off_ini = 0.000006494 V, v_off_fin = 0.000003657 V 11:04:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950423 Vs 11:04:59 Temperature Measurement, Probe Number = 0, T = 20.093000 C 11:04:59 Temperature Measurement, Probe Number = 1, T = 20.015000 C 11:05:00 Temperature Measurement, Probe Number = 2, T = 20.079000 C 11:05:01 Temperature Measurement, Probe Number = 3, T = 20.023000 C 11:05:01 Temperature Measurement, Probe Number = 4, T = 20.494000 C 11:05:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.49 11:05:02 Integrated Voltage Measurement... 11:05:21 Voltage Offset Correction: v_off_ini = 0.000004594 V, v_off_fin = 0.000007097 V 11:05:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036319 Vs 11:05:22 Integrated Voltage Measurement... 11:05:41 Voltage Offset Correction: v_off_ini = 0.000006142 V, v_off_fin = 0.000002057 V 11:05:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960927 Vs 11:05:44 Temperature Measurement, Probe Number = 0, T = 20.095000 C 11:05:44 Temperature Measurement, Probe Number = 1, T = 20.017000 C 11:05:45 Temperature Measurement, Probe Number = 2, T = 20.082000 C 11:05:46 Temperature Measurement, Probe Number = 3, T = 20.025000 C 11:05:46 Temperature Measurement, Probe Number = 4, T = 20.517000 C 11:05:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.52 11:05:47 Integrated Voltage Measurement... 11:06:06 Voltage Offset Correction: v_off_ini = 0.000002852 V, v_off_fin = 0.000005880 V 11:06:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171026497 Vs 11:06:06 Integrated Voltage Measurement... 11:06:25 Voltage Offset Correction: v_off_ini = 0.000005633 V, v_off_fin = 0.000002588 V 11:06:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958709 Vs 11:06:28 Temperature Measurement, Probe Number = 0, T = 20.093000 C 11:06:29 Temperature Measurement, Probe Number = 1, T = 20.016000 C 11:06:30 Temperature Measurement, Probe Number = 2, T = 20.082000 C 11:06:30 Temperature Measurement, Probe Number = 3, T = 20.024000 C 11:06:31 Temperature Measurement, Probe Number = 4, T = 20.560000 C 11:06:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.56 11:06:31 Integrated Voltage Measurement... 11:06:51 Voltage Offset Correction: v_off_ini = -0.000001648 V, v_off_fin = 0.000006902 V 11:06:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171032229 Vs 11:06:51 Integrated Voltage Measurement... 11:07:11 Voltage Offset Correction: v_off_ini = 0.000006461 V, v_off_fin = 0.000003091 V 11:07:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961114 Vs 11:07:13 Temperature Measurement, Probe Number = 0, T = 20.092000 C 11:07:14 Temperature Measurement, Probe Number = 1, T = 20.017000 C 11:07:15 Temperature Measurement, Probe Number = 2, T = 20.084000 C 11:07:15 Temperature Measurement, Probe Number = 3, T = 20.026000 C 11:07:16 Temperature Measurement, Probe Number = 4, T = 20.578000 C 11:07:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.58 11:07:16 Integrated Voltage Measurement... 11:07:36 Voltage Offset Correction: v_off_ini = 0.000003633 V, v_off_fin = 0.000008074 V 11:07:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020649 Vs 11:07:36 Integrated Voltage Measurement... 11:07:55 Voltage Offset Correction: v_off_ini = 0.000005668 V, v_off_fin = 0.000002684 V 11:07:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964270 Vs 11:07:58 Temperature Measurement, Probe Number = 0, T = 20.094000 C 11:07:59 Temperature Measurement, Probe Number = 1, T = 20.017000 C 11:07:59 Temperature Measurement, Probe Number = 2, T = 20.084000 C 11:08:00 Temperature Measurement, Probe Number = 3, T = 20.025000 C 11:08:01 Temperature Measurement, Probe Number = 4, T = 20.583000 C 11:08:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.58 11:08:01 Integrated Voltage Measurement... 11:08:20 Voltage Offset Correction: v_off_ini = 0.000003434 V, v_off_fin = 0.000005438 V 11:08:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171022220 Vs 11:08:20 Integrated Voltage Measurement... 11:08:39 Voltage Offset Correction: v_off_ini = 0.000005492 V, v_off_fin = 0.000002563 V 11:08:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956579 Vs 11:08:42 Temperature Measurement, Probe Number = 0, T = 20.097000 C 11:08:43 Temperature Measurement, Probe Number = 1, T = 20.020000 C 11:08:44 Temperature Measurement, Probe Number = 2, T = 20.087000 C 11:08:44 Temperature Measurement, Probe Number = 3, T = 20.028000 C 11:08:45 Temperature Measurement, Probe Number = 4, T = 20.549000 C 11:08:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.55 11:08:45 Integrated Voltage Measurement... 11:09:05 Voltage Offset Correction: v_off_ini = 0.000004230 V, v_off_fin = 0.000006046 V 11:09:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171015948 Vs 11:09:05 Integrated Voltage Measurement... 11:09:24 Voltage Offset Correction: v_off_ini = 0.000005537 V, v_off_fin = 0.000002162 V 11:09:24 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170959299 Vs 11:39:27 Temperature Measurement, Probe Number = 0, T = 20.063000 C 11:39:28 Temperature Measurement, Probe Number = 1, T = 19.979000 C 11:39:29 Temperature Measurement, Probe Number = 2, T = 20.051000 C 11:39:29 Temperature Measurement, Probe Number = 3, T = 19.992000 C 11:39:30 Temperature Measurement, Probe Number = 4, T = 19.666000 C 11:39:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.06 P1 = Bottom 2, Value = 19.98 P2 = Top 1, Value = 20.05 P3 = Top 2, Value = 19.99 P4 = Room, Value = 19.67 11:39:30 Integrated Voltage Measurement... 11:39:49 Voltage Offset Correction: v_off_ini = 0.000005271 V, v_off_fin = 0.000007238 V 11:39:49 Integrated Voltage Measurement Delta Gap = 0.0040010 m VT = 0.171076402 Vs 11:39:49 Integrated Voltage Measurement... 11:40:08 Voltage Offset Correction: v_off_ini = 0.000006933 V, v_off_fin = 0.000002678 V 11:40:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971821 Vs 11:40:11 Temperature Measurement, Probe Number = 0, T = 20.073000 C 11:40:12 Temperature Measurement, Probe Number = 1, T = 19.985000 C 11:40:13 Temperature Measurement, Probe Number = 2, T = 20.061000 C 11:40:13 Temperature Measurement, Probe Number = 3, T = 19.999000 C 11:40:14 Temperature Measurement, Probe Number = 4, T = 19.822000 C 11:40:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.07 P1 = Bottom 2, Value = 19.98 P2 = Top 1, Value = 20.06 P3 = Top 2, Value = 20.00 P4 = Room, Value = 19.82 11:40:14 Integrated Voltage Measurement... 11:40:34 Voltage Offset Correction: v_off_ini = 0.000005019 V, v_off_fin = 0.000007128 V 11:40:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171056973 Vs 11:40:34 Integrated Voltage Measurement... 11:40:53 Voltage Offset Correction: v_off_ini = 0.000006897 V, v_off_fin = 0.000004252 V 11:40:53 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170966027 Vs 11:40:56 Temperature Measurement, Probe Number = 0, T = 20.076000 C 11:40:57 Temperature Measurement, Probe Number = 1, T = 19.991000 C 11:40:57 Temperature Measurement, Probe Number = 2, T = 20.065000 C 11:40:58 Temperature Measurement, Probe Number = 3, T = 20.003000 C 11:40:59 Temperature Measurement, Probe Number = 4, T = 19.967000 C 11:40:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 19.99 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.00 P4 = Room, Value = 19.97 11:40:59 Integrated Voltage Measurement... 11:41:19 Voltage Offset Correction: v_off_ini = 0.000005195 V, v_off_fin = 0.000007018 V 11:41:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171056359 Vs 11:41:19 Integrated Voltage Measurement... 11:41:38 Voltage Offset Correction: v_off_ini = 0.000006535 V, v_off_fin = 0.000003178 V 11:41:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972052 Vs 11:41:41 Temperature Measurement, Probe Number = 0, T = 20.077000 C 11:41:42 Temperature Measurement, Probe Number = 1, T = 19.990000 C 11:41:43 Temperature Measurement, Probe Number = 2, T = 20.061000 C 11:41:43 Temperature Measurement, Probe Number = 3, T = 20.000000 C 11:41:44 Temperature Measurement, Probe Number = 4, T = 20.011000 C 11:41:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 19.99 P2 = Top 1, Value = 20.06 P3 = Top 2, Value = 20.00 P4 = Room, Value = 20.01 11:41:44 Integrated Voltage Measurement... 11:42:04 Voltage Offset Correction: v_off_ini = 0.000004198 V, v_off_fin = 0.000006982 V 11:42:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050852 Vs 11:42:04 Integrated Voltage Measurement... 11:42:23 Voltage Offset Correction: v_off_ini = 0.000005977 V, v_off_fin = 0.000003141 V 11:42:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967642 Vs 11:42:26 Temperature Measurement, Probe Number = 0, T = 20.078000 C 11:42:26 Temperature Measurement, Probe Number = 1, T = 19.994000 C 11:42:27 Temperature Measurement, Probe Number = 2, T = 20.063000 C 11:42:28 Temperature Measurement, Probe Number = 3, T = 20.003000 C 11:42:28 Temperature Measurement, Probe Number = 4, T = 19.991000 C 11:42:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 19.99 P2 = Top 1, Value = 20.06 P3 = Top 2, Value = 20.00 P4 = Room, Value = 19.99 11:42:28 Integrated Voltage Measurement... 11:42:48 Voltage Offset Correction: v_off_ini = 0.000004540 V, v_off_fin = 0.000006643 V 11:42:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171056601 Vs 11:42:48 Integrated Voltage Measurement... 11:43:07 Voltage Offset Correction: v_off_ini = 0.000006721 V, v_off_fin = 0.000003126 V 11:43:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966278 Vs 11:43:10 Temperature Measurement, Probe Number = 0, T = 20.083000 C 11:43:11 Temperature Measurement, Probe Number = 1, T = 20.000000 C 11:43:12 Temperature Measurement, Probe Number = 2, T = 20.070000 C 11:43:12 Temperature Measurement, Probe Number = 3, T = 20.008000 C 11:43:13 Temperature Measurement, Probe Number = 4, T = 20.127000 C 11:43:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.13 11:43:13 Integrated Voltage Measurement... 11:43:32 Voltage Offset Correction: v_off_ini = 0.000004856 V, v_off_fin = 0.000007118 V 11:43:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058647 Vs 11:43:33 Integrated Voltage Measurement... 11:43:52 Voltage Offset Correction: v_off_ini = 0.000006988 V, v_off_fin = 0.000003541 V 11:43:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965189 Vs 11:43:55 Temperature Measurement, Probe Number = 0, T = 20.081000 C 11:43:55 Temperature Measurement, Probe Number = 1, T = 19.996000 C 11:43:56 Temperature Measurement, Probe Number = 2, T = 20.071000 C 11:43:57 Temperature Measurement, Probe Number = 3, T = 20.008000 C 11:43:57 Temperature Measurement, Probe Number = 4, T = 20.198000 C 11:43:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.20 11:43:57 Integrated Voltage Measurement... 11:44:17 Voltage Offset Correction: v_off_ini = 0.000004920 V, v_off_fin = 0.000007565 V 11:44:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171063052 Vs 11:44:17 Integrated Voltage Measurement... 11:44:37 Voltage Offset Correction: v_off_ini = 0.000006907 V, v_off_fin = 0.000003438 V 11:44:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971592 Vs 11:44:39 Temperature Measurement, Probe Number = 0, T = 20.079000 C 11:44:40 Temperature Measurement, Probe Number = 1, T = 20.000000 C 11:44:41 Temperature Measurement, Probe Number = 2, T = 20.069000 C 11:44:41 Temperature Measurement, Probe Number = 3, T = 20.009000 C 11:44:42 Temperature Measurement, Probe Number = 4, T = 20.251000 C 11:44:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.25 11:44:42 Integrated Voltage Measurement... 11:45:02 Voltage Offset Correction: v_off_ini = 0.000004560 V, v_off_fin = 0.000007173 V 11:45:02 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059573 Vs 11:45:02 Integrated Voltage Measurement... 11:45:22 Voltage Offset Correction: v_off_ini = 0.000006456 V, v_off_fin = 0.000003006 V 11:45:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971385 Vs 11:45:25 Temperature Measurement, Probe Number = 0, T = 20.084000 C 11:45:25 Temperature Measurement, Probe Number = 1, T = 20.002000 C 11:45:26 Temperature Measurement, Probe Number = 2, T = 20.069000 C 11:45:27 Temperature Measurement, Probe Number = 3, T = 20.009000 C 11:45:27 Temperature Measurement, Probe Number = 4, T = 20.260000 C 11:45:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.26 11:45:27 Integrated Voltage Measurement... 11:45:47 Voltage Offset Correction: v_off_ini = 0.000004453 V, v_off_fin = 0.000006779 V 11:45:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049900 Vs 11:45:47 Integrated Voltage Measurement... 11:46:06 Voltage Offset Correction: v_off_ini = 0.000006244 V, v_off_fin = 0.000002580 V 11:46:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969977 Vs 11:46:09 Temperature Measurement, Probe Number = 0, T = 20.082000 C 11:46:10 Temperature Measurement, Probe Number = 1, T = 20.000000 C 11:46:10 Temperature Measurement, Probe Number = 2, T = 20.069000 C 11:46:11 Temperature Measurement, Probe Number = 3, T = 20.010000 C 11:46:12 Temperature Measurement, Probe Number = 4, T = 20.221000 C 11:46:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.22 11:46:12 Integrated Voltage Measurement... 11:46:31 Voltage Offset Correction: v_off_ini = 0.000004525 V, v_off_fin = 0.000006966 V 11:46:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055905 Vs 11:46:31 Integrated Voltage Measurement... 11:46:51 Voltage Offset Correction: v_off_ini = 0.000006260 V, v_off_fin = 0.000002690 V 11:46:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970638 Vs 12:16:53 Temperature Measurement, Probe Number = 0, T = 20.080000 C 12:16:54 Temperature Measurement, Probe Number = 1, T = 20.003000 C 12:16:55 Temperature Measurement, Probe Number = 2, T = 20.069000 C 12:16:55 Temperature Measurement, Probe Number = 3, T = 20.012000 C 12:16:56 Temperature Measurement, Probe Number = 4, T = 20.200000 C 12:16:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.20 12:16:56 Integrated Voltage Measurement... 12:17:16 Voltage Offset Correction: v_off_ini = 0.000005018 V, v_off_fin = 0.000007110 V 12:17:16 Integrated Voltage Measurement Delta Gap = 0.0040021 m VT = 0.171118020 Vs 12:17:16 Integrated Voltage Measurement... 12:17:35 Voltage Offset Correction: v_off_ini = 0.000005956 V, v_off_fin = 0.000001956 V 12:17:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961405 Vs 12:17:38 Temperature Measurement, Probe Number = 0, T = 20.086000 C 12:17:38 Temperature Measurement, Probe Number = 1, T = 20.007000 C 12:17:39 Temperature Measurement, Probe Number = 2, T = 20.074000 C 12:17:40 Temperature Measurement, Probe Number = 3, T = 20.017000 C 12:17:40 Temperature Measurement, Probe Number = 4, T = 20.269000 C 12:17:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.27 12:17:41 Integrated Voltage Measurement... 12:18:00 Voltage Offset Correction: v_off_ini = 0.000003243 V, v_off_fin = 0.000006353 V 12:18:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171035917 Vs 12:18:00 Integrated Voltage Measurement... 12:18:20 Voltage Offset Correction: v_off_ini = 0.000005828 V, v_off_fin = 0.000003238 V 12:18:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961365 Vs 12:18:22 Temperature Measurement, Probe Number = 0, T = 20.088000 C 12:18:23 Temperature Measurement, Probe Number = 1, T = 20.006000 C 12:18:24 Temperature Measurement, Probe Number = 2, T = 20.076000 C 12:18:24 Temperature Measurement, Probe Number = 3, T = 20.014000 C 12:18:25 Temperature Measurement, Probe Number = 4, T = 20.377000 C 12:18:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.38 12:18:25 Integrated Voltage Measurement... 12:18:45 Voltage Offset Correction: v_off_ini = 0.000004193 V, v_off_fin = 0.000006535 V 12:18:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042715 Vs 12:18:45 Integrated Voltage Measurement... 12:19:04 Voltage Offset Correction: v_off_ini = 0.000005955 V, v_off_fin = 0.000002595 V 12:19:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960488 Vs 12:19:07 Temperature Measurement, Probe Number = 0, T = 20.085000 C 12:19:07 Temperature Measurement, Probe Number = 1, T = 20.006000 C 12:19:08 Temperature Measurement, Probe Number = 2, T = 20.072000 C 12:19:09 Temperature Measurement, Probe Number = 3, T = 20.012000 C 12:19:09 Temperature Measurement, Probe Number = 4, T = 20.299000 C 12:19:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.30 12:19:10 Integrated Voltage Measurement... 12:19:29 Voltage Offset Correction: v_off_ini = 0.000003816 V, v_off_fin = 0.000006224 V 12:19:29 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171035949 Vs 12:19:29 Integrated Voltage Measurement... 12:19:49 Voltage Offset Correction: v_off_ini = 0.000005592 V, v_off_fin = 0.000002165 V 12:19:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961688 Vs 12:19:52 Temperature Measurement, Probe Number = 0, T = 20.091000 C 12:19:52 Temperature Measurement, Probe Number = 1, T = 20.010000 C 12:19:53 Temperature Measurement, Probe Number = 2, T = 20.077000 C 12:19:54 Temperature Measurement, Probe Number = 3, T = 20.019000 C 12:19:54 Temperature Measurement, Probe Number = 4, T = 20.293000 C 12:19:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.29 12:19:54 Integrated Voltage Measurement... 12:20:13 Voltage Offset Correction: v_off_ini = 0.000003871 V, v_off_fin = 0.000005807 V 12:20:14 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171036448 Vs 12:20:14 Integrated Voltage Measurement... 12:20:33 Voltage Offset Correction: v_off_ini = 0.000005603 V, v_off_fin = 0.000002300 V 12:20:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963671 Vs 12:20:36 Temperature Measurement, Probe Number = 0, T = 20.090000 C 12:20:36 Temperature Measurement, Probe Number = 1, T = 20.011000 C 12:20:37 Temperature Measurement, Probe Number = 2, T = 20.078000 C 12:20:38 Temperature Measurement, Probe Number = 3, T = 20.019000 C 12:20:38 Temperature Measurement, Probe Number = 4, T = 20.389000 C 12:20:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.39 12:20:38 Integrated Voltage Measurement... 12:20:58 Voltage Offset Correction: v_off_ini = 0.000003508 V, v_off_fin = 0.000006647 V 12:20:58 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171039488 Vs 12:20:58 Integrated Voltage Measurement... 12:21:17 Voltage Offset Correction: v_off_ini = 0.000006000 V, v_off_fin = 0.000002659 V 12:21:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960949 Vs 12:21:20 Temperature Measurement, Probe Number = 0, T = 20.090000 C 12:21:21 Temperature Measurement, Probe Number = 1, T = 20.010000 C 12:21:21 Temperature Measurement, Probe Number = 2, T = 20.079000 C 12:21:22 Temperature Measurement, Probe Number = 3, T = 20.019000 C 12:21:23 Temperature Measurement, Probe Number = 4, T = 20.422000 C 12:21:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.42 12:21:23 Integrated Voltage Measurement... 12:21:42 Voltage Offset Correction: v_off_ini = 0.000004128 V, v_off_fin = 0.000006011 V 12:21:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171039966 Vs 12:21:43 Integrated Voltage Measurement... 12:22:02 Voltage Offset Correction: v_off_ini = 0.000005366 V, v_off_fin = 0.000002967 V 12:22:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958727 Vs 12:22:05 Temperature Measurement, Probe Number = 0, T = 20.085000 C 12:22:05 Temperature Measurement, Probe Number = 1, T = 20.006000 C 12:22:06 Temperature Measurement, Probe Number = 2, T = 20.074000 C 12:22:07 Temperature Measurement, Probe Number = 3, T = 20.014000 C 12:22:07 Temperature Measurement, Probe Number = 4, T = 20.419000 C 12:22:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.42 12:22:08 Integrated Voltage Measurement... 12:22:27 Voltage Offset Correction: v_off_ini = 0.000004200 V, v_off_fin = 0.000006344 V 12:22:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171040070 Vs 12:22:27 Integrated Voltage Measurement... 12:22:47 Voltage Offset Correction: v_off_ini = 0.000005619 V, v_off_fin = 0.000002807 V 12:22:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958375 Vs 12:22:49 Temperature Measurement, Probe Number = 0, T = 20.083000 C 12:22:50 Temperature Measurement, Probe Number = 1, T = 20.006000 C 12:22:51 Temperature Measurement, Probe Number = 2, T = 20.073000 C 12:22:51 Temperature Measurement, Probe Number = 3, T = 20.014000 C 12:22:52 Temperature Measurement, Probe Number = 4, T = 20.326000 C 12:22:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.07 P3 = Top 2, Value = 20.01 P4 = Room, Value = 20.33 12:22:52 Integrated Voltage Measurement... 12:23:12 Voltage Offset Correction: v_off_ini = 0.000004212 V, v_off_fin = 0.000005731 V 12:23:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171034542 Vs 12:23:12 Integrated Voltage Measurement... 12:23:31 Voltage Offset Correction: v_off_ini = 0.000005150 V, v_off_fin = 0.000002373 V 12:23:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966034 Vs 12:23:34 Temperature Measurement, Probe Number = 0, T = 20.087000 C 12:23:35 Temperature Measurement, Probe Number = 1, T = 20.007000 C 12:23:35 Temperature Measurement, Probe Number = 2, T = 20.076000 C 12:23:36 Temperature Measurement, Probe Number = 3, T = 20.017000 C 12:23:37 Temperature Measurement, Probe Number = 4, T = 20.323000 C 12:23:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.32 12:23:37 Integrated Voltage Measurement... 12:23:56 Voltage Offset Correction: v_off_ini = 0.000003489 V, v_off_fin = 0.000006111 V 12:23:56 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171036817 Vs 12:23:57 Integrated Voltage Measurement... 12:24:16 Voltage Offset Correction: v_off_ini = 0.000005761 V, v_off_fin = 0.000002006 V 12:24:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958326 Vs 12:54:18 Temperature Measurement, Probe Number = 0, T = 20.086000 C 12:54:19 Temperature Measurement, Probe Number = 1, T = 20.009000 C 12:54:20 Temperature Measurement, Probe Number = 2, T = 20.076000 C 12:54:20 Temperature Measurement, Probe Number = 3, T = 20.018000 C 12:54:21 Temperature Measurement, Probe Number = 4, T = 20.284000 C 12:54:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.28 12:54:21 Integrated Voltage Measurement... 12:54:40 Voltage Offset Correction: v_off_ini = 0.000005067 V, v_off_fin = 0.000006318 V 12:54:40 Integrated Voltage Measurement Delta Gap = 0.0040019 m VT = 0.171103816 Vs 12:54:41 Integrated Voltage Measurement... 12:55:00 Voltage Offset Correction: v_off_ini = 0.000006113 V, v_off_fin = 0.000003163 V 12:55:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957955 Vs 12:55:03 Temperature Measurement, Probe Number = 0, T = 20.090000 C 12:55:03 Temperature Measurement, Probe Number = 1, T = 20.014000 C 12:55:04 Temperature Measurement, Probe Number = 2, T = 20.078000 C 12:55:05 Temperature Measurement, Probe Number = 3, T = 20.022000 C 12:55:05 Temperature Measurement, Probe Number = 4, T = 20.294000 C 12:55:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.29 12:55:06 Integrated Voltage Measurement... 12:55:24 Voltage Offset Correction: v_off_ini = 0.000003680 V, v_off_fin = 0.000006244 V 12:55:25 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171030765 Vs 12:55:25 Integrated Voltage Measurement... 12:55:44 Voltage Offset Correction: v_off_ini = 0.000005838 V, v_off_fin = 0.000002074 V 12:55:44 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170960675 Vs 12:55:47 Temperature Measurement, Probe Number = 0, T = 20.092000 C 12:55:48 Temperature Measurement, Probe Number = 1, T = 20.015000 C 12:55:48 Temperature Measurement, Probe Number = 2, T = 20.078000 C 12:55:49 Temperature Measurement, Probe Number = 3, T = 20.020000 C 12:55:49 Temperature Measurement, Probe Number = 4, T = 20.311000 C 12:55:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.31 12:55:50 Integrated Voltage Measurement... 12:56:09 Voltage Offset Correction: v_off_ini = 0.000004130 V, v_off_fin = 0.000006026 V 12:56:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171030438 Vs 12:56:09 Integrated Voltage Measurement... 12:56:28 Voltage Offset Correction: v_off_ini = 0.000005706 V, v_off_fin = 0.000002440 V 12:56:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960532 Vs 12:56:31 Temperature Measurement, Probe Number = 0, T = 20.091000 C 12:56:32 Temperature Measurement, Probe Number = 1, T = 20.012000 C 12:56:33 Temperature Measurement, Probe Number = 2, T = 20.078000 C 12:56:33 Temperature Measurement, Probe Number = 3, T = 20.020000 C 12:56:34 Temperature Measurement, Probe Number = 4, T = 20.300000 C 12:56:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.30 12:56:34 Integrated Voltage Measurement... 12:56:53 Voltage Offset Correction: v_off_ini = 0.000003830 V, v_off_fin = 0.000006303 V 12:56:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171026864 Vs 12:56:54 Integrated Voltage Measurement... 12:57:13 Voltage Offset Correction: v_off_ini = 0.000005645 V, v_off_fin = 0.000002097 V 12:57:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959446 Vs 12:57:16 Temperature Measurement, Probe Number = 0, T = 20.094000 C 12:57:17 Temperature Measurement, Probe Number = 1, T = 20.014000 C 12:57:17 Temperature Measurement, Probe Number = 2, T = 20.078000 C 12:57:18 Temperature Measurement, Probe Number = 3, T = 20.020000 C 12:57:19 Temperature Measurement, Probe Number = 4, T = 20.300000 C 12:57:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.30 12:57:19 Integrated Voltage Measurement... 12:57:39 Voltage Offset Correction: v_off_ini = 0.000004268 V, v_off_fin = 0.000005944 V 12:57:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171030810 Vs 12:57:39 Integrated Voltage Measurement... 12:57:59 Voltage Offset Correction: v_off_ini = 0.000005442 V, v_off_fin = 0.000003071 V 12:57:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951794 Vs 12:58:01 Temperature Measurement, Probe Number = 0, T = 20.094000 C 12:58:02 Temperature Measurement, Probe Number = 1, T = 20.015000 C 12:58:03 Temperature Measurement, Probe Number = 2, T = 20.081000 C 12:58:03 Temperature Measurement, Probe Number = 3, T = 20.021000 C 12:58:04 Temperature Measurement, Probe Number = 4, T = 20.302000 C 12:58:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.30 12:58:04 Integrated Voltage Measurement... 12:58:23 Voltage Offset Correction: v_off_ini = 0.000004412 V, v_off_fin = 0.000006326 V 12:58:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171033292 Vs 12:58:24 Integrated Voltage Measurement... 12:58:43 Voltage Offset Correction: v_off_ini = 0.000005812 V, v_off_fin = 0.000002237 V 12:58:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956353 Vs 12:58:46 Temperature Measurement, Probe Number = 0, T = 20.094000 C 12:58:46 Temperature Measurement, Probe Number = 1, T = 20.017000 C 12:58:47 Temperature Measurement, Probe Number = 2, T = 20.080000 C 12:58:48 Temperature Measurement, Probe Number = 3, T = 20.023000 C 12:58:48 Temperature Measurement, Probe Number = 4, T = 20.212000 C 12:58:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.21 12:58:48 Integrated Voltage Measurement... 12:59:08 Voltage Offset Correction: v_off_ini = 0.000003577 V, v_off_fin = 0.000006230 V 12:59:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171032441 Vs 12:59:08 Integrated Voltage Measurement... 12:59:27 Voltage Offset Correction: v_off_ini = 0.000005317 V, v_off_fin = 0.000002639 V 12:59:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956763 Vs 12:59:30 Temperature Measurement, Probe Number = 0, T = 20.093000 C 12:59:31 Temperature Measurement, Probe Number = 1, T = 20.018000 C 12:59:32 Temperature Measurement, Probe Number = 2, T = 20.081000 C 12:59:32 Temperature Measurement, Probe Number = 3, T = 20.025000 C 12:59:33 Temperature Measurement, Probe Number = 4, T = 20.341000 C 12:59:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.34 12:59:33 Integrated Voltage Measurement... 12:59:53 Voltage Offset Correction: v_off_ini = 0.000003900 V, v_off_fin = 0.000006121 V 12:59:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031702 Vs 12:59:53 Integrated Voltage Measurement... 13:00:12 Voltage Offset Correction: v_off_ini = 0.000005985 V, v_off_fin = 0.000002634 V 13:00:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957110 Vs 13:00:15 Temperature Measurement, Probe Number = 0, T = 20.092000 C 13:00:15 Temperature Measurement, Probe Number = 1, T = 20.017000 C 13:00:16 Temperature Measurement, Probe Number = 2, T = 20.083000 C 13:00:17 Temperature Measurement, Probe Number = 3, T = 20.025000 C 13:00:17 Temperature Measurement, Probe Number = 4, T = 20.420000 C 13:00:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.42 13:00:18 Integrated Voltage Measurement... 13:00:37 Voltage Offset Correction: v_off_ini = 0.000004157 V, v_off_fin = 0.000006567 V 13:00:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035256 Vs 13:00:37 Integrated Voltage Measurement... 13:00:57 Voltage Offset Correction: v_off_ini = 0.000005899 V, v_off_fin = 0.000002418 V 13:00:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956351 Vs 13:00:59 Temperature Measurement, Probe Number = 0, T = 20.096000 C 13:01:00 Temperature Measurement, Probe Number = 1, T = 20.015000 C 13:01:01 Temperature Measurement, Probe Number = 2, T = 20.084000 C 13:01:01 Temperature Measurement, Probe Number = 3, T = 20.025000 C 13:01:02 Temperature Measurement, Probe Number = 4, T = 20.510000 C 13:01:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.51 13:01:02 Integrated Voltage Measurement... 13:01:22 Voltage Offset Correction: v_off_ini = 0.000003798 V, v_off_fin = 0.000006089 V 13:01:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171032689 Vs 13:01:22 Integrated Voltage Measurement... 13:01:41 Voltage Offset Correction: v_off_ini = 0.000005726 V, v_off_fin = 0.000003023 V 13:01:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958772 Vs 13:31:44 Temperature Measurement, Probe Number = 0, T = 20.094000 C 13:31:45 Temperature Measurement, Probe Number = 1, T = 20.018000 C 13:31:46 Temperature Measurement, Probe Number = 2, T = 20.084000 C 13:31:46 Temperature Measurement, Probe Number = 3, T = 20.027000 C 13:31:47 Temperature Measurement, Probe Number = 4, T = 20.431000 C 13:31:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.43 13:31:47 Integrated Voltage Measurement... 13:32:06 Voltage Offset Correction: v_off_ini = 0.000004892 V, v_off_fin = 0.000006261 V 13:32:06 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171084774 Vs 13:32:07 Integrated Voltage Measurement... 13:32:26 Voltage Offset Correction: v_off_ini = 0.000006228 V, v_off_fin = 0.000002627 V 13:32:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954459 Vs 13:32:29 Temperature Measurement, Probe Number = 0, T = 20.095000 C 13:32:29 Temperature Measurement, Probe Number = 1, T = 20.018000 C 13:32:30 Temperature Measurement, Probe Number = 2, T = 20.083000 C 13:32:31 Temperature Measurement, Probe Number = 3, T = 20.025000 C 13:32:31 Temperature Measurement, Probe Number = 4, T = 20.452000 C 13:32:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.45 13:32:32 Integrated Voltage Measurement... 13:32:50 Voltage Offset Correction: v_off_ini = 0.000003648 V, v_off_fin = 0.000006031 V 13:32:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171022826 Vs 13:32:51 Integrated Voltage Measurement... 13:33:10 Voltage Offset Correction: v_off_ini = 0.000005554 V, v_off_fin = 0.000002034 V 13:33:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955407 Vs 13:33:13 Temperature Measurement, Probe Number = 0, T = 20.094000 C 13:33:13 Temperature Measurement, Probe Number = 1, T = 20.017000 C 13:33:14 Temperature Measurement, Probe Number = 2, T = 20.082000 C 13:33:15 Temperature Measurement, Probe Number = 3, T = 20.024000 C 13:33:15 Temperature Measurement, Probe Number = 4, T = 20.379000 C 13:33:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.38 13:33:16 Integrated Voltage Measurement... 13:33:35 Voltage Offset Correction: v_off_ini = 0.000003697 V, v_off_fin = 0.000005710 V 13:33:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024349 Vs 13:33:36 Integrated Voltage Measurement... 13:33:55 Voltage Offset Correction: v_off_ini = 0.000005659 V, v_off_fin = 0.000002114 V 13:33:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957618 Vs 13:33:58 Temperature Measurement, Probe Number = 0, T = 20.096000 C 13:33:58 Temperature Measurement, Probe Number = 1, T = 20.018000 C 13:33:59 Temperature Measurement, Probe Number = 2, T = 20.086000 C 13:34:00 Temperature Measurement, Probe Number = 3, T = 20.027000 C 13:34:00 Temperature Measurement, Probe Number = 4, T = 20.339000 C 13:34:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.34 13:34:01 Integrated Voltage Measurement... 13:34:20 Voltage Offset Correction: v_off_ini = 0.000003266 V, v_off_fin = 0.000005605 V 13:34:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017859 Vs 13:34:20 Integrated Voltage Measurement... 13:34:40 Voltage Offset Correction: v_off_ini = 0.000005486 V, v_off_fin = 0.000002038 V 13:34:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960465 Vs 13:34:43 Temperature Measurement, Probe Number = 0, T = 20.090000 C 13:34:43 Temperature Measurement, Probe Number = 1, T = 20.015000 C 13:34:44 Temperature Measurement, Probe Number = 2, T = 20.079000 C 13:34:45 Temperature Measurement, Probe Number = 3, T = 20.023000 C 13:34:45 Temperature Measurement, Probe Number = 4, T = 20.353000 C 13:34:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.35 13:34:46 Integrated Voltage Measurement... 13:35:05 Voltage Offset Correction: v_off_ini = 0.000003521 V, v_off_fin = 0.000005664 V 13:35:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171018034 Vs 13:35:05 Integrated Voltage Measurement... 13:35:24 Voltage Offset Correction: v_off_ini = 0.000005242 V, v_off_fin = 0.000002060 V 13:35:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960274 Vs 13:35:27 Temperature Measurement, Probe Number = 0, T = 20.093000 C 13:35:28 Temperature Measurement, Probe Number = 1, T = 20.015000 C 13:35:28 Temperature Measurement, Probe Number = 2, T = 20.082000 C 13:35:29 Temperature Measurement, Probe Number = 3, T = 20.022000 C 13:35:30 Temperature Measurement, Probe Number = 4, T = 20.321000 C 13:35:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.32 13:35:30 Integrated Voltage Measurement... 13:35:49 Voltage Offset Correction: v_off_ini = 0.000002917 V, v_off_fin = 0.000006336 V 13:35:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020920 Vs 13:35:50 Integrated Voltage Measurement... 13:36:09 Voltage Offset Correction: v_off_ini = 0.000005001 V, v_off_fin = 0.000002293 V 13:36:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956350 Vs 13:36:12 Temperature Measurement, Probe Number = 0, T = 20.093000 C 13:36:13 Temperature Measurement, Probe Number = 1, T = 20.017000 C 13:36:13 Temperature Measurement, Probe Number = 2, T = 20.083000 C 13:36:14 Temperature Measurement, Probe Number = 3, T = 20.025000 C 13:36:15 Temperature Measurement, Probe Number = 4, T = 20.228000 C 13:36:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.23 13:36:15 Integrated Voltage Measurement... 13:36:34 Voltage Offset Correction: v_off_ini = 0.000003352 V, v_off_fin = 0.000006399 V 13:36:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171021957 Vs 13:36:34 Integrated Voltage Measurement... 13:36:54 Voltage Offset Correction: v_off_ini = 0.000005686 V, v_off_fin = 0.000002507 V 13:36:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957961 Vs 13:36:57 Temperature Measurement, Probe Number = 0, T = 20.093000 C 13:36:57 Temperature Measurement, Probe Number = 1, T = 20.017000 C 13:36:58 Temperature Measurement, Probe Number = 2, T = 20.081000 C 13:36:59 Temperature Measurement, Probe Number = 3, T = 20.022000 C 13:36:59 Temperature Measurement, Probe Number = 4, T = 20.245000 C 13:36:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.25 13:37:00 Integrated Voltage Measurement... 13:37:19 Voltage Offset Correction: v_off_ini = 0.000003506 V, v_off_fin = 0.000005635 V 13:37:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171021767 Vs 13:37:20 Integrated Voltage Measurement... 13:37:39 Voltage Offset Correction: v_off_ini = 0.000005751 V, v_off_fin = 0.000003049 V 13:37:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956504 Vs 13:37:42 Temperature Measurement, Probe Number = 0, T = 20.093000 C 13:37:43 Temperature Measurement, Probe Number = 1, T = 20.018000 C 13:37:43 Temperature Measurement, Probe Number = 2, T = 20.081000 C 13:37:44 Temperature Measurement, Probe Number = 3, T = 20.023000 C 13:37:44 Temperature Measurement, Probe Number = 4, T = 20.256000 C 13:37:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.26 13:37:45 Integrated Voltage Measurement... 13:38:04 Voltage Offset Correction: v_off_ini = 0.000003785 V, v_off_fin = 0.000005884 V 13:38:04 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171020066 Vs 13:38:04 Integrated Voltage Measurement... 13:38:23 Voltage Offset Correction: v_off_ini = 0.000005384 V, v_off_fin = 0.000001511 V 13:38:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956075 Vs 13:38:26 Temperature Measurement, Probe Number = 0, T = 20.091000 C 13:38:27 Temperature Measurement, Probe Number = 1, T = 20.016000 C 13:38:28 Temperature Measurement, Probe Number = 2, T = 20.081000 C 13:38:28 Temperature Measurement, Probe Number = 3, T = 20.024000 C 13:38:29 Temperature Measurement, Probe Number = 4, T = 20.209000 C 13:38:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.21 13:38:29 Integrated Voltage Measurement... 13:38:48 Voltage Offset Correction: v_off_ini = 0.000003384 V, v_off_fin = 0.000006311 V 13:38:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020767 Vs 13:38:49 Integrated Voltage Measurement... 13:39:08 Voltage Offset Correction: v_off_ini = 0.000005706 V, v_off_fin = 0.000002578 V 13:39:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955722 Vs 14:09:11 Temperature Measurement, Probe Number = 0, T = 20.096000 C 14:09:12 Temperature Measurement, Probe Number = 1, T = 20.018000 C 14:09:13 Temperature Measurement, Probe Number = 2, T = 20.086000 C 14:09:13 Temperature Measurement, Probe Number = 3, T = 20.029000 C 14:09:14 Temperature Measurement, Probe Number = 4, T = 20.295000 C 14:09:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.30 14:09:14 Integrated Voltage Measurement... 14:09:33 Voltage Offset Correction: v_off_ini = 0.000004698 V, v_off_fin = 0.000005659 V 14:09:33 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171077223 Vs 14:09:34 Integrated Voltage Measurement... 14:09:53 Voltage Offset Correction: v_off_ini = 0.000004802 V, v_off_fin = 0.000003013 V 14:09:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968213 Vs 14:09:56 Temperature Measurement, Probe Number = 0, T = 20.097000 C 14:09:56 Temperature Measurement, Probe Number = 1, T = 20.020000 C 14:09:57 Temperature Measurement, Probe Number = 2, T = 20.086000 C 14:09:58 Temperature Measurement, Probe Number = 3, T = 20.031000 C 14:09:58 Temperature Measurement, Probe Number = 4, T = 20.332000 C 14:09:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.33 14:09:59 Integrated Voltage Measurement... 14:10:18 Voltage Offset Correction: v_off_ini = 0.000003673 V, v_off_fin = 0.000006207 V 14:10:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171021554 Vs 14:10:19 Integrated Voltage Measurement... 14:10:38 Voltage Offset Correction: v_off_ini = 0.000005904 V, v_off_fin = 0.000002627 V 14:10:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960366 Vs 14:10:41 Temperature Measurement, Probe Number = 0, T = 20.098000 C 14:10:41 Temperature Measurement, Probe Number = 1, T = 20.019000 C 14:10:42 Temperature Measurement, Probe Number = 2, T = 20.084000 C 14:10:43 Temperature Measurement, Probe Number = 3, T = 20.029000 C 14:10:43 Temperature Measurement, Probe Number = 4, T = 20.287000 C 14:10:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.29 14:10:44 Integrated Voltage Measurement... 14:11:03 Voltage Offset Correction: v_off_ini = 0.000003609 V, v_off_fin = 0.000005577 V 14:11:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023347 Vs 14:11:03 Integrated Voltage Measurement... 14:11:22 Voltage Offset Correction: v_off_ini = 0.000005239 V, v_off_fin = 0.000002656 V 14:11:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958661 Vs 14:11:25 Temperature Measurement, Probe Number = 0, T = 20.099000 C 14:11:26 Temperature Measurement, Probe Number = 1, T = 20.021000 C 14:11:27 Temperature Measurement, Probe Number = 2, T = 20.087000 C 14:11:27 Temperature Measurement, Probe Number = 3, T = 20.029000 C 14:11:28 Temperature Measurement, Probe Number = 4, T = 20.192000 C 14:11:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.19 14:11:28 Integrated Voltage Measurement... 14:11:47 Voltage Offset Correction: v_off_ini = 0.000003798 V, v_off_fin = 0.000006272 V 14:11:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030194 Vs 14:11:48 Integrated Voltage Measurement... 14:12:08 Voltage Offset Correction: v_off_ini = 0.000005938 V, v_off_fin = 0.000002350 V 14:12:08 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170957744 Vs 14:12:11 Temperature Measurement, Probe Number = 0, T = 20.095000 C 14:12:11 Temperature Measurement, Probe Number = 1, T = 20.020000 C 14:12:12 Temperature Measurement, Probe Number = 2, T = 20.084000 C 14:12:13 Temperature Measurement, Probe Number = 3, T = 20.029000 C 14:12:13 Temperature Measurement, Probe Number = 4, T = 20.100000 C 14:12:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.10 14:12:14 Integrated Voltage Measurement... 14:12:33 Voltage Offset Correction: v_off_ini = 0.000003929 V, v_off_fin = 0.000006090 V 14:12:33 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171018296 Vs 14:12:33 Integrated Voltage Measurement... 14:12:52 Voltage Offset Correction: v_off_ini = 0.000005734 V, v_off_fin = 0.000002604 V 14:12:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956392 Vs 14:12:55 Temperature Measurement, Probe Number = 0, T = 20.096000 C 14:12:56 Temperature Measurement, Probe Number = 1, T = 20.018000 C 14:12:56 Temperature Measurement, Probe Number = 2, T = 20.086000 C 14:12:57 Temperature Measurement, Probe Number = 3, T = 20.028000 C 14:12:58 Temperature Measurement, Probe Number = 4, T = 20.191000 C 14:12:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.19 14:12:58 Integrated Voltage Measurement... 14:13:17 Voltage Offset Correction: v_off_ini = 0.000003435 V, v_off_fin = 0.000006018 V 14:13:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171022454 Vs 14:13:18 Integrated Voltage Measurement... 14:13:37 Voltage Offset Correction: v_off_ini = 0.000005726 V, v_off_fin = 0.000002885 V 14:13:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957106 Vs 14:13:40 Temperature Measurement, Probe Number = 0, T = 20.098000 C 14:13:40 Temperature Measurement, Probe Number = 1, T = 20.021000 C 14:13:41 Temperature Measurement, Probe Number = 2, T = 20.088000 C 14:13:42 Temperature Measurement, Probe Number = 3, T = 20.031000 C 14:13:42 Temperature Measurement, Probe Number = 4, T = 20.194000 C 14:13:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.19 14:13:42 Integrated Voltage Measurement... 14:14:02 Voltage Offset Correction: v_off_ini = 0.000003365 V, v_off_fin = 0.000006049 V 14:14:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023421 Vs 14:14:02 Integrated Voltage Measurement... 14:14:21 Voltage Offset Correction: v_off_ini = 0.000005634 V, v_off_fin = 0.000003048 V 14:14:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960068 Vs 14:14:24 Temperature Measurement, Probe Number = 0, T = 20.102000 C 14:14:25 Temperature Measurement, Probe Number = 1, T = 20.026000 C 14:14:26 Temperature Measurement, Probe Number = 2, T = 20.089000 C 14:14:26 Temperature Measurement, Probe Number = 3, T = 20.034000 C 14:14:27 Temperature Measurement, Probe Number = 4, T = 20.264000 C 14:14:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.26 14:14:27 Integrated Voltage Measurement... 14:14:47 Voltage Offset Correction: v_off_ini = 0.000003902 V, v_off_fin = 0.000006099 V 14:14:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171026453 Vs 14:14:47 Integrated Voltage Measurement... 14:15:06 Voltage Offset Correction: v_off_ini = 0.000005951 V, v_off_fin = 0.000002750 V 14:15:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955257 Vs 14:15:09 Temperature Measurement, Probe Number = 0, T = 20.105000 C 14:15:10 Temperature Measurement, Probe Number = 1, T = 20.025000 C 14:15:11 Temperature Measurement, Probe Number = 2, T = 20.090000 C 14:15:11 Temperature Measurement, Probe Number = 3, T = 20.033000 C 14:15:12 Temperature Measurement, Probe Number = 4, T = 20.362000 C 14:15:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.36 14:15:12 Integrated Voltage Measurement... 14:15:32 Voltage Offset Correction: v_off_ini = 0.000003930 V, v_off_fin = 0.000006808 V 14:15:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171026616 Vs 14:15:32 Integrated Voltage Measurement... 14:15:51 Voltage Offset Correction: v_off_ini = 0.000005705 V, v_off_fin = 0.000002739 V 14:15:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955445 Vs 14:15:54 Temperature Measurement, Probe Number = 0, T = 20.095000 C 14:15:54 Temperature Measurement, Probe Number = 1, T = 20.021000 C 14:15:55 Temperature Measurement, Probe Number = 2, T = 20.085000 C 14:15:56 Temperature Measurement, Probe Number = 3, T = 20.031000 C 14:15:56 Temperature Measurement, Probe Number = 4, T = 20.393000 C 14:15:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.39 14:15:57 Integrated Voltage Measurement... 14:16:16 Voltage Offset Correction: v_off_ini = 0.000003627 V, v_off_fin = 0.000006144 V 14:16:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025248 Vs 14:16:16 Integrated Voltage Measurement... 14:16:35 Voltage Offset Correction: v_off_ini = 0.000005639 V, v_off_fin = 0.000002246 V 14:16:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958339 Vs 14:46:38 Temperature Measurement, Probe Number = 0, T = 20.105000 C 14:46:39 Temperature Measurement, Probe Number = 1, T = 20.029000 C 14:46:40 Temperature Measurement, Probe Number = 2, T = 20.096000 C 14:46:40 Temperature Measurement, Probe Number = 3, T = 20.040000 C 14:46:41 Temperature Measurement, Probe Number = 4, T = 20.515000 C 14:46:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.52 14:46:41 Integrated Voltage Measurement... 14:47:01 Voltage Offset Correction: v_off_ini = 0.000005088 V, v_off_fin = 0.000006752 V 14:47:01 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171086848 Vs 14:47:01 Integrated Voltage Measurement... 14:47:20 Voltage Offset Correction: v_off_ini = 0.000005901 V, v_off_fin = 0.000002782 V 14:47:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951846 Vs 14:47:23 Temperature Measurement, Probe Number = 0, T = 20.103000 C 14:47:24 Temperature Measurement, Probe Number = 1, T = 20.026000 C 14:47:25 Temperature Measurement, Probe Number = 2, T = 20.093000 C 14:47:25 Temperature Measurement, Probe Number = 3, T = 20.037000 C 14:47:26 Temperature Measurement, Probe Number = 4, T = 20.493000 C 14:47:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.49 14:47:26 Integrated Voltage Measurement... 14:47:45 Voltage Offset Correction: v_off_ini = 0.000004191 V, v_off_fin = 0.000005868 V 14:47:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171015292 Vs 14:47:46 Integrated Voltage Measurement... 14:48:05 Voltage Offset Correction: v_off_ini = 0.000005756 V, v_off_fin = 0.000002174 V 14:48:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960794 Vs 14:48:08 Temperature Measurement, Probe Number = 0, T = 20.106000 C 14:48:08 Temperature Measurement, Probe Number = 1, T = 20.032000 C 14:48:09 Temperature Measurement, Probe Number = 2, T = 20.095000 C 14:48:10 Temperature Measurement, Probe Number = 3, T = 20.041000 C 14:48:10 Temperature Measurement, Probe Number = 4, T = 20.523000 C 14:48:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.52 14:48:10 Integrated Voltage Measurement... 14:48:30 Voltage Offset Correction: v_off_ini = 0.000003338 V, v_off_fin = 0.000006120 V 14:48:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017329 Vs 14:48:30 Integrated Voltage Measurement... 14:48:50 Voltage Offset Correction: v_off_ini = 0.000006127 V, v_off_fin = 0.000003297 V 14:48:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951225 Vs 14:48:52 Temperature Measurement, Probe Number = 0, T = 20.108000 C 14:48:53 Temperature Measurement, Probe Number = 1, T = 20.034000 C 14:48:54 Temperature Measurement, Probe Number = 2, T = 20.095000 C 14:48:54 Temperature Measurement, Probe Number = 3, T = 20.040000 C 14:48:55 Temperature Measurement, Probe Number = 4, T = 20.555000 C 14:48:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.55 14:48:55 Integrated Voltage Measurement... 14:49:15 Voltage Offset Correction: v_off_ini = 0.000004304 V, v_off_fin = 0.000006791 V 14:49:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024918 Vs 14:49:15 Integrated Voltage Measurement... 14:49:34 Voltage Offset Correction: v_off_ini = 0.000006206 V, v_off_fin = 0.000002730 V 14:49:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951572 Vs 14:49:37 Temperature Measurement, Probe Number = 0, T = 20.107000 C 14:49:38 Temperature Measurement, Probe Number = 1, T = 20.031000 C 14:49:39 Temperature Measurement, Probe Number = 2, T = 20.096000 C 14:49:39 Temperature Measurement, Probe Number = 3, T = 20.041000 C 14:49:40 Temperature Measurement, Probe Number = 4, T = 20.554000 C 14:49:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.55 14:49:40 Integrated Voltage Measurement... 14:49:59 Voltage Offset Correction: v_off_ini = 0.000003900 V, v_off_fin = 0.000006193 V 14:50:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020746 Vs 14:50:00 Integrated Voltage Measurement... 14:50:19 Voltage Offset Correction: v_off_ini = 0.000005937 V, v_off_fin = 0.000003314 V 14:50:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950055 Vs 14:50:22 Temperature Measurement, Probe Number = 0, T = 20.107000 C 14:50:23 Temperature Measurement, Probe Number = 1, T = 20.030000 C 14:50:23 Temperature Measurement, Probe Number = 2, T = 20.096000 C 14:50:24 Temperature Measurement, Probe Number = 3, T = 20.039000 C 14:50:25 Temperature Measurement, Probe Number = 4, T = 20.585000 C 14:50:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.59 14:50:25 Integrated Voltage Measurement... 14:50:44 Voltage Offset Correction: v_off_ini = 0.000004396 V, v_off_fin = 0.000006709 V 14:50:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171026038 Vs 14:50:44 Integrated Voltage Measurement... 14:51:04 Voltage Offset Correction: v_off_ini = 0.000006323 V, v_off_fin = 0.000003453 V 14:51:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948195 Vs 14:51:07 Temperature Measurement, Probe Number = 0, T = 20.110000 C 14:51:07 Temperature Measurement, Probe Number = 1, T = 20.031000 C 14:51:08 Temperature Measurement, Probe Number = 2, T = 20.097000 C 14:51:09 Temperature Measurement, Probe Number = 3, T = 20.041000 C 14:51:09 Temperature Measurement, Probe Number = 4, T = 20.517000 C 14:51:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.52 14:51:09 Integrated Voltage Measurement... 14:51:29 Voltage Offset Correction: v_off_ini = 0.000003774 V, v_off_fin = 0.000005961 V 14:51:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017176 Vs 14:51:29 Integrated Voltage Measurement... 14:51:48 Voltage Offset Correction: v_off_ini = 0.000005504 V, v_off_fin = 0.000003056 V 14:51:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952854 Vs 14:51:51 Temperature Measurement, Probe Number = 0, T = 20.107000 C 14:51:52 Temperature Measurement, Probe Number = 1, T = 20.029000 C 14:51:52 Temperature Measurement, Probe Number = 2, T = 20.095000 C 14:51:53 Temperature Measurement, Probe Number = 3, T = 20.039000 C 14:51:54 Temperature Measurement, Probe Number = 4, T = 20.541000 C 14:51:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.54 14:51:54 Integrated Voltage Measurement... 14:52:15 Voltage Offset Correction: v_off_ini = 0.000003993 V, v_off_fin = 0.000006074 V 14:52:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171021705 Vs 14:52:15 Integrated Voltage Measurement... 14:52:34 Voltage Offset Correction: v_off_ini = 0.000005843 V, v_off_fin = 0.000002779 V 14:52:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948929 Vs 14:52:37 Temperature Measurement, Probe Number = 0, T = 20.106000 C 14:52:38 Temperature Measurement, Probe Number = 1, T = 20.027000 C 14:52:38 Temperature Measurement, Probe Number = 2, T = 20.094000 C 14:52:39 Temperature Measurement, Probe Number = 3, T = 20.037000 C 14:52:40 Temperature Measurement, Probe Number = 4, T = 20.446000 C 14:52:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.45 14:52:40 Integrated Voltage Measurement... 14:52:59 Voltage Offset Correction: v_off_ini = 0.000004538 V, v_off_fin = 0.000006579 V 14:52:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024478 Vs 14:52:59 Integrated Voltage Measurement... 14:53:18 Voltage Offset Correction: v_off_ini = 0.000006046 V, v_off_fin = 0.000003618 V 14:53:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170949007 Vs 14:53:21 Temperature Measurement, Probe Number = 0, T = 20.104000 C 14:53:22 Temperature Measurement, Probe Number = 1, T = 20.028000 C 14:53:23 Temperature Measurement, Probe Number = 2, T = 20.093000 C 14:53:23 Temperature Measurement, Probe Number = 3, T = 20.036000 C 14:53:24 Temperature Measurement, Probe Number = 4, T = 20.493000 C 14:53:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.49 14:53:24 Integrated Voltage Measurement... 14:53:43 Voltage Offset Correction: v_off_ini = 0.000004625 V, v_off_fin = 0.000007372 V 14:53:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171026787 Vs 14:53:44 Integrated Voltage Measurement... 14:54:03 Voltage Offset Correction: v_off_ini = 0.000006191 V, v_off_fin = 0.000003940 V 14:54:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170950798 Vs 15:24:06 Temperature Measurement, Probe Number = 0, T = 20.109000 C 15:24:07 Temperature Measurement, Probe Number = 1, T = 20.029000 C 15:24:07 Temperature Measurement, Probe Number = 2, T = 20.099000 C 15:24:08 Temperature Measurement, Probe Number = 3, T = 20.039000 C 15:24:09 Temperature Measurement, Probe Number = 4, T = 20.438000 C 15:24:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.44 15:24:09 Integrated Voltage Measurement... 15:24:28 Voltage Offset Correction: v_off_ini = 0.000004717 V, v_off_fin = 0.000006171 V 15:24:28 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171070793 Vs 15:24:29 Integrated Voltage Measurement... 15:24:48 Voltage Offset Correction: v_off_ini = 0.000005782 V, v_off_fin = 0.000003105 V 15:24:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952343 Vs 15:24:51 Temperature Measurement, Probe Number = 0, T = 20.111000 C 15:24:51 Temperature Measurement, Probe Number = 1, T = 20.032000 C 15:24:52 Temperature Measurement, Probe Number = 2, T = 20.098000 C 15:24:53 Temperature Measurement, Probe Number = 3, T = 20.039000 C 15:24:53 Temperature Measurement, Probe Number = 4, T = 20.400000 C 15:24:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.40 15:24:54 Integrated Voltage Measurement... 15:25:13 Voltage Offset Correction: v_off_ini = 0.000003763 V, v_off_fin = 0.000006347 V 15:25:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171018542 Vs 15:25:14 Integrated Voltage Measurement... 15:25:33 Voltage Offset Correction: v_off_ini = 0.000005133 V, v_off_fin = 0.000002359 V 15:25:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954445 Vs 15:25:36 Temperature Measurement, Probe Number = 0, T = 20.112000 C 15:25:37 Temperature Measurement, Probe Number = 1, T = 20.032000 C 15:25:37 Temperature Measurement, Probe Number = 2, T = 20.100000 C 15:25:38 Temperature Measurement, Probe Number = 3, T = 20.041000 C 15:25:39 Temperature Measurement, Probe Number = 4, T = 20.367000 C 15:25:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.37 15:25:39 Integrated Voltage Measurement... 15:25:58 Voltage Offset Correction: v_off_ini = 0.000003487 V, v_off_fin = 0.000006419 V 15:25:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171012810 Vs 15:25:58 Integrated Voltage Measurement... 15:26:18 Voltage Offset Correction: v_off_ini = 0.000005955 V, v_off_fin = 0.000002820 V 15:26:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950195 Vs 15:26:20 Temperature Measurement, Probe Number = 0, T = 20.111000 C 15:26:21 Temperature Measurement, Probe Number = 1, T = 20.036000 C 15:26:22 Temperature Measurement, Probe Number = 2, T = 20.100000 C 15:26:22 Temperature Measurement, Probe Number = 3, T = 20.045000 C 15:26:23 Temperature Measurement, Probe Number = 4, T = 20.407000 C 15:26:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 15:26:23 Integrated Voltage Measurement... 15:26:42 Voltage Offset Correction: v_off_ini = 0.000003937 V, v_off_fin = 0.000005828 V 15:26:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171013523 Vs 15:26:43 Integrated Voltage Measurement... 15:27:02 Voltage Offset Correction: v_off_ini = 0.000005279 V, v_off_fin = 0.000002752 V 15:27:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955870 Vs 15:27:05 Temperature Measurement, Probe Number = 0, T = 20.114000 C 15:27:05 Temperature Measurement, Probe Number = 1, T = 20.040000 C 15:27:06 Temperature Measurement, Probe Number = 2, T = 20.102000 C 15:27:07 Temperature Measurement, Probe Number = 3, T = 20.046000 C 15:27:07 Temperature Measurement, Probe Number = 4, T = 20.462000 C 15:27:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.46 15:27:08 Integrated Voltage Measurement... 15:27:27 Voltage Offset Correction: v_off_ini = 0.000003231 V, v_off_fin = 0.000006343 V 15:27:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171016901 Vs 15:27:27 Integrated Voltage Measurement... 15:27:46 Voltage Offset Correction: v_off_ini = 0.000005385 V, v_off_fin = 0.000002936 V 15:27:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170946894 Vs 15:27:49 Temperature Measurement, Probe Number = 0, T = 20.112000 C 15:27:50 Temperature Measurement, Probe Number = 1, T = 20.036000 C 15:27:51 Temperature Measurement, Probe Number = 2, T = 20.103000 C 15:27:51 Temperature Measurement, Probe Number = 3, T = 20.046000 C 15:27:52 Temperature Measurement, Probe Number = 4, T = 20.528000 C 15:27:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.53 15:27:52 Integrated Voltage Measurement... 15:28:11 Voltage Offset Correction: v_off_ini = 0.000003801 V, v_off_fin = 0.000006403 V 15:28:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171016053 Vs 15:28:12 Integrated Voltage Measurement... 15:28:31 Voltage Offset Correction: v_off_ini = 0.000005873 V, v_off_fin = 0.000003310 V 15:28:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951085 Vs 15:28:34 Temperature Measurement, Probe Number = 0, T = 20.111000 C 15:28:35 Temperature Measurement, Probe Number = 1, T = 20.037000 C 15:28:35 Temperature Measurement, Probe Number = 2, T = 20.101000 C 15:28:36 Temperature Measurement, Probe Number = 3, T = 20.046000 C 15:28:37 Temperature Measurement, Probe Number = 4, T = 20.505000 C 15:28:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.50 15:28:37 Integrated Voltage Measurement... 15:28:56 Voltage Offset Correction: v_off_ini = 0.000003586 V, v_off_fin = 0.000006052 V 15:28:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171021276 Vs 15:28:57 Integrated Voltage Measurement... 15:29:16 Voltage Offset Correction: v_off_ini = 0.000005921 V, v_off_fin = 0.000002747 V 15:29:16 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170949382 Vs 15:29:18 Temperature Measurement, Probe Number = 0, T = 20.111000 C 15:29:19 Temperature Measurement, Probe Number = 1, T = 20.034000 C 15:29:20 Temperature Measurement, Probe Number = 2, T = 20.101000 C 15:29:20 Temperature Measurement, Probe Number = 3, T = 20.046000 C 15:29:21 Temperature Measurement, Probe Number = 4, T = 20.534000 C 15:29:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.53 15:29:21 Integrated Voltage Measurement... 15:29:40 Voltage Offset Correction: v_off_ini = 0.000003893 V, v_off_fin = 0.000006583 V 15:29:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171026580 Vs 15:29:41 Integrated Voltage Measurement... 15:30:00 Voltage Offset Correction: v_off_ini = 0.000006103 V, v_off_fin = 0.000003407 V 15:30:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949863 Vs 15:30:03 Temperature Measurement, Probe Number = 0, T = 20.109000 C 15:30:04 Temperature Measurement, Probe Number = 1, T = 20.033000 C 15:30:05 Temperature Measurement, Probe Number = 2, T = 20.100000 C 15:30:05 Temperature Measurement, Probe Number = 3, T = 20.045000 C 15:30:06 Temperature Measurement, Probe Number = 4, T = 20.500000 C 15:30:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.50 15:30:06 Integrated Voltage Measurement... 15:30:25 Voltage Offset Correction: v_off_ini = 0.000003867 V, v_off_fin = 0.000006647 V 15:30:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171019168 Vs 15:30:26 Integrated Voltage Measurement... 15:30:45 Voltage Offset Correction: v_off_ini = 0.000005939 V, v_off_fin = 0.000002833 V 15:30:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170947669 Vs 15:30:48 Temperature Measurement, Probe Number = 0, T = 20.108000 C 15:30:48 Temperature Measurement, Probe Number = 1, T = 20.036000 C 15:30:49 Temperature Measurement, Probe Number = 2, T = 20.097000 C 15:30:50 Temperature Measurement, Probe Number = 3, T = 20.044000 C 15:30:50 Temperature Measurement, Probe Number = 4, T = 20.472000 C 15:30:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.47 15:30:50 Integrated Voltage Measurement... 15:31:10 Voltage Offset Correction: v_off_ini = 0.000004252 V, v_off_fin = 0.000007021 V 15:31:10 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171026274 Vs 15:31:10 Integrated Voltage Measurement... 15:31:30 Voltage Offset Correction: v_off_ini = 0.000006176 V, v_off_fin = 0.000003389 V 15:31:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170945112 Vs 16:01:33 Temperature Measurement, Probe Number = 0, T = 20.119000 C 16:01:33 Temperature Measurement, Probe Number = 1, T = 20.044000 C 16:01:34 Temperature Measurement, Probe Number = 2, T = 20.108000 C 16:01:35 Temperature Measurement, Probe Number = 3, T = 20.053000 C 16:01:35 Temperature Measurement, Probe Number = 4, T = 20.511000 C 16:01:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.51 16:01:35 Integrated Voltage Measurement... 16:01:55 Voltage Offset Correction: v_off_ini = 0.000004967 V, v_off_fin = 0.000007077 V 16:01:55 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171077057 Vs 16:01:55 Integrated Voltage Measurement... 16:02:14 Voltage Offset Correction: v_off_ini = 0.000005778 V, v_off_fin = 0.000002974 V 16:02:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950398 Vs 16:02:17 Temperature Measurement, Probe Number = 0, T = 20.122000 C 16:02:18 Temperature Measurement, Probe Number = 1, T = 20.046000 C 16:02:18 Temperature Measurement, Probe Number = 2, T = 20.111000 C 16:02:19 Temperature Measurement, Probe Number = 3, T = 20.054000 C 16:02:20 Temperature Measurement, Probe Number = 4, T = 20.574000 C 16:02:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.57 16:02:20 Integrated Voltage Measurement... 16:02:39 Voltage Offset Correction: v_off_ini = 0.000003377 V, v_off_fin = 0.000006556 V 16:02:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017025 Vs 16:02:40 Integrated Voltage Measurement... 16:03:00 Voltage Offset Correction: v_off_ini = 0.000006124 V, v_off_fin = 0.000003247 V 16:03:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948847 Vs 16:03:02 Temperature Measurement, Probe Number = 0, T = 20.123000 C 16:03:03 Temperature Measurement, Probe Number = 1, T = 20.046000 C 16:03:04 Temperature Measurement, Probe Number = 2, T = 20.111000 C 16:03:04 Temperature Measurement, Probe Number = 3, T = 20.052000 C 16:03:05 Temperature Measurement, Probe Number = 4, T = 20.597000 C 16:03:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.60 16:03:05 Integrated Voltage Measurement... 16:03:25 Voltage Offset Correction: v_off_ini = 0.000004331 V, v_off_fin = 0.000006193 V 16:03:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171014348 Vs 16:03:25 Integrated Voltage Measurement... 16:03:45 Voltage Offset Correction: v_off_ini = 0.000005703 V, v_off_fin = 0.000002958 V 16:03:45 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170951727 Vs 16:03:48 Temperature Measurement, Probe Number = 0, T = 20.119000 C 16:03:48 Temperature Measurement, Probe Number = 1, T = 20.041000 C 16:03:49 Temperature Measurement, Probe Number = 2, T = 20.106000 C 16:03:50 Temperature Measurement, Probe Number = 3, T = 20.048000 C 16:03:50 Temperature Measurement, Probe Number = 4, T = 20.558000 C 16:03:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.56 16:03:50 Integrated Voltage Measurement... 16:04:10 Voltage Offset Correction: v_off_ini = 0.000004270 V, v_off_fin = 0.000006146 V 16:04:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171018691 Vs 16:04:10 Integrated Voltage Measurement... 16:04:30 Voltage Offset Correction: v_off_ini = 0.000006055 V, v_off_fin = 0.000002962 V 16:04:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954481 Vs 16:04:33 Temperature Measurement, Probe Number = 0, T = 20.114000 C 16:04:34 Temperature Measurement, Probe Number = 1, T = 20.041000 C 16:04:35 Temperature Measurement, Probe Number = 2, T = 20.102000 C 16:04:35 Temperature Measurement, Probe Number = 3, T = 20.045000 C 16:04:36 Temperature Measurement, Probe Number = 4, T = 20.456000 C 16:04:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.46 16:04:36 Integrated Voltage Measurement... 16:04:56 Voltage Offset Correction: v_off_ini = 0.000003753 V, v_off_fin = 0.000006402 V 16:04:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171013186 Vs 16:04:56 Integrated Voltage Measurement... 16:05:16 Voltage Offset Correction: v_off_ini = 0.000005517 V, v_off_fin = 0.000002655 V 16:05:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950829 Vs 16:05:18 Temperature Measurement, Probe Number = 0, T = 20.118000 C 16:05:19 Temperature Measurement, Probe Number = 1, T = 20.040000 C 16:05:20 Temperature Measurement, Probe Number = 2, T = 20.106000 C 16:05:20 Temperature Measurement, Probe Number = 3, T = 20.050000 C 16:05:21 Temperature Measurement, Probe Number = 4, T = 20.443000 C 16:05:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.44 16:05:21 Integrated Voltage Measurement... 16:05:41 Voltage Offset Correction: v_off_ini = 0.000003834 V, v_off_fin = 0.000006221 V 16:05:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171018143 Vs 16:05:41 Integrated Voltage Measurement... 16:06:00 Voltage Offset Correction: v_off_ini = 0.000005530 V, v_off_fin = 0.000002408 V 16:06:00 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170949340 Vs 16:06:03 Temperature Measurement, Probe Number = 0, T = 20.115000 C 16:06:04 Temperature Measurement, Probe Number = 1, T = 20.039000 C 16:06:04 Temperature Measurement, Probe Number = 2, T = 20.103000 C 16:06:05 Temperature Measurement, Probe Number = 3, T = 20.047000 C 16:06:05 Temperature Measurement, Probe Number = 4, T = 20.467000 C 16:06:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.47 16:06:06 Integrated Voltage Measurement... 16:06:25 Voltage Offset Correction: v_off_ini = 0.000003078 V, v_off_fin = 0.000006143 V 16:06:25 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171017485 Vs 16:06:25 Integrated Voltage Measurement... 16:06:45 Voltage Offset Correction: v_off_ini = 0.000005568 V, v_off_fin = 0.000002148 V 16:06:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956658 Vs 16:06:48 Temperature Measurement, Probe Number = 0, T = 20.118000 C 16:06:48 Temperature Measurement, Probe Number = 1, T = 20.038000 C 16:06:49 Temperature Measurement, Probe Number = 2, T = 20.103000 C 16:06:50 Temperature Measurement, Probe Number = 3, T = 20.046000 C 16:06:50 Temperature Measurement, Probe Number = 4, T = 20.400000 C 16:06:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.40 16:06:51 Integrated Voltage Measurement... 16:07:10 Voltage Offset Correction: v_off_ini = 0.000003341 V, v_off_fin = 0.000007051 V 16:07:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017785 Vs 16:07:11 Integrated Voltage Measurement... 16:07:30 Voltage Offset Correction: v_off_ini = 0.000006522 V, v_off_fin = 0.000003319 V 16:07:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170940164 Vs 16:07:33 Temperature Measurement, Probe Number = 0, T = 20.118000 C 16:07:33 Temperature Measurement, Probe Number = 1, T = 20.037000 C 16:07:34 Temperature Measurement, Probe Number = 2, T = 20.102000 C 16:07:35 Temperature Measurement, Probe Number = 3, T = 20.045000 C 16:07:35 Temperature Measurement, Probe Number = 4, T = 20.264000 C 16:07:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.26 16:07:35 Integrated Voltage Measurement... 16:07:55 Voltage Offset Correction: v_off_ini = 0.000004738 V, v_off_fin = 0.000006840 V 16:07:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171029957 Vs 16:07:55 Integrated Voltage Measurement... 16:08:14 Voltage Offset Correction: v_off_ini = 0.000006199 V, v_off_fin = 0.000002201 V 16:08:14 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170950130 Vs 16:08:17 Temperature Measurement, Probe Number = 0, T = 20.116000 C 16:08:18 Temperature Measurement, Probe Number = 1, T = 20.037000 C 16:08:19 Temperature Measurement, Probe Number = 2, T = 20.104000 C 16:08:19 Temperature Measurement, Probe Number = 3, T = 20.047000 C 16:08:20 Temperature Measurement, Probe Number = 4, T = 20.274000 C 16:08:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.27 16:08:20 Integrated Voltage Measurement... 16:08:39 Voltage Offset Correction: v_off_ini = 0.000003804 V, v_off_fin = 0.000006703 V 16:08:39 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171023200 Vs 16:08:40 Integrated Voltage Measurement... 16:08:59 Voltage Offset Correction: v_off_ini = 0.000006157 V, v_off_fin = 0.000002844 V 16:08:59 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170946157 Vs 16:39:02 Temperature Measurement, Probe Number = 0, T = 20.116000 C 16:39:03 Temperature Measurement, Probe Number = 1, T = 20.044000 C 16:39:03 Temperature Measurement, Probe Number = 2, T = 20.104000 C 16:39:04 Temperature Measurement, Probe Number = 3, T = 20.052000 C 16:39:05 Temperature Measurement, Probe Number = 4, T = 20.480000 C 16:39:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.48 16:39:05 Integrated Voltage Measurement... 16:39:24 Voltage Offset Correction: v_off_ini = 0.000004561 V, v_off_fin = 0.000006691 V 16:39:24 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171073655 Vs 16:39:24 Integrated Voltage Measurement... 16:39:44 Voltage Offset Correction: v_off_ini = 0.000005966 V, v_off_fin = 0.000003263 V 16:39:44 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170955051 Vs 16:39:47 Temperature Measurement, Probe Number = 0, T = 20.122000 C 16:39:47 Temperature Measurement, Probe Number = 1, T = 20.045000 C 16:39:48 Temperature Measurement, Probe Number = 2, T = 20.107000 C 16:39:49 Temperature Measurement, Probe Number = 3, T = 20.051000 C 16:39:49 Temperature Measurement, Probe Number = 4, T = 20.415000 C 16:39:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 16:39:50 Integrated Voltage Measurement... 16:40:09 Voltage Offset Correction: v_off_ini = 0.000003686 V, v_off_fin = 0.000006438 V 16:40:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171027644 Vs 16:40:09 Integrated Voltage Measurement... 16:40:29 Voltage Offset Correction: v_off_ini = 0.000006043 V, v_off_fin = 0.000002710 V 16:40:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951344 Vs 16:40:32 Temperature Measurement, Probe Number = 0, T = 20.118000 C 16:40:33 Temperature Measurement, Probe Number = 1, T = 20.043000 C 16:40:33 Temperature Measurement, Probe Number = 2, T = 20.103000 C 16:40:34 Temperature Measurement, Probe Number = 3, T = 20.050000 C 16:40:35 Temperature Measurement, Probe Number = 4, T = 20.377000 C 16:40:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.38 16:40:35 Integrated Voltage Measurement... 16:40:54 Voltage Offset Correction: v_off_ini = 0.000003647 V, v_off_fin = 0.000006686 V 16:40:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171020437 Vs 16:40:54 Integrated Voltage Measurement... 16:41:14 Voltage Offset Correction: v_off_ini = 0.000005462 V, v_off_fin = 0.000002933 V 16:41:14 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170957074 Vs 16:41:17 Temperature Measurement, Probe Number = 0, T = 20.122000 C 16:41:17 Temperature Measurement, Probe Number = 1, T = 20.045000 C 16:41:18 Temperature Measurement, Probe Number = 2, T = 20.107000 C 16:41:19 Temperature Measurement, Probe Number = 3, T = 20.050000 C 16:41:19 Temperature Measurement, Probe Number = 4, T = 20.301000 C 16:41:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.30 16:41:20 Integrated Voltage Measurement... 16:41:39 Voltage Offset Correction: v_off_ini = 0.000003703 V, v_off_fin = 0.000006026 V 16:41:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171022381 Vs 16:41:39 Integrated Voltage Measurement... 16:41:58 Voltage Offset Correction: v_off_ini = 0.000005631 V, v_off_fin = 0.000002350 V 16:41:59 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170955032 Vs 16:42:01 Temperature Measurement, Probe Number = 0, T = 20.124000 C 16:42:02 Temperature Measurement, Probe Number = 1, T = 20.046000 C 16:42:03 Temperature Measurement, Probe Number = 2, T = 20.107000 C 16:42:03 Temperature Measurement, Probe Number = 3, T = 20.050000 C 16:42:04 Temperature Measurement, Probe Number = 4, T = 20.169000 C 16:42:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.17 16:42:04 Integrated Voltage Measurement... 16:42:23 Voltage Offset Correction: v_off_ini = 0.000003957 V, v_off_fin = 0.000007177 V 16:42:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171034825 Vs 16:42:24 Integrated Voltage Measurement... 16:42:43 Voltage Offset Correction: v_off_ini = 0.000006556 V, v_off_fin = 0.000002775 V 16:42:43 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170950435 Vs 16:42:46 Temperature Measurement, Probe Number = 0, T = 20.122000 C 16:42:47 Temperature Measurement, Probe Number = 1, T = 20.040000 C 16:42:47 Temperature Measurement, Probe Number = 2, T = 20.107000 C 16:42:48 Temperature Measurement, Probe Number = 3, T = 20.047000 C 16:42:49 Temperature Measurement, Probe Number = 4, T = 20.121000 C 16:42:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.12 16:42:49 Integrated Voltage Measurement... 16:43:08 Voltage Offset Correction: v_off_ini = 0.000004291 V, v_off_fin = 0.000006807 V 16:43:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171031754 Vs 16:43:09 Integrated Voltage Measurement... 16:43:28 Voltage Offset Correction: v_off_ini = 0.000005709 V, v_off_fin = 0.000002225 V 16:43:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170953139 Vs 16:43:31 Temperature Measurement, Probe Number = 0, T = 20.123000 C 16:43:32 Temperature Measurement, Probe Number = 1, T = 20.046000 C 16:43:32 Temperature Measurement, Probe Number = 2, T = 20.110000 C 16:43:33 Temperature Measurement, Probe Number = 3, T = 20.051000 C 16:43:34 Temperature Measurement, Probe Number = 4, T = 20.195000 C 16:43:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.20 16:43:34 Integrated Voltage Measurement... 16:43:53 Voltage Offset Correction: v_off_ini = 0.000004280 V, v_off_fin = 0.000005986 V 16:43:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171027334 Vs 16:43:54 Integrated Voltage Measurement... 16:44:13 Voltage Offset Correction: v_off_ini = 0.000005962 V, v_off_fin = 0.000002688 V 16:44:13 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170950529 Vs 16:44:16 Temperature Measurement, Probe Number = 0, T = 20.124000 C 16:44:16 Temperature Measurement, Probe Number = 1, T = 20.046000 C 16:44:17 Temperature Measurement, Probe Number = 2, T = 20.109000 C 16:44:18 Temperature Measurement, Probe Number = 3, T = 20.052000 C 16:44:18 Temperature Measurement, Probe Number = 4, T = 20.257000 C 16:44:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.26 16:44:18 Integrated Voltage Measurement... 16:44:38 Voltage Offset Correction: v_off_ini = 0.000004307 V, v_off_fin = 0.000007067 V 16:44:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171028286 Vs 16:44:38 Integrated Voltage Measurement... 16:44:57 Voltage Offset Correction: v_off_ini = 0.000006177 V, v_off_fin = 0.000002727 V 16:44:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170947549 Vs 16:45:00 Temperature Measurement, Probe Number = 0, T = 20.127000 C 16:45:01 Temperature Measurement, Probe Number = 1, T = 20.051000 C 16:45:01 Temperature Measurement, Probe Number = 2, T = 20.111000 C 16:45:02 Temperature Measurement, Probe Number = 3, T = 20.057000 C 16:45:03 Temperature Measurement, Probe Number = 4, T = 20.324000 C 16:45:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.32 16:45:03 Integrated Voltage Measurement... 16:45:22 Voltage Offset Correction: v_off_ini = 0.000004458 V, v_off_fin = 0.000006445 V 16:45:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171031409 Vs 16:45:22 Integrated Voltage Measurement... 16:45:42 Voltage Offset Correction: v_off_ini = 0.000006486 V, v_off_fin = 0.000002774 V 16:45:42 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170952927 Vs 16:45:44 Temperature Measurement, Probe Number = 0, T = 20.129000 C 16:45:45 Temperature Measurement, Probe Number = 1, T = 20.052000 C 16:45:46 Temperature Measurement, Probe Number = 2, T = 20.113000 C 16:45:46 Temperature Measurement, Probe Number = 3, T = 20.058000 C 16:45:47 Temperature Measurement, Probe Number = 4, T = 20.428000 C 16:45:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.43 16:45:47 Integrated Voltage Measurement... 16:46:07 Voltage Offset Correction: v_off_ini = 0.000003486 V, v_off_fin = 0.000006702 V 16:46:07 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171026602 Vs 16:46:07 Integrated Voltage Measurement... 16:46:26 Voltage Offset Correction: v_off_ini = 0.000005612 V, v_off_fin = 0.000002524 V 16:46:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955062 Vs 17:16:29 Temperature Measurement, Probe Number = 0, T = 20.125000 C 17:16:30 Temperature Measurement, Probe Number = 1, T = 20.050000 C 17:16:31 Temperature Measurement, Probe Number = 2, T = 20.113000 C 17:16:31 Temperature Measurement, Probe Number = 3, T = 20.059000 C 17:16:32 Temperature Measurement, Probe Number = 4, T = 20.274000 C 17:16:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.27 17:16:32 Integrated Voltage Measurement... 17:16:52 Voltage Offset Correction: v_off_ini = 0.000004804 V, v_off_fin = 0.000006189 V 17:16:52 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171082743 Vs 17:16:52 Integrated Voltage Measurement... 17:17:11 Voltage Offset Correction: v_off_ini = 0.000005378 V, v_off_fin = 0.000002052 V 17:17:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952924 Vs 17:17:14 Temperature Measurement, Probe Number = 0, T = 20.121000 C 17:17:15 Temperature Measurement, Probe Number = 1, T = 20.048000 C 17:17:16 Temperature Measurement, Probe Number = 2, T = 20.110000 C 17:17:16 Temperature Measurement, Probe Number = 3, T = 20.057000 C 17:17:17 Temperature Measurement, Probe Number = 4, T = 20.221000 C 17:17:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.22 17:17:17 Integrated Voltage Measurement... 17:17:37 Voltage Offset Correction: v_off_ini = 0.000003472 V, v_off_fin = 0.000006270 V 17:17:37 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171020424 Vs 17:17:37 Integrated Voltage Measurement... 17:17:57 Voltage Offset Correction: v_off_ini = 0.000005684 V, v_off_fin = 0.000002339 V 17:17:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951805 Vs 17:17:59 Temperature Measurement, Probe Number = 0, T = 20.122000 C 17:18:00 Temperature Measurement, Probe Number = 1, T = 20.049000 C 17:18:01 Temperature Measurement, Probe Number = 2, T = 20.111000 C 17:18:01 Temperature Measurement, Probe Number = 3, T = 20.056000 C 17:18:02 Temperature Measurement, Probe Number = 4, T = 20.221000 C 17:18:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.22 17:18:02 Integrated Voltage Measurement... 17:18:22 Voltage Offset Correction: v_off_ini = 0.000003727 V, v_off_fin = 0.000005942 V 17:18:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171022074 Vs 17:18:22 Integrated Voltage Measurement... 17:18:41 Voltage Offset Correction: v_off_ini = 0.000005688 V, v_off_fin = 0.000001405 V 17:18:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954148 Vs 17:18:44 Temperature Measurement, Probe Number = 0, T = 20.125000 C 17:18:45 Temperature Measurement, Probe Number = 1, T = 20.049000 C 17:18:46 Temperature Measurement, Probe Number = 2, T = 20.112000 C 17:18:46 Temperature Measurement, Probe Number = 3, T = 20.057000 C 17:18:47 Temperature Measurement, Probe Number = 4, T = 20.292000 C 17:18:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.29 17:18:47 Integrated Voltage Measurement... 17:19:06 Voltage Offset Correction: v_off_ini = 0.000003339 V, v_off_fin = 0.000006600 V 17:19:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020241 Vs 17:19:07 Integrated Voltage Measurement... 17:19:26 Voltage Offset Correction: v_off_ini = 0.000005719 V, v_off_fin = 0.000002494 V 17:19:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952703 Vs 17:19:29 Temperature Measurement, Probe Number = 0, T = 20.129000 C 17:19:29 Temperature Measurement, Probe Number = 1, T = 20.050000 C 17:19:30 Temperature Measurement, Probe Number = 2, T = 20.115000 C 17:19:31 Temperature Measurement, Probe Number = 3, T = 20.055000 C 17:19:31 Temperature Measurement, Probe Number = 4, T = 20.378000 C 17:19:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.38 17:19:32 Integrated Voltage Measurement... 17:19:51 Voltage Offset Correction: v_off_ini = 0.000003696 V, v_off_fin = 0.000005734 V 17:19:51 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171024172 Vs 17:19:51 Integrated Voltage Measurement... 17:20:10 Voltage Offset Correction: v_off_ini = 0.000005570 V, v_off_fin = 0.000002660 V 17:20:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954814 Vs 17:20:13 Temperature Measurement, Probe Number = 0, T = 20.128000 C 17:20:14 Temperature Measurement, Probe Number = 1, T = 20.050000 C 17:20:15 Temperature Measurement, Probe Number = 2, T = 20.112000 C 17:20:15 Temperature Measurement, Probe Number = 3, T = 20.056000 C 17:20:16 Temperature Measurement, Probe Number = 4, T = 20.392000 C 17:20:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.39 17:20:16 Integrated Voltage Measurement... 17:20:35 Voltage Offset Correction: v_off_ini = 0.000004217 V, v_off_fin = 0.000006457 V 17:20:36 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171028015 Vs 17:20:36 Integrated Voltage Measurement... 17:20:55 Voltage Offset Correction: v_off_ini = 0.000005843 V, v_off_fin = 0.000002796 V 17:20:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950925 Vs 17:20:58 Temperature Measurement, Probe Number = 0, T = 20.129000 C 17:20:58 Temperature Measurement, Probe Number = 1, T = 20.051000 C 17:20:59 Temperature Measurement, Probe Number = 2, T = 20.115000 C 17:21:00 Temperature Measurement, Probe Number = 3, T = 20.058000 C 17:21:00 Temperature Measurement, Probe Number = 4, T = 20.373000 C 17:21:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.37 17:21:01 Integrated Voltage Measurement... 17:21:20 Voltage Offset Correction: v_off_ini = 0.000003793 V, v_off_fin = 0.000005964 V 17:21:21 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171028729 Vs 17:21:21 Integrated Voltage Measurement... 17:21:40 Voltage Offset Correction: v_off_ini = 0.000005456 V, v_off_fin = 0.000002822 V 17:21:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170950870 Vs 17:21:43 Temperature Measurement, Probe Number = 0, T = 20.128000 C 17:21:44 Temperature Measurement, Probe Number = 1, T = 20.051000 C 17:21:45 Temperature Measurement, Probe Number = 2, T = 20.114000 C 17:21:45 Temperature Measurement, Probe Number = 3, T = 20.057000 C 17:21:46 Temperature Measurement, Probe Number = 4, T = 20.333000 C 17:21:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.33 17:21:46 Integrated Voltage Measurement... 17:22:05 Voltage Offset Correction: v_off_ini = 0.000004156 V, v_off_fin = 0.000006143 V 17:22:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171019907 Vs 17:22:06 Integrated Voltage Measurement... 17:22:25 Voltage Offset Correction: v_off_ini = 0.000005873 V, v_off_fin = 0.000002120 V 17:22:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170952113 Vs 17:22:28 Temperature Measurement, Probe Number = 0, T = 20.123000 C 17:22:28 Temperature Measurement, Probe Number = 1, T = 20.047000 C 17:22:29 Temperature Measurement, Probe Number = 2, T = 20.110000 C 17:22:30 Temperature Measurement, Probe Number = 3, T = 20.054000 C 17:22:30 Temperature Measurement, Probe Number = 4, T = 20.289000 C 17:22:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.29 17:22:30 Integrated Voltage Measurement... 17:22:50 Voltage Offset Correction: v_off_ini = 0.000003366 V, v_off_fin = 0.000005722 V 17:22:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171020858 Vs 17:22:50 Integrated Voltage Measurement... 17:23:10 Voltage Offset Correction: v_off_ini = 0.000005016 V, v_off_fin = 0.000002030 V 17:23:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960198 Vs 17:23:13 Temperature Measurement, Probe Number = 0, T = 20.128000 C 17:23:14 Temperature Measurement, Probe Number = 1, T = 20.052000 C 17:23:14 Temperature Measurement, Probe Number = 2, T = 20.116000 C 17:23:15 Temperature Measurement, Probe Number = 3, T = 20.060000 C 17:23:16 Temperature Measurement, Probe Number = 4, T = 20.356000 C 17:23:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.36 17:23:16 Integrated Voltage Measurement... 17:23:35 Voltage Offset Correction: v_off_ini = 0.000003147 V, v_off_fin = 0.000005948 V 17:23:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171012529 Vs 17:23:35 Integrated Voltage Measurement... 17:23:54 Voltage Offset Correction: v_off_ini = 0.000005415 V, v_off_fin = 0.000001847 V 17:23:54 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170954528 Vs 17:53:57 Temperature Measurement, Probe Number = 0, T = 20.128000 C 17:53:58 Temperature Measurement, Probe Number = 1, T = 20.056000 C 17:53:58 Temperature Measurement, Probe Number = 2, T = 20.116000 C 17:53:59 Temperature Measurement, Probe Number = 3, T = 20.063000 C 17:54:00 Temperature Measurement, Probe Number = 4, T = 20.459000 C 17:54:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.46 17:54:00 Integrated Voltage Measurement... 17:54:19 Voltage Offset Correction: v_off_ini = 0.000005125 V, v_off_fin = 0.000006372 V 17:54:19 Integrated Voltage Measurement Delta Gap = 0.0040017 m VT = 0.171086914 Vs 17:54:19 Integrated Voltage Measurement... 17:54:39 Voltage Offset Correction: v_off_ini = 0.000006169 V, v_off_fin = 0.000002253 V 17:54:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952650 Vs 17:54:42 Temperature Measurement, Probe Number = 0, T = 20.133000 C 17:54:42 Temperature Measurement, Probe Number = 1, T = 20.055000 C 17:54:43 Temperature Measurement, Probe Number = 2, T = 20.121000 C 17:54:44 Temperature Measurement, Probe Number = 3, T = 20.062000 C 17:54:44 Temperature Measurement, Probe Number = 4, T = 20.527000 C 17:54:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.53 17:54:44 Integrated Voltage Measurement... 17:55:04 Voltage Offset Correction: v_off_ini = 0.000003985 V, v_off_fin = 0.000006661 V 17:55:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171021125 Vs 17:55:04 Integrated Voltage Measurement... 17:55:23 Voltage Offset Correction: v_off_ini = 0.000006131 V, v_off_fin = 0.000002172 V 17:55:23 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170953185 Vs 17:55:26 Temperature Measurement, Probe Number = 0, T = 20.129000 C 17:55:27 Temperature Measurement, Probe Number = 1, T = 20.051000 C 17:55:27 Temperature Measurement, Probe Number = 2, T = 20.115000 C 17:55:28 Temperature Measurement, Probe Number = 3, T = 20.057000 C 17:55:29 Temperature Measurement, Probe Number = 4, T = 20.466000 C 17:55:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.47 17:55:29 Integrated Voltage Measurement... 17:55:48 Voltage Offset Correction: v_off_ini = 0.000004173 V, v_off_fin = 0.000005750 V 17:55:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171026451 Vs 17:55:49 Integrated Voltage Measurement... 17:56:08 Voltage Offset Correction: v_off_ini = 0.000005424 V, v_off_fin = 0.000002575 V 17:56:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951605 Vs 17:56:11 Temperature Measurement, Probe Number = 0, T = 20.130000 C 17:56:11 Temperature Measurement, Probe Number = 1, T = 20.051000 C 17:56:12 Temperature Measurement, Probe Number = 2, T = 20.115000 C 17:56:13 Temperature Measurement, Probe Number = 3, T = 20.057000 C 17:56:13 Temperature Measurement, Probe Number = 4, T = 20.377000 C 17:56:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.38 17:56:14 Integrated Voltage Measurement... 17:56:33 Voltage Offset Correction: v_off_ini = 0.000003337 V, v_off_fin = 0.000006297 V 17:56:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023496 Vs 17:56:33 Integrated Voltage Measurement... 17:56:52 Voltage Offset Correction: v_off_ini = 0.000005571 V, v_off_fin = 0.000001916 V 17:56:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949459 Vs 17:56:55 Temperature Measurement, Probe Number = 0, T = 20.130000 C 17:56:56 Temperature Measurement, Probe Number = 1, T = 20.049000 C 17:56:57 Temperature Measurement, Probe Number = 2, T = 20.115000 C 17:56:57 Temperature Measurement, Probe Number = 3, T = 20.055000 C 17:56:58 Temperature Measurement, Probe Number = 4, T = 20.392000 C 17:56:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.39 17:56:58 Integrated Voltage Measurement... 17:57:17 Voltage Offset Correction: v_off_ini = 0.000003381 V, v_off_fin = 0.000006490 V 17:57:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171023566 Vs 17:57:18 Integrated Voltage Measurement... 17:57:37 Voltage Offset Correction: v_off_ini = 0.000005956 V, v_off_fin = 0.000001899 V 17:57:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170948817 Vs 17:57:40 Temperature Measurement, Probe Number = 0, T = 20.130000 C 17:57:40 Temperature Measurement, Probe Number = 1, T = 20.053000 C 17:57:41 Temperature Measurement, Probe Number = 2, T = 20.115000 C 17:57:42 Temperature Measurement, Probe Number = 3, T = 20.058000 C 17:57:42 Temperature Measurement, Probe Number = 4, T = 20.411000 C 17:57:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.41 17:57:43 Integrated Voltage Measurement... 17:58:02 Voltage Offset Correction: v_off_ini = 0.000004188 V, v_off_fin = 0.000006122 V 17:58:02 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171021186 Vs 17:58:03 Integrated Voltage Measurement... 17:58:22 Voltage Offset Correction: v_off_ini = 0.000005788 V, v_off_fin = 0.000002802 V 17:58:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956765 Vs 17:58:25 Temperature Measurement, Probe Number = 0, T = 20.131000 C 17:58:26 Temperature Measurement, Probe Number = 1, T = 20.054000 C 17:58:26 Temperature Measurement, Probe Number = 2, T = 20.118000 C 17:58:27 Temperature Measurement, Probe Number = 3, T = 20.061000 C 17:58:27 Temperature Measurement, Probe Number = 4, T = 20.473000 C 17:58:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.47 17:58:28 Integrated Voltage Measurement... 17:58:47 Voltage Offset Correction: v_off_ini = 0.000003275 V, v_off_fin = 0.000006325 V 17:58:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023958 Vs 17:58:47 Integrated Voltage Measurement... 17:59:07 Voltage Offset Correction: v_off_ini = 0.000005719 V, v_off_fin = 0.000002639 V 17:59:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952807 Vs 17:59:09 Temperature Measurement, Probe Number = 0, T = 20.137000 C 17:59:10 Temperature Measurement, Probe Number = 1, T = 20.058000 C 17:59:11 Temperature Measurement, Probe Number = 2, T = 20.121000 C 17:59:11 Temperature Measurement, Probe Number = 3, T = 20.065000 C 17:59:12 Temperature Measurement, Probe Number = 4, T = 20.450000 C 17:59:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.45 17:59:12 Integrated Voltage Measurement... 17:59:32 Voltage Offset Correction: v_off_ini = 0.000003500 V, v_off_fin = 0.000006553 V 17:59:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171023909 Vs 17:59:32 Integrated Voltage Measurement... 17:59:51 Voltage Offset Correction: v_off_ini = 0.000005848 V, v_off_fin = 0.000002680 V 17:59:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170949880 Vs 17:59:54 Temperature Measurement, Probe Number = 0, T = 20.133000 C 17:59:55 Temperature Measurement, Probe Number = 1, T = 20.056000 C 17:59:55 Temperature Measurement, Probe Number = 2, T = 20.117000 C 17:59:56 Temperature Measurement, Probe Number = 3, T = 20.061000 C 17:59:57 Temperature Measurement, Probe Number = 4, T = 20.440000 C 17:59:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.44 17:59:57 Integrated Voltage Measurement... 18:00:16 Voltage Offset Correction: v_off_ini = 0.000003402 V, v_off_fin = 0.000006034 V 18:00:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023442 Vs 18:00:17 Integrated Voltage Measurement... 18:00:36 Voltage Offset Correction: v_off_ini = 0.000005333 V, v_off_fin = 0.000002807 V 18:00:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953403 Vs 18:00:39 Temperature Measurement, Probe Number = 0, T = 20.125000 C 18:00:39 Temperature Measurement, Probe Number = 1, T = 20.050000 C 18:00:40 Temperature Measurement, Probe Number = 2, T = 20.110000 C 18:00:40 Temperature Measurement, Probe Number = 3, T = 20.055000 C 18:00:41 Temperature Measurement, Probe Number = 4, T = 20.351000 C 18:00:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.35 18:00:41 Integrated Voltage Measurement... 18:01:01 Voltage Offset Correction: v_off_ini = 0.000003194 V, v_off_fin = 0.000005950 V 18:01:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171025129 Vs 18:01:01 Integrated Voltage Measurement... 18:01:20 Voltage Offset Correction: v_off_ini = 0.000005807 V, v_off_fin = 0.000002744 V 18:01:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955374 Vs 18:31:23 Temperature Measurement, Probe Number = 0, T = 20.129000 C 18:31:24 Temperature Measurement, Probe Number = 1, T = 20.053000 C 18:31:24 Temperature Measurement, Probe Number = 2, T = 20.118000 C 18:31:25 Temperature Measurement, Probe Number = 3, T = 20.062000 C 18:31:26 Temperature Measurement, Probe Number = 4, T = 20.312000 C 18:31:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.31 18:31:26 Integrated Voltage Measurement... 18:31:45 Voltage Offset Correction: v_off_ini = 0.000004434 V, v_off_fin = 0.000006078 V 18:31:46 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171070619 Vs 18:31:46 Integrated Voltage Measurement... 18:32:05 Voltage Offset Correction: v_off_ini = 0.000005898 V, v_off_fin = 0.000002894 V 18:32:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952594 Vs 18:32:08 Temperature Measurement, Probe Number = 0, T = 20.134000 C 18:32:09 Temperature Measurement, Probe Number = 1, T = 20.056000 C 18:32:09 Temperature Measurement, Probe Number = 2, T = 20.120000 C 18:32:10 Temperature Measurement, Probe Number = 3, T = 20.064000 C 18:32:11 Temperature Measurement, Probe Number = 4, T = 20.323000 C 18:32:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.32 18:32:11 Integrated Voltage Measurement... 18:32:30 Voltage Offset Correction: v_off_ini = 0.000004251 V, v_off_fin = 0.000006524 V 18:32:30 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171027558 Vs 18:32:31 Integrated Voltage Measurement... 18:32:50 Voltage Offset Correction: v_off_ini = 0.000005611 V, v_off_fin = 0.000001517 V 18:32:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957834 Vs 18:32:52 Temperature Measurement, Probe Number = 0, T = 20.134000 C 18:32:53 Temperature Measurement, Probe Number = 1, T = 20.058000 C 18:32:54 Temperature Measurement, Probe Number = 2, T = 20.122000 C 18:32:54 Temperature Measurement, Probe Number = 3, T = 20.066000 C 18:32:55 Temperature Measurement, Probe Number = 4, T = 20.374000 C 18:32:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.37 18:32:55 Integrated Voltage Measurement... 18:33:15 Voltage Offset Correction: v_off_ini = 0.000002597 V, v_off_fin = 0.000005978 V 18:33:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171016176 Vs 18:33:15 Integrated Voltage Measurement... 18:33:34 Voltage Offset Correction: v_off_ini = 0.000005291 V, v_off_fin = 0.000002897 V 18:33:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960731 Vs 18:33:37 Temperature Measurement, Probe Number = 0, T = 20.134000 C 18:33:38 Temperature Measurement, Probe Number = 1, T = 20.060000 C 18:33:39 Temperature Measurement, Probe Number = 2, T = 20.121000 C 18:33:39 Temperature Measurement, Probe Number = 3, T = 20.067000 C 18:33:40 Temperature Measurement, Probe Number = 4, T = 20.445000 C 18:33:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.45 18:33:40 Integrated Voltage Measurement... 18:33:59 Voltage Offset Correction: v_off_ini = 0.000003043 V, v_off_fin = 0.000006172 V 18:33:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171019342 Vs 18:34:00 Integrated Voltage Measurement... 18:34:19 Voltage Offset Correction: v_off_ini = 0.000005819 V, v_off_fin = 0.000002553 V 18:34:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955501 Vs 18:34:22 Temperature Measurement, Probe Number = 0, T = 20.139000 C 18:34:22 Temperature Measurement, Probe Number = 1, T = 20.062000 C 18:34:23 Temperature Measurement, Probe Number = 2, T = 20.126000 C 18:34:24 Temperature Measurement, Probe Number = 3, T = 20.071000 C 18:34:24 Temperature Measurement, Probe Number = 4, T = 20.494000 C 18:34:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.49 18:34:24 Integrated Voltage Measurement... 18:34:43 Voltage Offset Correction: v_off_ini = 0.000003611 V, v_off_fin = 0.000006613 V 18:34:44 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171025096 Vs 18:34:44 Integrated Voltage Measurement... 18:35:03 Voltage Offset Correction: v_off_ini = 0.000005623 V, v_off_fin = 0.000002677 V 18:35:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170954012 Vs 18:35:06 Temperature Measurement, Probe Number = 0, T = 20.135000 C 18:35:06 Temperature Measurement, Probe Number = 1, T = 20.059000 C 18:35:07 Temperature Measurement, Probe Number = 2, T = 20.124000 C 18:35:08 Temperature Measurement, Probe Number = 3, T = 20.068000 C 18:35:08 Temperature Measurement, Probe Number = 4, T = 20.518000 C 18:35:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.52 18:35:09 Integrated Voltage Measurement... 18:35:28 Voltage Offset Correction: v_off_ini = 0.000004186 V, v_off_fin = 0.000006348 V 18:35:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171031072 Vs 18:35:28 Integrated Voltage Measurement... 18:35:47 Voltage Offset Correction: v_off_ini = 0.000005944 V, v_off_fin = 0.000002798 V 18:35:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957056 Vs 18:35:50 Temperature Measurement, Probe Number = 0, T = 20.138000 C 18:35:51 Temperature Measurement, Probe Number = 1, T = 20.062000 C 18:35:51 Temperature Measurement, Probe Number = 2, T = 20.123000 C 18:35:52 Temperature Measurement, Probe Number = 3, T = 20.067000 C 18:35:53 Temperature Measurement, Probe Number = 4, T = 20.428000 C 18:35:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.43 18:35:53 Integrated Voltage Measurement... 18:36:12 Voltage Offset Correction: v_off_ini = 0.000002945 V, v_off_fin = 0.000006499 V 18:36:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171020967 Vs 18:36:12 Integrated Voltage Measurement... 18:36:32 Voltage Offset Correction: v_off_ini = 0.000005656 V, v_off_fin = 0.000002709 V 18:36:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170957021 Vs 18:36:35 Temperature Measurement, Probe Number = 0, T = 20.135000 C 18:36:35 Temperature Measurement, Probe Number = 1, T = 20.059000 C 18:36:36 Temperature Measurement, Probe Number = 2, T = 20.120000 C 18:36:37 Temperature Measurement, Probe Number = 3, T = 20.064000 C 18:36:37 Temperature Measurement, Probe Number = 4, T = 20.389000 C 18:36:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.39 18:36:37 Integrated Voltage Measurement... 18:36:57 Voltage Offset Correction: v_off_ini = 0.000004091 V, v_off_fin = 0.000006191 V 18:36:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025754 Vs 18:36:57 Integrated Voltage Measurement... 18:37:16 Voltage Offset Correction: v_off_ini = 0.000005576 V, v_off_fin = 0.000002416 V 18:37:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951789 Vs 18:37:19 Temperature Measurement, Probe Number = 0, T = 20.132000 C 18:37:20 Temperature Measurement, Probe Number = 1, T = 20.058000 C 18:37:20 Temperature Measurement, Probe Number = 2, T = 20.118000 C 18:37:21 Temperature Measurement, Probe Number = 3, T = 20.063000 C 18:37:22 Temperature Measurement, Probe Number = 4, T = 20.355000 C 18:37:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.36 18:37:22 Integrated Voltage Measurement... 18:37:41 Voltage Offset Correction: v_off_ini = 0.000003449 V, v_off_fin = 0.000005862 V 18:37:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171017717 Vs 18:37:41 Integrated Voltage Measurement... 18:38:01 Voltage Offset Correction: v_off_ini = 0.000005057 V, v_off_fin = 0.000002708 V 18:38:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958935 Vs 18:38:04 Temperature Measurement, Probe Number = 0, T = 20.131000 C 18:38:04 Temperature Measurement, Probe Number = 1, T = 20.056000 C 18:38:05 Temperature Measurement, Probe Number = 2, T = 20.120000 C 18:38:06 Temperature Measurement, Probe Number = 3, T = 20.064000 C 18:38:06 Temperature Measurement, Probe Number = 4, T = 20.423000 C 18:38:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.42 18:38:06 Integrated Voltage Measurement... 18:38:26 Voltage Offset Correction: v_off_ini = 0.000003489 V, v_off_fin = 0.000005727 V 18:38:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171019754 Vs 18:38:26 Integrated Voltage Measurement... 18:38:45 Voltage Offset Correction: v_off_ini = 0.000005569 V, v_off_fin = 0.000001967 V 18:38:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962985 Vs 19:08:48 Temperature Measurement, Probe Number = 0, T = 20.139000 C 19:08:49 Temperature Measurement, Probe Number = 1, T = 20.060000 C 19:08:50 Temperature Measurement, Probe Number = 2, T = 20.126000 C 19:08:50 Temperature Measurement, Probe Number = 3, T = 20.067000 C 19:08:51 Temperature Measurement, Probe Number = 4, T = 20.355000 C 19:08:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.36 19:08:51 Integrated Voltage Measurement... 19:09:10 Voltage Offset Correction: v_off_ini = 0.000005234 V, v_off_fin = 0.000005744 V 19:09:10 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171084400 Vs 19:09:11 Integrated Voltage Measurement... 19:09:30 Voltage Offset Correction: v_off_ini = 0.000005843 V, v_off_fin = 0.000002855 V 19:09:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170963170 Vs 19:09:33 Temperature Measurement, Probe Number = 0, T = 20.139000 C 19:09:33 Temperature Measurement, Probe Number = 1, T = 20.063000 C 19:09:34 Temperature Measurement, Probe Number = 2, T = 20.126000 C 19:09:35 Temperature Measurement, Probe Number = 3, T = 20.069000 C 19:09:35 Temperature Measurement, Probe Number = 4, T = 20.394000 C 19:09:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.39 19:09:36 Integrated Voltage Measurement... 19:09:55 Voltage Offset Correction: v_off_ini = 0.000004116 V, v_off_fin = 0.000007271 V 19:09:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030830 Vs 19:09:55 Integrated Voltage Measurement... 19:10:15 Voltage Offset Correction: v_off_ini = 0.000005739 V, v_off_fin = 0.000003125 V 19:10:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955541 Vs 19:10:18 Temperature Measurement, Probe Number = 0, T = 20.143000 C 19:10:18 Temperature Measurement, Probe Number = 1, T = 20.064000 C 19:10:19 Temperature Measurement, Probe Number = 2, T = 20.128000 C 19:10:20 Temperature Measurement, Probe Number = 3, T = 20.073000 C 19:10:20 Temperature Measurement, Probe Number = 4, T = 20.462000 C 19:10:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.46 19:10:21 Integrated Voltage Measurement... 19:10:40 Voltage Offset Correction: v_off_ini = 0.000004232 V, v_off_fin = 0.000006769 V 19:10:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030963 Vs 19:10:40 Integrated Voltage Measurement... 19:11:00 Voltage Offset Correction: v_off_ini = 0.000006472 V, v_off_fin = 0.000003433 V 19:11:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953979 Vs 19:11:03 Temperature Measurement, Probe Number = 0, T = 20.140000 C 19:11:04 Temperature Measurement, Probe Number = 1, T = 20.061000 C 19:11:04 Temperature Measurement, Probe Number = 2, T = 20.125000 C 19:11:05 Temperature Measurement, Probe Number = 3, T = 20.070000 C 19:11:06 Temperature Measurement, Probe Number = 4, T = 20.462000 C 19:11:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.46 19:11:06 Integrated Voltage Measurement... 19:11:25 Voltage Offset Correction: v_off_ini = 0.000004638 V, v_off_fin = 0.000006561 V 19:11:25 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171022061 Vs 19:11:25 Integrated Voltage Measurement... 19:11:45 Voltage Offset Correction: v_off_ini = 0.000005852 V, v_off_fin = 0.000001851 V 19:11:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960070 Vs 19:11:48 Temperature Measurement, Probe Number = 0, T = 20.136000 C 19:11:48 Temperature Measurement, Probe Number = 1, T = 20.056000 C 19:11:49 Temperature Measurement, Probe Number = 2, T = 20.121000 C 19:11:50 Temperature Measurement, Probe Number = 3, T = 20.065000 C 19:11:50 Temperature Measurement, Probe Number = 4, T = 20.455000 C 19:11:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.45 19:11:50 Integrated Voltage Measurement... 19:12:10 Voltage Offset Correction: v_off_ini = 0.000004118 V, v_off_fin = 0.000006736 V 19:12:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171026234 Vs 19:12:10 Integrated Voltage Measurement... 19:12:29 Voltage Offset Correction: v_off_ini = 0.000005559 V, v_off_fin = 0.000002859 V 19:12:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956333 Vs 19:12:32 Temperature Measurement, Probe Number = 0, T = 20.132000 C 19:12:33 Temperature Measurement, Probe Number = 1, T = 20.051000 C 19:12:33 Temperature Measurement, Probe Number = 2, T = 20.117000 C 19:12:34 Temperature Measurement, Probe Number = 3, T = 20.061000 C 19:12:35 Temperature Measurement, Probe Number = 4, T = 20.374000 C 19:12:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.37 19:12:35 Integrated Voltage Measurement... 19:12:54 Voltage Offset Correction: v_off_ini = 0.000003788 V, v_off_fin = 0.000005969 V 19:12:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171025912 Vs 19:12:54 Integrated Voltage Measurement... 19:13:13 Voltage Offset Correction: v_off_ini = 0.000006279 V, v_off_fin = 0.000002862 V 19:13:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955911 Vs 19:13:16 Temperature Measurement, Probe Number = 0, T = 20.137000 C 19:13:17 Temperature Measurement, Probe Number = 1, T = 20.057000 C 19:13:18 Temperature Measurement, Probe Number = 2, T = 20.124000 C 19:13:18 Temperature Measurement, Probe Number = 3, T = 20.066000 C 19:13:19 Temperature Measurement, Probe Number = 4, T = 20.375000 C 19:13:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.38 19:13:19 Integrated Voltage Measurement... 19:13:38 Voltage Offset Correction: v_off_ini = 0.000004107 V, v_off_fin = 0.000006713 V 19:13:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024842 Vs 19:13:39 Integrated Voltage Measurement... 19:13:58 Voltage Offset Correction: v_off_ini = 0.000006345 V, v_off_fin = 0.000002966 V 19:13:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954264 Vs 19:14:01 Temperature Measurement, Probe Number = 0, T = 20.140000 C 19:14:01 Temperature Measurement, Probe Number = 1, T = 20.060000 C 19:14:02 Temperature Measurement, Probe Number = 2, T = 20.126000 C 19:14:03 Temperature Measurement, Probe Number = 3, T = 20.067000 C 19:14:03 Temperature Measurement, Probe Number = 4, T = 20.442000 C 19:14:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.44 19:14:04 Integrated Voltage Measurement... 19:14:23 Voltage Offset Correction: v_off_ini = 0.000004435 V, v_off_fin = 0.000006368 V 19:14:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025894 Vs 19:14:23 Integrated Voltage Measurement... 19:14:42 Voltage Offset Correction: v_off_ini = 0.000005953 V, v_off_fin = 0.000002723 V 19:14:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954986 Vs 19:14:45 Temperature Measurement, Probe Number = 0, T = 20.141000 C 19:14:46 Temperature Measurement, Probe Number = 1, T = 20.060000 C 19:14:47 Temperature Measurement, Probe Number = 2, T = 20.127000 C 19:14:47 Temperature Measurement, Probe Number = 3, T = 20.068000 C 19:14:48 Temperature Measurement, Probe Number = 4, T = 20.486000 C 19:14:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.49 19:14:48 Integrated Voltage Measurement... 19:15:07 Voltage Offset Correction: v_off_ini = 0.000003428 V, v_off_fin = 0.000006806 V 19:15:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171028897 Vs 19:15:08 Integrated Voltage Measurement... 19:15:27 Voltage Offset Correction: v_off_ini = 0.000005854 V, v_off_fin = 0.000003122 V 19:15:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952610 Vs 19:15:30 Temperature Measurement, Probe Number = 0, T = 20.143000 C 19:15:31 Temperature Measurement, Probe Number = 1, T = 20.062000 C 19:15:31 Temperature Measurement, Probe Number = 2, T = 20.130000 C 19:15:32 Temperature Measurement, Probe Number = 3, T = 20.071000 C 19:15:33 Temperature Measurement, Probe Number = 4, T = 20.500000 C 19:15:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.50 19:15:33 Integrated Voltage Measurement... 19:15:52 Voltage Offset Correction: v_off_ini = 0.000004647 V, v_off_fin = 0.000006328 V 19:15:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171027418 Vs 19:15:53 Integrated Voltage Measurement... 19:16:12 Voltage Offset Correction: v_off_ini = 0.000006395 V, v_off_fin = 0.000002446 V 19:16:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956385 Vs 19:46:15 Temperature Measurement, Probe Number = 0, T = 20.142000 C 19:46:16 Temperature Measurement, Probe Number = 1, T = 20.064000 C 19:46:16 Temperature Measurement, Probe Number = 2, T = 20.129000 C 19:46:17 Temperature Measurement, Probe Number = 3, T = 20.072000 C 19:46:18 Temperature Measurement, Probe Number = 4, T = 20.516000 C 19:46:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.52 19:46:18 Integrated Voltage Measurement... 19:46:37 Voltage Offset Correction: v_off_ini = 0.000004982 V, v_off_fin = 0.000006355 V 19:46:37 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171075714 Vs 19:46:37 Integrated Voltage Measurement... 19:46:56 Voltage Offset Correction: v_off_ini = 0.000005558 V, v_off_fin = 0.000002897 V 19:46:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959196 Vs 19:46:59 Temperature Measurement, Probe Number = 0, T = 20.134000 C 19:47:00 Temperature Measurement, Probe Number = 1, T = 20.060000 C 19:47:01 Temperature Measurement, Probe Number = 2, T = 20.122000 C 19:47:01 Temperature Measurement, Probe Number = 3, T = 20.067000 C 19:47:02 Temperature Measurement, Probe Number = 4, T = 20.474000 C 19:47:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.47 19:47:02 Integrated Voltage Measurement... 19:47:21 Voltage Offset Correction: v_off_ini = 0.000003511 V, v_off_fin = 0.000005864 V 19:47:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171019087 Vs 19:47:22 Integrated Voltage Measurement... 19:47:41 Voltage Offset Correction: v_off_ini = 0.000005872 V, v_off_fin = 0.000003465 V 19:47:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955188 Vs 19:47:44 Temperature Measurement, Probe Number = 0, T = 20.137000 C 19:47:45 Temperature Measurement, Probe Number = 1, T = 20.061000 C 19:47:46 Temperature Measurement, Probe Number = 2, T = 20.123000 C 19:47:46 Temperature Measurement, Probe Number = 3, T = 20.068000 C 19:47:47 Temperature Measurement, Probe Number = 4, T = 20.407000 C 19:47:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.41 19:47:47 Integrated Voltage Measurement... 19:48:06 Voltage Offset Correction: v_off_ini = 0.000004073 V, v_off_fin = 0.000006507 V 19:48:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171021736 Vs 19:48:07 Integrated Voltage Measurement... 19:48:26 Voltage Offset Correction: v_off_ini = 0.000006017 V, v_off_fin = 0.000002868 V 19:48:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954668 Vs 19:48:29 Temperature Measurement, Probe Number = 0, T = 20.140000 C 19:48:30 Temperature Measurement, Probe Number = 1, T = 20.064000 C 19:48:31 Temperature Measurement, Probe Number = 2, T = 20.125000 C 19:48:31 Temperature Measurement, Probe Number = 3, T = 20.069000 C 19:48:32 Temperature Measurement, Probe Number = 4, T = 20.328000 C 19:48:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.33 19:48:32 Integrated Voltage Measurement... 19:48:51 Voltage Offset Correction: v_off_ini = 0.000004333 V, v_off_fin = 0.000006185 V 19:48:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171022451 Vs 19:48:52 Integrated Voltage Measurement... 19:49:11 Voltage Offset Correction: v_off_ini = 0.000005438 V, v_off_fin = 0.000002831 V 19:49:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955988 Vs 19:49:14 Temperature Measurement, Probe Number = 0, T = 20.145000 C 19:49:15 Temperature Measurement, Probe Number = 1, T = 20.067000 C 19:49:15 Temperature Measurement, Probe Number = 2, T = 20.128000 C 19:49:16 Temperature Measurement, Probe Number = 3, T = 20.072000 C 19:49:17 Temperature Measurement, Probe Number = 4, T = 20.346000 C 19:49:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.35 19:49:17 Integrated Voltage Measurement... 19:49:36 Voltage Offset Correction: v_off_ini = 0.000004231 V, v_off_fin = 0.000006592 V 19:49:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025446 Vs 19:49:37 Integrated Voltage Measurement... 19:49:56 Voltage Offset Correction: v_off_ini = 0.000005831 V, v_off_fin = 0.000002344 V 19:49:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952818 Vs 19:49:59 Temperature Measurement, Probe Number = 0, T = 20.142000 C 19:49:59 Temperature Measurement, Probe Number = 1, T = 20.064000 C 19:50:00 Temperature Measurement, Probe Number = 2, T = 20.128000 C 19:50:01 Temperature Measurement, Probe Number = 3, T = 20.071000 C 19:50:01 Temperature Measurement, Probe Number = 4, T = 20.491000 C 19:50:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.49 19:50:02 Integrated Voltage Measurement... 19:50:21 Voltage Offset Correction: v_off_ini = 0.000004277 V, v_off_fin = 0.000006361 V 19:50:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171026055 Vs 19:50:21 Integrated Voltage Measurement... 19:50:40 Voltage Offset Correction: v_off_ini = 0.000006301 V, v_off_fin = 0.000002860 V 19:50:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955848 Vs 19:50:43 Temperature Measurement, Probe Number = 0, T = 20.144000 C 19:50:44 Temperature Measurement, Probe Number = 1, T = 20.066000 C 19:50:45 Temperature Measurement, Probe Number = 2, T = 20.131000 C 19:50:45 Temperature Measurement, Probe Number = 3, T = 20.075000 C 19:50:46 Temperature Measurement, Probe Number = 4, T = 20.568000 C 19:50:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.57 19:50:46 Integrated Voltage Measurement... 19:51:05 Voltage Offset Correction: v_off_ini = 0.000004123 V, v_off_fin = 0.000006195 V 19:51:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025895 Vs 19:51:06 Integrated Voltage Measurement... 19:51:25 Voltage Offset Correction: v_off_ini = 0.000006157 V, v_off_fin = 0.000002993 V 19:51:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951583 Vs 19:51:28 Temperature Measurement, Probe Number = 0, T = 20.141000 C 19:51:28 Temperature Measurement, Probe Number = 1, T = 20.064000 C 19:51:29 Temperature Measurement, Probe Number = 2, T = 20.131000 C 19:51:30 Temperature Measurement, Probe Number = 3, T = 20.073000 C 19:51:30 Temperature Measurement, Probe Number = 4, T = 20.676000 C 19:51:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.68 19:51:30 Integrated Voltage Measurement... 19:51:50 Voltage Offset Correction: v_off_ini = 0.000004078 V, v_off_fin = 0.000005790 V 19:51:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025578 Vs 19:51:50 Integrated Voltage Measurement... 19:52:09 Voltage Offset Correction: v_off_ini = 0.000005303 V, v_off_fin = 0.000002707 V 19:52:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957869 Vs 19:52:12 Temperature Measurement, Probe Number = 0, T = 20.142000 C 19:52:13 Temperature Measurement, Probe Number = 1, T = 20.065000 C 19:52:13 Temperature Measurement, Probe Number = 2, T = 20.125000 C 19:52:14 Temperature Measurement, Probe Number = 3, T = 20.069000 C 19:52:15 Temperature Measurement, Probe Number = 4, T = 20.578000 C 19:52:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.58 19:52:15 Integrated Voltage Measurement... 19:52:34 Voltage Offset Correction: v_off_ini = 0.000003611 V, v_off_fin = 0.000006142 V 19:52:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171021084 Vs 19:52:34 Integrated Voltage Measurement... 19:52:54 Voltage Offset Correction: v_off_ini = 0.000005563 V, v_off_fin = 0.000002946 V 19:52:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956635 Vs 19:52:57 Temperature Measurement, Probe Number = 0, T = 20.137000 C 19:52:57 Temperature Measurement, Probe Number = 1, T = 20.060000 C 19:52:58 Temperature Measurement, Probe Number = 2, T = 20.122000 C 19:52:58 Temperature Measurement, Probe Number = 3, T = 20.066000 C 19:52:59 Temperature Measurement, Probe Number = 4, T = 20.505000 C 19:52:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.50 19:52:59 Integrated Voltage Measurement... 19:53:19 Voltage Offset Correction: v_off_ini = 0.000003369 V, v_off_fin = 0.000006515 V 19:53:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023098 Vs 19:53:19 Integrated Voltage Measurement... 19:53:38 Voltage Offset Correction: v_off_ini = 0.000006232 V, v_off_fin = 0.000002262 V 19:53:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170952568 Vs 20:23:41 Temperature Measurement, Probe Number = 0, T = 20.135000 C 20:23:42 Temperature Measurement, Probe Number = 1, T = 20.061000 C 20:23:42 Temperature Measurement, Probe Number = 2, T = 20.123000 C 20:23:43 Temperature Measurement, Probe Number = 3, T = 20.069000 C 20:23:44 Temperature Measurement, Probe Number = 4, T = 20.282000 C 20:23:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.28 20:23:44 Integrated Voltage Measurement... 20:24:03 Voltage Offset Correction: v_off_ini = 0.000005654 V, v_off_fin = 0.000006595 V 20:24:03 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171083869 Vs 20:24:03 Integrated Voltage Measurement... 20:24:22 Voltage Offset Correction: v_off_ini = 0.000006337 V, v_off_fin = 0.000003264 V 20:24:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954850 Vs 20:24:25 Temperature Measurement, Probe Number = 0, T = 20.143000 C 20:24:26 Temperature Measurement, Probe Number = 1, T = 20.064000 C 20:24:27 Temperature Measurement, Probe Number = 2, T = 20.126000 C 20:24:27 Temperature Measurement, Probe Number = 3, T = 20.068000 C 20:24:28 Temperature Measurement, Probe Number = 4, T = 20.287000 C 20:24:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.29 20:24:28 Integrated Voltage Measurement... 20:24:48 Voltage Offset Correction: v_off_ini = 0.000003859 V, v_off_fin = 0.000006593 V 20:24:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171024499 Vs 20:24:48 Integrated Voltage Measurement... 20:25:07 Voltage Offset Correction: v_off_ini = 0.000005928 V, v_off_fin = 0.000002489 V 20:25:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955196 Vs 20:25:10 Temperature Measurement, Probe Number = 0, T = 20.141000 C 20:25:10 Temperature Measurement, Probe Number = 1, T = 20.061000 C 20:25:11 Temperature Measurement, Probe Number = 2, T = 20.126000 C 20:25:12 Temperature Measurement, Probe Number = 3, T = 20.067000 C 20:25:12 Temperature Measurement, Probe Number = 4, T = 20.325000 C 20:25:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.32 20:25:13 Integrated Voltage Measurement... 20:25:32 Voltage Offset Correction: v_off_ini = 0.000003978 V, v_off_fin = 0.000006144 V 20:25:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171028224 Vs 20:25:33 Integrated Voltage Measurement... 20:25:52 Voltage Offset Correction: v_off_ini = 0.000005477 V, v_off_fin = 0.000002455 V 20:25:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965065 Vs 20:25:55 Temperature Measurement, Probe Number = 0, T = 20.141000 C 20:25:55 Temperature Measurement, Probe Number = 1, T = 20.062000 C 20:25:56 Temperature Measurement, Probe Number = 2, T = 20.125000 C 20:25:57 Temperature Measurement, Probe Number = 3, T = 20.068000 C 20:25:57 Temperature Measurement, Probe Number = 4, T = 20.292000 C 20:25:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.29 20:25:58 Integrated Voltage Measurement... 20:26:17 Voltage Offset Correction: v_off_ini = 0.000003757 V, v_off_fin = 0.000006079 V 20:26:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028500 Vs 20:26:17 Integrated Voltage Measurement... 20:26:37 Voltage Offset Correction: v_off_ini = 0.000005818 V, v_off_fin = 0.000003175 V 20:26:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955284 Vs 20:26:40 Temperature Measurement, Probe Number = 0, T = 20.140000 C 20:26:40 Temperature Measurement, Probe Number = 1, T = 20.063000 C 20:26:41 Temperature Measurement, Probe Number = 2, T = 20.123000 C 20:26:42 Temperature Measurement, Probe Number = 3, T = 20.068000 C 20:26:42 Temperature Measurement, Probe Number = 4, T = 20.291000 C 20:26:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.29 20:26:43 Integrated Voltage Measurement... 20:27:02 Voltage Offset Correction: v_off_ini = 0.000004100 V, v_off_fin = 0.000006239 V 20:27:03 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171024629 Vs 20:27:03 Integrated Voltage Measurement... 20:27:22 Voltage Offset Correction: v_off_ini = 0.000005146 V, v_off_fin = 0.000002388 V 20:27:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959122 Vs 20:27:25 Temperature Measurement, Probe Number = 0, T = 20.131000 C 20:27:25 Temperature Measurement, Probe Number = 1, T = 20.054000 C 20:27:26 Temperature Measurement, Probe Number = 2, T = 20.118000 C 20:27:27 Temperature Measurement, Probe Number = 3, T = 20.062000 C 20:27:27 Temperature Measurement, Probe Number = 4, T = 20.274000 C 20:27:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.27 20:27:28 Integrated Voltage Measurement... 20:27:47 Voltage Offset Correction: v_off_ini = 0.000003970 V, v_off_fin = 0.000006247 V 20:27:47 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171029861 Vs 20:27:47 Integrated Voltage Measurement... 20:28:07 Voltage Offset Correction: v_off_ini = 0.000005837 V, v_off_fin = 0.000002957 V 20:28:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951828 Vs 20:28:10 Temperature Measurement, Probe Number = 0, T = 20.137000 C 20:28:10 Temperature Measurement, Probe Number = 1, T = 20.062000 C 20:28:11 Temperature Measurement, Probe Number = 2, T = 20.124000 C 20:28:12 Temperature Measurement, Probe Number = 3, T = 20.068000 C 20:28:12 Temperature Measurement, Probe Number = 4, T = 20.227000 C 20:28:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.23 20:28:12 Integrated Voltage Measurement... 20:28:31 Voltage Offset Correction: v_off_ini = 0.000003942 V, v_off_fin = 0.000007016 V 20:28:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171033986 Vs 20:28:32 Integrated Voltage Measurement... 20:28:51 Voltage Offset Correction: v_off_ini = 0.000006135 V, v_off_fin = 0.000003013 V 20:28:51 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170953127 Vs 20:28:54 Temperature Measurement, Probe Number = 0, T = 20.138000 C 20:28:54 Temperature Measurement, Probe Number = 1, T = 20.062000 C 20:28:55 Temperature Measurement, Probe Number = 2, T = 20.125000 C 20:28:56 Temperature Measurement, Probe Number = 3, T = 20.069000 C 20:28:56 Temperature Measurement, Probe Number = 4, T = 20.190000 C 20:28:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.19 20:28:57 Integrated Voltage Measurement... 20:29:16 Voltage Offset Correction: v_off_ini = 0.000003942 V, v_off_fin = 0.000006795 V 20:29:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029815 Vs 20:29:16 Integrated Voltage Measurement... 20:29:35 Voltage Offset Correction: v_off_ini = 0.000005940 V, v_off_fin = 0.000002488 V 20:29:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960670 Vs 20:29:38 Temperature Measurement, Probe Number = 0, T = 20.137000 C 20:29:39 Temperature Measurement, Probe Number = 1, T = 20.057000 C 20:29:39 Temperature Measurement, Probe Number = 2, T = 20.125000 C 20:29:40 Temperature Measurement, Probe Number = 3, T = 20.065000 C 20:29:41 Temperature Measurement, Probe Number = 4, T = 20.134000 C 20:29:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.13 20:29:41 Integrated Voltage Measurement... 20:30:01 Voltage Offset Correction: v_off_ini = 0.000003515 V, v_off_fin = 0.000005909 V 20:30:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029798 Vs 20:30:01 Integrated Voltage Measurement... 20:30:20 Voltage Offset Correction: v_off_ini = 0.000005531 V, v_off_fin = 0.000002166 V 20:30:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959354 Vs 20:30:23 Temperature Measurement, Probe Number = 0, T = 20.137000 C 20:30:24 Temperature Measurement, Probe Number = 1, T = 20.055000 C 20:30:25 Temperature Measurement, Probe Number = 2, T = 20.123000 C 20:30:25 Temperature Measurement, Probe Number = 3, T = 20.063000 C 20:30:26 Temperature Measurement, Probe Number = 4, T = 20.228000 C 20:30:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.23 20:30:26 Integrated Voltage Measurement... 20:30:45 Voltage Offset Correction: v_off_ini = 0.000003572 V, v_off_fin = 0.000006100 V 20:30:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171027866 Vs 20:30:46 Integrated Voltage Measurement... 20:31:05 Voltage Offset Correction: v_off_ini = 0.000005656 V, v_off_fin = 0.000002533 V 20:31:05 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170962906 Vs 21:01:08 Temperature Measurement, Probe Number = 0, T = 20.136000 C 21:01:08 Temperature Measurement, Probe Number = 1, T = 20.057000 C 21:01:09 Temperature Measurement, Probe Number = 2, T = 20.124000 C 21:01:10 Temperature Measurement, Probe Number = 3, T = 20.067000 C 21:01:10 Temperature Measurement, Probe Number = 4, T = 20.312000 C 21:01:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.31 21:01:10 Integrated Voltage Measurement... 21:01:29 Voltage Offset Correction: v_off_ini = 0.000004889 V, v_off_fin = 0.000007120 V 21:01:30 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171084720 Vs 21:01:30 Integrated Voltage Measurement... 21:01:49 Voltage Offset Correction: v_off_ini = 0.000006388 V, v_off_fin = 0.000003697 V 21:01:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953514 Vs 21:01:52 Temperature Measurement, Probe Number = 0, T = 20.139000 C 21:01:52 Temperature Measurement, Probe Number = 1, T = 20.057000 C 21:01:53 Temperature Measurement, Probe Number = 2, T = 20.124000 C 21:01:54 Temperature Measurement, Probe Number = 3, T = 20.066000 C 21:01:54 Temperature Measurement, Probe Number = 4, T = 20.284000 C 21:01:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.28 21:01:55 Integrated Voltage Measurement... 21:02:13 Voltage Offset Correction: v_off_ini = 0.000004259 V, v_off_fin = 0.000006827 V 21:02:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037135 Vs 21:02:14 Integrated Voltage Measurement... 21:02:33 Voltage Offset Correction: v_off_ini = 0.000006189 V, v_off_fin = 0.000003603 V 21:02:33 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170960218 Vs 21:02:36 Temperature Measurement, Probe Number = 0, T = 20.134000 C 21:02:37 Temperature Measurement, Probe Number = 1, T = 20.053000 C 21:02:37 Temperature Measurement, Probe Number = 2, T = 20.122000 C 21:02:38 Temperature Measurement, Probe Number = 3, T = 20.063000 C 21:02:38 Temperature Measurement, Probe Number = 4, T = 20.185000 C 21:02:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.18 21:02:39 Integrated Voltage Measurement... 21:02:58 Voltage Offset Correction: v_off_ini = 0.000004781 V, v_off_fin = 0.000006718 V 21:02:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036793 Vs 21:02:59 Integrated Voltage Measurement... 21:03:18 Voltage Offset Correction: v_off_ini = 0.000006195 V, v_off_fin = 0.000003212 V 21:03:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960094 Vs 21:03:21 Temperature Measurement, Probe Number = 0, T = 20.139000 C 21:03:22 Temperature Measurement, Probe Number = 1, T = 20.056000 C 21:03:22 Temperature Measurement, Probe Number = 2, T = 20.123000 C 21:03:23 Temperature Measurement, Probe Number = 3, T = 20.063000 C 21:03:24 Temperature Measurement, Probe Number = 4, T = 20.135000 C 21:03:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.14 21:03:24 Integrated Voltage Measurement... 21:03:43 Voltage Offset Correction: v_off_ini = 0.000004262 V, v_off_fin = 0.000006612 V 21:03:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171032795 Vs 21:03:44 Integrated Voltage Measurement... 21:04:02 Voltage Offset Correction: v_off_ini = 0.000006521 V, v_off_fin = 0.000003017 V 21:04:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960409 Vs 21:04:05 Temperature Measurement, Probe Number = 0, T = 20.136000 C 21:04:06 Temperature Measurement, Probe Number = 1, T = 20.057000 C 21:04:07 Temperature Measurement, Probe Number = 2, T = 20.122000 C 21:04:07 Temperature Measurement, Probe Number = 3, T = 20.064000 C 21:04:08 Temperature Measurement, Probe Number = 4, T = 20.093000 C 21:04:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.09 21:04:08 Integrated Voltage Measurement... 21:04:27 Voltage Offset Correction: v_off_ini = 0.000004309 V, v_off_fin = 0.000006835 V 21:04:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171038631 Vs 21:04:28 Integrated Voltage Measurement... 21:04:47 Voltage Offset Correction: v_off_ini = 0.000006194 V, v_off_fin = 0.000003144 V 21:04:47 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170955514 Vs 21:04:50 Temperature Measurement, Probe Number = 0, T = 20.134000 C 21:04:50 Temperature Measurement, Probe Number = 1, T = 20.053000 C 21:04:51 Temperature Measurement, Probe Number = 2, T = 20.123000 C 21:04:52 Temperature Measurement, Probe Number = 3, T = 20.063000 C 21:04:52 Temperature Measurement, Probe Number = 4, T = 20.068000 C 21:04:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.07 21:04:52 Integrated Voltage Measurement... 21:05:12 Voltage Offset Correction: v_off_ini = 0.000004562 V, v_off_fin = 0.000007119 V 21:05:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042940 Vs 21:05:12 Integrated Voltage Measurement... 21:05:31 Voltage Offset Correction: v_off_ini = 0.000006756 V, v_off_fin = 0.000003294 V 21:05:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955387 Vs 21:05:34 Temperature Measurement, Probe Number = 0, T = 20.137000 C 21:05:35 Temperature Measurement, Probe Number = 1, T = 20.059000 C 21:05:36 Temperature Measurement, Probe Number = 2, T = 20.122000 C 21:05:36 Temperature Measurement, Probe Number = 3, T = 20.066000 C 21:05:37 Temperature Measurement, Probe Number = 4, T = 20.088000 C 21:05:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.09 21:05:37 Integrated Voltage Measurement... 21:05:57 Voltage Offset Correction: v_off_ini = 0.000004333 V, v_off_fin = 0.000006524 V 21:05:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037551 Vs 21:05:57 Integrated Voltage Measurement... 21:06:17 Voltage Offset Correction: v_off_ini = 0.000005976 V, v_off_fin = 0.000003333 V 21:06:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958073 Vs 21:06:20 Temperature Measurement, Probe Number = 0, T = 20.138000 C 21:06:20 Temperature Measurement, Probe Number = 1, T = 20.059000 C 21:06:21 Temperature Measurement, Probe Number = 2, T = 20.126000 C 21:06:22 Temperature Measurement, Probe Number = 3, T = 20.068000 C 21:06:22 Temperature Measurement, Probe Number = 4, T = 20.212000 C 21:06:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.21 21:06:22 Integrated Voltage Measurement... 21:06:42 Voltage Offset Correction: v_off_ini = 0.000004788 V, v_off_fin = 0.000006598 V 21:06:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036686 Vs 21:06:42 Integrated Voltage Measurement... 21:07:01 Voltage Offset Correction: v_off_ini = 0.000005959 V, v_off_fin = 0.000002613 V 21:07:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959082 Vs 21:07:04 Temperature Measurement, Probe Number = 0, T = 20.138000 C 21:07:05 Temperature Measurement, Probe Number = 1, T = 20.057000 C 21:07:06 Temperature Measurement, Probe Number = 2, T = 20.124000 C 21:07:06 Temperature Measurement, Probe Number = 3, T = 20.067000 C 21:07:07 Temperature Measurement, Probe Number = 4, T = 20.252000 C 21:07:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.25 21:07:07 Integrated Voltage Measurement... 21:07:26 Voltage Offset Correction: v_off_ini = 0.000003979 V, v_off_fin = 0.000006067 V 21:07:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035350 Vs 21:07:27 Integrated Voltage Measurement... 21:07:46 Voltage Offset Correction: v_off_ini = 0.000005654 V, v_off_fin = 0.000002160 V 21:07:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965872 Vs 21:07:49 Temperature Measurement, Probe Number = 0, T = 20.131000 C 21:07:49 Temperature Measurement, Probe Number = 1, T = 20.051000 C 21:07:50 Temperature Measurement, Probe Number = 2, T = 20.122000 C 21:07:51 Temperature Measurement, Probe Number = 3, T = 20.065000 C 21:07:51 Temperature Measurement, Probe Number = 4, T = 20.179000 C 21:07:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.18 21:07:52 Integrated Voltage Measurement... 21:08:11 Voltage Offset Correction: v_off_ini = 0.000003770 V, v_off_fin = 0.000006303 V 21:08:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029843 Vs 21:08:11 Integrated Voltage Measurement... 21:08:30 Voltage Offset Correction: v_off_ini = 0.000005765 V, v_off_fin = 0.000002748 V 21:08:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964326 Vs 21:38:33 Temperature Measurement, Probe Number = 0, T = 20.127000 C 21:38:34 Temperature Measurement, Probe Number = 1, T = 20.046000 C 21:38:35 Temperature Measurement, Probe Number = 2, T = 20.117000 C 21:38:35 Temperature Measurement, Probe Number = 3, T = 20.058000 C 21:38:36 Temperature Measurement, Probe Number = 4, T = 20.150000 C 21:38:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.15 21:38:36 Integrated Voltage Measurement... 21:38:55 Voltage Offset Correction: v_off_ini = 0.000004922 V, v_off_fin = 0.000006273 V 21:38:56 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171080630 Vs 21:38:56 Integrated Voltage Measurement... 21:39:15 Voltage Offset Correction: v_off_ini = 0.000005986 V, v_off_fin = 0.000002533 V 21:39:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967150 Vs 21:39:18 Temperature Measurement, Probe Number = 0, T = 20.125000 C 21:39:18 Temperature Measurement, Probe Number = 1, T = 20.042000 C 21:39:19 Temperature Measurement, Probe Number = 2, T = 20.115000 C 21:39:20 Temperature Measurement, Probe Number = 3, T = 20.057000 C 21:39:20 Temperature Measurement, Probe Number = 4, T = 20.045000 C 21:39:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.05 21:39:20 Integrated Voltage Measurement... 21:39:40 Voltage Offset Correction: v_off_ini = 0.000003681 V, v_off_fin = 0.000006323 V 21:39:40 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171038336 Vs 21:39:40 Integrated Voltage Measurement... 21:40:00 Voltage Offset Correction: v_off_ini = 0.000005571 V, v_off_fin = 0.000003185 V 21:40:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969325 Vs 21:40:03 Temperature Measurement, Probe Number = 0, T = 20.128000 C 21:40:03 Temperature Measurement, Probe Number = 1, T = 20.047000 C 21:40:04 Temperature Measurement, Probe Number = 2, T = 20.115000 C 21:40:05 Temperature Measurement, Probe Number = 3, T = 20.056000 C 21:40:05 Temperature Measurement, Probe Number = 4, T = 20.034000 C 21:40:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.03 21:40:06 Integrated Voltage Measurement... 21:40:25 Voltage Offset Correction: v_off_ini = 0.000004035 V, v_off_fin = 0.000006297 V 21:40:25 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171032420 Vs 21:40:25 Integrated Voltage Measurement... 21:40:45 Voltage Offset Correction: v_off_ini = 0.000005560 V, v_off_fin = 0.000002986 V 21:40:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969193 Vs 21:40:48 Temperature Measurement, Probe Number = 0, T = 20.128000 C 21:40:48 Temperature Measurement, Probe Number = 1, T = 20.048000 C 21:40:49 Temperature Measurement, Probe Number = 2, T = 20.118000 C 21:40:50 Temperature Measurement, Probe Number = 3, T = 20.060000 C 21:40:50 Temperature Measurement, Probe Number = 4, T = 20.061000 C 21:40:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.06 21:40:51 Integrated Voltage Measurement... 21:41:10 Voltage Offset Correction: v_off_ini = 0.000004106 V, v_off_fin = 0.000006268 V 21:41:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035518 Vs 21:41:10 Integrated Voltage Measurement... 21:41:30 Voltage Offset Correction: v_off_ini = 0.000005782 V, v_off_fin = 0.000002456 V 21:41:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965463 Vs 21:41:33 Temperature Measurement, Probe Number = 0, T = 20.129000 C 21:41:33 Temperature Measurement, Probe Number = 1, T = 20.049000 C 21:41:34 Temperature Measurement, Probe Number = 2, T = 20.117000 C 21:41:35 Temperature Measurement, Probe Number = 3, T = 20.061000 C 21:41:35 Temperature Measurement, Probe Number = 4, T = 20.120000 C 21:41:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.12 21:41:35 Integrated Voltage Measurement... 21:41:55 Voltage Offset Correction: v_off_ini = 0.000003333 V, v_off_fin = 0.000006540 V 21:41:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034660 Vs 21:41:55 Integrated Voltage Measurement... 21:42:15 Voltage Offset Correction: v_off_ini = 0.000006015 V, v_off_fin = 0.000002275 V 21:42:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967560 Vs 21:42:18 Temperature Measurement, Probe Number = 0, T = 20.128000 C 21:42:19 Temperature Measurement, Probe Number = 1, T = 20.047000 C 21:42:19 Temperature Measurement, Probe Number = 2, T = 20.118000 C 21:42:20 Temperature Measurement, Probe Number = 3, T = 20.060000 C 21:42:21 Temperature Measurement, Probe Number = 4, T = 20.135000 C 21:42:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.14 21:42:21 Integrated Voltage Measurement... 21:42:40 Voltage Offset Correction: v_off_ini = 0.000003844 V, v_off_fin = 0.000006730 V 21:42:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034410 Vs 21:42:40 Integrated Voltage Measurement... 21:43:00 Voltage Offset Correction: v_off_ini = 0.000006031 V, v_off_fin = 0.000002211 V 21:43:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965077 Vs 21:43:03 Temperature Measurement, Probe Number = 0, T = 20.128000 C 21:43:03 Temperature Measurement, Probe Number = 1, T = 20.051000 C 21:43:04 Temperature Measurement, Probe Number = 2, T = 20.115000 C 21:43:05 Temperature Measurement, Probe Number = 3, T = 20.061000 C 21:43:05 Temperature Measurement, Probe Number = 4, T = 20.069000 C 21:43:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.07 21:43:06 Integrated Voltage Measurement... 21:43:25 Voltage Offset Correction: v_off_ini = 0.000003576 V, v_off_fin = 0.000006027 V 21:43:25 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171037761 Vs 21:43:25 Integrated Voltage Measurement... 21:43:44 Voltage Offset Correction: v_off_ini = 0.000006102 V, v_off_fin = 0.000002826 V 21:43:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963194 Vs 21:43:47 Temperature Measurement, Probe Number = 0, T = 20.132000 C 21:43:48 Temperature Measurement, Probe Number = 1, T = 20.056000 C 21:43:48 Temperature Measurement, Probe Number = 2, T = 20.119000 C 21:43:49 Temperature Measurement, Probe Number = 3, T = 20.062000 C 21:43:50 Temperature Measurement, Probe Number = 4, T = 20.089000 C 21:43:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.09 21:43:50 Integrated Voltage Measurement... 21:44:09 Voltage Offset Correction: v_off_ini = 0.000003830 V, v_off_fin = 0.000006347 V 21:44:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171043885 Vs 21:44:09 Integrated Voltage Measurement... 21:44:28 Voltage Offset Correction: v_off_ini = 0.000006246 V, v_off_fin = 0.000002954 V 21:44:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963176 Vs 21:44:31 Temperature Measurement, Probe Number = 0, T = 20.133000 C 21:44:32 Temperature Measurement, Probe Number = 1, T = 20.056000 C 21:44:33 Temperature Measurement, Probe Number = 2, T = 20.121000 C 21:44:33 Temperature Measurement, Probe Number = 3, T = 20.063000 C 21:44:34 Temperature Measurement, Probe Number = 4, T = 20.037000 C 21:44:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.04 21:44:34 Integrated Voltage Measurement... 21:44:53 Voltage Offset Correction: v_off_ini = 0.000004137 V, v_off_fin = 0.000006492 V 21:44:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041131 Vs 21:44:54 Integrated Voltage Measurement... 21:45:13 Voltage Offset Correction: v_off_ini = 0.000006001 V, v_off_fin = 0.000002753 V 21:45:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967960 Vs 21:45:16 Temperature Measurement, Probe Number = 0, T = 20.135000 C 21:45:16 Temperature Measurement, Probe Number = 1, T = 20.058000 C 21:45:17 Temperature Measurement, Probe Number = 2, T = 20.122000 C 21:45:18 Temperature Measurement, Probe Number = 3, T = 20.063000 C 21:45:18 Temperature Measurement, Probe Number = 4, T = 20.003000 C 21:45:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.00 21:45:19 Integrated Voltage Measurement... 21:45:38 Voltage Offset Correction: v_off_ini = 0.000003930 V, v_off_fin = 0.000005842 V 21:45:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038167 Vs 21:45:38 Integrated Voltage Measurement... 21:45:58 Voltage Offset Correction: v_off_ini = 0.000005171 V, v_off_fin = 0.000002982 V 21:45:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969971 Vs 22:16:01 Temperature Measurement, Probe Number = 0, T = 20.119000 C 22:16:01 Temperature Measurement, Probe Number = 1, T = 20.043000 C 22:16:02 Temperature Measurement, Probe Number = 2, T = 20.112000 C 22:16:03 Temperature Measurement, Probe Number = 3, T = 20.056000 C 22:16:03 Temperature Measurement, Probe Number = 4, T = 20.115000 C 22:16:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.11 22:16:03 Integrated Voltage Measurement... 22:16:23 Voltage Offset Correction: v_off_ini = 0.000004869 V, v_off_fin = 0.000006401 V 22:16:23 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171085286 Vs 22:16:23 Integrated Voltage Measurement... 22:16:42 Voltage Offset Correction: v_off_ini = 0.000005728 V, v_off_fin = 0.000002760 V 22:16:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971341 Vs 22:16:45 Temperature Measurement, Probe Number = 0, T = 20.128000 C 22:16:46 Temperature Measurement, Probe Number = 1, T = 20.050000 C 22:16:47 Temperature Measurement, Probe Number = 2, T = 20.118000 C 22:16:47 Temperature Measurement, Probe Number = 3, T = 20.060000 C 22:16:48 Temperature Measurement, Probe Number = 4, T = 20.147000 C 22:16:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.15 22:16:48 Integrated Voltage Measurement... 22:17:07 Voltage Offset Correction: v_off_ini = 0.000003853 V, v_off_fin = 0.000006449 V 22:17:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046863 Vs 22:17:08 Integrated Voltage Measurement... 22:17:27 Voltage Offset Correction: v_off_ini = 0.000006261 V, v_off_fin = 0.000003361 V 22:17:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971933 Vs 22:17:30 Temperature Measurement, Probe Number = 0, T = 20.127000 C 22:17:30 Temperature Measurement, Probe Number = 1, T = 20.051000 C 22:17:31 Temperature Measurement, Probe Number = 2, T = 20.119000 C 22:17:32 Temperature Measurement, Probe Number = 3, T = 20.061000 C 22:17:32 Temperature Measurement, Probe Number = 4, T = 20.200000 C 22:17:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.20 22:17:33 Integrated Voltage Measurement... 22:17:52 Voltage Offset Correction: v_off_ini = 0.000004288 V, v_off_fin = 0.000006155 V 22:17:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052211 Vs 22:17:52 Integrated Voltage Measurement... 22:18:12 Voltage Offset Correction: v_off_ini = 0.000005867 V, v_off_fin = 0.000003828 V 22:18:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973491 Vs 22:18:15 Temperature Measurement, Probe Number = 0, T = 20.125000 C 22:18:16 Temperature Measurement, Probe Number = 1, T = 20.044000 C 22:18:17 Temperature Measurement, Probe Number = 2, T = 20.113000 C 22:18:17 Temperature Measurement, Probe Number = 3, T = 20.054000 C 22:18:18 Temperature Measurement, Probe Number = 4, T = 20.122000 C 22:18:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.12 22:18:18 Integrated Voltage Measurement... 22:18:37 Voltage Offset Correction: v_off_ini = 0.000004783 V, v_off_fin = 0.000006245 V 22:18:38 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171044853 Vs 22:18:38 Integrated Voltage Measurement... 22:18:57 Voltage Offset Correction: v_off_ini = 0.000005700 V, v_off_fin = 0.000003211 V 22:18:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974031 Vs 22:19:00 Temperature Measurement, Probe Number = 0, T = 20.126000 C 22:19:01 Temperature Measurement, Probe Number = 1, T = 20.045000 C 22:19:02 Temperature Measurement, Probe Number = 2, T = 20.114000 C 22:19:02 Temperature Measurement, Probe Number = 3, T = 20.055000 C 22:19:03 Temperature Measurement, Probe Number = 4, T = 20.052000 C 22:19:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.05 22:19:03 Integrated Voltage Measurement... 22:19:23 Voltage Offset Correction: v_off_ini = 0.000004949 V, v_off_fin = 0.000006694 V 22:19:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049712 Vs 22:19:23 Integrated Voltage Measurement... 22:19:42 Voltage Offset Correction: v_off_ini = 0.000005996 V, v_off_fin = 0.000002928 V 22:19:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965600 Vs 22:19:45 Temperature Measurement, Probe Number = 0, T = 20.125000 C 22:19:46 Temperature Measurement, Probe Number = 1, T = 20.048000 C 22:19:47 Temperature Measurement, Probe Number = 2, T = 20.115000 C 22:19:47 Temperature Measurement, Probe Number = 3, T = 20.057000 C 22:19:48 Temperature Measurement, Probe Number = 4, T = 20.013000 C 22:19:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.01 22:19:48 Integrated Voltage Measurement... 22:20:07 Voltage Offset Correction: v_off_ini = 0.000004286 V, v_off_fin = 0.000006801 V 22:20:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058592 Vs 22:20:08 Integrated Voltage Measurement... 22:20:27 Voltage Offset Correction: v_off_ini = 0.000006493 V, v_off_fin = 0.000003455 V 22:20:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971251 Vs 22:20:30 Temperature Measurement, Probe Number = 0, T = 20.124000 C 22:20:31 Temperature Measurement, Probe Number = 1, T = 20.043000 C 22:20:32 Temperature Measurement, Probe Number = 2, T = 20.112000 C 22:20:32 Temperature Measurement, Probe Number = 3, T = 20.052000 C 22:20:33 Temperature Measurement, Probe Number = 4, T = 20.069000 C 22:20:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.07 22:20:33 Integrated Voltage Measurement... 22:20:53 Voltage Offset Correction: v_off_ini = 0.000004614 V, v_off_fin = 0.000006751 V 22:20:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051107 Vs 22:20:53 Integrated Voltage Measurement... 22:21:13 Voltage Offset Correction: v_off_ini = 0.000006432 V, v_off_fin = 0.000003447 V 22:21:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961405 Vs 22:21:15 Temperature Measurement, Probe Number = 0, T = 20.124000 C 22:21:16 Temperature Measurement, Probe Number = 1, T = 20.046000 C 22:21:17 Temperature Measurement, Probe Number = 2, T = 20.111000 C 22:21:17 Temperature Measurement, Probe Number = 3, T = 20.053000 C 22:21:18 Temperature Measurement, Probe Number = 4, T = 20.080000 C 22:21:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.08 22:21:18 Integrated Voltage Measurement... 22:21:38 Voltage Offset Correction: v_off_ini = 0.000004652 V, v_off_fin = 0.000006620 V 22:21:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051708 Vs 22:21:38 Integrated Voltage Measurement... 22:21:58 Voltage Offset Correction: v_off_ini = 0.000006405 V, v_off_fin = 0.000003229 V 22:21:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966914 Vs 22:22:01 Temperature Measurement, Probe Number = 0, T = 20.127000 C 22:22:01 Temperature Measurement, Probe Number = 1, T = 20.048000 C 22:22:02 Temperature Measurement, Probe Number = 2, T = 20.116000 C 22:22:02 Temperature Measurement, Probe Number = 3, T = 20.058000 C 22:22:03 Temperature Measurement, Probe Number = 4, T = 20.162000 C 22:22:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.16 22:22:03 Integrated Voltage Measurement... 22:22:23 Voltage Offset Correction: v_off_ini = 0.000004524 V, v_off_fin = 0.000005987 V 22:22:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050907 Vs 22:22:23 Integrated Voltage Measurement... 22:22:43 Voltage Offset Correction: v_off_ini = 0.000006238 V, v_off_fin = 0.000003811 V 22:22:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967010 Vs 22:22:46 Temperature Measurement, Probe Number = 0, T = 20.121000 C 22:22:46 Temperature Measurement, Probe Number = 1, T = 20.043000 C 22:22:47 Temperature Measurement, Probe Number = 2, T = 20.112000 C 22:22:48 Temperature Measurement, Probe Number = 3, T = 20.054000 C 22:22:48 Temperature Measurement, Probe Number = 4, T = 20.170000 C 22:22:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.17 22:22:48 Integrated Voltage Measurement... 22:23:08 Voltage Offset Correction: v_off_ini = 0.000004173 V, v_off_fin = 0.000006667 V 22:23:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048398 Vs 22:23:08 Integrated Voltage Measurement... 22:23:27 Voltage Offset Correction: v_off_ini = 0.000006055 V, v_off_fin = 0.000002760 V 22:23:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970597 Vs 22:53:30 Temperature Measurement, Probe Number = 0, T = 20.119000 C 22:53:31 Temperature Measurement, Probe Number = 1, T = 20.040000 C 22:53:32 Temperature Measurement, Probe Number = 2, T = 20.113000 C 22:53:32 Temperature Measurement, Probe Number = 3, T = 20.056000 C 22:53:33 Temperature Measurement, Probe Number = 4, T = 20.309000 C 22:53:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.31 22:53:33 Integrated Voltage Measurement... 22:53:53 Voltage Offset Correction: v_off_ini = 0.000005015 V, v_off_fin = 0.000006397 V 22:53:53 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171091204 Vs 22:53:53 Integrated Voltage Measurement... 22:54:12 Voltage Offset Correction: v_off_ini = 0.000006523 V, v_off_fin = 0.000002713 V 22:54:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971057 Vs 22:54:15 Temperature Measurement, Probe Number = 0, T = 20.118000 C 22:54:16 Temperature Measurement, Probe Number = 1, T = 20.039000 C 22:54:17 Temperature Measurement, Probe Number = 2, T = 20.113000 C 22:54:17 Temperature Measurement, Probe Number = 3, T = 20.055000 C 22:54:18 Temperature Measurement, Probe Number = 4, T = 20.343000 C 22:54:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.34 22:54:18 Integrated Voltage Measurement... 22:54:39 Voltage Offset Correction: v_off_ini = 0.000004102 V, v_off_fin = 0.000006132 V 22:54:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047565 Vs 22:54:40 Integrated Voltage Measurement... 22:54:59 Voltage Offset Correction: v_off_ini = 0.000005653 V, v_off_fin = 0.000003196 V 22:54:59 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170969107 Vs 22:55:02 Temperature Measurement, Probe Number = 0, T = 20.114000 C 22:55:02 Temperature Measurement, Probe Number = 1, T = 20.034000 C 22:55:03 Temperature Measurement, Probe Number = 2, T = 20.107000 C 22:55:04 Temperature Measurement, Probe Number = 3, T = 20.048000 C 22:55:04 Temperature Measurement, Probe Number = 4, T = 20.261000 C 22:55:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.26 22:55:05 Integrated Voltage Measurement... 22:55:24 Voltage Offset Correction: v_off_ini = 0.000004134 V, v_off_fin = 0.000006636 V 22:55:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048106 Vs 22:55:24 Integrated Voltage Measurement... 22:55:43 Voltage Offset Correction: v_off_ini = 0.000005496 V, v_off_fin = 0.000002255 V 22:55:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976157 Vs 22:55:46 Temperature Measurement, Probe Number = 0, T = 20.113000 C 22:55:47 Temperature Measurement, Probe Number = 1, T = 20.034000 C 22:55:48 Temperature Measurement, Probe Number = 2, T = 20.103000 C 22:55:48 Temperature Measurement, Probe Number = 3, T = 20.045000 C 22:55:49 Temperature Measurement, Probe Number = 4, T = 20.173000 C 22:55:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.17 22:55:49 Integrated Voltage Measurement... 22:56:09 Voltage Offset Correction: v_off_ini = 0.000003338 V, v_off_fin = 0.000005947 V 22:56:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041082 Vs 22:56:09 Integrated Voltage Measurement... 22:56:29 Voltage Offset Correction: v_off_ini = 0.000005958 V, v_off_fin = 0.000002543 V 22:56:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974782 Vs 22:56:32 Temperature Measurement, Probe Number = 0, T = 20.116000 C 22:56:32 Temperature Measurement, Probe Number = 1, T = 20.038000 C 22:56:33 Temperature Measurement, Probe Number = 2, T = 20.106000 C 22:56:33 Temperature Measurement, Probe Number = 3, T = 20.048000 C 22:56:34 Temperature Measurement, Probe Number = 4, T = 20.096000 C 22:56:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.10 22:56:34 Integrated Voltage Measurement... 22:56:54 Voltage Offset Correction: v_off_ini = 0.000004151 V, v_off_fin = 0.000006498 V 22:56:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048171 Vs 22:56:54 Integrated Voltage Measurement... 22:57:14 Voltage Offset Correction: v_off_ini = 0.000006206 V, v_off_fin = 0.000003503 V 22:57:14 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170973601 Vs 22:57:17 Temperature Measurement, Probe Number = 0, T = 20.118000 C 22:57:17 Temperature Measurement, Probe Number = 1, T = 20.036000 C 22:57:18 Temperature Measurement, Probe Number = 2, T = 20.109000 C 22:57:19 Temperature Measurement, Probe Number = 3, T = 20.048000 C 22:57:19 Temperature Measurement, Probe Number = 4, T = 20.109000 C 22:57:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.11 22:57:20 Integrated Voltage Measurement... 22:57:39 Voltage Offset Correction: v_off_ini = 0.000004181 V, v_off_fin = 0.000006334 V 22:57:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044359 Vs 22:57:39 Integrated Voltage Measurement... 22:57:59 Voltage Offset Correction: v_off_ini = 0.000006169 V, v_off_fin = 0.000002162 V 22:57:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969692 Vs 22:58:02 Temperature Measurement, Probe Number = 0, T = 20.111000 C 22:58:02 Temperature Measurement, Probe Number = 1, T = 20.032000 C 22:58:03 Temperature Measurement, Probe Number = 2, T = 20.104000 C 22:58:04 Temperature Measurement, Probe Number = 3, T = 20.046000 C 22:58:04 Temperature Measurement, Probe Number = 4, T = 20.031000 C 22:58:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.03 22:58:04 Integrated Voltage Measurement... 22:58:24 Voltage Offset Correction: v_off_ini = 0.000004207 V, v_off_fin = 0.000005843 V 22:58:24 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171042381 Vs 22:58:24 Integrated Voltage Measurement... 22:58:43 Voltage Offset Correction: v_off_ini = 0.000005731 V, v_off_fin = 0.000002339 V 22:58:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974746 Vs 22:58:46 Temperature Measurement, Probe Number = 0, T = 20.119000 C 22:58:47 Temperature Measurement, Probe Number = 1, T = 20.039000 C 22:58:47 Temperature Measurement, Probe Number = 2, T = 20.113000 C 22:58:48 Temperature Measurement, Probe Number = 3, T = 20.054000 C 22:58:49 Temperature Measurement, Probe Number = 4, T = 20.180000 C 22:58:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.18 22:58:49 Integrated Voltage Measurement... 22:59:08 Voltage Offset Correction: v_off_ini = 0.000004099 V, v_off_fin = 0.000006328 V 22:59:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050518 Vs 22:59:08 Integrated Voltage Measurement... 22:59:28 Voltage Offset Correction: v_off_ini = 0.000005817 V, v_off_fin = 0.000003049 V 22:59:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967321 Vs 22:59:31 Temperature Measurement, Probe Number = 0, T = 20.117000 C 22:59:31 Temperature Measurement, Probe Number = 1, T = 20.036000 C 22:59:32 Temperature Measurement, Probe Number = 2, T = 20.111000 C 22:59:33 Temperature Measurement, Probe Number = 3, T = 20.049000 C 22:59:33 Temperature Measurement, Probe Number = 4, T = 20.225000 C 22:59:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.23 22:59:34 Integrated Voltage Measurement... 22:59:53 Voltage Offset Correction: v_off_ini = 0.000004461 V, v_off_fin = 0.000006821 V 22:59:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050019 Vs 22:59:53 Integrated Voltage Measurement... 23:00:13 Voltage Offset Correction: v_off_ini = 0.000006457 V, v_off_fin = 0.000003415 V 23:00:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967514 Vs 23:00:16 Temperature Measurement, Probe Number = 0, T = 20.114000 C 23:00:16 Temperature Measurement, Probe Number = 1, T = 20.035000 C 23:00:17 Temperature Measurement, Probe Number = 2, T = 20.107000 C 23:00:18 Temperature Measurement, Probe Number = 3, T = 20.048000 C 23:00:18 Temperature Measurement, Probe Number = 4, T = 20.223000 C 23:00:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.22 23:00:18 Integrated Voltage Measurement... 23:00:38 Voltage Offset Correction: v_off_ini = 0.000004284 V, v_off_fin = 0.000005989 V 23:00:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045122 Vs 23:00:39 Integrated Voltage Measurement... 23:00:58 Voltage Offset Correction: v_off_ini = 0.000005358 V, v_off_fin = 0.000002401 V 23:00:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973136 Vs 23:31:01 Temperature Measurement, Probe Number = 0, T = 20.105000 C 23:31:01 Temperature Measurement, Probe Number = 1, T = 20.027000 C 23:31:02 Temperature Measurement, Probe Number = 2, T = 20.102000 C 23:31:03 Temperature Measurement, Probe Number = 3, T = 20.045000 C 23:31:03 Temperature Measurement, Probe Number = 4, T = 20.213000 C 23:31:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.21 23:31:04 Integrated Voltage Measurement... 23:31:23 Voltage Offset Correction: v_off_ini = 0.000005529 V, v_off_fin = 0.000007089 V 23:31:23 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171105144 Vs 23:31:23 Integrated Voltage Measurement... 23:31:42 Voltage Offset Correction: v_off_ini = 0.000006177 V, v_off_fin = 0.000002916 V 23:31:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969047 Vs 23:31:45 Temperature Measurement, Probe Number = 0, T = 20.113000 C 23:31:46 Temperature Measurement, Probe Number = 1, T = 20.032000 C 23:31:47 Temperature Measurement, Probe Number = 2, T = 20.104000 C 23:31:47 Temperature Measurement, Probe Number = 3, T = 20.047000 C 23:31:48 Temperature Measurement, Probe Number = 4, T = 20.155000 C 23:31:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.16 23:31:48 Integrated Voltage Measurement... 23:32:07 Voltage Offset Correction: v_off_ini = 0.000003739 V, v_off_fin = 0.000006079 V 23:32:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036800 Vs 23:32:07 Integrated Voltage Measurement... 23:32:27 Voltage Offset Correction: v_off_ini = 0.000005888 V, v_off_fin = 0.000002361 V 23:32:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971143 Vs 23:32:30 Temperature Measurement, Probe Number = 0, T = 20.102000 C 23:32:30 Temperature Measurement, Probe Number = 1, T = 20.024000 C 23:32:31 Temperature Measurement, Probe Number = 2, T = 20.096000 C 23:32:32 Temperature Measurement, Probe Number = 3, T = 20.041000 C 23:32:32 Temperature Measurement, Probe Number = 4, T = 20.151000 C 23:32:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.15 23:32:33 Integrated Voltage Measurement... 23:32:52 Voltage Offset Correction: v_off_ini = 0.000003419 V, v_off_fin = 0.000006468 V 23:32:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035468 Vs 23:32:53 Integrated Voltage Measurement... 23:33:12 Voltage Offset Correction: v_off_ini = 0.000005912 V, v_off_fin = 0.000003264 V 23:33:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969397 Vs 23:33:15 Temperature Measurement, Probe Number = 0, T = 20.106000 C 23:33:15 Temperature Measurement, Probe Number = 1, T = 20.027000 C 23:33:16 Temperature Measurement, Probe Number = 2, T = 20.101000 C 23:33:17 Temperature Measurement, Probe Number = 3, T = 20.045000 C 23:33:17 Temperature Measurement, Probe Number = 4, T = 20.180000 C 23:33:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.18 23:33:18 Integrated Voltage Measurement... 23:33:37 Voltage Offset Correction: v_off_ini = 0.000003784 V, v_off_fin = 0.000006838 V 23:33:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040128 Vs 23:33:37 Integrated Voltage Measurement... 23:33:57 Voltage Offset Correction: v_off_ini = 0.000006000 V, v_off_fin = 0.000002600 V 23:33:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968985 Vs 23:34:00 Temperature Measurement, Probe Number = 0, T = 20.113000 C 23:34:00 Temperature Measurement, Probe Number = 1, T = 20.033000 C 23:34:01 Temperature Measurement, Probe Number = 2, T = 20.107000 C 23:34:02 Temperature Measurement, Probe Number = 3, T = 20.050000 C 23:34:02 Temperature Measurement, Probe Number = 4, T = 20.229000 C 23:34:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.23 23:34:02 Integrated Voltage Measurement... 23:34:22 Voltage Offset Correction: v_off_ini = 0.000003662 V, v_off_fin = 0.000006018 V 23:34:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036157 Vs 23:34:23 Integrated Voltage Measurement... 23:34:42 Voltage Offset Correction: v_off_ini = 0.000005572 V, v_off_fin = 0.000003151 V 23:34:42 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170968233 Vs 23:34:45 Temperature Measurement, Probe Number = 0, T = 20.113000 C 23:34:45 Temperature Measurement, Probe Number = 1, T = 20.032000 C 23:34:46 Temperature Measurement, Probe Number = 2, T = 20.108000 C 23:34:47 Temperature Measurement, Probe Number = 3, T = 20.049000 C 23:34:47 Temperature Measurement, Probe Number = 4, T = 20.306000 C 23:34:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.31 23:34:48 Integrated Voltage Measurement... 23:35:07 Voltage Offset Correction: v_off_ini = 0.000004226 V, v_off_fin = 0.000006173 V 23:35:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037996 Vs 23:35:07 Integrated Voltage Measurement... 23:35:26 Voltage Offset Correction: v_off_ini = 0.000005715 V, v_off_fin = 0.000002972 V 23:35:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969128 Vs 23:35:29 Temperature Measurement, Probe Number = 0, T = 20.111000 C 23:35:30 Temperature Measurement, Probe Number = 1, T = 20.031000 C 23:35:31 Temperature Measurement, Probe Number = 2, T = 20.105000 C 23:35:31 Temperature Measurement, Probe Number = 3, T = 20.048000 C 23:35:32 Temperature Measurement, Probe Number = 4, T = 20.261000 C 23:35:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.26 23:35:32 Integrated Voltage Measurement... 23:35:52 Voltage Offset Correction: v_off_ini = 0.000004067 V, v_off_fin = 0.000006282 V 23:35:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042077 Vs 23:35:52 Integrated Voltage Measurement... 23:36:12 Voltage Offset Correction: v_off_ini = 0.000005766 V, v_off_fin = 0.000002500 V 23:36:12 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170966133 Vs 23:36:14 Temperature Measurement, Probe Number = 0, T = 20.112000 C 23:36:15 Temperature Measurement, Probe Number = 1, T = 20.032000 C 23:36:16 Temperature Measurement, Probe Number = 2, T = 20.105000 C 23:36:16 Temperature Measurement, Probe Number = 3, T = 20.046000 C 23:36:17 Temperature Measurement, Probe Number = 4, T = 20.278000 C 23:36:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.28 23:36:17 Integrated Voltage Measurement... 23:36:37 Voltage Offset Correction: v_off_ini = 0.000003318 V, v_off_fin = 0.000005947 V 23:36:37 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171036493 Vs 23:36:38 Integrated Voltage Measurement... 23:36:57 Voltage Offset Correction: v_off_ini = 0.000005473 V, v_off_fin = 0.000002757 V 23:36:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968020 Vs 23:37:00 Temperature Measurement, Probe Number = 0, T = 20.110000 C 23:37:00 Temperature Measurement, Probe Number = 1, T = 20.033000 C 23:37:01 Temperature Measurement, Probe Number = 2, T = 20.105000 C 23:37:01 Temperature Measurement, Probe Number = 3, T = 20.047000 C 23:37:02 Temperature Measurement, Probe Number = 4, T = 20.357000 C 23:37:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.36 23:37:02 Integrated Voltage Measurement... 23:37:22 Voltage Offset Correction: v_off_ini = 0.000003460 V, v_off_fin = 0.000005892 V 23:37:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034041 Vs 23:37:22 Integrated Voltage Measurement... 23:37:41 Voltage Offset Correction: v_off_ini = 0.000005604 V, v_off_fin = 0.000002275 V 23:37:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973453 Vs 23:37:44 Temperature Measurement, Probe Number = 0, T = 20.114000 C 23:37:45 Temperature Measurement, Probe Number = 1, T = 20.038000 C 23:37:46 Temperature Measurement, Probe Number = 2, T = 20.109000 C 23:37:46 Temperature Measurement, Probe Number = 3, T = 20.050000 C 23:37:47 Temperature Measurement, Probe Number = 4, T = 20.392000 C 23:37:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.39 23:37:47 Integrated Voltage Measurement... 23:38:07 Voltage Offset Correction: v_off_ini = 0.000003554 V, v_off_fin = 0.000006155 V 23:38:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036438 Vs 23:38:07 Integrated Voltage Measurement... 23:38:26 Voltage Offset Correction: v_off_ini = 0.000005387 V, v_off_fin = 0.000002652 V 23:38:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970998 Vs 00:08:29 Temperature Measurement, Probe Number = 0, T = 20.112000 C 00:08:30 Temperature Measurement, Probe Number = 1, T = 20.036000 C 00:08:31 Temperature Measurement, Probe Number = 2, T = 20.107000 C 00:08:31 Temperature Measurement, Probe Number = 3, T = 20.052000 C 00:08:32 Temperature Measurement, Probe Number = 4, T = 20.327000 C 00:08:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.33 00:08:32 Integrated Voltage Measurement... 00:08:51 Voltage Offset Correction: v_off_ini = 0.000004730 V, v_off_fin = 0.000006937 V 00:08:52 Integrated Voltage Measurement Delta Gap = 0.0040018 m VT = 0.171101244 Vs 00:08:52 Integrated Voltage Measurement... 00:09:11 Voltage Offset Correction: v_off_ini = 0.000006105 V, v_off_fin = 0.000003567 V 00:09:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956459 Vs 00:09:14 Temperature Measurement, Probe Number = 0, T = 20.113000 C 00:09:15 Temperature Measurement, Probe Number = 1, T = 20.036000 C 00:09:16 Temperature Measurement, Probe Number = 2, T = 20.108000 C 00:09:16 Temperature Measurement, Probe Number = 3, T = 20.050000 C 00:09:17 Temperature Measurement, Probe Number = 4, T = 20.361000 C 00:09:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.36 00:09:17 Integrated Voltage Measurement... 00:09:36 Voltage Offset Correction: v_off_ini = 0.000004510 V, v_off_fin = 0.000006346 V 00:09:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030480 Vs 00:09:37 Integrated Voltage Measurement... 00:09:56 Voltage Offset Correction: v_off_ini = 0.000006247 V, v_off_fin = 0.000003220 V 00:09:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960213 Vs 00:09:58 Temperature Measurement, Probe Number = 0, T = 20.116000 C 00:09:59 Temperature Measurement, Probe Number = 1, T = 20.039000 C 00:10:00 Temperature Measurement, Probe Number = 2, T = 20.109000 C 00:10:00 Temperature Measurement, Probe Number = 3, T = 20.054000 C 00:10:01 Temperature Measurement, Probe Number = 4, T = 20.423000 C 00:10:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.42 00:10:01 Integrated Voltage Measurement... 00:10:21 Voltage Offset Correction: v_off_ini = 0.000004200 V, v_off_fin = 0.000006449 V 00:10:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035189 Vs 00:10:21 Integrated Voltage Measurement... 00:10:40 Voltage Offset Correction: v_off_ini = 0.000005854 V, v_off_fin = 0.000002854 V 00:10:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959370 Vs 00:10:43 Temperature Measurement, Probe Number = 0, T = 20.106000 C 00:10:44 Temperature Measurement, Probe Number = 1, T = 20.035000 C 00:10:45 Temperature Measurement, Probe Number = 2, T = 20.103000 C 00:10:45 Temperature Measurement, Probe Number = 3, T = 20.050000 C 00:10:46 Temperature Measurement, Probe Number = 4, T = 20.419000 C 00:10:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.42 00:10:46 Integrated Voltage Measurement... 00:11:06 Voltage Offset Correction: v_off_ini = 0.000004216 V, v_off_fin = 0.000005927 V 00:11:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031621 Vs 00:11:06 Integrated Voltage Measurement... 00:11:25 Voltage Offset Correction: v_off_ini = 0.000005463 V, v_off_fin = 0.000002233 V 00:11:26 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170961934 Vs 00:11:29 Temperature Measurement, Probe Number = 0, T = 20.112000 C 00:11:29 Temperature Measurement, Probe Number = 1, T = 20.035000 C 00:11:30 Temperature Measurement, Probe Number = 2, T = 20.109000 C 00:11:30 Temperature Measurement, Probe Number = 3, T = 20.052000 C 00:11:31 Temperature Measurement, Probe Number = 4, T = 20.343000 C 00:11:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.34 00:11:31 Integrated Voltage Measurement... 00:11:51 Voltage Offset Correction: v_off_ini = 0.000003804 V, v_off_fin = 0.000006283 V 00:11:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033865 Vs 00:11:51 Integrated Voltage Measurement... 00:12:11 Voltage Offset Correction: v_off_ini = 0.000005999 V, v_off_fin = 0.000002939 V 00:12:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955653 Vs 00:12:14 Temperature Measurement, Probe Number = 0, T = 20.118000 C 00:12:14 Temperature Measurement, Probe Number = 1, T = 20.040000 C 00:12:15 Temperature Measurement, Probe Number = 2, T = 20.110000 C 00:12:16 Temperature Measurement, Probe Number = 3, T = 20.054000 C 00:12:16 Temperature Measurement, Probe Number = 4, T = 20.255000 C 00:12:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.25 00:12:17 Integrated Voltage Measurement... 00:12:36 Voltage Offset Correction: v_off_ini = 0.000004448 V, v_off_fin = 0.000006447 V 00:12:36 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171024684 Vs 00:12:36 Integrated Voltage Measurement... 00:12:56 Voltage Offset Correction: v_off_ini = 0.000006030 V, v_off_fin = 0.000002215 V 00:12:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958557 Vs 00:12:59 Temperature Measurement, Probe Number = 0, T = 20.120000 C 00:12:59 Temperature Measurement, Probe Number = 1, T = 20.042000 C 00:13:00 Temperature Measurement, Probe Number = 2, T = 20.114000 C 00:13:01 Temperature Measurement, Probe Number = 3, T = 20.056000 C 00:13:01 Temperature Measurement, Probe Number = 4, T = 20.364000 C 00:13:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.36 00:13:01 Integrated Voltage Measurement... 00:13:21 Voltage Offset Correction: v_off_ini = 0.000004280 V, v_off_fin = 0.000006201 V 00:13:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028086 Vs 00:13:21 Integrated Voltage Measurement... 00:13:40 Voltage Offset Correction: v_off_ini = 0.000005631 V, v_off_fin = 0.000002645 V 00:13:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961091 Vs 00:13:43 Temperature Measurement, Probe Number = 0, T = 20.119000 C 00:13:44 Temperature Measurement, Probe Number = 1, T = 20.040000 C 00:13:44 Temperature Measurement, Probe Number = 2, T = 20.115000 C 00:13:45 Temperature Measurement, Probe Number = 3, T = 20.054000 C 00:13:46 Temperature Measurement, Probe Number = 4, T = 20.398000 C 00:13:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.40 00:13:46 Integrated Voltage Measurement... 00:14:06 Voltage Offset Correction: v_off_ini = 0.000004216 V, v_off_fin = 0.000005854 V 00:14:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033276 Vs 00:14:07 Integrated Voltage Measurement... 00:14:26 Voltage Offset Correction: v_off_ini = 0.000005724 V, v_off_fin = 0.000002852 V 00:14:26 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170958137 Vs 00:14:29 Temperature Measurement, Probe Number = 0, T = 20.117000 C 00:14:30 Temperature Measurement, Probe Number = 1, T = 20.041000 C 00:14:30 Temperature Measurement, Probe Number = 2, T = 20.110000 C 00:14:31 Temperature Measurement, Probe Number = 3, T = 20.055000 C 00:14:32 Temperature Measurement, Probe Number = 4, T = 20.401000 C 00:14:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.40 00:14:32 Integrated Voltage Measurement... 00:14:51 Voltage Offset Correction: v_off_ini = 0.000003928 V, v_off_fin = 0.000007231 V 00:14:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036772 Vs 00:14:51 Integrated Voltage Measurement... 00:15:11 Voltage Offset Correction: v_off_ini = 0.000006630 V, v_off_fin = 0.000003930 V 00:15:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953796 Vs 00:15:14 Temperature Measurement, Probe Number = 0, T = 20.119000 C 00:15:14 Temperature Measurement, Probe Number = 1, T = 20.042000 C 00:15:15 Temperature Measurement, Probe Number = 2, T = 20.113000 C 00:15:16 Temperature Measurement, Probe Number = 3, T = 20.056000 C 00:15:16 Temperature Measurement, Probe Number = 4, T = 20.435000 C 00:15:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.43 00:15:16 Integrated Voltage Measurement... 00:15:36 Voltage Offset Correction: v_off_ini = 0.000004929 V, v_off_fin = 0.000006692 V 00:15:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037022 Vs 00:15:36 Integrated Voltage Measurement... 00:15:55 Voltage Offset Correction: v_off_ini = 0.000006436 V, v_off_fin = 0.000003243 V 00:15:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170953706 Vs 00:45:58 Temperature Measurement, Probe Number = 0, T = 20.115000 C 00:45:59 Temperature Measurement, Probe Number = 1, T = 20.035000 C 00:46:00 Temperature Measurement, Probe Number = 2, T = 20.110000 C 00:46:00 Temperature Measurement, Probe Number = 3, T = 20.051000 C 00:46:01 Temperature Measurement, Probe Number = 4, T = 20.290000 C 00:46:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.29 00:46:01 Integrated Voltage Measurement... 00:46:21 Voltage Offset Correction: v_off_ini = 0.000005922 V, v_off_fin = 0.000007187 V 00:46:21 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171090685 Vs 00:46:21 Integrated Voltage Measurement... 00:46:41 Voltage Offset Correction: v_off_ini = 0.000006169 V, v_off_fin = 0.000002879 V 00:46:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961966 Vs 00:46:44 Temperature Measurement, Probe Number = 0, T = 20.116000 C 00:46:44 Temperature Measurement, Probe Number = 1, T = 20.035000 C 00:46:45 Temperature Measurement, Probe Number = 2, T = 20.108000 C 00:46:46 Temperature Measurement, Probe Number = 3, T = 20.047000 C 00:46:46 Temperature Measurement, Probe Number = 4, T = 20.183000 C 00:46:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.18 00:46:46 Integrated Voltage Measurement... 00:47:06 Voltage Offset Correction: v_off_ini = 0.000004417 V, v_off_fin = 0.000006763 V 00:47:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037099 Vs 00:47:06 Integrated Voltage Measurement... 00:47:26 Voltage Offset Correction: v_off_ini = 0.000006098 V, v_off_fin = 0.000002550 V 00:47:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966639 Vs 00:47:29 Temperature Measurement, Probe Number = 0, T = 20.121000 C 00:47:29 Temperature Measurement, Probe Number = 1, T = 20.041000 C 00:47:30 Temperature Measurement, Probe Number = 2, T = 20.115000 C 00:47:30 Temperature Measurement, Probe Number = 3, T = 20.056000 C 00:47:31 Temperature Measurement, Probe Number = 4, T = 20.259000 C 00:47:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.26 00:47:31 Integrated Voltage Measurement... 00:47:51 Voltage Offset Correction: v_off_ini = 0.000004382 V, v_off_fin = 0.000006573 V 00:47:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034701 Vs 00:47:51 Integrated Voltage Measurement... 00:48:10 Voltage Offset Correction: v_off_ini = 0.000006016 V, v_off_fin = 0.000003144 V 00:48:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961694 Vs 00:48:13 Temperature Measurement, Probe Number = 0, T = 20.122000 C 00:48:14 Temperature Measurement, Probe Number = 1, T = 20.041000 C 00:48:14 Temperature Measurement, Probe Number = 2, T = 20.116000 C 00:48:15 Temperature Measurement, Probe Number = 3, T = 20.055000 C 00:48:16 Temperature Measurement, Probe Number = 4, T = 20.314000 C 00:48:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.31 00:48:16 Integrated Voltage Measurement... 00:48:35 Voltage Offset Correction: v_off_ini = 0.000003840 V, v_off_fin = 0.000005853 V 00:48:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171032007 Vs 00:48:36 Integrated Voltage Measurement... 00:48:55 Voltage Offset Correction: v_off_ini = 0.000005986 V, v_off_fin = 0.000002748 V 00:48:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965560 Vs 00:48:58 Temperature Measurement, Probe Number = 0, T = 20.124000 C 00:48:58 Temperature Measurement, Probe Number = 1, T = 20.042000 C 00:48:59 Temperature Measurement, Probe Number = 2, T = 20.119000 C 00:49:00 Temperature Measurement, Probe Number = 3, T = 20.057000 C 00:49:00 Temperature Measurement, Probe Number = 4, T = 20.407000 C 00:49:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.41 00:49:01 Integrated Voltage Measurement... 00:49:21 Voltage Offset Correction: v_off_ini = 0.000004256 V, v_off_fin = 0.000006466 V 00:49:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036393 Vs 00:49:21 Integrated Voltage Measurement... 00:49:40 Voltage Offset Correction: v_off_ini = 0.000005694 V, v_off_fin = 0.000003433 V 00:49:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961412 Vs 00:49:43 Temperature Measurement, Probe Number = 0, T = 20.117000 C 00:49:44 Temperature Measurement, Probe Number = 1, T = 20.035000 C 00:49:45 Temperature Measurement, Probe Number = 2, T = 20.110000 C 00:49:45 Temperature Measurement, Probe Number = 3, T = 20.051000 C 00:49:46 Temperature Measurement, Probe Number = 4, T = 20.483000 C 00:49:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.48 00:49:46 Integrated Voltage Measurement... 00:50:05 Voltage Offset Correction: v_off_ini = 0.000004518 V, v_off_fin = 0.000005979 V 00:50:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035073 Vs 00:50:06 Integrated Voltage Measurement... 00:50:25 Voltage Offset Correction: v_off_ini = 0.000005768 V, v_off_fin = 0.000003359 V 00:50:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962569 Vs 00:50:28 Temperature Measurement, Probe Number = 0, T = 20.113000 C 00:50:29 Temperature Measurement, Probe Number = 1, T = 20.036000 C 00:50:30 Temperature Measurement, Probe Number = 2, T = 20.106000 C 00:50:30 Temperature Measurement, Probe Number = 3, T = 20.049000 C 00:50:31 Temperature Measurement, Probe Number = 4, T = 20.375000 C 00:50:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.38 00:50:31 Integrated Voltage Measurement... 00:50:50 Voltage Offset Correction: v_off_ini = 0.000004593 V, v_off_fin = 0.000006409 V 00:50:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035374 Vs 00:50:51 Integrated Voltage Measurement... 00:51:09 Voltage Offset Correction: v_off_ini = 0.000005868 V, v_off_fin = 0.000002512 V 00:51:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965897 Vs 00:51:12 Temperature Measurement, Probe Number = 0, T = 20.122000 C 00:51:13 Temperature Measurement, Probe Number = 1, T = 20.042000 C 00:51:14 Temperature Measurement, Probe Number = 2, T = 20.117000 C 00:51:14 Temperature Measurement, Probe Number = 3, T = 20.058000 C 00:51:15 Temperature Measurement, Probe Number = 4, T = 20.473000 C 00:51:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.47 00:51:15 Integrated Voltage Measurement... 00:51:34 Voltage Offset Correction: v_off_ini = 0.000003700 V, v_off_fin = 0.000006810 V 00:51:35 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171037005 Vs 00:51:35 Integrated Voltage Measurement... 00:51:54 Voltage Offset Correction: v_off_ini = 0.000006350 V, v_off_fin = 0.000003164 V 00:51:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964031 Vs 00:51:57 Temperature Measurement, Probe Number = 0, T = 20.122000 C 00:51:58 Temperature Measurement, Probe Number = 1, T = 20.041000 C 00:51:58 Temperature Measurement, Probe Number = 2, T = 20.115000 C 00:51:59 Temperature Measurement, Probe Number = 3, T = 20.055000 C 00:52:00 Temperature Measurement, Probe Number = 4, T = 20.524000 C 00:52:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.52 00:52:00 Integrated Voltage Measurement... 00:52:19 Voltage Offset Correction: v_off_ini = 0.000004739 V, v_off_fin = 0.000006151 V 00:52:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030730 Vs 00:52:20 Integrated Voltage Measurement... 00:52:38 Voltage Offset Correction: v_off_ini = 0.000006328 V, v_off_fin = 0.000002730 V 00:52:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962322 Vs 00:52:41 Temperature Measurement, Probe Number = 0, T = 20.123000 C 00:52:42 Temperature Measurement, Probe Number = 1, T = 20.043000 C 00:52:43 Temperature Measurement, Probe Number = 2, T = 20.118000 C 00:52:43 Temperature Measurement, Probe Number = 3, T = 20.059000 C 00:52:44 Temperature Measurement, Probe Number = 4, T = 20.609000 C 00:52:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.61 00:52:44 Integrated Voltage Measurement... 00:53:03 Voltage Offset Correction: v_off_ini = 0.000003751 V, v_off_fin = 0.000006365 V 00:53:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035021 Vs 00:53:04 Integrated Voltage Measurement... 00:53:23 Voltage Offset Correction: v_off_ini = 0.000005988 V, v_off_fin = 0.000003277 V 00:53:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961235 Vs 01:23:26 Temperature Measurement, Probe Number = 0, T = 20.121000 C 01:23:26 Temperature Measurement, Probe Number = 1, T = 20.038000 C 01:23:27 Temperature Measurement, Probe Number = 2, T = 20.114000 C 01:23:28 Temperature Measurement, Probe Number = 3, T = 20.052000 C 01:23:28 Temperature Measurement, Probe Number = 4, T = 20.508000 C 01:23:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.51 01:23:28 Integrated Voltage Measurement... 01:23:48 Voltage Offset Correction: v_off_ini = 0.000005059 V, v_off_fin = 0.000006814 V 01:23:48 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171082435 Vs 01:23:48 Integrated Voltage Measurement... 01:24:07 Voltage Offset Correction: v_off_ini = 0.000006007 V, v_off_fin = 0.000002576 V 01:24:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963705 Vs 01:24:10 Temperature Measurement, Probe Number = 0, T = 20.115000 C 01:24:10 Temperature Measurement, Probe Number = 1, T = 20.033000 C 01:24:11 Temperature Measurement, Probe Number = 2, T = 20.108000 C 01:24:12 Temperature Measurement, Probe Number = 3, T = 20.048000 C 01:24:12 Temperature Measurement, Probe Number = 4, T = 20.424000 C 01:24:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.42 01:24:13 Integrated Voltage Measurement... 01:24:32 Voltage Offset Correction: v_off_ini = 0.000003588 V, v_off_fin = 0.000005914 V 01:24:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171018588 Vs 01:24:32 Integrated Voltage Measurement... 01:24:51 Voltage Offset Correction: v_off_ini = 0.000005496 V, v_off_fin = 0.000002438 V 01:24:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964864 Vs 01:24:54 Temperature Measurement, Probe Number = 0, T = 20.122000 C 01:24:55 Temperature Measurement, Probe Number = 1, T = 20.041000 C 01:24:56 Temperature Measurement, Probe Number = 2, T = 20.110000 C 01:24:56 Temperature Measurement, Probe Number = 3, T = 20.052000 C 01:24:57 Temperature Measurement, Probe Number = 4, T = 20.340000 C 01:24:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.34 01:24:57 Integrated Voltage Measurement... 01:25:16 Voltage Offset Correction: v_off_ini = 0.000004101 V, v_off_fin = 0.000006283 V 01:25:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023038 Vs 01:25:17 Integrated Voltage Measurement... 01:25:37 Voltage Offset Correction: v_off_ini = 0.000005775 V, v_off_fin = 0.000003098 V 01:25:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964156 Vs 01:25:39 Temperature Measurement, Probe Number = 0, T = 20.122000 C 01:25:40 Temperature Measurement, Probe Number = 1, T = 20.041000 C 01:25:41 Temperature Measurement, Probe Number = 2, T = 20.113000 C 01:25:41 Temperature Measurement, Probe Number = 3, T = 20.054000 C 01:25:42 Temperature Measurement, Probe Number = 4, T = 20.429000 C 01:25:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.43 01:25:42 Integrated Voltage Measurement... 01:26:02 Voltage Offset Correction: v_off_ini = 0.000004329 V, v_off_fin = 0.000005985 V 01:26:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017983 Vs 01:26:02 Integrated Voltage Measurement... 01:26:21 Voltage Offset Correction: v_off_ini = 0.000005256 V, v_off_fin = 0.000002743 V 01:26:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963592 Vs 01:26:24 Temperature Measurement, Probe Number = 0, T = 20.126000 C 01:26:25 Temperature Measurement, Probe Number = 1, T = 20.046000 C 01:26:26 Temperature Measurement, Probe Number = 2, T = 20.115000 C 01:26:26 Temperature Measurement, Probe Number = 3, T = 20.056000 C 01:26:27 Temperature Measurement, Probe Number = 4, T = 20.407000 C 01:26:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.41 01:26:27 Integrated Voltage Measurement... 01:26:47 Voltage Offset Correction: v_off_ini = 0.000004267 V, v_off_fin = 0.000006664 V 01:26:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029938 Vs 01:26:47 Integrated Voltage Measurement... 01:27:07 Voltage Offset Correction: v_off_ini = 0.000005525 V, v_off_fin = 0.000003175 V 01:27:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960083 Vs 01:27:09 Temperature Measurement, Probe Number = 0, T = 20.124000 C 01:27:10 Temperature Measurement, Probe Number = 1, T = 20.042000 C 01:27:11 Temperature Measurement, Probe Number = 2, T = 20.115000 C 01:27:12 Temperature Measurement, Probe Number = 3, T = 20.057000 C 01:27:12 Temperature Measurement, Probe Number = 4, T = 20.420000 C 01:27:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.42 01:27:12 Integrated Voltage Measurement... 01:27:32 Voltage Offset Correction: v_off_ini = 0.000004293 V, v_off_fin = 0.000006463 V 01:27:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028002 Vs 01:27:32 Integrated Voltage Measurement... 01:27:51 Voltage Offset Correction: v_off_ini = 0.000006044 V, v_off_fin = 0.000003300 V 01:27:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960298 Vs 01:27:54 Temperature Measurement, Probe Number = 0, T = 20.123000 C 01:27:55 Temperature Measurement, Probe Number = 1, T = 20.040000 C 01:27:56 Temperature Measurement, Probe Number = 2, T = 20.113000 C 01:27:56 Temperature Measurement, Probe Number = 3, T = 20.056000 C 01:27:57 Temperature Measurement, Probe Number = 4, T = 20.493000 C 01:27:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.49 01:27:57 Integrated Voltage Measurement... 01:28:17 Voltage Offset Correction: v_off_ini = 0.000004325 V, v_off_fin = 0.000006630 V 01:28:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029027 Vs 01:28:17 Integrated Voltage Measurement... 01:28:37 Voltage Offset Correction: v_off_ini = 0.000005702 V, v_off_fin = 0.000003629 V 01:28:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959419 Vs 01:28:39 Temperature Measurement, Probe Number = 0, T = 20.124000 C 01:28:40 Temperature Measurement, Probe Number = 1, T = 20.040000 C 01:28:41 Temperature Measurement, Probe Number = 2, T = 20.113000 C 01:28:41 Temperature Measurement, Probe Number = 3, T = 20.053000 C 01:28:42 Temperature Measurement, Probe Number = 4, T = 20.471000 C 01:28:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.47 01:28:42 Integrated Voltage Measurement... 01:29:02 Voltage Offset Correction: v_off_ini = 0.000004104 V, v_off_fin = 0.000006609 V 01:29:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031643 Vs 01:29:02 Integrated Voltage Measurement... 01:29:22 Voltage Offset Correction: v_off_ini = 0.000006169 V, v_off_fin = 0.000003405 V 01:29:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959345 Vs 01:29:24 Temperature Measurement, Probe Number = 0, T = 20.123000 C 01:29:25 Temperature Measurement, Probe Number = 1, T = 20.040000 C 01:29:26 Temperature Measurement, Probe Number = 2, T = 20.114000 C 01:29:26 Temperature Measurement, Probe Number = 3, T = 20.052000 C 01:29:27 Temperature Measurement, Probe Number = 4, T = 20.392000 C 01:29:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.39 01:29:27 Integrated Voltage Measurement... 01:29:47 Voltage Offset Correction: v_off_ini = 0.000004524 V, v_off_fin = 0.000006580 V 01:29:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030468 Vs 01:29:47 Integrated Voltage Measurement... 01:30:06 Voltage Offset Correction: v_off_ini = 0.000005856 V, v_off_fin = 0.000003083 V 01:30:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958239 Vs 01:30:09 Temperature Measurement, Probe Number = 0, T = 20.121000 C 01:30:10 Temperature Measurement, Probe Number = 1, T = 20.040000 C 01:30:11 Temperature Measurement, Probe Number = 2, T = 20.114000 C 01:30:11 Temperature Measurement, Probe Number = 3, T = 20.055000 C 01:30:12 Temperature Measurement, Probe Number = 4, T = 20.420000 C 01:30:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.42 01:30:12 Integrated Voltage Measurement... 01:30:31 Voltage Offset Correction: v_off_ini = 0.000004120 V, v_off_fin = 0.000006717 V 01:30:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171027229 Vs 01:30:32 Integrated Voltage Measurement... 01:30:51 Voltage Offset Correction: v_off_ini = 0.000005864 V, v_off_fin = 0.000003394 V 01:30:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959677 Vs 02:00:54 Temperature Measurement, Probe Number = 0, T = 20.113000 C 02:00:54 Temperature Measurement, Probe Number = 1, T = 20.036000 C 02:00:55 Temperature Measurement, Probe Number = 2, T = 20.103000 C 02:00:56 Temperature Measurement, Probe Number = 3, T = 20.045000 C 02:00:56 Temperature Measurement, Probe Number = 4, T = 20.260000 C 02:00:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.26 02:00:57 Integrated Voltage Measurement... 02:01:16 Voltage Offset Correction: v_off_ini = 0.000004579 V, v_off_fin = 0.000006346 V 02:01:17 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171073878 Vs 02:01:17 Integrated Voltage Measurement... 02:01:36 Voltage Offset Correction: v_off_ini = 0.000005677 V, v_off_fin = 0.000003329 V 02:01:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960714 Vs 02:01:39 Temperature Measurement, Probe Number = 0, T = 20.123000 C 02:01:39 Temperature Measurement, Probe Number = 1, T = 20.041000 C 02:01:40 Temperature Measurement, Probe Number = 2, T = 20.113000 C 02:01:41 Temperature Measurement, Probe Number = 3, T = 20.051000 C 02:01:41 Temperature Measurement, Probe Number = 4, T = 20.294000 C 02:01:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.29 02:01:42 Integrated Voltage Measurement... 02:02:01 Voltage Offset Correction: v_off_ini = 0.000003552 V, v_off_fin = 0.000006055 V 02:02:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171027704 Vs 02:02:01 Integrated Voltage Measurement... 02:02:21 Voltage Offset Correction: v_off_ini = 0.000005652 V, v_off_fin = 0.000002952 V 02:02:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965038 Vs 02:02:24 Temperature Measurement, Probe Number = 0, T = 20.119000 C 02:02:24 Temperature Measurement, Probe Number = 1, T = 20.036000 C 02:02:25 Temperature Measurement, Probe Number = 2, T = 20.110000 C 02:02:26 Temperature Measurement, Probe Number = 3, T = 20.047000 C 02:02:26 Temperature Measurement, Probe Number = 4, T = 20.433000 C 02:02:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.43 02:02:26 Integrated Voltage Measurement... 02:02:46 Voltage Offset Correction: v_off_ini = 0.000003875 V, v_off_fin = 0.000006483 V 02:02:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028651 Vs 02:02:46 Integrated Voltage Measurement... 02:03:05 Voltage Offset Correction: v_off_ini = 0.000005752 V, v_off_fin = 0.000001803 V 02:03:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961845 Vs 02:03:08 Temperature Measurement, Probe Number = 0, T = 20.120000 C 02:03:09 Temperature Measurement, Probe Number = 1, T = 20.042000 C 02:03:09 Temperature Measurement, Probe Number = 2, T = 20.109000 C 02:03:10 Temperature Measurement, Probe Number = 3, T = 20.052000 C 02:03:11 Temperature Measurement, Probe Number = 4, T = 20.419000 C 02:03:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.42 02:03:11 Integrated Voltage Measurement... 02:03:30 Voltage Offset Correction: v_off_ini = 0.000004093 V, v_off_fin = 0.000006119 V 02:03:30 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171030821 Vs 02:03:30 Integrated Voltage Measurement... 02:03:49 Voltage Offset Correction: v_off_ini = 0.000005772 V, v_off_fin = 0.000002455 V 02:03:49 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170962536 Vs 02:03:52 Temperature Measurement, Probe Number = 0, T = 20.123000 C 02:03:53 Temperature Measurement, Probe Number = 1, T = 20.042000 C 02:03:54 Temperature Measurement, Probe Number = 2, T = 20.114000 C 02:03:54 Temperature Measurement, Probe Number = 3, T = 20.053000 C 02:03:55 Temperature Measurement, Probe Number = 4, T = 20.479000 C 02:03:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.48 02:03:55 Integrated Voltage Measurement... 02:04:14 Voltage Offset Correction: v_off_ini = 0.000004164 V, v_off_fin = 0.000006379 V 02:04:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030195 Vs 02:04:15 Integrated Voltage Measurement... 02:04:34 Voltage Offset Correction: v_off_ini = 0.000005761 V, v_off_fin = 0.000002623 V 02:04:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964123 Vs 02:04:37 Temperature Measurement, Probe Number = 0, T = 20.121000 C 02:04:37 Temperature Measurement, Probe Number = 1, T = 20.039000 C 02:04:38 Temperature Measurement, Probe Number = 2, T = 20.105000 C 02:04:39 Temperature Measurement, Probe Number = 3, T = 20.045000 C 02:04:39 Temperature Measurement, Probe Number = 4, T = 20.500000 C 02:04:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.50 02:04:40 Integrated Voltage Measurement... 02:04:59 Voltage Offset Correction: v_off_ini = 0.000003758 V, v_off_fin = 0.000006161 V 02:05:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033192 Vs 02:05:00 Integrated Voltage Measurement... 02:05:19 Voltage Offset Correction: v_off_ini = 0.000005613 V, v_off_fin = 0.000002620 V 02:05:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969162 Vs 02:05:22 Temperature Measurement, Probe Number = 0, T = 20.122000 C 02:05:23 Temperature Measurement, Probe Number = 1, T = 20.042000 C 02:05:23 Temperature Measurement, Probe Number = 2, T = 20.111000 C 02:05:24 Temperature Measurement, Probe Number = 3, T = 20.051000 C 02:05:25 Temperature Measurement, Probe Number = 4, T = 20.529000 C 02:05:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.53 02:05:25 Integrated Voltage Measurement... 02:05:44 Voltage Offset Correction: v_off_ini = 0.000003815 V, v_off_fin = 0.000006366 V 02:05:44 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171036230 Vs 02:05:44 Integrated Voltage Measurement... 02:06:03 Voltage Offset Correction: v_off_ini = 0.000005833 V, v_off_fin = 0.000002290 V 02:06:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965747 Vs 02:06:06 Temperature Measurement, Probe Number = 0, T = 20.119000 C 02:06:07 Temperature Measurement, Probe Number = 1, T = 20.041000 C 02:06:08 Temperature Measurement, Probe Number = 2, T = 20.106000 C 02:06:08 Temperature Measurement, Probe Number = 3, T = 20.048000 C 02:06:09 Temperature Measurement, Probe Number = 4, T = 20.394000 C 02:06:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.39 02:06:09 Integrated Voltage Measurement... 02:06:28 Voltage Offset Correction: v_off_ini = 0.000003433 V, v_off_fin = 0.000006213 V 02:06:29 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171030972 Vs 02:06:29 Integrated Voltage Measurement... 02:06:48 Voltage Offset Correction: v_off_ini = 0.000005548 V, v_off_fin = 0.000002695 V 02:06:48 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170961666 Vs 02:06:51 Temperature Measurement, Probe Number = 0, T = 20.122000 C 02:06:52 Temperature Measurement, Probe Number = 1, T = 20.043000 C 02:06:52 Temperature Measurement, Probe Number = 2, T = 20.109000 C 02:06:53 Temperature Measurement, Probe Number = 3, T = 20.050000 C 02:06:54 Temperature Measurement, Probe Number = 4, T = 20.371000 C 02:06:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.37 02:06:54 Integrated Voltage Measurement... 02:07:13 Voltage Offset Correction: v_off_ini = 0.000003836 V, v_off_fin = 0.000006380 V 02:07:13 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171031728 Vs 02:07:14 Integrated Voltage Measurement... 02:07:33 Voltage Offset Correction: v_off_ini = 0.000005810 V, v_off_fin = 0.000002542 V 02:07:33 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170960430 Vs 02:07:36 Temperature Measurement, Probe Number = 0, T = 20.120000 C 02:07:36 Temperature Measurement, Probe Number = 1, T = 20.040000 C 02:07:37 Temperature Measurement, Probe Number = 2, T = 20.108000 C 02:07:38 Temperature Measurement, Probe Number = 3, T = 20.050000 C 02:07:38 Temperature Measurement, Probe Number = 4, T = 20.446000 C 02:07:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.45 02:07:38 Integrated Voltage Measurement... 02:07:58 Voltage Offset Correction: v_off_ini = 0.000003742 V, v_off_fin = 0.000006557 V 02:07:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034872 Vs 02:07:58 Integrated Voltage Measurement... 02:08:17 Voltage Offset Correction: v_off_ini = 0.000006047 V, v_off_fin = 0.000002571 V 02:08:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170957402 Vs 02:38:20 Temperature Measurement, Probe Number = 0, T = 20.123000 C 02:38:21 Temperature Measurement, Probe Number = 1, T = 20.046000 C 02:38:22 Temperature Measurement, Probe Number = 2, T = 20.111000 C 02:38:22 Temperature Measurement, Probe Number = 3, T = 20.055000 C 02:38:23 Temperature Measurement, Probe Number = 4, T = 20.420000 C 02:38:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.42 02:38:23 Integrated Voltage Measurement... 02:38:42 Voltage Offset Correction: v_off_ini = 0.000004776 V, v_off_fin = 0.000006034 V 02:38:43 Integrated Voltage Measurement Delta Gap = 0.0040018 m VT = 0.171089571 Vs 02:38:43 Integrated Voltage Measurement... 02:39:02 Voltage Offset Correction: v_off_ini = 0.000005488 V, v_off_fin = 0.000002030 V 02:39:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960310 Vs 02:39:05 Temperature Measurement, Probe Number = 0, T = 20.126000 C 02:39:06 Temperature Measurement, Probe Number = 1, T = 20.047000 C 02:39:06 Temperature Measurement, Probe Number = 2, T = 20.113000 C 02:39:07 Temperature Measurement, Probe Number = 3, T = 20.056000 C 02:39:08 Temperature Measurement, Probe Number = 4, T = 20.462000 C 02:39:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.46 02:39:08 Integrated Voltage Measurement... 02:39:28 Voltage Offset Correction: v_off_ini = 0.000003365 V, v_off_fin = 0.000005621 V 02:39:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171015176 Vs 02:39:28 Integrated Voltage Measurement... 02:39:47 Voltage Offset Correction: v_off_ini = 0.000005299 V, v_off_fin = 0.000002409 V 02:39:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959187 Vs 02:39:50 Temperature Measurement, Probe Number = 0, T = 20.126000 C 02:39:51 Temperature Measurement, Probe Number = 1, T = 20.050000 C 02:39:52 Temperature Measurement, Probe Number = 2, T = 20.112000 C 02:39:52 Temperature Measurement, Probe Number = 3, T = 20.057000 C 02:39:53 Temperature Measurement, Probe Number = 4, T = 20.460000 C 02:39:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.46 02:39:53 Integrated Voltage Measurement... 02:40:12 Voltage Offset Correction: v_off_ini = 0.000003584 V, v_off_fin = 0.000006166 V 02:40:13 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171016727 Vs 02:40:13 Integrated Voltage Measurement... 02:40:32 Voltage Offset Correction: v_off_ini = 0.000005677 V, v_off_fin = 0.000002815 V 02:40:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958674 Vs 02:40:35 Temperature Measurement, Probe Number = 0, T = 20.125000 C 02:40:36 Temperature Measurement, Probe Number = 1, T = 20.046000 C 02:40:37 Temperature Measurement, Probe Number = 2, T = 20.110000 C 02:40:37 Temperature Measurement, Probe Number = 3, T = 20.056000 C 02:40:38 Temperature Measurement, Probe Number = 4, T = 20.538000 C 02:40:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.54 02:40:38 Integrated Voltage Measurement... 02:40:57 Voltage Offset Correction: v_off_ini = 0.000003655 V, v_off_fin = 0.000005429 V 02:40:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171015902 Vs 02:40:58 Integrated Voltage Measurement... 02:41:17 Voltage Offset Correction: v_off_ini = 0.000005217 V, v_off_fin = 0.000002561 V 02:41:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962468 Vs 02:41:20 Temperature Measurement, Probe Number = 0, T = 20.124000 C 02:41:21 Temperature Measurement, Probe Number = 1, T = 20.045000 C 02:41:21 Temperature Measurement, Probe Number = 2, T = 20.112000 C 02:41:22 Temperature Measurement, Probe Number = 3, T = 20.055000 C 02:41:23 Temperature Measurement, Probe Number = 4, T = 20.559000 C 02:41:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.56 02:41:23 Integrated Voltage Measurement... 02:41:42 Voltage Offset Correction: v_off_ini = 0.000002993 V, v_off_fin = 0.000005845 V 02:41:43 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171015720 Vs 02:41:43 Integrated Voltage Measurement... 02:42:02 Voltage Offset Correction: v_off_ini = 0.000005408 V, v_off_fin = 0.000002149 V 02:42:02 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170961853 Vs 02:42:05 Temperature Measurement, Probe Number = 0, T = 20.130000 C 02:42:06 Temperature Measurement, Probe Number = 1, T = 20.051000 C 02:42:06 Temperature Measurement, Probe Number = 2, T = 20.117000 C 02:42:07 Temperature Measurement, Probe Number = 3, T = 20.060000 C 02:42:08 Temperature Measurement, Probe Number = 4, T = 20.652000 C 02:42:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.65 02:42:08 Integrated Voltage Measurement... 02:42:28 Voltage Offset Correction: v_off_ini = 0.000003749 V, v_off_fin = 0.000006371 V 02:42:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171021857 Vs 02:42:28 Integrated Voltage Measurement... 02:42:47 Voltage Offset Correction: v_off_ini = 0.000005317 V, v_off_fin = 0.000002082 V 02:42:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170956267 Vs 02:42:50 Temperature Measurement, Probe Number = 0, T = 20.127000 C 02:42:51 Temperature Measurement, Probe Number = 1, T = 20.052000 C 02:42:52 Temperature Measurement, Probe Number = 2, T = 20.115000 C 02:42:52 Temperature Measurement, Probe Number = 3, T = 20.059000 C 02:42:53 Temperature Measurement, Probe Number = 4, T = 20.624000 C 02:42:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.62 02:42:53 Integrated Voltage Measurement... 02:43:13 Voltage Offset Correction: v_off_ini = 0.000003960 V, v_off_fin = 0.000006342 V 02:43:13 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171023765 Vs 02:43:13 Integrated Voltage Measurement... 02:43:32 Voltage Offset Correction: v_off_ini = 0.000005542 V, v_off_fin = 0.000002334 V 02:43:33 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170963560 Vs 02:43:35 Temperature Measurement, Probe Number = 0, T = 20.125000 C 02:43:36 Temperature Measurement, Probe Number = 1, T = 20.050000 C 02:43:37 Temperature Measurement, Probe Number = 2, T = 20.113000 C 02:43:37 Temperature Measurement, Probe Number = 3, T = 20.058000 C 02:43:38 Temperature Measurement, Probe Number = 4, T = 20.554000 C 02:43:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.55 02:43:38 Integrated Voltage Measurement... 02:43:59 Voltage Offset Correction: v_off_ini = 0.000003705 V, v_off_fin = 0.000005986 V 02:43:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171025239 Vs 02:43:59 Integrated Voltage Measurement... 02:44:18 Voltage Offset Correction: v_off_ini = 0.000005120 V, v_off_fin = 0.000002365 V 02:44:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959645 Vs 02:44:21 Temperature Measurement, Probe Number = 0, T = 20.131000 C 02:44:22 Temperature Measurement, Probe Number = 1, T = 20.051000 C 02:44:23 Temperature Measurement, Probe Number = 2, T = 20.118000 C 02:44:23 Temperature Measurement, Probe Number = 3, T = 20.061000 C 02:44:24 Temperature Measurement, Probe Number = 4, T = 20.610000 C 02:44:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.61 02:44:24 Integrated Voltage Measurement... 02:44:43 Voltage Offset Correction: v_off_ini = 0.000003223 V, v_off_fin = 0.000006141 V 02:44:44 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171019678 Vs 02:44:44 Integrated Voltage Measurement... 02:45:03 Voltage Offset Correction: v_off_ini = 0.000005091 V, v_off_fin = 0.000001866 V 02:45:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170964077 Vs 02:45:06 Temperature Measurement, Probe Number = 0, T = 20.127000 C 02:45:06 Temperature Measurement, Probe Number = 1, T = 20.046000 C 02:45:07 Temperature Measurement, Probe Number = 2, T = 20.117000 C 02:45:08 Temperature Measurement, Probe Number = 3, T = 20.057000 C 02:45:08 Temperature Measurement, Probe Number = 4, T = 20.631000 C 02:45:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.63 02:45:08 Integrated Voltage Measurement... 02:45:28 Voltage Offset Correction: v_off_ini = 0.000003189 V, v_off_fin = 0.000005906 V 02:45:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171025953 Vs 02:45:28 Integrated Voltage Measurement... 02:45:47 Voltage Offset Correction: v_off_ini = 0.000005276 V, v_off_fin = 0.000001735 V 02:45:47 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170961909 Vs 03:15:50 Temperature Measurement, Probe Number = 0, T = 20.118000 C 03:15:51 Temperature Measurement, Probe Number = 1, T = 20.038000 C 03:15:51 Temperature Measurement, Probe Number = 2, T = 20.106000 C 03:15:52 Temperature Measurement, Probe Number = 3, T = 20.047000 C 03:15:53 Temperature Measurement, Probe Number = 4, T = 20.259000 C 03:15:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.26 03:15:53 Integrated Voltage Measurement... 03:16:14 Voltage Offset Correction: v_off_ini = 0.000004376 V, v_off_fin = 0.000006195 V 03:16:14 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171081703 Vs 03:16:14 Integrated Voltage Measurement... 03:16:34 Voltage Offset Correction: v_off_ini = 0.000005475 V, v_off_fin = 0.000002551 V 03:16:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964960 Vs 03:16:37 Temperature Measurement, Probe Number = 0, T = 20.127000 C 03:16:37 Temperature Measurement, Probe Number = 1, T = 20.044000 C 03:16:38 Temperature Measurement, Probe Number = 2, T = 20.113000 C 03:16:39 Temperature Measurement, Probe Number = 3, T = 20.051000 C 03:16:39 Temperature Measurement, Probe Number = 4, T = 20.362000 C 03:16:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.36 03:16:39 Integrated Voltage Measurement... 03:16:59 Voltage Offset Correction: v_off_ini = 0.000003633 V, v_off_fin = 0.000006188 V 03:16:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024591 Vs 03:16:59 Integrated Voltage Measurement... 03:17:18 Voltage Offset Correction: v_off_ini = 0.000005835 V, v_off_fin = 0.000002182 V 03:17:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170966782 Vs 03:17:21 Temperature Measurement, Probe Number = 0, T = 20.131000 C 03:17:22 Temperature Measurement, Probe Number = 1, T = 20.048000 C 03:17:23 Temperature Measurement, Probe Number = 2, T = 20.119000 C 03:17:23 Temperature Measurement, Probe Number = 3, T = 20.055000 C 03:17:24 Temperature Measurement, Probe Number = 4, T = 20.417000 C 03:17:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.42 03:17:24 Integrated Voltage Measurement... 03:17:44 Voltage Offset Correction: v_off_ini = 0.000003624 V, v_off_fin = 0.000006921 V 03:17:44 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171034474 Vs 03:17:44 Integrated Voltage Measurement... 03:18:03 Voltage Offset Correction: v_off_ini = 0.000005601 V, v_off_fin = 0.000002216 V 03:18:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170965212 Vs 03:18:06 Temperature Measurement, Probe Number = 0, T = 20.128000 C 03:18:06 Temperature Measurement, Probe Number = 1, T = 20.048000 C 03:18:07 Temperature Measurement, Probe Number = 2, T = 20.115000 C 03:18:08 Temperature Measurement, Probe Number = 3, T = 20.056000 C 03:18:08 Temperature Measurement, Probe Number = 4, T = 20.441000 C 03:18:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.44 03:18:09 Integrated Voltage Measurement... 03:18:28 Voltage Offset Correction: v_off_ini = 0.000003520 V, v_off_fin = 0.000006414 V 03:18:29 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171036042 Vs 03:18:29 Integrated Voltage Measurement... 03:18:48 Voltage Offset Correction: v_off_ini = 0.000005848 V, v_off_fin = 0.000001770 V 03:18:48 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170961068 Vs 03:18:51 Temperature Measurement, Probe Number = 0, T = 20.133000 C 03:18:52 Temperature Measurement, Probe Number = 1, T = 20.052000 C 03:18:52 Temperature Measurement, Probe Number = 2, T = 20.120000 C 03:18:53 Temperature Measurement, Probe Number = 3, T = 20.061000 C 03:18:54 Temperature Measurement, Probe Number = 4, T = 20.523000 C 03:18:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.52 03:18:54 Integrated Voltage Measurement... 03:19:13 Voltage Offset Correction: v_off_ini = 0.000003870 V, v_off_fin = 0.000006428 V 03:19:13 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171034019 Vs 03:19:13 Integrated Voltage Measurement... 03:19:33 Voltage Offset Correction: v_off_ini = 0.000006169 V, v_off_fin = 0.000002651 V 03:19:33 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170966817 Vs 03:19:35 Temperature Measurement, Probe Number = 0, T = 20.128000 C 03:19:36 Temperature Measurement, Probe Number = 1, T = 20.045000 C 03:19:37 Temperature Measurement, Probe Number = 2, T = 20.116000 C 03:19:37 Temperature Measurement, Probe Number = 3, T = 20.056000 C 03:19:38 Temperature Measurement, Probe Number = 4, T = 20.549000 C 03:19:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.55 03:19:38 Integrated Voltage Measurement... 03:19:57 Voltage Offset Correction: v_off_ini = 0.000003873 V, v_off_fin = 0.000006494 V 03:19:57 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171035281 Vs 03:19:58 Integrated Voltage Measurement... 03:20:17 Voltage Offset Correction: v_off_ini = 0.000006177 V, v_off_fin = 0.000002868 V 03:20:17 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170965338 Vs 03:20:20 Temperature Measurement, Probe Number = 0, T = 20.124000 C 03:20:21 Temperature Measurement, Probe Number = 1, T = 20.045000 C 03:20:21 Temperature Measurement, Probe Number = 2, T = 20.112000 C 03:20:22 Temperature Measurement, Probe Number = 3, T = 20.053000 C 03:20:23 Temperature Measurement, Probe Number = 4, T = 20.486000 C 03:20:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.49 03:20:23 Integrated Voltage Measurement... 03:20:42 Voltage Offset Correction: v_off_ini = 0.000003221 V, v_off_fin = 0.000006413 V 03:20:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171029255 Vs 03:20:42 Integrated Voltage Measurement... 03:21:02 Voltage Offset Correction: v_off_ini = 0.000005521 V, v_off_fin = 0.000002174 V 03:21:02 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971115 Vs 03:21:05 Temperature Measurement, Probe Number = 0, T = 20.118000 C 03:21:05 Temperature Measurement, Probe Number = 1, T = 20.039000 C 03:21:06 Temperature Measurement, Probe Number = 2, T = 20.104000 C 03:21:07 Temperature Measurement, Probe Number = 3, T = 20.046000 C 03:21:07 Temperature Measurement, Probe Number = 4, T = 20.425000 C 03:21:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.43 03:21:07 Integrated Voltage Measurement... 03:21:27 Voltage Offset Correction: v_off_ini = 0.000003462 V, v_off_fin = 0.000006286 V 03:21:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171034161 Vs 03:21:27 Integrated Voltage Measurement... 03:21:47 Voltage Offset Correction: v_off_ini = 0.000006071 V, v_off_fin = 0.000002455 V 03:21:47 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170969620 Vs 03:21:50 Temperature Measurement, Probe Number = 0, T = 20.121000 C 03:21:50 Temperature Measurement, Probe Number = 1, T = 20.039000 C 03:21:51 Temperature Measurement, Probe Number = 2, T = 20.108000 C 03:21:52 Temperature Measurement, Probe Number = 3, T = 20.049000 C 03:21:52 Temperature Measurement, Probe Number = 4, T = 20.431000 C 03:21:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.43 03:21:53 Integrated Voltage Measurement... 03:22:12 Voltage Offset Correction: v_off_ini = 0.000003793 V, v_off_fin = 0.000005767 V 03:22:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171028094 Vs 03:22:12 Integrated Voltage Measurement... 03:22:31 Voltage Offset Correction: v_off_ini = 0.000005633 V, v_off_fin = 0.000001797 V 03:22:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170969006 Vs 03:22:34 Temperature Measurement, Probe Number = 0, T = 20.124000 C 03:22:35 Temperature Measurement, Probe Number = 1, T = 20.045000 C 03:22:36 Temperature Measurement, Probe Number = 2, T = 20.109000 C 03:22:36 Temperature Measurement, Probe Number = 3, T = 20.051000 C 03:22:37 Temperature Measurement, Probe Number = 4, T = 20.398000 C 03:22:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.40 03:22:37 Integrated Voltage Measurement... 03:22:56 Voltage Offset Correction: v_off_ini = 0.000003228 V, v_off_fin = 0.000006128 V 03:22:56 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171035031 Vs 03:22:56 Integrated Voltage Measurement... 03:23:15 Voltage Offset Correction: v_off_ini = 0.000005809 V, v_off_fin = 0.000002710 V 03:23:16 Integrated Voltage Measurement Delta Gap = -0.0040005 m VT = -0.170968703 Vs 03:53:18 Temperature Measurement, Probe Number = 0, T = 20.132000 C 03:53:19 Temperature Measurement, Probe Number = 1, T = 20.051000 C 03:53:20 Temperature Measurement, Probe Number = 2, T = 20.117000 C 03:53:20 Temperature Measurement, Probe Number = 3, T = 20.057000 C 03:53:21 Temperature Measurement, Probe Number = 4, T = 20.506000 C 03:53:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.51 03:53:21 Integrated Voltage Measurement... 03:53:42 Voltage Offset Correction: v_off_ini = 0.000003945 V, v_off_fin = 0.000005482 V 03:53:42 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171082469 Vs 03:53:42 Integrated Voltage Measurement... 03:54:01 Voltage Offset Correction: v_off_ini = 0.000005318 V, v_off_fin = 0.000002105 V 03:54:01 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170973183 Vs 03:54:04 Temperature Measurement, Probe Number = 0, T = 20.132000 C 03:54:05 Temperature Measurement, Probe Number = 1, T = 20.048000 C 03:54:06 Temperature Measurement, Probe Number = 2, T = 20.119000 C 03:54:06 Temperature Measurement, Probe Number = 3, T = 20.056000 C 03:54:07 Temperature Measurement, Probe Number = 4, T = 20.540000 C 03:54:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.54 03:54:07 Integrated Voltage Measurement... 03:54:28 Voltage Offset Correction: v_off_ini = 0.000002865 V, v_off_fin = 0.000005665 V 03:54:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171032649 Vs 03:54:28 Integrated Voltage Measurement... 03:54:47 Voltage Offset Correction: v_off_ini = 0.000004614 V, v_off_fin = 0.000001649 V 03:54:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977865 Vs 03:54:50 Temperature Measurement, Probe Number = 0, T = 20.133000 C 03:54:51 Temperature Measurement, Probe Number = 1, T = 20.051000 C 03:54:51 Temperature Measurement, Probe Number = 2, T = 20.119000 C 03:54:52 Temperature Measurement, Probe Number = 3, T = 20.059000 C 03:54:53 Temperature Measurement, Probe Number = 4, T = 20.531000 C 03:54:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.53 03:54:53 Integrated Voltage Measurement... 03:55:12 Voltage Offset Correction: v_off_ini = 0.000002802 V, v_off_fin = 0.000006059 V 03:55:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171030376 Vs 03:55:12 Integrated Voltage Measurement... 03:55:31 Voltage Offset Correction: v_off_ini = 0.000005681 V, v_off_fin = 0.000002590 V 03:55:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971478 Vs 03:55:34 Temperature Measurement, Probe Number = 0, T = 20.134000 C 03:55:35 Temperature Measurement, Probe Number = 1, T = 20.049000 C 03:55:36 Temperature Measurement, Probe Number = 2, T = 20.119000 C 03:55:36 Temperature Measurement, Probe Number = 3, T = 20.057000 C 03:55:37 Temperature Measurement, Probe Number = 4, T = 20.569000 C 03:55:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.57 03:55:37 Integrated Voltage Measurement... 03:55:56 Voltage Offset Correction: v_off_ini = 0.000003472 V, v_off_fin = 0.000006422 V 03:55:57 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171037494 Vs 03:55:57 Integrated Voltage Measurement... 03:56:16 Voltage Offset Correction: v_off_ini = 0.000005638 V, v_off_fin = 0.000001783 V 03:56:17 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975012 Vs 03:56:19 Temperature Measurement, Probe Number = 0, T = 20.125000 C 03:56:20 Temperature Measurement, Probe Number = 1, T = 20.040000 C 03:56:21 Temperature Measurement, Probe Number = 2, T = 20.112000 C 03:56:21 Temperature Measurement, Probe Number = 3, T = 20.049000 C 03:56:22 Temperature Measurement, Probe Number = 4, T = 20.523000 C 03:56:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.52 03:56:22 Integrated Voltage Measurement... 03:56:41 Voltage Offset Correction: v_off_ini = 0.000003784 V, v_off_fin = 0.000005709 V 03:56:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171034816 Vs 03:56:42 Integrated Voltage Measurement... 03:57:01 Voltage Offset Correction: v_off_ini = 0.000005363 V, v_off_fin = 0.000002044 V 03:57:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977994 Vs 03:57:04 Temperature Measurement, Probe Number = 0, T = 20.127000 C 03:57:05 Temperature Measurement, Probe Number = 1, T = 20.044000 C 03:57:05 Temperature Measurement, Probe Number = 2, T = 20.114000 C 03:57:06 Temperature Measurement, Probe Number = 3, T = 20.053000 C 03:57:07 Temperature Measurement, Probe Number = 4, T = 20.498000 C 03:57:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.50 03:57:07 Integrated Voltage Measurement... 03:57:27 Voltage Offset Correction: v_off_ini = 0.000003064 V, v_off_fin = 0.000005588 V 03:57:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171030266 Vs 03:57:28 Integrated Voltage Measurement... 03:57:47 Voltage Offset Correction: v_off_ini = 0.000005074 V, v_off_fin = 0.000001733 V 03:57:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974478 Vs 03:57:49 Temperature Measurement, Probe Number = 0, T = 20.127000 C 03:57:50 Temperature Measurement, Probe Number = 1, T = 20.044000 C 03:57:51 Temperature Measurement, Probe Number = 2, T = 20.113000 C 03:57:51 Temperature Measurement, Probe Number = 3, T = 20.053000 C 03:57:52 Temperature Measurement, Probe Number = 4, T = 20.407000 C 03:57:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 03:57:52 Integrated Voltage Measurement... 03:58:12 Voltage Offset Correction: v_off_ini = 0.000003430 V, v_off_fin = 0.000006187 V 03:58:12 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171034320 Vs 03:58:12 Integrated Voltage Measurement... 03:58:31 Voltage Offset Correction: v_off_ini = 0.000005576 V, v_off_fin = 0.000002124 V 03:58:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977589 Vs 03:58:34 Temperature Measurement, Probe Number = 0, T = 20.133000 C 03:58:35 Temperature Measurement, Probe Number = 1, T = 20.050000 C 03:58:36 Temperature Measurement, Probe Number = 2, T = 20.118000 C 03:58:36 Temperature Measurement, Probe Number = 3, T = 20.057000 C 03:58:37 Temperature Measurement, Probe Number = 4, T = 20.382000 C 03:58:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.38 03:58:37 Integrated Voltage Measurement... 03:58:56 Voltage Offset Correction: v_off_ini = 0.000003321 V, v_off_fin = 0.000005641 V 03:58:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171030068 Vs 03:58:57 Integrated Voltage Measurement... 03:59:16 Voltage Offset Correction: v_off_ini = 0.000005353 V, v_off_fin = 0.000001343 V 03:59:16 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170972789 Vs 03:59:19 Temperature Measurement, Probe Number = 0, T = 20.132000 C 03:59:19 Temperature Measurement, Probe Number = 1, T = 20.047000 C 03:59:20 Temperature Measurement, Probe Number = 2, T = 20.115000 C 03:59:21 Temperature Measurement, Probe Number = 3, T = 20.051000 C 03:59:21 Temperature Measurement, Probe Number = 4, T = 20.384000 C 03:59:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.38 03:59:22 Integrated Voltage Measurement... 03:59:41 Voltage Offset Correction: v_off_ini = 0.000003348 V, v_off_fin = 0.000005885 V 03:59:41 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171032665 Vs 03:59:41 Integrated Voltage Measurement... 04:00:00 Voltage Offset Correction: v_off_ini = 0.000005315 V, v_off_fin = 0.000001539 V 04:00:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976230 Vs 04:00:03 Temperature Measurement, Probe Number = 0, T = 20.132000 C 04:00:04 Temperature Measurement, Probe Number = 1, T = 20.046000 C 04:00:05 Temperature Measurement, Probe Number = 2, T = 20.118000 C 04:00:05 Temperature Measurement, Probe Number = 3, T = 20.053000 C 04:00:06 Temperature Measurement, Probe Number = 4, T = 20.409000 C 04:00:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 04:00:06 Integrated Voltage Measurement... 04:00:26 Voltage Offset Correction: v_off_ini = 0.000003244 V, v_off_fin = 0.000005607 V 04:00:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171027805 Vs 04:00:26 Integrated Voltage Measurement... 04:00:45 Voltage Offset Correction: v_off_ini = 0.000005581 V, v_off_fin = 0.000001706 V 04:00:45 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971496 Vs 04:30:48 Temperature Measurement, Probe Number = 0, T = 20.128000 C 04:30:48 Temperature Measurement, Probe Number = 1, T = 20.047000 C 04:30:49 Temperature Measurement, Probe Number = 2, T = 20.113000 C 04:30:50 Temperature Measurement, Probe Number = 3, T = 20.053000 C 04:30:50 Temperature Measurement, Probe Number = 4, T = 20.371000 C 04:30:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.37 04:30:51 Integrated Voltage Measurement... 04:31:10 Voltage Offset Correction: v_off_ini = 0.000004073 V, v_off_fin = 0.000006204 V 04:31:10 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171086892 Vs 04:31:10 Integrated Voltage Measurement... 04:31:29 Voltage Offset Correction: v_off_ini = 0.000005809 V, v_off_fin = 0.000002445 V 04:31:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971640 Vs 04:31:32 Temperature Measurement, Probe Number = 0, T = 20.128000 C 04:31:33 Temperature Measurement, Probe Number = 1, T = 20.047000 C 04:31:34 Temperature Measurement, Probe Number = 2, T = 20.110000 C 04:31:34 Temperature Measurement, Probe Number = 3, T = 20.051000 C 04:31:35 Temperature Measurement, Probe Number = 4, T = 20.446000 C 04:31:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.45 04:31:35 Integrated Voltage Measurement... 04:31:54 Voltage Offset Correction: v_off_ini = 0.000003003 V, v_off_fin = 0.000006158 V 04:31:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171033964 Vs 04:31:55 Integrated Voltage Measurement... 04:32:14 Voltage Offset Correction: v_off_ini = 0.000005071 V, v_off_fin = 0.000002201 V 04:32:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971812 Vs 04:32:17 Temperature Measurement, Probe Number = 0, T = 20.128000 C 04:32:17 Temperature Measurement, Probe Number = 1, T = 20.047000 C 04:32:18 Temperature Measurement, Probe Number = 2, T = 20.112000 C 04:32:19 Temperature Measurement, Probe Number = 3, T = 20.053000 C 04:32:19 Temperature Measurement, Probe Number = 4, T = 20.459000 C 04:32:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.46 04:32:20 Integrated Voltage Measurement... 04:32:39 Voltage Offset Correction: v_off_ini = 0.000003942 V, v_off_fin = 0.000006225 V 04:32:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171031917 Vs 04:32:39 Integrated Voltage Measurement... 04:32:59 Voltage Offset Correction: v_off_ini = 0.000005389 V, v_off_fin = 0.000002074 V 04:32:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971793 Vs 04:33:01 Temperature Measurement, Probe Number = 0, T = 20.131000 C 04:33:02 Temperature Measurement, Probe Number = 1, T = 20.050000 C 04:33:03 Temperature Measurement, Probe Number = 2, T = 20.113000 C 04:33:03 Temperature Measurement, Probe Number = 3, T = 20.055000 C 04:33:04 Temperature Measurement, Probe Number = 4, T = 20.444000 C 04:33:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.44 04:33:04 Integrated Voltage Measurement... 04:33:23 Voltage Offset Correction: v_off_ini = 0.000004103 V, v_off_fin = 0.000006283 V 04:33:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171037865 Vs 04:33:24 Integrated Voltage Measurement... 04:33:43 Voltage Offset Correction: v_off_ini = 0.000005741 V, v_off_fin = 0.000002313 V 04:33:43 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170970436 Vs 04:33:46 Temperature Measurement, Probe Number = 0, T = 20.133000 C 04:33:46 Temperature Measurement, Probe Number = 1, T = 20.052000 C 04:33:47 Temperature Measurement, Probe Number = 2, T = 20.114000 C 04:33:48 Temperature Measurement, Probe Number = 3, T = 20.055000 C 04:33:48 Temperature Measurement, Probe Number = 4, T = 20.433000 C 04:33:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.43 04:33:49 Integrated Voltage Measurement... 04:34:08 Voltage Offset Correction: v_off_ini = 0.000003627 V, v_off_fin = 0.000006276 V 04:34:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171037410 Vs 04:34:08 Integrated Voltage Measurement... 04:34:28 Voltage Offset Correction: v_off_ini = 0.000005936 V, v_off_fin = 0.000002031 V 04:34:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170974526 Vs 04:34:30 Temperature Measurement, Probe Number = 0, T = 20.130000 C 04:34:31 Temperature Measurement, Probe Number = 1, T = 20.045000 C 04:34:32 Temperature Measurement, Probe Number = 2, T = 20.116000 C 04:34:32 Temperature Measurement, Probe Number = 3, T = 20.056000 C 04:34:33 Temperature Measurement, Probe Number = 4, T = 20.487000 C 04:34:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.49 04:34:33 Integrated Voltage Measurement... 04:34:52 Voltage Offset Correction: v_off_ini = 0.000003282 V, v_off_fin = 0.000005694 V 04:34:52 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171033084 Vs 04:34:53 Integrated Voltage Measurement... 04:35:12 Voltage Offset Correction: v_off_ini = 0.000005077 V, v_off_fin = 0.000000853 V 04:35:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972529 Vs 04:35:14 Temperature Measurement, Probe Number = 0, T = 20.120000 C 04:35:15 Temperature Measurement, Probe Number = 1, T = 20.040000 C 04:35:16 Temperature Measurement, Probe Number = 2, T = 20.105000 C 04:35:16 Temperature Measurement, Probe Number = 3, T = 20.046000 C 04:35:17 Temperature Measurement, Probe Number = 4, T = 20.396000 C 04:35:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.40 04:35:17 Integrated Voltage Measurement... 04:35:36 Voltage Offset Correction: v_off_ini = 0.000003017 V, v_off_fin = 0.000006132 V 04:35:37 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171033963 Vs 04:35:37 Integrated Voltage Measurement... 04:35:56 Voltage Offset Correction: v_off_ini = 0.000005571 V, v_off_fin = 0.000001592 V 04:35:56 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971178 Vs 04:35:59 Temperature Measurement, Probe Number = 0, T = 20.123000 C 04:35:59 Temperature Measurement, Probe Number = 1, T = 20.043000 C 04:36:00 Temperature Measurement, Probe Number = 2, T = 20.103000 C 04:36:01 Temperature Measurement, Probe Number = 3, T = 20.044000 C 04:36:01 Temperature Measurement, Probe Number = 4, T = 20.285000 C 04:36:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.29 04:36:01 Integrated Voltage Measurement... 04:36:21 Voltage Offset Correction: v_off_ini = 0.000002740 V, v_off_fin = 0.000005890 V 04:36:21 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171035657 Vs 04:36:21 Integrated Voltage Measurement... 04:36:40 Voltage Offset Correction: v_off_ini = 0.000005000 V, v_off_fin = 0.000001668 V 04:36:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974523 Vs 04:36:43 Temperature Measurement, Probe Number = 0, T = 20.121000 C 04:36:44 Temperature Measurement, Probe Number = 1, T = 20.040000 C 04:36:44 Temperature Measurement, Probe Number = 2, T = 20.101000 C 04:36:45 Temperature Measurement, Probe Number = 3, T = 20.041000 C 04:36:46 Temperature Measurement, Probe Number = 4, T = 20.262000 C 04:36:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.26 04:36:46 Integrated Voltage Measurement... 04:37:05 Voltage Offset Correction: v_off_ini = 0.000003154 V, v_off_fin = 0.000005710 V 04:37:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171030107 Vs 04:37:05 Integrated Voltage Measurement... 04:37:24 Voltage Offset Correction: v_off_ini = 0.000005061 V, v_off_fin = 0.000001589 V 04:37:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170974681 Vs 04:37:27 Temperature Measurement, Probe Number = 0, T = 20.120000 C 04:37:28 Temperature Measurement, Probe Number = 1, T = 20.044000 C 04:37:29 Temperature Measurement, Probe Number = 2, T = 20.104000 C 04:37:29 Temperature Measurement, Probe Number = 3, T = 20.047000 C 04:37:30 Temperature Measurement, Probe Number = 4, T = 20.257000 C 04:37:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.26 04:37:30 Integrated Voltage Measurement... 04:37:49 Voltage Offset Correction: v_off_ini = 0.000003217 V, v_off_fin = 0.000005742 V 04:37:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171030230 Vs 04:37:50 Integrated Voltage Measurement... 04:38:09 Voltage Offset Correction: v_off_ini = 0.000005657 V, v_off_fin = 0.000002199 V 04:38:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971723 Vs 05:08:12 Temperature Measurement, Probe Number = 0, T = 20.127000 C 05:08:12 Temperature Measurement, Probe Number = 1, T = 20.046000 C 05:08:13 Temperature Measurement, Probe Number = 2, T = 20.110000 C 05:08:14 Temperature Measurement, Probe Number = 3, T = 20.050000 C 05:08:14 Temperature Measurement, Probe Number = 4, T = 20.414000 C 05:08:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 05:08:15 Integrated Voltage Measurement... 05:08:34 Voltage Offset Correction: v_off_ini = 0.000003963 V, v_off_fin = 0.000006033 V 05:08:34 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171083161 Vs 05:08:34 Integrated Voltage Measurement... 05:08:53 Voltage Offset Correction: v_off_ini = 0.000005475 V, v_off_fin = 0.000002410 V 05:08:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971926 Vs 05:08:56 Temperature Measurement, Probe Number = 0, T = 20.128000 C 05:08:57 Temperature Measurement, Probe Number = 1, T = 20.046000 C 05:08:57 Temperature Measurement, Probe Number = 2, T = 20.110000 C 05:08:58 Temperature Measurement, Probe Number = 3, T = 20.049000 C 05:08:59 Temperature Measurement, Probe Number = 4, T = 20.433000 C 05:08:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.43 05:08:59 Integrated Voltage Measurement... 05:09:20 Voltage Offset Correction: v_off_ini = 0.000002802 V, v_off_fin = 0.000005580 V 05:09:20 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171029595 Vs 05:09:20 Integrated Voltage Measurement... 05:09:39 Voltage Offset Correction: v_off_ini = 0.000005224 V, v_off_fin = 0.000001330 V 05:09:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973409 Vs 05:09:42 Temperature Measurement, Probe Number = 0, T = 20.123000 C 05:09:43 Temperature Measurement, Probe Number = 1, T = 20.044000 C 05:09:44 Temperature Measurement, Probe Number = 2, T = 20.105000 C 05:09:44 Temperature Measurement, Probe Number = 3, T = 20.047000 C 05:09:45 Temperature Measurement, Probe Number = 4, T = 20.340000 C 05:09:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.34 05:09:45 Integrated Voltage Measurement... 05:10:04 Voltage Offset Correction: v_off_ini = 0.000003327 V, v_off_fin = 0.000005670 V 05:10:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171030794 Vs 05:10:05 Integrated Voltage Measurement... 05:10:24 Voltage Offset Correction: v_off_ini = 0.000005516 V, v_off_fin = 0.000002626 V 05:10:24 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971113 Vs 05:10:27 Temperature Measurement, Probe Number = 0, T = 20.130000 C 05:10:28 Temperature Measurement, Probe Number = 1, T = 20.045000 C 05:10:28 Temperature Measurement, Probe Number = 2, T = 20.111000 C 05:10:29 Temperature Measurement, Probe Number = 3, T = 20.050000 C 05:10:30 Temperature Measurement, Probe Number = 4, T = 20.319000 C 05:10:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.32 05:10:30 Integrated Voltage Measurement... 05:10:49 Voltage Offset Correction: v_off_ini = 0.000003345 V, v_off_fin = 0.000006223 V 05:10:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030364 Vs 05:10:50 Integrated Voltage Measurement... 05:11:09 Voltage Offset Correction: v_off_ini = 0.000005690 V, v_off_fin = 0.000002190 V 05:11:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969342 Vs 05:11:12 Temperature Measurement, Probe Number = 0, T = 20.122000 C 05:11:12 Temperature Measurement, Probe Number = 1, T = 20.037000 C 05:11:13 Temperature Measurement, Probe Number = 2, T = 20.103000 C 05:11:14 Temperature Measurement, Probe Number = 3, T = 20.043000 C 05:11:14 Temperature Measurement, Probe Number = 4, T = 20.376000 C 05:11:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.38 05:11:15 Integrated Voltage Measurement... 05:11:34 Voltage Offset Correction: v_off_ini = 0.000003541 V, v_off_fin = 0.000005959 V 05:11:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033913 Vs 05:11:34 Integrated Voltage Measurement... 05:11:54 Voltage Offset Correction: v_off_ini = 0.000005533 V, v_off_fin = 0.000001655 V 05:11:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969325 Vs 05:11:56 Temperature Measurement, Probe Number = 0, T = 20.119000 C 05:11:57 Temperature Measurement, Probe Number = 1, T = 20.035000 C 05:11:58 Temperature Measurement, Probe Number = 2, T = 20.102000 C 05:11:58 Temperature Measurement, Probe Number = 3, T = 20.041000 C 05:11:59 Temperature Measurement, Probe Number = 4, T = 20.352000 C 05:11:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.35 05:11:59 Integrated Voltage Measurement... 05:12:18 Voltage Offset Correction: v_off_ini = 0.000003543 V, v_off_fin = 0.000005973 V 05:12:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171031985 Vs 05:12:19 Integrated Voltage Measurement... 05:12:38 Voltage Offset Correction: v_off_ini = 0.000005450 V, v_off_fin = 0.000001323 V 05:12:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977234 Vs 05:12:41 Temperature Measurement, Probe Number = 0, T = 20.129000 C 05:12:42 Temperature Measurement, Probe Number = 1, T = 20.044000 C 05:12:43 Temperature Measurement, Probe Number = 2, T = 20.112000 C 05:12:43 Temperature Measurement, Probe Number = 3, T = 20.050000 C 05:12:44 Temperature Measurement, Probe Number = 4, T = 20.370000 C 05:12:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.37 05:12:44 Integrated Voltage Measurement... 05:13:04 Voltage Offset Correction: v_off_ini = 0.000003315 V, v_off_fin = 0.000006131 V 05:13:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171035255 Vs 05:13:04 Integrated Voltage Measurement... 05:13:23 Voltage Offset Correction: v_off_ini = 0.000005583 V, v_off_fin = 0.000002265 V 05:13:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969587 Vs 05:13:26 Temperature Measurement, Probe Number = 0, T = 20.128000 C 05:13:27 Temperature Measurement, Probe Number = 1, T = 20.045000 C 05:13:27 Temperature Measurement, Probe Number = 2, T = 20.112000 C 05:13:28 Temperature Measurement, Probe Number = 3, T = 20.052000 C 05:13:29 Temperature Measurement, Probe Number = 4, T = 20.365000 C 05:13:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.36 05:13:29 Integrated Voltage Measurement... 05:13:48 Voltage Offset Correction: v_off_ini = 0.000003254 V, v_off_fin = 0.000006167 V 05:13:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035000 Vs 05:13:49 Integrated Voltage Measurement... 05:14:08 Voltage Offset Correction: v_off_ini = 0.000005551 V, v_off_fin = 0.000001951 V 05:14:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972070 Vs 05:14:11 Temperature Measurement, Probe Number = 0, T = 20.130000 C 05:14:11 Temperature Measurement, Probe Number = 1, T = 20.046000 C 05:14:12 Temperature Measurement, Probe Number = 2, T = 20.115000 C 05:14:13 Temperature Measurement, Probe Number = 3, T = 20.052000 C 05:14:13 Temperature Measurement, Probe Number = 4, T = 20.449000 C 05:14:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.45 05:14:14 Integrated Voltage Measurement... 05:14:33 Voltage Offset Correction: v_off_ini = 0.000002907 V, v_off_fin = 0.000005822 V 05:14:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171032715 Vs 05:14:33 Integrated Voltage Measurement... 05:14:52 Voltage Offset Correction: v_off_ini = 0.000005403 V, v_off_fin = 0.000002096 V 05:14:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970882 Vs 05:14:55 Temperature Measurement, Probe Number = 0, T = 20.131000 C 05:14:56 Temperature Measurement, Probe Number = 1, T = 20.049000 C 05:14:57 Temperature Measurement, Probe Number = 2, T = 20.114000 C 05:14:57 Temperature Measurement, Probe Number = 3, T = 20.054000 C 05:14:58 Temperature Measurement, Probe Number = 4, T = 20.498000 C 05:14:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.50 05:14:58 Integrated Voltage Measurement... 05:15:18 Voltage Offset Correction: v_off_ini = 0.000003013 V, v_off_fin = 0.000005833 V 05:15:18 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171031546 Vs 05:15:18 Integrated Voltage Measurement... 05:15:37 Voltage Offset Correction: v_off_ini = 0.000005105 V, v_off_fin = 0.000002019 V 05:15:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975822 Vs 05:45:40 Temperature Measurement, Probe Number = 0, T = 20.119000 C 05:45:41 Temperature Measurement, Probe Number = 1, T = 20.040000 C 05:45:42 Temperature Measurement, Probe Number = 2, T = 20.101000 C 05:45:42 Temperature Measurement, Probe Number = 3, T = 20.044000 C 05:45:43 Temperature Measurement, Probe Number = 4, T = 20.341000 C 05:45:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.34 05:45:43 Integrated Voltage Measurement... 05:46:03 Voltage Offset Correction: v_off_ini = 0.000003902 V, v_off_fin = 0.000005782 V 05:46:03 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171081476 Vs 05:46:03 Integrated Voltage Measurement... 05:46:22 Voltage Offset Correction: v_off_ini = 0.000005415 V, v_off_fin = 0.000002742 V 05:46:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973129 Vs 05:46:25 Temperature Measurement, Probe Number = 0, T = 20.127000 C 05:46:26 Temperature Measurement, Probe Number = 1, T = 20.043000 C 05:46:27 Temperature Measurement, Probe Number = 2, T = 20.111000 C 05:46:27 Temperature Measurement, Probe Number = 3, T = 20.049000 C 05:46:28 Temperature Measurement, Probe Number = 4, T = 20.315000 C 05:46:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.32 05:46:28 Integrated Voltage Measurement... 05:46:47 Voltage Offset Correction: v_off_ini = 0.000003781 V, v_off_fin = 0.000005591 V 05:46:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028652 Vs 05:46:48 Integrated Voltage Measurement... 05:47:07 Voltage Offset Correction: v_off_ini = 0.000005008 V, v_off_fin = 0.000001831 V 05:47:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979455 Vs 05:47:10 Temperature Measurement, Probe Number = 0, T = 20.130000 C 05:47:11 Temperature Measurement, Probe Number = 1, T = 20.047000 C 05:47:11 Temperature Measurement, Probe Number = 2, T = 20.113000 C 05:47:12 Temperature Measurement, Probe Number = 3, T = 20.052000 C 05:47:13 Temperature Measurement, Probe Number = 4, T = 20.367000 C 05:47:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.37 05:47:13 Integrated Voltage Measurement... 05:47:32 Voltage Offset Correction: v_off_ini = 0.000003157 V, v_off_fin = 0.000005898 V 05:47:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028440 Vs 05:47:32 Integrated Voltage Measurement... 05:47:51 Voltage Offset Correction: v_off_ini = 0.000005876 V, v_off_fin = 0.000002632 V 05:47:52 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170972341 Vs 05:47:54 Temperature Measurement, Probe Number = 0, T = 20.130000 C 05:47:55 Temperature Measurement, Probe Number = 1, T = 20.049000 C 05:47:56 Temperature Measurement, Probe Number = 2, T = 20.112000 C 05:47:56 Temperature Measurement, Probe Number = 3, T = 20.053000 C 05:47:57 Temperature Measurement, Probe Number = 4, T = 20.378000 C 05:47:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.38 05:47:57 Integrated Voltage Measurement... 05:48:17 Voltage Offset Correction: v_off_ini = 0.000004111 V, v_off_fin = 0.000005829 V 05:48:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035501 Vs 05:48:17 Integrated Voltage Measurement... 05:48:36 Voltage Offset Correction: v_off_ini = 0.000005085 V, v_off_fin = 0.000002315 V 05:48:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975587 Vs 05:48:39 Temperature Measurement, Probe Number = 0, T = 20.135000 C 05:48:40 Temperature Measurement, Probe Number = 1, T = 20.052000 C 05:48:41 Temperature Measurement, Probe Number = 2, T = 20.116000 C 05:48:41 Temperature Measurement, Probe Number = 3, T = 20.056000 C 05:48:42 Temperature Measurement, Probe Number = 4, T = 20.402000 C 05:48:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.40 05:48:42 Integrated Voltage Measurement... 05:49:02 Voltage Offset Correction: v_off_ini = 0.000003894 V, v_off_fin = 0.000005337 V 05:49:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029583 Vs 05:49:02 Integrated Voltage Measurement... 05:49:21 Voltage Offset Correction: v_off_ini = 0.000005271 V, v_off_fin = 0.000002188 V 05:49:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972975 Vs 05:49:24 Temperature Measurement, Probe Number = 0, T = 20.136000 C 05:49:24 Temperature Measurement, Probe Number = 1, T = 20.053000 C 05:49:25 Temperature Measurement, Probe Number = 2, T = 20.115000 C 05:49:26 Temperature Measurement, Probe Number = 3, T = 20.053000 C 05:49:26 Temperature Measurement, Probe Number = 4, T = 20.471000 C 05:49:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.47 05:49:26 Integrated Voltage Measurement... 05:49:46 Voltage Offset Correction: v_off_ini = 0.000003734 V, v_off_fin = 0.000006547 V 05:49:46 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171035383 Vs 05:49:46 Integrated Voltage Measurement... 05:50:05 Voltage Offset Correction: v_off_ini = 0.000005676 V, v_off_fin = 0.000002111 V 05:50:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968540 Vs 05:50:08 Temperature Measurement, Probe Number = 0, T = 20.132000 C 05:50:08 Temperature Measurement, Probe Number = 1, T = 20.048000 C 05:50:09 Temperature Measurement, Probe Number = 2, T = 20.111000 C 05:50:10 Temperature Measurement, Probe Number = 3, T = 20.050000 C 05:50:10 Temperature Measurement, Probe Number = 4, T = 20.485000 C 05:50:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.48 05:50:10 Integrated Voltage Measurement... 05:50:30 Voltage Offset Correction: v_off_ini = 0.000003406 V, v_off_fin = 0.000005550 V 05:50:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034241 Vs 05:50:30 Integrated Voltage Measurement... 05:50:49 Voltage Offset Correction: v_off_ini = 0.000005804 V, v_off_fin = 0.000002294 V 05:50:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973407 Vs 05:50:52 Temperature Measurement, Probe Number = 0, T = 20.121000 C 05:50:53 Temperature Measurement, Probe Number = 1, T = 20.037000 C 05:50:54 Temperature Measurement, Probe Number = 2, T = 20.105000 C 05:50:54 Temperature Measurement, Probe Number = 3, T = 20.044000 C 05:50:55 Temperature Measurement, Probe Number = 4, T = 20.497000 C 05:50:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.50 05:50:55 Integrated Voltage Measurement... 05:51:14 Voltage Offset Correction: v_off_ini = 0.000003861 V, v_off_fin = 0.000005905 V 05:51:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171032183 Vs 05:51:14 Integrated Voltage Measurement... 05:51:34 Voltage Offset Correction: v_off_ini = 0.000005394 V, v_off_fin = 0.000002843 V 05:51:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976122 Vs 05:51:37 Temperature Measurement, Probe Number = 0, T = 20.112000 C 05:51:37 Temperature Measurement, Probe Number = 1, T = 20.030000 C 05:51:38 Temperature Measurement, Probe Number = 2, T = 20.097000 C 05:51:39 Temperature Measurement, Probe Number = 3, T = 20.036000 C 05:51:39 Temperature Measurement, Probe Number = 4, T = 20.366000 C 05:51:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.37 05:51:40 Integrated Voltage Measurement... 05:51:59 Voltage Offset Correction: v_off_ini = 0.000003284 V, v_off_fin = 0.000005438 V 05:51:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025433 Vs 05:51:59 Integrated Voltage Measurement... 05:52:18 Voltage Offset Correction: v_off_ini = 0.000004991 V, v_off_fin = 0.000002136 V 05:52:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972658 Vs 05:52:21 Temperature Measurement, Probe Number = 0, T = 20.127000 C 05:52:22 Temperature Measurement, Probe Number = 1, T = 20.042000 C 05:52:22 Temperature Measurement, Probe Number = 2, T = 20.108000 C 05:52:23 Temperature Measurement, Probe Number = 3, T = 20.045000 C 05:52:24 Temperature Measurement, Probe Number = 4, T = 20.370000 C 05:52:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.37 05:52:24 Integrated Voltage Measurement... 05:52:45 Voltage Offset Correction: v_off_ini = 0.000003205 V, v_off_fin = 0.000005831 V 05:52:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030559 Vs 05:52:45 Integrated Voltage Measurement... 05:53:04 Voltage Offset Correction: v_off_ini = 0.000005327 V, v_off_fin = 0.000003174 V 05:53:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966422 Vs 06:23:07 Temperature Measurement, Probe Number = 0, T = 20.124000 C 06:23:08 Temperature Measurement, Probe Number = 1, T = 20.046000 C 06:23:08 Temperature Measurement, Probe Number = 2, T = 20.105000 C 06:23:09 Temperature Measurement, Probe Number = 3, T = 20.049000 C 06:23:10 Temperature Measurement, Probe Number = 4, T = 20.476000 C 06:23:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.48 06:23:10 Integrated Voltage Measurement... 06:23:29 Voltage Offset Correction: v_off_ini = 0.000003902 V, v_off_fin = 0.000005854 V 06:23:29 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171081023 Vs 06:23:29 Integrated Voltage Measurement... 06:23:49 Voltage Offset Correction: v_off_ini = 0.000005431 V, v_off_fin = 0.000002251 V 06:23:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973288 Vs 06:23:52 Temperature Measurement, Probe Number = 0, T = 20.130000 C 06:23:52 Temperature Measurement, Probe Number = 1, T = 20.049000 C 06:23:53 Temperature Measurement, Probe Number = 2, T = 20.112000 C 06:23:54 Temperature Measurement, Probe Number = 3, T = 20.054000 C 06:23:54 Temperature Measurement, Probe Number = 4, T = 20.485000 C 06:23:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.48 06:23:54 Integrated Voltage Measurement... 06:24:14 Voltage Offset Correction: v_off_ini = 0.000003656 V, v_off_fin = 0.000005256 V 06:24:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023210 Vs 06:24:14 Integrated Voltage Measurement... 06:24:33 Voltage Offset Correction: v_off_ini = 0.000004830 V, v_off_fin = 0.000001826 V 06:24:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972871 Vs 06:24:36 Temperature Measurement, Probe Number = 0, T = 20.134000 C 06:24:37 Temperature Measurement, Probe Number = 1, T = 20.052000 C 06:24:37 Temperature Measurement, Probe Number = 2, T = 20.115000 C 06:24:38 Temperature Measurement, Probe Number = 3, T = 20.058000 C 06:24:39 Temperature Measurement, Probe Number = 4, T = 20.480000 C 06:24:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.48 06:24:39 Integrated Voltage Measurement... 06:24:58 Voltage Offset Correction: v_off_ini = 0.000003580 V, v_off_fin = 0.000005314 V 06:24:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171026315 Vs 06:24:58 Integrated Voltage Measurement... 06:25:17 Voltage Offset Correction: v_off_ini = 0.000005590 V, v_off_fin = 0.000001459 V 06:25:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970591 Vs 06:25:20 Temperature Measurement, Probe Number = 0, T = 20.128000 C 06:25:21 Temperature Measurement, Probe Number = 1, T = 20.049000 C 06:25:21 Temperature Measurement, Probe Number = 2, T = 20.108000 C 06:25:22 Temperature Measurement, Probe Number = 3, T = 20.053000 C 06:25:23 Temperature Measurement, Probe Number = 4, T = 20.545000 C 06:25:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.55 06:25:23 Integrated Voltage Measurement... 06:25:42 Voltage Offset Correction: v_off_ini = 0.000003922 V, v_off_fin = 0.000006152 V 06:25:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171027956 Vs 06:25:42 Integrated Voltage Measurement... 06:26:01 Voltage Offset Correction: v_off_ini = 0.000005827 V, v_off_fin = 0.000002182 V 06:26:01 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170966288 Vs 06:26:04 Temperature Measurement, Probe Number = 0, T = 20.128000 C 06:26:05 Temperature Measurement, Probe Number = 1, T = 20.052000 C 06:26:05 Temperature Measurement, Probe Number = 2, T = 20.107000 C 06:26:06 Temperature Measurement, Probe Number = 3, T = 20.052000 C 06:26:07 Temperature Measurement, Probe Number = 4, T = 20.507000 C 06:26:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.51 06:26:07 Integrated Voltage Measurement... 06:26:26 Voltage Offset Correction: v_off_ini = 0.000003423 V, v_off_fin = 0.000005772 V 06:26:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025414 Vs 06:26:27 Integrated Voltage Measurement... 06:26:46 Voltage Offset Correction: v_off_ini = 0.000005591 V, v_off_fin = 0.000002390 V 06:26:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966143 Vs 06:26:49 Temperature Measurement, Probe Number = 0, T = 20.131000 C 06:26:50 Temperature Measurement, Probe Number = 1, T = 20.051000 C 06:26:51 Temperature Measurement, Probe Number = 2, T = 20.109000 C 06:26:51 Temperature Measurement, Probe Number = 3, T = 20.052000 C 06:26:52 Temperature Measurement, Probe Number = 4, T = 20.423000 C 06:26:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.42 06:26:52 Integrated Voltage Measurement... 06:27:11 Voltage Offset Correction: v_off_ini = 0.000003582 V, v_off_fin = 0.000006106 V 06:27:12 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171014481 Vs 06:27:12 Integrated Voltage Measurement... 06:27:31 Voltage Offset Correction: v_off_ini = 0.000005150 V, v_off_fin = 0.000002288 V 06:27:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971791 Vs 06:27:34 Temperature Measurement, Probe Number = 0, T = 20.129000 C 06:27:35 Temperature Measurement, Probe Number = 1, T = 20.053000 C 06:27:35 Temperature Measurement, Probe Number = 2, T = 20.109000 C 06:27:36 Temperature Measurement, Probe Number = 3, T = 20.054000 C 06:27:37 Temperature Measurement, Probe Number = 4, T = 20.475000 C 06:27:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.48 06:27:37 Integrated Voltage Measurement... 06:27:56 Voltage Offset Correction: v_off_ini = 0.000003482 V, v_off_fin = 0.000006272 V 06:27:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025024 Vs 06:27:57 Integrated Voltage Measurement... 06:28:16 Voltage Offset Correction: v_off_ini = 0.000005762 V, v_off_fin = 0.000002486 V 06:28:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963861 Vs 06:28:19 Temperature Measurement, Probe Number = 0, T = 20.131000 C 06:28:19 Temperature Measurement, Probe Number = 1, T = 20.048000 C 06:28:20 Temperature Measurement, Probe Number = 2, T = 20.115000 C 06:28:21 Temperature Measurement, Probe Number = 3, T = 20.053000 C 06:28:21 Temperature Measurement, Probe Number = 4, T = 20.548000 C 06:28:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.55 06:28:21 Integrated Voltage Measurement... 06:28:41 Voltage Offset Correction: v_off_ini = 0.000003631 V, v_off_fin = 0.000006037 V 06:28:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020432 Vs 06:28:41 Integrated Voltage Measurement... 06:29:00 Voltage Offset Correction: v_off_ini = 0.000005468 V, v_off_fin = 0.000002957 V 06:29:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962537 Vs 06:29:03 Temperature Measurement, Probe Number = 0, T = 20.130000 C 06:29:04 Temperature Measurement, Probe Number = 1, T = 20.049000 C 06:29:04 Temperature Measurement, Probe Number = 2, T = 20.113000 C 06:29:05 Temperature Measurement, Probe Number = 3, T = 20.054000 C 06:29:06 Temperature Measurement, Probe Number = 4, T = 20.596000 C 06:29:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.60 06:29:06 Integrated Voltage Measurement... 06:29:26 Voltage Offset Correction: v_off_ini = 0.000003386 V, v_off_fin = 0.000005726 V 06:29:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020675 Vs 06:29:26 Integrated Voltage Measurement... 06:29:46 Voltage Offset Correction: v_off_ini = 0.000004799 V, v_off_fin = 0.000002379 V 06:29:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969428 Vs 06:29:48 Temperature Measurement, Probe Number = 0, T = 20.134000 C 06:29:49 Temperature Measurement, Probe Number = 1, T = 20.050000 C 06:29:50 Temperature Measurement, Probe Number = 2, T = 20.115000 C 06:29:50 Temperature Measurement, Probe Number = 3, T = 20.055000 C 06:29:51 Temperature Measurement, Probe Number = 4, T = 20.628000 C 06:29:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.63 06:29:51 Integrated Voltage Measurement... 06:30:10 Voltage Offset Correction: v_off_ini = 0.000002479 V, v_off_fin = 0.000005944 V 06:30:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017866 Vs 06:30:11 Integrated Voltage Measurement... 06:30:30 Voltage Offset Correction: v_off_ini = 0.000005263 V, v_off_fin = 0.000002016 V 06:30:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170966909 Vs 07:00:33 Temperature Measurement, Probe Number = 0, T = 20.136000 C 07:00:33 Temperature Measurement, Probe Number = 1, T = 20.057000 C 07:00:34 Temperature Measurement, Probe Number = 2, T = 20.116000 C 07:00:35 Temperature Measurement, Probe Number = 3, T = 20.059000 C 07:00:35 Temperature Measurement, Probe Number = 4, T = 20.513000 C 07:00:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.51 07:00:35 Integrated Voltage Measurement... 07:00:54 Voltage Offset Correction: v_off_ini = 0.000003835 V, v_off_fin = 0.000005439 V 07:00:55 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171075533 Vs 07:00:55 Integrated Voltage Measurement... 07:01:14 Voltage Offset Correction: v_off_ini = 0.000005225 V, v_off_fin = 0.000002082 V 07:01:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965668 Vs 07:01:17 Temperature Measurement, Probe Number = 0, T = 20.132000 C 07:01:18 Temperature Measurement, Probe Number = 1, T = 20.055000 C 07:01:18 Temperature Measurement, Probe Number = 2, T = 20.112000 C 07:01:19 Temperature Measurement, Probe Number = 3, T = 20.057000 C 07:01:20 Temperature Measurement, Probe Number = 4, T = 20.555000 C 07:01:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.55 07:01:20 Integrated Voltage Measurement... 07:01:40 Voltage Offset Correction: v_off_ini = 0.000002661 V, v_off_fin = 0.000005954 V 07:01:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171012360 Vs 07:01:40 Integrated Voltage Measurement... 07:01:59 Voltage Offset Correction: v_off_ini = 0.000005336 V, v_off_fin = 0.000002676 V 07:01:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966239 Vs 07:02:02 Temperature Measurement, Probe Number = 0, T = 20.134000 C 07:02:03 Temperature Measurement, Probe Number = 1, T = 20.052000 C 07:02:03 Temperature Measurement, Probe Number = 2, T = 20.112000 C 07:02:04 Temperature Measurement, Probe Number = 3, T = 20.055000 C 07:02:05 Temperature Measurement, Probe Number = 4, T = 20.566000 C 07:02:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.57 07:02:05 Integrated Voltage Measurement... 07:02:24 Voltage Offset Correction: v_off_ini = 0.000003581 V, v_off_fin = 0.000006194 V 07:02:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171014967 Vs 07:02:25 Integrated Voltage Measurement... 07:02:44 Voltage Offset Correction: v_off_ini = 0.000004963 V, v_off_fin = 0.000001983 V 07:02:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963304 Vs 07:02:47 Temperature Measurement, Probe Number = 0, T = 20.125000 C 07:02:47 Temperature Measurement, Probe Number = 1, T = 20.049000 C 07:02:48 Temperature Measurement, Probe Number = 2, T = 20.104000 C 07:02:48 Temperature Measurement, Probe Number = 3, T = 20.050000 C 07:02:49 Temperature Measurement, Probe Number = 4, T = 20.579000 C 07:02:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.58 07:02:49 Integrated Voltage Measurement... 07:03:09 Voltage Offset Correction: v_off_ini = 0.000003206 V, v_off_fin = 0.000005421 V 07:03:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171018252 Vs 07:03:10 Integrated Voltage Measurement... 07:03:29 Voltage Offset Correction: v_off_ini = 0.000004897 V, v_off_fin = 0.000002462 V 07:03:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965626 Vs 07:03:32 Temperature Measurement, Probe Number = 0, T = 20.134000 C 07:03:32 Temperature Measurement, Probe Number = 1, T = 20.056000 C 07:03:33 Temperature Measurement, Probe Number = 2, T = 20.117000 C 07:03:34 Temperature Measurement, Probe Number = 3, T = 20.058000 C 07:03:34 Temperature Measurement, Probe Number = 4, T = 20.602000 C 07:03:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.60 07:03:34 Integrated Voltage Measurement... 07:03:54 Voltage Offset Correction: v_off_ini = 0.000003417 V, v_off_fin = 0.000005894 V 07:03:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171015117 Vs 07:03:54 Integrated Voltage Measurement... 07:04:13 Voltage Offset Correction: v_off_ini = 0.000005129 V, v_off_fin = 0.000002176 V 07:04:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962574 Vs 07:04:16 Temperature Measurement, Probe Number = 0, T = 20.133000 C 07:04:17 Temperature Measurement, Probe Number = 1, T = 20.053000 C 07:04:18 Temperature Measurement, Probe Number = 2, T = 20.114000 C 07:04:18 Temperature Measurement, Probe Number = 3, T = 20.055000 C 07:04:19 Temperature Measurement, Probe Number = 4, T = 20.639000 C 07:04:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.64 07:04:19 Integrated Voltage Measurement... 07:04:39 Voltage Offset Correction: v_off_ini = 0.000003696 V, v_off_fin = 0.000006101 V 07:04:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017720 Vs 07:04:39 Integrated Voltage Measurement... 07:04:58 Voltage Offset Correction: v_off_ini = 0.000005084 V, v_off_fin = 0.000002294 V 07:04:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970246 Vs 07:05:01 Temperature Measurement, Probe Number = 0, T = 20.131000 C 07:05:02 Temperature Measurement, Probe Number = 1, T = 20.049000 C 07:05:03 Temperature Measurement, Probe Number = 2, T = 20.113000 C 07:05:03 Temperature Measurement, Probe Number = 3, T = 20.052000 C 07:05:04 Temperature Measurement, Probe Number = 4, T = 20.612000 C 07:05:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.61 07:05:04 Integrated Voltage Measurement... 07:05:24 Voltage Offset Correction: v_off_ini = 0.000003342 V, v_off_fin = 0.000005910 V 07:05:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020292 Vs 07:05:24 Integrated Voltage Measurement... 07:05:43 Voltage Offset Correction: v_off_ini = 0.000004978 V, v_off_fin = 0.000002338 V 07:05:43 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170960648 Vs 07:05:46 Temperature Measurement, Probe Number = 0, T = 20.131000 C 07:05:47 Temperature Measurement, Probe Number = 1, T = 20.052000 C 07:05:47 Temperature Measurement, Probe Number = 2, T = 20.110000 C 07:05:48 Temperature Measurement, Probe Number = 3, T = 20.052000 C 07:05:49 Temperature Measurement, Probe Number = 4, T = 20.544000 C 07:05:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.54 07:05:49 Integrated Voltage Measurement... 07:06:08 Voltage Offset Correction: v_off_ini = 0.000003398 V, v_off_fin = 0.000006091 V 07:06:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171020508 Vs 07:06:08 Integrated Voltage Measurement... 07:06:28 Voltage Offset Correction: v_off_ini = 0.000005253 V, v_off_fin = 0.000002318 V 07:06:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170963807 Vs 07:06:31 Temperature Measurement, Probe Number = 0, T = 20.139000 C 07:06:31 Temperature Measurement, Probe Number = 1, T = 20.057000 C 07:06:32 Temperature Measurement, Probe Number = 2, T = 20.117000 C 07:06:33 Temperature Measurement, Probe Number = 3, T = 20.059000 C 07:06:33 Temperature Measurement, Probe Number = 4, T = 20.538000 C 07:06:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.54 07:06:33 Integrated Voltage Measurement... 07:06:53 Voltage Offset Correction: v_off_ini = 0.000003579 V, v_off_fin = 0.000006097 V 07:06:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017607 Vs 07:06:54 Integrated Voltage Measurement... 07:07:13 Voltage Offset Correction: v_off_ini = 0.000004852 V, v_off_fin = 0.000002495 V 07:07:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961777 Vs 07:07:16 Temperature Measurement, Probe Number = 0, T = 20.141000 C 07:07:16 Temperature Measurement, Probe Number = 1, T = 20.061000 C 07:07:17 Temperature Measurement, Probe Number = 2, T = 20.121000 C 07:07:18 Temperature Measurement, Probe Number = 3, T = 20.062000 C 07:07:18 Temperature Measurement, Probe Number = 4, T = 20.619000 C 07:07:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.62 07:07:19 Integrated Voltage Measurement... 07:07:38 Voltage Offset Correction: v_off_ini = 0.000003049 V, v_off_fin = 0.000005908 V 07:07:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171023439 Vs 07:07:38 Integrated Voltage Measurement... 07:07:57 Voltage Offset Correction: v_off_ini = 0.000005753 V, v_off_fin = 0.000001578 V 07:07:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170960936 Vs 07:38:00 Temperature Measurement, Probe Number = 0, T = 20.136000 C 07:38:01 Temperature Measurement, Probe Number = 1, T = 20.056000 C 07:38:01 Temperature Measurement, Probe Number = 2, T = 20.118000 C 07:38:02 Temperature Measurement, Probe Number = 3, T = 20.058000 C 07:38:03 Temperature Measurement, Probe Number = 4, T = 20.514000 C 07:38:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.51 07:38:03 Integrated Voltage Measurement... 07:38:22 Voltage Offset Correction: v_off_ini = 0.000004189 V, v_off_fin = 0.000006223 V 07:38:22 Integrated Voltage Measurement Delta Gap = 0.0040018 m VT = 0.171078198 Vs 07:38:22 Integrated Voltage Measurement... 07:38:42 Voltage Offset Correction: v_off_ini = 0.000005475 V, v_off_fin = 0.000001693 V 07:38:42 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170967465 Vs 07:38:44 Temperature Measurement, Probe Number = 0, T = 20.137000 C 07:38:45 Temperature Measurement, Probe Number = 1, T = 20.057000 C 07:38:46 Temperature Measurement, Probe Number = 2, T = 20.114000 C 07:38:46 Temperature Measurement, Probe Number = 3, T = 20.058000 C 07:38:47 Temperature Measurement, Probe Number = 4, T = 20.490000 C 07:38:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.49 07:38:47 Integrated Voltage Measurement... 07:39:07 Voltage Offset Correction: v_off_ini = 0.000003190 V, v_off_fin = 0.000005796 V 07:39:07 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171017454 Vs 07:39:07 Integrated Voltage Measurement... 07:39:26 Voltage Offset Correction: v_off_ini = 0.000004766 V, v_off_fin = 0.000001882 V 07:39:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962038 Vs 07:39:29 Temperature Measurement, Probe Number = 0, T = 20.138000 C 07:39:30 Temperature Measurement, Probe Number = 1, T = 20.061000 C 07:39:30 Temperature Measurement, Probe Number = 2, T = 20.114000 C 07:39:31 Temperature Measurement, Probe Number = 3, T = 20.059000 C 07:39:32 Temperature Measurement, Probe Number = 4, T = 20.498000 C 07:39:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.50 07:39:32 Integrated Voltage Measurement... 07:39:51 Voltage Offset Correction: v_off_ini = 0.000003172 V, v_off_fin = 0.000005758 V 07:39:51 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171022495 Vs 07:39:51 Integrated Voltage Measurement... 07:40:11 Voltage Offset Correction: v_off_ini = 0.000005011 V, v_off_fin = 0.000002197 V 07:40:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965187 Vs 07:40:14 Temperature Measurement, Probe Number = 0, T = 20.140000 C 07:40:14 Temperature Measurement, Probe Number = 1, T = 20.059000 C 07:40:15 Temperature Measurement, Probe Number = 2, T = 20.118000 C 07:40:16 Temperature Measurement, Probe Number = 3, T = 20.058000 C 07:40:16 Temperature Measurement, Probe Number = 4, T = 20.560000 C 07:40:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.56 07:40:16 Integrated Voltage Measurement... 07:40:36 Voltage Offset Correction: v_off_ini = 0.000002969 V, v_off_fin = 0.000005914 V 07:40:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171019506 Vs 07:40:36 Integrated Voltage Measurement... 07:40:55 Voltage Offset Correction: v_off_ini = 0.000004752 V, v_off_fin = 0.000001454 V 07:40:55 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170964224 Vs 07:40:58 Temperature Measurement, Probe Number = 0, T = 20.140000 C 07:40:59 Temperature Measurement, Probe Number = 1, T = 20.059000 C 07:40:59 Temperature Measurement, Probe Number = 2, T = 20.120000 C 07:41:00 Temperature Measurement, Probe Number = 3, T = 20.060000 C 07:41:01 Temperature Measurement, Probe Number = 4, T = 20.562000 C 07:41:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.56 07:41:01 Integrated Voltage Measurement... 07:41:20 Voltage Offset Correction: v_off_ini = 0.000002188 V, v_off_fin = 0.000005489 V 07:41:20 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171017140 Vs 07:41:21 Integrated Voltage Measurement... 07:41:40 Voltage Offset Correction: v_off_ini = 0.000005204 V, v_off_fin = 0.000001848 V 07:41:40 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170968386 Vs 07:41:43 Temperature Measurement, Probe Number = 0, T = 20.140000 C 07:41:43 Temperature Measurement, Probe Number = 1, T = 20.061000 C 07:41:44 Temperature Measurement, Probe Number = 2, T = 20.120000 C 07:41:45 Temperature Measurement, Probe Number = 3, T = 20.062000 C 07:41:45 Temperature Measurement, Probe Number = 4, T = 20.618000 C 07:41:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.62 07:41:46 Integrated Voltage Measurement... 07:42:05 Voltage Offset Correction: v_off_ini = 0.000003129 V, v_off_fin = 0.000005308 V 07:42:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171014493 Vs 07:42:05 Integrated Voltage Measurement... 07:42:24 Voltage Offset Correction: v_off_ini = 0.000004481 V, v_off_fin = 0.000002006 V 07:42:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170966492 Vs 07:42:27 Temperature Measurement, Probe Number = 0, T = 20.137000 C 07:42:28 Temperature Measurement, Probe Number = 1, T = 20.053000 C 07:42:29 Temperature Measurement, Probe Number = 2, T = 20.116000 C 07:42:29 Temperature Measurement, Probe Number = 3, T = 20.055000 C 07:42:30 Temperature Measurement, Probe Number = 4, T = 20.603000 C 07:42:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.60 07:42:30 Integrated Voltage Measurement... 07:42:49 Voltage Offset Correction: v_off_ini = 0.000003024 V, v_off_fin = 0.000005854 V 07:42:49 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171018191 Vs 07:42:49 Integrated Voltage Measurement... 07:43:08 Voltage Offset Correction: v_off_ini = 0.000004653 V, v_off_fin = 0.000001912 V 07:43:09 Integrated Voltage Measurement Delta Gap = -0.0040005 m VT = -0.170963821 Vs 07:43:12 Temperature Measurement, Probe Number = 0, T = 20.137000 C 07:43:12 Temperature Measurement, Probe Number = 1, T = 20.056000 C 07:43:13 Temperature Measurement, Probe Number = 2, T = 20.115000 C 07:43:14 Temperature Measurement, Probe Number = 3, T = 20.055000 C 07:43:14 Temperature Measurement, Probe Number = 4, T = 20.575000 C 07:43:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.57 07:43:14 Integrated Voltage Measurement... 07:43:33 Voltage Offset Correction: v_off_ini = 0.000002826 V, v_off_fin = 0.000005764 V 07:43:34 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171023823 Vs 07:43:34 Integrated Voltage Measurement... 07:43:53 Voltage Offset Correction: v_off_ini = 0.000006188 V, v_off_fin = 0.000001995 V 07:43:53 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170960781 Vs 07:43:56 Temperature Measurement, Probe Number = 0, T = 20.138000 C 07:43:57 Temperature Measurement, Probe Number = 1, T = 20.055000 C 07:43:57 Temperature Measurement, Probe Number = 2, T = 20.112000 C 07:43:58 Temperature Measurement, Probe Number = 3, T = 20.052000 C 07:43:59 Temperature Measurement, Probe Number = 4, T = 20.483000 C 07:43:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.48 07:43:59 Integrated Voltage Measurement... 07:44:18 Voltage Offset Correction: v_off_ini = 0.000003430 V, v_off_fin = 0.000005564 V 07:44:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171015886 Vs 07:44:19 Integrated Voltage Measurement... 07:44:38 Voltage Offset Correction: v_off_ini = 0.000005238 V, v_off_fin = 0.000002090 V 07:44:38 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170961687 Vs 07:44:41 Temperature Measurement, Probe Number = 0, T = 20.136000 C 07:44:42 Temperature Measurement, Probe Number = 1, T = 20.056000 C 07:44:42 Temperature Measurement, Probe Number = 2, T = 20.112000 C 07:44:43 Temperature Measurement, Probe Number = 3, T = 20.053000 C 07:44:44 Temperature Measurement, Probe Number = 4, T = 20.424000 C 07:44:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.42 07:44:44 Integrated Voltage Measurement... 07:45:04 Voltage Offset Correction: v_off_ini = 0.000003154 V, v_off_fin = 0.000005418 V 07:45:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171017790 Vs 07:45:04 Integrated Voltage Measurement... 07:45:23 Voltage Offset Correction: v_off_ini = 0.000004886 V, v_off_fin = 0.000002329 V 07:45:23 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170965993 Vs 08:15:26 Temperature Measurement, Probe Number = 0, T = 20.143000 C 08:15:27 Temperature Measurement, Probe Number = 1, T = 20.065000 C 08:15:28 Temperature Measurement, Probe Number = 2, T = 20.122000 C 08:15:28 Temperature Measurement, Probe Number = 3, T = 20.065000 C 08:15:29 Temperature Measurement, Probe Number = 4, T = 20.472000 C 08:15:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.47 08:15:29 Integrated Voltage Measurement... 08:15:48 Voltage Offset Correction: v_off_ini = 0.000004933 V, v_off_fin = 0.000006195 V 08:15:48 Integrated Voltage Measurement Delta Gap = 0.0040017 m VT = 0.171082431 Vs 08:15:49 Integrated Voltage Measurement... 08:16:08 Voltage Offset Correction: v_off_ini = 0.000005228 V, v_off_fin = 0.000002238 V 08:16:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961232 Vs 08:16:11 Temperature Measurement, Probe Number = 0, T = 20.140000 C 08:16:12 Temperature Measurement, Probe Number = 1, T = 20.061000 C 08:16:12 Temperature Measurement, Probe Number = 2, T = 20.119000 C 08:16:13 Temperature Measurement, Probe Number = 3, T = 20.062000 C 08:16:14 Temperature Measurement, Probe Number = 4, T = 20.425000 C 08:16:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.43 08:16:14 Integrated Voltage Measurement... 08:16:33 Voltage Offset Correction: v_off_ini = 0.000003734 V, v_off_fin = 0.000005550 V 08:16:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171022816 Vs 08:16:33 Integrated Voltage Measurement... 08:16:53 Voltage Offset Correction: v_off_ini = 0.000005181 V, v_off_fin = 0.000002426 V 08:16:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966265 Vs 08:16:56 Temperature Measurement, Probe Number = 0, T = 20.140000 C 08:16:56 Temperature Measurement, Probe Number = 1, T = 20.062000 C 08:16:57 Temperature Measurement, Probe Number = 2, T = 20.119000 C 08:16:58 Temperature Measurement, Probe Number = 3, T = 20.061000 C 08:16:58 Temperature Measurement, Probe Number = 4, T = 20.415000 C 08:16:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.41 08:16:58 Integrated Voltage Measurement... 08:17:18 Voltage Offset Correction: v_off_ini = 0.000003799 V, v_off_fin = 0.000006103 V 08:17:18 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171017086 Vs 08:17:18 Integrated Voltage Measurement... 08:17:38 Voltage Offset Correction: v_off_ini = 0.000005922 V, v_off_fin = 0.000002572 V 08:17:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964201 Vs 08:17:40 Temperature Measurement, Probe Number = 0, T = 20.142000 C 08:17:41 Temperature Measurement, Probe Number = 1, T = 20.061000 C 08:17:42 Temperature Measurement, Probe Number = 2, T = 20.123000 C 08:17:42 Temperature Measurement, Probe Number = 3, T = 20.062000 C 08:17:43 Temperature Measurement, Probe Number = 4, T = 20.463000 C 08:17:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.46 08:17:43 Integrated Voltage Measurement... 08:18:03 Voltage Offset Correction: v_off_ini = 0.000003602 V, v_off_fin = 0.000005584 V 08:18:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171015318 Vs 08:18:03 Integrated Voltage Measurement... 08:18:23 Voltage Offset Correction: v_off_ini = 0.000004580 V, v_off_fin = 0.000002435 V 08:18:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965912 Vs 08:18:25 Temperature Measurement, Probe Number = 0, T = 20.140000 C 08:18:26 Temperature Measurement, Probe Number = 1, T = 20.062000 C 08:18:27 Temperature Measurement, Probe Number = 2, T = 20.119000 C 08:18:27 Temperature Measurement, Probe Number = 3, T = 20.063000 C 08:18:28 Temperature Measurement, Probe Number = 4, T = 20.452000 C 08:18:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.45 08:18:28 Integrated Voltage Measurement... 08:18:47 Voltage Offset Correction: v_off_ini = 0.000003861 V, v_off_fin = 0.000005627 V 08:18:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171013777 Vs 08:18:48 Integrated Voltage Measurement... 08:19:07 Voltage Offset Correction: v_off_ini = 0.000005569 V, v_off_fin = 0.000002229 V 08:19:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967380 Vs 08:19:10 Temperature Measurement, Probe Number = 0, T = 20.145000 C 08:19:10 Temperature Measurement, Probe Number = 1, T = 20.064000 C 08:19:11 Temperature Measurement, Probe Number = 2, T = 20.124000 C 08:19:12 Temperature Measurement, Probe Number = 3, T = 20.065000 C 08:19:12 Temperature Measurement, Probe Number = 4, T = 20.551000 C 08:19:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.55 08:19:12 Integrated Voltage Measurement... 08:19:32 Voltage Offset Correction: v_off_ini = 0.000002974 V, v_off_fin = 0.000005749 V 08:19:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171017536 Vs 08:19:32 Integrated Voltage Measurement... 08:19:51 Voltage Offset Correction: v_off_ini = 0.000004821 V, v_off_fin = 0.000001727 V 08:19:52 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170964529 Vs 08:19:54 Temperature Measurement, Probe Number = 0, T = 20.140000 C 08:19:55 Temperature Measurement, Probe Number = 1, T = 20.060000 C 08:19:56 Temperature Measurement, Probe Number = 2, T = 20.117000 C 08:19:56 Temperature Measurement, Probe Number = 3, T = 20.058000 C 08:19:57 Temperature Measurement, Probe Number = 4, T = 20.577000 C 08:19:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.58 08:19:57 Integrated Voltage Measurement... 08:20:16 Voltage Offset Correction: v_off_ini = 0.000002840 V, v_off_fin = 0.000005793 V 08:20:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171015538 Vs 08:20:17 Integrated Voltage Measurement... 08:20:36 Voltage Offset Correction: v_off_ini = 0.000005485 V, v_off_fin = 0.000001870 V 08:20:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170963970 Vs 08:20:39 Temperature Measurement, Probe Number = 0, T = 20.141000 C 08:20:39 Temperature Measurement, Probe Number = 1, T = 20.063000 C 08:20:40 Temperature Measurement, Probe Number = 2, T = 20.115000 C 08:20:41 Temperature Measurement, Probe Number = 3, T = 20.058000 C 08:20:41 Temperature Measurement, Probe Number = 4, T = 20.514000 C 08:20:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.51 08:20:42 Integrated Voltage Measurement... 08:21:01 Voltage Offset Correction: v_off_ini = 0.000002742 V, v_off_fin = 0.000006088 V 08:21:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171020949 Vs 08:21:01 Integrated Voltage Measurement... 08:21:21 Voltage Offset Correction: v_off_ini = 0.000005404 V, v_off_fin = 0.000002350 V 08:21:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964190 Vs 08:21:23 Temperature Measurement, Probe Number = 0, T = 20.143000 C 08:21:24 Temperature Measurement, Probe Number = 1, T = 20.062000 C 08:21:25 Temperature Measurement, Probe Number = 2, T = 20.121000 C 08:21:25 Temperature Measurement, Probe Number = 3, T = 20.062000 C 08:21:26 Temperature Measurement, Probe Number = 4, T = 20.554000 C 08:21:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.55 08:21:26 Integrated Voltage Measurement... 08:21:46 Voltage Offset Correction: v_off_ini = 0.000002944 V, v_off_fin = 0.000006108 V 08:21:46 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171022560 Vs 08:21:46 Integrated Voltage Measurement... 08:22:05 Voltage Offset Correction: v_off_ini = 0.000005718 V, v_off_fin = 0.000001927 V 08:22:05 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170964243 Vs 08:22:08 Temperature Measurement, Probe Number = 0, T = 20.143000 C 08:22:08 Temperature Measurement, Probe Number = 1, T = 20.062000 C 08:22:09 Temperature Measurement, Probe Number = 2, T = 20.122000 C 08:22:10 Temperature Measurement, Probe Number = 3, T = 20.063000 C 08:22:10 Temperature Measurement, Probe Number = 4, T = 20.541000 C 08:22:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.54 08:22:11 Integrated Voltage Measurement... 08:22:30 Voltage Offset Correction: v_off_ini = 0.000003222 V, v_off_fin = 0.000005485 V 08:22:30 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171023183 Vs 08:22:30 Integrated Voltage Measurement... 08:22:49 Voltage Offset Correction: v_off_ini = 0.000005608 V, v_off_fin = 0.000001864 V 08:22:49 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170963217 Vs 08:52:52 Temperature Measurement, Probe Number = 0, T = 20.132000 C 08:52:53 Temperature Measurement, Probe Number = 1, T = 20.055000 C 08:52:53 Temperature Measurement, Probe Number = 2, T = 20.111000 C 08:52:54 Temperature Measurement, Probe Number = 3, T = 20.055000 C 08:52:54 Temperature Measurement, Probe Number = 4, T = 20.349000 C 08:52:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.35 08:52:55 Integrated Voltage Measurement... 08:53:14 Voltage Offset Correction: v_off_ini = 0.000004176 V, v_off_fin = 0.000005612 V 08:53:15 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171069007 Vs 08:53:15 Integrated Voltage Measurement... 08:53:34 Voltage Offset Correction: v_off_ini = 0.000005222 V, v_off_fin = 0.000001404 V 08:53:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970735 Vs 08:53:37 Temperature Measurement, Probe Number = 0, T = 20.130000 C 08:53:37 Temperature Measurement, Probe Number = 1, T = 20.052000 C 08:53:38 Temperature Measurement, Probe Number = 2, T = 20.109000 C 08:53:39 Temperature Measurement, Probe Number = 3, T = 20.053000 C 08:53:39 Temperature Measurement, Probe Number = 4, T = 20.410000 C 08:53:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 08:53:40 Integrated Voltage Measurement... 08:53:59 Voltage Offset Correction: v_off_ini = 0.000002995 V, v_off_fin = 0.000005610 V 08:53:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171016184 Vs 08:53:59 Integrated Voltage Measurement... 08:54:18 Voltage Offset Correction: v_off_ini = 0.000005085 V, v_off_fin = 0.000001545 V 08:54:18 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971560 Vs 08:54:21 Temperature Measurement, Probe Number = 0, T = 20.134000 C 08:54:22 Temperature Measurement, Probe Number = 1, T = 20.056000 C 08:54:22 Temperature Measurement, Probe Number = 2, T = 20.110000 C 08:54:23 Temperature Measurement, Probe Number = 3, T = 20.054000 C 08:54:24 Temperature Measurement, Probe Number = 4, T = 20.300000 C 08:54:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.30 08:54:24 Integrated Voltage Measurement... 08:54:43 Voltage Offset Correction: v_off_ini = 0.000004043 V, v_off_fin = 0.000005821 V 08:54:43 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171021750 Vs 08:54:43 Integrated Voltage Measurement... 08:55:03 Voltage Offset Correction: v_off_ini = 0.000005138 V, v_off_fin = 0.000001796 V 08:55:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170974260 Vs 08:55:06 Temperature Measurement, Probe Number = 0, T = 20.135000 C 08:55:06 Temperature Measurement, Probe Number = 1, T = 20.055000 C 08:55:07 Temperature Measurement, Probe Number = 2, T = 20.113000 C 08:55:07 Temperature Measurement, Probe Number = 3, T = 20.054000 C 08:55:08 Temperature Measurement, Probe Number = 4, T = 20.316000 C 08:55:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.32 08:55:08 Integrated Voltage Measurement... 08:55:28 Voltage Offset Correction: v_off_ini = 0.000003094 V, v_off_fin = 0.000005514 V 08:55:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171016570 Vs 08:55:28 Integrated Voltage Measurement... 08:55:47 Voltage Offset Correction: v_off_ini = 0.000005387 V, v_off_fin = 0.000002635 V 08:55:47 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170968114 Vs 08:55:50 Temperature Measurement, Probe Number = 0, T = 20.145000 C 08:55:51 Temperature Measurement, Probe Number = 1, T = 20.063000 C 08:55:51 Temperature Measurement, Probe Number = 2, T = 20.121000 C 08:55:52 Temperature Measurement, Probe Number = 3, T = 20.062000 C 08:55:53 Temperature Measurement, Probe Number = 4, T = 20.424000 C 08:55:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.42 08:55:53 Integrated Voltage Measurement... 08:56:12 Voltage Offset Correction: v_off_ini = 0.000003229 V, v_off_fin = 0.000005763 V 08:56:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171023304 Vs 08:56:12 Integrated Voltage Measurement... 08:56:32 Voltage Offset Correction: v_off_ini = 0.000005324 V, v_off_fin = 0.000002244 V 08:56:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170967974 Vs 08:56:35 Temperature Measurement, Probe Number = 0, T = 20.141000 C 08:56:35 Temperature Measurement, Probe Number = 1, T = 20.064000 C 08:56:36 Temperature Measurement, Probe Number = 2, T = 20.119000 C 08:56:36 Temperature Measurement, Probe Number = 3, T = 20.063000 C 08:56:37 Temperature Measurement, Probe Number = 4, T = 20.445000 C 08:56:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.45 08:56:37 Integrated Voltage Measurement... 08:56:56 Voltage Offset Correction: v_off_ini = 0.000003938 V, v_off_fin = 0.000005429 V 08:56:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171019717 Vs 08:56:57 Integrated Voltage Measurement... 08:57:16 Voltage Offset Correction: v_off_ini = 0.000004943 V, v_off_fin = 0.000001109 V 08:57:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971740 Vs 08:57:19 Temperature Measurement, Probe Number = 0, T = 20.136000 C 08:57:20 Temperature Measurement, Probe Number = 1, T = 20.060000 C 08:57:20 Temperature Measurement, Probe Number = 2, T = 20.117000 C 08:57:21 Temperature Measurement, Probe Number = 3, T = 20.062000 C 08:57:22 Temperature Measurement, Probe Number = 4, T = 20.488000 C 08:57:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.49 08:57:22 Integrated Voltage Measurement... 08:57:41 Voltage Offset Correction: v_off_ini = 0.000002783 V, v_off_fin = 0.000005804 V 08:57:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171016122 Vs 08:57:41 Integrated Voltage Measurement... 08:58:00 Voltage Offset Correction: v_off_ini = 0.000004629 V, v_off_fin = 0.000002085 V 08:58:00 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170973422 Vs 08:58:03 Temperature Measurement, Probe Number = 0, T = 20.141000 C 08:58:04 Temperature Measurement, Probe Number = 1, T = 20.060000 C 08:58:04 Temperature Measurement, Probe Number = 2, T = 20.117000 C 08:58:05 Temperature Measurement, Probe Number = 3, T = 20.062000 C 08:58:06 Temperature Measurement, Probe Number = 4, T = 20.500000 C 08:58:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.50 08:58:06 Integrated Voltage Measurement... 08:58:25 Voltage Offset Correction: v_off_ini = 0.000003123 V, v_off_fin = 0.000006224 V 08:58:25 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171027707 Vs 08:58:26 Integrated Voltage Measurement... 08:58:45 Voltage Offset Correction: v_off_ini = 0.000005150 V, v_off_fin = 0.000002032 V 08:58:45 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170967528 Vs 08:58:48 Temperature Measurement, Probe Number = 0, T = 20.144000 C 08:58:48 Temperature Measurement, Probe Number = 1, T = 20.066000 C 08:58:49 Temperature Measurement, Probe Number = 2, T = 20.117000 C 08:58:50 Temperature Measurement, Probe Number = 3, T = 20.063000 C 08:58:50 Temperature Measurement, Probe Number = 4, T = 20.555000 C 08:58:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.55 08:58:51 Integrated Voltage Measurement... 08:59:10 Voltage Offset Correction: v_off_ini = 0.000003112 V, v_off_fin = 0.000005454 V 08:59:10 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171025453 Vs 08:59:10 Integrated Voltage Measurement... 08:59:29 Voltage Offset Correction: v_off_ini = 0.000005327 V, v_off_fin = 0.000001723 V 08:59:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971786 Vs 08:59:32 Temperature Measurement, Probe Number = 0, T = 20.147000 C 08:59:33 Temperature Measurement, Probe Number = 1, T = 20.065000 C 08:59:34 Temperature Measurement, Probe Number = 2, T = 20.124000 C 08:59:34 Temperature Measurement, Probe Number = 3, T = 20.066000 C 08:59:35 Temperature Measurement, Probe Number = 4, T = 20.608000 C 08:59:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.61 08:59:35 Integrated Voltage Measurement... 08:59:54 Voltage Offset Correction: v_off_ini = 0.000002567 V, v_off_fin = 0.000005663 V 08:59:55 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171019806 Vs 08:59:55 Integrated Voltage Measurement... 09:00:14 Voltage Offset Correction: v_off_ini = 0.000004914 V, v_off_fin = 0.000001600 V 09:00:14 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977732 Vs 09:30:17 Temperature Measurement, Probe Number = 0, T = 20.144000 C 09:30:18 Temperature Measurement, Probe Number = 1, T = 20.063000 C 09:30:19 Temperature Measurement, Probe Number = 2, T = 20.121000 C 09:30:19 Temperature Measurement, Probe Number = 3, T = 20.063000 C 09:30:20 Temperature Measurement, Probe Number = 4, T = 20.433000 C 09:30:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.43 09:30:20 Integrated Voltage Measurement... 09:30:40 Voltage Offset Correction: v_off_ini = 0.000004897 V, v_off_fin = 0.000005741 V 09:30:40 Integrated Voltage Measurement Delta Gap = 0.0040017 m VT = 0.171085775 Vs 09:30:40 Integrated Voltage Measurement... 09:30:59 Voltage Offset Correction: v_off_ini = 0.000005482 V, v_off_fin = 0.000001928 V 09:31:00 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170959662 Vs 09:31:02 Temperature Measurement, Probe Number = 0, T = 20.148000 C 09:31:03 Temperature Measurement, Probe Number = 1, T = 20.067000 C 09:31:04 Temperature Measurement, Probe Number = 2, T = 20.124000 C 09:31:04 Temperature Measurement, Probe Number = 3, T = 20.067000 C 09:31:05 Temperature Measurement, Probe Number = 4, T = 20.470000 C 09:31:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.47 09:31:05 Integrated Voltage Measurement... 09:31:24 Voltage Offset Correction: v_off_ini = 0.000003348 V, v_off_fin = 0.000006709 V 09:31:25 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171026978 Vs 09:31:25 Integrated Voltage Measurement... 09:31:44 Voltage Offset Correction: v_off_ini = 0.000005893 V, v_off_fin = 0.000002502 V 09:31:44 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170961398 Vs 09:31:47 Temperature Measurement, Probe Number = 0, T = 20.150000 C 09:31:48 Temperature Measurement, Probe Number = 1, T = 20.070000 C 09:31:48 Temperature Measurement, Probe Number = 2, T = 20.127000 C 09:31:49 Temperature Measurement, Probe Number = 3, T = 20.067000 C 09:31:50 Temperature Measurement, Probe Number = 4, T = 20.500000 C 09:31:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.50 09:31:50 Integrated Voltage Measurement... 09:32:09 Voltage Offset Correction: v_off_ini = 0.000003761 V, v_off_fin = 0.000006305 V 09:32:09 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171030594 Vs 09:32:10 Integrated Voltage Measurement... 09:32:28 Voltage Offset Correction: v_off_ini = 0.000006096 V, v_off_fin = 0.000002188 V 09:32:29 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170962873 Vs 09:32:31 Temperature Measurement, Probe Number = 0, T = 20.145000 C 09:32:32 Temperature Measurement, Probe Number = 1, T = 20.066000 C 09:32:33 Temperature Measurement, Probe Number = 2, T = 20.119000 C 09:32:33 Temperature Measurement, Probe Number = 3, T = 20.062000 C 09:32:34 Temperature Measurement, Probe Number = 4, T = 20.494000 C 09:32:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.49 09:32:34 Integrated Voltage Measurement... 09:32:53 Voltage Offset Correction: v_off_ini = 0.000003687 V, v_off_fin = 0.000006537 V 09:32:54 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171028409 Vs 09:32:54 Integrated Voltage Measurement... 09:33:13 Voltage Offset Correction: v_off_ini = 0.000005616 V, v_off_fin = 0.000002677 V 09:33:13 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170962300 Vs 09:33:16 Temperature Measurement, Probe Number = 0, T = 20.147000 C 09:33:17 Temperature Measurement, Probe Number = 1, T = 20.067000 C 09:33:17 Temperature Measurement, Probe Number = 2, T = 20.121000 C 09:33:18 Temperature Measurement, Probe Number = 3, T = 20.065000 C 09:33:19 Temperature Measurement, Probe Number = 4, T = 20.423000 C 09:33:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.42 09:33:19 Integrated Voltage Measurement... 09:33:38 Voltage Offset Correction: v_off_ini = 0.000003270 V, v_off_fin = 0.000005749 V 09:33:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171025242 Vs 09:33:39 Integrated Voltage Measurement... 09:33:58 Voltage Offset Correction: v_off_ini = 0.000006061 V, v_off_fin = 0.000002618 V 09:33:58 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170958686 Vs 09:34:00 Temperature Measurement, Probe Number = 0, T = 20.153000 C 09:34:01 Temperature Measurement, Probe Number = 1, T = 20.069000 C 09:34:02 Temperature Measurement, Probe Number = 2, T = 20.129000 C 09:34:02 Temperature Measurement, Probe Number = 3, T = 20.067000 C 09:34:03 Temperature Measurement, Probe Number = 4, T = 20.421000 C 09:34:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.42 09:34:03 Integrated Voltage Measurement... 09:34:22 Voltage Offset Correction: v_off_ini = 0.000003202 V, v_off_fin = 0.000005682 V 09:34:22 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171024083 Vs 09:34:23 Integrated Voltage Measurement... 09:34:42 Voltage Offset Correction: v_off_ini = 0.000005979 V, v_off_fin = 0.000001976 V 09:34:42 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170959328 Vs 09:34:45 Temperature Measurement, Probe Number = 0, T = 20.156000 C 09:34:45 Temperature Measurement, Probe Number = 1, T = 20.074000 C 09:34:46 Temperature Measurement, Probe Number = 2, T = 20.130000 C 09:34:46 Temperature Measurement, Probe Number = 3, T = 20.071000 C 09:34:47 Temperature Measurement, Probe Number = 4, T = 20.500000 C 09:34:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.50 09:34:47 Integrated Voltage Measurement... 09:35:07 Voltage Offset Correction: v_off_ini = 0.000003194 V, v_off_fin = 0.000006028 V 09:35:07 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171027091 Vs 09:35:07 Integrated Voltage Measurement... 09:35:26 Voltage Offset Correction: v_off_ini = 0.000005105 V, v_off_fin = 0.000001712 V 09:35:27 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975312 Vs 09:35:29 Temperature Measurement, Probe Number = 0, T = 20.154000 C 09:35:30 Temperature Measurement, Probe Number = 1, T = 20.074000 C 09:35:31 Temperature Measurement, Probe Number = 2, T = 20.131000 C 09:35:31 Temperature Measurement, Probe Number = 3, T = 20.070000 C 09:35:32 Temperature Measurement, Probe Number = 4, T = 20.578000 C 09:35:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.58 09:35:32 Integrated Voltage Measurement... 09:35:51 Voltage Offset Correction: v_off_ini = 0.000003780 V, v_off_fin = 0.000005828 V 09:35:52 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171022447 Vs 09:35:52 Integrated Voltage Measurement... 09:36:11 Voltage Offset Correction: v_off_ini = 0.000005238 V, v_off_fin = 0.000001798 V 09:36:11 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170964935 Vs 09:36:14 Temperature Measurement, Probe Number = 0, T = 20.149000 C 09:36:14 Temperature Measurement, Probe Number = 1, T = 20.074000 C 09:36:15 Temperature Measurement, Probe Number = 2, T = 20.123000 C 09:36:16 Temperature Measurement, Probe Number = 3, T = 20.067000 C 09:36:16 Temperature Measurement, Probe Number = 4, T = 20.628000 C 09:36:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.63 09:36:16 Integrated Voltage Measurement... 09:36:36 Voltage Offset Correction: v_off_ini = 0.000003355 V, v_off_fin = 0.000005347 V 09:36:36 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171026942 Vs 09:36:36 Integrated Voltage Measurement... 09:36:55 Voltage Offset Correction: v_off_ini = 0.000005107 V, v_off_fin = 0.000002143 V 09:36:55 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170964623 Vs 09:36:58 Temperature Measurement, Probe Number = 0, T = 20.151000 C 09:36:58 Temperature Measurement, Probe Number = 1, T = 20.070000 C 09:36:59 Temperature Measurement, Probe Number = 2, T = 20.127000 C 09:37:00 Temperature Measurement, Probe Number = 3, T = 20.069000 C 09:37:00 Temperature Measurement, Probe Number = 4, T = 20.658000 C 09:37:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.66 09:37:01 Integrated Voltage Measurement... 09:37:20 Voltage Offset Correction: v_off_ini = 0.000003643 V, v_off_fin = 0.000006528 V 09:37:20 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171030542 Vs 09:37:20 Integrated Voltage Measurement... 09:37:40 Voltage Offset Correction: v_off_ini = 0.000005798 V, v_off_fin = 0.000002559 V 09:37:40 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170961552 Vs 10:07:43 Temperature Measurement, Probe Number = 0, T = 20.154000 C 10:07:43 Temperature Measurement, Probe Number = 1, T = 20.074000 C 10:07:44 Temperature Measurement, Probe Number = 2, T = 20.129000 C 10:07:45 Temperature Measurement, Probe Number = 3, T = 20.072000 C 10:07:45 Temperature Measurement, Probe Number = 4, T = 20.487000 C 10:07:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.49 10:07:45 Integrated Voltage Measurement... 10:08:05 Voltage Offset Correction: v_off_ini = 0.000004761 V, v_off_fin = 0.000006197 V 10:08:05 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171080538 Vs 10:08:05 Integrated Voltage Measurement... 10:08:25 Voltage Offset Correction: v_off_ini = 0.000005611 V, v_off_fin = 0.000002251 V 10:08:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961876 Vs 10:08:27 Temperature Measurement, Probe Number = 0, T = 20.158000 C 10:08:28 Temperature Measurement, Probe Number = 1, T = 20.077000 C 10:08:29 Temperature Measurement, Probe Number = 2, T = 20.131000 C 10:08:29 Temperature Measurement, Probe Number = 3, T = 20.073000 C 10:08:30 Temperature Measurement, Probe Number = 4, T = 20.510000 C 10:08:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.51 10:08:30 Integrated Voltage Measurement... 10:08:50 Voltage Offset Correction: v_off_ini = 0.000003800 V, v_off_fin = 0.000005979 V 10:08:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171020706 Vs 10:08:50 Integrated Voltage Measurement... 10:09:09 Voltage Offset Correction: v_off_ini = 0.000005178 V, v_off_fin = 0.000002188 V 10:09:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170960556 Vs 10:09:12 Temperature Measurement, Probe Number = 0, T = 20.158000 C 10:09:12 Temperature Measurement, Probe Number = 1, T = 20.077000 C 10:09:13 Temperature Measurement, Probe Number = 2, T = 20.135000 C 10:09:14 Temperature Measurement, Probe Number = 3, T = 20.076000 C 10:09:14 Temperature Measurement, Probe Number = 4, T = 20.579000 C 10:09:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.58 10:09:15 Integrated Voltage Measurement... 10:09:34 Voltage Offset Correction: v_off_ini = 0.000002786 V, v_off_fin = 0.000005992 V 10:09:34 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171020481 Vs 10:09:34 Integrated Voltage Measurement... 10:09:53 Voltage Offset Correction: v_off_ini = 0.000004915 V, v_off_fin = 0.000001915 V 10:09:53 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170964612 Vs 10:09:56 Temperature Measurement, Probe Number = 0, T = 20.153000 C 10:09:56 Temperature Measurement, Probe Number = 1, T = 20.074000 C 10:09:57 Temperature Measurement, Probe Number = 2, T = 20.128000 C 10:09:58 Temperature Measurement, Probe Number = 3, T = 20.071000 C 10:09:58 Temperature Measurement, Probe Number = 4, T = 20.571000 C 10:09:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.57 10:09:59 Integrated Voltage Measurement... 10:10:18 Voltage Offset Correction: v_off_ini = 0.000003580 V, v_off_fin = 0.000005973 V 10:10:18 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171022353 Vs 10:10:18 Integrated Voltage Measurement... 10:10:38 Voltage Offset Correction: v_off_ini = 0.000005347 V, v_off_fin = 0.000001452 V 10:10:38 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170968696 Vs 10:10:40 Temperature Measurement, Probe Number = 0, T = 20.155000 C 10:10:41 Temperature Measurement, Probe Number = 1, T = 20.074000 C 10:10:42 Temperature Measurement, Probe Number = 2, T = 20.132000 C 10:10:42 Temperature Measurement, Probe Number = 3, T = 20.072000 C 10:10:43 Temperature Measurement, Probe Number = 4, T = 20.596000 C 10:10:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.60 10:10:43 Integrated Voltage Measurement... 10:11:03 Voltage Offset Correction: v_off_ini = 0.000002814 V, v_off_fin = 0.000005628 V 10:11:03 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171019544 Vs 10:11:03 Integrated Voltage Measurement... 10:11:22 Voltage Offset Correction: v_off_ini = 0.000005417 V, v_off_fin = 0.000001793 V 10:11:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967442 Vs 10:11:25 Temperature Measurement, Probe Number = 0, T = 20.151000 C 10:11:26 Temperature Measurement, Probe Number = 1, T = 20.069000 C 10:11:26 Temperature Measurement, Probe Number = 2, T = 20.127000 C 10:11:27 Temperature Measurement, Probe Number = 3, T = 20.068000 C 10:11:28 Temperature Measurement, Probe Number = 4, T = 20.599000 C 10:11:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.60 10:11:28 Integrated Voltage Measurement... 10:11:47 Voltage Offset Correction: v_off_ini = 0.000003035 V, v_off_fin = 0.000006105 V 10:11:47 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171019759 Vs 10:11:47 Integrated Voltage Measurement... 10:12:07 Voltage Offset Correction: v_off_ini = 0.000005822 V, v_off_fin = 0.000002304 V 10:12:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961788 Vs 10:12:10 Temperature Measurement, Probe Number = 0, T = 20.151000 C 10:12:10 Temperature Measurement, Probe Number = 1, T = 20.071000 C 10:12:11 Temperature Measurement, Probe Number = 2, T = 20.129000 C 10:12:12 Temperature Measurement, Probe Number = 3, T = 20.071000 C 10:12:12 Temperature Measurement, Probe Number = 4, T = 20.540000 C 10:12:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.54 10:12:13 Integrated Voltage Measurement... 10:12:32 Voltage Offset Correction: v_off_ini = 0.000002710 V, v_off_fin = 0.000006189 V 10:12:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017215 Vs 10:12:33 Integrated Voltage Measurement... 10:12:52 Voltage Offset Correction: v_off_ini = 0.000005619 V, v_off_fin = 0.000001843 V 10:12:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963784 Vs 10:12:55 Temperature Measurement, Probe Number = 0, T = 20.146000 C 10:12:55 Temperature Measurement, Probe Number = 1, T = 20.070000 C 10:12:56 Temperature Measurement, Probe Number = 2, T = 20.123000 C 10:12:57 Temperature Measurement, Probe Number = 3, T = 20.067000 C 10:12:57 Temperature Measurement, Probe Number = 4, T = 20.503000 C 10:12:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.50 10:12:57 Integrated Voltage Measurement... 10:13:17 Voltage Offset Correction: v_off_ini = 0.000003025 V, v_off_fin = 0.000006061 V 10:13:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171021726 Vs 10:13:17 Integrated Voltage Measurement... 10:13:36 Voltage Offset Correction: v_off_ini = 0.000005595 V, v_off_fin = 0.000001108 V 10:13:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170955495 Vs 10:13:39 Temperature Measurement, Probe Number = 0, T = 20.150000 C 10:13:40 Temperature Measurement, Probe Number = 1, T = 20.072000 C 10:13:41 Temperature Measurement, Probe Number = 2, T = 20.129000 C 10:13:41 Temperature Measurement, Probe Number = 3, T = 20.071000 C 10:13:42 Temperature Measurement, Probe Number = 4, T = 20.509000 C 10:13:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.51 10:13:42 Integrated Voltage Measurement... 10:14:01 Voltage Offset Correction: v_off_ini = 0.000003171 V, v_off_fin = 0.000005962 V 10:14:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171017178 Vs 10:14:01 Integrated Voltage Measurement... 10:14:20 Voltage Offset Correction: v_off_ini = 0.000005758 V, v_off_fin = 0.000001712 V 10:14:21 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170964858 Vs 10:14:23 Temperature Measurement, Probe Number = 0, T = 20.152000 C 10:14:24 Temperature Measurement, Probe Number = 1, T = 20.072000 C 10:14:25 Temperature Measurement, Probe Number = 2, T = 20.126000 C 10:14:25 Temperature Measurement, Probe Number = 3, T = 20.068000 C 10:14:26 Temperature Measurement, Probe Number = 4, T = 20.438000 C 10:14:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.44 10:14:26 Integrated Voltage Measurement... 10:14:45 Voltage Offset Correction: v_off_ini = 0.000002505 V, v_off_fin = 0.000005092 V 10:14:46 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171012351 Vs 10:14:46 Integrated Voltage Measurement... 10:15:05 Voltage Offset Correction: v_off_ini = 0.000004976 V, v_off_fin = 0.000001815 V 10:15:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966408 Vs 10:45:08 Temperature Measurement, Probe Number = 0, T = 20.156000 C 10:45:09 Temperature Measurement, Probe Number = 1, T = 20.075000 C 10:45:09 Temperature Measurement, Probe Number = 2, T = 20.132000 C 10:45:10 Temperature Measurement, Probe Number = 3, T = 20.072000 C 10:45:11 Temperature Measurement, Probe Number = 4, T = 20.415000 C 10:45:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.41 10:45:11 Integrated Voltage Measurement... 10:45:30 Voltage Offset Correction: v_off_ini = 0.000004299 V, v_off_fin = 0.000005556 V 10:45:30 Integrated Voltage Measurement Delta Gap = 0.0040017 m VT = 0.171069928 Vs 10:45:30 Integrated Voltage Measurement... 10:45:49 Voltage Offset Correction: v_off_ini = 0.000005341 V, v_off_fin = 0.000002676 V 10:45:50 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170961513 Vs 10:45:52 Temperature Measurement, Probe Number = 0, T = 20.161000 C 10:45:53 Temperature Measurement, Probe Number = 1, T = 20.080000 C 10:45:54 Temperature Measurement, Probe Number = 2, T = 20.135000 C 10:45:54 Temperature Measurement, Probe Number = 3, T = 20.076000 C 10:45:55 Temperature Measurement, Probe Number = 4, T = 20.515000 C 10:45:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.52 10:45:55 Integrated Voltage Measurement... 10:46:14 Voltage Offset Correction: v_off_ini = 0.000003334 V, v_off_fin = 0.000005420 V 10:46:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171013009 Vs 10:46:15 Integrated Voltage Measurement... 10:46:34 Voltage Offset Correction: v_off_ini = 0.000005308 V, v_off_fin = 0.000002127 V 10:46:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960594 Vs 10:46:37 Temperature Measurement, Probe Number = 0, T = 20.153000 C 10:46:37 Temperature Measurement, Probe Number = 1, T = 20.074000 C 10:46:38 Temperature Measurement, Probe Number = 2, T = 20.129000 C 10:46:39 Temperature Measurement, Probe Number = 3, T = 20.072000 C 10:46:39 Temperature Measurement, Probe Number = 4, T = 20.573000 C 10:46:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.57 10:46:40 Integrated Voltage Measurement... 10:46:59 Voltage Offset Correction: v_off_ini = 0.000003066 V, v_off_fin = 0.000006343 V 10:46:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171018647 Vs 10:46:59 Integrated Voltage Measurement... 10:47:18 Voltage Offset Correction: v_off_ini = 0.000005780 V, v_off_fin = 0.000002188 V 10:47:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954722 Vs 10:47:21 Temperature Measurement, Probe Number = 0, T = 20.156000 C 10:47:22 Temperature Measurement, Probe Number = 1, T = 20.077000 C 10:47:22 Temperature Measurement, Probe Number = 2, T = 20.131000 C 10:47:23 Temperature Measurement, Probe Number = 3, T = 20.074000 C 10:47:24 Temperature Measurement, Probe Number = 4, T = 20.571000 C 10:47:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.57 10:47:24 Integrated Voltage Measurement... 10:47:43 Voltage Offset Correction: v_off_ini = 0.000002584 V, v_off_fin = 0.000005560 V 10:47:43 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171012647 Vs 10:47:44 Integrated Voltage Measurement... 10:48:02 Voltage Offset Correction: v_off_ini = 0.000004760 V, v_off_fin = 0.000001975 V 10:48:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170952590 Vs 10:48:05 Temperature Measurement, Probe Number = 0, T = 20.155000 C 10:48:06 Temperature Measurement, Probe Number = 1, T = 20.079000 C 10:48:07 Temperature Measurement, Probe Number = 2, T = 20.131000 C 10:48:07 Temperature Measurement, Probe Number = 3, T = 20.076000 C 10:48:08 Temperature Measurement, Probe Number = 4, T = 20.606000 C 10:48:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.61 10:48:08 Integrated Voltage Measurement... 10:48:27 Voltage Offset Correction: v_off_ini = 0.000003643 V, v_off_fin = 0.000005633 V 10:48:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171023323 Vs 10:48:27 Integrated Voltage Measurement... 10:48:47 Voltage Offset Correction: v_off_ini = 0.000005504 V, v_off_fin = 0.000002167 V 10:48:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170954024 Vs 10:48:49 Temperature Measurement, Probe Number = 0, T = 20.159000 C 10:48:50 Temperature Measurement, Probe Number = 1, T = 20.082000 C 10:48:51 Temperature Measurement, Probe Number = 2, T = 20.136000 C 10:48:51 Temperature Measurement, Probe Number = 3, T = 20.080000 C 10:48:52 Temperature Measurement, Probe Number = 4, T = 20.663000 C 10:48:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.66 10:48:52 Integrated Voltage Measurement... 10:49:12 Voltage Offset Correction: v_off_ini = 0.000003107 V, v_off_fin = 0.000005895 V 10:49:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171014995 Vs 10:49:12 Integrated Voltage Measurement... 10:49:31 Voltage Offset Correction: v_off_ini = 0.000005139 V, v_off_fin = 0.000001799 V 10:49:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960297 Vs 10:49:34 Temperature Measurement, Probe Number = 0, T = 20.157000 C 10:49:35 Temperature Measurement, Probe Number = 1, T = 20.077000 C 10:49:35 Temperature Measurement, Probe Number = 2, T = 20.135000 C 10:49:36 Temperature Measurement, Probe Number = 3, T = 20.076000 C 10:49:37 Temperature Measurement, Probe Number = 4, T = 20.687000 C 10:49:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.69 10:49:37 Integrated Voltage Measurement... 10:49:57 Voltage Offset Correction: v_off_ini = 0.000003184 V, v_off_fin = 0.000005760 V 10:49:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171012236 Vs 10:49:57 Integrated Voltage Measurement... 10:50:16 Voltage Offset Correction: v_off_ini = 0.000005433 V, v_off_fin = 0.000002545 V 10:50:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964481 Vs 10:50:19 Temperature Measurement, Probe Number = 0, T = 20.157000 C 10:50:20 Temperature Measurement, Probe Number = 1, T = 20.078000 C 10:50:21 Temperature Measurement, Probe Number = 2, T = 20.133000 C 10:50:21 Temperature Measurement, Probe Number = 3, T = 20.076000 C 10:50:22 Temperature Measurement, Probe Number = 4, T = 20.627000 C 10:50:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.63 10:50:22 Integrated Voltage Measurement... 10:50:42 Voltage Offset Correction: v_off_ini = 0.000003355 V, v_off_fin = 0.000005565 V 10:50:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171013915 Vs 10:50:42 Integrated Voltage Measurement... 10:51:01 Voltage Offset Correction: v_off_ini = 0.000005232 V, v_off_fin = 0.000001953 V 10:51:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960014 Vs 10:51:04 Temperature Measurement, Probe Number = 0, T = 20.159000 C 10:51:05 Temperature Measurement, Probe Number = 1, T = 20.082000 C 10:51:06 Temperature Measurement, Probe Number = 2, T = 20.137000 C 10:51:06 Temperature Measurement, Probe Number = 3, T = 20.078000 C 10:51:07 Temperature Measurement, Probe Number = 4, T = 20.700000 C 10:51:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.70 10:51:07 Integrated Voltage Measurement... 10:51:27 Voltage Offset Correction: v_off_ini = 0.000003116 V, v_off_fin = 0.000005141 V 10:51:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171013925 Vs 10:51:27 Integrated Voltage Measurement... 10:51:47 Voltage Offset Correction: v_off_ini = 0.000005123 V, v_off_fin = 0.000002337 V 10:51:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962873 Vs 10:51:50 Temperature Measurement, Probe Number = 0, T = 20.159000 C 10:51:50 Temperature Measurement, Probe Number = 1, T = 20.082000 C 10:51:51 Temperature Measurement, Probe Number = 2, T = 20.134000 C 10:51:52 Temperature Measurement, Probe Number = 3, T = 20.078000 C 10:51:52 Temperature Measurement, Probe Number = 4, T = 20.714000 C 10:51:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.71 10:51:52 Integrated Voltage Measurement... 10:52:12 Voltage Offset Correction: v_off_ini = 0.000002947 V, v_off_fin = 0.000005876 V 10:52:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171012950 Vs 10:52:12 Integrated Voltage Measurement... 10:52:31 Voltage Offset Correction: v_off_ini = 0.000004843 V, v_off_fin = 0.000001753 V 10:52:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170961001 Vs 11:22:34 Temperature Measurement, Probe Number = 0, T = 20.166000 C 11:22:35 Temperature Measurement, Probe Number = 1, T = 20.092000 C 11:22:36 Temperature Measurement, Probe Number = 2, T = 20.143000 C 11:22:36 Temperature Measurement, Probe Number = 3, T = 20.088000 C 11:22:37 Temperature Measurement, Probe Number = 4, T = 20.557000 C 11:22:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.56 11:22:37 Integrated Voltage Measurement... 11:22:57 Voltage Offset Correction: v_off_ini = 0.000004454 V, v_off_fin = 0.000005650 V 11:22:57 Integrated Voltage Measurement Delta Gap = 0.0040019 m VT = 0.171081410 Vs 11:22:58 Integrated Voltage Measurement... 11:23:17 Voltage Offset Correction: v_off_ini = 0.000005401 V, v_off_fin = 0.000002765 V 11:23:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962929 Vs 11:23:20 Temperature Measurement, Probe Number = 0, T = 20.163000 C 11:23:20 Temperature Measurement, Probe Number = 1, T = 20.087000 C 11:23:21 Temperature Measurement, Probe Number = 2, T = 20.142000 C 11:23:22 Temperature Measurement, Probe Number = 3, T = 20.086000 C 11:23:22 Temperature Measurement, Probe Number = 4, T = 20.498000 C 11:23:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.50 11:23:23 Integrated Voltage Measurement... 11:23:41 Voltage Offset Correction: v_off_ini = 0.000003616 V, v_off_fin = 0.000006242 V 11:23:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171002930 Vs 11:23:42 Integrated Voltage Measurement... 11:24:01 Voltage Offset Correction: v_off_ini = 0.000005311 V, v_off_fin = 0.000001263 V 11:24:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962944 Vs 11:24:04 Temperature Measurement, Probe Number = 0, T = 20.164000 C 11:24:04 Temperature Measurement, Probe Number = 1, T = 20.089000 C 11:24:05 Temperature Measurement, Probe Number = 2, T = 20.142000 C 11:24:06 Temperature Measurement, Probe Number = 3, T = 20.086000 C 11:24:06 Temperature Measurement, Probe Number = 4, T = 20.501000 C 11:24:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.50 11:24:07 Integrated Voltage Measurement... 11:24:26 Voltage Offset Correction: v_off_ini = 0.000002919 V, v_off_fin = 0.000005709 V 11:24:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171007021 Vs 11:24:26 Integrated Voltage Measurement... 11:24:46 Voltage Offset Correction: v_off_ini = 0.000005342 V, v_off_fin = 0.000001616 V 11:24:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964526 Vs 11:24:49 Temperature Measurement, Probe Number = 0, T = 20.167000 C 11:24:49 Temperature Measurement, Probe Number = 1, T = 20.093000 C 11:24:50 Temperature Measurement, Probe Number = 2, T = 20.143000 C 11:24:51 Temperature Measurement, Probe Number = 3, T = 20.087000 C 11:24:51 Temperature Measurement, Probe Number = 4, T = 20.458000 C 11:24:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.46 11:24:51 Integrated Voltage Measurement... 11:25:11 Voltage Offset Correction: v_off_ini = 0.000002785 V, v_off_fin = 0.000005125 V 11:25:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171003516 Vs 11:25:11 Integrated Voltage Measurement... 11:25:30 Voltage Offset Correction: v_off_ini = 0.000005013 V, v_off_fin = 0.000001754 V 11:25:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170963522 Vs 11:25:33 Temperature Measurement, Probe Number = 0, T = 20.170000 C 11:25:33 Temperature Measurement, Probe Number = 1, T = 20.095000 C 11:25:34 Temperature Measurement, Probe Number = 2, T = 20.144000 C 11:25:35 Temperature Measurement, Probe Number = 3, T = 20.088000 C 11:25:35 Temperature Measurement, Probe Number = 4, T = 20.457000 C 11:25:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.46 11:25:36 Integrated Voltage Measurement... 11:25:55 Voltage Offset Correction: v_off_ini = 0.000002869 V, v_off_fin = 0.000005641 V 11:25:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171006393 Vs 11:25:55 Integrated Voltage Measurement... 11:26:15 Voltage Offset Correction: v_off_ini = 0.000005188 V, v_off_fin = 0.000002108 V 11:26:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963552 Vs 11:26:18 Temperature Measurement, Probe Number = 0, T = 20.168000 C 11:26:18 Temperature Measurement, Probe Number = 1, T = 20.095000 C 11:26:19 Temperature Measurement, Probe Number = 2, T = 20.143000 C 11:26:19 Temperature Measurement, Probe Number = 3, T = 20.088000 C 11:26:20 Temperature Measurement, Probe Number = 4, T = 20.461000 C 11:26:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.46 11:26:20 Integrated Voltage Measurement... 11:26:40 Voltage Offset Correction: v_off_ini = 0.000003046 V, v_off_fin = 0.000005556 V 11:26:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171008976 Vs 11:26:40 Integrated Voltage Measurement... 11:26:59 Voltage Offset Correction: v_off_ini = 0.000005131 V, v_off_fin = 0.000001856 V 11:26:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958332 Vs 11:27:02 Temperature Measurement, Probe Number = 0, T = 20.167000 C 11:27:03 Temperature Measurement, Probe Number = 1, T = 20.092000 C 11:27:03 Temperature Measurement, Probe Number = 2, T = 20.141000 C 11:27:04 Temperature Measurement, Probe Number = 3, T = 20.087000 C 11:27:05 Temperature Measurement, Probe Number = 4, T = 20.449000 C 11:27:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.45 11:27:05 Integrated Voltage Measurement... 11:27:24 Voltage Offset Correction: v_off_ini = 0.000002763 V, v_off_fin = 0.000005595 V 11:27:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171004989 Vs 11:27:25 Integrated Voltage Measurement... 11:27:44 Voltage Offset Correction: v_off_ini = 0.000004900 V, v_off_fin = 0.000001947 V 11:27:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961494 Vs 11:27:47 Temperature Measurement, Probe Number = 0, T = 20.169000 C 11:27:47 Temperature Measurement, Probe Number = 1, T = 20.093000 C 11:27:48 Temperature Measurement, Probe Number = 2, T = 20.143000 C 11:27:49 Temperature Measurement, Probe Number = 3, T = 20.088000 C 11:27:49 Temperature Measurement, Probe Number = 4, T = 20.459000 C 11:27:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.46 11:27:50 Integrated Voltage Measurement... 11:28:09 Voltage Offset Correction: v_off_ini = 0.000002982 V, v_off_fin = 0.000005420 V 11:28:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171004004 Vs 11:28:10 Integrated Voltage Measurement... 11:28:29 Voltage Offset Correction: v_off_ini = 0.000005284 V, v_off_fin = 0.000002174 V 11:28:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968045 Vs 11:28:32 Temperature Measurement, Probe Number = 0, T = 20.175000 C 11:28:33 Temperature Measurement, Probe Number = 1, T = 20.099000 C 11:28:33 Temperature Measurement, Probe Number = 2, T = 20.150000 C 11:28:34 Temperature Measurement, Probe Number = 3, T = 20.094000 C 11:28:35 Temperature Measurement, Probe Number = 4, T = 20.477000 C 11:28:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.48 11:28:35 Integrated Voltage Measurement... 11:28:54 Voltage Offset Correction: v_off_ini = 0.000002887 V, v_off_fin = 0.000005181 V 11:28:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171003680 Vs 11:28:55 Integrated Voltage Measurement... 11:29:14 Voltage Offset Correction: v_off_ini = 0.000004545 V, v_off_fin = 0.000002189 V 11:29:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964365 Vs 11:29:17 Temperature Measurement, Probe Number = 0, T = 20.175000 C 11:29:17 Temperature Measurement, Probe Number = 1, T = 20.101000 C 11:29:18 Temperature Measurement, Probe Number = 2, T = 20.150000 C 11:29:19 Temperature Measurement, Probe Number = 3, T = 20.096000 C 11:29:19 Temperature Measurement, Probe Number = 4, T = 20.571000 C 11:29:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.57 11:29:20 Integrated Voltage Measurement... 11:29:39 Voltage Offset Correction: v_off_ini = 0.000002745 V, v_off_fin = 0.000005999 V 11:29:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171007842 Vs 11:29:39 Integrated Voltage Measurement... 11:29:58 Voltage Offset Correction: v_off_ini = 0.000005094 V, v_off_fin = 0.000002247 V 11:29:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961354 Vs 12:00:01 Temperature Measurement, Probe Number = 0, T = 20.168000 C 12:00:02 Temperature Measurement, Probe Number = 1, T = 20.089000 C 12:00:03 Temperature Measurement, Probe Number = 2, T = 20.147000 C 12:00:03 Temperature Measurement, Probe Number = 3, T = 20.091000 C 12:00:04 Temperature Measurement, Probe Number = 4, T = 20.583000 C 12:00:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.58 12:00:04 Integrated Voltage Measurement... 12:00:23 Voltage Offset Correction: v_off_ini = 0.000004103 V, v_off_fin = 0.000005273 V 12:00:23 Integrated Voltage Measurement Delta Gap = 0.0040020 m VT = 0.171067614 Vs 12:00:24 Integrated Voltage Measurement... 12:00:43 Voltage Offset Correction: v_off_ini = 0.000005192 V, v_off_fin = 0.000002277 V 12:00:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958479 Vs 12:00:46 Temperature Measurement, Probe Number = 0, T = 20.168000 C 12:00:46 Temperature Measurement, Probe Number = 1, T = 20.092000 C 12:00:47 Temperature Measurement, Probe Number = 2, T = 20.147000 C 12:00:48 Temperature Measurement, Probe Number = 3, T = 20.091000 C 12:00:48 Temperature Measurement, Probe Number = 4, T = 20.550000 C 12:00:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.55 12:00:48 Integrated Voltage Measurement... 12:01:08 Voltage Offset Correction: v_off_ini = 0.000003847 V, v_off_fin = 0.000006178 V 12:01:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171008963 Vs 12:01:08 Integrated Voltage Measurement... 12:01:27 Voltage Offset Correction: v_off_ini = 0.000005547 V, v_off_fin = 0.000002153 V 12:01:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170955421 Vs 12:01:30 Temperature Measurement, Probe Number = 0, T = 20.168000 C 12:01:31 Temperature Measurement, Probe Number = 1, T = 20.092000 C 12:01:32 Temperature Measurement, Probe Number = 2, T = 20.147000 C 12:01:32 Temperature Measurement, Probe Number = 3, T = 20.092000 C 12:01:33 Temperature Measurement, Probe Number = 4, T = 20.506000 C 12:01:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.51 12:01:33 Integrated Voltage Measurement... 12:01:52 Voltage Offset Correction: v_off_ini = 0.000003857 V, v_off_fin = 0.000005895 V 12:01:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171005095 Vs 12:01:52 Integrated Voltage Measurement... 12:02:12 Voltage Offset Correction: v_off_ini = 0.000005378 V, v_off_fin = 0.000001685 V 12:02:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967278 Vs 12:02:15 Temperature Measurement, Probe Number = 0, T = 20.166000 C 12:02:15 Temperature Measurement, Probe Number = 1, T = 20.086000 C 12:02:16 Temperature Measurement, Probe Number = 2, T = 20.144000 C 12:02:17 Temperature Measurement, Probe Number = 3, T = 20.086000 C 12:02:17 Temperature Measurement, Probe Number = 4, T = 20.488000 C 12:02:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.49 12:02:18 Integrated Voltage Measurement... 12:02:37 Voltage Offset Correction: v_off_ini = 0.000003301 V, v_off_fin = 0.000005782 V 12:02:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171004262 Vs 12:02:37 Integrated Voltage Measurement... 12:02:56 Voltage Offset Correction: v_off_ini = 0.000005168 V, v_off_fin = 0.000002242 V 12:02:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170960967 Vs 12:02:59 Temperature Measurement, Probe Number = 0, T = 20.166000 C 12:03:00 Temperature Measurement, Probe Number = 1, T = 20.091000 C 12:03:01 Temperature Measurement, Probe Number = 2, T = 20.145000 C 12:03:01 Temperature Measurement, Probe Number = 3, T = 20.089000 C 12:03:02 Temperature Measurement, Probe Number = 4, T = 20.460000 C 12:03:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.46 12:03:02 Integrated Voltage Measurement... 12:03:21 Voltage Offset Correction: v_off_ini = 0.000003058 V, v_off_fin = 0.000005987 V 12:03:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171007096 Vs 12:03:22 Integrated Voltage Measurement... 12:03:40 Voltage Offset Correction: v_off_ini = 0.000004773 V, v_off_fin = 0.000001449 V 12:03:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960939 Vs 12:03:43 Temperature Measurement, Probe Number = 0, T = 20.168000 C 12:03:44 Temperature Measurement, Probe Number = 1, T = 20.091000 C 12:03:45 Temperature Measurement, Probe Number = 2, T = 20.148000 C 12:03:45 Temperature Measurement, Probe Number = 3, T = 20.090000 C 12:03:46 Temperature Measurement, Probe Number = 4, T = 20.423000 C 12:03:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.42 12:03:46 Integrated Voltage Measurement... 12:04:05 Voltage Offset Correction: v_off_ini = 0.000002683 V, v_off_fin = 0.000005604 V 12:04:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171006924 Vs 12:04:06 Integrated Voltage Measurement... 12:04:25 Voltage Offset Correction: v_off_ini = 0.000004855 V, v_off_fin = 0.000002080 V 12:04:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964119 Vs 12:04:28 Temperature Measurement, Probe Number = 0, T = 20.174000 C 12:04:28 Temperature Measurement, Probe Number = 1, T = 20.099000 C 12:04:29 Temperature Measurement, Probe Number = 2, T = 20.151000 C 12:04:30 Temperature Measurement, Probe Number = 3, T = 20.096000 C 12:04:30 Temperature Measurement, Probe Number = 4, T = 20.544000 C 12:04:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.54 12:04:30 Integrated Voltage Measurement... 12:04:50 Voltage Offset Correction: v_off_ini = 0.000002489 V, v_off_fin = 0.000004964 V 12:04:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171000962 Vs 12:04:50 Integrated Voltage Measurement... 12:05:10 Voltage Offset Correction: v_off_ini = 0.000004336 V, v_off_fin = 0.000001894 V 12:05:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970849 Vs 12:05:13 Temperature Measurement, Probe Number = 0, T = 20.174000 C 12:05:13 Temperature Measurement, Probe Number = 1, T = 20.096000 C 12:05:14 Temperature Measurement, Probe Number = 2, T = 20.154000 C 12:05:15 Temperature Measurement, Probe Number = 3, T = 20.095000 C 12:05:15 Temperature Measurement, Probe Number = 4, T = 20.461000 C 12:05:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.46 12:05:15 Integrated Voltage Measurement... 12:05:35 Voltage Offset Correction: v_off_ini = 0.000003183 V, v_off_fin = 0.000005748 V 12:05:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171003987 Vs 12:05:35 Integrated Voltage Measurement... 12:05:54 Voltage Offset Correction: v_off_ini = 0.000005049 V, v_off_fin = 0.000001424 V 12:05:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964145 Vs 12:05:57 Temperature Measurement, Probe Number = 0, T = 20.176000 C 12:05:58 Temperature Measurement, Probe Number = 1, T = 20.101000 C 12:05:58 Temperature Measurement, Probe Number = 2, T = 20.153000 C 12:05:59 Temperature Measurement, Probe Number = 3, T = 20.099000 C 12:06:00 Temperature Measurement, Probe Number = 4, T = 20.386000 C 12:06:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.39 12:06:00 Integrated Voltage Measurement... 12:06:20 Voltage Offset Correction: v_off_ini = 0.000003208 V, v_off_fin = 0.000006098 V 12:06:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171010928 Vs 12:06:20 Integrated Voltage Measurement... 12:06:39 Voltage Offset Correction: v_off_ini = 0.000005787 V, v_off_fin = 0.000002784 V 12:06:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959122 Vs 12:06:42 Temperature Measurement, Probe Number = 0, T = 20.177000 C 12:06:43 Temperature Measurement, Probe Number = 1, T = 20.102000 C 12:06:44 Temperature Measurement, Probe Number = 2, T = 20.154000 C 12:06:44 Temperature Measurement, Probe Number = 3, T = 20.098000 C 12:06:45 Temperature Measurement, Probe Number = 4, T = 20.481000 C 12:06:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.48 12:06:45 Integrated Voltage Measurement... 12:07:04 Voltage Offset Correction: v_off_ini = 0.000003756 V, v_off_fin = 0.000006337 V 12:07:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171008261 Vs 12:07:05 Integrated Voltage Measurement... 12:07:24 Voltage Offset Correction: v_off_ini = 0.000005987 V, v_off_fin = 0.000002336 V 12:07:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170951325 Vs 12:37:27 Temperature Measurement, Probe Number = 0, T = 20.172000 C 12:37:27 Temperature Measurement, Probe Number = 1, T = 20.099000 C 12:37:28 Temperature Measurement, Probe Number = 2, T = 20.151000 C 12:37:29 Temperature Measurement, Probe Number = 3, T = 20.097000 C 12:37:29 Temperature Measurement, Probe Number = 4, T = 20.533000 C 12:37:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.53 12:37:29 Integrated Voltage Measurement... 12:37:49 Voltage Offset Correction: v_off_ini = 0.000004262 V, v_off_fin = 0.000005795 V 12:37:49 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171057622 Vs 12:37:49 Integrated Voltage Measurement... 12:38:08 Voltage Offset Correction: v_off_ini = 0.000005211 V, v_off_fin = 0.000001992 V 12:38:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964002 Vs 12:38:11 Temperature Measurement, Probe Number = 0, T = 20.174000 C 12:38:12 Temperature Measurement, Probe Number = 1, T = 20.100000 C 12:38:12 Temperature Measurement, Probe Number = 2, T = 20.153000 C 12:38:13 Temperature Measurement, Probe Number = 3, T = 20.098000 C 12:38:14 Temperature Measurement, Probe Number = 4, T = 20.447000 C 12:38:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.45 12:38:14 Integrated Voltage Measurement... 12:38:33 Voltage Offset Correction: v_off_ini = 0.000003213 V, v_off_fin = 0.000005666 V 12:38:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171003145 Vs 12:38:34 Integrated Voltage Measurement... 12:38:53 Voltage Offset Correction: v_off_ini = 0.000004919 V, v_off_fin = 0.000001396 V 12:38:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962304 Vs 12:38:56 Temperature Measurement, Probe Number = 0, T = 20.173000 C 12:38:56 Temperature Measurement, Probe Number = 1, T = 20.102000 C 12:38:57 Temperature Measurement, Probe Number = 2, T = 20.152000 C 12:38:58 Temperature Measurement, Probe Number = 3, T = 20.099000 C 12:38:58 Temperature Measurement, Probe Number = 4, T = 20.430000 C 12:38:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.43 12:38:58 Integrated Voltage Measurement... 12:39:18 Voltage Offset Correction: v_off_ini = 0.000003049 V, v_off_fin = 0.000005410 V 12:39:18 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171004107 Vs 12:39:18 Integrated Voltage Measurement... 12:39:37 Voltage Offset Correction: v_off_ini = 0.000004724 V, v_off_fin = 0.000001516 V 12:39:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971902 Vs 12:39:40 Temperature Measurement, Probe Number = 0, T = 20.177000 C 12:39:41 Temperature Measurement, Probe Number = 1, T = 20.104000 C 12:39:42 Temperature Measurement, Probe Number = 2, T = 20.153000 C 12:39:42 Temperature Measurement, Probe Number = 3, T = 20.098000 C 12:39:43 Temperature Measurement, Probe Number = 4, T = 20.412000 C 12:39:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 12:39:43 Integrated Voltage Measurement... 12:40:02 Voltage Offset Correction: v_off_ini = 0.000003118 V, v_off_fin = 0.000005506 V 12:40:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171002267 Vs 12:40:03 Integrated Voltage Measurement... 12:40:22 Voltage Offset Correction: v_off_ini = 0.000004855 V, v_off_fin = 0.000001242 V 12:40:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962030 Vs 12:40:25 Temperature Measurement, Probe Number = 0, T = 20.173000 C 12:40:26 Temperature Measurement, Probe Number = 1, T = 20.100000 C 12:40:26 Temperature Measurement, Probe Number = 2, T = 20.151000 C 12:40:27 Temperature Measurement, Probe Number = 3, T = 20.096000 C 12:40:28 Temperature Measurement, Probe Number = 4, T = 20.423000 C 12:40:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.42 12:40:28 Integrated Voltage Measurement... 12:40:47 Voltage Offset Correction: v_off_ini = 0.000002920 V, v_off_fin = 0.000005762 V 12:40:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171006460 Vs 12:40:47 Integrated Voltage Measurement... 12:41:07 Voltage Offset Correction: v_off_ini = 0.000004592 V, v_off_fin = 0.000001647 V 12:41:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961518 Vs 12:41:10 Temperature Measurement, Probe Number = 0, T = 20.178000 C 12:41:10 Temperature Measurement, Probe Number = 1, T = 20.099000 C 12:41:11 Temperature Measurement, Probe Number = 2, T = 20.152000 C 12:41:11 Temperature Measurement, Probe Number = 3, T = 20.095000 C 12:41:12 Temperature Measurement, Probe Number = 4, T = 20.410000 C 12:41:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.41 12:41:12 Integrated Voltage Measurement... 12:41:32 Voltage Offset Correction: v_off_ini = 0.000003409 V, v_off_fin = 0.000005394 V 12:41:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171008894 Vs 12:41:32 Integrated Voltage Measurement... 12:41:51 Voltage Offset Correction: v_off_ini = 0.000004531 V, v_off_fin = 0.000001642 V 12:41:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964039 Vs 12:41:54 Temperature Measurement, Probe Number = 0, T = 20.175000 C 12:41:55 Temperature Measurement, Probe Number = 1, T = 20.097000 C 12:41:55 Temperature Measurement, Probe Number = 2, T = 20.151000 C 12:41:56 Temperature Measurement, Probe Number = 3, T = 20.094000 C 12:41:57 Temperature Measurement, Probe Number = 4, T = 20.377000 C 12:41:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.38 12:41:57 Integrated Voltage Measurement... 12:42:16 Voltage Offset Correction: v_off_ini = 0.000003081 V, v_off_fin = 0.000005774 V 12:42:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171006642 Vs 12:42:16 Integrated Voltage Measurement... 12:42:36 Voltage Offset Correction: v_off_ini = 0.000005274 V, v_off_fin = 0.000002224 V 12:42:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961098 Vs 12:42:39 Temperature Measurement, Probe Number = 0, T = 20.175000 C 12:42:39 Temperature Measurement, Probe Number = 1, T = 20.097000 C 12:42:40 Temperature Measurement, Probe Number = 2, T = 20.150000 C 12:42:41 Temperature Measurement, Probe Number = 3, T = 20.092000 C 12:42:41 Temperature Measurement, Probe Number = 4, T = 20.371000 C 12:42:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.37 12:42:41 Integrated Voltage Measurement... 12:43:01 Voltage Offset Correction: v_off_ini = 0.000003012 V, v_off_fin = 0.000005577 V 12:43:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171011572 Vs 12:43:02 Integrated Voltage Measurement... 12:43:21 Voltage Offset Correction: v_off_ini = 0.000006006 V, v_off_fin = 0.000001784 V 12:43:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958699 Vs 12:43:24 Temperature Measurement, Probe Number = 0, T = 20.172000 C 12:43:24 Temperature Measurement, Probe Number = 1, T = 20.095000 C 12:43:25 Temperature Measurement, Probe Number = 2, T = 20.150000 C 12:43:26 Temperature Measurement, Probe Number = 3, T = 20.094000 C 12:43:26 Temperature Measurement, Probe Number = 4, T = 20.307000 C 12:43:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.31 12:43:26 Integrated Voltage Measurement... 12:43:46 Voltage Offset Correction: v_off_ini = 0.000003265 V, v_off_fin = 0.000005735 V 12:43:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171012421 Vs 12:43:46 Integrated Voltage Measurement... 12:44:05 Voltage Offset Correction: v_off_ini = 0.000005011 V, v_off_fin = 0.000002338 V 12:44:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170960248 Vs 12:44:08 Temperature Measurement, Probe Number = 0, T = 20.176000 C 12:44:09 Temperature Measurement, Probe Number = 1, T = 20.097000 C 12:44:10 Temperature Measurement, Probe Number = 2, T = 20.156000 C 12:44:10 Temperature Measurement, Probe Number = 3, T = 20.099000 C 12:44:11 Temperature Measurement, Probe Number = 4, T = 20.372000 C 12:44:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.37 12:44:11 Integrated Voltage Measurement... 12:44:30 Voltage Offset Correction: v_off_ini = 0.000002423 V, v_off_fin = 0.000005480 V 12:44:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171006723 Vs 12:44:30 Integrated Voltage Measurement... 12:44:49 Voltage Offset Correction: v_off_ini = 0.000004831 V, v_off_fin = 0.000001590 V 12:44:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965617 Vs 13:14:52 Temperature Measurement, Probe Number = 0, T = 20.178000 C 13:14:53 Temperature Measurement, Probe Number = 1, T = 20.102000 C 13:14:54 Temperature Measurement, Probe Number = 2, T = 20.158000 C 13:14:54 Temperature Measurement, Probe Number = 3, T = 20.102000 C 13:14:55 Temperature Measurement, Probe Number = 4, T = 20.483000 C 13:14:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.48 13:14:55 Integrated Voltage Measurement... 13:15:14 Voltage Offset Correction: v_off_ini = 0.000003781 V, v_off_fin = 0.000005770 V 13:15:14 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171067876 Vs 13:15:15 Integrated Voltage Measurement... 13:15:34 Voltage Offset Correction: v_off_ini = 0.000005696 V, v_off_fin = 0.000002740 V 13:15:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961707 Vs 13:15:37 Temperature Measurement, Probe Number = 0, T = 20.182000 C 13:15:38 Temperature Measurement, Probe Number = 1, T = 20.104000 C 13:15:38 Temperature Measurement, Probe Number = 2, T = 20.163000 C 13:15:39 Temperature Measurement, Probe Number = 3, T = 20.107000 C 13:15:40 Temperature Measurement, Probe Number = 4, T = 20.520000 C 13:15:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.52 13:15:40 Integrated Voltage Measurement... 13:15:59 Voltage Offset Correction: v_off_ini = 0.000003914 V, v_off_fin = 0.000006364 V 13:15:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171012291 Vs 13:16:00 Integrated Voltage Measurement... 13:16:19 Voltage Offset Correction: v_off_ini = 0.000005084 V, v_off_fin = 0.000002017 V 13:16:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964877 Vs 13:16:22 Temperature Measurement, Probe Number = 0, T = 20.179000 C 13:16:22 Temperature Measurement, Probe Number = 1, T = 20.102000 C 13:16:23 Temperature Measurement, Probe Number = 2, T = 20.156000 C 13:16:24 Temperature Measurement, Probe Number = 3, T = 20.100000 C 13:16:24 Temperature Measurement, Probe Number = 4, T = 20.410000 C 13:16:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 13:16:24 Integrated Voltage Measurement... 13:16:44 Voltage Offset Correction: v_off_ini = 0.000003732 V, v_off_fin = 0.000005973 V 13:16:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171010869 Vs 13:16:44 Integrated Voltage Measurement... 13:17:03 Voltage Offset Correction: v_off_ini = 0.000005191 V, v_off_fin = 0.000002235 V 13:17:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964235 Vs 13:17:06 Temperature Measurement, Probe Number = 0, T = 20.180000 C 13:17:07 Temperature Measurement, Probe Number = 1, T = 20.100000 C 13:17:07 Temperature Measurement, Probe Number = 2, T = 20.155000 C 13:17:08 Temperature Measurement, Probe Number = 3, T = 20.097000 C 13:17:09 Temperature Measurement, Probe Number = 4, T = 20.399000 C 13:17:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.40 13:17:09 Integrated Voltage Measurement... 13:17:28 Voltage Offset Correction: v_off_ini = 0.000003191 V, v_off_fin = 0.000005679 V 13:17:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171005315 Vs 13:17:28 Integrated Voltage Measurement... 13:17:47 Voltage Offset Correction: v_off_ini = 0.000004717 V, v_off_fin = 0.000002100 V 13:17:48 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170968872 Vs 13:17:50 Temperature Measurement, Probe Number = 0, T = 20.168000 C 13:17:51 Temperature Measurement, Probe Number = 1, T = 20.094000 C 13:17:52 Temperature Measurement, Probe Number = 2, T = 20.148000 C 13:17:52 Temperature Measurement, Probe Number = 3, T = 20.094000 C 13:17:53 Temperature Measurement, Probe Number = 4, T = 20.362000 C 13:17:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.36 13:17:53 Integrated Voltage Measurement... 13:18:12 Voltage Offset Correction: v_off_ini = 0.000001975 V, v_off_fin = 0.000005705 V 13:18:13 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171004899 Vs 13:18:13 Integrated Voltage Measurement... 13:18:32 Voltage Offset Correction: v_off_ini = 0.000005028 V, v_off_fin = 0.000001552 V 13:18:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970192 Vs 13:18:35 Temperature Measurement, Probe Number = 0, T = 20.172000 C 13:18:36 Temperature Measurement, Probe Number = 1, T = 20.099000 C 13:18:36 Temperature Measurement, Probe Number = 2, T = 20.151000 C 13:18:37 Temperature Measurement, Probe Number = 3, T = 20.097000 C 13:18:38 Temperature Measurement, Probe Number = 4, T = 20.318000 C 13:18:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.32 13:18:38 Integrated Voltage Measurement... 13:18:57 Voltage Offset Correction: v_off_ini = 0.000003146 V, v_off_fin = 0.000005738 V 13:18:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171001187 Vs 13:18:58 Integrated Voltage Measurement... 13:19:17 Voltage Offset Correction: v_off_ini = 0.000004799 V, v_off_fin = 0.000002394 V 13:19:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967955 Vs 13:19:20 Temperature Measurement, Probe Number = 0, T = 20.176000 C 13:19:20 Temperature Measurement, Probe Number = 1, T = 20.100000 C 13:19:21 Temperature Measurement, Probe Number = 2, T = 20.153000 C 13:19:22 Temperature Measurement, Probe Number = 3, T = 20.097000 C 13:19:22 Temperature Measurement, Probe Number = 4, T = 20.246000 C 13:19:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.25 13:19:22 Integrated Voltage Measurement... 13:19:42 Voltage Offset Correction: v_off_ini = 0.000003328 V, v_off_fin = 0.000004764 V 13:19:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171005097 Vs 13:19:42 Integrated Voltage Measurement... 13:20:01 Voltage Offset Correction: v_off_ini = 0.000004872 V, v_off_fin = 0.000001573 V 13:20:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970024 Vs 13:20:04 Temperature Measurement, Probe Number = 0, T = 20.177000 C 13:20:05 Temperature Measurement, Probe Number = 1, T = 20.102000 C 13:20:05 Temperature Measurement, Probe Number = 2, T = 20.156000 C 13:20:06 Temperature Measurement, Probe Number = 3, T = 20.101000 C 13:20:07 Temperature Measurement, Probe Number = 4, T = 20.340000 C 13:20:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.34 13:20:07 Integrated Voltage Measurement... 13:20:26 Voltage Offset Correction: v_off_ini = 0.000002691 V, v_off_fin = 0.000006403 V 13:20:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171010666 Vs 13:20:27 Integrated Voltage Measurement... 13:20:46 Voltage Offset Correction: v_off_ini = 0.000005933 V, v_off_fin = 0.000001499 V 13:20:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964376 Vs 13:20:48 Temperature Measurement, Probe Number = 0, T = 20.180000 C 13:20:49 Temperature Measurement, Probe Number = 1, T = 20.101000 C 13:20:50 Temperature Measurement, Probe Number = 2, T = 20.161000 C 13:20:50 Temperature Measurement, Probe Number = 3, T = 20.103000 C 13:20:51 Temperature Measurement, Probe Number = 4, T = 20.381000 C 13:20:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.38 13:20:51 Integrated Voltage Measurement... 13:21:11 Voltage Offset Correction: v_off_ini = 0.000002913 V, v_off_fin = 0.000005723 V 13:21:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171012990 Vs 13:21:12 Integrated Voltage Measurement... 13:21:31 Voltage Offset Correction: v_off_ini = 0.000004912 V, v_off_fin = 0.000002168 V 13:21:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964112 Vs 13:21:34 Temperature Measurement, Probe Number = 0, T = 20.175000 C 13:21:34 Temperature Measurement, Probe Number = 1, T = 20.098000 C 13:21:35 Temperature Measurement, Probe Number = 2, T = 20.157000 C 13:21:36 Temperature Measurement, Probe Number = 3, T = 20.099000 C 13:21:36 Temperature Measurement, Probe Number = 4, T = 20.530000 C 13:21:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.53 13:21:36 Integrated Voltage Measurement... 13:21:55 Voltage Offset Correction: v_off_ini = 0.000003503 V, v_off_fin = 0.000005861 V 13:21:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171011472 Vs 13:21:56 Integrated Voltage Measurement... 13:22:15 Voltage Offset Correction: v_off_ini = 0.000004702 V, v_off_fin = 0.000001261 V 13:22:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967122 Vs 13:52:18 Temperature Measurement, Probe Number = 0, T = 20.184000 C 13:52:18 Temperature Measurement, Probe Number = 1, T = 20.108000 C 13:52:19 Temperature Measurement, Probe Number = 2, T = 20.163000 C 13:52:20 Temperature Measurement, Probe Number = 3, T = 20.106000 C 13:52:20 Temperature Measurement, Probe Number = 4, T = 20.435000 C 13:52:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.43 13:52:21 Integrated Voltage Measurement... 13:52:40 Voltage Offset Correction: v_off_ini = 0.000004388 V, v_off_fin = 0.000005816 V 13:52:40 Integrated Voltage Measurement Delta Gap = 0.0040018 m VT = 0.171077256 Vs 13:52:40 Integrated Voltage Measurement... 13:52:59 Voltage Offset Correction: v_off_ini = 0.000005155 V, v_off_fin = 0.000001906 V 13:52:59 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170967767 Vs 13:53:02 Temperature Measurement, Probe Number = 0, T = 20.185000 C 13:53:03 Temperature Measurement, Probe Number = 1, T = 20.110000 C 13:53:03 Temperature Measurement, Probe Number = 2, T = 20.162000 C 13:53:04 Temperature Measurement, Probe Number = 3, T = 20.108000 C 13:53:05 Temperature Measurement, Probe Number = 4, T = 20.375000 C 13:53:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.38 13:53:05 Integrated Voltage Measurement... 13:53:25 Voltage Offset Correction: v_off_ini = 0.000002695 V, v_off_fin = 0.000005570 V 13:53:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171009574 Vs 13:53:25 Integrated Voltage Measurement... 13:53:44 Voltage Offset Correction: v_off_ini = 0.000005024 V, v_off_fin = 0.000001937 V 13:53:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969290 Vs 13:53:47 Temperature Measurement, Probe Number = 0, T = 20.182000 C 13:53:48 Temperature Measurement, Probe Number = 1, T = 20.106000 C 13:53:48 Temperature Measurement, Probe Number = 2, T = 20.164000 C 13:53:49 Temperature Measurement, Probe Number = 3, T = 20.109000 C 13:53:50 Temperature Measurement, Probe Number = 4, T = 20.432000 C 13:53:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.43 13:53:50 Integrated Voltage Measurement... 13:54:10 Voltage Offset Correction: v_off_ini = 0.000002375 V, v_off_fin = 0.000004571 V 13:54:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171010826 Vs 13:54:10 Integrated Voltage Measurement... 13:54:29 Voltage Offset Correction: v_off_ini = 0.000004457 V, v_off_fin = 0.000001510 V 13:54:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974315 Vs 13:54:32 Temperature Measurement, Probe Number = 0, T = 20.184000 C 13:54:33 Temperature Measurement, Probe Number = 1, T = 20.109000 C 13:54:34 Temperature Measurement, Probe Number = 2, T = 20.163000 C 13:54:34 Temperature Measurement, Probe Number = 3, T = 20.110000 C 13:54:35 Temperature Measurement, Probe Number = 4, T = 20.441000 C 13:54:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.44 13:54:35 Integrated Voltage Measurement... 13:54:55 Voltage Offset Correction: v_off_ini = 0.000002888 V, v_off_fin = 0.000005341 V 13:54:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171008822 Vs 13:54:55 Integrated Voltage Measurement... 13:55:14 Voltage Offset Correction: v_off_ini = 0.000004655 V, v_off_fin = 0.000001189 V 13:55:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972488 Vs 13:55:17 Temperature Measurement, Probe Number = 0, T = 20.191000 C 13:55:18 Temperature Measurement, Probe Number = 1, T = 20.116000 C 13:55:19 Temperature Measurement, Probe Number = 2, T = 20.167000 C 13:55:19 Temperature Measurement, Probe Number = 3, T = 20.114000 C 13:55:20 Temperature Measurement, Probe Number = 4, T = 20.500000 C 13:55:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.50 13:55:20 Integrated Voltage Measurement... 13:55:41 Voltage Offset Correction: v_off_ini = 0.000002606 V, v_off_fin = 0.000005265 V 13:55:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171013197 Vs 13:55:41 Integrated Voltage Measurement... 13:56:01 Voltage Offset Correction: v_off_ini = 0.000004997 V, v_off_fin = 0.000002215 V 13:56:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967516 Vs 13:56:03 Temperature Measurement, Probe Number = 0, T = 20.186000 C 13:56:04 Temperature Measurement, Probe Number = 1, T = 20.113000 C 13:56:05 Temperature Measurement, Probe Number = 2, T = 20.163000 C 13:56:05 Temperature Measurement, Probe Number = 3, T = 20.109000 C 13:56:06 Temperature Measurement, Probe Number = 4, T = 20.513000 C 13:56:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.51 13:56:06 Integrated Voltage Measurement... 13:56:26 Voltage Offset Correction: v_off_ini = 0.000003341 V, v_off_fin = 0.000005349 V 13:56:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171017664 Vs 13:56:26 Integrated Voltage Measurement... 13:56:45 Voltage Offset Correction: v_off_ini = 0.000005217 V, v_off_fin = 0.000001831 V 13:56:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967961 Vs 13:56:48 Temperature Measurement, Probe Number = 0, T = 20.186000 C 13:56:48 Temperature Measurement, Probe Number = 1, T = 20.110000 C 13:56:49 Temperature Measurement, Probe Number = 2, T = 20.166000 C 13:56:50 Temperature Measurement, Probe Number = 3, T = 20.110000 C 13:56:50 Temperature Measurement, Probe Number = 4, T = 20.481000 C 13:56:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.48 13:56:51 Integrated Voltage Measurement... 13:57:10 Voltage Offset Correction: v_off_ini = 0.000002915 V, v_off_fin = 0.000005575 V 13:57:10 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171017773 Vs 13:57:10 Integrated Voltage Measurement... 13:57:30 Voltage Offset Correction: v_off_ini = 0.000005570 V, v_off_fin = 0.000002388 V 13:57:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965223 Vs 13:57:33 Temperature Measurement, Probe Number = 0, T = 20.184000 C 13:57:33 Temperature Measurement, Probe Number = 1, T = 20.107000 C 13:57:34 Temperature Measurement, Probe Number = 2, T = 20.163000 C 13:57:35 Temperature Measurement, Probe Number = 3, T = 20.107000 C 13:57:35 Temperature Measurement, Probe Number = 4, T = 20.465000 C 13:57:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.46 13:57:35 Integrated Voltage Measurement... 13:57:55 Voltage Offset Correction: v_off_ini = 0.000003632 V, v_off_fin = 0.000005962 V 13:57:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020168 Vs 13:57:55 Integrated Voltage Measurement... 13:58:15 Voltage Offset Correction: v_off_ini = 0.000006087 V, v_off_fin = 0.000002537 V 13:58:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963201 Vs 13:58:18 Temperature Measurement, Probe Number = 0, T = 20.185000 C 13:58:18 Temperature Measurement, Probe Number = 1, T = 20.104000 C 13:58:19 Temperature Measurement, Probe Number = 2, T = 20.162000 C 13:58:20 Temperature Measurement, Probe Number = 3, T = 20.106000 C 13:58:20 Temperature Measurement, Probe Number = 4, T = 20.407000 C 13:58:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.41 13:58:20 Integrated Voltage Measurement... 13:58:40 Voltage Offset Correction: v_off_ini = 0.000003344 V, v_off_fin = 0.000006101 V 13:58:40 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171015754 Vs 13:58:40 Integrated Voltage Measurement... 13:58:59 Voltage Offset Correction: v_off_ini = 0.000005074 V, v_off_fin = 0.000001568 V 13:58:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966871 Vs 13:59:02 Temperature Measurement, Probe Number = 0, T = 20.185000 C 13:59:03 Temperature Measurement, Probe Number = 1, T = 20.108000 C 13:59:03 Temperature Measurement, Probe Number = 2, T = 20.162000 C 13:59:04 Temperature Measurement, Probe Number = 3, T = 20.108000 C 13:59:05 Temperature Measurement, Probe Number = 4, T = 20.416000 C 13:59:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.42 13:59:05 Integrated Voltage Measurement... 13:59:24 Voltage Offset Correction: v_off_ini = 0.000002576 V, v_off_fin = 0.000005677 V 13:59:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171008808 Vs 13:59:24 Integrated Voltage Measurement... 13:59:44 Voltage Offset Correction: v_off_ini = 0.000005461 V, v_off_fin = 0.000003576 V 13:59:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965039 Vs 14:29:46 Temperature Measurement, Probe Number = 0, T = 20.184000 C 14:29:47 Temperature Measurement, Probe Number = 1, T = 20.108000 C 14:29:48 Temperature Measurement, Probe Number = 2, T = 20.164000 C 14:29:48 Temperature Measurement, Probe Number = 3, T = 20.110000 C 14:29:49 Temperature Measurement, Probe Number = 4, T = 20.462000 C 14:29:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.46 14:29:49 Integrated Voltage Measurement... 14:30:08 Voltage Offset Correction: v_off_ini = 0.000004210 V, v_off_fin = 0.000005825 V 14:30:08 Integrated Voltage Measurement Delta Gap = 0.0040018 m VT = 0.171076972 Vs 14:30:08 Integrated Voltage Measurement... 14:30:28 Voltage Offset Correction: v_off_ini = 0.000004887 V, v_off_fin = 0.000001461 V 14:30:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170964365 Vs 14:30:31 Temperature Measurement, Probe Number = 0, T = 20.187000 C 14:30:31 Temperature Measurement, Probe Number = 1, T = 20.110000 C 14:30:32 Temperature Measurement, Probe Number = 2, T = 20.168000 C 14:30:33 Temperature Measurement, Probe Number = 3, T = 20.113000 C 14:30:33 Temperature Measurement, Probe Number = 4, T = 20.456000 C 14:30:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.46 14:30:34 Integrated Voltage Measurement... 14:30:53 Voltage Offset Correction: v_off_ini = 0.000003299 V, v_off_fin = 0.000005446 V 14:30:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171007715 Vs 14:30:53 Integrated Voltage Measurement... 14:31:13 Voltage Offset Correction: v_off_ini = 0.000005469 V, v_off_fin = 0.000002337 V 14:31:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965155 Vs 14:31:16 Temperature Measurement, Probe Number = 0, T = 20.187000 C 14:31:17 Temperature Measurement, Probe Number = 1, T = 20.111000 C 14:31:17 Temperature Measurement, Probe Number = 2, T = 20.167000 C 14:31:18 Temperature Measurement, Probe Number = 3, T = 20.112000 C 14:31:19 Temperature Measurement, Probe Number = 4, T = 20.500000 C 14:31:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.50 14:31:19 Integrated Voltage Measurement... 14:31:38 Voltage Offset Correction: v_off_ini = 0.000003811 V, v_off_fin = 0.000005972 V 14:31:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171006338 Vs 14:31:38 Integrated Voltage Measurement... 14:31:57 Voltage Offset Correction: v_off_ini = 0.000005294 V, v_off_fin = 0.000002297 V 14:31:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170958039 Vs 14:32:00 Temperature Measurement, Probe Number = 0, T = 20.186000 C 14:32:01 Temperature Measurement, Probe Number = 1, T = 20.109000 C 14:32:02 Temperature Measurement, Probe Number = 2, T = 20.165000 C 14:32:02 Temperature Measurement, Probe Number = 3, T = 20.109000 C 14:32:03 Temperature Measurement, Probe Number = 4, T = 20.439000 C 14:32:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.44 14:32:03 Integrated Voltage Measurement... 14:32:23 Voltage Offset Correction: v_off_ini = 0.000003500 V, v_off_fin = 0.000005627 V 14:32:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171013899 Vs 14:32:23 Integrated Voltage Measurement... 14:32:42 Voltage Offset Correction: v_off_ini = 0.000005136 V, v_off_fin = 0.000001716 V 14:32:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962316 Vs 14:32:45 Temperature Measurement, Probe Number = 0, T = 20.191000 C 14:32:46 Temperature Measurement, Probe Number = 1, T = 20.112000 C 14:32:46 Temperature Measurement, Probe Number = 2, T = 20.169000 C 14:32:47 Temperature Measurement, Probe Number = 3, T = 20.113000 C 14:32:48 Temperature Measurement, Probe Number = 4, T = 20.381000 C 14:32:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.38 14:32:48 Integrated Voltage Measurement... 14:33:07 Voltage Offset Correction: v_off_ini = -0.000000598 V, v_off_fin = 0.000006963 V 14:33:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171010060 Vs 14:33:08 Integrated Voltage Measurement... 14:33:27 Voltage Offset Correction: v_off_ini = 0.000005206 V, v_off_fin = 0.000002736 V 14:33:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961158 Vs 14:33:30 Temperature Measurement, Probe Number = 0, T = 20.188000 C 14:33:31 Temperature Measurement, Probe Number = 1, T = 20.113000 C 14:33:31 Temperature Measurement, Probe Number = 2, T = 20.167000 C 14:33:32 Temperature Measurement, Probe Number = 3, T = 20.113000 C 14:33:33 Temperature Measurement, Probe Number = 4, T = 20.374000 C 14:33:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.37 14:33:33 Integrated Voltage Measurement... 14:33:52 Voltage Offset Correction: v_off_ini = 0.000003389 V, v_off_fin = 0.000006736 V 14:33:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171012414 Vs 14:33:52 Integrated Voltage Measurement... 14:34:11 Voltage Offset Correction: v_off_ini = 0.000005295 V, v_off_fin = 0.000001839 V 14:34:12 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170965254 Vs 14:34:14 Temperature Measurement, Probe Number = 0, T = 20.185000 C 14:34:15 Temperature Measurement, Probe Number = 1, T = 20.104000 C 14:34:16 Temperature Measurement, Probe Number = 2, T = 20.165000 C 14:34:16 Temperature Measurement, Probe Number = 3, T = 20.107000 C 14:34:17 Temperature Measurement, Probe Number = 4, T = 20.366000 C 14:34:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.37 14:34:17 Integrated Voltage Measurement... 14:34:36 Voltage Offset Correction: v_off_ini = 0.000002953 V, v_off_fin = 0.000006016 V 14:34:37 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171014074 Vs 14:34:37 Integrated Voltage Measurement... 14:34:56 Voltage Offset Correction: v_off_ini = 0.000005185 V, v_off_fin = 0.000002839 V 14:34:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170962834 Vs 14:34:59 Temperature Measurement, Probe Number = 0, T = 20.191000 C 14:35:00 Temperature Measurement, Probe Number = 1, T = 20.111000 C 14:35:01 Temperature Measurement, Probe Number = 2, T = 20.171000 C 14:35:01 Temperature Measurement, Probe Number = 3, T = 20.111000 C 14:35:02 Temperature Measurement, Probe Number = 4, T = 20.446000 C 14:35:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.45 14:35:02 Integrated Voltage Measurement... 14:35:21 Voltage Offset Correction: v_off_ini = 0.000003340 V, v_off_fin = 0.000006316 V 14:35:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171010788 Vs 14:35:22 Integrated Voltage Measurement... 14:35:41 Voltage Offset Correction: v_off_ini = 0.000005337 V, v_off_fin = 0.000001380 V 14:35:41 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170962349 Vs 14:35:44 Temperature Measurement, Probe Number = 0, T = 20.188000 C 14:35:44 Temperature Measurement, Probe Number = 1, T = 20.107000 C 14:35:45 Temperature Measurement, Probe Number = 2, T = 20.168000 C 14:35:46 Temperature Measurement, Probe Number = 3, T = 20.110000 C 14:35:46 Temperature Measurement, Probe Number = 4, T = 20.421000 C 14:35:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.42 14:35:46 Integrated Voltage Measurement... 14:36:05 Voltage Offset Correction: v_off_ini = 0.000002979 V, v_off_fin = 0.000005596 V 14:36:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171015171 Vs 14:36:06 Integrated Voltage Measurement... 14:36:25 Voltage Offset Correction: v_off_ini = 0.000005184 V, v_off_fin = 0.000001584 V 14:36:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170960181 Vs 14:36:28 Temperature Measurement, Probe Number = 0, T = 20.187000 C 14:36:28 Temperature Measurement, Probe Number = 1, T = 20.109000 C 14:36:29 Temperature Measurement, Probe Number = 2, T = 20.167000 C 14:36:30 Temperature Measurement, Probe Number = 3, T = 20.108000 C 14:36:30 Temperature Measurement, Probe Number = 4, T = 20.432000 C 14:36:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.43 14:36:30 Integrated Voltage Measurement... 14:36:50 Voltage Offset Correction: v_off_ini = 0.000003160 V, v_off_fin = 0.000005719 V 14:36:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171016414 Vs 14:36:50 Integrated Voltage Measurement... 14:37:09 Voltage Offset Correction: v_off_ini = 0.000005036 V, v_off_fin = 0.000002279 V 14:37:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170961682 Vs 15:07:12 Temperature Measurement, Probe Number = 0, T = 20.183000 C 15:07:12 Temperature Measurement, Probe Number = 1, T = 20.107000 C 15:07:13 Temperature Measurement, Probe Number = 2, T = 20.166000 C 15:07:14 Temperature Measurement, Probe Number = 3, T = 20.109000 C 15:07:14 Temperature Measurement, Probe Number = 4, T = 20.373000 C 15:07:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.37 15:07:15 Integrated Voltage Measurement... 15:07:34 Voltage Offset Correction: v_off_ini = 0.000004343 V, v_off_fin = 0.000005321 V 15:07:34 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171065737 Vs 15:07:34 Integrated Voltage Measurement... 15:07:53 Voltage Offset Correction: v_off_ini = 0.000004773 V, v_off_fin = 0.000002696 V 15:07:53 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170974798 Vs 15:07:56 Temperature Measurement, Probe Number = 0, T = 20.186000 C 15:07:57 Temperature Measurement, Probe Number = 1, T = 20.112000 C 15:07:57 Temperature Measurement, Probe Number = 2, T = 20.166000 C 15:07:58 Temperature Measurement, Probe Number = 3, T = 20.113000 C 15:07:59 Temperature Measurement, Probe Number = 4, T = 20.424000 C 15:07:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.42 15:07:59 Integrated Voltage Measurement... 15:08:18 Voltage Offset Correction: v_off_ini = 0.000003539 V, v_off_fin = 0.000006054 V 15:08:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171012411 Vs 15:08:19 Integrated Voltage Measurement... 15:08:38 Voltage Offset Correction: v_off_ini = 0.000005770 V, v_off_fin = 0.000001472 V 15:08:38 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170972083 Vs 15:08:40 Temperature Measurement, Probe Number = 0, T = 20.191000 C 15:08:41 Temperature Measurement, Probe Number = 1, T = 20.114000 C 15:08:42 Temperature Measurement, Probe Number = 2, T = 20.173000 C 15:08:42 Temperature Measurement, Probe Number = 3, T = 20.115000 C 15:08:43 Temperature Measurement, Probe Number = 4, T = 20.432000 C 15:08:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.43 15:08:43 Integrated Voltage Measurement... 15:09:03 Voltage Offset Correction: v_off_ini = 0.000003454 V, v_off_fin = 0.000005757 V 15:09:03 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171017361 Vs 15:09:03 Integrated Voltage Measurement... 15:09:22 Voltage Offset Correction: v_off_ini = 0.000004777 V, v_off_fin = 0.000002318 V 15:09:23 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975315 Vs 15:09:25 Temperature Measurement, Probe Number = 0, T = 20.196000 C 15:09:26 Temperature Measurement, Probe Number = 1, T = 20.117000 C 15:09:27 Temperature Measurement, Probe Number = 2, T = 20.175000 C 15:09:27 Temperature Measurement, Probe Number = 3, T = 20.117000 C 15:09:28 Temperature Measurement, Probe Number = 4, T = 20.487000 C 15:09:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.49 15:09:28 Integrated Voltage Measurement... 15:09:47 Voltage Offset Correction: v_off_ini = 0.000003691 V, v_off_fin = 0.000005680 V 15:09:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017646 Vs 15:09:48 Integrated Voltage Measurement... 15:10:07 Voltage Offset Correction: v_off_ini = 0.000005257 V, v_off_fin = 0.000002584 V 15:10:07 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170972363 Vs 15:10:10 Temperature Measurement, Probe Number = 0, T = 20.194000 C 15:10:10 Temperature Measurement, Probe Number = 1, T = 20.115000 C 15:10:11 Temperature Measurement, Probe Number = 2, T = 20.175000 C 15:10:12 Temperature Measurement, Probe Number = 3, T = 20.117000 C 15:10:12 Temperature Measurement, Probe Number = 4, T = 20.473000 C 15:10:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.47 15:10:12 Integrated Voltage Measurement... 15:10:32 Voltage Offset Correction: v_off_ini = 0.000003606 V, v_off_fin = 0.000006053 V 15:10:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171020956 Vs 15:10:33 Integrated Voltage Measurement... 15:10:52 Voltage Offset Correction: v_off_ini = 0.000004876 V, v_off_fin = 0.000001885 V 15:10:52 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170970624 Vs 15:10:55 Temperature Measurement, Probe Number = 0, T = 20.191000 C 15:10:55 Temperature Measurement, Probe Number = 1, T = 20.112000 C 15:10:56 Temperature Measurement, Probe Number = 2, T = 20.172000 C 15:10:57 Temperature Measurement, Probe Number = 3, T = 20.114000 C 15:10:57 Temperature Measurement, Probe Number = 4, T = 20.520000 C 15:10:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.52 15:10:57 Integrated Voltage Measurement... 15:11:17 Voltage Offset Correction: v_off_ini = 0.000003619 V, v_off_fin = 0.000005415 V 15:11:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171016336 Vs 15:11:18 Integrated Voltage Measurement... 15:11:37 Voltage Offset Correction: v_off_ini = 0.000005116 V, v_off_fin = 0.000002328 V 15:11:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967744 Vs 15:11:39 Temperature Measurement, Probe Number = 0, T = 20.188000 C 15:11:40 Temperature Measurement, Probe Number = 1, T = 20.106000 C 15:11:41 Temperature Measurement, Probe Number = 2, T = 20.173000 C 15:11:41 Temperature Measurement, Probe Number = 3, T = 20.111000 C 15:11:42 Temperature Measurement, Probe Number = 4, T = 20.519000 C 15:11:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.52 15:11:42 Integrated Voltage Measurement... 15:12:02 Voltage Offset Correction: v_off_ini = 0.000003698 V, v_off_fin = 0.000005641 V 15:12:02 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171023854 Vs 15:12:02 Integrated Voltage Measurement... 15:12:21 Voltage Offset Correction: v_off_ini = 0.000005565 V, v_off_fin = 0.000001764 V 15:12:21 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170970174 Vs 15:12:24 Temperature Measurement, Probe Number = 0, T = 20.184000 C 15:12:25 Temperature Measurement, Probe Number = 1, T = 20.102000 C 15:12:25 Temperature Measurement, Probe Number = 2, T = 20.165000 C 15:12:26 Temperature Measurement, Probe Number = 3, T = 20.105000 C 15:12:26 Temperature Measurement, Probe Number = 4, T = 20.426000 C 15:12:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.43 15:12:27 Integrated Voltage Measurement... 15:12:46 Voltage Offset Correction: v_off_ini = 0.000003130 V, v_off_fin = 0.000005655 V 15:12:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171018867 Vs 15:12:46 Integrated Voltage Measurement... 15:13:06 Voltage Offset Correction: v_off_ini = 0.000004796 V, v_off_fin = 0.000002230 V 15:13:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974604 Vs 15:13:09 Temperature Measurement, Probe Number = 0, T = 20.179000 C 15:13:09 Temperature Measurement, Probe Number = 1, T = 20.099000 C 15:13:10 Temperature Measurement, Probe Number = 2, T = 20.162000 C 15:13:11 Temperature Measurement, Probe Number = 3, T = 20.103000 C 15:13:11 Temperature Measurement, Probe Number = 4, T = 20.430000 C 15:13:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.43 15:13:11 Integrated Voltage Measurement... 15:13:31 Voltage Offset Correction: v_off_ini = 0.000003309 V, v_off_fin = 0.000006238 V 15:13:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171019983 Vs 15:13:31 Integrated Voltage Measurement... 15:13:54 Voltage Offset Correction: v_off_ini = 0.000005519 V, v_off_fin = 0.000004069 V 15:13:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969955 Vs 15:13:57 Temperature Measurement, Probe Number = 0, T = 20.182000 C 15:13:58 Temperature Measurement, Probe Number = 1, T = 20.101000 C 15:13:58 Temperature Measurement, Probe Number = 2, T = 20.161000 C 15:13:59 Temperature Measurement, Probe Number = 3, T = 20.102000 C 15:14:00 Temperature Measurement, Probe Number = 4, T = 20.422000 C 15:14:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.42 15:14:00 Integrated Voltage Measurement... 15:14:19 Voltage Offset Correction: v_off_ini = 0.000003433 V, v_off_fin = 0.000005559 V 15:14:19 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171004428 Vs 15:14:19 Integrated Voltage Measurement... 15:14:39 Voltage Offset Correction: v_off_ini = 0.000005178 V, v_off_fin = 0.000002053 V 15:14:39 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170974755 Vs 15:44:42 Temperature Measurement, Probe Number = 0, T = 20.181000 C 15:44:43 Temperature Measurement, Probe Number = 1, T = 20.100000 C 15:44:43 Temperature Measurement, Probe Number = 2, T = 20.163000 C 15:44:44 Temperature Measurement, Probe Number = 3, T = 20.105000 C 15:44:45 Temperature Measurement, Probe Number = 4, T = 20.296000 C 15:44:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.30 15:44:45 Integrated Voltage Measurement... 15:45:04 Voltage Offset Correction: v_off_ini = 0.000004561 V, v_off_fin = 0.000006416 V 15:45:04 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171079655 Vs 15:45:04 Integrated Voltage Measurement... 15:45:24 Voltage Offset Correction: v_off_ini = 0.000005979 V, v_off_fin = 0.000002206 V 15:45:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965198 Vs 15:45:27 Temperature Measurement, Probe Number = 0, T = 20.184000 C 15:45:27 Temperature Measurement, Probe Number = 1, T = 20.101000 C 15:45:28 Temperature Measurement, Probe Number = 2, T = 20.162000 C 15:45:28 Temperature Measurement, Probe Number = 3, T = 20.104000 C 15:45:29 Temperature Measurement, Probe Number = 4, T = 20.343000 C 15:45:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.34 15:45:29 Integrated Voltage Measurement... 15:45:49 Voltage Offset Correction: v_off_ini = 0.000003189 V, v_off_fin = 0.000006163 V 15:45:49 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171026737 Vs 15:45:49 Integrated Voltage Measurement... 15:46:08 Voltage Offset Correction: v_off_ini = 0.000005816 V, v_off_fin = 0.000002237 V 15:46:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170964718 Vs 15:46:11 Temperature Measurement, Probe Number = 0, T = 20.184000 C 15:46:12 Temperature Measurement, Probe Number = 1, T = 20.103000 C 15:46:12 Temperature Measurement, Probe Number = 2, T = 20.165000 C 15:46:13 Temperature Measurement, Probe Number = 3, T = 20.105000 C 15:46:14 Temperature Measurement, Probe Number = 4, T = 20.281000 C 15:46:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.28 15:46:14 Integrated Voltage Measurement... 15:46:34 Voltage Offset Correction: v_off_ini = 0.000003292 V, v_off_fin = 0.000006320 V 15:46:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025948 Vs 15:46:34 Integrated Voltage Measurement... 15:46:54 Voltage Offset Correction: v_off_ini = 0.000005575 V, v_off_fin = 0.000001962 V 15:46:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971207 Vs 15:46:57 Temperature Measurement, Probe Number = 0, T = 20.186000 C 15:46:57 Temperature Measurement, Probe Number = 1, T = 20.102000 C 15:46:58 Temperature Measurement, Probe Number = 2, T = 20.167000 C 15:46:59 Temperature Measurement, Probe Number = 3, T = 20.107000 C 15:46:59 Temperature Measurement, Probe Number = 4, T = 20.292000 C 15:46:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.29 15:47:00 Integrated Voltage Measurement... 15:47:19 Voltage Offset Correction: v_off_ini = 0.000003158 V, v_off_fin = 0.000005484 V 15:47:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171013234 Vs 15:47:19 Integrated Voltage Measurement... 15:47:38 Voltage Offset Correction: v_off_ini = 0.000005435 V, v_off_fin = 0.000002357 V 15:47:39 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170965423 Vs 15:47:41 Temperature Measurement, Probe Number = 0, T = 20.185000 C 15:47:42 Temperature Measurement, Probe Number = 1, T = 20.101000 C 15:47:43 Temperature Measurement, Probe Number = 2, T = 20.164000 C 15:47:43 Temperature Measurement, Probe Number = 3, T = 20.103000 C 15:47:44 Temperature Measurement, Probe Number = 4, T = 20.330000 C 15:47:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.33 15:47:44 Integrated Voltage Measurement... 15:48:03 Voltage Offset Correction: v_off_ini = 0.000003460 V, v_off_fin = 0.000005398 V 15:48:03 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171017906 Vs 15:48:04 Integrated Voltage Measurement... 15:48:23 Voltage Offset Correction: v_off_ini = 0.000005028 V, v_off_fin = 0.000002409 V 15:48:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970828 Vs 15:48:26 Temperature Measurement, Probe Number = 0, T = 20.187000 C 15:48:27 Temperature Measurement, Probe Number = 1, T = 20.104000 C 15:48:27 Temperature Measurement, Probe Number = 2, T = 20.164000 C 15:48:28 Temperature Measurement, Probe Number = 3, T = 20.102000 C 15:48:28 Temperature Measurement, Probe Number = 4, T = 20.316000 C 15:48:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.32 15:48:29 Integrated Voltage Measurement... 15:48:48 Voltage Offset Correction: v_off_ini = 0.000003088 V, v_off_fin = 0.000005560 V 15:48:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017411 Vs 15:48:48 Integrated Voltage Measurement... 15:49:08 Voltage Offset Correction: v_off_ini = 0.000005635 V, v_off_fin = 0.000002209 V 15:49:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969401 Vs 15:49:10 Temperature Measurement, Probe Number = 0, T = 20.190000 C 15:49:11 Temperature Measurement, Probe Number = 1, T = 20.107000 C 15:49:12 Temperature Measurement, Probe Number = 2, T = 20.166000 C 15:49:12 Temperature Measurement, Probe Number = 3, T = 20.105000 C 15:49:13 Temperature Measurement, Probe Number = 4, T = 20.335000 C 15:49:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.34 15:49:13 Integrated Voltage Measurement... 15:49:32 Voltage Offset Correction: v_off_ini = 0.000002942 V, v_off_fin = 0.000005167 V 15:49:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171013479 Vs 15:49:33 Integrated Voltage Measurement... 15:49:52 Voltage Offset Correction: v_off_ini = 0.000005104 V, v_off_fin = 0.000001844 V 15:49:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970702 Vs 15:49:54 Temperature Measurement, Probe Number = 0, T = 20.183000 C 15:49:55 Temperature Measurement, Probe Number = 1, T = 20.101000 C 15:49:56 Temperature Measurement, Probe Number = 2, T = 20.166000 C 15:49:56 Temperature Measurement, Probe Number = 3, T = 20.104000 C 15:49:57 Temperature Measurement, Probe Number = 4, T = 20.297000 C 15:49:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.30 15:49:57 Integrated Voltage Measurement... 15:50:17 Voltage Offset Correction: v_off_ini = 0.000003213 V, v_off_fin = 0.000005955 V 15:50:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171016296 Vs 15:50:17 Integrated Voltage Measurement... 15:50:36 Voltage Offset Correction: v_off_ini = 0.000005576 V, v_off_fin = 0.000002047 V 15:50:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975452 Vs 15:50:39 Temperature Measurement, Probe Number = 0, T = 20.185000 C 15:50:40 Temperature Measurement, Probe Number = 1, T = 20.103000 C 15:50:41 Temperature Measurement, Probe Number = 2, T = 20.166000 C 15:50:41 Temperature Measurement, Probe Number = 3, T = 20.105000 C 15:50:42 Temperature Measurement, Probe Number = 4, T = 20.293000 C 15:50:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.29 15:50:42 Integrated Voltage Measurement... 15:51:01 Voltage Offset Correction: v_off_ini = 0.000003205 V, v_off_fin = 0.000004943 V 15:51:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171010232 Vs 15:51:02 Integrated Voltage Measurement... 15:51:20 Voltage Offset Correction: v_off_ini = 0.000004682 V, v_off_fin = 0.000001556 V 15:51:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972551 Vs 15:51:23 Temperature Measurement, Probe Number = 0, T = 20.188000 C 15:51:24 Temperature Measurement, Probe Number = 1, T = 20.105000 C 15:51:25 Temperature Measurement, Probe Number = 2, T = 20.170000 C 15:51:25 Temperature Measurement, Probe Number = 3, T = 20.106000 C 15:51:26 Temperature Measurement, Probe Number = 4, T = 20.277000 C 15:51:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.28 15:51:26 Integrated Voltage Measurement... 15:51:46 Voltage Offset Correction: v_off_ini = 0.000002985 V, v_off_fin = 0.000006039 V 15:51:46 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171021321 Vs 15:51:46 Integrated Voltage Measurement... 15:52:05 Voltage Offset Correction: v_off_ini = 0.000005320 V, v_off_fin = 0.000002584 V 15:52:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968296 Vs 16:22:08 Temperature Measurement, Probe Number = 0, T = 20.170000 C 16:22:09 Temperature Measurement, Probe Number = 1, T = 20.097000 C 16:22:10 Temperature Measurement, Probe Number = 2, T = 20.154000 C 16:22:10 Temperature Measurement, Probe Number = 3, T = 20.098000 C 16:22:11 Temperature Measurement, Probe Number = 4, T = 19.927000 C 16:22:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 19.93 16:22:11 Integrated Voltage Measurement... 16:22:30 Voltage Offset Correction: v_off_ini = 0.000004679 V, v_off_fin = 0.000005979 V 16:22:31 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171067201 Vs 16:22:31 Integrated Voltage Measurement... 16:22:50 Voltage Offset Correction: v_off_ini = 0.000005268 V, v_off_fin = 0.000002734 V 16:22:51 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170975557 Vs 16:22:53 Temperature Measurement, Probe Number = 0, T = 20.177000 C 16:22:54 Temperature Measurement, Probe Number = 1, T = 20.099000 C 16:22:55 Temperature Measurement, Probe Number = 2, T = 20.159000 C 16:22:55 Temperature Measurement, Probe Number = 3, T = 20.101000 C 16:22:56 Temperature Measurement, Probe Number = 4, T = 19.975000 C 16:22:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 19.98 16:22:56 Integrated Voltage Measurement... 16:23:15 Voltage Offset Correction: v_off_ini = 0.000003780 V, v_off_fin = 0.000005598 V 16:23:16 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171020997 Vs 16:23:16 Integrated Voltage Measurement... 16:23:35 Voltage Offset Correction: v_off_ini = 0.000005331 V, v_off_fin = 0.000002390 V 16:23:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977153 Vs 16:23:38 Temperature Measurement, Probe Number = 0, T = 20.180000 C 16:23:39 Temperature Measurement, Probe Number = 1, T = 20.101000 C 16:23:39 Temperature Measurement, Probe Number = 2, T = 20.160000 C 16:23:40 Temperature Measurement, Probe Number = 3, T = 20.102000 C 16:23:41 Temperature Measurement, Probe Number = 4, T = 20.111000 C 16:23:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.11 16:23:41 Integrated Voltage Measurement... 16:24:00 Voltage Offset Correction: v_off_ini = 0.000003559 V, v_off_fin = 0.000006144 V 16:24:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029578 Vs 16:24:00 Integrated Voltage Measurement... 16:24:19 Voltage Offset Correction: v_off_ini = 0.000006231 V, v_off_fin = 0.000001922 V 16:24:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968457 Vs 16:24:22 Temperature Measurement, Probe Number = 0, T = 20.182000 C 16:24:23 Temperature Measurement, Probe Number = 1, T = 20.102000 C 16:24:24 Temperature Measurement, Probe Number = 2, T = 20.162000 C 16:24:24 Temperature Measurement, Probe Number = 3, T = 20.103000 C 16:24:25 Temperature Measurement, Probe Number = 4, T = 20.080000 C 16:24:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.08 16:24:25 Integrated Voltage Measurement... 16:24:44 Voltage Offset Correction: v_off_ini = 0.000003432 V, v_off_fin = 0.000006784 V 16:24:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171021743 Vs 16:24:45 Integrated Voltage Measurement... 16:25:04 Voltage Offset Correction: v_off_ini = 0.000005545 V, v_off_fin = 0.000002362 V 16:25:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969937 Vs 16:25:07 Temperature Measurement, Probe Number = 0, T = 20.184000 C 16:25:07 Temperature Measurement, Probe Number = 1, T = 20.102000 C 16:25:08 Temperature Measurement, Probe Number = 2, T = 20.165000 C 16:25:09 Temperature Measurement, Probe Number = 3, T = 20.105000 C 16:25:09 Temperature Measurement, Probe Number = 4, T = 20.219000 C 16:25:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.22 16:25:10 Integrated Voltage Measurement... 16:25:29 Voltage Offset Correction: v_off_ini = 0.000003964 V, v_off_fin = 0.000005487 V 16:25:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029514 Vs 16:25:29 Integrated Voltage Measurement... 16:25:48 Voltage Offset Correction: v_off_ini = 0.000005684 V, v_off_fin = 0.000002071 V 16:25:49 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170974908 Vs 16:25:51 Temperature Measurement, Probe Number = 0, T = 20.182000 C 16:25:52 Temperature Measurement, Probe Number = 1, T = 20.101000 C 16:25:53 Temperature Measurement, Probe Number = 2, T = 20.162000 C 16:25:53 Temperature Measurement, Probe Number = 3, T = 20.102000 C 16:25:54 Temperature Measurement, Probe Number = 4, T = 20.309000 C 16:25:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.31 16:25:54 Integrated Voltage Measurement... 16:26:13 Voltage Offset Correction: v_off_ini = 0.000003200 V, v_off_fin = 0.000005247 V 16:26:14 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171020419 Vs 16:26:14 Integrated Voltage Measurement... 16:26:33 Voltage Offset Correction: v_off_ini = 0.000004871 V, v_off_fin = 0.000002119 V 16:26:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976147 Vs 16:26:36 Temperature Measurement, Probe Number = 0, T = 20.185000 C 16:26:36 Temperature Measurement, Probe Number = 1, T = 20.104000 C 16:26:37 Temperature Measurement, Probe Number = 2, T = 20.162000 C 16:26:38 Temperature Measurement, Probe Number = 3, T = 20.103000 C 16:26:38 Temperature Measurement, Probe Number = 4, T = 20.234000 C 16:26:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.23 16:26:38 Integrated Voltage Measurement... 16:26:58 Voltage Offset Correction: v_off_ini = 0.000003197 V, v_off_fin = 0.000005282 V 16:26:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020863 Vs 16:26:58 Integrated Voltage Measurement... 16:27:18 Voltage Offset Correction: v_off_ini = 0.000004975 V, v_off_fin = 0.000002451 V 16:27:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979900 Vs 16:27:21 Temperature Measurement, Probe Number = 0, T = 20.186000 C 16:27:21 Temperature Measurement, Probe Number = 1, T = 20.103000 C 16:27:22 Temperature Measurement, Probe Number = 2, T = 20.162000 C 16:27:23 Temperature Measurement, Probe Number = 3, T = 20.101000 C 16:27:23 Temperature Measurement, Probe Number = 4, T = 20.258000 C 16:27:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.26 16:27:24 Integrated Voltage Measurement... 16:27:43 Voltage Offset Correction: v_off_ini = 0.000003613 V, v_off_fin = 0.000005570 V 16:27:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171022096 Vs 16:27:43 Integrated Voltage Measurement... 16:28:03 Voltage Offset Correction: v_off_ini = 0.000005798 V, v_off_fin = 0.000002705 V 16:28:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974483 Vs 16:28:06 Temperature Measurement, Probe Number = 0, T = 20.184000 C 16:28:06 Temperature Measurement, Probe Number = 1, T = 20.103000 C 16:28:07 Temperature Measurement, Probe Number = 2, T = 20.161000 C 16:28:08 Temperature Measurement, Probe Number = 3, T = 20.101000 C 16:28:08 Temperature Measurement, Probe Number = 4, T = 20.217000 C 16:28:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.22 16:28:08 Integrated Voltage Measurement... 16:28:28 Voltage Offset Correction: v_off_ini = 0.000003926 V, v_off_fin = 0.000006409 V 16:28:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030931 Vs 16:28:29 Integrated Voltage Measurement... 16:28:48 Voltage Offset Correction: v_off_ini = 0.000005594 V, v_off_fin = 0.000002463 V 16:28:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968279 Vs 16:28:51 Temperature Measurement, Probe Number = 0, T = 20.181000 C 16:28:51 Temperature Measurement, Probe Number = 1, T = 20.101000 C 16:28:52 Temperature Measurement, Probe Number = 2, T = 20.161000 C 16:28:53 Temperature Measurement, Probe Number = 3, T = 20.104000 C 16:28:53 Temperature Measurement, Probe Number = 4, T = 20.160000 C 16:28:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.16 16:28:54 Integrated Voltage Measurement... 16:29:13 Voltage Offset Correction: v_off_ini = 0.000003389 V, v_off_fin = 0.000005702 V 16:29:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171021683 Vs 16:29:13 Integrated Voltage Measurement... 16:29:32 Voltage Offset Correction: v_off_ini = 0.000005489 V, v_off_fin = 0.000001985 V 16:29:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973095 Vs 16:59:35 Temperature Measurement, Probe Number = 0, T = 20.179000 C 16:59:36 Temperature Measurement, Probe Number = 1, T = 20.095000 C 16:59:37 Temperature Measurement, Probe Number = 2, T = 20.163000 C 16:59:37 Temperature Measurement, Probe Number = 3, T = 20.102000 C 16:59:38 Temperature Measurement, Probe Number = 4, T = 20.187000 C 16:59:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.19 16:59:38 Integrated Voltage Measurement... 16:59:57 Voltage Offset Correction: v_off_ini = 0.000004522 V, v_off_fin = 0.000006158 V 16:59:57 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171079532 Vs 16:59:58 Integrated Voltage Measurement... 17:00:17 Voltage Offset Correction: v_off_ini = 0.000005583 V, v_off_fin = 0.000002084 V 17:00:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977421 Vs 17:00:20 Temperature Measurement, Probe Number = 0, T = 20.180000 C 17:00:20 Temperature Measurement, Probe Number = 1, T = 20.099000 C 17:00:21 Temperature Measurement, Probe Number = 2, T = 20.163000 C 17:00:22 Temperature Measurement, Probe Number = 3, T = 20.102000 C 17:00:22 Temperature Measurement, Probe Number = 4, T = 20.103000 C 17:00:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.10 17:00:22 Integrated Voltage Measurement... 17:00:42 Voltage Offset Correction: v_off_ini = 0.000003555 V, v_off_fin = 0.000005449 V 17:00:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023071 Vs 17:00:42 Integrated Voltage Measurement... 17:01:02 Voltage Offset Correction: v_off_ini = 0.000005380 V, v_off_fin = 0.000002363 V 17:01:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977817 Vs 17:01:05 Temperature Measurement, Probe Number = 0, T = 20.184000 C 17:01:05 Temperature Measurement, Probe Number = 1, T = 20.104000 C 17:01:06 Temperature Measurement, Probe Number = 2, T = 20.164000 C 17:01:07 Temperature Measurement, Probe Number = 3, T = 20.106000 C 17:01:07 Temperature Measurement, Probe Number = 4, T = 20.110000 C 17:01:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.11 17:01:07 Integrated Voltage Measurement... 17:01:28 Voltage Offset Correction: v_off_ini = 0.000002585 V, v_off_fin = 0.000005735 V 17:01:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171019192 Vs 17:01:28 Integrated Voltage Measurement... 17:01:47 Voltage Offset Correction: v_off_ini = 0.000004815 V, v_off_fin = 0.000002076 V 17:01:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972636 Vs 17:01:50 Temperature Measurement, Probe Number = 0, T = 20.181000 C 17:01:51 Temperature Measurement, Probe Number = 1, T = 20.102000 C 17:01:51 Temperature Measurement, Probe Number = 2, T = 20.164000 C 17:01:52 Temperature Measurement, Probe Number = 3, T = 20.107000 C 17:01:53 Temperature Measurement, Probe Number = 4, T = 20.154000 C 17:01:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.15 17:01:53 Integrated Voltage Measurement... 17:02:12 Voltage Offset Correction: v_off_ini = 0.000003266 V, v_off_fin = 0.000006019 V 17:02:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024867 Vs 17:02:12 Integrated Voltage Measurement... 17:02:32 Voltage Offset Correction: v_off_ini = 0.000005077 V, v_off_fin = 0.000002611 V 17:02:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977706 Vs 17:02:35 Temperature Measurement, Probe Number = 0, T = 20.185000 C 17:02:36 Temperature Measurement, Probe Number = 1, T = 20.107000 C 17:02:36 Temperature Measurement, Probe Number = 2, T = 20.168000 C 17:02:37 Temperature Measurement, Probe Number = 3, T = 20.111000 C 17:02:38 Temperature Measurement, Probe Number = 4, T = 20.286000 C 17:02:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.29 17:02:38 Integrated Voltage Measurement... 17:02:58 Voltage Offset Correction: v_off_ini = 0.000003007 V, v_off_fin = 0.000005876 V 17:02:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171020425 Vs 17:02:58 Integrated Voltage Measurement... 17:03:17 Voltage Offset Correction: v_off_ini = 0.000004915 V, v_off_fin = 0.000002500 V 17:03:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973320 Vs 17:03:20 Temperature Measurement, Probe Number = 0, T = 20.183000 C 17:03:21 Temperature Measurement, Probe Number = 1, T = 20.100000 C 17:03:21 Temperature Measurement, Probe Number = 2, T = 20.167000 C 17:03:22 Temperature Measurement, Probe Number = 3, T = 20.108000 C 17:03:23 Temperature Measurement, Probe Number = 4, T = 20.365000 C 17:03:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.36 17:03:23 Integrated Voltage Measurement... 17:03:42 Voltage Offset Correction: v_off_ini = 0.000003218 V, v_off_fin = 0.000005836 V 17:03:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171021506 Vs 17:03:42 Integrated Voltage Measurement... 17:04:01 Voltage Offset Correction: v_off_ini = 0.000005075 V, v_off_fin = 0.000002459 V 17:04:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971797 Vs 17:04:04 Temperature Measurement, Probe Number = 0, T = 20.184000 C 17:04:05 Temperature Measurement, Probe Number = 1, T = 20.102000 C 17:04:05 Temperature Measurement, Probe Number = 2, T = 20.168000 C 17:04:06 Temperature Measurement, Probe Number = 3, T = 20.108000 C 17:04:07 Temperature Measurement, Probe Number = 4, T = 20.410000 C 17:04:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.41 17:04:07 Integrated Voltage Measurement... 17:04:26 Voltage Offset Correction: v_off_ini = 0.000003424 V, v_off_fin = 0.000006118 V 17:04:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171029212 Vs 17:04:27 Integrated Voltage Measurement... 17:04:46 Voltage Offset Correction: v_off_ini = 0.000005422 V, v_off_fin = 0.000002593 V 17:04:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973223 Vs 17:04:49 Temperature Measurement, Probe Number = 0, T = 20.182000 C 17:04:50 Temperature Measurement, Probe Number = 1, T = 20.103000 C 17:04:50 Temperature Measurement, Probe Number = 2, T = 20.165000 C 17:04:51 Temperature Measurement, Probe Number = 3, T = 20.108000 C 17:04:52 Temperature Measurement, Probe Number = 4, T = 20.444000 C 17:04:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.44 17:04:52 Integrated Voltage Measurement... 17:05:11 Voltage Offset Correction: v_off_ini = 0.000003137 V, v_off_fin = 0.000005315 V 17:05:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171022894 Vs 17:05:11 Integrated Voltage Measurement... 17:05:30 Voltage Offset Correction: v_off_ini = 0.000005269 V, v_off_fin = 0.000002460 V 17:05:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974187 Vs 17:05:33 Temperature Measurement, Probe Number = 0, T = 20.184000 C 17:05:34 Temperature Measurement, Probe Number = 1, T = 20.104000 C 17:05:35 Temperature Measurement, Probe Number = 2, T = 20.170000 C 17:05:35 Temperature Measurement, Probe Number = 3, T = 20.112000 C 17:05:36 Temperature Measurement, Probe Number = 4, T = 20.422000 C 17:05:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.42 17:05:36 Integrated Voltage Measurement... 17:05:55 Voltage Offset Correction: v_off_ini = 0.000003523 V, v_off_fin = 0.000005898 V 17:05:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171026750 Vs 17:05:55 Integrated Voltage Measurement... 17:06:14 Voltage Offset Correction: v_off_ini = 0.000005175 V, v_off_fin = 0.000002275 V 17:06:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970898 Vs 17:06:17 Temperature Measurement, Probe Number = 0, T = 20.184000 C 17:06:18 Temperature Measurement, Probe Number = 1, T = 20.104000 C 17:06:19 Temperature Measurement, Probe Number = 2, T = 20.167000 C 17:06:19 Temperature Measurement, Probe Number = 3, T = 20.109000 C 17:06:20 Temperature Measurement, Probe Number = 4, T = 20.498000 C 17:06:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.50 17:06:20 Integrated Voltage Measurement... 17:06:39 Voltage Offset Correction: v_off_ini = 0.000003797 V, v_off_fin = 0.000005365 V 17:06:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024268 Vs 17:06:40 Integrated Voltage Measurement... 17:06:59 Voltage Offset Correction: v_off_ini = 0.000005412 V, v_off_fin = 0.000002396 V 17:06:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972393 Vs 17:37:01 Temperature Measurement, Probe Number = 0, T = 20.173000 C 17:37:02 Temperature Measurement, Probe Number = 1, T = 20.095000 C 17:37:03 Temperature Measurement, Probe Number = 2, T = 20.158000 C 17:37:03 Temperature Measurement, Probe Number = 3, T = 20.102000 C 17:37:04 Temperature Measurement, Probe Number = 4, T = 20.156000 C 17:37:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.16 17:37:04 Integrated Voltage Measurement... 17:37:23 Voltage Offset Correction: v_off_ini = 0.000004351 V, v_off_fin = 0.000005521 V 17:37:24 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171076041 Vs 17:37:24 Integrated Voltage Measurement... 17:37:43 Voltage Offset Correction: v_off_ini = 0.000004819 V, v_off_fin = 0.000002631 V 17:37:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977796 Vs 17:37:46 Temperature Measurement, Probe Number = 0, T = 20.177000 C 17:37:47 Temperature Measurement, Probe Number = 1, T = 20.098000 C 17:37:47 Temperature Measurement, Probe Number = 2, T = 20.161000 C 17:37:48 Temperature Measurement, Probe Number = 3, T = 20.104000 C 17:37:49 Temperature Measurement, Probe Number = 4, T = 20.144000 C 17:37:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.14 17:37:49 Integrated Voltage Measurement... 17:38:08 Voltage Offset Correction: v_off_ini = 0.000003358 V, v_off_fin = 0.000005368 V 17:38:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171015124 Vs 17:38:09 Integrated Voltage Measurement... 17:38:28 Voltage Offset Correction: v_off_ini = 0.000005351 V, v_off_fin = 0.000002266 V 17:38:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973915 Vs 17:38:30 Temperature Measurement, Probe Number = 0, T = 20.179000 C 17:38:31 Temperature Measurement, Probe Number = 1, T = 20.098000 C 17:38:32 Temperature Measurement, Probe Number = 2, T = 20.164000 C 17:38:32 Temperature Measurement, Probe Number = 3, T = 20.106000 C 17:38:33 Temperature Measurement, Probe Number = 4, T = 20.124000 C 17:38:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.12 17:38:33 Integrated Voltage Measurement... 17:38:52 Voltage Offset Correction: v_off_ini = 0.000002997 V, v_off_fin = 0.000005552 V 17:38:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171019179 Vs 17:38:53 Integrated Voltage Measurement... 17:39:12 Voltage Offset Correction: v_off_ini = 0.000004812 V, v_off_fin = 0.000001703 V 17:39:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980760 Vs 17:39:15 Temperature Measurement, Probe Number = 0, T = 20.181000 C 17:39:16 Temperature Measurement, Probe Number = 1, T = 20.101000 C 17:39:16 Temperature Measurement, Probe Number = 2, T = 20.164000 C 17:39:17 Temperature Measurement, Probe Number = 3, T = 20.107000 C 17:39:18 Temperature Measurement, Probe Number = 4, T = 20.143000 C 17:39:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.14 17:39:18 Integrated Voltage Measurement... 17:39:37 Voltage Offset Correction: v_off_ini = 0.000003033 V, v_off_fin = 0.000005051 V 17:39:37 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171017906 Vs 17:39:38 Integrated Voltage Measurement... 17:39:57 Voltage Offset Correction: v_off_ini = 0.000005420 V, v_off_fin = 0.000002288 V 17:39:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978744 Vs 17:40:00 Temperature Measurement, Probe Number = 0, T = 20.183000 C 17:40:00 Temperature Measurement, Probe Number = 1, T = 20.102000 C 17:40:01 Temperature Measurement, Probe Number = 2, T = 20.169000 C 17:40:02 Temperature Measurement, Probe Number = 3, T = 20.109000 C 17:40:02 Temperature Measurement, Probe Number = 4, T = 20.295000 C 17:40:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.30 17:40:03 Integrated Voltage Measurement... 17:40:22 Voltage Offset Correction: v_off_ini = 0.000003234 V, v_off_fin = 0.000005947 V 17:40:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171018945 Vs 17:40:22 Integrated Voltage Measurement... 17:40:41 Voltage Offset Correction: v_off_ini = 0.000005879 V, v_off_fin = 0.000002834 V 17:40:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970475 Vs 17:40:44 Temperature Measurement, Probe Number = 0, T = 20.186000 C 17:40:45 Temperature Measurement, Probe Number = 1, T = 20.103000 C 17:40:46 Temperature Measurement, Probe Number = 2, T = 20.167000 C 17:40:46 Temperature Measurement, Probe Number = 3, T = 20.109000 C 17:40:47 Temperature Measurement, Probe Number = 4, T = 20.365000 C 17:40:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.36 17:40:47 Integrated Voltage Measurement... 17:41:06 Voltage Offset Correction: v_off_ini = 0.000003419 V, v_off_fin = 0.000006285 V 17:41:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025619 Vs 17:41:07 Integrated Voltage Measurement... 17:41:26 Voltage Offset Correction: v_off_ini = 0.000005352 V, v_off_fin = 0.000002080 V 17:41:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970958 Vs 17:41:29 Temperature Measurement, Probe Number = 0, T = 20.186000 C 17:41:30 Temperature Measurement, Probe Number = 1, T = 20.100000 C 17:41:30 Temperature Measurement, Probe Number = 2, T = 20.169000 C 17:41:31 Temperature Measurement, Probe Number = 3, T = 20.110000 C 17:41:31 Temperature Measurement, Probe Number = 4, T = 20.399000 C 17:41:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.40 17:41:32 Integrated Voltage Measurement... 17:41:51 Voltage Offset Correction: v_off_ini = 0.000003469 V, v_off_fin = 0.000006262 V 17:41:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025309 Vs 17:41:51 Integrated Voltage Measurement... 17:42:10 Voltage Offset Correction: v_off_ini = 0.000005439 V, v_off_fin = 0.000002742 V 17:42:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970262 Vs 17:42:13 Temperature Measurement, Probe Number = 0, T = 20.183000 C 17:42:14 Temperature Measurement, Probe Number = 1, T = 20.099000 C 17:42:15 Temperature Measurement, Probe Number = 2, T = 20.166000 C 17:42:15 Temperature Measurement, Probe Number = 3, T = 20.108000 C 17:42:16 Temperature Measurement, Probe Number = 4, T = 20.330000 C 17:42:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.33 17:42:16 Integrated Voltage Measurement... 17:42:35 Voltage Offset Correction: v_off_ini = 0.000003896 V, v_off_fin = 0.000006275 V 17:42:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023887 Vs 17:42:36 Integrated Voltage Measurement... 17:42:55 Voltage Offset Correction: v_off_ini = 0.000005590 V, v_off_fin = 0.000002191 V 17:42:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972283 Vs 17:42:58 Temperature Measurement, Probe Number = 0, T = 20.182000 C 17:42:59 Temperature Measurement, Probe Number = 1, T = 20.099000 C 17:42:59 Temperature Measurement, Probe Number = 2, T = 20.165000 C 17:43:00 Temperature Measurement, Probe Number = 3, T = 20.107000 C 17:43:01 Temperature Measurement, Probe Number = 4, T = 20.328000 C 17:43:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.33 17:43:01 Integrated Voltage Measurement... 17:43:20 Voltage Offset Correction: v_off_ini = 0.000003628 V, v_off_fin = 0.000005953 V 17:43:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171026060 Vs 17:43:20 Integrated Voltage Measurement... 17:43:40 Voltage Offset Correction: v_off_ini = 0.000005257 V, v_off_fin = 0.000002122 V 17:43:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970590 Vs 17:43:43 Temperature Measurement, Probe Number = 0, T = 20.180000 C 17:43:43 Temperature Measurement, Probe Number = 1, T = 20.097000 C 17:43:44 Temperature Measurement, Probe Number = 2, T = 20.164000 C 17:43:45 Temperature Measurement, Probe Number = 3, T = 20.105000 C 17:43:45 Temperature Measurement, Probe Number = 4, T = 20.269000 C 17:43:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.27 17:43:45 Integrated Voltage Measurement... 17:44:05 Voltage Offset Correction: v_off_ini = 0.000003827 V, v_off_fin = 0.000006023 V 17:44:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028241 Vs 17:44:05 Integrated Voltage Measurement... 17:44:25 Voltage Offset Correction: v_off_ini = 0.000005369 V, v_off_fin = 0.000002053 V 17:44:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978235 Vs 18:14:28 Temperature Measurement, Probe Number = 0, T = 20.175000 C 18:14:28 Temperature Measurement, Probe Number = 1, T = 20.096000 C 18:14:29 Temperature Measurement, Probe Number = 2, T = 20.160000 C 18:14:30 Temperature Measurement, Probe Number = 3, T = 20.103000 C 18:14:30 Temperature Measurement, Probe Number = 4, T = 20.308000 C 18:14:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.31 18:14:31 Integrated Voltage Measurement... 18:14:50 Voltage Offset Correction: v_off_ini = 0.000003617 V, v_off_fin = 0.000005463 V 18:14:50 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171069570 Vs 18:14:50 Integrated Voltage Measurement... 18:15:09 Voltage Offset Correction: v_off_ini = 0.000004435 V, v_off_fin = 0.000002106 V 18:15:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976479 Vs 18:15:12 Temperature Measurement, Probe Number = 0, T = 20.179000 C 18:15:13 Temperature Measurement, Probe Number = 1, T = 20.099000 C 18:15:14 Temperature Measurement, Probe Number = 2, T = 20.163000 C 18:15:14 Temperature Measurement, Probe Number = 3, T = 20.104000 C 18:15:15 Temperature Measurement, Probe Number = 4, T = 20.395000 C 18:15:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.39 18:15:15 Integrated Voltage Measurement... 18:15:35 Voltage Offset Correction: v_off_ini = 0.000003229 V, v_off_fin = 0.000006212 V 18:15:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024674 Vs 18:15:35 Integrated Voltage Measurement... 18:15:54 Voltage Offset Correction: v_off_ini = 0.000005357 V, v_off_fin = 0.000002452 V 18:15:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973360 Vs 18:15:57 Temperature Measurement, Probe Number = 0, T = 20.182000 C 18:15:57 Temperature Measurement, Probe Number = 1, T = 20.101000 C 18:15:58 Temperature Measurement, Probe Number = 2, T = 20.166000 C 18:15:59 Temperature Measurement, Probe Number = 3, T = 20.107000 C 18:15:59 Temperature Measurement, Probe Number = 4, T = 20.394000 C 18:15:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.39 18:16:00 Integrated Voltage Measurement... 18:16:19 Voltage Offset Correction: v_off_ini = 0.000003120 V, v_off_fin = 0.000005470 V 18:16:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171018415 Vs 18:16:19 Integrated Voltage Measurement... 18:16:39 Voltage Offset Correction: v_off_ini = 0.000005180 V, v_off_fin = 0.000001692 V 18:16:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985610 Vs 18:16:42 Temperature Measurement, Probe Number = 0, T = 20.181000 C 18:16:42 Temperature Measurement, Probe Number = 1, T = 20.100000 C 18:16:43 Temperature Measurement, Probe Number = 2, T = 20.164000 C 18:16:44 Temperature Measurement, Probe Number = 3, T = 20.104000 C 18:16:44 Temperature Measurement, Probe Number = 4, T = 20.427000 C 18:16:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.43 18:16:44 Integrated Voltage Measurement... 18:17:04 Voltage Offset Correction: v_off_ini = 0.000003026 V, v_off_fin = 0.000005031 V 18:17:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017434 Vs 18:17:04 Integrated Voltage Measurement... 18:17:24 Voltage Offset Correction: v_off_ini = 0.000004947 V, v_off_fin = 0.000002328 V 18:17:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981492 Vs 18:17:27 Temperature Measurement, Probe Number = 0, T = 20.173000 C 18:17:27 Temperature Measurement, Probe Number = 1, T = 20.096000 C 18:17:28 Temperature Measurement, Probe Number = 2, T = 20.159000 C 18:17:29 Temperature Measurement, Probe Number = 3, T = 20.102000 C 18:17:29 Temperature Measurement, Probe Number = 4, T = 20.440000 C 18:17:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.44 18:17:29 Integrated Voltage Measurement... 18:17:49 Voltage Offset Correction: v_off_ini = 0.000002927 V, v_off_fin = 0.000005156 V 18:17:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171017459 Vs 18:17:49 Integrated Voltage Measurement... 18:18:08 Voltage Offset Correction: v_off_ini = 0.000004594 V, v_off_fin = 0.000001811 V 18:18:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980772 Vs 18:18:11 Temperature Measurement, Probe Number = 0, T = 20.174000 C 18:18:12 Temperature Measurement, Probe Number = 1, T = 20.096000 C 18:18:13 Temperature Measurement, Probe Number = 2, T = 20.159000 C 18:18:13 Temperature Measurement, Probe Number = 3, T = 20.102000 C 18:18:14 Temperature Measurement, Probe Number = 4, T = 20.348000 C 18:18:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.35 18:18:14 Integrated Voltage Measurement... 18:18:33 Voltage Offset Correction: v_off_ini = 0.000002615 V, v_off_fin = 0.000005354 V 18:18:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171013961 Vs 18:18:34 Integrated Voltage Measurement... 18:18:53 Voltage Offset Correction: v_off_ini = 0.000004725 V, v_off_fin = 0.000002095 V 18:18:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987708 Vs 18:18:56 Temperature Measurement, Probe Number = 0, T = 20.179000 C 18:18:56 Temperature Measurement, Probe Number = 1, T = 20.099000 C 18:18:57 Temperature Measurement, Probe Number = 2, T = 20.161000 C 18:18:58 Temperature Measurement, Probe Number = 3, T = 20.103000 C 18:18:58 Temperature Measurement, Probe Number = 4, T = 20.231000 C 18:18:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.23 18:18:59 Integrated Voltage Measurement... 18:19:18 Voltage Offset Correction: v_off_ini = 0.000002919 V, v_off_fin = 0.000006331 V 18:19:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171018016 Vs 18:19:18 Integrated Voltage Measurement... 18:19:37 Voltage Offset Correction: v_off_ini = 0.000004920 V, v_off_fin = 0.000001566 V 18:19:38 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982119 Vs 18:19:40 Temperature Measurement, Probe Number = 0, T = 20.182000 C 18:19:41 Temperature Measurement, Probe Number = 1, T = 20.105000 C 18:19:42 Temperature Measurement, Probe Number = 2, T = 20.162000 C 18:19:42 Temperature Measurement, Probe Number = 3, T = 20.104000 C 18:19:43 Temperature Measurement, Probe Number = 4, T = 20.220000 C 18:19:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.22 18:19:43 Integrated Voltage Measurement... 18:20:02 Voltage Offset Correction: v_off_ini = 0.000003219 V, v_off_fin = 0.000005441 V 18:20:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171025897 Vs 18:20:03 Integrated Voltage Measurement... 18:20:22 Voltage Offset Correction: v_off_ini = 0.000004811 V, v_off_fin = 0.000001580 V 18:20:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984826 Vs 18:20:25 Temperature Measurement, Probe Number = 0, T = 20.181000 C 18:20:26 Temperature Measurement, Probe Number = 1, T = 20.102000 C 18:20:26 Temperature Measurement, Probe Number = 2, T = 20.165000 C 18:20:27 Temperature Measurement, Probe Number = 3, T = 20.108000 C 18:20:27 Temperature Measurement, Probe Number = 4, T = 20.274000 C 18:20:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.27 18:20:28 Integrated Voltage Measurement... 18:20:47 Voltage Offset Correction: v_off_ini = 0.000002992 V, v_off_fin = 0.000005531 V 18:20:47 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171027859 Vs 18:20:47 Integrated Voltage Measurement... 18:21:07 Voltage Offset Correction: v_off_ini = 0.000005588 V, v_off_fin = 0.000001993 V 18:21:07 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983067 Vs 18:21:10 Temperature Measurement, Probe Number = 0, T = 20.180000 C 18:21:10 Temperature Measurement, Probe Number = 1, T = 20.100000 C 18:21:11 Temperature Measurement, Probe Number = 2, T = 20.168000 C 18:21:11 Temperature Measurement, Probe Number = 3, T = 20.109000 C 18:21:12 Temperature Measurement, Probe Number = 4, T = 20.345000 C 18:21:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.34 18:21:12 Integrated Voltage Measurement... 18:21:31 Voltage Offset Correction: v_off_ini = 0.000003321 V, v_off_fin = 0.000005588 V 18:21:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171030991 Vs 18:21:32 Integrated Voltage Measurement... 18:21:51 Voltage Offset Correction: v_off_ini = 0.000005364 V, v_off_fin = 0.000001936 V 18:21:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982200 Vs 18:51:54 Temperature Measurement, Probe Number = 0, T = 20.168000 C 18:51:55 Temperature Measurement, Probe Number = 1, T = 20.088000 C 18:51:56 Temperature Measurement, Probe Number = 2, T = 20.157000 C 18:51:56 Temperature Measurement, Probe Number = 3, T = 20.098000 C 18:51:57 Temperature Measurement, Probe Number = 4, T = 20.062000 C 18:51:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.06 18:51:57 Integrated Voltage Measurement... 18:52:16 Voltage Offset Correction: v_off_ini = 0.000004427 V, v_off_fin = 0.000006126 V 18:52:16 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171083824 Vs 18:52:16 Integrated Voltage Measurement... 18:52:35 Voltage Offset Correction: v_off_ini = 0.000005922 V, v_off_fin = 0.000002510 V 18:52:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982633 Vs 18:52:38 Temperature Measurement, Probe Number = 0, T = 20.171000 C 18:52:39 Temperature Measurement, Probe Number = 1, T = 20.090000 C 18:52:40 Temperature Measurement, Probe Number = 2, T = 20.158000 C 18:52:40 Temperature Measurement, Probe Number = 3, T = 20.100000 C 18:52:41 Temperature Measurement, Probe Number = 4, T = 20.131000 C 18:52:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.13 18:52:41 Integrated Voltage Measurement... 18:53:01 Voltage Offset Correction: v_off_ini = 0.000003169 V, v_off_fin = 0.000005631 V 18:53:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171032686 Vs 18:53:01 Integrated Voltage Measurement... 18:53:20 Voltage Offset Correction: v_off_ini = 0.000004850 V, v_off_fin = 0.000001898 V 18:53:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981922 Vs 18:53:23 Temperature Measurement, Probe Number = 0, T = 20.165000 C 18:53:24 Temperature Measurement, Probe Number = 1, T = 20.084000 C 18:53:25 Temperature Measurement, Probe Number = 2, T = 20.153000 C 18:53:25 Temperature Measurement, Probe Number = 3, T = 20.096000 C 18:53:26 Temperature Measurement, Probe Number = 4, T = 20.099000 C 18:53:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.10 18:53:26 Integrated Voltage Measurement... 18:53:45 Voltage Offset Correction: v_off_ini = 0.000003274 V, v_off_fin = 0.000005729 V 18:53:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030812 Vs 18:53:45 Integrated Voltage Measurement... 18:54:04 Voltage Offset Correction: v_off_ini = 0.000005635 V, v_off_fin = 0.000001895 V 18:54:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982846 Vs 18:54:07 Temperature Measurement, Probe Number = 0, T = 20.169000 C 18:54:08 Temperature Measurement, Probe Number = 1, T = 20.088000 C 18:54:09 Temperature Measurement, Probe Number = 2, T = 20.157000 C 18:54:09 Temperature Measurement, Probe Number = 3, T = 20.098000 C 18:54:10 Temperature Measurement, Probe Number = 4, T = 20.076000 C 18:54:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.08 18:54:10 Integrated Voltage Measurement... 18:54:29 Voltage Offset Correction: v_off_ini = 0.000004151 V, v_off_fin = 0.000006215 V 18:54:29 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171040484 Vs 18:54:30 Integrated Voltage Measurement... 18:54:49 Voltage Offset Correction: v_off_ini = 0.000006286 V, v_off_fin = 0.000002609 V 18:54:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975946 Vs 18:54:51 Temperature Measurement, Probe Number = 0, T = 20.170000 C 18:54:52 Temperature Measurement, Probe Number = 1, T = 20.092000 C 18:54:53 Temperature Measurement, Probe Number = 2, T = 20.158000 C 18:54:53 Temperature Measurement, Probe Number = 3, T = 20.101000 C 18:54:54 Temperature Measurement, Probe Number = 4, T = 20.092000 C 18:54:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.09 18:54:54 Integrated Voltage Measurement... 18:55:14 Voltage Offset Correction: v_off_ini = 0.000003628 V, v_off_fin = 0.000006807 V 18:55:14 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042552 Vs 18:55:14 Integrated Voltage Measurement... 18:55:33 Voltage Offset Correction: v_off_ini = 0.000006384 V, v_off_fin = 0.000002923 V 18:55:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979416 Vs 18:55:36 Temperature Measurement, Probe Number = 0, T = 20.171000 C 18:55:37 Temperature Measurement, Probe Number = 1, T = 20.094000 C 18:55:37 Temperature Measurement, Probe Number = 2, T = 20.157000 C 18:55:38 Temperature Measurement, Probe Number = 3, T = 20.101000 C 18:55:39 Temperature Measurement, Probe Number = 4, T = 20.051000 C 18:55:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.05 18:55:39 Integrated Voltage Measurement... 18:55:58 Voltage Offset Correction: v_off_ini = 0.000003943 V, v_off_fin = 0.000006247 V 18:55:58 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171033656 Vs 18:55:58 Integrated Voltage Measurement... 18:56:17 Voltage Offset Correction: v_off_ini = 0.000005403 V, v_off_fin = 0.000001751 V 18:56:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983618 Vs 18:56:20 Temperature Measurement, Probe Number = 0, T = 20.178000 C 18:56:21 Temperature Measurement, Probe Number = 1, T = 20.095000 C 18:56:21 Temperature Measurement, Probe Number = 2, T = 20.162000 C 18:56:22 Temperature Measurement, Probe Number = 3, T = 20.104000 C 18:56:23 Temperature Measurement, Probe Number = 4, T = 20.094000 C 18:56:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.09 18:56:23 Integrated Voltage Measurement... 18:56:42 Voltage Offset Correction: v_off_ini = 0.000003788 V, v_off_fin = 0.000005947 V 18:56:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035780 Vs 18:56:43 Integrated Voltage Measurement... 18:57:02 Voltage Offset Correction: v_off_ini = 0.000005473 V, v_off_fin = 0.000001960 V 18:57:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985646 Vs 18:57:05 Temperature Measurement, Probe Number = 0, T = 20.175000 C 18:57:05 Temperature Measurement, Probe Number = 1, T = 20.095000 C 18:57:06 Temperature Measurement, Probe Number = 2, T = 20.160000 C 18:57:07 Temperature Measurement, Probe Number = 3, T = 20.104000 C 18:57:07 Temperature Measurement, Probe Number = 4, T = 20.152000 C 18:57:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.15 18:57:07 Integrated Voltage Measurement... 18:57:27 Voltage Offset Correction: v_off_ini = 0.000003165 V, v_off_fin = 0.000006457 V 18:57:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037330 Vs 18:57:27 Integrated Voltage Measurement... 18:57:47 Voltage Offset Correction: v_off_ini = 0.000005515 V, v_off_fin = 0.000001966 V 18:57:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987085 Vs 18:57:49 Temperature Measurement, Probe Number = 0, T = 20.177000 C 18:57:50 Temperature Measurement, Probe Number = 1, T = 20.096000 C 18:57:51 Temperature Measurement, Probe Number = 2, T = 20.161000 C 18:57:51 Temperature Measurement, Probe Number = 3, T = 20.102000 C 18:57:52 Temperature Measurement, Probe Number = 4, T = 20.200000 C 18:57:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.20 18:57:52 Integrated Voltage Measurement... 18:58:12 Voltage Offset Correction: v_off_ini = 0.000003278 V, v_off_fin = 0.000005602 V 18:58:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033089 Vs 18:58:12 Integrated Voltage Measurement... 18:58:31 Voltage Offset Correction: v_off_ini = 0.000005296 V, v_off_fin = 0.000002307 V 18:58:31 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987780 Vs 18:58:34 Temperature Measurement, Probe Number = 0, T = 20.174000 C 18:58:35 Temperature Measurement, Probe Number = 1, T = 20.094000 C 18:58:35 Temperature Measurement, Probe Number = 2, T = 20.157000 C 18:58:36 Temperature Measurement, Probe Number = 3, T = 20.098000 C 18:58:36 Temperature Measurement, Probe Number = 4, T = 20.111000 C 18:58:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.11 18:58:37 Integrated Voltage Measurement... 18:58:56 Voltage Offset Correction: v_off_ini = 0.000003541 V, v_off_fin = 0.000005092 V 18:58:56 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171033602 Vs 18:58:56 Integrated Voltage Measurement... 18:59:16 Voltage Offset Correction: v_off_ini = 0.000004417 V, v_off_fin = 0.000001866 V 18:59:16 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170993703 Vs 19:29:18 Temperature Measurement, Probe Number = 0, T = 20.171000 C 19:29:19 Temperature Measurement, Probe Number = 1, T = 20.095000 C 19:29:20 Temperature Measurement, Probe Number = 2, T = 20.159000 C 19:29:20 Temperature Measurement, Probe Number = 3, T = 20.104000 C 19:29:21 Temperature Measurement, Probe Number = 4, T = 20.215000 C 19:29:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.21 19:29:21 Integrated Voltage Measurement... 19:29:41 Voltage Offset Correction: v_off_ini = 0.000004393 V, v_off_fin = 0.000005082 V 19:29:42 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171084457 Vs 19:29:42 Integrated Voltage Measurement... 19:30:01 Voltage Offset Correction: v_off_ini = 0.000004769 V, v_off_fin = 0.000002216 V 19:30:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993037 Vs 19:30:04 Temperature Measurement, Probe Number = 0, T = 20.175000 C 19:30:04 Temperature Measurement, Probe Number = 1, T = 20.096000 C 19:30:05 Temperature Measurement, Probe Number = 2, T = 20.162000 C 19:30:06 Temperature Measurement, Probe Number = 3, T = 20.106000 C 19:30:06 Temperature Measurement, Probe Number = 4, T = 20.252000 C 19:30:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.25 19:30:06 Integrated Voltage Measurement... 19:30:26 Voltage Offset Correction: v_off_ini = 0.000003255 V, v_off_fin = 0.000005839 V 19:30:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037512 Vs 19:30:26 Integrated Voltage Measurement... 19:30:45 Voltage Offset Correction: v_off_ini = 0.000005756 V, v_off_fin = 0.000001674 V 19:30:45 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988366 Vs 19:30:48 Temperature Measurement, Probe Number = 0, T = 20.172000 C 19:30:49 Temperature Measurement, Probe Number = 1, T = 20.094000 C 19:30:49 Temperature Measurement, Probe Number = 2, T = 20.159000 C 19:30:50 Temperature Measurement, Probe Number = 3, T = 20.104000 C 19:30:50 Temperature Measurement, Probe Number = 4, T = 20.287000 C 19:30:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.29 19:30:51 Integrated Voltage Measurement... 19:31:10 Voltage Offset Correction: v_off_ini = 0.000003406 V, v_off_fin = 0.000006117 V 19:31:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040271 Vs 19:31:10 Integrated Voltage Measurement... 19:31:30 Voltage Offset Correction: v_off_ini = 0.000004932 V, v_off_fin = 0.000002001 V 19:31:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993900 Vs 19:31:32 Temperature Measurement, Probe Number = 0, T = 20.174000 C 19:31:33 Temperature Measurement, Probe Number = 1, T = 20.094000 C 19:31:34 Temperature Measurement, Probe Number = 2, T = 20.159000 C 19:31:34 Temperature Measurement, Probe Number = 3, T = 20.102000 C 19:31:35 Temperature Measurement, Probe Number = 4, T = 20.329000 C 19:31:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.33 19:31:35 Integrated Voltage Measurement... 19:31:54 Voltage Offset Correction: v_off_ini = 0.000003341 V, v_off_fin = 0.000005749 V 19:31:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038758 Vs 19:31:55 Integrated Voltage Measurement... 19:32:14 Voltage Offset Correction: v_off_ini = 0.000005352 V, v_off_fin = 0.000001935 V 19:32:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991947 Vs 19:32:17 Temperature Measurement, Probe Number = 0, T = 20.176000 C 19:32:18 Temperature Measurement, Probe Number = 1, T = 20.098000 C 19:32:19 Temperature Measurement, Probe Number = 2, T = 20.161000 C 19:32:19 Temperature Measurement, Probe Number = 3, T = 20.106000 C 19:32:20 Temperature Measurement, Probe Number = 4, T = 20.342000 C 19:32:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.34 19:32:20 Integrated Voltage Measurement... 19:32:39 Voltage Offset Correction: v_off_ini = 0.000003515 V, v_off_fin = 0.000005580 V 19:32:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036142 Vs 19:32:39 Integrated Voltage Measurement... 19:32:59 Voltage Offset Correction: v_off_ini = 0.000005216 V, v_off_fin = 0.000001995 V 19:32:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992967 Vs 19:33:02 Temperature Measurement, Probe Number = 0, T = 20.181000 C 19:33:02 Temperature Measurement, Probe Number = 1, T = 20.099000 C 19:33:03 Temperature Measurement, Probe Number = 2, T = 20.169000 C 19:33:04 Temperature Measurement, Probe Number = 3, T = 20.110000 C 19:33:04 Temperature Measurement, Probe Number = 4, T = 20.397000 C 19:33:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.40 19:33:05 Integrated Voltage Measurement... 19:33:24 Voltage Offset Correction: v_off_ini = 0.000002544 V, v_off_fin = 0.000005830 V 19:33:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171036347 Vs 19:33:24 Integrated Voltage Measurement... 19:33:43 Voltage Offset Correction: v_off_ini = 0.000005188 V, v_off_fin = 0.000002398 V 19:33:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989367 Vs 19:33:46 Temperature Measurement, Probe Number = 0, T = 20.174000 C 19:33:47 Temperature Measurement, Probe Number = 1, T = 20.095000 C 19:33:47 Temperature Measurement, Probe Number = 2, T = 20.161000 C 19:33:48 Temperature Measurement, Probe Number = 3, T = 20.104000 C 19:33:49 Temperature Measurement, Probe Number = 4, T = 20.387000 C 19:33:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.39 19:33:49 Integrated Voltage Measurement... 19:34:08 Voltage Offset Correction: v_off_ini = 0.000003083 V, v_off_fin = 0.000006191 V 19:34:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038905 Vs 19:34:08 Integrated Voltage Measurement... 19:34:28 Voltage Offset Correction: v_off_ini = 0.000005403 V, v_off_fin = 0.000002281 V 19:34:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000296 Vs 19:34:31 Temperature Measurement, Probe Number = 0, T = 20.174000 C 19:34:31 Temperature Measurement, Probe Number = 1, T = 20.092000 C 19:34:32 Temperature Measurement, Probe Number = 2, T = 20.158000 C 19:34:33 Temperature Measurement, Probe Number = 3, T = 20.099000 C 19:34:33 Temperature Measurement, Probe Number = 4, T = 20.317000 C 19:34:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.32 19:34:34 Integrated Voltage Measurement... 19:34:53 Voltage Offset Correction: v_off_ini = 0.000003279 V, v_off_fin = 0.000005138 V 19:34:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171038675 Vs 19:34:54 Integrated Voltage Measurement... 19:35:13 Voltage Offset Correction: v_off_ini = 0.000005065 V, v_off_fin = 0.000001404 V 19:35:13 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170996424 Vs 19:35:16 Temperature Measurement, Probe Number = 0, T = 20.174000 C 19:35:16 Temperature Measurement, Probe Number = 1, T = 20.092000 C 19:35:17 Temperature Measurement, Probe Number = 2, T = 20.159000 C 19:35:18 Temperature Measurement, Probe Number = 3, T = 20.103000 C 19:35:18 Temperature Measurement, Probe Number = 4, T = 20.376000 C 19:35:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.38 19:35:19 Integrated Voltage Measurement... 19:35:38 Voltage Offset Correction: v_off_ini = 0.000003022 V, v_off_fin = 0.000005663 V 19:35:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171038920 Vs 19:35:38 Integrated Voltage Measurement... 19:35:57 Voltage Offset Correction: v_off_ini = 0.000005243 V, v_off_fin = 0.000002189 V 19:35:58 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170991023 Vs 19:36:00 Temperature Measurement, Probe Number = 0, T = 20.174000 C 19:36:01 Temperature Measurement, Probe Number = 1, T = 20.093000 C 19:36:02 Temperature Measurement, Probe Number = 2, T = 20.159000 C 19:36:02 Temperature Measurement, Probe Number = 3, T = 20.103000 C 19:36:03 Temperature Measurement, Probe Number = 4, T = 20.412000 C 19:36:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 19:36:03 Integrated Voltage Measurement... 19:36:22 Voltage Offset Correction: v_off_ini = 0.000003082 V, v_off_fin = 0.000005705 V 19:36:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171035601 Vs 19:36:23 Integrated Voltage Measurement... 19:36:42 Voltage Offset Correction: v_off_ini = 0.000005196 V, v_off_fin = 0.000001179 V 19:36:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999403 Vs 20:06:45 Temperature Measurement, Probe Number = 0, T = 20.167000 C 20:06:46 Temperature Measurement, Probe Number = 1, T = 20.087000 C 20:06:46 Temperature Measurement, Probe Number = 2, T = 20.156000 C 20:06:47 Temperature Measurement, Probe Number = 3, T = 20.100000 C 20:06:48 Temperature Measurement, Probe Number = 4, T = 20.444000 C 20:06:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.44 20:06:48 Integrated Voltage Measurement... 20:07:07 Voltage Offset Correction: v_off_ini = 0.000004297 V, v_off_fin = 0.000006478 V 20:07:07 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171098265 Vs 20:07:08 Integrated Voltage Measurement... 20:07:27 Voltage Offset Correction: v_off_ini = 0.000005503 V, v_off_fin = 0.000002030 V 20:07:27 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170990383 Vs 20:07:30 Temperature Measurement, Probe Number = 0, T = 20.172000 C 20:07:30 Temperature Measurement, Probe Number = 1, T = 20.094000 C 20:07:31 Temperature Measurement, Probe Number = 2, T = 20.160000 C 20:07:32 Temperature Measurement, Probe Number = 3, T = 20.102000 C 20:07:32 Temperature Measurement, Probe Number = 4, T = 20.330000 C 20:07:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.33 20:07:33 Integrated Voltage Measurement... 20:07:52 Voltage Offset Correction: v_off_ini = 0.000003625 V, v_off_fin = 0.000005794 V 20:07:52 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171034421 Vs 20:07:52 Integrated Voltage Measurement... 20:08:11 Voltage Offset Correction: v_off_ini = 0.000005044 V, v_off_fin = 0.000002241 V 20:08:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989807 Vs 20:08:14 Temperature Measurement, Probe Number = 0, T = 20.174000 C 20:08:15 Temperature Measurement, Probe Number = 1, T = 20.094000 C 20:08:16 Temperature Measurement, Probe Number = 2, T = 20.162000 C 20:08:16 Temperature Measurement, Probe Number = 3, T = 20.103000 C 20:08:17 Temperature Measurement, Probe Number = 4, T = 20.446000 C 20:08:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.45 20:08:17 Integrated Voltage Measurement... 20:08:37 Voltage Offset Correction: v_off_ini = 0.000003267 V, v_off_fin = 0.000006033 V 20:08:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042483 Vs 20:08:37 Integrated Voltage Measurement... 20:08:56 Voltage Offset Correction: v_off_ini = 0.000005409 V, v_off_fin = 0.000001818 V 20:08:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989322 Vs 20:08:59 Temperature Measurement, Probe Number = 0, T = 20.171000 C 20:09:00 Temperature Measurement, Probe Number = 1, T = 20.094000 C 20:09:01 Temperature Measurement, Probe Number = 2, T = 20.159000 C 20:09:01 Temperature Measurement, Probe Number = 3, T = 20.101000 C 20:09:02 Temperature Measurement, Probe Number = 4, T = 20.417000 C 20:09:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.42 20:09:02 Integrated Voltage Measurement... 20:09:21 Voltage Offset Correction: v_off_ini = 0.000003694 V, v_off_fin = 0.000006259 V 20:09:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041960 Vs 20:09:22 Integrated Voltage Measurement... 20:09:41 Voltage Offset Correction: v_off_ini = 0.000005391 V, v_off_fin = 0.000001808 V 20:09:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993403 Vs 20:09:44 Temperature Measurement, Probe Number = 0, T = 20.178000 C 20:09:45 Temperature Measurement, Probe Number = 1, T = 20.097000 C 20:09:45 Temperature Measurement, Probe Number = 2, T = 20.163000 C 20:09:46 Temperature Measurement, Probe Number = 3, T = 20.106000 C 20:09:47 Temperature Measurement, Probe Number = 4, T = 20.309000 C 20:09:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.31 20:09:47 Integrated Voltage Measurement... 20:10:06 Voltage Offset Correction: v_off_ini = 0.000003702 V, v_off_fin = 0.000006292 V 20:10:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043346 Vs 20:10:07 Integrated Voltage Measurement... 20:10:25 Voltage Offset Correction: v_off_ini = 0.000005743 V, v_off_fin = 0.000002418 V 20:10:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988488 Vs 20:10:28 Temperature Measurement, Probe Number = 0, T = 20.177000 C 20:10:29 Temperature Measurement, Probe Number = 1, T = 20.096000 C 20:10:30 Temperature Measurement, Probe Number = 2, T = 20.162000 C 20:10:30 Temperature Measurement, Probe Number = 3, T = 20.106000 C 20:10:31 Temperature Measurement, Probe Number = 4, T = 20.391000 C 20:10:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.39 20:10:31 Integrated Voltage Measurement... 20:10:51 Voltage Offset Correction: v_off_ini = 0.000003944 V, v_off_fin = 0.000005505 V 20:10:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046277 Vs 20:10:51 Integrated Voltage Measurement... 20:11:11 Voltage Offset Correction: v_off_ini = 0.000005163 V, v_off_fin = 0.000002900 V 20:11:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992915 Vs 20:11:13 Temperature Measurement, Probe Number = 0, T = 20.172000 C 20:11:14 Temperature Measurement, Probe Number = 1, T = 20.091000 C 20:11:15 Temperature Measurement, Probe Number = 2, T = 20.161000 C 20:11:15 Temperature Measurement, Probe Number = 3, T = 20.103000 C 20:11:16 Temperature Measurement, Probe Number = 4, T = 20.437000 C 20:11:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.44 20:11:16 Integrated Voltage Measurement... 20:11:35 Voltage Offset Correction: v_off_ini = 0.000003528 V, v_off_fin = 0.000005459 V 20:11:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039284 Vs 20:11:36 Integrated Voltage Measurement... 20:11:55 Voltage Offset Correction: v_off_ini = 0.000005211 V, v_off_fin = 0.000002724 V 20:11:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996341 Vs 20:11:58 Temperature Measurement, Probe Number = 0, T = 20.167000 C 20:11:58 Temperature Measurement, Probe Number = 1, T = 20.086000 C 20:11:59 Temperature Measurement, Probe Number = 2, T = 20.155000 C 20:12:00 Temperature Measurement, Probe Number = 3, T = 20.097000 C 20:12:00 Temperature Measurement, Probe Number = 4, T = 20.442000 C 20:12:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.44 20:12:00 Integrated Voltage Measurement... 20:12:20 Voltage Offset Correction: v_off_ini = 0.000002948 V, v_off_fin = 0.000005186 V 20:12:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037813 Vs 20:12:20 Integrated Voltage Measurement... 20:12:39 Voltage Offset Correction: v_off_ini = 0.000005434 V, v_off_fin = 0.000002854 V 20:12:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989289 Vs 20:12:42 Temperature Measurement, Probe Number = 0, T = 20.171000 C 20:12:42 Temperature Measurement, Probe Number = 1, T = 20.090000 C 20:12:43 Temperature Measurement, Probe Number = 2, T = 20.159000 C 20:12:44 Temperature Measurement, Probe Number = 3, T = 20.100000 C 20:12:44 Temperature Measurement, Probe Number = 4, T = 20.458000 C 20:12:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.46 20:12:45 Integrated Voltage Measurement... 20:13:04 Voltage Offset Correction: v_off_ini = 0.000003674 V, v_off_fin = 0.000006615 V 20:13:04 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171040318 Vs 20:13:04 Integrated Voltage Measurement... 20:13:23 Voltage Offset Correction: v_off_ini = 0.000005672 V, v_off_fin = 0.000002953 V 20:13:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992914 Vs 20:13:26 Temperature Measurement, Probe Number = 0, T = 20.171000 C 20:13:27 Temperature Measurement, Probe Number = 1, T = 20.088000 C 20:13:27 Temperature Measurement, Probe Number = 2, T = 20.158000 C 20:13:28 Temperature Measurement, Probe Number = 3, T = 20.098000 C 20:13:28 Temperature Measurement, Probe Number = 4, T = 20.393000 C 20:13:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.39 20:13:29 Integrated Voltage Measurement... 20:13:48 Voltage Offset Correction: v_off_ini = 0.000004041 V, v_off_fin = 0.000006099 V 20:13:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042874 Vs 20:13:48 Integrated Voltage Measurement... 20:14:07 Voltage Offset Correction: v_off_ini = 0.000005556 V, v_off_fin = 0.000001954 V 20:14:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997619 Vs 20:44:10 Temperature Measurement, Probe Number = 0, T = 20.163000 C 20:44:11 Temperature Measurement, Probe Number = 1, T = 20.086000 C 20:44:12 Temperature Measurement, Probe Number = 2, T = 20.153000 C 20:44:12 Temperature Measurement, Probe Number = 3, T = 20.096000 C 20:44:13 Temperature Measurement, Probe Number = 4, T = 20.240000 C 20:44:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.24 20:44:13 Integrated Voltage Measurement... 20:44:33 Voltage Offset Correction: v_off_ini = 0.000004475 V, v_off_fin = 0.000005570 V 20:44:33 Integrated Voltage Measurement Delta Gap = 0.0040010 m VT = 0.171079406 Vs 20:44:33 Integrated Voltage Measurement... 20:44:52 Voltage Offset Correction: v_off_ini = 0.000005344 V, v_off_fin = 0.000002738 V 20:44:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995669 Vs 20:44:55 Temperature Measurement, Probe Number = 0, T = 20.166000 C 20:44:56 Temperature Measurement, Probe Number = 1, T = 20.087000 C 20:44:57 Temperature Measurement, Probe Number = 2, T = 20.153000 C 20:44:57 Temperature Measurement, Probe Number = 3, T = 20.097000 C 20:44:58 Temperature Measurement, Probe Number = 4, T = 20.274000 C 20:44:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.27 20:44:58 Integrated Voltage Measurement... 20:45:18 Voltage Offset Correction: v_off_ini = 0.000004298 V, v_off_fin = 0.000005862 V 20:45:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038951 Vs 20:45:18 Integrated Voltage Measurement... 20:45:37 Voltage Offset Correction: v_off_ini = 0.000005509 V, v_off_fin = 0.000003326 V 20:45:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988614 Vs 20:45:40 Temperature Measurement, Probe Number = 0, T = 20.168000 C 20:45:40 Temperature Measurement, Probe Number = 1, T = 20.087000 C 20:45:41 Temperature Measurement, Probe Number = 2, T = 20.155000 C 20:45:42 Temperature Measurement, Probe Number = 3, T = 20.096000 C 20:45:42 Temperature Measurement, Probe Number = 4, T = 20.285000 C 20:45:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.29 20:45:42 Integrated Voltage Measurement... 20:46:02 Voltage Offset Correction: v_off_ini = 0.000003729 V, v_off_fin = 0.000006044 V 20:46:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042821 Vs 20:46:02 Integrated Voltage Measurement... 20:46:21 Voltage Offset Correction: v_off_ini = 0.000005477 V, v_off_fin = 0.000002314 V 20:46:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992070 Vs 20:46:24 Temperature Measurement, Probe Number = 0, T = 20.168000 C 20:46:25 Temperature Measurement, Probe Number = 1, T = 20.088000 C 20:46:25 Temperature Measurement, Probe Number = 2, T = 20.155000 C 20:46:26 Temperature Measurement, Probe Number = 3, T = 20.099000 C 20:46:27 Temperature Measurement, Probe Number = 4, T = 20.273000 C 20:46:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.27 20:46:27 Integrated Voltage Measurement... 20:46:46 Voltage Offset Correction: v_off_ini = 0.000003402 V, v_off_fin = 0.000005908 V 20:46:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037842 Vs 20:46:46 Integrated Voltage Measurement... 20:47:06 Voltage Offset Correction: v_off_ini = 0.000005638 V, v_off_fin = 0.000002863 V 20:47:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993294 Vs 20:47:08 Temperature Measurement, Probe Number = 0, T = 20.173000 C 20:47:09 Temperature Measurement, Probe Number = 1, T = 20.094000 C 20:47:10 Temperature Measurement, Probe Number = 2, T = 20.162000 C 20:47:10 Temperature Measurement, Probe Number = 3, T = 20.106000 C 20:47:11 Temperature Measurement, Probe Number = 4, T = 20.301000 C 20:47:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.30 20:47:11 Integrated Voltage Measurement... 20:47:31 Voltage Offset Correction: v_off_ini = 0.000004101 V, v_off_fin = 0.000006206 V 20:47:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045645 Vs 20:47:31 Integrated Voltage Measurement... 20:47:50 Voltage Offset Correction: v_off_ini = 0.000005180 V, v_off_fin = 0.000003408 V 20:47:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987991 Vs 20:47:53 Temperature Measurement, Probe Number = 0, T = 20.169000 C 20:47:53 Temperature Measurement, Probe Number = 1, T = 20.091000 C 20:47:54 Temperature Measurement, Probe Number = 2, T = 20.158000 C 20:47:55 Temperature Measurement, Probe Number = 3, T = 20.102000 C 20:47:55 Temperature Measurement, Probe Number = 4, T = 20.348000 C 20:47:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.35 20:47:56 Integrated Voltage Measurement... 20:48:15 Voltage Offset Correction: v_off_ini = 0.000003490 V, v_off_fin = 0.000005836 V 20:48:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043187 Vs 20:48:15 Integrated Voltage Measurement... 20:48:34 Voltage Offset Correction: v_off_ini = 0.000005357 V, v_off_fin = 0.000002353 V 20:48:34 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994053 Vs 20:48:37 Temperature Measurement, Probe Number = 0, T = 20.169000 C 20:48:38 Temperature Measurement, Probe Number = 1, T = 20.089000 C 20:48:38 Temperature Measurement, Probe Number = 2, T = 20.159000 C 20:48:39 Temperature Measurement, Probe Number = 3, T = 20.102000 C 20:48:39 Temperature Measurement, Probe Number = 4, T = 20.419000 C 20:48:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.42 20:48:40 Integrated Voltage Measurement... 20:48:59 Voltage Offset Correction: v_off_ini = 0.000003489 V, v_off_fin = 0.000005961 V 20:48:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049064 Vs 20:48:59 Integrated Voltage Measurement... 20:49:19 Voltage Offset Correction: v_off_ini = 0.000005723 V, v_off_fin = 0.000002165 V 20:49:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998021 Vs 20:49:22 Temperature Measurement, Probe Number = 0, T = 20.170000 C 20:49:22 Temperature Measurement, Probe Number = 1, T = 20.089000 C 20:49:23 Temperature Measurement, Probe Number = 2, T = 20.156000 C 20:49:24 Temperature Measurement, Probe Number = 3, T = 20.099000 C 20:49:24 Temperature Measurement, Probe Number = 4, T = 20.405000 C 20:49:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 20:49:24 Integrated Voltage Measurement... 20:49:44 Voltage Offset Correction: v_off_ini = 0.000002404 V, v_off_fin = 0.000005564 V 20:49:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042202 Vs 20:49:44 Integrated Voltage Measurement... 20:50:03 Voltage Offset Correction: v_off_ini = 0.000005130 V, v_off_fin = 0.000002233 V 20:50:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994890 Vs 20:50:06 Temperature Measurement, Probe Number = 0, T = 20.170000 C 20:50:07 Temperature Measurement, Probe Number = 1, T = 20.089000 C 20:50:07 Temperature Measurement, Probe Number = 2, T = 20.160000 C 20:50:08 Temperature Measurement, Probe Number = 3, T = 20.102000 C 20:50:09 Temperature Measurement, Probe Number = 4, T = 20.456000 C 20:50:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.46 20:50:09 Integrated Voltage Measurement... 20:50:28 Voltage Offset Correction: v_off_ini = 0.000003329 V, v_off_fin = 0.000005920 V 20:50:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045143 Vs 20:50:29 Integrated Voltage Measurement... 20:50:48 Voltage Offset Correction: v_off_ini = 0.000004880 V, v_off_fin = 0.000002254 V 20:50:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999982 Vs 20:50:51 Temperature Measurement, Probe Number = 0, T = 20.174000 C 20:50:52 Temperature Measurement, Probe Number = 1, T = 20.089000 C 20:50:52 Temperature Measurement, Probe Number = 2, T = 20.162000 C 20:50:53 Temperature Measurement, Probe Number = 3, T = 20.102000 C 20:50:54 Temperature Measurement, Probe Number = 4, T = 20.512000 C 20:50:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.51 20:50:54 Integrated Voltage Measurement... 20:51:13 Voltage Offset Correction: v_off_ini = 0.000003665 V, v_off_fin = 0.000005728 V 20:51:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041715 Vs 20:51:14 Integrated Voltage Measurement... 20:51:33 Voltage Offset Correction: v_off_ini = 0.000004971 V, v_off_fin = 0.000002284 V 20:51:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997673 Vs 21:21:36 Temperature Measurement, Probe Number = 0, T = 20.162000 C 21:21:36 Temperature Measurement, Probe Number = 1, T = 20.083000 C 21:21:37 Temperature Measurement, Probe Number = 2, T = 20.153000 C 21:21:38 Temperature Measurement, Probe Number = 3, T = 20.095000 C 21:21:38 Temperature Measurement, Probe Number = 4, T = 20.302000 C 21:21:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.30 21:21:39 Integrated Voltage Measurement... 21:21:58 Voltage Offset Correction: v_off_ini = 0.000004654 V, v_off_fin = 0.000006226 V 21:21:58 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171095380 Vs 21:21:58 Integrated Voltage Measurement... 21:22:18 Voltage Offset Correction: v_off_ini = 0.000005880 V, v_off_fin = 0.000002310 V 21:22:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993335 Vs 21:22:21 Temperature Measurement, Probe Number = 0, T = 20.164000 C 21:22:21 Temperature Measurement, Probe Number = 1, T = 20.085000 C 21:22:22 Temperature Measurement, Probe Number = 2, T = 20.154000 C 21:22:23 Temperature Measurement, Probe Number = 3, T = 20.097000 C 21:22:23 Temperature Measurement, Probe Number = 4, T = 20.324000 C 21:22:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.32 21:22:23 Integrated Voltage Measurement... 21:22:43 Voltage Offset Correction: v_off_ini = 0.000003067 V, v_off_fin = 0.000006322 V 21:22:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049123 Vs 21:22:43 Integrated Voltage Measurement... 21:23:03 Voltage Offset Correction: v_off_ini = 0.000005613 V, v_off_fin = 0.000002635 V 21:23:03 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170987831 Vs 21:23:06 Temperature Measurement, Probe Number = 0, T = 20.169000 C 21:23:07 Temperature Measurement, Probe Number = 1, T = 20.088000 C 21:23:07 Temperature Measurement, Probe Number = 2, T = 20.159000 C 21:23:08 Temperature Measurement, Probe Number = 3, T = 20.101000 C 21:23:09 Temperature Measurement, Probe Number = 4, T = 20.386000 C 21:23:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.39 21:23:09 Integrated Voltage Measurement... 21:23:28 Voltage Offset Correction: v_off_ini = 0.000003645 V, v_off_fin = 0.000005922 V 21:23:28 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171044553 Vs 21:23:29 Integrated Voltage Measurement... 21:23:48 Voltage Offset Correction: v_off_ini = 0.000005195 V, v_off_fin = 0.000002543 V 21:23:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993061 Vs 21:23:51 Temperature Measurement, Probe Number = 0, T = 20.168000 C 21:23:51 Temperature Measurement, Probe Number = 1, T = 20.084000 C 21:23:52 Temperature Measurement, Probe Number = 2, T = 20.156000 C 21:23:53 Temperature Measurement, Probe Number = 3, T = 20.097000 C 21:23:53 Temperature Measurement, Probe Number = 4, T = 20.393000 C 21:23:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.39 21:23:54 Integrated Voltage Measurement... 21:24:13 Voltage Offset Correction: v_off_ini = 0.000003234 V, v_off_fin = 0.000006428 V 21:24:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052080 Vs 21:24:13 Integrated Voltage Measurement... 21:24:33 Voltage Offset Correction: v_off_ini = 0.000005406 V, v_off_fin = 0.000002671 V 21:24:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989020 Vs 21:24:35 Temperature Measurement, Probe Number = 0, T = 20.169000 C 21:24:36 Temperature Measurement, Probe Number = 1, T = 20.085000 C 21:24:37 Temperature Measurement, Probe Number = 2, T = 20.155000 C 21:24:37 Temperature Measurement, Probe Number = 3, T = 20.097000 C 21:24:38 Temperature Measurement, Probe Number = 4, T = 20.408000 C 21:24:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 21:24:38 Integrated Voltage Measurement... 21:24:57 Voltage Offset Correction: v_off_ini = 0.000003400 V, v_off_fin = 0.000006292 V 21:24:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054606 Vs 21:24:58 Integrated Voltage Measurement... 21:25:17 Voltage Offset Correction: v_off_ini = 0.000005799 V, v_off_fin = 0.000002757 V 21:25:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989199 Vs 21:25:20 Temperature Measurement, Probe Number = 0, T = 20.164000 C 21:25:21 Temperature Measurement, Probe Number = 1, T = 20.082000 C 21:25:21 Temperature Measurement, Probe Number = 2, T = 20.154000 C 21:25:22 Temperature Measurement, Probe Number = 3, T = 20.096000 C 21:25:23 Temperature Measurement, Probe Number = 4, T = 20.337000 C 21:25:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.34 21:25:23 Integrated Voltage Measurement... 21:25:42 Voltage Offset Correction: v_off_ini = 0.000003819 V, v_off_fin = 0.000006646 V 21:25:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171057154 Vs 21:25:43 Integrated Voltage Measurement... 21:26:02 Voltage Offset Correction: v_off_ini = 0.000005670 V, v_off_fin = 0.000003347 V 21:26:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985577 Vs 21:26:05 Temperature Measurement, Probe Number = 0, T = 20.169000 C 21:26:05 Temperature Measurement, Probe Number = 1, T = 20.084000 C 21:26:06 Temperature Measurement, Probe Number = 2, T = 20.157000 C 21:26:07 Temperature Measurement, Probe Number = 3, T = 20.095000 C 21:26:07 Temperature Measurement, Probe Number = 4, T = 20.361000 C 21:26:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.36 21:26:08 Integrated Voltage Measurement... 21:26:27 Voltage Offset Correction: v_off_ini = 0.000004122 V, v_off_fin = 0.000006817 V 21:26:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060887 Vs 21:26:27 Integrated Voltage Measurement... 21:26:46 Voltage Offset Correction: v_off_ini = 0.000006768 V, v_off_fin = 0.000002887 V 21:26:47 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987413 Vs 21:26:49 Temperature Measurement, Probe Number = 0, T = 20.167000 C 21:26:50 Temperature Measurement, Probe Number = 1, T = 20.086000 C 21:26:51 Temperature Measurement, Probe Number = 2, T = 20.155000 C 21:26:51 Temperature Measurement, Probe Number = 3, T = 20.096000 C 21:26:52 Temperature Measurement, Probe Number = 4, T = 20.366000 C 21:26:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.37 21:26:52 Integrated Voltage Measurement... 21:27:12 Voltage Offset Correction: v_off_ini = 0.000003773 V, v_off_fin = 0.000007229 V 21:27:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171060204 Vs 21:27:12 Integrated Voltage Measurement... 21:27:32 Voltage Offset Correction: v_off_ini = 0.000006532 V, v_off_fin = 0.000003064 V 21:27:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986650 Vs 21:27:34 Temperature Measurement, Probe Number = 0, T = 20.168000 C 21:27:35 Temperature Measurement, Probe Number = 1, T = 20.086000 C 21:27:36 Temperature Measurement, Probe Number = 2, T = 20.155000 C 21:27:36 Temperature Measurement, Probe Number = 3, T = 20.096000 C 21:27:37 Temperature Measurement, Probe Number = 4, T = 20.329000 C 21:27:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.33 21:27:37 Integrated Voltage Measurement... 21:27:57 Voltage Offset Correction: v_off_ini = 0.000003943 V, v_off_fin = 0.000006749 V 21:27:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060153 Vs 21:27:57 Integrated Voltage Measurement... 21:28:16 Voltage Offset Correction: v_off_ini = 0.000006277 V, v_off_fin = 0.000003027 V 21:28:16 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987680 Vs 21:28:19 Temperature Measurement, Probe Number = 0, T = 20.165000 C 21:28:20 Temperature Measurement, Probe Number = 1, T = 20.084000 C 21:28:20 Temperature Measurement, Probe Number = 2, T = 20.153000 C 21:28:21 Temperature Measurement, Probe Number = 3, T = 20.095000 C 21:28:22 Temperature Measurement, Probe Number = 4, T = 20.364000 C 21:28:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.36 21:28:22 Integrated Voltage Measurement... 21:28:41 Voltage Offset Correction: v_off_ini = 0.000004029 V, v_off_fin = 0.000006992 V 21:28:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171066480 Vs 21:28:42 Integrated Voltage Measurement... 21:29:01 Voltage Offset Correction: v_off_ini = 0.000006118 V, v_off_fin = 0.000002076 V 21:29:01 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170985233 Vs 21:59:04 Temperature Measurement, Probe Number = 0, T = 20.159000 C 21:59:04 Temperature Measurement, Probe Number = 1, T = 20.080000 C 21:59:05 Temperature Measurement, Probe Number = 2, T = 20.150000 C 21:59:06 Temperature Measurement, Probe Number = 3, T = 20.093000 C 21:59:06 Temperature Measurement, Probe Number = 4, T = 20.152000 C 21:59:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.15 21:59:07 Integrated Voltage Measurement... 21:59:26 Voltage Offset Correction: v_off_ini = 0.000004747 V, v_off_fin = 0.000006373 V 21:59:26 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171105924 Vs 21:59:26 Integrated Voltage Measurement... 21:59:45 Voltage Offset Correction: v_off_ini = 0.000005528 V, v_off_fin = 0.000002602 V 21:59:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997489 Vs 21:59:48 Temperature Measurement, Probe Number = 0, T = 20.164000 C 21:59:49 Temperature Measurement, Probe Number = 1, T = 20.082000 C 21:59:49 Temperature Measurement, Probe Number = 2, T = 20.155000 C 21:59:50 Temperature Measurement, Probe Number = 3, T = 20.096000 C 21:59:51 Temperature Measurement, Probe Number = 4, T = 20.246000 C 21:59:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.25 21:59:51 Integrated Voltage Measurement... 22:00:10 Voltage Offset Correction: v_off_ini = 0.000003914 V, v_off_fin = 0.000006090 V 22:00:11 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052301 Vs 22:00:11 Integrated Voltage Measurement... 22:00:31 Voltage Offset Correction: v_off_ini = 0.000005366 V, v_off_fin = 0.000002347 V 22:00:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997381 Vs 22:00:34 Temperature Measurement, Probe Number = 0, T = 20.158000 C 22:00:34 Temperature Measurement, Probe Number = 1, T = 20.075000 C 22:00:35 Temperature Measurement, Probe Number = 2, T = 20.150000 C 22:00:35 Temperature Measurement, Probe Number = 3, T = 20.090000 C 22:00:36 Temperature Measurement, Probe Number = 4, T = 20.288000 C 22:00:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.29 22:00:36 Integrated Voltage Measurement... 22:00:56 Voltage Offset Correction: v_off_ini = 0.000004000 V, v_off_fin = 0.000005771 V 22:00:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051170 Vs 22:00:56 Integrated Voltage Measurement... 22:01:15 Voltage Offset Correction: v_off_ini = 0.000005026 V, v_off_fin = 0.000001978 V 22:01:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996969 Vs 22:01:18 Temperature Measurement, Probe Number = 0, T = 20.155000 C 22:01:19 Temperature Measurement, Probe Number = 1, T = 20.075000 C 22:01:19 Temperature Measurement, Probe Number = 2, T = 20.147000 C 22:01:20 Temperature Measurement, Probe Number = 3, T = 20.090000 C 22:01:21 Temperature Measurement, Probe Number = 4, T = 20.192000 C 22:01:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.19 22:01:21 Integrated Voltage Measurement... 22:01:41 Voltage Offset Correction: v_off_ini = 0.000003319 V, v_off_fin = 0.000006101 V 22:01:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049999 Vs 22:01:41 Integrated Voltage Measurement... 22:02:01 Voltage Offset Correction: v_off_ini = 0.000005236 V, v_off_fin = 0.000002575 V 22:02:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997353 Vs 22:02:04 Temperature Measurement, Probe Number = 0, T = 20.163000 C 22:02:04 Temperature Measurement, Probe Number = 1, T = 20.082000 C 22:02:05 Temperature Measurement, Probe Number = 2, T = 20.150000 C 22:02:06 Temperature Measurement, Probe Number = 3, T = 20.093000 C 22:02:06 Temperature Measurement, Probe Number = 4, T = 20.195000 C 22:02:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.20 22:02:07 Integrated Voltage Measurement... 22:02:26 Voltage Offset Correction: v_off_ini = 0.000003514 V, v_off_fin = 0.000005883 V 22:02:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049382 Vs 22:02:26 Integrated Voltage Measurement... 22:02:45 Voltage Offset Correction: v_off_ini = 0.000005285 V, v_off_fin = 0.000002229 V 22:02:45 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170998151 Vs 22:02:48 Temperature Measurement, Probe Number = 0, T = 20.165000 C 22:02:49 Temperature Measurement, Probe Number = 1, T = 20.085000 C 22:02:49 Temperature Measurement, Probe Number = 2, T = 20.152000 C 22:02:50 Temperature Measurement, Probe Number = 3, T = 20.094000 C 22:02:50 Temperature Measurement, Probe Number = 4, T = 20.251000 C 22:02:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.25 22:02:51 Integrated Voltage Measurement... 22:03:10 Voltage Offset Correction: v_off_ini = 0.000002830 V, v_off_fin = 0.000005944 V 22:03:10 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053264 Vs 22:03:10 Integrated Voltage Measurement... 22:03:30 Voltage Offset Correction: v_off_ini = 0.000004759 V, v_off_fin = 0.000001983 V 22:03:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002023 Vs 22:03:33 Temperature Measurement, Probe Number = 0, T = 20.165000 C 22:03:33 Temperature Measurement, Probe Number = 1, T = 20.086000 C 22:03:34 Temperature Measurement, Probe Number = 2, T = 20.152000 C 22:03:35 Temperature Measurement, Probe Number = 3, T = 20.094000 C 22:03:35 Temperature Measurement, Probe Number = 4, T = 20.270000 C 22:03:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.27 22:03:36 Integrated Voltage Measurement... 22:03:55 Voltage Offset Correction: v_off_ini = 0.000003299 V, v_off_fin = 0.000006178 V 22:03:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046886 Vs 22:03:55 Integrated Voltage Measurement... 22:04:14 Voltage Offset Correction: v_off_ini = 0.000005152 V, v_off_fin = 0.000002229 V 22:04:14 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170998559 Vs 22:04:17 Temperature Measurement, Probe Number = 0, T = 20.162000 C 22:04:18 Temperature Measurement, Probe Number = 1, T = 20.082000 C 22:04:18 Temperature Measurement, Probe Number = 2, T = 20.151000 C 22:04:19 Temperature Measurement, Probe Number = 3, T = 20.094000 C 22:04:20 Temperature Measurement, Probe Number = 4, T = 20.317000 C 22:04:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.32 22:04:20 Integrated Voltage Measurement... 22:04:39 Voltage Offset Correction: v_off_ini = 0.000003174 V, v_off_fin = 0.000005906 V 22:04:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052886 Vs 22:04:39 Integrated Voltage Measurement... 22:04:59 Voltage Offset Correction: v_off_ini = 0.000005423 V, v_off_fin = 0.000002831 V 22:04:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993856 Vs 22:05:02 Temperature Measurement, Probe Number = 0, T = 20.157000 C 22:05:02 Temperature Measurement, Probe Number = 1, T = 20.076000 C 22:05:03 Temperature Measurement, Probe Number = 2, T = 20.151000 C 22:05:04 Temperature Measurement, Probe Number = 3, T = 20.092000 C 22:05:04 Temperature Measurement, Probe Number = 4, T = 20.302000 C 22:05:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.30 22:05:04 Integrated Voltage Measurement... 22:05:24 Voltage Offset Correction: v_off_ini = 0.000003977 V, v_off_fin = 0.000006300 V 22:05:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059345 Vs 22:05:24 Integrated Voltage Measurement... 22:05:43 Voltage Offset Correction: v_off_ini = 0.000005981 V, v_off_fin = 0.000003103 V 22:05:43 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983536 Vs 22:05:46 Temperature Measurement, Probe Number = 0, T = 20.158000 C 22:05:47 Temperature Measurement, Probe Number = 1, T = 20.079000 C 22:05:47 Temperature Measurement, Probe Number = 2, T = 20.149000 C 22:05:48 Temperature Measurement, Probe Number = 3, T = 20.092000 C 22:05:49 Temperature Measurement, Probe Number = 4, T = 20.319000 C 22:05:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.32 22:05:49 Integrated Voltage Measurement... 22:06:08 Voltage Offset Correction: v_off_ini = 0.000003809 V, v_off_fin = 0.000006588 V 22:06:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061982 Vs 22:06:09 Integrated Voltage Measurement... 22:06:28 Voltage Offset Correction: v_off_ini = 0.000005598 V, v_off_fin = 0.000002664 V 22:06:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989665 Vs 22:36:31 Temperature Measurement, Probe Number = 0, T = 20.153000 C 22:36:31 Temperature Measurement, Probe Number = 1, T = 20.071000 C 22:36:32 Temperature Measurement, Probe Number = 2, T = 20.147000 C 22:36:33 Temperature Measurement, Probe Number = 3, T = 20.087000 C 22:36:33 Temperature Measurement, Probe Number = 4, T = 20.195000 C 22:36:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.20 22:36:33 Integrated Voltage Measurement... 22:36:53 Voltage Offset Correction: v_off_ini = 0.000004193 V, v_off_fin = 0.000006050 V 22:36:53 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171098271 Vs 22:36:53 Integrated Voltage Measurement... 22:37:12 Voltage Offset Correction: v_off_ini = 0.000005415 V, v_off_fin = 0.000002142 V 22:37:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996332 Vs 22:37:15 Temperature Measurement, Probe Number = 0, T = 20.159000 C 22:37:15 Temperature Measurement, Probe Number = 1, T = 20.080000 C 22:37:16 Temperature Measurement, Probe Number = 2, T = 20.150000 C 22:37:17 Temperature Measurement, Probe Number = 3, T = 20.091000 C 22:37:17 Temperature Measurement, Probe Number = 4, T = 20.179000 C 22:37:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.18 22:37:18 Integrated Voltage Measurement... 22:37:37 Voltage Offset Correction: v_off_ini = 0.000002751 V, v_off_fin = 0.000006554 V 22:37:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055826 Vs 22:37:37 Integrated Voltage Measurement... 22:37:56 Voltage Offset Correction: v_off_ini = 0.000006001 V, v_off_fin = 0.000002473 V 22:37:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990267 Vs 22:37:59 Temperature Measurement, Probe Number = 0, T = 20.161000 C 22:38:00 Temperature Measurement, Probe Number = 1, T = 20.078000 C 22:38:00 Temperature Measurement, Probe Number = 2, T = 20.153000 C 22:38:01 Temperature Measurement, Probe Number = 3, T = 20.092000 C 22:38:02 Temperature Measurement, Probe Number = 4, T = 20.250000 C 22:38:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.25 22:38:02 Integrated Voltage Measurement... 22:38:21 Voltage Offset Correction: v_off_ini = 0.000003474 V, v_off_fin = 0.000006166 V 22:38:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053777 Vs 22:38:21 Integrated Voltage Measurement... 22:38:41 Voltage Offset Correction: v_off_ini = 0.000005490 V, v_off_fin = 0.000002450 V 22:38:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998300 Vs 22:38:44 Temperature Measurement, Probe Number = 0, T = 20.157000 C 22:38:44 Temperature Measurement, Probe Number = 1, T = 20.074000 C 22:38:45 Temperature Measurement, Probe Number = 2, T = 20.149000 C 22:38:46 Temperature Measurement, Probe Number = 3, T = 20.091000 C 22:38:46 Temperature Measurement, Probe Number = 4, T = 20.305000 C 22:38:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.30 22:38:47 Integrated Voltage Measurement... 22:39:06 Voltage Offset Correction: v_off_ini = 0.000003663 V, v_off_fin = 0.000006140 V 22:39:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171057130 Vs 22:39:06 Integrated Voltage Measurement... 22:39:26 Voltage Offset Correction: v_off_ini = 0.000005923 V, v_off_fin = 0.000002349 V 22:39:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996279 Vs 22:39:29 Temperature Measurement, Probe Number = 0, T = 20.159000 C 22:39:29 Temperature Measurement, Probe Number = 1, T = 20.076000 C 22:39:30 Temperature Measurement, Probe Number = 2, T = 20.148000 C 22:39:31 Temperature Measurement, Probe Number = 3, T = 20.089000 C 22:39:31 Temperature Measurement, Probe Number = 4, T = 20.250000 C 22:39:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.25 22:39:32 Integrated Voltage Measurement... 22:39:51 Voltage Offset Correction: v_off_ini = 0.000003364 V, v_off_fin = 0.000005905 V 22:39:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052689 Vs 22:39:51 Integrated Voltage Measurement... 22:40:10 Voltage Offset Correction: v_off_ini = 0.000005357 V, v_off_fin = 0.000001962 V 22:40:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995859 Vs 22:40:13 Temperature Measurement, Probe Number = 0, T = 20.161000 C 22:40:14 Temperature Measurement, Probe Number = 1, T = 20.080000 C 22:40:14 Temperature Measurement, Probe Number = 2, T = 20.153000 C 22:40:15 Temperature Measurement, Probe Number = 3, T = 20.093000 C 22:40:16 Temperature Measurement, Probe Number = 4, T = 20.264000 C 22:40:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.26 22:40:16 Integrated Voltage Measurement... 22:40:35 Voltage Offset Correction: v_off_ini = 0.000003576 V, v_off_fin = 0.000005949 V 22:40:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058468 Vs 22:40:36 Integrated Voltage Measurement... 22:40:55 Voltage Offset Correction: v_off_ini = 0.000005402 V, v_off_fin = 0.000001531 V 22:40:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998277 Vs 22:40:58 Temperature Measurement, Probe Number = 0, T = 20.163000 C 22:40:59 Temperature Measurement, Probe Number = 1, T = 20.081000 C 22:40:59 Temperature Measurement, Probe Number = 2, T = 20.154000 C 22:41:00 Temperature Measurement, Probe Number = 3, T = 20.096000 C 22:41:01 Temperature Measurement, Probe Number = 4, T = 20.306000 C 22:41:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.31 22:41:01 Integrated Voltage Measurement... 22:41:21 Voltage Offset Correction: v_off_ini = 0.000002929 V, v_off_fin = 0.000005971 V 22:41:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053228 Vs 22:41:21 Integrated Voltage Measurement... 22:41:40 Voltage Offset Correction: v_off_ini = 0.000004939 V, v_off_fin = 0.000002088 V 22:41:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992426 Vs 22:41:43 Temperature Measurement, Probe Number = 0, T = 20.156000 C 22:41:44 Temperature Measurement, Probe Number = 1, T = 20.076000 C 22:41:45 Temperature Measurement, Probe Number = 2, T = 20.148000 C 22:41:45 Temperature Measurement, Probe Number = 3, T = 20.091000 C 22:41:46 Temperature Measurement, Probe Number = 4, T = 20.254000 C 22:41:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.25 22:41:46 Integrated Voltage Measurement... 22:42:05 Voltage Offset Correction: v_off_ini = 0.000003331 V, v_off_fin = 0.000006397 V 22:42:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053538 Vs 22:42:06 Integrated Voltage Measurement... 22:42:25 Voltage Offset Correction: v_off_ini = 0.000005570 V, v_off_fin = 0.000002279 V 22:42:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995601 Vs 22:42:28 Temperature Measurement, Probe Number = 0, T = 20.157000 C 22:42:29 Temperature Measurement, Probe Number = 1, T = 20.075000 C 22:42:29 Temperature Measurement, Probe Number = 2, T = 20.149000 C 22:42:30 Temperature Measurement, Probe Number = 3, T = 20.090000 C 22:42:31 Temperature Measurement, Probe Number = 4, T = 20.257000 C 22:42:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.26 22:42:31 Integrated Voltage Measurement... 22:42:50 Voltage Offset Correction: v_off_ini = 0.000003478 V, v_off_fin = 0.000005901 V 22:42:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054766 Vs 22:42:51 Integrated Voltage Measurement... 22:43:10 Voltage Offset Correction: v_off_ini = 0.000005232 V, v_off_fin = 0.000001812 V 22:43:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997589 Vs 22:43:13 Temperature Measurement, Probe Number = 0, T = 20.155000 C 22:43:14 Temperature Measurement, Probe Number = 1, T = 20.076000 C 22:43:15 Temperature Measurement, Probe Number = 2, T = 20.146000 C 22:43:15 Temperature Measurement, Probe Number = 3, T = 20.088000 C 22:43:16 Temperature Measurement, Probe Number = 4, T = 20.246000 C 22:43:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.25 22:43:16 Integrated Voltage Measurement... 22:43:35 Voltage Offset Correction: v_off_ini = 0.000003071 V, v_off_fin = 0.000006213 V 22:43:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052194 Vs 22:43:36 Integrated Voltage Measurement... 22:43:55 Voltage Offset Correction: v_off_ini = 0.000005411 V, v_off_fin = 0.000002057 V 22:43:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992937 Vs 23:13:58 Temperature Measurement, Probe Number = 0, T = 20.152000 C 23:13:58 Temperature Measurement, Probe Number = 1, T = 20.070000 C 23:13:59 Temperature Measurement, Probe Number = 2, T = 20.145000 C 23:14:00 Temperature Measurement, Probe Number = 3, T = 20.085000 C 23:14:00 Temperature Measurement, Probe Number = 4, T = 20.123000 C 23:14:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.12 23:14:00 Integrated Voltage Measurement... 23:14:19 Voltage Offset Correction: v_off_ini = 0.000004453 V, v_off_fin = 0.000006514 V 23:14:20 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171109091 Vs 23:14:20 Integrated Voltage Measurement... 23:14:39 Voltage Offset Correction: v_off_ini = 0.000005561 V, v_off_fin = 0.000002932 V 23:14:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996391 Vs 23:14:42 Temperature Measurement, Probe Number = 0, T = 20.155000 C 23:14:43 Temperature Measurement, Probe Number = 1, T = 20.072000 C 23:14:43 Temperature Measurement, Probe Number = 2, T = 20.146000 C 23:14:44 Temperature Measurement, Probe Number = 3, T = 20.086000 C 23:14:45 Temperature Measurement, Probe Number = 4, T = 20.252000 C 23:14:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.25 23:14:45 Integrated Voltage Measurement... 23:15:04 Voltage Offset Correction: v_off_ini = 0.000003608 V, v_off_fin = 0.000006338 V 23:15:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055228 Vs 23:15:05 Integrated Voltage Measurement... 23:15:24 Voltage Offset Correction: v_off_ini = 0.000005450 V, v_off_fin = 0.000002285 V 23:15:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171003061 Vs 23:15:27 Temperature Measurement, Probe Number = 0, T = 20.153000 C 23:15:28 Temperature Measurement, Probe Number = 1, T = 20.072000 C 23:15:28 Temperature Measurement, Probe Number = 2, T = 20.146000 C 23:15:29 Temperature Measurement, Probe Number = 3, T = 20.088000 C 23:15:30 Temperature Measurement, Probe Number = 4, T = 20.317000 C 23:15:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.32 23:15:30 Integrated Voltage Measurement... 23:15:50 Voltage Offset Correction: v_off_ini = 0.000003467 V, v_off_fin = 0.000005833 V 23:15:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054633 Vs 23:15:50 Integrated Voltage Measurement... 23:16:09 Voltage Offset Correction: v_off_ini = 0.000005367 V, v_off_fin = 0.000002217 V 23:16:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000130 Vs 23:16:12 Temperature Measurement, Probe Number = 0, T = 20.151000 C 23:16:13 Temperature Measurement, Probe Number = 1, T = 20.070000 C 23:16:14 Temperature Measurement, Probe Number = 2, T = 20.146000 C 23:16:14 Temperature Measurement, Probe Number = 3, T = 20.088000 C 23:16:15 Temperature Measurement, Probe Number = 4, T = 20.331000 C 23:16:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.33 23:16:15 Integrated Voltage Measurement... 23:16:35 Voltage Offset Correction: v_off_ini = 0.000003521 V, v_off_fin = 0.000006215 V 23:16:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060321 Vs 23:16:35 Integrated Voltage Measurement... 23:16:54 Voltage Offset Correction: v_off_ini = 0.000005804 V, v_off_fin = 0.000002449 V 23:16:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995984 Vs 23:16:57 Temperature Measurement, Probe Number = 0, T = 20.144000 C 23:16:57 Temperature Measurement, Probe Number = 1, T = 20.064000 C 23:16:58 Temperature Measurement, Probe Number = 2, T = 20.141000 C 23:16:59 Temperature Measurement, Probe Number = 3, T = 20.083000 C 23:16:59 Temperature Measurement, Probe Number = 4, T = 20.330000 C 23:16:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.33 23:17:00 Integrated Voltage Measurement... 23:17:19 Voltage Offset Correction: v_off_ini = 0.000002873 V, v_off_fin = 0.000006447 V 23:17:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055643 Vs 23:17:19 Integrated Voltage Measurement... 23:17:38 Voltage Offset Correction: v_off_ini = 0.000005691 V, v_off_fin = 0.000002165 V 23:17:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993732 Vs 23:17:41 Temperature Measurement, Probe Number = 0, T = 20.144000 C 23:17:42 Temperature Measurement, Probe Number = 1, T = 20.063000 C 23:17:43 Temperature Measurement, Probe Number = 2, T = 20.140000 C 23:17:43 Temperature Measurement, Probe Number = 3, T = 20.082000 C 23:17:44 Temperature Measurement, Probe Number = 4, T = 20.320000 C 23:17:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.32 23:17:44 Integrated Voltage Measurement... 23:18:03 Voltage Offset Correction: v_off_ini = 0.000003301 V, v_off_fin = 0.000006579 V 23:18:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060159 Vs 23:18:04 Integrated Voltage Measurement... 23:18:23 Voltage Offset Correction: v_off_ini = 0.000005824 V, v_off_fin = 0.000002602 V 23:18:23 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994997 Vs 23:18:26 Temperature Measurement, Probe Number = 0, T = 20.149000 C 23:18:26 Temperature Measurement, Probe Number = 1, T = 20.068000 C 23:18:27 Temperature Measurement, Probe Number = 2, T = 20.144000 C 23:18:28 Temperature Measurement, Probe Number = 3, T = 20.083000 C 23:18:28 Temperature Measurement, Probe Number = 4, T = 20.274000 C 23:18:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.27 23:18:28 Integrated Voltage Measurement... 23:18:47 Voltage Offset Correction: v_off_ini = 0.000003570 V, v_off_fin = 0.000006089 V 23:18:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055742 Vs 23:18:48 Integrated Voltage Measurement... 23:19:07 Voltage Offset Correction: v_off_ini = 0.000005929 V, v_off_fin = 0.000002260 V 23:19:07 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170993971 Vs 23:19:10 Temperature Measurement, Probe Number = 0, T = 20.151000 C 23:19:10 Temperature Measurement, Probe Number = 1, T = 20.070000 C 23:19:11 Temperature Measurement, Probe Number = 2, T = 20.145000 C 23:19:12 Temperature Measurement, Probe Number = 3, T = 20.084000 C 23:19:12 Temperature Measurement, Probe Number = 4, T = 20.217000 C 23:19:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.22 23:19:13 Integrated Voltage Measurement... 23:19:32 Voltage Offset Correction: v_off_ini = 0.000003513 V, v_off_fin = 0.000006364 V 23:19:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061022 Vs 23:19:32 Integrated Voltage Measurement... 23:19:52 Voltage Offset Correction: v_off_ini = 0.000005616 V, v_off_fin = 0.000002913 V 23:19:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990810 Vs 23:19:55 Temperature Measurement, Probe Number = 0, T = 20.151000 C 23:19:55 Temperature Measurement, Probe Number = 1, T = 20.067000 C 23:19:56 Temperature Measurement, Probe Number = 2, T = 20.144000 C 23:19:57 Temperature Measurement, Probe Number = 3, T = 20.080000 C 23:19:57 Temperature Measurement, Probe Number = 4, T = 20.151000 C 23:19:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.15 23:19:58 Integrated Voltage Measurement... 23:20:17 Voltage Offset Correction: v_off_ini = 0.000003902 V, v_off_fin = 0.000005048 V 23:20:17 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171050112 Vs 23:20:17 Integrated Voltage Measurement... 23:20:36 Voltage Offset Correction: v_off_ini = 0.000004976 V, v_off_fin = 0.000002051 V 23:20:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000513 Vs 23:20:39 Temperature Measurement, Probe Number = 0, T = 20.149000 C 23:20:39 Temperature Measurement, Probe Number = 1, T = 20.069000 C 23:20:40 Temperature Measurement, Probe Number = 2, T = 20.144000 C 23:20:41 Temperature Measurement, Probe Number = 3, T = 20.082000 C 23:20:41 Temperature Measurement, Probe Number = 4, T = 20.125000 C 23:20:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.12 23:20:42 Integrated Voltage Measurement... 23:21:01 Voltage Offset Correction: v_off_ini = 0.000003130 V, v_off_fin = 0.000006145 V 23:21:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052652 Vs 23:21:01 Integrated Voltage Measurement... 23:21:20 Voltage Offset Correction: v_off_ini = 0.000005383 V, v_off_fin = 0.000002541 V 23:21:20 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170998348 Vs 23:51:23 Temperature Measurement, Probe Number = 0, T = 20.138000 C 23:51:24 Temperature Measurement, Probe Number = 1, T = 20.057000 C 23:51:24 Temperature Measurement, Probe Number = 2, T = 20.136000 C 23:51:25 Temperature Measurement, Probe Number = 3, T = 20.078000 C 23:51:26 Temperature Measurement, Probe Number = 4, T = 20.499000 C 23:51:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.50 23:51:26 Integrated Voltage Measurement... 23:51:45 Voltage Offset Correction: v_off_ini = 0.000004260 V, v_off_fin = 0.000006062 V 23:51:45 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171107305 Vs 23:51:45 Integrated Voltage Measurement... 23:52:05 Voltage Offset Correction: v_off_ini = 0.000005290 V, v_off_fin = 0.000002294 V 23:52:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997484 Vs 23:52:08 Temperature Measurement, Probe Number = 0, T = 20.146000 C 23:52:08 Temperature Measurement, Probe Number = 1, T = 20.066000 C 23:52:09 Temperature Measurement, Probe Number = 2, T = 20.138000 C 23:52:10 Temperature Measurement, Probe Number = 3, T = 20.081000 C 23:52:10 Temperature Measurement, Probe Number = 4, T = 20.435000 C 23:52:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.43 23:52:11 Integrated Voltage Measurement... 23:52:30 Voltage Offset Correction: v_off_ini = 0.000003152 V, v_off_fin = 0.000006279 V 23:52:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048042 Vs 23:52:30 Integrated Voltage Measurement... 23:52:50 Voltage Offset Correction: v_off_ini = 0.000005022 V, v_off_fin = 0.000001802 V 23:52:50 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170996431 Vs 23:52:53 Temperature Measurement, Probe Number = 0, T = 20.148000 C 23:52:53 Temperature Measurement, Probe Number = 1, T = 20.068000 C 23:52:54 Temperature Measurement, Probe Number = 2, T = 20.142000 C 23:52:55 Temperature Measurement, Probe Number = 3, T = 20.084000 C 23:52:55 Temperature Measurement, Probe Number = 4, T = 20.362000 C 23:52:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.36 23:52:55 Integrated Voltage Measurement... 23:53:15 Voltage Offset Correction: v_off_ini = 0.000003245 V, v_off_fin = 0.000005824 V 23:53:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052061 Vs 23:53:15 Integrated Voltage Measurement... 23:53:34 Voltage Offset Correction: v_off_ini = 0.000005259 V, v_off_fin = 0.000001846 V 23:53:34 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994575 Vs 23:53:37 Temperature Measurement, Probe Number = 0, T = 20.153000 C 23:53:38 Temperature Measurement, Probe Number = 1, T = 20.072000 C 23:53:38 Temperature Measurement, Probe Number = 2, T = 20.147000 C 23:53:39 Temperature Measurement, Probe Number = 3, T = 20.088000 C 23:53:40 Temperature Measurement, Probe Number = 4, T = 20.367000 C 23:53:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.37 23:53:40 Integrated Voltage Measurement... 23:53:59 Voltage Offset Correction: v_off_ini = 0.000003107 V, v_off_fin = 0.000006001 V 23:53:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052585 Vs 23:53:59 Integrated Voltage Measurement... 23:54:19 Voltage Offset Correction: v_off_ini = 0.000005179 V, v_off_fin = 0.000001982 V 23:54:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999072 Vs 23:54:22 Temperature Measurement, Probe Number = 0, T = 20.157000 C 23:54:22 Temperature Measurement, Probe Number = 1, T = 20.074000 C 23:54:23 Temperature Measurement, Probe Number = 2, T = 20.152000 C 23:54:24 Temperature Measurement, Probe Number = 3, T = 20.092000 C 23:54:24 Temperature Measurement, Probe Number = 4, T = 20.388000 C 23:54:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.39 23:54:24 Integrated Voltage Measurement... 23:54:44 Voltage Offset Correction: v_off_ini = 0.000003064 V, v_off_fin = 0.000005566 V 23:54:44 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171048775 Vs 23:54:44 Integrated Voltage Measurement... 23:55:03 Voltage Offset Correction: v_off_ini = 0.000005090 V, v_off_fin = 0.000001825 V 23:55:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998599 Vs 23:55:06 Temperature Measurement, Probe Number = 0, T = 20.153000 C 23:55:07 Temperature Measurement, Probe Number = 1, T = 20.068000 C 23:55:08 Temperature Measurement, Probe Number = 2, T = 20.150000 C 23:55:08 Temperature Measurement, Probe Number = 3, T = 20.087000 C 23:55:09 Temperature Measurement, Probe Number = 4, T = 20.442000 C 23:55:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.44 23:55:09 Integrated Voltage Measurement... 23:55:28 Voltage Offset Correction: v_off_ini = 0.000003021 V, v_off_fin = 0.000005544 V 23:55:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049399 Vs 23:55:29 Integrated Voltage Measurement... 23:55:48 Voltage Offset Correction: v_off_ini = 0.000004948 V, v_off_fin = 0.000001833 V 23:55:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998967 Vs 23:55:51 Temperature Measurement, Probe Number = 0, T = 20.145000 C 23:55:52 Temperature Measurement, Probe Number = 1, T = 20.064000 C 23:55:52 Temperature Measurement, Probe Number = 2, T = 20.138000 C 23:55:53 Temperature Measurement, Probe Number = 3, T = 20.079000 C 23:55:53 Temperature Measurement, Probe Number = 4, T = 20.382000 C 23:55:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.38 23:55:54 Integrated Voltage Measurement... 23:56:13 Voltage Offset Correction: v_off_ini = 0.000003139 V, v_off_fin = 0.000005905 V 23:56:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044228 Vs 23:56:13 Integrated Voltage Measurement... 23:56:32 Voltage Offset Correction: v_off_ini = 0.000004957 V, v_off_fin = 0.000002439 V 23:56:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991430 Vs 23:56:35 Temperature Measurement, Probe Number = 0, T = 20.149000 C 23:56:36 Temperature Measurement, Probe Number = 1, T = 20.066000 C 23:56:37 Temperature Measurement, Probe Number = 2, T = 20.143000 C 23:56:37 Temperature Measurement, Probe Number = 3, T = 20.084000 C 23:56:38 Temperature Measurement, Probe Number = 4, T = 20.434000 C 23:56:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.43 23:56:38 Integrated Voltage Measurement... 23:56:57 Voltage Offset Correction: v_off_ini = 0.000003536 V, v_off_fin = 0.000006147 V 23:56:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049289 Vs 23:56:58 Integrated Voltage Measurement... 23:57:17 Voltage Offset Correction: v_off_ini = 0.000005629 V, v_off_fin = 0.000002282 V 23:57:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990587 Vs 23:57:20 Temperature Measurement, Probe Number = 0, T = 20.148000 C 23:57:21 Temperature Measurement, Probe Number = 1, T = 20.066000 C 23:57:21 Temperature Measurement, Probe Number = 2, T = 20.144000 C 23:57:22 Temperature Measurement, Probe Number = 3, T = 20.084000 C 23:57:23 Temperature Measurement, Probe Number = 4, T = 20.430000 C 23:57:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.43 23:57:23 Integrated Voltage Measurement... 23:57:42 Voltage Offset Correction: v_off_ini = 0.000003514 V, v_off_fin = 0.000006754 V 23:57:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051426 Vs 23:57:43 Integrated Voltage Measurement... 23:58:02 Voltage Offset Correction: v_off_ini = 0.000005829 V, v_off_fin = 0.000002483 V 23:58:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986693 Vs 23:58:05 Temperature Measurement, Probe Number = 0, T = 20.147000 C 23:58:05 Temperature Measurement, Probe Number = 1, T = 20.064000 C 23:58:06 Temperature Measurement, Probe Number = 2, T = 20.139000 C 23:58:07 Temperature Measurement, Probe Number = 3, T = 20.081000 C 23:58:07 Temperature Measurement, Probe Number = 4, T = 20.346000 C 23:58:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.35 23:58:07 Integrated Voltage Measurement... 23:58:27 Voltage Offset Correction: v_off_ini = 0.000003089 V, v_off_fin = 0.000006531 V 23:58:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053071 Vs 23:58:27 Integrated Voltage Measurement... 23:58:46 Voltage Offset Correction: v_off_ini = 0.000005488 V, v_off_fin = 0.000002641 V 23:58:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992101 Vs 00:28:49 Temperature Measurement, Probe Number = 0, T = 20.136000 C 00:28:50 Temperature Measurement, Probe Number = 1, T = 20.059000 C 00:28:50 Temperature Measurement, Probe Number = 2, T = 20.131000 C 00:28:51 Temperature Measurement, Probe Number = 3, T = 20.074000 C 00:28:52 Temperature Measurement, Probe Number = 4, T = 20.255000 C 00:28:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.25 00:28:52 Integrated Voltage Measurement... 00:29:12 Voltage Offset Correction: v_off_ini = 0.000004807 V, v_off_fin = 0.000005641 V 00:29:12 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171099995 Vs 00:29:12 Integrated Voltage Measurement... 00:29:31 Voltage Offset Correction: v_off_ini = 0.000005517 V, v_off_fin = 0.000003051 V 00:29:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988188 Vs 00:29:34 Temperature Measurement, Probe Number = 0, T = 20.141000 C 00:29:35 Temperature Measurement, Probe Number = 1, T = 20.059000 C 00:29:36 Temperature Measurement, Probe Number = 2, T = 20.136000 C 00:29:36 Temperature Measurement, Probe Number = 3, T = 20.074000 C 00:29:37 Temperature Measurement, Probe Number = 4, T = 20.329000 C 00:29:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.33 00:29:37 Integrated Voltage Measurement... 00:29:56 Voltage Offset Correction: v_off_ini = 0.000003191 V, v_off_fin = 0.000005953 V 00:29:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047345 Vs 00:29:57 Integrated Voltage Measurement... 00:30:16 Voltage Offset Correction: v_off_ini = 0.000006103 V, v_off_fin = 0.000003116 V 00:30:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988751 Vs 00:30:19 Temperature Measurement, Probe Number = 0, T = 20.145000 C 00:30:20 Temperature Measurement, Probe Number = 1, T = 20.065000 C 00:30:20 Temperature Measurement, Probe Number = 2, T = 20.139000 C 00:30:21 Temperature Measurement, Probe Number = 3, T = 20.080000 C 00:30:22 Temperature Measurement, Probe Number = 4, T = 20.356000 C 00:30:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.36 00:30:22 Integrated Voltage Measurement... 00:30:41 Voltage Offset Correction: v_off_ini = 0.000004216 V, v_off_fin = 0.000006690 V 00:30:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047716 Vs 00:30:41 Integrated Voltage Measurement... 00:31:00 Voltage Offset Correction: v_off_ini = 0.000005492 V, v_off_fin = 0.000002985 V 00:31:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989472 Vs 00:31:03 Temperature Measurement, Probe Number = 0, T = 20.147000 C 00:31:04 Temperature Measurement, Probe Number = 1, T = 20.066000 C 00:31:05 Temperature Measurement, Probe Number = 2, T = 20.141000 C 00:31:05 Temperature Measurement, Probe Number = 3, T = 20.080000 C 00:31:06 Temperature Measurement, Probe Number = 4, T = 20.358000 C 00:31:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.36 00:31:06 Integrated Voltage Measurement... 00:31:26 Voltage Offset Correction: v_off_ini = 0.000003755 V, v_off_fin = 0.000006190 V 00:31:26 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171044900 Vs 00:31:26 Integrated Voltage Measurement... 00:31:45 Voltage Offset Correction: v_off_ini = 0.000005993 V, v_off_fin = 0.000003057 V 00:31:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987489 Vs 00:31:48 Temperature Measurement, Probe Number = 0, T = 20.141000 C 00:31:49 Temperature Measurement, Probe Number = 1, T = 20.060000 C 00:31:49 Temperature Measurement, Probe Number = 2, T = 20.135000 C 00:31:50 Temperature Measurement, Probe Number = 3, T = 20.077000 C 00:31:51 Temperature Measurement, Probe Number = 4, T = 20.328000 C 00:31:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.33 00:31:51 Integrated Voltage Measurement... 00:32:10 Voltage Offset Correction: v_off_ini = 0.000003677 V, v_off_fin = 0.000005870 V 00:32:10 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171032662 Vs 00:32:10 Integrated Voltage Measurement... 00:32:29 Voltage Offset Correction: v_off_ini = 0.000004980 V, v_off_fin = 0.000002523 V 00:32:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993716 Vs 00:32:32 Temperature Measurement, Probe Number = 0, T = 20.140000 C 00:32:33 Temperature Measurement, Probe Number = 1, T = 20.060000 C 00:32:33 Temperature Measurement, Probe Number = 2, T = 20.132000 C 00:32:34 Temperature Measurement, Probe Number = 3, T = 20.075000 C 00:32:35 Temperature Measurement, Probe Number = 4, T = 20.221000 C 00:32:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.22 00:32:35 Integrated Voltage Measurement... 00:32:54 Voltage Offset Correction: v_off_ini = 0.000003678 V, v_off_fin = 0.000006504 V 00:32:54 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171044064 Vs 00:32:55 Integrated Voltage Measurement... 00:33:14 Voltage Offset Correction: v_off_ini = 0.000005124 V, v_off_fin = 0.000002254 V 00:33:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992319 Vs 00:33:17 Temperature Measurement, Probe Number = 0, T = 20.146000 C 00:33:17 Temperature Measurement, Probe Number = 1, T = 20.064000 C 00:33:18 Temperature Measurement, Probe Number = 2, T = 20.137000 C 00:33:19 Temperature Measurement, Probe Number = 3, T = 20.077000 C 00:33:19 Temperature Measurement, Probe Number = 4, T = 20.218000 C 00:33:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.22 00:33:19 Integrated Voltage Measurement... 00:33:39 Voltage Offset Correction: v_off_ini = 0.000003493 V, v_off_fin = 0.000006104 V 00:33:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053295 Vs 00:33:39 Integrated Voltage Measurement... 00:33:58 Voltage Offset Correction: v_off_ini = 0.000005616 V, v_off_fin = 0.000002606 V 00:33:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995853 Vs 00:34:01 Temperature Measurement, Probe Number = 0, T = 20.150000 C 00:34:01 Temperature Measurement, Probe Number = 1, T = 20.068000 C 00:34:02 Temperature Measurement, Probe Number = 2, T = 20.144000 C 00:34:03 Temperature Measurement, Probe Number = 3, T = 20.083000 C 00:34:03 Temperature Measurement, Probe Number = 4, T = 20.277000 C 00:34:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.28 00:34:04 Integrated Voltage Measurement... 00:34:23 Voltage Offset Correction: v_off_ini = 0.000004008 V, v_off_fin = 0.000006645 V 00:34:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054583 Vs 00:34:23 Integrated Voltage Measurement... 00:34:42 Voltage Offset Correction: v_off_ini = 0.000006090 V, v_off_fin = 0.000002841 V 00:34:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986093 Vs 00:34:45 Temperature Measurement, Probe Number = 0, T = 20.145000 C 00:34:45 Temperature Measurement, Probe Number = 1, T = 20.061000 C 00:34:46 Temperature Measurement, Probe Number = 2, T = 20.141000 C 00:34:47 Temperature Measurement, Probe Number = 3, T = 20.081000 C 00:34:47 Temperature Measurement, Probe Number = 4, T = 20.341000 C 00:34:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.34 00:34:47 Integrated Voltage Measurement... 00:35:07 Voltage Offset Correction: v_off_ini = 0.000004111 V, v_off_fin = 0.000006392 V 00:35:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171056258 Vs 00:35:07 Integrated Voltage Measurement... 00:35:26 Voltage Offset Correction: v_off_ini = 0.000005801 V, v_off_fin = 0.000002251 V 00:35:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989719 Vs 00:35:29 Temperature Measurement, Probe Number = 0, T = 20.144000 C 00:35:29 Temperature Measurement, Probe Number = 1, T = 20.061000 C 00:35:30 Temperature Measurement, Probe Number = 2, T = 20.138000 C 00:35:31 Temperature Measurement, Probe Number = 3, T = 20.079000 C 00:35:31 Temperature Measurement, Probe Number = 4, T = 20.208000 C 00:35:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.21 00:35:32 Integrated Voltage Measurement... 00:35:51 Voltage Offset Correction: v_off_ini = 0.000003213 V, v_off_fin = 0.000006400 V 00:35:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055335 Vs 00:35:51 Integrated Voltage Measurement... 00:36:10 Voltage Offset Correction: v_off_ini = 0.000005943 V, v_off_fin = 0.000003225 V 00:36:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989334 Vs 01:06:13 Temperature Measurement, Probe Number = 0, T = 20.138000 C 01:06:13 Temperature Measurement, Probe Number = 1, T = 20.057000 C 01:06:14 Temperature Measurement, Probe Number = 2, T = 20.133000 C 01:06:15 Temperature Measurement, Probe Number = 3, T = 20.075000 C 01:06:15 Temperature Measurement, Probe Number = 4, T = 20.276000 C 01:06:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.28 01:06:16 Integrated Voltage Measurement... 01:06:35 Voltage Offset Correction: v_off_ini = 0.000004216 V, v_off_fin = 0.000006238 V 01:06:35 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171092370 Vs 01:06:35 Integrated Voltage Measurement... 01:06:54 Voltage Offset Correction: v_off_ini = 0.000005709 V, v_off_fin = 0.000002626 V 01:06:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001497 Vs 01:06:57 Temperature Measurement, Probe Number = 0, T = 20.140000 C 01:06:58 Temperature Measurement, Probe Number = 1, T = 20.058000 C 01:06:59 Temperature Measurement, Probe Number = 2, T = 20.136000 C 01:06:59 Temperature Measurement, Probe Number = 3, T = 20.075000 C 01:07:00 Temperature Measurement, Probe Number = 4, T = 20.360000 C 01:07:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.36 01:07:00 Integrated Voltage Measurement... 01:07:19 Voltage Offset Correction: v_off_ini = 0.000004250 V, v_off_fin = 0.000006035 V 01:07:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171056318 Vs 01:07:19 Integrated Voltage Measurement... 01:07:39 Voltage Offset Correction: v_off_ini = 0.000006144 V, v_off_fin = 0.000002948 V 01:07:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993837 Vs 01:07:42 Temperature Measurement, Probe Number = 0, T = 20.141000 C 01:07:42 Temperature Measurement, Probe Number = 1, T = 20.061000 C 01:07:43 Temperature Measurement, Probe Number = 2, T = 20.131000 C 01:07:44 Temperature Measurement, Probe Number = 3, T = 20.071000 C 01:07:44 Temperature Measurement, Probe Number = 4, T = 20.286000 C 01:07:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.29 01:07:45 Integrated Voltage Measurement... 01:08:04 Voltage Offset Correction: v_off_ini = 0.000004274 V, v_off_fin = 0.000006275 V 01:08:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054125 Vs 01:08:04 Integrated Voltage Measurement... 01:08:23 Voltage Offset Correction: v_off_ini = 0.000005704 V, v_off_fin = 0.000002686 V 01:08:23 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987558 Vs 01:08:26 Temperature Measurement, Probe Number = 0, T = 20.127000 C 01:08:26 Temperature Measurement, Probe Number = 1, T = 20.044000 C 01:08:27 Temperature Measurement, Probe Number = 2, T = 20.124000 C 01:08:28 Temperature Measurement, Probe Number = 3, T = 20.063000 C 01:08:28 Temperature Measurement, Probe Number = 4, T = 20.184000 C 01:08:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.18 01:08:29 Integrated Voltage Measurement... 01:08:48 Voltage Offset Correction: v_off_ini = 0.000004424 V, v_off_fin = 0.000006821 V 01:08:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171065123 Vs 01:08:48 Integrated Voltage Measurement... 01:09:08 Voltage Offset Correction: v_off_ini = 0.000006413 V, v_off_fin = 0.000002806 V 01:09:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991187 Vs 01:09:11 Temperature Measurement, Probe Number = 0, T = 20.136000 C 01:09:11 Temperature Measurement, Probe Number = 1, T = 20.052000 C 01:09:12 Temperature Measurement, Probe Number = 2, T = 20.131000 C 01:09:13 Temperature Measurement, Probe Number = 3, T = 20.070000 C 01:09:13 Temperature Measurement, Probe Number = 4, T = 20.207000 C 01:09:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.21 01:09:13 Integrated Voltage Measurement... 01:09:33 Voltage Offset Correction: v_off_ini = 0.000003584 V, v_off_fin = 0.000006601 V 01:09:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171056566 Vs 01:09:33 Integrated Voltage Measurement... 01:09:52 Voltage Offset Correction: v_off_ini = 0.000005892 V, v_off_fin = 0.000002200 V 01:09:52 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170993412 Vs 01:09:55 Temperature Measurement, Probe Number = 0, T = 20.142000 C 01:09:55 Temperature Measurement, Probe Number = 1, T = 20.056000 C 01:09:56 Temperature Measurement, Probe Number = 2, T = 20.133000 C 01:09:57 Temperature Measurement, Probe Number = 3, T = 20.073000 C 01:09:57 Temperature Measurement, Probe Number = 4, T = 20.269000 C 01:09:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.27 01:09:58 Integrated Voltage Measurement... 01:10:17 Voltage Offset Correction: v_off_ini = 0.000003938 V, v_off_fin = 0.000006578 V 01:10:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171056231 Vs 01:10:17 Integrated Voltage Measurement... 01:10:36 Voltage Offset Correction: v_off_ini = 0.000005732 V, v_off_fin = 0.000002271 V 01:10:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170995227 Vs 01:10:39 Temperature Measurement, Probe Number = 0, T = 20.142000 C 01:10:40 Temperature Measurement, Probe Number = 1, T = 20.054000 C 01:10:40 Temperature Measurement, Probe Number = 2, T = 20.137000 C 01:10:41 Temperature Measurement, Probe Number = 3, T = 20.073000 C 01:10:42 Temperature Measurement, Probe Number = 4, T = 20.293000 C 01:10:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.29 01:10:42 Integrated Voltage Measurement... 01:11:01 Voltage Offset Correction: v_off_ini = 0.000003743 V, v_off_fin = 0.000006222 V 01:11:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058627 Vs 01:11:01 Integrated Voltage Measurement... 01:11:20 Voltage Offset Correction: v_off_ini = 0.000005389 V, v_off_fin = 0.000002203 V 01:11:20 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170998035 Vs 01:11:23 Temperature Measurement, Probe Number = 0, T = 20.137000 C 01:11:24 Temperature Measurement, Probe Number = 1, T = 20.052000 C 01:11:24 Temperature Measurement, Probe Number = 2, T = 20.134000 C 01:11:25 Temperature Measurement, Probe Number = 3, T = 20.071000 C 01:11:26 Temperature Measurement, Probe Number = 4, T = 20.305000 C 01:11:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.30 01:11:26 Integrated Voltage Measurement... 01:11:45 Voltage Offset Correction: v_off_ini = 0.000003301 V, v_off_fin = 0.000005895 V 01:11:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055328 Vs 01:11:45 Integrated Voltage Measurement... 01:12:04 Voltage Offset Correction: v_off_ini = 0.000005570 V, v_off_fin = 0.000002463 V 01:12:05 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000765 Vs 01:12:07 Temperature Measurement, Probe Number = 0, T = 20.142000 C 01:12:08 Temperature Measurement, Probe Number = 1, T = 20.060000 C 01:12:09 Temperature Measurement, Probe Number = 2, T = 20.138000 C 01:12:09 Temperature Measurement, Probe Number = 3, T = 20.077000 C 01:12:10 Temperature Measurement, Probe Number = 4, T = 20.340000 C 01:12:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.34 01:12:10 Integrated Voltage Measurement... 01:12:29 Voltage Offset Correction: v_off_ini = 0.000004045 V, v_off_fin = 0.000006033 V 01:12:29 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057136 Vs 01:12:29 Integrated Voltage Measurement... 01:12:48 Voltage Offset Correction: v_off_ini = 0.000005796 V, v_off_fin = 0.000001824 V 01:12:49 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170999950 Vs 01:12:51 Temperature Measurement, Probe Number = 0, T = 20.144000 C 01:12:52 Temperature Measurement, Probe Number = 1, T = 20.063000 C 01:12:53 Temperature Measurement, Probe Number = 2, T = 20.136000 C 01:12:53 Temperature Measurement, Probe Number = 3, T = 20.077000 C 01:12:54 Temperature Measurement, Probe Number = 4, T = 20.316000 C 01:12:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.32 01:12:54 Integrated Voltage Measurement... 01:13:13 Voltage Offset Correction: v_off_ini = 0.000003084 V, v_off_fin = 0.000005807 V 01:13:14 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055045 Vs 01:13:14 Integrated Voltage Measurement... 01:13:33 Voltage Offset Correction: v_off_ini = 0.000004957 V, v_off_fin = 0.000001901 V 01:13:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171006744 Vs 01:43:36 Temperature Measurement, Probe Number = 0, T = 20.133000 C 01:43:37 Temperature Measurement, Probe Number = 1, T = 20.050000 C 01:43:37 Temperature Measurement, Probe Number = 2, T = 20.128000 C 01:43:38 Temperature Measurement, Probe Number = 3, T = 20.067000 C 01:43:38 Temperature Measurement, Probe Number = 4, T = 20.150000 C 01:43:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.15 01:43:39 Integrated Voltage Measurement... 01:43:58 Voltage Offset Correction: v_off_ini = 0.000004310 V, v_off_fin = 0.000006073 V 01:43:58 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171103321 Vs 01:43:59 Integrated Voltage Measurement... 01:44:18 Voltage Offset Correction: v_off_ini = 0.000005738 V, v_off_fin = 0.000002601 V 01:44:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998090 Vs 01:44:21 Temperature Measurement, Probe Number = 0, T = 20.139000 C 01:44:21 Temperature Measurement, Probe Number = 1, T = 20.056000 C 01:44:22 Temperature Measurement, Probe Number = 2, T = 20.131000 C 01:44:23 Temperature Measurement, Probe Number = 3, T = 20.069000 C 01:44:23 Temperature Measurement, Probe Number = 4, T = 20.149000 C 01:44:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.15 01:44:24 Integrated Voltage Measurement... 01:44:43 Voltage Offset Correction: v_off_ini = 0.000003937 V, v_off_fin = 0.000006427 V 01:44:43 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050697 Vs 01:44:43 Integrated Voltage Measurement... 01:45:02 Voltage Offset Correction: v_off_ini = 0.000005201 V, v_off_fin = 0.000001930 V 01:45:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170995995 Vs 01:45:05 Temperature Measurement, Probe Number = 0, T = 20.144000 C 01:45:06 Temperature Measurement, Probe Number = 1, T = 20.058000 C 01:45:07 Temperature Measurement, Probe Number = 2, T = 20.134000 C 01:45:07 Temperature Measurement, Probe Number = 3, T = 20.071000 C 01:45:08 Temperature Measurement, Probe Number = 4, T = 20.298000 C 01:45:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.30 01:45:08 Integrated Voltage Measurement... 01:45:27 Voltage Offset Correction: v_off_ini = 0.000003012 V, v_off_fin = 0.000006463 V 01:45:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053679 Vs 01:45:28 Integrated Voltage Measurement... 01:45:47 Voltage Offset Correction: v_off_ini = 0.000005055 V, v_off_fin = 0.000002190 V 01:45:47 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171001763 Vs 01:45:50 Temperature Measurement, Probe Number = 0, T = 20.145000 C 01:45:51 Temperature Measurement, Probe Number = 1, T = 20.060000 C 01:45:51 Temperature Measurement, Probe Number = 2, T = 20.139000 C 01:45:52 Temperature Measurement, Probe Number = 3, T = 20.077000 C 01:45:53 Temperature Measurement, Probe Number = 4, T = 20.400000 C 01:45:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.40 01:45:53 Integrated Voltage Measurement... 01:46:12 Voltage Offset Correction: v_off_ini = 0.000002988 V, v_off_fin = 0.000006060 V 01:46:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050719 Vs 01:46:13 Integrated Voltage Measurement... 01:46:32 Voltage Offset Correction: v_off_ini = 0.000005499 V, v_off_fin = 0.000002233 V 01:46:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998384 Vs 01:46:35 Temperature Measurement, Probe Number = 0, T = 20.144000 C 01:46:35 Temperature Measurement, Probe Number = 1, T = 20.057000 C 01:46:36 Temperature Measurement, Probe Number = 2, T = 20.137000 C 01:46:37 Temperature Measurement, Probe Number = 3, T = 20.075000 C 01:46:37 Temperature Measurement, Probe Number = 4, T = 20.436000 C 01:46:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.44 01:46:37 Integrated Voltage Measurement... 01:46:57 Voltage Offset Correction: v_off_ini = 0.000003064 V, v_off_fin = 0.000005825 V 01:46:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049276 Vs 01:46:57 Integrated Voltage Measurement... 01:47:16 Voltage Offset Correction: v_off_ini = 0.000005510 V, v_off_fin = 0.000002613 V 01:47:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996592 Vs 01:47:19 Temperature Measurement, Probe Number = 0, T = 20.137000 C 01:47:20 Temperature Measurement, Probe Number = 1, T = 20.053000 C 01:47:20 Temperature Measurement, Probe Number = 2, T = 20.131000 C 01:47:21 Temperature Measurement, Probe Number = 3, T = 20.069000 C 01:47:22 Temperature Measurement, Probe Number = 4, T = 20.401000 C 01:47:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.40 01:47:22 Integrated Voltage Measurement... 01:47:42 Voltage Offset Correction: v_off_ini = 0.000003377 V, v_off_fin = 0.000005909 V 01:47:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049680 Vs 01:47:42 Integrated Voltage Measurement... 01:48:01 Voltage Offset Correction: v_off_ini = 0.000005384 V, v_off_fin = 0.000002175 V 01:48:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000338 Vs 01:48:04 Temperature Measurement, Probe Number = 0, T = 20.136000 C 01:48:05 Temperature Measurement, Probe Number = 1, T = 20.053000 C 01:48:06 Temperature Measurement, Probe Number = 2, T = 20.130000 C 01:48:06 Temperature Measurement, Probe Number = 3, T = 20.067000 C 01:48:07 Temperature Measurement, Probe Number = 4, T = 20.301000 C 01:48:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.30 01:48:07 Integrated Voltage Measurement... 01:48:26 Voltage Offset Correction: v_off_ini = 0.000003885 V, v_off_fin = 0.000006293 V 01:48:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054330 Vs 01:48:27 Integrated Voltage Measurement... 01:48:46 Voltage Offset Correction: v_off_ini = 0.000005770 V, v_off_fin = 0.000003129 V 01:48:46 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994109 Vs 01:48:49 Temperature Measurement, Probe Number = 0, T = 20.135000 C 01:48:49 Temperature Measurement, Probe Number = 1, T = 20.050000 C 01:48:50 Temperature Measurement, Probe Number = 2, T = 20.127000 C 01:48:51 Temperature Measurement, Probe Number = 3, T = 20.063000 C 01:48:51 Temperature Measurement, Probe Number = 4, T = 20.240000 C 01:48:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.24 01:48:51 Integrated Voltage Measurement... 01:49:11 Voltage Offset Correction: v_off_ini = 0.000003624 V, v_off_fin = 0.000006796 V 01:49:11 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171060523 Vs 01:49:11 Integrated Voltage Measurement... 01:49:30 Voltage Offset Correction: v_off_ini = 0.000006013 V, v_off_fin = 0.000002644 V 01:49:31 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170995390 Vs 01:49:33 Temperature Measurement, Probe Number = 0, T = 20.134000 C 01:49:34 Temperature Measurement, Probe Number = 1, T = 20.052000 C 01:49:35 Temperature Measurement, Probe Number = 2, T = 20.127000 C 01:49:35 Temperature Measurement, Probe Number = 3, T = 20.065000 C 01:49:36 Temperature Measurement, Probe Number = 4, T = 20.198000 C 01:49:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.20 01:49:36 Integrated Voltage Measurement... 01:49:56 Voltage Offset Correction: v_off_ini = 0.000003619 V, v_off_fin = 0.000006498 V 01:49:56 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171056832 Vs 01:49:56 Integrated Voltage Measurement... 01:50:15 Voltage Offset Correction: v_off_ini = 0.000005715 V, v_off_fin = 0.000002340 V 01:50:15 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170992064 Vs 01:50:18 Temperature Measurement, Probe Number = 0, T = 20.139000 C 01:50:18 Temperature Measurement, Probe Number = 1, T = 20.061000 C 01:50:19 Temperature Measurement, Probe Number = 2, T = 20.134000 C 01:50:20 Temperature Measurement, Probe Number = 3, T = 20.073000 C 01:50:20 Temperature Measurement, Probe Number = 4, T = 20.278000 C 01:50:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.28 01:50:20 Integrated Voltage Measurement... 01:50:40 Voltage Offset Correction: v_off_ini = 0.000003748 V, v_off_fin = 0.000006131 V 01:50:40 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058759 Vs 01:50:40 Integrated Voltage Measurement... 01:50:59 Voltage Offset Correction: v_off_ini = 0.000005754 V, v_off_fin = 0.000001671 V 01:50:59 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000354 Vs 02:21:02 Temperature Measurement, Probe Number = 0, T = 20.141000 C 02:21:03 Temperature Measurement, Probe Number = 1, T = 20.060000 C 02:21:03 Temperature Measurement, Probe Number = 2, T = 20.135000 C 02:21:04 Temperature Measurement, Probe Number = 3, T = 20.074000 C 02:21:05 Temperature Measurement, Probe Number = 4, T = 20.261000 C 02:21:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.26 02:21:05 Integrated Voltage Measurement... 02:21:24 Voltage Offset Correction: v_off_ini = 0.000004459 V, v_off_fin = 0.000006275 V 02:21:24 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171110908 Vs 02:21:24 Integrated Voltage Measurement... 02:21:44 Voltage Offset Correction: v_off_ini = 0.000006014 V, v_off_fin = 0.000002638 V 02:21:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995076 Vs 02:21:46 Temperature Measurement, Probe Number = 0, T = 20.143000 C 02:21:47 Temperature Measurement, Probe Number = 1, T = 20.059000 C 02:21:48 Temperature Measurement, Probe Number = 2, T = 20.134000 C 02:21:48 Temperature Measurement, Probe Number = 3, T = 20.074000 C 02:21:49 Temperature Measurement, Probe Number = 4, T = 20.311000 C 02:21:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.31 02:21:49 Integrated Voltage Measurement... 02:22:08 Voltage Offset Correction: v_off_ini = 0.000003886 V, v_off_fin = 0.000005772 V 02:22:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055850 Vs 02:22:09 Integrated Voltage Measurement... 02:22:28 Voltage Offset Correction: v_off_ini = 0.000005770 V, v_off_fin = 0.000002637 V 02:22:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995697 Vs 02:22:31 Temperature Measurement, Probe Number = 0, T = 20.140000 C 02:22:31 Temperature Measurement, Probe Number = 1, T = 20.054000 C 02:22:32 Temperature Measurement, Probe Number = 2, T = 20.127000 C 02:22:33 Temperature Measurement, Probe Number = 3, T = 20.065000 C 02:22:33 Temperature Measurement, Probe Number = 4, T = 20.363000 C 02:22:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.36 02:22:34 Integrated Voltage Measurement... 02:22:53 Voltage Offset Correction: v_off_ini = 0.000003501 V, v_off_fin = 0.000006555 V 02:22:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055782 Vs 02:22:53 Integrated Voltage Measurement... 02:23:13 Voltage Offset Correction: v_off_ini = 0.000005495 V, v_off_fin = 0.000002718 V 02:23:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000563 Vs 02:23:16 Temperature Measurement, Probe Number = 0, T = 20.129000 C 02:23:16 Temperature Measurement, Probe Number = 1, T = 20.050000 C 02:23:17 Temperature Measurement, Probe Number = 2, T = 20.121000 C 02:23:18 Temperature Measurement, Probe Number = 3, T = 20.062000 C 02:23:18 Temperature Measurement, Probe Number = 4, T = 20.290000 C 02:23:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.29 02:23:19 Integrated Voltage Measurement... 02:23:38 Voltage Offset Correction: v_off_ini = 0.000003175 V, v_off_fin = 0.000006001 V 02:23:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050398 Vs 02:23:38 Integrated Voltage Measurement... 02:23:58 Voltage Offset Correction: v_off_ini = 0.000005522 V, v_off_fin = 0.000002693 V 02:23:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997594 Vs 02:24:01 Temperature Measurement, Probe Number = 0, T = 20.130000 C 02:24:02 Temperature Measurement, Probe Number = 1, T = 20.050000 C 02:24:02 Temperature Measurement, Probe Number = 2, T = 20.126000 C 02:24:03 Temperature Measurement, Probe Number = 3, T = 20.066000 C 02:24:03 Temperature Measurement, Probe Number = 4, T = 20.242000 C 02:24:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.24 02:24:04 Integrated Voltage Measurement... 02:24:23 Voltage Offset Correction: v_off_ini = 0.000003770 V, v_off_fin = 0.000006310 V 02:24:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048591 Vs 02:24:23 Integrated Voltage Measurement... 02:24:43 Voltage Offset Correction: v_off_ini = 0.000005662 V, v_off_fin = 0.000002146 V 02:24:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002517 Vs 02:24:46 Temperature Measurement, Probe Number = 0, T = 20.132000 C 02:24:47 Temperature Measurement, Probe Number = 1, T = 20.052000 C 02:24:47 Temperature Measurement, Probe Number = 2, T = 20.128000 C 02:24:48 Temperature Measurement, Probe Number = 3, T = 20.067000 C 02:24:49 Temperature Measurement, Probe Number = 4, T = 20.279000 C 02:24:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.28 02:24:49 Integrated Voltage Measurement... 02:25:08 Voltage Offset Correction: v_off_ini = 0.000003197 V, v_off_fin = 0.000006008 V 02:25:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055616 Vs 02:25:08 Integrated Voltage Measurement... 02:25:28 Voltage Offset Correction: v_off_ini = 0.000005292 V, v_off_fin = 0.000002271 V 02:25:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000709 Vs 02:25:31 Temperature Measurement, Probe Number = 0, T = 20.137000 C 02:25:32 Temperature Measurement, Probe Number = 1, T = 20.056000 C 02:25:32 Temperature Measurement, Probe Number = 2, T = 20.127000 C 02:25:33 Temperature Measurement, Probe Number = 3, T = 20.068000 C 02:25:34 Temperature Measurement, Probe Number = 4, T = 20.302000 C 02:25:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.30 02:25:34 Integrated Voltage Measurement... 02:25:53 Voltage Offset Correction: v_off_ini = 0.000003758 V, v_off_fin = 0.000006467 V 02:25:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057862 Vs 02:25:53 Integrated Voltage Measurement... 02:26:13 Voltage Offset Correction: v_off_ini = 0.000005894 V, v_off_fin = 0.000002371 V 02:26:13 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170995254 Vs 02:26:16 Temperature Measurement, Probe Number = 0, T = 20.135000 C 02:26:16 Temperature Measurement, Probe Number = 1, T = 20.054000 C 02:26:17 Temperature Measurement, Probe Number = 2, T = 20.128000 C 02:26:18 Temperature Measurement, Probe Number = 3, T = 20.069000 C 02:26:18 Temperature Measurement, Probe Number = 4, T = 20.343000 C 02:26:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.34 02:26:18 Integrated Voltage Measurement... 02:26:38 Voltage Offset Correction: v_off_ini = 0.000003687 V, v_off_fin = 0.000006096 V 02:26:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059841 Vs 02:26:38 Integrated Voltage Measurement... 02:26:57 Voltage Offset Correction: v_off_ini = 0.000005737 V, v_off_fin = 0.000002164 V 02:26:58 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170995433 Vs 02:27:00 Temperature Measurement, Probe Number = 0, T = 20.136000 C 02:27:01 Temperature Measurement, Probe Number = 1, T = 20.054000 C 02:27:02 Temperature Measurement, Probe Number = 2, T = 20.131000 C 02:27:02 Temperature Measurement, Probe Number = 3, T = 20.070000 C 02:27:03 Temperature Measurement, Probe Number = 4, T = 20.337000 C 02:27:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.34 02:27:03 Integrated Voltage Measurement... 02:27:24 Voltage Offset Correction: v_off_ini = 0.000003650 V, v_off_fin = 0.000006363 V 02:27:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062879 Vs 02:27:24 Integrated Voltage Measurement... 02:27:43 Voltage Offset Correction: v_off_ini = 0.000005547 V, v_off_fin = 0.000002550 V 02:27:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993185 Vs 02:27:46 Temperature Measurement, Probe Number = 0, T = 20.142000 C 02:27:47 Temperature Measurement, Probe Number = 1, T = 20.058000 C 02:27:47 Temperature Measurement, Probe Number = 2, T = 20.136000 C 02:27:48 Temperature Measurement, Probe Number = 3, T = 20.074000 C 02:27:49 Temperature Measurement, Probe Number = 4, T = 20.346000 C 02:27:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.35 02:27:49 Integrated Voltage Measurement... 02:28:08 Voltage Offset Correction: v_off_ini = 0.000003778 V, v_off_fin = 0.000006188 V 02:28:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059307 Vs 02:28:08 Integrated Voltage Measurement... 02:28:27 Voltage Offset Correction: v_off_ini = 0.000005608 V, v_off_fin = 0.000001839 V 02:28:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994212 Vs 02:58:30 Temperature Measurement, Probe Number = 0, T = 20.123000 C 02:58:31 Temperature Measurement, Probe Number = 1, T = 20.041000 C 02:58:32 Temperature Measurement, Probe Number = 2, T = 20.117000 C 02:58:32 Temperature Measurement, Probe Number = 3, T = 20.056000 C 02:58:33 Temperature Measurement, Probe Number = 4, T = 20.138000 C 02:58:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.14 02:58:33 Integrated Voltage Measurement... 02:58:52 Voltage Offset Correction: v_off_ini = 0.000004284 V, v_off_fin = 0.000006064 V 02:58:52 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171104788 Vs 02:58:52 Integrated Voltage Measurement... 02:59:11 Voltage Offset Correction: v_off_ini = 0.000005315 V, v_off_fin = 0.000002231 V 02:59:11 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170996512 Vs 02:59:14 Temperature Measurement, Probe Number = 0, T = 20.127000 C 02:59:15 Temperature Measurement, Probe Number = 1, T = 20.047000 C 02:59:15 Temperature Measurement, Probe Number = 2, T = 20.119000 C 02:59:16 Temperature Measurement, Probe Number = 3, T = 20.058000 C 02:59:17 Temperature Measurement, Probe Number = 4, T = 20.150000 C 02:59:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.15 02:59:17 Integrated Voltage Measurement... 02:59:36 Voltage Offset Correction: v_off_ini = 0.000003486 V, v_off_fin = 0.000006480 V 02:59:36 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171055486 Vs 02:59:36 Integrated Voltage Measurement... 02:59:55 Voltage Offset Correction: v_off_ini = 0.000005933 V, v_off_fin = 0.000002567 V 02:59:56 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170990511 Vs 02:59:58 Temperature Measurement, Probe Number = 0, T = 20.135000 C 02:59:59 Temperature Measurement, Probe Number = 1, T = 20.050000 C 03:00:00 Temperature Measurement, Probe Number = 2, T = 20.124000 C 03:00:00 Temperature Measurement, Probe Number = 3, T = 20.060000 C 03:00:01 Temperature Measurement, Probe Number = 4, T = 20.254000 C 03:00:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.25 03:00:01 Integrated Voltage Measurement... 03:00:20 Voltage Offset Correction: v_off_ini = 0.000003594 V, v_off_fin = 0.000006225 V 03:00:20 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055429 Vs 03:00:21 Integrated Voltage Measurement... 03:00:40 Voltage Offset Correction: v_off_ini = 0.000005909 V, v_off_fin = 0.000002673 V 03:00:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996330 Vs 03:00:43 Temperature Measurement, Probe Number = 0, T = 20.134000 C 03:00:44 Temperature Measurement, Probe Number = 1, T = 20.047000 C 03:00:44 Temperature Measurement, Probe Number = 2, T = 20.126000 C 03:00:45 Temperature Measurement, Probe Number = 3, T = 20.062000 C 03:00:46 Temperature Measurement, Probe Number = 4, T = 20.240000 C 03:00:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.24 03:00:46 Integrated Voltage Measurement... 03:01:05 Voltage Offset Correction: v_off_ini = 0.000003600 V, v_off_fin = 0.000006098 V 03:01:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171056853 Vs 03:01:05 Integrated Voltage Measurement... 03:01:24 Voltage Offset Correction: v_off_ini = 0.000005322 V, v_off_fin = 0.000001739 V 03:01:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170996589 Vs 03:01:27 Temperature Measurement, Probe Number = 0, T = 20.133000 C 03:01:28 Temperature Measurement, Probe Number = 1, T = 20.048000 C 03:01:29 Temperature Measurement, Probe Number = 2, T = 20.128000 C 03:01:29 Temperature Measurement, Probe Number = 3, T = 20.061000 C 03:01:30 Temperature Measurement, Probe Number = 4, T = 20.312000 C 03:01:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.31 03:01:30 Integrated Voltage Measurement... 03:01:50 Voltage Offset Correction: v_off_ini = 0.000003105 V, v_off_fin = 0.000005685 V 03:01:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051457 Vs 03:01:50 Integrated Voltage Measurement... 03:02:10 Voltage Offset Correction: v_off_ini = 0.000004805 V, v_off_fin = 0.000001475 V 03:02:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002290 Vs 03:02:12 Temperature Measurement, Probe Number = 0, T = 20.128000 C 03:02:13 Temperature Measurement, Probe Number = 1, T = 20.040000 C 03:02:14 Temperature Measurement, Probe Number = 2, T = 20.123000 C 03:02:14 Temperature Measurement, Probe Number = 3, T = 20.057000 C 03:02:15 Temperature Measurement, Probe Number = 4, T = 20.324000 C 03:02:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.32 03:02:15 Integrated Voltage Measurement... 03:02:34 Voltage Offset Correction: v_off_ini = 0.000002653 V, v_off_fin = 0.000005891 V 03:02:35 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044655 Vs 03:02:35 Integrated Voltage Measurement... 03:02:54 Voltage Offset Correction: v_off_ini = 0.000005476 V, v_off_fin = 0.000001563 V 03:02:54 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994279 Vs 03:02:57 Temperature Measurement, Probe Number = 0, T = 20.125000 C 03:02:57 Temperature Measurement, Probe Number = 1, T = 20.043000 C 03:02:58 Temperature Measurement, Probe Number = 2, T = 20.117000 C 03:02:59 Temperature Measurement, Probe Number = 3, T = 20.057000 C 03:02:59 Temperature Measurement, Probe Number = 4, T = 20.285000 C 03:02:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.29 03:02:59 Integrated Voltage Measurement... 03:03:19 Voltage Offset Correction: v_off_ini = 0.000002961 V, v_off_fin = 0.000006212 V 03:03:19 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171056451 Vs 03:03:19 Integrated Voltage Measurement... 03:03:39 Voltage Offset Correction: v_off_ini = 0.000005492 V, v_off_fin = 0.000002076 V 03:03:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999399 Vs 03:03:42 Temperature Measurement, Probe Number = 0, T = 20.129000 C 03:03:42 Temperature Measurement, Probe Number = 1, T = 20.043000 C 03:03:43 Temperature Measurement, Probe Number = 2, T = 20.121000 C 03:03:44 Temperature Measurement, Probe Number = 3, T = 20.060000 C 03:03:44 Temperature Measurement, Probe Number = 4, T = 20.309000 C 03:03:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.31 03:03:44 Integrated Voltage Measurement... 03:04:04 Voltage Offset Correction: v_off_ini = 0.000003118 V, v_off_fin = 0.000006108 V 03:04:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054101 Vs 03:04:04 Integrated Voltage Measurement... 03:04:24 Voltage Offset Correction: v_off_ini = 0.000005519 V, v_off_fin = 0.000002695 V 03:04:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999414 Vs 03:04:26 Temperature Measurement, Probe Number = 0, T = 20.134000 C 03:04:27 Temperature Measurement, Probe Number = 1, T = 20.047000 C 03:04:28 Temperature Measurement, Probe Number = 2, T = 20.125000 C 03:04:28 Temperature Measurement, Probe Number = 3, T = 20.064000 C 03:04:29 Temperature Measurement, Probe Number = 4, T = 20.352000 C 03:04:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.35 03:04:29 Integrated Voltage Measurement... 03:04:48 Voltage Offset Correction: v_off_ini = 0.000003754 V, v_off_fin = 0.000005778 V 03:04:49 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053886 Vs 03:04:49 Integrated Voltage Measurement... 03:05:08 Voltage Offset Correction: v_off_ini = 0.000005390 V, v_off_fin = 0.000001952 V 03:05:08 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000049 Vs 03:05:11 Temperature Measurement, Probe Number = 0, T = 20.135000 C 03:05:11 Temperature Measurement, Probe Number = 1, T = 20.049000 C 03:05:12 Temperature Measurement, Probe Number = 2, T = 20.126000 C 03:05:13 Temperature Measurement, Probe Number = 3, T = 20.060000 C 03:05:13 Temperature Measurement, Probe Number = 4, T = 20.360000 C 03:05:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.36 03:05:14 Integrated Voltage Measurement... 03:05:33 Voltage Offset Correction: v_off_ini = 0.000003222 V, v_off_fin = 0.000006271 V 03:05:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059450 Vs 03:05:33 Integrated Voltage Measurement... 03:05:53 Voltage Offset Correction: v_off_ini = 0.000005505 V, v_off_fin = 0.000002171 V 03:05:53 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170998243 Vs 03:35:55 Temperature Measurement, Probe Number = 0, T = 20.128000 C 03:35:56 Temperature Measurement, Probe Number = 1, T = 20.049000 C 03:35:57 Temperature Measurement, Probe Number = 2, T = 20.121000 C 03:35:58 Temperature Measurement, Probe Number = 3, T = 20.062000 C 03:35:58 Temperature Measurement, Probe Number = 4, T = 20.346000 C 03:35:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.35 03:35:59 Integrated Voltage Measurement... 03:36:18 Voltage Offset Correction: v_off_ini = 0.000004654 V, v_off_fin = 0.000006356 V 03:36:18 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171112468 Vs 03:36:18 Integrated Voltage Measurement... 03:36:38 Voltage Offset Correction: v_off_ini = 0.000005491 V, v_off_fin = 0.000002555 V 03:36:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002253 Vs 03:36:40 Temperature Measurement, Probe Number = 0, T = 20.128000 C 03:36:41 Temperature Measurement, Probe Number = 1, T = 20.044000 C 03:36:42 Temperature Measurement, Probe Number = 2, T = 20.120000 C 03:36:42 Temperature Measurement, Probe Number = 3, T = 20.059000 C 03:36:43 Temperature Measurement, Probe Number = 4, T = 20.341000 C 03:36:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.34 03:36:43 Integrated Voltage Measurement... 03:37:03 Voltage Offset Correction: v_off_ini = 0.000003578 V, v_off_fin = 0.000006126 V 03:37:03 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059342 Vs 03:37:03 Integrated Voltage Measurement... 03:37:22 Voltage Offset Correction: v_off_ini = 0.000005542 V, v_off_fin = 0.000001942 V 03:37:23 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170998675 Vs 03:37:25 Temperature Measurement, Probe Number = 0, T = 20.130000 C 03:37:26 Temperature Measurement, Probe Number = 1, T = 20.045000 C 03:37:27 Temperature Measurement, Probe Number = 2, T = 20.122000 C 03:37:27 Temperature Measurement, Probe Number = 3, T = 20.061000 C 03:37:28 Temperature Measurement, Probe Number = 4, T = 20.394000 C 03:37:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.39 03:37:28 Integrated Voltage Measurement... 03:37:48 Voltage Offset Correction: v_off_ini = 0.000003243 V, v_off_fin = 0.000005933 V 03:37:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057944 Vs 03:37:48 Integrated Voltage Measurement... 03:38:07 Voltage Offset Correction: v_off_ini = 0.000005414 V, v_off_fin = 0.000002540 V 03:38:07 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170992132 Vs 03:38:10 Temperature Measurement, Probe Number = 0, T = 20.126000 C 03:38:10 Temperature Measurement, Probe Number = 1, T = 20.044000 C 03:38:11 Temperature Measurement, Probe Number = 2, T = 20.116000 C 03:38:12 Temperature Measurement, Probe Number = 3, T = 20.055000 C 03:38:12 Temperature Measurement, Probe Number = 4, T = 20.386000 C 03:38:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.39 03:38:12 Integrated Voltage Measurement... 03:38:32 Voltage Offset Correction: v_off_ini = 0.000003341 V, v_off_fin = 0.000006149 V 03:38:32 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171056134 Vs 03:38:32 Integrated Voltage Measurement... 03:38:51 Voltage Offset Correction: v_off_ini = 0.000004967 V, v_off_fin = 0.000001624 V 03:38:51 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170999598 Vs 03:38:54 Temperature Measurement, Probe Number = 0, T = 20.119000 C 03:38:54 Temperature Measurement, Probe Number = 1, T = 20.038000 C 03:38:55 Temperature Measurement, Probe Number = 2, T = 20.109000 C 03:38:56 Temperature Measurement, Probe Number = 3, T = 20.049000 C 03:38:56 Temperature Measurement, Probe Number = 4, T = 20.272000 C 03:38:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.27 03:38:57 Integrated Voltage Measurement... 03:39:16 Voltage Offset Correction: v_off_ini = 0.000003051 V, v_off_fin = 0.000005865 V 03:39:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055175 Vs 03:39:16 Integrated Voltage Measurement... 03:39:36 Voltage Offset Correction: v_off_ini = 0.000005418 V, v_off_fin = 0.000001918 V 03:39:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001872 Vs 03:39:38 Temperature Measurement, Probe Number = 0, T = 20.121000 C 03:39:39 Temperature Measurement, Probe Number = 1, T = 20.038000 C 03:39:40 Temperature Measurement, Probe Number = 2, T = 20.112000 C 03:39:40 Temperature Measurement, Probe Number = 3, T = 20.050000 C 03:39:41 Temperature Measurement, Probe Number = 4, T = 20.248000 C 03:39:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.25 03:39:41 Integrated Voltage Measurement... 03:40:01 Voltage Offset Correction: v_off_ini = 0.000003423 V, v_off_fin = 0.000005911 V 03:40:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060249 Vs 03:40:01 Integrated Voltage Measurement... 03:40:20 Voltage Offset Correction: v_off_ini = 0.000005851 V, v_off_fin = 0.000002168 V 03:40:20 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170998321 Vs 03:40:23 Temperature Measurement, Probe Number = 0, T = 20.128000 C 03:40:24 Temperature Measurement, Probe Number = 1, T = 20.044000 C 03:40:24 Temperature Measurement, Probe Number = 2, T = 20.119000 C 03:40:25 Temperature Measurement, Probe Number = 3, T = 20.057000 C 03:40:26 Temperature Measurement, Probe Number = 4, T = 20.264000 C 03:40:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.26 03:40:26 Integrated Voltage Measurement... 03:40:45 Voltage Offset Correction: v_off_ini = 0.000003352 V, v_off_fin = 0.000006080 V 03:40:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171063450 Vs 03:40:45 Integrated Voltage Measurement... 03:41:05 Voltage Offset Correction: v_off_ini = 0.000005947 V, v_off_fin = 0.000001594 V 03:41:05 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171004431 Vs 03:41:08 Temperature Measurement, Probe Number = 0, T = 20.126000 C 03:41:08 Temperature Measurement, Probe Number = 1, T = 20.041000 C 03:41:09 Temperature Measurement, Probe Number = 2, T = 20.116000 C 03:41:10 Temperature Measurement, Probe Number = 3, T = 20.054000 C 03:41:10 Temperature Measurement, Probe Number = 4, T = 20.247000 C 03:41:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.25 03:41:10 Integrated Voltage Measurement... 03:41:30 Voltage Offset Correction: v_off_ini = 0.000003218 V, v_off_fin = 0.000006496 V 03:41:30 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171063821 Vs 03:41:30 Integrated Voltage Measurement... 03:41:49 Voltage Offset Correction: v_off_ini = 0.000005663 V, v_off_fin = 0.000002035 V 03:41:50 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170998344 Vs 03:41:52 Temperature Measurement, Probe Number = 0, T = 20.119000 C 03:41:53 Temperature Measurement, Probe Number = 1, T = 20.036000 C 03:41:54 Temperature Measurement, Probe Number = 2, T = 20.110000 C 03:41:54 Temperature Measurement, Probe Number = 3, T = 20.050000 C 03:41:55 Temperature Measurement, Probe Number = 4, T = 20.254000 C 03:41:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.25 03:41:55 Integrated Voltage Measurement... 03:42:14 Voltage Offset Correction: v_off_ini = 0.000003852 V, v_off_fin = 0.000006277 V 03:42:14 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171062843 Vs 03:42:14 Integrated Voltage Measurement... 03:42:33 Voltage Offset Correction: v_off_ini = 0.000005806 V, v_off_fin = 0.000001916 V 03:42:34 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170999585 Vs 03:42:36 Temperature Measurement, Probe Number = 0, T = 20.118000 C 03:42:37 Temperature Measurement, Probe Number = 1, T = 20.036000 C 03:42:38 Temperature Measurement, Probe Number = 2, T = 20.111000 C 03:42:38 Temperature Measurement, Probe Number = 3, T = 20.052000 C 03:42:39 Temperature Measurement, Probe Number = 4, T = 20.209000 C 03:42:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.21 03:42:39 Integrated Voltage Measurement... 03:42:59 Voltage Offset Correction: v_off_ini = 0.000003337 V, v_off_fin = 0.000006550 V 03:42:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171068030 Vs 03:42:59 Integrated Voltage Measurement... 03:43:18 Voltage Offset Correction: v_off_ini = 0.000005826 V, v_off_fin = 0.000002347 V 03:43:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994452 Vs 04:13:21 Temperature Measurement, Probe Number = 0, T = 20.115000 C 04:13:22 Temperature Measurement, Probe Number = 1, T = 20.036000 C 04:13:23 Temperature Measurement, Probe Number = 2, T = 20.108000 C 04:13:24 Temperature Measurement, Probe Number = 3, T = 20.050000 C 04:13:24 Temperature Measurement, Probe Number = 4, T = 20.280000 C 04:13:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.28 04:13:24 Integrated Voltage Measurement... 04:13:44 Voltage Offset Correction: v_off_ini = 0.000005017 V, v_off_fin = 0.000006692 V 04:13:44 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171121286 Vs 04:13:44 Integrated Voltage Measurement... 04:14:03 Voltage Offset Correction: v_off_ini = 0.000005857 V, v_off_fin = 0.000002583 V 04:14:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170990646 Vs 04:14:06 Temperature Measurement, Probe Number = 0, T = 20.118000 C 04:14:07 Temperature Measurement, Probe Number = 1, T = 20.037000 C 04:14:07 Temperature Measurement, Probe Number = 2, T = 20.109000 C 04:14:08 Temperature Measurement, Probe Number = 3, T = 20.050000 C 04:14:09 Temperature Measurement, Probe Number = 4, T = 20.224000 C 04:14:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.22 04:14:09 Integrated Voltage Measurement... 04:14:28 Voltage Offset Correction: v_off_ini = 0.000003044 V, v_off_fin = 0.000006058 V 04:14:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171062020 Vs 04:14:29 Integrated Voltage Measurement... 04:14:48 Voltage Offset Correction: v_off_ini = 0.000005453 V, v_off_fin = 0.000002352 V 04:14:48 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171002659 Vs 04:14:51 Temperature Measurement, Probe Number = 0, T = 20.121000 C 04:14:51 Temperature Measurement, Probe Number = 1, T = 20.036000 C 04:14:52 Temperature Measurement, Probe Number = 2, T = 20.114000 C 04:14:53 Temperature Measurement, Probe Number = 3, T = 20.052000 C 04:14:53 Temperature Measurement, Probe Number = 4, T = 20.200000 C 04:14:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.20 04:14:53 Integrated Voltage Measurement... 04:15:14 Voltage Offset Correction: v_off_ini = 0.000002958 V, v_off_fin = 0.000005890 V 04:15:14 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057987 Vs 04:15:15 Integrated Voltage Measurement... 04:15:34 Voltage Offset Correction: v_off_ini = 0.000005280 V, v_off_fin = 0.000001950 V 04:15:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001759 Vs 04:15:37 Temperature Measurement, Probe Number = 0, T = 20.121000 C 04:15:37 Temperature Measurement, Probe Number = 1, T = 20.038000 C 04:15:38 Temperature Measurement, Probe Number = 2, T = 20.113000 C 04:15:39 Temperature Measurement, Probe Number = 3, T = 20.053000 C 04:15:39 Temperature Measurement, Probe Number = 4, T = 20.293000 C 04:15:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.29 04:15:40 Integrated Voltage Measurement... 04:15:59 Voltage Offset Correction: v_off_ini = 0.000003646 V, v_off_fin = 0.000006076 V 04:15:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058370 Vs 04:15:59 Integrated Voltage Measurement... 04:16:18 Voltage Offset Correction: v_off_ini = 0.000005184 V, v_off_fin = 0.000001972 V 04:16:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170999929 Vs 04:16:21 Temperature Measurement, Probe Number = 0, T = 20.124000 C 04:16:22 Temperature Measurement, Probe Number = 1, T = 20.040000 C 04:16:23 Temperature Measurement, Probe Number = 2, T = 20.116000 C 04:16:23 Temperature Measurement, Probe Number = 3, T = 20.055000 C 04:16:24 Temperature Measurement, Probe Number = 4, T = 20.375000 C 04:16:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.38 04:16:24 Integrated Voltage Measurement... 04:16:43 Voltage Offset Correction: v_off_ini = 0.000003271 V, v_off_fin = 0.000006196 V 04:16:43 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171061434 Vs 04:16:44 Integrated Voltage Measurement... 04:17:03 Voltage Offset Correction: v_off_ini = 0.000005657 V, v_off_fin = 0.000002022 V 04:17:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000508 Vs 04:17:06 Temperature Measurement, Probe Number = 0, T = 20.124000 C 04:17:07 Temperature Measurement, Probe Number = 1, T = 20.041000 C 04:17:08 Temperature Measurement, Probe Number = 2, T = 20.116000 C 04:17:08 Temperature Measurement, Probe Number = 3, T = 20.054000 C 04:17:09 Temperature Measurement, Probe Number = 4, T = 20.472000 C 04:17:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.47 04:17:09 Integrated Voltage Measurement... 04:17:29 Voltage Offset Correction: v_off_ini = 0.000003415 V, v_off_fin = 0.000006083 V 04:17:29 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054451 Vs 04:17:29 Integrated Voltage Measurement... 04:17:48 Voltage Offset Correction: v_off_ini = 0.000005433 V, v_off_fin = 0.000002353 V 04:17:49 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170996267 Vs 04:17:51 Temperature Measurement, Probe Number = 0, T = 20.123000 C 04:17:52 Temperature Measurement, Probe Number = 1, T = 20.043000 C 04:17:53 Temperature Measurement, Probe Number = 2, T = 20.111000 C 04:17:53 Temperature Measurement, Probe Number = 3, T = 20.051000 C 04:17:54 Temperature Measurement, Probe Number = 4, T = 20.456000 C 04:17:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.46 04:17:54 Integrated Voltage Measurement... 04:18:13 Voltage Offset Correction: v_off_ini = 0.000003585 V, v_off_fin = 0.000006456 V 04:18:14 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171062121 Vs 04:18:14 Integrated Voltage Measurement... 04:18:33 Voltage Offset Correction: v_off_ini = 0.000005471 V, v_off_fin = 0.000002343 V 04:18:33 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997643 Vs 04:18:36 Temperature Measurement, Probe Number = 0, T = 20.122000 C 04:18:36 Temperature Measurement, Probe Number = 1, T = 20.039000 C 04:18:37 Temperature Measurement, Probe Number = 2, T = 20.113000 C 04:18:38 Temperature Measurement, Probe Number = 3, T = 20.051000 C 04:18:38 Temperature Measurement, Probe Number = 4, T = 20.428000 C 04:18:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.43 04:18:39 Integrated Voltage Measurement... 04:18:58 Voltage Offset Correction: v_off_ini = 0.000003358 V, v_off_fin = 0.000006146 V 04:18:58 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171062209 Vs 04:18:58 Integrated Voltage Measurement... 04:19:17 Voltage Offset Correction: v_off_ini = 0.000005548 V, v_off_fin = 0.000001951 V 04:19:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998080 Vs 04:19:20 Temperature Measurement, Probe Number = 0, T = 20.121000 C 04:19:21 Temperature Measurement, Probe Number = 1, T = 20.038000 C 04:19:22 Temperature Measurement, Probe Number = 2, T = 20.112000 C 04:19:22 Temperature Measurement, Probe Number = 3, T = 20.051000 C 04:19:23 Temperature Measurement, Probe Number = 4, T = 20.404000 C 04:19:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.40 04:19:23 Integrated Voltage Measurement... 04:19:43 Voltage Offset Correction: v_off_ini = 0.000002950 V, v_off_fin = 0.000005740 V 04:19:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058186 Vs 04:19:43 Integrated Voltage Measurement... 04:20:02 Voltage Offset Correction: v_off_ini = 0.000004998 V, v_off_fin = 0.000001865 V 04:20:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171002185 Vs 04:20:05 Temperature Measurement, Probe Number = 0, T = 20.124000 C 04:20:06 Temperature Measurement, Probe Number = 1, T = 20.040000 C 04:20:07 Temperature Measurement, Probe Number = 2, T = 20.114000 C 04:20:07 Temperature Measurement, Probe Number = 3, T = 20.051000 C 04:20:08 Temperature Measurement, Probe Number = 4, T = 20.383000 C 04:20:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.38 04:20:08 Integrated Voltage Measurement... 04:20:27 Voltage Offset Correction: v_off_ini = 0.000002961 V, v_off_fin = 0.000006504 V 04:20:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171061528 Vs 04:20:28 Integrated Voltage Measurement... 04:20:47 Voltage Offset Correction: v_off_ini = 0.000005534 V, v_off_fin = 0.000001642 V 04:20:47 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170998367 Vs 04:50:50 Temperature Measurement, Probe Number = 0, T = 20.116000 C 04:50:50 Temperature Measurement, Probe Number = 1, T = 20.029000 C 04:50:51 Temperature Measurement, Probe Number = 2, T = 20.106000 C 04:50:52 Temperature Measurement, Probe Number = 3, T = 20.042000 C 04:50:52 Temperature Measurement, Probe Number = 4, T = 20.205000 C 04:50:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.20 04:50:52 Integrated Voltage Measurement... 04:51:11 Voltage Offset Correction: v_off_ini = 0.000004176 V, v_off_fin = 0.000005539 V 04:51:12 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171106728 Vs 04:51:12 Integrated Voltage Measurement... 04:51:31 Voltage Offset Correction: v_off_ini = 0.000004989 V, v_off_fin = 0.000001565 V 04:51:31 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171009019 Vs 04:51:34 Temperature Measurement, Probe Number = 0, T = 20.114000 C 04:51:34 Temperature Measurement, Probe Number = 1, T = 20.026000 C 04:51:35 Temperature Measurement, Probe Number = 2, T = 20.105000 C 04:51:36 Temperature Measurement, Probe Number = 3, T = 20.041000 C 04:51:36 Temperature Measurement, Probe Number = 4, T = 20.303000 C 04:51:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.30 04:51:36 Integrated Voltage Measurement... 04:51:56 Voltage Offset Correction: v_off_ini = 0.000002900 V, v_off_fin = 0.000006229 V 04:51:56 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171055787 Vs 04:51:56 Integrated Voltage Measurement... 04:52:16 Voltage Offset Correction: v_off_ini = 0.000005468 V, v_off_fin = 0.000001730 V 04:52:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171008428 Vs 04:52:19 Temperature Measurement, Probe Number = 0, T = 20.116000 C 04:52:20 Temperature Measurement, Probe Number = 1, T = 20.028000 C 04:52:20 Temperature Measurement, Probe Number = 2, T = 20.104000 C 04:52:21 Temperature Measurement, Probe Number = 3, T = 20.039000 C 04:52:22 Temperature Measurement, Probe Number = 4, T = 20.224000 C 04:52:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.22 04:52:22 Integrated Voltage Measurement... 04:52:41 Voltage Offset Correction: v_off_ini = 0.000002808 V, v_off_fin = 0.000005521 V 04:52:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045578 Vs 04:52:41 Integrated Voltage Measurement... 04:53:00 Voltage Offset Correction: v_off_ini = 0.000004344 V, v_off_fin = 0.000001696 V 04:53:01 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171006593 Vs 04:53:03 Temperature Measurement, Probe Number = 0, T = 20.112000 C 04:53:04 Temperature Measurement, Probe Number = 1, T = 20.024000 C 04:53:05 Temperature Measurement, Probe Number = 2, T = 20.099000 C 04:53:05 Temperature Measurement, Probe Number = 3, T = 20.036000 C 04:53:06 Temperature Measurement, Probe Number = 4, T = 20.135000 C 04:53:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.14 04:53:06 Integrated Voltage Measurement... 04:53:26 Voltage Offset Correction: v_off_ini = 0.000002987 V, v_off_fin = 0.000005685 V 04:53:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050745 Vs 04:53:26 Integrated Voltage Measurement... 04:53:46 Voltage Offset Correction: v_off_ini = 0.000004820 V, v_off_fin = 0.000001967 V 04:53:46 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171004529 Vs 04:53:48 Temperature Measurement, Probe Number = 0, T = 20.106000 C 04:53:49 Temperature Measurement, Probe Number = 1, T = 20.021000 C 04:53:50 Temperature Measurement, Probe Number = 2, T = 20.097000 C 04:53:50 Temperature Measurement, Probe Number = 3, T = 20.034000 C 04:53:51 Temperature Measurement, Probe Number = 4, T = 20.157000 C 04:53:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.16 04:53:51 Integrated Voltage Measurement... 04:54:11 Voltage Offset Correction: v_off_ini = 0.000003097 V, v_off_fin = 0.000005547 V 04:54:11 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171056063 Vs 04:54:11 Integrated Voltage Measurement... 04:54:31 Voltage Offset Correction: v_off_ini = 0.000005021 V, v_off_fin = 0.000002441 V 04:54:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002068 Vs 04:54:34 Temperature Measurement, Probe Number = 0, T = 20.107000 C 04:54:34 Temperature Measurement, Probe Number = 1, T = 20.025000 C 04:54:35 Temperature Measurement, Probe Number = 2, T = 20.098000 C 04:54:35 Temperature Measurement, Probe Number = 3, T = 20.036000 C 04:54:36 Temperature Measurement, Probe Number = 4, T = 20.133000 C 04:54:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.13 04:54:36 Integrated Voltage Measurement... 04:54:56 Voltage Offset Correction: v_off_ini = 0.000003129 V, v_off_fin = 0.000005928 V 04:54:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050974 Vs 04:54:56 Integrated Voltage Measurement... 04:55:16 Voltage Offset Correction: v_off_ini = 0.000005181 V, v_off_fin = 0.000001745 V 04:55:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171003836 Vs 04:55:19 Temperature Measurement, Probe Number = 0, T = 20.116000 C 04:55:20 Temperature Measurement, Probe Number = 1, T = 20.032000 C 04:55:20 Temperature Measurement, Probe Number = 2, T = 20.105000 C 04:55:21 Temperature Measurement, Probe Number = 3, T = 20.043000 C 04:55:22 Temperature Measurement, Probe Number = 4, T = 20.153000 C 04:55:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.15 04:55:22 Integrated Voltage Measurement... 04:55:41 Voltage Offset Correction: v_off_ini = 0.000003212 V, v_off_fin = 0.000006064 V 04:55:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054886 Vs 04:55:41 Integrated Voltage Measurement... 04:56:01 Voltage Offset Correction: v_off_ini = 0.000005443 V, v_off_fin = 0.000001877 V 04:56:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000798 Vs 04:56:04 Temperature Measurement, Probe Number = 0, T = 20.120000 C 04:56:04 Temperature Measurement, Probe Number = 1, T = 20.033000 C 04:56:05 Temperature Measurement, Probe Number = 2, T = 20.113000 C 04:56:06 Temperature Measurement, Probe Number = 3, T = 20.048000 C 04:56:06 Temperature Measurement, Probe Number = 4, T = 20.267000 C 04:56:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.27 04:56:06 Integrated Voltage Measurement... 04:56:26 Voltage Offset Correction: v_off_ini = 0.000003256 V, v_off_fin = 0.000006284 V 04:56:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058534 Vs 04:56:26 Integrated Voltage Measurement... 04:56:45 Voltage Offset Correction: v_off_ini = 0.000005605 V, v_off_fin = 0.000002223 V 04:56:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999493 Vs 04:56:48 Temperature Measurement, Probe Number = 0, T = 20.113000 C 04:56:49 Temperature Measurement, Probe Number = 1, T = 20.024000 C 04:56:49 Temperature Measurement, Probe Number = 2, T = 20.105000 C 04:56:50 Temperature Measurement, Probe Number = 3, T = 20.039000 C 04:56:51 Temperature Measurement, Probe Number = 4, T = 20.272000 C 04:56:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.27 04:56:51 Integrated Voltage Measurement... 04:57:10 Voltage Offset Correction: v_off_ini = 0.000003133 V, v_off_fin = 0.000005693 V 04:57:10 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054964 Vs 04:57:10 Integrated Voltage Measurement... 04:57:30 Voltage Offset Correction: v_off_ini = 0.000005065 V, v_off_fin = 0.000001854 V 04:57:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171008886 Vs 04:57:33 Temperature Measurement, Probe Number = 0, T = 20.116000 C 04:57:33 Temperature Measurement, Probe Number = 1, T = 20.033000 C 04:57:34 Temperature Measurement, Probe Number = 2, T = 20.106000 C 04:57:35 Temperature Measurement, Probe Number = 3, T = 20.044000 C 04:57:35 Temperature Measurement, Probe Number = 4, T = 20.247000 C 04:57:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.25 04:57:36 Integrated Voltage Measurement... 04:57:55 Voltage Offset Correction: v_off_ini = 0.000002851 V, v_off_fin = 0.000005626 V 04:57:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055556 Vs 04:57:55 Integrated Voltage Measurement... 04:58:14 Voltage Offset Correction: v_off_ini = 0.000004794 V, v_off_fin = 0.000001900 V 04:58:14 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170999151 Vs 05:28:17 Temperature Measurement, Probe Number = 0, T = 20.107000 C 05:28:18 Temperature Measurement, Probe Number = 1, T = 20.023000 C 05:28:19 Temperature Measurement, Probe Number = 2, T = 20.099000 C 05:28:19 Temperature Measurement, Probe Number = 3, T = 20.037000 C 05:28:20 Temperature Measurement, Probe Number = 4, T = 20.229000 C 05:28:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.23 05:28:20 Integrated Voltage Measurement... 05:28:39 Voltage Offset Correction: v_off_ini = 0.000004422 V, v_off_fin = 0.000006012 V 05:28:39 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171107980 Vs 05:28:39 Integrated Voltage Measurement... 05:28:59 Voltage Offset Correction: v_off_ini = 0.000006140 V, v_off_fin = 0.000002214 V 05:28:59 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170995967 Vs 05:29:02 Temperature Measurement, Probe Number = 0, T = 20.111000 C 05:29:02 Temperature Measurement, Probe Number = 1, T = 20.025000 C 05:29:03 Temperature Measurement, Probe Number = 2, T = 20.102000 C 05:29:04 Temperature Measurement, Probe Number = 3, T = 20.039000 C 05:29:04 Temperature Measurement, Probe Number = 4, T = 20.249000 C 05:29:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.25 05:29:05 Integrated Voltage Measurement... 05:29:24 Voltage Offset Correction: v_off_ini = 0.000003365 V, v_off_fin = 0.000006493 V 05:29:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055938 Vs 05:29:24 Integrated Voltage Measurement... 05:29:43 Voltage Offset Correction: v_off_ini = 0.000005429 V, v_off_fin = 0.000001923 V 05:29:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996922 Vs 05:29:46 Temperature Measurement, Probe Number = 0, T = 20.109000 C 05:29:47 Temperature Measurement, Probe Number = 1, T = 20.025000 C 05:29:48 Temperature Measurement, Probe Number = 2, T = 20.099000 C 05:29:48 Temperature Measurement, Probe Number = 3, T = 20.038000 C 05:29:49 Temperature Measurement, Probe Number = 4, T = 20.285000 C 05:29:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.29 05:29:49 Integrated Voltage Measurement... 05:30:08 Voltage Offset Correction: v_off_ini = 0.000003614 V, v_off_fin = 0.000006059 V 05:30:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055469 Vs 05:30:09 Integrated Voltage Measurement... 05:30:28 Voltage Offset Correction: v_off_ini = 0.000005313 V, v_off_fin = 0.000002305 V 05:30:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999144 Vs 05:30:31 Temperature Measurement, Probe Number = 0, T = 20.113000 C 05:30:32 Temperature Measurement, Probe Number = 1, T = 20.030000 C 05:30:32 Temperature Measurement, Probe Number = 2, T = 20.102000 C 05:30:33 Temperature Measurement, Probe Number = 3, T = 20.043000 C 05:30:34 Temperature Measurement, Probe Number = 4, T = 20.229000 C 05:30:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.23 05:30:34 Integrated Voltage Measurement... 05:30:53 Voltage Offset Correction: v_off_ini = 0.000003564 V, v_off_fin = 0.000006232 V 05:30:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049458 Vs 05:30:54 Integrated Voltage Measurement... 05:31:13 Voltage Offset Correction: v_off_ini = 0.000005055 V, v_off_fin = 0.000002131 V 05:31:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171003322 Vs 05:31:16 Temperature Measurement, Probe Number = 0, T = 20.115000 C 05:31:17 Temperature Measurement, Probe Number = 1, T = 20.028000 C 05:31:17 Temperature Measurement, Probe Number = 2, T = 20.105000 C 05:31:18 Temperature Measurement, Probe Number = 3, T = 20.041000 C 05:31:19 Temperature Measurement, Probe Number = 4, T = 20.241000 C 05:31:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.24 05:31:19 Integrated Voltage Measurement... 05:31:38 Voltage Offset Correction: v_off_ini = 0.000003384 V, v_off_fin = 0.000005961 V 05:31:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060269 Vs 05:31:39 Integrated Voltage Measurement... 05:31:58 Voltage Offset Correction: v_off_ini = 0.000005625 V, v_off_fin = 0.000002097 V 05:31:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998477 Vs 05:32:01 Temperature Measurement, Probe Number = 0, T = 20.113000 C 05:32:01 Temperature Measurement, Probe Number = 1, T = 20.024000 C 05:32:02 Temperature Measurement, Probe Number = 2, T = 20.102000 C 05:32:03 Temperature Measurement, Probe Number = 3, T = 20.038000 C 05:32:03 Temperature Measurement, Probe Number = 4, T = 20.195000 C 05:32:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.20 05:32:04 Integrated Voltage Measurement... 05:32:23 Voltage Offset Correction: v_off_ini = 0.000003267 V, v_off_fin = 0.000006235 V 05:32:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171056941 Vs 05:32:24 Integrated Voltage Measurement... 05:32:43 Voltage Offset Correction: v_off_ini = 0.000005304 V, v_off_fin = 0.000002734 V 05:32:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996924 Vs 05:32:46 Temperature Measurement, Probe Number = 0, T = 20.115000 C 05:32:47 Temperature Measurement, Probe Number = 1, T = 20.029000 C 05:32:47 Temperature Measurement, Probe Number = 2, T = 20.105000 C 05:32:48 Temperature Measurement, Probe Number = 3, T = 20.042000 C 05:32:49 Temperature Measurement, Probe Number = 4, T = 20.248000 C 05:32:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.25 05:32:49 Integrated Voltage Measurement... 05:33:09 Voltage Offset Correction: v_off_ini = 0.000003292 V, v_off_fin = 0.000006266 V 05:33:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171056692 Vs 05:33:09 Integrated Voltage Measurement... 05:33:28 Voltage Offset Correction: v_off_ini = 0.000005375 V, v_off_fin = 0.000002136 V 05:33:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998080 Vs 05:33:31 Temperature Measurement, Probe Number = 0, T = 20.114000 C 05:33:32 Temperature Measurement, Probe Number = 1, T = 20.028000 C 05:33:32 Temperature Measurement, Probe Number = 2, T = 20.104000 C 05:33:33 Temperature Measurement, Probe Number = 3, T = 20.038000 C 05:33:34 Temperature Measurement, Probe Number = 4, T = 20.280000 C 05:33:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.28 05:33:34 Integrated Voltage Measurement... 05:33:55 Voltage Offset Correction: v_off_ini = 0.000003765 V, v_off_fin = 0.000005969 V 05:33:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171056662 Vs 05:33:55 Integrated Voltage Measurement... 05:34:15 Voltage Offset Correction: v_off_ini = 0.000005820 V, v_off_fin = 0.000002933 V 05:34:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998137 Vs 05:34:17 Temperature Measurement, Probe Number = 0, T = 20.106000 C 05:34:18 Temperature Measurement, Probe Number = 1, T = 20.021000 C 05:34:19 Temperature Measurement, Probe Number = 2, T = 20.098000 C 05:34:19 Temperature Measurement, Probe Number = 3, T = 20.035000 C 05:34:20 Temperature Measurement, Probe Number = 4, T = 20.168000 C 05:34:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.17 05:34:20 Integrated Voltage Measurement... 05:34:40 Voltage Offset Correction: v_off_ini = 0.000003409 V, v_off_fin = 0.000005537 V 05:34:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048343 Vs 05:34:40 Integrated Voltage Measurement... 05:34:59 Voltage Offset Correction: v_off_ini = 0.000004773 V, v_off_fin = 0.000002505 V 05:35:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001191 Vs 05:35:02 Temperature Measurement, Probe Number = 0, T = 20.111000 C 05:35:03 Temperature Measurement, Probe Number = 1, T = 20.025000 C 05:35:04 Temperature Measurement, Probe Number = 2, T = 20.103000 C 05:35:04 Temperature Measurement, Probe Number = 3, T = 20.039000 C 05:35:05 Temperature Measurement, Probe Number = 4, T = 20.259000 C 05:35:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.26 05:35:05 Integrated Voltage Measurement... 05:35:24 Voltage Offset Correction: v_off_ini = 0.000003975 V, v_off_fin = 0.000006168 V 05:35:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053778 Vs 05:35:25 Integrated Voltage Measurement... 05:35:44 Voltage Offset Correction: v_off_ini = 0.000005292 V, v_off_fin = 0.000002196 V 05:35:44 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170998312 Vs 06:05:47 Temperature Measurement, Probe Number = 0, T = 20.099000 C 06:05:48 Temperature Measurement, Probe Number = 1, T = 20.018000 C 06:05:48 Temperature Measurement, Probe Number = 2, T = 20.091000 C 06:05:49 Temperature Measurement, Probe Number = 3, T = 20.031000 C 06:05:49 Temperature Measurement, Probe Number = 4, T = 20.156000 C 06:05:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.16 06:05:50 Integrated Voltage Measurement... 06:06:09 Voltage Offset Correction: v_off_ini = 0.000004396 V, v_off_fin = 0.000006410 V 06:06:09 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171108193 Vs 06:06:09 Integrated Voltage Measurement... 06:06:28 Voltage Offset Correction: v_off_ini = 0.000005663 V, v_off_fin = 0.000002707 V 06:06:29 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170995958 Vs 06:06:31 Temperature Measurement, Probe Number = 0, T = 20.107000 C 06:06:32 Temperature Measurement, Probe Number = 1, T = 20.022000 C 06:06:33 Temperature Measurement, Probe Number = 2, T = 20.097000 C 06:06:33 Temperature Measurement, Probe Number = 3, T = 20.035000 C 06:06:34 Temperature Measurement, Probe Number = 4, T = 20.235000 C 06:06:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.23 06:06:34 Integrated Voltage Measurement... 06:06:53 Voltage Offset Correction: v_off_ini = 0.000003896 V, v_off_fin = 0.000006138 V 06:06:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059161 Vs 06:06:54 Integrated Voltage Measurement... 06:07:13 Voltage Offset Correction: v_off_ini = 0.000005554 V, v_off_fin = 0.000002461 V 06:07:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991872 Vs 06:07:16 Temperature Measurement, Probe Number = 0, T = 20.104000 C 06:07:16 Temperature Measurement, Probe Number = 1, T = 20.017000 C 06:07:17 Temperature Measurement, Probe Number = 2, T = 20.094000 C 06:07:17 Temperature Measurement, Probe Number = 3, T = 20.029000 C 06:07:18 Temperature Measurement, Probe Number = 4, T = 20.226000 C 06:07:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.23 06:07:18 Integrated Voltage Measurement... 06:07:38 Voltage Offset Correction: v_off_ini = 0.000003710 V, v_off_fin = 0.000006085 V 06:07:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055538 Vs 06:07:38 Integrated Voltage Measurement... 06:07:58 Voltage Offset Correction: v_off_ini = 0.000005601 V, v_off_fin = 0.000002597 V 06:07:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988733 Vs 06:08:00 Temperature Measurement, Probe Number = 0, T = 20.104000 C 06:08:01 Temperature Measurement, Probe Number = 1, T = 20.018000 C 06:08:02 Temperature Measurement, Probe Number = 2, T = 20.092000 C 06:08:03 Temperature Measurement, Probe Number = 3, T = 20.029000 C 06:08:03 Temperature Measurement, Probe Number = 4, T = 20.181000 C 06:08:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.18 06:08:03 Integrated Voltage Measurement... 06:08:23 Voltage Offset Correction: v_off_ini = 0.000004226 V, v_off_fin = 0.000006592 V 06:08:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171060371 Vs 06:08:24 Integrated Voltage Measurement... 06:08:43 Voltage Offset Correction: v_off_ini = 0.000006187 V, v_off_fin = 0.000003157 V 06:08:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985596 Vs 06:08:46 Temperature Measurement, Probe Number = 0, T = 20.109000 C 06:08:46 Temperature Measurement, Probe Number = 1, T = 20.021000 C 06:08:47 Temperature Measurement, Probe Number = 2, T = 20.098000 C 06:08:48 Temperature Measurement, Probe Number = 3, T = 20.034000 C 06:08:48 Temperature Measurement, Probe Number = 4, T = 20.209000 C 06:08:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.21 06:08:48 Integrated Voltage Measurement... 06:09:08 Voltage Offset Correction: v_off_ini = 0.000004066 V, v_off_fin = 0.000005868 V 06:09:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055688 Vs 06:09:08 Integrated Voltage Measurement... 06:09:28 Voltage Offset Correction: v_off_ini = 0.000005592 V, v_off_fin = 0.000002497 V 06:09:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170996532 Vs 06:09:30 Temperature Measurement, Probe Number = 0, T = 20.104000 C 06:09:31 Temperature Measurement, Probe Number = 1, T = 20.019000 C 06:09:32 Temperature Measurement, Probe Number = 2, T = 20.094000 C 06:09:32 Temperature Measurement, Probe Number = 3, T = 20.031000 C 06:09:33 Temperature Measurement, Probe Number = 4, T = 20.210000 C 06:09:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.21 06:09:33 Integrated Voltage Measurement... 06:09:52 Voltage Offset Correction: v_off_ini = 0.000004139 V, v_off_fin = 0.000005690 V 06:09:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047651 Vs 06:09:53 Integrated Voltage Measurement... 06:10:12 Voltage Offset Correction: v_off_ini = 0.000005189 V, v_off_fin = 0.000001960 V 06:10:12 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170993160 Vs 06:10:15 Temperature Measurement, Probe Number = 0, T = 20.106000 C 06:10:15 Temperature Measurement, Probe Number = 1, T = 20.025000 C 06:10:16 Temperature Measurement, Probe Number = 2, T = 20.094000 C 06:10:17 Temperature Measurement, Probe Number = 3, T = 20.032000 C 06:10:17 Temperature Measurement, Probe Number = 4, T = 20.145000 C 06:10:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.14 06:10:18 Integrated Voltage Measurement... 06:10:37 Voltage Offset Correction: v_off_ini = 0.000003875 V, v_off_fin = 0.000006012 V 06:10:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050140 Vs 06:10:37 Integrated Voltage Measurement... 06:10:57 Voltage Offset Correction: v_off_ini = 0.000005178 V, v_off_fin = 0.000001972 V 06:10:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992898 Vs 06:10:59 Temperature Measurement, Probe Number = 0, T = 20.106000 C 06:11:00 Temperature Measurement, Probe Number = 1, T = 20.023000 C 06:11:01 Temperature Measurement, Probe Number = 2, T = 20.097000 C 06:11:01 Temperature Measurement, Probe Number = 3, T = 20.033000 C 06:11:02 Temperature Measurement, Probe Number = 4, T = 20.246000 C 06:11:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.25 06:11:02 Integrated Voltage Measurement... 06:11:22 Voltage Offset Correction: v_off_ini = 0.000003218 V, v_off_fin = 0.000005215 V 06:11:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047444 Vs 06:11:22 Integrated Voltage Measurement... 06:11:42 Voltage Offset Correction: v_off_ini = 0.000005434 V, v_off_fin = 0.000002566 V 06:11:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994758 Vs 06:11:45 Temperature Measurement, Probe Number = 0, T = 20.105000 C 06:11:46 Temperature Measurement, Probe Number = 1, T = 20.023000 C 06:11:46 Temperature Measurement, Probe Number = 2, T = 20.095000 C 06:11:47 Temperature Measurement, Probe Number = 3, T = 20.035000 C 06:11:47 Temperature Measurement, Probe Number = 4, T = 20.299000 C 06:11:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.30 06:11:48 Integrated Voltage Measurement... 06:12:07 Voltage Offset Correction: v_off_ini = 0.000003724 V, v_off_fin = 0.000005940 V 06:12:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044407 Vs 06:12:07 Integrated Voltage Measurement... 06:12:26 Voltage Offset Correction: v_off_ini = 0.000005148 V, v_off_fin = 0.000002384 V 06:12:26 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170992927 Vs 06:12:29 Temperature Measurement, Probe Number = 0, T = 20.111000 C 06:12:30 Temperature Measurement, Probe Number = 1, T = 20.028000 C 06:12:30 Temperature Measurement, Probe Number = 2, T = 20.102000 C 06:12:31 Temperature Measurement, Probe Number = 3, T = 20.041000 C 06:12:32 Temperature Measurement, Probe Number = 4, T = 20.279000 C 06:12:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.28 06:12:32 Integrated Voltage Measurement... 06:12:51 Voltage Offset Correction: v_off_ini = 0.000003016 V, v_off_fin = 0.000006101 V 06:12:51 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053332 Vs 06:12:52 Integrated Voltage Measurement... 06:13:11 Voltage Offset Correction: v_off_ini = 0.000005400 V, v_off_fin = 0.000002351 V 06:13:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990649 Vs 06:43:14 Temperature Measurement, Probe Number = 0, T = 20.103000 C 06:43:14 Temperature Measurement, Probe Number = 1, T = 20.016000 C 06:43:15 Temperature Measurement, Probe Number = 2, T = 20.092000 C 06:43:16 Temperature Measurement, Probe Number = 3, T = 20.026000 C 06:43:16 Temperature Measurement, Probe Number = 4, T = 20.290000 C 06:43:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.29 06:43:17 Integrated Voltage Measurement... 06:43:36 Voltage Offset Correction: v_off_ini = 0.000004768 V, v_off_fin = 0.000006934 V 06:43:36 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171097220 Vs 06:43:36 Integrated Voltage Measurement... 06:43:56 Voltage Offset Correction: v_off_ini = 0.000005363 V, v_off_fin = 0.000002184 V 06:43:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996072 Vs 06:43:59 Temperature Measurement, Probe Number = 0, T = 20.098000 C 06:43:59 Temperature Measurement, Probe Number = 1, T = 20.016000 C 06:44:00 Temperature Measurement, Probe Number = 2, T = 20.087000 C 06:44:01 Temperature Measurement, Probe Number = 3, T = 20.026000 C 06:44:01 Temperature Measurement, Probe Number = 4, T = 20.287000 C 06:44:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.29 06:44:01 Integrated Voltage Measurement... 06:44:21 Voltage Offset Correction: v_off_ini = 0.000003753 V, v_off_fin = 0.000006169 V 06:44:21 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171048867 Vs 06:44:21 Integrated Voltage Measurement... 06:44:40 Voltage Offset Correction: v_off_ini = 0.000005540 V, v_off_fin = 0.000001662 V 06:44:40 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994150 Vs 06:44:43 Temperature Measurement, Probe Number = 0, T = 20.103000 C 06:44:44 Temperature Measurement, Probe Number = 1, T = 20.019000 C 06:44:44 Temperature Measurement, Probe Number = 2, T = 20.092000 C 06:44:45 Temperature Measurement, Probe Number = 3, T = 20.029000 C 06:44:46 Temperature Measurement, Probe Number = 4, T = 20.310000 C 06:44:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.31 06:44:46 Integrated Voltage Measurement... 06:45:05 Voltage Offset Correction: v_off_ini = 0.000003396 V, v_off_fin = 0.000005793 V 06:45:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052877 Vs 06:45:05 Integrated Voltage Measurement... 06:45:24 Voltage Offset Correction: v_off_ini = 0.000005504 V, v_off_fin = 0.000002010 V 06:45:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991279 Vs 06:45:27 Temperature Measurement, Probe Number = 0, T = 20.106000 C 06:45:28 Temperature Measurement, Probe Number = 1, T = 20.020000 C 06:45:29 Temperature Measurement, Probe Number = 2, T = 20.097000 C 06:45:29 Temperature Measurement, Probe Number = 3, T = 20.033000 C 06:45:30 Temperature Measurement, Probe Number = 4, T = 20.379000 C 06:45:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.38 06:45:30 Integrated Voltage Measurement... 06:45:49 Voltage Offset Correction: v_off_ini = 0.000003598 V, v_off_fin = 0.000006305 V 06:45:49 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171048922 Vs 06:45:50 Integrated Voltage Measurement... 06:46:09 Voltage Offset Correction: v_off_ini = 0.000005827 V, v_off_fin = 0.000002170 V 06:46:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989736 Vs 06:46:12 Temperature Measurement, Probe Number = 0, T = 20.101000 C 06:46:12 Temperature Measurement, Probe Number = 1, T = 20.018000 C 06:46:13 Temperature Measurement, Probe Number = 2, T = 20.088000 C 06:46:14 Temperature Measurement, Probe Number = 3, T = 20.028000 C 06:46:14 Temperature Measurement, Probe Number = 4, T = 20.359000 C 06:46:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.36 06:46:15 Integrated Voltage Measurement... 06:46:34 Voltage Offset Correction: v_off_ini = 0.000003217 V, v_off_fin = 0.000006030 V 06:46:34 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054890 Vs 06:46:34 Integrated Voltage Measurement... 06:46:53 Voltage Offset Correction: v_off_ini = 0.000005771 V, v_off_fin = 0.000002310 V 06:46:53 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986850 Vs 06:46:56 Temperature Measurement, Probe Number = 0, T = 20.101000 C 06:46:57 Temperature Measurement, Probe Number = 1, T = 20.018000 C 06:46:57 Temperature Measurement, Probe Number = 2, T = 20.091000 C 06:46:58 Temperature Measurement, Probe Number = 3, T = 20.030000 C 06:46:59 Temperature Measurement, Probe Number = 4, T = 20.272000 C 06:46:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.27 06:46:59 Integrated Voltage Measurement... 06:47:18 Voltage Offset Correction: v_off_ini = 0.000003451 V, v_off_fin = 0.000006376 V 06:47:18 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171061470 Vs 06:47:19 Integrated Voltage Measurement... 06:47:38 Voltage Offset Correction: v_off_ini = 0.000006143 V, v_off_fin = 0.000001541 V 06:47:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990976 Vs 06:47:41 Temperature Measurement, Probe Number = 0, T = 20.094000 C 06:47:42 Temperature Measurement, Probe Number = 1, T = 20.011000 C 06:47:42 Temperature Measurement, Probe Number = 2, T = 20.085000 C 06:47:43 Temperature Measurement, Probe Number = 3, T = 20.025000 C 06:47:44 Temperature Measurement, Probe Number = 4, T = 20.272000 C 06:47:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.27 06:47:44 Integrated Voltage Measurement... 06:48:03 Voltage Offset Correction: v_off_ini = 0.000003914 V, v_off_fin = 0.000006154 V 06:48:03 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055615 Vs 06:48:03 Integrated Voltage Measurement... 06:48:22 Voltage Offset Correction: v_off_ini = 0.000005655 V, v_off_fin = 0.000001983 V 06:48:23 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170990906 Vs 06:48:25 Temperature Measurement, Probe Number = 0, T = 20.100000 C 06:48:26 Temperature Measurement, Probe Number = 1, T = 20.013000 C 06:48:27 Temperature Measurement, Probe Number = 2, T = 20.088000 C 06:48:27 Temperature Measurement, Probe Number = 3, T = 20.025000 C 06:48:28 Temperature Measurement, Probe Number = 4, T = 20.218000 C 06:48:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.22 06:48:28 Integrated Voltage Measurement... 06:48:47 Voltage Offset Correction: v_off_ini = 0.000003818 V, v_off_fin = 0.000005749 V 06:48:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055801 Vs 06:48:48 Integrated Voltage Measurement... 06:49:07 Voltage Offset Correction: v_off_ini = 0.000005368 V, v_off_fin = 0.000002994 V 06:49:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989357 Vs 06:49:10 Temperature Measurement, Probe Number = 0, T = 20.108000 C 06:49:10 Temperature Measurement, Probe Number = 1, T = 20.017000 C 06:49:11 Temperature Measurement, Probe Number = 2, T = 20.093000 C 06:49:12 Temperature Measurement, Probe Number = 3, T = 20.029000 C 06:49:12 Temperature Measurement, Probe Number = 4, T = 20.280000 C 06:49:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.28 06:49:12 Integrated Voltage Measurement... 06:49:32 Voltage Offset Correction: v_off_ini = 0.000003599 V, v_off_fin = 0.000006259 V 06:49:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055470 Vs 06:49:32 Integrated Voltage Measurement... 06:49:51 Voltage Offset Correction: v_off_ini = 0.000006094 V, v_off_fin = 0.000002514 V 06:49:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988546 Vs 06:49:54 Temperature Measurement, Probe Number = 0, T = 20.108000 C 06:49:55 Temperature Measurement, Probe Number = 1, T = 20.021000 C 06:49:56 Temperature Measurement, Probe Number = 2, T = 20.096000 C 06:49:56 Temperature Measurement, Probe Number = 3, T = 20.033000 C 06:49:57 Temperature Measurement, Probe Number = 4, T = 20.256000 C 06:49:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.26 06:49:57 Integrated Voltage Measurement... 06:50:16 Voltage Offset Correction: v_off_ini = 0.000003580 V, v_off_fin = 0.000005473 V 06:50:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048258 Vs 06:50:17 Integrated Voltage Measurement... 06:50:36 Voltage Offset Correction: v_off_ini = 0.000005560 V, v_off_fin = 0.000002343 V 06:50:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988371 Vs 07:20:39 Temperature Measurement, Probe Number = 0, T = 20.097000 C 07:20:39 Temperature Measurement, Probe Number = 1, T = 20.010000 C 07:20:40 Temperature Measurement, Probe Number = 2, T = 20.087000 C 07:20:41 Temperature Measurement, Probe Number = 3, T = 20.023000 C 07:20:41 Temperature Measurement, Probe Number = 4, T = 20.395000 C 07:20:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.39 07:20:41 Integrated Voltage Measurement... 07:21:01 Voltage Offset Correction: v_off_ini = 0.000004387 V, v_off_fin = 0.000006143 V 07:21:01 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171099300 Vs 07:21:01 Integrated Voltage Measurement... 07:21:20 Voltage Offset Correction: v_off_ini = 0.000005924 V, v_off_fin = 0.000002510 V 07:21:20 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994177 Vs 07:21:23 Temperature Measurement, Probe Number = 0, T = 20.103000 C 07:21:24 Temperature Measurement, Probe Number = 1, T = 20.018000 C 07:21:24 Temperature Measurement, Probe Number = 2, T = 20.090000 C 07:21:25 Temperature Measurement, Probe Number = 3, T = 20.029000 C 07:21:26 Temperature Measurement, Probe Number = 4, T = 20.384000 C 07:21:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.38 07:21:26 Integrated Voltage Measurement... 07:21:45 Voltage Offset Correction: v_off_ini = 0.000004032 V, v_off_fin = 0.000006225 V 07:21:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046328 Vs 07:21:46 Integrated Voltage Measurement... 07:22:05 Voltage Offset Correction: v_off_ini = 0.000004951 V, v_off_fin = 0.000002938 V 07:22:05 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170991059 Vs 07:22:08 Temperature Measurement, Probe Number = 0, T = 20.101000 C 07:22:08 Temperature Measurement, Probe Number = 1, T = 20.014000 C 07:22:09 Temperature Measurement, Probe Number = 2, T = 20.091000 C 07:22:10 Temperature Measurement, Probe Number = 3, T = 20.028000 C 07:22:10 Temperature Measurement, Probe Number = 4, T = 20.376000 C 07:22:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.38 07:22:10 Integrated Voltage Measurement... 07:22:30 Voltage Offset Correction: v_off_ini = 0.000003936 V, v_off_fin = 0.000005704 V 07:22:30 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052056 Vs 07:22:30 Integrated Voltage Measurement... 07:22:49 Voltage Offset Correction: v_off_ini = 0.000005375 V, v_off_fin = 0.000002203 V 07:22:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988993 Vs 07:22:52 Temperature Measurement, Probe Number = 0, T = 20.097000 C 07:22:53 Temperature Measurement, Probe Number = 1, T = 20.012000 C 07:22:54 Temperature Measurement, Probe Number = 2, T = 20.085000 C 07:22:54 Temperature Measurement, Probe Number = 3, T = 20.023000 C 07:22:55 Temperature Measurement, Probe Number = 4, T = 20.352000 C 07:22:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.35 07:22:55 Integrated Voltage Measurement... 07:23:14 Voltage Offset Correction: v_off_ini = 0.000003059 V, v_off_fin = 0.000005922 V 07:23:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051909 Vs 07:23:15 Integrated Voltage Measurement... 07:23:34 Voltage Offset Correction: v_off_ini = 0.000005612 V, v_off_fin = 0.000002284 V 07:23:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992962 Vs 07:23:37 Temperature Measurement, Probe Number = 0, T = 20.101000 C 07:23:37 Temperature Measurement, Probe Number = 1, T = 20.018000 C 07:23:38 Temperature Measurement, Probe Number = 2, T = 20.090000 C 07:23:39 Temperature Measurement, Probe Number = 3, T = 20.029000 C 07:23:39 Temperature Measurement, Probe Number = 4, T = 20.231000 C 07:23:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.23 07:23:39 Integrated Voltage Measurement... 07:23:59 Voltage Offset Correction: v_off_ini = 0.000003645 V, v_off_fin = 0.000005894 V 07:23:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049244 Vs 07:23:59 Integrated Voltage Measurement... 07:24:18 Voltage Offset Correction: v_off_ini = 0.000005142 V, v_off_fin = 0.000002077 V 07:24:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001815 Vs 07:24:21 Temperature Measurement, Probe Number = 0, T = 20.098000 C 07:24:22 Temperature Measurement, Probe Number = 1, T = 20.013000 C 07:24:23 Temperature Measurement, Probe Number = 2, T = 20.089000 C 07:24:23 Temperature Measurement, Probe Number = 3, T = 20.026000 C 07:24:24 Temperature Measurement, Probe Number = 4, T = 20.287000 C 07:24:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.29 07:24:24 Integrated Voltage Measurement... 07:24:44 Voltage Offset Correction: v_off_ini = 0.000003691 V, v_off_fin = 0.000005638 V 07:24:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054089 Vs 07:24:45 Integrated Voltage Measurement... 07:25:04 Voltage Offset Correction: v_off_ini = 0.000005571 V, v_off_fin = 0.000002379 V 07:25:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988044 Vs 07:25:07 Temperature Measurement, Probe Number = 0, T = 20.095000 C 07:25:07 Temperature Measurement, Probe Number = 1, T = 20.011000 C 07:25:08 Temperature Measurement, Probe Number = 2, T = 20.083000 C 07:25:09 Temperature Measurement, Probe Number = 3, T = 20.023000 C 07:25:09 Temperature Measurement, Probe Number = 4, T = 20.257000 C 07:25:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.26 07:25:10 Integrated Voltage Measurement... 07:25:29 Voltage Offset Correction: v_off_ini = 0.000003376 V, v_off_fin = 0.000006507 V 07:25:29 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057023 Vs 07:25:29 Integrated Voltage Measurement... 07:25:49 Voltage Offset Correction: v_off_ini = 0.000005813 V, v_off_fin = 0.000003077 V 07:25:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991857 Vs 07:25:52 Temperature Measurement, Probe Number = 0, T = 20.100000 C 07:25:53 Temperature Measurement, Probe Number = 1, T = 20.014000 C 07:25:53 Temperature Measurement, Probe Number = 2, T = 20.088000 C 07:25:54 Temperature Measurement, Probe Number = 3, T = 20.026000 C 07:25:55 Temperature Measurement, Probe Number = 4, T = 20.264000 C 07:25:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.26 07:25:55 Integrated Voltage Measurement... 07:26:14 Voltage Offset Correction: v_off_ini = 0.000003894 V, v_off_fin = 0.000006161 V 07:26:14 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054905 Vs 07:26:14 Integrated Voltage Measurement... 07:26:34 Voltage Offset Correction: v_off_ini = 0.000005645 V, v_off_fin = 0.000002566 V 07:26:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995636 Vs 07:26:36 Temperature Measurement, Probe Number = 0, T = 20.102000 C 07:26:37 Temperature Measurement, Probe Number = 1, T = 20.017000 C 07:26:38 Temperature Measurement, Probe Number = 2, T = 20.093000 C 07:26:38 Temperature Measurement, Probe Number = 3, T = 20.029000 C 07:26:39 Temperature Measurement, Probe Number = 4, T = 20.394000 C 07:26:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.39 07:26:39 Integrated Voltage Measurement... 07:26:59 Voltage Offset Correction: v_off_ini = 0.000003420 V, v_off_fin = 0.000006448 V 07:26:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059505 Vs 07:26:59 Integrated Voltage Measurement... 07:27:18 Voltage Offset Correction: v_off_ini = 0.000005728 V, v_off_fin = 0.000002130 V 07:27:18 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170993541 Vs 07:27:21 Temperature Measurement, Probe Number = 0, T = 20.105000 C 07:27:22 Temperature Measurement, Probe Number = 1, T = 20.021000 C 07:27:22 Temperature Measurement, Probe Number = 2, T = 20.094000 C 07:27:23 Temperature Measurement, Probe Number = 3, T = 20.032000 C 07:27:24 Temperature Measurement, Probe Number = 4, T = 20.429000 C 07:27:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.43 07:27:24 Integrated Voltage Measurement... 07:27:43 Voltage Offset Correction: v_off_ini = 0.000003242 V, v_off_fin = 0.000006591 V 07:27:43 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059114 Vs 07:27:43 Integrated Voltage Measurement... 07:28:03 Voltage Offset Correction: v_off_ini = 0.000005702 V, v_off_fin = 0.000002803 V 07:28:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170990650 Vs 07:58:06 Temperature Measurement, Probe Number = 0, T = 20.094000 C 07:58:07 Temperature Measurement, Probe Number = 1, T = 20.013000 C 07:58:07 Temperature Measurement, Probe Number = 2, T = 20.083000 C 07:58:08 Temperature Measurement, Probe Number = 3, T = 20.023000 C 07:58:09 Temperature Measurement, Probe Number = 4, T = 20.391000 C 07:58:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.39 07:58:09 Integrated Voltage Measurement... 07:58:28 Voltage Offset Correction: v_off_ini = 0.000005331 V, v_off_fin = 0.000006435 V 07:58:28 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171109008 Vs 07:58:28 Integrated Voltage Measurement... 07:58:47 Voltage Offset Correction: v_off_ini = 0.000006187 V, v_off_fin = 0.000002730 V 07:58:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991180 Vs 07:58:50 Temperature Measurement, Probe Number = 0, T = 20.102000 C 07:58:51 Temperature Measurement, Probe Number = 1, T = 20.020000 C 07:58:51 Temperature Measurement, Probe Number = 2, T = 20.087000 C 07:58:52 Temperature Measurement, Probe Number = 3, T = 20.027000 C 07:58:53 Temperature Measurement, Probe Number = 4, T = 20.405000 C 07:58:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.41 07:58:53 Integrated Voltage Measurement... 07:59:12 Voltage Offset Correction: v_off_ini = 0.000003622 V, v_off_fin = 0.000006516 V 07:59:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053342 Vs 07:59:12 Integrated Voltage Measurement... 07:59:32 Voltage Offset Correction: v_off_ini = 0.000005662 V, v_off_fin = 0.000003011 V 07:59:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988791 Vs 07:59:34 Temperature Measurement, Probe Number = 0, T = 20.098000 C 07:59:35 Temperature Measurement, Probe Number = 1, T = 20.014000 C 07:59:36 Temperature Measurement, Probe Number = 2, T = 20.087000 C 07:59:36 Temperature Measurement, Probe Number = 3, T = 20.026000 C 07:59:37 Temperature Measurement, Probe Number = 4, T = 20.486000 C 07:59:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.49 07:59:37 Integrated Voltage Measurement... 07:59:57 Voltage Offset Correction: v_off_ini = 0.000003978 V, v_off_fin = 0.000006270 V 07:59:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054966 Vs 07:59:57 Integrated Voltage Measurement... 08:00:16 Voltage Offset Correction: v_off_ini = 0.000005659 V, v_off_fin = 0.000002578 V 08:00:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993242 Vs 08:00:19 Temperature Measurement, Probe Number = 0, T = 20.105000 C 08:00:20 Temperature Measurement, Probe Number = 1, T = 20.022000 C 08:00:20 Temperature Measurement, Probe Number = 2, T = 20.092000 C 08:00:21 Temperature Measurement, Probe Number = 3, T = 20.032000 C 08:00:22 Temperature Measurement, Probe Number = 4, T = 20.477000 C 08:00:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.48 08:00:22 Integrated Voltage Measurement... 08:00:41 Voltage Offset Correction: v_off_ini = 0.000003550 V, v_off_fin = 0.000006709 V 08:00:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052410 Vs 08:00:42 Integrated Voltage Measurement... 08:01:01 Voltage Offset Correction: v_off_ini = 0.000005155 V, v_off_fin = 0.000002010 V 08:01:01 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170998451 Vs 08:01:04 Temperature Measurement, Probe Number = 0, T = 20.102000 C 08:01:04 Temperature Measurement, Probe Number = 1, T = 20.018000 C 08:01:05 Temperature Measurement, Probe Number = 2, T = 20.089000 C 08:01:06 Temperature Measurement, Probe Number = 3, T = 20.027000 C 08:01:06 Temperature Measurement, Probe Number = 4, T = 20.479000 C 08:01:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.48 08:01:07 Integrated Voltage Measurement... 08:01:26 Voltage Offset Correction: v_off_ini = 0.000003351 V, v_off_fin = 0.000006034 V 08:01:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049730 Vs 08:01:26 Integrated Voltage Measurement... 08:01:45 Voltage Offset Correction: v_off_ini = 0.000005817 V, v_off_fin = 0.000002268 V 08:01:45 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170990245 Vs 08:01:48 Temperature Measurement, Probe Number = 0, T = 20.100000 C 08:01:49 Temperature Measurement, Probe Number = 1, T = 20.016000 C 08:01:49 Temperature Measurement, Probe Number = 2, T = 20.088000 C 08:01:50 Temperature Measurement, Probe Number = 3, T = 20.027000 C 08:01:51 Temperature Measurement, Probe Number = 4, T = 20.439000 C 08:01:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.44 08:01:51 Integrated Voltage Measurement... 08:02:10 Voltage Offset Correction: v_off_ini = 0.000003669 V, v_off_fin = 0.000005787 V 08:02:10 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057992 Vs 08:02:10 Integrated Voltage Measurement... 08:02:30 Voltage Offset Correction: v_off_ini = 0.000006148 V, v_off_fin = 0.000002559 V 08:02:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170990218 Vs 08:02:32 Temperature Measurement, Probe Number = 0, T = 20.098000 C 08:02:33 Temperature Measurement, Probe Number = 1, T = 20.014000 C 08:02:34 Temperature Measurement, Probe Number = 2, T = 20.086000 C 08:02:34 Temperature Measurement, Probe Number = 3, T = 20.024000 C 08:02:35 Temperature Measurement, Probe Number = 4, T = 20.382000 C 08:02:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.38 08:02:35 Integrated Voltage Measurement... 08:02:54 Voltage Offset Correction: v_off_ini = 0.000004004 V, v_off_fin = 0.000005648 V 08:02:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171056742 Vs 08:02:55 Integrated Voltage Measurement... 08:03:14 Voltage Offset Correction: v_off_ini = 0.000005020 V, v_off_fin = 0.000002289 V 08:03:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994590 Vs 08:03:17 Temperature Measurement, Probe Number = 0, T = 20.092000 C 08:03:18 Temperature Measurement, Probe Number = 1, T = 20.011000 C 08:03:18 Temperature Measurement, Probe Number = 2, T = 20.081000 C 08:03:19 Temperature Measurement, Probe Number = 3, T = 20.020000 C 08:03:20 Temperature Measurement, Probe Number = 4, T = 20.247000 C 08:03:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.25 08:03:20 Integrated Voltage Measurement... 08:03:39 Voltage Offset Correction: v_off_ini = 0.000003313 V, v_off_fin = 0.000006688 V 08:03:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052155 Vs 08:03:40 Integrated Voltage Measurement... 08:03:59 Voltage Offset Correction: v_off_ini = 0.000005708 V, v_off_fin = 0.000002228 V 08:03:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988261 Vs 08:04:01 Temperature Measurement, Probe Number = 0, T = 20.094000 C 08:04:02 Temperature Measurement, Probe Number = 1, T = 20.011000 C 08:04:03 Temperature Measurement, Probe Number = 2, T = 20.082000 C 08:04:03 Temperature Measurement, Probe Number = 3, T = 20.022000 C 08:04:04 Temperature Measurement, Probe Number = 4, T = 20.230000 C 08:04:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.23 08:04:04 Integrated Voltage Measurement... 08:04:24 Voltage Offset Correction: v_off_ini = 0.000003503 V, v_off_fin = 0.000006149 V 08:04:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171056360 Vs 08:04:24 Integrated Voltage Measurement... 08:04:43 Voltage Offset Correction: v_off_ini = 0.000005361 V, v_off_fin = 0.000002689 V 08:04:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996660 Vs 08:04:46 Temperature Measurement, Probe Number = 0, T = 20.097000 C 08:04:47 Temperature Measurement, Probe Number = 1, T = 20.013000 C 08:04:47 Temperature Measurement, Probe Number = 2, T = 20.085000 C 08:04:48 Temperature Measurement, Probe Number = 3, T = 20.025000 C 08:04:49 Temperature Measurement, Probe Number = 4, T = 20.323000 C 08:04:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.32 08:04:49 Integrated Voltage Measurement... 08:05:08 Voltage Offset Correction: v_off_ini = 0.000003642 V, v_off_fin = 0.000006646 V 08:05:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050805 Vs 08:05:09 Integrated Voltage Measurement... 08:05:28 Voltage Offset Correction: v_off_ini = 0.000005145 V, v_off_fin = 0.000002996 V 08:05:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993286 Vs 08:35:31 Temperature Measurement, Probe Number = 0, T = 20.098000 C 08:35:31 Temperature Measurement, Probe Number = 1, T = 20.015000 C 08:35:32 Temperature Measurement, Probe Number = 2, T = 20.086000 C 08:35:33 Temperature Measurement, Probe Number = 3, T = 20.024000 C 08:35:33 Temperature Measurement, Probe Number = 4, T = 20.265000 C 08:35:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.27 08:35:34 Integrated Voltage Measurement... 08:35:53 Voltage Offset Correction: v_off_ini = 0.000004570 V, v_off_fin = 0.000006329 V 08:35:54 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171104782 Vs 08:35:54 Integrated Voltage Measurement... 08:36:13 Voltage Offset Correction: v_off_ini = 0.000005551 V, v_off_fin = 0.000002017 V 08:36:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990424 Vs 08:36:16 Temperature Measurement, Probe Number = 0, T = 20.093000 C 08:36:17 Temperature Measurement, Probe Number = 1, T = 20.014000 C 08:36:17 Temperature Measurement, Probe Number = 2, T = 20.082000 C 08:36:18 Temperature Measurement, Probe Number = 3, T = 20.021000 C 08:36:19 Temperature Measurement, Probe Number = 4, T = 20.240000 C 08:36:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.24 08:36:19 Integrated Voltage Measurement... 08:36:38 Voltage Offset Correction: v_off_ini = 0.000003109 V, v_off_fin = 0.000006137 V 08:36:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042178 Vs 08:36:39 Integrated Voltage Measurement... 08:36:58 Voltage Offset Correction: v_off_ini = 0.000005058 V, v_off_fin = 0.000002095 V 08:36:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989128 Vs 08:37:01 Temperature Measurement, Probe Number = 0, T = 20.095000 C 08:37:01 Temperature Measurement, Probe Number = 1, T = 20.016000 C 08:37:02 Temperature Measurement, Probe Number = 2, T = 20.083000 C 08:37:03 Temperature Measurement, Probe Number = 3, T = 20.024000 C 08:37:03 Temperature Measurement, Probe Number = 4, T = 20.245000 C 08:37:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.25 08:37:03 Integrated Voltage Measurement... 08:37:23 Voltage Offset Correction: v_off_ini = 0.000003167 V, v_off_fin = 0.000006329 V 08:37:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054264 Vs 08:37:23 Integrated Voltage Measurement... 08:37:42 Voltage Offset Correction: v_off_ini = 0.000005916 V, v_off_fin = 0.000002127 V 08:37:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988846 Vs 08:37:45 Temperature Measurement, Probe Number = 0, T = 20.095000 C 08:37:46 Temperature Measurement, Probe Number = 1, T = 20.017000 C 08:37:46 Temperature Measurement, Probe Number = 2, T = 20.084000 C 08:37:47 Temperature Measurement, Probe Number = 3, T = 20.025000 C 08:37:48 Temperature Measurement, Probe Number = 4, T = 20.284000 C 08:37:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.28 08:37:48 Integrated Voltage Measurement... 08:38:07 Voltage Offset Correction: v_off_ini = 0.000003660 V, v_off_fin = 0.000006023 V 08:38:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053132 Vs 08:38:08 Integrated Voltage Measurement... 08:38:27 Voltage Offset Correction: v_off_ini = 0.000005583 V, v_off_fin = 0.000002182 V 08:38:27 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988671 Vs 08:38:30 Temperature Measurement, Probe Number = 0, T = 20.098000 C 08:38:30 Temperature Measurement, Probe Number = 1, T = 20.018000 C 08:38:31 Temperature Measurement, Probe Number = 2, T = 20.084000 C 08:38:32 Temperature Measurement, Probe Number = 3, T = 20.024000 C 08:38:32 Temperature Measurement, Probe Number = 4, T = 20.330000 C 08:38:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.33 08:38:33 Integrated Voltage Measurement... 08:38:52 Voltage Offset Correction: v_off_ini = 0.000003811 V, v_off_fin = 0.000006434 V 08:38:52 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051625 Vs 08:38:52 Integrated Voltage Measurement... 08:39:11 Voltage Offset Correction: v_off_ini = 0.000005611 V, v_off_fin = 0.000003035 V 08:39:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992135 Vs 08:39:14 Temperature Measurement, Probe Number = 0, T = 20.094000 C 08:39:15 Temperature Measurement, Probe Number = 1, T = 20.013000 C 08:39:16 Temperature Measurement, Probe Number = 2, T = 20.082000 C 08:39:16 Temperature Measurement, Probe Number = 3, T = 20.023000 C 08:39:17 Temperature Measurement, Probe Number = 4, T = 20.333000 C 08:39:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.33 08:39:17 Integrated Voltage Measurement... 08:39:37 Voltage Offset Correction: v_off_ini = 0.000003670 V, v_off_fin = 0.000005793 V 08:39:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047522 Vs 08:39:37 Integrated Voltage Measurement... 08:39:57 Voltage Offset Correction: v_off_ini = 0.000005571 V, v_off_fin = 0.000002632 V 08:39:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988154 Vs 08:39:59 Temperature Measurement, Probe Number = 0, T = 20.097000 C 08:40:00 Temperature Measurement, Probe Number = 1, T = 20.017000 C 08:40:01 Temperature Measurement, Probe Number = 2, T = 20.086000 C 08:40:01 Temperature Measurement, Probe Number = 3, T = 20.026000 C 08:40:02 Temperature Measurement, Probe Number = 4, T = 20.348000 C 08:40:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.35 08:40:02 Integrated Voltage Measurement... 08:40:21 Voltage Offset Correction: v_off_ini = 0.000004129 V, v_off_fin = 0.000006139 V 08:40:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052590 Vs 08:40:22 Integrated Voltage Measurement... 08:40:41 Voltage Offset Correction: v_off_ini = 0.000005681 V, v_off_fin = 0.000002413 V 08:40:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985262 Vs 08:40:44 Temperature Measurement, Probe Number = 0, T = 20.096000 C 08:40:44 Temperature Measurement, Probe Number = 1, T = 20.012000 C 08:40:45 Temperature Measurement, Probe Number = 2, T = 20.087000 C 08:40:46 Temperature Measurement, Probe Number = 3, T = 20.024000 C 08:40:46 Temperature Measurement, Probe Number = 4, T = 20.377000 C 08:40:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.38 08:40:47 Integrated Voltage Measurement... 08:41:06 Voltage Offset Correction: v_off_ini = 0.000004051 V, v_off_fin = 0.000006295 V 08:41:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051401 Vs 08:41:06 Integrated Voltage Measurement... 08:41:25 Voltage Offset Correction: v_off_ini = 0.000006366 V, v_off_fin = 0.000002079 V 08:41:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988087 Vs 08:41:28 Temperature Measurement, Probe Number = 0, T = 20.099000 C 08:41:29 Temperature Measurement, Probe Number = 1, T = 20.015000 C 08:41:29 Temperature Measurement, Probe Number = 2, T = 20.083000 C 08:41:30 Temperature Measurement, Probe Number = 3, T = 20.023000 C 08:41:30 Temperature Measurement, Probe Number = 4, T = 20.389000 C 08:41:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.39 08:41:31 Integrated Voltage Measurement... 08:41:50 Voltage Offset Correction: v_off_ini = 0.000002868 V, v_off_fin = 0.000006541 V 08:41:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057416 Vs 08:41:50 Integrated Voltage Measurement... 08:42:11 Voltage Offset Correction: v_off_ini = 0.000005585 V, v_off_fin = 0.000002945 V 08:42:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993429 Vs 08:42:14 Temperature Measurement, Probe Number = 0, T = 20.093000 C 08:42:14 Temperature Measurement, Probe Number = 1, T = 20.011000 C 08:42:15 Temperature Measurement, Probe Number = 2, T = 20.081000 C 08:42:16 Temperature Measurement, Probe Number = 3, T = 20.020000 C 08:42:16 Temperature Measurement, Probe Number = 4, T = 20.358000 C 08:42:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.02 P4 = Room, Value = 20.36 08:42:16 Integrated Voltage Measurement... 08:42:36 Voltage Offset Correction: v_off_ini = 0.000004021 V, v_off_fin = 0.000006825 V 08:42:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048700 Vs 08:42:36 Integrated Voltage Measurement... 08:42:55 Voltage Offset Correction: v_off_ini = 0.000005896 V, v_off_fin = 0.000002828 V 08:42:55 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170984552 Vs 09:12:58 Temperature Measurement, Probe Number = 0, T = 20.096000 C 09:12:59 Temperature Measurement, Probe Number = 1, T = 20.016000 C 09:12:59 Temperature Measurement, Probe Number = 2, T = 20.085000 C 09:13:00 Temperature Measurement, Probe Number = 3, T = 20.027000 C 09:13:01 Temperature Measurement, Probe Number = 4, T = 20.361000 C 09:13:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.36 09:13:01 Integrated Voltage Measurement... 09:13:20 Voltage Offset Correction: v_off_ini = 0.000004136 V, v_off_fin = 0.000005901 V 09:13:20 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171100201 Vs 09:13:20 Integrated Voltage Measurement... 09:13:39 Voltage Offset Correction: v_off_ini = 0.000004697 V, v_off_fin = 0.000002255 V 09:13:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993476 Vs 09:13:42 Temperature Measurement, Probe Number = 0, T = 20.095000 C 09:13:43 Temperature Measurement, Probe Number = 1, T = 20.017000 C 09:13:44 Temperature Measurement, Probe Number = 2, T = 20.083000 C 09:13:44 Temperature Measurement, Probe Number = 3, T = 20.027000 C 09:13:45 Temperature Measurement, Probe Number = 4, T = 20.414000 C 09:13:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.41 09:13:45 Integrated Voltage Measurement... 09:14:05 Voltage Offset Correction: v_off_ini = 0.000003675 V, v_off_fin = 0.000006144 V 09:14:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044176 Vs 09:14:05 Integrated Voltage Measurement... 09:14:24 Voltage Offset Correction: v_off_ini = 0.000005428 V, v_off_fin = 0.000002497 V 09:14:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987181 Vs 09:14:27 Temperature Measurement, Probe Number = 0, T = 20.098000 C 09:14:27 Temperature Measurement, Probe Number = 1, T = 20.021000 C 09:14:28 Temperature Measurement, Probe Number = 2, T = 20.083000 C 09:14:29 Temperature Measurement, Probe Number = 3, T = 20.028000 C 09:14:29 Temperature Measurement, Probe Number = 4, T = 20.436000 C 09:14:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.08 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.44 09:14:30 Integrated Voltage Measurement... 09:14:49 Voltage Offset Correction: v_off_ini = 0.000004030 V, v_off_fin = 0.000006656 V 09:14:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045229 Vs 09:14:49 Integrated Voltage Measurement... 09:15:09 Voltage Offset Correction: v_off_ini = 0.000005405 V, v_off_fin = 0.000002936 V 09:15:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992383 Vs 09:15:12 Temperature Measurement, Probe Number = 0, T = 20.103000 C 09:15:12 Temperature Measurement, Probe Number = 1, T = 20.018000 C 09:15:13 Temperature Measurement, Probe Number = 2, T = 20.090000 C 09:15:14 Temperature Measurement, Probe Number = 3, T = 20.028000 C 09:15:14 Temperature Measurement, Probe Number = 4, T = 20.494000 C 09:15:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.49 09:15:14 Integrated Voltage Measurement... 09:15:34 Voltage Offset Correction: v_off_ini = 0.000003273 V, v_off_fin = 0.000005525 V 09:15:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037761 Vs 09:15:34 Integrated Voltage Measurement... 09:15:54 Voltage Offset Correction: v_off_ini = 0.000004807 V, v_off_fin = 0.000001752 V 09:15:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995194 Vs 09:15:57 Temperature Measurement, Probe Number = 0, T = 20.110000 C 09:15:57 Temperature Measurement, Probe Number = 1, T = 20.027000 C 09:15:58 Temperature Measurement, Probe Number = 2, T = 20.096000 C 09:15:59 Temperature Measurement, Probe Number = 3, T = 20.035000 C 09:15:59 Temperature Measurement, Probe Number = 4, T = 20.523000 C 09:15:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.52 09:15:59 Integrated Voltage Measurement... 09:16:19 Voltage Offset Correction: v_off_ini = 0.000003001 V, v_off_fin = 0.000006111 V 09:16:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040059 Vs 09:16:19 Integrated Voltage Measurement... 09:16:38 Voltage Offset Correction: v_off_ini = 0.000004703 V, v_off_fin = 0.000002510 V 09:16:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991640 Vs 09:16:41 Temperature Measurement, Probe Number = 0, T = 20.108000 C 09:16:42 Temperature Measurement, Probe Number = 1, T = 20.025000 C 09:16:43 Temperature Measurement, Probe Number = 2, T = 20.095000 C 09:16:43 Temperature Measurement, Probe Number = 3, T = 20.035000 C 09:16:44 Temperature Measurement, Probe Number = 4, T = 20.600000 C 09:16:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.60 09:16:44 Integrated Voltage Measurement... 09:17:03 Voltage Offset Correction: v_off_ini = 0.000003057 V, v_off_fin = 0.000006451 V 09:17:03 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171038019 Vs 09:17:04 Integrated Voltage Measurement... 09:17:23 Voltage Offset Correction: v_off_ini = 0.000005242 V, v_off_fin = 0.000002055 V 09:17:23 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170990413 Vs 09:17:26 Temperature Measurement, Probe Number = 0, T = 20.103000 C 09:17:26 Temperature Measurement, Probe Number = 1, T = 20.018000 C 09:17:27 Temperature Measurement, Probe Number = 2, T = 20.093000 C 09:17:28 Temperature Measurement, Probe Number = 3, T = 20.031000 C 09:17:28 Temperature Measurement, Probe Number = 4, T = 20.570000 C 09:17:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.57 09:17:29 Integrated Voltage Measurement... 09:17:48 Voltage Offset Correction: v_off_ini = 0.000003390 V, v_off_fin = 0.000005674 V 09:17:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043021 Vs 09:17:48 Integrated Voltage Measurement... 09:18:07 Voltage Offset Correction: v_off_ini = 0.000005720 V, v_off_fin = 0.000002248 V 09:18:08 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170985095 Vs 09:18:11 Temperature Measurement, Probe Number = 0, T = 20.103000 C 09:18:11 Temperature Measurement, Probe Number = 1, T = 20.022000 C 09:18:12 Temperature Measurement, Probe Number = 2, T = 20.090000 C 09:18:13 Temperature Measurement, Probe Number = 3, T = 20.033000 C 09:18:13 Temperature Measurement, Probe Number = 4, T = 20.496000 C 09:18:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.50 09:18:13 Integrated Voltage Measurement... 09:18:32 Voltage Offset Correction: v_off_ini = 0.000003347 V, v_off_fin = 0.000005940 V 09:18:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171046661 Vs 09:18:33 Integrated Voltage Measurement... 09:18:52 Voltage Offset Correction: v_off_ini = 0.000005342 V, v_off_fin = 0.000001141 V 09:18:52 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170989985 Vs 09:18:55 Temperature Measurement, Probe Number = 0, T = 20.105000 C 09:18:56 Temperature Measurement, Probe Number = 1, T = 20.023000 C 09:18:56 Temperature Measurement, Probe Number = 2, T = 20.093000 C 09:18:57 Temperature Measurement, Probe Number = 3, T = 20.035000 C 09:18:58 Temperature Measurement, Probe Number = 4, T = 20.495000 C 09:18:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.50 09:18:58 Integrated Voltage Measurement... 09:19:17 Voltage Offset Correction: v_off_ini = 0.000002800 V, v_off_fin = 0.000005763 V 09:19:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045521 Vs 09:19:18 Integrated Voltage Measurement... 09:19:36 Voltage Offset Correction: v_off_ini = 0.000005597 V, v_off_fin = 0.000001416 V 09:19:37 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986308 Vs 09:19:39 Temperature Measurement, Probe Number = 0, T = 20.101000 C 09:19:40 Temperature Measurement, Probe Number = 1, T = 20.019000 C 09:19:41 Temperature Measurement, Probe Number = 2, T = 20.088000 C 09:19:41 Temperature Measurement, Probe Number = 3, T = 20.031000 C 09:19:42 Temperature Measurement, Probe Number = 4, T = 20.503000 C 09:19:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.50 09:19:42 Integrated Voltage Measurement... 09:20:01 Voltage Offset Correction: v_off_ini = 0.000002695 V, v_off_fin = 0.000005369 V 09:20:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047288 Vs 09:20:02 Integrated Voltage Measurement... 09:20:21 Voltage Offset Correction: v_off_ini = 0.000004998 V, v_off_fin = 0.000001916 V 09:20:21 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987669 Vs 09:50:24 Temperature Measurement, Probe Number = 0, T = 20.104000 C 09:50:24 Temperature Measurement, Probe Number = 1, T = 20.025000 C 09:50:25 Temperature Measurement, Probe Number = 2, T = 20.092000 C 09:50:25 Temperature Measurement, Probe Number = 3, T = 20.034000 C 09:50:26 Temperature Measurement, Probe Number = 4, T = 20.498000 C 09:50:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.50 09:50:26 Integrated Voltage Measurement... 09:50:45 Voltage Offset Correction: v_off_ini = 0.000004308 V, v_off_fin = 0.000005821 V 09:50:46 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171102128 Vs 09:50:46 Integrated Voltage Measurement... 09:51:05 Voltage Offset Correction: v_off_ini = 0.000005570 V, v_off_fin = 0.000002850 V 09:51:05 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988589 Vs 09:51:08 Temperature Measurement, Probe Number = 0, T = 20.098000 C 09:51:09 Temperature Measurement, Probe Number = 1, T = 20.021000 C 09:51:09 Temperature Measurement, Probe Number = 2, T = 20.086000 C 09:51:10 Temperature Measurement, Probe Number = 3, T = 20.029000 C 09:51:11 Temperature Measurement, Probe Number = 4, T = 20.477000 C 09:51:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.48 09:51:11 Integrated Voltage Measurement... 09:51:30 Voltage Offset Correction: v_off_ini = 0.000003897 V, v_off_fin = 0.000005994 V 09:51:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171041981 Vs 09:51:31 Integrated Voltage Measurement... 09:51:50 Voltage Offset Correction: v_off_ini = 0.000005151 V, v_off_fin = 0.000002305 V 09:51:50 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988714 Vs 09:51:53 Temperature Measurement, Probe Number = 0, T = 20.102000 C 09:51:54 Temperature Measurement, Probe Number = 1, T = 20.025000 C 09:51:54 Temperature Measurement, Probe Number = 2, T = 20.088000 C 09:51:55 Temperature Measurement, Probe Number = 3, T = 20.033000 C 09:51:56 Temperature Measurement, Probe Number = 4, T = 20.430000 C 09:51:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.43 09:51:56 Integrated Voltage Measurement... 09:52:15 Voltage Offset Correction: v_off_ini = 0.000003402 V, v_off_fin = 0.000005862 V 09:52:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171036179 Vs 09:52:15 Integrated Voltage Measurement... 09:52:34 Voltage Offset Correction: v_off_ini = 0.000003849 V, v_off_fin = 0.000001818 V 09:52:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990958 Vs 09:52:37 Temperature Measurement, Probe Number = 0, T = 20.100000 C 09:52:38 Temperature Measurement, Probe Number = 1, T = 20.023000 C 09:52:39 Temperature Measurement, Probe Number = 2, T = 20.087000 C 09:52:39 Temperature Measurement, Probe Number = 3, T = 20.031000 C 09:52:40 Temperature Measurement, Probe Number = 4, T = 20.432000 C 09:52:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.43 09:52:40 Integrated Voltage Measurement... 09:52:59 Voltage Offset Correction: v_off_ini = 0.000003206 V, v_off_fin = 0.000005378 V 09:53:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171039860 Vs 09:53:00 Integrated Voltage Measurement... 09:53:19 Voltage Offset Correction: v_off_ini = 0.000004323 V, v_off_fin = 0.000001298 V 09:53:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997622 Vs 09:53:21 Temperature Measurement, Probe Number = 0, T = 20.102000 C 09:53:22 Temperature Measurement, Probe Number = 1, T = 20.025000 C 09:53:23 Temperature Measurement, Probe Number = 2, T = 20.086000 C 09:53:23 Temperature Measurement, Probe Number = 3, T = 20.030000 C 09:53:24 Temperature Measurement, Probe Number = 4, T = 20.336000 C 09:53:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.34 09:53:24 Integrated Voltage Measurement... 09:53:44 Voltage Offset Correction: v_off_ini = 0.000001877 V, v_off_fin = 0.000005534 V 09:53:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036330 Vs 09:53:44 Integrated Voltage Measurement... 09:54:03 Voltage Offset Correction: v_off_ini = 0.000004935 V, v_off_fin = 0.000001637 V 09:54:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990675 Vs 09:54:06 Temperature Measurement, Probe Number = 0, T = 20.106000 C 09:54:06 Temperature Measurement, Probe Number = 1, T = 20.026000 C 09:54:07 Temperature Measurement, Probe Number = 2, T = 20.089000 C 09:54:08 Temperature Measurement, Probe Number = 3, T = 20.031000 C 09:54:08 Temperature Measurement, Probe Number = 4, T = 20.273000 C 09:54:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.27 09:54:09 Integrated Voltage Measurement... 09:54:28 Voltage Offset Correction: v_off_ini = 0.000003292 V, v_off_fin = 0.000005468 V 09:54:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038241 Vs 09:54:28 Integrated Voltage Measurement... 09:54:47 Voltage Offset Correction: v_off_ini = 0.000004907 V, v_off_fin = 0.000001837 V 09:54:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995068 Vs 09:54:50 Temperature Measurement, Probe Number = 0, T = 20.103000 C 09:54:51 Temperature Measurement, Probe Number = 1, T = 20.026000 C 09:54:52 Temperature Measurement, Probe Number = 2, T = 20.089000 C 09:54:52 Temperature Measurement, Probe Number = 3, T = 20.031000 C 09:54:53 Temperature Measurement, Probe Number = 4, T = 20.227000 C 09:54:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.23 09:54:53 Integrated Voltage Measurement... 09:55:12 Voltage Offset Correction: v_off_ini = 0.000002996 V, v_off_fin = 0.000005909 V 09:55:13 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171036200 Vs 09:55:13 Integrated Voltage Measurement... 09:55:32 Voltage Offset Correction: v_off_ini = 0.000005250 V, v_off_fin = 0.000002063 V 09:55:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987891 Vs 09:55:35 Temperature Measurement, Probe Number = 0, T = 20.099000 C 09:55:35 Temperature Measurement, Probe Number = 1, T = 20.023000 C 09:55:36 Temperature Measurement, Probe Number = 2, T = 20.085000 C 09:55:37 Temperature Measurement, Probe Number = 3, T = 20.028000 C 09:55:37 Temperature Measurement, Probe Number = 4, T = 20.199000 C 09:55:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.20 09:55:37 Integrated Voltage Measurement... 09:55:57 Voltage Offset Correction: v_off_ini = 0.000003376 V, v_off_fin = 0.000005845 V 09:55:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171043948 Vs 09:55:57 Integrated Voltage Measurement... 09:56:16 Voltage Offset Correction: v_off_ini = 0.000006050 V, v_off_fin = 0.000003072 V 09:56:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989391 Vs 09:56:19 Temperature Measurement, Probe Number = 0, T = 20.103000 C 09:56:20 Temperature Measurement, Probe Number = 1, T = 20.024000 C 09:56:21 Temperature Measurement, Probe Number = 2, T = 20.089000 C 09:56:21 Temperature Measurement, Probe Number = 3, T = 20.031000 C 09:56:22 Temperature Measurement, Probe Number = 4, T = 20.234000 C 09:56:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.23 09:56:22 Integrated Voltage Measurement... 09:56:42 Voltage Offset Correction: v_off_ini = 0.000003647 V, v_off_fin = 0.000005913 V 09:56:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041118 Vs 09:56:42 Integrated Voltage Measurement... 09:57:01 Voltage Offset Correction: v_off_ini = 0.000005905 V, v_off_fin = 0.000002255 V 09:57:01 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988679 Vs 09:57:04 Temperature Measurement, Probe Number = 0, T = 20.105000 C 09:57:04 Temperature Measurement, Probe Number = 1, T = 20.024000 C 09:57:05 Temperature Measurement, Probe Number = 2, T = 20.089000 C 09:57:06 Temperature Measurement, Probe Number = 3, T = 20.031000 C 09:57:06 Temperature Measurement, Probe Number = 4, T = 20.259000 C 09:57:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.26 09:57:07 Integrated Voltage Measurement... 09:57:27 Voltage Offset Correction: v_off_ini = 0.000003402 V, v_off_fin = 0.000006193 V 09:57:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047584 Vs 09:57:27 Integrated Voltage Measurement... 09:57:46 Voltage Offset Correction: v_off_ini = 0.000005682 V, v_off_fin = 0.000001870 V 09:57:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983877 Vs 10:27:49 Temperature Measurement, Probe Number = 0, T = 20.106000 C 10:27:50 Temperature Measurement, Probe Number = 1, T = 20.029000 C 10:27:50 Temperature Measurement, Probe Number = 2, T = 20.094000 C 10:27:51 Temperature Measurement, Probe Number = 3, T = 20.038000 C 10:27:52 Temperature Measurement, Probe Number = 4, T = 20.395000 C 10:27:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.39 10:27:52 Integrated Voltage Measurement... 10:28:11 Voltage Offset Correction: v_off_ini = 0.000004742 V, v_off_fin = 0.000006196 V 10:28:11 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171091766 Vs 10:28:11 Integrated Voltage Measurement... 10:28:30 Voltage Offset Correction: v_off_ini = 0.000005612 V, v_off_fin = 0.000002291 V 10:28:31 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170989895 Vs 10:28:33 Temperature Measurement, Probe Number = 0, T = 20.106000 C 10:28:34 Temperature Measurement, Probe Number = 1, T = 20.030000 C 10:28:35 Temperature Measurement, Probe Number = 2, T = 20.093000 C 10:28:35 Temperature Measurement, Probe Number = 3, T = 20.036000 C 10:28:36 Temperature Measurement, Probe Number = 4, T = 20.355000 C 10:28:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.36 10:28:36 Integrated Voltage Measurement... 10:28:55 Voltage Offset Correction: v_off_ini = 0.000003148 V, v_off_fin = 0.000006023 V 10:28:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171033375 Vs 10:28:55 Integrated Voltage Measurement... 10:29:15 Voltage Offset Correction: v_off_ini = 0.000005406 V, v_off_fin = 0.000002240 V 10:29:15 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170989335 Vs 10:29:17 Temperature Measurement, Probe Number = 0, T = 20.107000 C 10:29:18 Temperature Measurement, Probe Number = 1, T = 20.031000 C 10:29:19 Temperature Measurement, Probe Number = 2, T = 20.093000 C 10:29:19 Temperature Measurement, Probe Number = 3, T = 20.037000 C 10:29:20 Temperature Measurement, Probe Number = 4, T = 20.392000 C 10:29:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.39 10:29:20 Integrated Voltage Measurement... 10:29:40 Voltage Offset Correction: v_off_ini = 0.000003307 V, v_off_fin = 0.000006073 V 10:29:40 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171033701 Vs 10:29:40 Integrated Voltage Measurement... 10:29:59 Voltage Offset Correction: v_off_ini = 0.000005374 V, v_off_fin = 0.000002126 V 10:29:59 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986955 Vs 10:30:02 Temperature Measurement, Probe Number = 0, T = 20.113000 C 10:30:02 Temperature Measurement, Probe Number = 1, T = 20.034000 C 10:30:03 Temperature Measurement, Probe Number = 2, T = 20.098000 C 10:30:04 Temperature Measurement, Probe Number = 3, T = 20.041000 C 10:30:04 Temperature Measurement, Probe Number = 4, T = 20.448000 C 10:30:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.45 10:30:05 Integrated Voltage Measurement... 10:30:24 Voltage Offset Correction: v_off_ini = 0.000003425 V, v_off_fin = 0.000006554 V 10:30:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171040326 Vs 10:30:24 Integrated Voltage Measurement... 10:30:44 Voltage Offset Correction: v_off_ini = 0.000005731 V, v_off_fin = 0.000002196 V 10:30:44 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170991069 Vs 10:30:47 Temperature Measurement, Probe Number = 0, T = 20.113000 C 10:30:47 Temperature Measurement, Probe Number = 1, T = 20.036000 C 10:30:48 Temperature Measurement, Probe Number = 2, T = 20.099000 C 10:30:49 Temperature Measurement, Probe Number = 3, T = 20.043000 C 10:30:49 Temperature Measurement, Probe Number = 4, T = 20.457000 C 10:30:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.46 10:30:49 Integrated Voltage Measurement... 10:31:09 Voltage Offset Correction: v_off_ini = 0.000003613 V, v_off_fin = 0.000006389 V 10:31:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036341 Vs 10:31:09 Integrated Voltage Measurement... 10:31:29 Voltage Offset Correction: v_off_ini = 0.000005987 V, v_off_fin = 0.000002179 V 10:31:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986956 Vs 10:31:32 Temperature Measurement, Probe Number = 0, T = 20.113000 C 10:31:32 Temperature Measurement, Probe Number = 1, T = 20.031000 C 10:31:33 Temperature Measurement, Probe Number = 2, T = 20.098000 C 10:31:34 Temperature Measurement, Probe Number = 3, T = 20.040000 C 10:31:34 Temperature Measurement, Probe Number = 4, T = 20.482000 C 10:31:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.48 10:31:35 Integrated Voltage Measurement... 10:31:54 Voltage Offset Correction: v_off_ini = 0.000003855 V, v_off_fin = 0.000005855 V 10:31:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042706 Vs 10:31:54 Integrated Voltage Measurement... 10:32:14 Voltage Offset Correction: v_off_ini = 0.000005910 V, v_off_fin = 0.000002608 V 10:32:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988239 Vs 10:32:17 Temperature Measurement, Probe Number = 0, T = 20.115000 C 10:32:17 Temperature Measurement, Probe Number = 1, T = 20.033000 C 10:32:18 Temperature Measurement, Probe Number = 2, T = 20.103000 C 10:32:19 Temperature Measurement, Probe Number = 3, T = 20.043000 C 10:32:19 Temperature Measurement, Probe Number = 4, T = 20.381000 C 10:32:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.38 10:32:19 Integrated Voltage Measurement... 10:32:39 Voltage Offset Correction: v_off_ini = 0.000002975 V, v_off_fin = 0.000005864 V 10:32:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038520 Vs 10:32:40 Integrated Voltage Measurement... 10:32:59 Voltage Offset Correction: v_off_ini = 0.000005290 V, v_off_fin = 0.000002163 V 10:32:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986938 Vs 10:33:02 Temperature Measurement, Probe Number = 0, T = 20.115000 C 10:33:02 Temperature Measurement, Probe Number = 1, T = 20.034000 C 10:33:03 Temperature Measurement, Probe Number = 2, T = 20.101000 C 10:33:04 Temperature Measurement, Probe Number = 3, T = 20.043000 C 10:33:04 Temperature Measurement, Probe Number = 4, T = 20.397000 C 10:33:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.40 10:33:05 Integrated Voltage Measurement... 10:33:24 Voltage Offset Correction: v_off_ini = 0.000003791 V, v_off_fin = 0.000006326 V 10:33:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042970 Vs 10:33:24 Integrated Voltage Measurement... 10:33:43 Voltage Offset Correction: v_off_ini = 0.000005932 V, v_off_fin = 0.000003345 V 10:33:44 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981753 Vs 10:33:46 Temperature Measurement, Probe Number = 0, T = 20.114000 C 10:33:47 Temperature Measurement, Probe Number = 1, T = 20.035000 C 10:33:48 Temperature Measurement, Probe Number = 2, T = 20.102000 C 10:33:48 Temperature Measurement, Probe Number = 3, T = 20.043000 C 10:33:49 Temperature Measurement, Probe Number = 4, T = 20.406000 C 10:33:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.41 10:33:49 Integrated Voltage Measurement... 10:34:08 Voltage Offset Correction: v_off_ini = 0.000003783 V, v_off_fin = 0.000007054 V 10:34:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051273 Vs 10:34:09 Integrated Voltage Measurement... 10:34:28 Voltage Offset Correction: v_off_ini = 0.000006100 V, v_off_fin = 0.000003589 V 10:34:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979886 Vs 10:34:31 Temperature Measurement, Probe Number = 0, T = 20.114000 C 10:34:32 Temperature Measurement, Probe Number = 1, T = 20.037000 C 10:34:32 Temperature Measurement, Probe Number = 2, T = 20.100000 C 10:34:33 Temperature Measurement, Probe Number = 3, T = 20.042000 C 10:34:34 Temperature Measurement, Probe Number = 4, T = 20.388000 C 10:34:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.39 10:34:34 Integrated Voltage Measurement... 10:34:53 Voltage Offset Correction: v_off_ini = 0.000004182 V, v_off_fin = 0.000005892 V 10:34:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042076 Vs 10:34:54 Integrated Voltage Measurement... 10:35:13 Voltage Offset Correction: v_off_ini = 0.000005890 V, v_off_fin = 0.000002032 V 10:35:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986391 Vs 11:05:16 Temperature Measurement, Probe Number = 0, T = 20.127000 C 11:05:17 Temperature Measurement, Probe Number = 1, T = 20.050000 C 11:05:17 Temperature Measurement, Probe Number = 2, T = 20.114000 C 11:05:18 Temperature Measurement, Probe Number = 3, T = 20.057000 C 11:05:19 Temperature Measurement, Probe Number = 4, T = 20.559000 C 11:05:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.56 11:05:19 Integrated Voltage Measurement... 11:05:38 Voltage Offset Correction: v_off_ini = 0.000004876 V, v_off_fin = 0.000006061 V 11:05:38 Integrated Voltage Measurement Delta Gap = 0.0040020 m VT = 0.171104884 Vs 11:05:39 Integrated Voltage Measurement... 11:05:58 Voltage Offset Correction: v_off_ini = 0.000005611 V, v_off_fin = 0.000002129 V 11:05:58 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980696 Vs 11:06:01 Temperature Measurement, Probe Number = 0, T = 20.125000 C 11:06:01 Temperature Measurement, Probe Number = 1, T = 20.050000 C 11:06:02 Temperature Measurement, Probe Number = 2, T = 20.112000 C 11:06:03 Temperature Measurement, Probe Number = 3, T = 20.057000 C 11:06:03 Temperature Measurement, Probe Number = 4, T = 20.656000 C 11:06:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.66 11:06:04 Integrated Voltage Measurement... 11:06:23 Voltage Offset Correction: v_off_ini = 0.000003980 V, v_off_fin = 0.000005808 V 11:06:23 Integrated Voltage Measurement Delta Gap = 0.0040007 m VT = 0.171037261 Vs 11:06:24 Integrated Voltage Measurement... 11:06:43 Voltage Offset Correction: v_off_ini = 0.000005372 V, v_off_fin = 0.000002747 V 11:06:43 Integrated Voltage Measurement Delta Gap = -0.0040005 m VT = -0.170969407 Vs 11:06:45 Temperature Measurement, Probe Number = 0, T = 20.125000 C 11:06:46 Temperature Measurement, Probe Number = 1, T = 20.047000 C 11:06:47 Temperature Measurement, Probe Number = 2, T = 20.111000 C 11:06:47 Temperature Measurement, Probe Number = 3, T = 20.055000 C 11:06:48 Temperature Measurement, Probe Number = 4, T = 20.691000 C 11:06:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.69 11:06:48 Integrated Voltage Measurement... 11:07:07 Voltage Offset Correction: v_off_ini = 0.000003808 V, v_off_fin = 0.000006159 V 11:07:08 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171037428 Vs 11:07:08 Integrated Voltage Measurement... 11:07:27 Voltage Offset Correction: v_off_ini = 0.000005888 V, v_off_fin = 0.000002425 V 11:07:27 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975639 Vs 11:07:30 Temperature Measurement, Probe Number = 0, T = 20.121000 C 11:07:31 Temperature Measurement, Probe Number = 1, T = 20.048000 C 11:07:31 Temperature Measurement, Probe Number = 2, T = 20.107000 C 11:07:32 Temperature Measurement, Probe Number = 3, T = 20.053000 C 11:07:33 Temperature Measurement, Probe Number = 4, T = 20.673000 C 11:07:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.67 11:07:33 Integrated Voltage Measurement... 11:07:52 Voltage Offset Correction: v_off_ini = 0.000004102 V, v_off_fin = 0.000006225 V 11:07:52 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171037773 Vs 11:07:52 Integrated Voltage Measurement... 11:08:11 Voltage Offset Correction: v_off_ini = 0.000005559 V, v_off_fin = 0.000001900 V 11:08:12 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170976494 Vs 11:08:14 Temperature Measurement, Probe Number = 0, T = 20.119000 C 11:08:15 Temperature Measurement, Probe Number = 1, T = 20.047000 C 11:08:16 Temperature Measurement, Probe Number = 2, T = 20.106000 C 11:08:16 Temperature Measurement, Probe Number = 3, T = 20.053000 C 11:08:17 Temperature Measurement, Probe Number = 4, T = 20.631000 C 11:08:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.63 11:08:17 Integrated Voltage Measurement... 11:08:37 Voltage Offset Correction: v_off_ini = 0.000003132 V, v_off_fin = 0.000006676 V 11:08:37 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171035780 Vs 11:08:37 Integrated Voltage Measurement... 11:08:56 Voltage Offset Correction: v_off_ini = 0.000005969 V, v_off_fin = 0.000002343 V 11:08:56 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170976372 Vs 11:08:59 Temperature Measurement, Probe Number = 0, T = 20.118000 C 11:09:00 Temperature Measurement, Probe Number = 1, T = 20.045000 C 11:09:00 Temperature Measurement, Probe Number = 2, T = 20.109000 C 11:09:01 Temperature Measurement, Probe Number = 3, T = 20.054000 C 11:09:02 Temperature Measurement, Probe Number = 4, T = 20.587000 C 11:09:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.59 11:09:02 Integrated Voltage Measurement... 11:09:21 Voltage Offset Correction: v_off_ini = 0.000003235 V, v_off_fin = 0.000006083 V 11:09:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171033795 Vs 11:09:22 Integrated Voltage Measurement... 11:09:41 Voltage Offset Correction: v_off_ini = 0.000005318 V, v_off_fin = 0.000002276 V 11:09:41 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980757 Vs 11:09:44 Temperature Measurement, Probe Number = 0, T = 20.118000 C 11:09:44 Temperature Measurement, Probe Number = 1, T = 20.043000 C 11:09:45 Temperature Measurement, Probe Number = 2, T = 20.108000 C 11:09:46 Temperature Measurement, Probe Number = 3, T = 20.052000 C 11:09:46 Temperature Measurement, Probe Number = 4, T = 20.558000 C 11:09:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.56 11:09:46 Integrated Voltage Measurement... 11:10:05 Voltage Offset Correction: v_off_ini = 0.000003251 V, v_off_fin = 0.000006200 V 11:10:06 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171040420 Vs 11:10:06 Integrated Voltage Measurement... 11:10:25 Voltage Offset Correction: v_off_ini = 0.000005720 V, v_off_fin = 0.000001980 V 11:10:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983841 Vs 11:10:28 Temperature Measurement, Probe Number = 0, T = 20.123000 C 11:10:28 Temperature Measurement, Probe Number = 1, T = 20.050000 C 11:10:29 Temperature Measurement, Probe Number = 2, T = 20.109000 C 11:10:30 Temperature Measurement, Probe Number = 3, T = 20.055000 C 11:10:30 Temperature Measurement, Probe Number = 4, T = 20.603000 C 11:10:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.60 11:10:31 Integrated Voltage Measurement... 11:10:50 Voltage Offset Correction: v_off_ini = 0.000003534 V, v_off_fin = 0.000006051 V 11:10:50 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171043542 Vs 11:10:50 Integrated Voltage Measurement... 11:11:09 Voltage Offset Correction: v_off_ini = 0.000005412 V, v_off_fin = 0.000002008 V 11:11:10 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170985563 Vs 11:11:12 Temperature Measurement, Probe Number = 0, T = 20.125000 C 11:11:13 Temperature Measurement, Probe Number = 1, T = 20.052000 C 11:11:14 Temperature Measurement, Probe Number = 2, T = 20.111000 C 11:11:14 Temperature Measurement, Probe Number = 3, T = 20.056000 C 11:11:15 Temperature Measurement, Probe Number = 4, T = 20.615000 C 11:11:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.61 11:11:15 Integrated Voltage Measurement... 11:11:34 Voltage Offset Correction: v_off_ini = 0.000003132 V, v_off_fin = 0.000006224 V 11:11:35 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171034895 Vs 11:11:35 Integrated Voltage Measurement... 11:11:54 Voltage Offset Correction: v_off_ini = 0.000005218 V, v_off_fin = 0.000002235 V 11:11:54 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979976 Vs 11:11:57 Temperature Measurement, Probe Number = 0, T = 20.126000 C 11:11:57 Temperature Measurement, Probe Number = 1, T = 20.054000 C 11:11:58 Temperature Measurement, Probe Number = 2, T = 20.113000 C 11:11:59 Temperature Measurement, Probe Number = 3, T = 20.059000 C 11:11:59 Temperature Measurement, Probe Number = 4, T = 20.674000 C 11:11:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.67 11:12:00 Integrated Voltage Measurement... 11:12:19 Voltage Offset Correction: v_off_ini = 0.000003378 V, v_off_fin = 0.000006085 V 11:12:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171038143 Vs 11:12:19 Integrated Voltage Measurement... 11:12:39 Voltage Offset Correction: v_off_ini = 0.000005390 V, v_off_fin = 0.000001917 V 11:12:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984149 Vs 11:42:41 Temperature Measurement, Probe Number = 0, T = 20.117000 C 11:42:42 Temperature Measurement, Probe Number = 1, T = 20.044000 C 11:42:43 Temperature Measurement, Probe Number = 2, T = 20.108000 C 11:42:43 Temperature Measurement, Probe Number = 3, T = 20.054000 C 11:42:44 Temperature Measurement, Probe Number = 4, T = 20.359000 C 11:42:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.36 11:42:44 Integrated Voltage Measurement... 11:43:04 Voltage Offset Correction: v_off_ini = 0.000003362 V, v_off_fin = 0.000005099 V 11:43:04 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171080923 Vs 11:43:04 Integrated Voltage Measurement... 11:43:23 Voltage Offset Correction: v_off_ini = 0.000004900 V, v_off_fin = 0.000002325 V 11:43:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986156 Vs 11:43:26 Temperature Measurement, Probe Number = 0, T = 20.119000 C 11:43:27 Temperature Measurement, Probe Number = 1, T = 20.048000 C 11:43:27 Temperature Measurement, Probe Number = 2, T = 20.108000 C 11:43:28 Temperature Measurement, Probe Number = 3, T = 20.056000 C 11:43:29 Temperature Measurement, Probe Number = 4, T = 20.296000 C 11:43:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.30 11:43:29 Integrated Voltage Measurement... 11:43:48 Voltage Offset Correction: v_off_ini = 0.000002620 V, v_off_fin = 0.000005794 V 11:43:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171016845 Vs 11:43:49 Integrated Voltage Measurement... 11:44:08 Voltage Offset Correction: v_off_ini = 0.000005255 V, v_off_fin = 0.000002608 V 11:44:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980142 Vs 11:44:11 Temperature Measurement, Probe Number = 0, T = 20.122000 C 11:44:11 Temperature Measurement, Probe Number = 1, T = 20.049000 C 11:44:12 Temperature Measurement, Probe Number = 2, T = 20.112000 C 11:44:13 Temperature Measurement, Probe Number = 3, T = 20.058000 C 11:44:13 Temperature Measurement, Probe Number = 4, T = 20.366000 C 11:44:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.37 11:44:13 Integrated Voltage Measurement... 11:44:33 Voltage Offset Correction: v_off_ini = 0.000003023 V, v_off_fin = 0.000006012 V 11:44:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171023643 Vs 11:44:33 Integrated Voltage Measurement... 11:44:52 Voltage Offset Correction: v_off_ini = 0.000005267 V, v_off_fin = 0.000003117 V 11:44:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979702 Vs 11:44:55 Temperature Measurement, Probe Number = 0, T = 20.121000 C 11:44:56 Temperature Measurement, Probe Number = 1, T = 20.045000 C 11:44:57 Temperature Measurement, Probe Number = 2, T = 20.111000 C 11:44:57 Temperature Measurement, Probe Number = 3, T = 20.054000 C 11:44:58 Temperature Measurement, Probe Number = 4, T = 20.419000 C 11:44:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.42 11:44:58 Integrated Voltage Measurement... 11:45:18 Voltage Offset Correction: v_off_ini = 0.000003993 V, v_off_fin = 0.000006381 V 11:45:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035013 Vs 11:45:18 Integrated Voltage Measurement... 11:45:37 Voltage Offset Correction: v_off_ini = 0.000006214 V, v_off_fin = 0.000002921 V 11:45:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969551 Vs 11:45:40 Temperature Measurement, Probe Number = 0, T = 20.126000 C 11:45:40 Temperature Measurement, Probe Number = 1, T = 20.051000 C 11:45:41 Temperature Measurement, Probe Number = 2, T = 20.114000 C 11:45:42 Temperature Measurement, Probe Number = 3, T = 20.058000 C 11:45:42 Temperature Measurement, Probe Number = 4, T = 20.449000 C 11:45:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.45 11:45:43 Integrated Voltage Measurement... 11:46:02 Voltage Offset Correction: v_off_ini = 0.000004309 V, v_off_fin = 0.000006566 V 11:46:02 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171037189 Vs 11:46:02 Integrated Voltage Measurement... 11:46:22 Voltage Offset Correction: v_off_ini = 0.000005644 V, v_off_fin = 0.000003151 V 11:46:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971195 Vs 11:46:24 Temperature Measurement, Probe Number = 0, T = 20.123000 C 11:46:25 Temperature Measurement, Probe Number = 1, T = 20.049000 C 11:46:26 Temperature Measurement, Probe Number = 2, T = 20.111000 C 11:46:26 Temperature Measurement, Probe Number = 3, T = 20.057000 C 11:46:27 Temperature Measurement, Probe Number = 4, T = 20.399000 C 11:46:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.40 11:46:27 Integrated Voltage Measurement... 11:46:47 Voltage Offset Correction: v_off_ini = 0.000004035 V, v_off_fin = 0.000006464 V 11:46:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034657 Vs 11:46:47 Integrated Voltage Measurement... 11:47:06 Voltage Offset Correction: v_off_ini = 0.000005699 V, v_off_fin = 0.000002549 V 11:47:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977443 Vs 11:47:09 Temperature Measurement, Probe Number = 0, T = 20.124000 C 11:47:10 Temperature Measurement, Probe Number = 1, T = 20.050000 C 11:47:10 Temperature Measurement, Probe Number = 2, T = 20.110000 C 11:47:11 Temperature Measurement, Probe Number = 3, T = 20.057000 C 11:47:12 Temperature Measurement, Probe Number = 4, T = 20.360000 C 11:47:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.36 11:47:12 Integrated Voltage Measurement... 11:47:31 Voltage Offset Correction: v_off_ini = 0.000003597 V, v_off_fin = 0.000006229 V 11:47:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171025970 Vs 11:47:31 Integrated Voltage Measurement... 11:47:51 Voltage Offset Correction: v_off_ini = 0.000005299 V, v_off_fin = 0.000002283 V 11:47:51 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982742 Vs 11:47:54 Temperature Measurement, Probe Number = 0, T = 20.125000 C 11:47:54 Temperature Measurement, Probe Number = 1, T = 20.051000 C 11:47:55 Temperature Measurement, Probe Number = 2, T = 20.112000 C 11:47:56 Temperature Measurement, Probe Number = 3, T = 20.058000 C 11:47:56 Temperature Measurement, Probe Number = 4, T = 20.358000 C 11:47:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.36 11:47:56 Integrated Voltage Measurement... 11:48:16 Voltage Offset Correction: v_off_ini = 0.000003206 V, v_off_fin = 0.000005976 V 11:48:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028069 Vs 11:48:16 Integrated Voltage Measurement... 11:48:36 Voltage Offset Correction: v_off_ini = 0.000005367 V, v_off_fin = 0.000003352 V 11:48:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979730 Vs 11:48:39 Temperature Measurement, Probe Number = 0, T = 20.124000 C 11:48:40 Temperature Measurement, Probe Number = 1, T = 20.051000 C 11:48:41 Temperature Measurement, Probe Number = 2, T = 20.111000 C 11:48:41 Temperature Measurement, Probe Number = 3, T = 20.057000 C 11:48:42 Temperature Measurement, Probe Number = 4, T = 20.345000 C 11:48:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.34 11:48:42 Integrated Voltage Measurement... 11:49:01 Voltage Offset Correction: v_off_ini = 0.000003430 V, v_off_fin = 0.000006032 V 11:49:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023776 Vs 11:49:02 Integrated Voltage Measurement... 11:49:21 Voltage Offset Correction: v_off_ini = 0.000005480 V, v_off_fin = 0.000002248 V 11:49:21 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980970 Vs 11:49:24 Temperature Measurement, Probe Number = 0, T = 20.122000 C 11:49:24 Temperature Measurement, Probe Number = 1, T = 20.052000 C 11:49:25 Temperature Measurement, Probe Number = 2, T = 20.111000 C 11:49:26 Temperature Measurement, Probe Number = 3, T = 20.058000 C 11:49:26 Temperature Measurement, Probe Number = 4, T = 20.336000 C 11:49:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.34 11:49:27 Integrated Voltage Measurement... 11:49:46 Voltage Offset Correction: v_off_ini = 0.000003881 V, v_off_fin = 0.000005744 V 11:49:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030603 Vs 11:49:46 Integrated Voltage Measurement... 11:50:05 Voltage Offset Correction: v_off_ini = 0.000005351 V, v_off_fin = 0.000001662 V 11:50:06 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977543 Vs 12:20:08 Temperature Measurement, Probe Number = 0, T = 20.121000 C 12:20:09 Temperature Measurement, Probe Number = 1, T = 20.045000 C 12:20:10 Temperature Measurement, Probe Number = 2, T = 20.109000 C 12:20:10 Temperature Measurement, Probe Number = 3, T = 20.053000 C 12:20:11 Temperature Measurement, Probe Number = 4, T = 20.283000 C 12:20:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.28 12:20:11 Integrated Voltage Measurement... 12:20:30 Voltage Offset Correction: v_off_ini = 0.000004374 V, v_off_fin = 0.000006085 V 12:20:30 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171077745 Vs 12:20:31 Integrated Voltage Measurement... 12:20:50 Voltage Offset Correction: v_off_ini = 0.000005740 V, v_off_fin = 0.000002616 V 12:20:50 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170985502 Vs 12:20:53 Temperature Measurement, Probe Number = 0, T = 20.118000 C 12:20:54 Temperature Measurement, Probe Number = 1, T = 20.046000 C 12:20:54 Temperature Measurement, Probe Number = 2, T = 20.106000 C 12:20:55 Temperature Measurement, Probe Number = 3, T = 20.051000 C 12:20:56 Temperature Measurement, Probe Number = 4, T = 20.259000 C 12:20:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.26 12:20:56 Integrated Voltage Measurement... 12:21:15 Voltage Offset Correction: v_off_ini = 0.000003327 V, v_off_fin = 0.000005475 V 12:21:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171028066 Vs 12:21:16 Integrated Voltage Measurement... 12:21:35 Voltage Offset Correction: v_off_ini = 0.000005263 V, v_off_fin = 0.000002079 V 12:21:35 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170989586 Vs 12:21:38 Temperature Measurement, Probe Number = 0, T = 20.117000 C 12:21:38 Temperature Measurement, Probe Number = 1, T = 20.042000 C 12:21:39 Temperature Measurement, Probe Number = 2, T = 20.105000 C 12:21:40 Temperature Measurement, Probe Number = 3, T = 20.049000 C 12:21:40 Temperature Measurement, Probe Number = 4, T = 20.166000 C 12:21:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.17 12:21:41 Integrated Voltage Measurement... 12:22:00 Voltage Offset Correction: v_off_ini = 0.000003112 V, v_off_fin = 0.000005616 V 12:22:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171024431 Vs 12:22:00 Integrated Voltage Measurement... 12:22:19 Voltage Offset Correction: v_off_ini = 0.000004946 V, v_off_fin = 0.000002326 V 12:22:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170985483 Vs 12:22:22 Temperature Measurement, Probe Number = 0, T = 20.118000 C 12:22:23 Temperature Measurement, Probe Number = 1, T = 20.044000 C 12:22:23 Temperature Measurement, Probe Number = 2, T = 20.106000 C 12:22:24 Temperature Measurement, Probe Number = 3, T = 20.049000 C 12:22:25 Temperature Measurement, Probe Number = 4, T = 20.090000 C 12:22:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.09 12:22:25 Integrated Voltage Measurement... 12:22:45 Voltage Offset Correction: v_off_ini = 0.000003000 V, v_off_fin = 0.000005835 V 12:22:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171027565 Vs 12:22:45 Integrated Voltage Measurement... 12:23:04 Voltage Offset Correction: v_off_ini = 0.000004954 V, v_off_fin = 0.000001940 V 12:23:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988036 Vs 12:23:07 Temperature Measurement, Probe Number = 0, T = 20.119000 C 12:23:08 Temperature Measurement, Probe Number = 1, T = 20.047000 C 12:23:08 Temperature Measurement, Probe Number = 2, T = 20.107000 C 12:23:09 Temperature Measurement, Probe Number = 3, T = 20.053000 C 12:23:10 Temperature Measurement, Probe Number = 4, T = 20.097000 C 12:23:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.10 12:23:10 Integrated Voltage Measurement... 12:23:29 Voltage Offset Correction: v_off_ini = 0.000002940 V, v_off_fin = 0.000005431 V 12:23:29 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171030520 Vs 12:23:30 Integrated Voltage Measurement... 12:23:48 Voltage Offset Correction: v_off_ini = 0.000005266 V, v_off_fin = 0.000002470 V 12:23:49 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983280 Vs 12:23:51 Temperature Measurement, Probe Number = 0, T = 20.122000 C 12:23:52 Temperature Measurement, Probe Number = 1, T = 20.048000 C 12:23:53 Temperature Measurement, Probe Number = 2, T = 20.111000 C 12:23:53 Temperature Measurement, Probe Number = 3, T = 20.055000 C 12:23:54 Temperature Measurement, Probe Number = 4, T = 20.247000 C 12:23:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.25 12:23:54 Integrated Voltage Measurement... 12:24:13 Voltage Offset Correction: v_off_ini = 0.000003235 V, v_off_fin = 0.000005415 V 12:24:13 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171031264 Vs 12:24:13 Integrated Voltage Measurement... 12:24:33 Voltage Offset Correction: v_off_ini = 0.000005658 V, v_off_fin = 0.000001913 V 12:24:33 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987251 Vs 12:24:35 Temperature Measurement, Probe Number = 0, T = 20.128000 C 12:24:36 Temperature Measurement, Probe Number = 1, T = 20.055000 C 12:24:37 Temperature Measurement, Probe Number = 2, T = 20.116000 C 12:24:37 Temperature Measurement, Probe Number = 3, T = 20.059000 C 12:24:38 Temperature Measurement, Probe Number = 4, T = 20.359000 C 12:24:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.36 12:24:38 Integrated Voltage Measurement... 12:24:58 Voltage Offset Correction: v_off_ini = 0.000003313 V, v_off_fin = 0.000006164 V 12:24:58 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171034435 Vs 12:24:58 Integrated Voltage Measurement... 12:25:17 Voltage Offset Correction: v_off_ini = 0.000005270 V, v_off_fin = 0.000002576 V 12:25:17 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987818 Vs 12:25:20 Temperature Measurement, Probe Number = 0, T = 20.126000 C 12:25:21 Temperature Measurement, Probe Number = 1, T = 20.053000 C 12:25:21 Temperature Measurement, Probe Number = 2, T = 20.113000 C 12:25:22 Temperature Measurement, Probe Number = 3, T = 20.057000 C 12:25:23 Temperature Measurement, Probe Number = 4, T = 20.329000 C 12:25:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.33 12:25:23 Integrated Voltage Measurement... 12:25:42 Voltage Offset Correction: v_off_ini = 0.000003690 V, v_off_fin = 0.000005929 V 12:25:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034988 Vs 12:25:42 Integrated Voltage Measurement... 12:26:02 Voltage Offset Correction: v_off_ini = 0.000005668 V, v_off_fin = 0.000002912 V 12:26:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975604 Vs 12:26:05 Temperature Measurement, Probe Number = 0, T = 20.123000 C 12:26:05 Temperature Measurement, Probe Number = 1, T = 20.048000 C 12:26:06 Temperature Measurement, Probe Number = 2, T = 20.111000 C 12:26:06 Temperature Measurement, Probe Number = 3, T = 20.054000 C 12:26:07 Temperature Measurement, Probe Number = 4, T = 20.318000 C 12:26:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.32 12:26:07 Integrated Voltage Measurement... 12:26:27 Voltage Offset Correction: v_off_ini = 0.000004269 V, v_off_fin = 0.000005940 V 12:26:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171036858 Vs 12:26:27 Integrated Voltage Measurement... 12:26:46 Voltage Offset Correction: v_off_ini = 0.000005477 V, v_off_fin = 0.000002107 V 12:26:47 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170991602 Vs 12:26:49 Temperature Measurement, Probe Number = 0, T = 20.123000 C 12:26:50 Temperature Measurement, Probe Number = 1, T = 20.044000 C 12:26:51 Temperature Measurement, Probe Number = 2, T = 20.112000 C 12:26:51 Temperature Measurement, Probe Number = 3, T = 20.054000 C 12:26:52 Temperature Measurement, Probe Number = 4, T = 20.405000 C 12:26:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 12:26:52 Integrated Voltage Measurement... 12:27:11 Voltage Offset Correction: v_off_ini = 0.000003277 V, v_off_fin = 0.000005989 V 12:27:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036250 Vs 12:27:12 Integrated Voltage Measurement... 12:27:31 Voltage Offset Correction: v_off_ini = 0.000005529 V, v_off_fin = 0.000001776 V 12:27:31 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170984591 Vs 12:57:34 Temperature Measurement, Probe Number = 0, T = 20.124000 C 12:57:34 Temperature Measurement, Probe Number = 1, T = 20.048000 C 12:57:35 Temperature Measurement, Probe Number = 2, T = 20.112000 C 12:57:36 Temperature Measurement, Probe Number = 3, T = 20.056000 C 12:57:36 Temperature Measurement, Probe Number = 4, T = 19.945000 C 12:57:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 19.95 12:57:36 Integrated Voltage Measurement... 12:57:56 Voltage Offset Correction: v_off_ini = 0.000005109 V, v_off_fin = 0.000006892 V 12:57:56 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171094849 Vs 12:57:56 Integrated Voltage Measurement... 12:58:15 Voltage Offset Correction: v_off_ini = 0.000006038 V, v_off_fin = 0.000003085 V 12:58:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983993 Vs 12:58:18 Temperature Measurement, Probe Number = 0, T = 20.128000 C 12:58:19 Temperature Measurement, Probe Number = 1, T = 20.051000 C 12:58:20 Temperature Measurement, Probe Number = 2, T = 20.115000 C 12:58:20 Temperature Measurement, Probe Number = 3, T = 20.060000 C 12:58:21 Temperature Measurement, Probe Number = 4, T = 20.020000 C 12:58:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.02 12:58:21 Integrated Voltage Measurement... 12:58:40 Voltage Offset Correction: v_off_ini = 0.000003841 V, v_off_fin = 0.000006765 V 12:58:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040261 Vs 12:58:41 Integrated Voltage Measurement... 12:59:00 Voltage Offset Correction: v_off_ini = 0.000005543 V, v_off_fin = 0.000002718 V 12:59:00 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170985135 Vs 12:59:03 Temperature Measurement, Probe Number = 0, T = 20.128000 C 12:59:03 Temperature Measurement, Probe Number = 1, T = 20.052000 C 12:59:04 Temperature Measurement, Probe Number = 2, T = 20.117000 C 12:59:05 Temperature Measurement, Probe Number = 3, T = 20.062000 C 12:59:05 Temperature Measurement, Probe Number = 4, T = 20.071000 C 12:59:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.07 12:59:05 Integrated Voltage Measurement... 12:59:25 Voltage Offset Correction: v_off_ini = 0.000003840 V, v_off_fin = 0.000006007 V 12:59:25 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171043083 Vs 12:59:25 Integrated Voltage Measurement... 12:59:44 Voltage Offset Correction: v_off_ini = 0.000005772 V, v_off_fin = 0.000002144 V 12:59:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987127 Vs 12:59:47 Temperature Measurement, Probe Number = 0, T = 20.130000 C 12:59:47 Temperature Measurement, Probe Number = 1, T = 20.055000 C 12:59:48 Temperature Measurement, Probe Number = 2, T = 20.117000 C 12:59:49 Temperature Measurement, Probe Number = 3, T = 20.064000 C 12:59:49 Temperature Measurement, Probe Number = 4, T = 20.182000 C 12:59:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.18 12:59:49 Integrated Voltage Measurement... 13:00:09 Voltage Offset Correction: v_off_ini = 0.000003180 V, v_off_fin = 0.000006136 V 13:00:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040264 Vs 13:00:09 Integrated Voltage Measurement... 13:00:29 Voltage Offset Correction: v_off_ini = 0.000005727 V, v_off_fin = 0.000001899 V 13:00:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993789 Vs 13:00:31 Temperature Measurement, Probe Number = 0, T = 20.132000 C 13:00:32 Temperature Measurement, Probe Number = 1, T = 20.056000 C 13:00:33 Temperature Measurement, Probe Number = 2, T = 20.118000 C 13:00:33 Temperature Measurement, Probe Number = 3, T = 20.066000 C 13:00:34 Temperature Measurement, Probe Number = 4, T = 20.312000 C 13:00:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.31 13:00:34 Integrated Voltage Measurement... 13:00:54 Voltage Offset Correction: v_off_ini = 0.000003981 V, v_off_fin = 0.000005877 V 13:00:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038433 Vs 13:00:54 Integrated Voltage Measurement... 13:01:13 Voltage Offset Correction: v_off_ini = 0.000004863 V, v_off_fin = 0.000002502 V 13:01:13 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170993827 Vs 13:01:16 Temperature Measurement, Probe Number = 0, T = 20.130000 C 13:01:16 Temperature Measurement, Probe Number = 1, T = 20.057000 C 13:01:17 Temperature Measurement, Probe Number = 2, T = 20.117000 C 13:01:18 Temperature Measurement, Probe Number = 3, T = 20.065000 C 13:01:18 Temperature Measurement, Probe Number = 4, T = 20.340000 C 13:01:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.34 13:01:18 Integrated Voltage Measurement... 13:01:38 Voltage Offset Correction: v_off_ini = 0.000003305 V, v_off_fin = 0.000005638 V 13:01:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171041383 Vs 13:01:38 Integrated Voltage Measurement... 13:01:58 Voltage Offset Correction: v_off_ini = 0.000006135 V, v_off_fin = 0.000001563 V 13:01:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995094 Vs 13:02:00 Temperature Measurement, Probe Number = 0, T = 20.129000 C 13:02:01 Temperature Measurement, Probe Number = 1, T = 20.055000 C 13:02:02 Temperature Measurement, Probe Number = 2, T = 20.117000 C 13:02:02 Temperature Measurement, Probe Number = 3, T = 20.064000 C 13:02:03 Temperature Measurement, Probe Number = 4, T = 20.280000 C 13:02:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.28 13:02:03 Integrated Voltage Measurement... 13:02:23 Voltage Offset Correction: v_off_ini = 0.000002964 V, v_off_fin = 0.000006184 V 13:02:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043293 Vs 13:02:24 Integrated Voltage Measurement... 13:02:43 Voltage Offset Correction: v_off_ini = 0.000005475 V, v_off_fin = 0.000002479 V 13:02:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989305 Vs 13:02:46 Temperature Measurement, Probe Number = 0, T = 20.129000 C 13:02:47 Temperature Measurement, Probe Number = 1, T = 20.052000 C 13:02:47 Temperature Measurement, Probe Number = 2, T = 20.119000 C 13:02:48 Temperature Measurement, Probe Number = 3, T = 20.062000 C 13:02:49 Temperature Measurement, Probe Number = 4, T = 20.273000 C 13:02:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.27 13:02:49 Integrated Voltage Measurement... 13:03:10 Voltage Offset Correction: v_off_ini = 0.000003800 V, v_off_fin = 0.000005808 V 13:03:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043874 Vs 13:03:10 Integrated Voltage Measurement... 13:03:29 Voltage Offset Correction: v_off_ini = 0.000004826 V, v_off_fin = 0.000002091 V 13:03:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989597 Vs 13:03:32 Temperature Measurement, Probe Number = 0, T = 20.128000 C 13:03:33 Temperature Measurement, Probe Number = 1, T = 20.050000 C 13:03:33 Temperature Measurement, Probe Number = 2, T = 20.115000 C 13:03:34 Temperature Measurement, Probe Number = 3, T = 20.059000 C 13:03:35 Temperature Measurement, Probe Number = 4, T = 20.211000 C 13:03:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.21 13:03:35 Integrated Voltage Measurement... 13:03:54 Voltage Offset Correction: v_off_ini = 0.000003503 V, v_off_fin = 0.000005844 V 13:03:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041921 Vs 13:03:55 Integrated Voltage Measurement... 13:04:14 Voltage Offset Correction: v_off_ini = 0.000005211 V, v_off_fin = 0.000002298 V 13:04:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994089 Vs 13:04:17 Temperature Measurement, Probe Number = 0, T = 20.127000 C 13:04:17 Temperature Measurement, Probe Number = 1, T = 20.052000 C 13:04:18 Temperature Measurement, Probe Number = 2, T = 20.114000 C 13:04:19 Temperature Measurement, Probe Number = 3, T = 20.059000 C 13:04:19 Temperature Measurement, Probe Number = 4, T = 20.165000 C 13:04:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.16 13:04:19 Integrated Voltage Measurement... 13:04:39 Voltage Offset Correction: v_off_ini = 0.000003296 V, v_off_fin = 0.000006496 V 13:04:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047454 Vs 13:04:39 Integrated Voltage Measurement... 13:04:58 Voltage Offset Correction: v_off_ini = 0.000006219 V, v_off_fin = 0.000002996 V 13:04:58 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170984468 Vs 13:35:01 Temperature Measurement, Probe Number = 0, T = 20.125000 C 13:35:02 Temperature Measurement, Probe Number = 1, T = 20.051000 C 13:35:03 Temperature Measurement, Probe Number = 2, T = 20.117000 C 13:35:03 Temperature Measurement, Probe Number = 3, T = 20.063000 C 13:35:04 Temperature Measurement, Probe Number = 4, T = 20.357000 C 13:35:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.36 13:35:04 Integrated Voltage Measurement... 13:35:24 Voltage Offset Correction: v_off_ini = 0.000004795 V, v_off_fin = 0.000006320 V 13:35:24 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171106375 Vs 13:35:24 Integrated Voltage Measurement... 13:35:43 Voltage Offset Correction: v_off_ini = 0.000006188 V, v_off_fin = 0.000003011 V 13:35:43 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170985957 Vs 13:35:46 Temperature Measurement, Probe Number = 0, T = 20.132000 C 13:35:47 Temperature Measurement, Probe Number = 1, T = 20.057000 C 13:35:47 Temperature Measurement, Probe Number = 2, T = 20.124000 C 13:35:48 Temperature Measurement, Probe Number = 3, T = 20.069000 C 13:35:49 Temperature Measurement, Probe Number = 4, T = 20.421000 C 13:35:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.42 13:35:49 Integrated Voltage Measurement... 13:36:08 Voltage Offset Correction: v_off_ini = 0.000003930 V, v_off_fin = 0.000006206 V 13:36:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047882 Vs 13:36:08 Integrated Voltage Measurement... 13:36:28 Voltage Offset Correction: v_off_ini = 0.000005887 V, v_off_fin = 0.000002666 V 13:36:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985735 Vs 13:36:31 Temperature Measurement, Probe Number = 0, T = 20.135000 C 13:36:31 Temperature Measurement, Probe Number = 1, T = 20.058000 C 13:36:32 Temperature Measurement, Probe Number = 2, T = 20.122000 C 13:36:33 Temperature Measurement, Probe Number = 3, T = 20.066000 C 13:36:33 Temperature Measurement, Probe Number = 4, T = 20.450000 C 13:36:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.45 13:36:33 Integrated Voltage Measurement... 13:36:53 Voltage Offset Correction: v_off_ini = 0.000003890 V, v_off_fin = 0.000006320 V 13:36:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045565 Vs 13:36:53 Integrated Voltage Measurement... 13:37:12 Voltage Offset Correction: v_off_ini = 0.000005798 V, v_off_fin = 0.000001920 V 13:37:12 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170989204 Vs 13:37:15 Temperature Measurement, Probe Number = 0, T = 20.129000 C 13:37:16 Temperature Measurement, Probe Number = 1, T = 20.055000 C 13:37:16 Temperature Measurement, Probe Number = 2, T = 20.118000 C 13:37:17 Temperature Measurement, Probe Number = 3, T = 20.064000 C 13:37:18 Temperature Measurement, Probe Number = 4, T = 20.444000 C 13:37:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.44 13:37:18 Integrated Voltage Measurement... 13:37:37 Voltage Offset Correction: v_off_ini = 0.000003566 V, v_off_fin = 0.000006112 V 13:37:37 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171048348 Vs 13:37:37 Integrated Voltage Measurement... 13:37:57 Voltage Offset Correction: v_off_ini = 0.000005765 V, v_off_fin = 0.000002641 V 13:37:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987915 Vs 13:38:00 Temperature Measurement, Probe Number = 0, T = 20.133000 C 13:38:00 Temperature Measurement, Probe Number = 1, T = 20.058000 C 13:38:01 Temperature Measurement, Probe Number = 2, T = 20.120000 C 13:38:02 Temperature Measurement, Probe Number = 3, T = 20.064000 C 13:38:02 Temperature Measurement, Probe Number = 4, T = 20.443000 C 13:38:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.44 13:38:03 Integrated Voltage Measurement... 13:38:22 Voltage Offset Correction: v_off_ini = 0.000003912 V, v_off_fin = 0.000006640 V 13:38:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044044 Vs 13:38:22 Integrated Voltage Measurement... 13:38:41 Voltage Offset Correction: v_off_ini = 0.000005633 V, v_off_fin = 0.000002255 V 13:38:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985892 Vs 13:38:44 Temperature Measurement, Probe Number = 0, T = 20.133000 C 13:38:45 Temperature Measurement, Probe Number = 1, T = 20.058000 C 13:38:46 Temperature Measurement, Probe Number = 2, T = 20.120000 C 13:38:46 Temperature Measurement, Probe Number = 3, T = 20.065000 C 13:38:47 Temperature Measurement, Probe Number = 4, T = 20.427000 C 13:38:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.43 13:38:47 Integrated Voltage Measurement... 13:39:06 Voltage Offset Correction: v_off_ini = 0.000003756 V, v_off_fin = 0.000005753 V 13:39:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045522 Vs 13:39:06 Integrated Voltage Measurement... 13:39:26 Voltage Offset Correction: v_off_ini = 0.000005531 V, v_off_fin = 0.000002736 V 13:39:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988418 Vs 13:39:29 Temperature Measurement, Probe Number = 0, T = 20.135000 C 13:39:29 Temperature Measurement, Probe Number = 1, T = 20.060000 C 13:39:30 Temperature Measurement, Probe Number = 2, T = 20.119000 C 13:39:31 Temperature Measurement, Probe Number = 3, T = 20.064000 C 13:39:31 Temperature Measurement, Probe Number = 4, T = 20.362000 C 13:39:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.36 13:39:31 Integrated Voltage Measurement... 13:39:51 Voltage Offset Correction: v_off_ini = 0.000003359 V, v_off_fin = 0.000005653 V 13:39:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042404 Vs 13:39:51 Integrated Voltage Measurement... 13:40:10 Voltage Offset Correction: v_off_ini = 0.000005304 V, v_off_fin = 0.000001938 V 13:40:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993384 Vs 13:40:13 Temperature Measurement, Probe Number = 0, T = 20.135000 C 13:40:14 Temperature Measurement, Probe Number = 1, T = 20.058000 C 13:40:15 Temperature Measurement, Probe Number = 2, T = 20.121000 C 13:40:15 Temperature Measurement, Probe Number = 3, T = 20.064000 C 13:40:16 Temperature Measurement, Probe Number = 4, T = 20.371000 C 13:40:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.37 13:40:16 Integrated Voltage Measurement... 13:40:35 Voltage Offset Correction: v_off_ini = 0.000003641 V, v_off_fin = 0.000006068 V 13:40:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044070 Vs 13:40:36 Integrated Voltage Measurement... 13:40:55 Voltage Offset Correction: v_off_ini = 0.000005299 V, v_off_fin = 0.000002017 V 13:40:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993319 Vs 13:40:58 Temperature Measurement, Probe Number = 0, T = 20.133000 C 13:40:59 Temperature Measurement, Probe Number = 1, T = 20.062000 C 13:40:59 Temperature Measurement, Probe Number = 2, T = 20.119000 C 13:41:00 Temperature Measurement, Probe Number = 3, T = 20.066000 C 13:41:01 Temperature Measurement, Probe Number = 4, T = 20.373000 C 13:41:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.37 13:41:01 Integrated Voltage Measurement... 13:41:20 Voltage Offset Correction: v_off_ini = 0.000003380 V, v_off_fin = 0.000005580 V 13:41:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040171 Vs 13:41:20 Integrated Voltage Measurement... 13:41:40 Voltage Offset Correction: v_off_ini = 0.000005371 V, v_off_fin = 0.000002643 V 13:41:40 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988121 Vs 13:41:42 Temperature Measurement, Probe Number = 0, T = 20.136000 C 13:41:43 Temperature Measurement, Probe Number = 1, T = 20.061000 C 13:41:44 Temperature Measurement, Probe Number = 2, T = 20.121000 C 13:41:44 Temperature Measurement, Probe Number = 3, T = 20.067000 C 13:41:45 Temperature Measurement, Probe Number = 4, T = 20.330000 C 13:41:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.33 13:41:45 Integrated Voltage Measurement... 13:42:05 Voltage Offset Correction: v_off_ini = 0.000002892 V, v_off_fin = 0.000006071 V 13:42:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044068 Vs 13:42:05 Integrated Voltage Measurement... 13:42:24 Voltage Offset Correction: v_off_ini = 0.000005281 V, v_off_fin = 0.000002012 V 13:42:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990775 Vs 14:12:27 Temperature Measurement, Probe Number = 0, T = 20.136000 C 14:12:28 Temperature Measurement, Probe Number = 1, T = 20.063000 C 14:12:29 Temperature Measurement, Probe Number = 2, T = 20.125000 C 14:12:29 Temperature Measurement, Probe Number = 3, T = 20.072000 C 14:12:30 Temperature Measurement, Probe Number = 4, T = 20.451000 C 14:12:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.45 14:12:30 Integrated Voltage Measurement... 14:12:49 Voltage Offset Correction: v_off_ini = 0.000004773 V, v_off_fin = 0.000006396 V 14:12:50 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171087645 Vs 14:12:50 Integrated Voltage Measurement... 14:13:09 Voltage Offset Correction: v_off_ini = 0.000005764 V, v_off_fin = 0.000002530 V 14:13:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997102 Vs 14:13:12 Temperature Measurement, Probe Number = 0, T = 20.138000 C 14:13:12 Temperature Measurement, Probe Number = 1, T = 20.063000 C 14:13:13 Temperature Measurement, Probe Number = 2, T = 20.129000 C 14:13:14 Temperature Measurement, Probe Number = 3, T = 20.074000 C 14:13:14 Temperature Measurement, Probe Number = 4, T = 20.437000 C 14:13:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.44 14:13:15 Integrated Voltage Measurement... 14:13:34 Voltage Offset Correction: v_off_ini = 0.000003610 V, v_off_fin = 0.000006515 V 14:13:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036717 Vs 14:13:35 Integrated Voltage Measurement... 14:13:54 Voltage Offset Correction: v_off_ini = 0.000005869 V, v_off_fin = 0.000002122 V 14:13:54 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170991948 Vs 14:13:57 Temperature Measurement, Probe Number = 0, T = 20.138000 C 14:13:58 Temperature Measurement, Probe Number = 1, T = 20.063000 C 14:13:58 Temperature Measurement, Probe Number = 2, T = 20.126000 C 14:13:59 Temperature Measurement, Probe Number = 3, T = 20.071000 C 14:14:00 Temperature Measurement, Probe Number = 4, T = 20.406000 C 14:14:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.41 14:14:00 Integrated Voltage Measurement... 14:14:19 Voltage Offset Correction: v_off_ini = 0.000004131 V, v_off_fin = 0.000006533 V 14:14:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041789 Vs 14:14:20 Integrated Voltage Measurement... 14:14:39 Voltage Offset Correction: v_off_ini = 0.000005520 V, v_off_fin = 0.000002930 V 14:14:39 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986964 Vs 14:14:41 Temperature Measurement, Probe Number = 0, T = 20.140000 C 14:14:42 Temperature Measurement, Probe Number = 1, T = 20.063000 C 14:14:43 Temperature Measurement, Probe Number = 2, T = 20.125000 C 14:14:43 Temperature Measurement, Probe Number = 3, T = 20.070000 C 14:14:44 Temperature Measurement, Probe Number = 4, T = 20.362000 C 14:14:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.36 14:14:44 Integrated Voltage Measurement... 14:15:04 Voltage Offset Correction: v_off_ini = 0.000003822 V, v_off_fin = 0.000006493 V 14:15:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171034374 Vs 14:15:04 Integrated Voltage Measurement... 14:15:23 Voltage Offset Correction: v_off_ini = 0.000005667 V, v_off_fin = 0.000002631 V 14:15:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989406 Vs 14:15:26 Temperature Measurement, Probe Number = 0, T = 20.134000 C 14:15:27 Temperature Measurement, Probe Number = 1, T = 20.060000 C 14:15:28 Temperature Measurement, Probe Number = 2, T = 20.121000 C 14:15:28 Temperature Measurement, Probe Number = 3, T = 20.068000 C 14:15:29 Temperature Measurement, Probe Number = 4, T = 20.264000 C 14:15:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.26 14:15:29 Integrated Voltage Measurement... 14:15:48 Voltage Offset Correction: v_off_ini = 0.000003741 V, v_off_fin = 0.000006243 V 14:15:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171033448 Vs 14:15:49 Integrated Voltage Measurement... 14:16:08 Voltage Offset Correction: v_off_ini = 0.000005600 V, v_off_fin = 0.000001890 V 14:16:08 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170991936 Vs 14:16:11 Temperature Measurement, Probe Number = 0, T = 20.141000 C 14:16:11 Temperature Measurement, Probe Number = 1, T = 20.063000 C 14:16:12 Temperature Measurement, Probe Number = 2, T = 20.124000 C 14:16:13 Temperature Measurement, Probe Number = 3, T = 20.069000 C 14:16:13 Temperature Measurement, Probe Number = 4, T = 20.296000 C 14:16:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.30 14:16:14 Integrated Voltage Measurement... 14:16:33 Voltage Offset Correction: v_off_ini = 0.000003180 V, v_off_fin = 0.000006119 V 14:16:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030308 Vs 14:16:33 Integrated Voltage Measurement... 14:16:52 Voltage Offset Correction: v_off_ini = 0.000005591 V, v_off_fin = 0.000002450 V 14:16:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996317 Vs 14:16:55 Temperature Measurement, Probe Number = 0, T = 20.142000 C 14:16:56 Temperature Measurement, Probe Number = 1, T = 20.064000 C 14:16:57 Temperature Measurement, Probe Number = 2, T = 20.128000 C 14:16:57 Temperature Measurement, Probe Number = 3, T = 20.073000 C 14:16:58 Temperature Measurement, Probe Number = 4, T = 20.334000 C 14:16:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.33 14:16:58 Integrated Voltage Measurement... 14:17:18 Voltage Offset Correction: v_off_ini = 0.000003614 V, v_off_fin = 0.000005747 V 14:17:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171032135 Vs 14:17:18 Integrated Voltage Measurement... 14:17:37 Voltage Offset Correction: v_off_ini = 0.000005532 V, v_off_fin = 0.000002546 V 14:17:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991386 Vs 14:17:40 Temperature Measurement, Probe Number = 0, T = 20.138000 C 14:17:40 Temperature Measurement, Probe Number = 1, T = 20.063000 C 14:17:41 Temperature Measurement, Probe Number = 2, T = 20.126000 C 14:17:42 Temperature Measurement, Probe Number = 3, T = 20.071000 C 14:17:42 Temperature Measurement, Probe Number = 4, T = 20.389000 C 14:17:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.39 14:17:43 Integrated Voltage Measurement... 14:18:02 Voltage Offset Correction: v_off_ini = 0.000003331 V, v_off_fin = 0.000005780 V 14:18:02 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171031078 Vs 14:18:02 Integrated Voltage Measurement... 14:18:22 Voltage Offset Correction: v_off_ini = 0.000005411 V, v_off_fin = 0.000002304 V 14:18:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996390 Vs 14:18:25 Temperature Measurement, Probe Number = 0, T = 20.137000 C 14:18:25 Temperature Measurement, Probe Number = 1, T = 20.060000 C 14:18:26 Temperature Measurement, Probe Number = 2, T = 20.126000 C 14:18:27 Temperature Measurement, Probe Number = 3, T = 20.071000 C 14:18:27 Temperature Measurement, Probe Number = 4, T = 20.357000 C 14:18:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.36 14:18:27 Integrated Voltage Measurement... 14:18:47 Voltage Offset Correction: v_off_ini = 0.000003233 V, v_off_fin = 0.000005911 V 14:18:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030504 Vs 14:18:47 Integrated Voltage Measurement... 14:19:06 Voltage Offset Correction: v_off_ini = 0.000005191 V, v_off_fin = 0.000002360 V 14:19:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992435 Vs 14:19:09 Temperature Measurement, Probe Number = 0, T = 20.140000 C 14:19:10 Temperature Measurement, Probe Number = 1, T = 20.064000 C 14:19:11 Temperature Measurement, Probe Number = 2, T = 20.128000 C 14:19:11 Temperature Measurement, Probe Number = 3, T = 20.072000 C 14:19:12 Temperature Measurement, Probe Number = 4, T = 20.429000 C 14:19:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.43 14:19:12 Integrated Voltage Measurement... 14:19:31 Voltage Offset Correction: v_off_ini = 0.000003604 V, v_off_fin = 0.000006510 V 14:19:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171036705 Vs 14:19:32 Integrated Voltage Measurement... 14:19:51 Voltage Offset Correction: v_off_ini = 0.000004870 V, v_off_fin = 0.000002662 V 14:19:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992744 Vs 14:49:54 Temperature Measurement, Probe Number = 0, T = 20.148000 C 14:49:54 Temperature Measurement, Probe Number = 1, T = 20.069000 C 14:49:55 Temperature Measurement, Probe Number = 2, T = 20.137000 C 14:49:55 Temperature Measurement, Probe Number = 3, T = 20.080000 C 14:49:56 Temperature Measurement, Probe Number = 4, T = 20.505000 C 14:49:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.50 14:49:56 Integrated Voltage Measurement... 14:50:16 Voltage Offset Correction: v_off_ini = 0.000003994 V, v_off_fin = 0.000005231 V 14:50:16 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171077272 Vs 14:50:16 Integrated Voltage Measurement... 14:50:35 Voltage Offset Correction: v_off_ini = 0.000005132 V, v_off_fin = 0.000001736 V 14:50:35 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170990784 Vs 14:50:38 Temperature Measurement, Probe Number = 0, T = 20.145000 C 14:50:38 Temperature Measurement, Probe Number = 1, T = 20.069000 C 14:50:39 Temperature Measurement, Probe Number = 2, T = 20.134000 C 14:50:40 Temperature Measurement, Probe Number = 3, T = 20.080000 C 14:50:40 Temperature Measurement, Probe Number = 4, T = 20.515000 C 14:50:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.52 14:50:41 Integrated Voltage Measurement... 14:51:00 Voltage Offset Correction: v_off_ini = 0.000003480 V, v_off_fin = 0.000005913 V 14:51:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171028092 Vs 14:51:00 Integrated Voltage Measurement... 14:51:20 Voltage Offset Correction: v_off_ini = 0.000005230 V, v_off_fin = 0.000002366 V 14:51:20 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170993481 Vs 14:51:23 Temperature Measurement, Probe Number = 0, T = 20.150000 C 14:51:23 Temperature Measurement, Probe Number = 1, T = 20.072000 C 14:51:24 Temperature Measurement, Probe Number = 2, T = 20.138000 C 14:51:25 Temperature Measurement, Probe Number = 3, T = 20.084000 C 14:51:25 Temperature Measurement, Probe Number = 4, T = 20.592000 C 14:51:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.59 14:51:25 Integrated Voltage Measurement... 14:51:45 Voltage Offset Correction: v_off_ini = 0.000003525 V, v_off_fin = 0.000006020 V 14:51:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171024239 Vs 14:51:45 Integrated Voltage Measurement... 14:52:04 Voltage Offset Correction: v_off_ini = 0.000005169 V, v_off_fin = 0.000002560 V 14:52:04 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170990830 Vs 14:52:07 Temperature Measurement, Probe Number = 0, T = 20.150000 C 14:52:08 Temperature Measurement, Probe Number = 1, T = 20.068000 C 14:52:08 Temperature Measurement, Probe Number = 2, T = 20.140000 C 14:52:09 Temperature Measurement, Probe Number = 3, T = 20.080000 C 14:52:10 Temperature Measurement, Probe Number = 4, T = 20.626000 C 14:52:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.63 14:52:10 Integrated Voltage Measurement... 14:52:29 Voltage Offset Correction: v_off_ini = 0.000003618 V, v_off_fin = 0.000006144 V 14:52:29 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171029140 Vs 14:52:29 Integrated Voltage Measurement... 14:52:49 Voltage Offset Correction: v_off_ini = 0.000005446 V, v_off_fin = 0.000002979 V 14:52:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984147 Vs 14:52:52 Temperature Measurement, Probe Number = 0, T = 20.150000 C 14:52:53 Temperature Measurement, Probe Number = 1, T = 20.069000 C 14:52:53 Temperature Measurement, Probe Number = 2, T = 20.139000 C 14:52:54 Temperature Measurement, Probe Number = 3, T = 20.081000 C 14:52:54 Temperature Measurement, Probe Number = 4, T = 20.689000 C 14:52:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.69 14:52:55 Integrated Voltage Measurement... 14:53:14 Voltage Offset Correction: v_off_ini = 0.000003578 V, v_off_fin = 0.000006133 V 14:53:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028718 Vs 14:53:14 Integrated Voltage Measurement... 14:53:33 Voltage Offset Correction: v_off_ini = 0.000005617 V, v_off_fin = 0.000002057 V 14:53:33 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986171 Vs 14:53:36 Temperature Measurement, Probe Number = 0, T = 20.146000 C 14:53:37 Temperature Measurement, Probe Number = 1, T = 20.068000 C 14:53:37 Temperature Measurement, Probe Number = 2, T = 20.134000 C 14:53:38 Temperature Measurement, Probe Number = 3, T = 20.078000 C 14:53:39 Temperature Measurement, Probe Number = 4, T = 20.637000 C 14:53:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.64 14:53:39 Integrated Voltage Measurement... 14:53:59 Voltage Offset Correction: v_off_ini = 0.000003721 V, v_off_fin = 0.000006494 V 14:53:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171030478 Vs 14:53:59 Integrated Voltage Measurement... 14:54:18 Voltage Offset Correction: v_off_ini = 0.000005759 V, v_off_fin = 0.000001745 V 14:54:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985236 Vs 14:54:21 Temperature Measurement, Probe Number = 0, T = 20.150000 C 14:54:22 Temperature Measurement, Probe Number = 1, T = 20.076000 C 14:54:22 Temperature Measurement, Probe Number = 2, T = 20.136000 C 14:54:23 Temperature Measurement, Probe Number = 3, T = 20.081000 C 14:54:24 Temperature Measurement, Probe Number = 4, T = 20.537000 C 14:54:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.54 14:54:24 Integrated Voltage Measurement... 14:54:43 Voltage Offset Correction: v_off_ini = 0.000003574 V, v_off_fin = 0.000006422 V 14:54:43 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171027282 Vs 14:54:44 Integrated Voltage Measurement... 14:55:03 Voltage Offset Correction: v_off_ini = 0.000005646 V, v_off_fin = 0.000002333 V 14:55:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989973 Vs 14:55:06 Temperature Measurement, Probe Number = 0, T = 20.154000 C 14:55:07 Temperature Measurement, Probe Number = 1, T = 20.076000 C 14:55:07 Temperature Measurement, Probe Number = 2, T = 20.140000 C 14:55:08 Temperature Measurement, Probe Number = 3, T = 20.082000 C 14:55:09 Temperature Measurement, Probe Number = 4, T = 20.576000 C 14:55:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.58 14:55:09 Integrated Voltage Measurement... 14:55:28 Voltage Offset Correction: v_off_ini = 0.000003210 V, v_off_fin = 0.000006505 V 14:55:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030744 Vs 14:55:29 Integrated Voltage Measurement... 14:55:47 Voltage Offset Correction: v_off_ini = 0.000005827 V, v_off_fin = 0.000002877 V 14:55:48 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979414 Vs 14:55:50 Temperature Measurement, Probe Number = 0, T = 20.156000 C 14:55:51 Temperature Measurement, Probe Number = 1, T = 20.079000 C 14:55:52 Temperature Measurement, Probe Number = 2, T = 20.143000 C 14:55:52 Temperature Measurement, Probe Number = 3, T = 20.085000 C 14:55:53 Temperature Measurement, Probe Number = 4, T = 20.568000 C 14:55:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.57 14:55:53 Integrated Voltage Measurement... 14:56:12 Voltage Offset Correction: v_off_ini = 0.000002688 V, v_off_fin = 0.000006170 V 14:56:13 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171035550 Vs 14:56:13 Integrated Voltage Measurement... 14:56:32 Voltage Offset Correction: v_off_ini = 0.000005845 V, v_off_fin = 0.000003168 V 14:56:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987893 Vs 14:56:35 Temperature Measurement, Probe Number = 0, T = 20.157000 C 14:56:36 Temperature Measurement, Probe Number = 1, T = 20.079000 C 14:56:36 Temperature Measurement, Probe Number = 2, T = 20.143000 C 14:56:37 Temperature Measurement, Probe Number = 3, T = 20.086000 C 14:56:38 Temperature Measurement, Probe Number = 4, T = 20.527000 C 14:56:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.53 14:56:38 Integrated Voltage Measurement... 14:56:57 Voltage Offset Correction: v_off_ini = 0.000003082 V, v_off_fin = 0.000006523 V 14:56:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171035579 Vs 14:56:58 Integrated Voltage Measurement... 14:57:17 Voltage Offset Correction: v_off_ini = 0.000005807 V, v_off_fin = 0.000002690 V 14:57:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981969 Vs 15:27:20 Temperature Measurement, Probe Number = 0, T = 20.155000 C 15:27:20 Temperature Measurement, Probe Number = 1, T = 20.081000 C 15:27:21 Temperature Measurement, Probe Number = 2, T = 20.143000 C 15:27:21 Temperature Measurement, Probe Number = 3, T = 20.091000 C 15:27:22 Temperature Measurement, Probe Number = 4, T = 20.558000 C 15:27:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.56 15:27:22 Integrated Voltage Measurement... 15:27:41 Voltage Offset Correction: v_off_ini = 0.000004912 V, v_off_fin = 0.000006463 V 15:27:41 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171091575 Vs 15:27:42 Integrated Voltage Measurement... 15:28:01 Voltage Offset Correction: v_off_ini = 0.000005753 V, v_off_fin = 0.000003052 V 15:28:01 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170976722 Vs 15:28:04 Temperature Measurement, Probe Number = 0, T = 20.159000 C 15:28:04 Temperature Measurement, Probe Number = 1, T = 20.082000 C 15:28:05 Temperature Measurement, Probe Number = 2, T = 20.146000 C 15:28:06 Temperature Measurement, Probe Number = 3, T = 20.093000 C 15:28:06 Temperature Measurement, Probe Number = 4, T = 20.610000 C 15:28:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.61 15:28:07 Integrated Voltage Measurement... 15:28:26 Voltage Offset Correction: v_off_ini = 0.000003872 V, v_off_fin = 0.000006929 V 15:28:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031715 Vs 15:28:26 Integrated Voltage Measurement... 15:28:45 Voltage Offset Correction: v_off_ini = 0.000006106 V, v_off_fin = 0.000003292 V 15:28:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966473 Vs 15:28:48 Temperature Measurement, Probe Number = 0, T = 20.154000 C 15:28:49 Temperature Measurement, Probe Number = 1, T = 20.079000 C 15:28:50 Temperature Measurement, Probe Number = 2, T = 20.142000 C 15:28:50 Temperature Measurement, Probe Number = 3, T = 20.090000 C 15:28:51 Temperature Measurement, Probe Number = 4, T = 20.651000 C 15:28:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.65 15:28:51 Integrated Voltage Measurement... 15:29:10 Voltage Offset Correction: v_off_ini = 0.000004127 V, v_off_fin = 0.000006627 V 15:29:11 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171035069 Vs 15:29:11 Integrated Voltage Measurement... 15:29:30 Voltage Offset Correction: v_off_ini = 0.000005688 V, v_off_fin = 0.000002691 V 15:29:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973439 Vs 15:29:33 Temperature Measurement, Probe Number = 0, T = 20.156000 C 15:29:34 Temperature Measurement, Probe Number = 1, T = 20.081000 C 15:29:35 Temperature Measurement, Probe Number = 2, T = 20.143000 C 15:29:35 Temperature Measurement, Probe Number = 3, T = 20.090000 C 15:29:36 Temperature Measurement, Probe Number = 4, T = 20.660000 C 15:29:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.66 15:29:36 Integrated Voltage Measurement... 15:29:56 Voltage Offset Correction: v_off_ini = 0.000003277 V, v_off_fin = 0.000006079 V 15:29:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030708 Vs 15:29:56 Integrated Voltage Measurement... 15:30:16 Voltage Offset Correction: v_off_ini = 0.000005341 V, v_off_fin = 0.000002600 V 15:30:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975760 Vs 15:30:18 Temperature Measurement, Probe Number = 0, T = 20.159000 C 15:30:19 Temperature Measurement, Probe Number = 1, T = 20.080000 C 15:30:20 Temperature Measurement, Probe Number = 2, T = 20.145000 C 15:30:20 Temperature Measurement, Probe Number = 3, T = 20.091000 C 15:30:21 Temperature Measurement, Probe Number = 4, T = 20.654000 C 15:30:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.65 15:30:21 Integrated Voltage Measurement... 15:30:40 Voltage Offset Correction: v_off_ini = 0.000003610 V, v_off_fin = 0.000005778 V 15:30:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171028943 Vs 15:30:41 Integrated Voltage Measurement... 15:31:00 Voltage Offset Correction: v_off_ini = 0.000005189 V, v_off_fin = 0.000001804 V 15:31:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980425 Vs 15:31:03 Temperature Measurement, Probe Number = 0, T = 20.155000 C 15:31:03 Temperature Measurement, Probe Number = 1, T = 20.075000 C 15:31:04 Temperature Measurement, Probe Number = 2, T = 20.145000 C 15:31:05 Temperature Measurement, Probe Number = 3, T = 20.088000 C 15:31:05 Temperature Measurement, Probe Number = 4, T = 20.624000 C 15:31:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.62 15:31:05 Integrated Voltage Measurement... 15:31:25 Voltage Offset Correction: v_off_ini = 0.000003810 V, v_off_fin = 0.000005611 V 15:31:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171027621 Vs 15:31:26 Integrated Voltage Measurement... 15:31:45 Voltage Offset Correction: v_off_ini = 0.000004919 V, v_off_fin = 0.000002394 V 15:31:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979355 Vs 15:31:48 Temperature Measurement, Probe Number = 0, T = 20.153000 C 15:31:49 Temperature Measurement, Probe Number = 1, T = 20.075000 C 15:31:50 Temperature Measurement, Probe Number = 2, T = 20.141000 C 15:31:50 Temperature Measurement, Probe Number = 3, T = 20.087000 C 15:31:51 Temperature Measurement, Probe Number = 4, T = 20.561000 C 15:31:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.56 15:31:51 Integrated Voltage Measurement... 15:32:10 Voltage Offset Correction: v_off_ini = 0.000003249 V, v_off_fin = 0.000005405 V 15:32:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171014796 Vs 15:32:10 Integrated Voltage Measurement... 15:32:29 Voltage Offset Correction: v_off_ini = 0.000005246 V, v_off_fin = 0.000001928 V 15:32:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984647 Vs 15:32:32 Temperature Measurement, Probe Number = 0, T = 20.157000 C 15:32:33 Temperature Measurement, Probe Number = 1, T = 20.080000 C 15:32:34 Temperature Measurement, Probe Number = 2, T = 20.142000 C 15:32:34 Temperature Measurement, Probe Number = 3, T = 20.087000 C 15:32:35 Temperature Measurement, Probe Number = 4, T = 20.577000 C 15:32:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.58 15:32:35 Integrated Voltage Measurement... 15:32:55 Voltage Offset Correction: v_off_ini = 0.000003595 V, v_off_fin = 0.000006224 V 15:32:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171025443 Vs 15:32:55 Integrated Voltage Measurement... 15:33:14 Voltage Offset Correction: v_off_ini = 0.000005736 V, v_off_fin = 0.000001618 V 15:33:14 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971522 Vs 15:33:17 Temperature Measurement, Probe Number = 0, T = 20.155000 C 15:33:17 Temperature Measurement, Probe Number = 1, T = 20.079000 C 15:33:18 Temperature Measurement, Probe Number = 2, T = 20.141000 C 15:33:19 Temperature Measurement, Probe Number = 3, T = 20.088000 C 15:33:19 Temperature Measurement, Probe Number = 4, T = 20.431000 C 15:33:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.43 15:33:20 Integrated Voltage Measurement... 15:33:39 Voltage Offset Correction: v_off_ini = 0.000003712 V, v_off_fin = 0.000006448 V 15:33:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171033210 Vs 15:33:39 Integrated Voltage Measurement... 15:33:58 Voltage Offset Correction: v_off_ini = 0.000005742 V, v_off_fin = 0.000003173 V 15:33:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978032 Vs 15:34:01 Temperature Measurement, Probe Number = 0, T = 20.159000 C 15:34:02 Temperature Measurement, Probe Number = 1, T = 20.079000 C 15:34:02 Temperature Measurement, Probe Number = 2, T = 20.143000 C 15:34:03 Temperature Measurement, Probe Number = 3, T = 20.089000 C 15:34:04 Temperature Measurement, Probe Number = 4, T = 20.394000 C 15:34:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.39 15:34:04 Integrated Voltage Measurement... 15:34:23 Voltage Offset Correction: v_off_ini = 0.000003932 V, v_off_fin = 0.000006026 V 15:34:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023553 Vs 15:34:24 Integrated Voltage Measurement... 15:34:43 Voltage Offset Correction: v_off_ini = 0.000005630 V, v_off_fin = 0.000001185 V 15:34:43 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982177 Vs 16:04:46 Temperature Measurement, Probe Number = 0, T = 20.152000 C 16:04:46 Temperature Measurement, Probe Number = 1, T = 20.075000 C 16:04:47 Temperature Measurement, Probe Number = 2, T = 20.139000 C 16:04:48 Temperature Measurement, Probe Number = 3, T = 20.083000 C 16:04:48 Temperature Measurement, Probe Number = 4, T = 20.276000 C 16:04:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.28 16:04:49 Integrated Voltage Measurement... 16:05:08 Voltage Offset Correction: v_off_ini = 0.000004571 V, v_off_fin = 0.000005791 V 16:05:09 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171081683 Vs 16:05:09 Integrated Voltage Measurement... 16:05:28 Voltage Offset Correction: v_off_ini = 0.000005151 V, v_off_fin = 0.000002135 V 16:05:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982000 Vs 16:05:31 Temperature Measurement, Probe Number = 0, T = 20.157000 C 16:05:32 Temperature Measurement, Probe Number = 1, T = 20.081000 C 16:05:32 Temperature Measurement, Probe Number = 2, T = 20.142000 C 16:05:33 Temperature Measurement, Probe Number = 3, T = 20.087000 C 16:05:34 Temperature Measurement, Probe Number = 4, T = 20.311000 C 16:05:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.31 16:05:34 Integrated Voltage Measurement... 16:05:53 Voltage Offset Correction: v_off_ini = 0.000003561 V, v_off_fin = 0.000006961 V 16:05:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171034164 Vs 16:05:53 Integrated Voltage Measurement... 16:06:13 Voltage Offset Correction: v_off_ini = 0.000005666 V, v_off_fin = 0.000002415 V 16:06:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977158 Vs 16:06:16 Temperature Measurement, Probe Number = 0, T = 20.159000 C 16:06:16 Temperature Measurement, Probe Number = 1, T = 20.079000 C 16:06:17 Temperature Measurement, Probe Number = 2, T = 20.145000 C 16:06:18 Temperature Measurement, Probe Number = 3, T = 20.088000 C 16:06:18 Temperature Measurement, Probe Number = 4, T = 20.187000 C 16:06:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.19 16:06:18 Integrated Voltage Measurement... 16:06:38 Voltage Offset Correction: v_off_ini = 0.000003886 V, v_off_fin = 0.000006339 V 16:06:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171028852 Vs 16:06:38 Integrated Voltage Measurement... 16:06:58 Voltage Offset Correction: v_off_ini = 0.000005607 V, v_off_fin = 0.000002225 V 16:06:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984464 Vs 16:07:00 Temperature Measurement, Probe Number = 0, T = 20.160000 C 16:07:01 Temperature Measurement, Probe Number = 1, T = 20.079000 C 16:07:02 Temperature Measurement, Probe Number = 2, T = 20.144000 C 16:07:02 Temperature Measurement, Probe Number = 3, T = 20.085000 C 16:07:03 Temperature Measurement, Probe Number = 4, T = 20.099000 C 16:07:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.10 16:07:03 Integrated Voltage Measurement... 16:07:23 Voltage Offset Correction: v_off_ini = 0.000003204 V, v_off_fin = 0.000006429 V 16:07:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029924 Vs 16:07:23 Integrated Voltage Measurement... 16:07:42 Voltage Offset Correction: v_off_ini = 0.000005241 V, v_off_fin = 0.000002442 V 16:07:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978117 Vs 16:07:45 Temperature Measurement, Probe Number = 0, T = 20.159000 C 16:07:45 Temperature Measurement, Probe Number = 1, T = 20.077000 C 16:07:46 Temperature Measurement, Probe Number = 2, T = 20.141000 C 16:07:47 Temperature Measurement, Probe Number = 3, T = 20.084000 C 16:07:47 Temperature Measurement, Probe Number = 4, T = 20.046000 C 16:07:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.05 16:07:48 Integrated Voltage Measurement... 16:08:07 Voltage Offset Correction: v_off_ini = 0.000003657 V, v_off_fin = 0.000006061 V 16:08:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171029858 Vs 16:08:07 Integrated Voltage Measurement... 16:08:26 Voltage Offset Correction: v_off_ini = 0.000005172 V, v_off_fin = 0.000001907 V 16:08:26 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170985298 Vs 16:08:29 Temperature Measurement, Probe Number = 0, T = 20.158000 C 16:08:29 Temperature Measurement, Probe Number = 1, T = 20.076000 C 16:08:30 Temperature Measurement, Probe Number = 2, T = 20.143000 C 16:08:31 Temperature Measurement, Probe Number = 3, T = 20.086000 C 16:08:31 Temperature Measurement, Probe Number = 4, T = 20.109000 C 16:08:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.11 16:08:32 Integrated Voltage Measurement... 16:08:51 Voltage Offset Correction: v_off_ini = 0.000002543 V, v_off_fin = 0.000005887 V 16:08:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031426 Vs 16:08:51 Integrated Voltage Measurement... 16:09:10 Voltage Offset Correction: v_off_ini = 0.000005089 V, v_off_fin = 0.000002184 V 16:09:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985540 Vs 16:09:13 Temperature Measurement, Probe Number = 0, T = 20.161000 C 16:09:14 Temperature Measurement, Probe Number = 1, T = 20.080000 C 16:09:14 Temperature Measurement, Probe Number = 2, T = 20.149000 C 16:09:15 Temperature Measurement, Probe Number = 3, T = 20.089000 C 16:09:16 Temperature Measurement, Probe Number = 4, T = 20.242000 C 16:09:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.24 16:09:16 Integrated Voltage Measurement... 16:09:35 Voltage Offset Correction: v_off_ini = 0.000002917 V, v_off_fin = 0.000005777 V 16:09:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037083 Vs 16:09:36 Integrated Voltage Measurement... 16:09:55 Voltage Offset Correction: v_off_ini = 0.000004950 V, v_off_fin = 0.000002475 V 16:09:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989375 Vs 16:09:58 Temperature Measurement, Probe Number = 0, T = 20.159000 C 16:09:59 Temperature Measurement, Probe Number = 1, T = 20.079000 C 16:09:59 Temperature Measurement, Probe Number = 2, T = 20.143000 C 16:10:00 Temperature Measurement, Probe Number = 3, T = 20.088000 C 16:10:01 Temperature Measurement, Probe Number = 4, T = 20.246000 C 16:10:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.25 16:10:01 Integrated Voltage Measurement... 16:10:20 Voltage Offset Correction: v_off_ini = 0.000003909 V, v_off_fin = 0.000006099 V 16:10:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038150 Vs 16:10:21 Integrated Voltage Measurement... 16:10:40 Voltage Offset Correction: v_off_ini = 0.000005606 V, v_off_fin = 0.000002637 V 16:10:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980819 Vs 16:10:43 Temperature Measurement, Probe Number = 0, T = 20.164000 C 16:10:44 Temperature Measurement, Probe Number = 1, T = 20.082000 C 16:10:44 Temperature Measurement, Probe Number = 2, T = 20.148000 C 16:10:45 Temperature Measurement, Probe Number = 3, T = 20.091000 C 16:10:46 Temperature Measurement, Probe Number = 4, T = 20.323000 C 16:10:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.32 16:10:46 Integrated Voltage Measurement... 16:11:05 Voltage Offset Correction: v_off_ini = 0.000003643 V, v_off_fin = 0.000005965 V 16:11:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038756 Vs 16:11:06 Integrated Voltage Measurement... 16:11:25 Voltage Offset Correction: v_off_ini = 0.000005966 V, v_off_fin = 0.000001843 V 16:11:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984835 Vs 16:11:28 Temperature Measurement, Probe Number = 0, T = 20.164000 C 16:11:28 Temperature Measurement, Probe Number = 1, T = 20.082000 C 16:11:29 Temperature Measurement, Probe Number = 2, T = 20.151000 C 16:11:30 Temperature Measurement, Probe Number = 3, T = 20.091000 C 16:11:30 Temperature Measurement, Probe Number = 4, T = 20.325000 C 16:11:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.32 16:11:31 Integrated Voltage Measurement... 16:11:50 Voltage Offset Correction: v_off_ini = 0.000003706 V, v_off_fin = 0.000006175 V 16:11:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171041677 Vs 16:11:50 Integrated Voltage Measurement... 16:12:09 Voltage Offset Correction: v_off_ini = 0.000005566 V, v_off_fin = 0.000002367 V 16:12:10 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980531 Vs 16:42:12 Temperature Measurement, Probe Number = 0, T = 20.163000 C 16:42:13 Temperature Measurement, Probe Number = 1, T = 20.085000 C 16:42:14 Temperature Measurement, Probe Number = 2, T = 20.150000 C 16:42:14 Temperature Measurement, Probe Number = 3, T = 20.093000 C 16:42:15 Temperature Measurement, Probe Number = 4, T = 20.228000 C 16:42:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.23 16:42:15 Integrated Voltage Measurement... 16:42:35 Voltage Offset Correction: v_off_ini = 0.000004621 V, v_off_fin = 0.000006548 V 16:42:35 Integrated Voltage Measurement Delta Gap = 0.0040020 m VT = 0.171090563 Vs 16:42:35 Integrated Voltage Measurement... 16:42:54 Voltage Offset Correction: v_off_ini = 0.000005466 V, v_off_fin = 0.000002983 V 16:42:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975550 Vs 16:42:57 Temperature Measurement, Probe Number = 0, T = 20.159000 C 16:42:58 Temperature Measurement, Probe Number = 1, T = 20.083000 C 16:42:58 Temperature Measurement, Probe Number = 2, T = 20.146000 C 16:42:59 Temperature Measurement, Probe Number = 3, T = 20.092000 C 16:43:00 Temperature Measurement, Probe Number = 4, T = 20.324000 C 16:43:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.32 16:43:00 Integrated Voltage Measurement... 16:43:19 Voltage Offset Correction: v_off_ini = 0.000003508 V, v_off_fin = 0.000008598 V 16:43:19 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171025452 Vs 16:43:19 Integrated Voltage Measurement... 16:43:39 Voltage Offset Correction: v_off_ini = 0.000005718 V, v_off_fin = 0.000002361 V 16:43:39 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170966407 Vs 16:43:41 Temperature Measurement, Probe Number = 0, T = 20.157000 C 16:43:42 Temperature Measurement, Probe Number = 1, T = 20.085000 C 16:43:43 Temperature Measurement, Probe Number = 2, T = 20.144000 C 16:43:43 Temperature Measurement, Probe Number = 3, T = 20.093000 C 16:43:44 Temperature Measurement, Probe Number = 4, T = 20.381000 C 16:43:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.38 16:43:44 Integrated Voltage Measurement... 16:44:03 Voltage Offset Correction: v_off_ini = 0.000003095 V, v_off_fin = 0.000006554 V 16:44:03 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171037364 Vs 16:44:04 Integrated Voltage Measurement... 16:44:23 Voltage Offset Correction: v_off_ini = 0.000006177 V, v_off_fin = 0.000002567 V 16:44:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976306 Vs 16:44:25 Temperature Measurement, Probe Number = 0, T = 20.163000 C 16:44:26 Temperature Measurement, Probe Number = 1, T = 20.090000 C 16:44:27 Temperature Measurement, Probe Number = 2, T = 20.149000 C 16:44:27 Temperature Measurement, Probe Number = 3, T = 20.096000 C 16:44:28 Temperature Measurement, Probe Number = 4, T = 20.486000 C 16:44:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.49 16:44:28 Integrated Voltage Measurement... 16:44:47 Voltage Offset Correction: v_off_ini = 0.000004236 V, v_off_fin = 0.000006709 V 16:44:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042893 Vs 16:44:48 Integrated Voltage Measurement... 16:45:07 Voltage Offset Correction: v_off_ini = 0.000006206 V, v_off_fin = 0.000003473 V 16:45:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967986 Vs 16:45:10 Temperature Measurement, Probe Number = 0, T = 20.170000 C 16:45:11 Temperature Measurement, Probe Number = 1, T = 20.094000 C 16:45:11 Temperature Measurement, Probe Number = 2, T = 20.154000 C 16:45:12 Temperature Measurement, Probe Number = 3, T = 20.100000 C 16:45:13 Temperature Measurement, Probe Number = 4, T = 20.537000 C 16:45:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.54 16:45:13 Integrated Voltage Measurement... 16:45:32 Voltage Offset Correction: v_off_ini = 0.000004347 V, v_off_fin = 0.000006665 V 16:45:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046644 Vs 16:45:33 Integrated Voltage Measurement... 16:45:51 Voltage Offset Correction: v_off_ini = 0.000006251 V, v_off_fin = 0.000003354 V 16:45:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966216 Vs 16:45:54 Temperature Measurement, Probe Number = 0, T = 20.172000 C 16:45:55 Temperature Measurement, Probe Number = 1, T = 20.096000 C 16:45:56 Temperature Measurement, Probe Number = 2, T = 20.153000 C 16:45:56 Temperature Measurement, Probe Number = 3, T = 20.099000 C 16:45:57 Temperature Measurement, Probe Number = 4, T = 20.555000 C 16:45:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.55 16:45:57 Integrated Voltage Measurement... 16:46:16 Voltage Offset Correction: v_off_ini = 0.000004730 V, v_off_fin = 0.000006781 V 16:46:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044566 Vs 16:46:17 Integrated Voltage Measurement... 16:46:36 Voltage Offset Correction: v_off_ini = 0.000005924 V, v_off_fin = 0.000003495 V 16:46:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971747 Vs 16:46:39 Temperature Measurement, Probe Number = 0, T = 20.165000 C 16:46:39 Temperature Measurement, Probe Number = 1, T = 20.089000 C 16:46:40 Temperature Measurement, Probe Number = 2, T = 20.149000 C 16:46:41 Temperature Measurement, Probe Number = 3, T = 20.097000 C 16:46:41 Temperature Measurement, Probe Number = 4, T = 20.528000 C 16:46:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.53 16:46:41 Integrated Voltage Measurement... 16:47:01 Voltage Offset Correction: v_off_ini = 0.000004217 V, v_off_fin = 0.000006514 V 16:47:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171043142 Vs 16:47:01 Integrated Voltage Measurement... 16:47:20 Voltage Offset Correction: v_off_ini = 0.000006153 V, v_off_fin = 0.000002677 V 16:47:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969261 Vs 16:47:23 Temperature Measurement, Probe Number = 0, T = 20.165000 C 16:47:24 Temperature Measurement, Probe Number = 1, T = 20.088000 C 16:47:24 Temperature Measurement, Probe Number = 2, T = 20.148000 C 16:47:25 Temperature Measurement, Probe Number = 3, T = 20.094000 C 16:47:26 Temperature Measurement, Probe Number = 4, T = 20.453000 C 16:47:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.45 16:47:26 Integrated Voltage Measurement... 16:47:45 Voltage Offset Correction: v_off_ini = 0.000003983 V, v_off_fin = 0.000006469 V 16:47:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037589 Vs 16:47:45 Integrated Voltage Measurement... 16:48:04 Voltage Offset Correction: v_off_ini = 0.000005453 V, v_off_fin = 0.000002279 V 16:48:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974817 Vs 16:48:07 Temperature Measurement, Probe Number = 0, T = 20.167000 C 16:48:08 Temperature Measurement, Probe Number = 1, T = 20.091000 C 16:48:09 Temperature Measurement, Probe Number = 2, T = 20.150000 C 16:48:09 Temperature Measurement, Probe Number = 3, T = 20.096000 C 16:48:10 Temperature Measurement, Probe Number = 4, T = 20.456000 C 16:48:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.46 16:48:10 Integrated Voltage Measurement... 16:48:29 Voltage Offset Correction: v_off_ini = 0.000004207 V, v_off_fin = 0.000006766 V 16:48:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044598 Vs 16:48:30 Integrated Voltage Measurement... 16:48:49 Voltage Offset Correction: v_off_ini = 0.000005934 V, v_off_fin = 0.000003568 V 16:48:49 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170972515 Vs 16:48:52 Temperature Measurement, Probe Number = 0, T = 20.163000 C 16:48:52 Temperature Measurement, Probe Number = 1, T = 20.087000 C 16:48:53 Temperature Measurement, Probe Number = 2, T = 20.147000 C 16:48:54 Temperature Measurement, Probe Number = 3, T = 20.092000 C 16:48:54 Temperature Measurement, Probe Number = 4, T = 20.537000 C 16:48:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.54 16:48:55 Integrated Voltage Measurement... 16:49:14 Voltage Offset Correction: v_off_ini = 0.000003644 V, v_off_fin = 0.000006313 V 16:49:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044175 Vs 16:49:15 Integrated Voltage Measurement... 16:49:34 Voltage Offset Correction: v_off_ini = 0.000005582 V, v_off_fin = 0.000002730 V 16:49:34 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170969817 Vs 17:19:37 Temperature Measurement, Probe Number = 0, T = 20.160000 C 17:19:38 Temperature Measurement, Probe Number = 1, T = 20.082000 C 17:19:38 Temperature Measurement, Probe Number = 2, T = 20.148000 C 17:19:39 Temperature Measurement, Probe Number = 3, T = 20.090000 C 17:19:40 Temperature Measurement, Probe Number = 4, T = 20.273000 C 17:19:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.27 17:19:40 Integrated Voltage Measurement... 17:19:59 Voltage Offset Correction: v_off_ini = 0.000004297 V, v_off_fin = 0.000006568 V 17:19:59 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171086597 Vs 17:19:59 Integrated Voltage Measurement... 17:20:19 Voltage Offset Correction: v_off_ini = 0.000005973 V, v_off_fin = 0.000002756 V 17:20:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170978089 Vs 17:20:22 Temperature Measurement, Probe Number = 0, T = 20.166000 C 17:20:22 Temperature Measurement, Probe Number = 1, T = 20.086000 C 17:20:23 Temperature Measurement, Probe Number = 2, T = 20.148000 C 17:20:24 Temperature Measurement, Probe Number = 3, T = 20.092000 C 17:20:24 Temperature Measurement, Probe Number = 4, T = 20.312000 C 17:20:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.31 17:20:24 Integrated Voltage Measurement... 17:20:44 Voltage Offset Correction: v_off_ini = 0.000003964 V, v_off_fin = 0.000006596 V 17:20:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040824 Vs 17:20:44 Integrated Voltage Measurement... 17:21:04 Voltage Offset Correction: v_off_ini = 0.000005868 V, v_off_fin = 0.000002983 V 17:21:04 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170974179 Vs 17:21:07 Temperature Measurement, Probe Number = 0, T = 20.160000 C 17:21:07 Temperature Measurement, Probe Number = 1, T = 20.086000 C 17:21:08 Temperature Measurement, Probe Number = 2, T = 20.145000 C 17:21:09 Temperature Measurement, Probe Number = 3, T = 20.091000 C 17:21:09 Temperature Measurement, Probe Number = 4, T = 20.272000 C 17:21:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.27 17:21:09 Integrated Voltage Measurement... 17:21:29 Voltage Offset Correction: v_off_ini = 0.000003398 V, v_off_fin = 0.000006204 V 17:21:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037413 Vs 17:21:29 Integrated Voltage Measurement... 17:21:49 Voltage Offset Correction: v_off_ini = 0.000005359 V, v_off_fin = 0.000002856 V 17:21:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978405 Vs 17:21:51 Temperature Measurement, Probe Number = 0, T = 20.161000 C 17:21:52 Temperature Measurement, Probe Number = 1, T = 20.087000 C 17:21:53 Temperature Measurement, Probe Number = 2, T = 20.147000 C 17:21:53 Temperature Measurement, Probe Number = 3, T = 20.094000 C 17:21:54 Temperature Measurement, Probe Number = 4, T = 20.281000 C 17:21:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.28 17:21:54 Integrated Voltage Measurement... 17:22:14 Voltage Offset Correction: v_off_ini = 0.000003563 V, v_off_fin = 0.000005865 V 17:22:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038545 Vs 17:22:14 Integrated Voltage Measurement... 17:22:33 Voltage Offset Correction: v_off_ini = 0.000005319 V, v_off_fin = 0.000002801 V 17:22:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985327 Vs 17:22:36 Temperature Measurement, Probe Number = 0, T = 20.164000 C 17:22:36 Temperature Measurement, Probe Number = 1, T = 20.087000 C 17:22:37 Temperature Measurement, Probe Number = 2, T = 20.148000 C 17:22:38 Temperature Measurement, Probe Number = 3, T = 20.095000 C 17:22:38 Temperature Measurement, Probe Number = 4, T = 20.220000 C 17:22:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.22 17:22:39 Integrated Voltage Measurement... 17:22:58 Voltage Offset Correction: v_off_ini = 0.000002691 V, v_off_fin = 0.000006253 V 17:22:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036575 Vs 17:22:58 Integrated Voltage Measurement... 17:23:18 Voltage Offset Correction: v_off_ini = 0.000005903 V, v_off_fin = 0.000001896 V 17:23:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978790 Vs 17:23:21 Temperature Measurement, Probe Number = 0, T = 20.163000 C 17:23:21 Temperature Measurement, Probe Number = 1, T = 20.087000 C 17:23:22 Temperature Measurement, Probe Number = 2, T = 20.150000 C 17:23:23 Temperature Measurement, Probe Number = 3, T = 20.095000 C 17:23:23 Temperature Measurement, Probe Number = 4, T = 20.254000 C 17:23:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.25 17:23:24 Integrated Voltage Measurement... 17:23:43 Voltage Offset Correction: v_off_ini = 0.000003116 V, v_off_fin = 0.000006428 V 17:23:43 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171032221 Vs 17:23:43 Integrated Voltage Measurement... 17:24:02 Voltage Offset Correction: v_off_ini = 0.000006083 V, v_off_fin = 0.000002194 V 17:24:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978024 Vs 17:24:05 Temperature Measurement, Probe Number = 0, T = 20.162000 C 17:24:06 Temperature Measurement, Probe Number = 1, T = 20.083000 C 17:24:06 Temperature Measurement, Probe Number = 2, T = 20.148000 C 17:24:07 Temperature Measurement, Probe Number = 3, T = 20.091000 C 17:24:08 Temperature Measurement, Probe Number = 4, T = 20.226000 C 17:24:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.23 17:24:08 Integrated Voltage Measurement... 17:24:27 Voltage Offset Correction: v_off_ini = 0.000003683 V, v_off_fin = 0.000005784 V 17:24:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037315 Vs 17:24:27 Integrated Voltage Measurement... 17:24:47 Voltage Offset Correction: v_off_ini = 0.000005042 V, v_off_fin = 0.000002362 V 17:24:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989802 Vs 17:24:50 Temperature Measurement, Probe Number = 0, T = 20.164000 C 17:24:50 Temperature Measurement, Probe Number = 1, T = 20.087000 C 17:24:51 Temperature Measurement, Probe Number = 2, T = 20.152000 C 17:24:52 Temperature Measurement, Probe Number = 3, T = 20.095000 C 17:24:52 Temperature Measurement, Probe Number = 4, T = 20.334000 C 17:24:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.33 17:24:52 Integrated Voltage Measurement... 17:25:12 Voltage Offset Correction: v_off_ini = 0.000003119 V, v_off_fin = 0.000005970 V 17:25:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035412 Vs 17:25:12 Integrated Voltage Measurement... 17:25:31 Voltage Offset Correction: v_off_ini = 0.000004774 V, v_off_fin = 0.000002233 V 17:25:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986058 Vs 17:25:34 Temperature Measurement, Probe Number = 0, T = 20.165000 C 17:25:35 Temperature Measurement, Probe Number = 1, T = 20.088000 C 17:25:35 Temperature Measurement, Probe Number = 2, T = 20.154000 C 17:25:36 Temperature Measurement, Probe Number = 3, T = 20.094000 C 17:25:37 Temperature Measurement, Probe Number = 4, T = 20.361000 C 17:25:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.36 17:25:37 Integrated Voltage Measurement... 17:25:56 Voltage Offset Correction: v_off_ini = 0.000003411 V, v_off_fin = 0.000005931 V 17:25:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042639 Vs 17:25:56 Integrated Voltage Measurement... 17:26:15 Voltage Offset Correction: v_off_ini = 0.000005407 V, v_off_fin = 0.000002337 V 17:26:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977438 Vs 17:26:18 Temperature Measurement, Probe Number = 0, T = 20.165000 C 17:26:19 Temperature Measurement, Probe Number = 1, T = 20.091000 C 17:26:20 Temperature Measurement, Probe Number = 2, T = 20.150000 C 17:26:20 Temperature Measurement, Probe Number = 3, T = 20.095000 C 17:26:21 Temperature Measurement, Probe Number = 4, T = 20.408000 C 17:26:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.41 17:26:21 Integrated Voltage Measurement... 17:26:40 Voltage Offset Correction: v_off_ini = 0.000004143 V, v_off_fin = 0.000005977 V 17:26:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049268 Vs 17:26:41 Integrated Voltage Measurement... 17:27:00 Voltage Offset Correction: v_off_ini = 0.000005748 V, v_off_fin = 0.000002904 V 17:27:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978142 Vs 17:57:03 Temperature Measurement, Probe Number = 0, T = 20.167000 C 17:57:04 Temperature Measurement, Probe Number = 1, T = 20.087000 C 17:57:04 Temperature Measurement, Probe Number = 2, T = 20.153000 C 17:57:05 Temperature Measurement, Probe Number = 3, T = 20.097000 C 17:57:06 Temperature Measurement, Probe Number = 4, T = 20.371000 C 17:57:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.37 17:57:06 Integrated Voltage Measurement... 17:57:25 Voltage Offset Correction: v_off_ini = 0.000004466 V, v_off_fin = 0.000006148 V 17:57:25 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171083869 Vs 17:57:26 Integrated Voltage Measurement... 17:57:45 Voltage Offset Correction: v_off_ini = 0.000005430 V, v_off_fin = 0.000001914 V 17:57:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990414 Vs 17:57:48 Temperature Measurement, Probe Number = 0, T = 20.163000 C 17:57:48 Temperature Measurement, Probe Number = 1, T = 20.086000 C 17:57:49 Temperature Measurement, Probe Number = 2, T = 20.149000 C 17:57:50 Temperature Measurement, Probe Number = 3, T = 20.094000 C 17:57:50 Temperature Measurement, Probe Number = 4, T = 20.351000 C 17:57:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.35 17:57:50 Integrated Voltage Measurement... 17:58:10 Voltage Offset Correction: v_off_ini = 0.000003268 V, v_off_fin = 0.000005994 V 17:58:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041304 Vs 17:58:10 Integrated Voltage Measurement... 17:58:29 Voltage Offset Correction: v_off_ini = 0.000005933 V, v_off_fin = 0.000002862 V 17:58:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983254 Vs 17:58:32 Temperature Measurement, Probe Number = 0, T = 20.165000 C 17:58:33 Temperature Measurement, Probe Number = 1, T = 20.089000 C 17:58:34 Temperature Measurement, Probe Number = 2, T = 20.149000 C 17:58:34 Temperature Measurement, Probe Number = 3, T = 20.093000 C 17:58:35 Temperature Measurement, Probe Number = 4, T = 20.288000 C 17:58:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.29 17:58:35 Integrated Voltage Measurement... 17:58:55 Voltage Offset Correction: v_off_ini = 0.000003636 V, v_off_fin = 0.000005999 V 17:58:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039931 Vs 17:58:55 Integrated Voltage Measurement... 17:59:14 Voltage Offset Correction: v_off_ini = 0.000005374 V, v_off_fin = 0.000002319 V 17:59:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986711 Vs 17:59:17 Temperature Measurement, Probe Number = 0, T = 20.167000 C 17:59:18 Temperature Measurement, Probe Number = 1, T = 20.090000 C 17:59:18 Temperature Measurement, Probe Number = 2, T = 20.149000 C 17:59:19 Temperature Measurement, Probe Number = 3, T = 20.093000 C 17:59:20 Temperature Measurement, Probe Number = 4, T = 20.266000 C 17:59:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.27 17:59:20 Integrated Voltage Measurement... 17:59:39 Voltage Offset Correction: v_off_ini = 0.000003425 V, v_off_fin = 0.000006477 V 17:59:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039020 Vs 17:59:39 Integrated Voltage Measurement... 17:59:58 Voltage Offset Correction: v_off_ini = 0.000005618 V, v_off_fin = 0.000002803 V 17:59:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980681 Vs 18:00:01 Temperature Measurement, Probe Number = 0, T = 20.166000 C 18:00:02 Temperature Measurement, Probe Number = 1, T = 20.087000 C 18:00:03 Temperature Measurement, Probe Number = 2, T = 20.149000 C 18:00:03 Temperature Measurement, Probe Number = 3, T = 20.094000 C 18:00:04 Temperature Measurement, Probe Number = 4, T = 20.251000 C 18:00:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.25 18:00:04 Integrated Voltage Measurement... 18:00:23 Voltage Offset Correction: v_off_ini = 0.000003310 V, v_off_fin = 0.000005620 V 18:00:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035357 Vs 18:00:24 Integrated Voltage Measurement... 18:00:43 Voltage Offset Correction: v_off_ini = 0.000005510 V, v_off_fin = 0.000003184 V 18:00:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984359 Vs 18:00:46 Temperature Measurement, Probe Number = 0, T = 20.167000 C 18:00:46 Temperature Measurement, Probe Number = 1, T = 20.089000 C 18:00:47 Temperature Measurement, Probe Number = 2, T = 20.149000 C 18:00:47 Temperature Measurement, Probe Number = 3, T = 20.095000 C 18:00:48 Temperature Measurement, Probe Number = 4, T = 20.222000 C 18:00:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.22 18:00:48 Integrated Voltage Measurement... 18:01:07 Voltage Offset Correction: v_off_ini = 0.000003660 V, v_off_fin = 0.000005965 V 18:01:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043632 Vs 18:01:08 Integrated Voltage Measurement... 18:01:27 Voltage Offset Correction: v_off_ini = 0.000006053 V, v_off_fin = 0.000002457 V 18:01:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984992 Vs 18:01:30 Temperature Measurement, Probe Number = 0, T = 20.164000 C 18:01:31 Temperature Measurement, Probe Number = 1, T = 20.086000 C 18:01:31 Temperature Measurement, Probe Number = 2, T = 20.145000 C 18:01:32 Temperature Measurement, Probe Number = 3, T = 20.088000 C 18:01:33 Temperature Measurement, Probe Number = 4, T = 20.209000 C 18:01:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.21 18:01:33 Integrated Voltage Measurement... 18:01:53 Voltage Offset Correction: v_off_ini = 0.000003608 V, v_off_fin = 0.000006048 V 18:01:53 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171039739 Vs 18:01:53 Integrated Voltage Measurement... 18:02:13 Voltage Offset Correction: v_off_ini = 0.000005175 V, v_off_fin = 0.000002511 V 18:02:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986341 Vs 18:02:15 Temperature Measurement, Probe Number = 0, T = 20.158000 C 18:02:16 Temperature Measurement, Probe Number = 1, T = 20.084000 C 18:02:17 Temperature Measurement, Probe Number = 2, T = 20.142000 C 18:02:17 Temperature Measurement, Probe Number = 3, T = 20.087000 C 18:02:18 Temperature Measurement, Probe Number = 4, T = 20.132000 C 18:02:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.13 18:02:18 Integrated Voltage Measurement... 18:02:38 Voltage Offset Correction: v_off_ini = 0.000002893 V, v_off_fin = 0.000006330 V 18:02:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040394 Vs 18:02:38 Integrated Voltage Measurement... 18:02:58 Voltage Offset Correction: v_off_ini = 0.000005356 V, v_off_fin = 0.000002940 V 18:02:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986842 Vs 18:03:00 Temperature Measurement, Probe Number = 0, T = 20.165000 C 18:03:01 Temperature Measurement, Probe Number = 1, T = 20.088000 C 18:03:02 Temperature Measurement, Probe Number = 2, T = 20.149000 C 18:03:02 Temperature Measurement, Probe Number = 3, T = 20.093000 C 18:03:03 Temperature Measurement, Probe Number = 4, T = 20.266000 C 18:03:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.27 18:03:03 Integrated Voltage Measurement... 18:03:22 Voltage Offset Correction: v_off_ini = 0.000003768 V, v_off_fin = 0.000006140 V 18:03:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171040792 Vs 18:03:23 Integrated Voltage Measurement... 18:03:42 Voltage Offset Correction: v_off_ini = 0.000005139 V, v_off_fin = 0.000002293 V 18:03:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986750 Vs 18:03:45 Temperature Measurement, Probe Number = 0, T = 20.165000 C 18:03:45 Temperature Measurement, Probe Number = 1, T = 20.088000 C 18:03:46 Temperature Measurement, Probe Number = 2, T = 20.146000 C 18:03:47 Temperature Measurement, Probe Number = 3, T = 20.091000 C 18:03:47 Temperature Measurement, Probe Number = 4, T = 20.275000 C 18:03:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.27 18:03:47 Integrated Voltage Measurement... 18:04:07 Voltage Offset Correction: v_off_ini = 0.000003602 V, v_off_fin = 0.000005831 V 18:04:07 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042079 Vs 18:04:07 Integrated Voltage Measurement... 18:04:27 Voltage Offset Correction: v_off_ini = 0.000005406 V, v_off_fin = 0.000001696 V 18:04:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991146 Vs 18:34:29 Temperature Measurement, Probe Number = 0, T = 20.160000 C 18:34:30 Temperature Measurement, Probe Number = 1, T = 20.086000 C 18:34:31 Temperature Measurement, Probe Number = 2, T = 20.146000 C 18:34:31 Temperature Measurement, Probe Number = 3, T = 20.092000 C 18:34:32 Temperature Measurement, Probe Number = 4, T = 20.329000 C 18:34:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.33 18:34:32 Integrated Voltage Measurement... 18:34:51 Voltage Offset Correction: v_off_ini = 0.000005262 V, v_off_fin = 0.000006666 V 18:34:52 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171094780 Vs 18:34:52 Integrated Voltage Measurement... 18:35:11 Voltage Offset Correction: v_off_ini = 0.000006327 V, v_off_fin = 0.000003436 V 18:35:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984526 Vs 18:35:14 Temperature Measurement, Probe Number = 0, T = 20.162000 C 18:35:15 Temperature Measurement, Probe Number = 1, T = 20.091000 C 18:35:15 Temperature Measurement, Probe Number = 2, T = 20.149000 C 18:35:16 Temperature Measurement, Probe Number = 3, T = 20.095000 C 18:35:17 Temperature Measurement, Probe Number = 4, T = 20.273000 C 18:35:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.27 18:35:17 Integrated Voltage Measurement... 18:35:36 Voltage Offset Correction: v_off_ini = 0.000003948 V, v_off_fin = 0.000006413 V 18:35:36 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044765 Vs 18:35:37 Integrated Voltage Measurement... 18:35:56 Voltage Offset Correction: v_off_ini = 0.000006099 V, v_off_fin = 0.000002278 V 18:35:56 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170984189 Vs 18:35:59 Temperature Measurement, Probe Number = 0, T = 20.169000 C 18:35:59 Temperature Measurement, Probe Number = 1, T = 20.092000 C 18:36:00 Temperature Measurement, Probe Number = 2, T = 20.153000 C 18:36:01 Temperature Measurement, Probe Number = 3, T = 20.097000 C 18:36:01 Temperature Measurement, Probe Number = 4, T = 20.361000 C 18:36:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.36 18:36:01 Integrated Voltage Measurement... 18:36:21 Voltage Offset Correction: v_off_ini = 0.000002937 V, v_off_fin = 0.000005721 V 18:36:21 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042196 Vs 18:36:21 Integrated Voltage Measurement... 18:36:41 Voltage Offset Correction: v_off_ini = 0.000005420 V, v_off_fin = 0.000002070 V 18:36:41 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170995825 Vs 18:36:44 Temperature Measurement, Probe Number = 0, T = 20.174000 C 18:36:44 Temperature Measurement, Probe Number = 1, T = 20.095000 C 18:36:45 Temperature Measurement, Probe Number = 2, T = 20.157000 C 18:36:46 Temperature Measurement, Probe Number = 3, T = 20.102000 C 18:36:46 Temperature Measurement, Probe Number = 4, T = 20.404000 C 18:36:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.40 18:36:46 Integrated Voltage Measurement... 18:37:06 Voltage Offset Correction: v_off_ini = 0.000003526 V, v_off_fin = 0.000005525 V 18:37:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171032227 Vs 18:37:06 Integrated Voltage Measurement... 18:37:26 Voltage Offset Correction: v_off_ini = 0.000005219 V, v_off_fin = 0.000002150 V 18:37:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995916 Vs 18:37:29 Temperature Measurement, Probe Number = 0, T = 20.169000 C 18:37:29 Temperature Measurement, Probe Number = 1, T = 20.089000 C 18:37:30 Temperature Measurement, Probe Number = 2, T = 20.152000 C 18:37:31 Temperature Measurement, Probe Number = 3, T = 20.096000 C 18:37:31 Temperature Measurement, Probe Number = 4, T = 20.482000 C 18:37:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.48 18:37:32 Integrated Voltage Measurement... 18:37:51 Voltage Offset Correction: v_off_ini = 0.000002789 V, v_off_fin = 0.000006115 V 18:37:51 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171035501 Vs 18:37:51 Integrated Voltage Measurement... 18:38:10 Voltage Offset Correction: v_off_ini = 0.000005699 V, v_off_fin = 0.000001981 V 18:38:10 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170990109 Vs 18:38:13 Temperature Measurement, Probe Number = 0, T = 20.169000 C 18:38:14 Temperature Measurement, Probe Number = 1, T = 20.091000 C 18:38:14 Temperature Measurement, Probe Number = 2, T = 20.155000 C 18:38:15 Temperature Measurement, Probe Number = 3, T = 20.097000 C 18:38:15 Temperature Measurement, Probe Number = 4, T = 20.570000 C 18:38:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.57 18:38:16 Integrated Voltage Measurement... 18:38:35 Voltage Offset Correction: v_off_ini = 0.000003482 V, v_off_fin = 0.000006469 V 18:38:35 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047207 Vs 18:38:35 Integrated Voltage Measurement... 18:38:55 Voltage Offset Correction: v_off_ini = 0.000006205 V, v_off_fin = 0.000002805 V 18:38:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986503 Vs 18:38:58 Temperature Measurement, Probe Number = 0, T = 20.171000 C 18:38:58 Temperature Measurement, Probe Number = 1, T = 20.091000 C 18:38:59 Temperature Measurement, Probe Number = 2, T = 20.158000 C 18:39:00 Temperature Measurement, Probe Number = 3, T = 20.099000 C 18:39:00 Temperature Measurement, Probe Number = 4, T = 20.573000 C 18:39:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.57 18:39:00 Integrated Voltage Measurement... 18:39:20 Voltage Offset Correction: v_off_ini = 0.000004018 V, v_off_fin = 0.000006230 V 18:39:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046622 Vs 18:39:20 Integrated Voltage Measurement... 18:39:40 Voltage Offset Correction: v_off_ini = 0.000005685 V, v_off_fin = 0.000002885 V 18:39:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987636 Vs 18:39:43 Temperature Measurement, Probe Number = 0, T = 20.169000 C 18:39:43 Temperature Measurement, Probe Number = 1, T = 20.095000 C 18:39:44 Temperature Measurement, Probe Number = 2, T = 20.151000 C 18:39:45 Temperature Measurement, Probe Number = 3, T = 20.096000 C 18:39:45 Temperature Measurement, Probe Number = 4, T = 20.516000 C 18:39:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.52 18:39:46 Integrated Voltage Measurement... 18:40:05 Voltage Offset Correction: v_off_ini = 0.000003467 V, v_off_fin = 0.000006401 V 18:40:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041531 Vs 18:40:05 Integrated Voltage Measurement... 18:40:25 Voltage Offset Correction: v_off_ini = 0.000005745 V, v_off_fin = 0.000002728 V 18:40:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985583 Vs 18:40:28 Temperature Measurement, Probe Number = 0, T = 20.168000 C 18:40:28 Temperature Measurement, Probe Number = 1, T = 20.093000 C 18:40:29 Temperature Measurement, Probe Number = 2, T = 20.149000 C 18:40:30 Temperature Measurement, Probe Number = 3, T = 20.095000 C 18:40:30 Temperature Measurement, Probe Number = 4, T = 20.482000 C 18:40:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.48 18:40:31 Integrated Voltage Measurement... 18:40:50 Voltage Offset Correction: v_off_ini = 0.000003554 V, v_off_fin = 0.000006671 V 18:40:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044144 Vs 18:40:50 Integrated Voltage Measurement... 18:41:09 Voltage Offset Correction: v_off_ini = 0.000005733 V, v_off_fin = 0.000002302 V 18:41:10 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170984877 Vs 18:41:12 Temperature Measurement, Probe Number = 0, T = 20.167000 C 18:41:13 Temperature Measurement, Probe Number = 1, T = 20.090000 C 18:41:14 Temperature Measurement, Probe Number = 2, T = 20.149000 C 18:41:14 Temperature Measurement, Probe Number = 3, T = 20.093000 C 18:41:15 Temperature Measurement, Probe Number = 4, T = 20.429000 C 18:41:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.43 18:41:15 Integrated Voltage Measurement... 18:41:34 Voltage Offset Correction: v_off_ini = 0.000003179 V, v_off_fin = 0.000006480 V 18:41:34 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171040294 Vs 18:41:35 Integrated Voltage Measurement... 18:41:54 Voltage Offset Correction: v_off_ini = 0.000005132 V, v_off_fin = 0.000002332 V 18:41:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985280 Vs 19:11:57 Temperature Measurement, Probe Number = 0, T = 20.171000 C 19:11:57 Temperature Measurement, Probe Number = 1, T = 20.097000 C 19:11:58 Temperature Measurement, Probe Number = 2, T = 20.158000 C 19:11:59 Temperature Measurement, Probe Number = 3, T = 20.104000 C 19:11:59 Temperature Measurement, Probe Number = 4, T = 20.383000 C 19:11:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.38 19:12:00 Integrated Voltage Measurement... 19:12:19 Voltage Offset Correction: v_off_ini = 0.000004790 V, v_off_fin = 0.000006849 V 19:12:19 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171094850 Vs 19:12:19 Integrated Voltage Measurement... 19:12:38 Voltage Offset Correction: v_off_ini = 0.000005687 V, v_off_fin = 0.000002927 V 19:12:38 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170978220 Vs 19:12:41 Temperature Measurement, Probe Number = 0, T = 20.170000 C 19:12:42 Temperature Measurement, Probe Number = 1, T = 20.097000 C 19:12:42 Temperature Measurement, Probe Number = 2, T = 20.154000 C 19:12:43 Temperature Measurement, Probe Number = 3, T = 20.100000 C 19:12:44 Temperature Measurement, Probe Number = 4, T = 20.429000 C 19:12:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.43 19:12:44 Integrated Voltage Measurement... 19:13:04 Voltage Offset Correction: v_off_ini = 0.000004054 V, v_off_fin = 0.000006027 V 19:13:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044000 Vs 19:13:04 Integrated Voltage Measurement... 19:13:23 Voltage Offset Correction: v_off_ini = 0.000005592 V, v_off_fin = 0.000002565 V 19:13:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983639 Vs 19:13:26 Temperature Measurement, Probe Number = 0, T = 20.171000 C 19:13:27 Temperature Measurement, Probe Number = 1, T = 20.096000 C 19:13:27 Temperature Measurement, Probe Number = 2, T = 20.153000 C 19:13:28 Temperature Measurement, Probe Number = 3, T = 20.098000 C 19:13:29 Temperature Measurement, Probe Number = 4, T = 20.433000 C 19:13:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.43 19:13:29 Integrated Voltage Measurement... 19:13:48 Voltage Offset Correction: v_off_ini = 0.000003369 V, v_off_fin = 0.000006139 V 19:13:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042654 Vs 19:13:49 Integrated Voltage Measurement... 19:14:08 Voltage Offset Correction: v_off_ini = 0.000005465 V, v_off_fin = 0.000002811 V 19:14:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986283 Vs 19:14:11 Temperature Measurement, Probe Number = 0, T = 20.176000 C 19:14:11 Temperature Measurement, Probe Number = 1, T = 20.099000 C 19:14:12 Temperature Measurement, Probe Number = 2, T = 20.158000 C 19:14:13 Temperature Measurement, Probe Number = 3, T = 20.104000 C 19:14:13 Temperature Measurement, Probe Number = 4, T = 20.494000 C 19:14:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.49 19:14:14 Integrated Voltage Measurement... 19:14:33 Voltage Offset Correction: v_off_ini = 0.000004007 V, v_off_fin = 0.000006620 V 19:14:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045711 Vs 19:14:33 Integrated Voltage Measurement... 19:14:52 Voltage Offset Correction: v_off_ini = 0.000005701 V, v_off_fin = 0.000002633 V 19:14:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982025 Vs 19:14:55 Temperature Measurement, Probe Number = 0, T = 20.176000 C 19:14:56 Temperature Measurement, Probe Number = 1, T = 20.097000 C 19:14:57 Temperature Measurement, Probe Number = 2, T = 20.160000 C 19:14:57 Temperature Measurement, Probe Number = 3, T = 20.106000 C 19:14:58 Temperature Measurement, Probe Number = 4, T = 20.588000 C 19:14:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.59 19:14:58 Integrated Voltage Measurement... 19:15:17 Voltage Offset Correction: v_off_ini = 0.000003874 V, v_off_fin = 0.000006386 V 19:15:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052029 Vs 19:15:18 Integrated Voltage Measurement... 19:15:37 Voltage Offset Correction: v_off_ini = 0.000005760 V, v_off_fin = 0.000002326 V 19:15:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983991 Vs 19:15:40 Temperature Measurement, Probe Number = 0, T = 20.172000 C 19:15:41 Temperature Measurement, Probe Number = 1, T = 20.097000 C 19:15:41 Temperature Measurement, Probe Number = 2, T = 20.156000 C 19:15:42 Temperature Measurement, Probe Number = 3, T = 20.103000 C 19:15:43 Temperature Measurement, Probe Number = 4, T = 20.611000 C 19:15:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.61 19:15:43 Integrated Voltage Measurement... 19:16:02 Voltage Offset Correction: v_off_ini = 0.000003857 V, v_off_fin = 0.000006652 V 19:16:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045330 Vs 19:16:02 Integrated Voltage Measurement... 19:16:21 Voltage Offset Correction: v_off_ini = 0.000006149 V, v_off_fin = 0.000003055 V 19:16:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976031 Vs 19:16:24 Temperature Measurement, Probe Number = 0, T = 20.174000 C 19:16:25 Temperature Measurement, Probe Number = 1, T = 20.098000 C 19:16:26 Temperature Measurement, Probe Number = 2, T = 20.156000 C 19:16:26 Temperature Measurement, Probe Number = 3, T = 20.101000 C 19:16:27 Temperature Measurement, Probe Number = 4, T = 20.534000 C 19:16:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.53 19:16:27 Integrated Voltage Measurement... 19:16:47 Voltage Offset Correction: v_off_ini = 0.000004116 V, v_off_fin = 0.000006208 V 19:16:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049292 Vs 19:16:47 Integrated Voltage Measurement... 19:17:07 Voltage Offset Correction: v_off_ini = 0.000005935 V, v_off_fin = 0.000002470 V 19:17:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981352 Vs 19:17:09 Temperature Measurement, Probe Number = 0, T = 20.173000 C 19:17:10 Temperature Measurement, Probe Number = 1, T = 20.095000 C 19:17:11 Temperature Measurement, Probe Number = 2, T = 20.156000 C 19:17:11 Temperature Measurement, Probe Number = 3, T = 20.101000 C 19:17:12 Temperature Measurement, Probe Number = 4, T = 20.577000 C 19:17:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.58 19:17:12 Integrated Voltage Measurement... 19:17:31 Voltage Offset Correction: v_off_ini = 0.000003577 V, v_off_fin = 0.000006697 V 19:17:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045928 Vs 19:17:32 Integrated Voltage Measurement... 19:17:51 Voltage Offset Correction: v_off_ini = 0.000005892 V, v_off_fin = 0.000002501 V 19:17:51 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979697 Vs 19:17:54 Temperature Measurement, Probe Number = 0, T = 20.169000 C 19:17:54 Temperature Measurement, Probe Number = 1, T = 20.092000 C 19:17:55 Temperature Measurement, Probe Number = 2, T = 20.153000 C 19:17:56 Temperature Measurement, Probe Number = 3, T = 20.098000 C 19:17:56 Temperature Measurement, Probe Number = 4, T = 20.526000 C 19:17:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.53 19:17:56 Integrated Voltage Measurement... 19:18:16 Voltage Offset Correction: v_off_ini = 0.000003830 V, v_off_fin = 0.000006130 V 19:18:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047092 Vs 19:18:17 Integrated Voltage Measurement... 19:18:36 Voltage Offset Correction: v_off_ini = 0.000005669 V, v_off_fin = 0.000002140 V 19:18:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979284 Vs 19:18:39 Temperature Measurement, Probe Number = 0, T = 20.170000 C 19:18:39 Temperature Measurement, Probe Number = 1, T = 20.094000 C 19:18:40 Temperature Measurement, Probe Number = 2, T = 20.154000 C 19:18:40 Temperature Measurement, Probe Number = 3, T = 20.097000 C 19:18:41 Temperature Measurement, Probe Number = 4, T = 20.470000 C 19:18:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.47 19:18:41 Integrated Voltage Measurement... 19:19:01 Voltage Offset Correction: v_off_ini = 0.000004085 V, v_off_fin = 0.000006417 V 19:19:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171048681 Vs 19:19:01 Integrated Voltage Measurement... 19:19:20 Voltage Offset Correction: v_off_ini = 0.000005863 V, v_off_fin = 0.000002375 V 19:19:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982213 Vs 19:49:23 Temperature Measurement, Probe Number = 0, T = 20.166000 C 19:49:24 Temperature Measurement, Probe Number = 1, T = 20.092000 C 19:49:24 Temperature Measurement, Probe Number = 2, T = 20.153000 C 19:49:25 Temperature Measurement, Probe Number = 3, T = 20.099000 C 19:49:26 Temperature Measurement, Probe Number = 4, T = 20.387000 C 19:49:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.39 19:49:26 Integrated Voltage Measurement... 19:51:33 Voltage Offset Correction: v_off_ini = 0.000004534 V, v_off_fin = 0.000006405 V 19:51:34 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171096877 Vs 19:51:34 Integrated Voltage Measurement... 19:51:53 Voltage Offset Correction: v_off_ini = 0.000005022 V, v_off_fin = 0.000002446 V 19:51:53 Integrated Voltage Measurement Delta Gap = -0.0040010 m VT = -0.171001836 Vs 19:51:56 Temperature Measurement, Probe Number = 0, T = 20.175000 C 19:51:56 Temperature Measurement, Probe Number = 1, T = 20.100000 C 19:51:57 Temperature Measurement, Probe Number = 2, T = 20.160000 C 19:51:58 Temperature Measurement, Probe Number = 3, T = 20.104000 C 19:51:58 Temperature Measurement, Probe Number = 4, T = 20.280000 C 19:51:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.28 19:51:59 Integrated Voltage Measurement... 19:52:18 Voltage Offset Correction: v_off_ini = 0.000003748 V, v_off_fin = 0.000006117 V 19:52:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037367 Vs 19:52:18 Integrated Voltage Measurement... 19:52:38 Voltage Offset Correction: v_off_ini = 0.000005279 V, v_off_fin = 0.000001923 V 19:52:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981088 Vs 19:52:41 Temperature Measurement, Probe Number = 0, T = 20.177000 C 19:52:41 Temperature Measurement, Probe Number = 1, T = 20.099000 C 19:52:42 Temperature Measurement, Probe Number = 2, T = 20.159000 C 19:52:43 Temperature Measurement, Probe Number = 3, T = 20.104000 C 19:52:43 Temperature Measurement, Probe Number = 4, T = 20.255000 C 19:52:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.25 19:52:43 Integrated Voltage Measurement... 19:53:03 Voltage Offset Correction: v_off_ini = 0.000003232 V, v_off_fin = 0.000005729 V 19:53:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171032819 Vs 19:53:03 Integrated Voltage Measurement... 19:53:23 Voltage Offset Correction: v_off_ini = 0.000005195 V, v_off_fin = 0.000002422 V 19:53:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986953 Vs 19:53:26 Temperature Measurement, Probe Number = 0, T = 20.176000 C 19:53:26 Temperature Measurement, Probe Number = 1, T = 20.099000 C 19:53:27 Temperature Measurement, Probe Number = 2, T = 20.159000 C 19:53:28 Temperature Measurement, Probe Number = 3, T = 20.103000 C 19:53:28 Temperature Measurement, Probe Number = 4, T = 20.303000 C 19:53:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.30 19:53:28 Integrated Voltage Measurement... 19:53:48 Voltage Offset Correction: v_off_ini = 0.000003667 V, v_off_fin = 0.000006949 V 19:53:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042013 Vs 19:53:48 Integrated Voltage Measurement... 19:54:08 Voltage Offset Correction: v_off_ini = 0.000006052 V, v_off_fin = 0.000002594 V 19:54:08 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170976928 Vs 19:54:11 Temperature Measurement, Probe Number = 0, T = 20.173000 C 19:54:11 Temperature Measurement, Probe Number = 1, T = 20.097000 C 19:54:12 Temperature Measurement, Probe Number = 2, T = 20.157000 C 19:54:13 Temperature Measurement, Probe Number = 3, T = 20.103000 C 19:54:13 Temperature Measurement, Probe Number = 4, T = 20.279000 C 19:54:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.28 19:54:13 Integrated Voltage Measurement... 19:54:33 Voltage Offset Correction: v_off_ini = 0.000003260 V, v_off_fin = 0.000006039 V 19:54:33 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171033132 Vs 19:54:33 Integrated Voltage Measurement... 19:54:52 Voltage Offset Correction: v_off_ini = 0.000005795 V, v_off_fin = 0.000002555 V 19:54:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973890 Vs 19:54:55 Temperature Measurement, Probe Number = 0, T = 20.174000 C 19:54:56 Temperature Measurement, Probe Number = 1, T = 20.098000 C 19:54:56 Temperature Measurement, Probe Number = 2, T = 20.160000 C 19:54:57 Temperature Measurement, Probe Number = 3, T = 20.104000 C 19:54:58 Temperature Measurement, Probe Number = 4, T = 20.381000 C 19:54:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.38 19:54:58 Integrated Voltage Measurement... 19:55:17 Voltage Offset Correction: v_off_ini = 0.000003405 V, v_off_fin = 0.000006740 V 19:55:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044966 Vs 19:55:17 Integrated Voltage Measurement... 19:55:36 Voltage Offset Correction: v_off_ini = 0.000005895 V, v_off_fin = 0.000001601 V 19:55:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977964 Vs 19:55:39 Temperature Measurement, Probe Number = 0, T = 20.175000 C 19:55:40 Temperature Measurement, Probe Number = 1, T = 20.097000 C 19:55:40 Temperature Measurement, Probe Number = 2, T = 20.160000 C 19:55:41 Temperature Measurement, Probe Number = 3, T = 20.107000 C 19:55:42 Temperature Measurement, Probe Number = 4, T = 20.399000 C 19:55:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.40 19:55:42 Integrated Voltage Measurement... 19:56:01 Voltage Offset Correction: v_off_ini = 0.000003647 V, v_off_fin = 0.000006138 V 19:56:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171046366 Vs 19:56:01 Integrated Voltage Measurement... 19:56:21 Voltage Offset Correction: v_off_ini = 0.000005996 V, v_off_fin = 0.000002721 V 19:56:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982588 Vs 19:56:24 Temperature Measurement, Probe Number = 0, T = 20.173000 C 19:56:24 Temperature Measurement, Probe Number = 1, T = 20.093000 C 19:56:25 Temperature Measurement, Probe Number = 2, T = 20.159000 C 19:56:26 Temperature Measurement, Probe Number = 3, T = 20.104000 C 19:56:26 Temperature Measurement, Probe Number = 4, T = 20.419000 C 19:56:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.42 19:56:27 Integrated Voltage Measurement... 19:56:46 Voltage Offset Correction: v_off_ini = 0.000003800 V, v_off_fin = 0.000006202 V 19:56:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043102 Vs 19:56:46 Integrated Voltage Measurement... 19:57:05 Voltage Offset Correction: v_off_ini = 0.000006196 V, v_off_fin = 0.000002291 V 19:57:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979409 Vs 19:57:08 Temperature Measurement, Probe Number = 0, T = 20.173000 C 19:57:09 Temperature Measurement, Probe Number = 1, T = 20.096000 C 19:57:09 Temperature Measurement, Probe Number = 2, T = 20.156000 C 19:57:10 Temperature Measurement, Probe Number = 3, T = 20.103000 C 19:57:11 Temperature Measurement, Probe Number = 4, T = 20.390000 C 19:57:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.39 19:57:11 Integrated Voltage Measurement... 19:57:30 Voltage Offset Correction: v_off_ini = 0.000003681 V, v_off_fin = 0.000006011 V 19:57:30 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171040836 Vs 19:57:31 Integrated Voltage Measurement... 19:57:50 Voltage Offset Correction: v_off_ini = 0.000005620 V, v_off_fin = 0.000002344 V 19:57:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981164 Vs 19:57:53 Temperature Measurement, Probe Number = 0, T = 20.170000 C 19:57:53 Temperature Measurement, Probe Number = 1, T = 20.094000 C 19:57:54 Temperature Measurement, Probe Number = 2, T = 20.154000 C 19:57:55 Temperature Measurement, Probe Number = 3, T = 20.101000 C 19:57:55 Temperature Measurement, Probe Number = 4, T = 20.336000 C 19:57:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.34 19:57:56 Integrated Voltage Measurement... 19:58:15 Voltage Offset Correction: v_off_ini = 0.000003810 V, v_off_fin = 0.000006076 V 19:58:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039622 Vs 19:58:15 Integrated Voltage Measurement... 19:58:34 Voltage Offset Correction: v_off_ini = 0.000005968 V, v_off_fin = 0.000001638 V 19:58:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980981 Vs 20:28:37 Temperature Measurement, Probe Number = 0, T = 20.167000 C 20:28:38 Temperature Measurement, Probe Number = 1, T = 20.089000 C 20:28:39 Temperature Measurement, Probe Number = 2, T = 20.154000 C 20:28:39 Temperature Measurement, Probe Number = 3, T = 20.097000 C 20:28:40 Temperature Measurement, Probe Number = 4, T = 20.270000 C 20:28:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.27 20:28:40 Integrated Voltage Measurement... 20:28:59 Voltage Offset Correction: v_off_ini = 0.000004281 V, v_off_fin = 0.000006301 V 20:28:59 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171092843 Vs 20:28:59 Integrated Voltage Measurement... 20:29:19 Voltage Offset Correction: v_off_ini = 0.000006200 V, v_off_fin = 0.000001912 V 20:29:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985029 Vs 20:29:22 Temperature Measurement, Probe Number = 0, T = 20.173000 C 20:29:23 Temperature Measurement, Probe Number = 1, T = 20.096000 C 20:29:23 Temperature Measurement, Probe Number = 2, T = 20.158000 C 20:29:24 Temperature Measurement, Probe Number = 3, T = 20.103000 C 20:29:25 Temperature Measurement, Probe Number = 4, T = 20.257000 C 20:29:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.26 20:29:25 Integrated Voltage Measurement... 20:29:44 Voltage Offset Correction: v_off_ini = 0.000003612 V, v_off_fin = 0.000006039 V 20:29:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040859 Vs 20:29:44 Integrated Voltage Measurement... 20:30:03 Voltage Offset Correction: v_off_ini = 0.000005519 V, v_off_fin = 0.000002407 V 20:30:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987079 Vs 20:30:06 Temperature Measurement, Probe Number = 0, T = 20.173000 C 20:30:07 Temperature Measurement, Probe Number = 1, T = 20.097000 C 20:30:08 Temperature Measurement, Probe Number = 2, T = 20.155000 C 20:30:08 Temperature Measurement, Probe Number = 3, T = 20.102000 C 20:30:09 Temperature Measurement, Probe Number = 4, T = 20.277000 C 20:30:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.28 20:30:09 Integrated Voltage Measurement... 20:30:28 Voltage Offset Correction: v_off_ini = 0.000003776 V, v_off_fin = 0.000006230 V 20:30:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044553 Vs 20:30:29 Integrated Voltage Measurement... 20:30:48 Voltage Offset Correction: v_off_ini = 0.000005537 V, v_off_fin = 0.000002545 V 20:30:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988985 Vs 20:30:51 Temperature Measurement, Probe Number = 0, T = 20.171000 C 20:30:51 Temperature Measurement, Probe Number = 1, T = 20.095000 C 20:30:52 Temperature Measurement, Probe Number = 2, T = 20.155000 C 20:30:53 Temperature Measurement, Probe Number = 3, T = 20.100000 C 20:30:53 Temperature Measurement, Probe Number = 4, T = 20.276000 C 20:30:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.28 20:30:54 Integrated Voltage Measurement... 20:31:13 Voltage Offset Correction: v_off_ini = 0.000003845 V, v_off_fin = 0.000006216 V 20:31:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045591 Vs 20:31:13 Integrated Voltage Measurement... 20:31:32 Voltage Offset Correction: v_off_ini = 0.000005481 V, v_off_fin = 0.000002341 V 20:31:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988334 Vs 20:31:35 Temperature Measurement, Probe Number = 0, T = 20.175000 C 20:31:36 Temperature Measurement, Probe Number = 1, T = 20.094000 C 20:31:37 Temperature Measurement, Probe Number = 2, T = 20.159000 C 20:31:37 Temperature Measurement, Probe Number = 3, T = 20.104000 C 20:31:38 Temperature Measurement, Probe Number = 4, T = 20.275000 C 20:31:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.27 20:31:38 Integrated Voltage Measurement... 20:31:58 Voltage Offset Correction: v_off_ini = 0.000003610 V, v_off_fin = 0.000005933 V 20:31:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044007 Vs 20:31:58 Integrated Voltage Measurement... 20:32:17 Voltage Offset Correction: v_off_ini = 0.000005275 V, v_off_fin = 0.000001944 V 20:32:17 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170989427 Vs 20:32:20 Temperature Measurement, Probe Number = 0, T = 20.171000 C 20:32:20 Temperature Measurement, Probe Number = 1, T = 20.093000 C 20:32:21 Temperature Measurement, Probe Number = 2, T = 20.156000 C 20:32:22 Temperature Measurement, Probe Number = 3, T = 20.102000 C 20:32:22 Temperature Measurement, Probe Number = 4, T = 20.277000 C 20:32:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.28 20:32:23 Integrated Voltage Measurement... 20:32:42 Voltage Offset Correction: v_off_ini = 0.000003340 V, v_off_fin = 0.000005981 V 20:32:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040710 Vs 20:32:42 Integrated Voltage Measurement... 20:33:01 Voltage Offset Correction: v_off_ini = 0.000005253 V, v_off_fin = 0.000002141 V 20:33:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989969 Vs 20:33:04 Temperature Measurement, Probe Number = 0, T = 20.175000 C 20:33:05 Temperature Measurement, Probe Number = 1, T = 20.094000 C 20:33:06 Temperature Measurement, Probe Number = 2, T = 20.163000 C 20:33:06 Temperature Measurement, Probe Number = 3, T = 20.104000 C 20:33:07 Temperature Measurement, Probe Number = 4, T = 20.350000 C 20:33:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.35 20:33:07 Integrated Voltage Measurement... 20:33:26 Voltage Offset Correction: v_off_ini = 0.000003604 V, v_off_fin = 0.000006362 V 20:33:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040443 Vs 20:33:27 Integrated Voltage Measurement... 20:33:46 Voltage Offset Correction: v_off_ini = 0.000005902 V, v_off_fin = 0.000002914 V 20:33:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981463 Vs 20:33:49 Temperature Measurement, Probe Number = 0, T = 20.175000 C 20:33:49 Temperature Measurement, Probe Number = 1, T = 20.091000 C 20:33:50 Temperature Measurement, Probe Number = 2, T = 20.159000 C 20:33:51 Temperature Measurement, Probe Number = 3, T = 20.100000 C 20:33:51 Temperature Measurement, Probe Number = 4, T = 20.358000 C 20:33:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.36 20:33:51 Integrated Voltage Measurement... 20:34:11 Voltage Offset Correction: v_off_ini = 0.000003347 V, v_off_fin = 0.000006111 V 20:34:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042547 Vs 20:34:11 Integrated Voltage Measurement... 20:34:31 Voltage Offset Correction: v_off_ini = 0.000005654 V, v_off_fin = 0.000002513 V 20:34:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989145 Vs 20:34:34 Temperature Measurement, Probe Number = 0, T = 20.172000 C 20:34:34 Temperature Measurement, Probe Number = 1, T = 20.091000 C 20:34:35 Temperature Measurement, Probe Number = 2, T = 20.156000 C 20:34:35 Temperature Measurement, Probe Number = 3, T = 20.099000 C 20:34:36 Temperature Measurement, Probe Number = 4, T = 20.334000 C 20:34:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.33 20:34:36 Integrated Voltage Measurement... 20:34:56 Voltage Offset Correction: v_off_ini = 0.000002974 V, v_off_fin = 0.000005983 V 20:34:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044451 Vs 20:34:56 Integrated Voltage Measurement... 20:35:15 Voltage Offset Correction: v_off_ini = 0.000005487 V, v_off_fin = 0.000002401 V 20:35:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991521 Vs 20:35:18 Temperature Measurement, Probe Number = 0, T = 20.174000 C 20:35:19 Temperature Measurement, Probe Number = 1, T = 20.092000 C 20:35:20 Temperature Measurement, Probe Number = 2, T = 20.157000 C 20:35:20 Temperature Measurement, Probe Number = 3, T = 20.100000 C 20:35:21 Temperature Measurement, Probe Number = 4, T = 20.341000 C 20:35:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.34 20:35:21 Integrated Voltage Measurement... 20:35:40 Voltage Offset Correction: v_off_ini = 0.000003716 V, v_off_fin = 0.000005474 V 20:35:41 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171041810 Vs 20:35:41 Integrated Voltage Measurement... 20:36:00 Voltage Offset Correction: v_off_ini = 0.000005172 V, v_off_fin = 0.000001944 V 20:36:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992176 Vs 21:06:03 Temperature Measurement, Probe Number = 0, T = 20.161000 C 21:06:04 Temperature Measurement, Probe Number = 1, T = 20.086000 C 21:06:04 Temperature Measurement, Probe Number = 2, T = 20.146000 C 21:06:05 Temperature Measurement, Probe Number = 3, T = 20.093000 C 21:06:05 Temperature Measurement, Probe Number = 4, T = 20.197000 C 21:06:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.20 21:06:06 Integrated Voltage Measurement... 21:06:25 Voltage Offset Correction: v_off_ini = 0.000004534 V, v_off_fin = 0.000006865 V 21:06:25 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171092339 Vs 21:06:25 Integrated Voltage Measurement... 21:06:45 Voltage Offset Correction: v_off_ini = 0.000005894 V, v_off_fin = 0.000002592 V 21:06:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986717 Vs 21:06:48 Temperature Measurement, Probe Number = 0, T = 20.169000 C 21:06:48 Temperature Measurement, Probe Number = 1, T = 20.086000 C 21:06:49 Temperature Measurement, Probe Number = 2, T = 20.150000 C 21:06:50 Temperature Measurement, Probe Number = 3, T = 20.094000 C 21:06:50 Temperature Measurement, Probe Number = 4, T = 20.094000 C 21:06:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.09 21:06:50 Integrated Voltage Measurement... 21:07:10 Voltage Offset Correction: v_off_ini = 0.000004190 V, v_off_fin = 0.000006502 V 21:07:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045647 Vs 21:07:10 Integrated Voltage Measurement... 21:07:29 Voltage Offset Correction: v_off_ini = 0.000005718 V, v_off_fin = 0.000003240 V 21:07:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986416 Vs 21:07:32 Temperature Measurement, Probe Number = 0, T = 20.168000 C 21:07:33 Temperature Measurement, Probe Number = 1, T = 20.088000 C 21:07:34 Temperature Measurement, Probe Number = 2, T = 20.152000 C 21:07:34 Temperature Measurement, Probe Number = 3, T = 20.094000 C 21:07:35 Temperature Measurement, Probe Number = 4, T = 20.140000 C 21:07:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.14 21:07:35 Integrated Voltage Measurement... 21:07:55 Voltage Offset Correction: v_off_ini = 0.000003989 V, v_off_fin = 0.000006509 V 21:07:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041295 Vs 21:07:55 Integrated Voltage Measurement... 21:08:14 Voltage Offset Correction: v_off_ini = 0.000005462 V, v_off_fin = 0.000002910 V 21:08:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980759 Vs 21:08:17 Temperature Measurement, Probe Number = 0, T = 20.170000 C 21:08:18 Temperature Measurement, Probe Number = 1, T = 20.091000 C 21:08:19 Temperature Measurement, Probe Number = 2, T = 20.156000 C 21:08:19 Temperature Measurement, Probe Number = 3, T = 20.100000 C 21:08:20 Temperature Measurement, Probe Number = 4, T = 20.301000 C 21:08:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.30 21:08:20 Integrated Voltage Measurement... 21:08:40 Voltage Offset Correction: v_off_ini = 0.000003945 V, v_off_fin = 0.000006166 V 21:08:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043485 Vs 21:08:40 Integrated Voltage Measurement... 21:09:00 Voltage Offset Correction: v_off_ini = 0.000005602 V, v_off_fin = 0.000002583 V 21:09:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171009415 Vs 21:09:03 Temperature Measurement, Probe Number = 0, T = 20.171000 C 21:09:03 Temperature Measurement, Probe Number = 1, T = 20.093000 C 21:09:04 Temperature Measurement, Probe Number = 2, T = 20.156000 C 21:09:05 Temperature Measurement, Probe Number = 3, T = 20.101000 C 21:09:05 Temperature Measurement, Probe Number = 4, T = 20.413000 C 21:09:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 21:09:06 Integrated Voltage Measurement... 21:09:25 Voltage Offset Correction: v_off_ini = 0.000003731 V, v_off_fin = 0.000006413 V 21:09:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046277 Vs 21:09:25 Integrated Voltage Measurement... 21:09:44 Voltage Offset Correction: v_off_ini = 0.000005711 V, v_off_fin = 0.000002386 V 21:09:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983635 Vs 21:09:47 Temperature Measurement, Probe Number = 0, T = 20.175000 C 21:09:48 Temperature Measurement, Probe Number = 1, T = 20.093000 C 21:09:49 Temperature Measurement, Probe Number = 2, T = 20.160000 C 21:09:49 Temperature Measurement, Probe Number = 3, T = 20.104000 C 21:09:50 Temperature Measurement, Probe Number = 4, T = 20.310000 C 21:09:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.31 21:09:50 Integrated Voltage Measurement... 21:10:10 Voltage Offset Correction: v_off_ini = 0.000003885 V, v_off_fin = 0.000006097 V 21:10:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044761 Vs 21:10:10 Integrated Voltage Measurement... 21:10:30 Voltage Offset Correction: v_off_ini = 0.000005829 V, v_off_fin = 0.000002740 V 21:10:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985402 Vs 21:10:33 Temperature Measurement, Probe Number = 0, T = 20.177000 C 21:10:33 Temperature Measurement, Probe Number = 1, T = 20.091000 C 21:10:34 Temperature Measurement, Probe Number = 2, T = 20.161000 C 21:10:35 Temperature Measurement, Probe Number = 3, T = 20.101000 C 21:10:35 Temperature Measurement, Probe Number = 4, T = 20.414000 C 21:10:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 21:10:36 Integrated Voltage Measurement... 21:10:55 Voltage Offset Correction: v_off_ini = 0.000003881 V, v_off_fin = 0.000006691 V 21:10:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044899 Vs 21:10:55 Integrated Voltage Measurement... 21:11:15 Voltage Offset Correction: v_off_ini = 0.000006189 V, v_off_fin = 0.000002829 V 21:11:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982585 Vs 21:11:18 Temperature Measurement, Probe Number = 0, T = 20.166000 C 21:11:18 Temperature Measurement, Probe Number = 1, T = 20.091000 C 21:11:19 Temperature Measurement, Probe Number = 2, T = 20.152000 C 21:11:20 Temperature Measurement, Probe Number = 3, T = 20.098000 C 21:11:20 Temperature Measurement, Probe Number = 4, T = 20.411000 C 21:11:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 21:11:20 Integrated Voltage Measurement... 21:11:40 Voltage Offset Correction: v_off_ini = 0.000003774 V, v_off_fin = 0.000006529 V 21:11:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045636 Vs 21:11:40 Integrated Voltage Measurement... 21:11:59 Voltage Offset Correction: v_off_ini = 0.000006139 V, v_off_fin = 0.000003108 V 21:11:59 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981866 Vs 21:12:02 Temperature Measurement, Probe Number = 0, T = 20.172000 C 21:12:02 Temperature Measurement, Probe Number = 1, T = 20.091000 C 21:12:03 Temperature Measurement, Probe Number = 2, T = 20.158000 C 21:12:04 Temperature Measurement, Probe Number = 3, T = 20.100000 C 21:12:04 Temperature Measurement, Probe Number = 4, T = 20.456000 C 21:12:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.46 21:12:05 Integrated Voltage Measurement... 21:12:24 Voltage Offset Correction: v_off_ini = 0.000003556 V, v_off_fin = 0.000006913 V 21:12:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047642 Vs 21:12:24 Integrated Voltage Measurement... 21:12:44 Voltage Offset Correction: v_off_ini = 0.000005799 V, v_off_fin = 0.000002733 V 21:12:44 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170985812 Vs 21:12:47 Temperature Measurement, Probe Number = 0, T = 20.173000 C 21:12:47 Temperature Measurement, Probe Number = 1, T = 20.090000 C 21:12:48 Temperature Measurement, Probe Number = 2, T = 20.156000 C 21:12:49 Temperature Measurement, Probe Number = 3, T = 20.096000 C 21:12:49 Temperature Measurement, Probe Number = 4, T = 20.532000 C 21:12:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.53 21:12:50 Integrated Voltage Measurement... 21:13:09 Voltage Offset Correction: v_off_ini = 0.000004111 V, v_off_fin = 0.000006258 V 21:13:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045578 Vs 21:13:09 Integrated Voltage Measurement... 21:13:28 Voltage Offset Correction: v_off_ini = 0.000005575 V, v_off_fin = 0.000002990 V 21:13:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981304 Vs 21:43:31 Temperature Measurement, Probe Number = 0, T = 20.170000 C 21:43:32 Temperature Measurement, Probe Number = 1, T = 20.091000 C 21:43:32 Temperature Measurement, Probe Number = 2, T = 20.155000 C 21:43:33 Temperature Measurement, Probe Number = 3, T = 20.099000 C 21:43:34 Temperature Measurement, Probe Number = 4, T = 20.316000 C 21:43:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.32 21:43:34 Integrated Voltage Measurement... 21:43:53 Voltage Offset Correction: v_off_ini = 0.000004429 V, v_off_fin = 0.000006206 V 21:43:53 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171088529 Vs 21:43:53 Integrated Voltage Measurement... 21:44:12 Voltage Offset Correction: v_off_ini = 0.000005649 V, v_off_fin = 0.000002845 V 21:44:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984363 Vs 21:44:15 Temperature Measurement, Probe Number = 0, T = 20.176000 C 21:44:16 Temperature Measurement, Probe Number = 1, T = 20.095000 C 21:44:17 Temperature Measurement, Probe Number = 2, T = 20.159000 C 21:44:17 Temperature Measurement, Probe Number = 3, T = 20.102000 C 21:44:18 Temperature Measurement, Probe Number = 4, T = 20.361000 C 21:44:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.36 21:44:18 Integrated Voltage Measurement... 21:44:37 Voltage Offset Correction: v_off_ini = 0.000003806 V, v_off_fin = 0.000006192 V 21:44:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038015 Vs 21:44:37 Integrated Voltage Measurement... 21:44:57 Voltage Offset Correction: v_off_ini = 0.000005883 V, v_off_fin = 0.000002605 V 21:44:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984458 Vs 21:45:00 Temperature Measurement, Probe Number = 0, T = 20.175000 C 21:45:00 Temperature Measurement, Probe Number = 1, T = 20.095000 C 21:45:01 Temperature Measurement, Probe Number = 2, T = 20.158000 C 21:45:02 Temperature Measurement, Probe Number = 3, T = 20.102000 C 21:45:02 Temperature Measurement, Probe Number = 4, T = 20.437000 C 21:45:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.44 21:45:03 Integrated Voltage Measurement... 21:45:22 Voltage Offset Correction: v_off_ini = 0.000003983 V, v_off_fin = 0.000006407 V 21:45:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042227 Vs 21:45:22 Integrated Voltage Measurement... 21:45:42 Voltage Offset Correction: v_off_ini = 0.000005512 V, v_off_fin = 0.000002516 V 21:45:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985469 Vs 21:45:45 Temperature Measurement, Probe Number = 0, T = 20.174000 C 21:45:46 Temperature Measurement, Probe Number = 1, T = 20.097000 C 21:45:47 Temperature Measurement, Probe Number = 2, T = 20.160000 C 21:45:47 Temperature Measurement, Probe Number = 3, T = 20.104000 C 21:45:48 Temperature Measurement, Probe Number = 4, T = 20.364000 C 21:45:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.36 21:45:48 Integrated Voltage Measurement... 21:46:07 Voltage Offset Correction: v_off_ini = 0.000004106 V, v_off_fin = 0.000005506 V 21:46:07 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171036219 Vs 21:46:08 Integrated Voltage Measurement... 21:46:27 Voltage Offset Correction: v_off_ini = 0.000005347 V, v_off_fin = 0.000002164 V 21:46:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987551 Vs 21:46:30 Temperature Measurement, Probe Number = 0, T = 20.178000 C 21:46:30 Temperature Measurement, Probe Number = 1, T = 20.098000 C 21:46:31 Temperature Measurement, Probe Number = 2, T = 20.163000 C 21:46:32 Temperature Measurement, Probe Number = 3, T = 20.107000 C 21:46:32 Temperature Measurement, Probe Number = 4, T = 20.425000 C 21:46:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.43 21:46:33 Integrated Voltage Measurement... 21:46:52 Voltage Offset Correction: v_off_ini = 0.000003442 V, v_off_fin = 0.000006476 V 21:46:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042845 Vs 21:46:52 Integrated Voltage Measurement... 21:47:11 Voltage Offset Correction: v_off_ini = 0.000005556 V, v_off_fin = 0.000002321 V 21:47:12 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982679 Vs 21:47:14 Temperature Measurement, Probe Number = 0, T = 20.178000 C 21:47:15 Temperature Measurement, Probe Number = 1, T = 20.097000 C 21:47:16 Temperature Measurement, Probe Number = 2, T = 20.161000 C 21:47:16 Temperature Measurement, Probe Number = 3, T = 20.102000 C 21:47:17 Temperature Measurement, Probe Number = 4, T = 20.518000 C 21:47:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.52 21:47:17 Integrated Voltage Measurement... 21:47:36 Voltage Offset Correction: v_off_ini = 0.000003670 V, v_off_fin = 0.000006920 V 21:47:36 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171046267 Vs 21:47:37 Integrated Voltage Measurement... 21:47:56 Voltage Offset Correction: v_off_ini = 0.000005880 V, v_off_fin = 0.000003069 V 21:47:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979757 Vs 21:47:58 Temperature Measurement, Probe Number = 0, T = 20.178000 C 21:47:59 Temperature Measurement, Probe Number = 1, T = 20.098000 C 21:48:00 Temperature Measurement, Probe Number = 2, T = 20.160000 C 21:48:00 Temperature Measurement, Probe Number = 3, T = 20.104000 C 21:48:01 Temperature Measurement, Probe Number = 4, T = 20.472000 C 21:48:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.47 21:48:01 Integrated Voltage Measurement... 21:48:20 Voltage Offset Correction: v_off_ini = 0.000004072 V, v_off_fin = 0.000006712 V 21:48:21 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171046144 Vs 21:48:21 Integrated Voltage Measurement... 21:48:40 Voltage Offset Correction: v_off_ini = 0.000005911 V, v_off_fin = 0.000002654 V 21:48:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981182 Vs 21:48:42 Temperature Measurement, Probe Number = 0, T = 20.179000 C 21:48:43 Temperature Measurement, Probe Number = 1, T = 20.100000 C 21:48:44 Temperature Measurement, Probe Number = 2, T = 20.163000 C 21:48:44 Temperature Measurement, Probe Number = 3, T = 20.107000 C 21:48:45 Temperature Measurement, Probe Number = 4, T = 20.522000 C 21:48:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.52 21:48:45 Integrated Voltage Measurement... 21:49:05 Voltage Offset Correction: v_off_ini = 0.000004474 V, v_off_fin = 0.000006078 V 21:49:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047082 Vs 21:49:05 Integrated Voltage Measurement... 21:49:24 Voltage Offset Correction: v_off_ini = 0.000005558 V, v_off_fin = 0.000002695 V 21:49:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987017 Vs 21:49:27 Temperature Measurement, Probe Number = 0, T = 20.176000 C 21:49:28 Temperature Measurement, Probe Number = 1, T = 20.096000 C 21:49:29 Temperature Measurement, Probe Number = 2, T = 20.161000 C 21:49:29 Temperature Measurement, Probe Number = 3, T = 20.103000 C 21:49:30 Temperature Measurement, Probe Number = 4, T = 20.553000 C 21:49:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.55 21:49:30 Integrated Voltage Measurement... 21:49:50 Voltage Offset Correction: v_off_ini = 0.000003516 V, v_off_fin = 0.000006230 V 21:49:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048072 Vs 21:49:50 Integrated Voltage Measurement... 21:50:09 Voltage Offset Correction: v_off_ini = 0.000005744 V, v_off_fin = 0.000002345 V 21:50:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985432 Vs 21:50:12 Temperature Measurement, Probe Number = 0, T = 20.171000 C 21:50:13 Temperature Measurement, Probe Number = 1, T = 20.094000 C 21:50:14 Temperature Measurement, Probe Number = 2, T = 20.155000 C 21:50:14 Temperature Measurement, Probe Number = 3, T = 20.100000 C 21:50:15 Temperature Measurement, Probe Number = 4, T = 20.500000 C 21:50:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.50 21:50:15 Integrated Voltage Measurement... 21:50:35 Voltage Offset Correction: v_off_ini = 0.000004129 V, v_off_fin = 0.000006846 V 21:50:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046374 Vs 21:50:35 Integrated Voltage Measurement... 21:50:54 Voltage Offset Correction: v_off_ini = 0.000006362 V, v_off_fin = 0.000002162 V 21:50:54 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982126 Vs 22:20:57 Temperature Measurement, Probe Number = 0, T = 20.170000 C 22:20:57 Temperature Measurement, Probe Number = 1, T = 20.092000 C 22:20:58 Temperature Measurement, Probe Number = 2, T = 20.155000 C 22:20:59 Temperature Measurement, Probe Number = 3, T = 20.101000 C 22:20:59 Temperature Measurement, Probe Number = 4, T = 20.447000 C 22:20:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.45 22:20:59 Integrated Voltage Measurement... 22:21:19 Voltage Offset Correction: v_off_ini = 0.000004961 V, v_off_fin = 0.000007017 V 22:21:19 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171107460 Vs 22:21:19 Integrated Voltage Measurement... 22:21:39 Voltage Offset Correction: v_off_ini = 0.000006366 V, v_off_fin = 0.000002866 V 22:21:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981297 Vs 22:21:41 Temperature Measurement, Probe Number = 0, T = 20.175000 C 22:21:42 Temperature Measurement, Probe Number = 1, T = 20.093000 C 22:21:43 Temperature Measurement, Probe Number = 2, T = 20.157000 C 22:21:43 Temperature Measurement, Probe Number = 3, T = 20.099000 C 22:21:44 Temperature Measurement, Probe Number = 4, T = 20.444000 C 22:21:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.44 22:21:44 Integrated Voltage Measurement... 22:22:03 Voltage Offset Correction: v_off_ini = 0.000003678 V, v_off_fin = 0.000006452 V 22:22:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043450 Vs 22:22:04 Integrated Voltage Measurement... 22:22:23 Voltage Offset Correction: v_off_ini = 0.000005883 V, v_off_fin = 0.000002591 V 22:22:23 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981153 Vs 22:22:26 Temperature Measurement, Probe Number = 0, T = 20.174000 C 22:22:27 Temperature Measurement, Probe Number = 1, T = 20.094000 C 22:22:27 Temperature Measurement, Probe Number = 2, T = 20.157000 C 22:22:28 Temperature Measurement, Probe Number = 3, T = 20.100000 C 22:22:29 Temperature Measurement, Probe Number = 4, T = 20.415000 C 22:22:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 22:22:29 Integrated Voltage Measurement... 22:22:48 Voltage Offset Correction: v_off_ini = 0.000004545 V, v_off_fin = 0.000006338 V 22:22:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046592 Vs 22:22:49 Integrated Voltage Measurement... 22:23:08 Voltage Offset Correction: v_off_ini = 0.000005713 V, v_off_fin = 0.000001622 V 22:23:08 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981696 Vs 22:23:10 Temperature Measurement, Probe Number = 0, T = 20.175000 C 22:23:11 Temperature Measurement, Probe Number = 1, T = 20.093000 C 22:23:12 Temperature Measurement, Probe Number = 2, T = 20.157000 C 22:23:12 Temperature Measurement, Probe Number = 3, T = 20.101000 C 22:23:13 Temperature Measurement, Probe Number = 4, T = 20.382000 C 22:23:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.38 22:23:13 Integrated Voltage Measurement... 22:23:33 Voltage Offset Correction: v_off_ini = 0.000003554 V, v_off_fin = 0.000006079 V 22:23:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052038 Vs 22:23:33 Integrated Voltage Measurement... 22:23:52 Voltage Offset Correction: v_off_ini = 0.000005341 V, v_off_fin = 0.000003039 V 22:23:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984659 Vs 22:23:55 Temperature Measurement, Probe Number = 0, T = 20.170000 C 22:23:56 Temperature Measurement, Probe Number = 1, T = 20.091000 C 22:23:57 Temperature Measurement, Probe Number = 2, T = 20.154000 C 22:23:57 Temperature Measurement, Probe Number = 3, T = 20.099000 C 22:23:58 Temperature Measurement, Probe Number = 4, T = 20.289000 C 22:23:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.29 22:23:58 Integrated Voltage Measurement... 22:24:18 Voltage Offset Correction: v_off_ini = 0.000003676 V, v_off_fin = 0.000006328 V 22:24:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049576 Vs 22:24:18 Integrated Voltage Measurement... 22:24:38 Voltage Offset Correction: v_off_ini = 0.000005735 V, v_off_fin = 0.000002614 V 22:24:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984288 Vs 22:24:41 Temperature Measurement, Probe Number = 0, T = 20.173000 C 22:24:41 Temperature Measurement, Probe Number = 1, T = 20.094000 C 22:24:42 Temperature Measurement, Probe Number = 2, T = 20.157000 C 22:24:42 Temperature Measurement, Probe Number = 3, T = 20.103000 C 22:24:43 Temperature Measurement, Probe Number = 4, T = 20.260000 C 22:24:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.26 22:24:43 Integrated Voltage Measurement... 22:25:03 Voltage Offset Correction: v_off_ini = 0.000003893 V, v_off_fin = 0.000006797 V 22:25:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048929 Vs 22:25:03 Integrated Voltage Measurement... 22:25:23 Voltage Offset Correction: v_off_ini = 0.000006002 V, v_off_fin = 0.000002875 V 22:25:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984752 Vs 22:25:25 Temperature Measurement, Probe Number = 0, T = 20.173000 C 22:25:26 Temperature Measurement, Probe Number = 1, T = 20.093000 C 22:25:27 Temperature Measurement, Probe Number = 2, T = 20.156000 C 22:25:27 Temperature Measurement, Probe Number = 3, T = 20.100000 C 22:25:28 Temperature Measurement, Probe Number = 4, T = 20.248000 C 22:25:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.25 22:25:28 Integrated Voltage Measurement... 22:25:48 Voltage Offset Correction: v_off_ini = 0.000003852 V, v_off_fin = 0.000006413 V 22:25:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049468 Vs 22:25:48 Integrated Voltage Measurement... 22:26:07 Voltage Offset Correction: v_off_ini = 0.000006259 V, v_off_fin = 0.000002988 V 22:26:07 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977539 Vs 22:26:10 Temperature Measurement, Probe Number = 0, T = 20.176000 C 22:26:10 Temperature Measurement, Probe Number = 1, T = 20.093000 C 22:26:11 Temperature Measurement, Probe Number = 2, T = 20.159000 C 22:26:12 Temperature Measurement, Probe Number = 3, T = 20.100000 C 22:26:12 Temperature Measurement, Probe Number = 4, T = 20.324000 C 22:26:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.32 22:26:13 Integrated Voltage Measurement... 22:26:32 Voltage Offset Correction: v_off_ini = 0.000003256 V, v_off_fin = 0.000006526 V 22:26:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050719 Vs 22:26:32 Integrated Voltage Measurement... 22:26:52 Voltage Offset Correction: v_off_ini = 0.000006001 V, v_off_fin = 0.000002664 V 22:26:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984040 Vs 22:26:54 Temperature Measurement, Probe Number = 0, T = 20.171000 C 22:26:55 Temperature Measurement, Probe Number = 1, T = 20.091000 C 22:26:56 Temperature Measurement, Probe Number = 2, T = 20.154000 C 22:26:56 Temperature Measurement, Probe Number = 3, T = 20.097000 C 22:26:57 Temperature Measurement, Probe Number = 4, T = 20.281000 C 22:26:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.28 22:26:57 Integrated Voltage Measurement... 22:27:17 Voltage Offset Correction: v_off_ini = 0.000003662 V, v_off_fin = 0.000006942 V 22:27:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052506 Vs 22:27:17 Integrated Voltage Measurement... 22:27:37 Voltage Offset Correction: v_off_ini = 0.000006108 V, v_off_fin = 0.000003380 V 22:27:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983780 Vs 22:27:40 Temperature Measurement, Probe Number = 0, T = 20.170000 C 22:27:40 Temperature Measurement, Probe Number = 1, T = 20.092000 C 22:27:41 Temperature Measurement, Probe Number = 2, T = 20.153000 C 22:27:42 Temperature Measurement, Probe Number = 3, T = 20.098000 C 22:27:42 Temperature Measurement, Probe Number = 4, T = 20.172000 C 22:27:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.17 22:27:42 Integrated Voltage Measurement... 22:28:02 Voltage Offset Correction: v_off_ini = 0.000004154 V, v_off_fin = 0.000006649 V 22:28:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052003 Vs 22:28:02 Integrated Voltage Measurement... 22:28:21 Voltage Offset Correction: v_off_ini = 0.000005989 V, v_off_fin = 0.000002509 V 22:28:21 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170984434 Vs 22:58:24 Temperature Measurement, Probe Number = 0, T = 20.166000 C 22:58:25 Temperature Measurement, Probe Number = 1, T = 20.089000 C 22:58:25 Temperature Measurement, Probe Number = 2, T = 20.151000 C 22:58:26 Temperature Measurement, Probe Number = 3, T = 20.096000 C 22:58:27 Temperature Measurement, Probe Number = 4, T = 20.267000 C 22:58:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.27 22:58:27 Integrated Voltage Measurement... 22:58:46 Voltage Offset Correction: v_off_ini = 0.000004769 V, v_off_fin = 0.000006385 V 22:58:46 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171098650 Vs 22:58:46 Integrated Voltage Measurement... 22:59:06 Voltage Offset Correction: v_off_ini = 0.000005486 V, v_off_fin = 0.000002617 V 22:59:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992599 Vs 22:59:09 Temperature Measurement, Probe Number = 0, T = 20.170000 C 22:59:09 Temperature Measurement, Probe Number = 1, T = 20.094000 C 22:59:10 Temperature Measurement, Probe Number = 2, T = 20.153000 C 22:59:11 Temperature Measurement, Probe Number = 3, T = 20.098000 C 22:59:11 Temperature Measurement, Probe Number = 4, T = 20.266000 C 22:59:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.27 22:59:12 Integrated Voltage Measurement... 22:59:31 Voltage Offset Correction: v_off_ini = 0.000003163 V, v_off_fin = 0.000006546 V 22:59:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047692 Vs 22:59:31 Integrated Voltage Measurement... 22:59:50 Voltage Offset Correction: v_off_ini = 0.000006094 V, v_off_fin = 0.000003000 V 22:59:50 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170984517 Vs 22:59:53 Temperature Measurement, Probe Number = 0, T = 20.171000 C 22:59:54 Temperature Measurement, Probe Number = 1, T = 20.095000 C 22:59:54 Temperature Measurement, Probe Number = 2, T = 20.155000 C 22:59:55 Temperature Measurement, Probe Number = 3, T = 20.101000 C 22:59:56 Temperature Measurement, Probe Number = 4, T = 20.417000 C 22:59:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.42 22:59:56 Integrated Voltage Measurement... 23:00:15 Voltage Offset Correction: v_off_ini = 0.000004145 V, v_off_fin = 0.000006952 V 23:00:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058084 Vs 23:00:15 Integrated Voltage Measurement... 23:00:35 Voltage Offset Correction: v_off_ini = 0.000006499 V, v_off_fin = 0.000003023 V 23:00:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984814 Vs 23:00:38 Temperature Measurement, Probe Number = 0, T = 20.171000 C 23:00:38 Temperature Measurement, Probe Number = 1, T = 20.093000 C 23:00:39 Temperature Measurement, Probe Number = 2, T = 20.154000 C 23:00:40 Temperature Measurement, Probe Number = 3, T = 20.100000 C 23:00:40 Temperature Measurement, Probe Number = 4, T = 20.386000 C 23:00:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.39 23:00:41 Integrated Voltage Measurement... 23:01:00 Voltage Offset Correction: v_off_ini = 0.000004077 V, v_off_fin = 0.000006295 V 23:01:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051070 Vs 23:01:00 Integrated Voltage Measurement... 23:01:19 Voltage Offset Correction: v_off_ini = 0.000006053 V, v_off_fin = 0.000002464 V 23:01:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986767 Vs 23:01:22 Temperature Measurement, Probe Number = 0, T = 20.173000 C 23:01:23 Temperature Measurement, Probe Number = 1, T = 20.094000 C 23:01:23 Temperature Measurement, Probe Number = 2, T = 20.156000 C 23:01:24 Temperature Measurement, Probe Number = 3, T = 20.099000 C 23:01:25 Temperature Measurement, Probe Number = 4, T = 20.411000 C 23:01:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 23:01:25 Integrated Voltage Measurement... 23:01:46 Voltage Offset Correction: v_off_ini = 0.000004066 V, v_off_fin = 0.000006652 V 23:01:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052699 Vs 23:01:46 Integrated Voltage Measurement... 23:02:05 Voltage Offset Correction: v_off_ini = 0.000005579 V, v_off_fin = 0.000002510 V 23:02:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987484 Vs 23:02:08 Temperature Measurement, Probe Number = 0, T = 20.171000 C 23:02:09 Temperature Measurement, Probe Number = 1, T = 20.092000 C 23:02:09 Temperature Measurement, Probe Number = 2, T = 20.154000 C 23:02:10 Temperature Measurement, Probe Number = 3, T = 20.097000 C 23:02:11 Temperature Measurement, Probe Number = 4, T = 20.432000 C 23:02:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.43 23:02:11 Integrated Voltage Measurement... 23:02:31 Voltage Offset Correction: v_off_ini = 0.000003835 V, v_off_fin = 0.000006211 V 23:02:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053277 Vs 23:02:31 Integrated Voltage Measurement... 23:02:50 Voltage Offset Correction: v_off_ini = 0.000005347 V, v_off_fin = 0.000002795 V 23:02:51 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987477 Vs 23:02:53 Temperature Measurement, Probe Number = 0, T = 20.167000 C 23:02:54 Temperature Measurement, Probe Number = 1, T = 20.091000 C 23:02:55 Temperature Measurement, Probe Number = 2, T = 20.152000 C 23:02:55 Temperature Measurement, Probe Number = 3, T = 20.097000 C 23:02:56 Temperature Measurement, Probe Number = 4, T = 20.352000 C 23:02:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.35 23:02:56 Integrated Voltage Measurement... 23:03:15 Voltage Offset Correction: v_off_ini = 0.000003590 V, v_off_fin = 0.000006476 V 23:03:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053048 Vs 23:03:16 Integrated Voltage Measurement... 23:03:35 Voltage Offset Correction: v_off_ini = 0.000005671 V, v_off_fin = 0.000002313 V 23:03:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992222 Vs 23:03:38 Temperature Measurement, Probe Number = 0, T = 20.170000 C 23:03:38 Temperature Measurement, Probe Number = 1, T = 20.092000 C 23:03:39 Temperature Measurement, Probe Number = 2, T = 20.154000 C 23:03:40 Temperature Measurement, Probe Number = 3, T = 20.099000 C 23:03:40 Temperature Measurement, Probe Number = 4, T = 20.322000 C 23:03:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.32 23:03:41 Integrated Voltage Measurement... 23:04:00 Voltage Offset Correction: v_off_ini = 0.000003347 V, v_off_fin = 0.000006308 V 23:04:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052923 Vs 23:04:00 Integrated Voltage Measurement... 23:04:19 Voltage Offset Correction: v_off_ini = 0.000006478 V, v_off_fin = 0.000002980 V 23:04:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984069 Vs 23:04:22 Temperature Measurement, Probe Number = 0, T = 20.173000 C 23:04:22 Temperature Measurement, Probe Number = 1, T = 20.093000 C 23:04:23 Temperature Measurement, Probe Number = 2, T = 20.155000 C 23:04:24 Temperature Measurement, Probe Number = 3, T = 20.099000 C 23:04:24 Temperature Measurement, Probe Number = 4, T = 20.350000 C 23:04:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.35 23:04:25 Integrated Voltage Measurement... 23:04:44 Voltage Offset Correction: v_off_ini = 0.000003925 V, v_off_fin = 0.000006783 V 23:04:44 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171056281 Vs 23:04:44 Integrated Voltage Measurement... 23:05:04 Voltage Offset Correction: v_off_ini = 0.000006074 V, v_off_fin = 0.000002946 V 23:05:04 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988369 Vs 23:05:06 Temperature Measurement, Probe Number = 0, T = 20.172000 C 23:05:07 Temperature Measurement, Probe Number = 1, T = 20.092000 C 23:05:08 Temperature Measurement, Probe Number = 2, T = 20.156000 C 23:05:08 Temperature Measurement, Probe Number = 3, T = 20.098000 C 23:05:09 Temperature Measurement, Probe Number = 4, T = 20.389000 C 23:05:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.39 23:05:09 Integrated Voltage Measurement... 23:05:29 Voltage Offset Correction: v_off_ini = 0.000003708 V, v_off_fin = 0.000006437 V 23:05:29 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057029 Vs 23:05:29 Integrated Voltage Measurement... 23:05:48 Voltage Offset Correction: v_off_ini = 0.000006115 V, v_off_fin = 0.000002844 V 23:05:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991765 Vs 23:35:51 Temperature Measurement, Probe Number = 0, T = 20.170000 C 23:35:52 Temperature Measurement, Probe Number = 1, T = 20.089000 C 23:35:53 Temperature Measurement, Probe Number = 2, T = 20.156000 C 23:35:53 Temperature Measurement, Probe Number = 3, T = 20.100000 C 23:35:54 Temperature Measurement, Probe Number = 4, T = 20.349000 C 23:35:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.35 23:35:54 Integrated Voltage Measurement... 23:36:13 Voltage Offset Correction: v_off_ini = 0.000005166 V, v_off_fin = 0.000006938 V 23:36:13 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171105193 Vs 23:36:13 Integrated Voltage Measurement... 23:36:33 Voltage Offset Correction: v_off_ini = 0.000005862 V, v_off_fin = 0.000002110 V 23:36:33 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000005 Vs 23:36:35 Temperature Measurement, Probe Number = 0, T = 20.174000 C 23:36:36 Temperature Measurement, Probe Number = 1, T = 20.091000 C 23:36:37 Temperature Measurement, Probe Number = 2, T = 20.159000 C 23:36:37 Temperature Measurement, Probe Number = 3, T = 20.100000 C 23:36:38 Temperature Measurement, Probe Number = 4, T = 20.403000 C 23:36:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.40 23:36:38 Integrated Voltage Measurement... 23:36:58 Voltage Offset Correction: v_off_ini = 0.000003933 V, v_off_fin = 0.000006856 V 23:36:58 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171060851 Vs 23:36:58 Integrated Voltage Measurement... 23:37:17 Voltage Offset Correction: v_off_ini = 0.000006376 V, v_off_fin = 0.000002806 V 23:37:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985693 Vs 23:37:20 Temperature Measurement, Probe Number = 0, T = 20.172000 C 23:37:21 Temperature Measurement, Probe Number = 1, T = 20.088000 C 23:37:22 Temperature Measurement, Probe Number = 2, T = 20.155000 C 23:37:22 Temperature Measurement, Probe Number = 3, T = 20.095000 C 23:37:23 Temperature Measurement, Probe Number = 4, T = 20.344000 C 23:37:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.34 23:37:23 Integrated Voltage Measurement... 23:37:42 Voltage Offset Correction: v_off_ini = 0.000004306 V, v_off_fin = 0.000007212 V 23:37:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171057406 Vs 23:37:43 Integrated Voltage Measurement... 23:38:02 Voltage Offset Correction: v_off_ini = 0.000006300 V, v_off_fin = 0.000002986 V 23:38:02 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170984009 Vs 23:38:05 Temperature Measurement, Probe Number = 0, T = 20.167000 C 23:38:05 Temperature Measurement, Probe Number = 1, T = 20.086000 C 23:38:06 Temperature Measurement, Probe Number = 2, T = 20.154000 C 23:38:07 Temperature Measurement, Probe Number = 3, T = 20.095000 C 23:38:07 Temperature Measurement, Probe Number = 4, T = 20.233000 C 23:38:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.23 23:38:07 Integrated Voltage Measurement... 23:38:27 Voltage Offset Correction: v_off_ini = 0.000004143 V, v_off_fin = 0.000007301 V 23:38:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171066688 Vs 23:38:27 Integrated Voltage Measurement... 23:38:46 Voltage Offset Correction: v_off_ini = 0.000006260 V, v_off_fin = 0.000003395 V 23:38:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984535 Vs 23:38:49 Temperature Measurement, Probe Number = 0, T = 20.173000 C 23:38:50 Temperature Measurement, Probe Number = 1, T = 20.092000 C 23:38:51 Temperature Measurement, Probe Number = 2, T = 20.156000 C 23:38:51 Temperature Measurement, Probe Number = 3, T = 20.098000 C 23:38:52 Temperature Measurement, Probe Number = 4, T = 20.184000 C 23:38:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.18 23:38:52 Integrated Voltage Measurement... 23:39:12 Voltage Offset Correction: v_off_ini = 0.000004225 V, v_off_fin = 0.000006854 V 23:39:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064966 Vs 23:39:12 Integrated Voltage Measurement... 23:39:31 Voltage Offset Correction: v_off_ini = 0.000006227 V, v_off_fin = 0.000002777 V 23:39:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988340 Vs 23:39:34 Temperature Measurement, Probe Number = 0, T = 20.177000 C 23:39:35 Temperature Measurement, Probe Number = 1, T = 20.096000 C 23:39:36 Temperature Measurement, Probe Number = 2, T = 20.159000 C 23:39:36 Temperature Measurement, Probe Number = 3, T = 20.102000 C 23:39:37 Temperature Measurement, Probe Number = 4, T = 20.261000 C 23:39:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.26 23:39:37 Integrated Voltage Measurement... 23:39:57 Voltage Offset Correction: v_off_ini = 0.000004837 V, v_off_fin = 0.000007374 V 23:39:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171067248 Vs 23:39:57 Integrated Voltage Measurement... 23:40:17 Voltage Offset Correction: v_off_ini = 0.000006690 V, v_off_fin = 0.000003565 V 23:40:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983179 Vs 23:40:20 Temperature Measurement, Probe Number = 0, T = 20.177000 C 23:40:20 Temperature Measurement, Probe Number = 1, T = 20.094000 C 23:40:21 Temperature Measurement, Probe Number = 2, T = 20.159000 C 23:40:21 Temperature Measurement, Probe Number = 3, T = 20.101000 C 23:40:22 Temperature Measurement, Probe Number = 4, T = 20.358000 C 23:40:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.36 23:40:22 Integrated Voltage Measurement... 23:40:42 Voltage Offset Correction: v_off_ini = 0.000004537 V, v_off_fin = 0.000006600 V 23:40:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061954 Vs 23:40:42 Integrated Voltage Measurement... 23:41:02 Voltage Offset Correction: v_off_ini = 0.000006165 V, v_off_fin = 0.000002367 V 23:41:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992628 Vs 23:41:05 Temperature Measurement, Probe Number = 0, T = 20.172000 C 23:41:05 Temperature Measurement, Probe Number = 1, T = 20.090000 C 23:41:06 Temperature Measurement, Probe Number = 2, T = 20.157000 C 23:41:07 Temperature Measurement, Probe Number = 3, T = 20.097000 C 23:41:07 Temperature Measurement, Probe Number = 4, T = 20.409000 C 23:41:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 23:41:07 Integrated Voltage Measurement... 23:41:27 Voltage Offset Correction: v_off_ini = 0.000004479 V, v_off_fin = 0.000006595 V 23:41:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171063622 Vs 23:41:27 Integrated Voltage Measurement... 23:41:47 Voltage Offset Correction: v_off_ini = 0.000006383 V, v_off_fin = 0.000002889 V 23:41:47 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170990564 Vs 23:41:49 Temperature Measurement, Probe Number = 0, T = 20.165000 C 23:41:50 Temperature Measurement, Probe Number = 1, T = 20.083000 C 23:41:51 Temperature Measurement, Probe Number = 2, T = 20.151000 C 23:41:51 Temperature Measurement, Probe Number = 3, T = 20.092000 C 23:41:52 Temperature Measurement, Probe Number = 4, T = 20.342000 C 23:41:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.34 23:41:52 Integrated Voltage Measurement... 23:42:12 Voltage Offset Correction: v_off_ini = 0.000004342 V, v_off_fin = 0.000007098 V 23:42:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171067594 Vs 23:42:12 Integrated Voltage Measurement... 23:42:31 Voltage Offset Correction: v_off_ini = 0.000006467 V, v_off_fin = 0.000002988 V 23:42:31 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170984538 Vs 23:42:34 Temperature Measurement, Probe Number = 0, T = 20.165000 C 23:42:34 Temperature Measurement, Probe Number = 1, T = 20.084000 C 23:42:35 Temperature Measurement, Probe Number = 2, T = 20.148000 C 23:42:36 Temperature Measurement, Probe Number = 3, T = 20.091000 C 23:42:36 Temperature Measurement, Probe Number = 4, T = 20.228000 C 23:42:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.23 23:42:37 Integrated Voltage Measurement... 23:42:56 Voltage Offset Correction: v_off_ini = 0.000004525 V, v_off_fin = 0.000006308 V 23:42:56 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171063504 Vs 23:42:56 Integrated Voltage Measurement... 23:43:15 Voltage Offset Correction: v_off_ini = 0.000006392 V, v_off_fin = 0.000002812 V 23:43:15 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987233 Vs 00:13:18 Temperature Measurement, Probe Number = 0, T = 20.162000 C 00:13:18 Temperature Measurement, Probe Number = 1, T = 20.085000 C 00:13:19 Temperature Measurement, Probe Number = 2, T = 20.149000 C 00:13:20 Temperature Measurement, Probe Number = 3, T = 20.089000 C 00:13:20 Temperature Measurement, Probe Number = 4, T = 20.077000 C 00:13:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.08 00:13:21 Integrated Voltage Measurement... 00:13:40 Voltage Offset Correction: v_off_ini = 0.000005474 V, v_off_fin = 0.000007078 V 00:13:40 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171111194 Vs 00:13:40 Integrated Voltage Measurement... 00:13:59 Voltage Offset Correction: v_off_ini = 0.000006491 V, v_off_fin = 0.000003040 V 00:14:00 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170990304 Vs 00:14:02 Temperature Measurement, Probe Number = 0, T = 20.164000 C 00:14:03 Temperature Measurement, Probe Number = 1, T = 20.083000 C 00:14:04 Temperature Measurement, Probe Number = 2, T = 20.149000 C 00:14:04 Temperature Measurement, Probe Number = 3, T = 20.092000 C 00:14:05 Temperature Measurement, Probe Number = 4, T = 20.149000 C 00:14:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.15 00:14:05 Integrated Voltage Measurement... 00:14:24 Voltage Offset Correction: v_off_ini = 0.000004990 V, v_off_fin = 0.000007119 V 00:14:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171067835 Vs 00:14:24 Integrated Voltage Measurement... 00:14:43 Voltage Offset Correction: v_off_ini = 0.000006408 V, v_off_fin = 0.000002233 V 00:14:44 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170995314 Vs 00:14:46 Temperature Measurement, Probe Number = 0, T = 20.164000 C 00:14:47 Temperature Measurement, Probe Number = 1, T = 20.083000 C 00:14:48 Temperature Measurement, Probe Number = 2, T = 20.151000 C 00:14:48 Temperature Measurement, Probe Number = 3, T = 20.091000 C 00:14:49 Temperature Measurement, Probe Number = 4, T = 20.198000 C 00:14:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.20 00:14:49 Integrated Voltage Measurement... 00:15:08 Voltage Offset Correction: v_off_ini = 0.000004390 V, v_off_fin = 0.000006819 V 00:15:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171069694 Vs 00:15:08 Integrated Voltage Measurement... 00:15:28 Voltage Offset Correction: v_off_ini = 0.000006182 V, v_off_fin = 0.000002937 V 00:15:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992949 Vs 00:15:31 Temperature Measurement, Probe Number = 0, T = 20.162000 C 00:15:31 Temperature Measurement, Probe Number = 1, T = 20.080000 C 00:15:32 Temperature Measurement, Probe Number = 2, T = 20.148000 C 00:15:33 Temperature Measurement, Probe Number = 3, T = 20.089000 C 00:15:33 Temperature Measurement, Probe Number = 4, T = 20.180000 C 00:15:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.18 00:15:33 Integrated Voltage Measurement... 00:15:53 Voltage Offset Correction: v_off_ini = 0.000004318 V, v_off_fin = 0.000006414 V 00:15:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171068963 Vs 00:15:53 Integrated Voltage Measurement... 00:16:13 Voltage Offset Correction: v_off_ini = 0.000006329 V, v_off_fin = 0.000003007 V 00:16:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998221 Vs 00:16:16 Temperature Measurement, Probe Number = 0, T = 20.158000 C 00:16:16 Temperature Measurement, Probe Number = 1, T = 20.081000 C 00:16:17 Temperature Measurement, Probe Number = 2, T = 20.143000 C 00:16:18 Temperature Measurement, Probe Number = 3, T = 20.086000 C 00:16:18 Temperature Measurement, Probe Number = 4, T = 20.207000 C 00:16:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.21 00:16:19 Integrated Voltage Measurement... 00:16:38 Voltage Offset Correction: v_off_ini = 0.000004218 V, v_off_fin = 0.000006628 V 00:16:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064363 Vs 00:16:38 Integrated Voltage Measurement... 00:16:58 Voltage Offset Correction: v_off_ini = 0.000006317 V, v_off_fin = 0.000002949 V 00:16:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000305 Vs 00:17:01 Temperature Measurement, Probe Number = 0, T = 20.162000 C 00:17:01 Temperature Measurement, Probe Number = 1, T = 20.079000 C 00:17:02 Temperature Measurement, Probe Number = 2, T = 20.148000 C 00:17:03 Temperature Measurement, Probe Number = 3, T = 20.088000 C 00:17:03 Temperature Measurement, Probe Number = 4, T = 20.205000 C 00:17:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.20 00:17:03 Integrated Voltage Measurement... 00:17:23 Voltage Offset Correction: v_off_ini = 0.000003323 V, v_off_fin = 0.000006360 V 00:17:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062481 Vs 00:17:23 Integrated Voltage Measurement... 00:17:43 Voltage Offset Correction: v_off_ini = 0.000005872 V, v_off_fin = 0.000003058 V 00:17:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001048 Vs 00:17:46 Temperature Measurement, Probe Number = 0, T = 20.161000 C 00:17:46 Temperature Measurement, Probe Number = 1, T = 20.082000 C 00:17:47 Temperature Measurement, Probe Number = 2, T = 20.146000 C 00:17:48 Temperature Measurement, Probe Number = 3, T = 20.088000 C 00:17:48 Temperature Measurement, Probe Number = 4, T = 20.264000 C 00:17:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.26 00:17:49 Integrated Voltage Measurement... 00:18:08 Voltage Offset Correction: v_off_ini = 0.000004262 V, v_off_fin = 0.000006504 V 00:18:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064800 Vs 00:18:08 Integrated Voltage Measurement... 00:18:27 Voltage Offset Correction: v_off_ini = 0.000006220 V, v_off_fin = 0.000002433 V 00:18:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994812 Vs 00:18:30 Temperature Measurement, Probe Number = 0, T = 20.159000 C 00:18:31 Temperature Measurement, Probe Number = 1, T = 20.077000 C 00:18:31 Temperature Measurement, Probe Number = 2, T = 20.146000 C 00:18:32 Temperature Measurement, Probe Number = 3, T = 20.088000 C 00:18:33 Temperature Measurement, Probe Number = 4, T = 20.261000 C 00:18:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.26 00:18:33 Integrated Voltage Measurement... 00:18:52 Voltage Offset Correction: v_off_ini = 0.000004106 V, v_off_fin = 0.000006640 V 00:18:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062450 Vs 00:18:52 Integrated Voltage Measurement... 00:19:11 Voltage Offset Correction: v_off_ini = 0.000005854 V, v_off_fin = 0.000002974 V 00:19:11 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170993479 Vs 00:19:14 Temperature Measurement, Probe Number = 0, T = 20.153000 C 00:19:15 Temperature Measurement, Probe Number = 1, T = 20.073000 C 00:19:16 Temperature Measurement, Probe Number = 2, T = 20.139000 C 00:19:16 Temperature Measurement, Probe Number = 3, T = 20.083000 C 00:19:17 Temperature Measurement, Probe Number = 4, T = 20.204000 C 00:19:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.20 00:19:17 Integrated Voltage Measurement... 00:19:36 Voltage Offset Correction: v_off_ini = 0.000003487 V, v_off_fin = 0.000006732 V 00:19:36 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171068512 Vs 00:19:37 Integrated Voltage Measurement... 00:19:56 Voltage Offset Correction: v_off_ini = 0.000005964 V, v_off_fin = 0.000002082 V 00:19:56 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997944 Vs 00:19:58 Temperature Measurement, Probe Number = 0, T = 20.158000 C 00:19:59 Temperature Measurement, Probe Number = 1, T = 20.079000 C 00:20:00 Temperature Measurement, Probe Number = 2, T = 20.143000 C 00:20:00 Temperature Measurement, Probe Number = 3, T = 20.086000 C 00:20:01 Temperature Measurement, Probe Number = 4, T = 20.233000 C 00:20:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.23 00:20:01 Integrated Voltage Measurement... 00:20:20 Voltage Offset Correction: v_off_ini = 0.000003662 V, v_off_fin = 0.000006070 V 00:20:21 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058010 Vs 00:20:21 Integrated Voltage Measurement... 00:20:40 Voltage Offset Correction: v_off_ini = 0.000006076 V, v_off_fin = 0.000002764 V 00:20:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002129 Vs 00:50:43 Temperature Measurement, Probe Number = 0, T = 20.152000 C 00:50:44 Temperature Measurement, Probe Number = 1, T = 20.076000 C 00:50:44 Temperature Measurement, Probe Number = 2, T = 20.143000 C 00:50:45 Temperature Measurement, Probe Number = 3, T = 20.088000 C 00:50:46 Temperature Measurement, Probe Number = 4, T = 20.178000 C 00:50:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.18 00:50:46 Integrated Voltage Measurement... 00:51:05 Voltage Offset Correction: v_off_ini = 0.000004976 V, v_off_fin = 0.000006509 V 00:51:06 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171114429 Vs 00:51:06 Integrated Voltage Measurement... 00:51:25 Voltage Offset Correction: v_off_ini = 0.000005528 V, v_off_fin = 0.000002346 V 00:51:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999081 Vs 00:51:28 Temperature Measurement, Probe Number = 0, T = 20.155000 C 00:51:29 Temperature Measurement, Probe Number = 1, T = 20.080000 C 00:51:30 Temperature Measurement, Probe Number = 2, T = 20.146000 C 00:51:30 Temperature Measurement, Probe Number = 3, T = 20.090000 C 00:51:31 Temperature Measurement, Probe Number = 4, T = 20.183000 C 00:51:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.18 00:51:31 Integrated Voltage Measurement... 00:51:51 Voltage Offset Correction: v_off_ini = 0.000003710 V, v_off_fin = 0.000006458 V 00:51:51 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171060013 Vs 00:51:51 Integrated Voltage Measurement... 00:52:10 Voltage Offset Correction: v_off_ini = 0.000005936 V, v_off_fin = 0.000002605 V 00:52:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995482 Vs 00:52:13 Temperature Measurement, Probe Number = 0, T = 20.157000 C 00:52:14 Temperature Measurement, Probe Number = 1, T = 20.080000 C 00:52:15 Temperature Measurement, Probe Number = 2, T = 20.147000 C 00:52:15 Temperature Measurement, Probe Number = 3, T = 20.090000 C 00:52:16 Temperature Measurement, Probe Number = 4, T = 20.228000 C 00:52:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.23 00:52:16 Integrated Voltage Measurement... 00:52:35 Voltage Offset Correction: v_off_ini = 0.000004610 V, v_off_fin = 0.000007064 V 00:52:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061453 Vs 00:52:36 Integrated Voltage Measurement... 00:52:55 Voltage Offset Correction: v_off_ini = 0.000006127 V, v_off_fin = 0.000002649 V 00:52:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001677 Vs 00:52:58 Temperature Measurement, Probe Number = 0, T = 20.161000 C 00:52:59 Temperature Measurement, Probe Number = 1, T = 20.082000 C 00:53:00 Temperature Measurement, Probe Number = 2, T = 20.150000 C 00:53:00 Temperature Measurement, Probe Number = 3, T = 20.089000 C 00:53:01 Temperature Measurement, Probe Number = 4, T = 20.181000 C 00:53:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.18 00:53:01 Integrated Voltage Measurement... 00:53:21 Voltage Offset Correction: v_off_ini = 0.000003878 V, v_off_fin = 0.000006683 V 00:53:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061526 Vs 00:53:21 Integrated Voltage Measurement... 00:53:41 Voltage Offset Correction: v_off_ini = 0.000005808 V, v_off_fin = 0.000003050 V 00:53:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994342 Vs 00:53:43 Temperature Measurement, Probe Number = 0, T = 20.161000 C 00:53:44 Temperature Measurement, Probe Number = 1, T = 20.083000 C 00:53:45 Temperature Measurement, Probe Number = 2, T = 20.147000 C 00:53:45 Temperature Measurement, Probe Number = 3, T = 20.090000 C 00:53:46 Temperature Measurement, Probe Number = 4, T = 20.236000 C 00:53:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.24 00:53:46 Integrated Voltage Measurement... 00:54:06 Voltage Offset Correction: v_off_ini = 0.000003942 V, v_off_fin = 0.000006393 V 00:54:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058067 Vs 00:54:07 Integrated Voltage Measurement... 00:54:27 Voltage Offset Correction: v_off_ini = 0.000005719 V, v_off_fin = 0.000003266 V 00:54:27 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170995329 Vs 00:54:29 Temperature Measurement, Probe Number = 0, T = 20.159000 C 00:54:30 Temperature Measurement, Probe Number = 1, T = 20.082000 C 00:54:31 Temperature Measurement, Probe Number = 2, T = 20.148000 C 00:54:31 Temperature Measurement, Probe Number = 3, T = 20.091000 C 00:54:32 Temperature Measurement, Probe Number = 4, T = 20.288000 C 00:54:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.29 00:54:32 Integrated Voltage Measurement... 00:54:52 Voltage Offset Correction: v_off_ini = 0.000004342 V, v_off_fin = 0.000006705 V 00:54:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171057947 Vs 00:54:52 Integrated Voltage Measurement... 00:55:12 Voltage Offset Correction: v_off_ini = 0.000006259 V, v_off_fin = 0.000003886 V 00:55:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987489 Vs 00:55:15 Temperature Measurement, Probe Number = 0, T = 20.160000 C 00:55:15 Temperature Measurement, Probe Number = 1, T = 20.084000 C 00:55:16 Temperature Measurement, Probe Number = 2, T = 20.149000 C 00:55:17 Temperature Measurement, Probe Number = 3, T = 20.092000 C 00:55:17 Temperature Measurement, Probe Number = 4, T = 20.247000 C 00:55:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.25 00:55:17 Integrated Voltage Measurement... 00:55:37 Voltage Offset Correction: v_off_ini = 0.000004594 V, v_off_fin = 0.000007097 V 00:55:37 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171065546 Vs 00:55:38 Integrated Voltage Measurement... 00:55:57 Voltage Offset Correction: v_off_ini = 0.000006280 V, v_off_fin = 0.000002622 V 00:55:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170989047 Vs 00:56:00 Temperature Measurement, Probe Number = 0, T = 20.159000 C 00:56:00 Temperature Measurement, Probe Number = 1, T = 20.081000 C 00:56:01 Temperature Measurement, Probe Number = 2, T = 20.147000 C 00:56:02 Temperature Measurement, Probe Number = 3, T = 20.091000 C 00:56:02 Temperature Measurement, Probe Number = 4, T = 20.141000 C 00:56:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.14 00:56:03 Integrated Voltage Measurement... 00:56:23 Voltage Offset Correction: v_off_ini = 0.000004319 V, v_off_fin = 0.000006501 V 00:56:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066293 Vs 00:56:23 Integrated Voltage Measurement... 00:56:42 Voltage Offset Correction: v_off_ini = 0.000006077 V, v_off_fin = 0.000002457 V 00:56:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995625 Vs 00:56:45 Temperature Measurement, Probe Number = 0, T = 20.154000 C 00:56:45 Temperature Measurement, Probe Number = 1, T = 20.079000 C 00:56:46 Temperature Measurement, Probe Number = 2, T = 20.144000 C 00:56:47 Temperature Measurement, Probe Number = 3, T = 20.088000 C 00:56:47 Temperature Measurement, Probe Number = 4, T = 20.181000 C 00:56:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.18 00:56:48 Integrated Voltage Measurement... 00:57:08 Voltage Offset Correction: v_off_ini = 0.000004488 V, v_off_fin = 0.000006529 V 00:57:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171067931 Vs 00:57:08 Integrated Voltage Measurement... 00:57:27 Voltage Offset Correction: v_off_ini = 0.000005942 V, v_off_fin = 0.000002569 V 00:57:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992503 Vs 00:57:30 Temperature Measurement, Probe Number = 0, T = 20.152000 C 00:57:30 Temperature Measurement, Probe Number = 1, T = 20.076000 C 00:57:31 Temperature Measurement, Probe Number = 2, T = 20.142000 C 00:57:32 Temperature Measurement, Probe Number = 3, T = 20.086000 C 00:57:32 Temperature Measurement, Probe Number = 4, T = 20.229000 C 00:57:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.23 00:57:33 Integrated Voltage Measurement... 00:57:52 Voltage Offset Correction: v_off_ini = 0.000003592 V, v_off_fin = 0.000006736 V 00:57:52 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171067919 Vs 00:57:52 Integrated Voltage Measurement... 00:58:12 Voltage Offset Correction: v_off_ini = 0.000005617 V, v_off_fin = 0.000002772 V 00:58:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002695 Vs 01:28:15 Temperature Measurement, Probe Number = 0, T = 20.153000 C 01:28:15 Temperature Measurement, Probe Number = 1, T = 20.067000 C 01:28:16 Temperature Measurement, Probe Number = 2, T = 20.144000 C 01:28:17 Temperature Measurement, Probe Number = 3, T = 20.083000 C 01:28:17 Temperature Measurement, Probe Number = 4, T = 20.474000 C 01:28:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.47 01:28:18 Integrated Voltage Measurement... 01:28:38 Voltage Offset Correction: v_off_ini = 0.000004830 V, v_off_fin = 0.000006717 V 01:28:38 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171106930 Vs 01:28:38 Integrated Voltage Measurement... 01:28:58 Voltage Offset Correction: v_off_ini = 0.000005681 V, v_off_fin = 0.000001751 V 01:28:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171003247 Vs 01:29:01 Temperature Measurement, Probe Number = 0, T = 20.151000 C 01:29:01 Temperature Measurement, Probe Number = 1, T = 20.066000 C 01:29:02 Temperature Measurement, Probe Number = 2, T = 20.139000 C 01:29:03 Temperature Measurement, Probe Number = 3, T = 20.080000 C 01:29:03 Temperature Measurement, Probe Number = 4, T = 20.432000 C 01:29:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.43 01:29:04 Integrated Voltage Measurement... 01:29:23 Voltage Offset Correction: v_off_ini = 0.000003677 V, v_off_fin = 0.000006592 V 01:29:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054376 Vs 01:29:23 Integrated Voltage Measurement... 01:29:43 Voltage Offset Correction: v_off_ini = 0.000006240 V, v_off_fin = 0.000002315 V 01:29:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996753 Vs 01:29:46 Temperature Measurement, Probe Number = 0, T = 20.147000 C 01:29:47 Temperature Measurement, Probe Number = 1, T = 20.065000 C 01:29:47 Temperature Measurement, Probe Number = 2, T = 20.137000 C 01:29:48 Temperature Measurement, Probe Number = 3, T = 20.079000 C 01:29:48 Temperature Measurement, Probe Number = 4, T = 20.356000 C 01:29:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.36 01:29:49 Integrated Voltage Measurement... 01:30:08 Voltage Offset Correction: v_off_ini = 0.000003441 V, v_off_fin = 0.000005932 V 01:30:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049167 Vs 01:30:08 Integrated Voltage Measurement... 01:30:28 Voltage Offset Correction: v_off_ini = 0.000005867 V, v_off_fin = 0.000002646 V 01:30:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996084 Vs 01:30:31 Temperature Measurement, Probe Number = 0, T = 20.153000 C 01:30:31 Temperature Measurement, Probe Number = 1, T = 20.073000 C 01:30:32 Temperature Measurement, Probe Number = 2, T = 20.143000 C 01:30:33 Temperature Measurement, Probe Number = 3, T = 20.085000 C 01:30:33 Temperature Measurement, Probe Number = 4, T = 20.374000 C 01:30:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.37 01:30:33 Integrated Voltage Measurement... 01:30:53 Voltage Offset Correction: v_off_ini = 0.000003861 V, v_off_fin = 0.000007164 V 01:30:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058024 Vs 01:30:53 Integrated Voltage Measurement... 01:31:13 Voltage Offset Correction: v_off_ini = 0.000006172 V, v_off_fin = 0.000002572 V 01:31:13 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000272 Vs 01:31:16 Temperature Measurement, Probe Number = 0, T = 20.156000 C 01:31:17 Temperature Measurement, Probe Number = 1, T = 20.075000 C 01:31:17 Temperature Measurement, Probe Number = 2, T = 20.145000 C 01:31:18 Temperature Measurement, Probe Number = 3, T = 20.088000 C 01:31:19 Temperature Measurement, Probe Number = 4, T = 20.358000 C 01:31:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.36 01:31:19 Integrated Voltage Measurement... 01:31:38 Voltage Offset Correction: v_off_ini = 0.000004198 V, v_off_fin = 0.000007153 V 01:31:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171061610 Vs 01:31:38 Integrated Voltage Measurement... 01:31:58 Voltage Offset Correction: v_off_ini = 0.000006567 V, v_off_fin = 0.000003127 V 01:31:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993824 Vs 01:32:01 Temperature Measurement, Probe Number = 0, T = 20.158000 C 01:32:02 Temperature Measurement, Probe Number = 1, T = 20.076000 C 01:32:02 Temperature Measurement, Probe Number = 2, T = 20.149000 C 01:32:03 Temperature Measurement, Probe Number = 3, T = 20.089000 C 01:32:03 Temperature Measurement, Probe Number = 4, T = 20.414000 C 01:32:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.41 01:32:04 Integrated Voltage Measurement... 01:32:23 Voltage Offset Correction: v_off_ini = 0.000004307 V, v_off_fin = 0.000007685 V 01:32:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171064719 Vs 01:32:23 Integrated Voltage Measurement... 01:32:43 Voltage Offset Correction: v_off_ini = 0.000006921 V, v_off_fin = 0.000003547 V 01:32:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993324 Vs 01:32:46 Temperature Measurement, Probe Number = 0, T = 20.153000 C 01:32:47 Temperature Measurement, Probe Number = 1, T = 20.066000 C 01:32:47 Temperature Measurement, Probe Number = 2, T = 20.145000 C 01:32:48 Temperature Measurement, Probe Number = 3, T = 20.083000 C 01:32:49 Temperature Measurement, Probe Number = 4, T = 20.385000 C 01:32:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.39 01:32:49 Integrated Voltage Measurement... 01:33:09 Voltage Offset Correction: v_off_ini = 0.000004235 V, v_off_fin = 0.000006386 V 01:33:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171057233 Vs 01:33:09 Integrated Voltage Measurement... 01:33:28 Voltage Offset Correction: v_off_ini = 0.000005676 V, v_off_fin = 0.000002344 V 01:33:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995596 Vs 01:33:31 Temperature Measurement, Probe Number = 0, T = 20.145000 C 01:33:32 Temperature Measurement, Probe Number = 1, T = 20.065000 C 01:33:33 Temperature Measurement, Probe Number = 2, T = 20.139000 C 01:33:33 Temperature Measurement, Probe Number = 3, T = 20.081000 C 01:33:34 Temperature Measurement, Probe Number = 4, T = 20.301000 C 01:33:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.30 01:33:34 Integrated Voltage Measurement... 01:33:53 Voltage Offset Correction: v_off_ini = 0.000003880 V, v_off_fin = 0.000006266 V 01:33:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052143 Vs 01:33:54 Integrated Voltage Measurement... 01:34:13 Voltage Offset Correction: v_off_ini = 0.000005771 V, v_off_fin = 0.000002505 V 01:34:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995579 Vs 01:34:16 Temperature Measurement, Probe Number = 0, T = 20.153000 C 01:34:17 Temperature Measurement, Probe Number = 1, T = 20.072000 C 01:34:17 Temperature Measurement, Probe Number = 2, T = 20.144000 C 01:34:18 Temperature Measurement, Probe Number = 3, T = 20.087000 C 01:34:19 Temperature Measurement, Probe Number = 4, T = 20.224000 C 01:34:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.22 01:34:19 Integrated Voltage Measurement... 01:34:38 Voltage Offset Correction: v_off_ini = 0.000004066 V, v_off_fin = 0.000006436 V 01:34:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055215 Vs 01:34:39 Integrated Voltage Measurement... 01:34:58 Voltage Offset Correction: v_off_ini = 0.000006086 V, v_off_fin = 0.000002854 V 01:34:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994551 Vs 01:35:01 Temperature Measurement, Probe Number = 0, T = 20.157000 C 01:35:02 Temperature Measurement, Probe Number = 1, T = 20.078000 C 01:35:03 Temperature Measurement, Probe Number = 2, T = 20.147000 C 01:35:03 Temperature Measurement, Probe Number = 3, T = 20.090000 C 01:35:04 Temperature Measurement, Probe Number = 4, T = 20.339000 C 01:35:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.34 01:35:04 Integrated Voltage Measurement... 01:35:23 Voltage Offset Correction: v_off_ini = 0.000003568 V, v_off_fin = 0.000006811 V 01:35:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171057690 Vs 01:35:24 Integrated Voltage Measurement... 01:35:43 Voltage Offset Correction: v_off_ini = 0.000005965 V, v_off_fin = 0.000002443 V 01:35:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995912 Vs 02:05:46 Temperature Measurement, Probe Number = 0, T = 20.159000 C 02:05:47 Temperature Measurement, Probe Number = 1, T = 20.076000 C 02:05:48 Temperature Measurement, Probe Number = 2, T = 20.150000 C 02:05:48 Temperature Measurement, Probe Number = 3, T = 20.088000 C 02:05:49 Temperature Measurement, Probe Number = 4, T = 20.435000 C 02:05:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.43 02:05:49 Integrated Voltage Measurement... 02:06:09 Voltage Offset Correction: v_off_ini = 0.000005626 V, v_off_fin = 0.000007296 V 02:06:09 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171114835 Vs 02:06:09 Integrated Voltage Measurement... 02:06:28 Voltage Offset Correction: v_off_ini = 0.000006920 V, v_off_fin = 0.000003643 V 02:06:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988583 Vs 02:06:31 Temperature Measurement, Probe Number = 0, T = 20.153000 C 02:06:32 Temperature Measurement, Probe Number = 1, T = 20.073000 C 02:06:33 Temperature Measurement, Probe Number = 2, T = 20.144000 C 02:06:33 Temperature Measurement, Probe Number = 3, T = 20.085000 C 02:06:34 Temperature Measurement, Probe Number = 4, T = 20.434000 C 02:06:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.43 02:06:34 Integrated Voltage Measurement... 02:06:54 Voltage Offset Correction: v_off_ini = 0.000005001 V, v_off_fin = 0.000007107 V 02:06:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065957 Vs 02:06:54 Integrated Voltage Measurement... 02:07:14 Voltage Offset Correction: v_off_ini = 0.000006735 V, v_off_fin = 0.000003019 V 02:07:14 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170989652 Vs 02:07:16 Temperature Measurement, Probe Number = 0, T = 20.154000 C 02:07:17 Temperature Measurement, Probe Number = 1, T = 20.072000 C 02:07:18 Temperature Measurement, Probe Number = 2, T = 20.142000 C 02:07:18 Temperature Measurement, Probe Number = 3, T = 20.083000 C 02:07:19 Temperature Measurement, Probe Number = 4, T = 20.352000 C 02:07:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.35 02:07:19 Integrated Voltage Measurement... 02:07:39 Voltage Offset Correction: v_off_ini = 0.000004324 V, v_off_fin = 0.000007478 V 02:07:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171065614 Vs 02:07:39 Integrated Voltage Measurement... 02:07:59 Voltage Offset Correction: v_off_ini = 0.000006711 V, v_off_fin = 0.000004010 V 02:07:59 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981773 Vs 02:08:01 Temperature Measurement, Probe Number = 0, T = 20.151000 C 02:08:02 Temperature Measurement, Probe Number = 1, T = 20.071000 C 02:08:03 Temperature Measurement, Probe Number = 2, T = 20.139000 C 02:08:03 Temperature Measurement, Probe Number = 3, T = 20.079000 C 02:08:04 Temperature Measurement, Probe Number = 4, T = 20.336000 C 02:08:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.34 02:08:04 Integrated Voltage Measurement... 02:08:24 Voltage Offset Correction: v_off_ini = 0.000004703 V, v_off_fin = 0.000007411 V 02:08:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064518 Vs 02:08:24 Integrated Voltage Measurement... 02:08:44 Voltage Offset Correction: v_off_ini = 0.000006534 V, v_off_fin = 0.000004042 V 02:08:44 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982383 Vs 02:08:46 Temperature Measurement, Probe Number = 0, T = 20.156000 C 02:08:47 Temperature Measurement, Probe Number = 1, T = 20.072000 C 02:08:48 Temperature Measurement, Probe Number = 2, T = 20.145000 C 02:08:48 Temperature Measurement, Probe Number = 3, T = 20.083000 C 02:08:49 Temperature Measurement, Probe Number = 4, T = 20.386000 C 02:08:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.39 02:08:49 Integrated Voltage Measurement... 02:09:09 Voltage Offset Correction: v_off_ini = 0.000004579 V, v_off_fin = 0.000007891 V 02:09:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171071089 Vs 02:09:09 Integrated Voltage Measurement... 02:09:29 Voltage Offset Correction: v_off_ini = 0.000006974 V, v_off_fin = 0.000003113 V 02:09:29 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983174 Vs 02:09:32 Temperature Measurement, Probe Number = 0, T = 20.153000 C 02:09:32 Temperature Measurement, Probe Number = 1, T = 20.072000 C 02:09:33 Temperature Measurement, Probe Number = 2, T = 20.139000 C 02:09:34 Temperature Measurement, Probe Number = 3, T = 20.078000 C 02:09:34 Temperature Measurement, Probe Number = 4, T = 20.438000 C 02:09:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.44 02:09:34 Integrated Voltage Measurement... 02:09:54 Voltage Offset Correction: v_off_ini = 0.000004258 V, v_off_fin = 0.000007226 V 02:09:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065280 Vs 02:09:55 Integrated Voltage Measurement... 02:10:14 Voltage Offset Correction: v_off_ini = 0.000006185 V, v_off_fin = 0.000003647 V 02:10:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981326 Vs 02:10:17 Temperature Measurement, Probe Number = 0, T = 20.156000 C 02:10:17 Temperature Measurement, Probe Number = 1, T = 20.075000 C 02:10:18 Temperature Measurement, Probe Number = 2, T = 20.142000 C 02:10:19 Temperature Measurement, Probe Number = 3, T = 20.082000 C 02:10:19 Temperature Measurement, Probe Number = 4, T = 20.355000 C 02:10:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.36 02:10:20 Integrated Voltage Measurement... 02:10:39 Voltage Offset Correction: v_off_ini = 0.000004730 V, v_off_fin = 0.000007874 V 02:10:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171067074 Vs 02:10:39 Integrated Voltage Measurement... 02:10:59 Voltage Offset Correction: v_off_ini = 0.000006340 V, v_off_fin = 0.000003365 V 02:10:59 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170992371 Vs 02:11:02 Temperature Measurement, Probe Number = 0, T = 20.159000 C 02:11:02 Temperature Measurement, Probe Number = 1, T = 20.076000 C 02:11:03 Temperature Measurement, Probe Number = 2, T = 20.147000 C 02:11:04 Temperature Measurement, Probe Number = 3, T = 20.087000 C 02:11:04 Temperature Measurement, Probe Number = 4, T = 20.444000 C 02:11:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.44 02:11:04 Integrated Voltage Measurement... 02:11:24 Voltage Offset Correction: v_off_ini = 0.000004334 V, v_off_fin = 0.000007105 V 02:11:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171066451 Vs 02:11:24 Integrated Voltage Measurement... 02:11:44 Voltage Offset Correction: v_off_ini = 0.000006109 V, v_off_fin = 0.000003580 V 02:11:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984759 Vs 02:11:47 Temperature Measurement, Probe Number = 0, T = 20.156000 C 02:11:47 Temperature Measurement, Probe Number = 1, T = 20.074000 C 02:11:48 Temperature Measurement, Probe Number = 2, T = 20.145000 C 02:11:49 Temperature Measurement, Probe Number = 3, T = 20.086000 C 02:11:49 Temperature Measurement, Probe Number = 4, T = 20.501000 C 02:11:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.50 02:11:49 Integrated Voltage Measurement... 02:12:09 Voltage Offset Correction: v_off_ini = 0.000004286 V, v_off_fin = 0.000007227 V 02:12:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062786 Vs 02:12:09 Integrated Voltage Measurement... 02:12:29 Voltage Offset Correction: v_off_ini = 0.000006247 V, v_off_fin = 0.000003558 V 02:12:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986567 Vs 02:12:32 Temperature Measurement, Probe Number = 0, T = 20.153000 C 02:12:32 Temperature Measurement, Probe Number = 1, T = 20.072000 C 02:12:33 Temperature Measurement, Probe Number = 2, T = 20.144000 C 02:12:34 Temperature Measurement, Probe Number = 3, T = 20.086000 C 02:12:34 Temperature Measurement, Probe Number = 4, T = 20.513000 C 02:12:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.51 02:12:35 Integrated Voltage Measurement... 02:12:54 Voltage Offset Correction: v_off_ini = 0.000004515 V, v_off_fin = 0.000006926 V 02:12:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058880 Vs 02:12:54 Integrated Voltage Measurement... 02:13:15 Voltage Offset Correction: v_off_ini = 0.000006331 V, v_off_fin = 0.000003268 V 02:13:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988608 Vs 02:43:18 Temperature Measurement, Probe Number = 0, T = 20.149000 C 02:43:18 Temperature Measurement, Probe Number = 1, T = 20.065000 C 02:43:19 Temperature Measurement, Probe Number = 2, T = 20.139000 C 02:43:20 Temperature Measurement, Probe Number = 3, T = 20.077000 C 02:43:20 Temperature Measurement, Probe Number = 4, T = 20.259000 C 02:43:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.26 02:43:21 Integrated Voltage Measurement... 02:43:40 Voltage Offset Correction: v_off_ini = 0.000004763 V, v_off_fin = 0.000006506 V 02:43:40 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171093043 Vs 02:43:40 Integrated Voltage Measurement... 02:44:00 Voltage Offset Correction: v_off_ini = 0.000006210 V, v_off_fin = 0.000003038 V 02:44:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993589 Vs 02:44:03 Temperature Measurement, Probe Number = 0, T = 20.150000 C 02:44:04 Temperature Measurement, Probe Number = 1, T = 20.063000 C 02:44:05 Temperature Measurement, Probe Number = 2, T = 20.136000 C 02:44:05 Temperature Measurement, Probe Number = 3, T = 20.074000 C 02:44:06 Temperature Measurement, Probe Number = 4, T = 20.286000 C 02:44:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.29 02:44:06 Integrated Voltage Measurement... 02:44:26 Voltage Offset Correction: v_off_ini = 0.000004397 V, v_off_fin = 0.000007249 V 02:44:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060331 Vs 02:44:26 Integrated Voltage Measurement... 02:44:46 Voltage Offset Correction: v_off_ini = 0.000006178 V, v_off_fin = 0.000002946 V 02:44:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991639 Vs 02:44:49 Temperature Measurement, Probe Number = 0, T = 20.151000 C 02:44:49 Temperature Measurement, Probe Number = 1, T = 20.067000 C 02:44:50 Temperature Measurement, Probe Number = 2, T = 20.136000 C 02:44:51 Temperature Measurement, Probe Number = 3, T = 20.075000 C 02:44:51 Temperature Measurement, Probe Number = 4, T = 20.187000 C 02:44:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.19 02:44:51 Integrated Voltage Measurement... 02:45:11 Voltage Offset Correction: v_off_ini = 0.000004075 V, v_off_fin = 0.000006543 V 02:45:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055147 Vs 02:45:12 Integrated Voltage Measurement... 02:45:31 Voltage Offset Correction: v_off_ini = 0.000005959 V, v_off_fin = 0.000001945 V 02:45:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992693 Vs 02:45:34 Temperature Measurement, Probe Number = 0, T = 20.156000 C 02:45:35 Temperature Measurement, Probe Number = 1, T = 20.073000 C 02:45:35 Temperature Measurement, Probe Number = 2, T = 20.142000 C 02:45:36 Temperature Measurement, Probe Number = 3, T = 20.082000 C 02:45:37 Temperature Measurement, Probe Number = 4, T = 20.270000 C 02:45:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.27 02:45:37 Integrated Voltage Measurement... 02:45:56 Voltage Offset Correction: v_off_ini = 0.000003510 V, v_off_fin = 0.000006901 V 02:45:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058164 Vs 02:45:56 Integrated Voltage Measurement... 02:46:16 Voltage Offset Correction: v_off_ini = 0.000006698 V, v_off_fin = 0.000003498 V 02:46:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983482 Vs 02:46:19 Temperature Measurement, Probe Number = 0, T = 20.153000 C 02:46:19 Temperature Measurement, Probe Number = 1, T = 20.075000 C 02:46:20 Temperature Measurement, Probe Number = 2, T = 20.139000 C 02:46:21 Temperature Measurement, Probe Number = 3, T = 20.082000 C 02:46:21 Temperature Measurement, Probe Number = 4, T = 20.377000 C 02:46:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.38 02:46:22 Integrated Voltage Measurement... 02:46:42 Voltage Offset Correction: v_off_ini = 0.000004493 V, v_off_fin = 0.000007259 V 02:46:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064741 Vs 02:46:42 Integrated Voltage Measurement... 02:47:02 Voltage Offset Correction: v_off_ini = 0.000006838 V, v_off_fin = 0.000003951 V 02:47:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981090 Vs 02:47:05 Temperature Measurement, Probe Number = 0, T = 20.158000 C 02:47:05 Temperature Measurement, Probe Number = 1, T = 20.076000 C 02:47:06 Temperature Measurement, Probe Number = 2, T = 20.146000 C 02:47:06 Temperature Measurement, Probe Number = 3, T = 20.086000 C 02:47:07 Temperature Measurement, Probe Number = 4, T = 20.435000 C 02:47:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.43 02:47:07 Integrated Voltage Measurement... 02:47:27 Voltage Offset Correction: v_off_ini = 0.000004941 V, v_off_fin = 0.000007446 V 02:47:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066147 Vs 02:47:27 Integrated Voltage Measurement... 02:47:47 Voltage Offset Correction: v_off_ini = 0.000006121 V, v_off_fin = 0.000002753 V 02:47:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988396 Vs 02:47:50 Temperature Measurement, Probe Number = 0, T = 20.152000 C 02:47:50 Temperature Measurement, Probe Number = 1, T = 20.065000 C 02:47:51 Temperature Measurement, Probe Number = 2, T = 20.141000 C 02:47:52 Temperature Measurement, Probe Number = 3, T = 20.079000 C 02:47:52 Temperature Measurement, Probe Number = 4, T = 20.465000 C 02:47:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.46 02:47:53 Integrated Voltage Measurement... 02:48:12 Voltage Offset Correction: v_off_ini = 0.000004452 V, v_off_fin = 0.000006878 V 02:48:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060139 Vs 02:48:12 Integrated Voltage Measurement... 02:48:32 Voltage Offset Correction: v_off_ini = 0.000006356 V, v_off_fin = 0.000002807 V 02:48:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988642 Vs 02:48:35 Temperature Measurement, Probe Number = 0, T = 20.154000 C 02:48:36 Temperature Measurement, Probe Number = 1, T = 20.070000 C 02:48:36 Temperature Measurement, Probe Number = 2, T = 20.141000 C 02:48:37 Temperature Measurement, Probe Number = 3, T = 20.082000 C 02:48:38 Temperature Measurement, Probe Number = 4, T = 20.458000 C 02:48:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.46 02:48:38 Integrated Voltage Measurement... 02:48:57 Voltage Offset Correction: v_off_ini = 0.000003509 V, v_off_fin = 0.000006894 V 02:48:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171060544 Vs 02:48:57 Integrated Voltage Measurement... 02:49:17 Voltage Offset Correction: v_off_ini = 0.000006231 V, v_off_fin = 0.000002922 V 02:49:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992426 Vs 02:49:20 Temperature Measurement, Probe Number = 0, T = 20.149000 C 02:49:21 Temperature Measurement, Probe Number = 1, T = 20.062000 C 02:49:21 Temperature Measurement, Probe Number = 2, T = 20.135000 C 02:49:22 Temperature Measurement, Probe Number = 3, T = 20.075000 C 02:49:23 Temperature Measurement, Probe Number = 4, T = 20.474000 C 02:49:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.47 02:49:23 Integrated Voltage Measurement... 02:49:42 Voltage Offset Correction: v_off_ini = 0.000004351 V, v_off_fin = 0.000006875 V 02:49:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171061448 Vs 02:49:43 Integrated Voltage Measurement... 02:50:02 Voltage Offset Correction: v_off_ini = 0.000006399 V, v_off_fin = 0.000003188 V 02:50:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990785 Vs 02:50:05 Temperature Measurement, Probe Number = 0, T = 20.148000 C 02:50:06 Temperature Measurement, Probe Number = 1, T = 20.065000 C 02:50:07 Temperature Measurement, Probe Number = 2, T = 20.133000 C 02:50:07 Temperature Measurement, Probe Number = 3, T = 20.073000 C 02:50:08 Temperature Measurement, Probe Number = 4, T = 20.386000 C 02:50:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.39 02:50:08 Integrated Voltage Measurement... 02:50:28 Voltage Offset Correction: v_off_ini = 0.000004662 V, v_off_fin = 0.000007014 V 02:50:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058258 Vs 02:50:29 Integrated Voltage Measurement... 02:50:48 Voltage Offset Correction: v_off_ini = 0.000005887 V, v_off_fin = 0.000003209 V 02:50:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990808 Vs 03:20:51 Temperature Measurement, Probe Number = 0, T = 20.150000 C 03:20:52 Temperature Measurement, Probe Number = 1, T = 20.068000 C 03:20:53 Temperature Measurement, Probe Number = 2, T = 20.138000 C 03:20:53 Temperature Measurement, Probe Number = 3, T = 20.078000 C 03:20:54 Temperature Measurement, Probe Number = 4, T = 20.408000 C 03:20:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.41 03:20:54 Integrated Voltage Measurement... 03:21:13 Voltage Offset Correction: v_off_ini = 0.000005072 V, v_off_fin = 0.000007057 V 03:21:13 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171120684 Vs 03:21:14 Integrated Voltage Measurement... 03:21:33 Voltage Offset Correction: v_off_ini = 0.000006397 V, v_off_fin = 0.000002836 V 03:21:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990040 Vs 03:21:36 Temperature Measurement, Probe Number = 0, T = 20.143000 C 03:21:37 Temperature Measurement, Probe Number = 1, T = 20.067000 C 03:21:37 Temperature Measurement, Probe Number = 2, T = 20.132000 C 03:21:38 Temperature Measurement, Probe Number = 3, T = 20.076000 C 03:21:39 Temperature Measurement, Probe Number = 4, T = 20.385000 C 03:21:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.39 03:21:39 Integrated Voltage Measurement... 03:21:58 Voltage Offset Correction: v_off_ini = 0.000004210 V, v_off_fin = 0.000006795 V 03:21:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171063076 Vs 03:21:59 Integrated Voltage Measurement... 03:22:18 Voltage Offset Correction: v_off_ini = 0.000006121 V, v_off_fin = 0.000003496 V 03:22:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987089 Vs 03:22:21 Temperature Measurement, Probe Number = 0, T = 20.148000 C 03:22:22 Temperature Measurement, Probe Number = 1, T = 20.068000 C 03:22:22 Temperature Measurement, Probe Number = 2, T = 20.135000 C 03:22:23 Temperature Measurement, Probe Number = 3, T = 20.078000 C 03:22:24 Temperature Measurement, Probe Number = 4, T = 20.441000 C 03:22:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.44 03:22:24 Integrated Voltage Measurement... 03:22:43 Voltage Offset Correction: v_off_ini = 0.000004466 V, v_off_fin = 0.000007004 V 03:22:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064127 Vs 03:22:44 Integrated Voltage Measurement... 03:23:03 Voltage Offset Correction: v_off_ini = 0.000006636 V, v_off_fin = 0.000003667 V 03:23:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988496 Vs 03:23:06 Temperature Measurement, Probe Number = 0, T = 20.146000 C 03:23:07 Temperature Measurement, Probe Number = 1, T = 20.065000 C 03:23:08 Temperature Measurement, Probe Number = 2, T = 20.135000 C 03:23:08 Temperature Measurement, Probe Number = 3, T = 20.077000 C 03:23:09 Temperature Measurement, Probe Number = 4, T = 20.512000 C 03:23:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.51 03:23:09 Integrated Voltage Measurement... 03:23:29 Voltage Offset Correction: v_off_ini = 0.000004978 V, v_off_fin = 0.000006549 V 03:23:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171063792 Vs 03:23:30 Integrated Voltage Measurement... 03:23:49 Voltage Offset Correction: v_off_ini = 0.000006302 V, v_off_fin = 0.000003485 V 03:23:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982208 Vs 03:23:52 Temperature Measurement, Probe Number = 0, T = 20.147000 C 03:23:53 Temperature Measurement, Probe Number = 1, T = 20.066000 C 03:23:54 Temperature Measurement, Probe Number = 2, T = 20.133000 C 03:23:54 Temperature Measurement, Probe Number = 3, T = 20.076000 C 03:23:55 Temperature Measurement, Probe Number = 4, T = 20.425000 C 03:23:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.43 03:23:55 Integrated Voltage Measurement... 03:24:14 Voltage Offset Correction: v_off_ini = 0.000004699 V, v_off_fin = 0.000007339 V 03:24:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061122 Vs 03:24:15 Integrated Voltage Measurement... 03:24:35 Voltage Offset Correction: v_off_ini = 0.000006136 V, v_off_fin = 0.000003292 V 03:24:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986145 Vs 03:24:37 Temperature Measurement, Probe Number = 0, T = 20.151000 C 03:24:38 Temperature Measurement, Probe Number = 1, T = 20.067000 C 03:24:39 Temperature Measurement, Probe Number = 2, T = 20.141000 C 03:24:39 Temperature Measurement, Probe Number = 3, T = 20.080000 C 03:24:40 Temperature Measurement, Probe Number = 4, T = 20.460000 C 03:24:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.46 03:24:40 Integrated Voltage Measurement... 03:25:00 Voltage Offset Correction: v_off_ini = 0.000003887 V, v_off_fin = 0.000006293 V 03:25:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051367 Vs 03:25:00 Integrated Voltage Measurement... 03:25:20 Voltage Offset Correction: v_off_ini = 0.000005618 V, v_off_fin = 0.000003079 V 03:25:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991693 Vs 03:25:22 Temperature Measurement, Probe Number = 0, T = 20.150000 C 03:25:23 Temperature Measurement, Probe Number = 1, T = 20.063000 C 03:25:24 Temperature Measurement, Probe Number = 2, T = 20.140000 C 03:25:24 Temperature Measurement, Probe Number = 3, T = 20.078000 C 03:25:25 Temperature Measurement, Probe Number = 4, T = 20.473000 C 03:25:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.47 03:25:25 Integrated Voltage Measurement... 03:25:45 Voltage Offset Correction: v_off_ini = 0.000004352 V, v_off_fin = 0.000006478 V 03:25:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053445 Vs 03:25:45 Integrated Voltage Measurement... 03:26:05 Voltage Offset Correction: v_off_ini = 0.000005782 V, v_off_fin = 0.000003089 V 03:26:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995142 Vs 03:26:07 Temperature Measurement, Probe Number = 0, T = 20.149000 C 03:26:08 Temperature Measurement, Probe Number = 1, T = 20.067000 C 03:26:09 Temperature Measurement, Probe Number = 2, T = 20.135000 C 03:26:09 Temperature Measurement, Probe Number = 3, T = 20.076000 C 03:26:10 Temperature Measurement, Probe Number = 4, T = 20.362000 C 03:26:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.36 03:26:10 Integrated Voltage Measurement... 03:26:30 Voltage Offset Correction: v_off_ini = 0.000004397 V, v_off_fin = 0.000006696 V 03:26:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171056553 Vs 03:26:30 Integrated Voltage Measurement... 03:26:50 Voltage Offset Correction: v_off_ini = 0.000005412 V, v_off_fin = 0.000002341 V 03:26:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990456 Vs 03:26:52 Temperature Measurement, Probe Number = 0, T = 20.153000 C 03:26:53 Temperature Measurement, Probe Number = 1, T = 20.071000 C 03:26:54 Temperature Measurement, Probe Number = 2, T = 20.139000 C 03:26:54 Temperature Measurement, Probe Number = 3, T = 20.079000 C 03:26:55 Temperature Measurement, Probe Number = 4, T = 20.322000 C 03:26:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.32 03:26:55 Integrated Voltage Measurement... 03:27:15 Voltage Offset Correction: v_off_ini = 0.000003969 V, v_off_fin = 0.000006512 V 03:27:15 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171053280 Vs 03:27:15 Integrated Voltage Measurement... 03:27:35 Voltage Offset Correction: v_off_ini = 0.000005958 V, v_off_fin = 0.000003089 V 03:27:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995205 Vs 03:27:38 Temperature Measurement, Probe Number = 0, T = 20.151000 C 03:27:38 Temperature Measurement, Probe Number = 1, T = 20.068000 C 03:27:39 Temperature Measurement, Probe Number = 2, T = 20.138000 C 03:27:40 Temperature Measurement, Probe Number = 3, T = 20.079000 C 03:27:40 Temperature Measurement, Probe Number = 4, T = 20.365000 C 03:27:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.36 03:27:40 Integrated Voltage Measurement... 03:28:00 Voltage Offset Correction: v_off_ini = 0.000004278 V, v_off_fin = 0.000006611 V 03:28:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054782 Vs 03:28:00 Integrated Voltage Measurement... 03:28:20 Voltage Offset Correction: v_off_ini = 0.000005713 V, v_off_fin = 0.000002609 V 03:28:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995367 Vs 03:58:23 Temperature Measurement, Probe Number = 0, T = 20.148000 C 03:58:24 Temperature Measurement, Probe Number = 1, T = 20.067000 C 03:58:24 Temperature Measurement, Probe Number = 2, T = 20.135000 C 03:58:25 Temperature Measurement, Probe Number = 3, T = 20.075000 C 03:58:25 Temperature Measurement, Probe Number = 4, T = 20.386000 C 03:58:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.39 03:58:26 Integrated Voltage Measurement... 03:58:46 Voltage Offset Correction: v_off_ini = 0.000005213 V, v_off_fin = 0.000007236 V 03:58:46 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171108468 Vs 03:58:46 Integrated Voltage Measurement... 03:59:06 Voltage Offset Correction: v_off_ini = 0.000005917 V, v_off_fin = 0.000002489 V 03:59:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993077 Vs 03:59:09 Temperature Measurement, Probe Number = 0, T = 20.146000 C 03:59:09 Temperature Measurement, Probe Number = 1, T = 20.064000 C 03:59:10 Temperature Measurement, Probe Number = 2, T = 20.132000 C 03:59:11 Temperature Measurement, Probe Number = 3, T = 20.073000 C 03:59:11 Temperature Measurement, Probe Number = 4, T = 20.358000 C 03:59:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.36 03:59:11 Integrated Voltage Measurement... 03:59:32 Voltage Offset Correction: v_off_ini = 0.000004089 V, v_off_fin = 0.000006380 V 03:59:32 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171045870 Vs 03:59:32 Integrated Voltage Measurement... 03:59:52 Voltage Offset Correction: v_off_ini = 0.000006185 V, v_off_fin = 0.000003525 V 03:59:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994981 Vs 03:59:55 Temperature Measurement, Probe Number = 0, T = 20.148000 C 03:59:55 Temperature Measurement, Probe Number = 1, T = 20.066000 C 03:59:56 Temperature Measurement, Probe Number = 2, T = 20.131000 C 03:59:57 Temperature Measurement, Probe Number = 3, T = 20.073000 C 03:59:57 Temperature Measurement, Probe Number = 4, T = 20.325000 C 03:59:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.32 03:59:57 Integrated Voltage Measurement... 04:00:17 Voltage Offset Correction: v_off_ini = 0.000004600 V, v_off_fin = 0.000006646 V 04:00:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171057395 Vs 04:00:17 Integrated Voltage Measurement... 04:00:37 Voltage Offset Correction: v_off_ini = 0.000006027 V, v_off_fin = 0.000002877 V 04:00:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985870 Vs 04:00:40 Temperature Measurement, Probe Number = 0, T = 20.146000 C 04:00:40 Temperature Measurement, Probe Number = 1, T = 20.060000 C 04:00:41 Temperature Measurement, Probe Number = 2, T = 20.133000 C 04:00:42 Temperature Measurement, Probe Number = 3, T = 20.070000 C 04:00:42 Temperature Measurement, Probe Number = 4, T = 20.357000 C 04:00:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.36 04:00:43 Integrated Voltage Measurement... 04:01:02 Voltage Offset Correction: v_off_ini = 0.000004736 V, v_off_fin = 0.000007126 V 04:01:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052190 Vs 04:01:02 Integrated Voltage Measurement... 04:01:22 Voltage Offset Correction: v_off_ini = 0.000005914 V, v_off_fin = 0.000002951 V 04:01:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991064 Vs 04:01:25 Temperature Measurement, Probe Number = 0, T = 20.146000 C 04:01:25 Temperature Measurement, Probe Number = 1, T = 20.064000 C 04:01:26 Temperature Measurement, Probe Number = 2, T = 20.133000 C 04:01:27 Temperature Measurement, Probe Number = 3, T = 20.072000 C 04:01:27 Temperature Measurement, Probe Number = 4, T = 20.345000 C 04:01:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.34 04:01:28 Integrated Voltage Measurement... 04:01:47 Voltage Offset Correction: v_off_ini = 0.000004622 V, v_off_fin = 0.000006936 V 04:01:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054284 Vs 04:01:47 Integrated Voltage Measurement... 04:02:08 Voltage Offset Correction: v_off_ini = 0.000006297 V, v_off_fin = 0.000003089 V 04:02:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990180 Vs 04:02:11 Temperature Measurement, Probe Number = 0, T = 20.149000 C 04:02:11 Temperature Measurement, Probe Number = 1, T = 20.066000 C 04:02:12 Temperature Measurement, Probe Number = 2, T = 20.138000 C 04:02:13 Temperature Measurement, Probe Number = 3, T = 20.076000 C 04:02:13 Temperature Measurement, Probe Number = 4, T = 20.430000 C 04:02:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.43 04:02:13 Integrated Voltage Measurement... 04:02:33 Voltage Offset Correction: v_off_ini = 0.000004532 V, v_off_fin = 0.000006605 V 04:02:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053462 Vs 04:02:33 Integrated Voltage Measurement... 04:02:53 Voltage Offset Correction: v_off_ini = 0.000006525 V, v_off_fin = 0.000003301 V 04:02:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984698 Vs 04:02:56 Temperature Measurement, Probe Number = 0, T = 20.151000 C 04:02:56 Temperature Measurement, Probe Number = 1, T = 20.067000 C 04:02:57 Temperature Measurement, Probe Number = 2, T = 20.138000 C 04:02:58 Temperature Measurement, Probe Number = 3, T = 20.075000 C 04:02:58 Temperature Measurement, Probe Number = 4, T = 20.383000 C 04:02:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.38 04:02:59 Integrated Voltage Measurement... 04:03:18 Voltage Offset Correction: v_off_ini = 0.000004340 V, v_off_fin = 0.000006959 V 04:03:18 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171054549 Vs 04:03:18 Integrated Voltage Measurement... 04:03:38 Voltage Offset Correction: v_off_ini = 0.000006446 V, v_off_fin = 0.000003485 V 04:03:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982636 Vs 04:03:41 Temperature Measurement, Probe Number = 0, T = 20.150000 C 04:03:42 Temperature Measurement, Probe Number = 1, T = 20.069000 C 04:03:42 Temperature Measurement, Probe Number = 2, T = 20.138000 C 04:03:43 Temperature Measurement, Probe Number = 3, T = 20.078000 C 04:03:43 Temperature Measurement, Probe Number = 4, T = 20.457000 C 04:03:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.46 04:03:44 Integrated Voltage Measurement... 04:04:03 Voltage Offset Correction: v_off_ini = 0.000004585 V, v_off_fin = 0.000007145 V 04:04:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059771 Vs 04:04:04 Integrated Voltage Measurement... 04:04:23 Voltage Offset Correction: v_off_ini = 0.000006562 V, v_off_fin = 0.000003053 V 04:04:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978906 Vs 04:04:26 Temperature Measurement, Probe Number = 0, T = 20.151000 C 04:04:27 Temperature Measurement, Probe Number = 1, T = 20.066000 C 04:04:27 Temperature Measurement, Probe Number = 2, T = 20.140000 C 04:04:28 Temperature Measurement, Probe Number = 3, T = 20.076000 C 04:04:29 Temperature Measurement, Probe Number = 4, T = 20.529000 C 04:04:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.53 04:04:29 Integrated Voltage Measurement... 04:04:48 Voltage Offset Correction: v_off_ini = 0.000004342 V, v_off_fin = 0.000006820 V 04:04:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059335 Vs 04:04:49 Integrated Voltage Measurement... 04:05:08 Voltage Offset Correction: v_off_ini = 0.000006319 V, v_off_fin = 0.000003445 V 04:05:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984750 Vs 04:05:11 Temperature Measurement, Probe Number = 0, T = 20.147000 C 04:05:12 Temperature Measurement, Probe Number = 1, T = 20.067000 C 04:05:12 Temperature Measurement, Probe Number = 2, T = 20.133000 C 04:05:13 Temperature Measurement, Probe Number = 3, T = 20.072000 C 04:05:14 Temperature Measurement, Probe Number = 4, T = 20.452000 C 04:05:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.45 04:05:14 Integrated Voltage Measurement... 04:05:33 Voltage Offset Correction: v_off_ini = 0.000004237 V, v_off_fin = 0.000006586 V 04:05:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054734 Vs 04:05:34 Integrated Voltage Measurement... 04:05:53 Voltage Offset Correction: v_off_ini = 0.000005975 V, v_off_fin = 0.000003091 V 04:05:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992296 Vs 04:35:56 Temperature Measurement, Probe Number = 0, T = 20.142000 C 04:35:57 Temperature Measurement, Probe Number = 1, T = 20.057000 C 04:35:58 Temperature Measurement, Probe Number = 2, T = 20.127000 C 04:35:58 Temperature Measurement, Probe Number = 3, T = 20.065000 C 04:35:59 Temperature Measurement, Probe Number = 4, T = 20.406000 C 04:35:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.41 04:35:59 Integrated Voltage Measurement... 04:36:19 Voltage Offset Correction: v_off_ini = 0.000005166 V, v_off_fin = 0.000006287 V 04:36:19 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171100462 Vs 04:36:20 Integrated Voltage Measurement... 04:36:39 Voltage Offset Correction: v_off_ini = 0.000005700 V, v_off_fin = 0.000002983 V 04:36:39 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170989421 Vs 04:36:42 Temperature Measurement, Probe Number = 0, T = 20.143000 C 04:36:43 Temperature Measurement, Probe Number = 1, T = 20.061000 C 04:36:43 Temperature Measurement, Probe Number = 2, T = 20.128000 C 04:36:44 Temperature Measurement, Probe Number = 3, T = 20.069000 C 04:36:45 Temperature Measurement, Probe Number = 4, T = 20.412000 C 04:36:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.41 04:36:45 Integrated Voltage Measurement... 04:37:04 Voltage Offset Correction: v_off_ini = 0.000004110 V, v_off_fin = 0.000006896 V 04:37:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052415 Vs 04:37:05 Integrated Voltage Measurement... 04:37:24 Voltage Offset Correction: v_off_ini = 0.000006169 V, v_off_fin = 0.000003086 V 04:37:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987006 Vs 04:37:27 Temperature Measurement, Probe Number = 0, T = 20.147000 C 04:37:28 Temperature Measurement, Probe Number = 1, T = 20.065000 C 04:37:28 Temperature Measurement, Probe Number = 2, T = 20.133000 C 04:37:29 Temperature Measurement, Probe Number = 3, T = 20.074000 C 04:37:30 Temperature Measurement, Probe Number = 4, T = 20.457000 C 04:37:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.46 04:37:30 Integrated Voltage Measurement... 04:37:49 Voltage Offset Correction: v_off_ini = 0.000003929 V, v_off_fin = 0.000006491 V 04:37:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050930 Vs 04:37:50 Integrated Voltage Measurement... 04:38:09 Voltage Offset Correction: v_off_ini = 0.000005776 V, v_off_fin = 0.000003294 V 04:38:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993962 Vs 04:38:12 Temperature Measurement, Probe Number = 0, T = 20.146000 C 04:38:13 Temperature Measurement, Probe Number = 1, T = 20.062000 C 04:38:13 Temperature Measurement, Probe Number = 2, T = 20.132000 C 04:38:14 Temperature Measurement, Probe Number = 3, T = 20.072000 C 04:38:15 Temperature Measurement, Probe Number = 4, T = 20.529000 C 04:38:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.53 04:38:15 Integrated Voltage Measurement... 04:38:35 Voltage Offset Correction: v_off_ini = 0.000004996 V, v_off_fin = 0.000007172 V 04:38:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060549 Vs 04:38:35 Integrated Voltage Measurement... 04:38:55 Voltage Offset Correction: v_off_ini = 0.000006198 V, v_off_fin = 0.000003548 V 04:38:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982222 Vs 04:38:58 Temperature Measurement, Probe Number = 0, T = 20.147000 C 04:38:59 Temperature Measurement, Probe Number = 1, T = 20.064000 C 04:38:59 Temperature Measurement, Probe Number = 2, T = 20.132000 C 04:39:00 Temperature Measurement, Probe Number = 3, T = 20.072000 C 04:39:01 Temperature Measurement, Probe Number = 4, T = 20.596000 C 04:39:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.60 04:39:01 Integrated Voltage Measurement... 04:39:20 Voltage Offset Correction: v_off_ini = 0.000004929 V, v_off_fin = 0.000007189 V 04:39:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058212 Vs 04:39:21 Integrated Voltage Measurement... 04:39:40 Voltage Offset Correction: v_off_ini = 0.000006250 V, v_off_fin = 0.000002810 V 04:39:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989992 Vs 04:39:43 Temperature Measurement, Probe Number = 0, T = 20.147000 C 04:39:44 Temperature Measurement, Probe Number = 1, T = 20.063000 C 04:39:45 Temperature Measurement, Probe Number = 2, T = 20.134000 C 04:39:45 Temperature Measurement, Probe Number = 3, T = 20.071000 C 04:39:46 Temperature Measurement, Probe Number = 4, T = 20.622000 C 04:39:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.62 04:39:46 Integrated Voltage Measurement... 04:40:05 Voltage Offset Correction: v_off_ini = 0.000004030 V, v_off_fin = 0.000006801 V 04:40:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171057506 Vs 04:40:06 Integrated Voltage Measurement... 04:40:25 Voltage Offset Correction: v_off_ini = 0.000006316 V, v_off_fin = 0.000003641 V 04:40:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985854 Vs 04:40:29 Temperature Measurement, Probe Number = 0, T = 20.150000 C 04:40:29 Temperature Measurement, Probe Number = 1, T = 20.063000 C 04:40:30 Temperature Measurement, Probe Number = 2, T = 20.134000 C 04:40:31 Temperature Measurement, Probe Number = 3, T = 20.072000 C 04:40:31 Temperature Measurement, Probe Number = 4, T = 20.594000 C 04:40:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.59 04:40:31 Integrated Voltage Measurement... 04:40:51 Voltage Offset Correction: v_off_ini = 0.000004518 V, v_off_fin = 0.000006988 V 04:40:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061705 Vs 04:40:51 Integrated Voltage Measurement... 04:41:11 Voltage Offset Correction: v_off_ini = 0.000006687 V, v_off_fin = 0.000003098 V 04:41:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978477 Vs 04:41:13 Temperature Measurement, Probe Number = 0, T = 20.139000 C 04:41:14 Temperature Measurement, Probe Number = 1, T = 20.058000 C 04:41:15 Temperature Measurement, Probe Number = 2, T = 20.126000 C 04:41:15 Temperature Measurement, Probe Number = 3, T = 20.067000 C 04:41:16 Temperature Measurement, Probe Number = 4, T = 20.502000 C 04:41:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.50 04:41:16 Integrated Voltage Measurement... 04:41:36 Voltage Offset Correction: v_off_ini = 0.000004253 V, v_off_fin = 0.000006730 V 04:41:36 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171064766 Vs 04:41:36 Integrated Voltage Measurement... 04:41:56 Voltage Offset Correction: v_off_ini = 0.000006287 V, v_off_fin = 0.000003276 V 04:41:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988833 Vs 04:41:58 Temperature Measurement, Probe Number = 0, T = 20.144000 C 04:41:59 Temperature Measurement, Probe Number = 1, T = 20.064000 C 04:42:00 Temperature Measurement, Probe Number = 2, T = 20.129000 C 04:42:00 Temperature Measurement, Probe Number = 3, T = 20.070000 C 04:42:01 Temperature Measurement, Probe Number = 4, T = 20.424000 C 04:42:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.42 04:42:01 Integrated Voltage Measurement... 04:42:21 Voltage Offset Correction: v_off_ini = 0.000004387 V, v_off_fin = 0.000007380 V 04:42:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061928 Vs 04:42:21 Integrated Voltage Measurement... 04:42:41 Voltage Offset Correction: v_off_ini = 0.000006359 V, v_off_fin = 0.000003406 V 04:42:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987464 Vs 04:42:43 Temperature Measurement, Probe Number = 0, T = 20.148000 C 04:42:44 Temperature Measurement, Probe Number = 1, T = 20.064000 C 04:42:45 Temperature Measurement, Probe Number = 2, T = 20.134000 C 04:42:45 Temperature Measurement, Probe Number = 3, T = 20.069000 C 04:42:46 Temperature Measurement, Probe Number = 4, T = 20.447000 C 04:42:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.45 04:42:46 Integrated Voltage Measurement... 04:43:06 Voltage Offset Correction: v_off_ini = 0.000004660 V, v_off_fin = 0.000007707 V 04:43:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171066269 Vs 04:43:06 Integrated Voltage Measurement... 04:43:26 Voltage Offset Correction: v_off_ini = 0.000006620 V, v_off_fin = 0.000003312 V 04:43:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986305 Vs 05:13:28 Temperature Measurement, Probe Number = 0, T = 20.133000 C 05:13:29 Temperature Measurement, Probe Number = 1, T = 20.054000 C 05:13:30 Temperature Measurement, Probe Number = 2, T = 20.120000 C 05:13:30 Temperature Measurement, Probe Number = 3, T = 20.061000 C 05:13:31 Temperature Measurement, Probe Number = 4, T = 20.305000 C 05:13:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.30 05:13:31 Integrated Voltage Measurement... 05:13:51 Voltage Offset Correction: v_off_ini = 0.000005263 V, v_off_fin = 0.000006990 V 05:13:51 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171107912 Vs 05:13:51 Integrated Voltage Measurement... 05:14:10 Voltage Offset Correction: v_off_ini = 0.000006343 V, v_off_fin = 0.000003412 V 05:14:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985668 Vs 05:14:13 Temperature Measurement, Probe Number = 0, T = 20.139000 C 05:14:14 Temperature Measurement, Probe Number = 1, T = 20.056000 C 05:14:15 Temperature Measurement, Probe Number = 2, T = 20.124000 C 05:14:15 Temperature Measurement, Probe Number = 3, T = 20.061000 C 05:14:16 Temperature Measurement, Probe Number = 4, T = 20.287000 C 05:14:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.29 05:14:16 Integrated Voltage Measurement... 05:14:36 Voltage Offset Correction: v_off_ini = 0.000004609 V, v_off_fin = 0.000006827 V 05:14:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055765 Vs 05:14:36 Integrated Voltage Measurement... 05:14:55 Voltage Offset Correction: v_off_ini = 0.000006705 V, v_off_fin = 0.000003434 V 05:14:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987381 Vs 05:14:58 Temperature Measurement, Probe Number = 0, T = 20.145000 C 05:14:59 Temperature Measurement, Probe Number = 1, T = 20.063000 C 05:15:00 Temperature Measurement, Probe Number = 2, T = 20.126000 C 05:15:00 Temperature Measurement, Probe Number = 3, T = 20.066000 C 05:15:01 Temperature Measurement, Probe Number = 4, T = 20.201000 C 05:15:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.20 05:15:01 Integrated Voltage Measurement... 05:15:22 Voltage Offset Correction: v_off_ini = 0.000004516 V, v_off_fin = 0.000007084 V 05:15:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060099 Vs 05:15:22 Integrated Voltage Measurement... 05:15:42 Voltage Offset Correction: v_off_ini = 0.000006027 V, v_off_fin = 0.000003051 V 05:15:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985464 Vs 05:15:45 Temperature Measurement, Probe Number = 0, T = 20.147000 C 05:15:45 Temperature Measurement, Probe Number = 1, T = 20.064000 C 05:15:46 Temperature Measurement, Probe Number = 2, T = 20.130000 C 05:15:47 Temperature Measurement, Probe Number = 3, T = 20.069000 C 05:15:47 Temperature Measurement, Probe Number = 4, T = 20.214000 C 05:15:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.21 05:15:47 Integrated Voltage Measurement... 05:16:08 Voltage Offset Correction: v_off_ini = 0.000004085 V, v_off_fin = 0.000006697 V 05:16:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059309 Vs 05:16:08 Integrated Voltage Measurement... 05:16:28 Voltage Offset Correction: v_off_ini = 0.000006084 V, v_off_fin = 0.000003053 V 05:16:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989686 Vs 05:16:31 Temperature Measurement, Probe Number = 0, T = 20.147000 C 05:16:31 Temperature Measurement, Probe Number = 1, T = 20.064000 C 05:16:32 Temperature Measurement, Probe Number = 2, T = 20.133000 C 05:16:33 Temperature Measurement, Probe Number = 3, T = 20.072000 C 05:16:33 Temperature Measurement, Probe Number = 4, T = 20.327000 C 05:16:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.33 05:16:33 Integrated Voltage Measurement... 05:16:53 Voltage Offset Correction: v_off_ini = 0.000004318 V, v_off_fin = 0.000006658 V 05:16:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171061123 Vs 05:16:53 Integrated Voltage Measurement... 05:17:13 Voltage Offset Correction: v_off_ini = 0.000006312 V, v_off_fin = 0.000002789 V 05:17:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997352 Vs 05:17:16 Temperature Measurement, Probe Number = 0, T = 20.143000 C 05:17:16 Temperature Measurement, Probe Number = 1, T = 20.063000 C 05:17:17 Temperature Measurement, Probe Number = 2, T = 20.128000 C 05:17:18 Temperature Measurement, Probe Number = 3, T = 20.068000 C 05:17:18 Temperature Measurement, Probe Number = 4, T = 20.354000 C 05:17:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.35 05:17:18 Integrated Voltage Measurement... 05:17:38 Voltage Offset Correction: v_off_ini = 0.000003879 V, v_off_fin = 0.000006859 V 05:17:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059191 Vs 05:17:38 Integrated Voltage Measurement... 05:17:59 Voltage Offset Correction: v_off_ini = 0.000006000 V, v_off_fin = 0.000002504 V 05:17:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993314 Vs 05:18:01 Temperature Measurement, Probe Number = 0, T = 20.145000 C 05:18:02 Temperature Measurement, Probe Number = 1, T = 20.062000 C 05:18:03 Temperature Measurement, Probe Number = 2, T = 20.129000 C 05:18:03 Temperature Measurement, Probe Number = 3, T = 20.066000 C 05:18:04 Temperature Measurement, Probe Number = 4, T = 20.388000 C 05:18:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.39 05:18:04 Integrated Voltage Measurement... 05:18:24 Voltage Offset Correction: v_off_ini = 0.000004467 V, v_off_fin = 0.000007114 V 05:18:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066479 Vs 05:18:24 Integrated Voltage Measurement... 05:18:44 Voltage Offset Correction: v_off_ini = 0.000006729 V, v_off_fin = 0.000002355 V 05:18:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988061 Vs 05:18:47 Temperature Measurement, Probe Number = 0, T = 20.145000 C 05:18:47 Temperature Measurement, Probe Number = 1, T = 20.061000 C 05:18:48 Temperature Measurement, Probe Number = 2, T = 20.128000 C 05:18:49 Temperature Measurement, Probe Number = 3, T = 20.065000 C 05:18:49 Temperature Measurement, Probe Number = 4, T = 20.301000 C 05:18:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.30 05:18:50 Integrated Voltage Measurement... 05:19:09 Voltage Offset Correction: v_off_ini = 0.000004076 V, v_off_fin = 0.000006767 V 05:19:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171064719 Vs 05:19:10 Integrated Voltage Measurement... 05:19:29 Voltage Offset Correction: v_off_ini = 0.000006683 V, v_off_fin = 0.000003138 V 05:19:29 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170990896 Vs 05:19:32 Temperature Measurement, Probe Number = 0, T = 20.146000 C 05:19:33 Temperature Measurement, Probe Number = 1, T = 20.062000 C 05:19:33 Temperature Measurement, Probe Number = 2, T = 20.129000 C 05:19:34 Temperature Measurement, Probe Number = 3, T = 20.070000 C 05:19:35 Temperature Measurement, Probe Number = 4, T = 20.258000 C 05:19:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.26 05:19:35 Integrated Voltage Measurement... 05:19:55 Voltage Offset Correction: v_off_ini = 0.000004359 V, v_off_fin = 0.000006544 V 05:19:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171070344 Vs 05:19:55 Integrated Voltage Measurement... 05:20:15 Voltage Offset Correction: v_off_ini = 0.000005878 V, v_off_fin = 0.000003034 V 05:20:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996163 Vs 05:20:18 Temperature Measurement, Probe Number = 0, T = 20.143000 C 05:20:19 Temperature Measurement, Probe Number = 1, T = 20.061000 C 05:20:19 Temperature Measurement, Probe Number = 2, T = 20.129000 C 05:20:20 Temperature Measurement, Probe Number = 3, T = 20.069000 C 05:20:21 Temperature Measurement, Probe Number = 4, T = 20.340000 C 05:20:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.34 05:20:21 Integrated Voltage Measurement... 05:20:40 Voltage Offset Correction: v_off_ini = 0.000004058 V, v_off_fin = 0.000006901 V 05:20:40 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171060769 Vs 05:20:40 Integrated Voltage Measurement... 05:21:00 Voltage Offset Correction: v_off_ini = 0.000006126 V, v_off_fin = 0.000002828 V 05:21:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000845 Vs 05:51:03 Temperature Measurement, Probe Number = 0, T = 20.132000 C 05:51:04 Temperature Measurement, Probe Number = 1, T = 20.051000 C 05:51:04 Temperature Measurement, Probe Number = 2, T = 20.117000 C 05:51:05 Temperature Measurement, Probe Number = 3, T = 20.058000 C 05:51:06 Temperature Measurement, Probe Number = 4, T = 20.239000 C 05:51:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.24 05:51:06 Integrated Voltage Measurement... 05:51:25 Voltage Offset Correction: v_off_ini = 0.000004788 V, v_off_fin = 0.000006515 V 05:51:25 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171109450 Vs 05:51:26 Integrated Voltage Measurement... 05:51:45 Voltage Offset Correction: v_off_ini = 0.000006279 V, v_off_fin = 0.000003686 V 05:51:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995012 Vs 05:51:48 Temperature Measurement, Probe Number = 0, T = 20.129000 C 05:51:49 Temperature Measurement, Probe Number = 1, T = 20.054000 C 05:51:49 Temperature Measurement, Probe Number = 2, T = 20.115000 C 05:51:50 Temperature Measurement, Probe Number = 3, T = 20.057000 C 05:51:50 Temperature Measurement, Probe Number = 4, T = 20.270000 C 05:51:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.27 05:51:51 Integrated Voltage Measurement... 05:52:10 Voltage Offset Correction: v_off_ini = 0.000004085 V, v_off_fin = 0.000006721 V 05:52:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058483 Vs 05:52:10 Integrated Voltage Measurement... 05:52:31 Voltage Offset Correction: v_off_ini = 0.000005842 V, v_off_fin = 0.000003664 V 05:52:31 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170995458 Vs 05:52:34 Temperature Measurement, Probe Number = 0, T = 20.132000 C 05:52:34 Temperature Measurement, Probe Number = 1, T = 20.056000 C 05:52:35 Temperature Measurement, Probe Number = 2, T = 20.117000 C 05:52:36 Temperature Measurement, Probe Number = 3, T = 20.060000 C 05:52:36 Temperature Measurement, Probe Number = 4, T = 20.272000 C 05:52:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.27 05:52:36 Integrated Voltage Measurement... 05:52:56 Voltage Offset Correction: v_off_ini = 0.000004423 V, v_off_fin = 0.000006726 V 05:52:56 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171052448 Vs 05:52:56 Integrated Voltage Measurement... 05:53:16 Voltage Offset Correction: v_off_ini = 0.000005959 V, v_off_fin = 0.000003053 V 05:53:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993409 Vs 05:53:19 Temperature Measurement, Probe Number = 0, T = 20.140000 C 05:53:20 Temperature Measurement, Probe Number = 1, T = 20.059000 C 05:53:20 Temperature Measurement, Probe Number = 2, T = 20.126000 C 05:53:21 Temperature Measurement, Probe Number = 3, T = 20.066000 C 05:53:22 Temperature Measurement, Probe Number = 4, T = 20.287000 C 05:53:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.29 05:53:22 Integrated Voltage Measurement... 05:53:41 Voltage Offset Correction: v_off_ini = 0.000004020 V, v_off_fin = 0.000006520 V 05:53:41 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171049026 Vs 05:53:42 Integrated Voltage Measurement... 05:54:01 Voltage Offset Correction: v_off_ini = 0.000005798 V, v_off_fin = 0.000003159 V 05:54:01 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170992778 Vs 05:54:04 Temperature Measurement, Probe Number = 0, T = 20.142000 C 05:54:05 Temperature Measurement, Probe Number = 1, T = 20.062000 C 05:54:06 Temperature Measurement, Probe Number = 2, T = 20.124000 C 05:54:06 Temperature Measurement, Probe Number = 3, T = 20.066000 C 05:54:07 Temperature Measurement, Probe Number = 4, T = 20.331000 C 05:54:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.33 05:54:07 Integrated Voltage Measurement... 05:54:26 Voltage Offset Correction: v_off_ini = 0.000004092 V, v_off_fin = 0.000006280 V 05:54:27 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171050258 Vs 05:54:27 Integrated Voltage Measurement... 05:54:46 Voltage Offset Correction: v_off_ini = 0.000006220 V, v_off_fin = 0.000003100 V 05:54:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986888 Vs 05:54:49 Temperature Measurement, Probe Number = 0, T = 20.135000 C 05:54:50 Temperature Measurement, Probe Number = 1, T = 20.059000 C 05:54:50 Temperature Measurement, Probe Number = 2, T = 20.120000 C 05:54:51 Temperature Measurement, Probe Number = 3, T = 20.065000 C 05:54:52 Temperature Measurement, Probe Number = 4, T = 20.335000 C 05:54:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.34 05:54:52 Integrated Voltage Measurement... 05:55:11 Voltage Offset Correction: v_off_ini = 0.000003744 V, v_off_fin = 0.000006386 V 05:55:11 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171052047 Vs 05:55:12 Integrated Voltage Measurement... 05:55:31 Voltage Offset Correction: v_off_ini = 0.000006232 V, v_off_fin = 0.000003334 V 05:55:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993808 Vs 05:55:34 Temperature Measurement, Probe Number = 0, T = 20.136000 C 05:55:35 Temperature Measurement, Probe Number = 1, T = 20.056000 C 05:55:36 Temperature Measurement, Probe Number = 2, T = 20.121000 C 05:55:36 Temperature Measurement, Probe Number = 3, T = 20.063000 C 05:55:37 Temperature Measurement, Probe Number = 4, T = 20.362000 C 05:55:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.36 05:55:37 Integrated Voltage Measurement... 05:55:56 Voltage Offset Correction: v_off_ini = 0.000004050 V, v_off_fin = 0.000006602 V 05:55:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046258 Vs 05:55:57 Integrated Voltage Measurement... 05:56:17 Voltage Offset Correction: v_off_ini = 0.000006055 V, v_off_fin = 0.000002896 V 05:56:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996456 Vs 05:56:19 Temperature Measurement, Probe Number = 0, T = 20.136000 C 05:56:20 Temperature Measurement, Probe Number = 1, T = 20.054000 C 05:56:21 Temperature Measurement, Probe Number = 2, T = 20.119000 C 05:56:21 Temperature Measurement, Probe Number = 3, T = 20.061000 C 05:56:22 Temperature Measurement, Probe Number = 4, T = 20.274000 C 05:56:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.27 05:56:22 Integrated Voltage Measurement... 05:56:41 Voltage Offset Correction: v_off_ini = 0.000004306 V, v_off_fin = 0.000006449 V 05:56:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050060 Vs 05:56:42 Integrated Voltage Measurement... 05:57:02 Voltage Offset Correction: v_off_ini = 0.000006080 V, v_off_fin = 0.000002815 V 05:57:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992175 Vs 05:57:04 Temperature Measurement, Probe Number = 0, T = 20.135000 C 05:57:05 Temperature Measurement, Probe Number = 1, T = 20.052000 C 05:57:06 Temperature Measurement, Probe Number = 2, T = 20.119000 C 05:57:06 Temperature Measurement, Probe Number = 3, T = 20.061000 C 05:57:07 Temperature Measurement, Probe Number = 4, T = 20.185000 C 05:57:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.18 05:57:07 Integrated Voltage Measurement... 05:57:26 Voltage Offset Correction: v_off_ini = 0.000004307 V, v_off_fin = 0.000006694 V 05:57:27 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171055920 Vs 05:57:27 Integrated Voltage Measurement... 05:57:47 Voltage Offset Correction: v_off_ini = 0.000006734 V, v_off_fin = 0.000002244 V 05:57:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996945 Vs 05:57:49 Temperature Measurement, Probe Number = 0, T = 20.130000 C 05:57:50 Temperature Measurement, Probe Number = 1, T = 20.048000 C 05:57:51 Temperature Measurement, Probe Number = 2, T = 20.116000 C 05:57:51 Temperature Measurement, Probe Number = 3, T = 20.058000 C 05:57:52 Temperature Measurement, Probe Number = 4, T = 20.124000 C 05:57:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.12 05:57:52 Integrated Voltage Measurement... 05:58:12 Voltage Offset Correction: v_off_ini = 0.000004240 V, v_off_fin = 0.000006700 V 05:58:12 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171055101 Vs 05:58:12 Integrated Voltage Measurement... 05:58:32 Voltage Offset Correction: v_off_ini = 0.000005943 V, v_off_fin = 0.000003058 V 05:58:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983789 Vs 06:28:34 Temperature Measurement, Probe Number = 0, T = 20.141000 C 06:28:35 Temperature Measurement, Probe Number = 1, T = 20.058000 C 06:28:36 Temperature Measurement, Probe Number = 2, T = 20.127000 C 06:28:36 Temperature Measurement, Probe Number = 3, T = 20.065000 C 06:28:37 Temperature Measurement, Probe Number = 4, T = 20.380000 C 06:28:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.38 06:28:37 Integrated Voltage Measurement... 06:28:57 Voltage Offset Correction: v_off_ini = 0.000006377 V, v_off_fin = 0.000007735 V 06:28:57 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171113399 Vs 06:28:57 Integrated Voltage Measurement... 06:29:16 Voltage Offset Correction: v_off_ini = 0.000007070 V, v_off_fin = 0.000004157 V 06:29:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979549 Vs 06:29:19 Temperature Measurement, Probe Number = 0, T = 20.141000 C 06:29:20 Temperature Measurement, Probe Number = 1, T = 20.055000 C 06:29:21 Temperature Measurement, Probe Number = 2, T = 20.122000 C 06:29:21 Temperature Measurement, Probe Number = 3, T = 20.060000 C 06:29:22 Temperature Measurement, Probe Number = 4, T = 20.429000 C 06:29:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.43 06:29:22 Integrated Voltage Measurement... 06:29:41 Voltage Offset Correction: v_off_ini = 0.000005227 V, v_off_fin = 0.000007539 V 06:29:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171067809 Vs 06:29:42 Integrated Voltage Measurement... 06:30:01 Voltage Offset Correction: v_off_ini = 0.000007036 V, v_off_fin = 0.000003419 V 06:30:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982422 Vs 06:30:04 Temperature Measurement, Probe Number = 0, T = 20.136000 C 06:30:05 Temperature Measurement, Probe Number = 1, T = 20.053000 C 06:30:06 Temperature Measurement, Probe Number = 2, T = 20.116000 C 06:30:06 Temperature Measurement, Probe Number = 3, T = 20.057000 C 06:30:07 Temperature Measurement, Probe Number = 4, T = 20.400000 C 06:30:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.40 06:30:07 Integrated Voltage Measurement... 06:30:27 Voltage Offset Correction: v_off_ini = 0.000004782 V, v_off_fin = 0.000007015 V 06:30:27 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171061943 Vs 06:30:27 Integrated Voltage Measurement... 06:30:47 Voltage Offset Correction: v_off_ini = 0.000006894 V, v_off_fin = 0.000004217 V 06:30:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978221 Vs 06:30:49 Temperature Measurement, Probe Number = 0, T = 20.134000 C 06:30:50 Temperature Measurement, Probe Number = 1, T = 20.052000 C 06:30:51 Temperature Measurement, Probe Number = 2, T = 20.115000 C 06:30:51 Temperature Measurement, Probe Number = 3, T = 20.056000 C 06:30:52 Temperature Measurement, Probe Number = 4, T = 20.303000 C 06:30:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.30 06:30:52 Integrated Voltage Measurement... 06:31:12 Voltage Offset Correction: v_off_ini = 0.000004614 V, v_off_fin = 0.000007489 V 06:31:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058641 Vs 06:31:12 Integrated Voltage Measurement... 06:31:32 Voltage Offset Correction: v_off_ini = 0.000006287 V, v_off_fin = 0.000003697 V 06:31:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982888 Vs 06:31:34 Temperature Measurement, Probe Number = 0, T = 20.142000 C 06:31:35 Temperature Measurement, Probe Number = 1, T = 20.057000 C 06:31:36 Temperature Measurement, Probe Number = 2, T = 20.120000 C 06:31:36 Temperature Measurement, Probe Number = 3, T = 20.061000 C 06:31:37 Temperature Measurement, Probe Number = 4, T = 20.276000 C 06:31:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.28 06:31:37 Integrated Voltage Measurement... 06:31:57 Voltage Offset Correction: v_off_ini = 0.000004735 V, v_off_fin = 0.000007137 V 06:31:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171063916 Vs 06:31:57 Integrated Voltage Measurement... 06:32:17 Voltage Offset Correction: v_off_ini = 0.000006381 V, v_off_fin = 0.000003390 V 06:32:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983065 Vs 06:32:19 Temperature Measurement, Probe Number = 0, T = 20.146000 C 06:32:20 Temperature Measurement, Probe Number = 1, T = 20.060000 C 06:32:21 Temperature Measurement, Probe Number = 2, T = 20.124000 C 06:32:21 Temperature Measurement, Probe Number = 3, T = 20.063000 C 06:32:22 Temperature Measurement, Probe Number = 4, T = 20.298000 C 06:32:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.30 06:32:22 Integrated Voltage Measurement... 06:32:42 Voltage Offset Correction: v_off_ini = 0.000004561 V, v_off_fin = 0.000006881 V 06:32:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171063836 Vs 06:32:42 Integrated Voltage Measurement... 06:33:02 Voltage Offset Correction: v_off_ini = 0.000005978 V, v_off_fin = 0.000002744 V 06:33:02 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170992033 Vs 06:33:04 Temperature Measurement, Probe Number = 0, T = 20.138000 C 06:33:05 Temperature Measurement, Probe Number = 1, T = 20.052000 C 06:33:06 Temperature Measurement, Probe Number = 2, T = 20.119000 C 06:33:06 Temperature Measurement, Probe Number = 3, T = 20.059000 C 06:33:07 Temperature Measurement, Probe Number = 4, T = 20.295000 C 06:33:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.30 06:33:07 Integrated Voltage Measurement... 06:33:27 Voltage Offset Correction: v_off_ini = 0.000004435 V, v_off_fin = 0.000007232 V 06:33:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171067792 Vs 06:33:27 Integrated Voltage Measurement... 06:33:47 Voltage Offset Correction: v_off_ini = 0.000006786 V, v_off_fin = 0.000003850 V 06:33:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981941 Vs 06:33:50 Temperature Measurement, Probe Number = 0, T = 20.133000 C 06:33:50 Temperature Measurement, Probe Number = 1, T = 20.051000 C 06:33:51 Temperature Measurement, Probe Number = 2, T = 20.118000 C 06:33:52 Temperature Measurement, Probe Number = 3, T = 20.058000 C 06:33:52 Temperature Measurement, Probe Number = 4, T = 20.203000 C 06:33:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.20 06:33:53 Integrated Voltage Measurement... 06:34:12 Voltage Offset Correction: v_off_ini = 0.000005020 V, v_off_fin = 0.000007513 V 06:34:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061629 Vs 06:34:12 Integrated Voltage Measurement... 06:34:33 Voltage Offset Correction: v_off_ini = 0.000006455 V, v_off_fin = 0.000003356 V 06:34:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984260 Vs 06:34:36 Temperature Measurement, Probe Number = 0, T = 20.140000 C 06:34:36 Temperature Measurement, Probe Number = 1, T = 20.058000 C 06:34:37 Temperature Measurement, Probe Number = 2, T = 20.124000 C 06:34:38 Temperature Measurement, Probe Number = 3, T = 20.064000 C 06:34:38 Temperature Measurement, Probe Number = 4, T = 20.229000 C 06:34:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.23 06:34:39 Integrated Voltage Measurement... 06:34:58 Voltage Offset Correction: v_off_ini = 0.000004401 V, v_off_fin = 0.000006483 V 06:34:58 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171060033 Vs 06:34:58 Integrated Voltage Measurement... 06:35:18 Voltage Offset Correction: v_off_ini = 0.000006321 V, v_off_fin = 0.000003439 V 06:35:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989087 Vs 06:35:21 Temperature Measurement, Probe Number = 0, T = 20.141000 C 06:35:21 Temperature Measurement, Probe Number = 1, T = 20.054000 C 06:35:22 Temperature Measurement, Probe Number = 2, T = 20.125000 C 06:35:23 Temperature Measurement, Probe Number = 3, T = 20.062000 C 06:35:23 Temperature Measurement, Probe Number = 4, T = 20.347000 C 06:35:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.35 06:35:24 Integrated Voltage Measurement... 06:35:44 Voltage Offset Correction: v_off_ini = 0.000004303 V, v_off_fin = 0.000006308 V 06:35:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171063202 Vs 06:35:44 Integrated Voltage Measurement... 06:36:03 Voltage Offset Correction: v_off_ini = 0.000006429 V, v_off_fin = 0.000003176 V 06:36:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170984799 Vs 07:06:06 Temperature Measurement, Probe Number = 0, T = 20.140000 C 07:06:07 Temperature Measurement, Probe Number = 1, T = 20.059000 C 07:06:07 Temperature Measurement, Probe Number = 2, T = 20.123000 C 07:06:08 Temperature Measurement, Probe Number = 3, T = 20.065000 C 07:06:09 Temperature Measurement, Probe Number = 4, T = 20.366000 C 07:06:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.37 07:06:09 Integrated Voltage Measurement... 07:06:29 Voltage Offset Correction: v_off_ini = 0.000005242 V, v_off_fin = 0.000006915 V 07:06:29 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171112959 Vs 07:06:29 Integrated Voltage Measurement... 07:06:49 Voltage Offset Correction: v_off_ini = 0.000006082 V, v_off_fin = 0.000003109 V 07:06:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990431 Vs 07:06:52 Temperature Measurement, Probe Number = 0, T = 20.137000 C 07:06:52 Temperature Measurement, Probe Number = 1, T = 20.056000 C 07:06:53 Temperature Measurement, Probe Number = 2, T = 20.121000 C 07:06:54 Temperature Measurement, Probe Number = 3, T = 20.060000 C 07:06:54 Temperature Measurement, Probe Number = 4, T = 20.322000 C 07:06:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.32 07:06:55 Integrated Voltage Measurement... 07:07:14 Voltage Offset Correction: v_off_ini = 0.000004481 V, v_off_fin = 0.000007446 V 07:07:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059708 Vs 07:07:14 Integrated Voltage Measurement... 07:07:34 Voltage Offset Correction: v_off_ini = 0.000006318 V, v_off_fin = 0.000003469 V 07:07:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984623 Vs 07:07:37 Temperature Measurement, Probe Number = 0, T = 20.139000 C 07:07:38 Temperature Measurement, Probe Number = 1, T = 20.055000 C 07:07:38 Temperature Measurement, Probe Number = 2, T = 20.120000 C 07:07:39 Temperature Measurement, Probe Number = 3, T = 20.059000 C 07:07:40 Temperature Measurement, Probe Number = 4, T = 20.279000 C 07:07:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.28 07:07:40 Integrated Voltage Measurement... 07:07:59 Voltage Offset Correction: v_off_ini = 0.000004374 V, v_off_fin = 0.000006845 V 07:07:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060642 Vs 07:07:59 Integrated Voltage Measurement... 07:08:19 Voltage Offset Correction: v_off_ini = 0.000006428 V, v_off_fin = 0.000003290 V 07:08:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986800 Vs 07:08:22 Temperature Measurement, Probe Number = 0, T = 20.140000 C 07:08:23 Temperature Measurement, Probe Number = 1, T = 20.053000 C 07:08:23 Temperature Measurement, Probe Number = 2, T = 20.123000 C 07:08:24 Temperature Measurement, Probe Number = 3, T = 20.058000 C 07:08:24 Temperature Measurement, Probe Number = 4, T = 20.348000 C 07:08:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.35 07:08:25 Integrated Voltage Measurement... 07:08:45 Voltage Offset Correction: v_off_ini = 0.000004579 V, v_off_fin = 0.000006997 V 07:08:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065219 Vs 07:08:45 Integrated Voltage Measurement... 07:09:05 Voltage Offset Correction: v_off_ini = 0.000006542 V, v_off_fin = 0.000003209 V 07:09:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981800 Vs 07:09:08 Temperature Measurement, Probe Number = 0, T = 20.133000 C 07:09:09 Temperature Measurement, Probe Number = 1, T = 20.050000 C 07:09:09 Temperature Measurement, Probe Number = 2, T = 20.115000 C 07:09:10 Temperature Measurement, Probe Number = 3, T = 20.054000 C 07:09:11 Temperature Measurement, Probe Number = 4, T = 20.245000 C 07:09:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.25 07:09:11 Integrated Voltage Measurement... 07:09:30 Voltage Offset Correction: v_off_ini = 0.000004925 V, v_off_fin = 0.000006883 V 07:09:30 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059868 Vs 07:09:31 Integrated Voltage Measurement... 07:09:50 Voltage Offset Correction: v_off_ini = 0.000006298 V, v_off_fin = 0.000003460 V 07:09:50 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983509 Vs 07:09:53 Temperature Measurement, Probe Number = 0, T = 20.135000 C 07:09:54 Temperature Measurement, Probe Number = 1, T = 20.052000 C 07:09:54 Temperature Measurement, Probe Number = 2, T = 20.117000 C 07:09:55 Temperature Measurement, Probe Number = 3, T = 20.056000 C 07:09:56 Temperature Measurement, Probe Number = 4, T = 20.235000 C 07:09:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.23 07:09:56 Integrated Voltage Measurement... 07:10:15 Voltage Offset Correction: v_off_ini = 0.000004576 V, v_off_fin = 0.000007140 V 07:10:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060332 Vs 07:10:16 Integrated Voltage Measurement... 07:10:35 Voltage Offset Correction: v_off_ini = 0.000006269 V, v_off_fin = 0.000003048 V 07:10:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985568 Vs 07:10:38 Temperature Measurement, Probe Number = 0, T = 20.139000 C 07:10:39 Temperature Measurement, Probe Number = 1, T = 20.056000 C 07:10:39 Temperature Measurement, Probe Number = 2, T = 20.124000 C 07:10:40 Temperature Measurement, Probe Number = 3, T = 20.064000 C 07:10:41 Temperature Measurement, Probe Number = 4, T = 20.324000 C 07:10:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.32 07:10:41 Integrated Voltage Measurement... 07:11:00 Voltage Offset Correction: v_off_ini = 0.000005091 V, v_off_fin = 0.000008111 V 07:11:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073067 Vs 07:11:01 Integrated Voltage Measurement... 07:11:20 Voltage Offset Correction: v_off_ini = 0.000007656 V, v_off_fin = 0.000003717 V 07:11:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976910 Vs 07:11:23 Temperature Measurement, Probe Number = 0, T = 20.140000 C 07:11:24 Temperature Measurement, Probe Number = 1, T = 20.054000 C 07:11:25 Temperature Measurement, Probe Number = 2, T = 20.125000 C 07:11:25 Temperature Measurement, Probe Number = 3, T = 20.063000 C 07:11:26 Temperature Measurement, Probe Number = 4, T = 20.379000 C 07:11:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.38 07:11:26 Integrated Voltage Measurement... 07:11:46 Voltage Offset Correction: v_off_ini = 0.000005044 V, v_off_fin = 0.000007429 V 07:11:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076128 Vs 07:11:47 Integrated Voltage Measurement... 07:12:06 Voltage Offset Correction: v_off_ini = 0.000006700 V, v_off_fin = 0.000002954 V 07:12:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979448 Vs 07:12:09 Temperature Measurement, Probe Number = 0, T = 20.136000 C 07:12:10 Temperature Measurement, Probe Number = 1, T = 20.050000 C 07:12:11 Temperature Measurement, Probe Number = 2, T = 20.121000 C 07:12:11 Temperature Measurement, Probe Number = 3, T = 20.059000 C 07:12:12 Temperature Measurement, Probe Number = 4, T = 20.373000 C 07:12:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.37 07:12:12 Integrated Voltage Measurement... 07:12:32 Voltage Offset Correction: v_off_ini = 0.000005019 V, v_off_fin = 0.000007424 V 07:12:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072474 Vs 07:12:32 Integrated Voltage Measurement... 07:12:51 Voltage Offset Correction: v_off_ini = 0.000006875 V, v_off_fin = 0.000004078 V 07:12:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976074 Vs 07:12:54 Temperature Measurement, Probe Number = 0, T = 20.138000 C 07:12:55 Temperature Measurement, Probe Number = 1, T = 20.052000 C 07:12:56 Temperature Measurement, Probe Number = 2, T = 20.121000 C 07:12:56 Temperature Measurement, Probe Number = 3, T = 20.056000 C 07:12:57 Temperature Measurement, Probe Number = 4, T = 20.370000 C 07:12:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.37 07:12:57 Integrated Voltage Measurement... 07:13:17 Voltage Offset Correction: v_off_ini = 0.000004814 V, v_off_fin = 0.000007215 V 07:13:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070398 Vs 07:13:17 Integrated Voltage Measurement... 07:13:37 Voltage Offset Correction: v_off_ini = 0.000006555 V, v_off_fin = 0.000004124 V 07:13:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982223 Vs 07:43:39 Temperature Measurement, Probe Number = 0, T = 20.133000 C 07:43:40 Temperature Measurement, Probe Number = 1, T = 20.053000 C 07:43:41 Temperature Measurement, Probe Number = 2, T = 20.118000 C 07:43:41 Temperature Measurement, Probe Number = 3, T = 20.059000 C 07:43:42 Temperature Measurement, Probe Number = 4, T = 20.309000 C 07:43:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.31 07:43:42 Integrated Voltage Measurement... 07:44:01 Voltage Offset Correction: v_off_ini = 0.000005624 V, v_off_fin = 0.000007324 V 07:44:01 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171120780 Vs 07:44:02 Integrated Voltage Measurement... 07:44:21 Voltage Offset Correction: v_off_ini = 0.000007065 V, v_off_fin = 0.000003224 V 07:44:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983984 Vs 07:44:24 Temperature Measurement, Probe Number = 0, T = 20.138000 C 07:44:25 Temperature Measurement, Probe Number = 1, T = 20.054000 C 07:44:26 Temperature Measurement, Probe Number = 2, T = 20.121000 C 07:44:26 Temperature Measurement, Probe Number = 3, T = 20.059000 C 07:44:27 Temperature Measurement, Probe Number = 4, T = 20.394000 C 07:44:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.39 07:44:27 Integrated Voltage Measurement... 07:44:47 Voltage Offset Correction: v_off_ini = 0.000005242 V, v_off_fin = 0.000007468 V 07:44:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071449 Vs 07:44:47 Integrated Voltage Measurement... 07:45:06 Voltage Offset Correction: v_off_ini = 0.000006795 V, v_off_fin = 0.000003899 V 07:45:07 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170973905 Vs 07:45:09 Temperature Measurement, Probe Number = 0, T = 20.138000 C 07:45:10 Temperature Measurement, Probe Number = 1, T = 20.052000 C 07:45:11 Temperature Measurement, Probe Number = 2, T = 20.123000 C 07:45:11 Temperature Measurement, Probe Number = 3, T = 20.060000 C 07:45:12 Temperature Measurement, Probe Number = 4, T = 20.415000 C 07:45:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.41 07:45:12 Integrated Voltage Measurement... 07:45:32 Voltage Offset Correction: v_off_ini = 0.000004657 V, v_off_fin = 0.000008293 V 07:45:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171073453 Vs 07:45:32 Integrated Voltage Measurement... 07:45:51 Voltage Offset Correction: v_off_ini = 0.000007139 V, v_off_fin = 0.000003312 V 07:45:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974698 Vs 07:45:54 Temperature Measurement, Probe Number = 0, T = 20.133000 C 07:45:55 Temperature Measurement, Probe Number = 1, T = 20.054000 C 07:45:56 Temperature Measurement, Probe Number = 2, T = 20.117000 C 07:45:56 Temperature Measurement, Probe Number = 3, T = 20.057000 C 07:45:57 Temperature Measurement, Probe Number = 4, T = 20.465000 C 07:45:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.46 07:45:57 Integrated Voltage Measurement... 07:46:17 Voltage Offset Correction: v_off_ini = 0.000004928 V, v_off_fin = 0.000007546 V 07:46:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071958 Vs 07:46:17 Integrated Voltage Measurement... 07:46:36 Voltage Offset Correction: v_off_ini = 0.000007018 V, v_off_fin = 0.000003797 V 07:46:37 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971216 Vs 07:46:39 Temperature Measurement, Probe Number = 0, T = 20.130000 C 07:46:40 Temperature Measurement, Probe Number = 1, T = 20.050000 C 07:46:41 Temperature Measurement, Probe Number = 2, T = 20.116000 C 07:46:41 Temperature Measurement, Probe Number = 3, T = 20.057000 C 07:46:42 Temperature Measurement, Probe Number = 4, T = 20.501000 C 07:46:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.50 07:46:42 Integrated Voltage Measurement... 07:47:02 Voltage Offset Correction: v_off_ini = 0.000005282 V, v_off_fin = 0.000007574 V 07:47:02 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171076570 Vs 07:47:02 Integrated Voltage Measurement... 07:47:22 Voltage Offset Correction: v_off_ini = 0.000007251 V, v_off_fin = 0.000004129 V 07:47:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972984 Vs 07:47:24 Temperature Measurement, Probe Number = 0, T = 20.135000 C 07:47:25 Temperature Measurement, Probe Number = 1, T = 20.052000 C 07:47:26 Temperature Measurement, Probe Number = 2, T = 20.118000 C 07:47:26 Temperature Measurement, Probe Number = 3, T = 20.058000 C 07:47:27 Temperature Measurement, Probe Number = 4, T = 20.469000 C 07:47:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.47 07:47:27 Integrated Voltage Measurement... 07:47:48 Voltage Offset Correction: v_off_ini = 0.000004763 V, v_off_fin = 0.000007163 V 07:47:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066488 Vs 07:47:48 Integrated Voltage Measurement... 07:48:08 Voltage Offset Correction: v_off_ini = 0.000006178 V, v_off_fin = 0.000003644 V 07:48:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984175 Vs 07:48:11 Temperature Measurement, Probe Number = 0, T = 20.131000 C 07:48:11 Temperature Measurement, Probe Number = 1, T = 20.050000 C 07:48:12 Temperature Measurement, Probe Number = 2, T = 20.115000 C 07:48:13 Temperature Measurement, Probe Number = 3, T = 20.054000 C 07:48:13 Temperature Measurement, Probe Number = 4, T = 20.443000 C 07:48:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.44 07:48:13 Integrated Voltage Measurement... 07:48:33 Voltage Offset Correction: v_off_ini = 0.000005525 V, v_off_fin = 0.000007828 V 07:48:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072172 Vs 07:48:34 Integrated Voltage Measurement... 07:48:53 Voltage Offset Correction: v_off_ini = 0.000006996 V, v_off_fin = 0.000003908 V 07:48:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971216 Vs 07:48:56 Temperature Measurement, Probe Number = 0, T = 20.132000 C 07:48:56 Temperature Measurement, Probe Number = 1, T = 20.050000 C 07:48:57 Temperature Measurement, Probe Number = 2, T = 20.116000 C 07:48:58 Temperature Measurement, Probe Number = 3, T = 20.056000 C 07:48:58 Temperature Measurement, Probe Number = 4, T = 20.437000 C 07:48:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.44 07:48:59 Integrated Voltage Measurement... 07:49:18 Voltage Offset Correction: v_off_ini = 0.000005486 V, v_off_fin = 0.000007738 V 07:49:18 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171074060 Vs 07:49:18 Integrated Voltage Measurement... 07:49:38 Voltage Offset Correction: v_off_ini = 0.000007351 V, v_off_fin = 0.000003635 V 07:49:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974526 Vs 07:49:41 Temperature Measurement, Probe Number = 0, T = 20.132000 C 07:49:41 Temperature Measurement, Probe Number = 1, T = 20.051000 C 07:49:42 Temperature Measurement, Probe Number = 2, T = 20.115000 C 07:49:43 Temperature Measurement, Probe Number = 3, T = 20.055000 C 07:49:43 Temperature Measurement, Probe Number = 4, T = 20.309000 C 07:49:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.31 07:49:44 Integrated Voltage Measurement... 07:50:04 Voltage Offset Correction: v_off_ini = 0.000004159 V, v_off_fin = 0.000007474 V 07:50:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071850 Vs 07:50:04 Integrated Voltage Measurement... 07:50:24 Voltage Offset Correction: v_off_ini = 0.000006977 V, v_off_fin = 0.000003879 V 07:50:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980556 Vs 07:50:27 Temperature Measurement, Probe Number = 0, T = 20.141000 C 07:50:27 Temperature Measurement, Probe Number = 1, T = 20.057000 C 07:50:28 Temperature Measurement, Probe Number = 2, T = 20.119000 C 07:50:29 Temperature Measurement, Probe Number = 3, T = 20.059000 C 07:50:29 Temperature Measurement, Probe Number = 4, T = 20.298000 C 07:50:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.30 07:50:30 Integrated Voltage Measurement... 07:50:49 Voltage Offset Correction: v_off_ini = 0.000004869 V, v_off_fin = 0.000007178 V 07:50:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064775 Vs 07:50:49 Integrated Voltage Measurement... 07:51:10 Voltage Offset Correction: v_off_ini = 0.000006440 V, v_off_fin = 0.000004028 V 07:51:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980785 Vs 08:21:13 Temperature Measurement, Probe Number = 0, T = 20.132000 C 08:21:13 Temperature Measurement, Probe Number = 1, T = 20.056000 C 08:21:14 Temperature Measurement, Probe Number = 2, T = 20.117000 C 08:21:15 Temperature Measurement, Probe Number = 3, T = 20.062000 C 08:21:15 Temperature Measurement, Probe Number = 4, T = 20.437000 C 08:21:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.44 08:21:15 Integrated Voltage Measurement... 08:21:36 Voltage Offset Correction: v_off_ini = 0.000004515 V, v_off_fin = 0.000006100 V 08:21:36 Integrated Voltage Measurement Delta Gap = 0.0040017 m VT = 0.171105125 Vs 08:21:36 Integrated Voltage Measurement... 08:21:56 Voltage Offset Correction: v_off_ini = 0.000005446 V, v_off_fin = 0.000003420 V 08:21:56 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170988624 Vs 08:21:59 Temperature Measurement, Probe Number = 0, T = 20.135000 C 08:22:00 Temperature Measurement, Probe Number = 1, T = 20.059000 C 08:22:00 Temperature Measurement, Probe Number = 2, T = 20.117000 C 08:22:01 Temperature Measurement, Probe Number = 3, T = 20.061000 C 08:22:02 Temperature Measurement, Probe Number = 4, T = 20.309000 C 08:22:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.31 08:22:02 Integrated Voltage Measurement... 08:22:22 Voltage Offset Correction: v_off_ini = 0.000004414 V, v_off_fin = 0.000006817 V 08:22:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047086 Vs 08:22:22 Integrated Voltage Measurement... 08:22:42 Voltage Offset Correction: v_off_ini = 0.000005716 V, v_off_fin = 0.000003102 V 08:22:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979592 Vs 08:22:45 Temperature Measurement, Probe Number = 0, T = 20.136000 C 08:22:45 Temperature Measurement, Probe Number = 1, T = 20.060000 C 08:22:46 Temperature Measurement, Probe Number = 2, T = 20.117000 C 08:22:47 Temperature Measurement, Probe Number = 3, T = 20.062000 C 08:22:47 Temperature Measurement, Probe Number = 4, T = 20.250000 C 08:22:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.25 08:22:48 Integrated Voltage Measurement... 08:23:08 Voltage Offset Correction: v_off_ini = 0.000004002 V, v_off_fin = 0.000006031 V 08:23:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048342 Vs 08:23:08 Integrated Voltage Measurement... 08:23:28 Voltage Offset Correction: v_off_ini = 0.000005796 V, v_off_fin = 0.000001605 V 08:23:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982013 Vs 08:23:31 Temperature Measurement, Probe Number = 0, T = 20.138000 C 08:23:31 Temperature Measurement, Probe Number = 1, T = 20.063000 C 08:23:32 Temperature Measurement, Probe Number = 2, T = 20.121000 C 08:23:33 Temperature Measurement, Probe Number = 3, T = 20.067000 C 08:23:33 Temperature Measurement, Probe Number = 4, T = 20.303000 C 08:23:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.30 08:23:34 Integrated Voltage Measurement... 08:23:53 Voltage Offset Correction: v_off_ini = 0.000003459 V, v_off_fin = 0.000006467 V 08:23:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048910 Vs 08:23:53 Integrated Voltage Measurement... 08:24:13 Voltage Offset Correction: v_off_ini = 0.000006051 V, v_off_fin = 0.000002712 V 08:24:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982389 Vs 08:24:16 Temperature Measurement, Probe Number = 0, T = 20.136000 C 08:24:17 Temperature Measurement, Probe Number = 1, T = 20.063000 C 08:24:17 Temperature Measurement, Probe Number = 2, T = 20.121000 C 08:24:18 Temperature Measurement, Probe Number = 3, T = 20.068000 C 08:24:18 Temperature Measurement, Probe Number = 4, T = 20.404000 C 08:24:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.40 08:24:19 Integrated Voltage Measurement... 08:24:39 Voltage Offset Correction: v_off_ini = 0.000004127 V, v_off_fin = 0.000006607 V 08:24:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058756 Vs 08:24:40 Integrated Voltage Measurement... 08:25:00 Voltage Offset Correction: v_off_ini = 0.000005617 V, v_off_fin = 0.000003156 V 08:25:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982805 Vs 08:25:03 Temperature Measurement, Probe Number = 0, T = 20.139000 C 08:25:04 Temperature Measurement, Probe Number = 1, T = 20.064000 C 08:25:05 Temperature Measurement, Probe Number = 2, T = 20.123000 C 08:25:05 Temperature Measurement, Probe Number = 3, T = 20.069000 C 08:25:06 Temperature Measurement, Probe Number = 4, T = 20.428000 C 08:25:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.43 08:25:06 Integrated Voltage Measurement... 08:25:25 Voltage Offset Correction: v_off_ini = 0.000003492 V, v_off_fin = 0.000007404 V 08:25:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041890 Vs 08:25:26 Integrated Voltage Measurement... 08:25:45 Voltage Offset Correction: v_off_ini = 0.000006211 V, v_off_fin = 0.000003010 V 08:25:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990594 Vs 08:25:48 Temperature Measurement, Probe Number = 0, T = 20.141000 C 08:25:49 Temperature Measurement, Probe Number = 1, T = 20.064000 C 08:25:49 Temperature Measurement, Probe Number = 2, T = 20.122000 C 08:25:50 Temperature Measurement, Probe Number = 3, T = 20.068000 C 08:25:51 Temperature Measurement, Probe Number = 4, T = 20.381000 C 08:25:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.38 08:25:51 Integrated Voltage Measurement... 08:26:11 Voltage Offset Correction: v_off_ini = 0.000003978 V, v_off_fin = 0.000006540 V 08:26:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054155 Vs 08:26:12 Integrated Voltage Measurement... 08:26:31 Voltage Offset Correction: v_off_ini = 0.000005663 V, v_off_fin = 0.000003133 V 08:26:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978378 Vs 08:26:34 Temperature Measurement, Probe Number = 0, T = 20.141000 C 08:26:35 Temperature Measurement, Probe Number = 1, T = 20.063000 C 08:26:36 Temperature Measurement, Probe Number = 2, T = 20.124000 C 08:26:36 Temperature Measurement, Probe Number = 3, T = 20.069000 C 08:26:37 Temperature Measurement, Probe Number = 4, T = 20.489000 C 08:26:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.49 08:26:37 Integrated Voltage Measurement... 08:26:56 Voltage Offset Correction: v_off_ini = 0.000003259 V, v_off_fin = 0.000006297 V 08:26:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047559 Vs 08:26:57 Integrated Voltage Measurement... 08:27:16 Voltage Offset Correction: v_off_ini = 0.000006312 V, v_off_fin = 0.000002425 V 08:27:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985737 Vs 08:27:19 Temperature Measurement, Probe Number = 0, T = 20.139000 C 08:27:20 Temperature Measurement, Probe Number = 1, T = 20.062000 C 08:27:21 Temperature Measurement, Probe Number = 2, T = 20.122000 C 08:27:21 Temperature Measurement, Probe Number = 3, T = 20.066000 C 08:27:22 Temperature Measurement, Probe Number = 4, T = 20.494000 C 08:27:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.49 08:27:22 Integrated Voltage Measurement... 08:27:41 Voltage Offset Correction: v_off_ini = 0.000004531 V, v_off_fin = 0.000006527 V 08:27:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052481 Vs 08:27:42 Integrated Voltage Measurement... 08:28:02 Voltage Offset Correction: v_off_ini = 0.000005612 V, v_off_fin = 0.000003038 V 08:28:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989715 Vs 08:28:04 Temperature Measurement, Probe Number = 0, T = 20.137000 C 08:28:05 Temperature Measurement, Probe Number = 1, T = 20.059000 C 08:28:06 Temperature Measurement, Probe Number = 2, T = 20.121000 C 08:28:06 Temperature Measurement, Probe Number = 3, T = 20.066000 C 08:28:07 Temperature Measurement, Probe Number = 4, T = 20.402000 C 08:28:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.40 08:28:07 Integrated Voltage Measurement... 08:28:27 Voltage Offset Correction: v_off_ini = 0.000003999 V, v_off_fin = 0.000006727 V 08:28:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051972 Vs 08:28:28 Integrated Voltage Measurement... 08:28:48 Voltage Offset Correction: v_off_ini = 0.000006219 V, v_off_fin = 0.000002995 V 08:28:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983730 Vs 08:58:50 Temperature Measurement, Probe Number = 0, T = 20.132000 C 08:58:51 Temperature Measurement, Probe Number = 1, T = 20.054000 C 08:58:52 Temperature Measurement, Probe Number = 2, T = 20.119000 C 08:58:52 Temperature Measurement, Probe Number = 3, T = 20.063000 C 08:58:53 Temperature Measurement, Probe Number = 4, T = 20.318000 C 08:58:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.32 08:58:53 Integrated Voltage Measurement... 08:59:12 Voltage Offset Correction: v_off_ini = 0.000005461 V, v_off_fin = 0.000007114 V 08:59:13 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171101781 Vs 08:59:13 Integrated Voltage Measurement... 08:59:32 Voltage Offset Correction: v_off_ini = 0.000006745 V, v_off_fin = 0.000002181 V 08:59:32 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170973035 Vs 08:59:35 Temperature Measurement, Probe Number = 0, T = 20.135000 C 08:59:36 Temperature Measurement, Probe Number = 1, T = 20.055000 C 08:59:36 Temperature Measurement, Probe Number = 2, T = 20.120000 C 08:59:37 Temperature Measurement, Probe Number = 3, T = 20.063000 C 08:59:38 Temperature Measurement, Probe Number = 4, T = 20.304000 C 08:59:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.30 08:59:38 Integrated Voltage Measurement... 08:59:58 Voltage Offset Correction: v_off_ini = 0.000004543 V, v_off_fin = 0.000006938 V 08:59:58 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171048135 Vs 08:59:58 Integrated Voltage Measurement... 09:00:18 Voltage Offset Correction: v_off_ini = 0.000006562 V, v_off_fin = 0.000002230 V 09:00:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976718 Vs 09:00:20 Temperature Measurement, Probe Number = 0, T = 20.134000 C 09:00:21 Temperature Measurement, Probe Number = 1, T = 20.052000 C 09:00:22 Temperature Measurement, Probe Number = 2, T = 20.117000 C 09:00:22 Temperature Measurement, Probe Number = 3, T = 20.060000 C 09:00:23 Temperature Measurement, Probe Number = 4, T = 20.304000 C 09:00:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.30 09:00:23 Integrated Voltage Measurement... 09:00:42 Voltage Offset Correction: v_off_ini = 0.000003532 V, v_off_fin = 0.000006026 V 09:00:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043858 Vs 09:00:43 Integrated Voltage Measurement... 09:01:04 Voltage Offset Correction: v_off_ini = 0.000005788 V, v_off_fin = 0.000002738 V 09:01:04 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170981506 Vs 09:01:06 Temperature Measurement, Probe Number = 0, T = 20.131000 C 09:01:07 Temperature Measurement, Probe Number = 1, T = 20.052000 C 09:01:08 Temperature Measurement, Probe Number = 2, T = 20.116000 C 09:01:08 Temperature Measurement, Probe Number = 3, T = 20.059000 C 09:01:09 Temperature Measurement, Probe Number = 4, T = 20.239000 C 09:01:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.24 09:01:09 Integrated Voltage Measurement... 09:01:29 Voltage Offset Correction: v_off_ini = 0.000004251 V, v_off_fin = 0.000006497 V 09:01:29 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171044470 Vs 09:01:29 Integrated Voltage Measurement... 09:01:49 Voltage Offset Correction: v_off_ini = 0.000006088 V, v_off_fin = 0.000002568 V 09:01:49 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170981578 Vs 09:01:52 Temperature Measurement, Probe Number = 0, T = 20.136000 C 09:01:53 Temperature Measurement, Probe Number = 1, T = 20.058000 C 09:01:53 Temperature Measurement, Probe Number = 2, T = 20.119000 C 09:01:54 Temperature Measurement, Probe Number = 3, T = 20.065000 C 09:01:55 Temperature Measurement, Probe Number = 4, T = 20.332000 C 09:01:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.33 09:01:55 Integrated Voltage Measurement... 09:02:15 Voltage Offset Correction: v_off_ini = 0.000004701 V, v_off_fin = 0.000007020 V 09:02:15 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171053179 Vs 09:02:15 Integrated Voltage Measurement... 09:02:35 Voltage Offset Correction: v_off_ini = 0.000006469 V, v_off_fin = 0.000002877 V 09:02:35 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170978107 Vs 09:02:37 Temperature Measurement, Probe Number = 0, T = 20.137000 C 09:02:38 Temperature Measurement, Probe Number = 1, T = 20.056000 C 09:02:39 Temperature Measurement, Probe Number = 2, T = 20.121000 C 09:02:39 Temperature Measurement, Probe Number = 3, T = 20.063000 C 09:02:40 Temperature Measurement, Probe Number = 4, T = 20.416000 C 09:02:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.42 09:02:40 Integrated Voltage Measurement... 09:03:00 Voltage Offset Correction: v_off_ini = 0.000004265 V, v_off_fin = 0.000006332 V 09:03:00 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171046987 Vs 09:03:00 Integrated Voltage Measurement... 09:03:20 Voltage Offset Correction: v_off_ini = 0.000005944 V, v_off_fin = 0.000003481 V 09:03:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979787 Vs 09:03:23 Temperature Measurement, Probe Number = 0, T = 20.136000 C 09:03:23 Temperature Measurement, Probe Number = 1, T = 20.057000 C 09:03:24 Temperature Measurement, Probe Number = 2, T = 20.120000 C 09:03:25 Temperature Measurement, Probe Number = 3, T = 20.063000 C 09:03:25 Temperature Measurement, Probe Number = 4, T = 20.391000 C 09:03:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.39 09:03:25 Integrated Voltage Measurement... 09:03:45 Voltage Offset Correction: v_off_ini = 0.000003799 V, v_off_fin = 0.000006588 V 09:03:45 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171051855 Vs 09:03:45 Integrated Voltage Measurement... 09:04:05 Voltage Offset Correction: v_off_ini = 0.000006147 V, v_off_fin = 0.000003161 V 09:04:05 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170971738 Vs 09:04:08 Temperature Measurement, Probe Number = 0, T = 20.138000 C 09:04:08 Temperature Measurement, Probe Number = 1, T = 20.056000 C 09:04:09 Temperature Measurement, Probe Number = 2, T = 20.123000 C 09:04:10 Temperature Measurement, Probe Number = 3, T = 20.065000 C 09:04:10 Temperature Measurement, Probe Number = 4, T = 20.371000 C 09:04:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.37 09:04:11 Integrated Voltage Measurement... 09:04:30 Voltage Offset Correction: v_off_ini = 0.000004116 V, v_off_fin = 0.000006649 V 09:04:30 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171046088 Vs 09:04:30 Integrated Voltage Measurement... 09:04:50 Voltage Offset Correction: v_off_ini = 0.000005700 V, v_off_fin = 0.000002879 V 09:04:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987118 Vs 09:04:53 Temperature Measurement, Probe Number = 0, T = 20.136000 C 09:04:53 Temperature Measurement, Probe Number = 1, T = 20.053000 C 09:04:54 Temperature Measurement, Probe Number = 2, T = 20.124000 C 09:04:55 Temperature Measurement, Probe Number = 3, T = 20.063000 C 09:04:55 Temperature Measurement, Probe Number = 4, T = 20.377000 C 09:04:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.38 09:04:55 Integrated Voltage Measurement... 09:05:15 Voltage Offset Correction: v_off_ini = 0.000003216 V, v_off_fin = 0.000006131 V 09:05:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044091 Vs 09:05:15 Integrated Voltage Measurement... 09:05:36 Voltage Offset Correction: v_off_ini = 0.000005748 V, v_off_fin = 0.000002094 V 09:05:36 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170980567 Vs 09:05:38 Temperature Measurement, Probe Number = 0, T = 20.128000 C 09:05:39 Temperature Measurement, Probe Number = 1, T = 20.048000 C 09:05:40 Temperature Measurement, Probe Number = 2, T = 20.114000 C 09:05:40 Temperature Measurement, Probe Number = 3, T = 20.058000 C 09:05:41 Temperature Measurement, Probe Number = 4, T = 20.392000 C 09:05:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.39 09:05:41 Integrated Voltage Measurement... 09:06:01 Voltage Offset Correction: v_off_ini = 0.000004079 V, v_off_fin = 0.000006458 V 09:06:02 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171037454 Vs 09:06:02 Integrated Voltage Measurement... 09:06:21 Voltage Offset Correction: v_off_ini = 0.000005750 V, v_off_fin = 0.000002879 V 09:06:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985212 Vs 09:36:24 Temperature Measurement, Probe Number = 0, T = 20.133000 C 09:36:25 Temperature Measurement, Probe Number = 1, T = 20.056000 C 09:36:25 Temperature Measurement, Probe Number = 2, T = 20.120000 C 09:36:26 Temperature Measurement, Probe Number = 3, T = 20.064000 C 09:36:27 Temperature Measurement, Probe Number = 4, T = 20.255000 C 09:36:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.25 09:36:27 Integrated Voltage Measurement... 09:36:47 Voltage Offset Correction: v_off_ini = 0.000005358 V, v_off_fin = 0.000006571 V 09:36:47 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171100956 Vs 09:36:47 Integrated Voltage Measurement... 09:37:07 Voltage Offset Correction: v_off_ini = 0.000006562 V, v_off_fin = 0.000002699 V 09:37:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984214 Vs 09:37:10 Temperature Measurement, Probe Number = 0, T = 20.134000 C 09:37:10 Temperature Measurement, Probe Number = 1, T = 20.056000 C 09:37:11 Temperature Measurement, Probe Number = 2, T = 20.120000 C 09:37:12 Temperature Measurement, Probe Number = 3, T = 20.063000 C 09:37:12 Temperature Measurement, Probe Number = 4, T = 20.294000 C 09:37:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.29 09:37:13 Integrated Voltage Measurement... 09:37:33 Voltage Offset Correction: v_off_ini = 0.000004163 V, v_off_fin = 0.000005954 V 09:37:33 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171037107 Vs 09:37:33 Integrated Voltage Measurement... 09:37:53 Voltage Offset Correction: v_off_ini = 0.000005225 V, v_off_fin = 0.000003107 V 09:37:54 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170975178 Vs 09:37:56 Temperature Measurement, Probe Number = 0, T = 20.140000 C 09:37:57 Temperature Measurement, Probe Number = 1, T = 20.062000 C 09:37:58 Temperature Measurement, Probe Number = 2, T = 20.123000 C 09:37:58 Temperature Measurement, Probe Number = 3, T = 20.065000 C 09:37:59 Temperature Measurement, Probe Number = 4, T = 20.304000 C 09:37:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.30 09:37:59 Integrated Voltage Measurement... 09:38:20 Voltage Offset Correction: v_off_ini = 0.000003617 V, v_off_fin = 0.000006318 V 09:38:20 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171039573 Vs 09:38:20 Integrated Voltage Measurement... 09:38:40 Voltage Offset Correction: v_off_ini = 0.000005553 V, v_off_fin = 0.000002597 V 09:38:40 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170983160 Vs 09:38:43 Temperature Measurement, Probe Number = 0, T = 20.143000 C 09:38:43 Temperature Measurement, Probe Number = 1, T = 20.063000 C 09:38:44 Temperature Measurement, Probe Number = 2, T = 20.126000 C 09:38:45 Temperature Measurement, Probe Number = 3, T = 20.068000 C 09:38:45 Temperature Measurement, Probe Number = 4, T = 20.382000 C 09:38:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.38 09:38:46 Integrated Voltage Measurement... 09:39:06 Voltage Offset Correction: v_off_ini = 0.000004271 V, v_off_fin = 0.000007121 V 09:39:06 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171046331 Vs 09:39:06 Integrated Voltage Measurement... 09:39:26 Voltage Offset Correction: v_off_ini = 0.000006946 V, v_off_fin = 0.000003221 V 09:39:26 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170980975 Vs 09:39:29 Temperature Measurement, Probe Number = 0, T = 20.142000 C 09:39:29 Temperature Measurement, Probe Number = 1, T = 20.063000 C 09:39:30 Temperature Measurement, Probe Number = 2, T = 20.127000 C 09:39:31 Temperature Measurement, Probe Number = 3, T = 20.070000 C 09:39:31 Temperature Measurement, Probe Number = 4, T = 20.447000 C 09:39:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.45 09:39:32 Integrated Voltage Measurement... 09:39:51 Voltage Offset Correction: v_off_ini = 0.000004252 V, v_off_fin = 0.000007191 V 09:39:51 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171045626 Vs 09:39:52 Integrated Voltage Measurement... 09:40:11 Voltage Offset Correction: v_off_ini = 0.000006159 V, v_off_fin = 0.000002908 V 09:40:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977036 Vs 09:40:14 Temperature Measurement, Probe Number = 0, T = 20.139000 C 09:40:15 Temperature Measurement, Probe Number = 1, T = 20.059000 C 09:40:15 Temperature Measurement, Probe Number = 2, T = 20.123000 C 09:40:16 Temperature Measurement, Probe Number = 3, T = 20.068000 C 09:40:17 Temperature Measurement, Probe Number = 4, T = 20.447000 C 09:40:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.45 09:40:17 Integrated Voltage Measurement... 09:40:37 Voltage Offset Correction: v_off_ini = 0.000003978 V, v_off_fin = 0.000006129 V 09:40:37 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171032491 Vs 09:40:38 Integrated Voltage Measurement... 09:40:57 Voltage Offset Correction: v_off_ini = 0.000004378 V, v_off_fin = 0.000003173 V 09:40:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985012 Vs 09:41:00 Temperature Measurement, Probe Number = 0, T = 20.134000 C 09:41:01 Temperature Measurement, Probe Number = 1, T = 20.058000 C 09:41:01 Temperature Measurement, Probe Number = 2, T = 20.119000 C 09:41:02 Temperature Measurement, Probe Number = 3, T = 20.064000 C 09:41:03 Temperature Measurement, Probe Number = 4, T = 20.338000 C 09:41:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.34 09:41:03 Integrated Voltage Measurement... 09:41:23 Voltage Offset Correction: v_off_ini = 0.000004051 V, v_off_fin = 0.000006751 V 09:41:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044455 Vs 09:41:23 Integrated Voltage Measurement... 09:41:43 Voltage Offset Correction: v_off_ini = 0.000005897 V, v_off_fin = 0.000003334 V 09:41:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984973 Vs 09:41:46 Temperature Measurement, Probe Number = 0, T = 20.141000 C 09:41:47 Temperature Measurement, Probe Number = 1, T = 20.061000 C 09:41:47 Temperature Measurement, Probe Number = 2, T = 20.127000 C 09:41:48 Temperature Measurement, Probe Number = 3, T = 20.069000 C 09:41:49 Temperature Measurement, Probe Number = 4, T = 20.334000 C 09:41:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.33 09:41:49 Integrated Voltage Measurement... 09:42:09 Voltage Offset Correction: v_off_ini = 0.000003412 V, v_off_fin = 0.000006369 V 09:42:09 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171040605 Vs 09:42:10 Integrated Voltage Measurement... 09:42:29 Voltage Offset Correction: v_off_ini = 0.000005737 V, v_off_fin = 0.000002956 V 09:42:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982856 Vs 09:42:32 Temperature Measurement, Probe Number = 0, T = 20.138000 C 09:42:33 Temperature Measurement, Probe Number = 1, T = 20.063000 C 09:42:33 Temperature Measurement, Probe Number = 2, T = 20.123000 C 09:42:34 Temperature Measurement, Probe Number = 3, T = 20.069000 C 09:42:35 Temperature Measurement, Probe Number = 4, T = 20.353000 C 09:42:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.35 09:42:35 Integrated Voltage Measurement... 09:42:54 Voltage Offset Correction: v_off_ini = 0.000004466 V, v_off_fin = 0.000006628 V 09:42:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043918 Vs 09:42:55 Integrated Voltage Measurement... 09:43:14 Voltage Offset Correction: v_off_ini = 0.000005839 V, v_off_fin = 0.000003442 V 09:43:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980963 Vs 09:43:17 Temperature Measurement, Probe Number = 0, T = 20.142000 C 09:43:18 Temperature Measurement, Probe Number = 1, T = 20.066000 C 09:43:19 Temperature Measurement, Probe Number = 2, T = 20.125000 C 09:43:19 Temperature Measurement, Probe Number = 3, T = 20.070000 C 09:43:20 Temperature Measurement, Probe Number = 4, T = 20.280000 C 09:43:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.28 09:43:20 Integrated Voltage Measurement... 09:43:40 Voltage Offset Correction: v_off_ini = 0.000003943 V, v_off_fin = 0.000006463 V 09:43:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041016 Vs 09:43:40 Integrated Voltage Measurement... 09:44:00 Voltage Offset Correction: v_off_ini = 0.000005838 V, v_off_fin = 0.000002740 V 09:44:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987025 Vs 10:14:02 Temperature Measurement, Probe Number = 0, T = 20.146000 C 10:14:03 Temperature Measurement, Probe Number = 1, T = 20.069000 C 10:14:04 Temperature Measurement, Probe Number = 2, T = 20.132000 C 10:14:04 Temperature Measurement, Probe Number = 3, T = 20.077000 C 10:14:05 Temperature Measurement, Probe Number = 4, T = 20.527000 C 10:14:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.53 10:14:05 Integrated Voltage Measurement... 10:14:25 Voltage Offset Correction: v_off_ini = 0.000005628 V, v_off_fin = 0.000006988 V 10:14:26 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171106524 Vs 10:14:26 Integrated Voltage Measurement... 10:14:45 Voltage Offset Correction: v_off_ini = 0.000006410 V, v_off_fin = 0.000003296 V 10:14:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980087 Vs 10:14:48 Temperature Measurement, Probe Number = 0, T = 20.149000 C 10:14:49 Temperature Measurement, Probe Number = 1, T = 20.069000 C 10:14:50 Temperature Measurement, Probe Number = 2, T = 20.133000 C 10:14:50 Temperature Measurement, Probe Number = 3, T = 20.077000 C 10:14:51 Temperature Measurement, Probe Number = 4, T = 20.561000 C 10:14:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.56 10:14:51 Integrated Voltage Measurement... 10:15:12 Voltage Offset Correction: v_off_ini = 0.000003602 V, v_off_fin = 0.000006513 V 10:15:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044914 Vs 10:15:12 Integrated Voltage Measurement... 10:15:32 Voltage Offset Correction: v_off_ini = 0.000005936 V, v_off_fin = 0.000003508 V 10:15:32 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170976085 Vs 10:15:35 Temperature Measurement, Probe Number = 0, T = 20.148000 C 10:15:36 Temperature Measurement, Probe Number = 1, T = 20.067000 C 10:15:37 Temperature Measurement, Probe Number = 2, T = 20.128000 C 10:15:37 Temperature Measurement, Probe Number = 3, T = 20.073000 C 10:15:38 Temperature Measurement, Probe Number = 4, T = 20.539000 C 10:15:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.54 10:15:38 Integrated Voltage Measurement... 10:15:58 Voltage Offset Correction: v_off_ini = 0.000004109 V, v_off_fin = 0.000006471 V 10:15:58 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171038819 Vs 10:15:58 Integrated Voltage Measurement... 10:16:17 Voltage Offset Correction: v_off_ini = 0.000006078 V, v_off_fin = 0.000002432 V 10:16:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980574 Vs 10:16:20 Temperature Measurement, Probe Number = 0, T = 20.147000 C 10:16:21 Temperature Measurement, Probe Number = 1, T = 20.069000 C 10:16:22 Temperature Measurement, Probe Number = 2, T = 20.128000 C 10:16:22 Temperature Measurement, Probe Number = 3, T = 20.074000 C 10:16:23 Temperature Measurement, Probe Number = 4, T = 20.413000 C 10:16:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.41 10:16:23 Integrated Voltage Measurement... 10:16:42 Voltage Offset Correction: v_off_ini = 0.000003828 V, v_off_fin = 0.000006408 V 10:16:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043542 Vs 10:16:43 Integrated Voltage Measurement... 10:17:03 Voltage Offset Correction: v_off_ini = 0.000006035 V, v_off_fin = 0.000003023 V 10:17:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977734 Vs 10:17:05 Temperature Measurement, Probe Number = 0, T = 20.145000 C 10:17:06 Temperature Measurement, Probe Number = 1, T = 20.067000 C 10:17:07 Temperature Measurement, Probe Number = 2, T = 20.130000 C 10:17:07 Temperature Measurement, Probe Number = 3, T = 20.076000 C 10:17:08 Temperature Measurement, Probe Number = 4, T = 20.381000 C 10:17:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.38 10:17:08 Integrated Voltage Measurement... 10:17:28 Voltage Offset Correction: v_off_ini = 0.000003565 V, v_off_fin = 0.000006453 V 10:17:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043730 Vs 10:17:28 Integrated Voltage Measurement... 10:17:48 Voltage Offset Correction: v_off_ini = 0.000005653 V, v_off_fin = 0.000003177 V 10:17:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977692 Vs 10:17:50 Temperature Measurement, Probe Number = 0, T = 20.144000 C 10:17:51 Temperature Measurement, Probe Number = 1, T = 20.065000 C 10:17:52 Temperature Measurement, Probe Number = 2, T = 20.129000 C 10:17:52 Temperature Measurement, Probe Number = 3, T = 20.073000 C 10:17:53 Temperature Measurement, Probe Number = 4, T = 20.332000 C 10:17:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.33 10:17:53 Integrated Voltage Measurement... 10:18:13 Voltage Offset Correction: v_off_ini = 0.000004791 V, v_off_fin = 0.000007244 V 10:18:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048753 Vs 10:18:13 Integrated Voltage Measurement... 10:18:33 Voltage Offset Correction: v_off_ini = 0.000006692 V, v_off_fin = 0.000003656 V 10:18:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975906 Vs 10:18:36 Temperature Measurement, Probe Number = 0, T = 20.143000 C 10:18:36 Temperature Measurement, Probe Number = 1, T = 20.065000 C 10:18:37 Temperature Measurement, Probe Number = 2, T = 20.127000 C 10:18:38 Temperature Measurement, Probe Number = 3, T = 20.071000 C 10:18:38 Temperature Measurement, Probe Number = 4, T = 20.386000 C 10:18:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.39 10:18:38 Integrated Voltage Measurement... 10:18:58 Voltage Offset Correction: v_off_ini = 0.000003472 V, v_off_fin = 0.000006327 V 10:18:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043285 Vs 10:18:58 Integrated Voltage Measurement... 10:19:18 Voltage Offset Correction: v_off_ini = 0.000006671 V, v_off_fin = 0.000003058 V 10:19:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976388 Vs 10:19:21 Temperature Measurement, Probe Number = 0, T = 20.145000 C 10:19:21 Temperature Measurement, Probe Number = 1, T = 20.068000 C 10:19:22 Temperature Measurement, Probe Number = 2, T = 20.130000 C 10:19:23 Temperature Measurement, Probe Number = 3, T = 20.074000 C 10:19:23 Temperature Measurement, Probe Number = 4, T = 20.408000 C 10:19:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.41 10:19:23 Integrated Voltage Measurement... 10:19:43 Voltage Offset Correction: v_off_ini = 0.000004492 V, v_off_fin = 0.000007243 V 10:19:43 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047259 Vs 10:19:43 Integrated Voltage Measurement... 10:20:03 Voltage Offset Correction: v_off_ini = 0.000006904 V, v_off_fin = 0.000003586 V 10:20:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981631 Vs 10:20:06 Temperature Measurement, Probe Number = 0, T = 20.149000 C 10:20:06 Temperature Measurement, Probe Number = 1, T = 20.073000 C 10:20:07 Temperature Measurement, Probe Number = 2, T = 20.131000 C 10:20:08 Temperature Measurement, Probe Number = 3, T = 20.077000 C 10:20:08 Temperature Measurement, Probe Number = 4, T = 20.469000 C 10:20:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.47 10:20:09 Integrated Voltage Measurement... 10:20:28 Voltage Offset Correction: v_off_ini = 0.000004980 V, v_off_fin = 0.000006967 V 10:20:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048490 Vs 10:20:28 Integrated Voltage Measurement... 10:20:50 Voltage Offset Correction: v_off_ini = 0.000007379 V, v_off_fin = 0.000004394 V 10:20:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974074 Vs 10:20:53 Temperature Measurement, Probe Number = 0, T = 20.148000 C 10:20:53 Temperature Measurement, Probe Number = 1, T = 20.072000 C 10:20:54 Temperature Measurement, Probe Number = 2, T = 20.133000 C 10:20:55 Temperature Measurement, Probe Number = 3, T = 20.077000 C 10:20:55 Temperature Measurement, Probe Number = 4, T = 20.532000 C 10:20:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.53 10:20:55 Integrated Voltage Measurement... 10:21:16 Voltage Offset Correction: v_off_ini = 0.000004585 V, v_off_fin = 0.000007236 V 10:21:16 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171052680 Vs 10:21:16 Integrated Voltage Measurement... 10:21:36 Voltage Offset Correction: v_off_ini = 0.000006313 V, v_off_fin = 0.000003370 V 10:21:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972650 Vs 10:51:39 Temperature Measurement, Probe Number = 0, T = 20.149000 C 10:51:39 Temperature Measurement, Probe Number = 1, T = 20.075000 C 10:51:40 Temperature Measurement, Probe Number = 2, T = 20.136000 C 10:51:41 Temperature Measurement, Probe Number = 3, T = 20.082000 C 10:51:41 Temperature Measurement, Probe Number = 4, T = 20.557000 C 10:51:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.56 10:51:42 Integrated Voltage Measurement... 10:52:02 Voltage Offset Correction: v_off_ini = 0.000005254 V, v_off_fin = 0.000006266 V 10:52:02 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171094827 Vs 10:52:02 Integrated Voltage Measurement... 10:52:22 Voltage Offset Correction: v_off_ini = 0.000005652 V, v_off_fin = 0.000002505 V 10:52:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984826 Vs 10:52:25 Temperature Measurement, Probe Number = 0, T = 20.151000 C 10:52:25 Temperature Measurement, Probe Number = 1, T = 20.074000 C 10:52:26 Temperature Measurement, Probe Number = 2, T = 20.138000 C 10:52:27 Temperature Measurement, Probe Number = 3, T = 20.084000 C 10:52:27 Temperature Measurement, Probe Number = 4, T = 20.590000 C 10:52:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.59 10:52:27 Integrated Voltage Measurement... 10:52:47 Voltage Offset Correction: v_off_ini = 0.000002744 V, v_off_fin = 0.000006187 V 10:52:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035306 Vs 10:52:47 Integrated Voltage Measurement... 10:53:07 Voltage Offset Correction: v_off_ini = 0.000005564 V, v_off_fin = 0.000002959 V 10:53:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983274 Vs 10:53:10 Temperature Measurement, Probe Number = 0, T = 20.149000 C 10:53:10 Temperature Measurement, Probe Number = 1, T = 20.073000 C 10:53:11 Temperature Measurement, Probe Number = 2, T = 20.135000 C 10:53:12 Temperature Measurement, Probe Number = 3, T = 20.082000 C 10:53:12 Temperature Measurement, Probe Number = 4, T = 20.605000 C 10:53:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.61 10:53:13 Integrated Voltage Measurement... 10:53:32 Voltage Offset Correction: v_off_ini = 0.000004441 V, v_off_fin = 0.000006710 V 10:53:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041162 Vs 10:53:32 Integrated Voltage Measurement... 10:53:52 Voltage Offset Correction: v_off_ini = 0.000006037 V, v_off_fin = 0.000003063 V 10:53:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975113 Vs 10:53:55 Temperature Measurement, Probe Number = 0, T = 20.151000 C 10:53:55 Temperature Measurement, Probe Number = 1, T = 20.077000 C 10:53:56 Temperature Measurement, Probe Number = 2, T = 20.140000 C 10:53:57 Temperature Measurement, Probe Number = 3, T = 20.085000 C 10:53:57 Temperature Measurement, Probe Number = 4, T = 20.586000 C 10:53:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.59 10:53:58 Integrated Voltage Measurement... 10:54:18 Voltage Offset Correction: v_off_ini = 0.000004190 V, v_off_fin = 0.000006791 V 10:54:18 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045985 Vs 10:54:18 Integrated Voltage Measurement... 10:54:37 Voltage Offset Correction: v_off_ini = 0.000006411 V, v_off_fin = 0.000003006 V 10:54:37 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170972543 Vs 10:54:40 Temperature Measurement, Probe Number = 0, T = 20.148000 C 10:54:40 Temperature Measurement, Probe Number = 1, T = 20.075000 C 10:54:41 Temperature Measurement, Probe Number = 2, T = 20.138000 C 10:54:42 Temperature Measurement, Probe Number = 3, T = 20.082000 C 10:54:42 Temperature Measurement, Probe Number = 4, T = 20.554000 C 10:54:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.55 10:54:43 Integrated Voltage Measurement... 10:55:02 Voltage Offset Correction: v_off_ini = 0.000004065 V, v_off_fin = 0.000006717 V 10:55:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049508 Vs 10:55:03 Integrated Voltage Measurement... 10:55:22 Voltage Offset Correction: v_off_ini = 0.000005843 V, v_off_fin = 0.000003021 V 10:55:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973793 Vs 10:55:25 Temperature Measurement, Probe Number = 0, T = 20.145000 C 10:55:26 Temperature Measurement, Probe Number = 1, T = 20.070000 C 10:55:26 Temperature Measurement, Probe Number = 2, T = 20.131000 C 10:55:27 Temperature Measurement, Probe Number = 3, T = 20.077000 C 10:55:28 Temperature Measurement, Probe Number = 4, T = 20.440000 C 10:55:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.44 10:55:28 Integrated Voltage Measurement... 10:55:47 Voltage Offset Correction: v_off_ini = 0.000003800 V, v_off_fin = 0.000006477 V 10:55:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040455 Vs 10:55:47 Integrated Voltage Measurement... 10:56:07 Voltage Offset Correction: v_off_ini = 0.000005722 V, v_off_fin = 0.000003250 V 10:56:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977970 Vs 10:56:10 Temperature Measurement, Probe Number = 0, T = 20.151000 C 10:56:11 Temperature Measurement, Probe Number = 1, T = 20.075000 C 10:56:12 Temperature Measurement, Probe Number = 2, T = 20.136000 C 10:56:12 Temperature Measurement, Probe Number = 3, T = 20.083000 C 10:56:13 Temperature Measurement, Probe Number = 4, T = 20.362000 C 10:56:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.36 10:56:13 Integrated Voltage Measurement... 10:56:32 Voltage Offset Correction: v_off_ini = 0.000004312 V, v_off_fin = 0.000006728 V 10:56:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171037959 Vs 10:56:33 Integrated Voltage Measurement... 10:56:52 Voltage Offset Correction: v_off_ini = 0.000005949 V, v_off_fin = 0.000002475 V 10:56:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981695 Vs 10:56:55 Temperature Measurement, Probe Number = 0, T = 20.151000 C 10:56:56 Temperature Measurement, Probe Number = 1, T = 20.074000 C 10:56:56 Temperature Measurement, Probe Number = 2, T = 20.136000 C 10:56:57 Temperature Measurement, Probe Number = 3, T = 20.082000 C 10:56:58 Temperature Measurement, Probe Number = 4, T = 20.446000 C 10:56:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.45 10:56:58 Integrated Voltage Measurement... 10:57:17 Voltage Offset Correction: v_off_ini = 0.000003323 V, v_off_fin = 0.000005993 V 10:57:18 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171037434 Vs 10:57:18 Integrated Voltage Measurement... 10:57:38 Voltage Offset Correction: v_off_ini = 0.000005677 V, v_off_fin = 0.000002322 V 10:57:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981734 Vs 10:57:41 Temperature Measurement, Probe Number = 0, T = 20.152000 C 10:57:41 Temperature Measurement, Probe Number = 1, T = 20.075000 C 10:57:42 Temperature Measurement, Probe Number = 2, T = 20.137000 C 10:57:43 Temperature Measurement, Probe Number = 3, T = 20.083000 C 10:57:43 Temperature Measurement, Probe Number = 4, T = 20.496000 C 10:57:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.50 10:57:44 Integrated Voltage Measurement... 10:58:04 Voltage Offset Correction: v_off_ini = 0.000003376 V, v_off_fin = 0.000005999 V 10:58:04 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171043808 Vs 10:58:05 Integrated Voltage Measurement... 10:58:24 Voltage Offset Correction: v_off_ini = 0.000005444 V, v_off_fin = 0.000002454 V 10:58:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984670 Vs 10:58:27 Temperature Measurement, Probe Number = 0, T = 20.149000 C 10:58:28 Temperature Measurement, Probe Number = 1, T = 20.070000 C 10:58:28 Temperature Measurement, Probe Number = 2, T = 20.137000 C 10:58:29 Temperature Measurement, Probe Number = 3, T = 20.080000 C 10:58:30 Temperature Measurement, Probe Number = 4, T = 20.586000 C 10:58:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.59 10:58:30 Integrated Voltage Measurement... 10:58:50 Voltage Offset Correction: v_off_ini = 0.000003132 V, v_off_fin = 0.000006718 V 10:58:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045241 Vs 10:58:51 Integrated Voltage Measurement... 10:59:10 Voltage Offset Correction: v_off_ini = 0.000005612 V, v_off_fin = 0.000003164 V 10:59:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979813 Vs 11:29:13 Temperature Measurement, Probe Number = 0, T = 20.152000 C 11:29:14 Temperature Measurement, Probe Number = 1, T = 20.076000 C 11:29:15 Temperature Measurement, Probe Number = 2, T = 20.138000 C 11:29:15 Temperature Measurement, Probe Number = 3, T = 20.084000 C 11:29:16 Temperature Measurement, Probe Number = 4, T = 20.348000 C 11:29:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.35 11:29:16 Integrated Voltage Measurement... 11:29:35 Voltage Offset Correction: v_off_ini = 0.000005445 V, v_off_fin = 0.000006820 V 11:29:35 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171110298 Vs 11:29:36 Integrated Voltage Measurement... 11:29:55 Voltage Offset Correction: v_off_ini = 0.000006424 V, v_off_fin = 0.000004295 V 11:29:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975116 Vs 11:29:58 Temperature Measurement, Probe Number = 0, T = 20.157000 C 11:29:59 Temperature Measurement, Probe Number = 1, T = 20.078000 C 11:29:59 Temperature Measurement, Probe Number = 2, T = 20.141000 C 11:30:00 Temperature Measurement, Probe Number = 3, T = 20.086000 C 11:30:01 Temperature Measurement, Probe Number = 4, T = 20.268000 C 11:30:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.27 11:30:01 Integrated Voltage Measurement... 11:30:21 Voltage Offset Correction: v_off_ini = 0.000004400 V, v_off_fin = 0.000005901 V 11:30:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041526 Vs 11:30:22 Integrated Voltage Measurement... 11:30:41 Voltage Offset Correction: v_off_ini = 0.000005524 V, v_off_fin = 0.000003365 V 11:30:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970271 Vs 11:30:44 Temperature Measurement, Probe Number = 0, T = 20.157000 C 11:30:45 Temperature Measurement, Probe Number = 1, T = 20.080000 C 11:30:46 Temperature Measurement, Probe Number = 2, T = 20.140000 C 11:30:46 Temperature Measurement, Probe Number = 3, T = 20.085000 C 11:30:47 Temperature Measurement, Probe Number = 4, T = 20.247000 C 11:30:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.25 11:30:47 Integrated Voltage Measurement... 11:31:06 Voltage Offset Correction: v_off_ini = 0.000004261 V, v_off_fin = 0.000006313 V 11:31:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036395 Vs 11:31:07 Integrated Voltage Measurement... 11:31:26 Voltage Offset Correction: v_off_ini = 0.000005621 V, v_off_fin = 0.000002409 V 11:31:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980029 Vs 11:31:29 Temperature Measurement, Probe Number = 0, T = 20.155000 C 11:31:30 Temperature Measurement, Probe Number = 1, T = 20.078000 C 11:31:31 Temperature Measurement, Probe Number = 2, T = 20.139000 C 11:31:31 Temperature Measurement, Probe Number = 3, T = 20.084000 C 11:31:32 Temperature Measurement, Probe Number = 4, T = 20.212000 C 11:31:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.21 11:31:32 Integrated Voltage Measurement... 11:31:52 Voltage Offset Correction: v_off_ini = 0.000004577 V, v_off_fin = 0.000006100 V 11:31:53 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171036913 Vs 11:31:53 Integrated Voltage Measurement... 11:32:12 Voltage Offset Correction: v_off_ini = 0.000005716 V, v_off_fin = 0.000002662 V 11:32:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979900 Vs 11:32:15 Temperature Measurement, Probe Number = 0, T = 20.154000 C 11:32:16 Temperature Measurement, Probe Number = 1, T = 20.075000 C 11:32:17 Temperature Measurement, Probe Number = 2, T = 20.136000 C 11:32:17 Temperature Measurement, Probe Number = 3, T = 20.081000 C 11:32:18 Temperature Measurement, Probe Number = 4, T = 20.265000 C 11:32:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.27 11:32:18 Integrated Voltage Measurement... 11:32:37 Voltage Offset Correction: v_off_ini = 0.000003428 V, v_off_fin = 0.000006338 V 11:32:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038221 Vs 11:32:38 Integrated Voltage Measurement... 11:32:58 Voltage Offset Correction: v_off_ini = 0.000005478 V, v_off_fin = 0.000002652 V 11:32:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977789 Vs 11:33:00 Temperature Measurement, Probe Number = 0, T = 20.155000 C 11:33:01 Temperature Measurement, Probe Number = 1, T = 20.077000 C 11:33:02 Temperature Measurement, Probe Number = 2, T = 20.140000 C 11:33:02 Temperature Measurement, Probe Number = 3, T = 20.083000 C 11:33:03 Temperature Measurement, Probe Number = 4, T = 20.280000 C 11:33:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.28 11:33:03 Integrated Voltage Measurement... 11:33:23 Voltage Offset Correction: v_off_ini = 0.000003896 V, v_off_fin = 0.000006624 V 11:33:23 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171041575 Vs 11:33:23 Integrated Voltage Measurement... 11:33:43 Voltage Offset Correction: v_off_ini = 0.000005735 V, v_off_fin = 0.000002565 V 11:33:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981708 Vs 11:33:45 Temperature Measurement, Probe Number = 0, T = 20.159000 C 11:33:46 Temperature Measurement, Probe Number = 1, T = 20.081000 C 11:33:47 Temperature Measurement, Probe Number = 2, T = 20.143000 C 11:33:47 Temperature Measurement, Probe Number = 3, T = 20.088000 C 11:33:48 Temperature Measurement, Probe Number = 4, T = 20.395000 C 11:33:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.39 11:33:48 Integrated Voltage Measurement... 11:34:08 Voltage Offset Correction: v_off_ini = 0.000004434 V, v_off_fin = 0.000006424 V 11:34:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042164 Vs 11:34:08 Integrated Voltage Measurement... 11:34:28 Voltage Offset Correction: v_off_ini = 0.000005877 V, v_off_fin = 0.000003080 V 11:34:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975006 Vs 11:34:30 Temperature Measurement, Probe Number = 0, T = 20.159000 C 11:34:31 Temperature Measurement, Probe Number = 1, T = 20.082000 C 11:34:32 Temperature Measurement, Probe Number = 2, T = 20.143000 C 11:34:32 Temperature Measurement, Probe Number = 3, T = 20.087000 C 11:34:33 Temperature Measurement, Probe Number = 4, T = 20.462000 C 11:34:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.46 11:34:33 Integrated Voltage Measurement... 11:34:53 Voltage Offset Correction: v_off_ini = 0.000003641 V, v_off_fin = 0.000007026 V 11:34:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044978 Vs 11:34:53 Integrated Voltage Measurement... 11:35:13 Voltage Offset Correction: v_off_ini = 0.000006665 V, v_off_fin = 0.000003031 V 11:35:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971200 Vs 11:35:16 Temperature Measurement, Probe Number = 0, T = 20.158000 C 11:35:16 Temperature Measurement, Probe Number = 1, T = 20.082000 C 11:35:17 Temperature Measurement, Probe Number = 2, T = 20.141000 C 11:35:18 Temperature Measurement, Probe Number = 3, T = 20.087000 C 11:35:18 Temperature Measurement, Probe Number = 4, T = 20.492000 C 11:35:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.49 11:35:19 Integrated Voltage Measurement... 11:35:38 Voltage Offset Correction: v_off_ini = 0.000003634 V, v_off_fin = 0.000006496 V 11:35:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043196 Vs 11:35:38 Integrated Voltage Measurement... 11:35:58 Voltage Offset Correction: v_off_ini = 0.000006169 V, v_off_fin = 0.000003761 V 11:35:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974022 Vs 11:36:01 Temperature Measurement, Probe Number = 0, T = 20.156000 C 11:36:01 Temperature Measurement, Probe Number = 1, T = 20.077000 C 11:36:02 Temperature Measurement, Probe Number = 2, T = 20.141000 C 11:36:03 Temperature Measurement, Probe Number = 3, T = 20.085000 C 11:36:03 Temperature Measurement, Probe Number = 4, T = 20.565000 C 11:36:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.57 11:36:03 Integrated Voltage Measurement... 11:36:24 Voltage Offset Correction: v_off_ini = 0.000003790 V, v_off_fin = 0.000006239 V 11:36:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041509 Vs 11:36:24 Integrated Voltage Measurement... 11:36:44 Voltage Offset Correction: v_off_ini = 0.000005698 V, v_off_fin = 0.000003336 V 11:36:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977768 Vs 12:06:47 Temperature Measurement, Probe Number = 0, T = 20.158000 C 12:06:48 Temperature Measurement, Probe Number = 1, T = 20.083000 C 12:06:48 Temperature Measurement, Probe Number = 2, T = 20.143000 C 12:06:49 Temperature Measurement, Probe Number = 3, T = 20.091000 C 12:06:50 Temperature Measurement, Probe Number = 4, T = 20.384000 C 12:06:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.38 12:06:50 Integrated Voltage Measurement... 12:07:10 Voltage Offset Correction: v_off_ini = 0.000004538 V, v_off_fin = 0.000007125 V 12:07:10 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171099002 Vs 12:07:10 Integrated Voltage Measurement... 12:07:30 Voltage Offset Correction: v_off_ini = 0.000006293 V, v_off_fin = 0.000002763 V 12:07:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977595 Vs 12:07:33 Temperature Measurement, Probe Number = 0, T = 20.161000 C 12:07:34 Temperature Measurement, Probe Number = 1, T = 20.085000 C 12:07:34 Temperature Measurement, Probe Number = 2, T = 20.144000 C 12:07:35 Temperature Measurement, Probe Number = 3, T = 20.090000 C 12:07:36 Temperature Measurement, Probe Number = 4, T = 20.346000 C 12:07:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.35 12:07:36 Integrated Voltage Measurement... 12:07:56 Voltage Offset Correction: v_off_ini = 0.000004277 V, v_off_fin = 0.000006723 V 12:07:57 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171036902 Vs 12:07:57 Integrated Voltage Measurement... 12:08:16 Voltage Offset Correction: v_off_ini = 0.000006011 V, v_off_fin = 0.000002913 V 12:08:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978155 Vs 12:08:19 Temperature Measurement, Probe Number = 0, T = 20.159000 C 12:08:19 Temperature Measurement, Probe Number = 1, T = 20.083000 C 12:08:20 Temperature Measurement, Probe Number = 2, T = 20.143000 C 12:08:21 Temperature Measurement, Probe Number = 3, T = 20.089000 C 12:08:21 Temperature Measurement, Probe Number = 4, T = 20.343000 C 12:08:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.34 12:08:21 Integrated Voltage Measurement... 12:08:41 Voltage Offset Correction: v_off_ini = 0.000003698 V, v_off_fin = 0.000006585 V 12:08:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046872 Vs 12:08:42 Integrated Voltage Measurement... 12:09:02 Voltage Offset Correction: v_off_ini = 0.000006048 V, v_off_fin = 0.000002643 V 12:09:02 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170976166 Vs 12:09:05 Temperature Measurement, Probe Number = 0, T = 20.159000 C 12:09:05 Temperature Measurement, Probe Number = 1, T = 20.084000 C 12:09:06 Temperature Measurement, Probe Number = 2, T = 20.144000 C 12:09:07 Temperature Measurement, Probe Number = 3, T = 20.091000 C 12:09:07 Temperature Measurement, Probe Number = 4, T = 20.314000 C 12:09:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.31 12:09:07 Integrated Voltage Measurement... 12:09:28 Voltage Offset Correction: v_off_ini = 0.000004012 V, v_off_fin = 0.000006806 V 12:09:28 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171043533 Vs 12:09:28 Integrated Voltage Measurement... 12:09:48 Voltage Offset Correction: v_off_ini = 0.000006566 V, v_off_fin = 0.000003395 V 12:09:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974859 Vs 12:09:51 Temperature Measurement, Probe Number = 0, T = 20.163000 C 12:09:51 Temperature Measurement, Probe Number = 1, T = 20.088000 C 12:09:52 Temperature Measurement, Probe Number = 2, T = 20.148000 C 12:09:53 Temperature Measurement, Probe Number = 3, T = 20.094000 C 12:09:53 Temperature Measurement, Probe Number = 4, T = 20.376000 C 12:09:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.38 12:09:54 Integrated Voltage Measurement... 12:10:13 Voltage Offset Correction: v_off_ini = 0.000004667 V, v_off_fin = 0.000006503 V 12:10:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043657 Vs 12:10:13 Integrated Voltage Measurement... 12:10:33 Voltage Offset Correction: v_off_ini = 0.000005967 V, v_off_fin = 0.000003308 V 12:10:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974701 Vs 12:10:36 Temperature Measurement, Probe Number = 0, T = 20.162000 C 12:10:36 Temperature Measurement, Probe Number = 1, T = 20.087000 C 12:10:37 Temperature Measurement, Probe Number = 2, T = 20.146000 C 12:10:38 Temperature Measurement, Probe Number = 3, T = 20.094000 C 12:10:38 Temperature Measurement, Probe Number = 4, T = 20.485000 C 12:10:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.48 12:10:39 Integrated Voltage Measurement... 12:10:59 Voltage Offset Correction: v_off_ini = 0.000004184 V, v_off_fin = 0.000006572 V 12:10:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041644 Vs 12:10:59 Integrated Voltage Measurement... 12:11:19 Voltage Offset Correction: v_off_ini = 0.000006051 V, v_off_fin = 0.000002504 V 12:11:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974823 Vs 12:11:22 Temperature Measurement, Probe Number = 0, T = 20.160000 C 12:11:22 Temperature Measurement, Probe Number = 1, T = 20.085000 C 12:11:23 Temperature Measurement, Probe Number = 2, T = 20.146000 C 12:11:24 Temperature Measurement, Probe Number = 3, T = 20.093000 C 12:11:24 Temperature Measurement, Probe Number = 4, T = 20.535000 C 12:11:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.54 12:11:25 Integrated Voltage Measurement... 12:11:44 Voltage Offset Correction: v_off_ini = 0.000003985 V, v_off_fin = 0.000006816 V 12:11:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041556 Vs 12:11:45 Integrated Voltage Measurement... 12:12:04 Voltage Offset Correction: v_off_ini = 0.000005952 V, v_off_fin = 0.000002206 V 12:12:04 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982216 Vs 12:12:07 Temperature Measurement, Probe Number = 0, T = 20.159000 C 12:12:08 Temperature Measurement, Probe Number = 1, T = 20.087000 C 12:12:08 Temperature Measurement, Probe Number = 2, T = 20.144000 C 12:12:09 Temperature Measurement, Probe Number = 3, T = 20.092000 C 12:12:10 Temperature Measurement, Probe Number = 4, T = 20.534000 C 12:12:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.53 12:12:10 Integrated Voltage Measurement... 12:12:29 Voltage Offset Correction: v_off_ini = 0.000003657 V, v_off_fin = 0.000006309 V 12:12:29 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171040678 Vs 12:12:30 Integrated Voltage Measurement... 12:12:49 Voltage Offset Correction: v_off_ini = 0.000005864 V, v_off_fin = 0.000002888 V 12:12:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978265 Vs 12:12:52 Temperature Measurement, Probe Number = 0, T = 20.161000 C 12:12:53 Temperature Measurement, Probe Number = 1, T = 20.087000 C 12:12:53 Temperature Measurement, Probe Number = 2, T = 20.147000 C 12:12:54 Temperature Measurement, Probe Number = 3, T = 20.094000 C 12:12:55 Temperature Measurement, Probe Number = 4, T = 20.514000 C 12:12:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.51 12:12:55 Integrated Voltage Measurement... 12:13:14 Voltage Offset Correction: v_off_ini = 0.000003600 V, v_off_fin = 0.000006526 V 12:13:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038860 Vs 12:13:15 Integrated Voltage Measurement... 12:13:34 Voltage Offset Correction: v_off_ini = 0.000006000 V, v_off_fin = 0.000002741 V 12:13:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980009 Vs 12:13:37 Temperature Measurement, Probe Number = 0, T = 20.163000 C 12:13:38 Temperature Measurement, Probe Number = 1, T = 20.090000 C 12:13:38 Temperature Measurement, Probe Number = 2, T = 20.149000 C 12:13:39 Temperature Measurement, Probe Number = 3, T = 20.097000 C 12:13:40 Temperature Measurement, Probe Number = 4, T = 20.412000 C 12:13:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 12:13:40 Integrated Voltage Measurement... 12:13:59 Voltage Offset Correction: v_off_ini = 0.000004113 V, v_off_fin = 0.000006336 V 12:14:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043525 Vs 12:14:00 Integrated Voltage Measurement... 12:14:20 Voltage Offset Correction: v_off_ini = 0.000005709 V, v_off_fin = 0.000002470 V 12:14:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992773 Vs 12:44:23 Temperature Measurement, Probe Number = 0, T = 20.157000 C 12:44:24 Temperature Measurement, Probe Number = 1, T = 20.083000 C 12:44:25 Temperature Measurement, Probe Number = 2, T = 20.144000 C 12:44:25 Temperature Measurement, Probe Number = 3, T = 20.088000 C 12:44:26 Temperature Measurement, Probe Number = 4, T = 20.279000 C 12:44:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.28 12:44:26 Integrated Voltage Measurement... 12:44:46 Voltage Offset Correction: v_off_ini = 0.000005350 V, v_off_fin = 0.000006744 V 12:44:46 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171087125 Vs 12:44:46 Integrated Voltage Measurement... 12:45:06 Voltage Offset Correction: v_off_ini = 0.000005863 V, v_off_fin = 0.000003279 V 12:45:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977676 Vs 12:45:09 Temperature Measurement, Probe Number = 0, T = 20.161000 C 12:45:10 Temperature Measurement, Probe Number = 1, T = 20.086000 C 12:45:11 Temperature Measurement, Probe Number = 2, T = 20.142000 C 12:45:11 Temperature Measurement, Probe Number = 3, T = 20.089000 C 12:45:12 Temperature Measurement, Probe Number = 4, T = 20.284000 C 12:45:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.28 12:45:12 Integrated Voltage Measurement... 12:45:31 Voltage Offset Correction: v_off_ini = 0.000004089 V, v_off_fin = 0.000006889 V 12:45:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040532 Vs 12:45:32 Integrated Voltage Measurement... 12:45:52 Voltage Offset Correction: v_off_ini = 0.000005708 V, v_off_fin = 0.000002393 V 12:45:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981765 Vs 12:45:55 Temperature Measurement, Probe Number = 0, T = 20.160000 C 12:45:56 Temperature Measurement, Probe Number = 1, T = 20.086000 C 12:45:56 Temperature Measurement, Probe Number = 2, T = 20.142000 C 12:45:57 Temperature Measurement, Probe Number = 3, T = 20.087000 C 12:45:58 Temperature Measurement, Probe Number = 4, T = 20.296000 C 12:45:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.30 12:45:58 Integrated Voltage Measurement... 12:46:18 Voltage Offset Correction: v_off_ini = 0.000003665 V, v_off_fin = 0.000006501 V 12:46:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038082 Vs 12:46:18 Integrated Voltage Measurement... 12:46:38 Voltage Offset Correction: v_off_ini = 0.000005637 V, v_off_fin = 0.000002802 V 12:46:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987044 Vs 12:46:41 Temperature Measurement, Probe Number = 0, T = 20.154000 C 12:46:42 Temperature Measurement, Probe Number = 1, T = 20.081000 C 12:46:42 Temperature Measurement, Probe Number = 2, T = 20.138000 C 12:46:43 Temperature Measurement, Probe Number = 3, T = 20.085000 C 12:46:44 Temperature Measurement, Probe Number = 4, T = 20.250000 C 12:46:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.25 12:46:44 Integrated Voltage Measurement... 12:47:03 Voltage Offset Correction: v_off_ini = 0.000004068 V, v_off_fin = 0.000006304 V 12:47:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171041386 Vs 12:47:04 Integrated Voltage Measurement... 12:47:24 Voltage Offset Correction: v_off_ini = 0.000006000 V, v_off_fin = 0.000002091 V 12:47:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981501 Vs 12:47:26 Temperature Measurement, Probe Number = 0, T = 20.157000 C 12:47:27 Temperature Measurement, Probe Number = 1, T = 20.081000 C 12:47:28 Temperature Measurement, Probe Number = 2, T = 20.139000 C 12:47:28 Temperature Measurement, Probe Number = 3, T = 20.085000 C 12:47:29 Temperature Measurement, Probe Number = 4, T = 20.143000 C 12:47:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.14 12:47:29 Integrated Voltage Measurement... 12:47:49 Voltage Offset Correction: v_off_ini = 0.000003559 V, v_off_fin = 0.000006201 V 12:47:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038374 Vs 12:47:49 Integrated Voltage Measurement... 12:48:09 Voltage Offset Correction: v_off_ini = 0.000005658 V, v_off_fin = 0.000002474 V 12:48:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977260 Vs 12:48:12 Temperature Measurement, Probe Number = 0, T = 20.161000 C 12:48:12 Temperature Measurement, Probe Number = 1, T = 20.087000 C 12:48:13 Temperature Measurement, Probe Number = 2, T = 20.145000 C 12:48:14 Temperature Measurement, Probe Number = 3, T = 20.091000 C 12:48:14 Temperature Measurement, Probe Number = 4, T = 20.233000 C 12:48:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.23 12:48:15 Integrated Voltage Measurement... 12:48:35 Voltage Offset Correction: v_off_ini = 0.000003362 V, v_off_fin = 0.000006793 V 12:48:36 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171044721 Vs 12:48:36 Integrated Voltage Measurement... 12:48:56 Voltage Offset Correction: v_off_ini = 0.000005513 V, v_off_fin = 0.000003013 V 12:48:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974740 Vs 12:48:58 Temperature Measurement, Probe Number = 0, T = 20.161000 C 12:48:59 Temperature Measurement, Probe Number = 1, T = 20.088000 C 12:49:00 Temperature Measurement, Probe Number = 2, T = 20.143000 C 12:49:00 Temperature Measurement, Probe Number = 3, T = 20.090000 C 12:49:01 Temperature Measurement, Probe Number = 4, T = 20.272000 C 12:49:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.27 12:49:01 Integrated Voltage Measurement... 12:49:21 Voltage Offset Correction: v_off_ini = 0.000003672 V, v_off_fin = 0.000006151 V 12:49:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171038818 Vs 12:49:21 Integrated Voltage Measurement... 12:49:41 Voltage Offset Correction: v_off_ini = 0.000005453 V, v_off_fin = 0.000002327 V 12:49:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983285 Vs 12:49:44 Temperature Measurement, Probe Number = 0, T = 20.161000 C 12:49:44 Temperature Measurement, Probe Number = 1, T = 20.088000 C 12:49:45 Temperature Measurement, Probe Number = 2, T = 20.144000 C 12:49:46 Temperature Measurement, Probe Number = 3, T = 20.090000 C 12:49:46 Temperature Measurement, Probe Number = 4, T = 20.218000 C 12:49:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.22 12:49:46 Integrated Voltage Measurement... 12:50:07 Voltage Offset Correction: v_off_ini = 0.000004002 V, v_off_fin = 0.000005492 V 12:50:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039257 Vs 12:50:07 Integrated Voltage Measurement... 12:50:27 Voltage Offset Correction: v_off_ini = 0.000005138 V, v_off_fin = 0.000002524 V 12:50:28 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170983462 Vs 12:50:30 Temperature Measurement, Probe Number = 0, T = 20.164000 C 12:50:31 Temperature Measurement, Probe Number = 1, T = 20.089000 C 12:50:32 Temperature Measurement, Probe Number = 2, T = 20.145000 C 12:50:32 Temperature Measurement, Probe Number = 3, T = 20.090000 C 12:50:33 Temperature Measurement, Probe Number = 4, T = 20.134000 C 12:50:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.13 12:50:33 Integrated Voltage Measurement... 12:50:53 Voltage Offset Correction: v_off_ini = 0.000003986 V, v_off_fin = 0.000006601 V 12:50:53 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171040345 Vs 12:50:53 Integrated Voltage Measurement... 12:51:13 Voltage Offset Correction: v_off_ini = 0.000005760 V, v_off_fin = 0.000003162 V 12:51:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977471 Vs 12:51:16 Temperature Measurement, Probe Number = 0, T = 20.163000 C 12:51:16 Temperature Measurement, Probe Number = 1, T = 20.089000 C 12:51:17 Temperature Measurement, Probe Number = 2, T = 20.144000 C 12:51:18 Temperature Measurement, Probe Number = 3, T = 20.089000 C 12:51:18 Temperature Measurement, Probe Number = 4, T = 20.155000 C 12:51:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.16 12:51:18 Integrated Voltage Measurement... 12:51:38 Voltage Offset Correction: v_off_ini = 0.000003848 V, v_off_fin = 0.000006669 V 12:51:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171038942 Vs 12:51:38 Integrated Voltage Measurement... 12:51:59 Voltage Offset Correction: v_off_ini = 0.000006012 V, v_off_fin = 0.000002322 V 12:51:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983865 Vs 13:22:02 Temperature Measurement, Probe Number = 0, T = 20.160000 C 13:22:02 Temperature Measurement, Probe Number = 1, T = 20.084000 C 13:22:03 Temperature Measurement, Probe Number = 2, T = 20.147000 C 13:22:04 Temperature Measurement, Probe Number = 3, T = 20.093000 C 13:22:04 Temperature Measurement, Probe Number = 4, T = 20.390000 C 13:22:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.39 13:22:05 Integrated Voltage Measurement... 13:22:24 Voltage Offset Correction: v_off_ini = 0.000005536 V, v_off_fin = 0.000007250 V 13:22:24 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171094136 Vs 13:22:24 Integrated Voltage Measurement... 13:22:43 Voltage Offset Correction: v_off_ini = 0.000006768 V, v_off_fin = 0.000003702 V 13:22:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975301 Vs 13:22:46 Temperature Measurement, Probe Number = 0, T = 20.159000 C 13:22:47 Temperature Measurement, Probe Number = 1, T = 20.086000 C 13:22:48 Temperature Measurement, Probe Number = 2, T = 20.146000 C 13:22:48 Temperature Measurement, Probe Number = 3, T = 20.093000 C 13:22:49 Temperature Measurement, Probe Number = 4, T = 20.336000 C 13:22:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.34 13:22:49 Integrated Voltage Measurement... 13:23:09 Voltage Offset Correction: v_off_ini = 0.000004396 V, v_off_fin = 0.000006870 V 13:23:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171056569 Vs 13:23:09 Integrated Voltage Measurement... 13:23:28 Voltage Offset Correction: v_off_ini = 0.000006302 V, v_off_fin = 0.000002195 V 13:23:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170974613 Vs 13:23:31 Temperature Measurement, Probe Number = 0, T = 20.158000 C 13:23:32 Temperature Measurement, Probe Number = 1, T = 20.081000 C 13:23:33 Temperature Measurement, Probe Number = 2, T = 20.145000 C 13:23:33 Temperature Measurement, Probe Number = 3, T = 20.089000 C 13:23:34 Temperature Measurement, Probe Number = 4, T = 20.261000 C 13:23:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.26 13:23:34 Integrated Voltage Measurement... 13:23:54 Voltage Offset Correction: v_off_ini = 0.000004100 V, v_off_fin = 0.000006527 V 13:23:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053394 Vs 13:23:54 Integrated Voltage Measurement... 13:24:13 Voltage Offset Correction: v_off_ini = 0.000007100 V, v_off_fin = 0.000003012 V 13:24:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975550 Vs 13:24:16 Temperature Measurement, Probe Number = 0, T = 20.163000 C 13:24:17 Temperature Measurement, Probe Number = 1, T = 20.087000 C 13:24:18 Temperature Measurement, Probe Number = 2, T = 20.149000 C 13:24:18 Temperature Measurement, Probe Number = 3, T = 20.094000 C 13:24:19 Temperature Measurement, Probe Number = 4, T = 20.337000 C 13:24:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.34 13:24:19 Integrated Voltage Measurement... 13:24:38 Voltage Offset Correction: v_off_ini = 0.000004092 V, v_off_fin = 0.000007170 V 13:24:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053277 Vs 13:24:39 Integrated Voltage Measurement... 13:24:58 Voltage Offset Correction: v_off_ini = 0.000006662 V, v_off_fin = 0.000002807 V 13:24:58 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975002 Vs 13:25:01 Temperature Measurement, Probe Number = 0, T = 20.163000 C 13:25:01 Temperature Measurement, Probe Number = 1, T = 20.088000 C 13:25:02 Temperature Measurement, Probe Number = 2, T = 20.147000 C 13:25:03 Temperature Measurement, Probe Number = 3, T = 20.092000 C 13:25:03 Temperature Measurement, Probe Number = 4, T = 20.353000 C 13:25:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.35 13:25:04 Integrated Voltage Measurement... 13:25:23 Voltage Offset Correction: v_off_ini = 0.000003496 V, v_off_fin = 0.000006603 V 13:25:23 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171050196 Vs 13:25:23 Integrated Voltage Measurement... 13:25:42 Voltage Offset Correction: v_off_ini = 0.000005927 V, v_off_fin = 0.000002263 V 13:25:43 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980824 Vs 13:25:45 Temperature Measurement, Probe Number = 0, T = 20.163000 C 13:25:46 Temperature Measurement, Probe Number = 1, T = 20.086000 C 13:25:47 Temperature Measurement, Probe Number = 2, T = 20.146000 C 13:25:47 Temperature Measurement, Probe Number = 3, T = 20.090000 C 13:25:48 Temperature Measurement, Probe Number = 4, T = 20.342000 C 13:25:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.34 13:25:48 Integrated Voltage Measurement... 13:26:08 Voltage Offset Correction: v_off_ini = 0.000004549 V, v_off_fin = 0.000007057 V 13:26:08 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171055831 Vs 13:26:08 Integrated Voltage Measurement... 13:26:27 Voltage Offset Correction: v_off_ini = 0.000006605 V, v_off_fin = 0.000003054 V 13:26:27 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977193 Vs 13:26:30 Temperature Measurement, Probe Number = 0, T = 20.163000 C 13:26:31 Temperature Measurement, Probe Number = 1, T = 20.088000 C 13:26:31 Temperature Measurement, Probe Number = 2, T = 20.146000 C 13:26:32 Temperature Measurement, Probe Number = 3, T = 20.093000 C 13:26:33 Temperature Measurement, Probe Number = 4, T = 20.378000 C 13:26:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.38 13:26:33 Integrated Voltage Measurement... 13:26:52 Voltage Offset Correction: v_off_ini = 0.000004021 V, v_off_fin = 0.000007148 V 13:26:52 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171056716 Vs 13:26:52 Integrated Voltage Measurement... 13:27:12 Voltage Offset Correction: v_off_ini = 0.000006261 V, v_off_fin = 0.000003388 V 13:27:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978027 Vs 13:27:15 Temperature Measurement, Probe Number = 0, T = 20.166000 C 13:27:15 Temperature Measurement, Probe Number = 1, T = 20.091000 C 13:27:16 Temperature Measurement, Probe Number = 2, T = 20.150000 C 13:27:17 Temperature Measurement, Probe Number = 3, T = 20.095000 C 13:27:17 Temperature Measurement, Probe Number = 4, T = 20.441000 C 13:27:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.44 13:27:17 Integrated Voltage Measurement... 13:27:37 Voltage Offset Correction: v_off_ini = 0.000004650 V, v_off_fin = 0.000006246 V 13:27:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053355 Vs 13:27:37 Integrated Voltage Measurement... 13:27:57 Voltage Offset Correction: v_off_ini = 0.000006357 V, v_off_fin = 0.000003303 V 13:27:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978178 Vs 13:28:00 Temperature Measurement, Probe Number = 0, T = 20.164000 C 13:28:00 Temperature Measurement, Probe Number = 1, T = 20.087000 C 13:28:01 Temperature Measurement, Probe Number = 2, T = 20.148000 C 13:28:02 Temperature Measurement, Probe Number = 3, T = 20.093000 C 13:28:02 Temperature Measurement, Probe Number = 4, T = 20.519000 C 13:28:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.52 13:28:02 Integrated Voltage Measurement... 13:28:22 Voltage Offset Correction: v_off_ini = 0.000004767 V, v_off_fin = 0.000007196 V 13:28:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057049 Vs 13:28:22 Integrated Voltage Measurement... 13:28:42 Voltage Offset Correction: v_off_ini = 0.000006032 V, v_off_fin = 0.000002507 V 13:28:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974112 Vs 13:28:45 Temperature Measurement, Probe Number = 0, T = 20.166000 C 13:28:45 Temperature Measurement, Probe Number = 1, T = 20.089000 C 13:28:46 Temperature Measurement, Probe Number = 2, T = 20.149000 C 13:28:47 Temperature Measurement, Probe Number = 3, T = 20.095000 C 13:28:47 Temperature Measurement, Probe Number = 4, T = 20.498000 C 13:28:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.50 13:28:48 Integrated Voltage Measurement... 13:29:07 Voltage Offset Correction: v_off_ini = 0.000003420 V, v_off_fin = 0.000006073 V 13:29:07 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050609 Vs 13:29:07 Integrated Voltage Measurement... 13:29:27 Voltage Offset Correction: v_off_ini = 0.000005895 V, v_off_fin = 0.000002261 V 13:29:27 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982032 Vs 13:59:29 Temperature Measurement, Probe Number = 0, T = 20.173000 C 13:59:30 Temperature Measurement, Probe Number = 1, T = 20.095000 C 13:59:31 Temperature Measurement, Probe Number = 2, T = 20.156000 C 13:59:31 Temperature Measurement, Probe Number = 3, T = 20.101000 C 13:59:32 Temperature Measurement, Probe Number = 4, T = 20.298000 C 13:59:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.30 13:59:32 Integrated Voltage Measurement... 13:59:52 Voltage Offset Correction: v_off_ini = 0.000005002 V, v_off_fin = 0.000006339 V 13:59:52 Integrated Voltage Measurement Delta Gap = 0.0040020 m VT = 0.171113320 Vs 13:59:52 Integrated Voltage Measurement... 14:00:12 Voltage Offset Correction: v_off_ini = 0.000006431 V, v_off_fin = 0.000003275 V 14:00:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981160 Vs 14:00:15 Temperature Measurement, Probe Number = 0, T = 20.176000 C 14:00:15 Temperature Measurement, Probe Number = 1, T = 20.099000 C 14:00:16 Temperature Measurement, Probe Number = 2, T = 20.157000 C 14:00:17 Temperature Measurement, Probe Number = 3, T = 20.102000 C 14:00:17 Temperature Measurement, Probe Number = 4, T = 20.365000 C 14:00:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.36 14:00:18 Integrated Voltage Measurement... 14:00:37 Voltage Offset Correction: v_off_ini = 0.000004134 V, v_off_fin = 0.000007522 V 14:00:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050563 Vs 14:00:37 Integrated Voltage Measurement... 14:00:57 Voltage Offset Correction: v_off_ini = 0.000006550 V, v_off_fin = 0.000002907 V 14:00:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980660 Vs 14:01:00 Temperature Measurement, Probe Number = 0, T = 20.175000 C 14:01:00 Temperature Measurement, Probe Number = 1, T = 20.098000 C 14:01:01 Temperature Measurement, Probe Number = 2, T = 20.161000 C 14:01:02 Temperature Measurement, Probe Number = 3, T = 20.104000 C 14:01:02 Temperature Measurement, Probe Number = 4, T = 20.369000 C 14:01:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.37 14:01:02 Integrated Voltage Measurement... 14:01:22 Voltage Offset Correction: v_off_ini = 0.000004418 V, v_off_fin = 0.000006939 V 14:01:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058719 Vs 14:01:22 Integrated Voltage Measurement... 14:01:41 Voltage Offset Correction: v_off_ini = 0.000006070 V, v_off_fin = 0.000003365 V 14:01:41 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170976807 Vs 14:01:44 Temperature Measurement, Probe Number = 0, T = 20.172000 C 14:01:45 Temperature Measurement, Probe Number = 1, T = 20.097000 C 14:01:45 Temperature Measurement, Probe Number = 2, T = 20.156000 C 14:01:46 Temperature Measurement, Probe Number = 3, T = 20.100000 C 14:01:47 Temperature Measurement, Probe Number = 4, T = 20.371000 C 14:01:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.37 14:01:47 Integrated Voltage Measurement... 14:02:06 Voltage Offset Correction: v_off_ini = 0.000004809 V, v_off_fin = 0.000005990 V 14:02:06 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171053501 Vs 14:02:06 Integrated Voltage Measurement... 14:02:25 Voltage Offset Correction: v_off_ini = 0.000005918 V, v_off_fin = 0.000002667 V 14:02:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981033 Vs 14:02:28 Temperature Measurement, Probe Number = 0, T = 20.175000 C 14:02:29 Temperature Measurement, Probe Number = 1, T = 20.098000 C 14:02:29 Temperature Measurement, Probe Number = 2, T = 20.161000 C 14:02:30 Temperature Measurement, Probe Number = 3, T = 20.103000 C 14:02:31 Temperature Measurement, Probe Number = 4, T = 20.421000 C 14:02:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.42 14:02:31 Integrated Voltage Measurement... 14:02:51 Voltage Offset Correction: v_off_ini = 0.000003665 V, v_off_fin = 0.000006658 V 14:02:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046560 Vs 14:02:51 Integrated Voltage Measurement... 14:03:10 Voltage Offset Correction: v_off_ini = 0.000005555 V, v_off_fin = 0.000002679 V 14:03:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987493 Vs 14:03:13 Temperature Measurement, Probe Number = 0, T = 20.178000 C 14:03:14 Temperature Measurement, Probe Number = 1, T = 20.100000 C 14:03:14 Temperature Measurement, Probe Number = 2, T = 20.163000 C 14:03:15 Temperature Measurement, Probe Number = 3, T = 20.105000 C 14:03:16 Temperature Measurement, Probe Number = 4, T = 20.459000 C 14:03:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.46 14:03:16 Integrated Voltage Measurement... 14:03:35 Voltage Offset Correction: v_off_ini = 0.000004073 V, v_off_fin = 0.000006689 V 14:03:35 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052157 Vs 14:03:35 Integrated Voltage Measurement... 14:03:54 Voltage Offset Correction: v_off_ini = 0.000006181 V, v_off_fin = 0.000002622 V 14:03:55 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981242 Vs 14:03:57 Temperature Measurement, Probe Number = 0, T = 20.179000 C 14:03:58 Temperature Measurement, Probe Number = 1, T = 20.102000 C 14:03:59 Temperature Measurement, Probe Number = 2, T = 20.162000 C 14:03:59 Temperature Measurement, Probe Number = 3, T = 20.109000 C 14:04:00 Temperature Measurement, Probe Number = 4, T = 20.456000 C 14:04:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.46 14:04:00 Integrated Voltage Measurement... 14:04:19 Voltage Offset Correction: v_off_ini = 0.000004002 V, v_off_fin = 0.000006885 V 14:04:20 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171059567 Vs 14:04:20 Integrated Voltage Measurement... 14:04:39 Voltage Offset Correction: v_off_ini = 0.000006475 V, v_off_fin = 0.000002561 V 14:04:39 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981791 Vs 14:04:42 Temperature Measurement, Probe Number = 0, T = 20.177000 C 14:04:43 Temperature Measurement, Probe Number = 1, T = 20.098000 C 14:04:43 Temperature Measurement, Probe Number = 2, T = 20.162000 C 14:04:44 Temperature Measurement, Probe Number = 3, T = 20.107000 C 14:04:45 Temperature Measurement, Probe Number = 4, T = 20.515000 C 14:04:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.52 14:04:45 Integrated Voltage Measurement... 14:05:04 Voltage Offset Correction: v_off_ini = 0.000004068 V, v_off_fin = 0.000006565 V 14:05:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054441 Vs 14:05:05 Integrated Voltage Measurement... 14:05:24 Voltage Offset Correction: v_off_ini = 0.000006214 V, v_off_fin = 0.000003092 V 14:05:24 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980493 Vs 14:05:27 Temperature Measurement, Probe Number = 0, T = 20.179000 C 14:05:27 Temperature Measurement, Probe Number = 1, T = 20.103000 C 14:05:28 Temperature Measurement, Probe Number = 2, T = 20.159000 C 14:05:29 Temperature Measurement, Probe Number = 3, T = 20.106000 C 14:05:29 Temperature Measurement, Probe Number = 4, T = 20.451000 C 14:05:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.45 14:05:29 Integrated Voltage Measurement... 14:05:49 Voltage Offset Correction: v_off_ini = 0.000004380 V, v_off_fin = 0.000006711 V 14:05:49 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053434 Vs 14:05:49 Integrated Voltage Measurement... 14:06:08 Voltage Offset Correction: v_off_ini = 0.000006389 V, v_off_fin = 0.000002356 V 14:06:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978648 Vs 14:06:11 Temperature Measurement, Probe Number = 0, T = 20.173000 C 14:06:12 Temperature Measurement, Probe Number = 1, T = 20.096000 C 14:06:13 Temperature Measurement, Probe Number = 2, T = 20.158000 C 14:06:13 Temperature Measurement, Probe Number = 3, T = 20.102000 C 14:06:14 Temperature Measurement, Probe Number = 4, T = 20.531000 C 14:06:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.53 14:06:14 Integrated Voltage Measurement... 14:06:33 Voltage Offset Correction: v_off_ini = 0.000003908 V, v_off_fin = 0.000006038 V 14:06:34 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044894 Vs 14:06:34 Integrated Voltage Measurement... 14:06:54 Voltage Offset Correction: v_off_ini = 0.000006083 V, v_off_fin = 0.000002788 V 14:06:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985264 Vs 14:36:57 Temperature Measurement, Probe Number = 0, T = 20.176000 C 14:36:57 Temperature Measurement, Probe Number = 1, T = 20.100000 C 14:36:58 Temperature Measurement, Probe Number = 2, T = 20.163000 C 14:36:59 Temperature Measurement, Probe Number = 3, T = 20.108000 C 14:36:59 Temperature Measurement, Probe Number = 4, T = 20.516000 C 14:36:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.52 14:37:00 Integrated Voltage Measurement... 14:37:19 Voltage Offset Correction: v_off_ini = 0.000005222 V, v_off_fin = 0.000006743 V 14:37:20 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171094522 Vs 14:37:20 Integrated Voltage Measurement... 14:37:39 Voltage Offset Correction: v_off_ini = 0.000006434 V, v_off_fin = 0.000003306 V 14:37:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976722 Vs 14:37:42 Temperature Measurement, Probe Number = 0, T = 20.177000 C 14:37:43 Temperature Measurement, Probe Number = 1, T = 20.102000 C 14:37:43 Temperature Measurement, Probe Number = 2, T = 20.163000 C 14:37:44 Temperature Measurement, Probe Number = 3, T = 20.110000 C 14:37:45 Temperature Measurement, Probe Number = 4, T = 20.523000 C 14:37:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.52 14:37:45 Integrated Voltage Measurement... 14:38:04 Voltage Offset Correction: v_off_ini = 0.000004561 V, v_off_fin = 0.000006362 V 14:38:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044439 Vs 14:38:04 Integrated Voltage Measurement... 14:38:23 Voltage Offset Correction: v_off_ini = 0.000006398 V, v_off_fin = 0.000003165 V 14:38:23 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170978428 Vs 14:38:26 Temperature Measurement, Probe Number = 0, T = 20.183000 C 14:38:27 Temperature Measurement, Probe Number = 1, T = 20.105000 C 14:38:27 Temperature Measurement, Probe Number = 2, T = 20.167000 C 14:38:28 Temperature Measurement, Probe Number = 3, T = 20.114000 C 14:38:29 Temperature Measurement, Probe Number = 4, T = 20.540000 C 14:38:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.54 14:38:29 Integrated Voltage Measurement... 14:38:48 Voltage Offset Correction: v_off_ini = 0.000003807 V, v_off_fin = 0.000006398 V 14:38:49 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044290 Vs 14:38:49 Integrated Voltage Measurement... 14:39:08 Voltage Offset Correction: v_off_ini = 0.000006416 V, v_off_fin = 0.000003234 V 14:39:08 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170976231 Vs 14:39:11 Temperature Measurement, Probe Number = 0, T = 20.181000 C 14:39:11 Temperature Measurement, Probe Number = 1, T = 20.106000 C 14:39:12 Temperature Measurement, Probe Number = 2, T = 20.166000 C 14:39:13 Temperature Measurement, Probe Number = 3, T = 20.112000 C 14:39:13 Temperature Measurement, Probe Number = 4, T = 20.501000 C 14:39:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.50 14:39:14 Integrated Voltage Measurement... 14:39:33 Voltage Offset Correction: v_off_ini = 0.000004233 V, v_off_fin = 0.000006958 V 14:39:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042307 Vs 14:39:33 Integrated Voltage Measurement... 14:39:52 Voltage Offset Correction: v_off_ini = 0.000005595 V, v_off_fin = 0.000003055 V 14:39:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977436 Vs 14:39:55 Temperature Measurement, Probe Number = 0, T = 20.178000 C 14:39:56 Temperature Measurement, Probe Number = 1, T = 20.104000 C 14:39:57 Temperature Measurement, Probe Number = 2, T = 20.161000 C 14:39:57 Temperature Measurement, Probe Number = 3, T = 20.109000 C 14:39:58 Temperature Measurement, Probe Number = 4, T = 20.421000 C 14:39:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.42 14:39:58 Integrated Voltage Measurement... 14:40:18 Voltage Offset Correction: v_off_ini = 0.000004036 V, v_off_fin = 0.000006597 V 14:40:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043543 Vs 14:40:18 Integrated Voltage Measurement... 14:40:37 Voltage Offset Correction: v_off_ini = 0.000006096 V, v_off_fin = 0.000002458 V 14:40:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977618 Vs 14:40:40 Temperature Measurement, Probe Number = 0, T = 20.176000 C 14:40:41 Temperature Measurement, Probe Number = 1, T = 20.101000 C 14:40:42 Temperature Measurement, Probe Number = 2, T = 20.159000 C 14:40:42 Temperature Measurement, Probe Number = 3, T = 20.107000 C 14:40:43 Temperature Measurement, Probe Number = 4, T = 20.321000 C 14:40:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.32 14:40:43 Integrated Voltage Measurement... 14:41:03 Voltage Offset Correction: v_off_ini = 0.000004120 V, v_off_fin = 0.000006415 V 14:41:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040986 Vs 14:41:03 Integrated Voltage Measurement... 14:41:22 Voltage Offset Correction: v_off_ini = 0.000005865 V, v_off_fin = 0.000002813 V 14:41:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977047 Vs 14:41:25 Temperature Measurement, Probe Number = 0, T = 20.179000 C 14:41:26 Temperature Measurement, Probe Number = 1, T = 20.103000 C 14:41:27 Temperature Measurement, Probe Number = 2, T = 20.161000 C 14:41:27 Temperature Measurement, Probe Number = 3, T = 20.108000 C 14:41:28 Temperature Measurement, Probe Number = 4, T = 20.230000 C 14:41:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.23 14:41:28 Integrated Voltage Measurement... 14:41:47 Voltage Offset Correction: v_off_ini = 0.000004427 V, v_off_fin = 0.000006864 V 14:41:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171039254 Vs 14:41:48 Integrated Voltage Measurement... 14:42:07 Voltage Offset Correction: v_off_ini = 0.000006247 V, v_off_fin = 0.000003187 V 14:42:07 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170973122 Vs 14:42:10 Temperature Measurement, Probe Number = 0, T = 20.183000 C 14:42:10 Temperature Measurement, Probe Number = 1, T = 20.106000 C 14:42:11 Temperature Measurement, Probe Number = 2, T = 20.164000 C 14:42:12 Temperature Measurement, Probe Number = 3, T = 20.110000 C 14:42:12 Temperature Measurement, Probe Number = 4, T = 20.166000 C 14:42:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.17 14:42:13 Integrated Voltage Measurement... 14:42:32 Voltage Offset Correction: v_off_ini = 0.000003865 V, v_off_fin = 0.000006541 V 14:42:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045111 Vs 14:42:32 Integrated Voltage Measurement... 14:42:52 Voltage Offset Correction: v_off_ini = 0.000006336 V, v_off_fin = 0.000002933 V 14:42:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976157 Vs 14:42:55 Temperature Measurement, Probe Number = 0, T = 20.182000 C 14:42:55 Temperature Measurement, Probe Number = 1, T = 20.106000 C 14:42:56 Temperature Measurement, Probe Number = 2, T = 20.165000 C 14:42:57 Temperature Measurement, Probe Number = 3, T = 20.113000 C 14:42:57 Temperature Measurement, Probe Number = 4, T = 20.292000 C 14:42:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.29 14:42:58 Integrated Voltage Measurement... 14:43:17 Voltage Offset Correction: v_off_ini = 0.000004375 V, v_off_fin = 0.000006886 V 14:43:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171042242 Vs 14:43:17 Integrated Voltage Measurement... 14:43:37 Voltage Offset Correction: v_off_ini = 0.000006117 V, v_off_fin = 0.000003057 V 14:43:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980864 Vs 14:43:40 Temperature Measurement, Probe Number = 0, T = 20.183000 C 14:43:40 Temperature Measurement, Probe Number = 1, T = 20.104000 C 14:43:41 Temperature Measurement, Probe Number = 2, T = 20.165000 C 14:43:42 Temperature Measurement, Probe Number = 3, T = 20.110000 C 14:43:42 Temperature Measurement, Probe Number = 4, T = 20.312000 C 14:43:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.31 14:43:43 Integrated Voltage Measurement... 14:44:02 Voltage Offset Correction: v_off_ini = 0.000003531 V, v_off_fin = 0.000005971 V 14:44:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040878 Vs 14:44:02 Integrated Voltage Measurement... 14:44:22 Voltage Offset Correction: v_off_ini = 0.000005790 V, v_off_fin = 0.000002713 V 14:44:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982547 Vs 15:14:25 Temperature Measurement, Probe Number = 0, T = 20.183000 C 15:14:25 Temperature Measurement, Probe Number = 1, T = 20.109000 C 15:14:26 Temperature Measurement, Probe Number = 2, T = 20.170000 C 15:14:27 Temperature Measurement, Probe Number = 3, T = 20.118000 C 15:14:27 Temperature Measurement, Probe Number = 4, T = 20.589000 C 15:14:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.59 15:14:28 Integrated Voltage Measurement... 15:14:48 Voltage Offset Correction: v_off_ini = 0.000005806 V, v_off_fin = 0.000007475 V 15:14:48 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171107587 Vs 15:14:48 Integrated Voltage Measurement... 15:15:07 Voltage Offset Correction: v_off_ini = 0.000006028 V, v_off_fin = 0.000003103 V 15:15:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974482 Vs 15:15:10 Temperature Measurement, Probe Number = 0, T = 20.185000 C 15:15:11 Temperature Measurement, Probe Number = 1, T = 20.111000 C 15:15:11 Temperature Measurement, Probe Number = 2, T = 20.168000 C 15:15:12 Temperature Measurement, Probe Number = 3, T = 20.116000 C 15:15:13 Temperature Measurement, Probe Number = 4, T = 20.529000 C 15:15:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.53 15:15:13 Integrated Voltage Measurement... 15:15:32 Voltage Offset Correction: v_off_ini = 0.000004360 V, v_off_fin = 0.000006917 V 15:15:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171046256 Vs 15:15:32 Integrated Voltage Measurement... 15:15:52 Voltage Offset Correction: v_off_ini = 0.000006736 V, v_off_fin = 0.000003818 V 15:15:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974469 Vs 15:15:55 Temperature Measurement, Probe Number = 0, T = 20.185000 C 15:15:55 Temperature Measurement, Probe Number = 1, T = 20.111000 C 15:15:56 Temperature Measurement, Probe Number = 2, T = 20.169000 C 15:15:57 Temperature Measurement, Probe Number = 3, T = 20.115000 C 15:15:57 Temperature Measurement, Probe Number = 4, T = 20.497000 C 15:15:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.50 15:15:58 Integrated Voltage Measurement... 15:16:17 Voltage Offset Correction: v_off_ini = 0.000004740 V, v_off_fin = 0.000007765 V 15:16:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051195 Vs 15:16:17 Integrated Voltage Measurement... 15:16:36 Voltage Offset Correction: v_off_ini = 0.000006278 V, v_off_fin = 0.000003572 V 15:16:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170967519 Vs 15:16:39 Temperature Measurement, Probe Number = 0, T = 20.185000 C 15:16:40 Temperature Measurement, Probe Number = 1, T = 20.111000 C 15:16:40 Temperature Measurement, Probe Number = 2, T = 20.172000 C 15:16:41 Temperature Measurement, Probe Number = 3, T = 20.118000 C 15:16:42 Temperature Measurement, Probe Number = 4, T = 20.573000 C 15:16:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.57 15:16:42 Integrated Voltage Measurement... 15:17:01 Voltage Offset Correction: v_off_ini = 0.000004363 V, v_off_fin = 0.000007159 V 15:17:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053666 Vs 15:17:01 Integrated Voltage Measurement... 15:17:21 Voltage Offset Correction: v_off_ini = 0.000005478 V, v_off_fin = 0.000003209 V 15:17:21 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170978138 Vs 15:17:24 Temperature Measurement, Probe Number = 0, T = 20.176000 C 15:17:24 Temperature Measurement, Probe Number = 1, T = 20.099000 C 15:17:25 Temperature Measurement, Probe Number = 2, T = 20.164000 C 15:17:26 Temperature Measurement, Probe Number = 3, T = 20.110000 C 15:17:26 Temperature Measurement, Probe Number = 4, T = 20.547000 C 15:17:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.55 15:17:27 Integrated Voltage Measurement... 15:17:46 Voltage Offset Correction: v_off_ini = 0.000003825 V, v_off_fin = 0.000006005 V 15:17:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036935 Vs 15:17:46 Integrated Voltage Measurement... 15:18:05 Voltage Offset Correction: v_off_ini = 0.000005488 V, v_off_fin = 0.000002935 V 15:18:06 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170976076 Vs 15:18:08 Temperature Measurement, Probe Number = 0, T = 20.182000 C 15:18:09 Temperature Measurement, Probe Number = 1, T = 20.102000 C 15:18:10 Temperature Measurement, Probe Number = 2, T = 20.167000 C 15:18:10 Temperature Measurement, Probe Number = 3, T = 20.110000 C 15:18:11 Temperature Measurement, Probe Number = 4, T = 20.565000 C 15:18:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.57 15:18:11 Integrated Voltage Measurement... 15:18:30 Voltage Offset Correction: v_off_ini = 0.000004646 V, v_off_fin = 0.000007087 V 15:18:30 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049206 Vs 15:18:31 Integrated Voltage Measurement... 15:18:50 Voltage Offset Correction: v_off_ini = 0.000006726 V, v_off_fin = 0.000003228 V 15:18:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976574 Vs 15:18:53 Temperature Measurement, Probe Number = 0, T = 20.178000 C 15:18:54 Temperature Measurement, Probe Number = 1, T = 20.101000 C 15:18:55 Temperature Measurement, Probe Number = 2, T = 20.165000 C 15:18:55 Temperature Measurement, Probe Number = 3, T = 20.109000 C 15:18:56 Temperature Measurement, Probe Number = 4, T = 20.532000 C 15:18:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.53 15:18:56 Integrated Voltage Measurement... 15:19:15 Voltage Offset Correction: v_off_ini = 0.000004466 V, v_off_fin = 0.000006631 V 15:19:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045756 Vs 15:19:16 Integrated Voltage Measurement... 15:19:35 Voltage Offset Correction: v_off_ini = 0.000006385 V, v_off_fin = 0.000002488 V 15:19:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170992090 Vs 15:19:38 Temperature Measurement, Probe Number = 0, T = 20.184000 C 15:19:39 Temperature Measurement, Probe Number = 1, T = 20.106000 C 15:19:40 Temperature Measurement, Probe Number = 2, T = 20.167000 C 15:19:40 Temperature Measurement, Probe Number = 3, T = 20.114000 C 15:19:41 Temperature Measurement, Probe Number = 4, T = 20.474000 C 15:19:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.47 15:19:41 Integrated Voltage Measurement... 15:20:00 Voltage Offset Correction: v_off_ini = 0.000004023 V, v_off_fin = 0.000006301 V 15:20:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043277 Vs 15:20:01 Integrated Voltage Measurement... 15:20:20 Voltage Offset Correction: v_off_ini = 0.000006297 V, v_off_fin = 0.000002930 V 15:20:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978541 Vs 15:20:23 Temperature Measurement, Probe Number = 0, T = 20.180000 C 15:20:24 Temperature Measurement, Probe Number = 1, T = 20.107000 C 15:20:24 Temperature Measurement, Probe Number = 2, T = 20.166000 C 15:20:25 Temperature Measurement, Probe Number = 3, T = 20.114000 C 15:20:26 Temperature Measurement, Probe Number = 4, T = 20.397000 C 15:20:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.40 15:20:26 Integrated Voltage Measurement... 15:20:46 Voltage Offset Correction: v_off_ini = 0.000004165 V, v_off_fin = 0.000006832 V 15:20:46 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045040 Vs 15:20:46 Integrated Voltage Measurement... 15:21:05 Voltage Offset Correction: v_off_ini = 0.000006280 V, v_off_fin = 0.000002272 V 15:21:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977115 Vs 15:21:08 Temperature Measurement, Probe Number = 0, T = 20.186000 C 15:21:09 Temperature Measurement, Probe Number = 1, T = 20.111000 C 15:21:09 Temperature Measurement, Probe Number = 2, T = 20.168000 C 15:21:10 Temperature Measurement, Probe Number = 3, T = 20.115000 C 15:21:11 Temperature Measurement, Probe Number = 4, T = 20.414000 C 15:21:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.41 15:21:11 Integrated Voltage Measurement... 15:21:31 Voltage Offset Correction: v_off_ini = 0.000004022 V, v_off_fin = 0.000006377 V 15:21:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046489 Vs 15:21:31 Integrated Voltage Measurement... 15:21:51 Voltage Offset Correction: v_off_ini = 0.000005642 V, v_off_fin = 0.000003201 V 15:21:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974432 Vs 15:51:54 Temperature Measurement, Probe Number = 0, T = 20.186000 C 15:51:54 Temperature Measurement, Probe Number = 1, T = 20.111000 C 15:51:55 Temperature Measurement, Probe Number = 2, T = 20.173000 C 15:51:56 Temperature Measurement, Probe Number = 3, T = 20.120000 C 15:51:56 Temperature Measurement, Probe Number = 4, T = 20.466000 C 15:51:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.47 15:51:56 Integrated Voltage Measurement... 15:52:16 Voltage Offset Correction: v_off_ini = 0.000005493 V, v_off_fin = 0.000007687 V 15:52:16 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171105311 Vs 15:52:16 Integrated Voltage Measurement... 15:52:35 Voltage Offset Correction: v_off_ini = 0.000006810 V, v_off_fin = 0.000003777 V 15:52:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971658 Vs 15:52:38 Temperature Measurement, Probe Number = 0, T = 20.191000 C 15:52:39 Temperature Measurement, Probe Number = 1, T = 20.114000 C 15:52:39 Temperature Measurement, Probe Number = 2, T = 20.174000 C 15:52:40 Temperature Measurement, Probe Number = 3, T = 20.121000 C 15:52:41 Temperature Measurement, Probe Number = 4, T = 20.431000 C 15:52:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.43 15:52:41 Integrated Voltage Measurement... 15:53:00 Voltage Offset Correction: v_off_ini = 0.000004728 V, v_off_fin = 0.000006471 V 15:53:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047420 Vs 15:53:00 Integrated Voltage Measurement... 15:53:20 Voltage Offset Correction: v_off_ini = 0.000005488 V, v_off_fin = 0.000002405 V 15:53:20 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170976807 Vs 15:53:22 Temperature Measurement, Probe Number = 0, T = 20.191000 C 15:53:23 Temperature Measurement, Probe Number = 1, T = 20.116000 C 15:53:24 Temperature Measurement, Probe Number = 2, T = 20.177000 C 15:53:24 Temperature Measurement, Probe Number = 3, T = 20.124000 C 15:53:25 Temperature Measurement, Probe Number = 4, T = 20.417000 C 15:53:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.42 15:53:25 Integrated Voltage Measurement... 15:53:45 Voltage Offset Correction: v_off_ini = 0.000004109 V, v_off_fin = 0.000006067 V 15:53:45 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171045060 Vs 15:53:45 Integrated Voltage Measurement... 15:54:04 Voltage Offset Correction: v_off_ini = 0.000005852 V, v_off_fin = 0.000003369 V 15:54:04 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170985590 Vs 15:54:07 Temperature Measurement, Probe Number = 0, T = 20.188000 C 15:54:08 Temperature Measurement, Probe Number = 1, T = 20.114000 C 15:54:09 Temperature Measurement, Probe Number = 2, T = 20.175000 C 15:54:09 Temperature Measurement, Probe Number = 3, T = 20.123000 C 15:54:10 Temperature Measurement, Probe Number = 4, T = 20.458000 C 15:54:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.46 15:54:10 Integrated Voltage Measurement... 15:54:29 Voltage Offset Correction: v_off_ini = 0.000003642 V, v_off_fin = 0.000006367 V 15:54:29 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171039924 Vs 15:54:30 Integrated Voltage Measurement... 15:54:49 Voltage Offset Correction: v_off_ini = 0.000006074 V, v_off_fin = 0.000003144 V 15:54:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980836 Vs 15:54:52 Temperature Measurement, Probe Number = 0, T = 20.189000 C 15:54:52 Temperature Measurement, Probe Number = 1, T = 20.114000 C 15:54:53 Temperature Measurement, Probe Number = 2, T = 20.175000 C 15:54:54 Temperature Measurement, Probe Number = 3, T = 20.124000 C 15:54:54 Temperature Measurement, Probe Number = 4, T = 20.511000 C 15:54:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.51 15:54:55 Integrated Voltage Measurement... 15:55:14 Voltage Offset Correction: v_off_ini = 0.000004367 V, v_off_fin = 0.000006510 V 15:55:14 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171043320 Vs 15:55:15 Integrated Voltage Measurement... 15:55:34 Voltage Offset Correction: v_off_ini = 0.000006692 V, v_off_fin = 0.000003175 V 15:55:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978235 Vs 15:55:37 Temperature Measurement, Probe Number = 0, T = 20.190000 C 15:55:37 Temperature Measurement, Probe Number = 1, T = 20.116000 C 15:55:38 Temperature Measurement, Probe Number = 2, T = 20.176000 C 15:55:39 Temperature Measurement, Probe Number = 3, T = 20.123000 C 15:55:39 Temperature Measurement, Probe Number = 4, T = 20.460000 C 15:55:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.46 15:55:39 Integrated Voltage Measurement... 15:55:59 Voltage Offset Correction: v_off_ini = 0.000004691 V, v_off_fin = 0.000007285 V 15:55:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049690 Vs 15:55:59 Integrated Voltage Measurement... 15:56:18 Voltage Offset Correction: v_off_ini = 0.000006842 V, v_off_fin = 0.000003331 V 15:56:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977178 Vs 15:56:21 Temperature Measurement, Probe Number = 0, T = 20.188000 C 15:56:22 Temperature Measurement, Probe Number = 1, T = 20.111000 C 15:56:23 Temperature Measurement, Probe Number = 2, T = 20.174000 C 15:56:23 Temperature Measurement, Probe Number = 3, T = 20.120000 C 15:56:24 Temperature Measurement, Probe Number = 4, T = 20.397000 C 15:56:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.40 15:56:24 Integrated Voltage Measurement... 15:56:44 Voltage Offset Correction: v_off_ini = 0.000004397 V, v_off_fin = 0.000006807 V 15:56:44 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171048123 Vs 15:56:44 Integrated Voltage Measurement... 15:57:03 Voltage Offset Correction: v_off_ini = 0.000006799 V, v_off_fin = 0.000003212 V 15:57:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977102 Vs 15:57:06 Temperature Measurement, Probe Number = 0, T = 20.192000 C 15:57:06 Temperature Measurement, Probe Number = 1, T = 20.114000 C 15:57:07 Temperature Measurement, Probe Number = 2, T = 20.176000 C 15:57:08 Temperature Measurement, Probe Number = 3, T = 20.122000 C 15:57:08 Temperature Measurement, Probe Number = 4, T = 20.367000 C 15:57:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.37 15:57:09 Integrated Voltage Measurement... 15:57:28 Voltage Offset Correction: v_off_ini = 0.000003806 V, v_off_fin = 0.000006622 V 15:57:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047878 Vs 15:57:28 Integrated Voltage Measurement... 15:57:48 Voltage Offset Correction: v_off_ini = 0.000006599 V, v_off_fin = 0.000003381 V 15:57:48 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170973656 Vs 15:57:51 Temperature Measurement, Probe Number = 0, T = 20.191000 C 15:57:51 Temperature Measurement, Probe Number = 1, T = 20.118000 C 15:57:52 Temperature Measurement, Probe Number = 2, T = 20.175000 C 15:57:53 Temperature Measurement, Probe Number = 3, T = 20.124000 C 15:57:53 Temperature Measurement, Probe Number = 4, T = 20.367000 C 15:57:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.37 15:57:53 Integrated Voltage Measurement... 15:58:13 Voltage Offset Correction: v_off_ini = 0.000004000 V, v_off_fin = 0.000006868 V 15:58:13 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050719 Vs 15:58:13 Integrated Voltage Measurement... 15:58:32 Voltage Offset Correction: v_off_ini = 0.000006684 V, v_off_fin = 0.000003158 V 15:58:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170972816 Vs 15:58:35 Temperature Measurement, Probe Number = 0, T = 20.194000 C 15:58:36 Temperature Measurement, Probe Number = 1, T = 20.119000 C 15:58:36 Temperature Measurement, Probe Number = 2, T = 20.179000 C 15:58:37 Temperature Measurement, Probe Number = 3, T = 20.126000 C 15:58:38 Temperature Measurement, Probe Number = 4, T = 20.451000 C 15:58:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.45 15:58:38 Integrated Voltage Measurement... 15:58:57 Voltage Offset Correction: v_off_ini = 0.000004479 V, v_off_fin = 0.000007385 V 15:58:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059825 Vs 15:58:58 Integrated Voltage Measurement... 15:59:17 Voltage Offset Correction: v_off_ini = 0.000006484 V, v_off_fin = 0.000003678 V 15:59:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967836 Vs 16:29:20 Temperature Measurement, Probe Number = 0, T = 20.187000 C 16:29:20 Temperature Measurement, Probe Number = 1, T = 20.111000 C 16:29:21 Temperature Measurement, Probe Number = 2, T = 20.174000 C 16:29:22 Temperature Measurement, Probe Number = 3, T = 20.120000 C 16:29:22 Temperature Measurement, Probe Number = 4, T = 20.432000 C 16:29:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.43 16:29:22 Integrated Voltage Measurement... 16:29:42 Voltage Offset Correction: v_off_ini = 0.000004938 V, v_off_fin = 0.000006561 V 16:29:42 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171100089 Vs 16:29:42 Integrated Voltage Measurement... 16:30:02 Voltage Offset Correction: v_off_ini = 0.000005995 V, v_off_fin = 0.000003109 V 16:30:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978608 Vs 16:30:04 Temperature Measurement, Probe Number = 0, T = 20.187000 C 16:30:05 Temperature Measurement, Probe Number = 1, T = 20.112000 C 16:30:06 Temperature Measurement, Probe Number = 2, T = 20.175000 C 16:30:06 Temperature Measurement, Probe Number = 3, T = 20.120000 C 16:30:07 Temperature Measurement, Probe Number = 4, T = 20.403000 C 16:30:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.40 16:30:07 Integrated Voltage Measurement... 16:30:27 Voltage Offset Correction: v_off_ini = 0.000004166 V, v_off_fin = 0.000006987 V 16:30:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047034 Vs 16:30:27 Integrated Voltage Measurement... 16:30:46 Voltage Offset Correction: v_off_ini = 0.000006455 V, v_off_fin = 0.000003546 V 16:30:46 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170970530 Vs 16:30:49 Temperature Measurement, Probe Number = 0, T = 20.193000 C 16:30:50 Temperature Measurement, Probe Number = 1, T = 20.114000 C 16:30:50 Temperature Measurement, Probe Number = 2, T = 20.177000 C 16:30:51 Temperature Measurement, Probe Number = 3, T = 20.121000 C 16:30:52 Temperature Measurement, Probe Number = 4, T = 20.486000 C 16:30:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.49 16:30:52 Integrated Voltage Measurement... 16:31:12 Voltage Offset Correction: v_off_ini = 0.000004638 V, v_off_fin = 0.000007132 V 16:31:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053511 Vs 16:31:12 Integrated Voltage Measurement... 16:31:31 Voltage Offset Correction: v_off_ini = 0.000006712 V, v_off_fin = 0.000003056 V 16:31:31 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170973235 Vs 16:31:34 Temperature Measurement, Probe Number = 0, T = 20.191000 C 16:31:35 Temperature Measurement, Probe Number = 1, T = 20.117000 C 16:31:35 Temperature Measurement, Probe Number = 2, T = 20.177000 C 16:31:36 Temperature Measurement, Probe Number = 3, T = 20.123000 C 16:31:37 Temperature Measurement, Probe Number = 4, T = 20.444000 C 16:31:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.44 16:31:37 Integrated Voltage Measurement... 16:31:56 Voltage Offset Correction: v_off_ini = 0.000003902 V, v_off_fin = 0.000006226 V 16:31:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048254 Vs 16:31:56 Integrated Voltage Measurement... 16:32:16 Voltage Offset Correction: v_off_ini = 0.000006245 V, v_off_fin = 0.000003229 V 16:32:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976947 Vs 16:32:19 Temperature Measurement, Probe Number = 0, T = 20.196000 C 16:32:19 Temperature Measurement, Probe Number = 1, T = 20.118000 C 16:32:20 Temperature Measurement, Probe Number = 2, T = 20.181000 C 16:32:21 Temperature Measurement, Probe Number = 3, T = 20.126000 C 16:32:21 Temperature Measurement, Probe Number = 4, T = 20.501000 C 16:32:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.50 16:32:21 Integrated Voltage Measurement... 16:32:41 Voltage Offset Correction: v_off_ini = 0.000004391 V, v_off_fin = 0.000007060 V 16:32:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051084 Vs 16:32:41 Integrated Voltage Measurement... 16:33:01 Voltage Offset Correction: v_off_ini = 0.000006346 V, v_off_fin = 0.000003401 V 16:33:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973880 Vs 16:33:04 Temperature Measurement, Probe Number = 0, T = 20.195000 C 16:33:04 Temperature Measurement, Probe Number = 1, T = 20.119000 C 16:33:05 Temperature Measurement, Probe Number = 2, T = 20.181000 C 16:33:06 Temperature Measurement, Probe Number = 3, T = 20.127000 C 16:33:06 Temperature Measurement, Probe Number = 4, T = 20.518000 C 16:33:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.52 16:33:06 Integrated Voltage Measurement... 16:33:26 Voltage Offset Correction: v_off_ini = 0.000004524 V, v_off_fin = 0.000006825 V 16:33:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051003 Vs 16:33:26 Integrated Voltage Measurement... 16:33:45 Voltage Offset Correction: v_off_ini = 0.000005699 V, v_off_fin = 0.000003044 V 16:33:46 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971146 Vs 16:33:48 Temperature Measurement, Probe Number = 0, T = 20.194000 C 16:33:49 Temperature Measurement, Probe Number = 1, T = 20.114000 C 16:33:50 Temperature Measurement, Probe Number = 2, T = 20.178000 C 16:33:50 Temperature Measurement, Probe Number = 3, T = 20.123000 C 16:33:51 Temperature Measurement, Probe Number = 4, T = 20.520000 C 16:33:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.52 16:33:51 Integrated Voltage Measurement... 16:34:10 Voltage Offset Correction: v_off_ini = 0.000004203 V, v_off_fin = 0.000007273 V 16:34:10 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171048812 Vs 16:34:11 Integrated Voltage Measurement... 16:34:30 Voltage Offset Correction: v_off_ini = 0.000006416 V, v_off_fin = 0.000003314 V 16:34:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973245 Vs 16:34:33 Temperature Measurement, Probe Number = 0, T = 20.195000 C 16:34:33 Temperature Measurement, Probe Number = 1, T = 20.118000 C 16:34:34 Temperature Measurement, Probe Number = 2, T = 20.177000 C 16:34:35 Temperature Measurement, Probe Number = 3, T = 20.123000 C 16:34:35 Temperature Measurement, Probe Number = 4, T = 20.528000 C 16:34:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.53 16:34:36 Integrated Voltage Measurement... 16:34:55 Voltage Offset Correction: v_off_ini = 0.000004356 V, v_off_fin = 0.000006562 V 16:34:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045751 Vs 16:34:56 Integrated Voltage Measurement... 16:35:15 Voltage Offset Correction: v_off_ini = 0.000006092 V, v_off_fin = 0.000002962 V 16:35:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974396 Vs 16:35:18 Temperature Measurement, Probe Number = 0, T = 20.193000 C 16:35:19 Temperature Measurement, Probe Number = 1, T = 20.115000 C 16:35:19 Temperature Measurement, Probe Number = 2, T = 20.175000 C 16:35:20 Temperature Measurement, Probe Number = 3, T = 20.120000 C 16:35:21 Temperature Measurement, Probe Number = 4, T = 20.553000 C 16:35:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.55 16:35:21 Integrated Voltage Measurement... 16:35:40 Voltage Offset Correction: v_off_ini = 0.000004142 V, v_off_fin = 0.000006688 V 16:35:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044737 Vs 16:35:41 Integrated Voltage Measurement... 16:36:00 Voltage Offset Correction: v_off_ini = 0.000005946 V, v_off_fin = 0.000003007 V 16:36:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973677 Vs 16:36:03 Temperature Measurement, Probe Number = 0, T = 20.195000 C 16:36:04 Temperature Measurement, Probe Number = 1, T = 20.118000 C 16:36:05 Temperature Measurement, Probe Number = 2, T = 20.178000 C 16:36:05 Temperature Measurement, Probe Number = 3, T = 20.121000 C 16:36:06 Temperature Measurement, Probe Number = 4, T = 20.569000 C 16:36:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.57 16:36:06 Integrated Voltage Measurement... 16:36:25 Voltage Offset Correction: v_off_ini = 0.000003890 V, v_off_fin = 0.000006379 V 16:36:25 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047659 Vs 16:36:26 Integrated Voltage Measurement... 16:36:46 Voltage Offset Correction: v_off_ini = 0.000005767 V, v_off_fin = 0.000002557 V 16:36:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978726 Vs 17:06:48 Temperature Measurement, Probe Number = 0, T = 20.187000 C 17:06:49 Temperature Measurement, Probe Number = 1, T = 20.113000 C 17:06:50 Temperature Measurement, Probe Number = 2, T = 20.175000 C 17:06:50 Temperature Measurement, Probe Number = 3, T = 20.121000 C 17:06:51 Temperature Measurement, Probe Number = 4, T = 20.186000 C 17:06:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.19 17:06:51 Integrated Voltage Measurement... 17:07:10 Voltage Offset Correction: v_off_ini = 0.000005269 V, v_off_fin = 0.000006918 V 17:07:11 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171089902 Vs 17:07:11 Integrated Voltage Measurement... 17:07:30 Voltage Offset Correction: v_off_ini = 0.000006155 V, v_off_fin = 0.000002590 V 17:07:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980944 Vs 17:07:33 Temperature Measurement, Probe Number = 0, T = 20.192000 C 17:07:34 Temperature Measurement, Probe Number = 1, T = 20.116000 C 17:07:34 Temperature Measurement, Probe Number = 2, T = 20.177000 C 17:07:35 Temperature Measurement, Probe Number = 3, T = 20.121000 C 17:07:36 Temperature Measurement, Probe Number = 4, T = 20.187000 C 17:07:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.19 17:07:36 Integrated Voltage Measurement... 17:07:55 Voltage Offset Correction: v_off_ini = 0.000003974 V, v_off_fin = 0.000007214 V 17:07:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051267 Vs 17:07:56 Integrated Voltage Measurement... 17:08:15 Voltage Offset Correction: v_off_ini = 0.000006892 V, v_off_fin = 0.000002383 V 17:08:15 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977360 Vs 17:08:17 Temperature Measurement, Probe Number = 0, T = 20.194000 C 17:08:18 Temperature Measurement, Probe Number = 1, T = 20.118000 C 17:08:19 Temperature Measurement, Probe Number = 2, T = 20.180000 C 17:08:19 Temperature Measurement, Probe Number = 3, T = 20.123000 C 17:08:20 Temperature Measurement, Probe Number = 4, T = 20.246000 C 17:08:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.25 17:08:20 Integrated Voltage Measurement... 17:08:39 Voltage Offset Correction: v_off_ini = 0.000003034 V, v_off_fin = 0.000006434 V 17:08:40 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047166 Vs 17:08:40 Integrated Voltage Measurement... 17:08:59 Voltage Offset Correction: v_off_ini = 0.000006096 V, v_off_fin = 0.000002302 V 17:08:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984793 Vs 17:09:02 Temperature Measurement, Probe Number = 0, T = 20.194000 C 17:09:03 Temperature Measurement, Probe Number = 1, T = 20.118000 C 17:09:04 Temperature Measurement, Probe Number = 2, T = 20.180000 C 17:09:04 Temperature Measurement, Probe Number = 3, T = 20.125000 C 17:09:05 Temperature Measurement, Probe Number = 4, T = 20.269000 C 17:09:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.27 17:09:05 Integrated Voltage Measurement... 17:09:25 Voltage Offset Correction: v_off_ini = 0.000003682 V, v_off_fin = 0.000006332 V 17:09:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049750 Vs 17:09:25 Integrated Voltage Measurement... 17:09:44 Voltage Offset Correction: v_off_ini = 0.000005534 V, v_off_fin = 0.000002584 V 17:09:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983593 Vs 17:09:47 Temperature Measurement, Probe Number = 0, T = 20.195000 C 17:09:48 Temperature Measurement, Probe Number = 1, T = 20.117000 C 17:09:48 Temperature Measurement, Probe Number = 2, T = 20.182000 C 17:09:49 Temperature Measurement, Probe Number = 3, T = 20.126000 C 17:09:50 Temperature Measurement, Probe Number = 4, T = 20.393000 C 17:09:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.39 17:09:50 Integrated Voltage Measurement... 17:10:09 Voltage Offset Correction: v_off_ini = 0.000003815 V, v_off_fin = 0.000006695 V 17:10:10 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055735 Vs 17:10:10 Integrated Voltage Measurement... 17:10:29 Voltage Offset Correction: v_off_ini = 0.000005880 V, v_off_fin = 0.000002004 V 17:10:29 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979274 Vs 17:10:32 Temperature Measurement, Probe Number = 0, T = 20.197000 C 17:10:32 Temperature Measurement, Probe Number = 1, T = 20.120000 C 17:10:33 Temperature Measurement, Probe Number = 2, T = 20.181000 C 17:10:34 Temperature Measurement, Probe Number = 3, T = 20.125000 C 17:10:34 Temperature Measurement, Probe Number = 4, T = 20.351000 C 17:10:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.35 17:10:35 Integrated Voltage Measurement... 17:10:54 Voltage Offset Correction: v_off_ini = 0.000004251 V, v_off_fin = 0.000006681 V 17:10:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055454 Vs 17:10:54 Integrated Voltage Measurement... 17:11:13 Voltage Offset Correction: v_off_ini = 0.000006474 V, v_off_fin = 0.000002396 V 17:11:14 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981359 Vs 17:11:16 Temperature Measurement, Probe Number = 0, T = 20.198000 C 17:11:17 Temperature Measurement, Probe Number = 1, T = 20.120000 C 17:11:18 Temperature Measurement, Probe Number = 2, T = 20.182000 C 17:11:18 Temperature Measurement, Probe Number = 3, T = 20.125000 C 17:11:19 Temperature Measurement, Probe Number = 4, T = 20.369000 C 17:11:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.37 17:11:19 Integrated Voltage Measurement... 17:11:39 Voltage Offset Correction: v_off_ini = 0.000003410 V, v_off_fin = 0.000006293 V 17:11:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053676 Vs 17:11:39 Integrated Voltage Measurement... 17:11:58 Voltage Offset Correction: v_off_ini = 0.000006260 V, v_off_fin = 0.000002685 V 17:11:58 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983109 Vs 17:12:01 Temperature Measurement, Probe Number = 0, T = 20.196000 C 17:12:01 Temperature Measurement, Probe Number = 1, T = 20.119000 C 17:12:02 Temperature Measurement, Probe Number = 2, T = 20.182000 C 17:12:03 Temperature Measurement, Probe Number = 3, T = 20.127000 C 17:12:03 Temperature Measurement, Probe Number = 4, T = 20.348000 C 17:12:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.35 17:12:04 Integrated Voltage Measurement... 17:12:23 Voltage Offset Correction: v_off_ini = 0.000003630 V, v_off_fin = 0.000007114 V 17:12:23 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171052232 Vs 17:12:23 Integrated Voltage Measurement... 17:12:42 Voltage Offset Correction: v_off_ini = 0.000006455 V, v_off_fin = 0.000002644 V 17:12:43 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986408 Vs 17:12:45 Temperature Measurement, Probe Number = 0, T = 20.196000 C 17:12:46 Temperature Measurement, Probe Number = 1, T = 20.118000 C 17:12:47 Temperature Measurement, Probe Number = 2, T = 20.182000 C 17:12:47 Temperature Measurement, Probe Number = 3, T = 20.127000 C 17:12:48 Temperature Measurement, Probe Number = 4, T = 20.416000 C 17:12:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.42 17:12:48 Integrated Voltage Measurement... 17:13:08 Voltage Offset Correction: v_off_ini = 0.000004362 V, v_off_fin = 0.000007049 V 17:13:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059040 Vs 17:13:08 Integrated Voltage Measurement... 17:13:28 Voltage Offset Correction: v_off_ini = 0.000006194 V, v_off_fin = 0.000003647 V 17:13:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984280 Vs 17:13:31 Temperature Measurement, Probe Number = 0, T = 20.198000 C 17:13:31 Temperature Measurement, Probe Number = 1, T = 20.121000 C 17:13:32 Temperature Measurement, Probe Number = 2, T = 20.180000 C 17:13:32 Temperature Measurement, Probe Number = 3, T = 20.125000 C 17:13:33 Temperature Measurement, Probe Number = 4, T = 20.488000 C 17:13:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.49 17:13:33 Integrated Voltage Measurement... 17:13:53 Voltage Offset Correction: v_off_ini = 0.000004875 V, v_off_fin = 0.000006996 V 17:13:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054919 Vs 17:13:53 Integrated Voltage Measurement... 17:14:13 Voltage Offset Correction: v_off_ini = 0.000006128 V, v_off_fin = 0.000003264 V 17:14:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982735 Vs 17:44:16 Temperature Measurement, Probe Number = 0, T = 20.195000 C 17:44:16 Temperature Measurement, Probe Number = 1, T = 20.118000 C 17:44:17 Temperature Measurement, Probe Number = 2, T = 20.182000 C 17:44:18 Temperature Measurement, Probe Number = 3, T = 20.127000 C 17:44:18 Temperature Measurement, Probe Number = 4, T = 20.538000 C 17:44:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.54 17:44:19 Integrated Voltage Measurement... 17:44:38 Voltage Offset Correction: v_off_ini = 0.000005680 V, v_off_fin = 0.000006716 V 17:44:38 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171106628 Vs 17:44:38 Integrated Voltage Measurement... 17:44:58 Voltage Offset Correction: v_off_ini = 0.000006534 V, v_off_fin = 0.000003099 V 17:44:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988054 Vs 17:45:00 Temperature Measurement, Probe Number = 0, T = 20.199000 C 17:45:01 Temperature Measurement, Probe Number = 1, T = 20.123000 C 17:45:02 Temperature Measurement, Probe Number = 2, T = 20.183000 C 17:45:02 Temperature Measurement, Probe Number = 3, T = 20.128000 C 17:45:03 Temperature Measurement, Probe Number = 4, T = 20.539000 C 17:45:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.54 17:45:03 Integrated Voltage Measurement... 17:45:23 Voltage Offset Correction: v_off_ini = 0.000003762 V, v_off_fin = 0.000007059 V 17:45:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054571 Vs 17:45:23 Integrated Voltage Measurement... 17:45:42 Voltage Offset Correction: v_off_ini = 0.000006159 V, v_off_fin = 0.000003129 V 17:45:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980203 Vs 17:45:45 Temperature Measurement, Probe Number = 0, T = 20.198000 C 17:45:46 Temperature Measurement, Probe Number = 1, T = 20.120000 C 17:45:46 Temperature Measurement, Probe Number = 2, T = 20.184000 C 17:45:47 Temperature Measurement, Probe Number = 3, T = 20.127000 C 17:45:48 Temperature Measurement, Probe Number = 4, T = 20.532000 C 17:45:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.53 17:45:48 Integrated Voltage Measurement... 17:46:07 Voltage Offset Correction: v_off_ini = 0.000004709 V, v_off_fin = 0.000006695 V 17:46:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050774 Vs 17:46:07 Integrated Voltage Measurement... 17:46:27 Voltage Offset Correction: v_off_ini = 0.000006066 V, v_off_fin = 0.000003306 V 17:46:27 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979186 Vs 17:46:29 Temperature Measurement, Probe Number = 0, T = 20.198000 C 17:46:30 Temperature Measurement, Probe Number = 1, T = 20.123000 C 17:46:31 Temperature Measurement, Probe Number = 2, T = 20.182000 C 17:46:31 Temperature Measurement, Probe Number = 3, T = 20.127000 C 17:46:32 Temperature Measurement, Probe Number = 4, T = 20.524000 C 17:46:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.52 17:46:32 Integrated Voltage Measurement... 17:46:52 Voltage Offset Correction: v_off_ini = 0.000003835 V, v_off_fin = 0.000006998 V 17:46:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051051 Vs 17:46:52 Integrated Voltage Measurement... 17:47:11 Voltage Offset Correction: v_off_ini = 0.000006450 V, v_off_fin = 0.000003147 V 17:47:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975255 Vs 17:47:14 Temperature Measurement, Probe Number = 0, T = 20.202000 C 17:47:15 Temperature Measurement, Probe Number = 1, T = 20.126000 C 17:47:15 Temperature Measurement, Probe Number = 2, T = 20.188000 C 17:47:16 Temperature Measurement, Probe Number = 3, T = 20.132000 C 17:47:17 Temperature Measurement, Probe Number = 4, T = 20.609000 C 17:47:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.61 17:47:17 Integrated Voltage Measurement... 17:47:36 Voltage Offset Correction: v_off_ini = 0.000004197 V, v_off_fin = 0.000006971 V 17:47:36 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052901 Vs 17:47:37 Integrated Voltage Measurement... 17:47:56 Voltage Offset Correction: v_off_ini = 0.000005891 V, v_off_fin = 0.000002357 V 17:47:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982284 Vs 17:47:59 Temperature Measurement, Probe Number = 0, T = 20.204000 C 17:47:59 Temperature Measurement, Probe Number = 1, T = 20.125000 C 17:48:00 Temperature Measurement, Probe Number = 2, T = 20.188000 C 17:48:01 Temperature Measurement, Probe Number = 3, T = 20.132000 C 17:48:01 Temperature Measurement, Probe Number = 4, T = 20.586000 C 17:48:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.59 17:48:02 Integrated Voltage Measurement... 17:48:22 Voltage Offset Correction: v_off_ini = 0.000004660 V, v_off_fin = 0.000006805 V 17:48:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046999 Vs 17:48:22 Integrated Voltage Measurement... 17:48:41 Voltage Offset Correction: v_off_ini = 0.000005910 V, v_off_fin = 0.000002924 V 17:48:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978250 Vs 17:48:44 Temperature Measurement, Probe Number = 0, T = 20.190000 C 17:48:45 Temperature Measurement, Probe Number = 1, T = 20.113000 C 17:48:45 Temperature Measurement, Probe Number = 2, T = 20.176000 C 17:48:46 Temperature Measurement, Probe Number = 3, T = 20.122000 C 17:48:47 Temperature Measurement, Probe Number = 4, T = 20.452000 C 17:48:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.45 17:48:47 Integrated Voltage Measurement... 17:49:06 Voltage Offset Correction: v_off_ini = 0.000003742 V, v_off_fin = 0.000006572 V 17:49:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049586 Vs 17:49:06 Integrated Voltage Measurement... 17:49:26 Voltage Offset Correction: v_off_ini = 0.000006206 V, v_off_fin = 0.000003724 V 17:49:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977364 Vs 17:49:29 Temperature Measurement, Probe Number = 0, T = 20.191000 C 17:49:30 Temperature Measurement, Probe Number = 1, T = 20.115000 C 17:49:30 Temperature Measurement, Probe Number = 2, T = 20.178000 C 17:49:31 Temperature Measurement, Probe Number = 3, T = 20.123000 C 17:49:32 Temperature Measurement, Probe Number = 4, T = 20.487000 C 17:49:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.49 17:49:32 Integrated Voltage Measurement... 17:49:51 Voltage Offset Correction: v_off_ini = 0.000004574 V, v_off_fin = 0.000007004 V 17:49:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048992 Vs 17:49:51 Integrated Voltage Measurement... 17:50:10 Voltage Offset Correction: v_off_ini = 0.000006004 V, v_off_fin = 0.000003412 V 17:50:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977750 Vs 17:50:13 Temperature Measurement, Probe Number = 0, T = 20.198000 C 17:50:14 Temperature Measurement, Probe Number = 1, T = 20.124000 C 17:50:15 Temperature Measurement, Probe Number = 2, T = 20.183000 C 17:50:15 Temperature Measurement, Probe Number = 3, T = 20.130000 C 17:50:16 Temperature Measurement, Probe Number = 4, T = 20.535000 C 17:50:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.54 17:50:16 Integrated Voltage Measurement... 17:50:36 Voltage Offset Correction: v_off_ini = 0.000003934 V, v_off_fin = 0.000006884 V 17:50:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055881 Vs 17:50:36 Integrated Voltage Measurement... 17:50:55 Voltage Offset Correction: v_off_ini = 0.000006102 V, v_off_fin = 0.000003377 V 17:50:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970648 Vs 17:50:58 Temperature Measurement, Probe Number = 0, T = 20.201000 C 17:50:59 Temperature Measurement, Probe Number = 1, T = 20.126000 C 17:51:00 Temperature Measurement, Probe Number = 2, T = 20.187000 C 17:51:00 Temperature Measurement, Probe Number = 3, T = 20.134000 C 17:51:01 Temperature Measurement, Probe Number = 4, T = 20.607000 C 17:51:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.61 17:51:01 Integrated Voltage Measurement... 17:51:20 Voltage Offset Correction: v_off_ini = 0.000004515 V, v_off_fin = 0.000007338 V 17:51:21 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051668 Vs 17:51:21 Integrated Voltage Measurement... 17:51:40 Voltage Offset Correction: v_off_ini = 0.000006347 V, v_off_fin = 0.000003181 V 17:51:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973952 Vs 18:21:43 Temperature Measurement, Probe Number = 0, T = 20.194000 C 18:21:44 Temperature Measurement, Probe Number = 1, T = 20.118000 C 18:21:44 Temperature Measurement, Probe Number = 2, T = 20.181000 C 18:21:45 Temperature Measurement, Probe Number = 3, T = 20.125000 C 18:21:46 Temperature Measurement, Probe Number = 4, T = 20.371000 C 18:21:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.37 18:21:46 Integrated Voltage Measurement... 18:22:05 Voltage Offset Correction: v_off_ini = 0.000005615 V, v_off_fin = 0.000007500 V 18:22:05 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171104961 Vs 18:22:05 Integrated Voltage Measurement... 18:22:24 Voltage Offset Correction: v_off_ini = 0.000006981 V, v_off_fin = 0.000002814 V 18:22:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170973819 Vs 18:22:27 Temperature Measurement, Probe Number = 0, T = 20.200000 C 18:22:28 Temperature Measurement, Probe Number = 1, T = 20.123000 C 18:22:29 Temperature Measurement, Probe Number = 2, T = 20.184000 C 18:22:29 Temperature Measurement, Probe Number = 3, T = 20.128000 C 18:22:30 Temperature Measurement, Probe Number = 4, T = 20.380000 C 18:22:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.38 18:22:30 Integrated Voltage Measurement... 18:22:49 Voltage Offset Correction: v_off_ini = 0.000004633 V, v_off_fin = 0.000007133 V 18:22:49 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051332 Vs 18:22:50 Integrated Voltage Measurement... 18:23:09 Voltage Offset Correction: v_off_ini = 0.000006538 V, v_off_fin = 0.000003314 V 18:23:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970325 Vs 18:23:12 Temperature Measurement, Probe Number = 0, T = 20.200000 C 18:23:13 Temperature Measurement, Probe Number = 1, T = 20.124000 C 18:23:14 Temperature Measurement, Probe Number = 2, T = 20.184000 C 18:23:14 Temperature Measurement, Probe Number = 3, T = 20.129000 C 18:23:15 Temperature Measurement, Probe Number = 4, T = 20.378000 C 18:23:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.38 18:23:15 Integrated Voltage Measurement... 18:23:34 Voltage Offset Correction: v_off_ini = 0.000004250 V, v_off_fin = 0.000006940 V 18:23:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171044605 Vs 18:23:35 Integrated Voltage Measurement... 18:23:54 Voltage Offset Correction: v_off_ini = 0.000006530 V, v_off_fin = 0.000003098 V 18:23:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979695 Vs 18:23:57 Temperature Measurement, Probe Number = 0, T = 20.203000 C 18:23:58 Temperature Measurement, Probe Number = 1, T = 20.125000 C 18:23:58 Temperature Measurement, Probe Number = 2, T = 20.188000 C 18:23:59 Temperature Measurement, Probe Number = 3, T = 20.131000 C 18:24:00 Temperature Measurement, Probe Number = 4, T = 20.409000 C 18:24:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.41 18:24:00 Integrated Voltage Measurement... 18:24:19 Voltage Offset Correction: v_off_ini = 0.000004082 V, v_off_fin = 0.000006782 V 18:24:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054716 Vs 18:24:19 Integrated Voltage Measurement... 18:24:38 Voltage Offset Correction: v_off_ini = 0.000006769 V, v_off_fin = 0.000002554 V 18:24:39 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170978554 Vs 18:24:41 Temperature Measurement, Probe Number = 0, T = 20.205000 C 18:24:42 Temperature Measurement, Probe Number = 1, T = 20.125000 C 18:24:43 Temperature Measurement, Probe Number = 2, T = 20.189000 C 18:24:43 Temperature Measurement, Probe Number = 3, T = 20.133000 C 18:24:44 Temperature Measurement, Probe Number = 4, T = 20.410000 C 18:24:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.41 18:24:44 Integrated Voltage Measurement... 18:25:03 Voltage Offset Correction: v_off_ini = 0.000003695 V, v_off_fin = 0.000007250 V 18:25:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053694 Vs 18:25:04 Integrated Voltage Measurement... 18:25:23 Voltage Offset Correction: v_off_ini = 0.000006066 V, v_off_fin = 0.000003225 V 18:25:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983741 Vs 18:25:26 Temperature Measurement, Probe Number = 0, T = 20.206000 C 18:25:27 Temperature Measurement, Probe Number = 1, T = 20.127000 C 18:25:27 Temperature Measurement, Probe Number = 2, T = 20.191000 C 18:25:28 Temperature Measurement, Probe Number = 3, T = 20.133000 C 18:25:29 Temperature Measurement, Probe Number = 4, T = 20.441000 C 18:25:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.44 18:25:29 Integrated Voltage Measurement... 18:25:49 Voltage Offset Correction: v_off_ini = 0.000003754 V, v_off_fin = 0.000006646 V 18:25:49 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055399 Vs 18:25:49 Integrated Voltage Measurement... 18:26:08 Voltage Offset Correction: v_off_ini = 0.000006419 V, v_off_fin = 0.000003054 V 18:26:08 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980826 Vs 18:26:11 Temperature Measurement, Probe Number = 0, T = 20.206000 C 18:26:12 Temperature Measurement, Probe Number = 1, T = 20.128000 C 18:26:12 Temperature Measurement, Probe Number = 2, T = 20.189000 C 18:26:13 Temperature Measurement, Probe Number = 3, T = 20.136000 C 18:26:14 Temperature Measurement, Probe Number = 4, T = 20.421000 C 18:26:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.42 18:26:14 Integrated Voltage Measurement... 18:26:33 Voltage Offset Correction: v_off_ini = 0.000004538 V, v_off_fin = 0.000007348 V 18:26:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171064258 Vs 18:26:34 Integrated Voltage Measurement... 18:26:53 Voltage Offset Correction: v_off_ini = 0.000006649 V, v_off_fin = 0.000002575 V 18:26:53 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975853 Vs 18:26:56 Temperature Measurement, Probe Number = 0, T = 20.203000 C 18:26:56 Temperature Measurement, Probe Number = 1, T = 20.126000 C 18:26:57 Temperature Measurement, Probe Number = 2, T = 20.188000 C 18:26:58 Temperature Measurement, Probe Number = 3, T = 20.132000 C 18:26:58 Temperature Measurement, Probe Number = 4, T = 20.418000 C 18:26:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.42 18:26:58 Integrated Voltage Measurement... 18:27:18 Voltage Offset Correction: v_off_ini = 0.000004066 V, v_off_fin = 0.000007253 V 18:27:18 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171061236 Vs 18:27:18 Integrated Voltage Measurement... 18:27:37 Voltage Offset Correction: v_off_ini = 0.000006419 V, v_off_fin = 0.000002833 V 18:27:37 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981242 Vs 18:27:40 Temperature Measurement, Probe Number = 0, T = 20.203000 C 18:27:41 Temperature Measurement, Probe Number = 1, T = 20.126000 C 18:27:41 Temperature Measurement, Probe Number = 2, T = 20.191000 C 18:27:42 Temperature Measurement, Probe Number = 3, T = 20.132000 C 18:27:43 Temperature Measurement, Probe Number = 4, T = 20.465000 C 18:27:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.46 18:27:43 Integrated Voltage Measurement... 18:28:02 Voltage Offset Correction: v_off_ini = 0.000004121 V, v_off_fin = 0.000007229 V 18:28:02 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171060866 Vs 18:28:02 Integrated Voltage Measurement... 18:28:21 Voltage Offset Correction: v_off_ini = 0.000006595 V, v_off_fin = 0.000002461 V 18:28:22 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981461 Vs 18:28:25 Temperature Measurement, Probe Number = 0, T = 20.207000 C 18:28:25 Temperature Measurement, Probe Number = 1, T = 20.129000 C 18:28:26 Temperature Measurement, Probe Number = 2, T = 20.193000 C 18:28:26 Temperature Measurement, Probe Number = 3, T = 20.133000 C 18:28:27 Temperature Measurement, Probe Number = 4, T = 20.488000 C 18:28:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.49 18:28:27 Integrated Voltage Measurement... 18:28:47 Voltage Offset Correction: v_off_ini = 0.000003824 V, v_off_fin = 0.000007595 V 18:28:47 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171061884 Vs 18:28:47 Integrated Voltage Measurement... 18:29:06 Voltage Offset Correction: v_off_ini = 0.000006650 V, v_off_fin = 0.000002805 V 18:29:06 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170974514 Vs 18:59:09 Temperature Measurement, Probe Number = 0, T = 20.200000 C 18:59:09 Temperature Measurement, Probe Number = 1, T = 20.125000 C 18:59:10 Temperature Measurement, Probe Number = 2, T = 20.187000 C 18:59:11 Temperature Measurement, Probe Number = 3, T = 20.133000 C 18:59:11 Temperature Measurement, Probe Number = 4, T = 20.333000 C 18:59:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.33 18:59:12 Integrated Voltage Measurement... 18:59:31 Voltage Offset Correction: v_off_ini = 0.000005466 V, v_off_fin = 0.000007070 V 18:59:31 Integrated Voltage Measurement Delta Gap = 0.0040019 m VT = 0.171124510 Vs 18:59:31 Integrated Voltage Measurement... 18:59:51 Voltage Offset Correction: v_off_ini = 0.000006425 V, v_off_fin = 0.000003000 V 18:59:51 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170972351 Vs 18:59:53 Temperature Measurement, Probe Number = 0, T = 20.198000 C 18:59:54 Temperature Measurement, Probe Number = 1, T = 20.123000 C 18:59:55 Temperature Measurement, Probe Number = 2, T = 20.187000 C 18:59:55 Temperature Measurement, Probe Number = 3, T = 20.132000 C 18:59:56 Temperature Measurement, Probe Number = 4, T = 20.250000 C 18:59:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.25 18:59:56 Integrated Voltage Measurement... 19:00:16 Voltage Offset Correction: v_off_ini = 0.000004040 V, v_off_fin = 0.000006740 V 19:00:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171043293 Vs 19:00:16 Integrated Voltage Measurement... 19:00:35 Voltage Offset Correction: v_off_ini = 0.000006474 V, v_off_fin = 0.000002477 V 19:00:35 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975665 Vs 19:00:38 Temperature Measurement, Probe Number = 0, T = 20.201000 C 19:00:39 Temperature Measurement, Probe Number = 1, T = 20.120000 C 19:00:39 Temperature Measurement, Probe Number = 2, T = 20.190000 C 19:00:40 Temperature Measurement, Probe Number = 3, T = 20.134000 C 19:00:41 Temperature Measurement, Probe Number = 4, T = 20.328000 C 19:00:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.33 19:00:41 Integrated Voltage Measurement... 19:01:01 Voltage Offset Correction: v_off_ini = 0.000003831 V, v_off_fin = 0.000005870 V 19:01:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171043090 Vs 19:01:01 Integrated Voltage Measurement... 19:01:20 Voltage Offset Correction: v_off_ini = 0.000005655 V, v_off_fin = 0.000002037 V 19:01:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981775 Vs 19:01:23 Temperature Measurement, Probe Number = 0, T = 20.201000 C 19:01:24 Temperature Measurement, Probe Number = 1, T = 20.125000 C 19:01:25 Temperature Measurement, Probe Number = 2, T = 20.189000 C 19:01:25 Temperature Measurement, Probe Number = 3, T = 20.134000 C 19:01:26 Temperature Measurement, Probe Number = 4, T = 20.405000 C 19:01:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.41 19:01:26 Integrated Voltage Measurement... 19:01:46 Voltage Offset Correction: v_off_ini = 0.000004086 V, v_off_fin = 0.000006833 V 19:01:46 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047893 Vs 19:01:46 Integrated Voltage Measurement... 19:02:05 Voltage Offset Correction: v_off_ini = 0.000005938 V, v_off_fin = 0.000002582 V 19:02:05 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971028 Vs 19:02:08 Temperature Measurement, Probe Number = 0, T = 20.201000 C 19:02:08 Temperature Measurement, Probe Number = 1, T = 20.127000 C 19:02:09 Temperature Measurement, Probe Number = 2, T = 20.187000 C 19:02:10 Temperature Measurement, Probe Number = 3, T = 20.135000 C 19:02:10 Temperature Measurement, Probe Number = 4, T = 20.438000 C 19:02:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.44 19:02:10 Integrated Voltage Measurement... 19:02:30 Voltage Offset Correction: v_off_ini = 0.000003864 V, v_off_fin = 0.000006819 V 19:02:30 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171054262 Vs 19:02:30 Integrated Voltage Measurement... 19:02:49 Voltage Offset Correction: v_off_ini = 0.000006247 V, v_off_fin = 0.000002297 V 19:02:49 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170974782 Vs 19:02:52 Temperature Measurement, Probe Number = 0, T = 20.201000 C 19:02:52 Temperature Measurement, Probe Number = 1, T = 20.130000 C 19:02:53 Temperature Measurement, Probe Number = 2, T = 20.187000 C 19:02:54 Temperature Measurement, Probe Number = 3, T = 20.136000 C 19:02:54 Temperature Measurement, Probe Number = 4, T = 20.429000 C 19:02:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.43 19:02:55 Integrated Voltage Measurement... 19:03:14 Voltage Offset Correction: v_off_ini = 0.000003484 V, v_off_fin = 0.000006803 V 19:03:14 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171046484 Vs 19:03:14 Integrated Voltage Measurement... 19:03:34 Voltage Offset Correction: v_off_ini = 0.000006727 V, v_off_fin = 0.000002873 V 19:03:34 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971676 Vs 19:03:37 Temperature Measurement, Probe Number = 0, T = 20.198000 C 19:03:37 Temperature Measurement, Probe Number = 1, T = 20.126000 C 19:03:38 Temperature Measurement, Probe Number = 2, T = 20.185000 C 19:03:39 Temperature Measurement, Probe Number = 3, T = 20.134000 C 19:03:39 Temperature Measurement, Probe Number = 4, T = 20.323000 C 19:03:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.32 19:03:39 Integrated Voltage Measurement... 19:03:59 Voltage Offset Correction: v_off_ini = 0.000003694 V, v_off_fin = 0.000007168 V 19:03:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049725 Vs 19:03:59 Integrated Voltage Measurement... 19:04:18 Voltage Offset Correction: v_off_ini = 0.000006581 V, v_off_fin = 0.000002316 V 19:04:18 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170967420 Vs 19:04:21 Temperature Measurement, Probe Number = 0, T = 20.200000 C 19:04:22 Temperature Measurement, Probe Number = 1, T = 20.127000 C 19:04:22 Temperature Measurement, Probe Number = 2, T = 20.183000 C 19:04:23 Temperature Measurement, Probe Number = 3, T = 20.133000 C 19:04:24 Temperature Measurement, Probe Number = 4, T = 20.333000 C 19:04:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.33 19:04:24 Integrated Voltage Measurement... 19:04:43 Voltage Offset Correction: v_off_ini = 0.000004028 V, v_off_fin = 0.000006714 V 19:04:43 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171055289 Vs 19:04:43 Integrated Voltage Measurement... 19:05:02 Voltage Offset Correction: v_off_ini = 0.000006133 V, v_off_fin = 0.000003085 V 19:05:02 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170967203 Vs 19:05:05 Temperature Measurement, Probe Number = 0, T = 20.200000 C 19:05:06 Temperature Measurement, Probe Number = 1, T = 20.128000 C 19:05:06 Temperature Measurement, Probe Number = 2, T = 20.184000 C 19:05:07 Temperature Measurement, Probe Number = 3, T = 20.133000 C 19:05:08 Temperature Measurement, Probe Number = 4, T = 20.373000 C 19:05:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.37 19:05:08 Integrated Voltage Measurement... 19:05:27 Voltage Offset Correction: v_off_ini = 0.000004163 V, v_off_fin = 0.000007307 V 19:05:27 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171050962 Vs 19:05:28 Integrated Voltage Measurement... 19:05:47 Voltage Offset Correction: v_off_ini = 0.000006674 V, v_off_fin = 0.000002839 V 19:05:47 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170968619 Vs 19:05:50 Temperature Measurement, Probe Number = 0, T = 20.206000 C 19:05:50 Temperature Measurement, Probe Number = 1, T = 20.131000 C 19:05:51 Temperature Measurement, Probe Number = 2, T = 20.189000 C 19:05:52 Temperature Measurement, Probe Number = 3, T = 20.137000 C 19:05:52 Temperature Measurement, Probe Number = 4, T = 20.454000 C 19:05:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.45 19:05:53 Integrated Voltage Measurement... 19:06:12 Voltage Offset Correction: v_off_ini = 0.000004306 V, v_off_fin = 0.000006737 V 19:06:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051274 Vs 19:06:12 Integrated Voltage Measurement... 19:06:31 Voltage Offset Correction: v_off_ini = 0.000005802 V, v_off_fin = 0.000001573 V 19:06:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170973104 Vs 19:36:34 Temperature Measurement, Probe Number = 0, T = 20.196000 C 19:36:35 Temperature Measurement, Probe Number = 1, T = 20.119000 C 19:36:36 Temperature Measurement, Probe Number = 2, T = 20.183000 C 19:36:36 Temperature Measurement, Probe Number = 3, T = 20.128000 C 19:36:37 Temperature Measurement, Probe Number = 4, T = 20.234000 C 19:36:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.23 19:36:37 Integrated Voltage Measurement... 19:36:56 Voltage Offset Correction: v_off_ini = 0.000005163 V, v_off_fin = 0.000006183 V 19:36:56 Integrated Voltage Measurement Delta Gap = 0.0040018 m VT = 0.171107077 Vs 19:36:57 Integrated Voltage Measurement... 19:37:16 Voltage Offset Correction: v_off_ini = 0.000005687 V, v_off_fin = 0.000002565 V 19:37:16 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977686 Vs 19:37:19 Temperature Measurement, Probe Number = 0, T = 20.198000 C 19:37:19 Temperature Measurement, Probe Number = 1, T = 20.118000 C 19:37:20 Temperature Measurement, Probe Number = 2, T = 20.184000 C 19:37:21 Temperature Measurement, Probe Number = 3, T = 20.128000 C 19:37:21 Temperature Measurement, Probe Number = 4, T = 20.183000 C 19:37:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.18 19:37:22 Integrated Voltage Measurement... 19:37:41 Voltage Offset Correction: v_off_ini = 0.000003587 V, v_off_fin = 0.000006622 V 19:37:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044437 Vs 19:37:41 Integrated Voltage Measurement... 19:38:00 Voltage Offset Correction: v_off_ini = 0.000006139 V, v_off_fin = 0.000002332 V 19:38:00 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170973979 Vs 19:38:03 Temperature Measurement, Probe Number = 0, T = 20.194000 C 19:38:04 Temperature Measurement, Probe Number = 1, T = 20.116000 C 19:38:04 Temperature Measurement, Probe Number = 2, T = 20.178000 C 19:38:05 Temperature Measurement, Probe Number = 3, T = 20.123000 C 19:38:06 Temperature Measurement, Probe Number = 4, T = 20.070000 C 19:38:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.07 19:38:06 Integrated Voltage Measurement... 19:38:25 Voltage Offset Correction: v_off_ini = 0.000003438 V, v_off_fin = 0.000006344 V 19:38:25 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171043327 Vs 19:38:26 Integrated Voltage Measurement... 19:38:45 Voltage Offset Correction: v_off_ini = 0.000006065 V, v_off_fin = 0.000002597 V 19:38:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979000 Vs 19:38:48 Temperature Measurement, Probe Number = 0, T = 20.194000 C 19:38:49 Temperature Measurement, Probe Number = 1, T = 20.114000 C 19:38:49 Temperature Measurement, Probe Number = 2, T = 20.183000 C 19:38:50 Temperature Measurement, Probe Number = 3, T = 20.125000 C 19:38:50 Temperature Measurement, Probe Number = 4, T = 20.077000 C 19:38:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.08 19:38:51 Integrated Voltage Measurement... 19:39:10 Voltage Offset Correction: v_off_ini = 0.000004711 V, v_off_fin = 0.000007387 V 19:39:10 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050814 Vs 19:39:10 Integrated Voltage Measurement... 19:39:29 Voltage Offset Correction: v_off_ini = 0.000006313 V, v_off_fin = 0.000002932 V 19:39:29 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170968467 Vs 19:39:32 Temperature Measurement, Probe Number = 0, T = 20.200000 C 19:39:33 Temperature Measurement, Probe Number = 1, T = 20.119000 C 19:39:33 Temperature Measurement, Probe Number = 2, T = 20.182000 C 19:39:34 Temperature Measurement, Probe Number = 3, T = 20.123000 C 19:39:35 Temperature Measurement, Probe Number = 4, T = 20.070000 C 19:39:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.07 19:39:35 Integrated Voltage Measurement... 19:39:54 Voltage Offset Correction: v_off_ini = 0.000004134 V, v_off_fin = 0.000006827 V 19:39:54 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171051662 Vs 19:39:55 Integrated Voltage Measurement... 19:40:14 Voltage Offset Correction: v_off_ini = 0.000005956 V, v_off_fin = 0.000002298 V 19:40:14 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170974812 Vs 19:40:16 Temperature Measurement, Probe Number = 0, T = 20.201000 C 19:40:17 Temperature Measurement, Probe Number = 1, T = 20.120000 C 19:40:18 Temperature Measurement, Probe Number = 2, T = 20.185000 C 19:40:18 Temperature Measurement, Probe Number = 3, T = 20.126000 C 19:40:19 Temperature Measurement, Probe Number = 4, T = 20.081000 C 19:40:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.08 19:40:19 Integrated Voltage Measurement... 19:40:39 Voltage Offset Correction: v_off_ini = 0.000003921 V, v_off_fin = 0.000006538 V 19:40:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171048461 Vs 19:40:39 Integrated Voltage Measurement... 19:40:58 Voltage Offset Correction: v_off_ini = 0.000006116 V, v_off_fin = 0.000002654 V 19:40:59 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170976870 Vs 19:41:01 Temperature Measurement, Probe Number = 0, T = 20.201000 C 19:41:02 Temperature Measurement, Probe Number = 1, T = 20.124000 C 19:41:03 Temperature Measurement, Probe Number = 2, T = 20.184000 C 19:41:03 Temperature Measurement, Probe Number = 3, T = 20.126000 C 19:41:04 Temperature Measurement, Probe Number = 4, T = 20.116000 C 19:41:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.12 19:41:04 Integrated Voltage Measurement... 19:41:23 Voltage Offset Correction: v_off_ini = 0.000003849 V, v_off_fin = 0.000006347 V 19:41:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047904 Vs 19:41:24 Integrated Voltage Measurement... 19:41:43 Voltage Offset Correction: v_off_ini = 0.000005614 V, v_off_fin = 0.000001989 V 19:41:43 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977263 Vs 19:41:46 Temperature Measurement, Probe Number = 0, T = 20.201000 C 19:41:46 Temperature Measurement, Probe Number = 1, T = 20.125000 C 19:41:47 Temperature Measurement, Probe Number = 2, T = 20.182000 C 19:41:48 Temperature Measurement, Probe Number = 3, T = 20.125000 C 19:41:48 Temperature Measurement, Probe Number = 4, T = 20.063000 C 19:41:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.06 19:41:49 Integrated Voltage Measurement... 19:42:08 Voltage Offset Correction: v_off_ini = 0.000003969 V, v_off_fin = 0.000006846 V 19:42:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045561 Vs 19:42:08 Integrated Voltage Measurement... 19:42:27 Voltage Offset Correction: v_off_ini = 0.000005916 V, v_off_fin = 0.000002734 V 19:42:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974854 Vs 19:42:30 Temperature Measurement, Probe Number = 0, T = 20.200000 C 19:42:31 Temperature Measurement, Probe Number = 1, T = 20.121000 C 19:42:32 Temperature Measurement, Probe Number = 2, T = 20.178000 C 19:42:32 Temperature Measurement, Probe Number = 3, T = 20.122000 C 19:42:33 Temperature Measurement, Probe Number = 4, T = 20.099000 C 19:42:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.10 19:42:33 Integrated Voltage Measurement... 19:42:52 Voltage Offset Correction: v_off_ini = 0.000003929 V, v_off_fin = 0.000006689 V 19:42:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047943 Vs 19:42:53 Integrated Voltage Measurement... 19:43:12 Voltage Offset Correction: v_off_ini = 0.000005754 V, v_off_fin = 0.000001822 V 19:43:12 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170978266 Vs 19:43:15 Temperature Measurement, Probe Number = 0, T = 20.200000 C 19:43:15 Temperature Measurement, Probe Number = 1, T = 20.120000 C 19:43:16 Temperature Measurement, Probe Number = 2, T = 20.179000 C 19:43:17 Temperature Measurement, Probe Number = 3, T = 20.123000 C 19:43:17 Temperature Measurement, Probe Number = 4, T = 20.085000 C 19:43:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.09 19:43:18 Integrated Voltage Measurement... 19:43:37 Voltage Offset Correction: v_off_ini = 0.000003846 V, v_off_fin = 0.000006341 V 19:43:37 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045658 Vs 19:43:37 Integrated Voltage Measurement... 19:43:57 Voltage Offset Correction: v_off_ini = 0.000005859 V, v_off_fin = 0.000002296 V 19:43:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170976029 Vs 20:13:59 Temperature Measurement, Probe Number = 0, T = 20.203000 C 20:14:00 Temperature Measurement, Probe Number = 1, T = 20.126000 C 20:14:01 Temperature Measurement, Probe Number = 2, T = 20.188000 C 20:14:01 Temperature Measurement, Probe Number = 3, T = 20.129000 C 20:14:02 Temperature Measurement, Probe Number = 4, T = 20.264000 C 20:14:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.26 20:14:02 Integrated Voltage Measurement... 20:14:21 Voltage Offset Correction: v_off_ini = 0.000004708 V, v_off_fin = 0.000006102 V 20:14:22 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171094765 Vs 20:14:22 Integrated Voltage Measurement... 20:14:41 Voltage Offset Correction: v_off_ini = 0.000005538 V, v_off_fin = 0.000002510 V 20:14:41 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986621 Vs 20:14:44 Temperature Measurement, Probe Number = 0, T = 20.207000 C 20:14:45 Temperature Measurement, Probe Number = 1, T = 20.133000 C 20:14:45 Temperature Measurement, Probe Number = 2, T = 20.188000 C 20:14:46 Temperature Measurement, Probe Number = 3, T = 20.131000 C 20:14:47 Temperature Measurement, Probe Number = 4, T = 20.324000 C 20:14:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.32 20:14:47 Integrated Voltage Measurement... 20:15:07 Voltage Offset Correction: v_off_ini = 0.000003512 V, v_off_fin = 0.000006300 V 20:15:07 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049682 Vs 20:15:07 Integrated Voltage Measurement... 20:15:26 Voltage Offset Correction: v_off_ini = 0.000006133 V, v_off_fin = 0.000002299 V 20:15:27 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981760 Vs 20:15:29 Temperature Measurement, Probe Number = 0, T = 20.205000 C 20:15:30 Temperature Measurement, Probe Number = 1, T = 20.130000 C 20:15:31 Temperature Measurement, Probe Number = 2, T = 20.189000 C 20:15:31 Temperature Measurement, Probe Number = 3, T = 20.133000 C 20:15:32 Temperature Measurement, Probe Number = 4, T = 20.355000 C 20:15:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.36 20:15:32 Integrated Voltage Measurement... 20:15:52 Voltage Offset Correction: v_off_ini = 0.000004142 V, v_off_fin = 0.000006096 V 20:15:52 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047778 Vs 20:15:52 Integrated Voltage Measurement... 20:16:12 Voltage Offset Correction: v_off_ini = 0.000005428 V, v_off_fin = 0.000002729 V 20:16:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989456 Vs 20:16:14 Temperature Measurement, Probe Number = 0, T = 20.203000 C 20:16:15 Temperature Measurement, Probe Number = 1, T = 20.125000 C 20:16:16 Temperature Measurement, Probe Number = 2, T = 20.182000 C 20:16:16 Temperature Measurement, Probe Number = 3, T = 20.128000 C 20:16:17 Temperature Measurement, Probe Number = 4, T = 20.303000 C 20:16:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.30 20:16:17 Integrated Voltage Measurement... 20:16:37 Voltage Offset Correction: v_off_ini = 0.000003904 V, v_off_fin = 0.000007120 V 20:16:37 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049671 Vs 20:16:37 Integrated Voltage Measurement... 20:16:56 Voltage Offset Correction: v_off_ini = 0.000006314 V, v_off_fin = 0.000002549 V 20:16:56 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170978828 Vs 20:16:59 Temperature Measurement, Probe Number = 0, T = 20.198000 C 20:16:59 Temperature Measurement, Probe Number = 1, T = 20.117000 C 20:17:00 Temperature Measurement, Probe Number = 2, T = 20.181000 C 20:17:01 Temperature Measurement, Probe Number = 3, T = 20.123000 C 20:17:01 Temperature Measurement, Probe Number = 4, T = 20.306000 C 20:17:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.31 20:17:02 Integrated Voltage Measurement... 20:17:21 Voltage Offset Correction: v_off_ini = 0.000003854 V, v_off_fin = 0.000007153 V 20:17:21 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171053150 Vs 20:17:21 Integrated Voltage Measurement... 20:17:41 Voltage Offset Correction: v_off_ini = 0.000006098 V, v_off_fin = 0.000002762 V 20:17:41 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980306 Vs 20:17:44 Temperature Measurement, Probe Number = 0, T = 20.204000 C 20:17:44 Temperature Measurement, Probe Number = 1, T = 20.127000 C 20:17:45 Temperature Measurement, Probe Number = 2, T = 20.186000 C 20:17:46 Temperature Measurement, Probe Number = 3, T = 20.128000 C 20:17:46 Temperature Measurement, Probe Number = 4, T = 20.312000 C 20:17:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.31 20:17:47 Integrated Voltage Measurement... 20:18:06 Voltage Offset Correction: v_off_ini = 0.000004064 V, v_off_fin = 0.000006635 V 20:18:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045583 Vs 20:18:06 Integrated Voltage Measurement... 20:18:26 Voltage Offset Correction: v_off_ini = 0.000005880 V, v_off_fin = 0.000002704 V 20:18:26 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170985500 Vs 20:18:29 Temperature Measurement, Probe Number = 0, T = 20.206000 C 20:18:29 Temperature Measurement, Probe Number = 1, T = 20.132000 C 20:18:30 Temperature Measurement, Probe Number = 2, T = 20.188000 C 20:18:31 Temperature Measurement, Probe Number = 3, T = 20.132000 C 20:18:31 Temperature Measurement, Probe Number = 4, T = 20.327000 C 20:18:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.33 20:18:31 Integrated Voltage Measurement... 20:18:51 Voltage Offset Correction: v_off_ini = 0.000003329 V, v_off_fin = 0.000006700 V 20:18:51 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051281 Vs 20:18:51 Integrated Voltage Measurement... 20:19:10 Voltage Offset Correction: v_off_ini = 0.000005664 V, v_off_fin = 0.000002166 V 20:19:10 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983585 Vs 20:19:13 Temperature Measurement, Probe Number = 0, T = 20.208000 C 20:19:14 Temperature Measurement, Probe Number = 1, T = 20.134000 C 20:19:14 Temperature Measurement, Probe Number = 2, T = 20.191000 C 20:19:15 Temperature Measurement, Probe Number = 3, T = 20.135000 C 20:19:16 Temperature Measurement, Probe Number = 4, T = 20.404000 C 20:19:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.40 20:19:16 Integrated Voltage Measurement... 20:19:35 Voltage Offset Correction: v_off_ini = 0.000004297 V, v_off_fin = 0.000006880 V 20:19:35 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171060819 Vs 20:19:35 Integrated Voltage Measurement... 20:19:55 Voltage Offset Correction: v_off_ini = 0.000006491 V, v_off_fin = 0.000002515 V 20:19:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984594 Vs 20:19:58 Temperature Measurement, Probe Number = 0, T = 20.209000 C 20:19:58 Temperature Measurement, Probe Number = 1, T = 20.134000 C 20:19:59 Temperature Measurement, Probe Number = 2, T = 20.192000 C 20:20:00 Temperature Measurement, Probe Number = 3, T = 20.137000 C 20:20:00 Temperature Measurement, Probe Number = 4, T = 20.445000 C 20:20:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.45 20:20:01 Integrated Voltage Measurement... 20:20:20 Voltage Offset Correction: v_off_ini = 0.000004128 V, v_off_fin = 0.000006489 V 20:20:20 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053852 Vs 20:20:20 Integrated Voltage Measurement... 20:20:40 Voltage Offset Correction: v_off_ini = 0.000005850 V, v_off_fin = 0.000002765 V 20:20:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983414 Vs 20:20:43 Temperature Measurement, Probe Number = 0, T = 20.206000 C 20:20:44 Temperature Measurement, Probe Number = 1, T = 20.129000 C 20:20:44 Temperature Measurement, Probe Number = 2, T = 20.189000 C 20:20:45 Temperature Measurement, Probe Number = 3, T = 20.133000 C 20:20:46 Temperature Measurement, Probe Number = 4, T = 20.463000 C 20:20:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.46 20:20:46 Integrated Voltage Measurement... 20:21:06 Voltage Offset Correction: v_off_ini = 0.000004140 V, v_off_fin = 0.000006607 V 20:21:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171056502 Vs 20:21:06 Integrated Voltage Measurement... 20:21:25 Voltage Offset Correction: v_off_ini = 0.000006292 V, v_off_fin = 0.000002308 V 20:21:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983147 Vs 20:51:28 Temperature Measurement, Probe Number = 0, T = 20.203000 C 20:51:29 Temperature Measurement, Probe Number = 1, T = 20.126000 C 20:51:29 Temperature Measurement, Probe Number = 2, T = 20.187000 C 20:51:30 Temperature Measurement, Probe Number = 3, T = 20.131000 C 20:51:31 Temperature Measurement, Probe Number = 4, T = 20.348000 C 20:51:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.35 20:51:31 Integrated Voltage Measurement... 20:51:50 Voltage Offset Correction: v_off_ini = 0.000004579 V, v_off_fin = 0.000006322 V 20:51:50 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171106226 Vs 20:51:50 Integrated Voltage Measurement... 20:52:10 Voltage Offset Correction: v_off_ini = 0.000005332 V, v_off_fin = 0.000002730 V 20:52:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985144 Vs 20:52:13 Temperature Measurement, Probe Number = 0, T = 20.206000 C 20:52:13 Temperature Measurement, Probe Number = 1, T = 20.130000 C 20:52:14 Temperature Measurement, Probe Number = 2, T = 20.189000 C 20:52:15 Temperature Measurement, Probe Number = 3, T = 20.134000 C 20:52:15 Temperature Measurement, Probe Number = 4, T = 20.436000 C 20:52:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.44 20:52:15 Integrated Voltage Measurement... 20:52:35 Voltage Offset Correction: v_off_ini = 0.000003545 V, v_off_fin = 0.000006003 V 20:52:35 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045826 Vs 20:52:35 Integrated Voltage Measurement... 20:52:54 Voltage Offset Correction: v_off_ini = 0.000005984 V, v_off_fin = 0.000002908 V 20:52:54 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983102 Vs 20:52:57 Temperature Measurement, Probe Number = 0, T = 20.209000 C 20:52:58 Temperature Measurement, Probe Number = 1, T = 20.132000 C 20:52:58 Temperature Measurement, Probe Number = 2, T = 20.191000 C 20:52:59 Temperature Measurement, Probe Number = 3, T = 20.136000 C 20:53:00 Temperature Measurement, Probe Number = 4, T = 20.510000 C 20:53:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.51 20:53:00 Integrated Voltage Measurement... 20:53:19 Voltage Offset Correction: v_off_ini = 0.000003933 V, v_off_fin = 0.000006622 V 20:53:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051850 Vs 20:53:20 Integrated Voltage Measurement... 20:53:39 Voltage Offset Correction: v_off_ini = 0.000005638 V, v_off_fin = 0.000002393 V 20:53:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985203 Vs 20:53:42 Temperature Measurement, Probe Number = 0, T = 20.205000 C 20:53:43 Temperature Measurement, Probe Number = 1, T = 20.129000 C 20:53:43 Temperature Measurement, Probe Number = 2, T = 20.188000 C 20:53:44 Temperature Measurement, Probe Number = 3, T = 20.134000 C 20:53:45 Temperature Measurement, Probe Number = 4, T = 20.542000 C 20:53:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.54 20:53:45 Integrated Voltage Measurement... 20:54:04 Voltage Offset Correction: v_off_ini = 0.000003873 V, v_off_fin = 0.000006609 V 20:54:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049699 Vs 20:54:05 Integrated Voltage Measurement... 20:54:24 Voltage Offset Correction: v_off_ini = 0.000006637 V, v_off_fin = 0.000003165 V 20:54:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980302 Vs 20:54:27 Temperature Measurement, Probe Number = 0, T = 20.194000 C 20:54:27 Temperature Measurement, Probe Number = 1, T = 20.118000 C 20:54:28 Temperature Measurement, Probe Number = 2, T = 20.180000 C 20:54:29 Temperature Measurement, Probe Number = 3, T = 20.125000 C 20:54:29 Temperature Measurement, Probe Number = 4, T = 20.463000 C 20:54:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.46 20:54:30 Integrated Voltage Measurement... 20:54:49 Voltage Offset Correction: v_off_ini = 0.000004322 V, v_off_fin = 0.000006967 V 20:54:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050086 Vs 20:54:50 Integrated Voltage Measurement... 20:55:09 Voltage Offset Correction: v_off_ini = 0.000006006 V, v_off_fin = 0.000002402 V 20:55:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980537 Vs 20:55:12 Temperature Measurement, Probe Number = 0, T = 20.200000 C 20:55:13 Temperature Measurement, Probe Number = 1, T = 20.125000 C 20:55:13 Temperature Measurement, Probe Number = 2, T = 20.183000 C 20:55:14 Temperature Measurement, Probe Number = 3, T = 20.128000 C 20:55:15 Temperature Measurement, Probe Number = 4, T = 20.373000 C 20:55:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.37 20:55:15 Integrated Voltage Measurement... 20:55:34 Voltage Offset Correction: v_off_ini = 0.000004099 V, v_off_fin = 0.000007100 V 20:55:34 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052682 Vs 20:55:35 Integrated Voltage Measurement... 20:55:54 Voltage Offset Correction: v_off_ini = 0.000006027 V, v_off_fin = 0.000002889 V 20:55:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980263 Vs 20:55:57 Temperature Measurement, Probe Number = 0, T = 20.203000 C 20:55:58 Temperature Measurement, Probe Number = 1, T = 20.126000 C 20:55:58 Temperature Measurement, Probe Number = 2, T = 20.186000 C 20:55:59 Temperature Measurement, Probe Number = 3, T = 20.132000 C 20:56:00 Temperature Measurement, Probe Number = 4, T = 20.439000 C 20:56:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.44 20:56:00 Integrated Voltage Measurement... 20:56:19 Voltage Offset Correction: v_off_ini = 0.000004269 V, v_off_fin = 0.000006312 V 20:56:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053776 Vs 20:56:19 Integrated Voltage Measurement... 20:56:39 Voltage Offset Correction: v_off_ini = 0.000006339 V, v_off_fin = 0.000003116 V 20:56:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978120 Vs 20:56:42 Temperature Measurement, Probe Number = 0, T = 20.205000 C 20:56:43 Temperature Measurement, Probe Number = 1, T = 20.128000 C 20:56:44 Temperature Measurement, Probe Number = 2, T = 20.188000 C 20:56:44 Temperature Measurement, Probe Number = 3, T = 20.135000 C 20:56:45 Temperature Measurement, Probe Number = 4, T = 20.512000 C 20:56:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.51 20:56:45 Integrated Voltage Measurement... 20:57:05 Voltage Offset Correction: v_off_ini = 0.000004568 V, v_off_fin = 0.000007355 V 20:57:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051175 Vs 20:57:05 Integrated Voltage Measurement... 20:57:24 Voltage Offset Correction: v_off_ini = 0.000006078 V, v_off_fin = 0.000003082 V 20:57:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170978183 Vs 20:57:27 Temperature Measurement, Probe Number = 0, T = 20.205000 C 20:57:28 Temperature Measurement, Probe Number = 1, T = 20.124000 C 20:57:29 Temperature Measurement, Probe Number = 2, T = 20.187000 C 20:57:29 Temperature Measurement, Probe Number = 3, T = 20.132000 C 20:57:30 Temperature Measurement, Probe Number = 4, T = 20.439000 C 20:57:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.44 20:57:30 Integrated Voltage Measurement... 20:57:49 Voltage Offset Correction: v_off_ini = 0.000004343 V, v_off_fin = 0.000006799 V 20:57:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057293 Vs 20:57:50 Integrated Voltage Measurement... 20:58:10 Voltage Offset Correction: v_off_ini = 0.000005978 V, v_off_fin = 0.000002869 V 20:58:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977912 Vs 20:58:12 Temperature Measurement, Probe Number = 0, T = 20.198000 C 20:58:13 Temperature Measurement, Probe Number = 1, T = 20.122000 C 20:58:14 Temperature Measurement, Probe Number = 2, T = 20.183000 C 20:58:14 Temperature Measurement, Probe Number = 3, T = 20.130000 C 20:58:15 Temperature Measurement, Probe Number = 4, T = 20.367000 C 20:58:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.37 20:58:15 Integrated Voltage Measurement... 20:58:35 Voltage Offset Correction: v_off_ini = 0.000004207 V, v_off_fin = 0.000007185 V 20:58:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047132 Vs 20:58:35 Integrated Voltage Measurement... 20:58:54 Voltage Offset Correction: v_off_ini = 0.000006535 V, v_off_fin = 0.000002608 V 20:58:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977561 Vs 21:28:57 Temperature Measurement, Probe Number = 0, T = 20.196000 C 21:28:58 Temperature Measurement, Probe Number = 1, T = 20.120000 C 21:28:59 Temperature Measurement, Probe Number = 2, T = 20.181000 C 21:28:59 Temperature Measurement, Probe Number = 3, T = 20.125000 C 21:29:00 Temperature Measurement, Probe Number = 4, T = 20.251000 C 21:29:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.25 21:29:00 Integrated Voltage Measurement... 21:29:20 Voltage Offset Correction: v_off_ini = 0.000004379 V, v_off_fin = 0.000006265 V 21:29:20 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171091063 Vs 21:29:20 Integrated Voltage Measurement... 21:29:39 Voltage Offset Correction: v_off_ini = 0.000005432 V, v_off_fin = 0.000003001 V 21:29:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984441 Vs 21:29:42 Temperature Measurement, Probe Number = 0, T = 20.199000 C 21:29:43 Temperature Measurement, Probe Number = 1, T = 20.123000 C 21:29:43 Temperature Measurement, Probe Number = 2, T = 20.182000 C 21:29:44 Temperature Measurement, Probe Number = 3, T = 20.127000 C 21:29:45 Temperature Measurement, Probe Number = 4, T = 20.273000 C 21:29:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.27 21:29:45 Integrated Voltage Measurement... 21:30:04 Voltage Offset Correction: v_off_ini = 0.000003881 V, v_off_fin = 0.000006367 V 21:30:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040657 Vs 21:30:05 Integrated Voltage Measurement... 21:30:24 Voltage Offset Correction: v_off_ini = 0.000006296 V, v_off_fin = 0.000003137 V 21:30:24 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981936 Vs 21:30:26 Temperature Measurement, Probe Number = 0, T = 20.200000 C 21:30:27 Temperature Measurement, Probe Number = 1, T = 20.123000 C 21:30:28 Temperature Measurement, Probe Number = 2, T = 20.184000 C 21:30:28 Temperature Measurement, Probe Number = 3, T = 20.128000 C 21:30:29 Temperature Measurement, Probe Number = 4, T = 20.393000 C 21:30:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.39 21:30:29 Integrated Voltage Measurement... 21:30:49 Voltage Offset Correction: v_off_ini = 0.000004362 V, v_off_fin = 0.000006723 V 21:30:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050591 Vs 21:30:49 Integrated Voltage Measurement... 21:31:09 Voltage Offset Correction: v_off_ini = 0.000006405 V, v_off_fin = 0.000003661 V 21:31:09 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170978229 Vs 21:31:11 Temperature Measurement, Probe Number = 0, T = 20.206000 C 21:31:12 Temperature Measurement, Probe Number = 1, T = 20.128000 C 21:31:13 Temperature Measurement, Probe Number = 2, T = 20.188000 C 21:31:13 Temperature Measurement, Probe Number = 3, T = 20.133000 C 21:31:14 Temperature Measurement, Probe Number = 4, T = 20.441000 C 21:31:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.44 21:31:14 Integrated Voltage Measurement... 21:31:34 Voltage Offset Correction: v_off_ini = 0.000003806 V, v_off_fin = 0.000006826 V 21:31:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049532 Vs 21:31:34 Integrated Voltage Measurement... 21:31:53 Voltage Offset Correction: v_off_ini = 0.000006359 V, v_off_fin = 0.000002637 V 21:31:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979772 Vs 21:31:56 Temperature Measurement, Probe Number = 0, T = 20.207000 C 21:31:57 Temperature Measurement, Probe Number = 1, T = 20.128000 C 21:31:58 Temperature Measurement, Probe Number = 2, T = 20.190000 C 21:31:58 Temperature Measurement, Probe Number = 3, T = 20.133000 C 21:31:59 Temperature Measurement, Probe Number = 4, T = 20.544000 C 21:31:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.54 21:31:59 Integrated Voltage Measurement... 21:32:19 Voltage Offset Correction: v_off_ini = 0.000003911 V, v_off_fin = 0.000006855 V 21:32:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055713 Vs 21:32:19 Integrated Voltage Measurement... 21:32:38 Voltage Offset Correction: v_off_ini = 0.000005991 V, v_off_fin = 0.000003459 V 21:32:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983379 Vs 21:32:41 Temperature Measurement, Probe Number = 0, T = 20.199000 C 21:32:42 Temperature Measurement, Probe Number = 1, T = 20.123000 C 21:32:43 Temperature Measurement, Probe Number = 2, T = 20.183000 C 21:32:43 Temperature Measurement, Probe Number = 3, T = 20.128000 C 21:32:44 Temperature Measurement, Probe Number = 4, T = 20.554000 C 21:32:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.55 21:32:44 Integrated Voltage Measurement... 21:33:03 Voltage Offset Correction: v_off_ini = 0.000004311 V, v_off_fin = 0.000006912 V 21:33:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055141 Vs 21:33:04 Integrated Voltage Measurement... 21:33:23 Voltage Offset Correction: v_off_ini = 0.000006049 V, v_off_fin = 0.000002817 V 21:33:23 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979554 Vs 21:33:26 Temperature Measurement, Probe Number = 0, T = 20.196000 C 21:33:26 Temperature Measurement, Probe Number = 1, T = 20.119000 C 21:33:27 Temperature Measurement, Probe Number = 2, T = 20.181000 C 21:33:28 Temperature Measurement, Probe Number = 3, T = 20.124000 C 21:33:28 Temperature Measurement, Probe Number = 4, T = 20.453000 C 21:33:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.45 21:33:29 Integrated Voltage Measurement... 21:33:48 Voltage Offset Correction: v_off_ini = 0.000004107 V, v_off_fin = 0.000006550 V 21:33:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053276 Vs 21:33:48 Integrated Voltage Measurement... 21:34:08 Voltage Offset Correction: v_off_ini = 0.000006202 V, v_off_fin = 0.000002582 V 21:34:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984344 Vs 21:34:10 Temperature Measurement, Probe Number = 0, T = 20.192000 C 21:34:11 Temperature Measurement, Probe Number = 1, T = 20.114000 C 21:34:12 Temperature Measurement, Probe Number = 2, T = 20.178000 C 21:34:12 Temperature Measurement, Probe Number = 3, T = 20.122000 C 21:34:13 Temperature Measurement, Probe Number = 4, T = 20.340000 C 21:34:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.34 21:34:13 Integrated Voltage Measurement... 21:34:33 Voltage Offset Correction: v_off_ini = 0.000004161 V, v_off_fin = 0.000006497 V 21:34:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054394 Vs 21:34:33 Integrated Voltage Measurement... 21:34:52 Voltage Offset Correction: v_off_ini = 0.000006259 V, v_off_fin = 0.000002892 V 21:34:52 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170978838 Vs 21:34:55 Temperature Measurement, Probe Number = 0, T = 20.196000 C 21:34:55 Temperature Measurement, Probe Number = 1, T = 20.118000 C 21:34:56 Temperature Measurement, Probe Number = 2, T = 20.181000 C 21:34:57 Temperature Measurement, Probe Number = 3, T = 20.124000 C 21:34:57 Temperature Measurement, Probe Number = 4, T = 20.281000 C 21:34:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.28 21:34:58 Integrated Voltage Measurement... 21:35:17 Voltage Offset Correction: v_off_ini = 0.000003845 V, v_off_fin = 0.000006468 V 21:35:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051726 Vs 21:35:17 Integrated Voltage Measurement... 21:35:37 Voltage Offset Correction: v_off_ini = 0.000005755 V, v_off_fin = 0.000003478 V 21:35:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981619 Vs 21:35:40 Temperature Measurement, Probe Number = 0, T = 20.194000 C 21:35:40 Temperature Measurement, Probe Number = 1, T = 20.120000 C 21:35:41 Temperature Measurement, Probe Number = 2, T = 20.179000 C 21:35:42 Temperature Measurement, Probe Number = 3, T = 20.124000 C 21:35:42 Temperature Measurement, Probe Number = 4, T = 20.169000 C 21:35:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.17 21:35:42 Integrated Voltage Measurement... 21:36:02 Voltage Offset Correction: v_off_ini = 0.000004289 V, v_off_fin = 0.000007101 V 21:36:02 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171056097 Vs 21:36:02 Integrated Voltage Measurement... 21:36:22 Voltage Offset Correction: v_off_ini = 0.000006459 V, v_off_fin = 0.000003566 V 21:36:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979031 Vs 22:06:25 Temperature Measurement, Probe Number = 0, T = 20.195000 C 22:06:25 Temperature Measurement, Probe Number = 1, T = 20.122000 C 22:06:26 Temperature Measurement, Probe Number = 2, T = 20.181000 C 22:06:27 Temperature Measurement, Probe Number = 3, T = 20.129000 C 22:06:27 Temperature Measurement, Probe Number = 4, T = 20.350000 C 22:06:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.35 22:06:28 Integrated Voltage Measurement... 22:06:47 Voltage Offset Correction: v_off_ini = 0.000005605 V, v_off_fin = 0.000007243 V 22:06:47 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171102817 Vs 22:06:47 Integrated Voltage Measurement... 22:07:07 Voltage Offset Correction: v_off_ini = 0.000006539 V, v_off_fin = 0.000002579 V 22:07:07 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170978775 Vs 22:07:10 Temperature Measurement, Probe Number = 0, T = 20.200000 C 22:07:10 Temperature Measurement, Probe Number = 1, T = 20.123000 C 22:07:11 Temperature Measurement, Probe Number = 2, T = 20.185000 C 22:07:12 Temperature Measurement, Probe Number = 3, T = 20.130000 C 22:07:12 Temperature Measurement, Probe Number = 4, T = 20.400000 C 22:07:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.40 22:07:12 Integrated Voltage Measurement... 22:07:32 Voltage Offset Correction: v_off_ini = 0.000004368 V, v_off_fin = 0.000007118 V 22:07:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054850 Vs 22:07:32 Integrated Voltage Measurement... 22:07:51 Voltage Offset Correction: v_off_ini = 0.000006457 V, v_off_fin = 0.000003196 V 22:07:51 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977401 Vs 22:07:54 Temperature Measurement, Probe Number = 0, T = 20.198000 C 22:07:55 Temperature Measurement, Probe Number = 1, T = 20.124000 C 22:07:55 Temperature Measurement, Probe Number = 2, T = 20.184000 C 22:07:56 Temperature Measurement, Probe Number = 3, T = 20.131000 C 22:07:57 Temperature Measurement, Probe Number = 4, T = 20.474000 C 22:07:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.47 22:07:57 Integrated Voltage Measurement... 22:08:16 Voltage Offset Correction: v_off_ini = 0.000003862 V, v_off_fin = 0.000006693 V 22:08:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171056054 Vs 22:08:16 Integrated Voltage Measurement... 22:08:36 Voltage Offset Correction: v_off_ini = 0.000006079 V, v_off_fin = 0.000003118 V 22:08:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983017 Vs 22:08:39 Temperature Measurement, Probe Number = 0, T = 20.201000 C 22:08:39 Temperature Measurement, Probe Number = 1, T = 20.126000 C 22:08:40 Temperature Measurement, Probe Number = 2, T = 20.187000 C 22:08:41 Temperature Measurement, Probe Number = 3, T = 20.133000 C 22:08:41 Temperature Measurement, Probe Number = 4, T = 20.545000 C 22:08:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.55 22:08:42 Integrated Voltage Measurement... 22:09:01 Voltage Offset Correction: v_off_ini = 0.000004683 V, v_off_fin = 0.000006469 V 22:09:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053006 Vs 22:09:02 Integrated Voltage Measurement... 22:09:21 Voltage Offset Correction: v_off_ini = 0.000005687 V, v_off_fin = 0.000002679 V 22:09:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987305 Vs 22:09:24 Temperature Measurement, Probe Number = 0, T = 20.194000 C 22:09:24 Temperature Measurement, Probe Number = 1, T = 20.116000 C 22:09:25 Temperature Measurement, Probe Number = 2, T = 20.181000 C 22:09:26 Temperature Measurement, Probe Number = 3, T = 20.125000 C 22:09:26 Temperature Measurement, Probe Number = 4, T = 20.509000 C 22:09:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.51 22:09:26 Integrated Voltage Measurement... 22:09:46 Voltage Offset Correction: v_off_ini = 0.000004442 V, v_off_fin = 0.000006533 V 22:09:46 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050630 Vs 22:09:47 Integrated Voltage Measurement... 22:10:06 Voltage Offset Correction: v_off_ini = 0.000006521 V, v_off_fin = 0.000002849 V 22:10:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980941 Vs 22:10:09 Temperature Measurement, Probe Number = 0, T = 20.189000 C 22:10:09 Temperature Measurement, Probe Number = 1, T = 20.115000 C 22:10:10 Temperature Measurement, Probe Number = 2, T = 20.179000 C 22:10:11 Temperature Measurement, Probe Number = 3, T = 20.125000 C 22:10:11 Temperature Measurement, Probe Number = 4, T = 20.421000 C 22:10:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.42 22:10:12 Integrated Voltage Measurement... 22:10:31 Voltage Offset Correction: v_off_ini = 0.000004072 V, v_off_fin = 0.000006634 V 22:10:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053517 Vs 22:10:31 Integrated Voltage Measurement... 22:10:50 Voltage Offset Correction: v_off_ini = 0.000006098 V, v_off_fin = 0.000002681 V 22:10:51 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977115 Vs 22:10:53 Temperature Measurement, Probe Number = 0, T = 20.199000 C 22:10:54 Temperature Measurement, Probe Number = 1, T = 20.122000 C 22:10:55 Temperature Measurement, Probe Number = 2, T = 20.183000 C 22:10:55 Temperature Measurement, Probe Number = 3, T = 20.130000 C 22:10:56 Temperature Measurement, Probe Number = 4, T = 20.393000 C 22:10:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.39 22:10:56 Integrated Voltage Measurement... 22:11:15 Voltage Offset Correction: v_off_ini = 0.000004344 V, v_off_fin = 0.000007752 V 22:11:15 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171062185 Vs 22:11:16 Integrated Voltage Measurement... 22:11:35 Voltage Offset Correction: v_off_ini = 0.000006522 V, v_off_fin = 0.000003092 V 22:11:35 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977973 Vs 22:11:38 Temperature Measurement, Probe Number = 0, T = 20.203000 C 22:11:39 Temperature Measurement, Probe Number = 1, T = 20.126000 C 22:11:39 Temperature Measurement, Probe Number = 2, T = 20.187000 C 22:11:40 Temperature Measurement, Probe Number = 3, T = 20.132000 C 22:11:41 Temperature Measurement, Probe Number = 4, T = 20.370000 C 22:11:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.37 22:11:41 Integrated Voltage Measurement... 22:12:00 Voltage Offset Correction: v_off_ini = 0.000004479 V, v_off_fin = 0.000006722 V 22:12:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171060108 Vs 22:12:01 Integrated Voltage Measurement... 22:12:20 Voltage Offset Correction: v_off_ini = 0.000006411 V, v_off_fin = 0.000002704 V 22:12:20 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975039 Vs 22:12:22 Temperature Measurement, Probe Number = 0, T = 20.203000 C 22:12:23 Temperature Measurement, Probe Number = 1, T = 20.125000 C 22:12:24 Temperature Measurement, Probe Number = 2, T = 20.187000 C 22:12:24 Temperature Measurement, Probe Number = 3, T = 20.131000 C 22:12:25 Temperature Measurement, Probe Number = 4, T = 20.358000 C 22:12:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.36 22:12:25 Integrated Voltage Measurement... 22:12:44 Voltage Offset Correction: v_off_ini = 0.000004597 V, v_off_fin = 0.000007799 V 22:12:44 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171062393 Vs 22:12:45 Integrated Voltage Measurement... 22:13:05 Voltage Offset Correction: v_off_ini = 0.000006638 V, v_off_fin = 0.000002862 V 22:13:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977617 Vs 22:13:07 Temperature Measurement, Probe Number = 0, T = 20.201000 C 22:13:08 Temperature Measurement, Probe Number = 1, T = 20.124000 C 22:13:09 Temperature Measurement, Probe Number = 2, T = 20.183000 C 22:13:09 Temperature Measurement, Probe Number = 3, T = 20.128000 C 22:13:10 Temperature Measurement, Probe Number = 4, T = 20.367000 C 22:13:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.37 22:13:10 Integrated Voltage Measurement... 22:13:30 Voltage Offset Correction: v_off_ini = 0.000004069 V, v_off_fin = 0.000007148 V 22:13:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054303 Vs 22:13:30 Integrated Voltage Measurement... 22:13:49 Voltage Offset Correction: v_off_ini = 0.000006510 V, v_off_fin = 0.000002676 V 22:13:49 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979417 Vs 22:43:52 Temperature Measurement, Probe Number = 0, T = 20.195000 C 22:43:53 Temperature Measurement, Probe Number = 1, T = 20.118000 C 22:43:54 Temperature Measurement, Probe Number = 2, T = 20.182000 C 22:43:54 Temperature Measurement, Probe Number = 3, T = 20.128000 C 22:43:55 Temperature Measurement, Probe Number = 4, T = 20.325000 C 22:43:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.32 22:43:55 Integrated Voltage Measurement... 22:44:14 Voltage Offset Correction: v_off_ini = 0.000005736 V, v_off_fin = 0.000006895 V 22:44:15 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171116545 Vs 22:44:15 Integrated Voltage Measurement... 22:44:34 Voltage Offset Correction: v_off_ini = 0.000006724 V, v_off_fin = 0.000003185 V 22:44:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974055 Vs 22:44:37 Temperature Measurement, Probe Number = 0, T = 20.185000 C 22:44:38 Temperature Measurement, Probe Number = 1, T = 20.112000 C 22:44:39 Temperature Measurement, Probe Number = 2, T = 20.175000 C 22:44:39 Temperature Measurement, Probe Number = 3, T = 20.122000 C 22:44:40 Temperature Measurement, Probe Number = 4, T = 20.248000 C 22:44:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.25 22:44:40 Integrated Voltage Measurement... 22:44:59 Voltage Offset Correction: v_off_ini = 0.000004186 V, v_off_fin = 0.000007247 V 22:45:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052236 Vs 22:45:00 Integrated Voltage Measurement... 22:45:19 Voltage Offset Correction: v_off_ini = 0.000006316 V, v_off_fin = 0.000003374 V 22:45:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975728 Vs 22:45:22 Temperature Measurement, Probe Number = 0, T = 20.190000 C 22:45:23 Temperature Measurement, Probe Number = 1, T = 20.118000 C 22:45:23 Temperature Measurement, Probe Number = 2, T = 20.178000 C 22:45:24 Temperature Measurement, Probe Number = 3, T = 20.124000 C 22:45:25 Temperature Measurement, Probe Number = 4, T = 20.251000 C 22:45:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.25 22:45:25 Integrated Voltage Measurement... 22:45:44 Voltage Offset Correction: v_off_ini = 0.000003883 V, v_off_fin = 0.000007188 V 22:45:44 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058767 Vs 22:45:45 Integrated Voltage Measurement... 22:46:04 Voltage Offset Correction: v_off_ini = 0.000006094 V, v_off_fin = 0.000002664 V 22:46:04 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170973041 Vs 22:46:07 Temperature Measurement, Probe Number = 0, T = 20.197000 C 22:46:07 Temperature Measurement, Probe Number = 1, T = 20.121000 C 22:46:08 Temperature Measurement, Probe Number = 2, T = 20.182000 C 22:46:09 Temperature Measurement, Probe Number = 3, T = 20.128000 C 22:46:09 Temperature Measurement, Probe Number = 4, T = 20.346000 C 22:46:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.35 22:46:09 Integrated Voltage Measurement... 22:46:29 Voltage Offset Correction: v_off_ini = 0.000003938 V, v_off_fin = 0.000006417 V 22:46:29 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171056671 Vs 22:46:30 Integrated Voltage Measurement... 22:46:49 Voltage Offset Correction: v_off_ini = 0.000006038 V, v_off_fin = 0.000002698 V 22:46:49 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977859 Vs 22:46:52 Temperature Measurement, Probe Number = 0, T = 20.196000 C 22:46:52 Temperature Measurement, Probe Number = 1, T = 20.119000 C 22:46:53 Temperature Measurement, Probe Number = 2, T = 20.184000 C 22:46:54 Temperature Measurement, Probe Number = 3, T = 20.127000 C 22:46:54 Temperature Measurement, Probe Number = 4, T = 20.357000 C 22:46:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.36 22:46:54 Integrated Voltage Measurement... 22:47:14 Voltage Offset Correction: v_off_ini = 0.000004022 V, v_off_fin = 0.000007146 V 22:47:14 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171055483 Vs 22:47:14 Integrated Voltage Measurement... 22:47:33 Voltage Offset Correction: v_off_ini = 0.000006211 V, v_off_fin = 0.000003133 V 22:47:34 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170976222 Vs 22:47:36 Temperature Measurement, Probe Number = 0, T = 20.194000 C 22:47:37 Temperature Measurement, Probe Number = 1, T = 20.116000 C 22:47:38 Temperature Measurement, Probe Number = 2, T = 20.179000 C 22:47:38 Temperature Measurement, Probe Number = 3, T = 20.124000 C 22:47:39 Temperature Measurement, Probe Number = 4, T = 20.321000 C 22:47:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.32 22:47:39 Integrated Voltage Measurement... 22:47:58 Voltage Offset Correction: v_off_ini = 0.000003690 V, v_off_fin = 0.000006725 V 22:47:58 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171059886 Vs 22:47:59 Integrated Voltage Measurement... 22:48:18 Voltage Offset Correction: v_off_ini = 0.000006420 V, v_off_fin = 0.000003476 V 22:48:18 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975615 Vs 22:48:21 Temperature Measurement, Probe Number = 0, T = 20.197000 C 22:48:21 Temperature Measurement, Probe Number = 1, T = 20.120000 C 22:48:22 Temperature Measurement, Probe Number = 2, T = 20.180000 C 22:48:23 Temperature Measurement, Probe Number = 3, T = 20.125000 C 22:48:23 Temperature Measurement, Probe Number = 4, T = 20.311000 C 22:48:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.31 22:48:24 Integrated Voltage Measurement... 22:48:43 Voltage Offset Correction: v_off_ini = 0.000004542 V, v_off_fin = 0.000006711 V 22:48:43 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171061849 Vs 22:48:43 Integrated Voltage Measurement... 22:49:02 Voltage Offset Correction: v_off_ini = 0.000006034 V, v_off_fin = 0.000003610 V 22:49:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977161 Vs 22:49:05 Temperature Measurement, Probe Number = 0, T = 20.199000 C 22:49:06 Temperature Measurement, Probe Number = 1, T = 20.122000 C 22:49:07 Temperature Measurement, Probe Number = 2, T = 20.186000 C 22:49:07 Temperature Measurement, Probe Number = 3, T = 20.129000 C 22:49:08 Temperature Measurement, Probe Number = 4, T = 20.363000 C 22:49:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.36 22:49:08 Integrated Voltage Measurement... 22:49:28 Voltage Offset Correction: v_off_ini = 0.000004492 V, v_off_fin = 0.000007134 V 22:49:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059891 Vs 22:49:28 Integrated Voltage Measurement... 22:49:47 Voltage Offset Correction: v_off_ini = 0.000006657 V, v_off_fin = 0.000002704 V 22:49:47 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979250 Vs 22:49:50 Temperature Measurement, Probe Number = 0, T = 20.197000 C 22:49:50 Temperature Measurement, Probe Number = 1, T = 20.121000 C 22:49:51 Temperature Measurement, Probe Number = 2, T = 20.182000 C 22:49:52 Temperature Measurement, Probe Number = 3, T = 20.127000 C 22:49:52 Temperature Measurement, Probe Number = 4, T = 20.366000 C 22:49:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.37 22:49:53 Integrated Voltage Measurement... 22:50:12 Voltage Offset Correction: v_off_ini = 0.000004156 V, v_off_fin = 0.000007055 V 22:50:13 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171064890 Vs 22:50:13 Integrated Voltage Measurement... 22:50:32 Voltage Offset Correction: v_off_ini = 0.000006777 V, v_off_fin = 0.000002717 V 22:50:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977436 Vs 22:50:35 Temperature Measurement, Probe Number = 0, T = 20.201000 C 22:50:35 Temperature Measurement, Probe Number = 1, T = 20.125000 C 22:50:36 Temperature Measurement, Probe Number = 2, T = 20.184000 C 22:50:37 Temperature Measurement, Probe Number = 3, T = 20.128000 C 22:50:37 Temperature Measurement, Probe Number = 4, T = 20.307000 C 22:50:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.31 22:50:38 Integrated Voltage Measurement... 22:50:57 Voltage Offset Correction: v_off_ini = 0.000004261 V, v_off_fin = 0.000007014 V 22:50:57 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171060318 Vs 22:50:57 Integrated Voltage Measurement... 22:51:16 Voltage Offset Correction: v_off_ini = 0.000006514 V, v_off_fin = 0.000002631 V 22:51:16 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979357 Vs 23:21:19 Temperature Measurement, Probe Number = 0, T = 20.193000 C 23:21:20 Temperature Measurement, Probe Number = 1, T = 20.117000 C 23:21:20 Temperature Measurement, Probe Number = 2, T = 20.181000 C 23:21:21 Temperature Measurement, Probe Number = 3, T = 20.126000 C 23:21:22 Temperature Measurement, Probe Number = 4, T = 20.397000 C 23:21:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.40 23:21:22 Integrated Voltage Measurement... 23:21:51 Voltage Offset Correction: v_off_ini = 0.000005159 V, v_off_fin = 0.000003471 V 23:21:51 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171113402 Vs 23:21:51 Integrated Voltage Measurement... 23:22:11 Voltage Offset Correction: v_off_ini = 0.000005166 V, v_off_fin = 0.000003054 V 23:22:11 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170973809 Vs 23:22:13 Temperature Measurement, Probe Number = 0, T = 20.195000 C 23:22:14 Temperature Measurement, Probe Number = 1, T = 20.117000 C 23:22:15 Temperature Measurement, Probe Number = 2, T = 20.181000 C 23:22:15 Temperature Measurement, Probe Number = 3, T = 20.125000 C 23:22:16 Temperature Measurement, Probe Number = 4, T = 20.379000 C 23:22:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.38 23:22:16 Integrated Voltage Measurement... 23:22:36 Voltage Offset Correction: v_off_ini = 0.000003826 V, v_off_fin = 0.000007007 V 23:22:36 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058774 Vs 23:22:36 Integrated Voltage Measurement... 23:22:56 Voltage Offset Correction: v_off_ini = 0.000005862 V, v_off_fin = 0.000003226 V 23:22:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980876 Vs 23:22:59 Temperature Measurement, Probe Number = 0, T = 20.189000 C 23:22:59 Temperature Measurement, Probe Number = 1, T = 20.110000 C 23:23:00 Temperature Measurement, Probe Number = 2, T = 20.178000 C 23:23:01 Temperature Measurement, Probe Number = 3, T = 20.121000 C 23:23:01 Temperature Measurement, Probe Number = 4, T = 20.379000 C 23:23:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.38 23:23:02 Integrated Voltage Measurement... 23:23:22 Voltage Offset Correction: v_off_ini = 0.000004027 V, v_off_fin = 0.000006586 V 23:23:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052371 Vs 23:23:22 Integrated Voltage Measurement... 23:23:41 Voltage Offset Correction: v_off_ini = 0.000006154 V, v_off_fin = 0.000003353 V 23:23:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976828 Vs 23:23:44 Temperature Measurement, Probe Number = 0, T = 20.192000 C 23:23:44 Temperature Measurement, Probe Number = 1, T = 20.115000 C 23:23:45 Temperature Measurement, Probe Number = 2, T = 20.179000 C 23:23:46 Temperature Measurement, Probe Number = 3, T = 20.124000 C 23:23:46 Temperature Measurement, Probe Number = 4, T = 20.280000 C 23:23:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.28 23:23:47 Integrated Voltage Measurement... 23:24:06 Voltage Offset Correction: v_off_ini = 0.000004752 V, v_off_fin = 0.000007609 V 23:24:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171067526 Vs 23:24:06 Integrated Voltage Measurement... 23:24:25 Voltage Offset Correction: v_off_ini = 0.000007007 V, v_off_fin = 0.000003046 V 23:24:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975531 Vs 23:24:28 Temperature Measurement, Probe Number = 0, T = 20.190000 C 23:24:29 Temperature Measurement, Probe Number = 1, T = 20.111000 C 23:24:29 Temperature Measurement, Probe Number = 2, T = 20.178000 C 23:24:30 Temperature Measurement, Probe Number = 3, T = 20.121000 C 23:24:31 Temperature Measurement, Probe Number = 4, T = 20.178000 C 23:24:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.18 23:24:31 Integrated Voltage Measurement... 23:24:51 Voltage Offset Correction: v_off_ini = 0.000004981 V, v_off_fin = 0.000006863 V 23:24:51 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171066057 Vs 23:24:51 Integrated Voltage Measurement... 23:25:10 Voltage Offset Correction: v_off_ini = 0.000007133 V, v_off_fin = 0.000003079 V 23:25:10 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975351 Vs 23:25:13 Temperature Measurement, Probe Number = 0, T = 20.188000 C 23:25:14 Temperature Measurement, Probe Number = 1, T = 20.110000 C 23:25:14 Temperature Measurement, Probe Number = 2, T = 20.176000 C 23:25:15 Temperature Measurement, Probe Number = 3, T = 20.119000 C 23:25:16 Temperature Measurement, Probe Number = 4, T = 20.156000 C 23:25:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.16 23:25:16 Integrated Voltage Measurement... 23:25:35 Voltage Offset Correction: v_off_ini = 0.000004445 V, v_off_fin = 0.000007212 V 23:25:35 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171065921 Vs 23:25:35 Integrated Voltage Measurement... 23:25:55 Voltage Offset Correction: v_off_ini = 0.000006794 V, v_off_fin = 0.000003405 V 23:25:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977521 Vs 23:25:58 Temperature Measurement, Probe Number = 0, T = 20.192000 C 23:25:58 Temperature Measurement, Probe Number = 1, T = 20.115000 C 23:25:59 Temperature Measurement, Probe Number = 2, T = 20.177000 C 23:26:00 Temperature Measurement, Probe Number = 3, T = 20.121000 C 23:26:00 Temperature Measurement, Probe Number = 4, T = 20.224000 C 23:26:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.22 23:26:01 Integrated Voltage Measurement... 23:26:20 Voltage Offset Correction: v_off_ini = 0.000004398 V, v_off_fin = 0.000007123 V 23:26:20 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171061394 Vs 23:26:21 Integrated Voltage Measurement... 23:26:40 Voltage Offset Correction: v_off_ini = 0.000006892 V, v_off_fin = 0.000003431 V 23:26:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977816 Vs 23:26:43 Temperature Measurement, Probe Number = 0, T = 20.192000 C 23:26:44 Temperature Measurement, Probe Number = 1, T = 20.117000 C 23:26:44 Temperature Measurement, Probe Number = 2, T = 20.178000 C 23:26:45 Temperature Measurement, Probe Number = 3, T = 20.122000 C 23:26:46 Temperature Measurement, Probe Number = 4, T = 20.211000 C 23:26:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.21 23:26:46 Integrated Voltage Measurement... 23:27:06 Voltage Offset Correction: v_off_ini = 0.000004739 V, v_off_fin = 0.000007268 V 23:27:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171066292 Vs 23:27:06 Integrated Voltage Measurement... 23:27:25 Voltage Offset Correction: v_off_ini = 0.000006666 V, v_off_fin = 0.000003679 V 23:27:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972963 Vs 23:27:28 Temperature Measurement, Probe Number = 0, T = 20.195000 C 23:27:29 Temperature Measurement, Probe Number = 1, T = 20.121000 C 23:27:29 Temperature Measurement, Probe Number = 2, T = 20.180000 C 23:27:30 Temperature Measurement, Probe Number = 3, T = 20.125000 C 23:27:30 Temperature Measurement, Probe Number = 4, T = 20.175000 C 23:27:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.18 23:27:31 Integrated Voltage Measurement... 23:27:50 Voltage Offset Correction: v_off_ini = 0.000005061 V, v_off_fin = 0.000007295 V 23:27:51 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171066523 Vs 23:27:51 Integrated Voltage Measurement... 23:28:10 Voltage Offset Correction: v_off_ini = 0.000006596 V, v_off_fin = 0.000003211 V 23:28:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979460 Vs 23:28:13 Temperature Measurement, Probe Number = 0, T = 20.190000 C 23:28:14 Temperature Measurement, Probe Number = 1, T = 20.115000 C 23:28:15 Temperature Measurement, Probe Number = 2, T = 20.176000 C 23:28:15 Temperature Measurement, Probe Number = 3, T = 20.122000 C 23:28:16 Temperature Measurement, Probe Number = 4, T = 20.216000 C 23:28:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.22 23:28:16 Integrated Voltage Measurement... 23:28:35 Voltage Offset Correction: v_off_ini = 0.000004495 V, v_off_fin = 0.000007169 V 23:28:36 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171056811 Vs 23:28:36 Integrated Voltage Measurement... 23:28:55 Voltage Offset Correction: v_off_ini = 0.000006910 V, v_off_fin = 0.000003826 V 23:28:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978636 Vs 23:58:58 Temperature Measurement, Probe Number = 0, T = 20.186000 C 23:58:59 Temperature Measurement, Probe Number = 1, T = 20.112000 C 23:58:59 Temperature Measurement, Probe Number = 2, T = 20.174000 C 23:59:00 Temperature Measurement, Probe Number = 3, T = 20.121000 C 23:59:01 Temperature Measurement, Probe Number = 4, T = 20.064000 C 23:59:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.06 23:59:01 Integrated Voltage Measurement... 23:59:20 Voltage Offset Correction: v_off_ini = 0.000005410 V, v_off_fin = 0.000007114 V 23:59:21 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171109148 Vs 23:59:21 Integrated Voltage Measurement... 23:59:40 Voltage Offset Correction: v_off_ini = 0.000006396 V, v_off_fin = 0.000003816 V 23:59:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979612 Vs 23:59:43 Temperature Measurement, Probe Number = 0, T = 20.189000 C 23:59:44 Temperature Measurement, Probe Number = 1, T = 20.114000 C 23:59:44 Temperature Measurement, Probe Number = 2, T = 20.176000 C 23:59:45 Temperature Measurement, Probe Number = 3, T = 20.122000 C 23:59:45 Temperature Measurement, Probe Number = 4, T = 20.072000 C 23:59:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.07 23:59:46 Integrated Voltage Measurement... 00:00:05 Voltage Offset Correction: v_off_ini = 0.000004379 V, v_off_fin = 0.000007747 V 00:00:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171063529 Vs 00:00:06 Integrated Voltage Measurement... 00:00:25 Voltage Offset Correction: v_off_ini = 0.000007045 V, v_off_fin = 0.000003590 V 00:00:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975000 Vs 00:00:28 Temperature Measurement, Probe Number = 0, T = 20.187000 C 00:00:29 Temperature Measurement, Probe Number = 1, T = 20.109000 C 00:00:29 Temperature Measurement, Probe Number = 2, T = 20.176000 C 00:00:30 Temperature Measurement, Probe Number = 3, T = 20.120000 C 00:00:31 Temperature Measurement, Probe Number = 4, T = 20.186000 C 00:00:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.19 00:00:31 Integrated Voltage Measurement... 00:00:50 Voltage Offset Correction: v_off_ini = 0.000004948 V, v_off_fin = 0.000007304 V 00:00:51 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171064151 Vs 00:00:51 Integrated Voltage Measurement... 00:01:11 Voltage Offset Correction: v_off_ini = 0.000006348 V, v_off_fin = 0.000003441 V 00:01:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979891 Vs 00:01:13 Temperature Measurement, Probe Number = 0, T = 20.182000 C 00:01:14 Temperature Measurement, Probe Number = 1, T = 20.106000 C 00:01:15 Temperature Measurement, Probe Number = 2, T = 20.170000 C 00:01:15 Temperature Measurement, Probe Number = 3, T = 20.114000 C 00:01:16 Temperature Measurement, Probe Number = 4, T = 20.146000 C 00:01:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.15 00:01:16 Integrated Voltage Measurement... 00:01:35 Voltage Offset Correction: v_off_ini = 0.000004766 V, v_off_fin = 0.000007271 V 00:01:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059072 Vs 00:01:36 Integrated Voltage Measurement... 00:01:55 Voltage Offset Correction: v_off_ini = 0.000006434 V, v_off_fin = 0.000002993 V 00:01:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981879 Vs 00:01:58 Temperature Measurement, Probe Number = 0, T = 20.182000 C 00:01:59 Temperature Measurement, Probe Number = 1, T = 20.109000 C 00:01:59 Temperature Measurement, Probe Number = 2, T = 20.171000 C 00:02:00 Temperature Measurement, Probe Number = 3, T = 20.116000 C 00:02:01 Temperature Measurement, Probe Number = 4, T = 20.129000 C 00:02:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.13 00:02:01 Integrated Voltage Measurement... 00:02:20 Voltage Offset Correction: v_off_ini = 0.000004352 V, v_off_fin = 0.000007569 V 00:02:20 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171062500 Vs 00:02:21 Integrated Voltage Measurement... 00:02:40 Voltage Offset Correction: v_off_ini = 0.000006661 V, v_off_fin = 0.000002774 V 00:02:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981002 Vs 00:02:43 Temperature Measurement, Probe Number = 0, T = 20.181000 C 00:02:43 Temperature Measurement, Probe Number = 1, T = 20.109000 C 00:02:44 Temperature Measurement, Probe Number = 2, T = 20.171000 C 00:02:45 Temperature Measurement, Probe Number = 3, T = 20.117000 C 00:02:45 Temperature Measurement, Probe Number = 4, T = 20.082000 C 00:02:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.08 00:02:45 Integrated Voltage Measurement... 00:03:05 Voltage Offset Correction: v_off_ini = 0.000003991 V, v_off_fin = 0.000007454 V 00:03:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059700 Vs 00:03:05 Integrated Voltage Measurement... 00:03:24 Voltage Offset Correction: v_off_ini = 0.000006516 V, v_off_fin = 0.000003202 V 00:03:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984000 Vs 00:03:27 Temperature Measurement, Probe Number = 0, T = 20.189000 C 00:03:28 Temperature Measurement, Probe Number = 1, T = 20.112000 C 00:03:29 Temperature Measurement, Probe Number = 2, T = 20.175000 C 00:03:29 Temperature Measurement, Probe Number = 3, T = 20.120000 C 00:03:30 Temperature Measurement, Probe Number = 4, T = 20.071000 C 00:03:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.07 00:03:30 Integrated Voltage Measurement... 00:03:49 Voltage Offset Correction: v_off_ini = 0.000004634 V, v_off_fin = 0.000006912 V 00:03:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171063343 Vs 00:03:50 Integrated Voltage Measurement... 00:04:09 Voltage Offset Correction: v_off_ini = 0.000006633 V, v_off_fin = 0.000004087 V 00:04:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170973982 Vs 00:04:12 Temperature Measurement, Probe Number = 0, T = 20.188000 C 00:04:12 Temperature Measurement, Probe Number = 1, T = 20.111000 C 00:04:13 Temperature Measurement, Probe Number = 2, T = 20.175000 C 00:04:14 Temperature Measurement, Probe Number = 3, T = 20.119000 C 00:04:14 Temperature Measurement, Probe Number = 4, T = 20.132000 C 00:04:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.13 00:04:15 Integrated Voltage Measurement... 00:04:34 Voltage Offset Correction: v_off_ini = 0.000004821 V, v_off_fin = 0.000007854 V 00:04:34 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171070267 Vs 00:04:34 Integrated Voltage Measurement... 00:04:53 Voltage Offset Correction: v_off_ini = 0.000007023 V, v_off_fin = 0.000003804 V 00:04:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972971 Vs 00:04:56 Temperature Measurement, Probe Number = 0, T = 20.188000 C 00:04:57 Temperature Measurement, Probe Number = 1, T = 20.112000 C 00:04:58 Temperature Measurement, Probe Number = 2, T = 20.173000 C 00:04:58 Temperature Measurement, Probe Number = 3, T = 20.120000 C 00:04:59 Temperature Measurement, Probe Number = 4, T = 20.169000 C 00:04:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.17 00:04:59 Integrated Voltage Measurement... 00:05:19 Voltage Offset Correction: v_off_ini = 0.000004386 V, v_off_fin = 0.000007577 V 00:05:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171066264 Vs 00:05:19 Integrated Voltage Measurement... 00:05:38 Voltage Offset Correction: v_off_ini = 0.000006913 V, v_off_fin = 0.000004077 V 00:05:38 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170974147 Vs 00:05:41 Temperature Measurement, Probe Number = 0, T = 20.188000 C 00:05:41 Temperature Measurement, Probe Number = 1, T = 20.110000 C 00:05:42 Temperature Measurement, Probe Number = 2, T = 20.173000 C 00:05:43 Temperature Measurement, Probe Number = 3, T = 20.117000 C 00:05:43 Temperature Measurement, Probe Number = 4, T = 20.159000 C 00:05:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.16 00:05:44 Integrated Voltage Measurement... 00:06:04 Voltage Offset Correction: v_off_ini = 0.000005384 V, v_off_fin = 0.000007099 V 00:06:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171069483 Vs 00:06:04 Integrated Voltage Measurement... 00:06:23 Voltage Offset Correction: v_off_ini = 0.000006485 V, v_off_fin = 0.000003503 V 00:06:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976156 Vs 00:36:26 Temperature Measurement, Probe Number = 0, T = 20.175000 C 00:36:26 Temperature Measurement, Probe Number = 1, T = 20.094000 C 00:36:27 Temperature Measurement, Probe Number = 2, T = 20.166000 C 00:36:28 Temperature Measurement, Probe Number = 3, T = 20.107000 C 00:36:28 Temperature Measurement, Probe Number = 4, T = 20.032000 C 00:36:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.03 00:36:29 Integrated Voltage Measurement... 00:36:48 Voltage Offset Correction: v_off_ini = 0.000005600 V, v_off_fin = 0.000007162 V 00:36:48 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171107128 Vs 00:36:48 Integrated Voltage Measurement... 00:37:07 Voltage Offset Correction: v_off_ini = 0.000006240 V, v_off_fin = 0.000003578 V 00:37:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987564 Vs 00:37:10 Temperature Measurement, Probe Number = 0, T = 20.179000 C 00:37:11 Temperature Measurement, Probe Number = 1, T = 20.101000 C 00:37:12 Temperature Measurement, Probe Number = 2, T = 20.169000 C 00:37:12 Temperature Measurement, Probe Number = 3, T = 20.110000 C 00:37:13 Temperature Measurement, Probe Number = 4, T = 20.112000 C 00:37:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.11 00:37:13 Integrated Voltage Measurement... 00:37:33 Voltage Offset Correction: v_off_ini = 0.000004389 V, v_off_fin = 0.000007248 V 00:37:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171069557 Vs 00:37:33 Integrated Voltage Measurement... 00:37:52 Voltage Offset Correction: v_off_ini = 0.000006597 V, v_off_fin = 0.000003431 V 00:37:52 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170985085 Vs 00:37:55 Temperature Measurement, Probe Number = 0, T = 20.181000 C 00:37:55 Temperature Measurement, Probe Number = 1, T = 20.106000 C 00:37:56 Temperature Measurement, Probe Number = 2, T = 20.171000 C 00:37:57 Temperature Measurement, Probe Number = 3, T = 20.112000 C 00:37:57 Temperature Measurement, Probe Number = 4, T = 20.157000 C 00:37:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.16 00:37:58 Integrated Voltage Measurement... 00:38:17 Voltage Offset Correction: v_off_ini = 0.000004072 V, v_off_fin = 0.000006882 V 00:38:17 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171069262 Vs 00:38:17 Integrated Voltage Measurement... 00:38:37 Voltage Offset Correction: v_off_ini = 0.000006259 V, v_off_fin = 0.000003444 V 00:38:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990440 Vs 00:38:39 Temperature Measurement, Probe Number = 0, T = 20.183000 C 00:38:40 Temperature Measurement, Probe Number = 1, T = 20.106000 C 00:38:41 Temperature Measurement, Probe Number = 2, T = 20.171000 C 00:38:41 Temperature Measurement, Probe Number = 3, T = 20.112000 C 00:38:42 Temperature Measurement, Probe Number = 4, T = 20.162000 C 00:38:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.16 00:38:42 Integrated Voltage Measurement... 00:39:02 Voltage Offset Correction: v_off_ini = 0.000004497 V, v_off_fin = 0.000007070 V 00:39:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171068494 Vs 00:39:03 Integrated Voltage Measurement... 00:39:22 Voltage Offset Correction: v_off_ini = 0.000006554 V, v_off_fin = 0.000003516 V 00:39:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983784 Vs 00:39:25 Temperature Measurement, Probe Number = 0, T = 20.175000 C 00:39:26 Temperature Measurement, Probe Number = 1, T = 20.099000 C 00:39:26 Temperature Measurement, Probe Number = 2, T = 20.167000 C 00:39:27 Temperature Measurement, Probe Number = 3, T = 20.110000 C 00:39:28 Temperature Measurement, Probe Number = 4, T = 20.110000 C 00:39:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.11 00:39:28 Integrated Voltage Measurement... 00:39:47 Voltage Offset Correction: v_off_ini = 0.000004246 V, v_off_fin = 0.000007182 V 00:39:47 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171064988 Vs 00:39:47 Integrated Voltage Measurement... 00:40:06 Voltage Offset Correction: v_off_ini = 0.000006361 V, v_off_fin = 0.000002904 V 00:40:06 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170989226 Vs 00:40:09 Temperature Measurement, Probe Number = 0, T = 20.173000 C 00:40:10 Temperature Measurement, Probe Number = 1, T = 20.094000 C 00:40:10 Temperature Measurement, Probe Number = 2, T = 20.166000 C 00:40:11 Temperature Measurement, Probe Number = 3, T = 20.106000 C 00:40:12 Temperature Measurement, Probe Number = 4, T = 20.110000 C 00:40:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.11 00:40:12 Integrated Voltage Measurement... 00:40:32 Voltage Offset Correction: v_off_ini = 0.000004825 V, v_off_fin = 0.000007298 V 00:40:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171073907 Vs 00:40:32 Integrated Voltage Measurement... 00:40:51 Voltage Offset Correction: v_off_ini = 0.000006755 V, v_off_fin = 0.000003260 V 00:40:51 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983057 Vs 00:40:54 Temperature Measurement, Probe Number = 0, T = 20.174000 C 00:40:55 Temperature Measurement, Probe Number = 1, T = 20.101000 C 00:40:55 Temperature Measurement, Probe Number = 2, T = 20.163000 C 00:40:56 Temperature Measurement, Probe Number = 3, T = 20.108000 C 00:40:57 Temperature Measurement, Probe Number = 4, T = 20.176000 C 00:40:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.18 00:40:57 Integrated Voltage Measurement... 00:41:16 Voltage Offset Correction: v_off_ini = 0.000004824 V, v_off_fin = 0.000007282 V 00:41:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171073351 Vs 00:41:17 Integrated Voltage Measurement... 00:41:36 Voltage Offset Correction: v_off_ini = 0.000006945 V, v_off_fin = 0.000002988 V 00:41:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170990893 Vs 00:41:39 Temperature Measurement, Probe Number = 0, T = 20.180000 C 00:41:40 Temperature Measurement, Probe Number = 1, T = 20.102000 C 00:41:40 Temperature Measurement, Probe Number = 2, T = 20.167000 C 00:41:41 Temperature Measurement, Probe Number = 3, T = 20.109000 C 00:41:42 Temperature Measurement, Probe Number = 4, T = 20.171000 C 00:41:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.17 00:41:42 Integrated Voltage Measurement... 00:42:01 Voltage Offset Correction: v_off_ini = 0.000004431 V, v_off_fin = 0.000007553 V 00:42:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066604 Vs 00:42:02 Integrated Voltage Measurement... 00:42:21 Voltage Offset Correction: v_off_ini = 0.000006878 V, v_off_fin = 0.000002828 V 00:42:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993932 Vs 00:42:24 Temperature Measurement, Probe Number = 0, T = 20.179000 C 00:42:24 Temperature Measurement, Probe Number = 1, T = 20.103000 C 00:42:25 Temperature Measurement, Probe Number = 2, T = 20.166000 C 00:42:26 Temperature Measurement, Probe Number = 3, T = 20.109000 C 00:42:26 Temperature Measurement, Probe Number = 4, T = 20.177000 C 00:42:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.18 00:42:27 Integrated Voltage Measurement... 00:42:46 Voltage Offset Correction: v_off_ini = 0.000003583 V, v_off_fin = 0.000006847 V 00:42:46 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171063189 Vs 00:42:47 Integrated Voltage Measurement... 00:43:06 Voltage Offset Correction: v_off_ini = 0.000005972 V, v_off_fin = 0.000002772 V 00:43:06 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170990206 Vs 00:43:08 Temperature Measurement, Probe Number = 0, T = 20.179000 C 00:43:09 Temperature Measurement, Probe Number = 1, T = 20.104000 C 00:43:10 Temperature Measurement, Probe Number = 2, T = 20.169000 C 00:43:10 Temperature Measurement, Probe Number = 3, T = 20.113000 C 00:43:11 Temperature Measurement, Probe Number = 4, T = 20.238000 C 00:43:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.24 00:43:11 Integrated Voltage Measurement... 00:43:30 Voltage Offset Correction: v_off_ini = 0.000004084 V, v_off_fin = 0.000007216 V 00:43:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171066597 Vs 00:43:31 Integrated Voltage Measurement... 00:43:50 Voltage Offset Correction: v_off_ini = 0.000005949 V, v_off_fin = 0.000002935 V 00:43:50 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170996272 Vs 01:13:53 Temperature Measurement, Probe Number = 0, T = 20.181000 C 01:13:54 Temperature Measurement, Probe Number = 1, T = 20.102000 C 01:13:54 Temperature Measurement, Probe Number = 2, T = 20.174000 C 01:13:55 Temperature Measurement, Probe Number = 3, T = 20.115000 C 01:13:56 Temperature Measurement, Probe Number = 4, T = 20.477000 C 01:13:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.48 01:13:56 Integrated Voltage Measurement... 01:14:15 Voltage Offset Correction: v_off_ini = 0.000005793 V, v_off_fin = 0.000007396 V 01:14:15 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171125100 Vs 01:14:15 Integrated Voltage Measurement... 01:14:35 Voltage Offset Correction: v_off_ini = 0.000006428 V, v_off_fin = 0.000003657 V 01:14:35 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170985666 Vs 01:14:38 Temperature Measurement, Probe Number = 0, T = 20.172000 C 01:14:38 Temperature Measurement, Probe Number = 1, T = 20.096000 C 01:14:39 Temperature Measurement, Probe Number = 2, T = 20.166000 C 01:14:40 Temperature Measurement, Probe Number = 3, T = 20.109000 C 01:14:40 Temperature Measurement, Probe Number = 4, T = 20.399000 C 01:14:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.40 01:14:40 Integrated Voltage Measurement... 01:15:01 Voltage Offset Correction: v_off_ini = 0.000004679 V, v_off_fin = 0.000006652 V 01:15:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066030 Vs 01:15:01 Integrated Voltage Measurement... 01:15:21 Voltage Offset Correction: v_off_ini = 0.000006413 V, v_off_fin = 0.000004005 V 01:15:21 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170982565 Vs 01:15:24 Temperature Measurement, Probe Number = 0, T = 20.178000 C 01:15:25 Temperature Measurement, Probe Number = 1, T = 20.100000 C 01:15:25 Temperature Measurement, Probe Number = 2, T = 20.171000 C 01:15:26 Temperature Measurement, Probe Number = 3, T = 20.114000 C 01:15:27 Temperature Measurement, Probe Number = 4, T = 20.290000 C 01:15:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.29 01:15:27 Integrated Voltage Measurement... 01:15:46 Voltage Offset Correction: v_off_ini = 0.000005100 V, v_off_fin = 0.000006784 V 01:15:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171057922 Vs 01:15:47 Integrated Voltage Measurement... 01:16:06 Voltage Offset Correction: v_off_ini = 0.000006150 V, v_off_fin = 0.000003460 V 01:16:06 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986019 Vs 01:16:09 Temperature Measurement, Probe Number = 0, T = 20.171000 C 01:16:09 Temperature Measurement, Probe Number = 1, T = 20.099000 C 01:16:10 Temperature Measurement, Probe Number = 2, T = 20.164000 C 01:16:11 Temperature Measurement, Probe Number = 3, T = 20.112000 C 01:16:11 Temperature Measurement, Probe Number = 4, T = 20.206000 C 01:16:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.21 01:16:12 Integrated Voltage Measurement... 01:16:31 Voltage Offset Correction: v_off_ini = 0.000004016 V, v_off_fin = 0.000006875 V 01:16:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171063946 Vs 01:16:32 Integrated Voltage Measurement... 01:16:51 Voltage Offset Correction: v_off_ini = 0.000006228 V, v_off_fin = 0.000003286 V 01:16:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983731 Vs 01:16:54 Temperature Measurement, Probe Number = 0, T = 20.179000 C 01:16:54 Temperature Measurement, Probe Number = 1, T = 20.104000 C 01:16:55 Temperature Measurement, Probe Number = 2, T = 20.170000 C 01:16:56 Temperature Measurement, Probe Number = 3, T = 20.115000 C 01:16:56 Temperature Measurement, Probe Number = 4, T = 20.179000 C 01:16:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.18 01:16:57 Integrated Voltage Measurement... 01:17:16 Voltage Offset Correction: v_off_ini = 0.000004406 V, v_off_fin = 0.000006865 V 01:17:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171062664 Vs 01:17:16 Integrated Voltage Measurement... 01:17:35 Voltage Offset Correction: v_off_ini = 0.000006629 V, v_off_fin = 0.000003046 V 01:17:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982218 Vs 01:17:38 Temperature Measurement, Probe Number = 0, T = 20.182000 C 01:17:39 Temperature Measurement, Probe Number = 1, T = 20.105000 C 01:17:39 Temperature Measurement, Probe Number = 2, T = 20.170000 C 01:17:40 Temperature Measurement, Probe Number = 3, T = 20.115000 C 01:17:41 Temperature Measurement, Probe Number = 4, T = 20.188000 C 01:17:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.19 01:17:41 Integrated Voltage Measurement... 01:18:00 Voltage Offset Correction: v_off_ini = 0.000004129 V, v_off_fin = 0.000006965 V 01:18:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059927 Vs 01:18:01 Integrated Voltage Measurement... 01:18:20 Voltage Offset Correction: v_off_ini = 0.000005599 V, v_off_fin = 0.000003484 V 01:18:20 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986195 Vs 01:18:22 Temperature Measurement, Probe Number = 0, T = 20.176000 C 01:18:23 Temperature Measurement, Probe Number = 1, T = 20.099000 C 01:18:24 Temperature Measurement, Probe Number = 2, T = 20.167000 C 01:18:24 Temperature Measurement, Probe Number = 3, T = 20.110000 C 01:18:25 Temperature Measurement, Probe Number = 4, T = 20.405000 C 01:18:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.41 01:18:25 Integrated Voltage Measurement... 01:18:45 Voltage Offset Correction: v_off_ini = 0.000004504 V, v_off_fin = 0.000006694 V 01:18:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171070835 Vs 01:18:45 Integrated Voltage Measurement... 01:19:05 Voltage Offset Correction: v_off_ini = 0.000006572 V, v_off_fin = 0.000003442 V 01:19:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979231 Vs 01:19:07 Temperature Measurement, Probe Number = 0, T = 20.180000 C 01:19:08 Temperature Measurement, Probe Number = 1, T = 20.103000 C 01:19:09 Temperature Measurement, Probe Number = 2, T = 20.167000 C 01:19:09 Temperature Measurement, Probe Number = 3, T = 20.110000 C 01:19:10 Temperature Measurement, Probe Number = 4, T = 20.356000 C 01:19:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.36 01:19:10 Integrated Voltage Measurement... 01:19:29 Voltage Offset Correction: v_off_ini = 0.000003954 V, v_off_fin = 0.000007775 V 01:19:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065152 Vs 01:19:30 Integrated Voltage Measurement... 01:19:49 Voltage Offset Correction: v_off_ini = 0.000007212 V, v_off_fin = 0.000003622 V 01:19:49 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170978580 Vs 01:19:52 Temperature Measurement, Probe Number = 0, T = 20.177000 C 01:19:52 Temperature Measurement, Probe Number = 1, T = 20.102000 C 01:19:53 Temperature Measurement, Probe Number = 2, T = 20.167000 C 01:19:54 Temperature Measurement, Probe Number = 3, T = 20.111000 C 01:19:54 Temperature Measurement, Probe Number = 4, T = 20.325000 C 01:19:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.32 01:19:54 Integrated Voltage Measurement... 01:20:14 Voltage Offset Correction: v_off_ini = 0.000004318 V, v_off_fin = 0.000007146 V 01:20:14 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171070893 Vs 01:20:14 Integrated Voltage Measurement... 01:20:34 Voltage Offset Correction: v_off_ini = 0.000006428 V, v_off_fin = 0.000003596 V 01:20:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981252 Vs 01:20:37 Temperature Measurement, Probe Number = 0, T = 20.179000 C 01:20:37 Temperature Measurement, Probe Number = 1, T = 20.102000 C 01:20:38 Temperature Measurement, Probe Number = 2, T = 20.170000 C 01:20:39 Temperature Measurement, Probe Number = 3, T = 20.113000 C 01:20:39 Temperature Measurement, Probe Number = 4, T = 20.297000 C 01:20:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.30 01:20:39 Integrated Voltage Measurement... 01:20:59 Voltage Offset Correction: v_off_ini = 0.000004681 V, v_off_fin = 0.000007693 V 01:20:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171069432 Vs 01:20:59 Integrated Voltage Measurement... 01:21:19 Voltage Offset Correction: v_off_ini = 0.000007206 V, v_off_fin = 0.000003435 V 01:21:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981134 Vs 01:51:21 Temperature Measurement, Probe Number = 0, T = 20.179000 C 01:51:22 Temperature Measurement, Probe Number = 1, T = 20.106000 C 01:51:23 Temperature Measurement, Probe Number = 2, T = 20.170000 C 01:51:23 Temperature Measurement, Probe Number = 3, T = 20.116000 C 01:51:24 Temperature Measurement, Probe Number = 4, T = 20.285000 C 01:51:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.29 01:51:24 Integrated Voltage Measurement... 01:51:44 Voltage Offset Correction: v_off_ini = 0.000006128 V, v_off_fin = 0.000006668 V 01:51:44 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171112640 Vs 01:51:44 Integrated Voltage Measurement... 01:52:03 Voltage Offset Correction: v_off_ini = 0.000006707 V, v_off_fin = 0.000002959 V 01:52:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987574 Vs 01:52:06 Temperature Measurement, Probe Number = 0, T = 20.177000 C 01:52:07 Temperature Measurement, Probe Number = 1, T = 20.100000 C 01:52:08 Temperature Measurement, Probe Number = 2, T = 20.169000 C 01:52:08 Temperature Measurement, Probe Number = 3, T = 20.111000 C 01:52:09 Temperature Measurement, Probe Number = 4, T = 20.354000 C 01:52:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.35 01:52:09 Integrated Voltage Measurement... 01:52:28 Voltage Offset Correction: v_off_ini = 0.000004400 V, v_off_fin = 0.000006310 V 01:52:29 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054385 Vs 01:52:29 Integrated Voltage Measurement... 01:52:48 Voltage Offset Correction: v_off_ini = 0.000005832 V, v_off_fin = 0.000003781 V 01:52:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986742 Vs 01:52:51 Temperature Measurement, Probe Number = 0, T = 20.176000 C 01:52:51 Temperature Measurement, Probe Number = 1, T = 20.098000 C 01:52:52 Temperature Measurement, Probe Number = 2, T = 20.167000 C 01:52:53 Temperature Measurement, Probe Number = 3, T = 20.110000 C 01:52:53 Temperature Measurement, Probe Number = 4, T = 20.409000 C 01:52:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.41 01:52:53 Integrated Voltage Measurement... 01:53:13 Voltage Offset Correction: v_off_ini = 0.000004318 V, v_off_fin = 0.000007262 V 01:53:13 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171061150 Vs 01:53:13 Integrated Voltage Measurement... 01:53:32 Voltage Offset Correction: v_off_ini = 0.000006469 V, v_off_fin = 0.000003690 V 01:53:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981650 Vs 01:53:35 Temperature Measurement, Probe Number = 0, T = 20.172000 C 01:53:36 Temperature Measurement, Probe Number = 1, T = 20.094000 C 01:53:36 Temperature Measurement, Probe Number = 2, T = 20.165000 C 01:53:37 Temperature Measurement, Probe Number = 3, T = 20.108000 C 01:53:38 Temperature Measurement, Probe Number = 4, T = 20.353000 C 01:53:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.35 01:53:38 Integrated Voltage Measurement... 01:53:57 Voltage Offset Correction: v_off_ini = 0.000004583 V, v_off_fin = 0.000006868 V 01:53:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171061997 Vs 01:53:57 Integrated Voltage Measurement... 01:54:17 Voltage Offset Correction: v_off_ini = 0.000006474 V, v_off_fin = 0.000003769 V 01:54:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986588 Vs 01:54:20 Temperature Measurement, Probe Number = 0, T = 20.176000 C 01:54:20 Temperature Measurement, Probe Number = 1, T = 20.100000 C 01:54:21 Temperature Measurement, Probe Number = 2, T = 20.166000 C 01:54:22 Temperature Measurement, Probe Number = 3, T = 20.109000 C 01:54:22 Temperature Measurement, Probe Number = 4, T = 20.370000 C 01:54:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.37 01:54:23 Integrated Voltage Measurement... 01:54:42 Voltage Offset Correction: v_off_ini = 0.000004811 V, v_off_fin = 0.000007986 V 01:54:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065972 Vs 01:54:42 Integrated Voltage Measurement... 01:55:02 Voltage Offset Correction: v_off_ini = 0.000007146 V, v_off_fin = 0.000003315 V 01:55:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980396 Vs 01:55:05 Temperature Measurement, Probe Number = 0, T = 20.181000 C 01:55:06 Temperature Measurement, Probe Number = 1, T = 20.103000 C 01:55:06 Temperature Measurement, Probe Number = 2, T = 20.169000 C 01:55:07 Temperature Measurement, Probe Number = 3, T = 20.111000 C 01:55:08 Temperature Measurement, Probe Number = 4, T = 20.343000 C 01:55:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.34 01:55:08 Integrated Voltage Measurement... 01:55:27 Voltage Offset Correction: v_off_ini = 0.000004941 V, v_off_fin = 0.000007874 V 01:55:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171068431 Vs 01:55:27 Integrated Voltage Measurement... 01:55:47 Voltage Offset Correction: v_off_ini = 0.000006782 V, v_off_fin = 0.000003538 V 01:55:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978216 Vs 01:55:50 Temperature Measurement, Probe Number = 0, T = 20.182000 C 01:55:50 Temperature Measurement, Probe Number = 1, T = 20.106000 C 01:55:51 Temperature Measurement, Probe Number = 2, T = 20.170000 C 01:55:52 Temperature Measurement, Probe Number = 3, T = 20.114000 C 01:55:52 Temperature Measurement, Probe Number = 4, T = 20.381000 C 01:55:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.38 01:55:52 Integrated Voltage Measurement... 01:56:12 Voltage Offset Correction: v_off_ini = 0.000004840 V, v_off_fin = 0.000007677 V 01:56:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171068776 Vs 01:56:12 Integrated Voltage Measurement... 01:56:31 Voltage Offset Correction: v_off_ini = 0.000006659 V, v_off_fin = 0.000003900 V 01:56:31 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975278 Vs 01:56:34 Temperature Measurement, Probe Number = 0, T = 20.180000 C 01:56:35 Temperature Measurement, Probe Number = 1, T = 20.102000 C 01:56:35 Temperature Measurement, Probe Number = 2, T = 20.170000 C 01:56:36 Temperature Measurement, Probe Number = 3, T = 20.113000 C 01:56:37 Temperature Measurement, Probe Number = 4, T = 20.428000 C 01:56:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.43 01:56:37 Integrated Voltage Measurement... 01:56:56 Voltage Offset Correction: v_off_ini = 0.000004379 V, v_off_fin = 0.000007885 V 01:56:56 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171070698 Vs 01:56:56 Integrated Voltage Measurement... 01:57:16 Voltage Offset Correction: v_off_ini = 0.000006988 V, v_off_fin = 0.000003995 V 01:57:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977196 Vs 01:57:19 Temperature Measurement, Probe Number = 0, T = 20.170000 C 01:57:19 Temperature Measurement, Probe Number = 1, T = 20.093000 C 01:57:20 Temperature Measurement, Probe Number = 2, T = 20.162000 C 01:57:21 Temperature Measurement, Probe Number = 3, T = 20.107000 C 01:57:21 Temperature Measurement, Probe Number = 4, T = 20.382000 C 01:57:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.38 01:57:21 Integrated Voltage Measurement... 01:57:41 Voltage Offset Correction: v_off_ini = 0.000004889 V, v_off_fin = 0.000007276 V 01:57:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171068917 Vs 01:57:41 Integrated Voltage Measurement... 01:58:01 Voltage Offset Correction: v_off_ini = 0.000006654 V, v_off_fin = 0.000003353 V 01:58:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983253 Vs 01:58:04 Temperature Measurement, Probe Number = 0, T = 20.175000 C 01:58:04 Temperature Measurement, Probe Number = 1, T = 20.098000 C 01:58:05 Temperature Measurement, Probe Number = 2, T = 20.165000 C 01:58:06 Temperature Measurement, Probe Number = 3, T = 20.110000 C 01:58:06 Temperature Measurement, Probe Number = 4, T = 20.318000 C 01:58:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.32 01:58:06 Integrated Voltage Measurement... 01:58:25 Voltage Offset Correction: v_off_ini = 0.000004347 V, v_off_fin = 0.000007697 V 01:58:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171072547 Vs 01:58:26 Integrated Voltage Measurement... 01:58:45 Voltage Offset Correction: v_off_ini = 0.000007079 V, v_off_fin = 0.000003318 V 01:58:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980356 Vs 02:28:48 Temperature Measurement, Probe Number = 0, T = 20.162000 C 02:28:49 Temperature Measurement, Probe Number = 1, T = 20.086000 C 02:28:50 Temperature Measurement, Probe Number = 2, T = 20.154000 C 02:28:50 Temperature Measurement, Probe Number = 3, T = 20.100000 C 02:28:51 Temperature Measurement, Probe Number = 4, T = 20.259000 C 02:28:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.26 02:28:51 Integrated Voltage Measurement... 02:29:10 Voltage Offset Correction: v_off_ini = 0.000006109 V, v_off_fin = 0.000007406 V 02:29:10 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171121034 Vs 02:29:11 Integrated Voltage Measurement... 02:29:30 Voltage Offset Correction: v_off_ini = 0.000006759 V, v_off_fin = 0.000003532 V 02:29:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982597 Vs 02:29:33 Temperature Measurement, Probe Number = 0, T = 20.168000 C 02:29:33 Temperature Measurement, Probe Number = 1, T = 20.093000 C 02:29:34 Temperature Measurement, Probe Number = 2, T = 20.158000 C 02:29:35 Temperature Measurement, Probe Number = 3, T = 20.104000 C 02:29:35 Temperature Measurement, Probe Number = 4, T = 20.310000 C 02:29:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.31 02:29:36 Integrated Voltage Measurement... 02:29:55 Voltage Offset Correction: v_off_ini = 0.000004320 V, v_off_fin = 0.000007177 V 02:29:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171067168 Vs 02:29:55 Integrated Voltage Measurement... 02:30:15 Voltage Offset Correction: v_off_ini = 0.000006743 V, v_off_fin = 0.000003248 V 02:30:15 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982404 Vs 02:30:18 Temperature Measurement, Probe Number = 0, T = 20.170000 C 02:30:18 Temperature Measurement, Probe Number = 1, T = 20.094000 C 02:30:19 Temperature Measurement, Probe Number = 2, T = 20.162000 C 02:30:20 Temperature Measurement, Probe Number = 3, T = 20.105000 C 02:30:20 Temperature Measurement, Probe Number = 4, T = 20.365000 C 02:30:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.36 02:30:20 Integrated Voltage Measurement... 02:30:39 Voltage Offset Correction: v_off_ini = 0.000004478 V, v_off_fin = 0.000007561 V 02:30:40 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171071111 Vs 02:30:40 Integrated Voltage Measurement... 02:30:59 Voltage Offset Correction: v_off_ini = 0.000007060 V, v_off_fin = 0.000003367 V 02:30:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983877 Vs 02:31:02 Temperature Measurement, Probe Number = 0, T = 20.173000 C 02:31:03 Temperature Measurement, Probe Number = 1, T = 20.097000 C 02:31:03 Temperature Measurement, Probe Number = 2, T = 20.163000 C 02:31:04 Temperature Measurement, Probe Number = 3, T = 20.107000 C 02:31:05 Temperature Measurement, Probe Number = 4, T = 20.376000 C 02:31:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.38 02:31:05 Integrated Voltage Measurement... 02:31:24 Voltage Offset Correction: v_off_ini = 0.000004378 V, v_off_fin = 0.000007113 V 02:31:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066694 Vs 02:31:25 Integrated Voltage Measurement... 02:31:44 Voltage Offset Correction: v_off_ini = 0.000006941 V, v_off_fin = 0.000003400 V 02:31:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981750 Vs 02:31:47 Temperature Measurement, Probe Number = 0, T = 20.174000 C 02:31:48 Temperature Measurement, Probe Number = 1, T = 20.101000 C 02:31:48 Temperature Measurement, Probe Number = 2, T = 20.162000 C 02:31:49 Temperature Measurement, Probe Number = 3, T = 20.109000 C 02:31:50 Temperature Measurement, Probe Number = 4, T = 20.417000 C 02:31:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.42 02:31:50 Integrated Voltage Measurement... 02:32:09 Voltage Offset Correction: v_off_ini = 0.000004460 V, v_off_fin = 0.000007677 V 02:32:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171067254 Vs 02:32:10 Integrated Voltage Measurement... 02:32:28 Voltage Offset Correction: v_off_ini = 0.000006635 V, v_off_fin = 0.000003716 V 02:32:29 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980305 Vs 02:32:31 Temperature Measurement, Probe Number = 0, T = 20.175000 C 02:32:32 Temperature Measurement, Probe Number = 1, T = 20.099000 C 02:32:33 Temperature Measurement, Probe Number = 2, T = 20.165000 C 02:32:33 Temperature Measurement, Probe Number = 3, T = 20.110000 C 02:32:34 Temperature Measurement, Probe Number = 4, T = 20.473000 C 02:32:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.47 02:32:34 Integrated Voltage Measurement... 02:32:54 Voltage Offset Correction: v_off_ini = 0.000005237 V, v_off_fin = 0.000007269 V 02:32:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171074182 Vs 02:32:54 Integrated Voltage Measurement... 02:33:13 Voltage Offset Correction: v_off_ini = 0.000007284 V, v_off_fin = 0.000003924 V 02:33:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979927 Vs 02:33:16 Temperature Measurement, Probe Number = 0, T = 20.177000 C 02:33:17 Temperature Measurement, Probe Number = 1, T = 20.099000 C 02:33:18 Temperature Measurement, Probe Number = 2, T = 20.165000 C 02:33:18 Temperature Measurement, Probe Number = 3, T = 20.108000 C 02:33:19 Temperature Measurement, Probe Number = 4, T = 20.487000 C 02:33:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.49 02:33:19 Integrated Voltage Measurement... 02:33:39 Voltage Offset Correction: v_off_ini = 0.000005057 V, v_off_fin = 0.000007517 V 02:33:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171070369 Vs 02:33:39 Integrated Voltage Measurement... 02:33:58 Voltage Offset Correction: v_off_ini = 0.000006936 V, v_off_fin = 0.000003442 V 02:33:58 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979264 Vs 02:34:01 Temperature Measurement, Probe Number = 0, T = 20.173000 C 02:34:02 Temperature Measurement, Probe Number = 1, T = 20.094000 C 02:34:02 Temperature Measurement, Probe Number = 2, T = 20.163000 C 02:34:03 Temperature Measurement, Probe Number = 3, T = 20.105000 C 02:34:04 Temperature Measurement, Probe Number = 4, T = 20.487000 C 02:34:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.49 02:34:04 Integrated Voltage Measurement... 02:34:24 Voltage Offset Correction: v_off_ini = 0.000004137 V, v_off_fin = 0.000007018 V 02:34:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171064032 Vs 02:34:24 Integrated Voltage Measurement... 02:34:43 Voltage Offset Correction: v_off_ini = 0.000006564 V, v_off_fin = 0.000003220 V 02:34:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982982 Vs 02:34:46 Temperature Measurement, Probe Number = 0, T = 20.164000 C 02:34:47 Temperature Measurement, Probe Number = 1, T = 20.087000 C 02:34:48 Temperature Measurement, Probe Number = 2, T = 20.157000 C 02:34:48 Temperature Measurement, Probe Number = 3, T = 20.101000 C 02:34:49 Temperature Measurement, Probe Number = 4, T = 20.367000 C 02:34:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.37 02:34:49 Integrated Voltage Measurement... 02:35:09 Voltage Offset Correction: v_off_ini = 0.000004574 V, v_off_fin = 0.000007385 V 02:35:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065353 Vs 02:35:10 Integrated Voltage Measurement... 02:35:29 Voltage Offset Correction: v_off_ini = 0.000007044 V, v_off_fin = 0.000003764 V 02:35:29 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977134 Vs 02:35:32 Temperature Measurement, Probe Number = 0, T = 20.166000 C 02:35:32 Temperature Measurement, Probe Number = 1, T = 20.090000 C 02:35:33 Temperature Measurement, Probe Number = 2, T = 20.158000 C 02:35:34 Temperature Measurement, Probe Number = 3, T = 20.102000 C 02:35:34 Temperature Measurement, Probe Number = 4, T = 20.313000 C 02:35:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.31 02:35:34 Integrated Voltage Measurement... 02:35:54 Voltage Offset Correction: v_off_ini = 0.000004355 V, v_off_fin = 0.000007336 V 02:35:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171071950 Vs 02:35:55 Integrated Voltage Measurement... 02:36:14 Voltage Offset Correction: v_off_ini = 0.000006855 V, v_off_fin = 0.000003500 V 02:36:14 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170976812 Vs 03:06:17 Temperature Measurement, Probe Number = 0, T = 20.172000 C 03:06:17 Temperature Measurement, Probe Number = 1, T = 20.098000 C 03:06:18 Temperature Measurement, Probe Number = 2, T = 20.161000 C 03:06:19 Temperature Measurement, Probe Number = 3, T = 20.108000 C 03:06:19 Temperature Measurement, Probe Number = 4, T = 20.415000 C 03:06:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.41 03:06:19 Integrated Voltage Measurement... 03:06:39 Voltage Offset Correction: v_off_ini = 0.000005197 V, v_off_fin = 0.000006903 V 03:06:39 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171120503 Vs 03:06:39 Integrated Voltage Measurement... 03:06:59 Voltage Offset Correction: v_off_ini = 0.000006407 V, v_off_fin = 0.000003292 V 03:06:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988330 Vs 03:07:01 Temperature Measurement, Probe Number = 0, T = 20.172000 C 03:07:02 Temperature Measurement, Probe Number = 1, T = 20.095000 C 03:07:03 Temperature Measurement, Probe Number = 2, T = 20.163000 C 03:07:03 Temperature Measurement, Probe Number = 3, T = 20.107000 C 03:07:04 Temperature Measurement, Probe Number = 4, T = 20.462000 C 03:07:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.46 03:07:04 Integrated Voltage Measurement... 03:07:24 Voltage Offset Correction: v_off_ini = 0.000004607 V, v_off_fin = 0.000006944 V 03:07:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058871 Vs 03:07:24 Integrated Voltage Measurement... 03:07:43 Voltage Offset Correction: v_off_ini = 0.000006031 V, v_off_fin = 0.000002961 V 03:07:44 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986730 Vs 03:07:46 Temperature Measurement, Probe Number = 0, T = 20.167000 C 03:07:47 Temperature Measurement, Probe Number = 1, T = 20.095000 C 03:07:48 Temperature Measurement, Probe Number = 2, T = 20.158000 C 03:07:48 Temperature Measurement, Probe Number = 3, T = 20.105000 C 03:07:49 Temperature Measurement, Probe Number = 4, T = 20.350000 C 03:07:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.35 03:07:49 Integrated Voltage Measurement... 03:08:08 Voltage Offset Correction: v_off_ini = 0.000004273 V, v_off_fin = 0.000007007 V 03:08:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051140 Vs 03:08:09 Integrated Voltage Measurement... 03:08:28 Voltage Offset Correction: v_off_ini = 0.000006250 V, v_off_fin = 0.000002611 V 03:08:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986998 Vs 03:08:31 Temperature Measurement, Probe Number = 0, T = 20.169000 C 03:08:31 Temperature Measurement, Probe Number = 1, T = 20.096000 C 03:08:32 Temperature Measurement, Probe Number = 2, T = 20.158000 C 03:08:33 Temperature Measurement, Probe Number = 3, T = 20.104000 C 03:08:33 Temperature Measurement, Probe Number = 4, T = 20.272000 C 03:08:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.27 03:08:34 Integrated Voltage Measurement... 03:08:53 Voltage Offset Correction: v_off_ini = 0.000003887 V, v_off_fin = 0.000006300 V 03:08:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053942 Vs 03:08:53 Integrated Voltage Measurement... 03:09:12 Voltage Offset Correction: v_off_ini = 0.000006202 V, v_off_fin = 0.000002878 V 03:09:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989091 Vs 03:09:15 Temperature Measurement, Probe Number = 0, T = 20.168000 C 03:09:16 Temperature Measurement, Probe Number = 1, T = 20.094000 C 03:09:17 Temperature Measurement, Probe Number = 2, T = 20.159000 C 03:09:17 Temperature Measurement, Probe Number = 3, T = 20.104000 C 03:09:18 Temperature Measurement, Probe Number = 4, T = 20.252000 C 03:09:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.25 03:09:18 Integrated Voltage Measurement... 03:09:37 Voltage Offset Correction: v_off_ini = 0.000004074 V, v_off_fin = 0.000006431 V 03:09:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054452 Vs 03:09:38 Integrated Voltage Measurement... 03:09:57 Voltage Offset Correction: v_off_ini = 0.000005649 V, v_off_fin = 0.000002796 V 03:09:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988421 Vs 03:10:00 Temperature Measurement, Probe Number = 0, T = 20.164000 C 03:10:00 Temperature Measurement, Probe Number = 1, T = 20.087000 C 03:10:01 Temperature Measurement, Probe Number = 2, T = 20.155000 C 03:10:02 Temperature Measurement, Probe Number = 3, T = 20.099000 C 03:10:02 Temperature Measurement, Probe Number = 4, T = 20.235000 C 03:10:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.23 03:10:03 Integrated Voltage Measurement... 03:10:22 Voltage Offset Correction: v_off_ini = 0.000004464 V, v_off_fin = 0.000006712 V 03:10:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059134 Vs 03:10:22 Integrated Voltage Measurement... 03:10:42 Voltage Offset Correction: v_off_ini = 0.000006280 V, v_off_fin = 0.000003597 V 03:10:42 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988588 Vs 03:10:45 Temperature Measurement, Probe Number = 0, T = 20.169000 C 03:10:45 Temperature Measurement, Probe Number = 1, T = 20.093000 C 03:10:46 Temperature Measurement, Probe Number = 2, T = 20.161000 C 03:10:47 Temperature Measurement, Probe Number = 3, T = 20.104000 C 03:10:47 Temperature Measurement, Probe Number = 4, T = 20.259000 C 03:10:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.26 03:10:47 Integrated Voltage Measurement... 03:11:07 Voltage Offset Correction: v_off_ini = 0.000004929 V, v_off_fin = 0.000006381 V 03:11:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058505 Vs 03:11:07 Integrated Voltage Measurement... 03:11:26 Voltage Offset Correction: v_off_ini = 0.000006736 V, v_off_fin = 0.000003188 V 03:11:26 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170984274 Vs 03:11:29 Temperature Measurement, Probe Number = 0, T = 20.170000 C 03:11:30 Temperature Measurement, Probe Number = 1, T = 20.095000 C 03:11:30 Temperature Measurement, Probe Number = 2, T = 20.161000 C 03:11:31 Temperature Measurement, Probe Number = 3, T = 20.106000 C 03:11:32 Temperature Measurement, Probe Number = 4, T = 20.357000 C 03:11:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.36 03:11:32 Integrated Voltage Measurement... 03:11:52 Voltage Offset Correction: v_off_ini = 0.000004277 V, v_off_fin = 0.000006774 V 03:11:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061197 Vs 03:11:52 Integrated Voltage Measurement... 03:12:11 Voltage Offset Correction: v_off_ini = 0.000005932 V, v_off_fin = 0.000002676 V 03:12:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985369 Vs 03:12:14 Temperature Measurement, Probe Number = 0, T = 20.172000 C 03:12:15 Temperature Measurement, Probe Number = 1, T = 20.096000 C 03:12:15 Temperature Measurement, Probe Number = 2, T = 20.165000 C 03:12:16 Temperature Measurement, Probe Number = 3, T = 20.108000 C 03:12:17 Temperature Measurement, Probe Number = 4, T = 20.464000 C 03:12:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.46 03:12:17 Integrated Voltage Measurement... 03:12:36 Voltage Offset Correction: v_off_ini = 0.000003871 V, v_off_fin = 0.000007942 V 03:12:36 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171066020 Vs 03:12:36 Integrated Voltage Measurement... 03:12:56 Voltage Offset Correction: v_off_ini = 0.000007477 V, v_off_fin = 0.000004136 V 03:12:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977021 Vs 03:12:59 Temperature Measurement, Probe Number = 0, T = 20.172000 C 03:12:59 Temperature Measurement, Probe Number = 1, T = 20.096000 C 03:13:00 Temperature Measurement, Probe Number = 2, T = 20.164000 C 03:13:01 Temperature Measurement, Probe Number = 3, T = 20.108000 C 03:13:01 Temperature Measurement, Probe Number = 4, T = 20.552000 C 03:13:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.55 03:13:02 Integrated Voltage Measurement... 03:13:21 Voltage Offset Correction: v_off_ini = 0.000005556 V, v_off_fin = 0.000008187 V 03:13:21 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171068489 Vs 03:13:21 Integrated Voltage Measurement... 03:13:40 Voltage Offset Correction: v_off_ini = 0.000007007 V, v_off_fin = 0.000003552 V 03:13:41 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170972886 Vs 03:43:43 Temperature Measurement, Probe Number = 0, T = 20.173000 C 03:43:44 Temperature Measurement, Probe Number = 1, T = 20.098000 C 03:43:45 Temperature Measurement, Probe Number = 2, T = 20.163000 C 03:43:45 Temperature Measurement, Probe Number = 3, T = 20.106000 C 03:43:46 Temperature Measurement, Probe Number = 4, T = 20.260000 C 03:43:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.26 03:43:46 Integrated Voltage Measurement... 03:44:06 Voltage Offset Correction: v_off_ini = 0.000005141 V, v_off_fin = 0.000006761 V 03:44:06 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171109952 Vs 03:44:06 Integrated Voltage Measurement... 03:44:26 Voltage Offset Correction: v_off_ini = 0.000005860 V, v_off_fin = 0.000002765 V 03:44:26 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170993826 Vs 03:44:29 Temperature Measurement, Probe Number = 0, T = 20.170000 C 03:44:29 Temperature Measurement, Probe Number = 1, T = 20.094000 C 03:44:30 Temperature Measurement, Probe Number = 2, T = 20.158000 C 03:44:31 Temperature Measurement, Probe Number = 3, T = 20.103000 C 03:44:31 Temperature Measurement, Probe Number = 4, T = 20.190000 C 03:44:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.19 03:44:32 Integrated Voltage Measurement... 03:44:51 Voltage Offset Correction: v_off_ini = 0.000004195 V, v_off_fin = 0.000006409 V 03:44:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051164 Vs 03:44:51 Integrated Voltage Measurement... 03:45:10 Voltage Offset Correction: v_off_ini = 0.000005704 V, v_off_fin = 0.000002659 V 03:45:11 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988125 Vs 03:45:13 Temperature Measurement, Probe Number = 0, T = 20.171000 C 03:45:14 Temperature Measurement, Probe Number = 1, T = 20.094000 C 03:45:15 Temperature Measurement, Probe Number = 2, T = 20.159000 C 03:45:15 Temperature Measurement, Probe Number = 3, T = 20.105000 C 03:45:16 Temperature Measurement, Probe Number = 4, T = 20.159000 C 03:45:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.16 03:45:16 Integrated Voltage Measurement... 03:45:35 Voltage Offset Correction: v_off_ini = 0.000003657 V, v_off_fin = 0.000006541 V 03:45:36 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171046773 Vs 03:45:36 Integrated Voltage Measurement... 03:45:55 Voltage Offset Correction: v_off_ini = 0.000005633 V, v_off_fin = 0.000002904 V 03:45:55 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987058 Vs 03:45:58 Temperature Measurement, Probe Number = 0, T = 20.171000 C 03:45:58 Temperature Measurement, Probe Number = 1, T = 20.096000 C 03:45:59 Temperature Measurement, Probe Number = 2, T = 20.159000 C 03:46:00 Temperature Measurement, Probe Number = 3, T = 20.105000 C 03:46:00 Temperature Measurement, Probe Number = 4, T = 20.180000 C 03:46:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.18 03:46:01 Integrated Voltage Measurement... 03:46:20 Voltage Offset Correction: v_off_ini = 0.000004043 V, v_off_fin = 0.000006344 V 03:46:20 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054410 Vs 03:46:20 Integrated Voltage Measurement... 03:46:39 Voltage Offset Correction: v_off_ini = 0.000005630 V, v_off_fin = 0.000002278 V 03:46:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990804 Vs 03:46:42 Temperature Measurement, Probe Number = 0, T = 20.167000 C 03:46:43 Temperature Measurement, Probe Number = 1, T = 20.094000 C 03:46:44 Temperature Measurement, Probe Number = 2, T = 20.157000 C 03:46:44 Temperature Measurement, Probe Number = 3, T = 20.103000 C 03:46:45 Temperature Measurement, Probe Number = 4, T = 20.288000 C 03:46:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.29 03:46:45 Integrated Voltage Measurement... 03:47:04 Voltage Offset Correction: v_off_ini = 0.000003221 V, v_off_fin = 0.000006440 V 03:47:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053550 Vs 03:47:05 Integrated Voltage Measurement... 03:47:24 Voltage Offset Correction: v_off_ini = 0.000005918 V, v_off_fin = 0.000003073 V 03:47:24 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170991752 Vs 03:47:27 Temperature Measurement, Probe Number = 0, T = 20.169000 C 03:47:28 Temperature Measurement, Probe Number = 1, T = 20.097000 C 03:47:28 Temperature Measurement, Probe Number = 2, T = 20.158000 C 03:47:29 Temperature Measurement, Probe Number = 3, T = 20.106000 C 03:47:30 Temperature Measurement, Probe Number = 4, T = 20.346000 C 03:47:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.35 03:47:30 Integrated Voltage Measurement... 03:47:50 Voltage Offset Correction: v_off_ini = 0.000004129 V, v_off_fin = 0.000006142 V 03:47:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052991 Vs 03:47:50 Integrated Voltage Measurement... 03:48:09 Voltage Offset Correction: v_off_ini = 0.000005882 V, v_off_fin = 0.000002664 V 03:48:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990612 Vs 03:48:12 Temperature Measurement, Probe Number = 0, T = 20.171000 C 03:48:13 Temperature Measurement, Probe Number = 1, T = 20.096000 C 03:48:14 Temperature Measurement, Probe Number = 2, T = 20.160000 C 03:48:14 Temperature Measurement, Probe Number = 3, T = 20.105000 C 03:48:15 Temperature Measurement, Probe Number = 4, T = 20.411000 C 03:48:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.41 03:48:15 Integrated Voltage Measurement... 03:48:35 Voltage Offset Correction: v_off_ini = 0.000004225 V, v_off_fin = 0.000006725 V 03:48:35 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050532 Vs 03:48:35 Integrated Voltage Measurement... 03:48:54 Voltage Offset Correction: v_off_ini = 0.000005867 V, v_off_fin = 0.000002965 V 03:48:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992382 Vs 03:48:57 Temperature Measurement, Probe Number = 0, T = 20.165000 C 03:48:58 Temperature Measurement, Probe Number = 1, T = 20.091000 C 03:48:59 Temperature Measurement, Probe Number = 2, T = 20.155000 C 03:48:59 Temperature Measurement, Probe Number = 3, T = 20.101000 C 03:49:00 Temperature Measurement, Probe Number = 4, T = 20.434000 C 03:49:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.43 03:49:00 Integrated Voltage Measurement... 03:49:20 Voltage Offset Correction: v_off_ini = 0.000004081 V, v_off_fin = 0.000006011 V 03:49:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051108 Vs 03:49:21 Integrated Voltage Measurement... 03:49:40 Voltage Offset Correction: v_off_ini = 0.000005687 V, v_off_fin = 0.000003265 V 03:49:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984406 Vs 03:49:42 Temperature Measurement, Probe Number = 0, T = 20.165000 C 03:49:43 Temperature Measurement, Probe Number = 1, T = 20.092000 C 03:49:44 Temperature Measurement, Probe Number = 2, T = 20.155000 C 03:49:44 Temperature Measurement, Probe Number = 3, T = 20.101000 C 03:49:45 Temperature Measurement, Probe Number = 4, T = 20.318000 C 03:49:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.32 03:49:45 Integrated Voltage Measurement... 03:50:05 Voltage Offset Correction: v_off_ini = 0.000004103 V, v_off_fin = 0.000006754 V 03:50:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054006 Vs 03:50:05 Integrated Voltage Measurement... 03:50:24 Voltage Offset Correction: v_off_ini = 0.000006068 V, v_off_fin = 0.000002915 V 03:50:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986235 Vs 03:50:27 Temperature Measurement, Probe Number = 0, T = 20.171000 C 03:50:28 Temperature Measurement, Probe Number = 1, T = 20.096000 C 03:50:29 Temperature Measurement, Probe Number = 2, T = 20.160000 C 03:50:29 Temperature Measurement, Probe Number = 3, T = 20.105000 C 03:50:30 Temperature Measurement, Probe Number = 4, T = 20.386000 C 03:50:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.39 03:50:30 Integrated Voltage Measurement... 03:50:49 Voltage Offset Correction: v_off_ini = 0.000003731 V, v_off_fin = 0.000007133 V 03:50:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059278 Vs 03:50:50 Integrated Voltage Measurement... 03:51:09 Voltage Offset Correction: v_off_ini = 0.000006410 V, v_off_fin = 0.000002864 V 03:51:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982596 Vs 04:21:12 Temperature Measurement, Probe Number = 0, T = 20.172000 C 04:21:12 Temperature Measurement, Probe Number = 1, T = 20.093000 C 04:21:13 Temperature Measurement, Probe Number = 2, T = 20.161000 C 04:21:14 Temperature Measurement, Probe Number = 3, T = 20.103000 C 04:21:14 Temperature Measurement, Probe Number = 4, T = 20.439000 C 04:21:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.44 04:21:14 Integrated Voltage Measurement... 04:21:34 Voltage Offset Correction: v_off_ini = 0.000005109 V, v_off_fin = 0.000006409 V 04:21:34 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171100954 Vs 04:21:34 Integrated Voltage Measurement... 04:21:53 Voltage Offset Correction: v_off_ini = 0.000005650 V, v_off_fin = 0.000003485 V 04:21:53 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170991442 Vs 04:21:56 Temperature Measurement, Probe Number = 0, T = 20.166000 C 04:21:57 Temperature Measurement, Probe Number = 1, T = 20.091000 C 04:21:57 Temperature Measurement, Probe Number = 2, T = 20.156000 C 04:21:58 Temperature Measurement, Probe Number = 3, T = 20.102000 C 04:21:59 Temperature Measurement, Probe Number = 4, T = 20.310000 C 04:21:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.31 04:21:59 Integrated Voltage Measurement... 04:22:18 Voltage Offset Correction: v_off_ini = 0.000004185 V, v_off_fin = 0.000006635 V 04:22:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054226 Vs 04:22:19 Integrated Voltage Measurement... 04:22:38 Voltage Offset Correction: v_off_ini = 0.000006366 V, v_off_fin = 0.000003032 V 04:22:38 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986792 Vs 04:22:41 Temperature Measurement, Probe Number = 0, T = 20.166000 C 04:22:41 Temperature Measurement, Probe Number = 1, T = 20.088000 C 04:22:42 Temperature Measurement, Probe Number = 2, T = 20.154000 C 04:22:43 Temperature Measurement, Probe Number = 3, T = 20.098000 C 04:22:43 Temperature Measurement, Probe Number = 4, T = 20.217000 C 04:22:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.22 04:22:43 Integrated Voltage Measurement... 04:23:03 Voltage Offset Correction: v_off_ini = 0.000004188 V, v_off_fin = 0.000007076 V 04:23:03 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171061051 Vs 04:23:03 Integrated Voltage Measurement... 04:23:23 Voltage Offset Correction: v_off_ini = 0.000006259 V, v_off_fin = 0.000003484 V 04:23:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986311 Vs 04:23:25 Temperature Measurement, Probe Number = 0, T = 20.170000 C 04:23:26 Temperature Measurement, Probe Number = 1, T = 20.096000 C 04:23:27 Temperature Measurement, Probe Number = 2, T = 20.157000 C 04:23:27 Temperature Measurement, Probe Number = 3, T = 20.103000 C 04:23:28 Temperature Measurement, Probe Number = 4, T = 20.257000 C 04:23:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.26 04:23:28 Integrated Voltage Measurement... 04:23:48 Voltage Offset Correction: v_off_ini = 0.000004710 V, v_off_fin = 0.000006986 V 04:23:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058799 Vs 04:23:48 Integrated Voltage Measurement... 04:24:08 Voltage Offset Correction: v_off_ini = 0.000006420 V, v_off_fin = 0.000003550 V 04:24:08 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987839 Vs 04:24:10 Temperature Measurement, Probe Number = 0, T = 20.168000 C 04:24:11 Temperature Measurement, Probe Number = 1, T = 20.093000 C 04:24:12 Temperature Measurement, Probe Number = 2, T = 20.156000 C 04:24:12 Temperature Measurement, Probe Number = 3, T = 20.101000 C 04:24:13 Temperature Measurement, Probe Number = 4, T = 20.311000 C 04:24:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.31 04:24:13 Integrated Voltage Measurement... 04:24:33 Voltage Offset Correction: v_off_ini = 0.000003712 V, v_off_fin = 0.000006391 V 04:24:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053650 Vs 04:24:33 Integrated Voltage Measurement... 04:24:52 Voltage Offset Correction: v_off_ini = 0.000005717 V, v_off_fin = 0.000003319 V 04:24:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989943 Vs 04:24:55 Temperature Measurement, Probe Number = 0, T = 20.162000 C 04:24:56 Temperature Measurement, Probe Number = 1, T = 20.091000 C 04:24:57 Temperature Measurement, Probe Number = 2, T = 20.152000 C 04:24:57 Temperature Measurement, Probe Number = 3, T = 20.097000 C 04:24:58 Temperature Measurement, Probe Number = 4, T = 20.233000 C 04:24:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.23 04:24:58 Integrated Voltage Measurement... 04:25:18 Voltage Offset Correction: v_off_ini = 0.000003858 V, v_off_fin = 0.000006623 V 04:25:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054183 Vs 04:25:18 Integrated Voltage Measurement... 04:25:38 Voltage Offset Correction: v_off_ini = 0.000006450 V, v_off_fin = 0.000003286 V 04:25:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990869 Vs 04:25:40 Temperature Measurement, Probe Number = 0, T = 20.166000 C 04:25:41 Temperature Measurement, Probe Number = 1, T = 20.090000 C 04:25:42 Temperature Measurement, Probe Number = 2, T = 20.155000 C 04:25:42 Temperature Measurement, Probe Number = 3, T = 20.097000 C 04:25:43 Temperature Measurement, Probe Number = 4, T = 20.152000 C 04:25:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.15 04:25:43 Integrated Voltage Measurement... 04:26:03 Voltage Offset Correction: v_off_ini = 0.000003829 V, v_off_fin = 0.000007035 V 04:26:03 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058814 Vs 04:26:03 Integrated Voltage Measurement... 04:26:22 Voltage Offset Correction: v_off_ini = 0.000006599 V, v_off_fin = 0.000002555 V 04:26:22 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987460 Vs 04:26:25 Temperature Measurement, Probe Number = 0, T = 20.169000 C 04:26:25 Temperature Measurement, Probe Number = 1, T = 20.093000 C 04:26:26 Temperature Measurement, Probe Number = 2, T = 20.158000 C 04:26:27 Temperature Measurement, Probe Number = 3, T = 20.102000 C 04:26:27 Temperature Measurement, Probe Number = 4, T = 20.187000 C 04:26:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.19 04:26:28 Integrated Voltage Measurement... 04:26:48 Voltage Offset Correction: v_off_ini = 0.000004471 V, v_off_fin = 0.000007330 V 04:26:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061045 Vs 04:26:48 Integrated Voltage Measurement... 04:27:07 Voltage Offset Correction: v_off_ini = 0.000006059 V, v_off_fin = 0.000002363 V 04:27:07 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987096 Vs 04:27:10 Temperature Measurement, Probe Number = 0, T = 20.166000 C 04:27:10 Temperature Measurement, Probe Number = 1, T = 20.087000 C 04:27:11 Temperature Measurement, Probe Number = 2, T = 20.157000 C 04:27:12 Temperature Measurement, Probe Number = 3, T = 20.098000 C 04:27:12 Temperature Measurement, Probe Number = 4, T = 20.238000 C 04:27:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.24 04:27:13 Integrated Voltage Measurement... 04:27:32 Voltage Offset Correction: v_off_ini = 0.000004265 V, v_off_fin = 0.000006682 V 04:27:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054915 Vs 04:27:32 Integrated Voltage Measurement... 04:27:52 Voltage Offset Correction: v_off_ini = 0.000005874 V, v_off_fin = 0.000002719 V 04:27:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995138 Vs 04:27:55 Temperature Measurement, Probe Number = 0, T = 20.161000 C 04:27:55 Temperature Measurement, Probe Number = 1, T = 20.083000 C 04:27:56 Temperature Measurement, Probe Number = 2, T = 20.153000 C 04:27:57 Temperature Measurement, Probe Number = 3, T = 20.095000 C 04:27:57 Temperature Measurement, Probe Number = 4, T = 20.187000 C 04:27:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.19 04:27:58 Integrated Voltage Measurement... 04:28:17 Voltage Offset Correction: v_off_ini = 0.000004598 V, v_off_fin = 0.000007209 V 04:28:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059628 Vs 04:28:18 Integrated Voltage Measurement... 04:28:37 Voltage Offset Correction: v_off_ini = 0.000006744 V, v_off_fin = 0.000003257 V 04:28:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982580 Vs 04:58:40 Temperature Measurement, Probe Number = 0, T = 20.160000 C 04:58:41 Temperature Measurement, Probe Number = 1, T = 20.083000 C 04:58:42 Temperature Measurement, Probe Number = 2, T = 20.150000 C 04:58:42 Temperature Measurement, Probe Number = 3, T = 20.093000 C 04:58:43 Temperature Measurement, Probe Number = 4, T = 20.339000 C 04:58:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.34 04:58:43 Integrated Voltage Measurement... 04:59:02 Voltage Offset Correction: v_off_ini = 0.000004864 V, v_off_fin = 0.000006942 V 04:59:02 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171097255 Vs 04:59:03 Integrated Voltage Measurement... 04:59:22 Voltage Offset Correction: v_off_ini = 0.000006185 V, v_off_fin = 0.000003627 V 04:59:22 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982698 Vs 04:59:25 Temperature Measurement, Probe Number = 0, T = 20.165000 C 04:59:25 Temperature Measurement, Probe Number = 1, T = 20.088000 C 04:59:26 Temperature Measurement, Probe Number = 2, T = 20.153000 C 04:59:27 Temperature Measurement, Probe Number = 3, T = 20.096000 C 04:59:27 Temperature Measurement, Probe Number = 4, T = 20.283000 C 04:59:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.28 04:59:27 Integrated Voltage Measurement... 04:59:47 Voltage Offset Correction: v_off_ini = 0.000004579 V, v_off_fin = 0.000007207 V 04:59:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049779 Vs 04:59:47 Integrated Voltage Measurement... 05:00:06 Voltage Offset Correction: v_off_ini = 0.000006171 V, v_off_fin = 0.000003066 V 05:00:06 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986149 Vs 05:00:09 Temperature Measurement, Probe Number = 0, T = 20.167000 C 05:00:10 Temperature Measurement, Probe Number = 1, T = 20.089000 C 05:00:10 Temperature Measurement, Probe Number = 2, T = 20.154000 C 05:00:11 Temperature Measurement, Probe Number = 3, T = 20.097000 C 05:00:12 Temperature Measurement, Probe Number = 4, T = 20.269000 C 05:00:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.27 05:00:12 Integrated Voltage Measurement... 05:00:31 Voltage Offset Correction: v_off_ini = 0.000003443 V, v_off_fin = 0.000006791 V 05:00:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053329 Vs 05:00:31 Integrated Voltage Measurement... 05:00:50 Voltage Offset Correction: v_off_ini = 0.000006147 V, v_off_fin = 0.000002966 V 05:00:51 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987437 Vs 05:00:53 Temperature Measurement, Probe Number = 0, T = 20.170000 C 05:00:54 Temperature Measurement, Probe Number = 1, T = 20.091000 C 05:00:55 Temperature Measurement, Probe Number = 2, T = 20.158000 C 05:00:55 Temperature Measurement, Probe Number = 3, T = 20.101000 C 05:00:56 Temperature Measurement, Probe Number = 4, T = 20.374000 C 05:00:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.37 05:00:56 Integrated Voltage Measurement... 05:01:15 Voltage Offset Correction: v_off_ini = 0.000003611 V, v_off_fin = 0.000007057 V 05:01:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171060580 Vs 05:01:15 Integrated Voltage Measurement... 05:01:35 Voltage Offset Correction: v_off_ini = 0.000006573 V, v_off_fin = 0.000003174 V 05:01:35 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987053 Vs 05:01:38 Temperature Measurement, Probe Number = 0, T = 20.164000 C 05:01:38 Temperature Measurement, Probe Number = 1, T = 20.088000 C 05:01:39 Temperature Measurement, Probe Number = 2, T = 20.154000 C 05:01:40 Temperature Measurement, Probe Number = 3, T = 20.099000 C 05:01:40 Temperature Measurement, Probe Number = 4, T = 20.334000 C 05:01:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.33 05:01:41 Integrated Voltage Measurement... 05:02:00 Voltage Offset Correction: v_off_ini = 0.000004628 V, v_off_fin = 0.000006982 V 05:02:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057053 Vs 05:02:00 Integrated Voltage Measurement... 05:02:19 Voltage Offset Correction: v_off_ini = 0.000006314 V, v_off_fin = 0.000003759 V 05:02:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982388 Vs 05:02:22 Temperature Measurement, Probe Number = 0, T = 20.167000 C 05:02:23 Temperature Measurement, Probe Number = 1, T = 20.093000 C 05:02:24 Temperature Measurement, Probe Number = 2, T = 20.156000 C 05:02:24 Temperature Measurement, Probe Number = 3, T = 20.102000 C 05:02:25 Temperature Measurement, Probe Number = 4, T = 20.258000 C 05:02:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.26 05:02:25 Integrated Voltage Measurement... 05:02:44 Voltage Offset Correction: v_off_ini = 0.000003961 V, v_off_fin = 0.000006475 V 05:02:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054741 Vs 05:02:45 Integrated Voltage Measurement... 05:03:04 Voltage Offset Correction: v_off_ini = 0.000005982 V, v_off_fin = 0.000003266 V 05:03:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985313 Vs 05:03:07 Temperature Measurement, Probe Number = 0, T = 20.168000 C 05:03:07 Temperature Measurement, Probe Number = 1, T = 20.093000 C 05:03:08 Temperature Measurement, Probe Number = 2, T = 20.158000 C 05:03:09 Temperature Measurement, Probe Number = 3, T = 20.102000 C 05:03:09 Temperature Measurement, Probe Number = 4, T = 20.351000 C 05:03:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.35 05:03:10 Integrated Voltage Measurement... 05:03:29 Voltage Offset Correction: v_off_ini = 0.000004744 V, v_off_fin = 0.000007111 V 05:03:29 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059444 Vs 05:03:29 Integrated Voltage Measurement... 05:03:48 Voltage Offset Correction: v_off_ini = 0.000006528 V, v_off_fin = 0.000003606 V 05:03:49 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170978134 Vs 05:03:51 Temperature Measurement, Probe Number = 0, T = 20.171000 C 05:03:52 Temperature Measurement, Probe Number = 1, T = 20.095000 C 05:03:53 Temperature Measurement, Probe Number = 2, T = 20.160000 C 05:03:53 Temperature Measurement, Probe Number = 3, T = 20.104000 C 05:03:54 Temperature Measurement, Probe Number = 4, T = 20.415000 C 05:03:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 05:03:54 Integrated Voltage Measurement... 05:04:13 Voltage Offset Correction: v_off_ini = 0.000005095 V, v_off_fin = 0.000007306 V 05:04:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062989 Vs 05:04:13 Integrated Voltage Measurement... 05:04:33 Voltage Offset Correction: v_off_ini = 0.000006410 V, v_off_fin = 0.000003225 V 05:04:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980311 Vs 05:04:35 Temperature Measurement, Probe Number = 0, T = 20.169000 C 05:04:36 Temperature Measurement, Probe Number = 1, T = 20.094000 C 05:04:37 Temperature Measurement, Probe Number = 2, T = 20.158000 C 05:04:37 Temperature Measurement, Probe Number = 3, T = 20.102000 C 05:04:38 Temperature Measurement, Probe Number = 4, T = 20.331000 C 05:04:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.33 05:04:38 Integrated Voltage Measurement... 05:04:57 Voltage Offset Correction: v_off_ini = 0.000005023 V, v_off_fin = 0.000007881 V 05:04:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064296 Vs 05:04:58 Integrated Voltage Measurement... 05:05:17 Voltage Offset Correction: v_off_ini = 0.000007227 V, v_off_fin = 0.000003770 V 05:05:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975981 Vs 05:05:20 Temperature Measurement, Probe Number = 0, T = 20.170000 C 05:05:21 Temperature Measurement, Probe Number = 1, T = 20.091000 C 05:05:22 Temperature Measurement, Probe Number = 2, T = 20.155000 C 05:05:22 Temperature Measurement, Probe Number = 3, T = 20.099000 C 05:05:23 Temperature Measurement, Probe Number = 4, T = 20.302000 C 05:05:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.30 05:05:23 Integrated Voltage Measurement... 05:05:42 Voltage Offset Correction: v_off_ini = 0.000005212 V, v_off_fin = 0.000007075 V 05:05:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062226 Vs 05:05:43 Integrated Voltage Measurement... 05:06:02 Voltage Offset Correction: v_off_ini = 0.000006678 V, v_off_fin = 0.000002930 V 05:06:02 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170978504 Vs 05:36:05 Temperature Measurement, Probe Number = 0, T = 20.172000 C 05:36:05 Temperature Measurement, Probe Number = 1, T = 20.094000 C 05:36:06 Temperature Measurement, Probe Number = 2, T = 20.160000 C 05:36:06 Temperature Measurement, Probe Number = 3, T = 20.104000 C 05:36:07 Temperature Measurement, Probe Number = 4, T = 20.460000 C 05:36:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.46 05:36:07 Integrated Voltage Measurement... 05:36:26 Voltage Offset Correction: v_off_ini = 0.000005369 V, v_off_fin = 0.000006974 V 05:36:27 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171109321 Vs 05:36:27 Integrated Voltage Measurement... 05:36:46 Voltage Offset Correction: v_off_ini = 0.000005939 V, v_off_fin = 0.000003204 V 05:36:46 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986996 Vs 05:36:49 Temperature Measurement, Probe Number = 0, T = 20.168000 C 05:36:49 Temperature Measurement, Probe Number = 1, T = 20.089000 C 05:36:50 Temperature Measurement, Probe Number = 2, T = 20.158000 C 05:36:51 Temperature Measurement, Probe Number = 3, T = 20.100000 C 05:36:51 Temperature Measurement, Probe Number = 4, T = 20.428000 C 05:36:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.43 05:36:52 Integrated Voltage Measurement... 05:37:11 Voltage Offset Correction: v_off_ini = 0.000003896 V, v_off_fin = 0.000007164 V 05:37:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052678 Vs 05:37:12 Integrated Voltage Measurement... 05:37:31 Voltage Offset Correction: v_off_ini = 0.000006467 V, v_off_fin = 0.000003404 V 05:37:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982243 Vs 05:37:34 Temperature Measurement, Probe Number = 0, T = 20.162000 C 05:37:35 Temperature Measurement, Probe Number = 1, T = 20.086000 C 05:37:35 Temperature Measurement, Probe Number = 2, T = 20.151000 C 05:37:36 Temperature Measurement, Probe Number = 3, T = 20.096000 C 05:37:37 Temperature Measurement, Probe Number = 4, T = 20.379000 C 05:37:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.38 05:37:37 Integrated Voltage Measurement... 05:37:56 Voltage Offset Correction: v_off_ini = 0.000005179 V, v_off_fin = 0.000007716 V 05:37:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171068945 Vs 05:37:57 Integrated Voltage Measurement... 05:38:16 Voltage Offset Correction: v_off_ini = 0.000006396 V, v_off_fin = 0.000003314 V 05:38:16 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170972314 Vs 05:38:19 Temperature Measurement, Probe Number = 0, T = 20.164000 C 05:38:19 Temperature Measurement, Probe Number = 1, T = 20.089000 C 05:38:20 Temperature Measurement, Probe Number = 2, T = 20.156000 C 05:38:21 Temperature Measurement, Probe Number = 3, T = 20.100000 C 05:38:21 Temperature Measurement, Probe Number = 4, T = 20.429000 C 05:38:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.43 05:38:22 Integrated Voltage Measurement... 05:38:41 Voltage Offset Correction: v_off_ini = 0.000005282 V, v_off_fin = 0.000007341 V 05:38:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171061400 Vs 05:38:41 Integrated Voltage Measurement... 05:39:01 Voltage Offset Correction: v_off_ini = 0.000006862 V, v_off_fin = 0.000003666 V 05:39:01 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981483 Vs 05:39:04 Temperature Measurement, Probe Number = 0, T = 20.166000 C 05:39:04 Temperature Measurement, Probe Number = 1, T = 20.090000 C 05:39:05 Temperature Measurement, Probe Number = 2, T = 20.155000 C 05:39:06 Temperature Measurement, Probe Number = 3, T = 20.099000 C 05:39:06 Temperature Measurement, Probe Number = 4, T = 20.341000 C 05:39:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.34 05:39:06 Integrated Voltage Measurement... 05:39:26 Voltage Offset Correction: v_off_ini = 0.000004169 V, v_off_fin = 0.000007118 V 05:39:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052165 Vs 05:39:26 Integrated Voltage Measurement... 05:39:46 Voltage Offset Correction: v_off_ini = 0.000006549 V, v_off_fin = 0.000003353 V 05:39:46 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980783 Vs 05:39:48 Temperature Measurement, Probe Number = 0, T = 20.164000 C 05:39:49 Temperature Measurement, Probe Number = 1, T = 20.090000 C 05:39:50 Temperature Measurement, Probe Number = 2, T = 20.154000 C 05:39:50 Temperature Measurement, Probe Number = 3, T = 20.098000 C 05:39:51 Temperature Measurement, Probe Number = 4, T = 20.377000 C 05:39:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.38 05:39:51 Integrated Voltage Measurement... 05:40:11 Voltage Offset Correction: v_off_ini = 0.000004325 V, v_off_fin = 0.000007074 V 05:40:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171057351 Vs 05:40:11 Integrated Voltage Measurement... 05:40:31 Voltage Offset Correction: v_off_ini = 0.000006529 V, v_off_fin = 0.000003154 V 05:40:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981357 Vs 05:40:34 Temperature Measurement, Probe Number = 0, T = 20.167000 C 05:40:34 Temperature Measurement, Probe Number = 1, T = 20.092000 C 05:40:35 Temperature Measurement, Probe Number = 2, T = 20.158000 C 05:40:36 Temperature Measurement, Probe Number = 3, T = 20.101000 C 05:40:36 Temperature Measurement, Probe Number = 4, T = 20.389000 C 05:40:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.39 05:40:37 Integrated Voltage Measurement... 05:40:56 Voltage Offset Correction: v_off_ini = 0.000003915 V, v_off_fin = 0.000006558 V 05:40:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048965 Vs 05:40:56 Integrated Voltage Measurement... 05:41:16 Voltage Offset Correction: v_off_ini = 0.000005739 V, v_off_fin = 0.000002548 V 05:41:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987926 Vs 05:41:19 Temperature Measurement, Probe Number = 0, T = 20.163000 C 05:41:19 Temperature Measurement, Probe Number = 1, T = 20.087000 C 05:41:20 Temperature Measurement, Probe Number = 2, T = 20.153000 C 05:41:21 Temperature Measurement, Probe Number = 3, T = 20.096000 C 05:41:21 Temperature Measurement, Probe Number = 4, T = 20.375000 C 05:41:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.38 05:41:21 Integrated Voltage Measurement... 05:41:41 Voltage Offset Correction: v_off_ini = 0.000003742 V, v_off_fin = 0.000006627 V 05:41:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171045847 Vs 05:41:41 Integrated Voltage Measurement... 05:42:01 Voltage Offset Correction: v_off_ini = 0.000005795 V, v_off_fin = 0.000002759 V 05:42:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987216 Vs 05:42:03 Temperature Measurement, Probe Number = 0, T = 20.166000 C 05:42:04 Temperature Measurement, Probe Number = 1, T = 20.094000 C 05:42:05 Temperature Measurement, Probe Number = 2, T = 20.155000 C 05:42:05 Temperature Measurement, Probe Number = 3, T = 20.101000 C 05:42:06 Temperature Measurement, Probe Number = 4, T = 20.407000 C 05:42:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 05:42:06 Integrated Voltage Measurement... 05:42:26 Voltage Offset Correction: v_off_ini = 0.000003769 V, v_off_fin = 0.000007024 V 05:42:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171056137 Vs 05:42:26 Integrated Voltage Measurement... 05:42:45 Voltage Offset Correction: v_off_ini = 0.000006196 V, v_off_fin = 0.000003297 V 05:42:45 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987558 Vs 05:42:48 Temperature Measurement, Probe Number = 0, T = 20.174000 C 05:42:48 Temperature Measurement, Probe Number = 1, T = 20.097000 C 05:42:49 Temperature Measurement, Probe Number = 2, T = 20.162000 C 05:42:50 Temperature Measurement, Probe Number = 3, T = 20.105000 C 05:42:50 Temperature Measurement, Probe Number = 4, T = 20.489000 C 05:42:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.49 05:42:51 Integrated Voltage Measurement... 05:43:11 Voltage Offset Correction: v_off_ini = 0.000003959 V, v_off_fin = 0.000006681 V 05:43:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058287 Vs 05:43:11 Integrated Voltage Measurement... 05:43:30 Voltage Offset Correction: v_off_ini = 0.000005849 V, v_off_fin = 0.000002924 V 05:43:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982493 Vs 06:13:33 Temperature Measurement, Probe Number = 0, T = 20.167000 C 06:13:34 Temperature Measurement, Probe Number = 1, T = 20.090000 C 06:13:34 Temperature Measurement, Probe Number = 2, T = 20.156000 C 06:13:35 Temperature Measurement, Probe Number = 3, T = 20.100000 C 06:13:36 Temperature Measurement, Probe Number = 4, T = 20.455000 C 06:13:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.45 06:13:36 Integrated Voltage Measurement... 06:13:56 Voltage Offset Correction: v_off_ini = 0.000005601 V, v_off_fin = 0.000006985 V 06:13:56 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171115484 Vs 06:13:56 Integrated Voltage Measurement... 06:14:15 Voltage Offset Correction: v_off_ini = 0.000006357 V, v_off_fin = 0.000002603 V 06:14:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986801 Vs 06:14:18 Temperature Measurement, Probe Number = 0, T = 20.163000 C 06:14:19 Temperature Measurement, Probe Number = 1, T = 20.084000 C 06:14:20 Temperature Measurement, Probe Number = 2, T = 20.154000 C 06:14:20 Temperature Measurement, Probe Number = 3, T = 20.094000 C 06:14:21 Temperature Measurement, Probe Number = 4, T = 20.378000 C 06:14:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.38 06:14:21 Integrated Voltage Measurement... 06:14:41 Voltage Offset Correction: v_off_ini = 0.000004442 V, v_off_fin = 0.000006487 V 06:14:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053434 Vs 06:14:41 Integrated Voltage Measurement... 06:15:00 Voltage Offset Correction: v_off_ini = 0.000006579 V, v_off_fin = 0.000002998 V 06:15:00 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170984631 Vs 06:15:03 Temperature Measurement, Probe Number = 0, T = 20.170000 C 06:15:03 Temperature Measurement, Probe Number = 1, T = 20.091000 C 06:15:04 Temperature Measurement, Probe Number = 2, T = 20.158000 C 06:15:05 Temperature Measurement, Probe Number = 3, T = 20.101000 C 06:15:05 Temperature Measurement, Probe Number = 4, T = 20.409000 C 06:15:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 06:15:06 Integrated Voltage Measurement... 06:15:25 Voltage Offset Correction: v_off_ini = 0.000003664 V, v_off_fin = 0.000007004 V 06:15:25 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171056769 Vs 06:15:25 Integrated Voltage Measurement... 06:15:45 Voltage Offset Correction: v_off_ini = 0.000006836 V, v_off_fin = 0.000003342 V 06:15:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988572 Vs 06:15:48 Temperature Measurement, Probe Number = 0, T = 20.173000 C 06:15:48 Temperature Measurement, Probe Number = 1, T = 20.094000 C 06:15:49 Temperature Measurement, Probe Number = 2, T = 20.163000 C 06:15:50 Temperature Measurement, Probe Number = 3, T = 20.104000 C 06:15:50 Temperature Measurement, Probe Number = 4, T = 20.446000 C 06:15:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.45 06:15:50 Integrated Voltage Measurement... 06:16:10 Voltage Offset Correction: v_off_ini = 0.000004653 V, v_off_fin = 0.000006629 V 06:16:10 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058762 Vs 06:16:10 Integrated Voltage Measurement... 06:16:29 Voltage Offset Correction: v_off_ini = 0.000006414 V, v_off_fin = 0.000003142 V 06:16:29 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983370 Vs 06:16:32 Temperature Measurement, Probe Number = 0, T = 20.169000 C 06:16:33 Temperature Measurement, Probe Number = 1, T = 20.088000 C 06:16:33 Temperature Measurement, Probe Number = 2, T = 20.158000 C 06:16:34 Temperature Measurement, Probe Number = 3, T = 20.099000 C 06:16:35 Temperature Measurement, Probe Number = 4, T = 20.441000 C 06:16:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.44 06:16:35 Integrated Voltage Measurement... 06:16:54 Voltage Offset Correction: v_off_ini = 0.000003728 V, v_off_fin = 0.000006756 V 06:16:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057361 Vs 06:16:54 Integrated Voltage Measurement... 06:17:14 Voltage Offset Correction: v_off_ini = 0.000006196 V, v_off_fin = 0.000003368 V 06:17:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988663 Vs 06:17:17 Temperature Measurement, Probe Number = 0, T = 20.164000 C 06:17:17 Temperature Measurement, Probe Number = 1, T = 20.089000 C 06:17:18 Temperature Measurement, Probe Number = 2, T = 20.155000 C 06:17:19 Temperature Measurement, Probe Number = 3, T = 20.099000 C 06:17:19 Temperature Measurement, Probe Number = 4, T = 20.492000 C 06:17:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.49 06:17:20 Integrated Voltage Measurement... 06:17:40 Voltage Offset Correction: v_off_ini = 0.000003934 V, v_off_fin = 0.000006446 V 06:17:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055526 Vs 06:17:40 Integrated Voltage Measurement... 06:17:59 Voltage Offset Correction: v_off_ini = 0.000005841 V, v_off_fin = 0.000003163 V 06:17:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988176 Vs 06:18:02 Temperature Measurement, Probe Number = 0, T = 20.168000 C 06:18:03 Temperature Measurement, Probe Number = 1, T = 20.092000 C 06:18:03 Temperature Measurement, Probe Number = 2, T = 20.156000 C 06:18:04 Temperature Measurement, Probe Number = 3, T = 20.101000 C 06:18:05 Temperature Measurement, Probe Number = 4, T = 20.415000 C 06:18:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 06:18:05 Integrated Voltage Measurement... 06:18:24 Voltage Offset Correction: v_off_ini = 0.000003778 V, v_off_fin = 0.000007069 V 06:18:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053803 Vs 06:18:24 Integrated Voltage Measurement... 06:18:44 Voltage Offset Correction: v_off_ini = 0.000005895 V, v_off_fin = 0.000002972 V 06:18:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985739 Vs 06:18:46 Temperature Measurement, Probe Number = 0, T = 20.167000 C 06:18:47 Temperature Measurement, Probe Number = 1, T = 20.088000 C 06:18:48 Temperature Measurement, Probe Number = 2, T = 20.155000 C 06:18:48 Temperature Measurement, Probe Number = 3, T = 20.098000 C 06:18:49 Temperature Measurement, Probe Number = 4, T = 20.430000 C 06:18:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.43 06:18:49 Integrated Voltage Measurement... 06:19:08 Voltage Offset Correction: v_off_ini = 0.000003977 V, v_off_fin = 0.000006998 V 06:19:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052047 Vs 06:19:09 Integrated Voltage Measurement... 06:19:28 Voltage Offset Correction: v_off_ini = 0.000006049 V, v_off_fin = 0.000003844 V 06:19:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170989495 Vs 06:19:31 Temperature Measurement, Probe Number = 0, T = 20.169000 C 06:19:31 Temperature Measurement, Probe Number = 1, T = 20.091000 C 06:19:32 Temperature Measurement, Probe Number = 2, T = 20.156000 C 06:19:33 Temperature Measurement, Probe Number = 3, T = 20.100000 C 06:19:33 Temperature Measurement, Probe Number = 4, T = 20.360000 C 06:19:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.36 06:19:34 Integrated Voltage Measurement... 06:19:52 Voltage Offset Correction: v_off_ini = 0.000004401 V, v_off_fin = 0.000007919 V 06:19:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058201 Vs 06:19:53 Integrated Voltage Measurement... 06:20:12 Voltage Offset Correction: v_off_ini = 0.000007022 V, v_off_fin = 0.000003128 V 06:20:13 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983258 Vs 06:20:15 Temperature Measurement, Probe Number = 0, T = 20.165000 C 06:20:16 Temperature Measurement, Probe Number = 1, T = 20.089000 C 06:20:17 Temperature Measurement, Probe Number = 2, T = 20.154000 C 06:20:17 Temperature Measurement, Probe Number = 3, T = 20.098000 C 06:20:18 Temperature Measurement, Probe Number = 4, T = 20.349000 C 06:20:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.35 06:20:18 Integrated Voltage Measurement... 06:20:37 Voltage Offset Correction: v_off_ini = 0.000004567 V, v_off_fin = 0.000007210 V 06:20:37 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057024 Vs 06:20:37 Integrated Voltage Measurement... 06:20:57 Voltage Offset Correction: v_off_ini = 0.000006659 V, v_off_fin = 0.000003551 V 06:20:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979313 Vs 06:51:00 Temperature Measurement, Probe Number = 0, T = 20.171000 C 06:51:00 Temperature Measurement, Probe Number = 1, T = 20.094000 C 06:51:01 Temperature Measurement, Probe Number = 2, T = 20.160000 C 06:51:02 Temperature Measurement, Probe Number = 3, T = 20.103000 C 06:51:02 Temperature Measurement, Probe Number = 4, T = 20.319000 C 06:51:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.32 06:51:02 Integrated Voltage Measurement... 06:51:22 Voltage Offset Correction: v_off_ini = 0.000004984 V, v_off_fin = 0.000006495 V 06:51:22 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171104567 Vs 06:51:23 Integrated Voltage Measurement... 06:51:42 Voltage Offset Correction: v_off_ini = 0.000005959 V, v_off_fin = 0.000002817 V 06:51:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993057 Vs 06:51:45 Temperature Measurement, Probe Number = 0, T = 20.162000 C 06:51:45 Temperature Measurement, Probe Number = 1, T = 20.084000 C 06:51:46 Temperature Measurement, Probe Number = 2, T = 20.151000 C 06:51:47 Temperature Measurement, Probe Number = 3, T = 20.094000 C 06:51:47 Temperature Measurement, Probe Number = 4, T = 20.366000 C 06:51:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.37 06:51:48 Integrated Voltage Measurement... 06:52:07 Voltage Offset Correction: v_off_ini = 0.000003627 V, v_off_fin = 0.000006274 V 06:52:07 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049114 Vs 06:52:07 Integrated Voltage Measurement... 06:52:26 Voltage Offset Correction: v_off_ini = 0.000005918 V, v_off_fin = 0.000002411 V 06:52:26 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170991804 Vs 06:52:29 Temperature Measurement, Probe Number = 0, T = 20.157000 C 06:52:30 Temperature Measurement, Probe Number = 1, T = 20.081000 C 06:52:30 Temperature Measurement, Probe Number = 2, T = 20.148000 C 06:52:31 Temperature Measurement, Probe Number = 3, T = 20.092000 C 06:52:32 Temperature Measurement, Probe Number = 4, T = 20.326000 C 06:52:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.33 06:52:32 Integrated Voltage Measurement... 06:52:51 Voltage Offset Correction: v_off_ini = 0.000003615 V, v_off_fin = 0.000006962 V 06:52:51 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049673 Vs 06:52:51 Integrated Voltage Measurement... 06:53:11 Voltage Offset Correction: v_off_ini = 0.000005397 V, v_off_fin = 0.000002904 V 06:53:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991555 Vs 06:53:14 Temperature Measurement, Probe Number = 0, T = 20.162000 C 06:53:14 Temperature Measurement, Probe Number = 1, T = 20.087000 C 06:53:15 Temperature Measurement, Probe Number = 2, T = 20.151000 C 06:53:15 Temperature Measurement, Probe Number = 3, T = 20.095000 C 06:53:16 Temperature Measurement, Probe Number = 4, T = 20.286000 C 06:53:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.29 06:53:16 Integrated Voltage Measurement... 06:53:36 Voltage Offset Correction: v_off_ini = 0.000004365 V, v_off_fin = 0.000006806 V 06:53:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050777 Vs 06:53:36 Integrated Voltage Measurement... 06:53:55 Voltage Offset Correction: v_off_ini = 0.000006709 V, v_off_fin = 0.000003232 V 06:53:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982395 Vs 06:53:58 Temperature Measurement, Probe Number = 0, T = 20.161000 C 06:53:59 Temperature Measurement, Probe Number = 1, T = 20.087000 C 06:54:00 Temperature Measurement, Probe Number = 2, T = 20.150000 C 06:54:00 Temperature Measurement, Probe Number = 3, T = 20.096000 C 06:54:01 Temperature Measurement, Probe Number = 4, T = 20.308000 C 06:54:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.31 06:54:01 Integrated Voltage Measurement... 06:54:21 Voltage Offset Correction: v_off_ini = 0.000004072 V, v_off_fin = 0.000006289 V 06:54:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051246 Vs 06:54:21 Integrated Voltage Measurement... 06:54:40 Voltage Offset Correction: v_off_ini = 0.000006204 V, v_off_fin = 0.000002279 V 06:54:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986587 Vs 06:54:43 Temperature Measurement, Probe Number = 0, T = 20.167000 C 06:54:44 Temperature Measurement, Probe Number = 1, T = 20.092000 C 06:54:45 Temperature Measurement, Probe Number = 2, T = 20.156000 C 06:54:45 Temperature Measurement, Probe Number = 3, T = 20.099000 C 06:54:46 Temperature Measurement, Probe Number = 4, T = 20.364000 C 06:54:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.36 06:54:46 Integrated Voltage Measurement... 06:55:05 Voltage Offset Correction: v_off_ini = 0.000004424 V, v_off_fin = 0.000007048 V 06:55:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053586 Vs 06:55:06 Integrated Voltage Measurement... 06:55:25 Voltage Offset Correction: v_off_ini = 0.000006221 V, v_off_fin = 0.000002654 V 06:55:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984511 Vs 06:55:28 Temperature Measurement, Probe Number = 0, T = 20.166000 C 06:55:28 Temperature Measurement, Probe Number = 1, T = 20.091000 C 06:55:29 Temperature Measurement, Probe Number = 2, T = 20.152000 C 06:55:29 Temperature Measurement, Probe Number = 3, T = 20.096000 C 06:55:30 Temperature Measurement, Probe Number = 4, T = 20.307000 C 06:55:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.31 06:55:30 Integrated Voltage Measurement... 06:55:49 Voltage Offset Correction: v_off_ini = 0.000004465 V, v_off_fin = 0.000006885 V 06:55:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052140 Vs 06:55:50 Integrated Voltage Measurement... 06:56:09 Voltage Offset Correction: v_off_ini = 0.000005989 V, v_off_fin = 0.000003946 V 06:56:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980970 Vs 06:56:12 Temperature Measurement, Probe Number = 0, T = 20.160000 C 06:56:12 Temperature Measurement, Probe Number = 1, T = 20.085000 C 06:56:13 Temperature Measurement, Probe Number = 2, T = 20.149000 C 06:56:14 Temperature Measurement, Probe Number = 3, T = 20.094000 C 06:56:14 Temperature Measurement, Probe Number = 4, T = 20.272000 C 06:56:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.27 06:56:14 Integrated Voltage Measurement... 06:56:33 Voltage Offset Correction: v_off_ini = 0.000004144 V, v_off_fin = 0.000007069 V 06:56:34 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050221 Vs 06:56:34 Integrated Voltage Measurement... 06:56:53 Voltage Offset Correction: v_off_ini = 0.000006746 V, v_off_fin = 0.000003446 V 06:56:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976424 Vs 06:56:56 Temperature Measurement, Probe Number = 0, T = 20.160000 C 06:56:56 Temperature Measurement, Probe Number = 1, T = 20.086000 C 06:56:57 Temperature Measurement, Probe Number = 2, T = 20.149000 C 06:56:58 Temperature Measurement, Probe Number = 3, T = 20.096000 C 06:56:58 Temperature Measurement, Probe Number = 4, T = 20.221000 C 06:56:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.22 06:56:58 Integrated Voltage Measurement... 06:57:18 Voltage Offset Correction: v_off_ini = 0.000004624 V, v_off_fin = 0.000007297 V 06:57:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053034 Vs 06:57:18 Integrated Voltage Measurement... 06:57:37 Voltage Offset Correction: v_off_ini = 0.000006510 V, v_off_fin = 0.000003423 V 06:57:38 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981578 Vs 06:57:40 Temperature Measurement, Probe Number = 0, T = 20.167000 C 06:57:41 Temperature Measurement, Probe Number = 1, T = 20.091000 C 06:57:42 Temperature Measurement, Probe Number = 2, T = 20.155000 C 06:57:42 Temperature Measurement, Probe Number = 3, T = 20.099000 C 06:57:43 Temperature Measurement, Probe Number = 4, T = 20.253000 C 06:57:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.25 06:57:43 Integrated Voltage Measurement... 06:58:02 Voltage Offset Correction: v_off_ini = 0.000004871 V, v_off_fin = 0.000007467 V 06:58:02 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058744 Vs 06:58:02 Integrated Voltage Measurement... 06:58:22 Voltage Offset Correction: v_off_ini = 0.000006454 V, v_off_fin = 0.000004111 V 06:58:22 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979916 Vs 07:28:24 Temperature Measurement, Probe Number = 0, T = 20.161000 C 07:28:25 Temperature Measurement, Probe Number = 1, T = 20.088000 C 07:28:26 Temperature Measurement, Probe Number = 2, T = 20.148000 C 07:28:26 Temperature Measurement, Probe Number = 3, T = 20.093000 C 07:28:27 Temperature Measurement, Probe Number = 4, T = 20.229000 C 07:28:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.23 07:28:27 Integrated Voltage Measurement... 07:28:47 Voltage Offset Correction: v_off_ini = 0.000004863 V, v_off_fin = 0.000006906 V 07:28:47 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171096599 Vs 07:28:47 Integrated Voltage Measurement... 07:29:06 Voltage Offset Correction: v_off_ini = 0.000006575 V, v_off_fin = 0.000002941 V 07:29:06 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980902 Vs 07:29:09 Temperature Measurement, Probe Number = 0, T = 20.170000 C 07:29:09 Temperature Measurement, Probe Number = 1, T = 20.093000 C 07:29:10 Temperature Measurement, Probe Number = 2, T = 20.155000 C 07:29:11 Temperature Measurement, Probe Number = 3, T = 20.098000 C 07:29:11 Temperature Measurement, Probe Number = 4, T = 20.314000 C 07:29:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.31 07:29:12 Integrated Voltage Measurement... 07:29:31 Voltage Offset Correction: v_off_ini = 0.000003979 V, v_off_fin = 0.000006926 V 07:29:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171049635 Vs 07:29:31 Integrated Voltage Measurement... 07:29:51 Voltage Offset Correction: v_off_ini = 0.000005779 V, v_off_fin = 0.000003973 V 07:29:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987105 Vs 07:29:53 Temperature Measurement, Probe Number = 0, T = 20.170000 C 07:29:54 Temperature Measurement, Probe Number = 1, T = 20.095000 C 07:29:55 Temperature Measurement, Probe Number = 2, T = 20.155000 C 07:29:55 Temperature Measurement, Probe Number = 3, T = 20.100000 C 07:29:56 Temperature Measurement, Probe Number = 4, T = 20.395000 C 07:29:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.39 07:29:56 Integrated Voltage Measurement... 07:30:16 Voltage Offset Correction: v_off_ini = 0.000004568 V, v_off_fin = 0.000007695 V 07:30:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053302 Vs 07:30:16 Integrated Voltage Measurement... 07:30:36 Voltage Offset Correction: v_off_ini = 0.000007046 V, v_off_fin = 0.000003307 V 07:30:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975220 Vs 07:30:38 Temperature Measurement, Probe Number = 0, T = 20.167000 C 07:30:39 Temperature Measurement, Probe Number = 1, T = 20.091000 C 07:30:40 Temperature Measurement, Probe Number = 2, T = 20.154000 C 07:30:40 Temperature Measurement, Probe Number = 3, T = 20.098000 C 07:30:41 Temperature Measurement, Probe Number = 4, T = 20.403000 C 07:30:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.40 07:30:41 Integrated Voltage Measurement... 07:31:01 Voltage Offset Correction: v_off_ini = 0.000005135 V, v_off_fin = 0.000007341 V 07:31:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053200 Vs 07:31:01 Integrated Voltage Measurement... 07:31:20 Voltage Offset Correction: v_off_ini = 0.000006221 V, v_off_fin = 0.000003762 V 07:31:20 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980070 Vs 07:31:23 Temperature Measurement, Probe Number = 0, T = 20.165000 C 07:31:24 Temperature Measurement, Probe Number = 1, T = 20.087000 C 07:31:24 Temperature Measurement, Probe Number = 2, T = 20.152000 C 07:31:25 Temperature Measurement, Probe Number = 3, T = 20.095000 C 07:31:26 Temperature Measurement, Probe Number = 4, T = 20.331000 C 07:31:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.33 07:31:26 Integrated Voltage Measurement... 07:31:45 Voltage Offset Correction: v_off_ini = 0.000004113 V, v_off_fin = 0.000006611 V 07:31:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053052 Vs 07:31:45 Integrated Voltage Measurement... 07:32:05 Voltage Offset Correction: v_off_ini = 0.000006697 V, v_off_fin = 0.000003884 V 07:32:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979893 Vs 07:32:08 Temperature Measurement, Probe Number = 0, T = 20.157000 C 07:32:08 Temperature Measurement, Probe Number = 1, T = 20.080000 C 07:32:09 Temperature Measurement, Probe Number = 2, T = 20.149000 C 07:32:10 Temperature Measurement, Probe Number = 3, T = 20.091000 C 07:32:10 Temperature Measurement, Probe Number = 4, T = 20.231000 C 07:32:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.23 07:32:10 Integrated Voltage Measurement... 07:32:30 Voltage Offset Correction: v_off_ini = 0.000004541 V, v_off_fin = 0.000006493 V 07:32:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171046539 Vs 07:32:30 Integrated Voltage Measurement... 07:32:49 Voltage Offset Correction: v_off_ini = 0.000005917 V, v_off_fin = 0.000002617 V 07:32:49 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982903 Vs 07:32:52 Temperature Measurement, Probe Number = 0, T = 20.166000 C 07:32:53 Temperature Measurement, Probe Number = 1, T = 20.087000 C 07:32:53 Temperature Measurement, Probe Number = 2, T = 20.152000 C 07:32:54 Temperature Measurement, Probe Number = 3, T = 20.094000 C 07:32:55 Temperature Measurement, Probe Number = 4, T = 20.270000 C 07:32:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.27 07:32:55 Integrated Voltage Measurement... 07:33:14 Voltage Offset Correction: v_off_ini = 0.000003918 V, v_off_fin = 0.000007008 V 07:33:14 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050048 Vs 07:33:14 Integrated Voltage Measurement... 07:33:34 Voltage Offset Correction: v_off_ini = 0.000005941 V, v_off_fin = 0.000003174 V 07:33:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984537 Vs 07:33:37 Temperature Measurement, Probe Number = 0, T = 20.171000 C 07:33:37 Temperature Measurement, Probe Number = 1, T = 20.091000 C 07:33:38 Temperature Measurement, Probe Number = 2, T = 20.157000 C 07:33:39 Temperature Measurement, Probe Number = 3, T = 20.099000 C 07:33:39 Temperature Measurement, Probe Number = 4, T = 20.350000 C 07:33:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.35 07:33:40 Integrated Voltage Measurement... 07:33:59 Voltage Offset Correction: v_off_ini = 0.000003658 V, v_off_fin = 0.000006904 V 07:33:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050158 Vs 07:33:59 Integrated Voltage Measurement... 07:34:19 Voltage Offset Correction: v_off_ini = 0.000006716 V, v_off_fin = 0.000003730 V 07:34:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975632 Vs 07:34:22 Temperature Measurement, Probe Number = 0, T = 20.170000 C 07:34:23 Temperature Measurement, Probe Number = 1, T = 20.090000 C 07:34:23 Temperature Measurement, Probe Number = 2, T = 20.157000 C 07:34:24 Temperature Measurement, Probe Number = 3, T = 20.097000 C 07:34:25 Temperature Measurement, Probe Number = 4, T = 20.475000 C 07:34:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.48 07:34:25 Integrated Voltage Measurement... 07:34:44 Voltage Offset Correction: v_off_ini = 0.000004418 V, v_off_fin = 0.000007172 V 07:34:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050529 Vs 07:34:44 Integrated Voltage Measurement... 07:35:04 Voltage Offset Correction: v_off_ini = 0.000006648 V, v_off_fin = 0.000002629 V 07:35:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977437 Vs 07:35:06 Temperature Measurement, Probe Number = 0, T = 20.169000 C 07:35:07 Temperature Measurement, Probe Number = 1, T = 20.089000 C 07:35:08 Temperature Measurement, Probe Number = 2, T = 20.155000 C 07:35:08 Temperature Measurement, Probe Number = 3, T = 20.097000 C 07:35:09 Temperature Measurement, Probe Number = 4, T = 20.418000 C 07:35:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.42 07:35:09 Integrated Voltage Measurement... 07:35:28 Voltage Offset Correction: v_off_ini = 0.000004319 V, v_off_fin = 0.000006897 V 07:35:29 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171052056 Vs 07:35:29 Integrated Voltage Measurement... 07:35:48 Voltage Offset Correction: v_off_ini = 0.000006738 V, v_off_fin = 0.000003401 V 07:35:48 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170976542 Vs 08:05:51 Temperature Measurement, Probe Number = 0, T = 20.158000 C 08:05:52 Temperature Measurement, Probe Number = 1, T = 20.081000 C 08:05:52 Temperature Measurement, Probe Number = 2, T = 20.145000 C 08:05:53 Temperature Measurement, Probe Number = 3, T = 20.090000 C 08:05:54 Temperature Measurement, Probe Number = 4, T = 20.410000 C 08:05:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.41 08:05:54 Integrated Voltage Measurement... 08:06:13 Voltage Offset Correction: v_off_ini = 0.000004686 V, v_off_fin = 0.000007182 V 08:06:13 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171101942 Vs 08:06:13 Integrated Voltage Measurement... 08:06:32 Voltage Offset Correction: v_off_ini = 0.000006277 V, v_off_fin = 0.000002422 V 08:06:33 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980536 Vs 08:06:35 Temperature Measurement, Probe Number = 0, T = 20.160000 C 08:06:36 Temperature Measurement, Probe Number = 1, T = 20.087000 C 08:06:37 Temperature Measurement, Probe Number = 2, T = 20.146000 C 08:06:37 Temperature Measurement, Probe Number = 3, T = 20.092000 C 08:06:38 Temperature Measurement, Probe Number = 4, T = 20.439000 C 08:06:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.44 08:06:38 Integrated Voltage Measurement... 08:06:57 Voltage Offset Correction: v_off_ini = 0.000003846 V, v_off_fin = 0.000006615 V 08:06:58 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171045366 Vs 08:06:58 Integrated Voltage Measurement... 08:07:17 Voltage Offset Correction: v_off_ini = 0.000006071 V, v_off_fin = 0.000003150 V 08:07:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978248 Vs 08:07:20 Temperature Measurement, Probe Number = 0, T = 20.163000 C 08:07:20 Temperature Measurement, Probe Number = 1, T = 20.089000 C 08:07:21 Temperature Measurement, Probe Number = 2, T = 20.148000 C 08:07:22 Temperature Measurement, Probe Number = 3, T = 20.094000 C 08:07:22 Temperature Measurement, Probe Number = 4, T = 20.404000 C 08:07:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.40 08:07:23 Integrated Voltage Measurement... 08:07:42 Voltage Offset Correction: v_off_ini = 0.000003536 V, v_off_fin = 0.000007044 V 08:07:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051539 Vs 08:07:43 Integrated Voltage Measurement... 08:08:02 Voltage Offset Correction: v_off_ini = 0.000006125 V, v_off_fin = 0.000003068 V 08:08:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983265 Vs 08:08:05 Temperature Measurement, Probe Number = 0, T = 20.161000 C 08:08:06 Temperature Measurement, Probe Number = 1, T = 20.086000 C 08:08:06 Temperature Measurement, Probe Number = 2, T = 20.148000 C 08:08:07 Temperature Measurement, Probe Number = 3, T = 20.092000 C 08:08:08 Temperature Measurement, Probe Number = 4, T = 20.334000 C 08:08:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.33 08:08:08 Integrated Voltage Measurement... 08:08:27 Voltage Offset Correction: v_off_ini = 0.000004352 V, v_off_fin = 0.000006863 V 08:08:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047888 Vs 08:08:28 Integrated Voltage Measurement... 08:08:47 Voltage Offset Correction: v_off_ini = 0.000005946 V, v_off_fin = 0.000002410 V 08:08:47 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982710 Vs 08:08:50 Temperature Measurement, Probe Number = 0, T = 20.168000 C 08:08:51 Temperature Measurement, Probe Number = 1, T = 20.091000 C 08:08:51 Temperature Measurement, Probe Number = 2, T = 20.153000 C 08:08:52 Temperature Measurement, Probe Number = 3, T = 20.096000 C 08:08:53 Temperature Measurement, Probe Number = 4, T = 20.313000 C 08:08:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.31 08:08:53 Integrated Voltage Measurement... 08:09:12 Voltage Offset Correction: v_off_ini = 0.000004444 V, v_off_fin = 0.000006692 V 08:09:13 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171052097 Vs 08:09:13 Integrated Voltage Measurement... 08:09:32 Voltage Offset Correction: v_off_ini = 0.000006461 V, v_off_fin = 0.000002540 V 08:09:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980346 Vs 08:09:35 Temperature Measurement, Probe Number = 0, T = 20.168000 C 08:09:36 Temperature Measurement, Probe Number = 1, T = 20.092000 C 08:09:36 Temperature Measurement, Probe Number = 2, T = 20.153000 C 08:09:37 Temperature Measurement, Probe Number = 3, T = 20.097000 C 08:09:38 Temperature Measurement, Probe Number = 4, T = 20.378000 C 08:09:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.38 08:09:38 Integrated Voltage Measurement... 08:09:58 Voltage Offset Correction: v_off_ini = 0.000004394 V, v_off_fin = 0.000006954 V 08:09:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050276 Vs 08:09:58 Integrated Voltage Measurement... 08:10:18 Voltage Offset Correction: v_off_ini = 0.000006165 V, v_off_fin = 0.000002357 V 08:10:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976533 Vs 08:10:20 Temperature Measurement, Probe Number = 0, T = 20.173000 C 08:10:21 Temperature Measurement, Probe Number = 1, T = 20.095000 C 08:10:22 Temperature Measurement, Probe Number = 2, T = 20.158000 C 08:10:22 Temperature Measurement, Probe Number = 3, T = 20.099000 C 08:10:23 Temperature Measurement, Probe Number = 4, T = 20.401000 C 08:10:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.40 08:10:23 Integrated Voltage Measurement... 08:10:43 Voltage Offset Correction: v_off_ini = 0.000004196 V, v_off_fin = 0.000006889 V 08:10:43 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171056377 Vs 08:10:43 Integrated Voltage Measurement... 08:11:02 Voltage Offset Correction: v_off_ini = 0.000005550 V, v_off_fin = 0.000002822 V 08:11:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985271 Vs 08:11:05 Temperature Measurement, Probe Number = 0, T = 20.175000 C 08:11:06 Temperature Measurement, Probe Number = 1, T = 20.095000 C 08:11:06 Temperature Measurement, Probe Number = 2, T = 20.159000 C 08:11:07 Temperature Measurement, Probe Number = 3, T = 20.102000 C 08:11:08 Temperature Measurement, Probe Number = 4, T = 20.489000 C 08:11:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.49 08:11:08 Integrated Voltage Measurement... 08:11:27 Voltage Offset Correction: v_off_ini = 0.000003914 V, v_off_fin = 0.000006600 V 08:11:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053116 Vs 08:11:28 Integrated Voltage Measurement... 08:11:47 Voltage Offset Correction: v_off_ini = 0.000006705 V, v_off_fin = 0.000003584 V 08:11:47 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170972996 Vs 08:11:50 Temperature Measurement, Probe Number = 0, T = 20.173000 C 08:11:50 Temperature Measurement, Probe Number = 1, T = 20.097000 C 08:11:51 Temperature Measurement, Probe Number = 2, T = 20.156000 C 08:11:52 Temperature Measurement, Probe Number = 3, T = 20.102000 C 08:11:52 Temperature Measurement, Probe Number = 4, T = 20.527000 C 08:11:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.53 08:11:52 Integrated Voltage Measurement... 08:12:12 Voltage Offset Correction: v_off_ini = 0.000004752 V, v_off_fin = 0.000006639 V 08:12:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057061 Vs 08:12:12 Integrated Voltage Measurement... 08:12:31 Voltage Offset Correction: v_off_ini = 0.000005417 V, v_off_fin = 0.000003349 V 08:12:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988817 Vs 08:12:34 Temperature Measurement, Probe Number = 0, T = 20.175000 C 08:12:35 Temperature Measurement, Probe Number = 1, T = 20.097000 C 08:12:36 Temperature Measurement, Probe Number = 2, T = 20.160000 C 08:12:36 Temperature Measurement, Probe Number = 3, T = 20.102000 C 08:12:37 Temperature Measurement, Probe Number = 4, T = 20.538000 C 08:12:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.54 08:12:37 Integrated Voltage Measurement... 08:12:57 Voltage Offset Correction: v_off_ini = 0.000004142 V, v_off_fin = 0.000007172 V 08:12:57 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053220 Vs 08:12:57 Integrated Voltage Measurement... 08:13:17 Voltage Offset Correction: v_off_ini = 0.000006115 V, v_off_fin = 0.000002831 V 08:13:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986009 Vs 08:43:20 Temperature Measurement, Probe Number = 0, T = 20.169000 C 08:43:20 Temperature Measurement, Probe Number = 1, T = 20.094000 C 08:43:21 Temperature Measurement, Probe Number = 2, T = 20.156000 C 08:43:22 Temperature Measurement, Probe Number = 3, T = 20.100000 C 08:43:22 Temperature Measurement, Probe Number = 4, T = 20.407000 C 08:43:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 08:43:22 Integrated Voltage Measurement... 08:43:42 Voltage Offset Correction: v_off_ini = 0.000005275 V, v_off_fin = 0.000006923 V 08:43:42 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171105232 Vs 08:43:42 Integrated Voltage Measurement... 08:44:01 Voltage Offset Correction: v_off_ini = 0.000006591 V, v_off_fin = 0.000003286 V 08:44:02 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975132 Vs 08:44:04 Temperature Measurement, Probe Number = 0, T = 20.168000 C 08:44:05 Temperature Measurement, Probe Number = 1, T = 20.093000 C 08:44:06 Temperature Measurement, Probe Number = 2, T = 20.154000 C 08:44:06 Temperature Measurement, Probe Number = 3, T = 20.098000 C 08:44:07 Temperature Measurement, Probe Number = 4, T = 20.439000 C 08:44:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.44 08:44:07 Integrated Voltage Measurement... 08:44:27 Voltage Offset Correction: v_off_ini = 0.000004795 V, v_off_fin = 0.000006902 V 08:44:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054258 Vs 08:44:27 Integrated Voltage Measurement... 08:44:47 Voltage Offset Correction: v_off_ini = 0.000006887 V, v_off_fin = 0.000003245 V 08:44:47 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971535 Vs 08:44:50 Temperature Measurement, Probe Number = 0, T = 20.165000 C 08:44:50 Temperature Measurement, Probe Number = 1, T = 20.090000 C 08:44:51 Temperature Measurement, Probe Number = 2, T = 20.152000 C 08:44:52 Temperature Measurement, Probe Number = 3, T = 20.097000 C 08:44:52 Temperature Measurement, Probe Number = 4, T = 20.525000 C 08:44:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.52 08:44:52 Integrated Voltage Measurement... 08:45:11 Voltage Offset Correction: v_off_ini = 0.000004824 V, v_off_fin = 0.000007484 V 08:45:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171053937 Vs 08:45:12 Integrated Voltage Measurement... 08:45:31 Voltage Offset Correction: v_off_ini = 0.000006822 V, v_off_fin = 0.000003153 V 08:45:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977827 Vs 08:45:34 Temperature Measurement, Probe Number = 0, T = 20.170000 C 08:45:35 Temperature Measurement, Probe Number = 1, T = 20.097000 C 08:45:35 Temperature Measurement, Probe Number = 2, T = 20.155000 C 08:45:36 Temperature Measurement, Probe Number = 3, T = 20.102000 C 08:45:37 Temperature Measurement, Probe Number = 4, T = 20.540000 C 08:45:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.54 08:45:37 Integrated Voltage Measurement... 08:45:56 Voltage Offset Correction: v_off_ini = 0.000004473 V, v_off_fin = 0.000007461 V 08:45:56 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055681 Vs 08:45:56 Integrated Voltage Measurement... 08:46:16 Voltage Offset Correction: v_off_ini = 0.000007271 V, v_off_fin = 0.000003889 V 08:46:16 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170972450 Vs 08:46:19 Temperature Measurement, Probe Number = 0, T = 20.174000 C 08:46:19 Temperature Measurement, Probe Number = 1, T = 20.100000 C 08:46:20 Temperature Measurement, Probe Number = 2, T = 20.158000 C 08:46:20 Temperature Measurement, Probe Number = 3, T = 20.104000 C 08:46:21 Temperature Measurement, Probe Number = 4, T = 20.610000 C 08:46:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.61 08:46:21 Integrated Voltage Measurement... 08:46:41 Voltage Offset Correction: v_off_ini = 0.000003896 V, v_off_fin = 0.000006678 V 08:46:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051476 Vs 08:46:41 Integrated Voltage Measurement... 08:47:01 Voltage Offset Correction: v_off_ini = 0.000006077 V, v_off_fin = 0.000003493 V 08:47:01 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170978558 Vs 08:47:04 Temperature Measurement, Probe Number = 0, T = 20.169000 C 08:47:04 Temperature Measurement, Probe Number = 1, T = 20.093000 C 08:47:05 Temperature Measurement, Probe Number = 2, T = 20.154000 C 08:47:06 Temperature Measurement, Probe Number = 3, T = 20.099000 C 08:47:06 Temperature Measurement, Probe Number = 4, T = 20.595000 C 08:47:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.59 08:47:06 Integrated Voltage Measurement... 08:47:26 Voltage Offset Correction: v_off_ini = 0.000003767 V, v_off_fin = 0.000006464 V 08:47:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051585 Vs 08:47:27 Integrated Voltage Measurement... 08:47:46 Voltage Offset Correction: v_off_ini = 0.000006780 V, v_off_fin = 0.000003325 V 08:47:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974886 Vs 08:47:49 Temperature Measurement, Probe Number = 0, T = 20.169000 C 08:47:50 Temperature Measurement, Probe Number = 1, T = 20.094000 C 08:47:50 Temperature Measurement, Probe Number = 2, T = 20.154000 C 08:47:51 Temperature Measurement, Probe Number = 3, T = 20.099000 C 08:47:52 Temperature Measurement, Probe Number = 4, T = 20.604000 C 08:47:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.60 08:47:52 Integrated Voltage Measurement... 08:48:11 Voltage Offset Correction: v_off_ini = 0.000004106 V, v_off_fin = 0.000006710 V 08:48:11 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047483 Vs 08:48:11 Integrated Voltage Measurement... 08:48:31 Voltage Offset Correction: v_off_ini = 0.000006210 V, v_off_fin = 0.000002612 V 08:48:31 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983255 Vs 08:48:34 Temperature Measurement, Probe Number = 0, T = 20.175000 C 08:48:34 Temperature Measurement, Probe Number = 1, T = 20.099000 C 08:48:35 Temperature Measurement, Probe Number = 2, T = 20.160000 C 08:48:36 Temperature Measurement, Probe Number = 3, T = 20.104000 C 08:48:36 Temperature Measurement, Probe Number = 4, T = 20.591000 C 08:48:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.59 08:48:37 Integrated Voltage Measurement... 08:48:56 Voltage Offset Correction: v_off_ini = 0.000004622 V, v_off_fin = 0.000006901 V 08:48:56 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054260 Vs 08:48:57 Integrated Voltage Measurement... 08:49:16 Voltage Offset Correction: v_off_ini = 0.000006155 V, v_off_fin = 0.000003196 V 08:49:16 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981698 Vs 08:49:19 Temperature Measurement, Probe Number = 0, T = 20.176000 C 08:49:19 Temperature Measurement, Probe Number = 1, T = 20.099000 C 08:49:20 Temperature Measurement, Probe Number = 2, T = 20.162000 C 08:49:21 Temperature Measurement, Probe Number = 3, T = 20.106000 C 08:49:21 Temperature Measurement, Probe Number = 4, T = 20.621000 C 08:49:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.62 08:49:22 Integrated Voltage Measurement... 08:49:41 Voltage Offset Correction: v_off_ini = 0.000003458 V, v_off_fin = 0.000006823 V 08:49:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050642 Vs 08:49:42 Integrated Voltage Measurement... 08:50:01 Voltage Offset Correction: v_off_ini = 0.000006353 V, v_off_fin = 0.000003144 V 08:50:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975246 Vs 08:50:04 Temperature Measurement, Probe Number = 0, T = 20.177000 C 08:50:05 Temperature Measurement, Probe Number = 1, T = 20.097000 C 08:50:05 Temperature Measurement, Probe Number = 2, T = 20.165000 C 08:50:06 Temperature Measurement, Probe Number = 3, T = 20.106000 C 08:50:06 Temperature Measurement, Probe Number = 4, T = 20.562000 C 08:50:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.56 08:50:07 Integrated Voltage Measurement... 08:50:26 Voltage Offset Correction: v_off_ini = 0.000004522 V, v_off_fin = 0.000006672 V 08:50:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050760 Vs 08:50:26 Integrated Voltage Measurement... 08:50:45 Voltage Offset Correction: v_off_ini = 0.000006467 V, v_off_fin = 0.000002874 V 08:50:46 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170974639 Vs 09:20:48 Temperature Measurement, Probe Number = 0, T = 20.174000 C 09:20:49 Temperature Measurement, Probe Number = 1, T = 20.098000 C 09:20:50 Temperature Measurement, Probe Number = 2, T = 20.160000 C 09:20:50 Temperature Measurement, Probe Number = 3, T = 20.104000 C 09:20:51 Temperature Measurement, Probe Number = 4, T = 20.412000 C 09:20:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 09:20:51 Integrated Voltage Measurement... 09:21:10 Voltage Offset Correction: v_off_ini = 0.000004987 V, v_off_fin = 0.000006755 V 09:21:10 Integrated Voltage Measurement Delta Gap = 0.0040022 m VT = 0.171109906 Vs 09:21:11 Integrated Voltage Measurement... 09:21:30 Voltage Offset Correction: v_off_ini = 0.000005772 V, v_off_fin = 0.000002264 V 09:21:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974633 Vs 09:21:33 Temperature Measurement, Probe Number = 0, T = 20.171000 C 09:21:34 Temperature Measurement, Probe Number = 1, T = 20.096000 C 09:21:34 Temperature Measurement, Probe Number = 2, T = 20.161000 C 09:21:35 Temperature Measurement, Probe Number = 3, T = 20.104000 C 09:21:36 Temperature Measurement, Probe Number = 4, T = 20.431000 C 09:21:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.43 09:21:36 Integrated Voltage Measurement... 09:21:55 Voltage Offset Correction: v_off_ini = 0.000003884 V, v_off_fin = 0.000007136 V 09:21:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171046281 Vs 09:21:56 Integrated Voltage Measurement... 09:22:15 Voltage Offset Correction: v_off_ini = 0.000007088 V, v_off_fin = 0.000002709 V 09:22:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977884 Vs 09:22:18 Temperature Measurement, Probe Number = 0, T = 20.174000 C 09:22:18 Temperature Measurement, Probe Number = 1, T = 20.101000 C 09:22:19 Temperature Measurement, Probe Number = 2, T = 20.158000 C 09:22:20 Temperature Measurement, Probe Number = 3, T = 20.104000 C 09:22:20 Temperature Measurement, Probe Number = 4, T = 20.444000 C 09:22:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.44 09:22:21 Integrated Voltage Measurement... 09:22:40 Voltage Offset Correction: v_off_ini = 0.000003881 V, v_off_fin = 0.000006686 V 09:22:40 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171046571 Vs 09:22:41 Integrated Voltage Measurement... 09:23:00 Voltage Offset Correction: v_off_ini = 0.000005782 V, v_off_fin = 0.000003427 V 09:23:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985634 Vs 09:23:03 Temperature Measurement, Probe Number = 0, T = 20.177000 C 09:23:04 Temperature Measurement, Probe Number = 1, T = 20.105000 C 09:23:04 Temperature Measurement, Probe Number = 2, T = 20.161000 C 09:23:05 Temperature Measurement, Probe Number = 3, T = 20.106000 C 09:23:06 Temperature Measurement, Probe Number = 4, T = 20.505000 C 09:23:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.50 09:23:06 Integrated Voltage Measurement... 09:23:25 Voltage Offset Correction: v_off_ini = 0.000003984 V, v_off_fin = 0.000007217 V 09:23:25 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171048236 Vs 09:23:26 Integrated Voltage Measurement... 09:23:45 Voltage Offset Correction: v_off_ini = 0.000006365 V, v_off_fin = 0.000002819 V 09:23:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974276 Vs 09:23:48 Temperature Measurement, Probe Number = 0, T = 20.179000 C 09:23:49 Temperature Measurement, Probe Number = 1, T = 20.104000 C 09:23:49 Temperature Measurement, Probe Number = 2, T = 20.161000 C 09:23:50 Temperature Measurement, Probe Number = 3, T = 20.105000 C 09:23:51 Temperature Measurement, Probe Number = 4, T = 20.544000 C 09:23:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.54 09:23:51 Integrated Voltage Measurement... 09:24:10 Voltage Offset Correction: v_off_ini = 0.000004610 V, v_off_fin = 0.000006974 V 09:24:10 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171050876 Vs 09:24:11 Integrated Voltage Measurement... 09:24:30 Voltage Offset Correction: v_off_ini = 0.000006294 V, v_off_fin = 0.000003307 V 09:24:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971485 Vs 09:24:33 Temperature Measurement, Probe Number = 0, T = 20.179000 C 09:24:33 Temperature Measurement, Probe Number = 1, T = 20.104000 C 09:24:34 Temperature Measurement, Probe Number = 2, T = 20.162000 C 09:24:35 Temperature Measurement, Probe Number = 3, T = 20.107000 C 09:24:35 Temperature Measurement, Probe Number = 4, T = 20.558000 C 09:24:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.56 09:24:35 Integrated Voltage Measurement... 09:24:55 Voltage Offset Correction: v_off_ini = 0.000004743 V, v_off_fin = 0.000007011 V 09:24:56 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171055131 Vs 09:24:56 Integrated Voltage Measurement... 09:25:15 Voltage Offset Correction: v_off_ini = 0.000006185 V, v_off_fin = 0.000003007 V 09:25:15 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975271 Vs 09:25:18 Temperature Measurement, Probe Number = 0, T = 20.173000 C 09:25:19 Temperature Measurement, Probe Number = 1, T = 20.098000 C 09:25:20 Temperature Measurement, Probe Number = 2, T = 20.159000 C 09:25:20 Temperature Measurement, Probe Number = 3, T = 20.104000 C 09:25:21 Temperature Measurement, Probe Number = 4, T = 20.559000 C 09:25:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.56 09:25:21 Integrated Voltage Measurement... 09:25:40 Voltage Offset Correction: v_off_ini = 0.000004011 V, v_off_fin = 0.000006392 V 09:25:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042573 Vs 09:25:41 Integrated Voltage Measurement... 09:26:00 Voltage Offset Correction: v_off_ini = 0.000005999 V, v_off_fin = 0.000002496 V 09:26:01 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170978768 Vs 09:26:03 Temperature Measurement, Probe Number = 0, T = 20.179000 C 09:26:04 Temperature Measurement, Probe Number = 1, T = 20.105000 C 09:26:05 Temperature Measurement, Probe Number = 2, T = 20.162000 C 09:26:05 Temperature Measurement, Probe Number = 3, T = 20.106000 C 09:26:06 Temperature Measurement, Probe Number = 4, T = 20.594000 C 09:26:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.59 09:26:06 Integrated Voltage Measurement... 09:26:26 Voltage Offset Correction: v_off_ini = 0.000004114 V, v_off_fin = 0.000006490 V 09:26:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171047087 Vs 09:26:26 Integrated Voltage Measurement... 09:26:45 Voltage Offset Correction: v_off_ini = 0.000006190 V, v_off_fin = 0.000003029 V 09:26:46 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975651 Vs 09:26:48 Temperature Measurement, Probe Number = 0, T = 20.184000 C 09:26:49 Temperature Measurement, Probe Number = 1, T = 20.109000 C 09:26:50 Temperature Measurement, Probe Number = 2, T = 20.167000 C 09:26:50 Temperature Measurement, Probe Number = 3, T = 20.111000 C 09:26:51 Temperature Measurement, Probe Number = 4, T = 20.654000 C 09:26:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.65 09:26:51 Integrated Voltage Measurement... 09:27:11 Voltage Offset Correction: v_off_ini = 0.000004690 V, v_off_fin = 0.000006843 V 09:27:11 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051168 Vs 09:27:11 Integrated Voltage Measurement... 09:27:31 Voltage Offset Correction: v_off_ini = 0.000006674 V, v_off_fin = 0.000003270 V 09:27:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977380 Vs 09:27:34 Temperature Measurement, Probe Number = 0, T = 20.185000 C 09:27:34 Temperature Measurement, Probe Number = 1, T = 20.110000 C 09:27:35 Temperature Measurement, Probe Number = 2, T = 20.170000 C 09:27:35 Temperature Measurement, Probe Number = 3, T = 20.113000 C 09:27:36 Temperature Measurement, Probe Number = 4, T = 20.673000 C 09:27:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.67 09:27:36 Integrated Voltage Measurement... 09:27:56 Voltage Offset Correction: v_off_ini = 0.000004404 V, v_off_fin = 0.000006382 V 09:27:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049337 Vs 09:27:56 Integrated Voltage Measurement... 09:28:16 Voltage Offset Correction: v_off_ini = 0.000006110 V, v_off_fin = 0.000002983 V 09:28:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978239 Vs 09:58:19 Temperature Measurement, Probe Number = 0, T = 20.177000 C 09:58:19 Temperature Measurement, Probe Number = 1, T = 20.104000 C 09:58:20 Temperature Measurement, Probe Number = 2, T = 20.164000 C 09:58:21 Temperature Measurement, Probe Number = 3, T = 20.110000 C 09:58:21 Temperature Measurement, Probe Number = 4, T = 20.450000 C 09:58:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.45 09:58:21 Integrated Voltage Measurement... 09:58:40 Voltage Offset Correction: v_off_ini = 0.000005355 V, v_off_fin = 0.000006778 V 09:58:41 Integrated Voltage Measurement Delta Gap = 0.0040017 m VT = 0.171108517 Vs 09:58:41 Integrated Voltage Measurement... 09:59:00 Voltage Offset Correction: v_off_ini = 0.000006794 V, v_off_fin = 0.000003218 V 09:59:00 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170967891 Vs 09:59:03 Temperature Measurement, Probe Number = 0, T = 20.180000 C 09:59:04 Temperature Measurement, Probe Number = 1, T = 20.107000 C 09:59:04 Temperature Measurement, Probe Number = 2, T = 20.164000 C 09:59:05 Temperature Measurement, Probe Number = 3, T = 20.111000 C 09:59:06 Temperature Measurement, Probe Number = 4, T = 20.370000 C 09:59:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.37 09:59:06 Integrated Voltage Measurement... 09:59:26 Voltage Offset Correction: v_off_ini = 0.000003964 V, v_off_fin = 0.000006935 V 09:59:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171046428 Vs 09:59:26 Integrated Voltage Measurement... 09:59:46 Voltage Offset Correction: v_off_ini = 0.000006663 V, v_off_fin = 0.000002926 V 09:59:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971629 Vs 09:59:48 Temperature Measurement, Probe Number = 0, T = 20.177000 C 09:59:49 Temperature Measurement, Probe Number = 1, T = 20.104000 C 09:59:50 Temperature Measurement, Probe Number = 2, T = 20.163000 C 09:59:50 Temperature Measurement, Probe Number = 3, T = 20.109000 C 09:59:51 Temperature Measurement, Probe Number = 4, T = 20.284000 C 09:59:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.28 09:59:51 Integrated Voltage Measurement... 10:00:11 Voltage Offset Correction: v_off_ini = 0.000004522 V, v_off_fin = 0.000007595 V 10:00:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048835 Vs 10:00:11 Integrated Voltage Measurement... 10:00:30 Voltage Offset Correction: v_off_ini = 0.000007022 V, v_off_fin = 0.000003795 V 10:00:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170959478 Vs 10:00:33 Temperature Measurement, Probe Number = 0, T = 20.183000 C 10:00:34 Temperature Measurement, Probe Number = 1, T = 20.110000 C 10:00:35 Temperature Measurement, Probe Number = 2, T = 20.167000 C 10:00:35 Temperature Measurement, Probe Number = 3, T = 20.113000 C 10:00:36 Temperature Measurement, Probe Number = 4, T = 20.275000 C 10:00:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.27 10:00:36 Integrated Voltage Measurement... 10:00:55 Voltage Offset Correction: v_off_ini = 0.000005172 V, v_off_fin = 0.000008112 V 10:00:56 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059542 Vs 10:00:56 Integrated Voltage Measurement... 10:01:15 Voltage Offset Correction: v_off_ini = 0.000006949 V, v_off_fin = 0.000002957 V 10:01:15 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170963269 Vs 10:01:18 Temperature Measurement, Probe Number = 0, T = 20.179000 C 10:01:19 Temperature Measurement, Probe Number = 1, T = 20.104000 C 10:01:19 Temperature Measurement, Probe Number = 2, T = 20.165000 C 10:01:20 Temperature Measurement, Probe Number = 3, T = 20.110000 C 10:01:21 Temperature Measurement, Probe Number = 4, T = 20.333000 C 10:01:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.33 10:01:21 Integrated Voltage Measurement... 10:01:41 Voltage Offset Correction: v_off_ini = 0.000004655 V, v_off_fin = 0.000007048 V 10:01:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171054979 Vs 10:01:41 Integrated Voltage Measurement... 10:02:01 Voltage Offset Correction: v_off_ini = 0.000006213 V, v_off_fin = 0.000003215 V 10:02:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170969073 Vs 10:02:04 Temperature Measurement, Probe Number = 0, T = 20.180000 C 10:02:05 Temperature Measurement, Probe Number = 1, T = 20.105000 C 10:02:05 Temperature Measurement, Probe Number = 2, T = 20.165000 C 10:02:06 Temperature Measurement, Probe Number = 3, T = 20.110000 C 10:02:07 Temperature Measurement, Probe Number = 4, T = 20.261000 C 10:02:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.26 10:02:07 Integrated Voltage Measurement... 10:02:26 Voltage Offset Correction: v_off_ini = 0.000003587 V, v_off_fin = 0.000006745 V 10:02:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171041670 Vs 10:02:26 Integrated Voltage Measurement... 10:02:46 Voltage Offset Correction: v_off_ini = 0.000006369 V, v_off_fin = 0.000002931 V 10:02:46 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971410 Vs 10:02:48 Temperature Measurement, Probe Number = 0, T = 20.183000 C 10:02:49 Temperature Measurement, Probe Number = 1, T = 20.109000 C 10:02:50 Temperature Measurement, Probe Number = 2, T = 20.167000 C 10:02:50 Temperature Measurement, Probe Number = 3, T = 20.113000 C 10:02:51 Temperature Measurement, Probe Number = 4, T = 20.235000 C 10:02:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.23 10:02:51 Integrated Voltage Measurement... 10:03:11 Voltage Offset Correction: v_off_ini = 0.000004218 V, v_off_fin = 0.000007103 V 10:03:11 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044438 Vs 10:03:11 Integrated Voltage Measurement... 10:03:30 Voltage Offset Correction: v_off_ini = 0.000006114 V, v_off_fin = 0.000002979 V 10:03:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170969050 Vs 10:03:33 Temperature Measurement, Probe Number = 0, T = 20.185000 C 10:03:33 Temperature Measurement, Probe Number = 1, T = 20.115000 C 10:03:34 Temperature Measurement, Probe Number = 2, T = 20.168000 C 10:03:35 Temperature Measurement, Probe Number = 3, T = 20.116000 C 10:03:35 Temperature Measurement, Probe Number = 4, T = 20.341000 C 10:03:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.34 10:03:36 Integrated Voltage Measurement... 10:03:55 Voltage Offset Correction: v_off_ini = 0.000004257 V, v_off_fin = 0.000006807 V 10:03:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171042440 Vs 10:03:55 Integrated Voltage Measurement... 10:04:14 Voltage Offset Correction: v_off_ini = 0.000006008 V, v_off_fin = 0.000002727 V 10:04:14 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971297 Vs 10:04:17 Temperature Measurement, Probe Number = 0, T = 20.191000 C 10:04:18 Temperature Measurement, Probe Number = 1, T = 20.118000 C 10:04:18 Temperature Measurement, Probe Number = 2, T = 20.174000 C 10:04:19 Temperature Measurement, Probe Number = 3, T = 20.121000 C 10:04:20 Temperature Measurement, Probe Number = 4, T = 20.479000 C 10:04:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.48 10:04:20 Integrated Voltage Measurement... 10:04:39 Voltage Offset Correction: v_off_ini = 0.000004131 V, v_off_fin = 0.000007415 V 10:04:39 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171045316 Vs 10:04:40 Integrated Voltage Measurement... 10:04:59 Voltage Offset Correction: v_off_ini = 0.000006242 V, v_off_fin = 0.000003141 V 10:04:59 Integrated Voltage Measurement Delta Gap = -0.0040005 m VT = -0.170972437 Vs 10:05:02 Temperature Measurement, Probe Number = 0, T = 20.191000 C 10:05:02 Temperature Measurement, Probe Number = 1, T = 20.119000 C 10:05:03 Temperature Measurement, Probe Number = 2, T = 20.174000 C 10:05:04 Temperature Measurement, Probe Number = 3, T = 20.122000 C 10:05:04 Temperature Measurement, Probe Number = 4, T = 20.519000 C 10:05:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.52 10:05:05 Integrated Voltage Measurement... 10:05:24 Voltage Offset Correction: v_off_ini = 0.000003688 V, v_off_fin = 0.000006491 V 10:05:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171044928 Vs 10:05:24 Integrated Voltage Measurement... 10:05:43 Voltage Offset Correction: v_off_ini = 0.000006117 V, v_off_fin = 0.000002590 V 10:05:43 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170969599 Vs 10:35:46 Temperature Measurement, Probe Number = 0, T = 20.192000 C 10:35:47 Temperature Measurement, Probe Number = 1, T = 20.122000 C 10:35:48 Temperature Measurement, Probe Number = 2, T = 20.176000 C 10:35:48 Temperature Measurement, Probe Number = 3, T = 20.124000 C 10:35:49 Temperature Measurement, Probe Number = 4, T = 20.437000 C 10:35:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.44 10:35:49 Integrated Voltage Measurement... 10:36:08 Voltage Offset Correction: v_off_ini = 0.000004816 V, v_off_fin = 0.000007183 V 10:36:08 Integrated Voltage Measurement Delta Gap = 0.0040019 m VT = 0.171111512 Vs 10:36:09 Integrated Voltage Measurement... 10:36:28 Voltage Offset Correction: v_off_ini = 0.000006305 V, v_off_fin = 0.000002739 V 10:36:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170970200 Vs 10:36:31 Temperature Measurement, Probe Number = 0, T = 20.198000 C 10:36:31 Temperature Measurement, Probe Number = 1, T = 20.128000 C 10:36:32 Temperature Measurement, Probe Number = 2, T = 20.183000 C 10:36:33 Temperature Measurement, Probe Number = 3, T = 20.130000 C 10:36:33 Temperature Measurement, Probe Number = 4, T = 20.513000 C 10:36:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.51 10:36:33 Integrated Voltage Measurement... 10:36:53 Voltage Offset Correction: v_off_ini = 0.000004028 V, v_off_fin = 0.000007000 V 10:36:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171039802 Vs 10:36:54 Integrated Voltage Measurement... 10:37:13 Voltage Offset Correction: v_off_ini = 0.000006386 V, v_off_fin = 0.000002830 V 10:37:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970425 Vs 10:37:16 Temperature Measurement, Probe Number = 0, T = 20.196000 C 10:37:17 Temperature Measurement, Probe Number = 1, T = 20.126000 C 10:37:17 Temperature Measurement, Probe Number = 2, T = 20.181000 C 10:37:18 Temperature Measurement, Probe Number = 3, T = 20.129000 C 10:37:19 Temperature Measurement, Probe Number = 4, T = 20.618000 C 10:37:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.62 10:37:19 Integrated Voltage Measurement... 10:37:38 Voltage Offset Correction: v_off_ini = 0.000004653 V, v_off_fin = 0.000006565 V 10:37:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171041210 Vs 10:37:39 Integrated Voltage Measurement... 10:37:58 Voltage Offset Correction: v_off_ini = 0.000005908 V, v_off_fin = 0.000003462 V 10:37:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970502 Vs 10:38:01 Temperature Measurement, Probe Number = 0, T = 20.202000 C 10:38:01 Temperature Measurement, Probe Number = 1, T = 20.130000 C 10:38:02 Temperature Measurement, Probe Number = 2, T = 20.184000 C 10:38:03 Temperature Measurement, Probe Number = 3, T = 20.133000 C 10:38:04 Temperature Measurement, Probe Number = 4, T = 20.643000 C 10:38:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.64 10:38:04 Integrated Voltage Measurement... 10:38:23 Voltage Offset Correction: v_off_ini = 0.000004325 V, v_off_fin = 0.000006306 V 10:38:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171040975 Vs 10:38:24 Integrated Voltage Measurement... 10:38:44 Voltage Offset Correction: v_off_ini = 0.000006314 V, v_off_fin = 0.000002617 V 10:38:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968533 Vs 10:38:47 Temperature Measurement, Probe Number = 0, T = 20.203000 C 10:38:47 Temperature Measurement, Probe Number = 1, T = 20.131000 C 10:38:48 Temperature Measurement, Probe Number = 2, T = 20.186000 C 10:38:49 Temperature Measurement, Probe Number = 3, T = 20.133000 C 10:38:49 Temperature Measurement, Probe Number = 4, T = 20.742000 C 10:38:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.74 10:38:49 Integrated Voltage Measurement... 10:39:09 Voltage Offset Correction: v_off_ini = 0.000003841 V, v_off_fin = 0.000006254 V 10:39:10 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171032048 Vs 10:39:10 Integrated Voltage Measurement... 10:39:29 Voltage Offset Correction: v_off_ini = 0.000006121 V, v_off_fin = 0.000002401 V 10:39:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971985 Vs 10:39:32 Temperature Measurement, Probe Number = 0, T = 20.202000 C 10:39:33 Temperature Measurement, Probe Number = 1, T = 20.130000 C 10:39:33 Temperature Measurement, Probe Number = 2, T = 20.183000 C 10:39:34 Temperature Measurement, Probe Number = 3, T = 20.131000 C 10:39:35 Temperature Measurement, Probe Number = 4, T = 20.734000 C 10:39:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.73 10:39:35 Integrated Voltage Measurement... 10:39:54 Voltage Offset Correction: v_off_ini = 0.000003937 V, v_off_fin = 0.000006335 V 10:39:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171035367 Vs 10:39:55 Integrated Voltage Measurement... 10:40:14 Voltage Offset Correction: v_off_ini = 0.000006144 V, v_off_fin = 0.000002579 V 10:40:14 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170976360 Vs 10:40:17 Temperature Measurement, Probe Number = 0, T = 20.201000 C 10:40:18 Temperature Measurement, Probe Number = 1, T = 20.126000 C 10:40:18 Temperature Measurement, Probe Number = 2, T = 20.184000 C 10:40:19 Temperature Measurement, Probe Number = 3, T = 20.129000 C 10:40:20 Temperature Measurement, Probe Number = 4, T = 20.741000 C 10:40:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.74 10:40:20 Integrated Voltage Measurement... 10:40:40 Voltage Offset Correction: v_off_ini = 0.000003514 V, v_off_fin = 0.000006408 V 10:40:40 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171038347 Vs 10:40:40 Integrated Voltage Measurement... 10:41:00 Voltage Offset Correction: v_off_ini = 0.000005504 V, v_off_fin = 0.000001966 V 10:41:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984232 Vs 10:41:03 Temperature Measurement, Probe Number = 0, T = 20.198000 C 10:41:03 Temperature Measurement, Probe Number = 1, T = 20.128000 C 10:41:04 Temperature Measurement, Probe Number = 2, T = 20.182000 C 10:41:05 Temperature Measurement, Probe Number = 3, T = 20.129000 C 10:41:05 Temperature Measurement, Probe Number = 4, T = 20.734000 C 10:41:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.73 10:41:05 Integrated Voltage Measurement... 10:41:26 Voltage Offset Correction: v_off_ini = 0.000003416 V, v_off_fin = 0.000005827 V 10:41:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171034596 Vs 10:41:26 Integrated Voltage Measurement... 10:41:46 Voltage Offset Correction: v_off_ini = 0.000005293 V, v_off_fin = 0.000001963 V 10:41:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982144 Vs 10:41:49 Temperature Measurement, Probe Number = 0, T = 20.201000 C 10:41:49 Temperature Measurement, Probe Number = 1, T = 20.132000 C 10:41:50 Temperature Measurement, Probe Number = 2, T = 20.184000 C 10:41:51 Temperature Measurement, Probe Number = 3, T = 20.132000 C 10:41:51 Temperature Measurement, Probe Number = 4, T = 20.744000 C 10:41:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.74 10:41:51 Integrated Voltage Measurement... 10:42:12 Voltage Offset Correction: v_off_ini = 0.000003826 V, v_off_fin = 0.000005912 V 10:42:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036695 Vs 10:42:12 Integrated Voltage Measurement... 10:42:33 Voltage Offset Correction: v_off_ini = 0.000006302 V, v_off_fin = 0.000003014 V 10:42:33 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170984328 Vs 10:42:36 Temperature Measurement, Probe Number = 0, T = 20.203000 C 10:42:36 Temperature Measurement, Probe Number = 1, T = 20.133000 C 10:42:37 Temperature Measurement, Probe Number = 2, T = 20.186000 C 10:42:38 Temperature Measurement, Probe Number = 3, T = 20.134000 C 10:42:38 Temperature Measurement, Probe Number = 4, T = 20.725000 C 10:42:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.73 10:42:39 Integrated Voltage Measurement... 10:42:59 Voltage Offset Correction: v_off_ini = 0.000004210 V, v_off_fin = 0.000007002 V 10:42:59 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171041222 Vs 10:42:59 Integrated Voltage Measurement... 10:43:19 Voltage Offset Correction: v_off_ini = 0.000006450 V, v_off_fin = 0.000002676 V 10:43:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968902 Vs 11:13:22 Temperature Measurement, Probe Number = 0, T = 20.199000 C 11:13:22 Temperature Measurement, Probe Number = 1, T = 20.125000 C 11:13:23 Temperature Measurement, Probe Number = 2, T = 20.185000 C 11:13:24 Temperature Measurement, Probe Number = 3, T = 20.130000 C 11:13:24 Temperature Measurement, Probe Number = 4, T = 20.493000 C 11:13:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.49 11:13:25 Integrated Voltage Measurement... 11:13:45 Voltage Offset Correction: v_off_ini = 0.000005278 V, v_off_fin = 0.000007050 V 11:13:45 Integrated Voltage Measurement Delta Gap = 0.0040018 m VT = 0.171105079 Vs 11:13:45 Integrated Voltage Measurement... 11:14:05 Voltage Offset Correction: v_off_ini = 0.000005960 V, v_off_fin = 0.000003657 V 11:14:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961353 Vs 11:14:08 Temperature Measurement, Probe Number = 0, T = 20.202000 C 11:14:08 Temperature Measurement, Probe Number = 1, T = 20.129000 C 11:14:09 Temperature Measurement, Probe Number = 2, T = 20.185000 C 11:14:10 Temperature Measurement, Probe Number = 3, T = 20.132000 C 11:14:10 Temperature Measurement, Probe Number = 4, T = 20.565000 C 11:14:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.57 11:14:10 Integrated Voltage Measurement... 11:14:30 Voltage Offset Correction: v_off_ini = 0.000004486 V, v_off_fin = 0.000006931 V 11:14:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171031981 Vs 11:14:30 Integrated Voltage Measurement... 11:14:50 Voltage Offset Correction: v_off_ini = 0.000005983 V, v_off_fin = 0.000002603 V 11:14:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170968856 Vs 11:14:53 Temperature Measurement, Probe Number = 0, T = 20.202000 C 11:14:53 Temperature Measurement, Probe Number = 1, T = 20.129000 C 11:14:54 Temperature Measurement, Probe Number = 2, T = 20.184000 C 11:14:55 Temperature Measurement, Probe Number = 3, T = 20.131000 C 11:14:55 Temperature Measurement, Probe Number = 4, T = 20.642000 C 11:14:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.64 11:14:55 Integrated Voltage Measurement... 11:15:15 Voltage Offset Correction: v_off_ini = 0.000003708 V, v_off_fin = 0.000006972 V 11:15:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171027919 Vs 11:15:15 Integrated Voltage Measurement... 11:15:35 Voltage Offset Correction: v_off_ini = 0.000005842 V, v_off_fin = 0.000002344 V 11:15:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970762 Vs 11:15:38 Temperature Measurement, Probe Number = 0, T = 20.201000 C 11:15:39 Temperature Measurement, Probe Number = 1, T = 20.127000 C 11:15:39 Temperature Measurement, Probe Number = 2, T = 20.183000 C 11:15:40 Temperature Measurement, Probe Number = 3, T = 20.129000 C 11:15:41 Temperature Measurement, Probe Number = 4, T = 20.599000 C 11:15:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.60 11:15:41 Integrated Voltage Measurement... 11:16:01 Voltage Offset Correction: v_off_ini = 0.000004316 V, v_off_fin = 0.000006501 V 11:16:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023901 Vs 11:16:01 Integrated Voltage Measurement... 11:16:21 Voltage Offset Correction: v_off_ini = 0.000005462 V, v_off_fin = 0.000003107 V 11:16:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975706 Vs 11:16:24 Temperature Measurement, Probe Number = 0, T = 20.203000 C 11:16:25 Temperature Measurement, Probe Number = 1, T = 20.128000 C 11:16:25 Temperature Measurement, Probe Number = 2, T = 20.180000 C 11:16:26 Temperature Measurement, Probe Number = 3, T = 20.128000 C 11:16:27 Temperature Measurement, Probe Number = 4, T = 20.494000 C 11:16:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.49 11:16:27 Integrated Voltage Measurement... 11:16:47 Voltage Offset Correction: v_off_ini = 0.000003983 V, v_off_fin = 0.000006388 V 11:16:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171023825 Vs 11:16:47 Integrated Voltage Measurement... 11:17:07 Voltage Offset Correction: v_off_ini = 0.000005844 V, v_off_fin = 0.000002918 V 11:17:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170963134 Vs 11:17:10 Temperature Measurement, Probe Number = 0, T = 20.195000 C 11:17:10 Temperature Measurement, Probe Number = 1, T = 20.120000 C 11:17:11 Temperature Measurement, Probe Number = 2, T = 20.181000 C 11:17:12 Temperature Measurement, Probe Number = 3, T = 20.126000 C 11:17:12 Temperature Measurement, Probe Number = 4, T = 20.387000 C 11:17:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.39 11:17:13 Integrated Voltage Measurement... 11:17:33 Voltage Offset Correction: v_off_ini = 0.000003738 V, v_off_fin = 0.000006314 V 11:17:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171030145 Vs 11:17:33 Integrated Voltage Measurement... 11:17:53 Voltage Offset Correction: v_off_ini = 0.000005839 V, v_off_fin = 0.000002474 V 11:17:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966864 Vs 11:17:56 Temperature Measurement, Probe Number = 0, T = 20.197000 C 11:17:56 Temperature Measurement, Probe Number = 1, T = 20.126000 C 11:17:57 Temperature Measurement, Probe Number = 2, T = 20.180000 C 11:17:58 Temperature Measurement, Probe Number = 3, T = 20.127000 C 11:17:58 Temperature Measurement, Probe Number = 4, T = 20.313000 C 11:17:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.31 11:17:59 Integrated Voltage Measurement... 11:18:18 Voltage Offset Correction: v_off_ini = 0.000004047 V, v_off_fin = 0.000006623 V 11:18:18 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171032754 Vs 11:18:19 Integrated Voltage Measurement... 11:18:38 Voltage Offset Correction: v_off_ini = 0.000006122 V, v_off_fin = 0.000002381 V 11:18:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170966978 Vs 11:18:41 Temperature Measurement, Probe Number = 0, T = 20.206000 C 11:18:42 Temperature Measurement, Probe Number = 1, T = 20.130000 C 11:18:42 Temperature Measurement, Probe Number = 2, T = 20.184000 C 11:18:43 Temperature Measurement, Probe Number = 3, T = 20.130000 C 11:18:44 Temperature Measurement, Probe Number = 4, T = 20.408000 C 11:18:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.41 11:18:44 Integrated Voltage Measurement... 11:19:04 Voltage Offset Correction: v_off_ini = 0.000003975 V, v_off_fin = 0.000006433 V 11:19:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171036730 Vs 11:19:05 Integrated Voltage Measurement... 11:19:24 Voltage Offset Correction: v_off_ini = 0.000005278 V, v_off_fin = 0.000002022 V 11:19:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977293 Vs 11:19:27 Temperature Measurement, Probe Number = 0, T = 20.206000 C 11:19:28 Temperature Measurement, Probe Number = 1, T = 20.130000 C 11:19:28 Temperature Measurement, Probe Number = 2, T = 20.185000 C 11:19:29 Temperature Measurement, Probe Number = 3, T = 20.130000 C 11:19:30 Temperature Measurement, Probe Number = 4, T = 20.520000 C 11:19:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.52 11:19:30 Integrated Voltage Measurement... 11:19:49 Voltage Offset Correction: v_off_ini = 0.000003877 V, v_off_fin = 0.000006750 V 11:19:49 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171040158 Vs 11:19:50 Integrated Voltage Measurement... 11:20:09 Voltage Offset Correction: v_off_ini = 0.000005911 V, v_off_fin = 0.000001791 V 11:20:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971902 Vs 11:20:12 Temperature Measurement, Probe Number = 0, T = 20.200000 C 11:20:13 Temperature Measurement, Probe Number = 1, T = 20.123000 C 11:20:13 Temperature Measurement, Probe Number = 2, T = 20.178000 C 11:20:14 Temperature Measurement, Probe Number = 3, T = 20.125000 C 11:20:15 Temperature Measurement, Probe Number = 4, T = 20.431000 C 11:20:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.43 11:20:15 Integrated Voltage Measurement... 11:20:34 Voltage Offset Correction: v_off_ini = 0.000003924 V, v_off_fin = 0.000006386 V 11:20:35 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171041964 Vs 11:20:35 Integrated Voltage Measurement... 11:20:54 Voltage Offset Correction: v_off_ini = 0.000005339 V, v_off_fin = 0.000001813 V 11:20:54 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170971426 Vs 11:50:57 Temperature Measurement, Probe Number = 0, T = 20.210000 C 11:50:58 Temperature Measurement, Probe Number = 1, T = 20.137000 C 11:50:58 Temperature Measurement, Probe Number = 2, T = 20.189000 C 11:50:59 Temperature Measurement, Probe Number = 3, T = 20.137000 C 11:51:00 Temperature Measurement, Probe Number = 4, T = 20.529000 C 11:51:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.53 11:51:00 Integrated Voltage Measurement... 11:51:20 Voltage Offset Correction: v_off_ini = 0.000006327 V, v_off_fin = 0.000007608 V 11:51:20 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171102579 Vs 11:51:20 Integrated Voltage Measurement... 11:51:40 Voltage Offset Correction: v_off_ini = 0.000007054 V, v_off_fin = 0.000003562 V 11:51:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972916 Vs 11:51:43 Temperature Measurement, Probe Number = 0, T = 20.205000 C 11:51:43 Temperature Measurement, Probe Number = 1, T = 20.130000 C 11:51:44 Temperature Measurement, Probe Number = 2, T = 20.186000 C 11:51:45 Temperature Measurement, Probe Number = 3, T = 20.130000 C 11:51:45 Temperature Measurement, Probe Number = 4, T = 20.518000 C 11:51:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.52 11:51:46 Integrated Voltage Measurement... 11:52:06 Voltage Offset Correction: v_off_ini = 0.000004721 V, v_off_fin = 0.000007200 V 11:52:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171060091 Vs 11:52:06 Integrated Voltage Measurement... 11:52:27 Voltage Offset Correction: v_off_ini = 0.000006487 V, v_off_fin = 0.000003562 V 11:52:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980046 Vs 11:52:30 Temperature Measurement, Probe Number = 0, T = 20.203000 C 11:52:30 Temperature Measurement, Probe Number = 1, T = 20.130000 C 11:52:31 Temperature Measurement, Probe Number = 2, T = 20.185000 C 11:52:32 Temperature Measurement, Probe Number = 3, T = 20.129000 C 11:52:32 Temperature Measurement, Probe Number = 4, T = 20.490000 C 11:52:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.49 11:52:33 Integrated Voltage Measurement... 11:52:52 Voltage Offset Correction: v_off_ini = 0.000004307 V, v_off_fin = 0.000007225 V 11:52:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053961 Vs 11:52:53 Integrated Voltage Measurement... 11:53:12 Voltage Offset Correction: v_off_ini = 0.000006540 V, v_off_fin = 0.000002585 V 11:53:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979077 Vs 11:53:15 Temperature Measurement, Probe Number = 0, T = 20.207000 C 11:53:16 Temperature Measurement, Probe Number = 1, T = 20.131000 C 11:53:17 Temperature Measurement, Probe Number = 2, T = 20.188000 C 11:53:17 Temperature Measurement, Probe Number = 3, T = 20.134000 C 11:53:18 Temperature Measurement, Probe Number = 4, T = 20.478000 C 11:53:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.48 11:53:18 Integrated Voltage Measurement... 11:53:38 Voltage Offset Correction: v_off_ini = 0.000004583 V, v_off_fin = 0.000007466 V 11:53:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171056033 Vs 11:53:39 Integrated Voltage Measurement... 11:53:58 Voltage Offset Correction: v_off_ini = 0.000006885 V, v_off_fin = 0.000003098 V 11:53:59 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980042 Vs 11:54:01 Temperature Measurement, Probe Number = 0, T = 20.207000 C 11:54:02 Temperature Measurement, Probe Number = 1, T = 20.131000 C 11:54:03 Temperature Measurement, Probe Number = 2, T = 20.185000 C 11:54:03 Temperature Measurement, Probe Number = 3, T = 20.130000 C 11:54:04 Temperature Measurement, Probe Number = 4, T = 20.493000 C 11:54:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.49 11:54:04 Integrated Voltage Measurement... 11:54:23 Voltage Offset Correction: v_off_ini = 0.000004403 V, v_off_fin = 0.000007452 V 11:54:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171060026 Vs 11:54:24 Integrated Voltage Measurement... 11:54:44 Voltage Offset Correction: v_off_ini = 0.000006239 V, v_off_fin = 0.000003260 V 11:54:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976632 Vs 11:54:47 Temperature Measurement, Probe Number = 0, T = 20.211000 C 11:54:48 Temperature Measurement, Probe Number = 1, T = 20.136000 C 11:54:48 Temperature Measurement, Probe Number = 2, T = 20.188000 C 11:54:49 Temperature Measurement, Probe Number = 3, T = 20.131000 C 11:54:49 Temperature Measurement, Probe Number = 4, T = 20.505000 C 11:54:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.50 11:54:50 Integrated Voltage Measurement... 11:55:09 Voltage Offset Correction: v_off_ini = 0.000004626 V, v_off_fin = 0.000008006 V 11:55:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054291 Vs 11:55:10 Integrated Voltage Measurement... 11:55:29 Voltage Offset Correction: v_off_ini = 0.000007199 V, v_off_fin = 0.000003806 V 11:55:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967085 Vs 11:55:32 Temperature Measurement, Probe Number = 0, T = 20.213000 C 11:55:33 Temperature Measurement, Probe Number = 1, T = 20.135000 C 11:55:34 Temperature Measurement, Probe Number = 2, T = 20.192000 C 11:55:34 Temperature Measurement, Probe Number = 3, T = 20.133000 C 11:55:35 Temperature Measurement, Probe Number = 4, T = 20.475000 C 11:55:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.48 11:55:35 Integrated Voltage Measurement... 11:55:55 Voltage Offset Correction: v_off_ini = 0.000005163 V, v_off_fin = 0.000007792 V 11:55:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171060448 Vs 11:55:56 Integrated Voltage Measurement... 11:56:15 Voltage Offset Correction: v_off_ini = 0.000006648 V, v_off_fin = 0.000004457 V 11:56:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975725 Vs 11:56:18 Temperature Measurement, Probe Number = 0, T = 20.213000 C 11:56:19 Temperature Measurement, Probe Number = 1, T = 20.133000 C 11:56:20 Temperature Measurement, Probe Number = 2, T = 20.192000 C 11:56:20 Temperature Measurement, Probe Number = 3, T = 20.134000 C 11:56:21 Temperature Measurement, Probe Number = 4, T = 20.454000 C 11:56:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.45 11:56:21 Integrated Voltage Measurement... 11:56:42 Voltage Offset Correction: v_off_ini = 0.000004314 V, v_off_fin = 0.000007193 V 11:56:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060562 Vs 11:56:42 Integrated Voltage Measurement... 11:57:02 Voltage Offset Correction: v_off_ini = 0.000006699 V, v_off_fin = 0.000003049 V 11:57:02 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170978765 Vs 11:57:04 Temperature Measurement, Probe Number = 0, T = 20.205000 C 11:57:05 Temperature Measurement, Probe Number = 1, T = 20.125000 C 11:57:06 Temperature Measurement, Probe Number = 2, T = 20.186000 C 11:57:06 Temperature Measurement, Probe Number = 3, T = 20.127000 C 11:57:07 Temperature Measurement, Probe Number = 4, T = 20.463000 C 11:57:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.46 11:57:07 Integrated Voltage Measurement... 11:57:27 Voltage Offset Correction: v_off_ini = 0.000004594 V, v_off_fin = 0.000007234 V 11:57:27 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171059806 Vs 11:57:27 Integrated Voltage Measurement... 11:57:47 Voltage Offset Correction: v_off_ini = 0.000006485 V, v_off_fin = 0.000004023 V 11:57:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971474 Vs 11:57:50 Temperature Measurement, Probe Number = 0, T = 20.208000 C 11:57:50 Temperature Measurement, Probe Number = 1, T = 20.130000 C 11:57:51 Temperature Measurement, Probe Number = 2, T = 20.189000 C 11:57:52 Temperature Measurement, Probe Number = 3, T = 20.132000 C 11:57:52 Temperature Measurement, Probe Number = 4, T = 20.442000 C 11:57:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.44 11:57:52 Integrated Voltage Measurement... 11:58:12 Voltage Offset Correction: v_off_ini = 0.000005160 V, v_off_fin = 0.000007468 V 11:58:12 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059865 Vs 11:58:12 Integrated Voltage Measurement... 11:58:32 Voltage Offset Correction: v_off_ini = 0.000006551 V, v_off_fin = 0.000003657 V 11:58:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979632 Vs 12:28:35 Temperature Measurement, Probe Number = 0, T = 20.195000 C 12:28:35 Temperature Measurement, Probe Number = 1, T = 20.119000 C 12:28:36 Temperature Measurement, Probe Number = 2, T = 20.174000 C 12:28:37 Temperature Measurement, Probe Number = 3, T = 20.118000 C 12:28:37 Temperature Measurement, Probe Number = 4, T = 20.338000 C 12:28:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.34 12:28:37 Integrated Voltage Measurement... 12:28:58 Voltage Offset Correction: v_off_ini = 0.000005272 V, v_off_fin = 0.000007132 V 12:28:58 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171092508 Vs 12:28:58 Integrated Voltage Measurement... 12:29:18 Voltage Offset Correction: v_off_ini = 0.000006435 V, v_off_fin = 0.000003241 V 12:29:18 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170983869 Vs 12:29:21 Temperature Measurement, Probe Number = 0, T = 20.204000 C 12:29:22 Temperature Measurement, Probe Number = 1, T = 20.124000 C 12:29:22 Temperature Measurement, Probe Number = 2, T = 20.178000 C 12:29:23 Temperature Measurement, Probe Number = 3, T = 20.120000 C 12:29:24 Temperature Measurement, Probe Number = 4, T = 20.341000 C 12:29:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.34 12:29:24 Integrated Voltage Measurement... 12:29:44 Voltage Offset Correction: v_off_ini = 0.000004920 V, v_off_fin = 0.000007360 V 12:29:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061840 Vs 12:29:44 Integrated Voltage Measurement... 12:30:04 Voltage Offset Correction: v_off_ini = 0.000007390 V, v_off_fin = 0.000003483 V 12:30:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980573 Vs 12:30:06 Temperature Measurement, Probe Number = 0, T = 20.202000 C 12:30:07 Temperature Measurement, Probe Number = 1, T = 20.125000 C 12:30:08 Temperature Measurement, Probe Number = 2, T = 20.177000 C 12:30:08 Temperature Measurement, Probe Number = 3, T = 20.121000 C 12:30:09 Temperature Measurement, Probe Number = 4, T = 20.242000 C 12:30:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.24 12:30:09 Integrated Voltage Measurement... 12:30:29 Voltage Offset Correction: v_off_ini = 0.000004997 V, v_off_fin = 0.000007971 V 12:30:29 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171063356 Vs 12:30:29 Integrated Voltage Measurement... 12:30:49 Voltage Offset Correction: v_off_ini = 0.000007310 V, v_off_fin = 0.000003023 V 12:30:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982159 Vs 12:30:52 Temperature Measurement, Probe Number = 0, T = 20.201000 C 12:30:52 Temperature Measurement, Probe Number = 1, T = 20.125000 C 12:30:53 Temperature Measurement, Probe Number = 2, T = 20.180000 C 12:30:53 Temperature Measurement, Probe Number = 3, T = 20.121000 C 12:30:54 Temperature Measurement, Probe Number = 4, T = 20.284000 C 12:30:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.28 12:30:54 Integrated Voltage Measurement... 12:31:14 Voltage Offset Correction: v_off_ini = 0.000005026 V, v_off_fin = 0.000006996 V 12:31:14 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171061018 Vs 12:31:14 Integrated Voltage Measurement... 12:31:34 Voltage Offset Correction: v_off_ini = 0.000006783 V, v_off_fin = 0.000002838 V 12:31:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984972 Vs 12:31:37 Temperature Measurement, Probe Number = 0, T = 20.197000 C 12:31:37 Temperature Measurement, Probe Number = 1, T = 20.123000 C 12:31:38 Temperature Measurement, Probe Number = 2, T = 20.175000 C 12:31:39 Temperature Measurement, Probe Number = 3, T = 20.119000 C 12:31:39 Temperature Measurement, Probe Number = 4, T = 20.232000 C 12:31:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.23 12:31:40 Integrated Voltage Measurement... 12:31:59 Voltage Offset Correction: v_off_ini = 0.000004663 V, v_off_fin = 0.000006565 V 12:31:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171056177 Vs 12:31:59 Integrated Voltage Measurement... 12:32:19 Voltage Offset Correction: v_off_ini = 0.000006189 V, v_off_fin = 0.000003281 V 12:32:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987138 Vs 12:32:22 Temperature Measurement, Probe Number = 0, T = 20.200000 C 12:32:22 Temperature Measurement, Probe Number = 1, T = 20.121000 C 12:32:23 Temperature Measurement, Probe Number = 2, T = 20.177000 C 12:32:24 Temperature Measurement, Probe Number = 3, T = 20.120000 C 12:32:24 Temperature Measurement, Probe Number = 4, T = 20.181000 C 12:32:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.18 12:32:24 Integrated Voltage Measurement... 12:32:44 Voltage Offset Correction: v_off_ini = 0.000004343 V, v_off_fin = 0.000006987 V 12:32:44 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057698 Vs 12:32:44 Integrated Voltage Measurement... 12:33:04 Voltage Offset Correction: v_off_ini = 0.000005896 V, v_off_fin = 0.000002945 V 12:33:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998047 Vs 12:33:07 Temperature Measurement, Probe Number = 0, T = 20.196000 C 12:33:08 Temperature Measurement, Probe Number = 1, T = 20.118000 C 12:33:08 Temperature Measurement, Probe Number = 2, T = 20.173000 C 12:33:09 Temperature Measurement, Probe Number = 3, T = 20.118000 C 12:33:09 Temperature Measurement, Probe Number = 4, T = 20.130000 C 12:33:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.13 12:33:10 Integrated Voltage Measurement... 12:33:29 Voltage Offset Correction: v_off_ini = 0.000004749 V, v_off_fin = 0.000006951 V 12:33:29 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058722 Vs 12:33:29 Integrated Voltage Measurement... 12:33:49 Voltage Offset Correction: v_off_ini = 0.000006635 V, v_off_fin = 0.000003082 V 12:33:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985724 Vs 12:33:52 Temperature Measurement, Probe Number = 0, T = 20.199000 C 12:33:52 Temperature Measurement, Probe Number = 1, T = 20.120000 C 12:33:53 Temperature Measurement, Probe Number = 2, T = 20.175000 C 12:33:54 Temperature Measurement, Probe Number = 3, T = 20.118000 C 12:33:54 Temperature Measurement, Probe Number = 4, T = 20.283000 C 12:33:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.28 12:33:55 Integrated Voltage Measurement... 12:34:15 Voltage Offset Correction: v_off_ini = 0.000004000 V, v_off_fin = 0.000007341 V 12:34:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064673 Vs 12:34:15 Integrated Voltage Measurement... 12:34:36 Voltage Offset Correction: v_off_ini = 0.000006750 V, v_off_fin = 0.000003679 V 12:34:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982756 Vs 12:34:39 Temperature Measurement, Probe Number = 0, T = 20.200000 C 12:34:39 Temperature Measurement, Probe Number = 1, T = 20.118000 C 12:34:40 Temperature Measurement, Probe Number = 2, T = 20.178000 C 12:34:41 Temperature Measurement, Probe Number = 3, T = 20.119000 C 12:34:41 Temperature Measurement, Probe Number = 4, T = 20.331000 C 12:34:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.33 12:34:41 Integrated Voltage Measurement... 12:35:01 Voltage Offset Correction: v_off_ini = 0.000004683 V, v_off_fin = 0.000007429 V 12:35:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064514 Vs 12:35:02 Integrated Voltage Measurement... 12:35:21 Voltage Offset Correction: v_off_ini = 0.000007317 V, v_off_fin = 0.000003039 V 12:35:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986978 Vs 12:35:24 Temperature Measurement, Probe Number = 0, T = 20.197000 C 12:35:25 Temperature Measurement, Probe Number = 1, T = 20.118000 C 12:35:25 Temperature Measurement, Probe Number = 2, T = 20.173000 C 12:35:26 Temperature Measurement, Probe Number = 3, T = 20.116000 C 12:35:27 Temperature Measurement, Probe Number = 4, T = 20.242000 C 12:35:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.24 12:35:27 Integrated Voltage Measurement... 12:35:46 Voltage Offset Correction: v_off_ini = 0.000004512 V, v_off_fin = 0.000007036 V 12:35:46 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171061789 Vs 12:35:47 Integrated Voltage Measurement... 12:36:06 Voltage Offset Correction: v_off_ini = 0.000006410 V, v_off_fin = 0.000002258 V 12:36:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992155 Vs 13:06:09 Temperature Measurement, Probe Number = 0, T = 20.195000 C 13:06:10 Temperature Measurement, Probe Number = 1, T = 20.117000 C 13:06:10 Temperature Measurement, Probe Number = 2, T = 20.174000 C 13:06:11 Temperature Measurement, Probe Number = 3, T = 20.116000 C 13:06:12 Temperature Measurement, Probe Number = 4, T = 20.249000 C 13:06:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.25 13:06:12 Integrated Voltage Measurement... 13:06:32 Voltage Offset Correction: v_off_ini = 0.000005425 V, v_off_fin = 0.000007080 V 13:06:32 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171109227 Vs 13:06:32 Integrated Voltage Measurement... 13:06:52 Voltage Offset Correction: v_off_ini = 0.000006369 V, v_off_fin = 0.000003561 V 13:06:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990814 Vs 13:06:55 Temperature Measurement, Probe Number = 0, T = 20.198000 C 13:06:56 Temperature Measurement, Probe Number = 1, T = 20.119000 C 13:06:56 Temperature Measurement, Probe Number = 2, T = 20.173000 C 13:06:57 Temperature Measurement, Probe Number = 3, T = 20.114000 C 13:06:58 Temperature Measurement, Probe Number = 4, T = 20.165000 C 13:06:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.16 13:06:58 Integrated Voltage Measurement... 13:07:18 Voltage Offset Correction: v_off_ini = 0.000004826 V, v_off_fin = 0.000007602 V 13:07:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065142 Vs 13:07:18 Integrated Voltage Measurement... 13:07:39 Voltage Offset Correction: v_off_ini = 0.000006864 V, v_off_fin = 0.000003172 V 13:07:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986359 Vs 13:07:42 Temperature Measurement, Probe Number = 0, T = 20.201000 C 13:07:42 Temperature Measurement, Probe Number = 1, T = 20.123000 C 13:07:43 Temperature Measurement, Probe Number = 2, T = 20.176000 C 13:07:44 Temperature Measurement, Probe Number = 3, T = 20.116000 C 13:07:44 Temperature Measurement, Probe Number = 4, T = 20.229000 C 13:07:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.23 13:07:45 Integrated Voltage Measurement... 13:08:04 Voltage Offset Correction: v_off_ini = 0.000004530 V, v_off_fin = 0.000007155 V 13:08:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055441 Vs 13:08:04 Integrated Voltage Measurement... 13:08:24 Voltage Offset Correction: v_off_ini = 0.000006630 V, v_off_fin = 0.000002927 V 13:08:24 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170995468 Vs 13:08:27 Temperature Measurement, Probe Number = 0, T = 20.202000 C 13:08:28 Temperature Measurement, Probe Number = 1, T = 20.124000 C 13:08:28 Temperature Measurement, Probe Number = 2, T = 20.179000 C 13:08:29 Temperature Measurement, Probe Number = 3, T = 20.121000 C 13:08:30 Temperature Measurement, Probe Number = 4, T = 20.285000 C 13:08:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.29 13:08:30 Integrated Voltage Measurement... 13:08:49 Voltage Offset Correction: v_off_ini = 0.000004690 V, v_off_fin = 0.000007500 V 13:08:49 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171067234 Vs 13:08:49 Integrated Voltage Measurement... 13:09:09 Voltage Offset Correction: v_off_ini = 0.000007002 V, v_off_fin = 0.000003535 V 13:09:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997207 Vs 13:09:12 Temperature Measurement, Probe Number = 0, T = 20.202000 C 13:09:13 Temperature Measurement, Probe Number = 1, T = 20.122000 C 13:09:13 Temperature Measurement, Probe Number = 2, T = 20.181000 C 13:09:14 Temperature Measurement, Probe Number = 3, T = 20.122000 C 13:09:15 Temperature Measurement, Probe Number = 4, T = 20.356000 C 13:09:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.36 13:09:15 Integrated Voltage Measurement... 13:09:34 Voltage Offset Correction: v_off_ini = 0.000004219 V, v_off_fin = 0.000007479 V 13:09:34 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171067471 Vs 13:09:35 Integrated Voltage Measurement... 13:09:54 Voltage Offset Correction: v_off_ini = 0.000006232 V, v_off_fin = 0.000003511 V 13:09:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993745 Vs 13:09:57 Temperature Measurement, Probe Number = 0, T = 20.200000 C 13:09:58 Temperature Measurement, Probe Number = 1, T = 20.119000 C 13:09:58 Temperature Measurement, Probe Number = 2, T = 20.178000 C 13:09:59 Temperature Measurement, Probe Number = 3, T = 20.121000 C 13:10:00 Temperature Measurement, Probe Number = 4, T = 20.388000 C 13:10:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.39 13:10:00 Integrated Voltage Measurement... 13:10:19 Voltage Offset Correction: v_off_ini = 0.000004433 V, v_off_fin = 0.000007193 V 13:10:20 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171065299 Vs 13:10:20 Integrated Voltage Measurement... 13:10:39 Voltage Offset Correction: v_off_ini = 0.000005791 V, v_off_fin = 0.000002468 V 13:10:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995828 Vs 13:10:42 Temperature Measurement, Probe Number = 0, T = 20.195000 C 13:10:43 Temperature Measurement, Probe Number = 1, T = 20.113000 C 13:10:44 Temperature Measurement, Probe Number = 2, T = 20.177000 C 13:10:44 Temperature Measurement, Probe Number = 3, T = 20.119000 C 13:10:45 Temperature Measurement, Probe Number = 4, T = 20.319000 C 13:10:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.32 13:10:45 Integrated Voltage Measurement... 13:11:04 Voltage Offset Correction: v_off_ini = 0.000003979 V, v_off_fin = 0.000006808 V 13:11:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059922 Vs 13:11:05 Integrated Voltage Measurement... 13:11:24 Voltage Offset Correction: v_off_ini = 0.000006334 V, v_off_fin = 0.000003112 V 13:11:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998651 Vs 13:11:27 Temperature Measurement, Probe Number = 0, T = 20.198000 C 13:11:28 Temperature Measurement, Probe Number = 1, T = 20.116000 C 13:11:29 Temperature Measurement, Probe Number = 2, T = 20.172000 C 13:11:29 Temperature Measurement, Probe Number = 3, T = 20.113000 C 13:11:30 Temperature Measurement, Probe Number = 4, T = 20.255000 C 13:11:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.25 13:11:30 Integrated Voltage Measurement... 13:11:50 Voltage Offset Correction: v_off_ini = 0.000004330 V, v_off_fin = 0.000007012 V 13:11:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171061201 Vs 13:11:50 Integrated Voltage Measurement... 13:12:09 Voltage Offset Correction: v_off_ini = 0.000006503 V, v_off_fin = 0.000003291 V 13:12:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989464 Vs 13:12:12 Temperature Measurement, Probe Number = 0, T = 20.200000 C 13:12:13 Temperature Measurement, Probe Number = 1, T = 20.117000 C 13:12:14 Temperature Measurement, Probe Number = 2, T = 20.176000 C 13:12:14 Temperature Measurement, Probe Number = 3, T = 20.118000 C 13:12:15 Temperature Measurement, Probe Number = 4, T = 20.228000 C 13:12:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.23 13:12:15 Integrated Voltage Measurement... 13:12:34 Voltage Offset Correction: v_off_ini = 0.000004144 V, v_off_fin = 0.000006703 V 13:12:35 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171062345 Vs 13:12:35 Integrated Voltage Measurement... 13:12:55 Voltage Offset Correction: v_off_ini = 0.000006265 V, v_off_fin = 0.000002756 V 13:12:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994356 Vs 13:12:57 Temperature Measurement, Probe Number = 0, T = 20.203000 C 13:12:58 Temperature Measurement, Probe Number = 1, T = 20.118000 C 13:12:59 Temperature Measurement, Probe Number = 2, T = 20.180000 C 13:12:59 Temperature Measurement, Probe Number = 3, T = 20.120000 C 13:13:00 Temperature Measurement, Probe Number = 4, T = 20.310000 C 13:13:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.31 13:13:00 Integrated Voltage Measurement... 13:13:20 Voltage Offset Correction: v_off_ini = 0.000004006 V, v_off_fin = 0.000007045 V 13:13:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064641 Vs 13:13:20 Integrated Voltage Measurement... 13:13:40 Voltage Offset Correction: v_off_ini = 0.000006461 V, v_off_fin = 0.000002643 V 13:13:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991977 Vs 13:43:42 Temperature Measurement, Probe Number = 0, T = 20.211000 C 13:43:43 Temperature Measurement, Probe Number = 1, T = 20.138000 C 13:43:44 Temperature Measurement, Probe Number = 2, T = 20.189000 C 13:43:45 Temperature Measurement, Probe Number = 3, T = 20.135000 C 13:43:45 Temperature Measurement, Probe Number = 4, T = 20.540000 C 13:43:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.54 13:43:46 Integrated Voltage Measurement... 13:44:07 Voltage Offset Correction: v_off_ini = 0.000005557 V, v_off_fin = 0.000006456 V 13:44:07 Integrated Voltage Measurement Delta Gap = 0.0040017 m VT = 0.171128359 Vs 13:44:07 Integrated Voltage Measurement... 13:44:27 Voltage Offset Correction: v_off_ini = 0.000006010 V, v_off_fin = 0.000003058 V 13:44:28 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170993072 Vs 13:44:30 Temperature Measurement, Probe Number = 0, T = 20.212000 C 13:44:31 Temperature Measurement, Probe Number = 1, T = 20.138000 C 13:44:32 Temperature Measurement, Probe Number = 2, T = 20.191000 C 13:44:32 Temperature Measurement, Probe Number = 3, T = 20.136000 C 13:44:33 Temperature Measurement, Probe Number = 4, T = 20.565000 C 13:44:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.57 13:44:33 Integrated Voltage Measurement... 13:44:53 Voltage Offset Correction: v_off_ini = 0.000004343 V, v_off_fin = 0.000006863 V 13:44:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171056652 Vs 13:44:54 Integrated Voltage Measurement... 13:45:14 Voltage Offset Correction: v_off_ini = 0.000006395 V, v_off_fin = 0.000003773 V 13:45:14 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170989038 Vs 13:45:17 Temperature Measurement, Probe Number = 0, T = 20.216000 C 13:45:18 Temperature Measurement, Probe Number = 1, T = 20.142000 C 13:45:18 Temperature Measurement, Probe Number = 2, T = 20.194000 C 13:45:19 Temperature Measurement, Probe Number = 3, T = 20.140000 C 13:45:20 Temperature Measurement, Probe Number = 4, T = 20.589000 C 13:45:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.59 13:45:20 Integrated Voltage Measurement... 13:45:40 Voltage Offset Correction: v_off_ini = 0.000004516 V, v_off_fin = 0.000007877 V 13:45:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059944 Vs 13:45:40 Integrated Voltage Measurement... 13:45:59 Voltage Offset Correction: v_off_ini = 0.000007058 V, v_off_fin = 0.000002983 V 13:46:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986844 Vs 13:46:02 Temperature Measurement, Probe Number = 0, T = 20.217000 C 13:46:03 Temperature Measurement, Probe Number = 1, T = 20.143000 C 13:46:04 Temperature Measurement, Probe Number = 2, T = 20.195000 C 13:46:04 Temperature Measurement, Probe Number = 3, T = 20.141000 C 13:46:05 Temperature Measurement, Probe Number = 4, T = 20.544000 C 13:46:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.54 13:46:05 Integrated Voltage Measurement... 13:46:26 Voltage Offset Correction: v_off_ini = 0.000004154 V, v_off_fin = 0.000007024 V 13:46:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061938 Vs 13:46:26 Integrated Voltage Measurement... 13:46:46 Voltage Offset Correction: v_off_ini = 0.000006390 V, v_off_fin = 0.000002866 V 13:46:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982274 Vs 13:46:49 Temperature Measurement, Probe Number = 0, T = 20.216000 C 13:46:49 Temperature Measurement, Probe Number = 1, T = 20.143000 C 13:46:50 Temperature Measurement, Probe Number = 2, T = 20.193000 C 13:46:51 Temperature Measurement, Probe Number = 3, T = 20.141000 C 13:46:51 Temperature Measurement, Probe Number = 4, T = 20.585000 C 13:46:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.59 13:46:51 Integrated Voltage Measurement... 13:47:12 Voltage Offset Correction: v_off_ini = 0.000003866 V, v_off_fin = 0.000007061 V 13:47:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171057776 Vs 13:47:12 Integrated Voltage Measurement... 13:47:32 Voltage Offset Correction: v_off_ini = 0.000006281 V, v_off_fin = 0.000003410 V 13:47:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981970 Vs 13:47:35 Temperature Measurement, Probe Number = 0, T = 20.216000 C 13:47:35 Temperature Measurement, Probe Number = 1, T = 20.143000 C 13:47:36 Temperature Measurement, Probe Number = 2, T = 20.192000 C 13:47:37 Temperature Measurement, Probe Number = 3, T = 20.141000 C 13:47:37 Temperature Measurement, Probe Number = 4, T = 20.658000 C 13:47:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.66 13:47:38 Integrated Voltage Measurement... 13:47:58 Voltage Offset Correction: v_off_ini = 0.000004716 V, v_off_fin = 0.000006939 V 13:47:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171056911 Vs 13:47:58 Integrated Voltage Measurement... 13:48:18 Voltage Offset Correction: v_off_ini = 0.000006356 V, v_off_fin = 0.000003071 V 13:48:19 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170979175 Vs 13:48:21 Temperature Measurement, Probe Number = 0, T = 20.217000 C 13:48:22 Temperature Measurement, Probe Number = 1, T = 20.143000 C 13:48:23 Temperature Measurement, Probe Number = 2, T = 20.193000 C 13:48:23 Temperature Measurement, Probe Number = 3, T = 20.141000 C 13:48:24 Temperature Measurement, Probe Number = 4, T = 20.684000 C 13:48:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.68 13:48:24 Integrated Voltage Measurement... 13:48:45 Voltage Offset Correction: v_off_ini = 0.000004548 V, v_off_fin = 0.000006643 V 13:48:45 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171055485 Vs 13:48:45 Integrated Voltage Measurement... 13:49:05 Voltage Offset Correction: v_off_ini = 0.000005646 V, v_off_fin = 0.000002607 V 13:49:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987633 Vs 13:49:08 Temperature Measurement, Probe Number = 0, T = 20.217000 C 13:49:09 Temperature Measurement, Probe Number = 1, T = 20.144000 C 13:49:09 Temperature Measurement, Probe Number = 2, T = 20.193000 C 13:49:10 Temperature Measurement, Probe Number = 3, T = 20.141000 C 13:49:11 Temperature Measurement, Probe Number = 4, T = 20.628000 C 13:49:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.63 13:49:11 Integrated Voltage Measurement... 13:49:31 Voltage Offset Correction: v_off_ini = 0.000004250 V, v_off_fin = 0.000006430 V 13:49:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058870 Vs 13:49:31 Integrated Voltage Measurement... 13:49:51 Voltage Offset Correction: v_off_ini = 0.000006122 V, v_off_fin = 0.000002680 V 13:49:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982503 Vs 13:49:54 Temperature Measurement, Probe Number = 0, T = 20.218000 C 13:49:54 Temperature Measurement, Probe Number = 1, T = 20.146000 C 13:49:55 Temperature Measurement, Probe Number = 2, T = 20.194000 C 13:49:56 Temperature Measurement, Probe Number = 3, T = 20.142000 C 13:49:56 Temperature Measurement, Probe Number = 4, T = 20.681000 C 13:49:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.68 13:49:57 Integrated Voltage Measurement... 13:50:17 Voltage Offset Correction: v_off_ini = 0.000004047 V, v_off_fin = 0.000006850 V 13:50:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059381 Vs 13:50:17 Integrated Voltage Measurement... 13:50:37 Voltage Offset Correction: v_off_ini = 0.000006045 V, v_off_fin = 0.000002653 V 13:50:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996285 Vs 13:50:40 Temperature Measurement, Probe Number = 0, T = 20.218000 C 13:50:41 Temperature Measurement, Probe Number = 1, T = 20.146000 C 13:50:41 Temperature Measurement, Probe Number = 2, T = 20.197000 C 13:50:42 Temperature Measurement, Probe Number = 3, T = 20.144000 C 13:50:43 Temperature Measurement, Probe Number = 4, T = 20.659000 C 13:50:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.66 13:50:43 Integrated Voltage Measurement... 13:51:03 Voltage Offset Correction: v_off_ini = 0.000003662 V, v_off_fin = 0.000007205 V 13:51:03 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171062095 Vs 13:51:03 Integrated Voltage Measurement... 13:51:23 Voltage Offset Correction: v_off_ini = 0.000005931 V, v_off_fin = 0.000002972 V 13:51:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992305 Vs 14:21:26 Temperature Measurement, Probe Number = 0, T = 20.208000 C 14:21:27 Temperature Measurement, Probe Number = 1, T = 20.135000 C 14:21:27 Temperature Measurement, Probe Number = 2, T = 20.188000 C 14:21:28 Temperature Measurement, Probe Number = 3, T = 20.136000 C 14:21:28 Temperature Measurement, Probe Number = 4, T = 20.590000 C 14:21:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.59 14:21:29 Integrated Voltage Measurement... 14:21:49 Voltage Offset Correction: v_off_ini = 0.000005596 V, v_off_fin = 0.000007134 V 14:21:49 Integrated Voltage Measurement Delta Gap = 0.0040017 m VT = 0.171125654 Vs 14:21:49 Integrated Voltage Measurement... 14:22:09 Voltage Offset Correction: v_off_ini = 0.000006245 V, v_off_fin = 0.000002894 V 14:22:09 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170973432 Vs 14:22:12 Temperature Measurement, Probe Number = 0, T = 20.211000 C 14:22:12 Temperature Measurement, Probe Number = 1, T = 20.136000 C 14:22:13 Temperature Measurement, Probe Number = 2, T = 20.191000 C 14:22:14 Temperature Measurement, Probe Number = 3, T = 20.138000 C 14:22:14 Temperature Measurement, Probe Number = 4, T = 20.500000 C 14:22:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.50 14:22:15 Integrated Voltage Measurement... 14:22:35 Voltage Offset Correction: v_off_ini = 0.000004583 V, v_off_fin = 0.000006794 V 14:22:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171052936 Vs 14:22:35 Integrated Voltage Measurement... 14:22:55 Voltage Offset Correction: v_off_ini = 0.000005790 V, v_off_fin = 0.000002699 V 14:22:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988445 Vs 14:22:58 Temperature Measurement, Probe Number = 0, T = 20.209000 C 14:22:59 Temperature Measurement, Probe Number = 1, T = 20.132000 C 14:22:59 Temperature Measurement, Probe Number = 2, T = 20.190000 C 14:23:00 Temperature Measurement, Probe Number = 3, T = 20.135000 C 14:23:01 Temperature Measurement, Probe Number = 4, T = 20.524000 C 14:23:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.52 14:23:01 Integrated Voltage Measurement... 14:23:20 Voltage Offset Correction: v_off_ini = 0.000004217 V, v_off_fin = 0.000007098 V 14:23:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050067 Vs 14:23:20 Integrated Voltage Measurement... 14:23:40 Voltage Offset Correction: v_off_ini = 0.000006727 V, v_off_fin = 0.000003454 V 14:23:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971106 Vs 14:23:43 Temperature Measurement, Probe Number = 0, T = 20.211000 C 14:23:44 Temperature Measurement, Probe Number = 1, T = 20.135000 C 14:23:44 Temperature Measurement, Probe Number = 2, T = 20.190000 C 14:23:45 Temperature Measurement, Probe Number = 3, T = 20.134000 C 14:23:45 Temperature Measurement, Probe Number = 4, T = 20.463000 C 14:23:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.46 14:23:46 Integrated Voltage Measurement... 14:24:05 Voltage Offset Correction: v_off_ini = 0.000004494 V, v_off_fin = 0.000007028 V 14:24:05 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171049049 Vs 14:24:06 Integrated Voltage Measurement... 14:24:25 Voltage Offset Correction: v_off_ini = 0.000006604 V, v_off_fin = 0.000002954 V 14:24:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972897 Vs 14:24:28 Temperature Measurement, Probe Number = 0, T = 20.208000 C 14:24:29 Temperature Measurement, Probe Number = 1, T = 20.134000 C 14:24:29 Temperature Measurement, Probe Number = 2, T = 20.188000 C 14:24:30 Temperature Measurement, Probe Number = 3, T = 20.131000 C 14:24:31 Temperature Measurement, Probe Number = 4, T = 20.448000 C 14:24:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.45 14:24:31 Integrated Voltage Measurement... 14:24:51 Voltage Offset Correction: v_off_ini = 0.000004764 V, v_off_fin = 0.000006859 V 14:24:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049625 Vs 14:24:52 Integrated Voltage Measurement... 14:25:11 Voltage Offset Correction: v_off_ini = 0.000006115 V, v_off_fin = 0.000002865 V 14:25:11 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170976651 Vs 14:25:14 Temperature Measurement, Probe Number = 0, T = 20.211000 C 14:25:15 Temperature Measurement, Probe Number = 1, T = 20.135000 C 14:25:15 Temperature Measurement, Probe Number = 2, T = 20.188000 C 14:25:16 Temperature Measurement, Probe Number = 3, T = 20.133000 C 14:25:17 Temperature Measurement, Probe Number = 4, T = 20.432000 C 14:25:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.43 14:25:17 Integrated Voltage Measurement... 14:25:37 Voltage Offset Correction: v_off_ini = 0.000003637 V, v_off_fin = 0.000007007 V 14:25:38 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171040392 Vs 14:25:38 Integrated Voltage Measurement... 14:25:58 Voltage Offset Correction: v_off_ini = 0.000006860 V, v_off_fin = 0.000003128 V 14:25:58 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170977865 Vs 14:26:01 Temperature Measurement, Probe Number = 0, T = 20.206000 C 14:26:02 Temperature Measurement, Probe Number = 1, T = 20.132000 C 14:26:02 Temperature Measurement, Probe Number = 2, T = 20.186000 C 14:26:03 Temperature Measurement, Probe Number = 3, T = 20.131000 C 14:26:04 Temperature Measurement, Probe Number = 4, T = 20.375000 C 14:26:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.38 14:26:04 Integrated Voltage Measurement... 14:26:24 Voltage Offset Correction: v_off_ini = 0.000005143 V, v_off_fin = 0.000006685 V 14:26:25 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171049731 Vs 14:26:25 Integrated Voltage Measurement... 14:26:44 Voltage Offset Correction: v_off_ini = 0.000006274 V, v_off_fin = 0.000003425 V 14:26:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170961804 Vs 14:26:47 Temperature Measurement, Probe Number = 0, T = 20.212000 C 14:26:48 Temperature Measurement, Probe Number = 1, T = 20.132000 C 14:26:49 Temperature Measurement, Probe Number = 2, T = 20.192000 C 14:26:49 Temperature Measurement, Probe Number = 3, T = 20.134000 C 14:26:50 Temperature Measurement, Probe Number = 4, T = 20.421000 C 14:26:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.42 14:26:50 Integrated Voltage Measurement... 14:27:10 Voltage Offset Correction: v_off_ini = 0.000004907 V, v_off_fin = 0.000007039 V 14:27:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171048492 Vs 14:27:11 Integrated Voltage Measurement... 14:27:30 Voltage Offset Correction: v_off_ini = 0.000006340 V, v_off_fin = 0.000003911 V 14:27:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980853 Vs 14:27:33 Temperature Measurement, Probe Number = 0, T = 20.211000 C 14:27:34 Temperature Measurement, Probe Number = 1, T = 20.136000 C 14:27:35 Temperature Measurement, Probe Number = 2, T = 20.193000 C 14:27:35 Temperature Measurement, Probe Number = 3, T = 20.137000 C 14:27:36 Temperature Measurement, Probe Number = 4, T = 20.504000 C 14:27:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.50 14:27:36 Integrated Voltage Measurement... 14:27:55 Voltage Offset Correction: v_off_ini = 0.000003810 V, v_off_fin = 0.000006827 V 14:27:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171047086 Vs 14:27:56 Integrated Voltage Measurement... 14:28:15 Voltage Offset Correction: v_off_ini = 0.000008296 V, v_off_fin = 0.000003540 V 14:28:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979132 Vs 14:28:18 Temperature Measurement, Probe Number = 0, T = 20.214000 C 14:28:19 Temperature Measurement, Probe Number = 1, T = 20.139000 C 14:28:20 Temperature Measurement, Probe Number = 2, T = 20.194000 C 14:28:20 Temperature Measurement, Probe Number = 3, T = 20.138000 C 14:28:21 Temperature Measurement, Probe Number = 4, T = 20.548000 C 14:28:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.55 14:28:21 Integrated Voltage Measurement... 14:28:40 Voltage Offset Correction: v_off_ini = 0.000004888 V, v_off_fin = 0.000007540 V 14:28:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171051223 Vs 14:28:41 Integrated Voltage Measurement... 14:29:01 Voltage Offset Correction: v_off_ini = 0.000007028 V, v_off_fin = 0.000003798 V 14:29:01 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170978891 Vs 14:59:04 Temperature Measurement, Probe Number = 0, T = 20.216000 C 14:59:05 Temperature Measurement, Probe Number = 1, T = 20.142000 C 14:59:06 Temperature Measurement, Probe Number = 2, T = 20.198000 C 14:59:06 Temperature Measurement, Probe Number = 3, T = 20.144000 C 14:59:07 Temperature Measurement, Probe Number = 4, T = 20.483000 C 14:59:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.48 14:59:07 Integrated Voltage Measurement... 14:59:26 Voltage Offset Correction: v_off_ini = 0.000005684 V, v_off_fin = 0.000007460 V 14:59:27 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171089422 Vs 14:59:27 Integrated Voltage Measurement... 14:59:46 Voltage Offset Correction: v_off_ini = 0.000006667 V, v_off_fin = 0.000003582 V 14:59:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977996 Vs 14:59:49 Temperature Measurement, Probe Number = 0, T = 20.217000 C 14:59:50 Temperature Measurement, Probe Number = 1, T = 20.142000 C 14:59:50 Temperature Measurement, Probe Number = 2, T = 20.197000 C 14:59:51 Temperature Measurement, Probe Number = 3, T = 20.141000 C 14:59:52 Temperature Measurement, Probe Number = 4, T = 20.547000 C 14:59:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.55 14:59:52 Integrated Voltage Measurement... 15:00:12 Voltage Offset Correction: v_off_ini = 0.000004939 V, v_off_fin = 0.000007684 V 15:00:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171056274 Vs 15:00:12 Integrated Voltage Measurement... 15:00:32 Voltage Offset Correction: v_off_ini = 0.000006758 V, v_off_fin = 0.000003573 V 15:00:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170976770 Vs 15:00:35 Temperature Measurement, Probe Number = 0, T = 20.218000 C 15:00:35 Temperature Measurement, Probe Number = 1, T = 20.142000 C 15:00:36 Temperature Measurement, Probe Number = 2, T = 20.197000 C 15:00:37 Temperature Measurement, Probe Number = 3, T = 20.142000 C 15:00:37 Temperature Measurement, Probe Number = 4, T = 20.542000 C 15:00:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.54 15:00:38 Integrated Voltage Measurement... 15:00:58 Voltage Offset Correction: v_off_ini = 0.000004293 V, v_off_fin = 0.000007605 V 15:00:58 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171061272 Vs 15:00:58 Integrated Voltage Measurement... 15:01:18 Voltage Offset Correction: v_off_ini = 0.000006773 V, v_off_fin = 0.000003559 V 15:01:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973245 Vs 15:01:20 Temperature Measurement, Probe Number = 0, T = 20.217000 C 15:01:21 Temperature Measurement, Probe Number = 1, T = 20.140000 C 15:01:22 Temperature Measurement, Probe Number = 2, T = 20.201000 C 15:01:22 Temperature Measurement, Probe Number = 3, T = 20.143000 C 15:01:23 Temperature Measurement, Probe Number = 4, T = 20.500000 C 15:01:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.50 15:01:23 Integrated Voltage Measurement... 15:01:43 Voltage Offset Correction: v_off_ini = 0.000004816 V, v_off_fin = 0.000007648 V 15:01:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064302 Vs 15:01:44 Integrated Voltage Measurement... 15:02:04 Voltage Offset Correction: v_off_ini = 0.000006547 V, v_off_fin = 0.000003454 V 15:02:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979848 Vs 15:02:06 Temperature Measurement, Probe Number = 0, T = 20.214000 C 15:02:07 Temperature Measurement, Probe Number = 1, T = 20.140000 C 15:02:08 Temperature Measurement, Probe Number = 2, T = 20.196000 C 15:02:08 Temperature Measurement, Probe Number = 3, T = 20.141000 C 15:02:09 Temperature Measurement, Probe Number = 4, T = 20.485000 C 15:02:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.48 15:02:09 Integrated Voltage Measurement... 15:02:30 Voltage Offset Correction: v_off_ini = 0.000003623 V, v_off_fin = 0.000007348 V 15:02:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060374 Vs 15:02:30 Integrated Voltage Measurement... 15:02:50 Voltage Offset Correction: v_off_ini = 0.000006837 V, v_off_fin = 0.000004738 V 15:02:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977328 Vs 15:02:53 Temperature Measurement, Probe Number = 0, T = 20.214000 C 15:02:54 Temperature Measurement, Probe Number = 1, T = 20.140000 C 15:02:55 Temperature Measurement, Probe Number = 2, T = 20.196000 C 15:02:55 Temperature Measurement, Probe Number = 3, T = 20.142000 C 15:02:56 Temperature Measurement, Probe Number = 4, T = 20.503000 C 15:02:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.50 15:02:56 Integrated Voltage Measurement... 15:03:16 Voltage Offset Correction: v_off_ini = 0.000004777 V, v_off_fin = 0.000007050 V 15:03:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055722 Vs 15:03:16 Integrated Voltage Measurement... 15:03:36 Voltage Offset Correction: v_off_ini = 0.000006700 V, v_off_fin = 0.000004288 V 15:03:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974432 Vs 15:03:39 Temperature Measurement, Probe Number = 0, T = 20.215000 C 15:03:39 Temperature Measurement, Probe Number = 1, T = 20.141000 C 15:03:40 Temperature Measurement, Probe Number = 2, T = 20.199000 C 15:03:41 Temperature Measurement, Probe Number = 3, T = 20.140000 C 15:03:41 Temperature Measurement, Probe Number = 4, T = 20.483000 C 15:03:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.48 15:03:41 Integrated Voltage Measurement... 15:04:01 Voltage Offset Correction: v_off_ini = 0.000005469 V, v_off_fin = 0.000007821 V 15:04:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064060 Vs 15:04:01 Integrated Voltage Measurement... 15:04:21 Voltage Offset Correction: v_off_ini = 0.000007064 V, v_off_fin = 0.000003199 V 15:04:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977968 Vs 15:04:24 Temperature Measurement, Probe Number = 0, T = 20.218000 C 15:04:25 Temperature Measurement, Probe Number = 1, T = 20.141000 C 15:04:25 Temperature Measurement, Probe Number = 2, T = 20.200000 C 15:04:26 Temperature Measurement, Probe Number = 3, T = 20.142000 C 15:04:27 Temperature Measurement, Probe Number = 4, T = 20.490000 C 15:04:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.49 15:04:27 Integrated Voltage Measurement... 15:04:46 Voltage Offset Correction: v_off_ini = 0.000004932 V, v_off_fin = 0.000008062 V 15:04:46 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171067097 Vs 15:04:47 Integrated Voltage Measurement... 15:05:06 Voltage Offset Correction: v_off_ini = 0.000007027 V, v_off_fin = 0.000003655 V 15:05:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976446 Vs 15:05:09 Temperature Measurement, Probe Number = 0, T = 20.216000 C 15:05:10 Temperature Measurement, Probe Number = 1, T = 20.142000 C 15:05:10 Temperature Measurement, Probe Number = 2, T = 20.198000 C 15:05:11 Temperature Measurement, Probe Number = 3, T = 20.144000 C 15:05:12 Temperature Measurement, Probe Number = 4, T = 20.447000 C 15:05:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.45 15:05:12 Integrated Voltage Measurement... 15:05:32 Voltage Offset Correction: v_off_ini = 0.000004653 V, v_off_fin = 0.000007254 V 15:05:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171063896 Vs 15:05:33 Integrated Voltage Measurement... 15:05:52 Voltage Offset Correction: v_off_ini = 0.000006198 V, v_off_fin = 0.000002955 V 15:05:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982614 Vs 15:05:55 Temperature Measurement, Probe Number = 0, T = 20.216000 C 15:05:55 Temperature Measurement, Probe Number = 1, T = 20.139000 C 15:05:56 Temperature Measurement, Probe Number = 2, T = 20.202000 C 15:05:57 Temperature Measurement, Probe Number = 3, T = 20.144000 C 15:05:57 Temperature Measurement, Probe Number = 4, T = 20.437000 C 15:05:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.22 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.44 15:05:58 Integrated Voltage Measurement... 15:06:17 Voltage Offset Correction: v_off_ini = 0.000004306 V, v_off_fin = 0.000007143 V 15:06:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062941 Vs 15:06:17 Integrated Voltage Measurement... 15:06:37 Voltage Offset Correction: v_off_ini = 0.000006793 V, v_off_fin = 0.000003970 V 15:06:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978325 Vs 15:36:40 Temperature Measurement, Probe Number = 0, T = 20.212000 C 15:36:40 Temperature Measurement, Probe Number = 1, T = 20.139000 C 15:36:41 Temperature Measurement, Probe Number = 2, T = 20.197000 C 15:36:42 Temperature Measurement, Probe Number = 3, T = 20.143000 C 15:36:42 Temperature Measurement, Probe Number = 4, T = 20.450000 C 15:36:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.45 15:36:43 Integrated Voltage Measurement... 15:37:02 Voltage Offset Correction: v_off_ini = 0.000005501 V, v_off_fin = 0.000007514 V 15:37:02 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171106353 Vs 15:37:02 Integrated Voltage Measurement... 15:37:22 Voltage Offset Correction: v_off_ini = 0.000006850 V, v_off_fin = 0.000003202 V 15:37:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988673 Vs 15:37:25 Temperature Measurement, Probe Number = 0, T = 20.213000 C 15:37:25 Temperature Measurement, Probe Number = 1, T = 20.143000 C 15:37:26 Temperature Measurement, Probe Number = 2, T = 20.202000 C 15:37:27 Temperature Measurement, Probe Number = 3, T = 20.149000 C 15:37:27 Temperature Measurement, Probe Number = 4, T = 20.475000 C 15:37:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.48 15:37:27 Integrated Voltage Measurement... 15:37:48 Voltage Offset Correction: v_off_ini = 0.000004456 V, v_off_fin = 0.000007344 V 15:37:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062573 Vs 15:37:48 Integrated Voltage Measurement... 15:38:07 Voltage Offset Correction: v_off_ini = 0.000006540 V, v_off_fin = 0.000002596 V 15:38:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979361 Vs 15:38:10 Temperature Measurement, Probe Number = 0, T = 20.214000 C 15:38:11 Temperature Measurement, Probe Number = 1, T = 20.141000 C 15:38:12 Temperature Measurement, Probe Number = 2, T = 20.200000 C 15:38:12 Temperature Measurement, Probe Number = 3, T = 20.145000 C 15:38:13 Temperature Measurement, Probe Number = 4, T = 20.502000 C 15:38:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.50 15:38:13 Integrated Voltage Measurement... 15:38:33 Voltage Offset Correction: v_off_ini = 0.000004284 V, v_off_fin = 0.000007262 V 15:38:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171063060 Vs 15:38:33 Integrated Voltage Measurement... 15:38:53 Voltage Offset Correction: v_off_ini = 0.000006668 V, v_off_fin = 0.000004162 V 15:38:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977923 Vs 15:38:56 Temperature Measurement, Probe Number = 0, T = 20.210000 C 15:38:56 Temperature Measurement, Probe Number = 1, T = 20.138000 C 15:38:57 Temperature Measurement, Probe Number = 2, T = 20.196000 C 15:38:58 Temperature Measurement, Probe Number = 3, T = 20.142000 C 15:38:58 Temperature Measurement, Probe Number = 4, T = 20.527000 C 15:38:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.53 15:38:59 Integrated Voltage Measurement... 15:39:20 Voltage Offset Correction: v_off_ini = 0.000004506 V, v_off_fin = 0.000006696 V 15:39:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062953 Vs 15:39:20 Integrated Voltage Measurement... 15:39:40 Voltage Offset Correction: v_off_ini = 0.000006509 V, v_off_fin = 0.000003369 V 15:39:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986747 Vs 15:39:43 Temperature Measurement, Probe Number = 0, T = 20.210000 C 15:39:44 Temperature Measurement, Probe Number = 1, T = 20.139000 C 15:39:44 Temperature Measurement, Probe Number = 2, T = 20.194000 C 15:39:45 Temperature Measurement, Probe Number = 3, T = 20.139000 C 15:39:46 Temperature Measurement, Probe Number = 4, T = 20.492000 C 15:39:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.49 15:39:46 Integrated Voltage Measurement... 15:40:06 Voltage Offset Correction: v_off_ini = 0.000004786 V, v_off_fin = 0.000007246 V 15:40:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171068491 Vs 15:40:07 Integrated Voltage Measurement... 15:40:26 Voltage Offset Correction: v_off_ini = 0.000006543 V, v_off_fin = 0.000003780 V 15:40:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975585 Vs 15:40:29 Temperature Measurement, Probe Number = 0, T = 20.212000 C 15:40:30 Temperature Measurement, Probe Number = 1, T = 20.137000 C 15:40:30 Temperature Measurement, Probe Number = 2, T = 20.195000 C 15:40:31 Temperature Measurement, Probe Number = 3, T = 20.139000 C 15:40:32 Temperature Measurement, Probe Number = 4, T = 20.501000 C 15:40:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.50 15:40:32 Integrated Voltage Measurement... 15:40:52 Voltage Offset Correction: v_off_ini = 0.000004431 V, v_off_fin = 0.000007404 V 15:40:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065153 Vs 15:40:53 Integrated Voltage Measurement... 15:41:12 Voltage Offset Correction: v_off_ini = 0.000006699 V, v_off_fin = 0.000003977 V 15:41:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983012 Vs 15:41:15 Temperature Measurement, Probe Number = 0, T = 20.212000 C 15:41:16 Temperature Measurement, Probe Number = 1, T = 20.138000 C 15:41:16 Temperature Measurement, Probe Number = 2, T = 20.196000 C 15:41:17 Temperature Measurement, Probe Number = 3, T = 20.143000 C 15:41:18 Temperature Measurement, Probe Number = 4, T = 20.490000 C 15:41:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.49 15:41:18 Integrated Voltage Measurement... 15:41:38 Voltage Offset Correction: v_off_ini = 0.000004748 V, v_off_fin = 0.000007514 V 15:41:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072817 Vs 15:41:39 Integrated Voltage Measurement... 15:41:58 Voltage Offset Correction: v_off_ini = 0.000006779 V, v_off_fin = 0.000003483 V 15:41:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982259 Vs 15:42:01 Temperature Measurement, Probe Number = 0, T = 20.209000 C 15:42:02 Temperature Measurement, Probe Number = 1, T = 20.137000 C 15:42:02 Temperature Measurement, Probe Number = 2, T = 20.197000 C 15:42:03 Temperature Measurement, Probe Number = 3, T = 20.144000 C 15:42:04 Temperature Measurement, Probe Number = 4, T = 20.452000 C 15:42:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.45 15:42:04 Integrated Voltage Measurement... 15:42:24 Voltage Offset Correction: v_off_ini = 0.000004761 V, v_off_fin = 0.000007719 V 15:42:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078606 Vs 15:42:25 Integrated Voltage Measurement... 15:42:44 Voltage Offset Correction: v_off_ini = 0.000007127 V, v_off_fin = 0.000004450 V 15:42:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974892 Vs 15:42:47 Temperature Measurement, Probe Number = 0, T = 20.209000 C 15:42:48 Temperature Measurement, Probe Number = 1, T = 20.138000 C 15:42:49 Temperature Measurement, Probe Number = 2, T = 20.196000 C 15:42:49 Temperature Measurement, Probe Number = 3, T = 20.141000 C 15:42:50 Temperature Measurement, Probe Number = 4, T = 20.410000 C 15:42:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.41 15:42:50 Integrated Voltage Measurement... 15:43:10 Voltage Offset Correction: v_off_ini = 0.000004951 V, v_off_fin = 0.000007849 V 15:43:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075659 Vs 15:43:11 Integrated Voltage Measurement... 15:43:31 Voltage Offset Correction: v_off_ini = 0.000007186 V, v_off_fin = 0.000003183 V 15:43:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987779 Vs 15:43:34 Temperature Measurement, Probe Number = 0, T = 20.207000 C 15:43:34 Temperature Measurement, Probe Number = 1, T = 20.134000 C 15:43:35 Temperature Measurement, Probe Number = 2, T = 20.196000 C 15:43:36 Temperature Measurement, Probe Number = 3, T = 20.142000 C 15:43:36 Temperature Measurement, Probe Number = 4, T = 20.420000 C 15:43:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.42 15:43:36 Integrated Voltage Measurement... 15:43:55 Voltage Offset Correction: v_off_ini = 0.000004990 V, v_off_fin = 0.000007297 V 15:43:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078117 Vs 15:43:56 Integrated Voltage Measurement... 15:44:15 Voltage Offset Correction: v_off_ini = 0.000006478 V, v_off_fin = 0.000003198 V 15:44:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986969 Vs 16:14:18 Temperature Measurement, Probe Number = 0, T = 20.205000 C 16:14:19 Temperature Measurement, Probe Number = 1, T = 20.136000 C 16:14:20 Temperature Measurement, Probe Number = 2, T = 20.193000 C 16:14:20 Temperature Measurement, Probe Number = 3, T = 20.143000 C 16:14:21 Temperature Measurement, Probe Number = 4, T = 20.287000 C 16:14:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.29 16:14:21 Integrated Voltage Measurement... 16:14:41 Voltage Offset Correction: v_off_ini = 0.000005385 V, v_off_fin = 0.000006855 V 16:14:42 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171131133 Vs 16:14:42 Integrated Voltage Measurement... 16:15:01 Voltage Offset Correction: v_off_ini = 0.000006486 V, v_off_fin = 0.000003209 V 16:15:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994536 Vs 16:15:04 Temperature Measurement, Probe Number = 0, T = 20.208000 C 16:15:05 Temperature Measurement, Probe Number = 1, T = 20.136000 C 16:15:06 Temperature Measurement, Probe Number = 2, T = 20.198000 C 16:15:06 Temperature Measurement, Probe Number = 3, T = 20.143000 C 16:15:07 Temperature Measurement, Probe Number = 4, T = 20.376000 C 16:15:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.38 16:15:07 Integrated Voltage Measurement... 16:15:26 Voltage Offset Correction: v_off_ini = 0.000003875 V, v_off_fin = 0.000007201 V 16:15:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171063229 Vs 16:15:27 Integrated Voltage Measurement... 16:15:47 Voltage Offset Correction: v_off_ini = 0.000007004 V, v_off_fin = 0.000003861 V 16:15:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985835 Vs 16:15:49 Temperature Measurement, Probe Number = 0, T = 20.207000 C 16:15:50 Temperature Measurement, Probe Number = 1, T = 20.128000 C 16:15:51 Temperature Measurement, Probe Number = 2, T = 20.195000 C 16:15:51 Temperature Measurement, Probe Number = 3, T = 20.139000 C 16:15:52 Temperature Measurement, Probe Number = 4, T = 20.440000 C 16:15:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.44 16:15:52 Integrated Voltage Measurement... 16:16:11 Voltage Offset Correction: v_off_ini = 0.000004940 V, v_off_fin = 0.000007482 V 16:16:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072719 Vs 16:16:12 Integrated Voltage Measurement... 16:16:31 Voltage Offset Correction: v_off_ini = 0.000007385 V, v_off_fin = 0.000004406 V 16:16:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973367 Vs 16:16:34 Temperature Measurement, Probe Number = 0, T = 20.205000 C 16:16:35 Temperature Measurement, Probe Number = 1, T = 20.129000 C 16:16:36 Temperature Measurement, Probe Number = 2, T = 20.193000 C 16:16:36 Temperature Measurement, Probe Number = 3, T = 20.137000 C 16:16:37 Temperature Measurement, Probe Number = 4, T = 20.428000 C 16:16:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.43 16:16:37 Integrated Voltage Measurement... 16:16:58 Voltage Offset Correction: v_off_ini = 0.000004800 V, v_off_fin = 0.000007271 V 16:16:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171077610 Vs 16:16:58 Integrated Voltage Measurement... 16:17:18 Voltage Offset Correction: v_off_ini = 0.000007174 V, v_off_fin = 0.000004507 V 16:17:18 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170973420 Vs 16:17:21 Temperature Measurement, Probe Number = 0, T = 20.203000 C 16:17:22 Temperature Measurement, Probe Number = 1, T = 20.130000 C 16:17:22 Temperature Measurement, Probe Number = 2, T = 20.190000 C 16:17:23 Temperature Measurement, Probe Number = 3, T = 20.136000 C 16:17:24 Temperature Measurement, Probe Number = 4, T = 20.456000 C 16:17:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.46 16:17:24 Integrated Voltage Measurement... 16:17:44 Voltage Offset Correction: v_off_ini = 0.000004191 V, v_off_fin = 0.000007845 V 16:17:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074062 Vs 16:17:44 Integrated Voltage Measurement... 16:18:04 Voltage Offset Correction: v_off_ini = 0.000007155 V, v_off_fin = 0.000003628 V 16:18:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976889 Vs 16:18:06 Temperature Measurement, Probe Number = 0, T = 20.208000 C 16:18:07 Temperature Measurement, Probe Number = 1, T = 20.131000 C 16:18:08 Temperature Measurement, Probe Number = 2, T = 20.192000 C 16:18:08 Temperature Measurement, Probe Number = 3, T = 20.139000 C 16:18:09 Temperature Measurement, Probe Number = 4, T = 20.456000 C 16:18:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.46 16:18:09 Integrated Voltage Measurement... 16:18:30 Voltage Offset Correction: v_off_ini = 0.000005202 V, v_off_fin = 0.000007524 V 16:18:30 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171080738 Vs 16:18:30 Integrated Voltage Measurement... 16:18:50 Voltage Offset Correction: v_off_ini = 0.000007881 V, v_off_fin = 0.000003970 V 16:18:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965869 Vs 16:18:52 Temperature Measurement, Probe Number = 0, T = 20.209000 C 16:18:53 Temperature Measurement, Probe Number = 1, T = 20.132000 C 16:18:54 Temperature Measurement, Probe Number = 2, T = 20.194000 C 16:18:54 Temperature Measurement, Probe Number = 3, T = 20.140000 C 16:18:55 Temperature Measurement, Probe Number = 4, T = 20.527000 C 16:18:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.53 16:18:55 Integrated Voltage Measurement... 16:19:15 Voltage Offset Correction: v_off_ini = 0.000005055 V, v_off_fin = 0.000007553 V 16:19:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075506 Vs 16:19:15 Integrated Voltage Measurement... 16:19:35 Voltage Offset Correction: v_off_ini = 0.000006700 V, v_off_fin = 0.000003652 V 16:19:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983583 Vs 16:19:38 Temperature Measurement, Probe Number = 0, T = 20.210000 C 16:19:38 Temperature Measurement, Probe Number = 1, T = 20.136000 C 16:19:39 Temperature Measurement, Probe Number = 2, T = 20.194000 C 16:19:40 Temperature Measurement, Probe Number = 3, T = 20.141000 C 16:19:40 Temperature Measurement, Probe Number = 4, T = 20.525000 C 16:19:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.52 16:19:41 Integrated Voltage Measurement... 16:20:00 Voltage Offset Correction: v_off_ini = 0.000005087 V, v_off_fin = 0.000007978 V 16:20:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171077008 Vs 16:20:00 Integrated Voltage Measurement... 16:20:20 Voltage Offset Correction: v_off_ini = 0.000007085 V, v_off_fin = 0.000004156 V 16:20:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983602 Vs 16:20:23 Temperature Measurement, Probe Number = 0, T = 20.208000 C 16:20:23 Temperature Measurement, Probe Number = 1, T = 20.133000 C 16:20:24 Temperature Measurement, Probe Number = 2, T = 20.194000 C 16:20:25 Temperature Measurement, Probe Number = 3, T = 20.142000 C 16:20:25 Temperature Measurement, Probe Number = 4, T = 20.544000 C 16:20:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.54 16:20:26 Integrated Voltage Measurement... 16:20:46 Voltage Offset Correction: v_off_ini = 0.000005006 V, v_off_fin = 0.000007482 V 16:20:46 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171071844 Vs 16:20:46 Integrated Voltage Measurement... 16:21:06 Voltage Offset Correction: v_off_ini = 0.000006509 V, v_off_fin = 0.000002346 V 16:21:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988909 Vs 16:21:09 Temperature Measurement, Probe Number = 0, T = 20.210000 C 16:21:09 Temperature Measurement, Probe Number = 1, T = 20.132000 C 16:21:10 Temperature Measurement, Probe Number = 2, T = 20.199000 C 16:21:11 Temperature Measurement, Probe Number = 3, T = 20.142000 C 16:21:11 Temperature Measurement, Probe Number = 4, T = 20.569000 C 16:21:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.57 16:21:12 Integrated Voltage Measurement... 16:21:32 Voltage Offset Correction: v_off_ini = 0.000004314 V, v_off_fin = 0.000007699 V 16:21:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075293 Vs 16:21:32 Integrated Voltage Measurement... 16:21:53 Voltage Offset Correction: v_off_ini = 0.000006792 V, v_off_fin = 0.000002696 V 16:21:53 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170980878 Vs 16:51:56 Temperature Measurement, Probe Number = 0, T = 20.197000 C 16:51:56 Temperature Measurement, Probe Number = 1, T = 20.126000 C 16:51:57 Temperature Measurement, Probe Number = 2, T = 20.188000 C 16:51:58 Temperature Measurement, Probe Number = 3, T = 20.135000 C 16:51:58 Temperature Measurement, Probe Number = 4, T = 20.387000 C 16:51:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.39 16:51:59 Integrated Voltage Measurement... 16:52:18 Voltage Offset Correction: v_off_ini = 0.000005765 V, v_off_fin = 0.000006836 V 16:52:18 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171109259 Vs 16:52:18 Integrated Voltage Measurement... 16:52:38 Voltage Offset Correction: v_off_ini = 0.000007511 V, v_off_fin = 0.000002939 V 16:52:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993030 Vs 16:52:41 Temperature Measurement, Probe Number = 0, T = 20.201000 C 16:52:42 Temperature Measurement, Probe Number = 1, T = 20.129000 C 16:52:42 Temperature Measurement, Probe Number = 2, T = 20.193000 C 16:52:43 Temperature Measurement, Probe Number = 3, T = 20.137000 C 16:52:44 Temperature Measurement, Probe Number = 4, T = 20.376000 C 16:52:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.38 16:52:44 Integrated Voltage Measurement... 16:53:03 Voltage Offset Correction: v_off_ini = 0.000004364 V, v_off_fin = 0.000007335 V 16:53:03 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171068781 Vs 16:53:03 Integrated Voltage Measurement... 16:53:23 Voltage Offset Correction: v_off_ini = 0.000006926 V, v_off_fin = 0.000003747 V 16:53:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985694 Vs 16:53:26 Temperature Measurement, Probe Number = 0, T = 20.207000 C 16:53:26 Temperature Measurement, Probe Number = 1, T = 20.130000 C 16:53:27 Temperature Measurement, Probe Number = 2, T = 20.195000 C 16:53:28 Temperature Measurement, Probe Number = 3, T = 20.141000 C 16:53:28 Temperature Measurement, Probe Number = 4, T = 20.420000 C 16:53:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.42 16:53:29 Integrated Voltage Measurement... 16:53:48 Voltage Offset Correction: v_off_ini = 0.000004295 V, v_off_fin = 0.000007261 V 16:53:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073914 Vs 16:53:48 Integrated Voltage Measurement... 16:54:09 Voltage Offset Correction: v_off_ini = 0.000007230 V, v_off_fin = 0.000003144 V 16:54:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991887 Vs 16:54:12 Temperature Measurement, Probe Number = 0, T = 20.204000 C 16:54:12 Temperature Measurement, Probe Number = 1, T = 20.132000 C 16:54:13 Temperature Measurement, Probe Number = 2, T = 20.190000 C 16:54:14 Temperature Measurement, Probe Number = 3, T = 20.137000 C 16:54:14 Temperature Measurement, Probe Number = 4, T = 20.406000 C 16:54:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.41 16:54:15 Integrated Voltage Measurement... 16:54:35 Voltage Offset Correction: v_off_ini = 0.000005021 V, v_off_fin = 0.000007974 V 16:54:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171067935 Vs 16:54:35 Integrated Voltage Measurement... 16:54:55 Voltage Offset Correction: v_off_ini = 0.000006810 V, v_off_fin = 0.000002866 V 16:54:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989866 Vs 16:54:58 Temperature Measurement, Probe Number = 0, T = 20.198000 C 16:54:59 Temperature Measurement, Probe Number = 1, T = 20.126000 C 16:54:59 Temperature Measurement, Probe Number = 2, T = 20.188000 C 16:55:00 Temperature Measurement, Probe Number = 3, T = 20.133000 C 16:55:01 Temperature Measurement, Probe Number = 4, T = 20.442000 C 16:55:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.44 16:55:01 Integrated Voltage Measurement... 16:55:21 Voltage Offset Correction: v_off_ini = 0.000005485 V, v_off_fin = 0.000007198 V 16:55:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074283 Vs 16:55:22 Integrated Voltage Measurement... 16:55:42 Voltage Offset Correction: v_off_ini = 0.000006923 V, v_off_fin = 0.000003149 V 16:55:42 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170986159 Vs 16:55:45 Temperature Measurement, Probe Number = 0, T = 20.201000 C 16:55:46 Temperature Measurement, Probe Number = 1, T = 20.128000 C 16:55:46 Temperature Measurement, Probe Number = 2, T = 20.190000 C 16:55:47 Temperature Measurement, Probe Number = 3, T = 20.138000 C 16:55:48 Temperature Measurement, Probe Number = 4, T = 20.457000 C 16:55:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.46 16:55:48 Integrated Voltage Measurement... 16:56:08 Voltage Offset Correction: v_off_ini = 0.000004786 V, v_off_fin = 0.000007446 V 16:56:08 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171072619 Vs 16:56:09 Integrated Voltage Measurement... 16:56:28 Voltage Offset Correction: v_off_ini = 0.000006651 V, v_off_fin = 0.000003713 V 16:56:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982571 Vs 16:56:31 Temperature Measurement, Probe Number = 0, T = 20.202000 C 16:56:32 Temperature Measurement, Probe Number = 1, T = 20.130000 C 16:56:32 Temperature Measurement, Probe Number = 2, T = 20.192000 C 16:56:33 Temperature Measurement, Probe Number = 3, T = 20.140000 C 16:56:34 Temperature Measurement, Probe Number = 4, T = 20.428000 C 16:56:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.43 16:56:34 Integrated Voltage Measurement... 16:56:53 Voltage Offset Correction: v_off_ini = 0.000004188 V, v_off_fin = 0.000006840 V 16:56:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070328 Vs 16:56:54 Integrated Voltage Measurement... 16:57:13 Voltage Offset Correction: v_off_ini = 0.000005966 V, v_off_fin = 0.000002522 V 16:57:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995464 Vs 16:57:16 Temperature Measurement, Probe Number = 0, T = 20.203000 C 16:57:17 Temperature Measurement, Probe Number = 1, T = 20.127000 C 16:57:17 Temperature Measurement, Probe Number = 2, T = 20.194000 C 16:57:18 Temperature Measurement, Probe Number = 3, T = 20.139000 C 16:57:19 Temperature Measurement, Probe Number = 4, T = 20.434000 C 16:57:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.43 16:57:19 Integrated Voltage Measurement... 16:57:38 Voltage Offset Correction: v_off_ini = 0.000003953 V, v_off_fin = 0.000006677 V 16:57:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066165 Vs 16:57:39 Integrated Voltage Measurement... 16:57:58 Voltage Offset Correction: v_off_ini = 0.000006316 V, v_off_fin = 0.000003348 V 16:57:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990060 Vs 16:58:01 Temperature Measurement, Probe Number = 0, T = 20.201000 C 16:58:02 Temperature Measurement, Probe Number = 1, T = 20.123000 C 16:58:02 Temperature Measurement, Probe Number = 2, T = 20.193000 C 16:58:03 Temperature Measurement, Probe Number = 3, T = 20.137000 C 16:58:04 Temperature Measurement, Probe Number = 4, T = 20.412000 C 16:58:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.41 16:58:04 Integrated Voltage Measurement... 16:58:24 Voltage Offset Correction: v_off_ini = 0.000004230 V, v_off_fin = 0.000006829 V 16:58:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066819 Vs 16:58:24 Integrated Voltage Measurement... 16:58:44 Voltage Offset Correction: v_off_ini = 0.000006338 V, v_off_fin = 0.000003263 V 16:58:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985617 Vs 16:58:47 Temperature Measurement, Probe Number = 0, T = 20.205000 C 16:58:48 Temperature Measurement, Probe Number = 1, T = 20.124000 C 16:58:49 Temperature Measurement, Probe Number = 2, T = 20.195000 C 16:58:49 Temperature Measurement, Probe Number = 3, T = 20.137000 C 16:58:50 Temperature Measurement, Probe Number = 4, T = 20.416000 C 16:58:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.42 16:58:50 Integrated Voltage Measurement... 16:59:11 Voltage Offset Correction: v_off_ini = 0.000004620 V, v_off_fin = 0.000007393 V 16:59:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076121 Vs 16:59:11 Integrated Voltage Measurement... 16:59:30 Voltage Offset Correction: v_off_ini = 0.000006510 V, v_off_fin = 0.000003880 V 16:59:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982031 Vs 17:29:33 Temperature Measurement, Probe Number = 0, T = 20.199000 C 17:29:34 Temperature Measurement, Probe Number = 1, T = 20.126000 C 17:29:35 Temperature Measurement, Probe Number = 2, T = 20.192000 C 17:29:35 Temperature Measurement, Probe Number = 3, T = 20.138000 C 17:29:36 Temperature Measurement, Probe Number = 4, T = 20.341000 C 17:29:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.34 17:29:36 Integrated Voltage Measurement... 17:29:55 Voltage Offset Correction: v_off_ini = 0.000005868 V, v_off_fin = 0.000007245 V 17:29:55 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171120912 Vs 17:29:56 Integrated Voltage Measurement... 17:30:15 Voltage Offset Correction: v_off_ini = 0.000006290 V, v_off_fin = 0.000003950 V 17:30:16 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988809 Vs 17:30:18 Temperature Measurement, Probe Number = 0, T = 20.196000 C 17:30:19 Temperature Measurement, Probe Number = 1, T = 20.125000 C 17:30:20 Temperature Measurement, Probe Number = 2, T = 20.191000 C 17:30:20 Temperature Measurement, Probe Number = 3, T = 20.138000 C 17:30:21 Temperature Measurement, Probe Number = 4, T = 20.404000 C 17:30:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.40 17:30:21 Integrated Voltage Measurement... 17:30:40 Voltage Offset Correction: v_off_ini = 0.000004549 V, v_off_fin = 0.000007438 V 17:30:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171071080 Vs 17:30:41 Integrated Voltage Measurement... 17:31:01 Voltage Offset Correction: v_off_ini = 0.000006498 V, v_off_fin = 0.000002987 V 17:31:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991451 Vs 17:31:03 Temperature Measurement, Probe Number = 0, T = 20.193000 C 17:31:04 Temperature Measurement, Probe Number = 1, T = 20.124000 C 17:31:05 Temperature Measurement, Probe Number = 2, T = 20.190000 C 17:31:05 Temperature Measurement, Probe Number = 3, T = 20.137000 C 17:31:06 Temperature Measurement, Probe Number = 4, T = 20.393000 C 17:31:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.39 17:31:06 Integrated Voltage Measurement... 17:31:28 Voltage Offset Correction: v_off_ini = 0.000004298 V, v_off_fin = 0.000003889 V 17:31:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.164953452 Vs 17:31:29 Integrated Voltage Measurement... 17:31:48 Voltage Offset Correction: v_off_ini = 0.000005698 V, v_off_fin = 0.000003568 V 17:31:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985853 Vs 17:31:51 Temperature Measurement, Probe Number = 0, T = 20.196000 C 17:31:52 Temperature Measurement, Probe Number = 1, T = 20.124000 C 17:31:53 Temperature Measurement, Probe Number = 2, T = 20.187000 C 17:31:53 Temperature Measurement, Probe Number = 3, T = 20.136000 C 17:31:54 Temperature Measurement, Probe Number = 4, T = 20.428000 C 17:31:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.43 17:31:54 Integrated Voltage Measurement... 17:32:14 Voltage Offset Correction: v_off_ini = 0.000004640 V, v_off_fin = 0.000007660 V 17:32:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076573 Vs 17:32:14 Integrated Voltage Measurement... 17:32:35 Voltage Offset Correction: v_off_ini = 0.000007266 V, v_off_fin = 0.000003797 V 17:32:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983563 Vs 17:32:37 Temperature Measurement, Probe Number = 0, T = 20.194000 C 17:32:38 Temperature Measurement, Probe Number = 1, T = 20.121000 C 17:32:39 Temperature Measurement, Probe Number = 2, T = 20.187000 C 17:32:39 Temperature Measurement, Probe Number = 3, T = 20.134000 C 17:32:40 Temperature Measurement, Probe Number = 4, T = 20.399000 C 17:32:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.40 17:32:40 Integrated Voltage Measurement... 17:33:01 Voltage Offset Correction: v_off_ini = 0.000005531 V, v_off_fin = 0.000007807 V 17:33:01 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171077956 Vs 17:33:01 Integrated Voltage Measurement... 17:33:21 Voltage Offset Correction: v_off_ini = 0.000006847 V, v_off_fin = 0.000004084 V 17:33:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979386 Vs 17:33:24 Temperature Measurement, Probe Number = 0, T = 20.193000 C 17:33:24 Temperature Measurement, Probe Number = 1, T = 20.121000 C 17:33:25 Temperature Measurement, Probe Number = 2, T = 20.187000 C 17:33:25 Temperature Measurement, Probe Number = 3, T = 20.134000 C 17:33:26 Temperature Measurement, Probe Number = 4, T = 20.391000 C 17:33:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.39 17:33:26 Integrated Voltage Measurement... 17:33:46 Voltage Offset Correction: v_off_ini = 0.000004985 V, v_off_fin = 0.000006584 V 17:33:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072454 Vs 17:33:47 Integrated Voltage Measurement... 17:34:07 Voltage Offset Correction: v_off_ini = 0.000006671 V, v_off_fin = 0.000003287 V 17:34:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988065 Vs 17:34:10 Temperature Measurement, Probe Number = 0, T = 20.198000 C 17:34:10 Temperature Measurement, Probe Number = 1, T = 20.126000 C 17:34:11 Temperature Measurement, Probe Number = 2, T = 20.189000 C 17:34:11 Temperature Measurement, Probe Number = 3, T = 20.137000 C 17:34:12 Temperature Measurement, Probe Number = 4, T = 20.377000 C 17:34:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.38 17:34:12 Integrated Voltage Measurement... 17:34:32 Voltage Offset Correction: v_off_ini = 0.000005617 V, v_off_fin = 0.000007404 V 17:34:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076468 Vs 17:34:32 Integrated Voltage Measurement... 17:34:52 Voltage Offset Correction: v_off_ini = 0.000007072 V, v_off_fin = 0.000003723 V 17:34:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986662 Vs 17:34:55 Temperature Measurement, Probe Number = 0, T = 20.198000 C 17:34:55 Temperature Measurement, Probe Number = 1, T = 20.125000 C 17:34:56 Temperature Measurement, Probe Number = 2, T = 20.191000 C 17:34:57 Temperature Measurement, Probe Number = 3, T = 20.139000 C 17:34:57 Temperature Measurement, Probe Number = 4, T = 20.425000 C 17:34:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.43 17:34:57 Integrated Voltage Measurement... 17:35:18 Voltage Offset Correction: v_off_ini = 0.000004294 V, v_off_fin = 0.000006907 V 17:35:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075695 Vs 17:35:18 Integrated Voltage Measurement... 17:35:39 Voltage Offset Correction: v_off_ini = 0.000006087 V, v_off_fin = 0.000003514 V 17:35:39 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170989556 Vs 17:35:42 Temperature Measurement, Probe Number = 0, T = 20.199000 C 17:35:42 Temperature Measurement, Probe Number = 1, T = 20.124000 C 17:35:43 Temperature Measurement, Probe Number = 2, T = 20.190000 C 17:35:44 Temperature Measurement, Probe Number = 3, T = 20.135000 C 17:35:44 Temperature Measurement, Probe Number = 4, T = 20.469000 C 17:35:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.47 17:35:44 Integrated Voltage Measurement... 17:36:05 Voltage Offset Correction: v_off_ini = 0.000004963 V, v_off_fin = 0.000007354 V 17:36:05 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171074079 Vs 17:36:05 Integrated Voltage Measurement... 17:36:25 Voltage Offset Correction: v_off_ini = 0.000007268 V, v_off_fin = 0.000003231 V 17:36:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983129 Vs 17:36:28 Temperature Measurement, Probe Number = 0, T = 20.195000 C 17:36:28 Temperature Measurement, Probe Number = 1, T = 20.121000 C 17:36:29 Temperature Measurement, Probe Number = 2, T = 20.188000 C 17:36:30 Temperature Measurement, Probe Number = 3, T = 20.133000 C 17:36:30 Temperature Measurement, Probe Number = 4, T = 20.473000 C 17:36:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.47 17:36:31 Integrated Voltage Measurement... 17:36:51 Voltage Offset Correction: v_off_ini = 0.000005238 V, v_off_fin = 0.000007344 V 17:36:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078379 Vs 17:36:51 Integrated Voltage Measurement... 17:37:11 Voltage Offset Correction: v_off_ini = 0.000007011 V, v_off_fin = 0.000003140 V 17:37:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983264 Vs 18:07:14 Temperature Measurement, Probe Number = 0, T = 20.191000 C 18:07:15 Temperature Measurement, Probe Number = 1, T = 20.117000 C 18:07:15 Temperature Measurement, Probe Number = 2, T = 20.188000 C 18:07:16 Temperature Measurement, Probe Number = 3, T = 20.133000 C 18:07:17 Temperature Measurement, Probe Number = 4, T = 20.386000 C 18:07:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.39 18:07:17 Integrated Voltage Measurement... 18:07:37 Voltage Offset Correction: v_off_ini = 0.000005334 V, v_off_fin = 0.000008134 V 18:07:37 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171130476 Vs 18:07:37 Integrated Voltage Measurement... 18:07:57 Voltage Offset Correction: v_off_ini = 0.000006722 V, v_off_fin = 0.000003245 V 18:07:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986265 Vs 18:08:00 Temperature Measurement, Probe Number = 0, T = 20.186000 C 18:08:00 Temperature Measurement, Probe Number = 1, T = 20.114000 C 18:08:01 Temperature Measurement, Probe Number = 2, T = 20.183000 C 18:08:02 Temperature Measurement, Probe Number = 3, T = 20.131000 C 18:08:02 Temperature Measurement, Probe Number = 4, T = 20.396000 C 18:08:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.40 18:08:02 Integrated Voltage Measurement... 18:08:22 Voltage Offset Correction: v_off_ini = 0.000005385 V, v_off_fin = 0.000007482 V 18:08:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171080410 Vs 18:08:22 Integrated Voltage Measurement... 18:08:42 Voltage Offset Correction: v_off_ini = 0.000007568 V, v_off_fin = 0.000003277 V 18:08:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982851 Vs 18:08:45 Temperature Measurement, Probe Number = 0, T = 20.185000 C 18:08:45 Temperature Measurement, Probe Number = 1, T = 20.114000 C 18:08:46 Temperature Measurement, Probe Number = 2, T = 20.180000 C 18:08:47 Temperature Measurement, Probe Number = 3, T = 20.128000 C 18:08:47 Temperature Measurement, Probe Number = 4, T = 20.345000 C 18:08:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.34 18:08:47 Integrated Voltage Measurement... 18:09:07 Voltage Offset Correction: v_off_ini = 0.000004644 V, v_off_fin = 0.000008023 V 18:09:07 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171077856 Vs 18:09:07 Integrated Voltage Measurement... 18:09:27 Voltage Offset Correction: v_off_ini = 0.000007106 V, v_off_fin = 0.000003358 V 18:09:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982382 Vs 18:09:30 Temperature Measurement, Probe Number = 0, T = 20.179000 C 18:09:31 Temperature Measurement, Probe Number = 1, T = 20.116000 C 18:09:31 Temperature Measurement, Probe Number = 2, T = 20.175000 C 18:09:32 Temperature Measurement, Probe Number = 3, T = 20.128000 C 18:09:33 Temperature Measurement, Probe Number = 4, T = 20.334000 C 18:09:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.33 18:09:33 Integrated Voltage Measurement... 18:09:53 Voltage Offset Correction: v_off_ini = 0.000004858 V, v_off_fin = 0.000007510 V 18:09:53 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171071548 Vs 18:09:53 Integrated Voltage Measurement... 18:10:13 Voltage Offset Correction: v_off_ini = 0.000006923 V, v_off_fin = 0.000003910 V 18:10:13 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170982140 Vs 18:10:16 Temperature Measurement, Probe Number = 0, T = 20.184000 C 18:10:17 Temperature Measurement, Probe Number = 1, T = 20.119000 C 18:10:17 Temperature Measurement, Probe Number = 2, T = 20.177000 C 18:10:18 Temperature Measurement, Probe Number = 3, T = 20.132000 C 18:10:19 Temperature Measurement, Probe Number = 4, T = 20.337000 C 18:10:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.34 18:10:19 Integrated Voltage Measurement... 18:10:38 Voltage Offset Correction: v_off_ini = 0.000004942 V, v_off_fin = 0.000007148 V 18:10:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070926 Vs 18:10:39 Integrated Voltage Measurement... 18:10:58 Voltage Offset Correction: v_off_ini = 0.000006706 V, v_off_fin = 0.000003276 V 18:10:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986193 Vs 18:11:01 Temperature Measurement, Probe Number = 0, T = 20.188000 C 18:11:02 Temperature Measurement, Probe Number = 1, T = 20.121000 C 18:11:02 Temperature Measurement, Probe Number = 2, T = 20.183000 C 18:11:03 Temperature Measurement, Probe Number = 3, T = 20.135000 C 18:11:04 Temperature Measurement, Probe Number = 4, T = 20.351000 C 18:11:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.35 18:11:04 Integrated Voltage Measurement... 18:11:23 Voltage Offset Correction: v_off_ini = 0.000004463 V, v_off_fin = 0.000007315 V 18:11:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074816 Vs 18:11:24 Integrated Voltage Measurement... 18:11:43 Voltage Offset Correction: v_off_ini = 0.000006691 V, v_off_fin = 0.000003373 V 18:11:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983013 Vs 18:11:46 Temperature Measurement, Probe Number = 0, T = 20.187000 C 18:11:47 Temperature Measurement, Probe Number = 1, T = 20.116000 C 18:11:48 Temperature Measurement, Probe Number = 2, T = 20.182000 C 18:11:48 Temperature Measurement, Probe Number = 3, T = 20.130000 C 18:11:49 Temperature Measurement, Probe Number = 4, T = 20.417000 C 18:11:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.42 18:11:49 Integrated Voltage Measurement... 18:12:08 Voltage Offset Correction: v_off_ini = 0.000004847 V, v_off_fin = 0.000006635 V 18:12:09 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171072146 Vs 18:12:09 Integrated Voltage Measurement... 18:12:29 Voltage Offset Correction: v_off_ini = 0.000006317 V, v_off_fin = 0.000004217 V 18:12:29 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170988792 Vs 18:12:32 Temperature Measurement, Probe Number = 0, T = 20.183000 C 18:12:32 Temperature Measurement, Probe Number = 1, T = 20.112000 C 18:12:33 Temperature Measurement, Probe Number = 2, T = 20.180000 C 18:12:34 Temperature Measurement, Probe Number = 3, T = 20.129000 C 18:12:34 Temperature Measurement, Probe Number = 4, T = 20.366000 C 18:12:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.37 18:12:35 Integrated Voltage Measurement... 18:12:55 Voltage Offset Correction: v_off_ini = 0.000004501 V, v_off_fin = 0.000007006 V 18:12:55 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171067759 Vs 18:12:55 Integrated Voltage Measurement... 18:13:15 Voltage Offset Correction: v_off_ini = 0.000006593 V, v_off_fin = 0.000003273 V 18:13:16 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170983737 Vs 18:13:18 Temperature Measurement, Probe Number = 0, T = 20.179000 C 18:13:19 Temperature Measurement, Probe Number = 1, T = 20.106000 C 18:13:20 Temperature Measurement, Probe Number = 2, T = 20.179000 C 18:13:20 Temperature Measurement, Probe Number = 3, T = 20.126000 C 18:13:21 Temperature Measurement, Probe Number = 4, T = 20.330000 C 18:13:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.33 18:13:21 Integrated Voltage Measurement... 18:13:41 Voltage Offset Correction: v_off_ini = 0.000004856 V, v_off_fin = 0.000007181 V 18:13:41 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171071074 Vs 18:13:41 Integrated Voltage Measurement... 18:14:00 Voltage Offset Correction: v_off_ini = 0.000006607 V, v_off_fin = 0.000004846 V 18:14:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982809 Vs 18:14:03 Temperature Measurement, Probe Number = 0, T = 20.186000 C 18:14:04 Temperature Measurement, Probe Number = 1, T = 20.115000 C 18:14:05 Temperature Measurement, Probe Number = 2, T = 20.181000 C 18:14:05 Temperature Measurement, Probe Number = 3, T = 20.128000 C 18:14:06 Temperature Measurement, Probe Number = 4, T = 20.376000 C 18:14:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.38 18:14:06 Integrated Voltage Measurement... 18:14:26 Voltage Offset Correction: v_off_ini = 0.000004101 V, v_off_fin = 0.000006846 V 18:14:27 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171063522 Vs 18:14:27 Integrated Voltage Measurement... 18:14:46 Voltage Offset Correction: v_off_ini = 0.000005962 V, v_off_fin = 0.000003445 V 18:14:47 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170986805 Vs 18:44:49 Temperature Measurement, Probe Number = 0, T = 20.181000 C 18:44:50 Temperature Measurement, Probe Number = 1, T = 20.112000 C 18:44:51 Temperature Measurement, Probe Number = 2, T = 20.179000 C 18:44:52 Temperature Measurement, Probe Number = 3, T = 20.127000 C 18:44:52 Temperature Measurement, Probe Number = 4, T = 20.366000 C 18:44:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.37 18:44:52 Integrated Voltage Measurement... 18:45:12 Voltage Offset Correction: v_off_ini = 0.000005602 V, v_off_fin = 0.000007854 V 18:45:12 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171114487 Vs 18:45:13 Integrated Voltage Measurement... 18:45:32 Voltage Offset Correction: v_off_ini = 0.000006569 V, v_off_fin = 0.000003122 V 18:45:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993437 Vs 18:45:35 Temperature Measurement, Probe Number = 0, T = 20.183000 C 18:45:36 Temperature Measurement, Probe Number = 1, T = 20.111000 C 18:45:37 Temperature Measurement, Probe Number = 2, T = 20.182000 C 18:45:37 Temperature Measurement, Probe Number = 3, T = 20.128000 C 18:45:38 Temperature Measurement, Probe Number = 4, T = 20.354000 C 18:45:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.35 18:45:38 Integrated Voltage Measurement... 18:45:58 Voltage Offset Correction: v_off_ini = 0.000004628 V, v_off_fin = 0.000007126 V 18:45:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064753 Vs 18:45:58 Integrated Voltage Measurement... 18:46:17 Voltage Offset Correction: v_off_ini = 0.000006603 V, v_off_fin = 0.000003451 V 18:46:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991649 Vs 18:46:20 Temperature Measurement, Probe Number = 0, T = 20.187000 C 18:46:21 Temperature Measurement, Probe Number = 1, T = 20.115000 C 18:46:22 Temperature Measurement, Probe Number = 2, T = 20.182000 C 18:46:22 Temperature Measurement, Probe Number = 3, T = 20.127000 C 18:46:23 Temperature Measurement, Probe Number = 4, T = 20.377000 C 18:46:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.38 18:46:23 Integrated Voltage Measurement... 18:46:42 Voltage Offset Correction: v_off_ini = 0.000004502 V, v_off_fin = 0.000006618 V 18:46:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065558 Vs 18:46:43 Integrated Voltage Measurement... 18:47:02 Voltage Offset Correction: v_off_ini = 0.000006594 V, v_off_fin = 0.000003747 V 18:47:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991216 Vs 18:47:05 Temperature Measurement, Probe Number = 0, T = 20.189000 C 18:47:06 Temperature Measurement, Probe Number = 1, T = 20.118000 C 18:47:07 Temperature Measurement, Probe Number = 2, T = 20.185000 C 18:47:07 Temperature Measurement, Probe Number = 3, T = 20.134000 C 18:47:08 Temperature Measurement, Probe Number = 4, T = 20.435000 C 18:47:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.43 18:47:08 Integrated Voltage Measurement... 18:47:27 Voltage Offset Correction: v_off_ini = 0.000004370 V, v_off_fin = 0.000007177 V 18:47:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171068224 Vs 18:47:28 Integrated Voltage Measurement... 18:47:48 Voltage Offset Correction: v_off_ini = 0.000006683 V, v_off_fin = 0.000003436 V 18:47:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988473 Vs 18:47:51 Temperature Measurement, Probe Number = 0, T = 20.188000 C 18:47:52 Temperature Measurement, Probe Number = 1, T = 20.116000 C 18:47:52 Temperature Measurement, Probe Number = 2, T = 20.186000 C 18:47:53 Temperature Measurement, Probe Number = 3, T = 20.136000 C 18:47:54 Temperature Measurement, Probe Number = 4, T = 20.435000 C 18:47:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.43 18:47:54 Integrated Voltage Measurement... 18:48:14 Voltage Offset Correction: v_off_ini = 0.000004899 V, v_off_fin = 0.000007129 V 18:48:15 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171063189 Vs 18:48:15 Integrated Voltage Measurement... 18:48:35 Voltage Offset Correction: v_off_ini = 0.000006578 V, v_off_fin = 0.000002758 V 18:48:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993857 Vs 18:48:38 Temperature Measurement, Probe Number = 0, T = 20.189000 C 18:48:38 Temperature Measurement, Probe Number = 1, T = 20.120000 C 18:48:39 Temperature Measurement, Probe Number = 2, T = 20.185000 C 18:48:40 Temperature Measurement, Probe Number = 3, T = 20.135000 C 18:48:40 Temperature Measurement, Probe Number = 4, T = 20.449000 C 18:48:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.45 18:48:40 Integrated Voltage Measurement... 18:49:00 Voltage Offset Correction: v_off_ini = 0.000004302 V, v_off_fin = 0.000007626 V 18:49:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064702 Vs 18:49:00 Integrated Voltage Measurement... 18:49:20 Voltage Offset Correction: v_off_ini = 0.000006904 V, v_off_fin = 0.000004119 V 18:49:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991014 Vs 18:49:22 Temperature Measurement, Probe Number = 0, T = 20.184000 C 18:49:23 Temperature Measurement, Probe Number = 1, T = 20.115000 C 18:49:24 Temperature Measurement, Probe Number = 2, T = 20.182000 C 18:49:24 Temperature Measurement, Probe Number = 3, T = 20.131000 C 18:49:25 Temperature Measurement, Probe Number = 4, T = 20.440000 C 18:49:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.44 18:49:25 Integrated Voltage Measurement... 18:49:45 Voltage Offset Correction: v_off_ini = 0.000004879 V, v_off_fin = 0.000007251 V 18:49:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066614 Vs 18:49:45 Integrated Voltage Measurement... 18:50:05 Voltage Offset Correction: v_off_ini = 0.000006903 V, v_off_fin = 0.000003221 V 18:50:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994846 Vs 18:50:08 Temperature Measurement, Probe Number = 0, T = 20.187000 C 18:50:08 Temperature Measurement, Probe Number = 1, T = 20.115000 C 18:50:09 Temperature Measurement, Probe Number = 2, T = 20.184000 C 18:50:10 Temperature Measurement, Probe Number = 3, T = 20.132000 C 18:50:10 Temperature Measurement, Probe Number = 4, T = 20.460000 C 18:50:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.46 18:50:10 Integrated Voltage Measurement... 18:50:30 Voltage Offset Correction: v_off_ini = 0.000004760 V, v_off_fin = 0.000007275 V 18:50:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171067578 Vs 18:50:30 Integrated Voltage Measurement... 18:50:50 Voltage Offset Correction: v_off_ini = 0.000006820 V, v_off_fin = 0.000003473 V 18:50:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988745 Vs 18:50:53 Temperature Measurement, Probe Number = 0, T = 20.189000 C 18:50:53 Temperature Measurement, Probe Number = 1, T = 20.115000 C 18:50:54 Temperature Measurement, Probe Number = 2, T = 20.185000 C 18:50:55 Temperature Measurement, Probe Number = 3, T = 20.134000 C 18:50:55 Temperature Measurement, Probe Number = 4, T = 20.469000 C 18:50:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.47 18:50:55 Integrated Voltage Measurement... 18:51:16 Voltage Offset Correction: v_off_ini = 0.000004097 V, v_off_fin = 0.000006600 V 18:51:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058076 Vs 18:51:16 Integrated Voltage Measurement... 18:51:36 Voltage Offset Correction: v_off_ini = 0.000005938 V, v_off_fin = 0.000002630 V 18:51:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998493 Vs 18:51:39 Temperature Measurement, Probe Number = 0, T = 20.187000 C 18:51:39 Temperature Measurement, Probe Number = 1, T = 20.113000 C 18:51:40 Temperature Measurement, Probe Number = 2, T = 20.185000 C 18:51:41 Temperature Measurement, Probe Number = 3, T = 20.132000 C 18:51:41 Temperature Measurement, Probe Number = 4, T = 20.457000 C 18:51:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.46 18:51:42 Integrated Voltage Measurement... 18:52:01 Voltage Offset Correction: v_off_ini = 0.000004041 V, v_off_fin = 0.000006600 V 18:52:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059879 Vs 18:52:02 Integrated Voltage Measurement... 18:52:21 Voltage Offset Correction: v_off_ini = 0.000006048 V, v_off_fin = 0.000003244 V 18:52:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991230 Vs 19:22:24 Temperature Measurement, Probe Number = 0, T = 20.185000 C 19:22:25 Temperature Measurement, Probe Number = 1, T = 20.113000 C 19:22:25 Temperature Measurement, Probe Number = 2, T = 20.184000 C 19:22:26 Temperature Measurement, Probe Number = 3, T = 20.129000 C 19:22:27 Temperature Measurement, Probe Number = 4, T = 20.497000 C 19:22:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.50 19:22:27 Integrated Voltage Measurement... 19:22:47 Voltage Offset Correction: v_off_ini = 0.000005998 V, v_off_fin = 0.000007668 V 19:22:47 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171119014 Vs 19:22:47 Integrated Voltage Measurement... 19:23:07 Voltage Offset Correction: v_off_ini = 0.000006710 V, v_off_fin = 0.000003804 V 19:23:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994394 Vs 19:23:10 Temperature Measurement, Probe Number = 0, T = 20.182000 C 19:23:10 Temperature Measurement, Probe Number = 1, T = 20.111000 C 19:23:11 Temperature Measurement, Probe Number = 2, T = 20.180000 C 19:23:12 Temperature Measurement, Probe Number = 3, T = 20.128000 C 19:23:12 Temperature Measurement, Probe Number = 4, T = 20.448000 C 19:23:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.45 19:23:12 Integrated Voltage Measurement... 19:23:32 Voltage Offset Correction: v_off_ini = 0.000005375 V, v_off_fin = 0.000007452 V 19:23:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065588 Vs 19:23:32 Integrated Voltage Measurement... 19:23:52 Voltage Offset Correction: v_off_ini = 0.000006690 V, v_off_fin = 0.000003680 V 19:23:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993769 Vs 19:23:55 Temperature Measurement, Probe Number = 0, T = 20.179000 C 19:23:55 Temperature Measurement, Probe Number = 1, T = 20.108000 C 19:23:56 Temperature Measurement, Probe Number = 2, T = 20.179000 C 19:23:57 Temperature Measurement, Probe Number = 3, T = 20.127000 C 19:23:57 Temperature Measurement, Probe Number = 4, T = 20.459000 C 19:23:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.46 19:23:58 Integrated Voltage Measurement... 19:24:17 Voltage Offset Correction: v_off_ini = 0.000004915 V, v_off_fin = 0.000007413 V 19:24:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062599 Vs 19:24:17 Integrated Voltage Measurement... 19:24:37 Voltage Offset Correction: v_off_ini = 0.000006487 V, v_off_fin = 0.000003900 V 19:24:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998320 Vs 19:24:40 Temperature Measurement, Probe Number = 0, T = 20.183000 C 19:24:40 Temperature Measurement, Probe Number = 1, T = 20.111000 C 19:24:41 Temperature Measurement, Probe Number = 2, T = 20.183000 C 19:24:42 Temperature Measurement, Probe Number = 3, T = 20.130000 C 19:24:42 Temperature Measurement, Probe Number = 4, T = 20.434000 C 19:24:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.43 19:24:43 Integrated Voltage Measurement... 19:25:02 Voltage Offset Correction: v_off_ini = 0.000004978 V, v_off_fin = 0.000007735 V 19:25:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066531 Vs 19:25:02 Integrated Voltage Measurement... 19:25:22 Voltage Offset Correction: v_off_ini = 0.000007029 V, v_off_fin = 0.000003832 V 19:25:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994982 Vs 19:25:25 Temperature Measurement, Probe Number = 0, T = 20.182000 C 19:25:26 Temperature Measurement, Probe Number = 1, T = 20.109000 C 19:25:26 Temperature Measurement, Probe Number = 2, T = 20.184000 C 19:25:27 Temperature Measurement, Probe Number = 3, T = 20.129000 C 19:25:28 Temperature Measurement, Probe Number = 4, T = 20.513000 C 19:25:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.51 19:25:28 Integrated Voltage Measurement... 19:25:47 Voltage Offset Correction: v_off_ini = 0.000004786 V, v_off_fin = 0.000007233 V 19:25:47 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171070645 Vs 19:25:47 Integrated Voltage Measurement... 19:26:08 Voltage Offset Correction: v_off_ini = 0.000006689 V, v_off_fin = 0.000003901 V 19:26:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994547 Vs 19:26:10 Temperature Measurement, Probe Number = 0, T = 20.185000 C 19:26:11 Temperature Measurement, Probe Number = 1, T = 20.109000 C 19:26:12 Temperature Measurement, Probe Number = 2, T = 20.183000 C 19:26:12 Temperature Measurement, Probe Number = 3, T = 20.128000 C 19:26:13 Temperature Measurement, Probe Number = 4, T = 20.467000 C 19:26:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.47 19:26:13 Integrated Voltage Measurement... 19:26:33 Voltage Offset Correction: v_off_ini = 0.000004605 V, v_off_fin = 0.000007195 V 19:26:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066665 Vs 19:26:33 Integrated Voltage Measurement... 19:26:54 Voltage Offset Correction: v_off_ini = 0.000006941 V, v_off_fin = 0.000003872 V 19:26:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989692 Vs 19:26:57 Temperature Measurement, Probe Number = 0, T = 20.182000 C 19:26:57 Temperature Measurement, Probe Number = 1, T = 20.109000 C 19:26:58 Temperature Measurement, Probe Number = 2, T = 20.181000 C 19:26:59 Temperature Measurement, Probe Number = 3, T = 20.127000 C 19:26:59 Temperature Measurement, Probe Number = 4, T = 20.453000 C 19:26:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.45 19:26:59 Integrated Voltage Measurement... 19:27:19 Voltage Offset Correction: v_off_ini = 0.000005445 V, v_off_fin = 0.000007313 V 19:27:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171067759 Vs 19:27:20 Integrated Voltage Measurement... 19:27:39 Voltage Offset Correction: v_off_ini = 0.000007198 V, v_off_fin = 0.000003313 V 19:27:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990651 Vs 19:27:42 Temperature Measurement, Probe Number = 0, T = 20.183000 C 19:27:43 Temperature Measurement, Probe Number = 1, T = 20.109000 C 19:27:43 Temperature Measurement, Probe Number = 2, T = 20.181000 C 19:27:44 Temperature Measurement, Probe Number = 3, T = 20.128000 C 19:27:45 Temperature Measurement, Probe Number = 4, T = 20.431000 C 19:27:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.43 19:27:45 Integrated Voltage Measurement... 19:28:04 Voltage Offset Correction: v_off_ini = 0.000004687 V, v_off_fin = 0.000007216 V 19:28:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066161 Vs 19:28:05 Integrated Voltage Measurement... 19:28:24 Voltage Offset Correction: v_off_ini = 0.000006672 V, v_off_fin = 0.000003429 V 19:28:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997241 Vs 19:28:27 Temperature Measurement, Probe Number = 0, T = 20.179000 C 19:28:28 Temperature Measurement, Probe Number = 1, T = 20.105000 C 19:28:28 Temperature Measurement, Probe Number = 2, T = 20.180000 C 19:28:29 Temperature Measurement, Probe Number = 3, T = 20.126000 C 19:28:30 Temperature Measurement, Probe Number = 4, T = 20.431000 C 19:28:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.43 19:28:30 Integrated Voltage Measurement... 19:28:49 Voltage Offset Correction: v_off_ini = 0.000004854 V, v_off_fin = 0.000007942 V 19:28:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070199 Vs 19:28:50 Integrated Voltage Measurement... 19:29:09 Voltage Offset Correction: v_off_ini = 0.000007170 V, v_off_fin = 0.000003721 V 19:29:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989454 Vs 19:29:12 Temperature Measurement, Probe Number = 0, T = 20.175000 C 19:29:13 Temperature Measurement, Probe Number = 1, T = 20.106000 C 19:29:14 Temperature Measurement, Probe Number = 2, T = 20.177000 C 19:29:14 Temperature Measurement, Probe Number = 3, T = 20.127000 C 19:29:15 Temperature Measurement, Probe Number = 4, T = 20.438000 C 19:29:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.44 19:29:15 Integrated Voltage Measurement... 19:29:34 Voltage Offset Correction: v_off_ini = 0.000005123 V, v_off_fin = 0.000007157 V 19:29:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070267 Vs 19:29:35 Integrated Voltage Measurement... 19:29:54 Voltage Offset Correction: v_off_ini = 0.000006463 V, v_off_fin = 0.000002857 V 19:29:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002871 Vs 19:59:57 Temperature Measurement, Probe Number = 0, T = 20.172000 C 19:59:58 Temperature Measurement, Probe Number = 1, T = 20.102000 C 19:59:59 Temperature Measurement, Probe Number = 2, T = 20.173000 C 19:59:59 Temperature Measurement, Probe Number = 3, T = 20.120000 C 20:00:00 Temperature Measurement, Probe Number = 4, T = 20.338000 C 20:00:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.34 20:00:00 Integrated Voltage Measurement... 20:00:19 Voltage Offset Correction: v_off_ini = 0.000006176 V, v_off_fin = 0.000007417 V 20:00:20 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171119214 Vs 20:00:20 Integrated Voltage Measurement... 20:00:39 Voltage Offset Correction: v_off_ini = 0.000007017 V, v_off_fin = 0.000003566 V 20:00:39 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170996659 Vs 20:00:42 Temperature Measurement, Probe Number = 0, T = 20.176000 C 20:00:43 Temperature Measurement, Probe Number = 1, T = 20.103000 C 20:00:44 Temperature Measurement, Probe Number = 2, T = 20.179000 C 20:00:44 Temperature Measurement, Probe Number = 3, T = 20.123000 C 20:00:45 Temperature Measurement, Probe Number = 4, T = 20.375000 C 20:00:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.38 20:00:45 Integrated Voltage Measurement... 20:01:04 Voltage Offset Correction: v_off_ini = 0.000004624 V, v_off_fin = 0.000007665 V 20:01:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070151 Vs 20:01:05 Integrated Voltage Measurement... 20:01:24 Voltage Offset Correction: v_off_ini = 0.000007127 V, v_off_fin = 0.000003665 V 20:01:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170995639 Vs 20:01:27 Temperature Measurement, Probe Number = 0, T = 20.170000 C 20:01:28 Temperature Measurement, Probe Number = 1, T = 20.099000 C 20:01:29 Temperature Measurement, Probe Number = 2, T = 20.172000 C 20:01:29 Temperature Measurement, Probe Number = 3, T = 20.117000 C 20:01:30 Temperature Measurement, Probe Number = 4, T = 20.326000 C 20:01:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.33 20:01:30 Integrated Voltage Measurement... 20:01:50 Voltage Offset Correction: v_off_ini = 0.000004876 V, v_off_fin = 0.000007566 V 20:01:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171069998 Vs 20:01:50 Integrated Voltage Measurement... 20:02:10 Voltage Offset Correction: v_off_ini = 0.000007198 V, v_off_fin = 0.000004494 V 20:02:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996930 Vs 20:02:12 Temperature Measurement, Probe Number = 0, T = 20.175000 C 20:02:13 Temperature Measurement, Probe Number = 1, T = 20.099000 C 20:02:14 Temperature Measurement, Probe Number = 2, T = 20.176000 C 20:02:14 Temperature Measurement, Probe Number = 3, T = 20.121000 C 20:02:15 Temperature Measurement, Probe Number = 4, T = 20.378000 C 20:02:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.38 20:02:15 Integrated Voltage Measurement... 20:02:34 Voltage Offset Correction: v_off_ini = 0.000005103 V, v_off_fin = 0.000007359 V 20:02:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073277 Vs 20:02:35 Integrated Voltage Measurement... 20:02:54 Voltage Offset Correction: v_off_ini = 0.000007105 V, v_off_fin = 0.000003702 V 20:02:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998167 Vs 20:02:57 Temperature Measurement, Probe Number = 0, T = 20.173000 C 20:02:58 Temperature Measurement, Probe Number = 1, T = 20.099000 C 20:02:59 Temperature Measurement, Probe Number = 2, T = 20.175000 C 20:02:59 Temperature Measurement, Probe Number = 3, T = 20.119000 C 20:03:00 Temperature Measurement, Probe Number = 4, T = 20.395000 C 20:03:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.39 20:03:00 Integrated Voltage Measurement... 20:03:20 Voltage Offset Correction: v_off_ini = 0.000005098 V, v_off_fin = 0.000008292 V 20:03:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080074 Vs 20:03:20 Integrated Voltage Measurement... 20:03:40 Voltage Offset Correction: v_off_ini = 0.000007720 V, v_off_fin = 0.000003164 V 20:03:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994790 Vs 20:03:43 Temperature Measurement, Probe Number = 0, T = 20.171000 C 20:03:43 Temperature Measurement, Probe Number = 1, T = 20.097000 C 20:03:44 Temperature Measurement, Probe Number = 2, T = 20.172000 C 20:03:44 Temperature Measurement, Probe Number = 3, T = 20.118000 C 20:03:45 Temperature Measurement, Probe Number = 4, T = 20.394000 C 20:03:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.39 20:03:45 Integrated Voltage Measurement... 20:04:05 Voltage Offset Correction: v_off_ini = 0.000005110 V, v_off_fin = 0.000008212 V 20:04:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171079693 Vs 20:04:05 Integrated Voltage Measurement... 20:04:25 Voltage Offset Correction: v_off_ini = 0.000006782 V, v_off_fin = 0.000004349 V 20:04:25 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170992320 Vs 20:04:27 Temperature Measurement, Probe Number = 0, T = 20.176000 C 20:04:28 Temperature Measurement, Probe Number = 1, T = 20.102000 C 20:04:29 Temperature Measurement, Probe Number = 2, T = 20.174000 C 20:04:29 Temperature Measurement, Probe Number = 3, T = 20.121000 C 20:04:30 Temperature Measurement, Probe Number = 4, T = 20.411000 C 20:04:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.41 20:04:30 Integrated Voltage Measurement... 20:04:50 Voltage Offset Correction: v_off_ini = 0.000005120 V, v_off_fin = 0.000007693 V 20:04:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078285 Vs 20:04:50 Integrated Voltage Measurement... 20:05:10 Voltage Offset Correction: v_off_ini = 0.000007020 V, v_off_fin = 0.000003921 V 20:05:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995721 Vs 20:05:13 Temperature Measurement, Probe Number = 0, T = 20.179000 C 20:05:13 Temperature Measurement, Probe Number = 1, T = 20.104000 C 20:05:14 Temperature Measurement, Probe Number = 2, T = 20.179000 C 20:05:15 Temperature Measurement, Probe Number = 3, T = 20.124000 C 20:05:15 Temperature Measurement, Probe Number = 4, T = 20.412000 C 20:05:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.41 20:05:15 Integrated Voltage Measurement... 20:05:35 Voltage Offset Correction: v_off_ini = 0.000005264 V, v_off_fin = 0.000008019 V 20:05:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071519 Vs 20:05:35 Integrated Voltage Measurement... 20:05:55 Voltage Offset Correction: v_off_ini = 0.000007209 V, v_off_fin = 0.000003901 V 20:05:56 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170991128 Vs 20:05:58 Temperature Measurement, Probe Number = 0, T = 20.176000 C 20:05:59 Temperature Measurement, Probe Number = 1, T = 20.102000 C 20:06:00 Temperature Measurement, Probe Number = 2, T = 20.177000 C 20:06:00 Temperature Measurement, Probe Number = 3, T = 20.123000 C 20:06:01 Temperature Measurement, Probe Number = 4, T = 20.418000 C 20:06:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.42 20:06:01 Integrated Voltage Measurement... 20:06:21 Voltage Offset Correction: v_off_ini = 0.000004955 V, v_off_fin = 0.000008088 V 20:06:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171077189 Vs 20:06:21 Integrated Voltage Measurement... 20:06:41 Voltage Offset Correction: v_off_ini = 0.000007193 V, v_off_fin = 0.000003621 V 20:06:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989494 Vs 20:06:44 Temperature Measurement, Probe Number = 0, T = 20.173000 C 20:06:44 Temperature Measurement, Probe Number = 1, T = 20.100000 C 20:06:45 Temperature Measurement, Probe Number = 2, T = 20.177000 C 20:06:46 Temperature Measurement, Probe Number = 3, T = 20.121000 C 20:06:46 Temperature Measurement, Probe Number = 4, T = 20.384000 C 20:06:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.38 20:06:47 Integrated Voltage Measurement... 20:07:06 Voltage Offset Correction: v_off_ini = 0.000004848 V, v_off_fin = 0.000007698 V 20:07:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171077440 Vs 20:07:06 Integrated Voltage Measurement... 20:07:26 Voltage Offset Correction: v_off_ini = 0.000007227 V, v_off_fin = 0.000003041 V 20:07:26 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997861 Vs 20:37:29 Temperature Measurement, Probe Number = 0, T = 20.175000 C 20:37:29 Temperature Measurement, Probe Number = 1, T = 20.105000 C 20:37:30 Temperature Measurement, Probe Number = 2, T = 20.176000 C 20:37:31 Temperature Measurement, Probe Number = 3, T = 20.126000 C 20:37:31 Temperature Measurement, Probe Number = 4, T = 20.428000 C 20:37:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.43 20:37:32 Integrated Voltage Measurement... 20:37:52 Voltage Offset Correction: v_off_ini = 0.000006042 V, v_off_fin = 0.000006430 V 20:37:52 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171118862 Vs 20:37:52 Integrated Voltage Measurement... 20:38:12 Voltage Offset Correction: v_off_ini = 0.000006234 V, v_off_fin = 0.000003246 V 20:38:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171004500 Vs 20:38:15 Temperature Measurement, Probe Number = 0, T = 20.174000 C 20:38:15 Temperature Measurement, Probe Number = 1, T = 20.101000 C 20:38:16 Temperature Measurement, Probe Number = 2, T = 20.178000 C 20:38:17 Temperature Measurement, Probe Number = 3, T = 20.125000 C 20:38:17 Temperature Measurement, Probe Number = 4, T = 20.455000 C 20:38:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.45 20:38:17 Integrated Voltage Measurement... 20:38:37 Voltage Offset Correction: v_off_ini = 0.000004664 V, v_off_fin = 0.000007455 V 20:38:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171068254 Vs 20:38:37 Integrated Voltage Measurement... 20:38:57 Voltage Offset Correction: v_off_ini = 0.000006700 V, v_off_fin = 0.000003111 V 20:38:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999082 Vs 20:39:00 Temperature Measurement, Probe Number = 0, T = 20.174000 C 20:39:00 Temperature Measurement, Probe Number = 1, T = 20.100000 C 20:39:01 Temperature Measurement, Probe Number = 2, T = 20.178000 C 20:39:02 Temperature Measurement, Probe Number = 3, T = 20.125000 C 20:39:02 Temperature Measurement, Probe Number = 4, T = 20.410000 C 20:39:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.41 20:39:02 Integrated Voltage Measurement... 20:39:22 Voltage Offset Correction: v_off_ini = 0.000004808 V, v_off_fin = 0.000007191 V 20:39:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171069440 Vs 20:39:22 Integrated Voltage Measurement... 20:39:42 Voltage Offset Correction: v_off_ini = 0.000006722 V, v_off_fin = 0.000003390 V 20:39:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002177 Vs 20:39:45 Temperature Measurement, Probe Number = 0, T = 20.169000 C 20:39:45 Temperature Measurement, Probe Number = 1, T = 20.098000 C 20:39:46 Temperature Measurement, Probe Number = 2, T = 20.174000 C 20:39:47 Temperature Measurement, Probe Number = 3, T = 20.121000 C 20:39:47 Temperature Measurement, Probe Number = 4, T = 20.431000 C 20:39:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.43 20:39:48 Integrated Voltage Measurement... 20:40:07 Voltage Offset Correction: v_off_ini = 0.000004336 V, v_off_fin = 0.000007201 V 20:40:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171063425 Vs 20:40:07 Integrated Voltage Measurement... 20:40:27 Voltage Offset Correction: v_off_ini = 0.000006301 V, v_off_fin = 0.000003401 V 20:40:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998192 Vs 20:40:30 Temperature Measurement, Probe Number = 0, T = 20.174000 C 20:40:30 Temperature Measurement, Probe Number = 1, T = 20.100000 C 20:40:31 Temperature Measurement, Probe Number = 2, T = 20.178000 C 20:40:32 Temperature Measurement, Probe Number = 3, T = 20.123000 C 20:40:32 Temperature Measurement, Probe Number = 4, T = 20.452000 C 20:40:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.45 20:40:33 Integrated Voltage Measurement... 20:40:53 Voltage Offset Correction: v_off_ini = 0.000004584 V, v_off_fin = 0.000007432 V 20:40:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070606 Vs 20:40:53 Integrated Voltage Measurement... 20:41:12 Voltage Offset Correction: v_off_ini = 0.000007170 V, v_off_fin = 0.000003988 V 20:41:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990950 Vs 20:41:15 Temperature Measurement, Probe Number = 0, T = 20.173000 C 20:41:16 Temperature Measurement, Probe Number = 1, T = 20.101000 C 20:41:16 Temperature Measurement, Probe Number = 2, T = 20.180000 C 20:41:17 Temperature Measurement, Probe Number = 3, T = 20.126000 C 20:41:18 Temperature Measurement, Probe Number = 4, T = 20.493000 C 20:41:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.49 20:41:18 Integrated Voltage Measurement... 20:41:38 Voltage Offset Correction: v_off_ini = 0.000005247 V, v_off_fin = 0.000007521 V 20:41:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171081632 Vs 20:41:38 Integrated Voltage Measurement... 20:41:58 Voltage Offset Correction: v_off_ini = 0.000006859 V, v_off_fin = 0.000003959 V 20:41:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989929 Vs 20:42:01 Temperature Measurement, Probe Number = 0, T = 20.172000 C 20:42:02 Temperature Measurement, Probe Number = 1, T = 20.097000 C 20:42:02 Temperature Measurement, Probe Number = 2, T = 20.176000 C 20:42:03 Temperature Measurement, Probe Number = 3, T = 20.123000 C 20:42:04 Temperature Measurement, Probe Number = 4, T = 20.450000 C 20:42:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.45 20:42:04 Integrated Voltage Measurement... 20:42:23 Voltage Offset Correction: v_off_ini = 0.000004952 V, v_off_fin = 0.000007299 V 20:42:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171078173 Vs 20:42:23 Integrated Voltage Measurement... 20:42:43 Voltage Offset Correction: v_off_ini = 0.000006914 V, v_off_fin = 0.000003402 V 20:42:43 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000412 Vs 20:42:46 Temperature Measurement, Probe Number = 0, T = 20.171000 C 20:42:47 Temperature Measurement, Probe Number = 1, T = 20.097000 C 20:42:47 Temperature Measurement, Probe Number = 2, T = 20.175000 C 20:42:48 Temperature Measurement, Probe Number = 3, T = 20.122000 C 20:42:49 Temperature Measurement, Probe Number = 4, T = 20.438000 C 20:42:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.44 20:42:49 Integrated Voltage Measurement... 20:43:08 Voltage Offset Correction: v_off_ini = 0.000005147 V, v_off_fin = 0.000007129 V 20:43:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072860 Vs 20:43:09 Integrated Voltage Measurement... 20:43:28 Voltage Offset Correction: v_off_ini = 0.000006487 V, v_off_fin = 0.000003557 V 20:43:29 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170995381 Vs 20:43:31 Temperature Measurement, Probe Number = 0, T = 20.173000 C 20:43:32 Temperature Measurement, Probe Number = 1, T = 20.098000 C 20:43:33 Temperature Measurement, Probe Number = 2, T = 20.179000 C 20:43:33 Temperature Measurement, Probe Number = 3, T = 20.123000 C 20:43:34 Temperature Measurement, Probe Number = 4, T = 20.461000 C 20:43:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.46 20:43:34 Integrated Voltage Measurement... 20:43:54 Voltage Offset Correction: v_off_ini = 0.000004366 V, v_off_fin = 0.000007446 V 20:43:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075321 Vs 20:43:54 Integrated Voltage Measurement... 20:44:13 Voltage Offset Correction: v_off_ini = 0.000006924 V, v_off_fin = 0.000003699 V 20:44:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993236 Vs 20:44:16 Temperature Measurement, Probe Number = 0, T = 20.173000 C 20:44:17 Temperature Measurement, Probe Number = 1, T = 20.097000 C 20:44:18 Temperature Measurement, Probe Number = 2, T = 20.177000 C 20:44:18 Temperature Measurement, Probe Number = 3, T = 20.121000 C 20:44:19 Temperature Measurement, Probe Number = 4, T = 20.509000 C 20:44:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.51 20:44:19 Integrated Voltage Measurement... 20:44:39 Voltage Offset Correction: v_off_ini = 0.000004759 V, v_off_fin = 0.000007591 V 20:44:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072519 Vs 20:44:39 Integrated Voltage Measurement... 20:44:59 Voltage Offset Correction: v_off_ini = 0.000006684 V, v_off_fin = 0.000003730 V 20:44:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997515 Vs 21:15:02 Temperature Measurement, Probe Number = 0, T = 20.167000 C 21:15:03 Temperature Measurement, Probe Number = 1, T = 20.091000 C 21:15:03 Temperature Measurement, Probe Number = 2, T = 20.172000 C 21:15:04 Temperature Measurement, Probe Number = 3, T = 20.117000 C 21:15:04 Temperature Measurement, Probe Number = 4, T = 20.500000 C 21:15:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.50 21:15:05 Integrated Voltage Measurement... 21:15:24 Voltage Offset Correction: v_off_ini = 0.000005734 V, v_off_fin = 0.000007410 V 21:15:24 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171112002 Vs 21:15:24 Integrated Voltage Measurement... 21:15:44 Voltage Offset Correction: v_off_ini = 0.000006765 V, v_off_fin = 0.000003456 V 21:15:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999590 Vs 21:15:47 Temperature Measurement, Probe Number = 0, T = 20.167000 C 21:15:48 Temperature Measurement, Probe Number = 1, T = 20.093000 C 21:15:48 Temperature Measurement, Probe Number = 2, T = 20.174000 C 21:15:49 Temperature Measurement, Probe Number = 3, T = 20.118000 C 21:15:50 Temperature Measurement, Probe Number = 4, T = 20.478000 C 21:15:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.48 21:15:50 Integrated Voltage Measurement... 21:16:10 Voltage Offset Correction: v_off_ini = 0.000004510 V, v_off_fin = 0.000006938 V 21:16:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072984 Vs 21:16:11 Integrated Voltage Measurement... 21:16:30 Voltage Offset Correction: v_off_ini = 0.000006355 V, v_off_fin = 0.000003203 V 21:16:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002469 Vs 21:16:33 Temperature Measurement, Probe Number = 0, T = 20.162000 C 21:16:34 Temperature Measurement, Probe Number = 1, T = 20.090000 C 21:16:35 Temperature Measurement, Probe Number = 2, T = 20.169000 C 21:16:35 Temperature Measurement, Probe Number = 3, T = 20.115000 C 21:16:36 Temperature Measurement, Probe Number = 4, T = 20.466000 C 21:16:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.47 21:16:36 Integrated Voltage Measurement... 21:16:55 Voltage Offset Correction: v_off_ini = 0.000004548 V, v_off_fin = 0.000007220 V 21:16:56 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171070733 Vs 21:16:56 Integrated Voltage Measurement... 21:17:15 Voltage Offset Correction: v_off_ini = 0.000006771 V, v_off_fin = 0.000004152 V 21:17:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998027 Vs 21:17:18 Temperature Measurement, Probe Number = 0, T = 20.161000 C 21:17:19 Temperature Measurement, Probe Number = 1, T = 20.092000 C 21:17:20 Temperature Measurement, Probe Number = 2, T = 20.169000 C 21:17:20 Temperature Measurement, Probe Number = 3, T = 20.115000 C 21:17:21 Temperature Measurement, Probe Number = 4, T = 20.401000 C 21:17:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.40 21:17:21 Integrated Voltage Measurement... 21:17:41 Voltage Offset Correction: v_off_ini = 0.000005268 V, v_off_fin = 0.000006974 V 21:17:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074559 Vs 21:17:41 Integrated Voltage Measurement... 21:18:00 Voltage Offset Correction: v_off_ini = 0.000006705 V, v_off_fin = 0.000002879 V 21:18:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001726 Vs 21:18:03 Temperature Measurement, Probe Number = 0, T = 20.163000 C 21:18:04 Temperature Measurement, Probe Number = 1, T = 20.092000 C 21:18:05 Temperature Measurement, Probe Number = 2, T = 20.168000 C 21:18:05 Temperature Measurement, Probe Number = 3, T = 20.113000 C 21:18:06 Temperature Measurement, Probe Number = 4, T = 20.374000 C 21:18:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.37 21:18:06 Integrated Voltage Measurement... 21:18:26 Voltage Offset Correction: v_off_ini = 0.000003954 V, v_off_fin = 0.000007300 V 21:18:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073516 Vs 21:18:26 Integrated Voltage Measurement... 21:18:45 Voltage Offset Correction: v_off_ini = 0.000007091 V, v_off_fin = 0.000003133 V 21:18:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002410 Vs 21:18:48 Temperature Measurement, Probe Number = 0, T = 20.165000 C 21:18:49 Temperature Measurement, Probe Number = 1, T = 20.089000 C 21:18:50 Temperature Measurement, Probe Number = 2, T = 20.173000 C 21:18:50 Temperature Measurement, Probe Number = 3, T = 20.116000 C 21:18:51 Temperature Measurement, Probe Number = 4, T = 20.380000 C 21:18:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.38 21:18:51 Integrated Voltage Measurement... 21:19:11 Voltage Offset Correction: v_off_ini = 0.000004340 V, v_off_fin = 0.000007032 V 21:19:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171069994 Vs 21:19:11 Integrated Voltage Measurement... 21:19:30 Voltage Offset Correction: v_off_ini = 0.000006696 V, v_off_fin = 0.000003126 V 21:19:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001632 Vs 21:19:33 Temperature Measurement, Probe Number = 0, T = 20.161000 C 21:19:34 Temperature Measurement, Probe Number = 1, T = 20.088000 C 21:19:35 Temperature Measurement, Probe Number = 2, T = 20.169000 C 21:19:35 Temperature Measurement, Probe Number = 3, T = 20.114000 C 21:19:36 Temperature Measurement, Probe Number = 4, T = 20.455000 C 21:19:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.45 21:19:36 Integrated Voltage Measurement... 21:19:57 Voltage Offset Correction: v_off_ini = 0.000004441 V, v_off_fin = 0.000007255 V 21:19:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074174 Vs 21:19:57 Integrated Voltage Measurement... 21:20:17 Voltage Offset Correction: v_off_ini = 0.000006746 V, v_off_fin = 0.000003617 V 21:20:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996587 Vs 21:20:20 Temperature Measurement, Probe Number = 0, T = 20.163000 C 21:20:20 Temperature Measurement, Probe Number = 1, T = 20.090000 C 21:20:21 Temperature Measurement, Probe Number = 2, T = 20.168000 C 21:20:22 Temperature Measurement, Probe Number = 3, T = 20.114000 C 21:20:22 Temperature Measurement, Probe Number = 4, T = 20.474000 C 21:20:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.47 21:20:22 Integrated Voltage Measurement... 21:20:42 Voltage Offset Correction: v_off_ini = 0.000004734 V, v_off_fin = 0.000007124 V 21:20:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171069805 Vs 21:20:42 Integrated Voltage Measurement... 21:21:02 Voltage Offset Correction: v_off_ini = 0.000006744 V, v_off_fin = 0.000003768 V 21:21:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994639 Vs 21:21:05 Temperature Measurement, Probe Number = 0, T = 20.164000 C 21:21:05 Temperature Measurement, Probe Number = 1, T = 20.088000 C 21:21:06 Temperature Measurement, Probe Number = 2, T = 20.171000 C 21:21:07 Temperature Measurement, Probe Number = 3, T = 20.114000 C 21:21:07 Temperature Measurement, Probe Number = 4, T = 20.450000 C 21:21:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.45 21:21:07 Integrated Voltage Measurement... 21:21:27 Voltage Offset Correction: v_off_ini = 0.000004735 V, v_off_fin = 0.000007811 V 21:21:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171077765 Vs 21:21:27 Integrated Voltage Measurement... 21:21:47 Voltage Offset Correction: v_off_ini = 0.000006866 V, v_off_fin = 0.000003739 V 21:21:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993522 Vs 21:21:50 Temperature Measurement, Probe Number = 0, T = 20.161000 C 21:21:50 Temperature Measurement, Probe Number = 1, T = 20.088000 C 21:21:51 Temperature Measurement, Probe Number = 2, T = 20.169000 C 21:21:52 Temperature Measurement, Probe Number = 3, T = 20.113000 C 21:21:52 Temperature Measurement, Probe Number = 4, T = 20.449000 C 21:21:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.45 21:21:53 Integrated Voltage Measurement... 21:22:12 Voltage Offset Correction: v_off_ini = 0.000004550 V, v_off_fin = 0.000007604 V 21:22:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075702 Vs 21:22:12 Integrated Voltage Measurement... 21:22:32 Voltage Offset Correction: v_off_ini = 0.000007021 V, v_off_fin = 0.000003549 V 21:22:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995554 Vs 21:52:35 Temperature Measurement, Probe Number = 0, T = 20.163000 C 21:52:35 Temperature Measurement, Probe Number = 1, T = 20.088000 C 21:52:36 Temperature Measurement, Probe Number = 2, T = 20.168000 C 21:52:37 Temperature Measurement, Probe Number = 3, T = 20.112000 C 21:52:37 Temperature Measurement, Probe Number = 4, T = 20.518000 C 21:52:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.52 21:52:38 Integrated Voltage Measurement... 21:52:57 Voltage Offset Correction: v_off_ini = 0.000006138 V, v_off_fin = 0.000007488 V 21:52:57 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171126359 Vs 21:52:57 Integrated Voltage Measurement... 21:53:17 Voltage Offset Correction: v_off_ini = 0.000006780 V, v_off_fin = 0.000003515 V 21:53:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171003773 Vs 21:53:20 Temperature Measurement, Probe Number = 0, T = 20.162000 C 21:53:20 Temperature Measurement, Probe Number = 1, T = 20.086000 C 21:53:21 Temperature Measurement, Probe Number = 2, T = 20.170000 C 21:53:22 Temperature Measurement, Probe Number = 3, T = 20.114000 C 21:53:22 Temperature Measurement, Probe Number = 4, T = 20.479000 C 21:53:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.48 21:53:22 Integrated Voltage Measurement... 21:53:42 Voltage Offset Correction: v_off_ini = 0.000004930 V, v_off_fin = 0.000007264 V 21:53:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171082162 Vs 21:53:42 Integrated Voltage Measurement... 21:54:02 Voltage Offset Correction: v_off_ini = 0.000006705 V, v_off_fin = 0.000003278 V 21:54:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002487 Vs 21:54:05 Temperature Measurement, Probe Number = 0, T = 20.157000 C 21:54:05 Temperature Measurement, Probe Number = 1, T = 20.083000 C 21:54:06 Temperature Measurement, Probe Number = 2, T = 20.166000 C 21:54:07 Temperature Measurement, Probe Number = 3, T = 20.111000 C 21:54:07 Temperature Measurement, Probe Number = 4, T = 20.416000 C 21:54:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.42 21:54:07 Integrated Voltage Measurement... 21:54:27 Voltage Offset Correction: v_off_ini = 0.000004479 V, v_off_fin = 0.000007693 V 21:54:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171082148 Vs 21:54:27 Integrated Voltage Measurement... 21:54:47 Voltage Offset Correction: v_off_ini = 0.000007261 V, v_off_fin = 0.000003414 V 21:54:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999700 Vs 21:54:50 Temperature Measurement, Probe Number = 0, T = 20.159000 C 21:54:51 Temperature Measurement, Probe Number = 1, T = 20.089000 C 21:54:52 Temperature Measurement, Probe Number = 2, T = 20.165000 C 21:54:52 Temperature Measurement, Probe Number = 3, T = 20.111000 C 21:54:53 Temperature Measurement, Probe Number = 4, T = 20.430000 C 21:54:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.43 21:54:53 Integrated Voltage Measurement... 21:55:13 Voltage Offset Correction: v_off_ini = 0.000004688 V, v_off_fin = 0.000007791 V 21:55:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078252 Vs 21:55:13 Integrated Voltage Measurement... 21:55:33 Voltage Offset Correction: v_off_ini = 0.000007087 V, v_off_fin = 0.000003956 V 21:55:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997834 Vs 21:55:36 Temperature Measurement, Probe Number = 0, T = 20.165000 C 21:55:37 Temperature Measurement, Probe Number = 1, T = 20.096000 C 21:55:38 Temperature Measurement, Probe Number = 2, T = 20.172000 C 21:55:38 Temperature Measurement, Probe Number = 3, T = 20.119000 C 21:55:39 Temperature Measurement, Probe Number = 4, T = 20.416000 C 21:55:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.42 21:55:39 Integrated Voltage Measurement... 21:55:59 Voltage Offset Correction: v_off_ini = 0.000004853 V, v_off_fin = 0.000007694 V 21:55:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171082529 Vs 21:55:59 Integrated Voltage Measurement... 21:56:19 Voltage Offset Correction: v_off_ini = 0.000007092 V, v_off_fin = 0.000003821 V 21:56:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998222 Vs 21:56:22 Temperature Measurement, Probe Number = 0, T = 20.168000 C 21:56:23 Temperature Measurement, Probe Number = 1, T = 20.096000 C 21:56:23 Temperature Measurement, Probe Number = 2, T = 20.173000 C 21:56:24 Temperature Measurement, Probe Number = 3, T = 20.119000 C 21:56:25 Temperature Measurement, Probe Number = 4, T = 20.476000 C 21:56:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.48 21:56:25 Integrated Voltage Measurement... 21:56:44 Voltage Offset Correction: v_off_ini = 0.000004714 V, v_off_fin = 0.000007065 V 21:56:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076432 Vs 21:56:45 Integrated Voltage Measurement... 21:57:05 Voltage Offset Correction: v_off_ini = 0.000006990 V, v_off_fin = 0.000003705 V 21:57:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998438 Vs 21:57:08 Temperature Measurement, Probe Number = 0, T = 20.166000 C 21:57:08 Temperature Measurement, Probe Number = 1, T = 20.092000 C 21:57:09 Temperature Measurement, Probe Number = 2, T = 20.171000 C 21:57:10 Temperature Measurement, Probe Number = 3, T = 20.115000 C 21:57:10 Temperature Measurement, Probe Number = 4, T = 20.472000 C 21:57:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.47 21:57:10 Integrated Voltage Measurement... 21:57:30 Voltage Offset Correction: v_off_ini = 0.000004907 V, v_off_fin = 0.000007215 V 21:57:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072798 Vs 21:57:30 Integrated Voltage Measurement... 21:57:50 Voltage Offset Correction: v_off_ini = 0.000006227 V, v_off_fin = 0.000003385 V 21:57:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171016061 Vs 21:57:53 Temperature Measurement, Probe Number = 0, T = 20.164000 C 21:57:54 Temperature Measurement, Probe Number = 1, T = 20.093000 C 21:57:54 Temperature Measurement, Probe Number = 2, T = 20.172000 C 21:57:55 Temperature Measurement, Probe Number = 3, T = 20.116000 C 21:57:56 Temperature Measurement, Probe Number = 4, T = 20.466000 C 21:57:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.47 21:57:56 Integrated Voltage Measurement... 21:58:15 Voltage Offset Correction: v_off_ini = 0.000004665 V, v_off_fin = 0.000007611 V 21:58:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171082034 Vs 21:58:15 Integrated Voltage Measurement... 21:58:35 Voltage Offset Correction: v_off_ini = 0.000007099 V, v_off_fin = 0.000003473 V 21:58:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171002256 Vs 21:58:38 Temperature Measurement, Probe Number = 0, T = 20.164000 C 21:58:39 Temperature Measurement, Probe Number = 1, T = 20.093000 C 21:58:39 Temperature Measurement, Probe Number = 2, T = 20.171000 C 21:58:40 Temperature Measurement, Probe Number = 3, T = 20.117000 C 21:58:41 Temperature Measurement, Probe Number = 4, T = 20.467000 C 21:58:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.47 21:58:41 Integrated Voltage Measurement... 21:59:00 Voltage Offset Correction: v_off_ini = 0.000004908 V, v_off_fin = 0.000007847 V 21:59:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171084361 Vs 21:59:01 Integrated Voltage Measurement... 21:59:20 Voltage Offset Correction: v_off_ini = 0.000006638 V, v_off_fin = 0.000003538 V 21:59:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171004678 Vs 21:59:23 Temperature Measurement, Probe Number = 0, T = 20.169000 C 21:59:24 Temperature Measurement, Probe Number = 1, T = 20.099000 C 21:59:24 Temperature Measurement, Probe Number = 2, T = 20.172000 C 21:59:25 Temperature Measurement, Probe Number = 3, T = 20.121000 C 21:59:26 Temperature Measurement, Probe Number = 4, T = 20.510000 C 21:59:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.51 21:59:26 Integrated Voltage Measurement... 21:59:45 Voltage Offset Correction: v_off_ini = 0.000004686 V, v_off_fin = 0.000007743 V 21:59:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079438 Vs 21:59:46 Integrated Voltage Measurement... 22:00:05 Voltage Offset Correction: v_off_ini = 0.000006856 V, v_off_fin = 0.000003348 V 22:00:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997926 Vs 22:30:08 Temperature Measurement, Probe Number = 0, T = 20.157000 C 22:30:09 Temperature Measurement, Probe Number = 1, T = 20.086000 C 22:30:10 Temperature Measurement, Probe Number = 2, T = 20.164000 C 22:30:10 Temperature Measurement, Probe Number = 3, T = 20.110000 C 22:30:11 Temperature Measurement, Probe Number = 4, T = 20.459000 C 22:30:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.46 22:30:11 Integrated Voltage Measurement... 22:30:31 Voltage Offset Correction: v_off_ini = 0.000006684 V, v_off_fin = 0.000008400 V 22:30:32 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171138598 Vs 22:30:32 Integrated Voltage Measurement... 22:30:53 Voltage Offset Correction: v_off_ini = 0.000007486 V, v_off_fin = 0.000003493 V 22:30:53 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.171021489 Vs 22:30:56 Temperature Measurement, Probe Number = 0, T = 20.157000 C 22:30:56 Temperature Measurement, Probe Number = 1, T = 20.088000 C 22:30:57 Temperature Measurement, Probe Number = 2, T = 20.166000 C 22:30:58 Temperature Measurement, Probe Number = 3, T = 20.113000 C 22:30:58 Temperature Measurement, Probe Number = 4, T = 20.443000 C 22:30:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.44 22:30:58 Integrated Voltage Measurement... 22:31:18 Voltage Offset Correction: v_off_ini = 0.000006044 V, v_off_fin = 0.000007949 V 22:31:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078046 Vs 22:31:19 Integrated Voltage Measurement... 22:31:38 Voltage Offset Correction: v_off_ini = 0.000007571 V, v_off_fin = 0.000004453 V 22:31:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985362 Vs 22:31:41 Temperature Measurement, Probe Number = 0, T = 20.158000 C 22:31:42 Temperature Measurement, Probe Number = 1, T = 20.088000 C 22:31:42 Temperature Measurement, Probe Number = 2, T = 20.167000 C 22:31:43 Temperature Measurement, Probe Number = 3, T = 20.112000 C 22:31:44 Temperature Measurement, Probe Number = 4, T = 20.435000 C 22:31:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.43 22:31:44 Integrated Voltage Measurement... 22:32:04 Voltage Offset Correction: v_off_ini = 0.000005412 V, v_off_fin = 0.000007567 V 22:32:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171082505 Vs 22:32:04 Integrated Voltage Measurement... 22:32:23 Voltage Offset Correction: v_off_ini = 0.000007270 V, v_off_fin = 0.000003623 V 22:32:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992287 Vs 22:32:26 Temperature Measurement, Probe Number = 0, T = 20.161000 C 22:32:27 Temperature Measurement, Probe Number = 1, T = 20.091000 C 22:32:28 Temperature Measurement, Probe Number = 2, T = 20.167000 C 22:32:28 Temperature Measurement, Probe Number = 3, T = 20.113000 C 22:32:29 Temperature Measurement, Probe Number = 4, T = 20.423000 C 22:32:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.42 22:32:29 Integrated Voltage Measurement... 22:32:48 Voltage Offset Correction: v_off_ini = 0.000004811 V, v_off_fin = 0.000007813 V 22:32:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171081330 Vs 22:32:49 Integrated Voltage Measurement... 22:33:08 Voltage Offset Correction: v_off_ini = 0.000007258 V, v_off_fin = 0.000004382 V 22:33:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992558 Vs 22:33:11 Temperature Measurement, Probe Number = 0, T = 20.163000 C 22:33:12 Temperature Measurement, Probe Number = 1, T = 20.094000 C 22:33:13 Temperature Measurement, Probe Number = 2, T = 20.171000 C 22:33:13 Temperature Measurement, Probe Number = 3, T = 20.117000 C 22:33:14 Temperature Measurement, Probe Number = 4, T = 20.481000 C 22:33:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.48 22:33:14 Integrated Voltage Measurement... 22:33:34 Voltage Offset Correction: v_off_ini = 0.000005478 V, v_off_fin = 0.000007608 V 22:33:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171082015 Vs 22:33:34 Integrated Voltage Measurement... 22:33:53 Voltage Offset Correction: v_off_ini = 0.000007126 V, v_off_fin = 0.000003531 V 22:33:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992313 Vs 22:33:56 Temperature Measurement, Probe Number = 0, T = 20.166000 C 22:33:57 Temperature Measurement, Probe Number = 1, T = 20.095000 C 22:33:57 Temperature Measurement, Probe Number = 2, T = 20.173000 C 22:33:58 Temperature Measurement, Probe Number = 3, T = 20.118000 C 22:33:59 Temperature Measurement, Probe Number = 4, T = 20.518000 C 22:33:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.52 22:33:59 Integrated Voltage Measurement... 22:34:18 Voltage Offset Correction: v_off_ini = 0.000004389 V, v_off_fin = 0.000007400 V 22:34:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075833 Vs 22:34:19 Integrated Voltage Measurement... 22:34:39 Voltage Offset Correction: v_off_ini = 0.000006701 V, v_off_fin = 0.000003291 V 22:34:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000748 Vs 22:34:41 Temperature Measurement, Probe Number = 0, T = 20.162000 C 22:34:42 Temperature Measurement, Probe Number = 1, T = 20.088000 C 22:34:43 Temperature Measurement, Probe Number = 2, T = 20.173000 C 22:34:43 Temperature Measurement, Probe Number = 3, T = 20.117000 C 22:34:44 Temperature Measurement, Probe Number = 4, T = 20.576000 C 22:34:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.58 22:34:44 Integrated Voltage Measurement... 22:35:04 Voltage Offset Correction: v_off_ini = 0.000004428 V, v_off_fin = 0.000006940 V 22:35:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072907 Vs 22:35:04 Integrated Voltage Measurement... 22:35:24 Voltage Offset Correction: v_off_ini = 0.000006467 V, v_off_fin = 0.000003749 V 22:35:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999891 Vs 22:35:27 Temperature Measurement, Probe Number = 0, T = 20.160000 C 22:35:27 Temperature Measurement, Probe Number = 1, T = 20.089000 C 22:35:28 Temperature Measurement, Probe Number = 2, T = 20.168000 C 22:35:29 Temperature Measurement, Probe Number = 3, T = 20.113000 C 22:35:29 Temperature Measurement, Probe Number = 4, T = 20.513000 C 22:35:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.51 22:35:29 Integrated Voltage Measurement... 22:35:49 Voltage Offset Correction: v_off_ini = 0.000004682 V, v_off_fin = 0.000007150 V 22:35:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074779 Vs 22:35:49 Integrated Voltage Measurement... 22:36:09 Voltage Offset Correction: v_off_ini = 0.000006437 V, v_off_fin = 0.000003902 V 22:36:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995649 Vs 22:36:11 Temperature Measurement, Probe Number = 0, T = 20.165000 C 22:36:12 Temperature Measurement, Probe Number = 1, T = 20.091000 C 22:36:13 Temperature Measurement, Probe Number = 2, T = 20.171000 C 22:36:13 Temperature Measurement, Probe Number = 3, T = 20.116000 C 22:36:14 Temperature Measurement, Probe Number = 4, T = 20.482000 C 22:36:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.48 22:36:14 Integrated Voltage Measurement... 22:36:34 Voltage Offset Correction: v_off_ini = 0.000004623 V, v_off_fin = 0.000007185 V 22:36:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075443 Vs 22:36:34 Integrated Voltage Measurement... 22:36:54 Voltage Offset Correction: v_off_ini = 0.000006681 V, v_off_fin = 0.000003613 V 22:36:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001081 Vs 22:36:57 Temperature Measurement, Probe Number = 0, T = 20.165000 C 22:36:57 Temperature Measurement, Probe Number = 1, T = 20.093000 C 22:36:58 Temperature Measurement, Probe Number = 2, T = 20.170000 C 22:36:59 Temperature Measurement, Probe Number = 3, T = 20.118000 C 22:36:59 Temperature Measurement, Probe Number = 4, T = 20.521000 C 22:36:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.52 22:37:00 Integrated Voltage Measurement... 22:37:19 Voltage Offset Correction: v_off_ini = 0.000004840 V, v_off_fin = 0.000007962 V 22:37:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171079558 Vs 22:37:19 Integrated Voltage Measurement... 22:37:39 Voltage Offset Correction: v_off_ini = 0.000007068 V, v_off_fin = 0.000003958 V 22:37:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997501 Vs 23:07:42 Temperature Measurement, Probe Number = 0, T = 20.159000 C 23:07:43 Temperature Measurement, Probe Number = 1, T = 20.085000 C 23:07:43 Temperature Measurement, Probe Number = 2, T = 20.168000 C 23:07:44 Temperature Measurement, Probe Number = 3, T = 20.112000 C 23:07:45 Temperature Measurement, Probe Number = 4, T = 20.421000 C 23:07:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.42 23:07:45 Integrated Voltage Measurement... 23:08:04 Voltage Offset Correction: v_off_ini = 0.000005348 V, v_off_fin = 0.000007625 V 23:08:05 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171124066 Vs 23:08:05 Integrated Voltage Measurement... 23:08:25 Voltage Offset Correction: v_off_ini = 0.000006836 V, v_off_fin = 0.000004099 V 23:08:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998689 Vs 23:08:27 Temperature Measurement, Probe Number = 0, T = 20.158000 C 23:08:28 Temperature Measurement, Probe Number = 1, T = 20.087000 C 23:08:29 Temperature Measurement, Probe Number = 2, T = 20.166000 C 23:08:29 Temperature Measurement, Probe Number = 3, T = 20.110000 C 23:08:30 Temperature Measurement, Probe Number = 4, T = 20.414000 C 23:08:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.41 23:08:30 Integrated Voltage Measurement... 23:08:50 Voltage Offset Correction: v_off_ini = 0.000004789 V, v_off_fin = 0.000007685 V 23:08:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078257 Vs 23:08:50 Integrated Voltage Measurement... 23:09:10 Voltage Offset Correction: v_off_ini = 0.000007273 V, v_off_fin = 0.000003990 V 23:09:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996315 Vs 23:09:13 Temperature Measurement, Probe Number = 0, T = 20.160000 C 23:09:13 Temperature Measurement, Probe Number = 1, T = 20.086000 C 23:09:14 Temperature Measurement, Probe Number = 2, T = 20.167000 C 23:09:14 Temperature Measurement, Probe Number = 3, T = 20.111000 C 23:09:15 Temperature Measurement, Probe Number = 4, T = 20.448000 C 23:09:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.45 23:09:15 Integrated Voltage Measurement... 23:09:35 Voltage Offset Correction: v_off_ini = 0.000005318 V, v_off_fin = 0.000007819 V 23:09:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080084 Vs 23:09:35 Integrated Voltage Measurement... 23:09:55 Voltage Offset Correction: v_off_ini = 0.000007137 V, v_off_fin = 0.000003560 V 23:09:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997373 Vs 23:09:58 Temperature Measurement, Probe Number = 0, T = 20.161000 C 23:09:58 Temperature Measurement, Probe Number = 1, T = 20.085000 C 23:09:59 Temperature Measurement, Probe Number = 2, T = 20.167000 C 23:10:00 Temperature Measurement, Probe Number = 3, T = 20.112000 C 23:10:00 Temperature Measurement, Probe Number = 4, T = 20.489000 C 23:10:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.49 23:10:00 Integrated Voltage Measurement... 23:10:20 Voltage Offset Correction: v_off_ini = 0.000005087 V, v_off_fin = 0.000007894 V 23:10:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171082838 Vs 23:10:20 Integrated Voltage Measurement... 23:10:40 Voltage Offset Correction: v_off_ini = 0.000007274 V, v_off_fin = 0.000003780 V 23:10:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996820 Vs 23:10:43 Temperature Measurement, Probe Number = 0, T = 20.159000 C 23:10:43 Temperature Measurement, Probe Number = 1, T = 20.083000 C 23:10:44 Temperature Measurement, Probe Number = 2, T = 20.166000 C 23:10:45 Temperature Measurement, Probe Number = 3, T = 20.111000 C 23:10:45 Temperature Measurement, Probe Number = 4, T = 20.476000 C 23:10:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.48 23:10:45 Integrated Voltage Measurement... 23:11:05 Voltage Offset Correction: v_off_ini = 0.000004963 V, v_off_fin = 0.000007706 V 23:11:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171086079 Vs 23:11:05 Integrated Voltage Measurement... 23:11:25 Voltage Offset Correction: v_off_ini = 0.000006906 V, v_off_fin = 0.000003463 V 23:11:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994362 Vs 23:11:28 Temperature Measurement, Probe Number = 0, T = 20.153000 C 23:11:28 Temperature Measurement, Probe Number = 1, T = 20.078000 C 23:11:29 Temperature Measurement, Probe Number = 2, T = 20.161000 C 23:11:30 Temperature Measurement, Probe Number = 3, T = 20.105000 C 23:11:30 Temperature Measurement, Probe Number = 4, T = 20.474000 C 23:11:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.47 23:11:31 Integrated Voltage Measurement... 23:11:50 Voltage Offset Correction: v_off_ini = 0.000005007 V, v_off_fin = 0.000007865 V 23:11:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079012 Vs 23:11:50 Integrated Voltage Measurement... 23:12:10 Voltage Offset Correction: v_off_ini = 0.000007068 V, v_off_fin = 0.000003468 V 23:12:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996477 Vs 23:12:13 Temperature Measurement, Probe Number = 0, T = 20.152000 C 23:12:13 Temperature Measurement, Probe Number = 1, T = 20.078000 C 23:12:14 Temperature Measurement, Probe Number = 2, T = 20.160000 C 23:12:15 Temperature Measurement, Probe Number = 3, T = 20.104000 C 23:12:15 Temperature Measurement, Probe Number = 4, T = 20.466000 C 23:12:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.47 23:12:16 Integrated Voltage Measurement... 23:12:35 Voltage Offset Correction: v_off_ini = 0.000004699 V, v_off_fin = 0.000007798 V 23:12:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171082286 Vs 23:12:36 Integrated Voltage Measurement... 23:12:56 Voltage Offset Correction: v_off_ini = 0.000006558 V, v_off_fin = 0.000003400 V 23:12:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000532 Vs 23:12:59 Temperature Measurement, Probe Number = 0, T = 20.152000 C 23:12:59 Temperature Measurement, Probe Number = 1, T = 20.084000 C 23:13:00 Temperature Measurement, Probe Number = 2, T = 20.160000 C 23:13:01 Temperature Measurement, Probe Number = 3, T = 20.107000 C 23:13:01 Temperature Measurement, Probe Number = 4, T = 20.417000 C 23:13:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.42 23:13:01 Integrated Voltage Measurement... 23:13:21 Voltage Offset Correction: v_off_ini = 0.000004522 V, v_off_fin = 0.000007283 V 23:13:21 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171077489 Vs 23:13:22 Integrated Voltage Measurement... 23:13:41 Voltage Offset Correction: v_off_ini = 0.000006720 V, v_off_fin = 0.000003919 V 23:13:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998902 Vs 23:13:44 Temperature Measurement, Probe Number = 0, T = 20.157000 C 23:13:45 Temperature Measurement, Probe Number = 1, T = 20.084000 C 23:13:45 Temperature Measurement, Probe Number = 2, T = 20.166000 C 23:13:46 Temperature Measurement, Probe Number = 3, T = 20.111000 C 23:13:47 Temperature Measurement, Probe Number = 4, T = 20.448000 C 23:13:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.45 23:13:47 Integrated Voltage Measurement... 23:14:06 Voltage Offset Correction: v_off_ini = 0.000004860 V, v_off_fin = 0.000007369 V 23:14:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171077043 Vs 23:14:06 Integrated Voltage Measurement... 23:14:26 Voltage Offset Correction: v_off_ini = 0.000006799 V, v_off_fin = 0.000003261 V 23:14:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171004679 Vs 23:14:29 Temperature Measurement, Probe Number = 0, T = 20.160000 C 23:14:30 Temperature Measurement, Probe Number = 1, T = 20.084000 C 23:14:30 Temperature Measurement, Probe Number = 2, T = 20.166000 C 23:14:31 Temperature Measurement, Probe Number = 3, T = 20.111000 C 23:14:32 Temperature Measurement, Probe Number = 4, T = 20.464000 C 23:14:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.46 23:14:32 Integrated Voltage Measurement... 23:14:51 Voltage Offset Correction: v_off_ini = 0.000004471 V, v_off_fin = 0.000007522 V 23:14:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076065 Vs 23:14:52 Integrated Voltage Measurement... 23:15:12 Voltage Offset Correction: v_off_ini = 0.000006734 V, v_off_fin = 0.000003764 V 23:15:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996266 Vs 23:45:15 Temperature Measurement, Probe Number = 0, T = 20.147000 C 23:45:15 Temperature Measurement, Probe Number = 1, T = 20.078000 C 23:45:16 Temperature Measurement, Probe Number = 2, T = 20.156000 C 23:45:17 Temperature Measurement, Probe Number = 3, T = 20.104000 C 23:45:17 Temperature Measurement, Probe Number = 4, T = 20.339000 C 23:45:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.34 23:45:18 Integrated Voltage Measurement... 23:45:37 Voltage Offset Correction: v_off_ini = 0.000005454 V, v_off_fin = 0.000007860 V 23:45:37 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171119990 Vs 23:45:37 Integrated Voltage Measurement... 23:45:57 Voltage Offset Correction: v_off_ini = 0.000006913 V, v_off_fin = 0.000003811 V 23:45:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995711 Vs 23:46:00 Temperature Measurement, Probe Number = 0, T = 20.154000 C 23:46:01 Temperature Measurement, Probe Number = 1, T = 20.082000 C 23:46:01 Temperature Measurement, Probe Number = 2, T = 20.157000 C 23:46:02 Temperature Measurement, Probe Number = 3, T = 20.108000 C 23:46:03 Temperature Measurement, Probe Number = 4, T = 20.324000 C 23:46:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.32 23:46:03 Integrated Voltage Measurement... 23:46:22 Voltage Offset Correction: v_off_ini = 0.000004838 V, v_off_fin = 0.000007575 V 23:46:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079049 Vs 23:46:23 Integrated Voltage Measurement... 23:46:42 Voltage Offset Correction: v_off_ini = 0.000007176 V, v_off_fin = 0.000003703 V 23:46:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999715 Vs 23:46:45 Temperature Measurement, Probe Number = 0, T = 20.153000 C 23:46:46 Temperature Measurement, Probe Number = 1, T = 20.075000 C 23:46:46 Temperature Measurement, Probe Number = 2, T = 20.160000 C 23:46:47 Temperature Measurement, Probe Number = 3, T = 20.105000 C 23:46:48 Temperature Measurement, Probe Number = 4, T = 20.359000 C 23:46:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.36 23:46:48 Integrated Voltage Measurement... 23:47:07 Voltage Offset Correction: v_off_ini = 0.000005211 V, v_off_fin = 0.000007971 V 23:47:07 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171088169 Vs 23:47:07 Integrated Voltage Measurement... 23:47:27 Voltage Offset Correction: v_off_ini = 0.000007470 V, v_off_fin = 0.000003788 V 23:47:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997667 Vs 23:47:30 Temperature Measurement, Probe Number = 0, T = 20.149000 C 23:47:31 Temperature Measurement, Probe Number = 1, T = 20.078000 C 23:47:31 Temperature Measurement, Probe Number = 2, T = 20.161000 C 23:47:32 Temperature Measurement, Probe Number = 3, T = 20.105000 C 23:47:33 Temperature Measurement, Probe Number = 4, T = 20.359000 C 23:47:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.36 23:47:33 Integrated Voltage Measurement... 23:47:52 Voltage Offset Correction: v_off_ini = 0.000005116 V, v_off_fin = 0.000008314 V 23:47:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171084902 Vs 23:47:53 Integrated Voltage Measurement... 23:48:12 Voltage Offset Correction: v_off_ini = 0.000007079 V, v_off_fin = 0.000003241 V 23:48:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995711 Vs 23:48:15 Temperature Measurement, Probe Number = 0, T = 20.152000 C 23:48:16 Temperature Measurement, Probe Number = 1, T = 20.079000 C 23:48:17 Temperature Measurement, Probe Number = 2, T = 20.163000 C 23:48:17 Temperature Measurement, Probe Number = 3, T = 20.107000 C 23:48:18 Temperature Measurement, Probe Number = 4, T = 20.324000 C 23:48:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.32 23:48:18 Integrated Voltage Measurement... 23:48:38 Voltage Offset Correction: v_off_ini = 0.000005005 V, v_off_fin = 0.000007373 V 23:48:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171081874 Vs 23:48:38 Integrated Voltage Measurement... 23:48:57 Voltage Offset Correction: v_off_ini = 0.000006813 V, v_off_fin = 0.000003148 V 23:48:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171000940 Vs 23:49:00 Temperature Measurement, Probe Number = 0, T = 20.155000 C 23:49:01 Temperature Measurement, Probe Number = 1, T = 20.082000 C 23:49:01 Temperature Measurement, Probe Number = 2, T = 20.166000 C 23:49:02 Temperature Measurement, Probe Number = 3, T = 20.111000 C 23:49:03 Temperature Measurement, Probe Number = 4, T = 20.327000 C 23:49:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.33 23:49:03 Integrated Voltage Measurement... 23:49:23 Voltage Offset Correction: v_off_ini = 0.000004567 V, v_off_fin = 0.000007265 V 23:49:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171085216 Vs 23:49:24 Integrated Voltage Measurement... 23:49:43 Voltage Offset Correction: v_off_ini = 0.000006517 V, v_off_fin = 0.000003631 V 23:49:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000585 Vs 23:49:46 Temperature Measurement, Probe Number = 0, T = 20.154000 C 23:49:47 Temperature Measurement, Probe Number = 1, T = 20.079000 C 23:49:48 Temperature Measurement, Probe Number = 2, T = 20.164000 C 23:49:48 Temperature Measurement, Probe Number = 3, T = 20.108000 C 23:49:49 Temperature Measurement, Probe Number = 4, T = 20.384000 C 23:49:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.38 23:49:49 Integrated Voltage Measurement... 23:50:08 Voltage Offset Correction: v_off_ini = 0.000005259 V, v_off_fin = 0.000007605 V 23:50:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171077474 Vs 23:50:09 Integrated Voltage Measurement... 23:50:28 Voltage Offset Correction: v_off_ini = 0.000007071 V, v_off_fin = 0.000003500 V 23:50:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998304 Vs 23:50:31 Temperature Measurement, Probe Number = 0, T = 20.152000 C 23:50:32 Temperature Measurement, Probe Number = 1, T = 20.082000 C 23:50:33 Temperature Measurement, Probe Number = 2, T = 20.164000 C 23:50:33 Temperature Measurement, Probe Number = 3, T = 20.109000 C 23:50:34 Temperature Measurement, Probe Number = 4, T = 20.370000 C 23:50:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.37 23:50:34 Integrated Voltage Measurement... 23:50:55 Voltage Offset Correction: v_off_ini = 0.000005008 V, v_off_fin = 0.000007622 V 23:50:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171085246 Vs 23:50:55 Integrated Voltage Measurement... 23:51:15 Voltage Offset Correction: v_off_ini = 0.000007009 V, v_off_fin = 0.000003884 V 23:51:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000769 Vs 23:51:17 Temperature Measurement, Probe Number = 0, T = 20.155000 C 23:51:18 Temperature Measurement, Probe Number = 1, T = 20.081000 C 23:51:19 Temperature Measurement, Probe Number = 2, T = 20.164000 C 23:51:19 Temperature Measurement, Probe Number = 3, T = 20.109000 C 23:51:20 Temperature Measurement, Probe Number = 4, T = 20.420000 C 23:51:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.42 23:51:20 Integrated Voltage Measurement... 23:51:40 Voltage Offset Correction: v_off_ini = 0.000004841 V, v_off_fin = 0.000007821 V 23:51:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080582 Vs 23:51:40 Integrated Voltage Measurement... 23:52:00 Voltage Offset Correction: v_off_ini = 0.000007147 V, v_off_fin = 0.000004453 V 23:52:00 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170996385 Vs 23:52:02 Temperature Measurement, Probe Number = 0, T = 20.155000 C 23:52:03 Temperature Measurement, Probe Number = 1, T = 20.077000 C 23:52:04 Temperature Measurement, Probe Number = 2, T = 20.162000 C 23:52:04 Temperature Measurement, Probe Number = 3, T = 20.106000 C 23:52:05 Temperature Measurement, Probe Number = 4, T = 20.434000 C 23:52:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.43 23:52:05 Integrated Voltage Measurement... 23:52:25 Voltage Offset Correction: v_off_ini = 0.000005260 V, v_off_fin = 0.000007689 V 23:52:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079465 Vs 23:52:25 Integrated Voltage Measurement... 23:52:45 Voltage Offset Correction: v_off_ini = 0.000007101 V, v_off_fin = 0.000003972 V 23:52:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171003841 Vs 00:22:48 Temperature Measurement, Probe Number = 0, T = 20.144000 C 00:22:48 Temperature Measurement, Probe Number = 1, T = 20.071000 C 00:22:49 Temperature Measurement, Probe Number = 2, T = 20.154000 C 00:22:50 Temperature Measurement, Probe Number = 3, T = 20.101000 C 00:22:50 Temperature Measurement, Probe Number = 4, T = 20.378000 C 00:22:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.38 00:22:50 Integrated Voltage Measurement... 00:23:11 Voltage Offset Correction: v_off_ini = 0.000005998 V, v_off_fin = 0.000008082 V 00:23:11 Integrated Voltage Measurement Delta Gap = 0.0040010 m VT = 0.171116892 Vs 00:23:11 Integrated Voltage Measurement... 00:23:30 Voltage Offset Correction: v_off_ini = 0.000007204 V, v_off_fin = 0.000003639 V 00:23:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999624 Vs 00:23:33 Temperature Measurement, Probe Number = 0, T = 20.150000 C 00:23:34 Temperature Measurement, Probe Number = 1, T = 20.077000 C 00:23:35 Temperature Measurement, Probe Number = 2, T = 20.159000 C 00:23:35 Temperature Measurement, Probe Number = 3, T = 20.106000 C 00:23:36 Temperature Measurement, Probe Number = 4, T = 20.387000 C 00:23:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.39 00:23:36 Integrated Voltage Measurement... 00:23:56 Voltage Offset Correction: v_off_ini = 0.000005235 V, v_off_fin = 0.000007526 V 00:23:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171077796 Vs 00:23:57 Integrated Voltage Measurement... 00:24:16 Voltage Offset Correction: v_off_ini = 0.000007332 V, v_off_fin = 0.000003990 V 00:24:16 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986020 Vs 00:24:19 Temperature Measurement, Probe Number = 0, T = 20.149000 C 00:24:19 Temperature Measurement, Probe Number = 1, T = 20.077000 C 00:24:20 Temperature Measurement, Probe Number = 2, T = 20.158000 C 00:24:21 Temperature Measurement, Probe Number = 3, T = 20.106000 C 00:24:21 Temperature Measurement, Probe Number = 4, T = 20.427000 C 00:24:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.43 00:24:21 Integrated Voltage Measurement... 00:24:41 Voltage Offset Correction: v_off_ini = 0.000004936 V, v_off_fin = 0.000008066 V 00:24:41 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171090337 Vs 00:24:41 Integrated Voltage Measurement... 00:25:00 Voltage Offset Correction: v_off_ini = 0.000007548 V, v_off_fin = 0.000003867 V 00:25:01 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170992268 Vs 00:25:03 Temperature Measurement, Probe Number = 0, T = 20.149000 C 00:25:04 Temperature Measurement, Probe Number = 1, T = 20.078000 C 00:25:05 Temperature Measurement, Probe Number = 2, T = 20.160000 C 00:25:05 Temperature Measurement, Probe Number = 3, T = 20.106000 C 00:25:06 Temperature Measurement, Probe Number = 4, T = 20.450000 C 00:25:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.45 00:25:06 Integrated Voltage Measurement... 00:25:26 Voltage Offset Correction: v_off_ini = 0.000005175 V, v_off_fin = 0.000008135 V 00:25:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171082090 Vs 00:25:27 Integrated Voltage Measurement... 00:25:46 Voltage Offset Correction: v_off_ini = 0.000007284 V, v_off_fin = 0.000004251 V 00:25:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989025 Vs 00:25:49 Temperature Measurement, Probe Number = 0, T = 20.151000 C 00:25:49 Temperature Measurement, Probe Number = 1, T = 20.077000 C 00:25:50 Temperature Measurement, Probe Number = 2, T = 20.161000 C 00:25:51 Temperature Measurement, Probe Number = 3, T = 20.106000 C 00:25:51 Temperature Measurement, Probe Number = 4, T = 20.461000 C 00:25:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.46 00:25:52 Integrated Voltage Measurement... 00:26:11 Voltage Offset Correction: v_off_ini = 0.000005522 V, v_off_fin = 0.000007997 V 00:26:11 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171087126 Vs 00:26:11 Integrated Voltage Measurement... 00:26:31 Voltage Offset Correction: v_off_ini = 0.000007614 V, v_off_fin = 0.000003884 V 00:26:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986942 Vs 00:26:34 Temperature Measurement, Probe Number = 0, T = 20.144000 C 00:26:34 Temperature Measurement, Probe Number = 1, T = 20.072000 C 00:26:35 Temperature Measurement, Probe Number = 2, T = 20.155000 C 00:26:36 Temperature Measurement, Probe Number = 3, T = 20.099000 C 00:26:36 Temperature Measurement, Probe Number = 4, T = 20.459000 C 00:26:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.46 00:26:36 Integrated Voltage Measurement... 00:26:57 Voltage Offset Correction: v_off_ini = 0.000005712 V, v_off_fin = 0.000008148 V 00:26:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171091042 Vs 00:26:57 Integrated Voltage Measurement... 00:27:17 Voltage Offset Correction: v_off_ini = 0.000007099 V, v_off_fin = 0.000004150 V 00:27:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990889 Vs 00:27:20 Temperature Measurement, Probe Number = 0, T = 20.143000 C 00:27:20 Temperature Measurement, Probe Number = 1, T = 20.071000 C 00:27:21 Temperature Measurement, Probe Number = 2, T = 20.155000 C 00:27:22 Temperature Measurement, Probe Number = 3, T = 20.100000 C 00:27:22 Temperature Measurement, Probe Number = 4, T = 20.438000 C 00:27:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.44 00:27:23 Integrated Voltage Measurement... 00:27:42 Voltage Offset Correction: v_off_ini = 0.000004431 V, v_off_fin = 0.000008290 V 00:27:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171083124 Vs 00:27:42 Integrated Voltage Measurement... 00:28:02 Voltage Offset Correction: v_off_ini = 0.000006711 V, v_off_fin = 0.000004122 V 00:28:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997436 Vs 00:28:05 Temperature Measurement, Probe Number = 0, T = 20.145000 C 00:28:05 Temperature Measurement, Probe Number = 1, T = 20.072000 C 00:28:06 Temperature Measurement, Probe Number = 2, T = 20.155000 C 00:28:07 Temperature Measurement, Probe Number = 3, T = 20.101000 C 00:28:07 Temperature Measurement, Probe Number = 4, T = 20.448000 C 00:28:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.45 00:28:08 Integrated Voltage Measurement... 00:28:27 Voltage Offset Correction: v_off_ini = 0.000005011 V, v_off_fin = 0.000007701 V 00:28:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076557 Vs 00:28:27 Integrated Voltage Measurement... 00:28:48 Voltage Offset Correction: v_off_ini = 0.000006742 V, v_off_fin = 0.000004020 V 00:28:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996313 Vs 00:28:50 Temperature Measurement, Probe Number = 0, T = 20.145000 C 00:28:51 Temperature Measurement, Probe Number = 1, T = 20.073000 C 00:28:52 Temperature Measurement, Probe Number = 2, T = 20.152000 C 00:28:52 Temperature Measurement, Probe Number = 3, T = 20.098000 C 00:28:53 Temperature Measurement, Probe Number = 4, T = 20.392000 C 00:28:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.39 00:28:53 Integrated Voltage Measurement... 00:29:13 Voltage Offset Correction: v_off_ini = 0.000004909 V, v_off_fin = 0.000007429 V 00:29:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073944 Vs 00:29:13 Integrated Voltage Measurement... 00:29:33 Voltage Offset Correction: v_off_ini = 0.000007018 V, v_off_fin = 0.000003073 V 00:29:33 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997991 Vs 00:29:36 Temperature Measurement, Probe Number = 0, T = 20.147000 C 00:29:36 Temperature Measurement, Probe Number = 1, T = 20.073000 C 00:29:37 Temperature Measurement, Probe Number = 2, T = 20.157000 C 00:29:38 Temperature Measurement, Probe Number = 3, T = 20.102000 C 00:29:38 Temperature Measurement, Probe Number = 4, T = 20.418000 C 00:29:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.42 00:29:39 Integrated Voltage Measurement... 00:29:58 Voltage Offset Correction: v_off_ini = 0.000004274 V, v_off_fin = 0.000006853 V 00:29:58 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171079064 Vs 00:29:59 Integrated Voltage Measurement... 00:30:18 Voltage Offset Correction: v_off_ini = 0.000006268 V, v_off_fin = 0.000003928 V 00:30:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995947 Vs 01:00:21 Temperature Measurement, Probe Number = 0, T = 20.136000 C 01:00:22 Temperature Measurement, Probe Number = 1, T = 20.064000 C 01:00:22 Temperature Measurement, Probe Number = 2, T = 20.149000 C 01:00:23 Temperature Measurement, Probe Number = 3, T = 20.094000 C 01:00:24 Temperature Measurement, Probe Number = 4, T = 20.471000 C 01:00:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.47 01:00:24 Integrated Voltage Measurement... 01:00:43 Voltage Offset Correction: v_off_ini = 0.000005810 V, v_off_fin = 0.000007088 V 01:00:43 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171124720 Vs 01:00:44 Integrated Voltage Measurement... 01:01:03 Voltage Offset Correction: v_off_ini = 0.000006383 V, v_off_fin = 0.000003004 V 01:01:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992873 Vs 01:01:06 Temperature Measurement, Probe Number = 0, T = 20.143000 C 01:01:06 Temperature Measurement, Probe Number = 1, T = 20.070000 C 01:01:07 Temperature Measurement, Probe Number = 2, T = 20.156000 C 01:01:08 Temperature Measurement, Probe Number = 3, T = 20.100000 C 01:01:08 Temperature Measurement, Probe Number = 4, T = 20.471000 C 01:01:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.47 01:01:09 Integrated Voltage Measurement... 01:01:28 Voltage Offset Correction: v_off_ini = 0.000004785 V, v_off_fin = 0.000007209 V 01:01:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171064837 Vs 01:01:28 Integrated Voltage Measurement... 01:01:48 Voltage Offset Correction: v_off_ini = 0.000006577 V, v_off_fin = 0.000003738 V 01:01:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986820 Vs 01:01:51 Temperature Measurement, Probe Number = 0, T = 20.135000 C 01:01:52 Temperature Measurement, Probe Number = 1, T = 20.061000 C 01:01:52 Temperature Measurement, Probe Number = 2, T = 20.147000 C 01:01:53 Temperature Measurement, Probe Number = 3, T = 20.092000 C 01:01:53 Temperature Measurement, Probe Number = 4, T = 20.473000 C 01:01:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.47 01:01:54 Integrated Voltage Measurement... 01:02:13 Voltage Offset Correction: v_off_ini = 0.000004691 V, v_off_fin = 0.000008345 V 01:02:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071242 Vs 01:02:13 Integrated Voltage Measurement... 01:02:33 Voltage Offset Correction: v_off_ini = 0.000007073 V, v_off_fin = 0.000003567 V 01:02:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170994389 Vs 01:02:36 Temperature Measurement, Probe Number = 0, T = 20.136000 C 01:02:37 Temperature Measurement, Probe Number = 1, T = 20.066000 C 01:02:37 Temperature Measurement, Probe Number = 2, T = 20.148000 C 01:02:38 Temperature Measurement, Probe Number = 3, T = 20.092000 C 01:02:39 Temperature Measurement, Probe Number = 4, T = 20.511000 C 01:02:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.51 01:02:39 Integrated Voltage Measurement... 01:02:58 Voltage Offset Correction: v_off_ini = 0.000004998 V, v_off_fin = 0.000007286 V 01:02:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171063357 Vs 01:02:58 Integrated Voltage Measurement... 01:03:19 Voltage Offset Correction: v_off_ini = 0.000006776 V, v_off_fin = 0.000003272 V 01:03:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992483 Vs 01:03:22 Temperature Measurement, Probe Number = 0, T = 20.144000 C 01:03:22 Temperature Measurement, Probe Number = 1, T = 20.072000 C 01:03:23 Temperature Measurement, Probe Number = 2, T = 20.153000 C 01:03:24 Temperature Measurement, Probe Number = 3, T = 20.097000 C 01:03:24 Temperature Measurement, Probe Number = 4, T = 20.472000 C 01:03:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.47 01:03:25 Integrated Voltage Measurement... 01:03:44 Voltage Offset Correction: v_off_ini = 0.000004792 V, v_off_fin = 0.000007477 V 01:03:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066934 Vs 01:03:45 Integrated Voltage Measurement... 01:04:04 Voltage Offset Correction: v_off_ini = 0.000006905 V, v_off_fin = 0.000003635 V 01:04:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984111 Vs 01:04:07 Temperature Measurement, Probe Number = 0, T = 20.145000 C 01:04:08 Temperature Measurement, Probe Number = 1, T = 20.071000 C 01:04:09 Temperature Measurement, Probe Number = 2, T = 20.157000 C 01:04:09 Temperature Measurement, Probe Number = 3, T = 20.099000 C 01:04:10 Temperature Measurement, Probe Number = 4, T = 20.475000 C 01:04:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.48 01:04:10 Integrated Voltage Measurement... 01:04:29 Voltage Offset Correction: v_off_ini = 0.000005183 V, v_off_fin = 0.000008178 V 01:04:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075975 Vs 01:04:30 Integrated Voltage Measurement... 01:04:50 Voltage Offset Correction: v_off_ini = 0.000007321 V, v_off_fin = 0.000004350 V 01:04:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977581 Vs 01:04:53 Temperature Measurement, Probe Number = 0, T = 20.142000 C 01:04:54 Temperature Measurement, Probe Number = 1, T = 20.073000 C 01:04:54 Temperature Measurement, Probe Number = 2, T = 20.157000 C 01:04:55 Temperature Measurement, Probe Number = 3, T = 20.102000 C 01:04:55 Temperature Measurement, Probe Number = 4, T = 20.507000 C 01:04:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.51 01:04:56 Integrated Voltage Measurement... 01:05:15 Voltage Offset Correction: v_off_ini = 0.000005330 V, v_off_fin = 0.000007965 V 01:05:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074037 Vs 01:05:16 Integrated Voltage Measurement... 01:05:35 Voltage Offset Correction: v_off_ini = 0.000007176 V, v_off_fin = 0.000003668 V 01:05:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984940 Vs 01:05:38 Temperature Measurement, Probe Number = 0, T = 20.142000 C 01:05:39 Temperature Measurement, Probe Number = 1, T = 20.073000 C 01:05:40 Temperature Measurement, Probe Number = 2, T = 20.156000 C 01:05:40 Temperature Measurement, Probe Number = 3, T = 20.103000 C 01:05:41 Temperature Measurement, Probe Number = 4, T = 20.531000 C 01:05:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.53 01:05:41 Integrated Voltage Measurement... 01:06:01 Voltage Offset Correction: v_off_ini = 0.000005311 V, v_off_fin = 0.000007929 V 01:06:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171076700 Vs 01:06:01 Integrated Voltage Measurement... 01:06:20 Voltage Offset Correction: v_off_ini = 0.000007169 V, v_off_fin = 0.000004402 V 01:06:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978332 Vs 01:06:23 Temperature Measurement, Probe Number = 0, T = 20.141000 C 01:06:24 Temperature Measurement, Probe Number = 1, T = 20.071000 C 01:06:25 Temperature Measurement, Probe Number = 2, T = 20.152000 C 01:06:25 Temperature Measurement, Probe Number = 3, T = 20.098000 C 01:06:26 Temperature Measurement, Probe Number = 4, T = 20.502000 C 01:06:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.50 01:06:26 Integrated Voltage Measurement... 01:06:46 Voltage Offset Correction: v_off_ini = 0.000005485 V, v_off_fin = 0.000008304 V 01:06:46 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171083318 Vs 01:06:46 Integrated Voltage Measurement... 01:07:05 Voltage Offset Correction: v_off_ini = 0.000007591 V, v_off_fin = 0.000004528 V 01:07:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979406 Vs 01:07:08 Temperature Measurement, Probe Number = 0, T = 20.142000 C 01:07:09 Temperature Measurement, Probe Number = 1, T = 20.071000 C 01:07:10 Temperature Measurement, Probe Number = 2, T = 20.155000 C 01:07:10 Temperature Measurement, Probe Number = 3, T = 20.100000 C 01:07:11 Temperature Measurement, Probe Number = 4, T = 20.472000 C 01:07:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.47 01:07:11 Integrated Voltage Measurement... 01:07:31 Voltage Offset Correction: v_off_ini = 0.000005212 V, v_off_fin = 0.000007759 V 01:07:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171078871 Vs 01:07:31 Integrated Voltage Measurement... 01:07:51 Voltage Offset Correction: v_off_ini = 0.000007530 V, v_off_fin = 0.000004096 V 01:07:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983192 Vs 01:37:54 Temperature Measurement, Probe Number = 0, T = 20.144000 C 01:37:55 Temperature Measurement, Probe Number = 1, T = 20.074000 C 01:37:55 Temperature Measurement, Probe Number = 2, T = 20.152000 C 01:37:56 Temperature Measurement, Probe Number = 3, T = 20.100000 C 01:37:57 Temperature Measurement, Probe Number = 4, T = 20.459000 C 01:37:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.46 01:37:57 Integrated Voltage Measurement... 01:38:17 Voltage Offset Correction: v_off_ini = 0.000005992 V, v_off_fin = 0.000007484 V 01:38:17 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171125952 Vs 01:38:17 Integrated Voltage Measurement... 01:38:36 Voltage Offset Correction: v_off_ini = 0.000006931 V, v_off_fin = 0.000003486 V 01:38:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986311 Vs 01:38:39 Temperature Measurement, Probe Number = 0, T = 20.148000 C 01:38:40 Temperature Measurement, Probe Number = 1, T = 20.078000 C 01:38:41 Temperature Measurement, Probe Number = 2, T = 20.159000 C 01:38:41 Temperature Measurement, Probe Number = 3, T = 20.105000 C 01:38:42 Temperature Measurement, Probe Number = 4, T = 20.470000 C 01:38:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.47 01:38:42 Integrated Voltage Measurement... 01:39:02 Voltage Offset Correction: v_off_ini = 0.000005241 V, v_off_fin = 0.000007229 V 01:39:02 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171070592 Vs 01:39:02 Integrated Voltage Measurement... 01:39:22 Voltage Offset Correction: v_off_ini = 0.000006635 V, v_off_fin = 0.000004014 V 01:39:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985694 Vs 01:39:25 Temperature Measurement, Probe Number = 0, T = 20.149000 C 01:39:26 Temperature Measurement, Probe Number = 1, T = 20.079000 C 01:39:26 Temperature Measurement, Probe Number = 2, T = 20.157000 C 01:39:27 Temperature Measurement, Probe Number = 3, T = 20.106000 C 01:39:28 Temperature Measurement, Probe Number = 4, T = 20.484000 C 01:39:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.48 01:39:28 Integrated Voltage Measurement... 01:39:48 Voltage Offset Correction: v_off_ini = 0.000004485 V, v_off_fin = 0.000007447 V 01:39:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171068618 Vs 01:39:48 Integrated Voltage Measurement... 01:40:08 Voltage Offset Correction: v_off_ini = 0.000006815 V, v_off_fin = 0.000003480 V 01:40:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989054 Vs 01:40:11 Temperature Measurement, Probe Number = 0, T = 20.150000 C 01:40:11 Temperature Measurement, Probe Number = 1, T = 20.078000 C 01:40:12 Temperature Measurement, Probe Number = 2, T = 20.159000 C 01:40:13 Temperature Measurement, Probe Number = 3, T = 20.106000 C 01:40:13 Temperature Measurement, Probe Number = 4, T = 20.518000 C 01:40:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.52 01:40:13 Integrated Voltage Measurement... 01:40:33 Voltage Offset Correction: v_off_ini = 0.000004971 V, v_off_fin = 0.000007907 V 01:40:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073777 Vs 01:40:33 Integrated Voltage Measurement... 01:40:53 Voltage Offset Correction: v_off_ini = 0.000006798 V, v_off_fin = 0.000003639 V 01:40:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987787 Vs 01:40:56 Temperature Measurement, Probe Number = 0, T = 20.148000 C 01:40:56 Temperature Measurement, Probe Number = 1, T = 20.077000 C 01:40:57 Temperature Measurement, Probe Number = 2, T = 20.156000 C 01:40:57 Temperature Measurement, Probe Number = 3, T = 20.105000 C 01:40:58 Temperature Measurement, Probe Number = 4, T = 20.593000 C 01:40:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.59 01:40:58 Integrated Voltage Measurement... 01:41:18 Voltage Offset Correction: v_off_ini = 0.000005025 V, v_off_fin = 0.000007247 V 01:41:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072641 Vs 01:41:19 Integrated Voltage Measurement... 01:41:38 Voltage Offset Correction: v_off_ini = 0.000006712 V, v_off_fin = 0.000003508 V 01:41:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986428 Vs 01:41:41 Temperature Measurement, Probe Number = 0, T = 20.148000 C 01:41:41 Temperature Measurement, Probe Number = 1, T = 20.079000 C 01:41:42 Temperature Measurement, Probe Number = 2, T = 20.158000 C 01:41:43 Temperature Measurement, Probe Number = 3, T = 20.106000 C 01:41:43 Temperature Measurement, Probe Number = 4, T = 20.550000 C 01:41:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.55 01:41:43 Integrated Voltage Measurement... 01:42:03 Voltage Offset Correction: v_off_ini = 0.000004632 V, v_off_fin = 0.000007713 V 01:42:03 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171077075 Vs 01:42:03 Integrated Voltage Measurement... 01:42:23 Voltage Offset Correction: v_off_ini = 0.000006548 V, v_off_fin = 0.000004031 V 01:42:23 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987250 Vs 01:42:26 Temperature Measurement, Probe Number = 0, T = 20.148000 C 01:42:26 Temperature Measurement, Probe Number = 1, T = 20.077000 C 01:42:27 Temperature Measurement, Probe Number = 2, T = 20.157000 C 01:42:28 Temperature Measurement, Probe Number = 3, T = 20.104000 C 01:42:28 Temperature Measurement, Probe Number = 4, T = 20.520000 C 01:42:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.52 01:42:29 Integrated Voltage Measurement... 01:42:48 Voltage Offset Correction: v_off_ini = 0.000004893 V, v_off_fin = 0.000007727 V 01:42:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171071454 Vs 01:42:48 Integrated Voltage Measurement... 01:43:08 Voltage Offset Correction: v_off_ini = 0.000006836 V, v_off_fin = 0.000003325 V 01:43:08 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987400 Vs 01:43:10 Temperature Measurement, Probe Number = 0, T = 20.148000 C 01:43:11 Temperature Measurement, Probe Number = 1, T = 20.077000 C 01:43:12 Temperature Measurement, Probe Number = 2, T = 20.155000 C 01:43:12 Temperature Measurement, Probe Number = 3, T = 20.103000 C 01:43:13 Temperature Measurement, Probe Number = 4, T = 20.517000 C 01:43:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.52 01:43:13 Integrated Voltage Measurement... 01:43:34 Voltage Offset Correction: v_off_ini = 0.000004573 V, v_off_fin = 0.000006849 V 01:43:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171069434 Vs 01:43:34 Integrated Voltage Measurement... 01:43:53 Voltage Offset Correction: v_off_ini = 0.000006238 V, v_off_fin = 0.000003646 V 01:43:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985124 Vs 01:43:56 Temperature Measurement, Probe Number = 0, T = 20.148000 C 01:43:57 Temperature Measurement, Probe Number = 1, T = 20.076000 C 01:43:57 Temperature Measurement, Probe Number = 2, T = 20.157000 C 01:43:58 Temperature Measurement, Probe Number = 3, T = 20.102000 C 01:43:59 Temperature Measurement, Probe Number = 4, T = 20.539000 C 01:43:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.54 01:43:59 Integrated Voltage Measurement... 01:44:18 Voltage Offset Correction: v_off_ini = 0.000005363 V, v_off_fin = 0.000007586 V 01:44:18 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171069834 Vs 01:44:19 Integrated Voltage Measurement... 01:44:38 Voltage Offset Correction: v_off_ini = 0.000006392 V, v_off_fin = 0.000003024 V 01:44:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990478 Vs 01:44:41 Temperature Measurement, Probe Number = 0, T = 20.146000 C 01:44:42 Temperature Measurement, Probe Number = 1, T = 20.075000 C 01:44:42 Temperature Measurement, Probe Number = 2, T = 20.153000 C 01:44:43 Temperature Measurement, Probe Number = 3, T = 20.101000 C 01:44:44 Temperature Measurement, Probe Number = 4, T = 20.576000 C 01:44:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.58 01:44:44 Integrated Voltage Measurement... 01:45:03 Voltage Offset Correction: v_off_ini = 0.000004543 V, v_off_fin = 0.000007648 V 01:45:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171068178 Vs 01:45:03 Integrated Voltage Measurement... 01:45:23 Voltage Offset Correction: v_off_ini = 0.000007021 V, v_off_fin = 0.000003256 V 01:45:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986250 Vs 02:15:26 Temperature Measurement, Probe Number = 0, T = 20.147000 C 02:15:27 Temperature Measurement, Probe Number = 1, T = 20.075000 C 02:15:27 Temperature Measurement, Probe Number = 2, T = 20.156000 C 02:15:28 Temperature Measurement, Probe Number = 3, T = 20.103000 C 02:15:29 Temperature Measurement, Probe Number = 4, T = 20.555000 C 02:15:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.55 02:15:29 Integrated Voltage Measurement... 02:15:49 Voltage Offset Correction: v_off_ini = 0.000006309 V, v_off_fin = 0.000007551 V 02:15:49 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171126209 Vs 02:15:49 Integrated Voltage Measurement... 02:16:09 Voltage Offset Correction: v_off_ini = 0.000006685 V, v_off_fin = 0.000003753 V 02:16:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985745 Vs 02:16:12 Temperature Measurement, Probe Number = 0, T = 20.144000 C 02:16:12 Temperature Measurement, Probe Number = 1, T = 20.075000 C 02:16:13 Temperature Measurement, Probe Number = 2, T = 20.154000 C 02:16:14 Temperature Measurement, Probe Number = 3, T = 20.102000 C 02:16:14 Temperature Measurement, Probe Number = 4, T = 20.527000 C 02:16:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.53 02:16:15 Integrated Voltage Measurement... 02:16:34 Voltage Offset Correction: v_off_ini = 0.000005089 V, v_off_fin = 0.000007167 V 02:16:34 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171067028 Vs 02:16:34 Integrated Voltage Measurement... 02:16:54 Voltage Offset Correction: v_off_ini = 0.000007116 V, v_off_fin = 0.000003644 V 02:16:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982641 Vs 02:16:57 Temperature Measurement, Probe Number = 0, T = 20.146000 C 02:16:58 Temperature Measurement, Probe Number = 1, T = 20.077000 C 02:16:58 Temperature Measurement, Probe Number = 2, T = 20.155000 C 02:16:59 Temperature Measurement, Probe Number = 3, T = 20.103000 C 02:17:00 Temperature Measurement, Probe Number = 4, T = 20.576000 C 02:17:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.58 02:17:00 Integrated Voltage Measurement... 02:17:19 Voltage Offset Correction: v_off_ini = 0.000005339 V, v_off_fin = 0.000007701 V 02:17:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171064841 Vs 02:17:19 Integrated Voltage Measurement... 02:17:39 Voltage Offset Correction: v_off_ini = 0.000006246 V, v_off_fin = 0.000003078 V 02:17:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986099 Vs 02:17:42 Temperature Measurement, Probe Number = 0, T = 20.149000 C 02:17:43 Temperature Measurement, Probe Number = 1, T = 20.077000 C 02:17:43 Temperature Measurement, Probe Number = 2, T = 20.157000 C 02:17:44 Temperature Measurement, Probe Number = 3, T = 20.102000 C 02:17:45 Temperature Measurement, Probe Number = 4, T = 20.554000 C 02:17:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.55 02:17:45 Integrated Voltage Measurement... 02:18:04 Voltage Offset Correction: v_off_ini = 0.000004896 V, v_off_fin = 0.000006783 V 02:18:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171057749 Vs 02:18:04 Integrated Voltage Measurement... 02:18:24 Voltage Offset Correction: v_off_ini = 0.000006166 V, v_off_fin = 0.000002957 V 02:18:24 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170990593 Vs 02:18:27 Temperature Measurement, Probe Number = 0, T = 20.150000 C 02:18:28 Temperature Measurement, Probe Number = 1, T = 20.080000 C 02:18:28 Temperature Measurement, Probe Number = 2, T = 20.158000 C 02:18:29 Temperature Measurement, Probe Number = 3, T = 20.106000 C 02:18:30 Temperature Measurement, Probe Number = 4, T = 20.601000 C 02:18:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.60 02:18:30 Integrated Voltage Measurement... 02:18:49 Voltage Offset Correction: v_off_ini = 0.000004879 V, v_off_fin = 0.000007438 V 02:18:49 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171065002 Vs 02:18:50 Integrated Voltage Measurement... 02:19:09 Voltage Offset Correction: v_off_ini = 0.000007199 V, v_off_fin = 0.000003531 V 02:19:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979649 Vs 02:19:12 Temperature Measurement, Probe Number = 0, T = 20.145000 C 02:19:13 Temperature Measurement, Probe Number = 1, T = 20.076000 C 02:19:14 Temperature Measurement, Probe Number = 2, T = 20.153000 C 02:19:14 Temperature Measurement, Probe Number = 3, T = 20.102000 C 02:19:15 Temperature Measurement, Probe Number = 4, T = 20.606000 C 02:19:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.61 02:19:15 Integrated Voltage Measurement... 02:19:35 Voltage Offset Correction: v_off_ini = 0.000005525 V, v_off_fin = 0.000007330 V 02:19:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171069753 Vs 02:19:36 Integrated Voltage Measurement... 02:19:55 Voltage Offset Correction: v_off_ini = 0.000006790 V, v_off_fin = 0.000003435 V 02:19:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980425 Vs 02:19:58 Temperature Measurement, Probe Number = 0, T = 20.148000 C 02:19:59 Temperature Measurement, Probe Number = 1, T = 20.078000 C 02:19:59 Temperature Measurement, Probe Number = 2, T = 20.156000 C 02:20:00 Temperature Measurement, Probe Number = 3, T = 20.105000 C 02:20:01 Temperature Measurement, Probe Number = 4, T = 20.578000 C 02:20:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.58 02:20:01 Integrated Voltage Measurement... 02:20:20 Voltage Offset Correction: v_off_ini = 0.000004663 V, v_off_fin = 0.000007864 V 02:20:20 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171072683 Vs 02:20:21 Integrated Voltage Measurement... 02:20:40 Voltage Offset Correction: v_off_ini = 0.000006885 V, v_off_fin = 0.000004027 V 02:20:41 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983249 Vs 02:20:43 Temperature Measurement, Probe Number = 0, T = 20.146000 C 02:20:44 Temperature Measurement, Probe Number = 1, T = 20.076000 C 02:20:45 Temperature Measurement, Probe Number = 2, T = 20.157000 C 02:20:45 Temperature Measurement, Probe Number = 3, T = 20.105000 C 02:20:46 Temperature Measurement, Probe Number = 4, T = 20.593000 C 02:20:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.59 02:20:46 Integrated Voltage Measurement... 02:21:06 Voltage Offset Correction: v_off_ini = 0.000005165 V, v_off_fin = 0.000007343 V 02:21:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171067673 Vs 02:21:06 Integrated Voltage Measurement... 02:21:26 Voltage Offset Correction: v_off_ini = 0.000007348 V, v_off_fin = 0.000003310 V 02:21:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976929 Vs 02:21:29 Temperature Measurement, Probe Number = 0, T = 20.146000 C 02:21:30 Temperature Measurement, Probe Number = 1, T = 20.076000 C 02:21:31 Temperature Measurement, Probe Number = 2, T = 20.155000 C 02:21:31 Temperature Measurement, Probe Number = 3, T = 20.104000 C 02:21:32 Temperature Measurement, Probe Number = 4, T = 20.593000 C 02:21:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.59 02:21:32 Integrated Voltage Measurement... 02:21:52 Voltage Offset Correction: v_off_ini = 0.000005168 V, v_off_fin = 0.000007074 V 02:21:52 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171062291 Vs 02:21:52 Integrated Voltage Measurement... 02:22:11 Voltage Offset Correction: v_off_ini = 0.000006395 V, v_off_fin = 0.000003454 V 02:22:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987599 Vs 02:22:14 Temperature Measurement, Probe Number = 0, T = 20.145000 C 02:22:15 Temperature Measurement, Probe Number = 1, T = 20.075000 C 02:22:16 Temperature Measurement, Probe Number = 2, T = 20.154000 C 02:22:16 Temperature Measurement, Probe Number = 3, T = 20.101000 C 02:22:17 Temperature Measurement, Probe Number = 4, T = 20.566000 C 02:22:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.57 02:22:17 Integrated Voltage Measurement... 02:22:37 Voltage Offset Correction: v_off_ini = 0.000004399 V, v_off_fin = 0.000007544 V 02:22:37 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171063472 Vs 02:22:37 Integrated Voltage Measurement... 02:22:57 Voltage Offset Correction: v_off_ini = 0.000006715 V, v_off_fin = 0.000003099 V 02:22:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983477 Vs 02:52:59 Temperature Measurement, Probe Number = 0, T = 20.147000 C 02:53:00 Temperature Measurement, Probe Number = 1, T = 20.076000 C 02:53:01 Temperature Measurement, Probe Number = 2, T = 20.156000 C 02:53:02 Temperature Measurement, Probe Number = 3, T = 20.103000 C 02:53:02 Temperature Measurement, Probe Number = 4, T = 20.496000 C 02:53:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.50 02:53:03 Integrated Voltage Measurement... 02:53:22 Voltage Offset Correction: v_off_ini = 0.000005363 V, v_off_fin = 0.000007406 V 02:53:22 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171122381 Vs 02:53:23 Integrated Voltage Measurement... 02:53:42 Voltage Offset Correction: v_off_ini = 0.000006696 V, v_off_fin = 0.000003729 V 02:53:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982741 Vs 02:53:45 Temperature Measurement, Probe Number = 0, T = 20.148000 C 02:53:46 Temperature Measurement, Probe Number = 1, T = 20.079000 C 02:53:47 Temperature Measurement, Probe Number = 2, T = 20.158000 C 02:53:47 Temperature Measurement, Probe Number = 3, T = 20.103000 C 02:53:48 Temperature Measurement, Probe Number = 4, T = 20.472000 C 02:53:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.47 02:53:48 Integrated Voltage Measurement... 02:54:07 Voltage Offset Correction: v_off_ini = 0.000004938 V, v_off_fin = 0.000007738 V 02:54:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171066696 Vs 02:54:08 Integrated Voltage Measurement... 02:54:27 Voltage Offset Correction: v_off_ini = 0.000007102 V, v_off_fin = 0.000003110 V 02:54:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981207 Vs 02:54:30 Temperature Measurement, Probe Number = 0, T = 20.141000 C 02:54:31 Temperature Measurement, Probe Number = 1, T = 20.072000 C 02:54:32 Temperature Measurement, Probe Number = 2, T = 20.150000 C 02:54:32 Temperature Measurement, Probe Number = 3, T = 20.098000 C 02:54:33 Temperature Measurement, Probe Number = 4, T = 20.478000 C 02:54:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.48 02:54:33 Integrated Voltage Measurement... 02:54:52 Voltage Offset Correction: v_off_ini = 0.000005035 V, v_off_fin = 0.000007854 V 02:54:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171069587 Vs 02:54:53 Integrated Voltage Measurement... 02:55:12 Voltage Offset Correction: v_off_ini = 0.000007199 V, v_off_fin = 0.000003773 V 02:55:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980814 Vs 02:55:15 Temperature Measurement, Probe Number = 0, T = 20.150000 C 02:55:16 Temperature Measurement, Probe Number = 1, T = 20.078000 C 02:55:17 Temperature Measurement, Probe Number = 2, T = 20.159000 C 02:55:17 Temperature Measurement, Probe Number = 3, T = 20.105000 C 02:55:18 Temperature Measurement, Probe Number = 4, T = 20.486000 C 02:55:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.49 02:55:18 Integrated Voltage Measurement... 02:55:38 Voltage Offset Correction: v_off_ini = 0.000004362 V, v_off_fin = 0.000006744 V 02:55:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171062921 Vs 02:55:38 Integrated Voltage Measurement... 02:55:58 Voltage Offset Correction: v_off_ini = 0.000006459 V, v_off_fin = 0.000003364 V 02:55:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982185 Vs 02:56:00 Temperature Measurement, Probe Number = 0, T = 20.150000 C 02:56:01 Temperature Measurement, Probe Number = 1, T = 20.080000 C 02:56:02 Temperature Measurement, Probe Number = 2, T = 20.159000 C 02:56:02 Temperature Measurement, Probe Number = 3, T = 20.105000 C 02:56:03 Temperature Measurement, Probe Number = 4, T = 20.531000 C 02:56:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.53 02:56:03 Integrated Voltage Measurement... 02:56:23 Voltage Offset Correction: v_off_ini = 0.000005056 V, v_off_fin = 0.000007721 V 02:56:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171069065 Vs 02:56:24 Integrated Voltage Measurement... 02:56:44 Voltage Offset Correction: v_off_ini = 0.000006864 V, v_off_fin = 0.000004004 V 02:56:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979757 Vs 02:56:46 Temperature Measurement, Probe Number = 0, T = 20.150000 C 02:56:47 Temperature Measurement, Probe Number = 1, T = 20.078000 C 02:56:48 Temperature Measurement, Probe Number = 2, T = 20.158000 C 02:56:48 Temperature Measurement, Probe Number = 3, T = 20.104000 C 02:56:49 Temperature Measurement, Probe Number = 4, T = 20.467000 C 02:56:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.47 02:56:49 Integrated Voltage Measurement... 02:57:09 Voltage Offset Correction: v_off_ini = 0.000004951 V, v_off_fin = 0.000007740 V 02:57:09 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171069999 Vs 02:57:09 Integrated Voltage Measurement... 02:57:29 Voltage Offset Correction: v_off_ini = 0.000006866 V, v_off_fin = 0.000003569 V 02:57:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981600 Vs 02:57:32 Temperature Measurement, Probe Number = 0, T = 20.152000 C 02:57:32 Temperature Measurement, Probe Number = 1, T = 20.079000 C 02:57:33 Temperature Measurement, Probe Number = 2, T = 20.159000 C 02:57:34 Temperature Measurement, Probe Number = 3, T = 20.106000 C 02:57:34 Temperature Measurement, Probe Number = 4, T = 20.487000 C 02:57:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.49 02:57:34 Integrated Voltage Measurement... 02:57:54 Voltage Offset Correction: v_off_ini = 0.000004244 V, v_off_fin = 0.000007486 V 02:57:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171061065 Vs 02:57:54 Integrated Voltage Measurement... 02:58:14 Voltage Offset Correction: v_off_ini = 0.000007124 V, v_off_fin = 0.000003837 V 02:58:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982192 Vs 02:58:17 Temperature Measurement, Probe Number = 0, T = 20.148000 C 02:58:18 Temperature Measurement, Probe Number = 1, T = 20.079000 C 02:58:19 Temperature Measurement, Probe Number = 2, T = 20.156000 C 02:58:19 Temperature Measurement, Probe Number = 3, T = 20.104000 C 02:58:20 Temperature Measurement, Probe Number = 4, T = 20.495000 C 02:58:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.50 02:58:20 Integrated Voltage Measurement... 02:58:40 Voltage Offset Correction: v_off_ini = 0.000005388 V, v_off_fin = 0.000008113 V 02:58:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171067740 Vs 02:58:40 Integrated Voltage Measurement... 02:59:00 Voltage Offset Correction: v_off_ini = 0.000007103 V, v_off_fin = 0.000003111 V 02:59:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985754 Vs 02:59:03 Temperature Measurement, Probe Number = 0, T = 20.151000 C 02:59:03 Temperature Measurement, Probe Number = 1, T = 20.079000 C 02:59:04 Temperature Measurement, Probe Number = 2, T = 20.156000 C 02:59:05 Temperature Measurement, Probe Number = 3, T = 20.104000 C 02:59:05 Temperature Measurement, Probe Number = 4, T = 20.502000 C 02:59:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.50 02:59:05 Integrated Voltage Measurement... 02:59:25 Voltage Offset Correction: v_off_ini = 0.000004767 V, v_off_fin = 0.000007235 V 02:59:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171066664 Vs 02:59:26 Integrated Voltage Measurement... 02:59:45 Voltage Offset Correction: v_off_ini = 0.000006272 V, v_off_fin = 0.000002873 V 02:59:45 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981074 Vs 02:59:48 Temperature Measurement, Probe Number = 0, T = 20.151000 C 02:59:48 Temperature Measurement, Probe Number = 1, T = 20.078000 C 02:59:49 Temperature Measurement, Probe Number = 2, T = 20.158000 C 02:59:50 Temperature Measurement, Probe Number = 3, T = 20.105000 C 02:59:50 Temperature Measurement, Probe Number = 4, T = 20.490000 C 02:59:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.49 02:59:51 Integrated Voltage Measurement... 03:00:10 Voltage Offset Correction: v_off_ini = 0.000004734 V, v_off_fin = 0.000007920 V 03:00:10 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171075228 Vs 03:00:10 Integrated Voltage Measurement... 03:00:30 Voltage Offset Correction: v_off_ini = 0.000006872 V, v_off_fin = 0.000003936 V 03:00:30 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980600 Vs 03:30:33 Temperature Measurement, Probe Number = 0, T = 20.148000 C 03:30:34 Temperature Measurement, Probe Number = 1, T = 20.076000 C 03:30:34 Temperature Measurement, Probe Number = 2, T = 20.155000 C 03:30:35 Temperature Measurement, Probe Number = 3, T = 20.100000 C 03:30:36 Temperature Measurement, Probe Number = 4, T = 20.514000 C 03:30:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.51 03:30:36 Integrated Voltage Measurement... 03:30:56 Voltage Offset Correction: v_off_ini = 0.000006181 V, v_off_fin = 0.000007835 V 03:30:56 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171125768 Vs 03:30:56 Integrated Voltage Measurement... 03:31:16 Voltage Offset Correction: v_off_ini = 0.000007433 V, v_off_fin = 0.000003798 V 03:31:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979547 Vs 03:31:19 Temperature Measurement, Probe Number = 0, T = 20.147000 C 03:31:19 Temperature Measurement, Probe Number = 1, T = 20.076000 C 03:31:20 Temperature Measurement, Probe Number = 2, T = 20.153000 C 03:31:21 Temperature Measurement, Probe Number = 3, T = 20.100000 C 03:31:21 Temperature Measurement, Probe Number = 4, T = 20.511000 C 03:31:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.51 03:31:21 Integrated Voltage Measurement... 03:31:42 Voltage Offset Correction: v_off_ini = 0.000004626 V, v_off_fin = 0.000007223 V 03:31:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064219 Vs 03:31:42 Integrated Voltage Measurement... 03:32:02 Voltage Offset Correction: v_off_ini = 0.000006696 V, v_off_fin = 0.000003442 V 03:32:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974690 Vs 03:32:05 Temperature Measurement, Probe Number = 0, T = 20.144000 C 03:32:06 Temperature Measurement, Probe Number = 1, T = 20.076000 C 03:32:06 Temperature Measurement, Probe Number = 2, T = 20.149000 C 03:32:07 Temperature Measurement, Probe Number = 3, T = 20.098000 C 03:32:08 Temperature Measurement, Probe Number = 4, T = 20.459000 C 03:32:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.46 03:32:08 Integrated Voltage Measurement... 03:32:27 Voltage Offset Correction: v_off_ini = 0.000005061 V, v_off_fin = 0.000007622 V 03:32:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061173 Vs 03:32:27 Integrated Voltage Measurement... 03:32:48 Voltage Offset Correction: v_off_ini = 0.000006859 V, v_off_fin = 0.000004276 V 03:32:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977699 Vs 03:32:51 Temperature Measurement, Probe Number = 0, T = 20.148000 C 03:32:51 Temperature Measurement, Probe Number = 1, T = 20.079000 C 03:32:52 Temperature Measurement, Probe Number = 2, T = 20.155000 C 03:32:53 Temperature Measurement, Probe Number = 3, T = 20.102000 C 03:32:53 Temperature Measurement, Probe Number = 4, T = 20.477000 C 03:32:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.48 03:32:53 Integrated Voltage Measurement... 03:33:13 Voltage Offset Correction: v_off_ini = 0.000004969 V, v_off_fin = 0.000006960 V 03:33:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171054467 Vs 03:33:14 Integrated Voltage Measurement... 03:33:33 Voltage Offset Correction: v_off_ini = 0.000006783 V, v_off_fin = 0.000003591 V 03:33:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988015 Vs 03:33:36 Temperature Measurement, Probe Number = 0, T = 20.148000 C 03:33:37 Temperature Measurement, Probe Number = 1, T = 20.077000 C 03:33:38 Temperature Measurement, Probe Number = 2, T = 20.154000 C 03:33:38 Temperature Measurement, Probe Number = 3, T = 20.102000 C 03:33:39 Temperature Measurement, Probe Number = 4, T = 20.468000 C 03:33:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.47 03:33:39 Integrated Voltage Measurement... 03:33:59 Voltage Offset Correction: v_off_ini = 0.000004354 V, v_off_fin = 0.000006579 V 03:33:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171055322 Vs 03:34:00 Integrated Voltage Measurement... 03:34:19 Voltage Offset Correction: v_off_ini = 0.000005808 V, v_off_fin = 0.000003283 V 03:34:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982890 Vs 03:34:22 Temperature Measurement, Probe Number = 0, T = 20.150000 C 03:34:23 Temperature Measurement, Probe Number = 1, T = 20.078000 C 03:34:23 Temperature Measurement, Probe Number = 2, T = 20.155000 C 03:34:24 Temperature Measurement, Probe Number = 3, T = 20.102000 C 03:34:25 Temperature Measurement, Probe Number = 4, T = 20.529000 C 03:34:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.53 03:34:25 Integrated Voltage Measurement... 03:34:44 Voltage Offset Correction: v_off_ini = 0.000004359 V, v_off_fin = 0.000007770 V 03:34:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060876 Vs 03:34:45 Integrated Voltage Measurement... 03:35:04 Voltage Offset Correction: v_off_ini = 0.000006821 V, v_off_fin = 0.000003563 V 03:35:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980869 Vs 03:35:07 Temperature Measurement, Probe Number = 0, T = 20.147000 C 03:35:08 Temperature Measurement, Probe Number = 1, T = 20.074000 C 03:35:08 Temperature Measurement, Probe Number = 2, T = 20.152000 C 03:35:09 Temperature Measurement, Probe Number = 3, T = 20.100000 C 03:35:10 Temperature Measurement, Probe Number = 4, T = 20.564000 C 03:35:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.56 03:35:10 Integrated Voltage Measurement... 03:35:29 Voltage Offset Correction: v_off_ini = 0.000004884 V, v_off_fin = 0.000007750 V 03:35:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171063379 Vs 03:35:30 Integrated Voltage Measurement... 03:35:49 Voltage Offset Correction: v_off_ini = 0.000006690 V, v_off_fin = 0.000003557 V 03:35:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974603 Vs 03:35:52 Temperature Measurement, Probe Number = 0, T = 20.150000 C 03:35:53 Temperature Measurement, Probe Number = 1, T = 20.078000 C 03:35:54 Temperature Measurement, Probe Number = 2, T = 20.156000 C 03:35:54 Temperature Measurement, Probe Number = 3, T = 20.101000 C 03:35:55 Temperature Measurement, Probe Number = 4, T = 20.539000 C 03:35:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.54 03:35:55 Integrated Voltage Measurement... 03:36:14 Voltage Offset Correction: v_off_ini = 0.000005267 V, v_off_fin = 0.000007482 V 03:36:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064421 Vs 03:36:15 Integrated Voltage Measurement... 03:36:35 Voltage Offset Correction: v_off_ini = 0.000007081 V, v_off_fin = 0.000003687 V 03:36:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975875 Vs 03:36:38 Temperature Measurement, Probe Number = 0, T = 20.152000 C 03:36:39 Temperature Measurement, Probe Number = 1, T = 20.082000 C 03:36:39 Temperature Measurement, Probe Number = 2, T = 20.156000 C 03:36:40 Temperature Measurement, Probe Number = 3, T = 20.103000 C 03:36:40 Temperature Measurement, Probe Number = 4, T = 20.585000 C 03:36:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.59 03:36:41 Integrated Voltage Measurement... 03:37:00 Voltage Offset Correction: v_off_ini = 0.000005363 V, v_off_fin = 0.000007690 V 03:37:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062911 Vs 03:37:01 Integrated Voltage Measurement... 03:37:20 Voltage Offset Correction: v_off_ini = 0.000006899 V, v_off_fin = 0.000004138 V 03:37:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975809 Vs 03:37:23 Temperature Measurement, Probe Number = 0, T = 20.151000 C 03:37:24 Temperature Measurement, Probe Number = 1, T = 20.081000 C 03:37:25 Temperature Measurement, Probe Number = 2, T = 20.157000 C 03:37:25 Temperature Measurement, Probe Number = 3, T = 20.104000 C 03:37:26 Temperature Measurement, Probe Number = 4, T = 20.579000 C 03:37:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.58 03:37:26 Integrated Voltage Measurement... 03:37:45 Voltage Offset Correction: v_off_ini = 0.000004938 V, v_off_fin = 0.000008320 V 03:37:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065789 Vs 03:37:46 Integrated Voltage Measurement... 03:38:05 Voltage Offset Correction: v_off_ini = 0.000007443 V, v_off_fin = 0.000004470 V 03:38:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170965541 Vs 04:08:08 Temperature Measurement, Probe Number = 0, T = 20.154000 C 04:08:09 Temperature Measurement, Probe Number = 1, T = 20.082000 C 04:08:10 Temperature Measurement, Probe Number = 2, T = 20.158000 C 04:08:10 Temperature Measurement, Probe Number = 3, T = 20.105000 C 04:08:11 Temperature Measurement, Probe Number = 4, T = 20.575000 C 04:08:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.57 04:08:11 Integrated Voltage Measurement... 04:08:31 Voltage Offset Correction: v_off_ini = 0.000005437 V, v_off_fin = 0.000007339 V 04:08:31 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171107635 Vs 04:08:31 Integrated Voltage Measurement... 04:08:51 Voltage Offset Correction: v_off_ini = 0.000007212 V, v_off_fin = 0.000003848 V 04:08:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980111 Vs 04:08:54 Temperature Measurement, Probe Number = 0, T = 20.153000 C 04:08:54 Temperature Measurement, Probe Number = 1, T = 20.081000 C 04:08:55 Temperature Measurement, Probe Number = 2, T = 20.157000 C 04:08:56 Temperature Measurement, Probe Number = 3, T = 20.104000 C 04:08:56 Temperature Measurement, Probe Number = 4, T = 20.568000 C 04:08:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.57 04:08:57 Integrated Voltage Measurement... 04:09:17 Voltage Offset Correction: v_off_ini = 0.000004484 V, v_off_fin = 0.000007147 V 04:09:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171057496 Vs 04:09:17 Integrated Voltage Measurement... 04:09:37 Voltage Offset Correction: v_off_ini = 0.000006298 V, v_off_fin = 0.000003475 V 04:09:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981000 Vs 04:09:40 Temperature Measurement, Probe Number = 0, T = 20.153000 C 04:09:41 Temperature Measurement, Probe Number = 1, T = 20.080000 C 04:09:42 Temperature Measurement, Probe Number = 2, T = 20.158000 C 04:09:42 Temperature Measurement, Probe Number = 3, T = 20.104000 C 04:09:43 Temperature Measurement, Probe Number = 4, T = 20.618000 C 04:09:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.62 04:09:43 Integrated Voltage Measurement... 04:10:03 Voltage Offset Correction: v_off_ini = 0.000004941 V, v_off_fin = 0.000007602 V 04:10:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061654 Vs 04:10:04 Integrated Voltage Measurement... 04:10:23 Voltage Offset Correction: v_off_ini = 0.000007048 V, v_off_fin = 0.000004039 V 04:10:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972960 Vs 04:10:26 Temperature Measurement, Probe Number = 0, T = 20.149000 C 04:10:27 Temperature Measurement, Probe Number = 1, T = 20.081000 C 04:10:28 Temperature Measurement, Probe Number = 2, T = 20.151000 C 04:10:28 Temperature Measurement, Probe Number = 3, T = 20.100000 C 04:10:29 Temperature Measurement, Probe Number = 4, T = 20.598000 C 04:10:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.60 04:10:29 Integrated Voltage Measurement... 04:10:49 Voltage Offset Correction: v_off_ini = 0.000004581 V, v_off_fin = 0.000006825 V 04:10:49 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171057868 Vs 04:10:49 Integrated Voltage Measurement... 04:11:08 Voltage Offset Correction: v_off_ini = 0.000006681 V, v_off_fin = 0.000002226 V 04:11:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170984698 Vs 04:11:11 Temperature Measurement, Probe Number = 0, T = 20.154000 C 04:11:12 Temperature Measurement, Probe Number = 1, T = 20.083000 C 04:11:13 Temperature Measurement, Probe Number = 2, T = 20.158000 C 04:11:13 Temperature Measurement, Probe Number = 3, T = 20.104000 C 04:11:14 Temperature Measurement, Probe Number = 4, T = 20.619000 C 04:11:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.62 04:11:14 Integrated Voltage Measurement... 04:11:34 Voltage Offset Correction: v_off_ini = 0.000003839 V, v_off_fin = 0.000006947 V 04:11:34 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058315 Vs 04:11:34 Integrated Voltage Measurement... 04:11:54 Voltage Offset Correction: v_off_ini = 0.000006555 V, v_off_fin = 0.000003206 V 04:11:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981921 Vs 04:11:56 Temperature Measurement, Probe Number = 0, T = 20.154000 C 04:11:57 Temperature Measurement, Probe Number = 1, T = 20.081000 C 04:11:58 Temperature Measurement, Probe Number = 2, T = 20.158000 C 04:11:58 Temperature Measurement, Probe Number = 3, T = 20.103000 C 04:11:59 Temperature Measurement, Probe Number = 4, T = 20.606000 C 04:11:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.61 04:11:59 Integrated Voltage Measurement... 04:12:19 Voltage Offset Correction: v_off_ini = 0.000004489 V, v_off_fin = 0.000007223 V 04:12:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171056439 Vs 04:12:19 Integrated Voltage Measurement... 04:12:39 Voltage Offset Correction: v_off_ini = 0.000006532 V, v_off_fin = 0.000002865 V 04:12:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983364 Vs 04:12:42 Temperature Measurement, Probe Number = 0, T = 20.157000 C 04:12:42 Temperature Measurement, Probe Number = 1, T = 20.085000 C 04:12:43 Temperature Measurement, Probe Number = 2, T = 20.161000 C 04:12:43 Temperature Measurement, Probe Number = 3, T = 20.106000 C 04:12:44 Temperature Measurement, Probe Number = 4, T = 20.591000 C 04:12:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.59 04:12:44 Integrated Voltage Measurement... 04:13:04 Voltage Offset Correction: v_off_ini = 0.000003944 V, v_off_fin = 0.000006625 V 04:13:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059864 Vs 04:13:04 Integrated Voltage Measurement... 04:13:24 Voltage Offset Correction: v_off_ini = 0.000006381 V, v_off_fin = 0.000003060 V 04:13:24 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983679 Vs 04:13:27 Temperature Measurement, Probe Number = 0, T = 20.154000 C 04:13:27 Temperature Measurement, Probe Number = 1, T = 20.082000 C 04:13:28 Temperature Measurement, Probe Number = 2, T = 20.159000 C 04:13:29 Temperature Measurement, Probe Number = 3, T = 20.104000 C 04:13:29 Temperature Measurement, Probe Number = 4, T = 20.639000 C 04:13:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.64 04:13:29 Integrated Voltage Measurement... 04:13:49 Voltage Offset Correction: v_off_ini = 0.000004688 V, v_off_fin = 0.000007609 V 04:13:49 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171065312 Vs 04:13:49 Integrated Voltage Measurement... 04:14:09 Voltage Offset Correction: v_off_ini = 0.000006897 V, v_off_fin = 0.000003816 V 04:14:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978944 Vs 04:14:12 Temperature Measurement, Probe Number = 0, T = 20.152000 C 04:14:12 Temperature Measurement, Probe Number = 1, T = 20.076000 C 04:14:13 Temperature Measurement, Probe Number = 2, T = 20.155000 C 04:14:14 Temperature Measurement, Probe Number = 3, T = 20.099000 C 04:14:14 Temperature Measurement, Probe Number = 4, T = 20.575000 C 04:14:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.57 04:14:15 Integrated Voltage Measurement... 04:14:34 Voltage Offset Correction: v_off_ini = 0.000005137 V, v_off_fin = 0.000007188 V 04:14:34 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171064367 Vs 04:14:34 Integrated Voltage Measurement... 04:14:54 Voltage Offset Correction: v_off_ini = 0.000006802 V, v_off_fin = 0.000002975 V 04:14:54 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980488 Vs 04:14:57 Temperature Measurement, Probe Number = 0, T = 20.154000 C 04:14:57 Temperature Measurement, Probe Number = 1, T = 20.079000 C 04:14:58 Temperature Measurement, Probe Number = 2, T = 20.157000 C 04:14:59 Temperature Measurement, Probe Number = 3, T = 20.101000 C 04:14:59 Temperature Measurement, Probe Number = 4, T = 20.635000 C 04:14:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.64 04:15:00 Integrated Voltage Measurement... 04:15:19 Voltage Offset Correction: v_off_ini = 0.000004316 V, v_off_fin = 0.000007303 V 04:15:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171062260 Vs 04:15:19 Integrated Voltage Measurement... 04:15:39 Voltage Offset Correction: v_off_ini = 0.000006479 V, v_off_fin = 0.000003120 V 04:15:39 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987227 Vs 04:45:42 Temperature Measurement, Probe Number = 0, T = 20.148000 C 04:45:43 Temperature Measurement, Probe Number = 1, T = 20.073000 C 04:45:43 Temperature Measurement, Probe Number = 2, T = 20.150000 C 04:45:44 Temperature Measurement, Probe Number = 3, T = 20.096000 C 04:45:45 Temperature Measurement, Probe Number = 4, T = 20.485000 C 04:45:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.48 04:45:45 Integrated Voltage Measurement... 04:46:04 Voltage Offset Correction: v_off_ini = 0.000005379 V, v_off_fin = 0.000007558 V 04:46:04 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171119502 Vs 04:46:05 Integrated Voltage Measurement... 04:46:24 Voltage Offset Correction: v_off_ini = 0.000007068 V, v_off_fin = 0.000002890 V 04:46:24 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979088 Vs 04:46:27 Temperature Measurement, Probe Number = 0, T = 20.156000 C 04:46:27 Temperature Measurement, Probe Number = 1, T = 20.080000 C 04:46:28 Temperature Measurement, Probe Number = 2, T = 20.153000 C 04:46:29 Temperature Measurement, Probe Number = 3, T = 20.099000 C 04:46:29 Temperature Measurement, Probe Number = 4, T = 20.482000 C 04:46:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.48 04:46:30 Integrated Voltage Measurement... 04:46:49 Voltage Offset Correction: v_off_ini = 0.000004233 V, v_off_fin = 0.000006856 V 04:46:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058528 Vs 04:46:50 Integrated Voltage Measurement... 04:47:09 Voltage Offset Correction: v_off_ini = 0.000006210 V, v_off_fin = 0.000002817 V 04:47:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980528 Vs 04:47:12 Temperature Measurement, Probe Number = 0, T = 20.158000 C 04:47:12 Temperature Measurement, Probe Number = 1, T = 20.084000 C 04:47:13 Temperature Measurement, Probe Number = 2, T = 20.156000 C 04:47:14 Temperature Measurement, Probe Number = 3, T = 20.104000 C 04:47:14 Temperature Measurement, Probe Number = 4, T = 20.546000 C 04:47:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.55 04:47:15 Integrated Voltage Measurement... 04:47:34 Voltage Offset Correction: v_off_ini = 0.000004675 V, v_off_fin = 0.000007281 V 04:47:34 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171066608 Vs 04:47:34 Integrated Voltage Measurement... 04:47:54 Voltage Offset Correction: v_off_ini = 0.000006316 V, v_off_fin = 0.000003376 V 04:47:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981712 Vs 04:47:57 Temperature Measurement, Probe Number = 0, T = 20.157000 C 04:47:57 Temperature Measurement, Probe Number = 1, T = 20.083000 C 04:47:58 Temperature Measurement, Probe Number = 2, T = 20.155000 C 04:47:59 Temperature Measurement, Probe Number = 3, T = 20.101000 C 04:47:59 Temperature Measurement, Probe Number = 4, T = 20.541000 C 04:47:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.54 04:47:59 Integrated Voltage Measurement... 04:48:19 Voltage Offset Correction: v_off_ini = 0.000004999 V, v_off_fin = 0.000006894 V 04:48:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060549 Vs 04:48:19 Integrated Voltage Measurement... 04:48:39 Voltage Offset Correction: v_off_ini = 0.000006145 V, v_off_fin = 0.000002910 V 04:48:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985000 Vs 04:48:42 Temperature Measurement, Probe Number = 0, T = 20.156000 C 04:48:42 Temperature Measurement, Probe Number = 1, T = 20.083000 C 04:48:43 Temperature Measurement, Probe Number = 2, T = 20.152000 C 04:48:44 Temperature Measurement, Probe Number = 3, T = 20.100000 C 04:48:44 Temperature Measurement, Probe Number = 4, T = 20.511000 C 04:48:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.51 04:48:45 Integrated Voltage Measurement... 04:49:05 Voltage Offset Correction: v_off_ini = 0.000004423 V, v_off_fin = 0.000006833 V 04:49:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058532 Vs 04:49:05 Integrated Voltage Measurement... 04:49:24 Voltage Offset Correction: v_off_ini = 0.000005853 V, v_off_fin = 0.000002654 V 04:49:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982880 Vs 04:49:27 Temperature Measurement, Probe Number = 0, T = 20.151000 C 04:49:27 Temperature Measurement, Probe Number = 1, T = 20.080000 C 04:49:28 Temperature Measurement, Probe Number = 2, T = 20.152000 C 04:49:29 Temperature Measurement, Probe Number = 3, T = 20.098000 C 04:49:29 Temperature Measurement, Probe Number = 4, T = 20.508000 C 04:49:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.51 04:49:30 Integrated Voltage Measurement... 04:49:50 Voltage Offset Correction: v_off_ini = 0.000004143 V, v_off_fin = 0.000007070 V 04:49:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171065439 Vs 04:49:50 Integrated Voltage Measurement... 04:50:09 Voltage Offset Correction: v_off_ini = 0.000006319 V, v_off_fin = 0.000002304 V 04:50:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982553 Vs 04:50:12 Temperature Measurement, Probe Number = 0, T = 20.155000 C 04:50:13 Temperature Measurement, Probe Number = 1, T = 20.082000 C 04:50:13 Temperature Measurement, Probe Number = 2, T = 20.153000 C 04:50:14 Temperature Measurement, Probe Number = 3, T = 20.097000 C 04:50:15 Temperature Measurement, Probe Number = 4, T = 20.486000 C 04:50:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.49 04:50:15 Integrated Voltage Measurement... 04:50:34 Voltage Offset Correction: v_off_ini = 0.000004128 V, v_off_fin = 0.000006772 V 04:50:34 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171060925 Vs 04:50:34 Integrated Voltage Measurement... 04:50:54 Voltage Offset Correction: v_off_ini = 0.000006432 V, v_off_fin = 0.000002887 V 04:50:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989073 Vs 04:50:57 Temperature Measurement, Probe Number = 0, T = 20.158000 C 04:50:58 Temperature Measurement, Probe Number = 1, T = 20.083000 C 04:50:58 Temperature Measurement, Probe Number = 2, T = 20.158000 C 04:50:59 Temperature Measurement, Probe Number = 3, T = 20.100000 C 04:51:00 Temperature Measurement, Probe Number = 4, T = 20.512000 C 04:51:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.51 04:51:00 Integrated Voltage Measurement... 04:51:19 Voltage Offset Correction: v_off_ini = 0.000003665 V, v_off_fin = 0.000007032 V 04:51:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171059380 Vs 04:51:20 Integrated Voltage Measurement... 04:51:39 Voltage Offset Correction: v_off_ini = 0.000006499 V, v_off_fin = 0.000002985 V 04:51:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983467 Vs 04:51:42 Temperature Measurement, Probe Number = 0, T = 20.154000 C 04:51:43 Temperature Measurement, Probe Number = 1, T = 20.081000 C 04:51:43 Temperature Measurement, Probe Number = 2, T = 20.155000 C 04:51:44 Temperature Measurement, Probe Number = 3, T = 20.099000 C 04:51:45 Temperature Measurement, Probe Number = 4, T = 20.551000 C 04:51:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.55 04:51:45 Integrated Voltage Measurement... 04:52:04 Voltage Offset Correction: v_off_ini = 0.000004556 V, v_off_fin = 0.000007232 V 04:52:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171063361 Vs 04:52:05 Integrated Voltage Measurement... 04:52:24 Voltage Offset Correction: v_off_ini = 0.000006989 V, v_off_fin = 0.000003634 V 04:52:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978749 Vs 04:52:27 Temperature Measurement, Probe Number = 0, T = 20.156000 C 04:52:28 Temperature Measurement, Probe Number = 1, T = 20.084000 C 04:52:28 Temperature Measurement, Probe Number = 2, T = 20.156000 C 04:52:29 Temperature Measurement, Probe Number = 3, T = 20.100000 C 04:52:30 Temperature Measurement, Probe Number = 4, T = 20.576000 C 04:52:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.58 04:52:30 Integrated Voltage Measurement... 04:52:49 Voltage Offset Correction: v_off_ini = 0.000004553 V, v_off_fin = 0.000007501 V 04:52:49 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171062982 Vs 04:52:50 Integrated Voltage Measurement... 04:53:09 Voltage Offset Correction: v_off_ini = 0.000006794 V, v_off_fin = 0.000003265 V 04:53:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985650 Vs 05:23:12 Temperature Measurement, Probe Number = 0, T = 20.153000 C 05:23:13 Temperature Measurement, Probe Number = 1, T = 20.081000 C 05:23:14 Temperature Measurement, Probe Number = 2, T = 20.152000 C 05:23:14 Temperature Measurement, Probe Number = 3, T = 20.095000 C 05:23:15 Temperature Measurement, Probe Number = 4, T = 20.521000 C 05:23:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.52 05:23:15 Integrated Voltage Measurement... 05:23:35 Voltage Offset Correction: v_off_ini = 0.000005878 V, v_off_fin = 0.000007705 V 05:23:35 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171122070 Vs 05:23:36 Integrated Voltage Measurement... 05:23:55 Voltage Offset Correction: v_off_ini = 0.000007326 V, v_off_fin = 0.000004533 V 05:23:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975081 Vs 05:23:58 Temperature Measurement, Probe Number = 0, T = 20.150000 C 05:23:59 Temperature Measurement, Probe Number = 1, T = 20.079000 C 05:23:59 Temperature Measurement, Probe Number = 2, T = 20.147000 C 05:24:00 Temperature Measurement, Probe Number = 3, T = 20.093000 C 05:24:01 Temperature Measurement, Probe Number = 4, T = 20.455000 C 05:24:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.45 05:24:01 Integrated Voltage Measurement... 05:24:21 Voltage Offset Correction: v_off_ini = 0.000004953 V, v_off_fin = 0.000007038 V 05:24:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064889 Vs 05:24:21 Integrated Voltage Measurement... 05:24:41 Voltage Offset Correction: v_off_ini = 0.000006476 V, v_off_fin = 0.000003229 V 05:24:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983663 Vs 05:24:44 Temperature Measurement, Probe Number = 0, T = 20.154000 C 05:24:45 Temperature Measurement, Probe Number = 1, T = 20.085000 C 05:24:45 Temperature Measurement, Probe Number = 2, T = 20.151000 C 05:24:46 Temperature Measurement, Probe Number = 3, T = 20.097000 C 05:24:47 Temperature Measurement, Probe Number = 4, T = 20.445000 C 05:24:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.45 05:24:47 Integrated Voltage Measurement... 05:25:07 Voltage Offset Correction: v_off_ini = 0.000003999 V, v_off_fin = 0.000007024 V 05:25:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171057352 Vs 05:25:08 Integrated Voltage Measurement... 05:25:27 Voltage Offset Correction: v_off_ini = 0.000006382 V, v_off_fin = 0.000003249 V 05:25:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985505 Vs 05:25:30 Temperature Measurement, Probe Number = 0, T = 20.157000 C 05:25:31 Temperature Measurement, Probe Number = 1, T = 20.085000 C 05:25:31 Temperature Measurement, Probe Number = 2, T = 20.156000 C 05:25:32 Temperature Measurement, Probe Number = 3, T = 20.101000 C 05:25:33 Temperature Measurement, Probe Number = 4, T = 20.494000 C 05:25:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.49 05:25:33 Integrated Voltage Measurement... 05:25:52 Voltage Offset Correction: v_off_ini = 0.000003992 V, v_off_fin = 0.000007340 V 05:25:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171064508 Vs 05:25:53 Integrated Voltage Measurement... 05:26:13 Voltage Offset Correction: v_off_ini = 0.000006759 V, v_off_fin = 0.000003694 V 05:26:13 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170985448 Vs 05:26:16 Temperature Measurement, Probe Number = 0, T = 20.155000 C 05:26:16 Temperature Measurement, Probe Number = 1, T = 20.082000 C 05:26:17 Temperature Measurement, Probe Number = 2, T = 20.156000 C 05:26:18 Temperature Measurement, Probe Number = 3, T = 20.099000 C 05:26:18 Temperature Measurement, Probe Number = 4, T = 20.554000 C 05:26:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.55 05:26:19 Integrated Voltage Measurement... 05:26:38 Voltage Offset Correction: v_off_ini = 0.000004146 V, v_off_fin = 0.000006979 V 05:26:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062872 Vs 05:26:39 Integrated Voltage Measurement... 05:26:58 Voltage Offset Correction: v_off_ini = 0.000006522 V, v_off_fin = 0.000002858 V 05:26:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990377 Vs 05:27:01 Temperature Measurement, Probe Number = 0, T = 20.147000 C 05:27:02 Temperature Measurement, Probe Number = 1, T = 20.072000 C 05:27:03 Temperature Measurement, Probe Number = 2, T = 20.148000 C 05:27:03 Temperature Measurement, Probe Number = 3, T = 20.094000 C 05:27:04 Temperature Measurement, Probe Number = 4, T = 20.583000 C 05:27:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.58 05:27:04 Integrated Voltage Measurement... 05:27:23 Voltage Offset Correction: v_off_ini = 0.000004287 V, v_off_fin = 0.000007048 V 05:27:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171060084 Vs 05:27:24 Integrated Voltage Measurement... 05:27:44 Voltage Offset Correction: v_off_ini = 0.000006443 V, v_off_fin = 0.000003318 V 05:27:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990325 Vs 05:27:46 Temperature Measurement, Probe Number = 0, T = 20.146000 C 05:27:47 Temperature Measurement, Probe Number = 1, T = 20.074000 C 05:27:48 Temperature Measurement, Probe Number = 2, T = 20.147000 C 05:27:48 Temperature Measurement, Probe Number = 3, T = 20.094000 C 05:27:49 Temperature Measurement, Probe Number = 4, T = 20.592000 C 05:27:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.59 05:27:49 Integrated Voltage Measurement... 05:28:09 Voltage Offset Correction: v_off_ini = 0.000004057 V, v_off_fin = 0.000006688 V 05:28:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171063006 Vs 05:28:10 Integrated Voltage Measurement... 05:28:30 Voltage Offset Correction: v_off_ini = 0.000006184 V, v_off_fin = 0.000002739 V 05:28:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985328 Vs 05:28:32 Temperature Measurement, Probe Number = 0, T = 20.153000 C 05:28:33 Temperature Measurement, Probe Number = 1, T = 20.081000 C 05:28:34 Temperature Measurement, Probe Number = 2, T = 20.152000 C 05:28:34 Temperature Measurement, Probe Number = 3, T = 20.097000 C 05:28:35 Temperature Measurement, Probe Number = 4, T = 20.504000 C 05:28:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.50 05:28:35 Integrated Voltage Measurement... 05:28:55 Voltage Offset Correction: v_off_ini = 0.000004477 V, v_off_fin = 0.000006941 V 05:28:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059840 Vs 05:28:55 Integrated Voltage Measurement... 05:29:15 Voltage Offset Correction: v_off_ini = 0.000006067 V, v_off_fin = 0.000003561 V 05:29:15 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982127 Vs 05:29:18 Temperature Measurement, Probe Number = 0, T = 20.159000 C 05:29:18 Temperature Measurement, Probe Number = 1, T = 20.086000 C 05:29:19 Temperature Measurement, Probe Number = 2, T = 20.157000 C 05:29:20 Temperature Measurement, Probe Number = 3, T = 20.104000 C 05:29:20 Temperature Measurement, Probe Number = 4, T = 20.539000 C 05:29:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.54 05:29:20 Integrated Voltage Measurement... 05:29:40 Voltage Offset Correction: v_off_ini = 0.000004930 V, v_off_fin = 0.000007405 V 05:29:40 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171066306 Vs 05:29:40 Integrated Voltage Measurement... 05:30:00 Voltage Offset Correction: v_off_ini = 0.000006726 V, v_off_fin = 0.000003316 V 05:30:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981331 Vs 05:30:03 Temperature Measurement, Probe Number = 0, T = 20.157000 C 05:30:03 Temperature Measurement, Probe Number = 1, T = 20.084000 C 05:30:04 Temperature Measurement, Probe Number = 2, T = 20.155000 C 05:30:05 Temperature Measurement, Probe Number = 3, T = 20.101000 C 05:30:05 Temperature Measurement, Probe Number = 4, T = 20.569000 C 05:30:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.57 05:30:06 Integrated Voltage Measurement... 05:30:25 Voltage Offset Correction: v_off_ini = 0.000004555 V, v_off_fin = 0.000007141 V 05:30:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064201 Vs 05:30:25 Integrated Voltage Measurement... 05:30:45 Voltage Offset Correction: v_off_ini = 0.000006639 V, v_off_fin = 0.000003223 V 05:30:45 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986199 Vs 06:00:48 Temperature Measurement, Probe Number = 0, T = 20.157000 C 06:00:49 Temperature Measurement, Probe Number = 1, T = 20.085000 C 06:00:49 Temperature Measurement, Probe Number = 2, T = 20.154000 C 06:00:50 Temperature Measurement, Probe Number = 3, T = 20.101000 C 06:00:51 Temperature Measurement, Probe Number = 4, T = 20.583000 C 06:00:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.58 06:00:51 Integrated Voltage Measurement... 06:01:11 Voltage Offset Correction: v_off_ini = 0.000006955 V, v_off_fin = 0.000008374 V 06:01:11 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171130154 Vs 06:01:12 Integrated Voltage Measurement... 06:01:32 Voltage Offset Correction: v_off_ini = 0.000007013 V, v_off_fin = 0.000004390 V 06:01:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972390 Vs 06:01:34 Temperature Measurement, Probe Number = 0, T = 20.159000 C 06:01:35 Temperature Measurement, Probe Number = 1, T = 20.086000 C 06:01:36 Temperature Measurement, Probe Number = 2, T = 20.156000 C 06:01:36 Temperature Measurement, Probe Number = 3, T = 20.101000 C 06:01:37 Temperature Measurement, Probe Number = 4, T = 20.621000 C 06:01:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.62 06:01:37 Integrated Voltage Measurement... 06:01:57 Voltage Offset Correction: v_off_ini = 0.000004872 V, v_off_fin = 0.000007800 V 06:01:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066262 Vs 06:01:58 Integrated Voltage Measurement... 06:02:17 Voltage Offset Correction: v_off_ini = 0.000007000 V, v_off_fin = 0.000003498 V 06:02:17 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975456 Vs 06:02:20 Temperature Measurement, Probe Number = 0, T = 20.157000 C 06:02:20 Temperature Measurement, Probe Number = 1, T = 20.083000 C 06:02:21 Temperature Measurement, Probe Number = 2, T = 20.155000 C 06:02:22 Temperature Measurement, Probe Number = 3, T = 20.100000 C 06:02:22 Temperature Measurement, Probe Number = 4, T = 20.635000 C 06:02:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.64 06:02:23 Integrated Voltage Measurement... 06:02:42 Voltage Offset Correction: v_off_ini = 0.000004958 V, v_off_fin = 0.000007762 V 06:02:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171070197 Vs 06:02:42 Integrated Voltage Measurement... 06:03:02 Voltage Offset Correction: v_off_ini = 0.000007104 V, v_off_fin = 0.000003729 V 06:03:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979468 Vs 06:03:05 Temperature Measurement, Probe Number = 0, T = 20.152000 C 06:03:05 Temperature Measurement, Probe Number = 1, T = 20.079000 C 06:03:06 Temperature Measurement, Probe Number = 2, T = 20.150000 C 06:03:07 Temperature Measurement, Probe Number = 3, T = 20.095000 C 06:03:07 Temperature Measurement, Probe Number = 4, T = 20.685000 C 06:03:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.68 06:03:07 Integrated Voltage Measurement... 06:03:27 Voltage Offset Correction: v_off_ini = 0.000004766 V, v_off_fin = 0.000007815 V 06:03:27 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171066601 Vs 06:03:27 Integrated Voltage Measurement... 06:03:47 Voltage Offset Correction: v_off_ini = 0.000007033 V, v_off_fin = 0.000003740 V 06:03:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978223 Vs 06:03:50 Temperature Measurement, Probe Number = 0, T = 20.157000 C 06:03:50 Temperature Measurement, Probe Number = 1, T = 20.080000 C 06:03:51 Temperature Measurement, Probe Number = 2, T = 20.151000 C 06:03:52 Temperature Measurement, Probe Number = 3, T = 20.096000 C 06:03:52 Temperature Measurement, Probe Number = 4, T = 20.625000 C 06:03:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.62 06:03:53 Integrated Voltage Measurement... 06:04:13 Voltage Offset Correction: v_off_ini = 0.000004793 V, v_off_fin = 0.000007623 V 06:04:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171068284 Vs 06:04:13 Integrated Voltage Measurement... 06:04:33 Voltage Offset Correction: v_off_ini = 0.000007258 V, v_off_fin = 0.000003847 V 06:04:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977064 Vs 06:04:35 Temperature Measurement, Probe Number = 0, T = 20.153000 C 06:04:36 Temperature Measurement, Probe Number = 1, T = 20.080000 C 06:04:37 Temperature Measurement, Probe Number = 2, T = 20.148000 C 06:04:37 Temperature Measurement, Probe Number = 3, T = 20.093000 C 06:04:38 Temperature Measurement, Probe Number = 4, T = 20.591000 C 06:04:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.59 06:04:38 Integrated Voltage Measurement... 06:04:58 Voltage Offset Correction: v_off_ini = 0.000004367 V, v_off_fin = 0.000007834 V 06:04:58 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171068886 Vs 06:04:58 Integrated Voltage Measurement... 06:05:19 Voltage Offset Correction: v_off_ini = 0.000006545 V, v_off_fin = 0.000003479 V 06:05:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978604 Vs 06:05:21 Temperature Measurement, Probe Number = 0, T = 20.161000 C 06:05:22 Temperature Measurement, Probe Number = 1, T = 20.085000 C 06:05:23 Temperature Measurement, Probe Number = 2, T = 20.154000 C 06:05:23 Temperature Measurement, Probe Number = 3, T = 20.101000 C 06:05:24 Temperature Measurement, Probe Number = 4, T = 20.634000 C 06:05:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.63 06:05:24 Integrated Voltage Measurement... 06:05:45 Voltage Offset Correction: v_off_ini = 0.000004896 V, v_off_fin = 0.000006998 V 06:05:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065140 Vs 06:05:45 Integrated Voltage Measurement... 06:06:05 Voltage Offset Correction: v_off_ini = 0.000006572 V, v_off_fin = 0.000003775 V 06:06:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977879 Vs 06:06:08 Temperature Measurement, Probe Number = 0, T = 20.156000 C 06:06:09 Temperature Measurement, Probe Number = 1, T = 20.084000 C 06:06:09 Temperature Measurement, Probe Number = 2, T = 20.155000 C 06:06:10 Temperature Measurement, Probe Number = 3, T = 20.099000 C 06:06:10 Temperature Measurement, Probe Number = 4, T = 20.647000 C 06:06:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.65 06:06:11 Integrated Voltage Measurement... 06:06:31 Voltage Offset Correction: v_off_ini = 0.000004974 V, v_off_fin = 0.000008066 V 06:06:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071184 Vs 06:06:31 Integrated Voltage Measurement... 06:06:51 Voltage Offset Correction: v_off_ini = 0.000007379 V, v_off_fin = 0.000004181 V 06:06:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970628 Vs 06:06:53 Temperature Measurement, Probe Number = 0, T = 20.154000 C 06:06:54 Temperature Measurement, Probe Number = 1, T = 20.083000 C 06:06:55 Temperature Measurement, Probe Number = 2, T = 20.152000 C 06:06:55 Temperature Measurement, Probe Number = 3, T = 20.095000 C 06:06:56 Temperature Measurement, Probe Number = 4, T = 20.625000 C 06:06:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.62 06:06:56 Integrated Voltage Measurement... 06:07:16 Voltage Offset Correction: v_off_ini = 0.000005316 V, v_off_fin = 0.000007616 V 06:07:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171068988 Vs 06:07:17 Integrated Voltage Measurement... 06:07:36 Voltage Offset Correction: v_off_ini = 0.000007067 V, v_off_fin = 0.000004463 V 06:07:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973390 Vs 06:07:39 Temperature Measurement, Probe Number = 0, T = 20.152000 C 06:07:40 Temperature Measurement, Probe Number = 1, T = 20.082000 C 06:07:40 Temperature Measurement, Probe Number = 2, T = 20.152000 C 06:07:41 Temperature Measurement, Probe Number = 3, T = 20.096000 C 06:07:42 Temperature Measurement, Probe Number = 4, T = 20.609000 C 06:07:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.61 06:07:42 Integrated Voltage Measurement... 06:08:01 Voltage Offset Correction: v_off_ini = 0.000005708 V, v_off_fin = 0.000008333 V 06:08:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071654 Vs 06:08:02 Integrated Voltage Measurement... 06:08:21 Voltage Offset Correction: v_off_ini = 0.000007090 V, v_off_fin = 0.000004512 V 06:08:21 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170973299 Vs 06:38:24 Temperature Measurement, Probe Number = 0, T = 20.151000 C 06:38:25 Temperature Measurement, Probe Number = 1, T = 20.076000 C 06:38:25 Temperature Measurement, Probe Number = 2, T = 20.148000 C 06:38:26 Temperature Measurement, Probe Number = 3, T = 20.092000 C 06:38:27 Temperature Measurement, Probe Number = 4, T = 20.453000 C 06:38:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.45 06:38:27 Integrated Voltage Measurement... 06:38:46 Voltage Offset Correction: v_off_ini = 0.000005878 V, v_off_fin = 0.000007831 V 06:38:46 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171113541 Vs 06:38:47 Integrated Voltage Measurement... 06:39:06 Voltage Offset Correction: v_off_ini = 0.000006872 V, v_off_fin = 0.000003667 V 06:39:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983130 Vs 06:39:09 Temperature Measurement, Probe Number = 0, T = 20.155000 C 06:39:10 Temperature Measurement, Probe Number = 1, T = 20.081000 C 06:39:10 Temperature Measurement, Probe Number = 2, T = 20.150000 C 06:39:11 Temperature Measurement, Probe Number = 3, T = 20.095000 C 06:39:12 Temperature Measurement, Probe Number = 4, T = 20.516000 C 06:39:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.52 06:39:12 Integrated Voltage Measurement... 06:39:32 Voltage Offset Correction: v_off_ini = 0.000004714 V, v_off_fin = 0.000007439 V 06:39:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066333 Vs 06:39:32 Integrated Voltage Measurement... 06:39:51 Voltage Offset Correction: v_off_ini = 0.000006992 V, v_off_fin = 0.000003515 V 06:39:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980422 Vs 06:39:54 Temperature Measurement, Probe Number = 0, T = 20.147000 C 06:39:55 Temperature Measurement, Probe Number = 1, T = 20.075000 C 06:39:56 Temperature Measurement, Probe Number = 2, T = 20.142000 C 06:39:56 Temperature Measurement, Probe Number = 3, T = 20.089000 C 06:39:57 Temperature Measurement, Probe Number = 4, T = 20.499000 C 06:39:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.50 06:39:57 Integrated Voltage Measurement... 06:40:17 Voltage Offset Correction: v_off_ini = 0.000005156 V, v_off_fin = 0.000007297 V 06:40:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171070818 Vs 06:40:17 Integrated Voltage Measurement... 06:40:37 Voltage Offset Correction: v_off_ini = 0.000007323 V, v_off_fin = 0.000004052 V 06:40:37 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170975115 Vs 06:40:40 Temperature Measurement, Probe Number = 0, T = 20.148000 C 06:40:41 Temperature Measurement, Probe Number = 1, T = 20.076000 C 06:40:42 Temperature Measurement, Probe Number = 2, T = 20.145000 C 06:40:42 Temperature Measurement, Probe Number = 3, T = 20.092000 C 06:40:43 Temperature Measurement, Probe Number = 4, T = 20.497000 C 06:40:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.50 06:40:43 Integrated Voltage Measurement... 06:41:02 Voltage Offset Correction: v_off_ini = 0.000004630 V, v_off_fin = 0.000007472 V 06:41:02 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171057165 Vs 06:41:03 Integrated Voltage Measurement... 06:41:22 Voltage Offset Correction: v_off_ini = 0.000006848 V, v_off_fin = 0.000003258 V 06:41:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985543 Vs 06:41:25 Temperature Measurement, Probe Number = 0, T = 20.154000 C 06:41:26 Temperature Measurement, Probe Number = 1, T = 20.078000 C 06:41:26 Temperature Measurement, Probe Number = 2, T = 20.145000 C 06:41:27 Temperature Measurement, Probe Number = 3, T = 20.091000 C 06:41:28 Temperature Measurement, Probe Number = 4, T = 20.487000 C 06:41:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.49 06:41:28 Integrated Voltage Measurement... 06:41:48 Voltage Offset Correction: v_off_ini = 0.000004404 V, v_off_fin = 0.000007136 V 06:41:48 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171057996 Vs 06:41:48 Integrated Voltage Measurement... 06:42:08 Voltage Offset Correction: v_off_ini = 0.000006520 V, v_off_fin = 0.000004008 V 06:42:08 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170976481 Vs 06:42:11 Temperature Measurement, Probe Number = 0, T = 20.154000 C 06:42:12 Temperature Measurement, Probe Number = 1, T = 20.079000 C 06:42:12 Temperature Measurement, Probe Number = 2, T = 20.149000 C 06:42:13 Temperature Measurement, Probe Number = 3, T = 20.094000 C 06:42:14 Temperature Measurement, Probe Number = 4, T = 20.525000 C 06:42:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.52 06:42:14 Integrated Voltage Measurement... 06:42:33 Voltage Offset Correction: v_off_ini = 0.000005163 V, v_off_fin = 0.000008023 V 06:42:34 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171066524 Vs 06:42:34 Integrated Voltage Measurement... 06:42:53 Voltage Offset Correction: v_off_ini = 0.000007101 V, v_off_fin = 0.000003842 V 06:42:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980848 Vs 06:42:56 Temperature Measurement, Probe Number = 0, T = 20.152000 C 06:42:57 Temperature Measurement, Probe Number = 1, T = 20.078000 C 06:42:58 Temperature Measurement, Probe Number = 2, T = 20.147000 C 06:42:58 Temperature Measurement, Probe Number = 3, T = 20.092000 C 06:42:59 Temperature Measurement, Probe Number = 4, T = 20.567000 C 06:42:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.57 06:42:59 Integrated Voltage Measurement... 06:43:19 Voltage Offset Correction: v_off_ini = 0.000004851 V, v_off_fin = 0.000007462 V 06:43:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066025 Vs 06:43:19 Integrated Voltage Measurement... 06:43:38 Voltage Offset Correction: v_off_ini = 0.000007003 V, v_off_fin = 0.000003231 V 06:43:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983577 Vs 06:43:41 Temperature Measurement, Probe Number = 0, T = 20.155000 C 06:43:42 Temperature Measurement, Probe Number = 1, T = 20.079000 C 06:43:43 Temperature Measurement, Probe Number = 2, T = 20.152000 C 06:43:43 Temperature Measurement, Probe Number = 3, T = 20.094000 C 06:43:44 Temperature Measurement, Probe Number = 4, T = 20.539000 C 06:43:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.54 06:43:44 Integrated Voltage Measurement... 06:44:04 Voltage Offset Correction: v_off_ini = 0.000004852 V, v_off_fin = 0.000007531 V 06:44:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171067282 Vs 06:44:05 Integrated Voltage Measurement... 06:44:24 Voltage Offset Correction: v_off_ini = 0.000007226 V, v_off_fin = 0.000003902 V 06:44:24 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979936 Vs 06:44:27 Temperature Measurement, Probe Number = 0, T = 20.152000 C 06:44:27 Temperature Measurement, Probe Number = 1, T = 20.078000 C 06:44:28 Temperature Measurement, Probe Number = 2, T = 20.151000 C 06:44:29 Temperature Measurement, Probe Number = 3, T = 20.092000 C 06:44:29 Temperature Measurement, Probe Number = 4, T = 20.585000 C 06:44:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.59 06:44:29 Integrated Voltage Measurement... 06:44:49 Voltage Offset Correction: v_off_ini = 0.000004988 V, v_off_fin = 0.000007684 V 06:44:49 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171073645 Vs 06:44:49 Integrated Voltage Measurement... 06:45:09 Voltage Offset Correction: v_off_ini = 0.000007331 V, v_off_fin = 0.000003404 V 06:45:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981269 Vs 06:45:11 Temperature Measurement, Probe Number = 0, T = 20.155000 C 06:45:12 Temperature Measurement, Probe Number = 1, T = 20.079000 C 06:45:13 Temperature Measurement, Probe Number = 2, T = 20.150000 C 06:45:13 Temperature Measurement, Probe Number = 3, T = 20.091000 C 06:45:14 Temperature Measurement, Probe Number = 4, T = 20.568000 C 06:45:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.57 06:45:14 Integrated Voltage Measurement... 06:45:34 Voltage Offset Correction: v_off_ini = 0.000004631 V, v_off_fin = 0.000007814 V 06:45:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171067735 Vs 06:45:34 Integrated Voltage Measurement... 06:45:54 Voltage Offset Correction: v_off_ini = 0.000006980 V, v_off_fin = 0.000004053 V 06:45:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982440 Vs 07:15:56 Temperature Measurement, Probe Number = 0, T = 20.156000 C 07:15:57 Temperature Measurement, Probe Number = 1, T = 20.081000 C 07:15:58 Temperature Measurement, Probe Number = 2, T = 20.151000 C 07:15:59 Temperature Measurement, Probe Number = 3, T = 20.094000 C 07:15:59 Temperature Measurement, Probe Number = 4, T = 20.553000 C 07:15:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.55 07:16:00 Integrated Voltage Measurement... 07:16:20 Voltage Offset Correction: v_off_ini = 0.000005732 V, v_off_fin = 0.000007366 V 07:16:20 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171115904 Vs 07:16:20 Integrated Voltage Measurement... 07:16:40 Voltage Offset Correction: v_off_ini = 0.000006821 V, v_off_fin = 0.000003411 V 07:16:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984751 Vs 07:16:42 Temperature Measurement, Probe Number = 0, T = 20.159000 C 07:16:43 Temperature Measurement, Probe Number = 1, T = 20.085000 C 07:16:44 Temperature Measurement, Probe Number = 2, T = 20.153000 C 07:16:44 Temperature Measurement, Probe Number = 3, T = 20.097000 C 07:16:45 Temperature Measurement, Probe Number = 4, T = 20.556000 C 07:16:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.56 07:16:45 Integrated Voltage Measurement... 07:17:04 Voltage Offset Correction: v_off_ini = 0.000005076 V, v_off_fin = 0.000007790 V 07:17:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171066137 Vs 07:17:05 Integrated Voltage Measurement... 07:17:25 Voltage Offset Correction: v_off_ini = 0.000007270 V, v_off_fin = 0.000004050 V 07:17:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984311 Vs 07:17:27 Temperature Measurement, Probe Number = 0, T = 20.155000 C 07:17:28 Temperature Measurement, Probe Number = 1, T = 20.083000 C 07:17:29 Temperature Measurement, Probe Number = 2, T = 20.150000 C 07:17:29 Temperature Measurement, Probe Number = 3, T = 20.096000 C 07:17:30 Temperature Measurement, Probe Number = 4, T = 20.585000 C 07:17:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.59 07:17:30 Integrated Voltage Measurement... 07:17:50 Voltage Offset Correction: v_off_ini = 0.000004996 V, v_off_fin = 0.000007745 V 07:17:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066535 Vs 07:17:50 Integrated Voltage Measurement... 07:18:10 Voltage Offset Correction: v_off_ini = 0.000006739 V, v_off_fin = 0.000004385 V 07:18:10 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170978450 Vs 07:18:13 Temperature Measurement, Probe Number = 0, T = 20.155000 C 07:18:13 Temperature Measurement, Probe Number = 1, T = 20.086000 C 07:18:14 Temperature Measurement, Probe Number = 2, T = 20.145000 C 07:18:15 Temperature Measurement, Probe Number = 3, T = 20.092000 C 07:18:15 Temperature Measurement, Probe Number = 4, T = 20.582000 C 07:18:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.58 07:18:15 Integrated Voltage Measurement... 07:18:35 Voltage Offset Correction: v_off_ini = 0.000005215 V, v_off_fin = 0.000007888 V 07:18:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066921 Vs 07:18:35 Integrated Voltage Measurement... 07:18:55 Voltage Offset Correction: v_off_ini = 0.000007165 V, v_off_fin = 0.000003715 V 07:18:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986681 Vs 07:18:58 Temperature Measurement, Probe Number = 0, T = 20.160000 C 07:18:58 Temperature Measurement, Probe Number = 1, T = 20.088000 C 07:18:59 Temperature Measurement, Probe Number = 2, T = 20.151000 C 07:18:59 Temperature Measurement, Probe Number = 3, T = 20.096000 C 07:19:00 Temperature Measurement, Probe Number = 4, T = 20.584000 C 07:19:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.58 07:19:00 Integrated Voltage Measurement... 07:19:20 Voltage Offset Correction: v_off_ini = 0.000005385 V, v_off_fin = 0.000007736 V 07:19:20 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171065679 Vs 07:19:20 Integrated Voltage Measurement... 07:19:40 Voltage Offset Correction: v_off_ini = 0.000006882 V, v_off_fin = 0.000003077 V 07:19:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986621 Vs 07:19:43 Temperature Measurement, Probe Number = 0, T = 20.159000 C 07:19:44 Temperature Measurement, Probe Number = 1, T = 20.085000 C 07:19:44 Temperature Measurement, Probe Number = 2, T = 20.150000 C 07:19:45 Temperature Measurement, Probe Number = 3, T = 20.096000 C 07:19:46 Temperature Measurement, Probe Number = 4, T = 20.567000 C 07:19:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.57 07:19:46 Integrated Voltage Measurement... 07:20:06 Voltage Offset Correction: v_off_ini = 0.000004942 V, v_off_fin = 0.000007485 V 07:20:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065360 Vs 07:20:06 Integrated Voltage Measurement... 07:20:26 Voltage Offset Correction: v_off_ini = 0.000006825 V, v_off_fin = 0.000003786 V 07:20:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990417 Vs 07:20:29 Temperature Measurement, Probe Number = 0, T = 20.160000 C 07:20:29 Temperature Measurement, Probe Number = 1, T = 20.086000 C 07:20:30 Temperature Measurement, Probe Number = 2, T = 20.153000 C 07:20:31 Temperature Measurement, Probe Number = 3, T = 20.097000 C 07:20:31 Temperature Measurement, Probe Number = 4, T = 20.624000 C 07:20:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.62 07:20:32 Integrated Voltage Measurement... 07:20:51 Voltage Offset Correction: v_off_ini = 0.000005224 V, v_off_fin = 0.000007510 V 07:20:51 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171064782 Vs 07:20:51 Integrated Voltage Measurement... 07:21:11 Voltage Offset Correction: v_off_ini = 0.000007067 V, v_off_fin = 0.000003622 V 07:21:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988032 Vs 07:21:14 Temperature Measurement, Probe Number = 0, T = 20.153000 C 07:21:14 Temperature Measurement, Probe Number = 1, T = 20.079000 C 07:21:15 Temperature Measurement, Probe Number = 2, T = 20.147000 C 07:21:16 Temperature Measurement, Probe Number = 3, T = 20.091000 C 07:21:16 Temperature Measurement, Probe Number = 4, T = 20.647000 C 07:21:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.65 07:21:17 Integrated Voltage Measurement... 07:21:36 Voltage Offset Correction: v_off_ini = 0.000004151 V, v_off_fin = 0.000007556 V 07:21:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171067583 Vs 07:21:36 Integrated Voltage Measurement... 07:21:56 Voltage Offset Correction: v_off_ini = 0.000006753 V, v_off_fin = 0.000003210 V 07:21:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993611 Vs 07:21:59 Temperature Measurement, Probe Number = 0, T = 20.152000 C 07:22:00 Temperature Measurement, Probe Number = 1, T = 20.080000 C 07:22:00 Temperature Measurement, Probe Number = 2, T = 20.144000 C 07:22:01 Temperature Measurement, Probe Number = 3, T = 20.089000 C 07:22:02 Temperature Measurement, Probe Number = 4, T = 20.565000 C 07:22:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.57 07:22:02 Integrated Voltage Measurement... 07:22:21 Voltage Offset Correction: v_off_ini = 0.000004614 V, v_off_fin = 0.000007062 V 07:22:21 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171063968 Vs 07:22:22 Integrated Voltage Measurement... 07:22:41 Voltage Offset Correction: v_off_ini = 0.000006380 V, v_off_fin = 0.000003267 V 07:22:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988076 Vs 07:22:44 Temperature Measurement, Probe Number = 0, T = 20.154000 C 07:22:45 Temperature Measurement, Probe Number = 1, T = 20.081000 C 07:22:45 Temperature Measurement, Probe Number = 2, T = 20.149000 C 07:22:46 Temperature Measurement, Probe Number = 3, T = 20.093000 C 07:22:47 Temperature Measurement, Probe Number = 4, T = 20.546000 C 07:22:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.55 07:22:47 Integrated Voltage Measurement... 07:23:06 Voltage Offset Correction: v_off_ini = 0.000004927 V, v_off_fin = 0.000007614 V 07:23:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171067744 Vs 07:23:07 Integrated Voltage Measurement... 07:23:26 Voltage Offset Correction: v_off_ini = 0.000006663 V, v_off_fin = 0.000002984 V 07:23:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984560 Vs 07:53:29 Temperature Measurement, Probe Number = 0, T = 20.150000 C 07:53:29 Temperature Measurement, Probe Number = 1, T = 20.079000 C 07:53:30 Temperature Measurement, Probe Number = 2, T = 20.144000 C 07:53:31 Temperature Measurement, Probe Number = 3, T = 20.091000 C 07:53:31 Temperature Measurement, Probe Number = 4, T = 20.574000 C 07:53:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.57 07:53:32 Integrated Voltage Measurement... 07:53:51 Voltage Offset Correction: v_off_ini = 0.000005702 V, v_off_fin = 0.000007073 V 07:53:51 Integrated Voltage Measurement Delta Gap = 0.0040019 m VT = 0.171129135 Vs 07:53:52 Integrated Voltage Measurement... 07:54:11 Voltage Offset Correction: v_off_ini = 0.000006303 V, v_off_fin = 0.000003191 V 07:54:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987846 Vs 07:54:14 Temperature Measurement, Probe Number = 0, T = 20.155000 C 07:54:15 Temperature Measurement, Probe Number = 1, T = 20.079000 C 07:54:15 Temperature Measurement, Probe Number = 2, T = 20.147000 C 07:54:16 Temperature Measurement, Probe Number = 3, T = 20.090000 C 07:54:17 Temperature Measurement, Probe Number = 4, T = 20.580000 C 07:54:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.58 07:54:17 Integrated Voltage Measurement... 07:54:36 Voltage Offset Correction: v_off_ini = 0.000004189 V, v_off_fin = 0.000007758 V 07:54:36 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171063263 Vs 07:54:36 Integrated Voltage Measurement... 07:54:56 Voltage Offset Correction: v_off_ini = 0.000006904 V, v_off_fin = 0.000004210 V 07:54:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977286 Vs 07:54:59 Temperature Measurement, Probe Number = 0, T = 20.154000 C 07:55:00 Temperature Measurement, Probe Number = 1, T = 20.078000 C 07:55:00 Temperature Measurement, Probe Number = 2, T = 20.145000 C 07:55:01 Temperature Measurement, Probe Number = 3, T = 20.089000 C 07:55:02 Temperature Measurement, Probe Number = 4, T = 20.542000 C 07:55:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.54 07:55:02 Integrated Voltage Measurement... 07:55:21 Voltage Offset Correction: v_off_ini = 0.000005133 V, v_off_fin = 0.000007795 V 07:55:21 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171070902 Vs 07:55:22 Integrated Voltage Measurement... 07:55:41 Voltage Offset Correction: v_off_ini = 0.000007359 V, v_off_fin = 0.000003700 V 07:55:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976914 Vs 07:55:44 Temperature Measurement, Probe Number = 0, T = 20.155000 C 07:55:45 Temperature Measurement, Probe Number = 1, T = 20.080000 C 07:55:45 Temperature Measurement, Probe Number = 2, T = 20.144000 C 07:55:46 Temperature Measurement, Probe Number = 3, T = 20.087000 C 07:55:47 Temperature Measurement, Probe Number = 4, T = 20.529000 C 07:55:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.53 07:55:47 Integrated Voltage Measurement... 07:56:06 Voltage Offset Correction: v_off_ini = 0.000005041 V, v_off_fin = 0.000008696 V 07:56:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171070134 Vs 07:56:07 Integrated Voltage Measurement... 07:56:26 Voltage Offset Correction: v_off_ini = 0.000007107 V, v_off_fin = 0.000003731 V 07:56:26 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983271 Vs 07:56:29 Temperature Measurement, Probe Number = 0, T = 20.156000 C 07:56:30 Temperature Measurement, Probe Number = 1, T = 20.080000 C 07:56:30 Temperature Measurement, Probe Number = 2, T = 20.150000 C 07:56:31 Temperature Measurement, Probe Number = 3, T = 20.091000 C 07:56:32 Temperature Measurement, Probe Number = 4, T = 20.481000 C 07:56:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.48 07:56:32 Integrated Voltage Measurement... 07:56:52 Voltage Offset Correction: v_off_ini = 0.000004137 V, v_off_fin = 0.000007165 V 07:56:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064648 Vs 07:56:52 Integrated Voltage Measurement... 07:57:11 Voltage Offset Correction: v_off_ini = 0.000006943 V, v_off_fin = 0.000003440 V 07:57:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981058 Vs 07:57:14 Temperature Measurement, Probe Number = 0, T = 20.162000 C 07:57:15 Temperature Measurement, Probe Number = 1, T = 20.087000 C 07:57:16 Temperature Measurement, Probe Number = 2, T = 20.152000 C 07:57:16 Temperature Measurement, Probe Number = 3, T = 20.096000 C 07:57:17 Temperature Measurement, Probe Number = 4, T = 20.551000 C 07:57:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.55 07:57:17 Integrated Voltage Measurement... 07:57:36 Voltage Offset Correction: v_off_ini = 0.000004766 V, v_off_fin = 0.000007641 V 07:57:37 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171069352 Vs 07:57:37 Integrated Voltage Measurement... 07:57:57 Voltage Offset Correction: v_off_ini = 0.000006936 V, v_off_fin = 0.000003626 V 07:57:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984049 Vs 07:58:00 Temperature Measurement, Probe Number = 0, T = 20.159000 C 07:58:01 Temperature Measurement, Probe Number = 1, T = 20.082000 C 07:58:01 Temperature Measurement, Probe Number = 2, T = 20.150000 C 07:58:02 Temperature Measurement, Probe Number = 3, T = 20.092000 C 07:58:03 Temperature Measurement, Probe Number = 4, T = 20.607000 C 07:58:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.61 07:58:03 Integrated Voltage Measurement... 07:58:23 Voltage Offset Correction: v_off_ini = 0.000004762 V, v_off_fin = 0.000007592 V 07:58:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066900 Vs 07:58:23 Integrated Voltage Measurement... 07:58:43 Voltage Offset Correction: v_off_ini = 0.000007000 V, v_off_fin = 0.000003384 V 07:58:43 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987553 Vs 07:58:46 Temperature Measurement, Probe Number = 0, T = 20.156000 C 07:58:46 Temperature Measurement, Probe Number = 1, T = 20.081000 C 07:58:47 Temperature Measurement, Probe Number = 2, T = 20.148000 C 07:58:47 Temperature Measurement, Probe Number = 3, T = 20.090000 C 07:58:48 Temperature Measurement, Probe Number = 4, T = 20.562000 C 07:58:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.56 07:58:48 Integrated Voltage Measurement... 07:59:07 Voltage Offset Correction: v_off_ini = 0.000004758 V, v_off_fin = 0.000007413 V 07:59:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171069559 Vs 07:59:08 Integrated Voltage Measurement... 07:59:28 Voltage Offset Correction: v_off_ini = 0.000006946 V, v_off_fin = 0.000004048 V 07:59:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983046 Vs 07:59:30 Temperature Measurement, Probe Number = 0, T = 20.157000 C 07:59:31 Temperature Measurement, Probe Number = 1, T = 20.083000 C 07:59:32 Temperature Measurement, Probe Number = 2, T = 20.151000 C 07:59:32 Temperature Measurement, Probe Number = 3, T = 20.092000 C 07:59:33 Temperature Measurement, Probe Number = 4, T = 20.561000 C 07:59:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.56 07:59:33 Integrated Voltage Measurement... 07:59:53 Voltage Offset Correction: v_off_ini = 0.000005101 V, v_off_fin = 0.000007280 V 07:59:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171068022 Vs 07:59:53 Integrated Voltage Measurement... 08:00:13 Voltage Offset Correction: v_off_ini = 0.000007007 V, v_off_fin = 0.000003944 V 08:00:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980539 Vs 08:00:15 Temperature Measurement, Probe Number = 0, T = 20.161000 C 08:00:16 Temperature Measurement, Probe Number = 1, T = 20.086000 C 08:00:17 Temperature Measurement, Probe Number = 2, T = 20.151000 C 08:00:17 Temperature Measurement, Probe Number = 3, T = 20.093000 C 08:00:18 Temperature Measurement, Probe Number = 4, T = 20.534000 C 08:00:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.53 08:00:18 Integrated Voltage Measurement... 08:00:38 Voltage Offset Correction: v_off_ini = 0.000004322 V, v_off_fin = 0.000007178 V 08:00:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070217 Vs 08:00:39 Integrated Voltage Measurement... 08:00:59 Voltage Offset Correction: v_off_ini = 0.000006152 V, v_off_fin = 0.000003221 V 08:00:59 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170984560 Vs 08:31:02 Temperature Measurement, Probe Number = 0, T = 20.161000 C 08:31:02 Temperature Measurement, Probe Number = 1, T = 20.089000 C 08:31:03 Temperature Measurement, Probe Number = 2, T = 20.152000 C 08:31:03 Temperature Measurement, Probe Number = 3, T = 20.096000 C 08:31:04 Temperature Measurement, Probe Number = 4, T = 20.497000 C 08:31:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.50 08:31:04 Integrated Voltage Measurement... 08:31:23 Voltage Offset Correction: v_off_ini = 0.000006795 V, v_off_fin = 0.000008305 V 08:31:24 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171129391 Vs 08:31:24 Integrated Voltage Measurement... 08:31:44 Voltage Offset Correction: v_off_ini = 0.000008124 V, v_off_fin = 0.000003951 V 08:31:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983289 Vs 08:31:46 Temperature Measurement, Probe Number = 0, T = 20.162000 C 08:31:47 Temperature Measurement, Probe Number = 1, T = 20.088000 C 08:31:48 Temperature Measurement, Probe Number = 2, T = 20.153000 C 08:31:48 Temperature Measurement, Probe Number = 3, T = 20.096000 C 08:31:49 Temperature Measurement, Probe Number = 4, T = 20.564000 C 08:31:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.56 08:31:49 Integrated Voltage Measurement... 08:32:09 Voltage Offset Correction: v_off_ini = 0.000005665 V, v_off_fin = 0.000007850 V 08:32:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072826 Vs 08:32:09 Integrated Voltage Measurement... 08:32:29 Voltage Offset Correction: v_off_ini = 0.000007582 V, v_off_fin = 0.000003826 V 08:32:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982700 Vs 08:32:31 Temperature Measurement, Probe Number = 0, T = 20.162000 C 08:32:32 Temperature Measurement, Probe Number = 1, T = 20.085000 C 08:32:33 Temperature Measurement, Probe Number = 2, T = 20.152000 C 08:32:33 Temperature Measurement, Probe Number = 3, T = 20.095000 C 08:32:34 Temperature Measurement, Probe Number = 4, T = 20.573000 C 08:32:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.57 08:32:34 Integrated Voltage Measurement... 08:32:54 Voltage Offset Correction: v_off_ini = 0.000004623 V, v_off_fin = 0.000007507 V 08:32:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171072415 Vs 08:32:54 Integrated Voltage Measurement... 08:33:15 Voltage Offset Correction: v_off_ini = 0.000007026 V, v_off_fin = 0.000003269 V 08:33:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988687 Vs 08:33:17 Temperature Measurement, Probe Number = 0, T = 20.161000 C 08:33:18 Temperature Measurement, Probe Number = 1, T = 20.085000 C 08:33:19 Temperature Measurement, Probe Number = 2, T = 20.149000 C 08:33:19 Temperature Measurement, Probe Number = 3, T = 20.093000 C 08:33:20 Temperature Measurement, Probe Number = 4, T = 20.532000 C 08:33:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.53 08:33:20 Integrated Voltage Measurement... 08:33:40 Voltage Offset Correction: v_off_ini = 0.000004975 V, v_off_fin = 0.000008152 V 08:33:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070374 Vs 08:33:40 Integrated Voltage Measurement... 08:34:00 Voltage Offset Correction: v_off_ini = 0.000007362 V, v_off_fin = 0.000003702 V 08:34:00 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979430 Vs 08:34:03 Temperature Measurement, Probe Number = 0, T = 20.159000 C 08:34:03 Temperature Measurement, Probe Number = 1, T = 20.082000 C 08:34:04 Temperature Measurement, Probe Number = 2, T = 20.151000 C 08:34:05 Temperature Measurement, Probe Number = 3, T = 20.093000 C 08:34:05 Temperature Measurement, Probe Number = 4, T = 20.533000 C 08:34:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.53 08:34:05 Integrated Voltage Measurement... 08:34:25 Voltage Offset Correction: v_off_ini = 0.000004761 V, v_off_fin = 0.000007816 V 08:34:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071417 Vs 08:34:25 Integrated Voltage Measurement... 08:34:45 Voltage Offset Correction: v_off_ini = 0.000007204 V, v_off_fin = 0.000003975 V 08:34:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988379 Vs 08:34:48 Temperature Measurement, Probe Number = 0, T = 20.158000 C 08:34:48 Temperature Measurement, Probe Number = 1, T = 20.081000 C 08:34:49 Temperature Measurement, Probe Number = 2, T = 20.146000 C 08:34:50 Temperature Measurement, Probe Number = 3, T = 20.090000 C 08:34:50 Temperature Measurement, Probe Number = 4, T = 20.495000 C 08:34:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.50 08:34:50 Integrated Voltage Measurement... 08:35:11 Voltage Offset Correction: v_off_ini = 0.000004586 V, v_off_fin = 0.000007421 V 08:35:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072873 Vs 08:35:11 Integrated Voltage Measurement... 08:35:31 Voltage Offset Correction: v_off_ini = 0.000007264 V, v_off_fin = 0.000003395 V 08:35:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986289 Vs 08:35:34 Temperature Measurement, Probe Number = 0, T = 20.161000 C 08:35:34 Temperature Measurement, Probe Number = 1, T = 20.085000 C 08:35:35 Temperature Measurement, Probe Number = 2, T = 20.151000 C 08:35:36 Temperature Measurement, Probe Number = 3, T = 20.093000 C 08:35:36 Temperature Measurement, Probe Number = 4, T = 20.520000 C 08:35:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.52 08:35:36 Integrated Voltage Measurement... 08:35:56 Voltage Offset Correction: v_off_ini = 0.000005201 V, v_off_fin = 0.000007525 V 08:35:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072009 Vs 08:35:57 Integrated Voltage Measurement... 08:36:17 Voltage Offset Correction: v_off_ini = 0.000007196 V, v_off_fin = 0.000004373 V 08:36:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978673 Vs 08:36:20 Temperature Measurement, Probe Number = 0, T = 20.163000 C 08:36:20 Temperature Measurement, Probe Number = 1, T = 20.089000 C 08:36:21 Temperature Measurement, Probe Number = 2, T = 20.152000 C 08:36:22 Temperature Measurement, Probe Number = 3, T = 20.097000 C 08:36:22 Temperature Measurement, Probe Number = 4, T = 20.606000 C 08:36:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.61 08:36:23 Integrated Voltage Measurement... 08:36:42 Voltage Offset Correction: v_off_ini = 0.000005395 V, v_off_fin = 0.000007460 V 08:36:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171068345 Vs 08:36:43 Integrated Voltage Measurement... 08:37:02 Voltage Offset Correction: v_off_ini = 0.000007252 V, v_off_fin = 0.000004200 V 08:37:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986111 Vs 08:37:05 Temperature Measurement, Probe Number = 0, T = 20.164000 C 08:37:05 Temperature Measurement, Probe Number = 1, T = 20.091000 C 08:37:06 Temperature Measurement, Probe Number = 2, T = 20.152000 C 08:37:07 Temperature Measurement, Probe Number = 3, T = 20.098000 C 08:37:07 Temperature Measurement, Probe Number = 4, T = 20.613000 C 08:37:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.61 08:37:08 Integrated Voltage Measurement... 08:37:27 Voltage Offset Correction: v_off_ini = 0.000003858 V, v_off_fin = 0.000007271 V 08:37:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073774 Vs 08:37:27 Integrated Voltage Measurement... 08:37:48 Voltage Offset Correction: v_off_ini = 0.000006474 V, v_off_fin = 0.000003639 V 08:37:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983677 Vs 08:37:51 Temperature Measurement, Probe Number = 0, T = 20.164000 C 08:37:51 Temperature Measurement, Probe Number = 1, T = 20.091000 C 08:37:52 Temperature Measurement, Probe Number = 2, T = 20.153000 C 08:37:53 Temperature Measurement, Probe Number = 3, T = 20.096000 C 08:37:53 Temperature Measurement, Probe Number = 4, T = 20.609000 C 08:37:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.61 08:37:53 Integrated Voltage Measurement... 08:38:13 Voltage Offset Correction: v_off_ini = 0.000005754 V, v_off_fin = 0.000007679 V 08:38:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070915 Vs 08:38:13 Integrated Voltage Measurement... 08:38:33 Voltage Offset Correction: v_off_ini = 0.000006950 V, v_off_fin = 0.000003467 V 08:38:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983813 Vs 09:08:36 Temperature Measurement, Probe Number = 0, T = 20.167000 C 09:08:37 Temperature Measurement, Probe Number = 1, T = 20.096000 C 09:08:37 Temperature Measurement, Probe Number = 2, T = 20.156000 C 09:08:38 Temperature Measurement, Probe Number = 3, T = 20.102000 C 09:08:39 Temperature Measurement, Probe Number = 4, T = 20.635000 C 09:08:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.64 09:08:39 Integrated Voltage Measurement... 09:08:59 Voltage Offset Correction: v_off_ini = 0.000005585 V, v_off_fin = 0.000007495 V 09:08:59 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171121055 Vs 09:08:59 Integrated Voltage Measurement... 09:09:19 Voltage Offset Correction: v_off_ini = 0.000007372 V, v_off_fin = 0.000003972 V 09:09:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977161 Vs 09:09:22 Temperature Measurement, Probe Number = 0, T = 20.164000 C 09:09:23 Temperature Measurement, Probe Number = 1, T = 20.092000 C 09:09:23 Temperature Measurement, Probe Number = 2, T = 20.155000 C 09:09:24 Temperature Measurement, Probe Number = 3, T = 20.099000 C 09:09:24 Temperature Measurement, Probe Number = 4, T = 20.626000 C 09:09:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.63 09:09:25 Integrated Voltage Measurement... 09:09:44 Voltage Offset Correction: v_off_ini = 0.000005197 V, v_off_fin = 0.000008022 V 09:09:44 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171071334 Vs 09:09:44 Integrated Voltage Measurement... 09:10:04 Voltage Offset Correction: v_off_ini = 0.000008147 V, v_off_fin = 0.000003992 V 09:10:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972944 Vs 09:10:07 Temperature Measurement, Probe Number = 0, T = 20.167000 C 09:10:08 Temperature Measurement, Probe Number = 1, T = 20.094000 C 09:10:08 Temperature Measurement, Probe Number = 2, T = 20.156000 C 09:10:09 Temperature Measurement, Probe Number = 3, T = 20.099000 C 09:10:10 Temperature Measurement, Probe Number = 4, T = 20.603000 C 09:10:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.60 09:10:10 Integrated Voltage Measurement... 09:10:29 Voltage Offset Correction: v_off_ini = 0.000005186 V, v_off_fin = 0.000008674 V 09:10:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075678 Vs 09:10:29 Integrated Voltage Measurement... 09:10:49 Voltage Offset Correction: v_off_ini = 0.000007625 V, v_off_fin = 0.000004471 V 09:10:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977832 Vs 09:10:52 Temperature Measurement, Probe Number = 0, T = 20.169000 C 09:10:53 Temperature Measurement, Probe Number = 1, T = 20.094000 C 09:10:53 Temperature Measurement, Probe Number = 2, T = 20.158000 C 09:10:54 Temperature Measurement, Probe Number = 3, T = 20.101000 C 09:10:55 Temperature Measurement, Probe Number = 4, T = 20.592000 C 09:10:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.59 09:10:55 Integrated Voltage Measurement... 09:11:14 Voltage Offset Correction: v_off_ini = 0.000005612 V, v_off_fin = 0.000008520 V 09:11:14 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171079639 Vs 09:11:15 Integrated Voltage Measurement... 09:11:34 Voltage Offset Correction: v_off_ini = 0.000008053 V, v_off_fin = 0.000004270 V 09:11:35 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170976592 Vs 09:11:37 Temperature Measurement, Probe Number = 0, T = 20.164000 C 09:11:38 Temperature Measurement, Probe Number = 1, T = 20.091000 C 09:11:39 Temperature Measurement, Probe Number = 2, T = 20.154000 C 09:11:39 Temperature Measurement, Probe Number = 3, T = 20.099000 C 09:11:40 Temperature Measurement, Probe Number = 4, T = 20.539000 C 09:11:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.54 09:11:40 Integrated Voltage Measurement... 09:12:00 Voltage Offset Correction: v_off_ini = 0.000005556 V, v_off_fin = 0.000008047 V 09:12:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075608 Vs 09:12:00 Integrated Voltage Measurement... 09:12:19 Voltage Offset Correction: v_off_ini = 0.000007388 V, v_off_fin = 0.000004085 V 09:12:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971988 Vs 09:12:22 Temperature Measurement, Probe Number = 0, T = 20.167000 C 09:12:23 Temperature Measurement, Probe Number = 1, T = 20.093000 C 09:12:24 Temperature Measurement, Probe Number = 2, T = 20.159000 C 09:12:24 Temperature Measurement, Probe Number = 3, T = 20.101000 C 09:12:25 Temperature Measurement, Probe Number = 4, T = 20.509000 C 09:12:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.51 09:12:25 Integrated Voltage Measurement... 09:12:44 Voltage Offset Correction: v_off_ini = 0.000005288 V, v_off_fin = 0.000008072 V 09:12:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171078910 Vs 09:12:45 Integrated Voltage Measurement... 09:13:04 Voltage Offset Correction: v_off_ini = 0.000007040 V, v_off_fin = 0.000003462 V 09:13:04 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170984648 Vs 09:13:07 Temperature Measurement, Probe Number = 0, T = 20.167000 C 09:13:08 Temperature Measurement, Probe Number = 1, T = 20.093000 C 09:13:08 Temperature Measurement, Probe Number = 2, T = 20.157000 C 09:13:09 Temperature Measurement, Probe Number = 3, T = 20.101000 C 09:13:10 Temperature Measurement, Probe Number = 4, T = 20.553000 C 09:13:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.55 09:13:10 Integrated Voltage Measurement... 09:13:29 Voltage Offset Correction: v_off_ini = 0.000005666 V, v_off_fin = 0.000008351 V 09:13:30 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171083177 Vs 09:13:30 Integrated Voltage Measurement... 09:13:49 Voltage Offset Correction: v_off_ini = 0.000007678 V, v_off_fin = 0.000003919 V 09:13:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974351 Vs 09:13:52 Temperature Measurement, Probe Number = 0, T = 20.167000 C 09:13:53 Temperature Measurement, Probe Number = 1, T = 20.093000 C 09:13:54 Temperature Measurement, Probe Number = 2, T = 20.158000 C 09:13:54 Temperature Measurement, Probe Number = 3, T = 20.100000 C 09:13:55 Temperature Measurement, Probe Number = 4, T = 20.578000 C 09:13:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.58 09:13:55 Integrated Voltage Measurement... 09:14:14 Voltage Offset Correction: v_off_ini = 0.000004915 V, v_off_fin = 0.000007512 V 09:14:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171075126 Vs 09:14:15 Integrated Voltage Measurement... 09:14:34 Voltage Offset Correction: v_off_ini = 0.000007424 V, v_off_fin = 0.000003555 V 09:14:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981673 Vs 09:14:37 Temperature Measurement, Probe Number = 0, T = 20.159000 C 09:14:38 Temperature Measurement, Probe Number = 1, T = 20.085000 C 09:14:38 Temperature Measurement, Probe Number = 2, T = 20.150000 C 09:14:39 Temperature Measurement, Probe Number = 3, T = 20.093000 C 09:14:40 Temperature Measurement, Probe Number = 4, T = 20.556000 C 09:14:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.56 09:14:40 Integrated Voltage Measurement... 09:15:00 Voltage Offset Correction: v_off_ini = 0.000004880 V, v_off_fin = 0.000007903 V 09:15:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171078451 Vs 09:15:00 Integrated Voltage Measurement... 09:15:20 Voltage Offset Correction: v_off_ini = 0.000007012 V, v_off_fin = 0.000003582 V 09:15:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983233 Vs 09:15:22 Temperature Measurement, Probe Number = 0, T = 20.161000 C 09:15:23 Temperature Measurement, Probe Number = 1, T = 20.091000 C 09:15:24 Temperature Measurement, Probe Number = 2, T = 20.153000 C 09:15:24 Temperature Measurement, Probe Number = 3, T = 20.098000 C 09:15:25 Temperature Measurement, Probe Number = 4, T = 20.511000 C 09:15:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.51 09:15:25 Integrated Voltage Measurement... 09:15:45 Voltage Offset Correction: v_off_ini = 0.000005237 V, v_off_fin = 0.000007984 V 09:15:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171073510 Vs 09:15:45 Integrated Voltage Measurement... 09:16:05 Voltage Offset Correction: v_off_ini = 0.000007245 V, v_off_fin = 0.000002836 V 09:16:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985064 Vs 09:46:07 Temperature Measurement, Probe Number = 0, T = 20.170000 C 09:46:08 Temperature Measurement, Probe Number = 1, T = 20.097000 C 09:46:09 Temperature Measurement, Probe Number = 2, T = 20.159000 C 09:46:09 Temperature Measurement, Probe Number = 3, T = 20.105000 C 09:46:10 Temperature Measurement, Probe Number = 4, T = 20.607000 C 09:46:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.61 09:46:10 Integrated Voltage Measurement... 09:46:30 Voltage Offset Correction: v_off_ini = 0.000005529 V, v_off_fin = 0.000007368 V 09:46:31 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171123235 Vs 09:46:31 Integrated Voltage Measurement... 09:46:50 Voltage Offset Correction: v_off_ini = 0.000006829 V, v_off_fin = 0.000003718 V 09:46:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986520 Vs 09:46:53 Temperature Measurement, Probe Number = 0, T = 20.173000 C 09:46:54 Temperature Measurement, Probe Number = 1, T = 20.100000 C 09:46:55 Temperature Measurement, Probe Number = 2, T = 20.160000 C 09:46:55 Temperature Measurement, Probe Number = 3, T = 20.106000 C 09:46:56 Temperature Measurement, Probe Number = 4, T = 20.604000 C 09:46:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.60 09:46:56 Integrated Voltage Measurement... 09:47:16 Voltage Offset Correction: v_off_ini = 0.000004574 V, v_off_fin = 0.000007306 V 09:47:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171068147 Vs 09:47:17 Integrated Voltage Measurement... 09:47:36 Voltage Offset Correction: v_off_ini = 0.000006900 V, v_off_fin = 0.000003554 V 09:47:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986184 Vs 09:47:39 Temperature Measurement, Probe Number = 0, T = 20.170000 C 09:47:40 Temperature Measurement, Probe Number = 1, T = 20.095000 C 09:47:41 Temperature Measurement, Probe Number = 2, T = 20.159000 C 09:47:41 Temperature Measurement, Probe Number = 3, T = 20.102000 C 09:47:42 Temperature Measurement, Probe Number = 4, T = 20.581000 C 09:47:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.58 09:47:42 Integrated Voltage Measurement... 09:48:02 Voltage Offset Correction: v_off_ini = 0.000004765 V, v_off_fin = 0.000007982 V 09:48:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074623 Vs 09:48:02 Integrated Voltage Measurement... 09:48:21 Voltage Offset Correction: v_off_ini = 0.000007156 V, v_off_fin = 0.000004221 V 09:48:22 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170976260 Vs 09:48:24 Temperature Measurement, Probe Number = 0, T = 20.166000 C 09:48:25 Temperature Measurement, Probe Number = 1, T = 20.095000 C 09:48:26 Temperature Measurement, Probe Number = 2, T = 20.156000 C 09:48:27 Temperature Measurement, Probe Number = 3, T = 20.100000 C 09:48:27 Temperature Measurement, Probe Number = 4, T = 20.507000 C 09:48:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.51 09:48:27 Integrated Voltage Measurement... 09:48:48 Voltage Offset Correction: v_off_ini = 0.000005189 V, v_off_fin = 0.000007573 V 09:48:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171078031 Vs 09:48:48 Integrated Voltage Measurement... 09:49:08 Voltage Offset Correction: v_off_ini = 0.000006653 V, v_off_fin = 0.000003150 V 09:49:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987352 Vs 09:49:11 Temperature Measurement, Probe Number = 0, T = 20.172000 C 09:49:11 Temperature Measurement, Probe Number = 1, T = 20.099000 C 09:49:12 Temperature Measurement, Probe Number = 2, T = 20.158000 C 09:49:13 Temperature Measurement, Probe Number = 3, T = 20.104000 C 09:49:13 Temperature Measurement, Probe Number = 4, T = 20.482000 C 09:49:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.48 09:49:13 Integrated Voltage Measurement... 09:49:33 Voltage Offset Correction: v_off_ini = 0.000004962 V, v_off_fin = 0.000007114 V 09:49:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171065848 Vs 09:49:34 Integrated Voltage Measurement... 09:49:54 Voltage Offset Correction: v_off_ini = 0.000006568 V, v_off_fin = 0.000003356 V 09:49:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986752 Vs 09:49:57 Temperature Measurement, Probe Number = 0, T = 20.173000 C 09:49:57 Temperature Measurement, Probe Number = 1, T = 20.101000 C 09:49:58 Temperature Measurement, Probe Number = 2, T = 20.160000 C 09:49:59 Temperature Measurement, Probe Number = 3, T = 20.107000 C 09:49:59 Temperature Measurement, Probe Number = 4, T = 20.564000 C 09:49:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.56 09:49:59 Integrated Voltage Measurement... 09:50:20 Voltage Offset Correction: v_off_ini = 0.000005127 V, v_off_fin = 0.000007077 V 09:50:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171068113 Vs 09:50:20 Integrated Voltage Measurement... 09:50:40 Voltage Offset Correction: v_off_ini = 0.000006624 V, v_off_fin = 0.000002815 V 09:50:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990185 Vs 09:50:43 Temperature Measurement, Probe Number = 0, T = 20.176000 C 09:50:43 Temperature Measurement, Probe Number = 1, T = 20.102000 C 09:50:44 Temperature Measurement, Probe Number = 2, T = 20.162000 C 09:50:45 Temperature Measurement, Probe Number = 3, T = 20.108000 C 09:50:45 Temperature Measurement, Probe Number = 4, T = 20.563000 C 09:50:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.56 09:50:46 Integrated Voltage Measurement... 09:51:05 Voltage Offset Correction: v_off_ini = 0.000004672 V, v_off_fin = 0.000007283 V 09:51:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171065267 Vs 09:51:05 Integrated Voltage Measurement... 09:51:25 Voltage Offset Correction: v_off_ini = 0.000006473 V, v_off_fin = 0.000003167 V 09:51:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993725 Vs 09:51:28 Temperature Measurement, Probe Number = 0, T = 20.173000 C 09:51:28 Temperature Measurement, Probe Number = 1, T = 20.103000 C 09:51:29 Temperature Measurement, Probe Number = 2, T = 20.161000 C 09:51:30 Temperature Measurement, Probe Number = 3, T = 20.106000 C 09:51:30 Temperature Measurement, Probe Number = 4, T = 20.570000 C 09:51:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.57 09:51:30 Integrated Voltage Measurement... 09:51:50 Voltage Offset Correction: v_off_ini = 0.000004717 V, v_off_fin = 0.000007400 V 09:51:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064342 Vs 09:51:50 Integrated Voltage Measurement... 09:52:10 Voltage Offset Correction: v_off_ini = 0.000006753 V, v_off_fin = 0.000003353 V 09:52:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989074 Vs 09:52:13 Temperature Measurement, Probe Number = 0, T = 20.175000 C 09:52:14 Temperature Measurement, Probe Number = 1, T = 20.105000 C 09:52:15 Temperature Measurement, Probe Number = 2, T = 20.161000 C 09:52:15 Temperature Measurement, Probe Number = 3, T = 20.109000 C 09:52:16 Temperature Measurement, Probe Number = 4, T = 20.566000 C 09:52:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.57 09:52:16 Integrated Voltage Measurement... 09:52:36 Voltage Offset Correction: v_off_ini = 0.000004367 V, v_off_fin = 0.000007546 V 09:52:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171068689 Vs 09:52:36 Integrated Voltage Measurement... 09:52:56 Voltage Offset Correction: v_off_ini = 0.000007035 V, v_off_fin = 0.000003969 V 09:52:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983485 Vs 09:52:59 Temperature Measurement, Probe Number = 0, T = 20.176000 C 09:53:00 Temperature Measurement, Probe Number = 1, T = 20.107000 C 09:53:00 Temperature Measurement, Probe Number = 2, T = 20.164000 C 09:53:01 Temperature Measurement, Probe Number = 3, T = 20.111000 C 09:53:02 Temperature Measurement, Probe Number = 4, T = 20.616000 C 09:53:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.62 09:53:02 Integrated Voltage Measurement... 09:53:22 Voltage Offset Correction: v_off_ini = 0.000004820 V, v_off_fin = 0.000007655 V 09:53:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171067698 Vs 09:53:22 Integrated Voltage Measurement... 09:53:42 Voltage Offset Correction: v_off_ini = 0.000006655 V, v_off_fin = 0.000003711 V 09:53:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979484 Vs 10:23:45 Temperature Measurement, Probe Number = 0, T = 20.173000 C 10:23:46 Temperature Measurement, Probe Number = 1, T = 20.100000 C 10:23:46 Temperature Measurement, Probe Number = 2, T = 20.162000 C 10:23:47 Temperature Measurement, Probe Number = 3, T = 20.107000 C 10:23:47 Temperature Measurement, Probe Number = 4, T = 20.522000 C 10:23:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.52 10:23:48 Integrated Voltage Measurement... 10:24:07 Voltage Offset Correction: v_off_ini = 0.000005837 V, v_off_fin = 0.000007675 V 10:24:07 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171117840 Vs 10:24:07 Integrated Voltage Measurement... 10:24:27 Voltage Offset Correction: v_off_ini = 0.000006838 V, v_off_fin = 0.000003489 V 10:24:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992930 Vs 10:24:30 Temperature Measurement, Probe Number = 0, T = 20.171000 C 10:24:30 Temperature Measurement, Probe Number = 1, T = 20.100000 C 10:24:31 Temperature Measurement, Probe Number = 2, T = 20.160000 C 10:24:32 Temperature Measurement, Probe Number = 3, T = 20.106000 C 10:24:32 Temperature Measurement, Probe Number = 4, T = 20.535000 C 10:24:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.54 10:24:33 Integrated Voltage Measurement... 10:24:52 Voltage Offset Correction: v_off_ini = 0.000005001 V, v_off_fin = 0.000007203 V 10:24:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171063360 Vs 10:24:52 Integrated Voltage Measurement... 10:25:12 Voltage Offset Correction: v_off_ini = 0.000006667 V, v_off_fin = 0.000003456 V 10:25:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991241 Vs 10:25:15 Temperature Measurement, Probe Number = 0, T = 20.176000 C 10:25:15 Temperature Measurement, Probe Number = 1, T = 20.105000 C 10:25:16 Temperature Measurement, Probe Number = 2, T = 20.163000 C 10:25:17 Temperature Measurement, Probe Number = 3, T = 20.110000 C 10:25:17 Temperature Measurement, Probe Number = 4, T = 20.562000 C 10:25:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.56 10:25:18 Integrated Voltage Measurement... 10:25:37 Voltage Offset Correction: v_off_ini = 0.000004730 V, v_off_fin = 0.000007054 V 10:25:37 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171062169 Vs 10:25:38 Integrated Voltage Measurement... 10:25:57 Voltage Offset Correction: v_off_ini = 0.000006646 V, v_off_fin = 0.000003002 V 10:25:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989331 Vs 10:26:00 Temperature Measurement, Probe Number = 0, T = 20.178000 C 10:26:00 Temperature Measurement, Probe Number = 1, T = 20.106000 C 10:26:01 Temperature Measurement, Probe Number = 2, T = 20.166000 C 10:26:02 Temperature Measurement, Probe Number = 3, T = 20.112000 C 10:26:02 Temperature Measurement, Probe Number = 4, T = 20.623000 C 10:26:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.62 10:26:03 Integrated Voltage Measurement... 10:26:22 Voltage Offset Correction: v_off_ini = 0.000004004 V, v_off_fin = 0.000007314 V 10:26:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059471 Vs 10:26:22 Integrated Voltage Measurement... 10:26:42 Voltage Offset Correction: v_off_ini = 0.000006616 V, v_off_fin = 0.000003231 V 10:26:42 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992171 Vs 10:26:45 Temperature Measurement, Probe Number = 0, T = 20.178000 C 10:26:46 Temperature Measurement, Probe Number = 1, T = 20.104000 C 10:26:46 Temperature Measurement, Probe Number = 2, T = 20.165000 C 10:26:47 Temperature Measurement, Probe Number = 3, T = 20.109000 C 10:26:48 Temperature Measurement, Probe Number = 4, T = 20.652000 C 10:26:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.65 10:26:48 Integrated Voltage Measurement... 10:27:07 Voltage Offset Correction: v_off_ini = 0.000004537 V, v_off_fin = 0.000006714 V 10:27:08 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171047951 Vs 10:27:08 Integrated Voltage Measurement... 10:27:27 Voltage Offset Correction: v_off_ini = 0.000006181 V, v_off_fin = 0.000003199 V 10:27:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995807 Vs 10:27:30 Temperature Measurement, Probe Number = 0, T = 20.179000 C 10:27:31 Temperature Measurement, Probe Number = 1, T = 20.105000 C 10:27:31 Temperature Measurement, Probe Number = 2, T = 20.166000 C 10:27:32 Temperature Measurement, Probe Number = 3, T = 20.112000 C 10:27:32 Temperature Measurement, Probe Number = 4, T = 20.598000 C 10:27:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.60 10:27:33 Integrated Voltage Measurement... 10:27:53 Voltage Offset Correction: v_off_ini = 0.000004501 V, v_off_fin = 0.000006759 V 10:27:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059154 Vs 10:27:53 Integrated Voltage Measurement... 10:28:13 Voltage Offset Correction: v_off_ini = 0.000006031 V, v_off_fin = 0.000003459 V 10:28:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001737 Vs 10:28:16 Temperature Measurement, Probe Number = 0, T = 20.177000 C 10:28:17 Temperature Measurement, Probe Number = 1, T = 20.103000 C 10:28:17 Temperature Measurement, Probe Number = 2, T = 20.166000 C 10:28:18 Temperature Measurement, Probe Number = 3, T = 20.109000 C 10:28:19 Temperature Measurement, Probe Number = 4, T = 20.605000 C 10:28:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.61 10:28:19 Integrated Voltage Measurement... 10:28:39 Voltage Offset Correction: v_off_ini = 0.000004704 V, v_off_fin = 0.000006950 V 10:28:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053366 Vs 10:28:39 Integrated Voltage Measurement... 10:28:59 Voltage Offset Correction: v_off_ini = 0.000006540 V, v_off_fin = 0.000003545 V 10:29:00 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170988962 Vs 10:29:02 Temperature Measurement, Probe Number = 0, T = 20.178000 C 10:29:03 Temperature Measurement, Probe Number = 1, T = 20.106000 C 10:29:04 Temperature Measurement, Probe Number = 2, T = 20.166000 C 10:29:04 Temperature Measurement, Probe Number = 3, T = 20.111000 C 10:29:05 Temperature Measurement, Probe Number = 4, T = 20.591000 C 10:29:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.59 10:29:05 Integrated Voltage Measurement... 10:29:24 Voltage Offset Correction: v_off_ini = 0.000004604 V, v_off_fin = 0.000007467 V 10:29:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058259 Vs 10:29:25 Integrated Voltage Measurement... 10:29:44 Voltage Offset Correction: v_off_ini = 0.000006796 V, v_off_fin = 0.000003229 V 10:29:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993268 Vs 10:29:47 Temperature Measurement, Probe Number = 0, T = 20.181000 C 10:29:48 Temperature Measurement, Probe Number = 1, T = 20.108000 C 10:29:49 Temperature Measurement, Probe Number = 2, T = 20.166000 C 10:29:49 Temperature Measurement, Probe Number = 3, T = 20.113000 C 10:29:50 Temperature Measurement, Probe Number = 4, T = 20.625000 C 10:29:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.62 10:29:50 Integrated Voltage Measurement... 10:30:09 Voltage Offset Correction: v_off_ini = 0.000004578 V, v_off_fin = 0.000007143 V 10:30:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062992 Vs 10:30:10 Integrated Voltage Measurement... 10:30:29 Voltage Offset Correction: v_off_ini = 0.000006698 V, v_off_fin = 0.000003227 V 10:30:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990244 Vs 10:30:32 Temperature Measurement, Probe Number = 0, T = 20.180000 C 10:30:33 Temperature Measurement, Probe Number = 1, T = 20.108000 C 10:30:34 Temperature Measurement, Probe Number = 2, T = 20.166000 C 10:30:34 Temperature Measurement, Probe Number = 3, T = 20.113000 C 10:30:35 Temperature Measurement, Probe Number = 4, T = 20.589000 C 10:30:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.59 10:30:35 Integrated Voltage Measurement... 10:30:55 Voltage Offset Correction: v_off_ini = 0.000004189 V, v_off_fin = 0.000007345 V 10:30:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059875 Vs 10:30:55 Integrated Voltage Measurement... 10:31:14 Voltage Offset Correction: v_off_ini = 0.000006729 V, v_off_fin = 0.000003635 V 10:31:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985944 Vs 11:01:17 Temperature Measurement, Probe Number = 0, T = 20.184000 C 11:01:18 Temperature Measurement, Probe Number = 1, T = 20.112000 C 11:01:19 Temperature Measurement, Probe Number = 2, T = 20.172000 C 11:01:19 Temperature Measurement, Probe Number = 3, T = 20.118000 C 11:01:20 Temperature Measurement, Probe Number = 4, T = 20.606000 C 11:01:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.61 11:01:20 Integrated Voltage Measurement... 11:01:40 Voltage Offset Correction: v_off_ini = 0.000005322 V, v_off_fin = 0.000006878 V 11:01:41 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171112511 Vs 11:01:41 Integrated Voltage Measurement... 11:02:00 Voltage Offset Correction: v_off_ini = 0.000006539 V, v_off_fin = 0.000003355 V 11:02:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986678 Vs 11:02:03 Temperature Measurement, Probe Number = 0, T = 20.183000 C 11:02:04 Temperature Measurement, Probe Number = 1, T = 20.115000 C 11:02:05 Temperature Measurement, Probe Number = 2, T = 20.168000 C 11:02:05 Temperature Measurement, Probe Number = 3, T = 20.117000 C 11:02:06 Temperature Measurement, Probe Number = 4, T = 20.606000 C 11:02:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.61 11:02:06 Integrated Voltage Measurement... 11:02:26 Voltage Offset Correction: v_off_ini = 0.000004371 V, v_off_fin = 0.000007165 V 11:02:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053926 Vs 11:02:26 Integrated Voltage Measurement... 11:02:45 Voltage Offset Correction: v_off_ini = 0.000006429 V, v_off_fin = 0.000003395 V 11:02:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985909 Vs 11:02:48 Temperature Measurement, Probe Number = 0, T = 20.185000 C 11:02:49 Temperature Measurement, Probe Number = 1, T = 20.116000 C 11:02:50 Temperature Measurement, Probe Number = 2, T = 20.171000 C 11:02:50 Temperature Measurement, Probe Number = 3, T = 20.117000 C 11:02:51 Temperature Measurement, Probe Number = 4, T = 20.619000 C 11:02:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.62 11:02:51 Integrated Voltage Measurement... 11:03:11 Voltage Offset Correction: v_off_ini = 0.000003841 V, v_off_fin = 0.000007164 V 11:03:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171051816 Vs 11:03:11 Integrated Voltage Measurement... 11:03:31 Voltage Offset Correction: v_off_ini = 0.000006041 V, v_off_fin = 0.000002907 V 11:03:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983965 Vs 11:03:33 Temperature Measurement, Probe Number = 0, T = 20.184000 C 11:03:34 Temperature Measurement, Probe Number = 1, T = 20.115000 C 11:03:35 Temperature Measurement, Probe Number = 2, T = 20.169000 C 11:03:35 Temperature Measurement, Probe Number = 3, T = 20.116000 C 11:03:36 Temperature Measurement, Probe Number = 4, T = 20.651000 C 11:03:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.65 11:03:36 Integrated Voltage Measurement... 11:03:56 Voltage Offset Correction: v_off_ini = 0.000004762 V, v_off_fin = 0.000006812 V 11:03:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171050785 Vs 11:03:57 Integrated Voltage Measurement... 11:04:16 Voltage Offset Correction: v_off_ini = 0.000005983 V, v_off_fin = 0.000003368 V 11:04:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987328 Vs 11:04:19 Temperature Measurement, Probe Number = 0, T = 20.183000 C 11:04:19 Temperature Measurement, Probe Number = 1, T = 20.113000 C 11:04:20 Temperature Measurement, Probe Number = 2, T = 20.172000 C 11:04:21 Temperature Measurement, Probe Number = 3, T = 20.117000 C 11:04:21 Temperature Measurement, Probe Number = 4, T = 20.664000 C 11:04:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.66 11:04:21 Integrated Voltage Measurement... 11:04:41 Voltage Offset Correction: v_off_ini = 0.000004262 V, v_off_fin = 0.000006677 V 11:04:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171048923 Vs 11:04:41 Integrated Voltage Measurement... 11:05:01 Voltage Offset Correction: v_off_ini = 0.000006365 V, v_off_fin = 0.000002460 V 11:05:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990030 Vs 11:05:04 Temperature Measurement, Probe Number = 0, T = 20.183000 C 11:05:04 Temperature Measurement, Probe Number = 1, T = 20.115000 C 11:05:05 Temperature Measurement, Probe Number = 2, T = 20.169000 C 11:05:06 Temperature Measurement, Probe Number = 3, T = 20.114000 C 11:05:06 Temperature Measurement, Probe Number = 4, T = 20.599000 C 11:05:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.60 11:05:06 Integrated Voltage Measurement... 11:05:26 Voltage Offset Correction: v_off_ini = 0.000003982 V, v_off_fin = 0.000006803 V 11:05:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171049767 Vs 11:05:26 Integrated Voltage Measurement... 11:05:46 Voltage Offset Correction: v_off_ini = 0.000006469 V, v_off_fin = 0.000003223 V 11:05:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987704 Vs 11:05:49 Temperature Measurement, Probe Number = 0, T = 20.185000 C 11:05:49 Temperature Measurement, Probe Number = 1, T = 20.115000 C 11:05:50 Temperature Measurement, Probe Number = 2, T = 20.170000 C 11:05:50 Temperature Measurement, Probe Number = 3, T = 20.116000 C 11:05:51 Temperature Measurement, Probe Number = 4, T = 20.600000 C 11:05:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.60 11:05:51 Integrated Voltage Measurement... 11:06:11 Voltage Offset Correction: v_off_ini = 0.000004263 V, v_off_fin = 0.000007273 V 11:06:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060068 Vs 11:06:11 Integrated Voltage Measurement... 11:06:31 Voltage Offset Correction: v_off_ini = 0.000006558 V, v_off_fin = 0.000003618 V 11:06:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980141 Vs 11:06:34 Temperature Measurement, Probe Number = 0, T = 20.188000 C 11:06:34 Temperature Measurement, Probe Number = 1, T = 20.118000 C 11:06:35 Temperature Measurement, Probe Number = 2, T = 20.173000 C 11:06:36 Temperature Measurement, Probe Number = 3, T = 20.119000 C 11:06:36 Temperature Measurement, Probe Number = 4, T = 20.583000 C 11:06:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.58 11:06:36 Integrated Voltage Measurement... 11:06:56 Voltage Offset Correction: v_off_ini = 0.000004633 V, v_off_fin = 0.000007084 V 11:06:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171053355 Vs 11:06:56 Integrated Voltage Measurement... 11:07:16 Voltage Offset Correction: v_off_ini = 0.000006731 V, v_off_fin = 0.000004392 V 11:07:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979368 Vs 11:07:19 Temperature Measurement, Probe Number = 0, T = 20.189000 C 11:07:20 Temperature Measurement, Probe Number = 1, T = 20.120000 C 11:07:21 Temperature Measurement, Probe Number = 2, T = 20.173000 C 11:07:21 Temperature Measurement, Probe Number = 3, T = 20.121000 C 11:07:22 Temperature Measurement, Probe Number = 4, T = 20.656000 C 11:07:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.66 11:07:22 Integrated Voltage Measurement... 11:07:42 Voltage Offset Correction: v_off_ini = 0.000004490 V, v_off_fin = 0.000007363 V 11:07:42 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171059160 Vs 11:07:42 Integrated Voltage Measurement... 11:08:03 Voltage Offset Correction: v_off_ini = 0.000007030 V, v_off_fin = 0.000003829 V 11:08:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980935 Vs 11:08:05 Temperature Measurement, Probe Number = 0, T = 20.190000 C 11:08:06 Temperature Measurement, Probe Number = 1, T = 20.118000 C 11:08:07 Temperature Measurement, Probe Number = 2, T = 20.175000 C 11:08:07 Temperature Measurement, Probe Number = 3, T = 20.121000 C 11:08:08 Temperature Measurement, Probe Number = 4, T = 20.702000 C 11:08:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.70 11:08:08 Integrated Voltage Measurement... 11:08:28 Voltage Offset Correction: v_off_ini = 0.000004709 V, v_off_fin = 0.000007491 V 11:08:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059111 Vs 11:08:28 Integrated Voltage Measurement... 11:08:48 Voltage Offset Correction: v_off_ini = 0.000006605 V, v_off_fin = 0.000003735 V 11:08:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974668 Vs 11:38:51 Temperature Measurement, Probe Number = 0, T = 20.184000 C 11:38:51 Temperature Measurement, Probe Number = 1, T = 20.114000 C 11:38:52 Temperature Measurement, Probe Number = 2, T = 20.171000 C 11:38:53 Temperature Measurement, Probe Number = 3, T = 20.119000 C 11:38:53 Temperature Measurement, Probe Number = 4, T = 20.514000 C 11:38:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.51 11:38:54 Integrated Voltage Measurement... 11:39:14 Voltage Offset Correction: v_off_ini = 0.000005713 V, v_off_fin = 0.000007382 V 11:39:14 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171116947 Vs 11:39:14 Integrated Voltage Measurement... 11:39:34 Voltage Offset Correction: v_off_ini = 0.000006510 V, v_off_fin = 0.000003939 V 11:39:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981855 Vs 11:39:37 Temperature Measurement, Probe Number = 0, T = 20.190000 C 11:39:38 Temperature Measurement, Probe Number = 1, T = 20.116000 C 11:39:39 Temperature Measurement, Probe Number = 2, T = 20.173000 C 11:39:39 Temperature Measurement, Probe Number = 3, T = 20.120000 C 11:39:40 Temperature Measurement, Probe Number = 4, T = 20.489000 C 11:39:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.49 11:39:40 Integrated Voltage Measurement... 11:40:01 Voltage Offset Correction: v_off_ini = 0.000004849 V, v_off_fin = 0.000007315 V 11:40:01 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171059672 Vs 11:40:01 Integrated Voltage Measurement... 11:40:21 Voltage Offset Correction: v_off_ini = 0.000006814 V, v_off_fin = 0.000004025 V 11:40:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978366 Vs 11:40:24 Temperature Measurement, Probe Number = 0, T = 20.191000 C 11:40:24 Temperature Measurement, Probe Number = 1, T = 20.118000 C 11:40:25 Temperature Measurement, Probe Number = 2, T = 20.177000 C 11:40:26 Temperature Measurement, Probe Number = 3, T = 20.121000 C 11:40:26 Temperature Measurement, Probe Number = 4, T = 20.457000 C 11:40:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.46 11:40:27 Integrated Voltage Measurement... 11:40:46 Voltage Offset Correction: v_off_ini = 0.000005021 V, v_off_fin = 0.000007390 V 11:40:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058943 Vs 11:40:46 Integrated Voltage Measurement... 11:41:06 Voltage Offset Correction: v_off_ini = 0.000006654 V, v_off_fin = 0.000004408 V 11:41:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981363 Vs 11:41:09 Temperature Measurement, Probe Number = 0, T = 20.185000 C 11:41:09 Temperature Measurement, Probe Number = 1, T = 20.112000 C 11:41:10 Temperature Measurement, Probe Number = 2, T = 20.175000 C 11:41:11 Temperature Measurement, Probe Number = 3, T = 20.119000 C 11:41:11 Temperature Measurement, Probe Number = 4, T = 20.510000 C 11:41:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.51 11:41:12 Integrated Voltage Measurement... 11:41:32 Voltage Offset Correction: v_off_ini = 0.000005268 V, v_off_fin = 0.000007822 V 11:41:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171067713 Vs 11:41:32 Integrated Voltage Measurement... 11:41:51 Voltage Offset Correction: v_off_ini = 0.000007174 V, v_off_fin = 0.000003788 V 11:41:51 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975022 Vs 11:41:54 Temperature Measurement, Probe Number = 0, T = 20.188000 C 11:41:54 Temperature Measurement, Probe Number = 1, T = 20.117000 C 11:41:55 Temperature Measurement, Probe Number = 2, T = 20.178000 C 11:41:56 Temperature Measurement, Probe Number = 3, T = 20.122000 C 11:41:56 Temperature Measurement, Probe Number = 4, T = 20.515000 C 11:41:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.52 11:41:57 Integrated Voltage Measurement... 11:42:17 Voltage Offset Correction: v_off_ini = 0.000004948 V, v_off_fin = 0.000007609 V 11:42:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171069544 Vs 11:42:17 Integrated Voltage Measurement... 11:42:37 Voltage Offset Correction: v_off_ini = 0.000006432 V, v_off_fin = 0.000003909 V 11:42:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978553 Vs 11:42:40 Temperature Measurement, Probe Number = 0, T = 20.189000 C 11:42:41 Temperature Measurement, Probe Number = 1, T = 20.116000 C 11:42:41 Temperature Measurement, Probe Number = 2, T = 20.179000 C 11:42:42 Temperature Measurement, Probe Number = 3, T = 20.123000 C 11:42:43 Temperature Measurement, Probe Number = 4, T = 20.544000 C 11:42:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.54 11:42:43 Integrated Voltage Measurement... 11:43:02 Voltage Offset Correction: v_off_ini = 0.000004705 V, v_off_fin = 0.000007624 V 11:43:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060272 Vs 11:43:02 Integrated Voltage Measurement... 11:43:22 Voltage Offset Correction: v_off_ini = 0.000006631 V, v_off_fin = 0.000003420 V 11:43:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984847 Vs 11:43:25 Temperature Measurement, Probe Number = 0, T = 20.183000 C 11:43:26 Temperature Measurement, Probe Number = 1, T = 20.114000 C 11:43:26 Temperature Measurement, Probe Number = 2, T = 20.170000 C 11:43:27 Temperature Measurement, Probe Number = 3, T = 20.118000 C 11:43:27 Temperature Measurement, Probe Number = 4, T = 20.560000 C 11:43:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.56 11:43:28 Integrated Voltage Measurement... 11:43:47 Voltage Offset Correction: v_off_ini = 0.000004749 V, v_off_fin = 0.000007412 V 11:43:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065375 Vs 11:43:48 Integrated Voltage Measurement... 11:44:07 Voltage Offset Correction: v_off_ini = 0.000006690 V, v_off_fin = 0.000003990 V 11:44:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980751 Vs 11:44:10 Temperature Measurement, Probe Number = 0, T = 20.188000 C 11:44:11 Temperature Measurement, Probe Number = 1, T = 20.117000 C 11:44:11 Temperature Measurement, Probe Number = 2, T = 20.175000 C 11:44:12 Temperature Measurement, Probe Number = 3, T = 20.120000 C 11:44:13 Temperature Measurement, Probe Number = 4, T = 20.543000 C 11:44:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.54 11:44:13 Integrated Voltage Measurement... 11:44:33 Voltage Offset Correction: v_off_ini = 0.000004440 V, v_off_fin = 0.000007618 V 11:44:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066328 Vs 11:44:33 Integrated Voltage Measurement... 11:44:52 Voltage Offset Correction: v_off_ini = 0.000007431 V, v_off_fin = 0.000003716 V 11:44:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977357 Vs 11:44:55 Temperature Measurement, Probe Number = 0, T = 20.190000 C 11:44:56 Temperature Measurement, Probe Number = 1, T = 20.116000 C 11:44:57 Temperature Measurement, Probe Number = 2, T = 20.178000 C 11:44:57 Temperature Measurement, Probe Number = 3, T = 20.123000 C 11:44:58 Temperature Measurement, Probe Number = 4, T = 20.572000 C 11:44:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.57 11:44:58 Integrated Voltage Measurement... 11:45:17 Voltage Offset Correction: v_off_ini = 0.000005234 V, v_off_fin = 0.000007783 V 11:45:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066405 Vs 11:45:18 Integrated Voltage Measurement... 11:45:37 Voltage Offset Correction: v_off_ini = 0.000006954 V, v_off_fin = 0.000003805 V 11:45:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979261 Vs 11:45:40 Temperature Measurement, Probe Number = 0, T = 20.189000 C 11:45:41 Temperature Measurement, Probe Number = 1, T = 20.116000 C 11:45:42 Temperature Measurement, Probe Number = 2, T = 20.175000 C 11:45:42 Temperature Measurement, Probe Number = 3, T = 20.121000 C 11:45:43 Temperature Measurement, Probe Number = 4, T = 20.580000 C 11:45:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.58 11:45:43 Integrated Voltage Measurement... 11:46:03 Voltage Offset Correction: v_off_ini = 0.000004138 V, v_off_fin = 0.000007554 V 11:46:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064384 Vs 11:46:03 Integrated Voltage Measurement... 11:46:22 Voltage Offset Correction: v_off_ini = 0.000007369 V, v_off_fin = 0.000003345 V 11:46:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982146 Vs 12:16:25 Temperature Measurement, Probe Number = 0, T = 20.195000 C 12:16:26 Temperature Measurement, Probe Number = 1, T = 20.124000 C 12:16:26 Temperature Measurement, Probe Number = 2, T = 20.182000 C 12:16:27 Temperature Measurement, Probe Number = 3, T = 20.127000 C 12:16:28 Temperature Measurement, Probe Number = 4, T = 20.626000 C 12:16:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.63 12:16:28 Integrated Voltage Measurement... 12:16:48 Voltage Offset Correction: v_off_ini = 0.000006820 V, v_off_fin = 0.000008161 V 12:16:48 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171126886 Vs 12:16:49 Integrated Voltage Measurement... 12:17:08 Voltage Offset Correction: v_off_ini = 0.000007835 V, v_off_fin = 0.000004382 V 12:17:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977142 Vs 12:17:11 Temperature Measurement, Probe Number = 0, T = 20.194000 C 12:17:12 Temperature Measurement, Probe Number = 1, T = 20.123000 C 12:17:13 Temperature Measurement, Probe Number = 2, T = 20.177000 C 12:17:13 Temperature Measurement, Probe Number = 3, T = 20.125000 C 12:17:14 Temperature Measurement, Probe Number = 4, T = 20.623000 C 12:17:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.62 12:17:14 Integrated Voltage Measurement... 12:17:33 Voltage Offset Correction: v_off_ini = 0.000005249 V, v_off_fin = 0.000007384 V 12:17:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171063154 Vs 12:17:34 Integrated Voltage Measurement... 12:17:54 Voltage Offset Correction: v_off_ini = 0.000007052 V, v_off_fin = 0.000003824 V 12:17:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984217 Vs 12:17:57 Temperature Measurement, Probe Number = 0, T = 20.196000 C 12:17:58 Temperature Measurement, Probe Number = 1, T = 20.123000 C 12:17:58 Temperature Measurement, Probe Number = 2, T = 20.179000 C 12:17:59 Temperature Measurement, Probe Number = 3, T = 20.126000 C 12:18:00 Temperature Measurement, Probe Number = 4, T = 20.629000 C 12:18:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.63 12:18:00 Integrated Voltage Measurement... 12:18:19 Voltage Offset Correction: v_off_ini = 0.000005168 V, v_off_fin = 0.000007972 V 12:18:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062701 Vs 12:18:20 Integrated Voltage Measurement... 12:18:39 Voltage Offset Correction: v_off_ini = 0.000007267 V, v_off_fin = 0.000004249 V 12:18:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977316 Vs 12:18:42 Temperature Measurement, Probe Number = 0, T = 20.196000 C 12:18:43 Temperature Measurement, Probe Number = 1, T = 20.126000 C 12:18:44 Temperature Measurement, Probe Number = 2, T = 20.178000 C 12:18:44 Temperature Measurement, Probe Number = 3, T = 20.123000 C 12:18:45 Temperature Measurement, Probe Number = 4, T = 20.584000 C 12:18:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.58 12:18:45 Integrated Voltage Measurement... 12:19:04 Voltage Offset Correction: v_off_ini = 0.000005133 V, v_off_fin = 0.000008689 V 12:19:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071869 Vs 12:19:05 Integrated Voltage Measurement... 12:19:25 Voltage Offset Correction: v_off_ini = 0.000007263 V, v_off_fin = 0.000003739 V 12:19:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974760 Vs 12:19:27 Temperature Measurement, Probe Number = 0, T = 20.196000 C 12:19:28 Temperature Measurement, Probe Number = 1, T = 20.127000 C 12:19:29 Temperature Measurement, Probe Number = 2, T = 20.180000 C 12:19:29 Temperature Measurement, Probe Number = 3, T = 20.126000 C 12:19:30 Temperature Measurement, Probe Number = 4, T = 20.565000 C 12:19:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.57 12:19:30 Integrated Voltage Measurement... 12:19:50 Voltage Offset Correction: v_off_ini = 0.000005431 V, v_off_fin = 0.000008179 V 12:19:50 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171069798 Vs 12:19:51 Integrated Voltage Measurement... 12:20:11 Voltage Offset Correction: v_off_ini = 0.000007126 V, v_off_fin = 0.000003966 V 12:20:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980492 Vs 12:20:13 Temperature Measurement, Probe Number = 0, T = 20.195000 C 12:20:14 Temperature Measurement, Probe Number = 1, T = 20.120000 C 12:20:15 Temperature Measurement, Probe Number = 2, T = 20.180000 C 12:20:15 Temperature Measurement, Probe Number = 3, T = 20.123000 C 12:20:16 Temperature Measurement, Probe Number = 4, T = 20.596000 C 12:20:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.60 12:20:16 Integrated Voltage Measurement... 12:20:36 Voltage Offset Correction: v_off_ini = 0.000005131 V, v_off_fin = 0.000006838 V 12:20:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066499 Vs 12:20:36 Integrated Voltage Measurement... 12:20:56 Voltage Offset Correction: v_off_ini = 0.000006175 V, v_off_fin = 0.000003351 V 12:20:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986655 Vs 12:20:58 Temperature Measurement, Probe Number = 0, T = 20.196000 C 12:20:59 Temperature Measurement, Probe Number = 1, T = 20.123000 C 12:21:00 Temperature Measurement, Probe Number = 2, T = 20.180000 C 12:21:00 Temperature Measurement, Probe Number = 3, T = 20.125000 C 12:21:01 Temperature Measurement, Probe Number = 4, T = 20.599000 C 12:21:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.60 12:21:01 Integrated Voltage Measurement... 12:21:21 Voltage Offset Correction: v_off_ini = 0.000004200 V, v_off_fin = 0.000007121 V 12:21:21 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171065071 Vs 12:21:21 Integrated Voltage Measurement... 12:21:41 Voltage Offset Correction: v_off_ini = 0.000006721 V, v_off_fin = 0.000003511 V 12:21:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989334 Vs 12:21:44 Temperature Measurement, Probe Number = 0, T = 20.195000 C 12:21:44 Temperature Measurement, Probe Number = 1, T = 20.123000 C 12:21:45 Temperature Measurement, Probe Number = 2, T = 20.180000 C 12:21:46 Temperature Measurement, Probe Number = 3, T = 20.127000 C 12:21:46 Temperature Measurement, Probe Number = 4, T = 20.550000 C 12:21:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.55 12:21:46 Integrated Voltage Measurement... 12:22:06 Voltage Offset Correction: v_off_ini = 0.000004634 V, v_off_fin = 0.000007307 V 12:22:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171063777 Vs 12:22:07 Integrated Voltage Measurement... 12:22:26 Voltage Offset Correction: v_off_ini = 0.000006618 V, v_off_fin = 0.000003352 V 12:22:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981027 Vs 12:22:29 Temperature Measurement, Probe Number = 0, T = 20.197000 C 12:22:29 Temperature Measurement, Probe Number = 1, T = 20.125000 C 12:22:30 Temperature Measurement, Probe Number = 2, T = 20.183000 C 12:22:31 Temperature Measurement, Probe Number = 3, T = 20.127000 C 12:22:31 Temperature Measurement, Probe Number = 4, T = 20.600000 C 12:22:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.60 12:22:31 Integrated Voltage Measurement... 12:22:51 Voltage Offset Correction: v_off_ini = 0.000004247 V, v_off_fin = 0.000007319 V 12:22:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066785 Vs 12:22:52 Integrated Voltage Measurement... 12:23:12 Voltage Offset Correction: v_off_ini = 0.000006548 V, v_off_fin = 0.000003907 V 12:23:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980847 Vs 12:23:15 Temperature Measurement, Probe Number = 0, T = 20.192000 C 12:23:16 Temperature Measurement, Probe Number = 1, T = 20.121000 C 12:23:16 Temperature Measurement, Probe Number = 2, T = 20.179000 C 12:23:17 Temperature Measurement, Probe Number = 3, T = 20.124000 C 12:23:17 Temperature Measurement, Probe Number = 4, T = 20.604000 C 12:23:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.60 12:23:18 Integrated Voltage Measurement... 12:23:37 Voltage Offset Correction: v_off_ini = 0.000004709 V, v_off_fin = 0.000007391 V 12:23:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062321 Vs 12:23:37 Integrated Voltage Measurement... 12:23:57 Voltage Offset Correction: v_off_ini = 0.000006394 V, v_off_fin = 0.000003568 V 12:23:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986304 Vs 12:54:00 Temperature Measurement, Probe Number = 0, T = 20.194000 C 12:54:00 Temperature Measurement, Probe Number = 1, T = 20.125000 C 12:54:01 Temperature Measurement, Probe Number = 2, T = 20.181000 C 12:54:02 Temperature Measurement, Probe Number = 3, T = 20.127000 C 12:54:02 Temperature Measurement, Probe Number = 4, T = 20.527000 C 12:54:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.53 12:54:03 Integrated Voltage Measurement... 12:54:22 Voltage Offset Correction: v_off_ini = 0.000005089 V, v_off_fin = 0.000007218 V 12:54:22 Integrated Voltage Measurement Delta Gap = 0.0040016 m VT = 0.171124279 Vs 12:54:22 Integrated Voltage Measurement... 12:54:42 Voltage Offset Correction: v_off_ini = 0.000006700 V, v_off_fin = 0.000003509 V 12:54:42 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980297 Vs 12:54:45 Temperature Measurement, Probe Number = 0, T = 20.200000 C 12:54:45 Temperature Measurement, Probe Number = 1, T = 20.130000 C 12:54:46 Temperature Measurement, Probe Number = 2, T = 20.182000 C 12:54:47 Temperature Measurement, Probe Number = 3, T = 20.128000 C 12:54:47 Temperature Measurement, Probe Number = 4, T = 20.516000 C 12:54:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.52 12:54:47 Integrated Voltage Measurement... 12:55:07 Voltage Offset Correction: v_off_ini = 0.000004805 V, v_off_fin = 0.000007892 V 12:55:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171067300 Vs 12:55:07 Integrated Voltage Measurement... 12:55:27 Voltage Offset Correction: v_off_ini = 0.000007285 V, v_off_fin = 0.000003964 V 12:55:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977924 Vs 12:55:30 Temperature Measurement, Probe Number = 0, T = 20.203000 C 12:55:30 Temperature Measurement, Probe Number = 1, T = 20.134000 C 12:55:31 Temperature Measurement, Probe Number = 2, T = 20.186000 C 12:55:32 Temperature Measurement, Probe Number = 3, T = 20.132000 C 12:55:32 Temperature Measurement, Probe Number = 4, T = 20.503000 C 12:55:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.50 12:55:33 Integrated Voltage Measurement... 12:55:52 Voltage Offset Correction: v_off_ini = 0.000004717 V, v_off_fin = 0.000007511 V 12:55:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064696 Vs 12:55:53 Integrated Voltage Measurement... 12:56:13 Voltage Offset Correction: v_off_ini = 0.000006989 V, v_off_fin = 0.000003899 V 12:56:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974815 Vs 12:56:16 Temperature Measurement, Probe Number = 0, T = 20.202000 C 12:56:16 Temperature Measurement, Probe Number = 1, T = 20.129000 C 12:56:17 Temperature Measurement, Probe Number = 2, T = 20.188000 C 12:56:18 Temperature Measurement, Probe Number = 3, T = 20.131000 C 12:56:18 Temperature Measurement, Probe Number = 4, T = 20.540000 C 12:56:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.54 12:56:19 Integrated Voltage Measurement... 12:56:38 Voltage Offset Correction: v_off_ini = 0.000004944 V, v_off_fin = 0.000007967 V 12:56:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065125 Vs 12:56:38 Integrated Voltage Measurement... 12:56:59 Voltage Offset Correction: v_off_ini = 0.000007101 V, v_off_fin = 0.000003892 V 12:56:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978489 Vs 12:57:01 Temperature Measurement, Probe Number = 0, T = 20.203000 C 12:57:02 Temperature Measurement, Probe Number = 1, T = 20.130000 C 12:57:03 Temperature Measurement, Probe Number = 2, T = 20.186000 C 12:57:03 Temperature Measurement, Probe Number = 3, T = 20.133000 C 12:57:04 Temperature Measurement, Probe Number = 4, T = 20.557000 C 12:57:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.56 12:57:04 Integrated Voltage Measurement... 12:57:24 Voltage Offset Correction: v_off_ini = 0.000004530 V, v_off_fin = 0.000007153 V 12:57:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171056970 Vs 12:57:24 Integrated Voltage Measurement... 12:57:45 Voltage Offset Correction: v_off_ini = 0.000007071 V, v_off_fin = 0.000003446 V 12:57:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985120 Vs 12:57:48 Temperature Measurement, Probe Number = 0, T = 20.205000 C 12:57:48 Temperature Measurement, Probe Number = 1, T = 20.133000 C 12:57:49 Temperature Measurement, Probe Number = 2, T = 20.190000 C 12:57:49 Temperature Measurement, Probe Number = 3, T = 20.135000 C 12:57:50 Temperature Measurement, Probe Number = 4, T = 20.629000 C 12:57:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.63 12:57:50 Integrated Voltage Measurement... 12:58:10 Voltage Offset Correction: v_off_ini = 0.000004753 V, v_off_fin = 0.000007741 V 12:58:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059395 Vs 12:58:11 Integrated Voltage Measurement... 12:58:31 Voltage Offset Correction: v_off_ini = 0.000006826 V, v_off_fin = 0.000003543 V 12:58:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978254 Vs 12:58:34 Temperature Measurement, Probe Number = 0, T = 20.205000 C 12:58:34 Temperature Measurement, Probe Number = 1, T = 20.132000 C 12:58:35 Temperature Measurement, Probe Number = 2, T = 20.189000 C 12:58:36 Temperature Measurement, Probe Number = 3, T = 20.135000 C 12:58:36 Temperature Measurement, Probe Number = 4, T = 20.624000 C 12:58:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.62 12:58:36 Integrated Voltage Measurement... 12:58:56 Voltage Offset Correction: v_off_ini = 0.000004810 V, v_off_fin = 0.000007561 V 12:58:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066959 Vs 12:58:57 Integrated Voltage Measurement... 12:59:16 Voltage Offset Correction: v_off_ini = 0.000007340 V, v_off_fin = 0.000003720 V 12:59:16 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979772 Vs 12:59:19 Temperature Measurement, Probe Number = 0, T = 20.206000 C 12:59:20 Temperature Measurement, Probe Number = 1, T = 20.134000 C 12:59:21 Temperature Measurement, Probe Number = 2, T = 20.191000 C 12:59:21 Temperature Measurement, Probe Number = 3, T = 20.136000 C 12:59:22 Temperature Measurement, Probe Number = 4, T = 20.652000 C 12:59:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.65 12:59:22 Integrated Voltage Measurement... 12:59:42 Voltage Offset Correction: v_off_ini = 0.000004863 V, v_off_fin = 0.000007757 V 12:59:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071694 Vs 12:59:43 Integrated Voltage Measurement... 13:00:03 Voltage Offset Correction: v_off_ini = 0.000007058 V, v_off_fin = 0.000004101 V 13:00:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980086 Vs 13:00:06 Temperature Measurement, Probe Number = 0, T = 20.205000 C 13:00:06 Temperature Measurement, Probe Number = 1, T = 20.133000 C 13:00:07 Temperature Measurement, Probe Number = 2, T = 20.191000 C 13:00:08 Temperature Measurement, Probe Number = 3, T = 20.136000 C 13:00:08 Temperature Measurement, Probe Number = 4, T = 20.701000 C 13:00:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.70 13:00:08 Integrated Voltage Measurement... 13:00:28 Voltage Offset Correction: v_off_ini = 0.000004830 V, v_off_fin = 0.000007251 V 13:00:29 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171063165 Vs 13:00:29 Integrated Voltage Measurement... 13:00:48 Voltage Offset Correction: v_off_ini = 0.000007237 V, v_off_fin = 0.000003446 V 13:00:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977130 Vs 13:00:51 Temperature Measurement, Probe Number = 0, T = 20.204000 C 13:00:51 Temperature Measurement, Probe Number = 1, T = 20.133000 C 13:00:52 Temperature Measurement, Probe Number = 2, T = 20.192000 C 13:00:53 Temperature Measurement, Probe Number = 3, T = 20.136000 C 13:00:53 Temperature Measurement, Probe Number = 4, T = 20.700000 C 13:00:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.70 13:00:54 Integrated Voltage Measurement... 13:01:13 Voltage Offset Correction: v_off_ini = 0.000004336 V, v_off_fin = 0.000007835 V 13:01:14 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171065346 Vs 13:01:14 Integrated Voltage Measurement... 13:01:33 Voltage Offset Correction: v_off_ini = 0.000007195 V, v_off_fin = 0.000004095 V 13:01:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975239 Vs 13:31:36 Temperature Measurement, Probe Number = 0, T = 20.206000 C 13:31:37 Temperature Measurement, Probe Number = 1, T = 20.138000 C 13:31:38 Temperature Measurement, Probe Number = 2, T = 20.193000 C 13:31:38 Temperature Measurement, Probe Number = 3, T = 20.141000 C 13:31:39 Temperature Measurement, Probe Number = 4, T = 20.648000 C 13:31:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.65 13:31:39 Integrated Voltage Measurement... 13:31:59 Voltage Offset Correction: v_off_ini = 0.000005897 V, v_off_fin = 0.000008353 V 13:31:59 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171121492 Vs 13:31:59 Integrated Voltage Measurement... 13:32:19 Voltage Offset Correction: v_off_ini = 0.000006973 V, v_off_fin = 0.000004119 V 13:32:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974915 Vs 13:32:22 Temperature Measurement, Probe Number = 0, T = 20.207000 C 13:32:23 Temperature Measurement, Probe Number = 1, T = 20.138000 C 13:32:23 Temperature Measurement, Probe Number = 2, T = 20.191000 C 13:32:24 Temperature Measurement, Probe Number = 3, T = 20.140000 C 13:32:25 Temperature Measurement, Probe Number = 4, T = 20.677000 C 13:32:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.68 13:32:25 Integrated Voltage Measurement... 13:32:44 Voltage Offset Correction: v_off_ini = 0.000004790 V, v_off_fin = 0.000007500 V 13:32:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059192 Vs 13:32:44 Integrated Voltage Measurement... 13:33:04 Voltage Offset Correction: v_off_ini = 0.000007307 V, v_off_fin = 0.000003142 V 13:33:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979462 Vs 13:33:07 Temperature Measurement, Probe Number = 0, T = 20.207000 C 13:33:08 Temperature Measurement, Probe Number = 1, T = 20.137000 C 13:33:08 Temperature Measurement, Probe Number = 2, T = 20.191000 C 13:33:09 Temperature Measurement, Probe Number = 3, T = 20.139000 C 13:33:10 Temperature Measurement, Probe Number = 4, T = 20.708000 C 13:33:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.71 13:33:10 Integrated Voltage Measurement... 13:33:30 Voltage Offset Correction: v_off_ini = 0.000004970 V, v_off_fin = 0.000007842 V 13:33:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171067891 Vs 13:33:31 Integrated Voltage Measurement... 13:33:50 Voltage Offset Correction: v_off_ini = 0.000007326 V, v_off_fin = 0.000003372 V 13:33:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977230 Vs 13:33:53 Temperature Measurement, Probe Number = 0, T = 20.208000 C 13:33:54 Temperature Measurement, Probe Number = 1, T = 20.136000 C 13:33:55 Temperature Measurement, Probe Number = 2, T = 20.193000 C 13:33:55 Temperature Measurement, Probe Number = 3, T = 20.140000 C 13:33:56 Temperature Measurement, Probe Number = 4, T = 20.729000 C 13:33:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.73 13:33:56 Integrated Voltage Measurement... 13:34:16 Voltage Offset Correction: v_off_ini = 0.000005362 V, v_off_fin = 0.000007796 V 13:34:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171067393 Vs 13:34:16 Integrated Voltage Measurement... 13:34:36 Voltage Offset Correction: v_off_ini = 0.000007446 V, v_off_fin = 0.000003651 V 13:34:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978986 Vs 13:34:38 Temperature Measurement, Probe Number = 0, T = 20.209000 C 13:34:39 Temperature Measurement, Probe Number = 1, T = 20.139000 C 13:34:40 Temperature Measurement, Probe Number = 2, T = 20.192000 C 13:34:40 Temperature Measurement, Probe Number = 3, T = 20.143000 C 13:34:41 Temperature Measurement, Probe Number = 4, T = 20.703000 C 13:34:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.70 13:34:41 Integrated Voltage Measurement... 13:35:00 Voltage Offset Correction: v_off_ini = 0.000005280 V, v_off_fin = 0.000008384 V 13:35:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171070374 Vs 13:35:01 Integrated Voltage Measurement... 13:35:20 Voltage Offset Correction: v_off_ini = 0.000007664 V, v_off_fin = 0.000004487 V 13:35:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973105 Vs 13:35:23 Temperature Measurement, Probe Number = 0, T = 20.209000 C 13:35:24 Temperature Measurement, Probe Number = 1, T = 20.141000 C 13:35:25 Temperature Measurement, Probe Number = 2, T = 20.192000 C 13:35:25 Temperature Measurement, Probe Number = 3, T = 20.141000 C 13:35:26 Temperature Measurement, Probe Number = 4, T = 20.714000 C 13:35:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.71 13:35:26 Integrated Voltage Measurement... 13:35:46 Voltage Offset Correction: v_off_ini = 0.000005695 V, v_off_fin = 0.000007311 V 13:35:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065764 Vs 13:35:46 Integrated Voltage Measurement... 13:36:07 Voltage Offset Correction: v_off_ini = 0.000006849 V, v_off_fin = 0.000004340 V 13:36:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972205 Vs 13:36:10 Temperature Measurement, Probe Number = 0, T = 20.209000 C 13:36:10 Temperature Measurement, Probe Number = 1, T = 20.142000 C 13:36:11 Temperature Measurement, Probe Number = 2, T = 20.193000 C 13:36:12 Temperature Measurement, Probe Number = 3, T = 20.142000 C 13:36:12 Temperature Measurement, Probe Number = 4, T = 20.745000 C 13:36:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.75 13:36:12 Integrated Voltage Measurement... 13:36:32 Voltage Offset Correction: v_off_ini = 0.000005341 V, v_off_fin = 0.000007537 V 13:36:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060644 Vs 13:36:32 Integrated Voltage Measurement... 13:36:52 Voltage Offset Correction: v_off_ini = 0.000006801 V, v_off_fin = 0.000003531 V 13:36:52 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979762 Vs 13:36:54 Temperature Measurement, Probe Number = 0, T = 20.208000 C 13:36:55 Temperature Measurement, Probe Number = 1, T = 20.139000 C 13:36:56 Temperature Measurement, Probe Number = 2, T = 20.193000 C 13:36:56 Temperature Measurement, Probe Number = 3, T = 20.141000 C 13:36:57 Temperature Measurement, Probe Number = 4, T = 20.735000 C 13:36:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.73 13:36:57 Integrated Voltage Measurement... 13:37:17 Voltage Offset Correction: v_off_ini = 0.000004958 V, v_off_fin = 0.000007553 V 13:37:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062480 Vs 13:37:17 Integrated Voltage Measurement... 13:37:37 Voltage Offset Correction: v_off_ini = 0.000007178 V, v_off_fin = 0.000003849 V 13:37:37 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975896 Vs 13:37:40 Temperature Measurement, Probe Number = 0, T = 20.208000 C 13:37:40 Temperature Measurement, Probe Number = 1, T = 20.141000 C 13:37:41 Temperature Measurement, Probe Number = 2, T = 20.195000 C 13:37:42 Temperature Measurement, Probe Number = 3, T = 20.142000 C 13:37:42 Temperature Measurement, Probe Number = 4, T = 20.688000 C 13:37:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.69 13:37:43 Integrated Voltage Measurement... 13:38:02 Voltage Offset Correction: v_off_ini = 0.000004663 V, v_off_fin = 0.000007411 V 13:38:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171060444 Vs 13:38:02 Integrated Voltage Measurement... 13:38:22 Voltage Offset Correction: v_off_ini = 0.000007259 V, v_off_fin = 0.000003782 V 13:38:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982181 Vs 13:38:25 Temperature Measurement, Probe Number = 0, T = 20.205000 C 13:38:25 Temperature Measurement, Probe Number = 1, T = 20.137000 C 13:38:26 Temperature Measurement, Probe Number = 2, T = 20.193000 C 13:38:27 Temperature Measurement, Probe Number = 3, T = 20.140000 C 13:38:27 Temperature Measurement, Probe Number = 4, T = 20.712000 C 13:38:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.71 13:38:28 Integrated Voltage Measurement... 13:38:47 Voltage Offset Correction: v_off_ini = 0.000004968 V, v_off_fin = 0.000008229 V 13:38:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062362 Vs 13:38:47 Integrated Voltage Measurement... 13:39:07 Voltage Offset Correction: v_off_ini = 0.000007719 V, v_off_fin = 0.000003717 V 13:39:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170967498 Vs 14:09:10 Temperature Measurement, Probe Number = 0, T = 20.214000 C 14:09:10 Temperature Measurement, Probe Number = 1, T = 20.147000 C 14:09:11 Temperature Measurement, Probe Number = 2, T = 20.199000 C 14:09:12 Temperature Measurement, Probe Number = 3, T = 20.149000 C 14:09:12 Temperature Measurement, Probe Number = 4, T = 20.616000 C 14:09:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.15 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.62 14:09:13 Integrated Voltage Measurement... 14:09:32 Voltage Offset Correction: v_off_ini = 0.000005850 V, v_off_fin = 0.000007540 V 14:09:32 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171114976 Vs 14:09:32 Integrated Voltage Measurement... 14:09:52 Voltage Offset Correction: v_off_ini = 0.000006885 V, v_off_fin = 0.000003379 V 14:09:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978942 Vs 14:09:55 Temperature Measurement, Probe Number = 0, T = 20.215000 C 14:09:55 Temperature Measurement, Probe Number = 1, T = 20.144000 C 14:09:56 Temperature Measurement, Probe Number = 2, T = 20.200000 C 14:09:57 Temperature Measurement, Probe Number = 3, T = 20.148000 C 14:09:57 Temperature Measurement, Probe Number = 4, T = 20.642000 C 14:09:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.64 14:09:57 Integrated Voltage Measurement... 14:10:17 Voltage Offset Correction: v_off_ini = 0.000004736 V, v_off_fin = 0.000006943 V 14:10:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171058045 Vs 14:10:17 Integrated Voltage Measurement... 14:10:37 Voltage Offset Correction: v_off_ini = 0.000006507 V, v_off_fin = 0.000003343 V 14:10:37 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979968 Vs 14:10:40 Temperature Measurement, Probe Number = 0, T = 20.210000 C 14:10:40 Temperature Measurement, Probe Number = 1, T = 20.141000 C 14:10:41 Temperature Measurement, Probe Number = 2, T = 20.196000 C 14:10:42 Temperature Measurement, Probe Number = 3, T = 20.142000 C 14:10:42 Temperature Measurement, Probe Number = 4, T = 20.629000 C 14:10:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.63 14:10:42 Integrated Voltage Measurement... 14:11:03 Voltage Offset Correction: v_off_ini = 0.000004790 V, v_off_fin = 0.000007337 V 14:11:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171056540 Vs 14:11:03 Integrated Voltage Measurement... 14:11:23 Voltage Offset Correction: v_off_ini = 0.000006484 V, v_off_fin = 0.000003249 V 14:11:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981689 Vs 14:11:26 Temperature Measurement, Probe Number = 0, T = 20.211000 C 14:11:26 Temperature Measurement, Probe Number = 1, T = 20.143000 C 14:11:27 Temperature Measurement, Probe Number = 2, T = 20.196000 C 14:11:28 Temperature Measurement, Probe Number = 3, T = 20.143000 C 14:11:28 Temperature Measurement, Probe Number = 4, T = 20.620000 C 14:11:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.62 14:11:28 Integrated Voltage Measurement... 14:11:48 Voltage Offset Correction: v_off_ini = 0.000004483 V, v_off_fin = 0.000007241 V 14:11:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171056797 Vs 14:11:48 Integrated Voltage Measurement... 14:12:08 Voltage Offset Correction: v_off_ini = 0.000006326 V, v_off_fin = 0.000003375 V 14:12:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984854 Vs 14:12:11 Temperature Measurement, Probe Number = 0, T = 20.213000 C 14:12:11 Temperature Measurement, Probe Number = 1, T = 20.145000 C 14:12:12 Temperature Measurement, Probe Number = 2, T = 20.199000 C 14:12:13 Temperature Measurement, Probe Number = 3, T = 20.146000 C 14:12:13 Temperature Measurement, Probe Number = 4, T = 20.627000 C 14:12:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.15 P4 = Room, Value = 20.63 14:12:14 Integrated Voltage Measurement... 14:12:33 Voltage Offset Correction: v_off_ini = 0.000004576 V, v_off_fin = 0.000007856 V 14:12:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171058232 Vs 14:12:33 Integrated Voltage Measurement... 14:12:53 Voltage Offset Correction: v_off_ini = 0.000006782 V, v_off_fin = 0.000004334 V 14:12:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971981 Vs 14:12:56 Temperature Measurement, Probe Number = 0, T = 20.213000 C 14:12:56 Temperature Measurement, Probe Number = 1, T = 20.139000 C 14:12:57 Temperature Measurement, Probe Number = 2, T = 20.200000 C 14:12:58 Temperature Measurement, Probe Number = 3, T = 20.145000 C 14:12:58 Temperature Measurement, Probe Number = 4, T = 20.603000 C 14:12:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.60 14:12:58 Integrated Voltage Measurement... 14:13:18 Voltage Offset Correction: v_off_ini = 0.000004379 V, v_off_fin = 0.000007858 V 14:13:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062359 Vs 14:13:18 Integrated Voltage Measurement... 14:13:38 Voltage Offset Correction: v_off_ini = 0.000007090 V, v_off_fin = 0.000004265 V 14:13:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970915 Vs 14:13:41 Temperature Measurement, Probe Number = 0, T = 20.210000 C 14:13:42 Temperature Measurement, Probe Number = 1, T = 20.138000 C 14:13:42 Temperature Measurement, Probe Number = 2, T = 20.198000 C 14:13:43 Temperature Measurement, Probe Number = 3, T = 20.142000 C 14:13:44 Temperature Measurement, Probe Number = 4, T = 20.603000 C 14:13:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.60 14:13:44 Integrated Voltage Measurement... 14:14:03 Voltage Offset Correction: v_off_ini = 0.000005340 V, v_off_fin = 0.000007793 V 14:14:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062896 Vs 14:14:03 Integrated Voltage Measurement... 14:14:23 Voltage Offset Correction: v_off_ini = 0.000007160 V, v_off_fin = 0.000003954 V 14:14:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972747 Vs 14:14:26 Temperature Measurement, Probe Number = 0, T = 20.209000 C 14:14:27 Temperature Measurement, Probe Number = 1, T = 20.138000 C 14:14:27 Temperature Measurement, Probe Number = 2, T = 20.195000 C 14:14:28 Temperature Measurement, Probe Number = 3, T = 20.143000 C 14:14:29 Temperature Measurement, Probe Number = 4, T = 20.551000 C 14:14:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.55 14:14:29 Integrated Voltage Measurement... 14:14:48 Voltage Offset Correction: v_off_ini = 0.000005112 V, v_off_fin = 0.000007594 V 14:14:48 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064592 Vs 14:14:48 Integrated Voltage Measurement... 14:15:08 Voltage Offset Correction: v_off_ini = 0.000006959 V, v_off_fin = 0.000003389 V 14:15:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980407 Vs 14:15:11 Temperature Measurement, Probe Number = 0, T = 20.211000 C 14:15:12 Temperature Measurement, Probe Number = 1, T = 20.139000 C 14:15:12 Temperature Measurement, Probe Number = 2, T = 20.195000 C 14:15:13 Temperature Measurement, Probe Number = 3, T = 20.140000 C 14:15:14 Temperature Measurement, Probe Number = 4, T = 20.599000 C 14:15:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.60 14:15:14 Integrated Voltage Measurement... 14:15:33 Voltage Offset Correction: v_off_ini = 0.000004867 V, v_off_fin = 0.000007565 V 14:15:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171065802 Vs 14:15:34 Integrated Voltage Measurement... 14:15:53 Voltage Offset Correction: v_off_ini = 0.000006949 V, v_off_fin = 0.000004367 V 14:15:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971733 Vs 14:15:56 Temperature Measurement, Probe Number = 0, T = 20.212000 C 14:15:57 Temperature Measurement, Probe Number = 1, T = 20.141000 C 14:15:57 Temperature Measurement, Probe Number = 2, T = 20.197000 C 14:15:58 Temperature Measurement, Probe Number = 3, T = 20.143000 C 14:15:59 Temperature Measurement, Probe Number = 4, T = 20.558000 C 14:15:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.56 14:15:59 Integrated Voltage Measurement... 14:16:19 Voltage Offset Correction: v_off_ini = 0.000005367 V, v_off_fin = 0.000008093 V 14:16:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171068840 Vs 14:16:19 Integrated Voltage Measurement... 14:16:39 Voltage Offset Correction: v_off_ini = 0.000007363 V, v_off_fin = 0.000004077 V 14:16:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970844 Vs 14:46:42 Temperature Measurement, Probe Number = 0, T = 20.207000 C 14:46:43 Temperature Measurement, Probe Number = 1, T = 20.137000 C 14:46:43 Temperature Measurement, Probe Number = 2, T = 20.193000 C 14:46:44 Temperature Measurement, Probe Number = 3, T = 20.139000 C 14:46:45 Temperature Measurement, Probe Number = 4, T = 20.550000 C 14:46:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.55 14:46:45 Integrated Voltage Measurement... 14:47:05 Voltage Offset Correction: v_off_ini = 0.000006462 V, v_off_fin = 0.000007993 V 14:47:05 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171111041 Vs 14:47:05 Integrated Voltage Measurement... 14:47:24 Voltage Offset Correction: v_off_ini = 0.000007174 V, v_off_fin = 0.000004387 V 14:47:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974999 Vs 14:47:27 Temperature Measurement, Probe Number = 0, T = 20.208000 C 14:47:28 Temperature Measurement, Probe Number = 1, T = 20.138000 C 14:47:28 Temperature Measurement, Probe Number = 2, T = 20.191000 C 14:47:29 Temperature Measurement, Probe Number = 3, T = 20.138000 C 14:47:30 Temperature Measurement, Probe Number = 4, T = 20.580000 C 14:47:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.58 14:47:30 Integrated Voltage Measurement... 14:47:49 Voltage Offset Correction: v_off_ini = 0.000004803 V, v_off_fin = 0.000007869 V 14:47:49 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171071720 Vs 14:47:50 Integrated Voltage Measurement... 14:48:09 Voltage Offset Correction: v_off_ini = 0.000006933 V, v_off_fin = 0.000004294 V 14:48:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980488 Vs 14:48:12 Temperature Measurement, Probe Number = 0, T = 20.213000 C 14:48:13 Temperature Measurement, Probe Number = 1, T = 20.140000 C 14:48:13 Temperature Measurement, Probe Number = 2, T = 20.197000 C 14:48:14 Temperature Measurement, Probe Number = 3, T = 20.143000 C 14:48:15 Temperature Measurement, Probe Number = 4, T = 20.573000 C 14:48:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.57 14:48:15 Integrated Voltage Measurement... 14:48:34 Voltage Offset Correction: v_off_ini = 0.000005205 V, v_off_fin = 0.000008137 V 14:48:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073843 Vs 14:48:35 Integrated Voltage Measurement... 14:48:54 Voltage Offset Correction: v_off_ini = 0.000007206 V, v_off_fin = 0.000003944 V 14:48:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976578 Vs 14:48:57 Temperature Measurement, Probe Number = 0, T = 20.208000 C 14:48:58 Temperature Measurement, Probe Number = 1, T = 20.139000 C 14:48:59 Temperature Measurement, Probe Number = 2, T = 20.195000 C 14:48:59 Temperature Measurement, Probe Number = 3, T = 20.141000 C 14:49:00 Temperature Measurement, Probe Number = 4, T = 20.592000 C 14:49:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.59 14:49:00 Integrated Voltage Measurement... 14:49:19 Voltage Offset Correction: v_off_ini = 0.000005297 V, v_off_fin = 0.000008125 V 14:49:20 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171073704 Vs 14:49:20 Integrated Voltage Measurement... 14:49:39 Voltage Offset Correction: v_off_ini = 0.000007219 V, v_off_fin = 0.000004006 V 14:49:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977617 Vs 14:49:42 Temperature Measurement, Probe Number = 0, T = 20.207000 C 14:49:43 Temperature Measurement, Probe Number = 1, T = 20.133000 C 14:49:44 Temperature Measurement, Probe Number = 2, T = 20.195000 C 14:49:44 Temperature Measurement, Probe Number = 3, T = 20.139000 C 14:49:45 Temperature Measurement, Probe Number = 4, T = 20.586000 C 14:49:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.59 14:49:45 Integrated Voltage Measurement... 14:50:04 Voltage Offset Correction: v_off_ini = 0.000005357 V, v_off_fin = 0.000007990 V 14:50:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074855 Vs 14:50:05 Integrated Voltage Measurement... 14:50:24 Voltage Offset Correction: v_off_ini = 0.000007231 V, v_off_fin = 0.000004151 V 14:50:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984200 Vs 14:50:27 Temperature Measurement, Probe Number = 0, T = 20.205000 C 14:50:28 Temperature Measurement, Probe Number = 1, T = 20.134000 C 14:50:29 Temperature Measurement, Probe Number = 2, T = 20.193000 C 14:50:29 Temperature Measurement, Probe Number = 3, T = 20.138000 C 14:50:30 Temperature Measurement, Probe Number = 4, T = 20.532000 C 14:50:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.53 14:50:30 Integrated Voltage Measurement... 14:50:49 Voltage Offset Correction: v_off_ini = 0.000004799 V, v_off_fin = 0.000007717 V 14:50:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171075456 Vs 14:50:50 Integrated Voltage Measurement... 14:51:09 Voltage Offset Correction: v_off_ini = 0.000007606 V, v_off_fin = 0.000003784 V 14:51:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981386 Vs 14:51:12 Temperature Measurement, Probe Number = 0, T = 20.211000 C 14:51:13 Temperature Measurement, Probe Number = 1, T = 20.139000 C 14:51:14 Temperature Measurement, Probe Number = 2, T = 20.196000 C 14:51:14 Temperature Measurement, Probe Number = 3, T = 20.142000 C 14:51:15 Temperature Measurement, Probe Number = 4, T = 20.519000 C 14:51:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.52 14:51:15 Integrated Voltage Measurement... 14:51:36 Voltage Offset Correction: v_off_ini = 0.000004925 V, v_off_fin = 0.000007727 V 14:51:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078716 Vs 14:51:36 Integrated Voltage Measurement... 14:51:56 Voltage Offset Correction: v_off_ini = 0.000007125 V, v_off_fin = 0.000003687 V 14:51:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974701 Vs 14:51:58 Temperature Measurement, Probe Number = 0, T = 20.213000 C 14:51:59 Temperature Measurement, Probe Number = 1, T = 20.143000 C 14:52:00 Temperature Measurement, Probe Number = 2, T = 20.197000 C 14:52:00 Temperature Measurement, Probe Number = 3, T = 20.144000 C 14:52:01 Temperature Measurement, Probe Number = 4, T = 20.553000 C 14:52:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.55 14:52:01 Integrated Voltage Measurement... 14:52:21 Voltage Offset Correction: v_off_ini = 0.000005687 V, v_off_fin = 0.000007819 V 14:52:21 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171077749 Vs 14:52:21 Integrated Voltage Measurement... 14:52:41 Voltage Offset Correction: v_off_ini = 0.000007479 V, v_off_fin = 0.000004047 V 14:52:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976485 Vs 14:52:43 Temperature Measurement, Probe Number = 0, T = 20.211000 C 14:52:44 Temperature Measurement, Probe Number = 1, T = 20.141000 C 14:52:45 Temperature Measurement, Probe Number = 2, T = 20.199000 C 14:52:45 Temperature Measurement, Probe Number = 3, T = 20.144000 C 14:52:46 Temperature Measurement, Probe Number = 4, T = 20.574000 C 14:52:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.57 14:52:46 Integrated Voltage Measurement... 14:53:06 Voltage Offset Correction: v_off_ini = 0.000005389 V, v_off_fin = 0.000008154 V 14:53:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076873 Vs 14:53:07 Integrated Voltage Measurement... 14:53:26 Voltage Offset Correction: v_off_ini = 0.000007379 V, v_off_fin = 0.000004226 V 14:53:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975034 Vs 14:53:29 Temperature Measurement, Probe Number = 0, T = 20.210000 C 14:53:29 Temperature Measurement, Probe Number = 1, T = 20.138000 C 14:53:30 Temperature Measurement, Probe Number = 2, T = 20.197000 C 14:53:31 Temperature Measurement, Probe Number = 3, T = 20.141000 C 14:53:31 Temperature Measurement, Probe Number = 4, T = 20.568000 C 14:53:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.57 14:53:32 Integrated Voltage Measurement... 14:53:51 Voltage Offset Correction: v_off_ini = 0.000004847 V, v_off_fin = 0.000007754 V 14:53:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072776 Vs 14:53:52 Integrated Voltage Measurement... 14:54:11 Voltage Offset Correction: v_off_ini = 0.000007006 V, v_off_fin = 0.000004089 V 14:54:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978367 Vs 15:24:14 Temperature Measurement, Probe Number = 0, T = 20.211000 C 15:24:14 Temperature Measurement, Probe Number = 1, T = 20.137000 C 15:24:15 Temperature Measurement, Probe Number = 2, T = 20.198000 C 15:24:16 Temperature Measurement, Probe Number = 3, T = 20.142000 C 15:24:16 Temperature Measurement, Probe Number = 4, T = 20.530000 C 15:24:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.53 15:24:17 Integrated Voltage Measurement... 15:24:37 Voltage Offset Correction: v_off_ini = 0.000006542 V, v_off_fin = 0.000008382 V 15:24:37 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171136963 Vs 15:24:37 Integrated Voltage Measurement... 15:24:57 Voltage Offset Correction: v_off_ini = 0.000007939 V, v_off_fin = 0.000004763 V 15:24:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974494 Vs 15:24:59 Temperature Measurement, Probe Number = 0, T = 20.210000 C 15:25:00 Temperature Measurement, Probe Number = 1, T = 20.136000 C 15:25:01 Temperature Measurement, Probe Number = 2, T = 20.196000 C 15:25:01 Temperature Measurement, Probe Number = 3, T = 20.141000 C 15:25:02 Temperature Measurement, Probe Number = 4, T = 20.487000 C 15:25:02 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.49 15:25:02 Integrated Voltage Measurement... 15:25:22 Voltage Offset Correction: v_off_ini = 0.000005752 V, v_off_fin = 0.000007862 V 15:25:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075285 Vs 15:25:23 Integrated Voltage Measurement... 15:25:42 Voltage Offset Correction: v_off_ini = 0.000007368 V, v_off_fin = 0.000003758 V 15:25:42 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979708 Vs 15:25:45 Temperature Measurement, Probe Number = 0, T = 20.209000 C 15:25:45 Temperature Measurement, Probe Number = 1, T = 20.137000 C 15:25:46 Temperature Measurement, Probe Number = 2, T = 20.195000 C 15:25:47 Temperature Measurement, Probe Number = 3, T = 20.139000 C 15:25:47 Temperature Measurement, Probe Number = 4, T = 20.490000 C 15:25:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.49 15:25:47 Integrated Voltage Measurement... 15:26:07 Voltage Offset Correction: v_off_ini = 0.000004781 V, v_off_fin = 0.000007534 V 15:26:07 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171075367 Vs 15:26:07 Integrated Voltage Measurement... 15:26:27 Voltage Offset Correction: v_off_ini = 0.000006786 V, v_off_fin = 0.000003262 V 15:26:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170989797 Vs 15:26:30 Temperature Measurement, Probe Number = 0, T = 20.201000 C 15:26:31 Temperature Measurement, Probe Number = 1, T = 20.128000 C 15:26:32 Temperature Measurement, Probe Number = 2, T = 20.189000 C 15:26:32 Temperature Measurement, Probe Number = 3, T = 20.135000 C 15:26:33 Temperature Measurement, Probe Number = 4, T = 20.505000 C 15:26:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.50 15:26:33 Integrated Voltage Measurement... 15:26:53 Voltage Offset Correction: v_off_ini = 0.000005023 V, v_off_fin = 0.000007744 V 15:26:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171077721 Vs 15:26:53 Integrated Voltage Measurement... 15:27:13 Voltage Offset Correction: v_off_ini = 0.000007003 V, v_off_fin = 0.000004228 V 15:27:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980856 Vs 15:27:16 Temperature Measurement, Probe Number = 0, T = 20.207000 C 15:27:16 Temperature Measurement, Probe Number = 1, T = 20.136000 C 15:27:17 Temperature Measurement, Probe Number = 2, T = 20.189000 C 15:27:18 Temperature Measurement, Probe Number = 3, T = 20.137000 C 15:27:18 Temperature Measurement, Probe Number = 4, T = 20.520000 C 15:27:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.52 15:27:18 Integrated Voltage Measurement... 15:27:38 Voltage Offset Correction: v_off_ini = 0.000005067 V, v_off_fin = 0.000008012 V 15:27:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076472 Vs 15:27:38 Integrated Voltage Measurement... 15:27:58 Voltage Offset Correction: v_off_ini = 0.000007178 V, v_off_fin = 0.000004538 V 15:27:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977333 Vs 15:28:01 Temperature Measurement, Probe Number = 0, T = 20.214000 C 15:28:01 Temperature Measurement, Probe Number = 1, T = 20.141000 C 15:28:02 Temperature Measurement, Probe Number = 2, T = 20.196000 C 15:28:03 Temperature Measurement, Probe Number = 3, T = 20.143000 C 15:28:03 Temperature Measurement, Probe Number = 4, T = 20.542000 C 15:28:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.54 15:28:04 Integrated Voltage Measurement... 15:28:23 Voltage Offset Correction: v_off_ini = 0.000005919 V, v_off_fin = 0.000007869 V 15:28:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171082491 Vs 15:28:23 Integrated Voltage Measurement... 15:28:43 Voltage Offset Correction: v_off_ini = 0.000006918 V, v_off_fin = 0.000003925 V 15:28:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980168 Vs 15:28:46 Temperature Measurement, Probe Number = 0, T = 20.213000 C 15:28:46 Temperature Measurement, Probe Number = 1, T = 20.142000 C 15:28:47 Temperature Measurement, Probe Number = 2, T = 20.196000 C 15:28:48 Temperature Measurement, Probe Number = 3, T = 20.143000 C 15:28:48 Temperature Measurement, Probe Number = 4, T = 20.591000 C 15:28:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.59 15:28:49 Integrated Voltage Measurement... 15:29:08 Voltage Offset Correction: v_off_ini = 0.000005055 V, v_off_fin = 0.000007828 V 15:29:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076646 Vs 15:29:09 Integrated Voltage Measurement... 15:29:28 Voltage Offset Correction: v_off_ini = 0.000006999 V, v_off_fin = 0.000003721 V 15:29:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986133 Vs 15:29:31 Temperature Measurement, Probe Number = 0, T = 20.210000 C 15:29:31 Temperature Measurement, Probe Number = 1, T = 20.138000 C 15:29:32 Temperature Measurement, Probe Number = 2, T = 20.194000 C 15:29:33 Temperature Measurement, Probe Number = 3, T = 20.142000 C 15:29:33 Temperature Measurement, Probe Number = 4, T = 20.598000 C 15:29:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.60 15:29:34 Integrated Voltage Measurement... 15:29:54 Voltage Offset Correction: v_off_ini = 0.000004490 V, v_off_fin = 0.000008056 V 15:29:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080027 Vs 15:29:54 Integrated Voltage Measurement... 15:30:14 Voltage Offset Correction: v_off_ini = 0.000007035 V, v_off_fin = 0.000003209 V 15:30:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988863 Vs 15:30:17 Temperature Measurement, Probe Number = 0, T = 20.207000 C 15:30:17 Temperature Measurement, Probe Number = 1, T = 20.137000 C 15:30:18 Temperature Measurement, Probe Number = 2, T = 20.192000 C 15:30:19 Temperature Measurement, Probe Number = 3, T = 20.136000 C 15:30:19 Temperature Measurement, Probe Number = 4, T = 20.569000 C 15:30:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.57 15:30:20 Integrated Voltage Measurement... 15:30:39 Voltage Offset Correction: v_off_ini = 0.000005504 V, v_off_fin = 0.000008211 V 15:30:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079252 Vs 15:30:39 Integrated Voltage Measurement... 15:30:59 Voltage Offset Correction: v_off_ini = 0.000007406 V, v_off_fin = 0.000004368 V 15:30:59 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979686 Vs 15:31:02 Temperature Measurement, Probe Number = 0, T = 20.208000 C 15:31:03 Temperature Measurement, Probe Number = 1, T = 20.136000 C 15:31:03 Temperature Measurement, Probe Number = 2, T = 20.194000 C 15:31:04 Temperature Measurement, Probe Number = 3, T = 20.139000 C 15:31:05 Temperature Measurement, Probe Number = 4, T = 20.609000 C 15:31:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.61 15:31:05 Integrated Voltage Measurement... 15:31:24 Voltage Offset Correction: v_off_ini = 0.000005179 V, v_off_fin = 0.000007893 V 15:31:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171075715 Vs 15:31:25 Integrated Voltage Measurement... 15:31:44 Voltage Offset Correction: v_off_ini = 0.000006874 V, v_off_fin = 0.000003925 V 15:31:45 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170985668 Vs 16:01:47 Temperature Measurement, Probe Number = 0, T = 20.208000 C 16:01:48 Temperature Measurement, Probe Number = 1, T = 20.132000 C 16:01:49 Temperature Measurement, Probe Number = 2, T = 20.194000 C 16:01:49 Temperature Measurement, Probe Number = 3, T = 20.138000 C 16:01:50 Temperature Measurement, Probe Number = 4, T = 20.461000 C 16:01:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.46 16:01:50 Integrated Voltage Measurement... 16:02:10 Voltage Offset Correction: v_off_ini = 0.000005829 V, v_off_fin = 0.000007775 V 16:02:10 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171124085 Vs 16:02:10 Integrated Voltage Measurement... 16:02:29 Voltage Offset Correction: v_off_ini = 0.000006957 V, v_off_fin = 0.000003234 V 16:02:29 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982697 Vs 16:02:32 Temperature Measurement, Probe Number = 0, T = 20.209000 C 16:02:33 Temperature Measurement, Probe Number = 1, T = 20.137000 C 16:02:34 Temperature Measurement, Probe Number = 2, T = 20.193000 C 16:02:34 Temperature Measurement, Probe Number = 3, T = 20.140000 C 16:02:35 Temperature Measurement, Probe Number = 4, T = 20.519000 C 16:02:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.52 16:02:35 Integrated Voltage Measurement... 16:02:54 Voltage Offset Correction: v_off_ini = 0.000005003 V, v_off_fin = 0.000008262 V 16:02:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171075603 Vs 16:02:55 Integrated Voltage Measurement... 16:03:14 Voltage Offset Correction: v_off_ini = 0.000007422 V, v_off_fin = 0.000004225 V 16:03:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985816 Vs 16:03:17 Temperature Measurement, Probe Number = 0, T = 20.212000 C 16:03:18 Temperature Measurement, Probe Number = 1, T = 20.135000 C 16:03:18 Temperature Measurement, Probe Number = 2, T = 20.197000 C 16:03:19 Temperature Measurement, Probe Number = 3, T = 20.142000 C 16:03:20 Temperature Measurement, Probe Number = 4, T = 20.523000 C 16:03:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.52 16:03:20 Integrated Voltage Measurement... 16:03:40 Voltage Offset Correction: v_off_ini = 0.000005086 V, v_off_fin = 0.000007453 V 16:03:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071776 Vs 16:03:40 Integrated Voltage Measurement... 16:03:59 Voltage Offset Correction: v_off_ini = 0.000006768 V, v_off_fin = 0.000004151 V 16:04:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984063 Vs 16:04:02 Temperature Measurement, Probe Number = 0, T = 20.207000 C 16:04:03 Temperature Measurement, Probe Number = 1, T = 20.134000 C 16:04:04 Temperature Measurement, Probe Number = 2, T = 20.194000 C 16:04:04 Temperature Measurement, Probe Number = 3, T = 20.139000 C 16:04:05 Temperature Measurement, Probe Number = 4, T = 20.506000 C 16:04:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.51 16:04:05 Integrated Voltage Measurement... 16:04:24 Voltage Offset Correction: v_off_ini = 0.000004232 V, v_off_fin = 0.000008391 V 16:04:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171076400 Vs 16:04:25 Integrated Voltage Measurement... 16:04:44 Voltage Offset Correction: v_off_ini = 0.000007251 V, v_off_fin = 0.000003968 V 16:04:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984007 Vs 16:04:47 Temperature Measurement, Probe Number = 0, T = 20.207000 C 16:04:48 Temperature Measurement, Probe Number = 1, T = 20.134000 C 16:04:48 Temperature Measurement, Probe Number = 2, T = 20.191000 C 16:04:49 Temperature Measurement, Probe Number = 3, T = 20.135000 C 16:04:50 Temperature Measurement, Probe Number = 4, T = 20.471000 C 16:04:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.47 16:04:50 Integrated Voltage Measurement... 16:05:09 Voltage Offset Correction: v_off_ini = 0.000005191 V, v_off_fin = 0.000007809 V 16:05:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074650 Vs 16:05:10 Integrated Voltage Measurement... 16:05:29 Voltage Offset Correction: v_off_ini = 0.000006968 V, v_off_fin = 0.000004348 V 16:05:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989584 Vs 16:05:32 Temperature Measurement, Probe Number = 0, T = 20.211000 C 16:05:33 Temperature Measurement, Probe Number = 1, T = 20.135000 C 16:05:34 Temperature Measurement, Probe Number = 2, T = 20.197000 C 16:05:34 Temperature Measurement, Probe Number = 3, T = 20.141000 C 16:05:35 Temperature Measurement, Probe Number = 4, T = 20.485000 C 16:05:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.48 16:05:35 Integrated Voltage Measurement... 16:05:54 Voltage Offset Correction: v_off_ini = 0.000005310 V, v_off_fin = 0.000008438 V 16:05:55 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075966 Vs 16:05:55 Integrated Voltage Measurement... 16:06:15 Voltage Offset Correction: v_off_ini = 0.000007227 V, v_off_fin = 0.000003764 V 16:06:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983579 Vs 16:06:18 Temperature Measurement, Probe Number = 0, T = 20.213000 C 16:06:19 Temperature Measurement, Probe Number = 1, T = 20.136000 C 16:06:19 Temperature Measurement, Probe Number = 2, T = 20.198000 C 16:06:20 Temperature Measurement, Probe Number = 3, T = 20.142000 C 16:06:20 Temperature Measurement, Probe Number = 4, T = 20.536000 C 16:06:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.54 16:06:21 Integrated Voltage Measurement... 16:06:40 Voltage Offset Correction: v_off_ini = 0.000004669 V, v_off_fin = 0.000007841 V 16:06:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066658 Vs 16:06:41 Integrated Voltage Measurement... 16:07:00 Voltage Offset Correction: v_off_ini = 0.000007104 V, v_off_fin = 0.000003684 V 16:07:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984379 Vs 16:07:03 Temperature Measurement, Probe Number = 0, T = 20.209000 C 16:07:04 Temperature Measurement, Probe Number = 1, T = 20.134000 C 16:07:05 Temperature Measurement, Probe Number = 2, T = 20.197000 C 16:07:05 Temperature Measurement, Probe Number = 3, T = 20.138000 C 16:07:06 Temperature Measurement, Probe Number = 4, T = 20.528000 C 16:07:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.53 16:07:06 Integrated Voltage Measurement... 16:07:26 Voltage Offset Correction: v_off_ini = 0.000005248 V, v_off_fin = 0.000007486 V 16:07:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071533 Vs 16:07:26 Integrated Voltage Measurement... 16:07:46 Voltage Offset Correction: v_off_ini = 0.000007204 V, v_off_fin = 0.000003726 V 16:07:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985419 Vs 16:07:48 Temperature Measurement, Probe Number = 0, T = 20.211000 C 16:07:49 Temperature Measurement, Probe Number = 1, T = 20.138000 C 16:07:50 Temperature Measurement, Probe Number = 2, T = 20.195000 C 16:07:50 Temperature Measurement, Probe Number = 3, T = 20.139000 C 16:07:51 Temperature Measurement, Probe Number = 4, T = 20.529000 C 16:07:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.53 16:07:51 Integrated Voltage Measurement... 16:08:11 Voltage Offset Correction: v_off_ini = 0.000004780 V, v_off_fin = 0.000007147 V 16:08:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171069805 Vs 16:08:11 Integrated Voltage Measurement... 16:08:31 Voltage Offset Correction: v_off_ini = 0.000006721 V, v_off_fin = 0.000003743 V 16:08:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987402 Vs 16:08:33 Temperature Measurement, Probe Number = 0, T = 20.213000 C 16:08:34 Temperature Measurement, Probe Number = 1, T = 20.141000 C 16:08:35 Temperature Measurement, Probe Number = 2, T = 20.200000 C 16:08:35 Temperature Measurement, Probe Number = 3, T = 20.145000 C 16:08:36 Temperature Measurement, Probe Number = 4, T = 20.524000 C 16:08:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.14 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.52 16:08:36 Integrated Voltage Measurement... 16:08:56 Voltage Offset Correction: v_off_ini = 0.000004868 V, v_off_fin = 0.000007437 V 16:08:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171069434 Vs 16:08:56 Integrated Voltage Measurement... 16:09:16 Voltage Offset Correction: v_off_ini = 0.000007278 V, v_off_fin = 0.000004055 V 16:09:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989317 Vs 16:39:19 Temperature Measurement, Probe Number = 0, T = 20.202000 C 16:39:19 Temperature Measurement, Probe Number = 1, T = 20.127000 C 16:39:20 Temperature Measurement, Probe Number = 2, T = 20.189000 C 16:39:20 Temperature Measurement, Probe Number = 3, T = 20.132000 C 16:39:21 Temperature Measurement, Probe Number = 4, T = 20.494000 C 16:39:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.49 16:39:21 Integrated Voltage Measurement... 16:41:21 Voltage Offset Correction: v_off_ini = 0.000005965 V, v_off_fin = 0.000007276 V 16:41:21 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171110306 Vs 16:41:22 Integrated Voltage Measurement... 16:41:41 Voltage Offset Correction: v_off_ini = 0.000005795 V, v_off_fin = 0.000003356 V 16:41:41 Integrated Voltage Measurement Delta Gap = -0.0040010 m VT = -0.171000903 Vs 16:41:44 Temperature Measurement, Probe Number = 0, T = 20.204000 C 16:41:44 Temperature Measurement, Probe Number = 1, T = 20.131000 C 16:41:45 Temperature Measurement, Probe Number = 2, T = 20.187000 C 16:41:46 Temperature Measurement, Probe Number = 3, T = 20.133000 C 16:41:46 Temperature Measurement, Probe Number = 4, T = 20.408000 C 16:41:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.41 16:41:47 Integrated Voltage Measurement... 16:42:06 Voltage Offset Correction: v_off_ini = 0.000004482 V, v_off_fin = 0.000007206 V 16:42:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171064344 Vs 16:42:06 Integrated Voltage Measurement... 16:42:26 Voltage Offset Correction: v_off_ini = 0.000006556 V, v_off_fin = 0.000003529 V 16:42:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990292 Vs 16:42:29 Temperature Measurement, Probe Number = 0, T = 20.203000 C 16:42:29 Temperature Measurement, Probe Number = 1, T = 20.131000 C 16:42:30 Temperature Measurement, Probe Number = 2, T = 20.187000 C 16:42:31 Temperature Measurement, Probe Number = 3, T = 20.133000 C 16:42:31 Temperature Measurement, Probe Number = 4, T = 20.407000 C 16:42:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.41 16:42:31 Integrated Voltage Measurement... 16:42:51 Voltage Offset Correction: v_off_ini = 0.000004341 V, v_off_fin = 0.000007966 V 16:42:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171063622 Vs 16:42:51 Integrated Voltage Measurement... 16:43:11 Voltage Offset Correction: v_off_ini = 0.000006985 V, v_off_fin = 0.000003583 V 16:43:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983412 Vs 16:43:14 Temperature Measurement, Probe Number = 0, T = 20.207000 C 16:43:14 Temperature Measurement, Probe Number = 1, T = 20.133000 C 16:43:15 Temperature Measurement, Probe Number = 2, T = 20.193000 C 16:43:16 Temperature Measurement, Probe Number = 3, T = 20.138000 C 16:43:16 Temperature Measurement, Probe Number = 4, T = 20.437000 C 16:43:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.44 16:43:17 Integrated Voltage Measurement... 16:43:36 Voltage Offset Correction: v_off_ini = 0.000004961 V, v_off_fin = 0.000007265 V 16:43:36 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171065235 Vs 16:43:36 Integrated Voltage Measurement... 16:43:56 Voltage Offset Correction: v_off_ini = 0.000006555 V, v_off_fin = 0.000004025 V 16:43:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978977 Vs 16:43:59 Temperature Measurement, Probe Number = 0, T = 20.206000 C 16:43:59 Temperature Measurement, Probe Number = 1, T = 20.129000 C 16:44:00 Temperature Measurement, Probe Number = 2, T = 20.193000 C 16:44:01 Temperature Measurement, Probe Number = 3, T = 20.136000 C 16:44:01 Temperature Measurement, Probe Number = 4, T = 20.506000 C 16:44:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.51 16:44:02 Integrated Voltage Measurement... 16:44:21 Voltage Offset Correction: v_off_ini = 0.000005175 V, v_off_fin = 0.000007190 V 16:44:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171063651 Vs 16:44:21 Integrated Voltage Measurement... 16:44:41 Voltage Offset Correction: v_off_ini = 0.000006584 V, v_off_fin = 0.000003295 V 16:44:41 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981124 Vs 16:44:44 Temperature Measurement, Probe Number = 0, T = 20.203000 C 16:44:44 Temperature Measurement, Probe Number = 1, T = 20.127000 C 16:44:45 Temperature Measurement, Probe Number = 2, T = 20.193000 C 16:44:46 Temperature Measurement, Probe Number = 3, T = 20.136000 C 16:44:46 Temperature Measurement, Probe Number = 4, T = 20.474000 C 16:44:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.47 16:44:47 Integrated Voltage Measurement... 16:45:07 Voltage Offset Correction: v_off_ini = 0.000004971 V, v_off_fin = 0.000007195 V 16:45:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171067687 Vs 16:45:07 Integrated Voltage Measurement... 16:45:27 Voltage Offset Correction: v_off_ini = 0.000006800 V, v_off_fin = 0.000003436 V 16:45:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987437 Vs 16:45:30 Temperature Measurement, Probe Number = 0, T = 20.200000 C 16:45:31 Temperature Measurement, Probe Number = 1, T = 20.124000 C 16:45:31 Temperature Measurement, Probe Number = 2, T = 20.190000 C 16:45:32 Temperature Measurement, Probe Number = 3, T = 20.131000 C 16:45:33 Temperature Measurement, Probe Number = 4, T = 20.411000 C 16:45:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.41 16:45:33 Integrated Voltage Measurement... 16:45:52 Voltage Offset Correction: v_off_ini = 0.000004719 V, v_off_fin = 0.000007089 V 16:45:52 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171064719 Vs 16:45:53 Integrated Voltage Measurement... 16:46:12 Voltage Offset Correction: v_off_ini = 0.000006250 V, v_off_fin = 0.000003692 V 16:46:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980703 Vs 16:46:15 Temperature Measurement, Probe Number = 0, T = 20.199000 C 16:46:16 Temperature Measurement, Probe Number = 1, T = 20.127000 C 16:46:16 Temperature Measurement, Probe Number = 2, T = 20.187000 C 16:46:17 Temperature Measurement, Probe Number = 3, T = 20.130000 C 16:46:18 Temperature Measurement, Probe Number = 4, T = 20.409000 C 16:46:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.41 16:46:18 Integrated Voltage Measurement... 16:46:37 Voltage Offset Correction: v_off_ini = 0.000005231 V, v_off_fin = 0.000007971 V 16:46:38 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071362 Vs 16:46:38 Integrated Voltage Measurement... 16:46:57 Voltage Offset Correction: v_off_ini = 0.000007662 V, v_off_fin = 0.000003987 V 16:46:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976145 Vs 16:47:00 Temperature Measurement, Probe Number = 0, T = 20.200000 C 16:47:01 Temperature Measurement, Probe Number = 1, T = 20.127000 C 16:47:02 Temperature Measurement, Probe Number = 2, T = 20.188000 C 16:47:02 Temperature Measurement, Probe Number = 3, T = 20.132000 C 16:47:03 Temperature Measurement, Probe Number = 4, T = 20.408000 C 16:47:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.41 16:47:03 Integrated Voltage Measurement... 16:47:23 Voltage Offset Correction: v_off_ini = 0.000004677 V, v_off_fin = 0.000007430 V 16:47:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171068137 Vs 16:47:23 Integrated Voltage Measurement... 16:47:42 Voltage Offset Correction: v_off_ini = 0.000006401 V, v_off_fin = 0.000003406 V 16:47:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983326 Vs 16:47:45 Temperature Measurement, Probe Number = 0, T = 20.204000 C 16:47:46 Temperature Measurement, Probe Number = 1, T = 20.129000 C 16:47:47 Temperature Measurement, Probe Number = 2, T = 20.193000 C 16:47:47 Temperature Measurement, Probe Number = 3, T = 20.135000 C 16:47:48 Temperature Measurement, Probe Number = 4, T = 20.413000 C 16:47:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.41 16:47:48 Integrated Voltage Measurement... 16:48:07 Voltage Offset Correction: v_off_ini = 0.000005058 V, v_off_fin = 0.000007300 V 16:48:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171072131 Vs 16:48:08 Integrated Voltage Measurement... 16:48:27 Voltage Offset Correction: v_off_ini = 0.000006093 V, v_off_fin = 0.000003459 V 16:48:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985058 Vs 17:18:30 Temperature Measurement, Probe Number = 0, T = 20.200000 C 17:18:31 Temperature Measurement, Probe Number = 1, T = 20.128000 C 17:18:31 Temperature Measurement, Probe Number = 2, T = 20.188000 C 17:18:32 Temperature Measurement, Probe Number = 3, T = 20.135000 C 17:18:33 Temperature Measurement, Probe Number = 4, T = 20.369000 C 17:18:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.37 17:18:33 Integrated Voltage Measurement... 17:18:52 Voltage Offset Correction: v_off_ini = 0.000006025 V, v_off_fin = 0.000007765 V 17:18:52 Integrated Voltage Measurement Delta Gap = 0.0040017 m VT = 0.171131610 Vs 17:18:52 Integrated Voltage Measurement... 17:19:12 Voltage Offset Correction: v_off_ini = 0.000006983 V, v_off_fin = 0.000004032 V 17:19:12 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980336 Vs 17:19:15 Temperature Measurement, Probe Number = 0, T = 20.202000 C 17:19:16 Temperature Measurement, Probe Number = 1, T = 20.126000 C 17:19:16 Temperature Measurement, Probe Number = 2, T = 20.189000 C 17:19:17 Temperature Measurement, Probe Number = 3, T = 20.134000 C 17:19:18 Temperature Measurement, Probe Number = 4, T = 20.385000 C 17:19:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.39 17:19:18 Integrated Voltage Measurement... 17:19:37 Voltage Offset Correction: v_off_ini = 0.000005502 V, v_off_fin = 0.000007645 V 17:19:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070550 Vs 17:19:37 Integrated Voltage Measurement... 17:19:57 Voltage Offset Correction: v_off_ini = 0.000007376 V, v_off_fin = 0.000004242 V 17:19:57 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979923 Vs 17:20:00 Temperature Measurement, Probe Number = 0, T = 20.200000 C 17:20:01 Temperature Measurement, Probe Number = 1, T = 20.125000 C 17:20:01 Temperature Measurement, Probe Number = 2, T = 20.189000 C 17:20:02 Temperature Measurement, Probe Number = 3, T = 20.134000 C 17:20:03 Temperature Measurement, Probe Number = 4, T = 20.434000 C 17:20:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.43 17:20:03 Integrated Voltage Measurement... 17:20:22 Voltage Offset Correction: v_off_ini = 0.000004614 V, v_off_fin = 0.000007845 V 17:20:22 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171066183 Vs 17:20:23 Integrated Voltage Measurement... 17:20:42 Voltage Offset Correction: v_off_ini = 0.000007583 V, v_off_fin = 0.000004185 V 17:20:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972076 Vs 17:20:45 Temperature Measurement, Probe Number = 0, T = 20.203000 C 17:20:46 Temperature Measurement, Probe Number = 1, T = 20.131000 C 17:20:47 Temperature Measurement, Probe Number = 2, T = 20.192000 C 17:20:47 Temperature Measurement, Probe Number = 3, T = 20.136000 C 17:20:48 Temperature Measurement, Probe Number = 4, T = 20.441000 C 17:20:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.44 17:20:48 Integrated Voltage Measurement... 17:21:07 Voltage Offset Correction: v_off_ini = 0.000005320 V, v_off_fin = 0.000007878 V 17:21:07 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171067554 Vs 17:21:08 Integrated Voltage Measurement... 17:21:27 Voltage Offset Correction: v_off_ini = 0.000006971 V, v_off_fin = 0.000004160 V 17:21:28 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170978992 Vs 17:21:30 Temperature Measurement, Probe Number = 0, T = 20.204000 C 17:21:31 Temperature Measurement, Probe Number = 1, T = 20.129000 C 17:21:32 Temperature Measurement, Probe Number = 2, T = 20.193000 C 17:21:32 Temperature Measurement, Probe Number = 3, T = 20.138000 C 17:21:33 Temperature Measurement, Probe Number = 4, T = 20.481000 C 17:21:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.48 17:21:33 Integrated Voltage Measurement... 17:21:53 Voltage Offset Correction: v_off_ini = 0.000005431 V, v_off_fin = 0.000007536 V 17:21:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064802 Vs 17:21:53 Integrated Voltage Measurement... 17:22:12 Voltage Offset Correction: v_off_ini = 0.000006723 V, v_off_fin = 0.000003311 V 17:22:13 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983023 Vs 17:22:15 Temperature Measurement, Probe Number = 0, T = 20.206000 C 17:22:16 Temperature Measurement, Probe Number = 1, T = 20.130000 C 17:22:17 Temperature Measurement, Probe Number = 2, T = 20.194000 C 17:22:17 Temperature Measurement, Probe Number = 3, T = 20.139000 C 17:22:18 Temperature Measurement, Probe Number = 4, T = 20.486000 C 17:22:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.21 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.49 17:22:18 Integrated Voltage Measurement... 17:22:37 Voltage Offset Correction: v_off_ini = 0.000004579 V, v_off_fin = 0.000007276 V 17:22:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171070633 Vs 17:22:38 Integrated Voltage Measurement... 17:22:57 Voltage Offset Correction: v_off_ini = 0.000007086 V, v_off_fin = 0.000003890 V 17:22:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170973046 Vs 17:23:00 Temperature Measurement, Probe Number = 0, T = 20.203000 C 17:23:01 Temperature Measurement, Probe Number = 1, T = 20.129000 C 17:23:02 Temperature Measurement, Probe Number = 2, T = 20.192000 C 17:23:02 Temperature Measurement, Probe Number = 3, T = 20.138000 C 17:23:03 Temperature Measurement, Probe Number = 4, T = 20.474000 C 17:23:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.47 17:23:03 Integrated Voltage Measurement... 17:23:23 Voltage Offset Correction: v_off_ini = 0.000005120 V, v_off_fin = 0.000007256 V 17:23:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171067472 Vs 17:23:23 Integrated Voltage Measurement... 17:23:43 Voltage Offset Correction: v_off_ini = 0.000007148 V, v_off_fin = 0.000004154 V 17:23:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976902 Vs 17:23:45 Temperature Measurement, Probe Number = 0, T = 20.205000 C 17:23:46 Temperature Measurement, Probe Number = 1, T = 20.133000 C 17:23:47 Temperature Measurement, Probe Number = 2, T = 20.196000 C 17:23:47 Temperature Measurement, Probe Number = 3, T = 20.141000 C 17:23:48 Temperature Measurement, Probe Number = 4, T = 20.525000 C 17:23:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.52 17:23:48 Integrated Voltage Measurement... 17:24:08 Voltage Offset Correction: v_off_ini = 0.000005177 V, v_off_fin = 0.000007236 V 17:24:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171064213 Vs 17:24:08 Integrated Voltage Measurement... 17:24:28 Voltage Offset Correction: v_off_ini = 0.000006849 V, v_off_fin = 0.000004136 V 17:24:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972120 Vs 17:24:30 Temperature Measurement, Probe Number = 0, T = 20.200000 C 17:24:31 Temperature Measurement, Probe Number = 1, T = 20.126000 C 17:24:32 Temperature Measurement, Probe Number = 2, T = 20.191000 C 17:24:32 Temperature Measurement, Probe Number = 3, T = 20.138000 C 17:24:33 Temperature Measurement, Probe Number = 4, T = 20.561000 C 17:24:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.56 17:24:33 Integrated Voltage Measurement... 17:24:53 Voltage Offset Correction: v_off_ini = 0.000005220 V, v_off_fin = 0.000007263 V 17:24:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070116 Vs 17:24:53 Integrated Voltage Measurement... 17:25:13 Voltage Offset Correction: v_off_ini = 0.000006850 V, v_off_fin = 0.000003421 V 17:25:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170970061 Vs 17:25:16 Temperature Measurement, Probe Number = 0, T = 20.200000 C 17:25:16 Temperature Measurement, Probe Number = 1, T = 20.128000 C 17:25:17 Temperature Measurement, Probe Number = 2, T = 20.189000 C 17:25:18 Temperature Measurement, Probe Number = 3, T = 20.137000 C 17:25:18 Temperature Measurement, Probe Number = 4, T = 20.537000 C 17:25:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.54 17:25:18 Integrated Voltage Measurement... 17:25:38 Voltage Offset Correction: v_off_ini = 0.000005012 V, v_off_fin = 0.000007622 V 17:25:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171064070 Vs 17:25:38 Integrated Voltage Measurement... 17:25:58 Voltage Offset Correction: v_off_ini = 0.000006963 V, v_off_fin = 0.000003753 V 17:25:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979931 Vs 17:56:01 Temperature Measurement, Probe Number = 0, T = 20.202000 C 17:56:01 Temperature Measurement, Probe Number = 1, T = 20.126000 C 17:56:02 Temperature Measurement, Probe Number = 2, T = 20.192000 C 17:56:03 Temperature Measurement, Probe Number = 3, T = 20.137000 C 17:56:03 Temperature Measurement, Probe Number = 4, T = 20.432000 C 17:56:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.43 17:56:03 Integrated Voltage Measurement... 17:56:23 Voltage Offset Correction: v_off_ini = 0.000005879 V, v_off_fin = 0.000007234 V 17:56:23 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171116367 Vs 17:56:23 Integrated Voltage Measurement... 17:56:43 Voltage Offset Correction: v_off_ini = 0.000006978 V, v_off_fin = 0.000003368 V 17:56:43 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983703 Vs 17:56:45 Temperature Measurement, Probe Number = 0, T = 20.203000 C 17:56:46 Temperature Measurement, Probe Number = 1, T = 20.127000 C 17:56:47 Temperature Measurement, Probe Number = 2, T = 20.193000 C 17:56:47 Temperature Measurement, Probe Number = 3, T = 20.137000 C 17:56:48 Temperature Measurement, Probe Number = 4, T = 20.464000 C 17:56:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.46 17:56:48 Integrated Voltage Measurement... 17:57:08 Voltage Offset Correction: v_off_ini = 0.000004700 V, v_off_fin = 0.000007635 V 17:57:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171071228 Vs 17:57:08 Integrated Voltage Measurement... 17:57:28 Voltage Offset Correction: v_off_ini = 0.000006849 V, v_off_fin = 0.000003758 V 17:57:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982180 Vs 17:57:31 Temperature Measurement, Probe Number = 0, T = 20.204000 C 17:57:31 Temperature Measurement, Probe Number = 1, T = 20.129000 C 17:57:32 Temperature Measurement, Probe Number = 2, T = 20.196000 C 17:57:33 Temperature Measurement, Probe Number = 3, T = 20.140000 C 17:57:33 Temperature Measurement, Probe Number = 4, T = 20.504000 C 17:57:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.20 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.50 17:57:33 Integrated Voltage Measurement... 17:57:53 Voltage Offset Correction: v_off_ini = 0.000004941 V, v_off_fin = 0.000007911 V 17:57:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171069026 Vs 17:57:53 Integrated Voltage Measurement... 17:58:13 Voltage Offset Correction: v_off_ini = 0.000007075 V, v_off_fin = 0.000003575 V 17:58:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980736 Vs 17:58:16 Temperature Measurement, Probe Number = 0, T = 20.202000 C 17:58:16 Temperature Measurement, Probe Number = 1, T = 20.129000 C 17:58:17 Temperature Measurement, Probe Number = 2, T = 20.193000 C 17:58:17 Temperature Measurement, Probe Number = 3, T = 20.139000 C 17:58:18 Temperature Measurement, Probe Number = 4, T = 20.513000 C 17:58:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.51 17:58:18 Integrated Voltage Measurement... 17:58:38 Voltage Offset Correction: v_off_ini = 0.000004869 V, v_off_fin = 0.000007199 V 17:58:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171069605 Vs 17:58:38 Integrated Voltage Measurement... 17:58:58 Voltage Offset Correction: v_off_ini = 0.000006811 V, v_off_fin = 0.000003330 V 17:58:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984857 Vs 17:59:01 Temperature Measurement, Probe Number = 0, T = 20.202000 C 17:59:01 Temperature Measurement, Probe Number = 1, T = 20.128000 C 17:59:02 Temperature Measurement, Probe Number = 2, T = 20.193000 C 17:59:03 Temperature Measurement, Probe Number = 3, T = 20.135000 C 17:59:03 Temperature Measurement, Probe Number = 4, T = 20.573000 C 17:59:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.57 17:59:03 Integrated Voltage Measurement... 17:59:23 Voltage Offset Correction: v_off_ini = 0.000004609 V, v_off_fin = 0.000007051 V 17:59:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171061536 Vs 17:59:24 Integrated Voltage Measurement... 17:59:43 Voltage Offset Correction: v_off_ini = 0.000006796 V, v_off_fin = 0.000003550 V 17:59:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981361 Vs 17:59:46 Temperature Measurement, Probe Number = 0, T = 20.198000 C 17:59:46 Temperature Measurement, Probe Number = 1, T = 20.121000 C 17:59:47 Temperature Measurement, Probe Number = 2, T = 20.188000 C 17:59:48 Temperature Measurement, Probe Number = 3, T = 20.131000 C 17:59:48 Temperature Measurement, Probe Number = 4, T = 20.583000 C 17:59:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.58 17:59:49 Integrated Voltage Measurement... 18:00:08 Voltage Offset Correction: v_off_ini = 0.000004417 V, v_off_fin = 0.000007608 V 18:00:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171069033 Vs 18:00:08 Integrated Voltage Measurement... 18:00:28 Voltage Offset Correction: v_off_ini = 0.000006835 V, v_off_fin = 0.000003551 V 18:00:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983890 Vs 18:00:31 Temperature Measurement, Probe Number = 0, T = 20.202000 C 18:00:32 Temperature Measurement, Probe Number = 1, T = 20.128000 C 18:00:32 Temperature Measurement, Probe Number = 2, T = 20.189000 C 18:00:33 Temperature Measurement, Probe Number = 3, T = 20.131000 C 18:00:34 Temperature Measurement, Probe Number = 4, T = 20.545000 C 18:00:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.55 18:00:34 Integrated Voltage Measurement... 18:00:54 Voltage Offset Correction: v_off_ini = 0.000005284 V, v_off_fin = 0.000007467 V 18:00:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171069691 Vs 18:00:54 Integrated Voltage Measurement... 18:01:13 Voltage Offset Correction: v_off_ini = 0.000007136 V, v_off_fin = 0.000003699 V 18:01:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977670 Vs 18:01:16 Temperature Measurement, Probe Number = 0, T = 20.202000 C 18:01:17 Temperature Measurement, Probe Number = 1, T = 20.128000 C 18:01:17 Temperature Measurement, Probe Number = 2, T = 20.191000 C 18:01:18 Temperature Measurement, Probe Number = 3, T = 20.134000 C 18:01:19 Temperature Measurement, Probe Number = 4, T = 20.523000 C 18:01:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.52 18:01:19 Integrated Voltage Measurement... 18:01:39 Voltage Offset Correction: v_off_ini = 0.000004445 V, v_off_fin = 0.000007282 V 18:01:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074684 Vs 18:01:39 Integrated Voltage Measurement... 18:01:58 Voltage Offset Correction: v_off_ini = 0.000006411 V, v_off_fin = 0.000002813 V 18:01:58 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981354 Vs 18:02:01 Temperature Measurement, Probe Number = 0, T = 20.201000 C 18:02:02 Temperature Measurement, Probe Number = 1, T = 20.127000 C 18:02:02 Temperature Measurement, Probe Number = 2, T = 20.192000 C 18:02:03 Temperature Measurement, Probe Number = 3, T = 20.135000 C 18:02:04 Temperature Measurement, Probe Number = 4, T = 20.495000 C 18:02:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.50 18:02:04 Integrated Voltage Measurement... 18:02:23 Voltage Offset Correction: v_off_ini = 0.000004956 V, v_off_fin = 0.000008207 V 18:02:23 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171078235 Vs 18:02:23 Integrated Voltage Measurement... 18:02:43 Voltage Offset Correction: v_off_ini = 0.000006839 V, v_off_fin = 0.000003334 V 18:02:43 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170983902 Vs 18:02:46 Temperature Measurement, Probe Number = 0, T = 20.200000 C 18:02:47 Temperature Measurement, Probe Number = 1, T = 20.126000 C 18:02:47 Temperature Measurement, Probe Number = 2, T = 20.188000 C 18:02:48 Temperature Measurement, Probe Number = 3, T = 20.132000 C 18:02:49 Temperature Measurement, Probe Number = 4, T = 20.505000 C 18:02:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.50 18:02:49 Integrated Voltage Measurement... 18:03:09 Voltage Offset Correction: v_off_ini = 0.000004613 V, v_off_fin = 0.000007573 V 18:03:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171069738 Vs 18:03:09 Integrated Voltage Measurement... 18:03:29 Voltage Offset Correction: v_off_ini = 0.000006565 V, v_off_fin = 0.000004170 V 18:03:29 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170980335 Vs 18:33:32 Temperature Measurement, Probe Number = 0, T = 20.198000 C 18:33:33 Temperature Measurement, Probe Number = 1, T = 20.124000 C 18:33:33 Temperature Measurement, Probe Number = 2, T = 20.189000 C 18:33:34 Temperature Measurement, Probe Number = 3, T = 20.134000 C 18:33:35 Temperature Measurement, Probe Number = 4, T = 20.516000 C 18:33:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.52 18:33:35 Integrated Voltage Measurement... 18:33:55 Voltage Offset Correction: v_off_ini = 0.000005972 V, v_off_fin = 0.000007331 V 18:33:55 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171112582 Vs 18:33:55 Integrated Voltage Measurement... 18:34:15 Voltage Offset Correction: v_off_ini = 0.000007094 V, v_off_fin = 0.000003499 V 18:34:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984712 Vs 18:34:18 Temperature Measurement, Probe Number = 0, T = 20.196000 C 18:34:18 Temperature Measurement, Probe Number = 1, T = 20.125000 C 18:34:19 Temperature Measurement, Probe Number = 2, T = 20.189000 C 18:34:20 Temperature Measurement, Probe Number = 3, T = 20.135000 C 18:34:20 Temperature Measurement, Probe Number = 4, T = 20.540000 C 18:34:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.54 18:34:21 Integrated Voltage Measurement... 18:34:40 Voltage Offset Correction: v_off_ini = 0.000005096 V, v_off_fin = 0.000007734 V 18:34:40 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065561 Vs 18:34:40 Integrated Voltage Measurement... 18:35:00 Voltage Offset Correction: v_off_ini = 0.000007746 V, v_off_fin = 0.000004543 V 18:35:00 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170977301 Vs 18:35:03 Temperature Measurement, Probe Number = 0, T = 20.198000 C 18:35:04 Temperature Measurement, Probe Number = 1, T = 20.122000 C 18:35:04 Temperature Measurement, Probe Number = 2, T = 20.189000 C 18:35:05 Temperature Measurement, Probe Number = 3, T = 20.133000 C 18:35:06 Temperature Measurement, Probe Number = 4, T = 20.508000 C 18:35:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.51 18:35:06 Integrated Voltage Measurement... 18:35:25 Voltage Offset Correction: v_off_ini = 0.000004909 V, v_off_fin = 0.000007290 V 18:35:25 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171063083 Vs 18:35:26 Integrated Voltage Measurement... 18:35:45 Voltage Offset Correction: v_off_ini = 0.000007260 V, v_off_fin = 0.000003872 V 18:35:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979323 Vs 18:35:48 Temperature Measurement, Probe Number = 0, T = 20.196000 C 18:35:49 Temperature Measurement, Probe Number = 1, T = 20.124000 C 18:35:49 Temperature Measurement, Probe Number = 2, T = 20.188000 C 18:35:50 Temperature Measurement, Probe Number = 3, T = 20.131000 C 18:35:51 Temperature Measurement, Probe Number = 4, T = 20.496000 C 18:35:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.50 18:35:51 Integrated Voltage Measurement... 18:36:11 Voltage Offset Correction: v_off_ini = 0.000004863 V, v_off_fin = 0.000007650 V 18:36:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065456 Vs 18:36:12 Integrated Voltage Measurement... 18:36:31 Voltage Offset Correction: v_off_ini = 0.000006810 V, v_off_fin = 0.000003477 V 18:36:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985549 Vs 18:36:34 Temperature Measurement, Probe Number = 0, T = 20.196000 C 18:36:35 Temperature Measurement, Probe Number = 1, T = 20.124000 C 18:36:36 Temperature Measurement, Probe Number = 2, T = 20.190000 C 18:36:36 Temperature Measurement, Probe Number = 3, T = 20.136000 C 18:36:37 Temperature Measurement, Probe Number = 4, T = 20.463000 C 18:36:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.46 18:36:37 Integrated Voltage Measurement... 18:36:56 Voltage Offset Correction: v_off_ini = 0.000005103 V, v_off_fin = 0.000007793 V 18:36:56 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171067981 Vs 18:36:57 Integrated Voltage Measurement... 18:37:16 Voltage Offset Correction: v_off_ini = 0.000006930 V, v_off_fin = 0.000003887 V 18:37:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987037 Vs 18:37:19 Temperature Measurement, Probe Number = 0, T = 20.198000 C 18:37:20 Temperature Measurement, Probe Number = 1, T = 20.124000 C 18:37:21 Temperature Measurement, Probe Number = 2, T = 20.188000 C 18:37:21 Temperature Measurement, Probe Number = 3, T = 20.131000 C 18:37:22 Temperature Measurement, Probe Number = 4, T = 20.471000 C 18:37:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.47 18:37:22 Integrated Voltage Measurement... 18:37:41 Voltage Offset Correction: v_off_ini = 0.000005378 V, v_off_fin = 0.000007878 V 18:37:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073551 Vs 18:37:42 Integrated Voltage Measurement... 18:38:01 Voltage Offset Correction: v_off_ini = 0.000007030 V, v_off_fin = 0.000003442 V 18:38:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984637 Vs 18:38:04 Temperature Measurement, Probe Number = 0, T = 20.200000 C 18:38:05 Temperature Measurement, Probe Number = 1, T = 20.125000 C 18:38:06 Temperature Measurement, Probe Number = 2, T = 20.191000 C 18:38:06 Temperature Measurement, Probe Number = 3, T = 20.134000 C 18:38:07 Temperature Measurement, Probe Number = 4, T = 20.475000 C 18:38:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.48 18:38:07 Integrated Voltage Measurement... 18:38:27 Voltage Offset Correction: v_off_ini = 0.000005024 V, v_off_fin = 0.000007615 V 18:38:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071392 Vs 18:38:28 Integrated Voltage Measurement... 18:38:48 Voltage Offset Correction: v_off_ini = 0.000007525 V, v_off_fin = 0.000004193 V 18:38:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985013 Vs 18:38:50 Temperature Measurement, Probe Number = 0, T = 20.201000 C 18:38:51 Temperature Measurement, Probe Number = 1, T = 20.126000 C 18:38:52 Temperature Measurement, Probe Number = 2, T = 20.193000 C 18:38:52 Temperature Measurement, Probe Number = 3, T = 20.137000 C 18:38:53 Temperature Measurement, Probe Number = 4, T = 20.513000 C 18:38:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.51 18:38:53 Integrated Voltage Measurement... 18:39:12 Voltage Offset Correction: v_off_ini = 0.000005562 V, v_off_fin = 0.000008324 V 18:39:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171077464 Vs 18:39:13 Integrated Voltage Measurement... 18:39:33 Voltage Offset Correction: v_off_ini = 0.000007292 V, v_off_fin = 0.000004444 V 18:39:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985779 Vs 18:39:36 Temperature Measurement, Probe Number = 0, T = 20.194000 C 18:39:37 Temperature Measurement, Probe Number = 1, T = 20.121000 C 18:39:37 Temperature Measurement, Probe Number = 2, T = 20.188000 C 18:39:38 Temperature Measurement, Probe Number = 3, T = 20.130000 C 18:39:39 Temperature Measurement, Probe Number = 4, T = 20.523000 C 18:39:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.52 18:39:39 Integrated Voltage Measurement... 18:39:59 Voltage Offset Correction: v_off_ini = 0.000005225 V, v_off_fin = 0.000007127 V 18:39:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171068362 Vs 18:39:59 Integrated Voltage Measurement... 18:40:19 Voltage Offset Correction: v_off_ini = 0.000006868 V, v_off_fin = 0.000003975 V 18:40:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987608 Vs 18:40:22 Temperature Measurement, Probe Number = 0, T = 20.196000 C 18:40:22 Temperature Measurement, Probe Number = 1, T = 20.125000 C 18:40:23 Temperature Measurement, Probe Number = 2, T = 20.188000 C 18:40:24 Temperature Measurement, Probe Number = 3, T = 20.132000 C 18:40:24 Temperature Measurement, Probe Number = 4, T = 20.473000 C 18:40:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.47 18:40:24 Integrated Voltage Measurement... 18:40:44 Voltage Offset Correction: v_off_ini = 0.000005067 V, v_off_fin = 0.000007644 V 18:40:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072156 Vs 18:40:45 Integrated Voltage Measurement... 18:41:04 Voltage Offset Correction: v_off_ini = 0.000006749 V, v_off_fin = 0.000003375 V 18:41:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984617 Vs 19:11:07 Temperature Measurement, Probe Number = 0, T = 20.191000 C 19:11:08 Temperature Measurement, Probe Number = 1, T = 20.117000 C 19:11:08 Temperature Measurement, Probe Number = 2, T = 20.188000 C 19:11:09 Temperature Measurement, Probe Number = 3, T = 20.131000 C 19:11:10 Temperature Measurement, Probe Number = 4, T = 20.426000 C 19:11:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.43 19:11:10 Integrated Voltage Measurement... 19:11:29 Voltage Offset Correction: v_off_ini = 0.000006317 V, v_off_fin = 0.000008186 V 19:11:30 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171135561 Vs 19:11:30 Integrated Voltage Measurement... 19:11:50 Voltage Offset Correction: v_off_ini = 0.000007703 V, v_off_fin = 0.000003787 V 19:11:50 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987441 Vs 19:11:52 Temperature Measurement, Probe Number = 0, T = 20.195000 C 19:11:53 Temperature Measurement, Probe Number = 1, T = 20.122000 C 19:11:54 Temperature Measurement, Probe Number = 2, T = 20.189000 C 19:11:54 Temperature Measurement, Probe Number = 3, T = 20.132000 C 19:11:55 Temperature Measurement, Probe Number = 4, T = 20.419000 C 19:11:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.42 19:11:55 Integrated Voltage Measurement... 19:12:15 Voltage Offset Correction: v_off_ini = 0.000004963 V, v_off_fin = 0.000007572 V 19:12:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070819 Vs 19:12:15 Integrated Voltage Measurement... 19:12:35 Voltage Offset Correction: v_off_ini = 0.000006962 V, v_off_fin = 0.000004053 V 19:12:35 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981475 Vs 19:12:38 Temperature Measurement, Probe Number = 0, T = 20.197000 C 19:12:38 Temperature Measurement, Probe Number = 1, T = 20.125000 C 19:12:39 Temperature Measurement, Probe Number = 2, T = 20.189000 C 19:12:40 Temperature Measurement, Probe Number = 3, T = 20.135000 C 19:12:40 Temperature Measurement, Probe Number = 4, T = 20.430000 C 19:12:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.43 19:12:40 Integrated Voltage Measurement... 19:13:00 Voltage Offset Correction: v_off_ini = 0.000005362 V, v_off_fin = 0.000007599 V 19:13:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074246 Vs 19:13:00 Integrated Voltage Measurement... 19:13:20 Voltage Offset Correction: v_off_ini = 0.000007054 V, v_off_fin = 0.000003776 V 19:13:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981443 Vs 19:13:23 Temperature Measurement, Probe Number = 0, T = 20.197000 C 19:13:23 Temperature Measurement, Probe Number = 1, T = 20.125000 C 19:13:24 Temperature Measurement, Probe Number = 2, T = 20.190000 C 19:13:24 Temperature Measurement, Probe Number = 3, T = 20.134000 C 19:13:25 Temperature Measurement, Probe Number = 4, T = 20.444000 C 19:13:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.44 19:13:25 Integrated Voltage Measurement... 19:13:45 Voltage Offset Correction: v_off_ini = 0.000004558 V, v_off_fin = 0.000007743 V 19:13:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076254 Vs 19:13:45 Integrated Voltage Measurement... 19:14:05 Voltage Offset Correction: v_off_ini = 0.000007139 V, v_off_fin = 0.000003521 V 19:14:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982655 Vs 19:14:08 Temperature Measurement, Probe Number = 0, T = 20.196000 C 19:14:09 Temperature Measurement, Probe Number = 1, T = 20.124000 C 19:14:09 Temperature Measurement, Probe Number = 2, T = 20.186000 C 19:14:10 Temperature Measurement, Probe Number = 3, T = 20.133000 C 19:14:11 Temperature Measurement, Probe Number = 4, T = 20.447000 C 19:14:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.45 19:14:11 Integrated Voltage Measurement... 19:14:31 Voltage Offset Correction: v_off_ini = 0.000004858 V, v_off_fin = 0.000007240 V 19:14:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074059 Vs 19:14:32 Integrated Voltage Measurement... 19:14:51 Voltage Offset Correction: v_off_ini = 0.000006949 V, v_off_fin = 0.000003147 V 19:14:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982735 Vs 19:14:54 Temperature Measurement, Probe Number = 0, T = 20.198000 C 19:14:55 Temperature Measurement, Probe Number = 1, T = 20.128000 C 19:14:55 Temperature Measurement, Probe Number = 2, T = 20.191000 C 19:14:56 Temperature Measurement, Probe Number = 3, T = 20.138000 C 19:14:57 Temperature Measurement, Probe Number = 4, T = 20.463000 C 19:14:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.13 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.46 19:14:57 Integrated Voltage Measurement... 19:15:16 Voltage Offset Correction: v_off_ini = 0.000005196 V, v_off_fin = 0.000007164 V 19:15:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171077063 Vs 19:15:16 Integrated Voltage Measurement... 19:15:36 Voltage Offset Correction: v_off_ini = 0.000006899 V, v_off_fin = 0.000003202 V 19:15:36 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997600 Vs 19:15:39 Temperature Measurement, Probe Number = 0, T = 20.197000 C 19:15:40 Temperature Measurement, Probe Number = 1, T = 20.124000 C 19:15:40 Temperature Measurement, Probe Number = 2, T = 20.190000 C 19:15:41 Temperature Measurement, Probe Number = 3, T = 20.135000 C 19:15:42 Temperature Measurement, Probe Number = 4, T = 20.490000 C 19:15:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.49 19:15:42 Integrated Voltage Measurement... 19:16:01 Voltage Offset Correction: v_off_ini = 0.000004557 V, v_off_fin = 0.000007716 V 19:16:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171075377 Vs 19:16:02 Integrated Voltage Measurement... 19:16:21 Voltage Offset Correction: v_off_ini = 0.000007456 V, v_off_fin = 0.000003565 V 19:16:21 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170985741 Vs 19:16:24 Temperature Measurement, Probe Number = 0, T = 20.198000 C 19:16:25 Temperature Measurement, Probe Number = 1, T = 20.122000 C 19:16:25 Temperature Measurement, Probe Number = 2, T = 20.194000 C 19:16:26 Temperature Measurement, Probe Number = 3, T = 20.137000 C 19:16:27 Temperature Measurement, Probe Number = 4, T = 20.493000 C 19:16:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.49 19:16:27 Integrated Voltage Measurement... 19:16:46 Voltage Offset Correction: v_off_ini = 0.000003913 V, v_off_fin = 0.000007400 V 19:16:46 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171073777 Vs 19:16:47 Integrated Voltage Measurement... 19:17:06 Voltage Offset Correction: v_off_ini = 0.000006828 V, v_off_fin = 0.000003338 V 19:17:06 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987220 Vs 19:17:09 Temperature Measurement, Probe Number = 0, T = 20.195000 C 19:17:10 Temperature Measurement, Probe Number = 1, T = 20.121000 C 19:17:10 Temperature Measurement, Probe Number = 2, T = 20.191000 C 19:17:11 Temperature Measurement, Probe Number = 3, T = 20.136000 C 19:17:12 Temperature Measurement, Probe Number = 4, T = 20.477000 C 19:17:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.48 19:17:12 Integrated Voltage Measurement... 19:17:31 Voltage Offset Correction: v_off_ini = 0.000004950 V, v_off_fin = 0.000007721 V 19:17:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171075426 Vs 19:17:31 Integrated Voltage Measurement... 19:17:52 Voltage Offset Correction: v_off_ini = 0.000007125 V, v_off_fin = 0.000003705 V 19:17:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986218 Vs 19:17:55 Temperature Measurement, Probe Number = 0, T = 20.196000 C 19:17:55 Temperature Measurement, Probe Number = 1, T = 20.125000 C 19:17:56 Temperature Measurement, Probe Number = 2, T = 20.191000 C 19:17:57 Temperature Measurement, Probe Number = 3, T = 20.135000 C 19:17:57 Temperature Measurement, Probe Number = 4, T = 20.434000 C 19:17:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.43 19:17:58 Integrated Voltage Measurement... 19:18:17 Voltage Offset Correction: v_off_ini = 0.000005435 V, v_off_fin = 0.000008063 V 19:18:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075200 Vs 19:18:18 Integrated Voltage Measurement... 19:18:37 Voltage Offset Correction: v_off_ini = 0.000007105 V, v_off_fin = 0.000004406 V 19:18:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982951 Vs 19:48:40 Temperature Measurement, Probe Number = 0, T = 20.193000 C 19:48:41 Temperature Measurement, Probe Number = 1, T = 20.123000 C 19:48:41 Temperature Measurement, Probe Number = 2, T = 20.190000 C 19:48:42 Temperature Measurement, Probe Number = 3, T = 20.137000 C 19:48:43 Temperature Measurement, Probe Number = 4, T = 20.539000 C 19:48:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.54 19:48:43 Integrated Voltage Measurement... 19:49:02 Voltage Offset Correction: v_off_ini = 0.000006233 V, v_off_fin = 0.000007380 V 19:49:02 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171132609 Vs 19:49:02 Integrated Voltage Measurement... 19:49:23 Voltage Offset Correction: v_off_ini = 0.000006815 V, v_off_fin = 0.000003930 V 19:49:23 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170980007 Vs 19:49:25 Temperature Measurement, Probe Number = 0, T = 20.193000 C 19:49:26 Temperature Measurement, Probe Number = 1, T = 20.120000 C 19:49:27 Temperature Measurement, Probe Number = 2, T = 20.189000 C 19:49:27 Temperature Measurement, Probe Number = 3, T = 20.134000 C 19:49:28 Temperature Measurement, Probe Number = 4, T = 20.519000 C 19:49:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.52 19:49:28 Integrated Voltage Measurement... 19:49:48 Voltage Offset Correction: v_off_ini = 0.000004820 V, v_off_fin = 0.000007343 V 19:49:48 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171069999 Vs 19:49:48 Integrated Voltage Measurement... 19:50:08 Voltage Offset Correction: v_off_ini = 0.000007244 V, v_off_fin = 0.000003466 V 19:50:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985588 Vs 19:50:11 Temperature Measurement, Probe Number = 0, T = 20.194000 C 19:50:12 Temperature Measurement, Probe Number = 1, T = 20.119000 C 19:50:12 Temperature Measurement, Probe Number = 2, T = 20.190000 C 19:50:13 Temperature Measurement, Probe Number = 3, T = 20.135000 C 19:50:14 Temperature Measurement, Probe Number = 4, T = 20.477000 C 19:50:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.48 19:50:14 Integrated Voltage Measurement... 19:50:33 Voltage Offset Correction: v_off_ini = 0.000005002 V, v_off_fin = 0.000008240 V 19:50:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171076682 Vs 19:50:33 Integrated Voltage Measurement... 19:50:53 Voltage Offset Correction: v_off_ini = 0.000007459 V, v_off_fin = 0.000004208 V 19:50:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983522 Vs 19:50:56 Temperature Measurement, Probe Number = 0, T = 20.197000 C 19:50:57 Temperature Measurement, Probe Number = 1, T = 20.121000 C 19:50:58 Temperature Measurement, Probe Number = 2, T = 20.189000 C 19:50:58 Temperature Measurement, Probe Number = 3, T = 20.136000 C 19:50:59 Temperature Measurement, Probe Number = 4, T = 20.476000 C 19:50:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.48 19:50:59 Integrated Voltage Measurement... 19:51:19 Voltage Offset Correction: v_off_ini = 0.000005287 V, v_off_fin = 0.000007945 V 19:51:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070440 Vs 19:51:19 Integrated Voltage Measurement... 19:51:38 Voltage Offset Correction: v_off_ini = 0.000006887 V, v_off_fin = 0.000002991 V 19:51:38 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170985749 Vs 19:51:41 Temperature Measurement, Probe Number = 0, T = 20.197000 C 19:51:42 Temperature Measurement, Probe Number = 1, T = 20.123000 C 19:51:42 Temperature Measurement, Probe Number = 2, T = 20.191000 C 19:51:43 Temperature Measurement, Probe Number = 3, T = 20.136000 C 19:51:44 Temperature Measurement, Probe Number = 4, T = 20.520000 C 19:51:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.20 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.14 P4 = Room, Value = 20.52 19:51:44 Integrated Voltage Measurement... 19:52:03 Voltage Offset Correction: v_off_ini = 0.000004994 V, v_off_fin = 0.000007559 V 19:52:03 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171076184 Vs 19:52:04 Integrated Voltage Measurement... 19:52:24 Voltage Offset Correction: v_off_ini = 0.000007068 V, v_off_fin = 0.000003278 V 19:52:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982439 Vs 19:52:27 Temperature Measurement, Probe Number = 0, T = 20.193000 C 19:52:27 Temperature Measurement, Probe Number = 1, T = 20.119000 C 19:52:28 Temperature Measurement, Probe Number = 2, T = 20.188000 C 19:52:29 Temperature Measurement, Probe Number = 3, T = 20.131000 C 19:52:29 Temperature Measurement, Probe Number = 4, T = 20.493000 C 19:52:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.49 19:52:30 Integrated Voltage Measurement... 19:52:49 Voltage Offset Correction: v_off_ini = 0.000005787 V, v_off_fin = 0.000007979 V 19:52:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076729 Vs 19:52:50 Integrated Voltage Measurement... 19:53:09 Voltage Offset Correction: v_off_ini = 0.000006952 V, v_off_fin = 0.000004155 V 19:53:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979916 Vs 19:53:12 Temperature Measurement, Probe Number = 0, T = 20.191000 C 19:53:13 Temperature Measurement, Probe Number = 1, T = 20.119000 C 19:53:14 Temperature Measurement, Probe Number = 2, T = 20.187000 C 19:53:14 Temperature Measurement, Probe Number = 3, T = 20.130000 C 19:53:15 Temperature Measurement, Probe Number = 4, T = 20.466000 C 19:53:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.47 19:53:15 Integrated Voltage Measurement... 19:53:35 Voltage Offset Correction: v_off_ini = 0.000005521 V, v_off_fin = 0.000007346 V 19:53:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071843 Vs 19:53:35 Integrated Voltage Measurement... 19:53:55 Voltage Offset Correction: v_off_ini = 0.000006549 V, v_off_fin = 0.000003464 V 19:53:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978715 Vs 19:53:58 Temperature Measurement, Probe Number = 0, T = 20.191000 C 19:53:59 Temperature Measurement, Probe Number = 1, T = 20.118000 C 19:54:00 Temperature Measurement, Probe Number = 2, T = 20.187000 C 19:54:00 Temperature Measurement, Probe Number = 3, T = 20.133000 C 19:54:01 Temperature Measurement, Probe Number = 4, T = 20.448000 C 19:54:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.45 19:54:01 Integrated Voltage Measurement... 19:54:21 Voltage Offset Correction: v_off_ini = 0.000005102 V, v_off_fin = 0.000007667 V 19:54:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171067248 Vs 19:54:21 Integrated Voltage Measurement... 19:54:40 Voltage Offset Correction: v_off_ini = 0.000007234 V, v_off_fin = 0.000003646 V 19:54:40 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972253 Vs 19:54:43 Temperature Measurement, Probe Number = 0, T = 20.192000 C 19:54:44 Temperature Measurement, Probe Number = 1, T = 20.119000 C 19:54:44 Temperature Measurement, Probe Number = 2, T = 20.186000 C 19:54:45 Temperature Measurement, Probe Number = 3, T = 20.132000 C 19:54:46 Temperature Measurement, Probe Number = 4, T = 20.444000 C 19:54:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.44 19:54:46 Integrated Voltage Measurement... 19:55:06 Voltage Offset Correction: v_off_ini = 0.000005450 V, v_off_fin = 0.000007525 V 19:55:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074445 Vs 19:55:07 Integrated Voltage Measurement... 19:55:26 Voltage Offset Correction: v_off_ini = 0.000007224 V, v_off_fin = 0.000003296 V 19:55:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972686 Vs 19:55:29 Temperature Measurement, Probe Number = 0, T = 20.188000 C 19:55:29 Temperature Measurement, Probe Number = 1, T = 20.111000 C 19:55:30 Temperature Measurement, Probe Number = 2, T = 20.185000 C 19:55:31 Temperature Measurement, Probe Number = 3, T = 20.129000 C 19:55:31 Temperature Measurement, Probe Number = 4, T = 20.443000 C 19:55:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.44 19:55:31 Integrated Voltage Measurement... 19:55:52 Voltage Offset Correction: v_off_ini = 0.000005086 V, v_off_fin = 0.000007459 V 19:55:52 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171078624 Vs 19:55:52 Integrated Voltage Measurement... 19:56:12 Voltage Offset Correction: v_off_ini = 0.000006774 V, v_off_fin = 0.000003693 V 19:56:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982128 Vs 20:26:15 Temperature Measurement, Probe Number = 0, T = 20.187000 C 20:26:15 Temperature Measurement, Probe Number = 1, T = 20.111000 C 20:26:16 Temperature Measurement, Probe Number = 2, T = 20.185000 C 20:26:17 Temperature Measurement, Probe Number = 3, T = 20.127000 C 20:26:17 Temperature Measurement, Probe Number = 4, T = 20.415000 C 20:26:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.41 20:26:17 Integrated Voltage Measurement... 20:26:38 Voltage Offset Correction: v_off_ini = 0.000006127 V, v_off_fin = 0.000007921 V 20:26:38 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171124480 Vs 20:26:38 Integrated Voltage Measurement... 20:26:58 Voltage Offset Correction: v_off_ini = 0.000007332 V, v_off_fin = 0.000004359 V 20:26:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170971760 Vs 20:27:01 Temperature Measurement, Probe Number = 0, T = 20.182000 C 20:27:02 Temperature Measurement, Probe Number = 1, T = 20.109000 C 20:27:02 Temperature Measurement, Probe Number = 2, T = 20.182000 C 20:27:03 Temperature Measurement, Probe Number = 3, T = 20.126000 C 20:27:04 Temperature Measurement, Probe Number = 4, T = 20.456000 C 20:27:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.46 20:27:04 Integrated Voltage Measurement... 20:27:24 Voltage Offset Correction: v_off_ini = 0.000005230 V, v_off_fin = 0.000008061 V 20:27:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073779 Vs 20:27:24 Integrated Voltage Measurement... 20:27:44 Voltage Offset Correction: v_off_ini = 0.000007578 V, v_off_fin = 0.000003935 V 20:27:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975447 Vs 20:27:46 Temperature Measurement, Probe Number = 0, T = 20.181000 C 20:27:47 Temperature Measurement, Probe Number = 1, T = 20.112000 C 20:27:48 Temperature Measurement, Probe Number = 2, T = 20.181000 C 20:27:48 Temperature Measurement, Probe Number = 3, T = 20.124000 C 20:27:49 Temperature Measurement, Probe Number = 4, T = 20.447000 C 20:27:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.45 20:27:49 Integrated Voltage Measurement... 20:28:10 Voltage Offset Correction: v_off_ini = 0.000004934 V, v_off_fin = 0.000007817 V 20:28:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073400 Vs 20:28:10 Integrated Voltage Measurement... 20:28:30 Voltage Offset Correction: v_off_ini = 0.000007011 V, v_off_fin = 0.000003564 V 20:28:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982953 Vs 20:28:33 Temperature Measurement, Probe Number = 0, T = 20.187000 C 20:28:33 Temperature Measurement, Probe Number = 1, T = 20.117000 C 20:28:34 Temperature Measurement, Probe Number = 2, T = 20.183000 C 20:28:34 Temperature Measurement, Probe Number = 3, T = 20.129000 C 20:28:35 Temperature Measurement, Probe Number = 4, T = 20.435000 C 20:28:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.43 20:28:35 Integrated Voltage Measurement... 20:28:56 Voltage Offset Correction: v_off_ini = 0.000005036 V, v_off_fin = 0.000007568 V 20:28:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070697 Vs 20:28:56 Integrated Voltage Measurement... 20:29:16 Voltage Offset Correction: v_off_ini = 0.000006760 V, v_off_fin = 0.000003802 V 20:29:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980293 Vs 20:29:18 Temperature Measurement, Probe Number = 0, T = 20.185000 C 20:29:19 Temperature Measurement, Probe Number = 1, T = 20.110000 C 20:29:20 Temperature Measurement, Probe Number = 2, T = 20.182000 C 20:29:20 Temperature Measurement, Probe Number = 3, T = 20.126000 C 20:29:21 Temperature Measurement, Probe Number = 4, T = 20.468000 C 20:29:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.47 20:29:21 Integrated Voltage Measurement... 20:29:41 Voltage Offset Correction: v_off_ini = 0.000005254 V, v_off_fin = 0.000008053 V 20:29:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171077195 Vs 20:29:41 Integrated Voltage Measurement... 20:30:01 Voltage Offset Correction: v_off_ini = 0.000007270 V, v_off_fin = 0.000003738 V 20:30:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972949 Vs 20:30:04 Temperature Measurement, Probe Number = 0, T = 20.189000 C 20:30:04 Temperature Measurement, Probe Number = 1, T = 20.116000 C 20:30:05 Temperature Measurement, Probe Number = 2, T = 20.185000 C 20:30:06 Temperature Measurement, Probe Number = 3, T = 20.129000 C 20:30:06 Temperature Measurement, Probe Number = 4, T = 20.470000 C 20:30:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.47 20:30:06 Integrated Voltage Measurement... 20:30:26 Voltage Offset Correction: v_off_ini = 0.000004672 V, v_off_fin = 0.000008363 V 20:30:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171076318 Vs 20:30:26 Integrated Voltage Measurement... 20:30:46 Voltage Offset Correction: v_off_ini = 0.000007392 V, v_off_fin = 0.000003283 V 20:30:46 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170975913 Vs 20:30:49 Temperature Measurement, Probe Number = 0, T = 20.192000 C 20:30:49 Temperature Measurement, Probe Number = 1, T = 20.117000 C 20:30:50 Temperature Measurement, Probe Number = 2, T = 20.188000 C 20:30:51 Temperature Measurement, Probe Number = 3, T = 20.133000 C 20:30:51 Temperature Measurement, Probe Number = 4, T = 20.518000 C 20:30:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.52 20:30:52 Integrated Voltage Measurement... 20:31:11 Voltage Offset Correction: v_off_ini = 0.000004893 V, v_off_fin = 0.000007827 V 20:31:11 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171078419 Vs 20:31:11 Integrated Voltage Measurement... 20:31:31 Voltage Offset Correction: v_off_ini = 0.000007359 V, v_off_fin = 0.000003813 V 20:31:31 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170981881 Vs 20:31:34 Temperature Measurement, Probe Number = 0, T = 20.190000 C 20:31:35 Temperature Measurement, Probe Number = 1, T = 20.114000 C 20:31:35 Temperature Measurement, Probe Number = 2, T = 20.186000 C 20:31:36 Temperature Measurement, Probe Number = 3, T = 20.131000 C 20:31:37 Temperature Measurement, Probe Number = 4, T = 20.556000 C 20:31:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.56 20:31:37 Integrated Voltage Measurement... 20:31:56 Voltage Offset Correction: v_off_ini = 0.000005656 V, v_off_fin = 0.000008294 V 20:31:56 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171083964 Vs 20:31:57 Integrated Voltage Measurement... 20:32:16 Voltage Offset Correction: v_off_ini = 0.000007323 V, v_off_fin = 0.000002992 V 20:32:16 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170976378 Vs 20:32:19 Temperature Measurement, Probe Number = 0, T = 20.191000 C 20:32:20 Temperature Measurement, Probe Number = 1, T = 20.115000 C 20:32:20 Temperature Measurement, Probe Number = 2, T = 20.186000 C 20:32:21 Temperature Measurement, Probe Number = 3, T = 20.132000 C 20:32:22 Temperature Measurement, Probe Number = 4, T = 20.587000 C 20:32:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.59 20:32:22 Integrated Voltage Measurement... 20:32:42 Voltage Offset Correction: v_off_ini = 0.000005161 V, v_off_fin = 0.000007723 V 20:32:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171077864 Vs 20:32:42 Integrated Voltage Measurement... 20:33:02 Voltage Offset Correction: v_off_ini = 0.000007052 V, v_off_fin = 0.000004591 V 20:33:02 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977437 Vs 20:33:05 Temperature Measurement, Probe Number = 0, T = 20.189000 C 20:33:06 Temperature Measurement, Probe Number = 1, T = 20.117000 C 20:33:06 Temperature Measurement, Probe Number = 2, T = 20.187000 C 20:33:07 Temperature Measurement, Probe Number = 3, T = 20.130000 C 20:33:08 Temperature Measurement, Probe Number = 4, T = 20.532000 C 20:33:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.12 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.53 20:33:08 Integrated Voltage Measurement... 20:33:28 Voltage Offset Correction: v_off_ini = 0.000005601 V, v_off_fin = 0.000007838 V 20:33:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171086708 Vs 20:33:28 Integrated Voltage Measurement... 20:33:48 Voltage Offset Correction: v_off_ini = 0.000007016 V, v_off_fin = 0.000003527 V 20:33:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980259 Vs 21:03:51 Temperature Measurement, Probe Number = 0, T = 20.185000 C 21:03:52 Temperature Measurement, Probe Number = 1, T = 20.113000 C 21:03:52 Temperature Measurement, Probe Number = 2, T = 20.184000 C 21:03:53 Temperature Measurement, Probe Number = 3, T = 20.130000 C 21:03:54 Temperature Measurement, Probe Number = 4, T = 20.499000 C 21:03:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.50 21:03:54 Integrated Voltage Measurement... 21:04:14 Voltage Offset Correction: v_off_ini = 0.000006176 V, v_off_fin = 0.000007462 V 21:04:14 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171125284 Vs 21:04:14 Integrated Voltage Measurement... 21:04:34 Voltage Offset Correction: v_off_ini = 0.000007572 V, v_off_fin = 0.000003818 V 21:04:34 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977943 Vs 21:04:37 Temperature Measurement, Probe Number = 0, T = 20.183000 C 21:04:37 Temperature Measurement, Probe Number = 1, T = 20.112000 C 21:04:38 Temperature Measurement, Probe Number = 2, T = 20.182000 C 21:04:39 Temperature Measurement, Probe Number = 3, T = 20.128000 C 21:04:39 Temperature Measurement, Probe Number = 4, T = 20.485000 C 21:04:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.48 21:04:40 Integrated Voltage Measurement... 21:04:59 Voltage Offset Correction: v_off_ini = 0.000005806 V, v_off_fin = 0.000008416 V 21:04:59 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171079454 Vs 21:04:59 Integrated Voltage Measurement... 21:05:19 Voltage Offset Correction: v_off_ini = 0.000007742 V, v_off_fin = 0.000003544 V 21:05:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977683 Vs 21:05:22 Temperature Measurement, Probe Number = 0, T = 20.186000 C 21:05:22 Temperature Measurement, Probe Number = 1, T = 20.113000 C 21:05:23 Temperature Measurement, Probe Number = 2, T = 20.182000 C 21:05:24 Temperature Measurement, Probe Number = 3, T = 20.129000 C 21:05:24 Temperature Measurement, Probe Number = 4, T = 20.522000 C 21:05:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.52 21:05:25 Integrated Voltage Measurement... 21:05:45 Voltage Offset Correction: v_off_ini = 0.000005025 V, v_off_fin = 0.000007924 V 21:05:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171074071 Vs 21:05:45 Integrated Voltage Measurement... 21:06:04 Voltage Offset Correction: v_off_ini = 0.000006532 V, v_off_fin = 0.000003412 V 21:06:04 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977113 Vs 21:06:07 Temperature Measurement, Probe Number = 0, T = 20.186000 C 21:06:08 Temperature Measurement, Probe Number = 1, T = 20.112000 C 21:06:08 Temperature Measurement, Probe Number = 2, T = 20.186000 C 21:06:09 Temperature Measurement, Probe Number = 3, T = 20.130000 C 21:06:10 Temperature Measurement, Probe Number = 4, T = 20.547000 C 21:06:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.55 21:06:10 Integrated Voltage Measurement... 21:06:29 Voltage Offset Correction: v_off_ini = 0.000004480 V, v_off_fin = 0.000007828 V 21:06:29 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171076164 Vs 21:06:30 Integrated Voltage Measurement... 21:06:49 Voltage Offset Correction: v_off_ini = 0.000007215 V, v_off_fin = 0.000003604 V 21:06:50 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982176 Vs 21:06:52 Temperature Measurement, Probe Number = 0, T = 20.186000 C 21:06:53 Temperature Measurement, Probe Number = 1, T = 20.113000 C 21:06:54 Temperature Measurement, Probe Number = 2, T = 20.186000 C 21:06:54 Temperature Measurement, Probe Number = 3, T = 20.130000 C 21:06:55 Temperature Measurement, Probe Number = 4, T = 20.516000 C 21:06:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.19 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.19 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.52 21:06:55 Integrated Voltage Measurement... 21:07:14 Voltage Offset Correction: v_off_ini = 0.000004939 V, v_off_fin = 0.000008324 V 21:07:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171075613 Vs 21:07:15 Integrated Voltage Measurement... 21:07:34 Voltage Offset Correction: v_off_ini = 0.000007210 V, v_off_fin = 0.000004143 V 21:07:34 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170977890 Vs 21:07:37 Temperature Measurement, Probe Number = 0, T = 20.181000 C 21:07:38 Temperature Measurement, Probe Number = 1, T = 20.113000 C 21:07:38 Temperature Measurement, Probe Number = 2, T = 20.179000 C 21:07:39 Temperature Measurement, Probe Number = 3, T = 20.126000 C 21:07:40 Temperature Measurement, Probe Number = 4, T = 20.504000 C 21:07:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.50 21:07:40 Integrated Voltage Measurement... 21:07:59 Voltage Offset Correction: v_off_ini = 0.000005020 V, v_off_fin = 0.000007758 V 21:07:59 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171079458 Vs 21:08:00 Integrated Voltage Measurement... 21:08:19 Voltage Offset Correction: v_off_ini = 0.000007187 V, v_off_fin = 0.000003840 V 21:08:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170978923 Vs 21:08:22 Temperature Measurement, Probe Number = 0, T = 20.185000 C 21:08:23 Temperature Measurement, Probe Number = 1, T = 20.112000 C 21:08:24 Temperature Measurement, Probe Number = 2, T = 20.182000 C 21:08:24 Temperature Measurement, Probe Number = 3, T = 20.127000 C 21:08:25 Temperature Measurement, Probe Number = 4, T = 20.465000 C 21:08:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.46 21:08:25 Integrated Voltage Measurement... 21:08:44 Voltage Offset Correction: v_off_ini = 0.000004840 V, v_off_fin = 0.000007912 V 21:08:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171078463 Vs 21:08:45 Integrated Voltage Measurement... 21:09:04 Voltage Offset Correction: v_off_ini = 0.000007327 V, v_off_fin = 0.000004020 V 21:09:04 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170972746 Vs 21:09:07 Temperature Measurement, Probe Number = 0, T = 20.185000 C 21:09:08 Temperature Measurement, Probe Number = 1, T = 20.111000 C 21:09:09 Temperature Measurement, Probe Number = 2, T = 20.183000 C 21:09:09 Temperature Measurement, Probe Number = 3, T = 20.128000 C 21:09:10 Temperature Measurement, Probe Number = 4, T = 20.483000 C 21:09:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.48 21:09:10 Integrated Voltage Measurement... 21:09:30 Voltage Offset Correction: v_off_ini = 0.000005379 V, v_off_fin = 0.000008137 V 21:09:31 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078849 Vs 21:09:31 Integrated Voltage Measurement... 21:09:50 Voltage Offset Correction: v_off_ini = 0.000006986 V, v_off_fin = 0.000002972 V 21:09:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980665 Vs 21:09:53 Temperature Measurement, Probe Number = 0, T = 20.182000 C 21:09:54 Temperature Measurement, Probe Number = 1, T = 20.111000 C 21:09:55 Temperature Measurement, Probe Number = 2, T = 20.181000 C 21:09:55 Temperature Measurement, Probe Number = 3, T = 20.128000 C 21:09:56 Temperature Measurement, Probe Number = 4, T = 20.507000 C 21:09:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.51 21:09:56 Integrated Voltage Measurement... 21:10:16 Voltage Offset Correction: v_off_ini = 0.000004743 V, v_off_fin = 0.000007516 V 21:10:16 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171071905 Vs 21:10:16 Integrated Voltage Measurement... 21:10:36 Voltage Offset Correction: v_off_ini = 0.000006916 V, v_off_fin = 0.000003573 V 21:10:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980113 Vs 21:10:38 Temperature Measurement, Probe Number = 0, T = 20.183000 C 21:10:39 Temperature Measurement, Probe Number = 1, T = 20.109000 C 21:10:40 Temperature Measurement, Probe Number = 2, T = 20.182000 C 21:10:40 Temperature Measurement, Probe Number = 3, T = 20.129000 C 21:10:41 Temperature Measurement, Probe Number = 4, T = 20.491000 C 21:10:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.49 21:10:41 Integrated Voltage Measurement... 21:11:01 Voltage Offset Correction: v_off_ini = 0.000004565 V, v_off_fin = 0.000007432 V 21:11:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171074499 Vs 21:11:01 Integrated Voltage Measurement... 21:11:21 Voltage Offset Correction: v_off_ini = 0.000007263 V, v_off_fin = 0.000003467 V 21:11:21 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979916 Vs 21:41:24 Temperature Measurement, Probe Number = 0, T = 20.180000 C 21:41:24 Temperature Measurement, Probe Number = 1, T = 20.112000 C 21:41:25 Temperature Measurement, Probe Number = 2, T = 20.181000 C 21:41:25 Temperature Measurement, Probe Number = 3, T = 20.129000 C 21:41:26 Temperature Measurement, Probe Number = 4, T = 20.380000 C 21:41:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.38 21:41:26 Integrated Voltage Measurement... 21:41:46 Voltage Offset Correction: v_off_ini = 0.000005868 V, v_off_fin = 0.000007648 V 21:41:46 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171123805 Vs 21:41:46 Integrated Voltage Measurement... 21:42:05 Voltage Offset Correction: v_off_ini = 0.000007315 V, v_off_fin = 0.000003253 V 21:42:06 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986985 Vs 21:42:08 Temperature Measurement, Probe Number = 0, T = 20.182000 C 21:42:09 Temperature Measurement, Probe Number = 1, T = 20.109000 C 21:42:10 Temperature Measurement, Probe Number = 2, T = 20.184000 C 21:42:10 Temperature Measurement, Probe Number = 3, T = 20.128000 C 21:42:11 Temperature Measurement, Probe Number = 4, T = 20.400000 C 21:42:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.40 21:42:11 Integrated Voltage Measurement... 21:42:31 Voltage Offset Correction: v_off_ini = 0.000004856 V, v_off_fin = 0.000007263 V 21:42:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171079303 Vs 21:42:32 Integrated Voltage Measurement... 21:42:52 Voltage Offset Correction: v_off_ini = 0.000006918 V, v_off_fin = 0.000003268 V 21:42:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983776 Vs 21:42:55 Temperature Measurement, Probe Number = 0, T = 20.182000 C 21:42:55 Temperature Measurement, Probe Number = 1, T = 20.108000 C 21:42:56 Temperature Measurement, Probe Number = 2, T = 20.182000 C 21:42:57 Temperature Measurement, Probe Number = 3, T = 20.127000 C 21:42:57 Temperature Measurement, Probe Number = 4, T = 20.428000 C 21:42:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.43 21:42:57 Integrated Voltage Measurement... 21:43:18 Voltage Offset Correction: v_off_ini = 0.000004961 V, v_off_fin = 0.000007840 V 21:43:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171077901 Vs 21:43:18 Integrated Voltage Measurement... 21:43:37 Voltage Offset Correction: v_off_ini = 0.000007213 V, v_off_fin = 0.000003458 V 21:43:38 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982121 Vs 21:43:40 Temperature Measurement, Probe Number = 0, T = 20.181000 C 21:43:41 Temperature Measurement, Probe Number = 1, T = 20.107000 C 21:43:42 Temperature Measurement, Probe Number = 2, T = 20.183000 C 21:43:42 Temperature Measurement, Probe Number = 3, T = 20.127000 C 21:43:43 Temperature Measurement, Probe Number = 4, T = 20.394000 C 21:43:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.39 21:43:43 Integrated Voltage Measurement... 21:44:03 Voltage Offset Correction: v_off_ini = 0.000004817 V, v_off_fin = 0.000007678 V 21:44:03 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171074013 Vs 21:44:03 Integrated Voltage Measurement... 21:44:23 Voltage Offset Correction: v_off_ini = 0.000006933 V, v_off_fin = 0.000003627 V 21:44:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982485 Vs 21:44:25 Temperature Measurement, Probe Number = 0, T = 20.177000 C 21:44:26 Temperature Measurement, Probe Number = 1, T = 20.107000 C 21:44:27 Temperature Measurement, Probe Number = 2, T = 20.177000 C 21:44:27 Temperature Measurement, Probe Number = 3, T = 20.124000 C 21:44:28 Temperature Measurement, Probe Number = 4, T = 20.413000 C 21:44:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.41 21:44:28 Integrated Voltage Measurement... 21:44:48 Voltage Offset Correction: v_off_ini = 0.000005060 V, v_off_fin = 0.000008257 V 21:44:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171078998 Vs 21:44:48 Integrated Voltage Measurement... 21:45:08 Voltage Offset Correction: v_off_ini = 0.000007766 V, v_off_fin = 0.000004002 V 21:45:08 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979753 Vs 21:45:10 Temperature Measurement, Probe Number = 0, T = 20.177000 C 21:45:11 Temperature Measurement, Probe Number = 1, T = 20.107000 C 21:45:12 Temperature Measurement, Probe Number = 2, T = 20.180000 C 21:45:12 Temperature Measurement, Probe Number = 3, T = 20.124000 C 21:45:13 Temperature Measurement, Probe Number = 4, T = 20.411000 C 21:45:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.41 21:45:13 Integrated Voltage Measurement... 21:45:33 Voltage Offset Correction: v_off_ini = 0.000005431 V, v_off_fin = 0.000007651 V 21:45:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171077491 Vs 21:45:34 Integrated Voltage Measurement... 21:45:53 Voltage Offset Correction: v_off_ini = 0.000006571 V, v_off_fin = 0.000003993 V 21:45:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981780 Vs 21:45:56 Temperature Measurement, Probe Number = 0, T = 20.180000 C 21:45:57 Temperature Measurement, Probe Number = 1, T = 20.109000 C 21:45:58 Temperature Measurement, Probe Number = 2, T = 20.180000 C 21:45:58 Temperature Measurement, Probe Number = 3, T = 20.124000 C 21:45:59 Temperature Measurement, Probe Number = 4, T = 20.390000 C 21:45:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.39 21:45:59 Integrated Voltage Measurement... 21:46:19 Voltage Offset Correction: v_off_ini = 0.000005253 V, v_off_fin = 0.000007549 V 21:46:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074024 Vs 21:46:20 Integrated Voltage Measurement... 21:46:39 Voltage Offset Correction: v_off_ini = 0.000006945 V, v_off_fin = 0.000003240 V 21:46:39 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170982242 Vs 21:46:42 Temperature Measurement, Probe Number = 0, T = 20.181000 C 21:46:43 Temperature Measurement, Probe Number = 1, T = 20.112000 C 21:46:43 Temperature Measurement, Probe Number = 2, T = 20.184000 C 21:46:44 Temperature Measurement, Probe Number = 3, T = 20.128000 C 21:46:45 Temperature Measurement, Probe Number = 4, T = 20.418000 C 21:46:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.42 21:46:45 Integrated Voltage Measurement... 21:47:04 Voltage Offset Correction: v_off_ini = 0.000004375 V, v_off_fin = 0.000007798 V 21:47:04 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171078073 Vs 21:47:04 Integrated Voltage Measurement... 21:47:24 Voltage Offset Correction: v_off_ini = 0.000007207 V, v_off_fin = 0.000003350 V 21:47:24 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170984120 Vs 21:47:27 Temperature Measurement, Probe Number = 0, T = 20.180000 C 21:47:28 Temperature Measurement, Probe Number = 1, T = 20.107000 C 21:47:28 Temperature Measurement, Probe Number = 2, T = 20.182000 C 21:47:29 Temperature Measurement, Probe Number = 3, T = 20.126000 C 21:47:30 Temperature Measurement, Probe Number = 4, T = 20.429000 C 21:47:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.13 P4 = Room, Value = 20.43 21:47:30 Integrated Voltage Measurement... 21:47:49 Voltage Offset Correction: v_off_ini = 0.000005112 V, v_off_fin = 0.000007460 V 21:47:49 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171079416 Vs 21:47:49 Integrated Voltage Measurement... 21:48:09 Voltage Offset Correction: v_off_ini = 0.000006793 V, v_off_fin = 0.000003603 V 21:48:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982252 Vs 21:48:12 Temperature Measurement, Probe Number = 0, T = 20.180000 C 21:48:12 Temperature Measurement, Probe Number = 1, T = 20.106000 C 21:48:13 Temperature Measurement, Probe Number = 2, T = 20.182000 C 21:48:14 Temperature Measurement, Probe Number = 3, T = 20.124000 C 21:48:14 Temperature Measurement, Probe Number = 4, T = 20.451000 C 21:48:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.45 21:48:15 Integrated Voltage Measurement... 21:48:34 Voltage Offset Correction: v_off_ini = 0.000004794 V, v_off_fin = 0.000007639 V 21:48:34 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171073065 Vs 21:48:34 Integrated Voltage Measurement... 21:48:54 Voltage Offset Correction: v_off_ini = 0.000006829 V, v_off_fin = 0.000003628 V 21:48:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980374 Vs 22:18:57 Temperature Measurement, Probe Number = 0, T = 20.175000 C 22:18:58 Temperature Measurement, Probe Number = 1, T = 20.107000 C 22:18:59 Temperature Measurement, Probe Number = 2, T = 20.177000 C 22:18:59 Temperature Measurement, Probe Number = 3, T = 20.124000 C 22:19:00 Temperature Measurement, Probe Number = 4, T = 20.452000 C 22:19:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.45 22:19:00 Integrated Voltage Measurement... 22:19:20 Voltage Offset Correction: v_off_ini = 0.000006341 V, v_off_fin = 0.000008331 V 22:19:20 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171130883 Vs 22:19:20 Integrated Voltage Measurement... 22:19:40 Voltage Offset Correction: v_off_ini = 0.000007439 V, v_off_fin = 0.000004018 V 22:19:40 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170979355 Vs 22:19:43 Temperature Measurement, Probe Number = 0, T = 20.178000 C 22:19:43 Temperature Measurement, Probe Number = 1, T = 20.104000 C 22:19:44 Temperature Measurement, Probe Number = 2, T = 20.179000 C 22:19:45 Temperature Measurement, Probe Number = 3, T = 20.124000 C 22:19:45 Temperature Measurement, Probe Number = 4, T = 20.427000 C 22:19:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.43 22:19:45 Integrated Voltage Measurement... 22:20:06 Voltage Offset Correction: v_off_ini = 0.000005321 V, v_off_fin = 0.000007184 V 22:20:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171078814 Vs 22:20:06 Integrated Voltage Measurement... 22:20:26 Voltage Offset Correction: v_off_ini = 0.000006617 V, v_off_fin = 0.000003606 V 22:20:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986261 Vs 22:20:29 Temperature Measurement, Probe Number = 0, T = 20.179000 C 22:20:29 Temperature Measurement, Probe Number = 1, T = 20.104000 C 22:20:30 Temperature Measurement, Probe Number = 2, T = 20.179000 C 22:20:31 Temperature Measurement, Probe Number = 3, T = 20.124000 C 22:20:31 Temperature Measurement, Probe Number = 4, T = 20.448000 C 22:20:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.45 22:20:32 Integrated Voltage Measurement... 22:20:52 Voltage Offset Correction: v_off_ini = 0.000004490 V, v_off_fin = 0.000007146 V 22:20:52 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075376 Vs 22:20:52 Integrated Voltage Measurement... 22:21:11 Voltage Offset Correction: v_off_ini = 0.000006337 V, v_off_fin = 0.000003254 V 22:21:11 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170984238 Vs 22:21:14 Temperature Measurement, Probe Number = 0, T = 20.174000 C 22:21:15 Temperature Measurement, Probe Number = 1, T = 20.098000 C 22:21:15 Temperature Measurement, Probe Number = 2, T = 20.176000 C 22:21:16 Temperature Measurement, Probe Number = 3, T = 20.121000 C 22:21:17 Temperature Measurement, Probe Number = 4, T = 20.459000 C 22:21:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.46 22:21:17 Integrated Voltage Measurement... 22:21:37 Voltage Offset Correction: v_off_ini = 0.000004457 V, v_off_fin = 0.000007733 V 22:21:37 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171079349 Vs 22:21:37 Integrated Voltage Measurement... 22:21:58 Voltage Offset Correction: v_off_ini = 0.000007304 V, v_off_fin = 0.000003606 V 22:21:58 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170982212 Vs 22:22:00 Temperature Measurement, Probe Number = 0, T = 20.172000 C 22:22:01 Temperature Measurement, Probe Number = 1, T = 20.101000 C 22:22:02 Temperature Measurement, Probe Number = 2, T = 20.175000 C 22:22:02 Temperature Measurement, Probe Number = 3, T = 20.118000 C 22:22:03 Temperature Measurement, Probe Number = 4, T = 20.423000 C 22:22:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.42 22:22:03 Integrated Voltage Measurement... 22:22:23 Voltage Offset Correction: v_off_ini = 0.000004678 V, v_off_fin = 0.000006938 V 22:22:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171069922 Vs 22:22:23 Integrated Voltage Measurement... 22:22:43 Voltage Offset Correction: v_off_ini = 0.000006376 V, v_off_fin = 0.000003886 V 22:22:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987175 Vs 22:22:46 Temperature Measurement, Probe Number = 0, T = 20.175000 C 22:22:47 Temperature Measurement, Probe Number = 1, T = 20.103000 C 22:22:47 Temperature Measurement, Probe Number = 2, T = 20.178000 C 22:22:48 Temperature Measurement, Probe Number = 3, T = 20.121000 C 22:22:48 Temperature Measurement, Probe Number = 4, T = 20.389000 C 22:22:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.39 22:22:49 Integrated Voltage Measurement... 22:23:09 Voltage Offset Correction: v_off_ini = 0.000004592 V, v_off_fin = 0.000007520 V 22:23:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072988 Vs 22:23:09 Integrated Voltage Measurement... 22:23:29 Voltage Offset Correction: v_off_ini = 0.000006649 V, v_off_fin = 0.000003548 V 22:23:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992641 Vs 22:23:32 Temperature Measurement, Probe Number = 0, T = 20.172000 C 22:23:33 Temperature Measurement, Probe Number = 1, T = 20.098000 C 22:23:33 Temperature Measurement, Probe Number = 2, T = 20.176000 C 22:23:34 Temperature Measurement, Probe Number = 3, T = 20.116000 C 22:23:35 Temperature Measurement, Probe Number = 4, T = 20.394000 C 22:23:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.39 22:23:35 Integrated Voltage Measurement... 22:23:54 Voltage Offset Correction: v_off_ini = 0.000004763 V, v_off_fin = 0.000007305 V 22:23:55 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171072374 Vs 22:23:55 Integrated Voltage Measurement... 22:24:14 Voltage Offset Correction: v_off_ini = 0.000006403 V, v_off_fin = 0.000003717 V 22:24:14 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988874 Vs 22:24:17 Temperature Measurement, Probe Number = 0, T = 20.174000 C 22:24:18 Temperature Measurement, Probe Number = 1, T = 20.099000 C 22:24:18 Temperature Measurement, Probe Number = 2, T = 20.177000 C 22:24:19 Temperature Measurement, Probe Number = 3, T = 20.117000 C 22:24:20 Temperature Measurement, Probe Number = 4, T = 20.377000 C 22:24:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.38 22:24:20 Integrated Voltage Measurement... 22:24:39 Voltage Offset Correction: v_off_ini = 0.000004419 V, v_off_fin = 0.000007561 V 22:24:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171075448 Vs 22:24:40 Integrated Voltage Measurement... 22:24:59 Voltage Offset Correction: v_off_ini = 0.000007016 V, v_off_fin = 0.000003362 V 22:24:59 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170989932 Vs 22:25:02 Temperature Measurement, Probe Number = 0, T = 20.178000 C 22:25:03 Temperature Measurement, Probe Number = 1, T = 20.105000 C 22:25:03 Temperature Measurement, Probe Number = 2, T = 20.177000 C 22:25:04 Temperature Measurement, Probe Number = 3, T = 20.124000 C 22:25:04 Temperature Measurement, Probe Number = 4, T = 20.409000 C 22:25:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.18 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.41 22:25:05 Integrated Voltage Measurement... 22:25:25 Voltage Offset Correction: v_off_ini = 0.000004794 V, v_off_fin = 0.000007572 V 22:25:25 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171083612 Vs 22:25:26 Integrated Voltage Measurement... 22:25:45 Voltage Offset Correction: v_off_ini = 0.000007076 V, v_off_fin = 0.000003725 V 22:25:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987415 Vs 22:25:48 Temperature Measurement, Probe Number = 0, T = 20.173000 C 22:25:49 Temperature Measurement, Probe Number = 1, T = 20.106000 C 22:25:49 Temperature Measurement, Probe Number = 2, T = 20.176000 C 22:25:50 Temperature Measurement, Probe Number = 3, T = 20.125000 C 22:25:51 Temperature Measurement, Probe Number = 4, T = 20.469000 C 22:25:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.11 P2 = Top 1, Value = 20.18 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.47 22:25:51 Integrated Voltage Measurement... 22:26:11 Voltage Offset Correction: v_off_ini = 0.000004820 V, v_off_fin = 0.000007781 V 22:26:11 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171084028 Vs 22:26:11 Integrated Voltage Measurement... 22:26:31 Voltage Offset Correction: v_off_ini = 0.000007111 V, v_off_fin = 0.000003403 V 22:26:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995721 Vs 22:56:34 Temperature Measurement, Probe Number = 0, T = 20.158000 C 22:56:35 Temperature Measurement, Probe Number = 1, T = 20.089000 C 22:56:36 Temperature Measurement, Probe Number = 2, T = 20.164000 C 22:56:36 Temperature Measurement, Probe Number = 3, T = 20.110000 C 22:56:37 Temperature Measurement, Probe Number = 4, T = 20.315000 C 22:56:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.32 22:56:37 Integrated Voltage Measurement... 22:56:56 Voltage Offset Correction: v_off_ini = 0.000006966 V, v_off_fin = 0.000008466 V 22:56:57 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171129904 Vs 22:56:57 Integrated Voltage Measurement... 22:57:16 Voltage Offset Correction: v_off_ini = 0.000007837 V, v_off_fin = 0.000003594 V 22:57:17 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988621 Vs 22:57:19 Temperature Measurement, Probe Number = 0, T = 20.164000 C 22:57:20 Temperature Measurement, Probe Number = 1, T = 20.093000 C 22:57:21 Temperature Measurement, Probe Number = 2, T = 20.171000 C 22:57:21 Temperature Measurement, Probe Number = 3, T = 20.115000 C 22:57:22 Temperature Measurement, Probe Number = 4, T = 20.313000 C 22:57:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.31 22:57:22 Integrated Voltage Measurement... 22:57:41 Voltage Offset Correction: v_off_ini = 0.000005938 V, v_off_fin = 0.000007758 V 22:57:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171092923 Vs 22:57:42 Integrated Voltage Measurement... 22:58:01 Voltage Offset Correction: v_off_ini = 0.000006765 V, v_off_fin = 0.000003995 V 22:58:02 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170992893 Vs 22:58:04 Temperature Measurement, Probe Number = 0, T = 20.164000 C 22:58:05 Temperature Measurement, Probe Number = 1, T = 20.094000 C 22:58:06 Temperature Measurement, Probe Number = 2, T = 20.172000 C 22:58:06 Temperature Measurement, Probe Number = 3, T = 20.116000 C 22:58:07 Temperature Measurement, Probe Number = 4, T = 20.354000 C 22:58:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.35 22:58:07 Integrated Voltage Measurement... 22:58:26 Voltage Offset Correction: v_off_ini = 0.000004837 V, v_off_fin = 0.000007983 V 22:58:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171085784 Vs 22:58:27 Integrated Voltage Measurement... 22:58:46 Voltage Offset Correction: v_off_ini = 0.000007122 V, v_off_fin = 0.000003814 V 22:58:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993256 Vs 22:58:49 Temperature Measurement, Probe Number = 0, T = 20.165000 C 22:58:50 Temperature Measurement, Probe Number = 1, T = 20.095000 C 22:58:51 Temperature Measurement, Probe Number = 2, T = 20.173000 C 22:58:51 Temperature Measurement, Probe Number = 3, T = 20.118000 C 22:58:52 Temperature Measurement, Probe Number = 4, T = 20.334000 C 22:58:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.33 22:58:52 Integrated Voltage Measurement... 22:59:12 Voltage Offset Correction: v_off_ini = 0.000004891 V, v_off_fin = 0.000007906 V 22:59:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171088821 Vs 22:59:13 Integrated Voltage Measurement... 22:59:32 Voltage Offset Correction: v_off_ini = 0.000007256 V, v_off_fin = 0.000004058 V 22:59:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992838 Vs 22:59:35 Temperature Measurement, Probe Number = 0, T = 20.167000 C 22:59:36 Temperature Measurement, Probe Number = 1, T = 20.096000 C 22:59:37 Temperature Measurement, Probe Number = 2, T = 20.173000 C 22:59:37 Temperature Measurement, Probe Number = 3, T = 20.119000 C 22:59:38 Temperature Measurement, Probe Number = 4, T = 20.347000 C 22:59:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.17 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.35 22:59:38 Integrated Voltage Measurement... 22:59:58 Voltage Offset Correction: v_off_ini = 0.000005088 V, v_off_fin = 0.000008065 V 22:59:58 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171093183 Vs 22:59:58 Integrated Voltage Measurement... 23:00:18 Voltage Offset Correction: v_off_ini = 0.000007797 V, v_off_fin = 0.000004091 V 23:00:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987696 Vs 23:00:20 Temperature Measurement, Probe Number = 0, T = 20.165000 C 23:00:21 Temperature Measurement, Probe Number = 1, T = 20.097000 C 23:00:22 Temperature Measurement, Probe Number = 2, T = 20.173000 C 23:00:22 Temperature Measurement, Probe Number = 3, T = 20.121000 C 23:00:23 Temperature Measurement, Probe Number = 4, T = 20.410000 C 23:00:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.41 23:00:23 Integrated Voltage Measurement... 23:00:43 Voltage Offset Correction: v_off_ini = 0.000005335 V, v_off_fin = 0.000008474 V 23:00:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171092525 Vs 23:00:43 Integrated Voltage Measurement... 23:01:03 Voltage Offset Correction: v_off_ini = 0.000007657 V, v_off_fin = 0.000004727 V 23:01:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988865 Vs 23:01:05 Temperature Measurement, Probe Number = 0, T = 20.165000 C 23:01:06 Temperature Measurement, Probe Number = 1, T = 20.099000 C 23:01:07 Temperature Measurement, Probe Number = 2, T = 20.172000 C 23:01:07 Temperature Measurement, Probe Number = 3, T = 20.116000 C 23:01:08 Temperature Measurement, Probe Number = 4, T = 20.377000 C 23:01:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.10 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.38 23:01:08 Integrated Voltage Measurement... 23:01:28 Voltage Offset Correction: v_off_ini = 0.000005637 V, v_off_fin = 0.000008497 V 23:01:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171102644 Vs 23:01:28 Integrated Voltage Measurement... 23:01:48 Voltage Offset Correction: v_off_ini = 0.000007902 V, v_off_fin = 0.000004624 V 23:01:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989159 Vs 23:01:51 Temperature Measurement, Probe Number = 0, T = 20.161000 C 23:01:51 Temperature Measurement, Probe Number = 1, T = 20.094000 C 23:01:52 Temperature Measurement, Probe Number = 2, T = 20.169000 C 23:01:53 Temperature Measurement, Probe Number = 3, T = 20.114000 C 23:01:53 Temperature Measurement, Probe Number = 4, T = 20.352000 C 23:01:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.35 23:01:53 Integrated Voltage Measurement... 23:02:13 Voltage Offset Correction: v_off_ini = 0.000005587 V, v_off_fin = 0.000008576 V 23:02:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171096212 Vs 23:02:13 Integrated Voltage Measurement... 23:02:32 Voltage Offset Correction: v_off_ini = 0.000007788 V, v_off_fin = 0.000004259 V 23:02:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987938 Vs 23:02:35 Temperature Measurement, Probe Number = 0, T = 20.163000 C 23:02:36 Temperature Measurement, Probe Number = 1, T = 20.093000 C 23:02:37 Temperature Measurement, Probe Number = 2, T = 20.171000 C 23:02:37 Temperature Measurement, Probe Number = 3, T = 20.117000 C 23:02:38 Temperature Measurement, Probe Number = 4, T = 20.351000 C 23:02:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.12 P4 = Room, Value = 20.35 23:02:38 Integrated Voltage Measurement... 23:02:58 Voltage Offset Correction: v_off_ini = 0.000005430 V, v_off_fin = 0.000008088 V 23:02:58 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171099059 Vs 23:02:58 Integrated Voltage Measurement... 23:03:18 Voltage Offset Correction: v_off_ini = 0.000007638 V, v_off_fin = 0.000004544 V 23:03:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985607 Vs 23:03:21 Temperature Measurement, Probe Number = 0, T = 20.165000 C 23:03:21 Temperature Measurement, Probe Number = 1, T = 20.092000 C 23:03:22 Temperature Measurement, Probe Number = 2, T = 20.169000 C 23:03:23 Temperature Measurement, Probe Number = 3, T = 20.115000 C 23:03:23 Temperature Measurement, Probe Number = 4, T = 20.341000 C 23:03:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.09 P2 = Top 1, Value = 20.17 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.34 23:03:23 Integrated Voltage Measurement... 23:03:44 Voltage Offset Correction: v_off_ini = 0.000005888 V, v_off_fin = 0.000008394 V 23:03:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171091965 Vs 23:03:44 Integrated Voltage Measurement... 23:04:04 Voltage Offset Correction: v_off_ini = 0.000007847 V, v_off_fin = 0.000004308 V 23:04:04 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987383 Vs 23:34:07 Temperature Measurement, Probe Number = 0, T = 20.151000 C 23:34:07 Temperature Measurement, Probe Number = 1, T = 20.081000 C 23:34:08 Temperature Measurement, Probe Number = 2, T = 20.160000 C 23:34:09 Temperature Measurement, Probe Number = 3, T = 20.104000 C 23:34:09 Temperature Measurement, Probe Number = 4, T = 20.218000 C 23:34:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.22 23:34:10 Integrated Voltage Measurement... 23:34:29 Voltage Offset Correction: v_off_ini = 0.000006098 V, v_off_fin = 0.000007402 V 23:34:29 Integrated Voltage Measurement Delta Gap = 0.0040011 m VT = 0.171124757 Vs 23:34:29 Integrated Voltage Measurement... 23:34:50 Voltage Offset Correction: v_off_ini = 0.000007119 V, v_off_fin = 0.000004840 V 23:34:50 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170992434 Vs 23:34:53 Temperature Measurement, Probe Number = 0, T = 20.155000 C 23:34:53 Temperature Measurement, Probe Number = 1, T = 20.081000 C 23:34:54 Temperature Measurement, Probe Number = 2, T = 20.161000 C 23:34:55 Temperature Measurement, Probe Number = 3, T = 20.106000 C 23:34:55 Temperature Measurement, Probe Number = 4, T = 20.236000 C 23:34:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.16 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.24 23:34:56 Integrated Voltage Measurement... 23:35:15 Voltage Offset Correction: v_off_ini = 0.000005457 V, v_off_fin = 0.000007758 V 23:35:15 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171086038 Vs 23:35:15 Integrated Voltage Measurement... 23:35:35 Voltage Offset Correction: v_off_ini = 0.000007658 V, v_off_fin = 0.000004332 V 23:35:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993007 Vs 23:35:38 Temperature Measurement, Probe Number = 0, T = 20.154000 C 23:35:38 Temperature Measurement, Probe Number = 1, T = 20.082000 C 23:35:39 Temperature Measurement, Probe Number = 2, T = 20.163000 C 23:35:40 Temperature Measurement, Probe Number = 3, T = 20.105000 C 23:35:40 Temperature Measurement, Probe Number = 4, T = 20.225000 C 23:35:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.11 P4 = Room, Value = 20.23 23:35:40 Integrated Voltage Measurement... 23:36:00 Voltage Offset Correction: v_off_ini = 0.000005524 V, v_off_fin = 0.000008052 V 23:36:00 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171093278 Vs 23:36:00 Integrated Voltage Measurement... 23:36:20 Voltage Offset Correction: v_off_ini = 0.000007585 V, v_off_fin = 0.000003973 V 23:36:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996802 Vs 23:36:23 Temperature Measurement, Probe Number = 0, T = 20.151000 C 23:36:23 Temperature Measurement, Probe Number = 1, T = 20.081000 C 23:36:24 Temperature Measurement, Probe Number = 2, T = 20.161000 C 23:36:25 Temperature Measurement, Probe Number = 3, T = 20.102000 C 23:36:25 Temperature Measurement, Probe Number = 4, T = 20.222000 C 23:36:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.22 23:36:26 Integrated Voltage Measurement... 23:36:45 Voltage Offset Correction: v_off_ini = 0.000005109 V, v_off_fin = 0.000008090 V 23:36:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171091180 Vs 23:36:45 Integrated Voltage Measurement... 23:37:05 Voltage Offset Correction: v_off_ini = 0.000007197 V, v_off_fin = 0.000003895 V 23:37:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999995 Vs 23:37:08 Temperature Measurement, Probe Number = 0, T = 20.153000 C 23:37:08 Temperature Measurement, Probe Number = 1, T = 20.081000 C 23:37:09 Temperature Measurement, Probe Number = 2, T = 20.160000 C 23:37:10 Temperature Measurement, Probe Number = 3, T = 20.104000 C 23:37:10 Temperature Measurement, Probe Number = 4, T = 20.214000 C 23:37:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.21 23:37:11 Integrated Voltage Measurement... 23:37:30 Voltage Offset Correction: v_off_ini = 0.000004888 V, v_off_fin = 0.000008049 V 23:37:30 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171089039 Vs 23:37:30 Integrated Voltage Measurement... 23:37:50 Voltage Offset Correction: v_off_ini = 0.000007300 V, v_off_fin = 0.000003822 V 23:37:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992725 Vs 23:37:53 Temperature Measurement, Probe Number = 0, T = 20.153000 C 23:37:54 Temperature Measurement, Probe Number = 1, T = 20.083000 C 23:37:54 Temperature Measurement, Probe Number = 2, T = 20.160000 C 23:37:55 Temperature Measurement, Probe Number = 3, T = 20.103000 C 23:37:56 Temperature Measurement, Probe Number = 4, T = 20.287000 C 23:37:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.29 23:37:56 Integrated Voltage Measurement... 23:38:15 Voltage Offset Correction: v_off_ini = 0.000005274 V, v_off_fin = 0.000007995 V 23:38:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171086114 Vs 23:38:16 Integrated Voltage Measurement... 23:38:35 Voltage Offset Correction: v_off_ini = 0.000007549 V, v_off_fin = 0.000004810 V 23:38:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990188 Vs 23:38:38 Temperature Measurement, Probe Number = 0, T = 20.152000 C 23:38:39 Temperature Measurement, Probe Number = 1, T = 20.078000 C 23:38:39 Temperature Measurement, Probe Number = 2, T = 20.159000 C 23:38:40 Temperature Measurement, Probe Number = 3, T = 20.102000 C 23:38:41 Temperature Measurement, Probe Number = 4, T = 20.275000 C 23:38:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.27 23:38:41 Integrated Voltage Measurement... 23:39:01 Voltage Offset Correction: v_off_ini = 0.000005512 V, v_off_fin = 0.000008061 V 23:39:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171091288 Vs 23:39:01 Integrated Voltage Measurement... 23:39:21 Voltage Offset Correction: v_off_ini = 0.000007390 V, v_off_fin = 0.000004046 V 23:39:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990160 Vs 23:39:24 Temperature Measurement, Probe Number = 0, T = 20.151000 C 23:39:25 Temperature Measurement, Probe Number = 1, T = 20.076000 C 23:39:25 Temperature Measurement, Probe Number = 2, T = 20.158000 C 23:39:26 Temperature Measurement, Probe Number = 3, T = 20.100000 C 23:39:27 Temperature Measurement, Probe Number = 4, T = 20.279000 C 23:39:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.28 23:39:27 Integrated Voltage Measurement... 23:39:46 Voltage Offset Correction: v_off_ini = 0.000005677 V, v_off_fin = 0.000008011 V 23:39:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171085484 Vs 23:39:47 Integrated Voltage Measurement... 23:40:06 Voltage Offset Correction: v_off_ini = 0.000007085 V, v_off_fin = 0.000004096 V 23:40:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996706 Vs 23:40:09 Temperature Measurement, Probe Number = 0, T = 20.152000 C 23:40:10 Temperature Measurement, Probe Number = 1, T = 20.078000 C 23:40:10 Temperature Measurement, Probe Number = 2, T = 20.161000 C 23:40:11 Temperature Measurement, Probe Number = 3, T = 20.101000 C 23:40:12 Temperature Measurement, Probe Number = 4, T = 20.259000 C 23:40:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.26 23:40:12 Integrated Voltage Measurement... 23:40:32 Voltage Offset Correction: v_off_ini = 0.000005334 V, v_off_fin = 0.000007502 V 23:40:32 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171085812 Vs 23:40:33 Integrated Voltage Measurement... 23:40:52 Voltage Offset Correction: v_off_ini = 0.000007104 V, v_off_fin = 0.000003854 V 23:40:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997913 Vs 23:40:55 Temperature Measurement, Probe Number = 0, T = 20.149000 C 23:40:56 Temperature Measurement, Probe Number = 1, T = 20.077000 C 23:40:57 Temperature Measurement, Probe Number = 2, T = 20.161000 C 23:40:57 Temperature Measurement, Probe Number = 3, T = 20.101000 C 23:40:58 Temperature Measurement, Probe Number = 4, T = 20.199000 C 23:40:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.15 P1 = Bottom 2, Value = 20.08 P2 = Top 1, Value = 20.16 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.20 23:40:58 Integrated Voltage Measurement... 23:41:17 Voltage Offset Correction: v_off_ini = 0.000005492 V, v_off_fin = 0.000008297 V 23:41:18 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171085720 Vs 23:41:18 Integrated Voltage Measurement... 23:41:37 Voltage Offset Correction: v_off_ini = 0.000007200 V, v_off_fin = 0.000004799 V 23:41:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991637 Vs 00:11:40 Temperature Measurement, Probe Number = 0, T = 20.140000 C 00:11:41 Temperature Measurement, Probe Number = 1, T = 20.066000 C 00:11:42 Temperature Measurement, Probe Number = 2, T = 20.149000 C 00:11:42 Temperature Measurement, Probe Number = 3, T = 20.093000 C 00:11:43 Temperature Measurement, Probe Number = 4, T = 20.338000 C 00:11:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.34 00:11:43 Integrated Voltage Measurement... 00:12:03 Voltage Offset Correction: v_off_ini = 0.000006851 V, v_off_fin = 0.000008025 V 00:12:03 Integrated Voltage Measurement Delta Gap = 0.0040010 m VT = 0.171128679 Vs 00:12:04 Integrated Voltage Measurement... 00:12:23 Voltage Offset Correction: v_off_ini = 0.000007682 V, v_off_fin = 0.000004152 V 00:12:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996903 Vs 00:12:26 Temperature Measurement, Probe Number = 0, T = 20.142000 C 00:12:27 Temperature Measurement, Probe Number = 1, T = 20.066000 C 00:12:27 Temperature Measurement, Probe Number = 2, T = 20.151000 C 00:12:28 Temperature Measurement, Probe Number = 3, T = 20.093000 C 00:12:29 Temperature Measurement, Probe Number = 4, T = 20.359000 C 00:12:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.36 00:12:29 Integrated Voltage Measurement... 00:12:48 Voltage Offset Correction: v_off_ini = 0.000005204 V, v_off_fin = 0.000008206 V 00:12:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171088473 Vs 00:12:49 Integrated Voltage Measurement... 00:13:08 Voltage Offset Correction: v_off_ini = 0.000007455 V, v_off_fin = 0.000004378 V 00:13:08 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994059 Vs 00:13:11 Temperature Measurement, Probe Number = 0, T = 20.134000 C 00:13:12 Temperature Measurement, Probe Number = 1, T = 20.059000 C 00:13:12 Temperature Measurement, Probe Number = 2, T = 20.144000 C 00:13:13 Temperature Measurement, Probe Number = 3, T = 20.088000 C 00:13:14 Temperature Measurement, Probe Number = 4, T = 20.315000 C 00:13:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.32 00:13:14 Integrated Voltage Measurement... 00:13:33 Voltage Offset Correction: v_off_ini = 0.000005760 V, v_off_fin = 0.000007824 V 00:13:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171087314 Vs 00:13:34 Integrated Voltage Measurement... 00:13:53 Voltage Offset Correction: v_off_ini = 0.000007487 V, v_off_fin = 0.000004049 V 00:13:53 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170993364 Vs 00:13:56 Temperature Measurement, Probe Number = 0, T = 20.139000 C 00:13:57 Temperature Measurement, Probe Number = 1, T = 20.064000 C 00:13:58 Temperature Measurement, Probe Number = 2, T = 20.149000 C 00:13:58 Temperature Measurement, Probe Number = 3, T = 20.088000 C 00:13:59 Temperature Measurement, Probe Number = 4, T = 20.301000 C 00:13:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.30 00:13:59 Integrated Voltage Measurement... 00:14:18 Voltage Offset Correction: v_off_ini = 0.000005584 V, v_off_fin = 0.000008033 V 00:14:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171089073 Vs 00:14:19 Integrated Voltage Measurement... 00:14:38 Voltage Offset Correction: v_off_ini = 0.000007667 V, v_off_fin = 0.000004269 V 00:14:39 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170991589 Vs 00:14:41 Temperature Measurement, Probe Number = 0, T = 20.144000 C 00:14:42 Temperature Measurement, Probe Number = 1, T = 20.066000 C 00:14:43 Temperature Measurement, Probe Number = 2, T = 20.151000 C 00:14:43 Temperature Measurement, Probe Number = 3, T = 20.093000 C 00:14:44 Temperature Measurement, Probe Number = 4, T = 20.337000 C 00:14:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.34 00:14:44 Integrated Voltage Measurement... 00:15:04 Voltage Offset Correction: v_off_ini = 0.000005382 V, v_off_fin = 0.000008236 V 00:15:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171093620 Vs 00:15:04 Integrated Voltage Measurement... 00:15:24 Voltage Offset Correction: v_off_ini = 0.000007793 V, v_off_fin = 0.000004709 V 00:15:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991280 Vs 00:15:27 Temperature Measurement, Probe Number = 0, T = 20.144000 C 00:15:28 Temperature Measurement, Probe Number = 1, T = 20.068000 C 00:15:28 Temperature Measurement, Probe Number = 2, T = 20.153000 C 00:15:29 Temperature Measurement, Probe Number = 3, T = 20.096000 C 00:15:30 Temperature Measurement, Probe Number = 4, T = 20.399000 C 00:15:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.40 00:15:30 Integrated Voltage Measurement... 00:15:50 Voltage Offset Correction: v_off_ini = 0.000005160 V, v_off_fin = 0.000007662 V 00:15:50 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171089906 Vs 00:15:50 Integrated Voltage Measurement... 00:16:10 Voltage Offset Correction: v_off_ini = 0.000007352 V, v_off_fin = 0.000004005 V 00:16:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995736 Vs 00:16:12 Temperature Measurement, Probe Number = 0, T = 20.139000 C 00:16:13 Temperature Measurement, Probe Number = 1, T = 20.069000 C 00:16:14 Temperature Measurement, Probe Number = 2, T = 20.148000 C 00:16:14 Temperature Measurement, Probe Number = 3, T = 20.096000 C 00:16:15 Temperature Measurement, Probe Number = 4, T = 20.426000 C 00:16:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.43 00:16:15 Integrated Voltage Measurement... 00:16:34 Voltage Offset Correction: v_off_ini = 0.000005096 V, v_off_fin = 0.000008295 V 00:16:35 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171090123 Vs 00:16:35 Integrated Voltage Measurement... 00:16:55 Voltage Offset Correction: v_off_ini = 0.000007449 V, v_off_fin = 0.000003617 V 00:16:55 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171001570 Vs 00:16:58 Temperature Measurement, Probe Number = 0, T = 20.141000 C 00:16:58 Temperature Measurement, Probe Number = 1, T = 20.069000 C 00:16:59 Temperature Measurement, Probe Number = 2, T = 20.148000 C 00:16:59 Temperature Measurement, Probe Number = 3, T = 20.096000 C 00:17:00 Temperature Measurement, Probe Number = 4, T = 20.411000 C 00:17:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.10 P4 = Room, Value = 20.41 00:17:00 Integrated Voltage Measurement... 00:17:20 Voltage Offset Correction: v_off_ini = 0.000004910 V, v_off_fin = 0.000007547 V 00:17:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171089146 Vs 00:17:21 Integrated Voltage Measurement... 00:17:40 Voltage Offset Correction: v_off_ini = 0.000007065 V, v_off_fin = 0.000003563 V 00:17:40 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994042 Vs 00:17:43 Temperature Measurement, Probe Number = 0, T = 20.143000 C 00:17:43 Temperature Measurement, Probe Number = 1, T = 20.067000 C 00:17:44 Temperature Measurement, Probe Number = 2, T = 20.150000 C 00:17:45 Temperature Measurement, Probe Number = 3, T = 20.095000 C 00:17:45 Temperature Measurement, Probe Number = 4, T = 20.450000 C 00:17:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.07 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.45 00:17:45 Integrated Voltage Measurement... 00:18:05 Voltage Offset Correction: v_off_ini = 0.000005010 V, v_off_fin = 0.000008050 V 00:18:05 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171092389 Vs 00:18:05 Integrated Voltage Measurement... 00:18:25 Voltage Offset Correction: v_off_ini = 0.000007247 V, v_off_fin = 0.000003793 V 00:18:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993381 Vs 00:18:28 Temperature Measurement, Probe Number = 0, T = 20.138000 C 00:18:28 Temperature Measurement, Probe Number = 1, T = 20.063000 C 00:18:29 Temperature Measurement, Probe Number = 2, T = 20.147000 C 00:18:30 Temperature Measurement, Probe Number = 3, T = 20.091000 C 00:18:30 Temperature Measurement, Probe Number = 4, T = 20.457000 C 00:18:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.46 00:18:31 Integrated Voltage Measurement... 00:18:50 Voltage Offset Correction: v_off_ini = 0.000005216 V, v_off_fin = 0.000008291 V 00:18:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171092043 Vs 00:18:50 Integrated Voltage Measurement... 00:19:10 Voltage Offset Correction: v_off_ini = 0.000007367 V, v_off_fin = 0.000003880 V 00:19:10 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997073 Vs 00:49:13 Temperature Measurement, Probe Number = 0, T = 20.131000 C 00:49:13 Temperature Measurement, Probe Number = 1, T = 20.060000 C 00:49:14 Temperature Measurement, Probe Number = 2, T = 20.142000 C 00:49:15 Temperature Measurement, Probe Number = 3, T = 20.084000 C 00:49:15 Temperature Measurement, Probe Number = 4, T = 20.419000 C 00:49:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.42 00:49:16 Integrated Voltage Measurement... 00:49:35 Voltage Offset Correction: v_off_ini = 0.000006333 V, v_off_fin = 0.000007806 V 00:49:35 Integrated Voltage Measurement Delta Gap = 0.0040017 m VT = 0.171144965 Vs 00:49:35 Integrated Voltage Measurement... 00:49:56 Voltage Offset Correction: v_off_ini = 0.000006974 V, v_off_fin = 0.000003993 V 00:49:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999889 Vs 00:49:58 Temperature Measurement, Probe Number = 0, T = 20.135000 C 00:49:59 Temperature Measurement, Probe Number = 1, T = 20.063000 C 00:50:00 Temperature Measurement, Probe Number = 2, T = 20.146000 C 00:50:00 Temperature Measurement, Probe Number = 3, T = 20.089000 C 00:50:01 Temperature Measurement, Probe Number = 4, T = 20.461000 C 00:50:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.46 00:50:02 Integrated Voltage Measurement... 00:50:21 Voltage Offset Correction: v_off_ini = 0.000004996 V, v_off_fin = 0.000007948 V 00:50:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076391 Vs 00:50:21 Integrated Voltage Measurement... 00:50:41 Voltage Offset Correction: v_off_ini = 0.000007436 V, v_off_fin = 0.000002732 V 00:50:41 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997201 Vs 00:50:44 Temperature Measurement, Probe Number = 0, T = 20.131000 C 00:50:44 Temperature Measurement, Probe Number = 1, T = 20.054000 C 00:50:45 Temperature Measurement, Probe Number = 2, T = 20.143000 C 00:50:46 Temperature Measurement, Probe Number = 3, T = 20.084000 C 00:50:46 Temperature Measurement, Probe Number = 4, T = 20.433000 C 00:50:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.43 00:50:46 Integrated Voltage Measurement... 00:51:06 Voltage Offset Correction: v_off_ini = 0.000005096 V, v_off_fin = 0.000007768 V 00:51:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171081380 Vs 00:51:06 Integrated Voltage Measurement... 00:51:26 Voltage Offset Correction: v_off_ini = 0.000007143 V, v_off_fin = 0.000004089 V 00:51:26 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170993208 Vs 00:51:29 Temperature Measurement, Probe Number = 0, T = 20.132000 C 00:51:29 Temperature Measurement, Probe Number = 1, T = 20.059000 C 00:51:30 Temperature Measurement, Probe Number = 2, T = 20.141000 C 00:51:31 Temperature Measurement, Probe Number = 3, T = 20.082000 C 00:51:31 Temperature Measurement, Probe Number = 4, T = 20.412000 C 00:51:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.41 00:51:32 Integrated Voltage Measurement... 00:51:51 Voltage Offset Correction: v_off_ini = 0.000004970 V, v_off_fin = 0.000006811 V 00:51:51 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073409 Vs 00:51:51 Integrated Voltage Measurement... 00:52:11 Voltage Offset Correction: v_off_ini = 0.000006658 V, v_off_fin = 0.000003071 V 00:52:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000040 Vs 00:52:14 Temperature Measurement, Probe Number = 0, T = 20.133000 C 00:52:14 Temperature Measurement, Probe Number = 1, T = 20.059000 C 00:52:15 Temperature Measurement, Probe Number = 2, T = 20.145000 C 00:52:16 Temperature Measurement, Probe Number = 3, T = 20.086000 C 00:52:16 Temperature Measurement, Probe Number = 4, T = 20.395000 C 00:52:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.39 00:52:16 Integrated Voltage Measurement... 00:52:37 Voltage Offset Correction: v_off_ini = 0.000005015 V, v_off_fin = 0.000007347 V 00:52:37 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171081176 Vs 00:52:37 Integrated Voltage Measurement... 00:52:57 Voltage Offset Correction: v_off_ini = 0.000006621 V, v_off_fin = 0.000003925 V 00:52:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993921 Vs 00:53:00 Temperature Measurement, Probe Number = 0, T = 20.133000 C 00:53:01 Temperature Measurement, Probe Number = 1, T = 20.060000 C 00:53:01 Temperature Measurement, Probe Number = 2, T = 20.140000 C 00:53:02 Temperature Measurement, Probe Number = 3, T = 20.085000 C 00:53:03 Temperature Measurement, Probe Number = 4, T = 20.428000 C 00:53:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.43 00:53:03 Integrated Voltage Measurement... 00:53:22 Voltage Offset Correction: v_off_ini = 0.000004634 V, v_off_fin = 0.000007396 V 00:53:22 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075194 Vs 00:53:23 Integrated Voltage Measurement... 00:53:42 Voltage Offset Correction: v_off_ini = 0.000007222 V, v_off_fin = 0.000003134 V 00:53:42 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997289 Vs 00:53:45 Temperature Measurement, Probe Number = 0, T = 20.135000 C 00:53:45 Temperature Measurement, Probe Number = 1, T = 20.056000 C 00:53:46 Temperature Measurement, Probe Number = 2, T = 20.146000 C 00:53:47 Temperature Measurement, Probe Number = 3, T = 20.085000 C 00:53:47 Temperature Measurement, Probe Number = 4, T = 20.445000 C 00:53:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.14 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.15 P3 = Top 2, Value = 20.09 P4 = Room, Value = 20.45 00:53:48 Integrated Voltage Measurement... 00:54:08 Voltage Offset Correction: v_off_ini = 0.000004413 V, v_off_fin = 0.000007542 V 00:54:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171079679 Vs 00:54:08 Integrated Voltage Measurement... 00:54:28 Voltage Offset Correction: v_off_ini = 0.000007007 V, v_off_fin = 0.000003620 V 00:54:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993303 Vs 00:54:31 Temperature Measurement, Probe Number = 0, T = 20.131000 C 00:54:32 Temperature Measurement, Probe Number = 1, T = 20.056000 C 00:54:32 Temperature Measurement, Probe Number = 2, T = 20.140000 C 00:54:33 Temperature Measurement, Probe Number = 3, T = 20.083000 C 00:54:34 Temperature Measurement, Probe Number = 4, T = 20.378000 C 00:54:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.06 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.38 00:54:34 Integrated Voltage Measurement... 00:54:53 Voltage Offset Correction: v_off_ini = 0.000005294 V, v_off_fin = 0.000007907 V 00:54:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080176 Vs 00:54:53 Integrated Voltage Measurement... 00:55:13 Voltage Offset Correction: v_off_ini = 0.000006838 V, v_off_fin = 0.000003801 V 00:55:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992807 Vs 00:55:16 Temperature Measurement, Probe Number = 0, T = 20.132000 C 00:55:17 Temperature Measurement, Probe Number = 1, T = 20.055000 C 00:55:17 Temperature Measurement, Probe Number = 2, T = 20.142000 C 00:55:18 Temperature Measurement, Probe Number = 3, T = 20.083000 C 00:55:19 Temperature Measurement, Probe Number = 4, T = 20.392000 C 00:55:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.39 00:55:19 Integrated Voltage Measurement... 00:55:38 Voltage Offset Correction: v_off_ini = 0.000005402 V, v_off_fin = 0.000007769 V 00:55:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171081927 Vs 00:55:39 Integrated Voltage Measurement... 00:55:58 Voltage Offset Correction: v_off_ini = 0.000007146 V, v_off_fin = 0.000003652 V 00:55:58 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989331 Vs 00:56:01 Temperature Measurement, Probe Number = 0, T = 20.132000 C 00:56:02 Temperature Measurement, Probe Number = 1, T = 20.054000 C 00:56:02 Temperature Measurement, Probe Number = 2, T = 20.144000 C 00:56:03 Temperature Measurement, Probe Number = 3, T = 20.083000 C 00:56:04 Temperature Measurement, Probe Number = 4, T = 20.338000 C 00:56:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.34 00:56:04 Integrated Voltage Measurement... 00:56:24 Voltage Offset Correction: v_off_ini = 0.000005458 V, v_off_fin = 0.000008112 V 00:56:24 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171088146 Vs 00:56:24 Integrated Voltage Measurement... 00:56:43 Voltage Offset Correction: v_off_ini = 0.000007435 V, v_off_fin = 0.000004125 V 00:56:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989442 Vs 01:26:46 Temperature Measurement, Probe Number = 0, T = 20.113000 C 01:26:47 Temperature Measurement, Probe Number = 1, T = 20.036000 C 01:26:48 Temperature Measurement, Probe Number = 2, T = 20.124000 C 01:26:48 Temperature Measurement, Probe Number = 3, T = 20.067000 C 01:26:49 Temperature Measurement, Probe Number = 4, T = 20.338000 C 01:26:49 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.34 01:26:49 Integrated Voltage Measurement... 01:27:09 Voltage Offset Correction: v_off_ini = 0.000006221 V, v_off_fin = 0.000007412 V 01:27:09 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171128100 Vs 01:27:09 Integrated Voltage Measurement... 01:27:29 Voltage Offset Correction: v_off_ini = 0.000007195 V, v_off_fin = 0.000003433 V 01:27:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993585 Vs 01:27:32 Temperature Measurement, Probe Number = 0, T = 20.121000 C 01:27:33 Temperature Measurement, Probe Number = 1, T = 20.046000 C 01:27:33 Temperature Measurement, Probe Number = 2, T = 20.128000 C 01:27:34 Temperature Measurement, Probe Number = 3, T = 20.070000 C 01:27:35 Temperature Measurement, Probe Number = 4, T = 20.339000 C 01:27:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.34 01:27:35 Integrated Voltage Measurement... 01:27:54 Voltage Offset Correction: v_off_ini = 0.000004785 V, v_off_fin = 0.000008056 V 01:27:54 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171079509 Vs 01:27:55 Integrated Voltage Measurement... 01:28:14 Voltage Offset Correction: v_off_ini = 0.000007521 V, v_off_fin = 0.000003435 V 01:28:14 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994139 Vs 01:28:17 Temperature Measurement, Probe Number = 0, T = 20.126000 C 01:28:18 Temperature Measurement, Probe Number = 1, T = 20.051000 C 01:28:19 Temperature Measurement, Probe Number = 2, T = 20.135000 C 01:28:19 Temperature Measurement, Probe Number = 3, T = 20.077000 C 01:28:20 Temperature Measurement, Probe Number = 4, T = 20.344000 C 01:28:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.34 01:28:20 Integrated Voltage Measurement... 01:28:39 Voltage Offset Correction: v_off_ini = 0.000004925 V, v_off_fin = 0.000007650 V 01:28:40 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171087862 Vs 01:28:40 Integrated Voltage Measurement... 01:28:59 Voltage Offset Correction: v_off_ini = 0.000007322 V, v_off_fin = 0.000003552 V 01:28:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990094 Vs 01:29:02 Temperature Measurement, Probe Number = 0, T = 20.128000 C 01:29:03 Temperature Measurement, Probe Number = 1, T = 20.049000 C 01:29:03 Temperature Measurement, Probe Number = 2, T = 20.137000 C 01:29:04 Temperature Measurement, Probe Number = 3, T = 20.076000 C 01:29:05 Temperature Measurement, Probe Number = 4, T = 20.378000 C 01:29:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.14 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.38 01:29:05 Integrated Voltage Measurement... 01:29:24 Voltage Offset Correction: v_off_ini = 0.000005045 V, v_off_fin = 0.000007904 V 01:29:25 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171085142 Vs 01:29:25 Integrated Voltage Measurement... 01:29:45 Voltage Offset Correction: v_off_ini = 0.000007650 V, v_off_fin = 0.000003918 V 01:29:45 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988617 Vs 01:29:48 Temperature Measurement, Probe Number = 0, T = 20.120000 C 01:29:48 Temperature Measurement, Probe Number = 1, T = 20.047000 C 01:29:49 Temperature Measurement, Probe Number = 2, T = 20.129000 C 01:29:50 Temperature Measurement, Probe Number = 3, T = 20.074000 C 01:29:50 Temperature Measurement, Probe Number = 4, T = 20.359000 C 01:29:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.36 01:29:51 Integrated Voltage Measurement... 01:30:11 Voltage Offset Correction: v_off_ini = 0.000005348 V, v_off_fin = 0.000008058 V 01:30:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171088136 Vs 01:30:11 Integrated Voltage Measurement... 01:30:31 Voltage Offset Correction: v_off_ini = 0.000007529 V, v_off_fin = 0.000004693 V 01:30:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987846 Vs 01:30:34 Temperature Measurement, Probe Number = 0, T = 20.120000 C 01:30:35 Temperature Measurement, Probe Number = 1, T = 20.046000 C 01:30:36 Temperature Measurement, Probe Number = 2, T = 20.129000 C 01:30:36 Temperature Measurement, Probe Number = 3, T = 20.071000 C 01:30:37 Temperature Measurement, Probe Number = 4, T = 20.393000 C 01:30:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.39 01:30:37 Integrated Voltage Measurement... 01:30:56 Voltage Offset Correction: v_off_ini = 0.000005559 V, v_off_fin = 0.000007945 V 01:30:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171089450 Vs 01:30:57 Integrated Voltage Measurement... 01:31:16 Voltage Offset Correction: v_off_ini = 0.000007252 V, v_off_fin = 0.000003474 V 01:31:17 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170996397 Vs 01:31:19 Temperature Measurement, Probe Number = 0, T = 20.122000 C 01:31:20 Temperature Measurement, Probe Number = 1, T = 20.045000 C 01:31:21 Temperature Measurement, Probe Number = 2, T = 20.131000 C 01:31:21 Temperature Measurement, Probe Number = 3, T = 20.070000 C 01:31:22 Temperature Measurement, Probe Number = 4, T = 20.332000 C 01:31:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.33 01:31:22 Integrated Voltage Measurement... 01:31:42 Voltage Offset Correction: v_off_ini = 0.000005224 V, v_off_fin = 0.000007862 V 01:31:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171088380 Vs 01:31:42 Integrated Voltage Measurement... 01:32:02 Voltage Offset Correction: v_off_ini = 0.000007193 V, v_off_fin = 0.000003782 V 01:32:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993442 Vs 01:32:05 Temperature Measurement, Probe Number = 0, T = 20.125000 C 01:32:06 Temperature Measurement, Probe Number = 1, T = 20.050000 C 01:32:06 Temperature Measurement, Probe Number = 2, T = 20.134000 C 01:32:07 Temperature Measurement, Probe Number = 3, T = 20.076000 C 01:32:08 Temperature Measurement, Probe Number = 4, T = 20.342000 C 01:32:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.34 01:32:08 Integrated Voltage Measurement... 01:32:28 Voltage Offset Correction: v_off_ini = 0.000005607 V, v_off_fin = 0.000008237 V 01:32:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171089832 Vs 01:32:29 Integrated Voltage Measurement... 01:32:49 Voltage Offset Correction: v_off_ini = 0.000007060 V, v_off_fin = 0.000004069 V 01:32:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986361 Vs 01:32:51 Temperature Measurement, Probe Number = 0, T = 20.126000 C 01:32:52 Temperature Measurement, Probe Number = 1, T = 20.052000 C 01:32:53 Temperature Measurement, Probe Number = 2, T = 20.134000 C 01:32:53 Temperature Measurement, Probe Number = 3, T = 20.079000 C 01:32:54 Temperature Measurement, Probe Number = 4, T = 20.383000 C 01:32:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.08 P4 = Room, Value = 20.38 01:32:54 Integrated Voltage Measurement... 01:33:14 Voltage Offset Correction: v_off_ini = 0.000005136 V, v_off_fin = 0.000008368 V 01:33:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171088669 Vs 01:33:14 Integrated Voltage Measurement... 01:33:34 Voltage Offset Correction: v_off_ini = 0.000007907 V, v_off_fin = 0.000004129 V 01:33:34 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170989234 Vs 01:33:37 Temperature Measurement, Probe Number = 0, T = 20.126000 C 01:33:37 Temperature Measurement, Probe Number = 1, T = 20.049000 C 01:33:38 Temperature Measurement, Probe Number = 2, T = 20.134000 C 01:33:39 Temperature Measurement, Probe Number = 3, T = 20.073000 C 01:33:39 Temperature Measurement, Probe Number = 4, T = 20.392000 C 01:33:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.13 P1 = Bottom 2, Value = 20.05 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.39 01:33:39 Integrated Voltage Measurement... 01:33:59 Voltage Offset Correction: v_off_ini = 0.000005517 V, v_off_fin = 0.000008009 V 01:33:59 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171091048 Vs 01:33:59 Integrated Voltage Measurement... 01:34:19 Voltage Offset Correction: v_off_ini = 0.000007579 V, v_off_fin = 0.000004076 V 01:34:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170991497 Vs 02:04:22 Temperature Measurement, Probe Number = 0, T = 20.116000 C 02:04:22 Temperature Measurement, Probe Number = 1, T = 20.043000 C 02:04:23 Temperature Measurement, Probe Number = 2, T = 20.123000 C 02:04:24 Temperature Measurement, Probe Number = 3, T = 20.070000 C 02:04:24 Temperature Measurement, Probe Number = 4, T = 20.394000 C 02:04:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.39 02:04:25 Integrated Voltage Measurement... 02:04:45 Voltage Offset Correction: v_off_ini = 0.000005965 V, v_off_fin = 0.000007448 V 02:04:45 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171133439 Vs 02:04:45 Integrated Voltage Measurement... 02:05:05 Voltage Offset Correction: v_off_ini = 0.000007461 V, v_off_fin = 0.000003961 V 02:05:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993631 Vs 02:05:07 Temperature Measurement, Probe Number = 0, T = 20.115000 C 02:05:08 Temperature Measurement, Probe Number = 1, T = 20.044000 C 02:05:09 Temperature Measurement, Probe Number = 2, T = 20.124000 C 02:05:09 Temperature Measurement, Probe Number = 3, T = 20.070000 C 02:05:10 Temperature Measurement, Probe Number = 4, T = 20.413000 C 02:05:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.41 02:05:10 Integrated Voltage Measurement... 02:05:30 Voltage Offset Correction: v_off_ini = 0.000004981 V, v_off_fin = 0.000008091 V 02:05:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171089241 Vs 02:05:30 Integrated Voltage Measurement... 02:05:50 Voltage Offset Correction: v_off_ini = 0.000007437 V, v_off_fin = 0.000003581 V 02:05:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993182 Vs 02:05:52 Temperature Measurement, Probe Number = 0, T = 20.113000 C 02:05:53 Temperature Measurement, Probe Number = 1, T = 20.042000 C 02:05:54 Temperature Measurement, Probe Number = 2, T = 20.124000 C 02:05:54 Temperature Measurement, Probe Number = 3, T = 20.067000 C 02:05:55 Temperature Measurement, Probe Number = 4, T = 20.420000 C 02:05:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.42 02:05:55 Integrated Voltage Measurement... 02:06:15 Voltage Offset Correction: v_off_ini = 0.000005157 V, v_off_fin = 0.000007795 V 02:06:15 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171092324 Vs 02:06:15 Integrated Voltage Measurement... 02:06:35 Voltage Offset Correction: v_off_ini = 0.000007179 V, v_off_fin = 0.000003959 V 02:06:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992660 Vs 02:06:38 Temperature Measurement, Probe Number = 0, T = 20.112000 C 02:06:38 Temperature Measurement, Probe Number = 1, T = 20.038000 C 02:06:39 Temperature Measurement, Probe Number = 2, T = 20.122000 C 02:06:39 Temperature Measurement, Probe Number = 3, T = 20.064000 C 02:06:40 Temperature Measurement, Probe Number = 4, T = 20.369000 C 02:06:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.37 02:06:40 Integrated Voltage Measurement... 02:07:01 Voltage Offset Correction: v_off_ini = 0.000005298 V, v_off_fin = 0.000007926 V 02:07:01 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171087798 Vs 02:07:01 Integrated Voltage Measurement... 02:07:21 Voltage Offset Correction: v_off_ini = 0.000007233 V, v_off_fin = 0.000003695 V 02:07:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995993 Vs 02:07:24 Temperature Measurement, Probe Number = 0, T = 20.117000 C 02:07:24 Temperature Measurement, Probe Number = 1, T = 20.042000 C 02:07:25 Temperature Measurement, Probe Number = 2, T = 20.126000 C 02:07:26 Temperature Measurement, Probe Number = 3, T = 20.069000 C 02:07:26 Temperature Measurement, Probe Number = 4, T = 20.366000 C 02:07:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.37 02:07:26 Integrated Voltage Measurement... 02:07:46 Voltage Offset Correction: v_off_ini = 0.000005481 V, v_off_fin = 0.000008160 V 02:07:46 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171092063 Vs 02:07:46 Integrated Voltage Measurement... 02:08:06 Voltage Offset Correction: v_off_ini = 0.000007520 V, v_off_fin = 0.000003895 V 02:08:06 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170990036 Vs 02:08:09 Temperature Measurement, Probe Number = 0, T = 20.116000 C 02:08:09 Temperature Measurement, Probe Number = 1, T = 20.043000 C 02:08:10 Temperature Measurement, Probe Number = 2, T = 20.128000 C 02:08:11 Temperature Measurement, Probe Number = 3, T = 20.070000 C 02:08:11 Temperature Measurement, Probe Number = 4, T = 20.382000 C 02:08:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.38 02:08:12 Integrated Voltage Measurement... 02:08:31 Voltage Offset Correction: v_off_ini = 0.000005516 V, v_off_fin = 0.000007955 V 02:08:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171093788 Vs 02:08:31 Integrated Voltage Measurement... 02:08:51 Voltage Offset Correction: v_off_ini = 0.000007247 V, v_off_fin = 0.000004062 V 02:08:51 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993842 Vs 02:08:54 Temperature Measurement, Probe Number = 0, T = 20.116000 C 02:08:55 Temperature Measurement, Probe Number = 1, T = 20.041000 C 02:08:55 Temperature Measurement, Probe Number = 2, T = 20.129000 C 02:08:56 Temperature Measurement, Probe Number = 3, T = 20.068000 C 02:08:56 Temperature Measurement, Probe Number = 4, T = 20.410000 C 02:08:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.41 02:08:57 Integrated Voltage Measurement... 02:09:17 Voltage Offset Correction: v_off_ini = 0.000005247 V, v_off_fin = 0.000007719 V 02:09:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171089489 Vs 02:09:17 Integrated Voltage Measurement... 02:09:37 Voltage Offset Correction: v_off_ini = 0.000007300 V, v_off_fin = 0.000004598 V 02:09:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995461 Vs 02:09:40 Temperature Measurement, Probe Number = 0, T = 20.115000 C 02:09:41 Temperature Measurement, Probe Number = 1, T = 20.040000 C 02:09:41 Temperature Measurement, Probe Number = 2, T = 20.124000 C 02:09:42 Temperature Measurement, Probe Number = 3, T = 20.066000 C 02:09:43 Temperature Measurement, Probe Number = 4, T = 20.370000 C 02:09:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.37 02:09:43 Integrated Voltage Measurement... 02:10:02 Voltage Offset Correction: v_off_ini = 0.000005905 V, v_off_fin = 0.000008304 V 02:10:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171089091 Vs 02:10:02 Integrated Voltage Measurement... 02:10:22 Voltage Offset Correction: v_off_ini = 0.000007727 V, v_off_fin = 0.000004235 V 02:10:22 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994819 Vs 02:10:25 Temperature Measurement, Probe Number = 0, T = 20.116000 C 02:10:26 Temperature Measurement, Probe Number = 1, T = 20.041000 C 02:10:26 Temperature Measurement, Probe Number = 2, T = 20.129000 C 02:10:27 Temperature Measurement, Probe Number = 3, T = 20.070000 C 02:10:27 Temperature Measurement, Probe Number = 4, T = 20.393000 C 02:10:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.12 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.13 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.39 02:10:28 Integrated Voltage Measurement... 02:10:47 Voltage Offset Correction: v_off_ini = 0.000005016 V, v_off_fin = 0.000008423 V 02:10:47 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171090458 Vs 02:10:47 Integrated Voltage Measurement... 02:11:07 Voltage Offset Correction: v_off_ini = 0.000007528 V, v_off_fin = 0.000003407 V 02:11:07 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.171006076 Vs 02:11:10 Temperature Measurement, Probe Number = 0, T = 20.113000 C 02:11:11 Temperature Measurement, Probe Number = 1, T = 20.037000 C 02:11:11 Temperature Measurement, Probe Number = 2, T = 20.124000 C 02:11:12 Temperature Measurement, Probe Number = 3, T = 20.066000 C 02:11:13 Temperature Measurement, Probe Number = 4, T = 20.393000 C 02:11:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.07 P4 = Room, Value = 20.39 02:11:13 Integrated Voltage Measurement... 02:11:33 Voltage Offset Correction: v_off_ini = 0.000005269 V, v_off_fin = 0.000008264 V 02:11:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171100574 Vs 02:11:33 Integrated Voltage Measurement... 02:11:52 Voltage Offset Correction: v_off_ini = 0.000007546 V, v_off_fin = 0.000004391 V 02:11:52 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170987996 Vs 02:41:55 Temperature Measurement, Probe Number = 0, T = 20.107000 C 02:41:56 Temperature Measurement, Probe Number = 1, T = 20.031000 C 02:41:56 Temperature Measurement, Probe Number = 2, T = 20.119000 C 02:41:57 Temperature Measurement, Probe Number = 3, T = 20.059000 C 02:41:58 Temperature Measurement, Probe Number = 4, T = 20.346000 C 02:41:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.35 02:41:58 Integrated Voltage Measurement... 02:42:17 Voltage Offset Correction: v_off_ini = 0.000006247 V, v_off_fin = 0.000008513 V 02:42:17 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171144957 Vs 02:42:18 Integrated Voltage Measurement... 02:42:38 Voltage Offset Correction: v_off_ini = 0.000008079 V, v_off_fin = 0.000004339 V 02:42:38 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998671 Vs 02:42:41 Temperature Measurement, Probe Number = 0, T = 20.110000 C 02:42:41 Temperature Measurement, Probe Number = 1, T = 20.035000 C 02:42:42 Temperature Measurement, Probe Number = 2, T = 20.120000 C 02:42:43 Temperature Measurement, Probe Number = 3, T = 20.063000 C 02:42:43 Temperature Measurement, Probe Number = 4, T = 20.347000 C 02:42:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.35 02:42:44 Integrated Voltage Measurement... 02:43:03 Voltage Offset Correction: v_off_ini = 0.000005739 V, v_off_fin = 0.000008026 V 02:43:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171088839 Vs 02:43:03 Integrated Voltage Measurement... 02:43:24 Voltage Offset Correction: v_off_ini = 0.000007219 V, v_off_fin = 0.000004114 V 02:43:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998447 Vs 02:43:27 Temperature Measurement, Probe Number = 0, T = 20.108000 C 02:43:27 Temperature Measurement, Probe Number = 1, T = 20.034000 C 02:43:28 Temperature Measurement, Probe Number = 2, T = 20.117000 C 02:43:29 Temperature Measurement, Probe Number = 3, T = 20.062000 C 02:43:29 Temperature Measurement, Probe Number = 4, T = 20.408000 C 02:43:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.41 02:43:29 Integrated Voltage Measurement... 02:43:49 Voltage Offset Correction: v_off_ini = 0.000005222 V, v_off_fin = 0.000007720 V 02:43:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171083737 Vs 02:43:50 Integrated Voltage Measurement... 02:44:09 Voltage Offset Correction: v_off_ini = 0.000007399 V, v_off_fin = 0.000004156 V 02:44:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993779 Vs 02:44:12 Temperature Measurement, Probe Number = 0, T = 20.107000 C 02:44:13 Temperature Measurement, Probe Number = 1, T = 20.034000 C 02:44:13 Temperature Measurement, Probe Number = 2, T = 20.118000 C 02:44:14 Temperature Measurement, Probe Number = 3, T = 20.061000 C 02:44:15 Temperature Measurement, Probe Number = 4, T = 20.381000 C 02:44:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.38 02:44:15 Integrated Voltage Measurement... 02:44:34 Voltage Offset Correction: v_off_ini = 0.000005130 V, v_off_fin = 0.000008141 V 02:44:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171088967 Vs 02:44:35 Integrated Voltage Measurement... 02:44:55 Voltage Offset Correction: v_off_ini = 0.000007183 V, v_off_fin = 0.000004543 V 02:44:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995428 Vs 02:44:57 Temperature Measurement, Probe Number = 0, T = 20.108000 C 02:44:58 Temperature Measurement, Probe Number = 1, T = 20.037000 C 02:44:59 Temperature Measurement, Probe Number = 2, T = 20.117000 C 02:44:59 Temperature Measurement, Probe Number = 3, T = 20.063000 C 02:45:00 Temperature Measurement, Probe Number = 4, T = 20.390000 C 02:45:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.04 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.39 02:45:00 Integrated Voltage Measurement... 02:45:20 Voltage Offset Correction: v_off_ini = 0.000005319 V, v_off_fin = 0.000007800 V 02:45:21 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171085978 Vs 02:45:21 Integrated Voltage Measurement... 02:45:41 Voltage Offset Correction: v_off_ini = 0.000007054 V, v_off_fin = 0.000004879 V 02:45:42 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170990363 Vs 02:45:44 Temperature Measurement, Probe Number = 0, T = 20.106000 C 02:45:45 Temperature Measurement, Probe Number = 1, T = 20.033000 C 02:45:46 Temperature Measurement, Probe Number = 2, T = 20.115000 C 02:45:46 Temperature Measurement, Probe Number = 3, T = 20.061000 C 02:45:47 Temperature Measurement, Probe Number = 4, T = 20.411000 C 02:45:47 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.41 02:45:47 Integrated Voltage Measurement... 02:46:07 Voltage Offset Correction: v_off_ini = 0.000005248 V, v_off_fin = 0.000007880 V 02:46:07 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171086778 Vs 02:46:07 Integrated Voltage Measurement... 02:46:27 Voltage Offset Correction: v_off_ini = 0.000007399 V, v_off_fin = 0.000004285 V 02:46:27 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995355 Vs 02:46:29 Temperature Measurement, Probe Number = 0, T = 20.106000 C 02:46:30 Temperature Measurement, Probe Number = 1, T = 20.031000 C 02:46:31 Temperature Measurement, Probe Number = 2, T = 20.116000 C 02:46:31 Temperature Measurement, Probe Number = 3, T = 20.059000 C 02:46:32 Temperature Measurement, Probe Number = 4, T = 20.363000 C 02:46:32 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.12 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.36 02:46:32 Integrated Voltage Measurement... 02:46:52 Voltage Offset Correction: v_off_ini = 0.000005329 V, v_off_fin = 0.000007694 V 02:46:53 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171087405 Vs 02:46:53 Integrated Voltage Measurement... 02:47:12 Voltage Offset Correction: v_off_ini = 0.000007041 V, v_off_fin = 0.000003965 V 02:47:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998121 Vs 02:47:15 Temperature Measurement, Probe Number = 0, T = 20.103000 C 02:47:16 Temperature Measurement, Probe Number = 1, T = 20.026000 C 02:47:17 Temperature Measurement, Probe Number = 2, T = 20.111000 C 02:47:17 Temperature Measurement, Probe Number = 3, T = 20.053000 C 02:47:18 Temperature Measurement, Probe Number = 4, T = 20.366000 C 02:47:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.37 02:47:18 Integrated Voltage Measurement... 02:47:38 Voltage Offset Correction: v_off_ini = 0.000005273 V, v_off_fin = 0.000007969 V 02:47:38 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171093066 Vs 02:47:38 Integrated Voltage Measurement... 02:47:58 Voltage Offset Correction: v_off_ini = 0.000007229 V, v_off_fin = 0.000003358 V 02:47:58 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997274 Vs 02:48:00 Temperature Measurement, Probe Number = 0, T = 20.105000 C 02:48:01 Temperature Measurement, Probe Number = 1, T = 20.028000 C 02:48:02 Temperature Measurement, Probe Number = 2, T = 20.114000 C 02:48:02 Temperature Measurement, Probe Number = 3, T = 20.056000 C 02:48:03 Temperature Measurement, Probe Number = 4, T = 20.354000 C 02:48:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.11 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.35 02:48:03 Integrated Voltage Measurement... 02:48:23 Voltage Offset Correction: v_off_ini = 0.000004850 V, v_off_fin = 0.000007553 V 02:48:23 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171094036 Vs 02:48:23 Integrated Voltage Measurement... 02:48:43 Voltage Offset Correction: v_off_ini = 0.000006974 V, v_off_fin = 0.000003768 V 02:48:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170999260 Vs 02:48:46 Temperature Measurement, Probe Number = 0, T = 20.104000 C 02:48:46 Temperature Measurement, Probe Number = 1, T = 20.025000 C 02:48:47 Temperature Measurement, Probe Number = 2, T = 20.113000 C 02:48:48 Temperature Measurement, Probe Number = 3, T = 20.057000 C 02:48:48 Temperature Measurement, Probe Number = 4, T = 20.366000 C 02:48:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.06 P4 = Room, Value = 20.37 02:48:49 Integrated Voltage Measurement... 02:49:08 Voltage Offset Correction: v_off_ini = 0.000004972 V, v_off_fin = 0.000007602 V 02:49:09 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171085996 Vs 02:49:09 Integrated Voltage Measurement... 02:49:29 Voltage Offset Correction: v_off_ini = 0.000006810 V, v_off_fin = 0.000003989 V 02:49:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171005121 Vs 03:19:32 Temperature Measurement, Probe Number = 0, T = 20.098000 C 03:19:33 Temperature Measurement, Probe Number = 1, T = 20.022000 C 03:19:33 Temperature Measurement, Probe Number = 2, T = 20.108000 C 03:19:34 Temperature Measurement, Probe Number = 3, T = 20.050000 C 03:19:35 Temperature Measurement, Probe Number = 4, T = 20.330000 C 03:19:35 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.33 03:19:35 Integrated Voltage Measurement... 03:19:55 Voltage Offset Correction: v_off_ini = 0.000006498 V, v_off_fin = 0.000007743 V 03:19:55 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171137650 Vs 03:19:56 Integrated Voltage Measurement... 03:20:16 Voltage Offset Correction: v_off_ini = 0.000007313 V, v_off_fin = 0.000004427 V 03:20:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993668 Vs 03:20:18 Temperature Measurement, Probe Number = 0, T = 20.101000 C 03:20:19 Temperature Measurement, Probe Number = 1, T = 20.027000 C 03:20:20 Temperature Measurement, Probe Number = 2, T = 20.112000 C 03:20:20 Temperature Measurement, Probe Number = 3, T = 20.053000 C 03:20:21 Temperature Measurement, Probe Number = 4, T = 20.368000 C 03:20:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.37 03:20:21 Integrated Voltage Measurement... 03:20:41 Voltage Offset Correction: v_off_ini = 0.000005102 V, v_off_fin = 0.000007694 V 03:20:41 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171086687 Vs 03:20:41 Integrated Voltage Measurement... 03:21:01 Voltage Offset Correction: v_off_ini = 0.000007496 V, v_off_fin = 0.000004103 V 03:21:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997847 Vs 03:21:03 Temperature Measurement, Probe Number = 0, T = 20.103000 C 03:21:04 Temperature Measurement, Probe Number = 1, T = 20.027000 C 03:21:05 Temperature Measurement, Probe Number = 2, T = 20.112000 C 03:21:05 Temperature Measurement, Probe Number = 3, T = 20.054000 C 03:21:06 Temperature Measurement, Probe Number = 4, T = 20.381000 C 03:21:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.38 03:21:06 Integrated Voltage Measurement... 03:21:26 Voltage Offset Correction: v_off_ini = 0.000005517 V, v_off_fin = 0.000008125 V 03:21:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171091733 Vs 03:21:26 Integrated Voltage Measurement... 03:21:46 Voltage Offset Correction: v_off_ini = 0.000007522 V, v_off_fin = 0.000004043 V 03:21:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171001088 Vs 03:21:49 Temperature Measurement, Probe Number = 0, T = 20.103000 C 03:21:49 Temperature Measurement, Probe Number = 1, T = 20.025000 C 03:21:50 Temperature Measurement, Probe Number = 2, T = 20.112000 C 03:21:51 Temperature Measurement, Probe Number = 3, T = 20.053000 C 03:21:51 Temperature Measurement, Probe Number = 4, T = 20.388000 C 03:21:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.39 03:21:51 Integrated Voltage Measurement... 03:22:11 Voltage Offset Correction: v_off_ini = 0.000005505 V, v_off_fin = 0.000008219 V 03:22:11 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171091224 Vs 03:22:11 Integrated Voltage Measurement... 03:22:32 Voltage Offset Correction: v_off_ini = 0.000007968 V, v_off_fin = 0.000004367 V 03:22:32 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170995034 Vs 03:22:35 Temperature Measurement, Probe Number = 0, T = 20.099000 C 03:22:35 Temperature Measurement, Probe Number = 1, T = 20.024000 C 03:22:36 Temperature Measurement, Probe Number = 2, T = 20.110000 C 03:22:37 Temperature Measurement, Probe Number = 3, T = 20.051000 C 03:22:37 Temperature Measurement, Probe Number = 4, T = 20.323000 C 03:22:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.32 03:22:37 Integrated Voltage Measurement... 03:22:57 Voltage Offset Correction: v_off_ini = 0.000005933 V, v_off_fin = 0.000007918 V 03:22:57 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171086048 Vs 03:22:57 Integrated Voltage Measurement... 03:23:17 Voltage Offset Correction: v_off_ini = 0.000007149 V, v_off_fin = 0.000004107 V 03:23:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993405 Vs 03:23:20 Temperature Measurement, Probe Number = 0, T = 20.101000 C 03:23:20 Temperature Measurement, Probe Number = 1, T = 20.025000 C 03:23:21 Temperature Measurement, Probe Number = 2, T = 20.113000 C 03:23:22 Temperature Measurement, Probe Number = 3, T = 20.052000 C 03:23:22 Temperature Measurement, Probe Number = 4, T = 20.364000 C 03:23:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.36 03:23:23 Integrated Voltage Measurement... 03:23:42 Voltage Offset Correction: v_off_ini = 0.000004894 V, v_off_fin = 0.000008149 V 03:23:42 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171086277 Vs 03:23:42 Integrated Voltage Measurement... 03:24:02 Voltage Offset Correction: v_off_ini = 0.000007329 V, v_off_fin = 0.000004791 V 03:24:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170995606 Vs 03:24:05 Temperature Measurement, Probe Number = 0, T = 20.098000 C 03:24:05 Temperature Measurement, Probe Number = 1, T = 20.025000 C 03:24:06 Temperature Measurement, Probe Number = 2, T = 20.113000 C 03:24:07 Temperature Measurement, Probe Number = 3, T = 20.054000 C 03:24:07 Temperature Measurement, Probe Number = 4, T = 20.331000 C 03:24:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.33 03:24:08 Integrated Voltage Measurement... 03:24:27 Voltage Offset Correction: v_off_ini = 0.000005318 V, v_off_fin = 0.000007969 V 03:24:27 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171090913 Vs 03:24:27 Integrated Voltage Measurement... 03:24:47 Voltage Offset Correction: v_off_ini = 0.000007389 V, v_off_fin = 0.000004263 V 03:24:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170998597 Vs 03:24:50 Temperature Measurement, Probe Number = 0, T = 20.100000 C 03:24:50 Temperature Measurement, Probe Number = 1, T = 20.024000 C 03:24:51 Temperature Measurement, Probe Number = 2, T = 20.112000 C 03:24:52 Temperature Measurement, Probe Number = 3, T = 20.053000 C 03:24:52 Temperature Measurement, Probe Number = 4, T = 20.374000 C 03:24:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.37 03:24:53 Integrated Voltage Measurement... 03:25:12 Voltage Offset Correction: v_off_ini = 0.000005148 V, v_off_fin = 0.000008119 V 03:25:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171090756 Vs 03:25:12 Integrated Voltage Measurement... 03:25:32 Voltage Offset Correction: v_off_ini = 0.000007667 V, v_off_fin = 0.000004098 V 03:25:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992231 Vs 03:25:35 Temperature Measurement, Probe Number = 0, T = 20.098000 C 03:25:35 Temperature Measurement, Probe Number = 1, T = 20.024000 C 03:25:36 Temperature Measurement, Probe Number = 2, T = 20.111000 C 03:25:37 Temperature Measurement, Probe Number = 3, T = 20.051000 C 03:25:37 Temperature Measurement, Probe Number = 4, T = 20.328000 C 03:25:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.33 03:25:38 Integrated Voltage Measurement... 03:25:58 Voltage Offset Correction: v_off_ini = 0.000005559 V, v_off_fin = 0.000008076 V 03:25:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171092055 Vs 03:25:58 Integrated Voltage Measurement... 03:26:17 Voltage Offset Correction: v_off_ini = 0.000007589 V, v_off_fin = 0.000004375 V 03:26:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989820 Vs 03:26:20 Temperature Measurement, Probe Number = 0, T = 20.098000 C 03:26:21 Temperature Measurement, Probe Number = 1, T = 20.018000 C 03:26:21 Temperature Measurement, Probe Number = 2, T = 20.110000 C 03:26:22 Temperature Measurement, Probe Number = 3, T = 20.051000 C 03:26:23 Temperature Measurement, Probe Number = 4, T = 20.354000 C 03:26:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.10 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.35 03:26:23 Integrated Voltage Measurement... 03:26:42 Voltage Offset Correction: v_off_ini = 0.000005361 V, v_off_fin = 0.000008440 V 03:26:42 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171093180 Vs 03:26:42 Integrated Voltage Measurement... 03:27:02 Voltage Offset Correction: v_off_ini = 0.000007814 V, v_off_fin = 0.000004311 V 03:27:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991837 Vs 03:57:05 Temperature Measurement, Probe Number = 0, T = 20.088000 C 03:57:06 Temperature Measurement, Probe Number = 1, T = 20.020000 C 03:57:06 Temperature Measurement, Probe Number = 2, T = 20.099000 C 03:57:07 Temperature Measurement, Probe Number = 3, T = 20.044000 C 03:57:08 Temperature Measurement, Probe Number = 4, T = 20.393000 C 03:57:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.39 03:57:08 Integrated Voltage Measurement... 03:57:27 Voltage Offset Correction: v_off_ini = 0.000006255 V, v_off_fin = 0.000008083 V 03:57:27 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171139451 Vs 03:57:28 Integrated Voltage Measurement... 03:57:47 Voltage Offset Correction: v_off_ini = 0.000007433 V, v_off_fin = 0.000004912 V 03:57:47 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983016 Vs 03:57:50 Temperature Measurement, Probe Number = 0, T = 20.090000 C 03:57:50 Temperature Measurement, Probe Number = 1, T = 20.020000 C 03:57:51 Temperature Measurement, Probe Number = 2, T = 20.100000 C 03:57:52 Temperature Measurement, Probe Number = 3, T = 20.046000 C 03:57:52 Temperature Measurement, Probe Number = 4, T = 20.415000 C 03:57:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 03:57:53 Integrated Voltage Measurement... 03:58:12 Voltage Offset Correction: v_off_ini = 0.000006382 V, v_off_fin = 0.000008372 V 03:58:12 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171089358 Vs 03:58:12 Integrated Voltage Measurement... 03:58:32 Voltage Offset Correction: v_off_ini = 0.000008079 V, v_off_fin = 0.000004730 V 03:58:32 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170974218 Vs 03:58:35 Temperature Measurement, Probe Number = 0, T = 20.090000 C 03:58:35 Temperature Measurement, Probe Number = 1, T = 20.021000 C 03:58:36 Temperature Measurement, Probe Number = 2, T = 20.102000 C 03:58:37 Temperature Measurement, Probe Number = 3, T = 20.046000 C 03:58:37 Temperature Measurement, Probe Number = 4, T = 20.431000 C 03:58:38 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.43 03:58:38 Integrated Voltage Measurement... 03:58:57 Voltage Offset Correction: v_off_ini = 0.000005357 V, v_off_fin = 0.000008467 V 03:58:57 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171077500 Vs 03:58:57 Integrated Voltage Measurement... 03:59:17 Voltage Offset Correction: v_off_ini = 0.000007514 V, v_off_fin = 0.000004027 V 03:59:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980637 Vs 03:59:20 Temperature Measurement, Probe Number = 0, T = 20.087000 C 03:59:21 Temperature Measurement, Probe Number = 1, T = 20.018000 C 03:59:21 Temperature Measurement, Probe Number = 2, T = 20.099000 C 03:59:22 Temperature Measurement, Probe Number = 3, T = 20.044000 C 03:59:23 Temperature Measurement, Probe Number = 4, T = 20.392000 C 03:59:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.39 03:59:23 Integrated Voltage Measurement... 03:59:42 Voltage Offset Correction: v_off_ini = 0.000005359 V, v_off_fin = 0.000008387 V 03:59:42 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079024 Vs 03:59:43 Integrated Voltage Measurement... 04:00:03 Voltage Offset Correction: v_off_ini = 0.000007488 V, v_off_fin = 0.000004474 V 04:00:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980262 Vs 04:00:06 Temperature Measurement, Probe Number = 0, T = 20.086000 C 04:00:06 Temperature Measurement, Probe Number = 1, T = 20.019000 C 04:00:07 Temperature Measurement, Probe Number = 2, T = 20.098000 C 04:00:08 Temperature Measurement, Probe Number = 3, T = 20.044000 C 04:00:08 Temperature Measurement, Probe Number = 4, T = 20.403000 C 04:00:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.40 04:00:09 Integrated Voltage Measurement... 04:00:28 Voltage Offset Correction: v_off_ini = 0.000005684 V, v_off_fin = 0.000007881 V 04:00:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080112 Vs 04:00:29 Integrated Voltage Measurement... 04:00:48 Voltage Offset Correction: v_off_ini = 0.000007363 V, v_off_fin = 0.000003583 V 04:00:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986800 Vs 04:00:51 Temperature Measurement, Probe Number = 0, T = 20.088000 C 04:00:52 Temperature Measurement, Probe Number = 1, T = 20.020000 C 04:00:52 Temperature Measurement, Probe Number = 2, T = 20.101000 C 04:00:53 Temperature Measurement, Probe Number = 3, T = 20.046000 C 04:00:54 Temperature Measurement, Probe Number = 4, T = 20.396000 C 04:00:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.40 04:00:54 Integrated Voltage Measurement... 04:01:13 Voltage Offset Correction: v_off_ini = 0.000005181 V, v_off_fin = 0.000007984 V 04:01:13 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078119 Vs 04:01:14 Integrated Voltage Measurement... 04:01:33 Voltage Offset Correction: v_off_ini = 0.000007299 V, v_off_fin = 0.000004088 V 04:01:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986515 Vs 04:01:36 Temperature Measurement, Probe Number = 0, T = 20.091000 C 04:01:37 Temperature Measurement, Probe Number = 1, T = 20.021000 C 04:01:38 Temperature Measurement, Probe Number = 2, T = 20.101000 C 04:01:38 Temperature Measurement, Probe Number = 3, T = 20.046000 C 04:01:39 Temperature Measurement, Probe Number = 4, T = 20.402000 C 04:01:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.40 04:01:39 Integrated Voltage Measurement... 04:01:58 Voltage Offset Correction: v_off_ini = 0.000005020 V, v_off_fin = 0.000007747 V 04:01:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078212 Vs 04:01:59 Integrated Voltage Measurement... 04:02:18 Voltage Offset Correction: v_off_ini = 0.000007386 V, v_off_fin = 0.000003534 V 04:02:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990623 Vs 04:02:21 Temperature Measurement, Probe Number = 0, T = 20.090000 C 04:02:22 Temperature Measurement, Probe Number = 1, T = 20.020000 C 04:02:23 Temperature Measurement, Probe Number = 2, T = 20.100000 C 04:02:23 Temperature Measurement, Probe Number = 3, T = 20.045000 C 04:02:24 Temperature Measurement, Probe Number = 4, T = 20.408000 C 04:02:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 04:02:24 Integrated Voltage Measurement... 04:02:43 Voltage Offset Correction: v_off_ini = 0.000004919 V, v_off_fin = 0.000007592 V 04:02:44 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171077418 Vs 04:02:44 Integrated Voltage Measurement... 04:03:03 Voltage Offset Correction: v_off_ini = 0.000006799 V, v_off_fin = 0.000003760 V 04:03:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993733 Vs 04:03:06 Temperature Measurement, Probe Number = 0, T = 20.091000 C 04:03:07 Temperature Measurement, Probe Number = 1, T = 20.021000 C 04:03:08 Temperature Measurement, Probe Number = 2, T = 20.102000 C 04:03:08 Temperature Measurement, Probe Number = 3, T = 20.045000 C 04:03:09 Temperature Measurement, Probe Number = 4, T = 20.383000 C 04:03:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.38 04:03:09 Integrated Voltage Measurement... 04:03:28 Voltage Offset Correction: v_off_ini = 0.000004685 V, v_off_fin = 0.000007881 V 04:03:29 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075179 Vs 04:03:29 Integrated Voltage Measurement... 04:03:49 Voltage Offset Correction: v_off_ini = 0.000006887 V, v_off_fin = 0.000004509 V 04:03:49 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986293 Vs 04:03:52 Temperature Measurement, Probe Number = 0, T = 20.091000 C 04:03:53 Temperature Measurement, Probe Number = 1, T = 20.022000 C 04:03:53 Temperature Measurement, Probe Number = 2, T = 20.102000 C 04:03:54 Temperature Measurement, Probe Number = 3, T = 20.045000 C 04:03:55 Temperature Measurement, Probe Number = 4, T = 20.419000 C 04:03:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.42 04:03:55 Integrated Voltage Measurement... 04:04:15 Voltage Offset Correction: v_off_ini = 0.000005382 V, v_off_fin = 0.000007951 V 04:04:15 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171078926 Vs 04:04:15 Integrated Voltage Measurement... 04:04:35 Voltage Offset Correction: v_off_ini = 0.000007484 V, v_off_fin = 0.000004648 V 04:04:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170980310 Vs 04:34:38 Temperature Measurement, Probe Number = 0, T = 20.091000 C 04:34:39 Temperature Measurement, Probe Number = 1, T = 20.026000 C 04:34:39 Temperature Measurement, Probe Number = 2, T = 20.103000 C 04:34:40 Temperature Measurement, Probe Number = 3, T = 20.051000 C 04:34:41 Temperature Measurement, Probe Number = 4, T = 20.411000 C 04:34:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 04:34:41 Integrated Voltage Measurement... 04:35:01 Voltage Offset Correction: v_off_ini = 0.000005893 V, v_off_fin = 0.000007840 V 04:35:01 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171132190 Vs 04:35:01 Integrated Voltage Measurement... 04:35:21 Voltage Offset Correction: v_off_ini = 0.000006947 V, v_off_fin = 0.000004010 V 04:35:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990810 Vs 04:35:24 Temperature Measurement, Probe Number = 0, T = 20.091000 C 04:35:25 Temperature Measurement, Probe Number = 1, T = 20.023000 C 04:35:25 Temperature Measurement, Probe Number = 2, T = 20.104000 C 04:35:26 Temperature Measurement, Probe Number = 3, T = 20.050000 C 04:35:26 Temperature Measurement, Probe Number = 4, T = 20.406000 C 04:35:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 04:35:27 Integrated Voltage Measurement... 04:35:46 Voltage Offset Correction: v_off_ini = 0.000004971 V, v_off_fin = 0.000007674 V 04:35:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171068696 Vs 04:35:47 Integrated Voltage Measurement... 04:36:07 Voltage Offset Correction: v_off_ini = 0.000007022 V, v_off_fin = 0.000004047 V 04:36:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982518 Vs 04:36:09 Temperature Measurement, Probe Number = 0, T = 20.086000 C 04:36:10 Temperature Measurement, Probe Number = 1, T = 20.020000 C 04:36:11 Temperature Measurement, Probe Number = 2, T = 20.101000 C 04:36:11 Temperature Measurement, Probe Number = 3, T = 20.048000 C 04:36:12 Temperature Measurement, Probe Number = 4, T = 20.414000 C 04:36:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.41 04:36:12 Integrated Voltage Measurement... 04:36:32 Voltage Offset Correction: v_off_ini = 0.000005649 V, v_off_fin = 0.000008268 V 04:36:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074449 Vs 04:36:32 Integrated Voltage Measurement... 04:36:52 Voltage Offset Correction: v_off_ini = 0.000007491 V, v_off_fin = 0.000004690 V 04:36:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170976158 Vs 04:36:54 Temperature Measurement, Probe Number = 0, T = 20.087000 C 04:36:55 Temperature Measurement, Probe Number = 1, T = 20.021000 C 04:36:56 Temperature Measurement, Probe Number = 2, T = 20.101000 C 04:36:56 Temperature Measurement, Probe Number = 3, T = 20.048000 C 04:36:57 Temperature Measurement, Probe Number = 4, T = 20.370000 C 04:36:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.37 04:36:57 Integrated Voltage Measurement... 04:37:17 Voltage Offset Correction: v_off_ini = 0.000005615 V, v_off_fin = 0.000007789 V 04:37:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074922 Vs 04:37:17 Integrated Voltage Measurement... 04:37:37 Voltage Offset Correction: v_off_ini = 0.000007072 V, v_off_fin = 0.000003557 V 04:37:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983861 Vs 04:37:39 Temperature Measurement, Probe Number = 0, T = 20.092000 C 04:37:40 Temperature Measurement, Probe Number = 1, T = 20.022000 C 04:37:41 Temperature Measurement, Probe Number = 2, T = 20.102000 C 04:37:41 Temperature Measurement, Probe Number = 3, T = 20.051000 C 04:37:42 Temperature Measurement, Probe Number = 4, T = 20.400000 C 04:37:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.40 04:37:42 Integrated Voltage Measurement... 04:38:02 Voltage Offset Correction: v_off_ini = 0.000005118 V, v_off_fin = 0.000007991 V 04:38:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073561 Vs 04:38:02 Integrated Voltage Measurement... 04:38:22 Voltage Offset Correction: v_off_ini = 0.000007199 V, v_off_fin = 0.000003807 V 04:38:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985627 Vs 04:38:25 Temperature Measurement, Probe Number = 0, T = 20.093000 C 04:38:25 Temperature Measurement, Probe Number = 1, T = 20.026000 C 04:38:26 Temperature Measurement, Probe Number = 2, T = 20.105000 C 04:38:27 Temperature Measurement, Probe Number = 3, T = 20.053000 C 04:38:27 Temperature Measurement, Probe Number = 4, T = 20.422000 C 04:38:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.42 04:38:27 Integrated Voltage Measurement... 04:38:47 Voltage Offset Correction: v_off_ini = 0.000004769 V, v_off_fin = 0.000007391 V 04:38:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065732 Vs 04:38:47 Integrated Voltage Measurement... 04:39:07 Voltage Offset Correction: v_off_ini = 0.000006414 V, v_off_fin = 0.000003644 V 04:39:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992651 Vs 04:39:10 Temperature Measurement, Probe Number = 0, T = 20.095000 C 04:39:10 Temperature Measurement, Probe Number = 1, T = 20.028000 C 04:39:11 Temperature Measurement, Probe Number = 2, T = 20.106000 C 04:39:12 Temperature Measurement, Probe Number = 3, T = 20.054000 C 04:39:12 Temperature Measurement, Probe Number = 4, T = 20.424000 C 04:39:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.11 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.42 04:39:13 Integrated Voltage Measurement... 04:39:32 Voltage Offset Correction: v_off_ini = 0.000004997 V, v_off_fin = 0.000007748 V 04:39:32 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171077155 Vs 04:39:32 Integrated Voltage Measurement... 04:39:52 Voltage Offset Correction: v_off_ini = 0.000007041 V, v_off_fin = 0.000003708 V 04:39:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989628 Vs 04:39:55 Temperature Measurement, Probe Number = 0, T = 20.095000 C 04:39:55 Temperature Measurement, Probe Number = 1, T = 20.027000 C 04:39:56 Temperature Measurement, Probe Number = 2, T = 20.104000 C 04:39:57 Temperature Measurement, Probe Number = 3, T = 20.053000 C 04:39:57 Temperature Measurement, Probe Number = 4, T = 20.445000 C 04:39:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.45 04:39:58 Integrated Voltage Measurement... 04:40:17 Voltage Offset Correction: v_off_ini = 0.000004701 V, v_off_fin = 0.000007609 V 04:40:17 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171071132 Vs 04:40:17 Integrated Voltage Measurement... 04:40:37 Voltage Offset Correction: v_off_ini = 0.000007239 V, v_off_fin = 0.000003761 V 04:40:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987810 Vs 04:40:40 Temperature Measurement, Probe Number = 0, T = 20.093000 C 04:40:40 Temperature Measurement, Probe Number = 1, T = 20.026000 C 04:40:41 Temperature Measurement, Probe Number = 2, T = 20.104000 C 04:40:42 Temperature Measurement, Probe Number = 3, T = 20.052000 C 04:40:42 Temperature Measurement, Probe Number = 4, T = 20.469000 C 04:40:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.47 04:40:43 Integrated Voltage Measurement... 04:41:03 Voltage Offset Correction: v_off_ini = 0.000005557 V, v_off_fin = 0.000007744 V 04:41:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075567 Vs 04:41:03 Integrated Voltage Measurement... 04:41:23 Voltage Offset Correction: v_off_ini = 0.000006730 V, v_off_fin = 0.000003949 V 04:41:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989376 Vs 04:41:26 Temperature Measurement, Probe Number = 0, T = 20.094000 C 04:41:27 Temperature Measurement, Probe Number = 1, T = 20.025000 C 04:41:27 Temperature Measurement, Probe Number = 2, T = 20.104000 C 04:41:28 Temperature Measurement, Probe Number = 3, T = 20.050000 C 04:41:28 Temperature Measurement, Probe Number = 4, T = 20.487000 C 04:41:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.49 04:41:29 Integrated Voltage Measurement... 04:41:49 Voltage Offset Correction: v_off_ini = 0.000005091 V, v_off_fin = 0.000007556 V 04:41:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074160 Vs 04:41:49 Integrated Voltage Measurement... 04:42:09 Voltage Offset Correction: v_off_ini = 0.000006816 V, v_off_fin = 0.000003829 V 04:42:09 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985457 Vs 05:12:12 Temperature Measurement, Probe Number = 0, T = 20.085000 C 05:12:13 Temperature Measurement, Probe Number = 1, T = 20.014000 C 05:12:14 Temperature Measurement, Probe Number = 2, T = 20.097000 C 05:12:14 Temperature Measurement, Probe Number = 3, T = 20.043000 C 05:12:15 Temperature Measurement, Probe Number = 4, T = 20.428000 C 05:12:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.43 05:12:15 Integrated Voltage Measurement... 05:12:35 Voltage Offset Correction: v_off_ini = 0.000005823 V, v_off_fin = 0.000008011 V 05:12:35 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171123498 Vs 05:12:35 Integrated Voltage Measurement... 05:12:55 Voltage Offset Correction: v_off_ini = 0.000007092 V, v_off_fin = 0.000003872 V 05:12:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989499 Vs 05:12:58 Temperature Measurement, Probe Number = 0, T = 20.090000 C 05:12:58 Temperature Measurement, Probe Number = 1, T = 20.019000 C 05:12:59 Temperature Measurement, Probe Number = 2, T = 20.102000 C 05:13:00 Temperature Measurement, Probe Number = 3, T = 20.047000 C 05:13:00 Temperature Measurement, Probe Number = 4, T = 20.441000 C 05:13:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.44 05:13:01 Integrated Voltage Measurement... 05:13:20 Voltage Offset Correction: v_off_ini = 0.000004991 V, v_off_fin = 0.000008071 V 05:13:20 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171079004 Vs 05:13:20 Integrated Voltage Measurement... 05:13:40 Voltage Offset Correction: v_off_ini = 0.000007357 V, v_off_fin = 0.000004036 V 05:13:40 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986449 Vs 05:13:43 Temperature Measurement, Probe Number = 0, T = 20.094000 C 05:13:43 Temperature Measurement, Probe Number = 1, T = 20.022000 C 05:13:44 Temperature Measurement, Probe Number = 2, T = 20.102000 C 05:13:45 Temperature Measurement, Probe Number = 3, T = 20.048000 C 05:13:45 Temperature Measurement, Probe Number = 4, T = 20.458000 C 05:13:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.46 05:13:46 Integrated Voltage Measurement... 05:14:05 Voltage Offset Correction: v_off_ini = 0.000005120 V, v_off_fin = 0.000007506 V 05:14:05 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075337 Vs 05:14:05 Integrated Voltage Measurement... 05:14:25 Voltage Offset Correction: v_off_ini = 0.000007332 V, v_off_fin = 0.000003915 V 05:14:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985382 Vs 05:14:28 Temperature Measurement, Probe Number = 0, T = 20.092000 C 05:14:28 Temperature Measurement, Probe Number = 1, T = 20.020000 C 05:14:29 Temperature Measurement, Probe Number = 2, T = 20.103000 C 05:14:30 Temperature Measurement, Probe Number = 3, T = 20.048000 C 05:14:30 Temperature Measurement, Probe Number = 4, T = 20.444000 C 05:14:30 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.44 05:14:31 Integrated Voltage Measurement... 05:14:50 Voltage Offset Correction: v_off_ini = 0.000005333 V, v_off_fin = 0.000008306 V 05:14:50 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171081138 Vs 05:14:50 Integrated Voltage Measurement... 05:15:11 Voltage Offset Correction: v_off_ini = 0.000007749 V, v_off_fin = 0.000004241 V 05:15:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984202 Vs 05:15:14 Temperature Measurement, Probe Number = 0, T = 20.091000 C 05:15:14 Temperature Measurement, Probe Number = 1, T = 20.018000 C 05:15:15 Temperature Measurement, Probe Number = 2, T = 20.102000 C 05:15:16 Temperature Measurement, Probe Number = 3, T = 20.048000 C 05:15:16 Temperature Measurement, Probe Number = 4, T = 20.476000 C 05:15:16 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.48 05:15:17 Integrated Voltage Measurement... 05:15:36 Voltage Offset Correction: v_off_ini = 0.000005164 V, v_off_fin = 0.000007977 V 05:15:36 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074871 Vs 05:15:37 Integrated Voltage Measurement... 05:15:57 Voltage Offset Correction: v_off_ini = 0.000007567 V, v_off_fin = 0.000004359 V 05:15:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985384 Vs 05:16:00 Temperature Measurement, Probe Number = 0, T = 20.086000 C 05:16:01 Temperature Measurement, Probe Number = 1, T = 20.013000 C 05:16:01 Temperature Measurement, Probe Number = 2, T = 20.100000 C 05:16:02 Temperature Measurement, Probe Number = 3, T = 20.045000 C 05:16:03 Temperature Measurement, Probe Number = 4, T = 20.449000 C 05:16:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.45 05:16:03 Integrated Voltage Measurement... 05:16:22 Voltage Offset Correction: v_off_ini = 0.000005376 V, v_off_fin = 0.000007996 V 05:16:23 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074283 Vs 05:16:23 Integrated Voltage Measurement... 05:16:42 Voltage Offset Correction: v_off_ini = 0.000007214 V, v_off_fin = 0.000004335 V 05:16:43 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988823 Vs 05:16:45 Temperature Measurement, Probe Number = 0, T = 20.084000 C 05:16:46 Temperature Measurement, Probe Number = 1, T = 20.016000 C 05:16:47 Temperature Measurement, Probe Number = 2, T = 20.097000 C 05:16:47 Temperature Measurement, Probe Number = 3, T = 20.042000 C 05:16:48 Temperature Measurement, Probe Number = 4, T = 20.403000 C 05:16:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.40 05:16:48 Integrated Voltage Measurement... 05:17:08 Voltage Offset Correction: v_off_ini = 0.000005283 V, v_off_fin = 0.000007876 V 05:17:08 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171081494 Vs 05:17:08 Integrated Voltage Measurement... 05:17:27 Voltage Offset Correction: v_off_ini = 0.000007345 V, v_off_fin = 0.000003169 V 05:17:27 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170984024 Vs 05:17:30 Temperature Measurement, Probe Number = 0, T = 20.090000 C 05:17:31 Temperature Measurement, Probe Number = 1, T = 20.018000 C 05:17:32 Temperature Measurement, Probe Number = 2, T = 20.100000 C 05:17:32 Temperature Measurement, Probe Number = 3, T = 20.043000 C 05:17:33 Temperature Measurement, Probe Number = 4, T = 20.418000 C 05:17:33 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.42 05:17:33 Integrated Voltage Measurement... 05:17:52 Voltage Offset Correction: v_off_ini = 0.000004857 V, v_off_fin = 0.000008149 V 05:17:53 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171079107 Vs 05:17:53 Integrated Voltage Measurement... 05:18:12 Voltage Offset Correction: v_off_ini = 0.000007336 V, v_off_fin = 0.000004161 V 05:18:12 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984237 Vs 05:18:15 Temperature Measurement, Probe Number = 0, T = 20.093000 C 05:18:16 Temperature Measurement, Probe Number = 1, T = 20.021000 C 05:18:17 Temperature Measurement, Probe Number = 2, T = 20.104000 C 05:18:17 Temperature Measurement, Probe Number = 3, T = 20.049000 C 05:18:18 Temperature Measurement, Probe Number = 4, T = 20.472000 C 05:18:18 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.47 05:18:18 Integrated Voltage Measurement... 05:18:38 Voltage Offset Correction: v_off_ini = 0.000005670 V, v_off_fin = 0.000007314 V 05:18:39 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078299 Vs 05:18:39 Integrated Voltage Measurement... 05:18:58 Voltage Offset Correction: v_off_ini = 0.000006451 V, v_off_fin = 0.000003661 V 05:18:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993435 Vs 05:19:01 Temperature Measurement, Probe Number = 0, T = 20.091000 C 05:19:02 Temperature Measurement, Probe Number = 1, T = 20.018000 C 05:19:03 Temperature Measurement, Probe Number = 2, T = 20.103000 C 05:19:03 Temperature Measurement, Probe Number = 3, T = 20.045000 C 05:19:04 Temperature Measurement, Probe Number = 4, T = 20.478000 C 05:19:04 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.48 05:19:04 Integrated Voltage Measurement... 05:19:24 Voltage Offset Correction: v_off_ini = 0.000005054 V, v_off_fin = 0.000007740 V 05:19:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171077973 Vs 05:19:25 Integrated Voltage Measurement... 05:19:44 Voltage Offset Correction: v_off_ini = 0.000007246 V, v_off_fin = 0.000003719 V 05:19:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987681 Vs 05:49:47 Temperature Measurement, Probe Number = 0, T = 20.083000 C 05:49:48 Temperature Measurement, Probe Number = 1, T = 20.013000 C 05:49:48 Temperature Measurement, Probe Number = 2, T = 20.096000 C 05:49:49 Temperature Measurement, Probe Number = 3, T = 20.040000 C 05:49:50 Temperature Measurement, Probe Number = 4, T = 20.319000 C 05:49:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.32 05:49:50 Integrated Voltage Measurement... 05:50:10 Voltage Offset Correction: v_off_ini = 0.000006253 V, v_off_fin = 0.000007750 V 05:50:10 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171123639 Vs 05:50:10 Integrated Voltage Measurement... 05:50:30 Voltage Offset Correction: v_off_ini = 0.000007137 V, v_off_fin = 0.000003587 V 05:50:30 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986905 Vs 05:50:33 Temperature Measurement, Probe Number = 0, T = 20.086000 C 05:50:34 Temperature Measurement, Probe Number = 1, T = 20.013000 C 05:50:34 Temperature Measurement, Probe Number = 2, T = 20.098000 C 05:50:35 Temperature Measurement, Probe Number = 3, T = 20.040000 C 05:50:36 Temperature Measurement, Probe Number = 4, T = 20.347000 C 05:50:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.35 05:50:36 Integrated Voltage Measurement... 05:50:55 Voltage Offset Correction: v_off_ini = 0.000005297 V, v_off_fin = 0.000007369 V 05:50:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070183 Vs 05:50:56 Integrated Voltage Measurement... 05:51:16 Voltage Offset Correction: v_off_ini = 0.000007247 V, v_off_fin = 0.000003966 V 05:51:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988425 Vs 05:51:18 Temperature Measurement, Probe Number = 0, T = 20.089000 C 05:51:19 Temperature Measurement, Probe Number = 1, T = 20.017000 C 05:51:20 Temperature Measurement, Probe Number = 2, T = 20.099000 C 05:51:20 Temperature Measurement, Probe Number = 3, T = 20.043000 C 05:51:21 Temperature Measurement, Probe Number = 4, T = 20.367000 C 05:51:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.37 05:51:21 Integrated Voltage Measurement... 05:51:41 Voltage Offset Correction: v_off_ini = 0.000005272 V, v_off_fin = 0.000007777 V 05:51:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070941 Vs 05:51:41 Integrated Voltage Measurement... 05:52:01 Voltage Offset Correction: v_off_ini = 0.000006946 V, v_off_fin = 0.000003389 V 05:52:01 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986875 Vs 05:52:03 Temperature Measurement, Probe Number = 0, T = 20.091000 C 05:52:04 Temperature Measurement, Probe Number = 1, T = 20.018000 C 05:52:05 Temperature Measurement, Probe Number = 2, T = 20.102000 C 05:52:05 Temperature Measurement, Probe Number = 3, T = 20.044000 C 05:52:06 Temperature Measurement, Probe Number = 4, T = 20.406000 C 05:52:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.41 05:52:06 Integrated Voltage Measurement... 05:52:26 Voltage Offset Correction: v_off_ini = 0.000004760 V, v_off_fin = 0.000007517 V 05:52:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072500 Vs 05:52:27 Integrated Voltage Measurement... 05:52:46 Voltage Offset Correction: v_off_ini = 0.000007353 V, v_off_fin = 0.000003656 V 05:52:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985879 Vs 05:52:49 Temperature Measurement, Probe Number = 0, T = 20.083000 C 05:52:49 Temperature Measurement, Probe Number = 1, T = 20.012000 C 05:52:50 Temperature Measurement, Probe Number = 2, T = 20.095000 C 05:52:51 Temperature Measurement, Probe Number = 3, T = 20.040000 C 05:52:51 Temperature Measurement, Probe Number = 4, T = 20.425000 C 05:52:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.43 05:52:51 Integrated Voltage Measurement... 05:53:11 Voltage Offset Correction: v_off_ini = 0.000004978 V, v_off_fin = 0.000007669 V 05:53:11 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171074657 Vs 05:53:11 Integrated Voltage Measurement... 05:53:31 Voltage Offset Correction: v_off_ini = 0.000006820 V, v_off_fin = 0.000004032 V 05:53:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987866 Vs 05:53:34 Temperature Measurement, Probe Number = 0, T = 20.080000 C 05:53:34 Temperature Measurement, Probe Number = 1, T = 20.008000 C 05:53:35 Temperature Measurement, Probe Number = 2, T = 20.092000 C 05:53:35 Temperature Measurement, Probe Number = 3, T = 20.036000 C 05:53:36 Temperature Measurement, Probe Number = 4, T = 20.438000 C 05:53:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.44 05:53:36 Integrated Voltage Measurement... 05:53:56 Voltage Offset Correction: v_off_ini = 0.000004771 V, v_off_fin = 0.000007683 V 05:53:56 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073491 Vs 05:53:56 Integrated Voltage Measurement... 05:54:16 Voltage Offset Correction: v_off_ini = 0.000006873 V, v_off_fin = 0.000003383 V 05:54:16 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170992838 Vs 05:54:19 Temperature Measurement, Probe Number = 0, T = 20.084000 C 05:54:19 Temperature Measurement, Probe Number = 1, T = 20.010000 C 05:54:20 Temperature Measurement, Probe Number = 2, T = 20.094000 C 05:54:21 Temperature Measurement, Probe Number = 3, T = 20.035000 C 05:54:21 Temperature Measurement, Probe Number = 4, T = 20.419000 C 05:54:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.42 05:54:21 Integrated Voltage Measurement... 05:54:41 Voltage Offset Correction: v_off_ini = 0.000004768 V, v_off_fin = 0.000007255 V 05:54:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171073358 Vs 05:54:41 Integrated Voltage Measurement... 05:55:01 Voltage Offset Correction: v_off_ini = 0.000007181 V, v_off_fin = 0.000004119 V 05:55:01 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170984960 Vs 05:55:04 Temperature Measurement, Probe Number = 0, T = 20.083000 C 05:55:04 Temperature Measurement, Probe Number = 1, T = 20.011000 C 05:55:05 Temperature Measurement, Probe Number = 2, T = 20.093000 C 05:55:06 Temperature Measurement, Probe Number = 3, T = 20.037000 C 05:55:06 Temperature Measurement, Probe Number = 4, T = 20.454000 C 05:55:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.45 05:55:06 Integrated Voltage Measurement... 05:55:26 Voltage Offset Correction: v_off_ini = 0.000005446 V, v_off_fin = 0.000008011 V 05:55:26 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078137 Vs 05:55:26 Integrated Voltage Measurement... 05:55:46 Voltage Offset Correction: v_off_ini = 0.000007079 V, v_off_fin = 0.000003726 V 05:55:46 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170990942 Vs 05:55:49 Temperature Measurement, Probe Number = 0, T = 20.086000 C 05:55:49 Temperature Measurement, Probe Number = 1, T = 20.015000 C 05:55:50 Temperature Measurement, Probe Number = 2, T = 20.097000 C 05:55:51 Temperature Measurement, Probe Number = 3, T = 20.042000 C 05:55:51 Temperature Measurement, Probe Number = 4, T = 20.433000 C 05:55:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.43 05:55:52 Integrated Voltage Measurement... 05:56:11 Voltage Offset Correction: v_off_ini = 0.000005044 V, v_off_fin = 0.000006998 V 05:56:11 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171072510 Vs 05:56:12 Integrated Voltage Measurement... 05:56:31 Voltage Offset Correction: v_off_ini = 0.000006279 V, v_off_fin = 0.000003219 V 05:56:31 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170998139 Vs 05:56:34 Temperature Measurement, Probe Number = 0, T = 20.086000 C 05:56:34 Temperature Measurement, Probe Number = 1, T = 20.015000 C 05:56:35 Temperature Measurement, Probe Number = 2, T = 20.097000 C 05:56:36 Temperature Measurement, Probe Number = 3, T = 20.042000 C 05:56:36 Temperature Measurement, Probe Number = 4, T = 20.455000 C 05:56:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.45 05:56:37 Integrated Voltage Measurement... 05:56:56 Voltage Offset Correction: v_off_ini = 0.000004790 V, v_off_fin = 0.000007468 V 05:56:56 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171075201 Vs 05:56:57 Integrated Voltage Measurement... 05:57:17 Voltage Offset Correction: v_off_ini = 0.000006717 V, v_off_fin = 0.000003691 V 05:57:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170997190 Vs 06:27:20 Temperature Measurement, Probe Number = 0, T = 20.087000 C 06:27:20 Temperature Measurement, Probe Number = 1, T = 20.014000 C 06:27:21 Temperature Measurement, Probe Number = 2, T = 20.098000 C 06:27:22 Temperature Measurement, Probe Number = 3, T = 20.041000 C 06:27:22 Temperature Measurement, Probe Number = 4, T = 20.433000 C 06:27:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.43 06:27:22 Integrated Voltage Measurement... 06:27:42 Voltage Offset Correction: v_off_ini = 0.000006091 V, v_off_fin = 0.000007828 V 06:27:42 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171123529 Vs 06:27:42 Integrated Voltage Measurement... 06:28:02 Voltage Offset Correction: v_off_ini = 0.000006974 V, v_off_fin = 0.000003517 V 06:28:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991822 Vs 06:28:05 Temperature Measurement, Probe Number = 0, T = 20.082000 C 06:28:05 Temperature Measurement, Probe Number = 1, T = 20.012000 C 06:28:06 Temperature Measurement, Probe Number = 2, T = 20.095000 C 06:28:07 Temperature Measurement, Probe Number = 3, T = 20.039000 C 06:28:07 Temperature Measurement, Probe Number = 4, T = 20.418000 C 06:28:07 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.42 06:28:08 Integrated Voltage Measurement... 06:28:28 Voltage Offset Correction: v_off_ini = 0.000005301 V, v_off_fin = 0.000007347 V 06:28:28 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072040 Vs 06:28:28 Integrated Voltage Measurement... 06:28:48 Voltage Offset Correction: v_off_ini = 0.000006534 V, v_off_fin = 0.000003904 V 06:28:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985114 Vs 06:28:51 Temperature Measurement, Probe Number = 0, T = 20.087000 C 06:28:51 Temperature Measurement, Probe Number = 1, T = 20.017000 C 06:28:52 Temperature Measurement, Probe Number = 2, T = 20.101000 C 06:28:53 Temperature Measurement, Probe Number = 3, T = 20.045000 C 06:28:53 Temperature Measurement, Probe Number = 4, T = 20.458000 C 06:28:53 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.46 06:28:54 Integrated Voltage Measurement... 06:29:14 Voltage Offset Correction: v_off_ini = 0.000004457 V, v_off_fin = 0.000007498 V 06:29:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071457 Vs 06:29:14 Integrated Voltage Measurement... 06:29:34 Voltage Offset Correction: v_off_ini = 0.000006511 V, v_off_fin = 0.000003609 V 06:29:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990287 Vs 06:29:37 Temperature Measurement, Probe Number = 0, T = 20.088000 C 06:29:37 Temperature Measurement, Probe Number = 1, T = 20.013000 C 06:29:38 Temperature Measurement, Probe Number = 2, T = 20.101000 C 06:29:39 Temperature Measurement, Probe Number = 3, T = 20.043000 C 06:29:39 Temperature Measurement, Probe Number = 4, T = 20.497000 C 06:29:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.50 06:29:40 Integrated Voltage Measurement... 06:29:59 Voltage Offset Correction: v_off_ini = 0.000004703 V, v_off_fin = 0.000007792 V 06:29:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071850 Vs 06:30:00 Integrated Voltage Measurement... 06:30:19 Voltage Offset Correction: v_off_ini = 0.000007095 V, v_off_fin = 0.000003954 V 06:30:19 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988531 Vs 06:30:22 Temperature Measurement, Probe Number = 0, T = 20.083000 C 06:30:23 Temperature Measurement, Probe Number = 1, T = 20.011000 C 06:30:23 Temperature Measurement, Probe Number = 2, T = 20.093000 C 06:30:24 Temperature Measurement, Probe Number = 3, T = 20.037000 C 06:30:25 Temperature Measurement, Probe Number = 4, T = 20.437000 C 06:30:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.44 06:30:25 Integrated Voltage Measurement... 06:30:45 Voltage Offset Correction: v_off_ini = 0.000004931 V, v_off_fin = 0.000007465 V 06:30:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075005 Vs 06:30:45 Integrated Voltage Measurement... 06:31:05 Voltage Offset Correction: v_off_ini = 0.000006999 V, v_off_fin = 0.000003499 V 06:31:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985903 Vs 06:31:08 Temperature Measurement, Probe Number = 0, T = 20.082000 C 06:31:09 Temperature Measurement, Probe Number = 1, T = 20.013000 C 06:31:09 Temperature Measurement, Probe Number = 2, T = 20.091000 C 06:31:10 Temperature Measurement, Probe Number = 3, T = 20.037000 C 06:31:11 Temperature Measurement, Probe Number = 4, T = 20.419000 C 06:31:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.42 06:31:11 Integrated Voltage Measurement... 06:31:30 Voltage Offset Correction: v_off_ini = 0.000005089 V, v_off_fin = 0.000008032 V 06:31:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079318 Vs 06:31:31 Integrated Voltage Measurement... 06:31:50 Voltage Offset Correction: v_off_ini = 0.000007393 V, v_off_fin = 0.000004300 V 06:31:50 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170981517 Vs 06:31:53 Temperature Measurement, Probe Number = 0, T = 20.086000 C 06:31:54 Temperature Measurement, Probe Number = 1, T = 20.015000 C 06:31:54 Temperature Measurement, Probe Number = 2, T = 20.095000 C 06:31:55 Temperature Measurement, Probe Number = 3, T = 20.041000 C 06:31:56 Temperature Measurement, Probe Number = 4, T = 20.471000 C 06:31:56 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.47 06:31:56 Integrated Voltage Measurement... 06:32:15 Voltage Offset Correction: v_off_ini = 0.000004969 V, v_off_fin = 0.000007793 V 06:32:16 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079596 Vs 06:32:16 Integrated Voltage Measurement... 06:32:35 Voltage Offset Correction: v_off_ini = 0.000007449 V, v_off_fin = 0.000003388 V 06:32:35 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985383 Vs 06:32:38 Temperature Measurement, Probe Number = 0, T = 20.087000 C 06:32:39 Temperature Measurement, Probe Number = 1, T = 20.014000 C 06:32:39 Temperature Measurement, Probe Number = 2, T = 20.097000 C 06:32:40 Temperature Measurement, Probe Number = 3, T = 20.041000 C 06:32:41 Temperature Measurement, Probe Number = 4, T = 20.495000 C 06:32:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.50 06:32:41 Integrated Voltage Measurement... 06:33:01 Voltage Offset Correction: v_off_ini = 0.000005475 V, v_off_fin = 0.000007480 V 06:33:01 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171081313 Vs 06:33:01 Integrated Voltage Measurement... 06:33:21 Voltage Offset Correction: v_off_ini = 0.000006951 V, v_off_fin = 0.000003499 V 06:33:21 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170983748 Vs 06:33:24 Temperature Measurement, Probe Number = 0, T = 20.086000 C 06:33:25 Temperature Measurement, Probe Number = 1, T = 20.012000 C 06:33:25 Temperature Measurement, Probe Number = 2, T = 20.096000 C 06:33:26 Temperature Measurement, Probe Number = 3, T = 20.038000 C 06:33:27 Temperature Measurement, Probe Number = 4, T = 20.482000 C 06:33:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.48 06:33:27 Integrated Voltage Measurement... 06:33:46 Voltage Offset Correction: v_off_ini = 0.000004716 V, v_off_fin = 0.000007465 V 06:33:47 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070641 Vs 06:33:47 Integrated Voltage Measurement... 06:34:06 Voltage Offset Correction: v_off_ini = 0.000006801 V, v_off_fin = 0.000003732 V 06:34:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989187 Vs 06:34:09 Temperature Measurement, Probe Number = 0, T = 20.085000 C 06:34:10 Temperature Measurement, Probe Number = 1, T = 20.009000 C 06:34:11 Temperature Measurement, Probe Number = 2, T = 20.093000 C 06:34:11 Temperature Measurement, Probe Number = 3, T = 20.036000 C 06:34:12 Temperature Measurement, Probe Number = 4, T = 20.444000 C 06:34:12 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.44 06:34:12 Integrated Voltage Measurement... 06:34:32 Voltage Offset Correction: v_off_ini = 0.000004340 V, v_off_fin = 0.000006869 V 06:34:32 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072234 Vs 06:34:32 Integrated Voltage Measurement... 06:34:53 Voltage Offset Correction: v_off_ini = 0.000006314 V, v_off_fin = 0.000004299 V 06:34:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986493 Vs 07:04:55 Temperature Measurement, Probe Number = 0, T = 20.086000 C 07:04:56 Temperature Measurement, Probe Number = 1, T = 20.014000 C 07:04:57 Temperature Measurement, Probe Number = 2, T = 20.094000 C 07:04:57 Temperature Measurement, Probe Number = 3, T = 20.039000 C 07:04:58 Temperature Measurement, Probe Number = 4, T = 20.463000 C 07:04:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.46 07:04:58 Integrated Voltage Measurement... 07:05:17 Voltage Offset Correction: v_off_ini = 0.000005983 V, v_off_fin = 0.000007517 V 07:05:18 Integrated Voltage Measurement Delta Gap = 0.0040013 m VT = 0.171117282 Vs 07:05:18 Integrated Voltage Measurement... 07:05:37 Voltage Offset Correction: v_off_ini = 0.000006984 V, v_off_fin = 0.000004145 V 07:05:37 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988119 Vs 07:05:40 Temperature Measurement, Probe Number = 0, T = 20.086000 C 07:05:41 Temperature Measurement, Probe Number = 1, T = 20.010000 C 07:05:42 Temperature Measurement, Probe Number = 2, T = 20.095000 C 07:05:42 Temperature Measurement, Probe Number = 3, T = 20.038000 C 07:05:43 Temperature Measurement, Probe Number = 4, T = 20.448000 C 07:05:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.45 07:05:43 Integrated Voltage Measurement... 07:06:02 Voltage Offset Correction: v_off_ini = 0.000005024 V, v_off_fin = 0.000007809 V 07:06:03 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171075543 Vs 07:06:03 Integrated Voltage Measurement... 07:06:22 Voltage Offset Correction: v_off_ini = 0.000006892 V, v_off_fin = 0.000003657 V 07:06:23 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986477 Vs 07:06:25 Temperature Measurement, Probe Number = 0, T = 20.083000 C 07:06:26 Temperature Measurement, Probe Number = 1, T = 20.010000 C 07:06:27 Temperature Measurement, Probe Number = 2, T = 20.092000 C 07:06:27 Temperature Measurement, Probe Number = 3, T = 20.036000 C 07:06:28 Temperature Measurement, Probe Number = 4, T = 20.432000 C 07:06:28 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.43 07:06:28 Integrated Voltage Measurement... 07:06:47 Voltage Offset Correction: v_off_ini = 0.000005068 V, v_off_fin = 0.000007693 V 07:06:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171073464 Vs 07:06:48 Integrated Voltage Measurement... 07:07:08 Voltage Offset Correction: v_off_ini = 0.000006789 V, v_off_fin = 0.000003677 V 07:07:08 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170996280 Vs 07:07:10 Temperature Measurement, Probe Number = 0, T = 20.078000 C 07:07:11 Temperature Measurement, Probe Number = 1, T = 20.005000 C 07:07:12 Temperature Measurement, Probe Number = 2, T = 20.089000 C 07:07:12 Temperature Measurement, Probe Number = 3, T = 20.033000 C 07:07:13 Temperature Measurement, Probe Number = 4, T = 20.432000 C 07:07:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.00 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.43 07:07:13 Integrated Voltage Measurement... 07:07:33 Voltage Offset Correction: v_off_ini = 0.000004441 V, v_off_fin = 0.000007541 V 07:07:33 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171071258 Vs 07:07:33 Integrated Voltage Measurement... 07:07:53 Voltage Offset Correction: v_off_ini = 0.000007103 V, v_off_fin = 0.000003345 V 07:07:53 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000198 Vs 07:07:56 Temperature Measurement, Probe Number = 0, T = 20.079000 C 07:07:57 Temperature Measurement, Probe Number = 1, T = 20.007000 C 07:07:57 Temperature Measurement, Probe Number = 2, T = 20.087000 C 07:07:58 Temperature Measurement, Probe Number = 3, T = 20.032000 C 07:07:59 Temperature Measurement, Probe Number = 4, T = 20.417000 C 07:07:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.42 07:07:59 Integrated Voltage Measurement... 07:08:19 Voltage Offset Correction: v_off_ini = 0.000004133 V, v_off_fin = 0.000007693 V 07:08:19 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171071692 Vs 07:08:19 Integrated Voltage Measurement... 07:08:39 Voltage Offset Correction: v_off_ini = 0.000007195 V, v_off_fin = 0.000004595 V 07:08:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986283 Vs 07:08:41 Temperature Measurement, Probe Number = 0, T = 20.083000 C 07:08:42 Temperature Measurement, Probe Number = 1, T = 20.009000 C 07:08:43 Temperature Measurement, Probe Number = 2, T = 20.090000 C 07:08:43 Temperature Measurement, Probe Number = 3, T = 20.032000 C 07:08:44 Temperature Measurement, Probe Number = 4, T = 20.397000 C 07:08:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.40 07:08:44 Integrated Voltage Measurement... 07:09:04 Voltage Offset Correction: v_off_ini = 0.000005557 V, v_off_fin = 0.000007691 V 07:09:04 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171076667 Vs 07:09:04 Integrated Voltage Measurement... 07:09:24 Voltage Offset Correction: v_off_ini = 0.000007084 V, v_off_fin = 0.000003520 V 07:09:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992996 Vs 07:09:26 Temperature Measurement, Probe Number = 0, T = 20.081000 C 07:09:27 Temperature Measurement, Probe Number = 1, T = 20.008000 C 07:09:28 Temperature Measurement, Probe Number = 2, T = 20.089000 C 07:09:28 Temperature Measurement, Probe Number = 3, T = 20.032000 C 07:09:29 Temperature Measurement, Probe Number = 4, T = 20.400000 C 07:09:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.40 07:09:29 Integrated Voltage Measurement... 07:09:49 Voltage Offset Correction: v_off_ini = 0.000004611 V, v_off_fin = 0.000007721 V 07:09:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171069250 Vs 07:09:49 Integrated Voltage Measurement... 07:10:09 Voltage Offset Correction: v_off_ini = 0.000007087 V, v_off_fin = 0.000003986 V 07:10:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990201 Vs 07:10:12 Temperature Measurement, Probe Number = 0, T = 20.085000 C 07:10:13 Temperature Measurement, Probe Number = 1, T = 20.011000 C 07:10:14 Temperature Measurement, Probe Number = 2, T = 20.091000 C 07:10:14 Temperature Measurement, Probe Number = 3, T = 20.034000 C 07:10:15 Temperature Measurement, Probe Number = 4, T = 20.361000 C 07:10:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.36 07:10:15 Integrated Voltage Measurement... 07:10:35 Voltage Offset Correction: v_off_ini = 0.000004709 V, v_off_fin = 0.000007418 V 07:10:35 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070061 Vs 07:10:35 Integrated Voltage Measurement... 07:10:55 Voltage Offset Correction: v_off_ini = 0.000006915 V, v_off_fin = 0.000003733 V 07:10:55 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992010 Vs 07:10:58 Temperature Measurement, Probe Number = 0, T = 20.084000 C 07:10:58 Temperature Measurement, Probe Number = 1, T = 20.010000 C 07:10:59 Temperature Measurement, Probe Number = 2, T = 20.090000 C 07:11:00 Temperature Measurement, Probe Number = 3, T = 20.035000 C 07:11:00 Temperature Measurement, Probe Number = 4, T = 20.344000 C 07:11:00 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.34 07:11:01 Integrated Voltage Measurement... 07:11:20 Voltage Offset Correction: v_off_ini = 0.000004842 V, v_off_fin = 0.000007544 V 07:11:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074302 Vs 07:11:20 Integrated Voltage Measurement... 07:11:40 Voltage Offset Correction: v_off_ini = 0.000006882 V, v_off_fin = 0.000003418 V 07:11:40 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170994871 Vs 07:11:43 Temperature Measurement, Probe Number = 0, T = 20.082000 C 07:11:43 Temperature Measurement, Probe Number = 1, T = 20.010000 C 07:11:44 Temperature Measurement, Probe Number = 2, T = 20.090000 C 07:11:45 Temperature Measurement, Probe Number = 3, T = 20.034000 C 07:11:45 Temperature Measurement, Probe Number = 4, T = 20.337000 C 07:11:45 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.34 07:11:46 Integrated Voltage Measurement... 07:12:05 Voltage Offset Correction: v_off_ini = 0.000004937 V, v_off_fin = 0.000007506 V 07:12:06 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171079797 Vs 07:12:06 Integrated Voltage Measurement... 07:12:25 Voltage Offset Correction: v_off_ini = 0.000006835 V, v_off_fin = 0.000003739 V 07:12:25 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985877 Vs 07:42:28 Temperature Measurement, Probe Number = 0, T = 20.085000 C 07:42:29 Temperature Measurement, Probe Number = 1, T = 20.016000 C 07:42:29 Temperature Measurement, Probe Number = 2, T = 20.094000 C 07:42:30 Temperature Measurement, Probe Number = 3, T = 20.039000 C 07:42:31 Temperature Measurement, Probe Number = 4, T = 20.474000 C 07:42:31 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.47 07:42:31 Integrated Voltage Measurement... 07:42:51 Voltage Offset Correction: v_off_ini = 0.000006420 V, v_off_fin = 0.000007544 V 07:42:52 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171130680 Vs 07:42:52 Integrated Voltage Measurement... 07:43:11 Voltage Offset Correction: v_off_ini = 0.000007283 V, v_off_fin = 0.000004250 V 07:43:11 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982142 Vs 07:43:14 Temperature Measurement, Probe Number = 0, T = 20.083000 C 07:43:15 Temperature Measurement, Probe Number = 1, T = 20.013000 C 07:43:15 Temperature Measurement, Probe Number = 2, T = 20.093000 C 07:43:16 Temperature Measurement, Probe Number = 3, T = 20.039000 C 07:43:17 Temperature Measurement, Probe Number = 4, T = 20.425000 C 07:43:17 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.43 07:43:17 Integrated Voltage Measurement... 07:43:36 Voltage Offset Correction: v_off_ini = 0.000005165 V, v_off_fin = 0.000007887 V 07:43:36 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171076259 Vs 07:43:36 Integrated Voltage Measurement... 07:43:57 Voltage Offset Correction: v_off_ini = 0.000007271 V, v_off_fin = 0.000003880 V 07:43:57 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993925 Vs 07:44:00 Temperature Measurement, Probe Number = 0, T = 20.087000 C 07:44:01 Temperature Measurement, Probe Number = 1, T = 20.013000 C 07:44:01 Temperature Measurement, Probe Number = 2, T = 20.092000 C 07:44:02 Temperature Measurement, Probe Number = 3, T = 20.037000 C 07:44:03 Temperature Measurement, Probe Number = 4, T = 20.399000 C 07:44:03 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.40 07:44:03 Integrated Voltage Measurement... 07:44:23 Voltage Offset Correction: v_off_ini = 0.000004971 V, v_off_fin = 0.000007672 V 07:44:23 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171071068 Vs 07:44:23 Integrated Voltage Measurement... 07:44:43 Voltage Offset Correction: v_off_ini = 0.000007080 V, v_off_fin = 0.000003916 V 07:44:43 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991598 Vs 07:44:46 Temperature Measurement, Probe Number = 0, T = 20.085000 C 07:44:46 Temperature Measurement, Probe Number = 1, T = 20.012000 C 07:44:47 Temperature Measurement, Probe Number = 2, T = 20.092000 C 07:44:48 Temperature Measurement, Probe Number = 3, T = 20.036000 C 07:44:48 Temperature Measurement, Probe Number = 4, T = 20.448000 C 07:44:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.45 07:44:49 Integrated Voltage Measurement... 07:45:08 Voltage Offset Correction: v_off_ini = 0.000004862 V, v_off_fin = 0.000008041 V 07:45:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076784 Vs 07:45:09 Integrated Voltage Measurement... 07:45:28 Voltage Offset Correction: v_off_ini = 0.000007334 V, v_off_fin = 0.000004248 V 07:45:28 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990326 Vs 07:45:31 Temperature Measurement, Probe Number = 0, T = 20.085000 C 07:45:32 Temperature Measurement, Probe Number = 1, T = 20.012000 C 07:45:32 Temperature Measurement, Probe Number = 2, T = 20.090000 C 07:45:33 Temperature Measurement, Probe Number = 3, T = 20.035000 C 07:45:34 Temperature Measurement, Probe Number = 4, T = 20.455000 C 07:45:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.45 07:45:34 Integrated Voltage Measurement... 07:45:54 Voltage Offset Correction: v_off_ini = 0.000005369 V, v_off_fin = 0.000007113 V 07:45:54 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171072597 Vs 07:45:54 Integrated Voltage Measurement... 07:46:13 Voltage Offset Correction: v_off_ini = 0.000006497 V, v_off_fin = 0.000003191 V 07:46:13 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991507 Vs 07:46:16 Temperature Measurement, Probe Number = 0, T = 20.085000 C 07:46:17 Temperature Measurement, Probe Number = 1, T = 20.016000 C 07:46:18 Temperature Measurement, Probe Number = 2, T = 20.093000 C 07:46:18 Temperature Measurement, Probe Number = 3, T = 20.040000 C 07:46:19 Temperature Measurement, Probe Number = 4, T = 20.459000 C 07:46:19 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.46 07:46:19 Integrated Voltage Measurement... 07:46:39 Voltage Offset Correction: v_off_ini = 0.000004871 V, v_off_fin = 0.000007599 V 07:46:39 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171075355 Vs 07:46:39 Integrated Voltage Measurement... 07:46:59 Voltage Offset Correction: v_off_ini = 0.000006643 V, v_off_fin = 0.000003430 V 07:46:59 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993941 Vs 07:47:02 Temperature Measurement, Probe Number = 0, T = 20.089000 C 07:47:03 Temperature Measurement, Probe Number = 1, T = 20.017000 C 07:47:03 Temperature Measurement, Probe Number = 2, T = 20.097000 C 07:47:04 Temperature Measurement, Probe Number = 3, T = 20.041000 C 07:47:05 Temperature Measurement, Probe Number = 4, T = 20.497000 C 07:47:05 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.50 07:47:05 Integrated Voltage Measurement... 07:47:24 Voltage Offset Correction: v_off_ini = 0.000004990 V, v_off_fin = 0.000007186 V 07:47:24 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171070530 Vs 07:47:25 Integrated Voltage Measurement... 07:47:44 Voltage Offset Correction: v_off_ini = 0.000006561 V, v_off_fin = 0.000003404 V 07:47:44 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988348 Vs 07:47:47 Temperature Measurement, Probe Number = 0, T = 20.089000 C 07:47:48 Temperature Measurement, Probe Number = 1, T = 20.015000 C 07:47:48 Temperature Measurement, Probe Number = 2, T = 20.097000 C 07:47:49 Temperature Measurement, Probe Number = 3, T = 20.039000 C 07:47:50 Temperature Measurement, Probe Number = 4, T = 20.475000 C 07:47:50 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.48 07:47:50 Integrated Voltage Measurement... 07:48:10 Voltage Offset Correction: v_off_ini = 0.000005157 V, v_off_fin = 0.000007773 V 07:48:10 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076333 Vs 07:48:10 Integrated Voltage Measurement... 07:48:30 Voltage Offset Correction: v_off_ini = 0.000006771 V, v_off_fin = 0.000004363 V 07:48:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988423 Vs 07:48:33 Temperature Measurement, Probe Number = 0, T = 20.089000 C 07:48:34 Temperature Measurement, Probe Number = 1, T = 20.014000 C 07:48:35 Temperature Measurement, Probe Number = 2, T = 20.094000 C 07:48:35 Temperature Measurement, Probe Number = 3, T = 20.037000 C 07:48:36 Temperature Measurement, Probe Number = 4, T = 20.462000 C 07:48:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.46 07:48:36 Integrated Voltage Measurement... 07:48:56 Voltage Offset Correction: v_off_ini = 0.000005551 V, v_off_fin = 0.000007495 V 07:48:57 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171077412 Vs 07:48:57 Integrated Voltage Measurement... 07:49:17 Voltage Offset Correction: v_off_ini = 0.000007070 V, v_off_fin = 0.000004723 V 07:49:17 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983772 Vs 07:49:20 Temperature Measurement, Probe Number = 0, T = 20.085000 C 07:49:20 Temperature Measurement, Probe Number = 1, T = 20.014000 C 07:49:21 Temperature Measurement, Probe Number = 2, T = 20.092000 C 07:49:22 Temperature Measurement, Probe Number = 3, T = 20.034000 C 07:49:22 Temperature Measurement, Probe Number = 4, T = 20.417000 C 07:49:22 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.42 07:49:23 Integrated Voltage Measurement... 07:49:42 Voltage Offset Correction: v_off_ini = 0.000005442 V, v_off_fin = 0.000008612 V 07:49:43 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171084870 Vs 07:49:43 Integrated Voltage Measurement... 07:50:02 Voltage Offset Correction: v_off_ini = 0.000007296 V, v_off_fin = 0.000004179 V 07:50:02 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985789 Vs 08:20:05 Temperature Measurement, Probe Number = 0, T = 20.087000 C 08:20:06 Temperature Measurement, Probe Number = 1, T = 20.017000 C 08:20:07 Temperature Measurement, Probe Number = 2, T = 20.094000 C 08:20:07 Temperature Measurement, Probe Number = 3, T = 20.040000 C 08:20:08 Temperature Measurement, Probe Number = 4, T = 20.435000 C 08:20:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.43 08:20:08 Integrated Voltage Measurement... 08:20:28 Voltage Offset Correction: v_off_ini = 0.000006050 V, v_off_fin = 0.000007851 V 08:20:29 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171126367 Vs 08:20:29 Integrated Voltage Measurement... 08:20:48 Voltage Offset Correction: v_off_ini = 0.000007290 V, v_off_fin = 0.000004405 V 08:20:48 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984642 Vs 08:20:51 Temperature Measurement, Probe Number = 0, T = 20.086000 C 08:20:52 Temperature Measurement, Probe Number = 1, T = 20.012000 C 08:20:52 Temperature Measurement, Probe Number = 2, T = 20.093000 C 08:20:53 Temperature Measurement, Probe Number = 3, T = 20.037000 C 08:20:54 Temperature Measurement, Probe Number = 4, T = 20.452000 C 08:20:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.45 08:20:54 Integrated Voltage Measurement... 08:21:13 Voltage Offset Correction: v_off_ini = 0.000005703 V, v_off_fin = 0.000008679 V 08:21:14 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171083598 Vs 08:21:14 Integrated Voltage Measurement... 08:21:33 Voltage Offset Correction: v_off_ini = 0.000008024 V, v_off_fin = 0.000004466 V 08:21:34 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979876 Vs 08:21:36 Temperature Measurement, Probe Number = 0, T = 20.083000 C 08:21:37 Temperature Measurement, Probe Number = 1, T = 20.010000 C 08:21:38 Temperature Measurement, Probe Number = 2, T = 20.089000 C 08:21:38 Temperature Measurement, Probe Number = 3, T = 20.033000 C 08:21:39 Temperature Measurement, Probe Number = 4, T = 20.455000 C 08:21:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.45 08:21:39 Integrated Voltage Measurement... 08:21:58 Voltage Offset Correction: v_off_ini = 0.000005979 V, v_off_fin = 0.000008215 V 08:21:59 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171081443 Vs 08:21:59 Integrated Voltage Measurement... 08:22:18 Voltage Offset Correction: v_off_ini = 0.000007305 V, v_off_fin = 0.000004298 V 08:22:19 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986532 Vs 08:22:21 Temperature Measurement, Probe Number = 0, T = 20.083000 C 08:22:22 Temperature Measurement, Probe Number = 1, T = 20.011000 C 08:22:23 Temperature Measurement, Probe Number = 2, T = 20.090000 C 08:22:23 Temperature Measurement, Probe Number = 3, T = 20.033000 C 08:22:24 Temperature Measurement, Probe Number = 4, T = 20.473000 C 08:22:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.47 08:22:24 Integrated Voltage Measurement... 08:22:44 Voltage Offset Correction: v_off_ini = 0.000005163 V, v_off_fin = 0.000007937 V 08:22:45 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076938 Vs 08:22:45 Integrated Voltage Measurement... 08:23:04 Voltage Offset Correction: v_off_ini = 0.000007483 V, v_off_fin = 0.000004387 V 08:23:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984859 Vs 08:23:07 Temperature Measurement, Probe Number = 0, T = 20.084000 C 08:23:08 Temperature Measurement, Probe Number = 1, T = 20.012000 C 08:23:09 Temperature Measurement, Probe Number = 2, T = 20.087000 C 08:23:09 Temperature Measurement, Probe Number = 3, T = 20.031000 C 08:23:10 Temperature Measurement, Probe Number = 4, T = 20.420000 C 08:23:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.42 08:23:10 Integrated Voltage Measurement... 08:23:30 Voltage Offset Correction: v_off_ini = 0.000005294 V, v_off_fin = 0.000008204 V 08:23:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171080354 Vs 08:23:30 Integrated Voltage Measurement... 08:23:50 Voltage Offset Correction: v_off_ini = 0.000007415 V, v_off_fin = 0.000004261 V 08:23:50 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170985110 Vs 08:23:52 Temperature Measurement, Probe Number = 0, T = 20.082000 C 08:23:53 Temperature Measurement, Probe Number = 1, T = 20.009000 C 08:23:54 Temperature Measurement, Probe Number = 2, T = 20.087000 C 08:23:54 Temperature Measurement, Probe Number = 3, T = 20.031000 C 08:23:55 Temperature Measurement, Probe Number = 4, T = 20.387000 C 08:23:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.39 08:23:55 Integrated Voltage Measurement... 08:24:15 Voltage Offset Correction: v_off_ini = 0.000005068 V, v_off_fin = 0.000008593 V 08:24:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171081449 Vs 08:24:15 Integrated Voltage Measurement... 08:24:35 Voltage Offset Correction: v_off_ini = 0.000007704 V, v_off_fin = 0.000003521 V 08:24:35 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988204 Vs 08:24:37 Temperature Measurement, Probe Number = 0, T = 20.085000 C 08:24:38 Temperature Measurement, Probe Number = 1, T = 20.014000 C 08:24:39 Temperature Measurement, Probe Number = 2, T = 20.091000 C 08:24:39 Temperature Measurement, Probe Number = 3, T = 20.036000 C 08:24:40 Temperature Measurement, Probe Number = 4, T = 20.405000 C 08:24:40 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.41 08:24:40 Integrated Voltage Measurement... 08:25:00 Voltage Offset Correction: v_off_ini = 0.000005341 V, v_off_fin = 0.000008340 V 08:25:00 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171083454 Vs 08:25:00 Integrated Voltage Measurement... 08:25:20 Voltage Offset Correction: v_off_ini = 0.000007026 V, v_off_fin = 0.000004415 V 08:25:20 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170983570 Vs 08:25:23 Temperature Measurement, Probe Number = 0, T = 20.087000 C 08:25:23 Temperature Measurement, Probe Number = 1, T = 20.018000 C 08:25:24 Temperature Measurement, Probe Number = 2, T = 20.093000 C 08:25:25 Temperature Measurement, Probe Number = 3, T = 20.039000 C 08:25:25 Temperature Measurement, Probe Number = 4, T = 20.449000 C 08:25:25 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.45 08:25:25 Integrated Voltage Measurement... 08:25:45 Voltage Offset Correction: v_off_ini = 0.000005574 V, v_off_fin = 0.000007966 V 08:25:45 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171083837 Vs 08:25:45 Integrated Voltage Measurement... 08:26:05 Voltage Offset Correction: v_off_ini = 0.000007033 V, v_off_fin = 0.000004752 V 08:26:05 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170979895 Vs 08:26:08 Temperature Measurement, Probe Number = 0, T = 20.088000 C 08:26:08 Temperature Measurement, Probe Number = 1, T = 20.018000 C 08:26:09 Temperature Measurement, Probe Number = 2, T = 20.093000 C 08:26:10 Temperature Measurement, Probe Number = 3, T = 20.040000 C 08:26:10 Temperature Measurement, Probe Number = 4, T = 20.517000 C 08:26:10 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.52 08:26:11 Integrated Voltage Measurement... 08:26:30 Voltage Offset Correction: v_off_ini = 0.000005457 V, v_off_fin = 0.000008151 V 08:26:30 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171077251 Vs 08:26:30 Integrated Voltage Measurement... 08:26:50 Voltage Offset Correction: v_off_ini = 0.000007002 V, v_off_fin = 0.000003639 V 08:26:50 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170991326 Vs 08:26:53 Temperature Measurement, Probe Number = 0, T = 20.089000 C 08:26:53 Temperature Measurement, Probe Number = 1, T = 20.019000 C 08:26:54 Temperature Measurement, Probe Number = 2, T = 20.096000 C 08:26:55 Temperature Measurement, Probe Number = 3, T = 20.042000 C 08:26:55 Temperature Measurement, Probe Number = 4, T = 20.525000 C 08:26:55 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.52 08:26:55 Integrated Voltage Measurement... 08:27:15 Voltage Offset Correction: v_off_ini = 0.000004286 V, v_off_fin = 0.000007966 V 08:27:15 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171074859 Vs 08:27:15 Integrated Voltage Measurement... 08:27:35 Voltage Offset Correction: v_off_ini = 0.000007542 V, v_off_fin = 0.000004213 V 08:27:36 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170984830 Vs 08:57:38 Temperature Measurement, Probe Number = 0, T = 20.083000 C 08:57:39 Temperature Measurement, Probe Number = 1, T = 20.007000 C 08:57:40 Temperature Measurement, Probe Number = 2, T = 20.089000 C 08:57:40 Temperature Measurement, Probe Number = 3, T = 20.032000 C 08:57:41 Temperature Measurement, Probe Number = 4, T = 20.394000 C 08:57:41 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.39 08:57:41 Integrated Voltage Measurement... 08:58:01 Voltage Offset Correction: v_off_ini = 0.000006034 V, v_off_fin = 0.000007883 V 08:58:01 Integrated Voltage Measurement Delta Gap = 0.0040012 m VT = 0.171119975 Vs 08:58:01 Integrated Voltage Measurement... 08:58:21 Voltage Offset Correction: v_off_ini = 0.000007201 V, v_off_fin = 0.000004245 V 08:58:21 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991576 Vs 08:58:24 Temperature Measurement, Probe Number = 0, T = 20.081000 C 08:58:24 Temperature Measurement, Probe Number = 1, T = 20.008000 C 08:58:25 Temperature Measurement, Probe Number = 2, T = 20.087000 C 08:58:26 Temperature Measurement, Probe Number = 3, T = 20.029000 C 08:58:26 Temperature Measurement, Probe Number = 4, T = 20.370000 C 08:58:26 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.37 08:58:27 Integrated Voltage Measurement... 08:58:46 Voltage Offset Correction: v_off_ini = 0.000005333 V, v_off_fin = 0.000008361 V 08:58:46 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171075947 Vs 08:58:46 Integrated Voltage Measurement... 08:59:06 Voltage Offset Correction: v_off_ini = 0.000007460 V, v_off_fin = 0.000003710 V 08:59:06 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991068 Vs 08:59:09 Temperature Measurement, Probe Number = 0, T = 20.087000 C 08:59:09 Temperature Measurement, Probe Number = 1, T = 20.014000 C 08:59:10 Temperature Measurement, Probe Number = 2, T = 20.089000 C 08:59:11 Temperature Measurement, Probe Number = 3, T = 20.034000 C 08:59:11 Temperature Measurement, Probe Number = 4, T = 20.366000 C 08:59:11 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.37 08:59:12 Integrated Voltage Measurement... 08:59:31 Voltage Offset Correction: v_off_ini = 0.000005222 V, v_off_fin = 0.000007813 V 08:59:31 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171079557 Vs 08:59:31 Integrated Voltage Measurement... 08:59:52 Voltage Offset Correction: v_off_ini = 0.000007856 V, v_off_fin = 0.000004091 V 08:59:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996116 Vs 08:59:54 Temperature Measurement, Probe Number = 0, T = 20.088000 C 08:59:55 Temperature Measurement, Probe Number = 1, T = 20.014000 C 08:59:56 Temperature Measurement, Probe Number = 2, T = 20.093000 C 08:59:56 Temperature Measurement, Probe Number = 3, T = 20.036000 C 08:59:57 Temperature Measurement, Probe Number = 4, T = 20.441000 C 08:59:57 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.44 08:59:57 Integrated Voltage Measurement... 09:00:17 Voltage Offset Correction: v_off_ini = 0.000005262 V, v_off_fin = 0.000008305 V 09:00:17 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076852 Vs 09:00:17 Integrated Voltage Measurement... 09:00:37 Voltage Offset Correction: v_off_ini = 0.000007527 V, v_off_fin = 0.000004411 V 09:00:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990664 Vs 09:00:40 Temperature Measurement, Probe Number = 0, T = 20.084000 C 09:00:40 Temperature Measurement, Probe Number = 1, T = 20.010000 C 09:00:41 Temperature Measurement, Probe Number = 2, T = 20.089000 C 09:00:42 Temperature Measurement, Probe Number = 3, T = 20.032000 C 09:00:42 Temperature Measurement, Probe Number = 4, T = 20.446000 C 09:00:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.45 09:00:43 Integrated Voltage Measurement... 09:01:02 Voltage Offset Correction: v_off_ini = 0.000005183 V, v_off_fin = 0.000007898 V 09:01:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078024 Vs 09:01:03 Integrated Voltage Measurement... 09:01:22 Voltage Offset Correction: v_off_ini = 0.000006909 V, v_off_fin = 0.000004110 V 09:01:22 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996165 Vs 09:01:25 Temperature Measurement, Probe Number = 0, T = 20.086000 C 09:01:25 Temperature Measurement, Probe Number = 1, T = 20.012000 C 09:01:26 Temperature Measurement, Probe Number = 2, T = 20.090000 C 09:01:27 Temperature Measurement, Probe Number = 3, T = 20.033000 C 09:01:27 Temperature Measurement, Probe Number = 4, T = 20.420000 C 09:01:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.42 09:01:28 Integrated Voltage Measurement... 09:01:47 Voltage Offset Correction: v_off_ini = 0.000005084 V, v_off_fin = 0.000007477 V 09:01:47 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171075379 Vs 09:01:47 Integrated Voltage Measurement... 09:02:07 Voltage Offset Correction: v_off_ini = 0.000006580 V, v_off_fin = 0.000003485 V 09:02:07 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996816 Vs 09:02:10 Temperature Measurement, Probe Number = 0, T = 20.087000 C 09:02:11 Temperature Measurement, Probe Number = 1, T = 20.012000 C 09:02:11 Temperature Measurement, Probe Number = 2, T = 20.093000 C 09:02:12 Temperature Measurement, Probe Number = 3, T = 20.034000 C 09:02:13 Temperature Measurement, Probe Number = 4, T = 20.445000 C 09:02:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.45 09:02:13 Integrated Voltage Measurement... 09:02:32 Voltage Offset Correction: v_off_ini = 0.000004553 V, v_off_fin = 0.000007995 V 09:02:33 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171076139 Vs 09:02:33 Integrated Voltage Measurement... 09:02:52 Voltage Offset Correction: v_off_ini = 0.000007208 V, v_off_fin = 0.000003880 V 09:02:52 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991080 Vs 09:02:55 Temperature Measurement, Probe Number = 0, T = 20.083000 C 09:02:56 Temperature Measurement, Probe Number = 1, T = 20.006000 C 09:02:56 Temperature Measurement, Probe Number = 2, T = 20.088000 C 09:02:57 Temperature Measurement, Probe Number = 3, T = 20.030000 C 09:02:58 Temperature Measurement, Probe Number = 4, T = 20.435000 C 09:02:58 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.43 09:02:58 Integrated Voltage Measurement... 09:03:17 Voltage Offset Correction: v_off_ini = 0.000004729 V, v_off_fin = 0.000007889 V 09:03:18 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171079932 Vs 09:03:18 Integrated Voltage Measurement... 09:03:37 Voltage Offset Correction: v_off_ini = 0.000006767 V, v_off_fin = 0.000004012 V 09:03:37 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170990075 Vs 09:03:40 Temperature Measurement, Probe Number = 0, T = 20.082000 C 09:03:41 Temperature Measurement, Probe Number = 1, T = 20.008000 C 09:03:41 Temperature Measurement, Probe Number = 2, T = 20.088000 C 09:03:42 Temperature Measurement, Probe Number = 3, T = 20.032000 C 09:03:43 Temperature Measurement, Probe Number = 4, T = 20.445000 C 09:03:43 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.45 09:03:43 Integrated Voltage Measurement... 09:04:03 Voltage Offset Correction: v_off_ini = 0.000005592 V, v_off_fin = 0.000007617 V 09:04:03 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171079710 Vs 09:04:04 Integrated Voltage Measurement... 09:04:23 Voltage Offset Correction: v_off_ini = 0.000006882 V, v_off_fin = 0.000003711 V 09:04:24 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.171000445 Vs 09:04:26 Temperature Measurement, Probe Number = 0, T = 20.085000 C 09:04:27 Temperature Measurement, Probe Number = 1, T = 20.009000 C 09:04:28 Temperature Measurement, Probe Number = 2, T = 20.091000 C 09:04:28 Temperature Measurement, Probe Number = 3, T = 20.034000 C 09:04:29 Temperature Measurement, Probe Number = 4, T = 20.454000 C 09:04:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.45 09:04:29 Integrated Voltage Measurement... 09:04:49 Voltage Offset Correction: v_off_ini = 0.000005143 V, v_off_fin = 0.000008032 V 09:04:49 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171078911 Vs 09:04:49 Integrated Voltage Measurement... 09:05:09 Voltage Offset Correction: v_off_ini = 0.000007187 V, v_off_fin = 0.000004341 V 09:05:10 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996033 Vs 09:35:12 Temperature Measurement, Probe Number = 0, T = 20.088000 C 09:35:13 Temperature Measurement, Probe Number = 1, T = 20.017000 C 09:35:14 Temperature Measurement, Probe Number = 2, T = 20.094000 C 09:35:15 Temperature Measurement, Probe Number = 3, T = 20.039000 C 09:35:15 Temperature Measurement, Probe Number = 4, T = 20.401000 C 09:35:15 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.40 09:35:16 Integrated Voltage Measurement... 09:35:35 Voltage Offset Correction: v_off_ini = 0.000005869 V, v_off_fin = 0.000007530 V 09:35:35 Integrated Voltage Measurement Delta Gap = 0.0040017 m VT = 0.171127095 Vs 09:35:35 Integrated Voltage Measurement... 09:35:56 Voltage Offset Correction: v_off_ini = 0.000006804 V, v_off_fin = 0.000004176 V 09:35:56 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170988954 Vs 09:35:59 Temperature Measurement, Probe Number = 0, T = 20.086000 C 09:35:59 Temperature Measurement, Probe Number = 1, T = 20.015000 C 09:36:00 Temperature Measurement, Probe Number = 2, T = 20.092000 C 09:36:01 Temperature Measurement, Probe Number = 3, T = 20.038000 C 09:36:01 Temperature Measurement, Probe Number = 4, T = 20.413000 C 09:36:01 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.41 09:36:01 Integrated Voltage Measurement... 09:36:22 Voltage Offset Correction: v_off_ini = 0.000005288 V, v_off_fin = 0.000006883 V 09:36:22 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171066236 Vs 09:36:22 Integrated Voltage Measurement... 09:36:42 Voltage Offset Correction: v_off_ini = 0.000006655 V, v_off_fin = 0.000004062 V 09:36:43 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170985109 Vs 09:36:45 Temperature Measurement, Probe Number = 0, T = 20.091000 C 09:36:46 Temperature Measurement, Probe Number = 1, T = 20.019000 C 09:36:47 Temperature Measurement, Probe Number = 2, T = 20.095000 C 09:36:47 Temperature Measurement, Probe Number = 3, T = 20.042000 C 09:36:48 Temperature Measurement, Probe Number = 4, T = 20.388000 C 09:36:48 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.39 09:36:48 Integrated Voltage Measurement... 09:37:07 Voltage Offset Correction: v_off_ini = 0.000004795 V, v_off_fin = 0.000007281 V 09:37:08 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171059758 Vs 09:37:08 Integrated Voltage Measurement... 09:37:28 Voltage Offset Correction: v_off_ini = 0.000007007 V, v_off_fin = 0.000004146 V 09:37:29 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989411 Vs 09:37:31 Temperature Measurement, Probe Number = 0, T = 20.090000 C 09:37:32 Temperature Measurement, Probe Number = 1, T = 20.021000 C 09:37:33 Temperature Measurement, Probe Number = 2, T = 20.095000 C 09:37:33 Temperature Measurement, Probe Number = 3, T = 20.044000 C 09:37:34 Temperature Measurement, Probe Number = 4, T = 20.406000 C 09:37:34 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.41 09:37:34 Integrated Voltage Measurement... 09:37:54 Voltage Offset Correction: v_off_ini = 0.000004955 V, v_off_fin = 0.000007894 V 09:37:55 Integrated Voltage Measurement Delta Gap = 0.0040003 m VT = 0.171067297 Vs 09:37:55 Integrated Voltage Measurement... 09:38:14 Voltage Offset Correction: v_off_ini = 0.000007286 V, v_off_fin = 0.000004272 V 09:38:15 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170978916 Vs 09:38:17 Temperature Measurement, Probe Number = 0, T = 20.091000 C 09:38:18 Temperature Measurement, Probe Number = 1, T = 20.019000 C 09:38:19 Temperature Measurement, Probe Number = 2, T = 20.098000 C 09:38:19 Temperature Measurement, Probe Number = 3, T = 20.043000 C 09:38:20 Temperature Measurement, Probe Number = 4, T = 20.437000 C 09:38:20 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.44 09:38:20 Integrated Voltage Measurement... 09:38:40 Voltage Offset Correction: v_off_ini = 0.000005208 V, v_off_fin = 0.000007332 V 09:38:41 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171069870 Vs 09:38:41 Integrated Voltage Measurement... 09:39:00 Voltage Offset Correction: v_off_ini = 0.000006621 V, v_off_fin = 0.000004312 V 09:39:01 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985994 Vs 09:39:03 Temperature Measurement, Probe Number = 0, T = 20.087000 C 09:39:04 Temperature Measurement, Probe Number = 1, T = 20.019000 C 09:39:05 Temperature Measurement, Probe Number = 2, T = 20.095000 C 09:39:05 Temperature Measurement, Probe Number = 3, T = 20.040000 C 09:39:06 Temperature Measurement, Probe Number = 4, T = 20.438000 C 09:39:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.44 09:39:06 Integrated Voltage Measurement... 09:39:26 Voltage Offset Correction: v_off_ini = 0.000005242 V, v_off_fin = 0.000007589 V 09:39:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171069893 Vs 09:39:26 Integrated Voltage Measurement... 09:39:46 Voltage Offset Correction: v_off_ini = 0.000007036 V, v_off_fin = 0.000002779 V 09:39:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170991637 Vs 09:39:49 Temperature Measurement, Probe Number = 0, T = 20.089000 C 09:39:49 Temperature Measurement, Probe Number = 1, T = 20.017000 C 09:39:50 Temperature Measurement, Probe Number = 2, T = 20.097000 C 09:39:50 Temperature Measurement, Probe Number = 3, T = 20.041000 C 09:39:51 Temperature Measurement, Probe Number = 4, T = 20.409000 C 09:39:51 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.41 09:39:51 Integrated Voltage Measurement... 09:40:11 Voltage Offset Correction: v_off_ini = 0.000004814 V, v_off_fin = 0.000007367 V 09:40:11 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171074412 Vs 09:40:11 Integrated Voltage Measurement... 09:40:31 Voltage Offset Correction: v_off_ini = 0.000006661 V, v_off_fin = 0.000003916 V 09:40:31 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170992533 Vs 09:40:34 Temperature Measurement, Probe Number = 0, T = 20.089000 C 09:40:34 Temperature Measurement, Probe Number = 1, T = 20.017000 C 09:40:35 Temperature Measurement, Probe Number = 2, T = 20.098000 C 09:40:36 Temperature Measurement, Probe Number = 3, T = 20.040000 C 09:40:36 Temperature Measurement, Probe Number = 4, T = 20.373000 C 09:40:36 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.37 09:40:36 Integrated Voltage Measurement... 09:40:56 Voltage Offset Correction: v_off_ini = 0.000005419 V, v_off_fin = 0.000007729 V 09:40:56 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171070877 Vs 09:40:56 Integrated Voltage Measurement... 09:41:16 Voltage Offset Correction: v_off_ini = 0.000006854 V, v_off_fin = 0.000003289 V 09:41:16 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170996425 Vs 09:41:19 Temperature Measurement, Probe Number = 0, T = 20.090000 C 09:41:19 Temperature Measurement, Probe Number = 1, T = 20.015000 C 09:41:20 Temperature Measurement, Probe Number = 2, T = 20.097000 C 09:41:21 Temperature Measurement, Probe Number = 3, T = 20.041000 C 09:41:21 Temperature Measurement, Probe Number = 4, T = 20.397000 C 09:41:21 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.40 09:41:21 Integrated Voltage Measurement... 09:41:41 Voltage Offset Correction: v_off_ini = 0.000004278 V, v_off_fin = 0.000007439 V 09:41:41 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171072150 Vs 09:41:41 Integrated Voltage Measurement... 09:42:01 Voltage Offset Correction: v_off_ini = 0.000006756 V, v_off_fin = 0.000003167 V 09:42:01 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986111 Vs 09:42:04 Temperature Measurement, Probe Number = 0, T = 20.087000 C 09:42:04 Temperature Measurement, Probe Number = 1, T = 20.016000 C 09:42:05 Temperature Measurement, Probe Number = 2, T = 20.094000 C 09:42:06 Temperature Measurement, Probe Number = 3, T = 20.040000 C 09:42:06 Temperature Measurement, Probe Number = 4, T = 20.400000 C 09:42:06 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.40 09:42:06 Integrated Voltage Measurement... 09:42:26 Voltage Offset Correction: v_off_ini = 0.000004819 V, v_off_fin = 0.000008014 V 09:42:26 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171072967 Vs 09:42:26 Integrated Voltage Measurement... 09:42:46 Voltage Offset Correction: v_off_ini = 0.000006944 V, v_off_fin = 0.000003386 V 09:42:46 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993289 Vs 10:12:49 Temperature Measurement, Probe Number = 0, T = 20.086000 C 10:12:50 Temperature Measurement, Probe Number = 1, T = 20.014000 C 10:12:50 Temperature Measurement, Probe Number = 2, T = 20.092000 C 10:12:51 Temperature Measurement, Probe Number = 3, T = 20.035000 C 10:12:52 Temperature Measurement, Probe Number = 4, T = 20.340000 C 10:12:52 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.34 10:12:52 Integrated Voltage Measurement... 10:13:12 Voltage Offset Correction: v_off_ini = 0.000006030 V, v_off_fin = 0.000007367 V 10:13:12 Integrated Voltage Measurement Delta Gap = 0.0040014 m VT = 0.171123805 Vs 10:13:12 Integrated Voltage Measurement... 10:13:32 Voltage Offset Correction: v_off_ini = 0.000006951 V, v_off_fin = 0.000003644 V 10:13:32 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986023 Vs 10:13:35 Temperature Measurement, Probe Number = 0, T = 20.084000 C 10:13:35 Temperature Measurement, Probe Number = 1, T = 20.012000 C 10:13:36 Temperature Measurement, Probe Number = 2, T = 20.092000 C 10:13:36 Temperature Measurement, Probe Number = 3, T = 20.034000 C 10:13:37 Temperature Measurement, Probe Number = 4, T = 20.309000 C 10:13:37 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.08 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.31 10:13:37 Integrated Voltage Measurement... 10:13:58 Voltage Offset Correction: v_off_ini = 0.000005057 V, v_off_fin = 0.000008240 V 10:13:58 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171077790 Vs 10:13:58 Integrated Voltage Measurement... 10:14:18 Voltage Offset Correction: v_off_ini = 0.000007555 V, v_off_fin = 0.000003656 V 10:14:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170986727 Vs 10:14:21 Temperature Measurement, Probe Number = 0, T = 20.086000 C 10:14:21 Temperature Measurement, Probe Number = 1, T = 20.014000 C 10:14:22 Temperature Measurement, Probe Number = 2, T = 20.093000 C 10:14:23 Temperature Measurement, Probe Number = 3, T = 20.035000 C 10:14:23 Temperature Measurement, Probe Number = 4, T = 20.367000 C 10:14:23 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.37 10:14:23 Integrated Voltage Measurement... 10:14:43 Voltage Offset Correction: v_off_ini = 0.000004663 V, v_off_fin = 0.000007080 V 10:14:43 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171072887 Vs 10:14:43 Integrated Voltage Measurement... 10:15:03 Voltage Offset Correction: v_off_ini = 0.000006488 V, v_off_fin = 0.000003449 V 10:15:03 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170997887 Vs 10:15:06 Temperature Measurement, Probe Number = 0, T = 20.085000 C 10:15:06 Temperature Measurement, Probe Number = 1, T = 20.013000 C 10:15:07 Temperature Measurement, Probe Number = 2, T = 20.088000 C 10:15:08 Temperature Measurement, Probe Number = 3, T = 20.032000 C 10:15:08 Temperature Measurement, Probe Number = 4, T = 20.366000 C 10:15:08 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.03 P4 = Room, Value = 20.37 10:15:09 Integrated Voltage Measurement... 10:15:28 Voltage Offset Correction: v_off_ini = 0.000004904 V, v_off_fin = 0.000007368 V 10:15:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171075096 Vs 10:15:28 Integrated Voltage Measurement... 10:15:48 Voltage Offset Correction: v_off_ini = 0.000007035 V, v_off_fin = 0.000003642 V 10:15:48 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170995274 Vs 10:15:51 Temperature Measurement, Probe Number = 0, T = 20.088000 C 10:15:52 Temperature Measurement, Probe Number = 1, T = 20.016000 C 10:15:52 Temperature Measurement, Probe Number = 2, T = 20.090000 C 10:15:53 Temperature Measurement, Probe Number = 3, T = 20.035000 C 10:15:54 Temperature Measurement, Probe Number = 4, T = 20.407000 C 10:15:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.41 10:15:54 Integrated Voltage Measurement... 10:16:13 Voltage Offset Correction: v_off_ini = 0.000004156 V, v_off_fin = 0.000007550 V 10:16:13 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171076909 Vs 10:16:13 Integrated Voltage Measurement... 10:16:33 Voltage Offset Correction: v_off_ini = 0.000006872 V, v_off_fin = 0.000003296 V 10:16:33 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170996586 Vs 10:16:36 Temperature Measurement, Probe Number = 0, T = 20.087000 C 10:16:37 Temperature Measurement, Probe Number = 1, T = 20.014000 C 10:16:37 Temperature Measurement, Probe Number = 2, T = 20.093000 C 10:16:38 Temperature Measurement, Probe Number = 3, T = 20.037000 C 10:16:39 Temperature Measurement, Probe Number = 4, T = 20.415000 C 10:16:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.01 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.41 10:16:39 Integrated Voltage Measurement... 10:16:58 Voltage Offset Correction: v_off_ini = 0.000004530 V, v_off_fin = 0.000007376 V 10:16:58 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171071024 Vs 10:16:59 Integrated Voltage Measurement... 10:17:18 Voltage Offset Correction: v_off_ini = 0.000006825 V, v_off_fin = 0.000002923 V 10:17:18 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170993341 Vs 10:17:21 Temperature Measurement, Probe Number = 0, T = 20.091000 C 10:17:22 Temperature Measurement, Probe Number = 1, T = 20.018000 C 10:17:22 Temperature Measurement, Probe Number = 2, T = 20.093000 C 10:17:23 Temperature Measurement, Probe Number = 3, T = 20.038000 C 10:17:24 Temperature Measurement, Probe Number = 4, T = 20.381000 C 10:17:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.38 10:17:24 Integrated Voltage Measurement... 10:17:43 Voltage Offset Correction: v_off_ini = 0.000004613 V, v_off_fin = 0.000007678 V 10:17:43 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171072735 Vs 10:17:44 Integrated Voltage Measurement... 10:18:03 Voltage Offset Correction: v_off_ini = 0.000006518 V, v_off_fin = 0.000003922 V 10:18:03 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170989747 Vs 10:18:06 Temperature Measurement, Probe Number = 0, T = 20.091000 C 10:18:07 Temperature Measurement, Probe Number = 1, T = 20.016000 C 10:18:07 Temperature Measurement, Probe Number = 2, T = 20.097000 C 10:18:08 Temperature Measurement, Probe Number = 3, T = 20.039000 C 10:18:09 Temperature Measurement, Probe Number = 4, T = 20.425000 C 10:18:09 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.43 10:18:09 Integrated Voltage Measurement... 10:18:28 Voltage Offset Correction: v_off_ini = 0.000005051 V, v_off_fin = 0.000007195 V 10:18:28 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171074498 Vs 10:18:29 Integrated Voltage Measurement... 10:18:48 Voltage Offset Correction: v_off_ini = 0.000006543 V, v_off_fin = 0.000003311 V 10:18:48 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170992741 Vs 10:18:51 Temperature Measurement, Probe Number = 0, T = 20.092000 C 10:18:52 Temperature Measurement, Probe Number = 1, T = 20.018000 C 10:18:53 Temperature Measurement, Probe Number = 2, T = 20.097000 C 10:18:53 Temperature Measurement, Probe Number = 3, T = 20.041000 C 10:18:54 Temperature Measurement, Probe Number = 4, T = 20.463000 C 10:18:54 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.46 10:18:54 Integrated Voltage Measurement... 10:19:13 Voltage Offset Correction: v_off_ini = 0.000004604 V, v_off_fin = 0.000007356 V 10:19:13 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171075667 Vs 10:19:14 Integrated Voltage Measurement... 10:19:33 Voltage Offset Correction: v_off_ini = 0.000007571 V, v_off_fin = 0.000003188 V 10:19:33 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170987469 Vs 10:19:36 Temperature Measurement, Probe Number = 0, T = 20.093000 C 10:19:37 Temperature Measurement, Probe Number = 1, T = 20.018000 C 10:19:37 Temperature Measurement, Probe Number = 2, T = 20.099000 C 10:19:38 Temperature Measurement, Probe Number = 3, T = 20.042000 C 10:19:39 Temperature Measurement, Probe Number = 4, T = 20.496000 C 10:19:39 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.50 10:19:39 Integrated Voltage Measurement... 10:19:58 Voltage Offset Correction: v_off_ini = 0.000004927 V, v_off_fin = 0.000007752 V 10:19:58 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171078370 Vs 10:19:59 Integrated Voltage Measurement... 10:20:18 Voltage Offset Correction: v_off_ini = 0.000007380 V, v_off_fin = 0.000004012 V 10:20:18 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170988164 Vs 10:50:21 Temperature Measurement, Probe Number = 0, T = 20.088000 C 10:50:22 Temperature Measurement, Probe Number = 1, T = 20.019000 C 10:50:23 Temperature Measurement, Probe Number = 2, T = 20.091000 C 10:50:23 Temperature Measurement, Probe Number = 3, T = 20.039000 C 10:50:24 Temperature Measurement, Probe Number = 4, T = 20.571000 C 10:50:24 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.57 10:50:24 Integrated Voltage Measurement... 10:50:44 Voltage Offset Correction: v_off_ini = 0.000006383 V, v_off_fin = 0.000007813 V 10:55:17 Integrated Voltage Measurement Delta Gap = 0.0040015 m VT = 0.171133803 Vs 10:55:17 Integrated Voltage Measurement... 10:55:37 Voltage Offset Correction: v_off_ini = 0.000006262 V, v_off_fin = 0.000004620 V 10:55:37 Integrated Voltage Measurement Delta Gap = -0.0040013 m VT = -0.171005672 Vs 10:55:40 Temperature Measurement, Probe Number = 0, T = 20.094000 C 10:55:40 Temperature Measurement, Probe Number = 1, T = 20.023000 C 10:55:41 Temperature Measurement, Probe Number = 2, T = 20.098000 C 10:55:41 Temperature Measurement, Probe Number = 3, T = 20.043000 C 10:55:42 Temperature Measurement, Probe Number = 4, T = 20.532000 C 10:55:42 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.53 10:55:42 Integrated Voltage Measurement... 10:56:02 Voltage Offset Correction: v_off_ini = 0.000004602 V, v_off_fin = 0.000007544 V 10:56:02 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171066752 Vs 10:56:02 Integrated Voltage Measurement... 10:56:22 Voltage Offset Correction: v_off_ini = 0.000007044 V, v_off_fin = 0.000003296 V 10:56:22 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170986203 Vs 10:56:25 Temperature Measurement, Probe Number = 0, T = 20.092000 C 10:56:25 Temperature Measurement, Probe Number = 1, T = 20.020000 C 10:56:26 Temperature Measurement, Probe Number = 2, T = 20.098000 C 10:56:27 Temperature Measurement, Probe Number = 3, T = 20.042000 C 10:56:27 Temperature Measurement, Probe Number = 4, T = 20.556000 C 10:56:27 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.56 10:56:28 Integrated Voltage Measurement... 10:56:48 Voltage Offset Correction: v_off_ini = 0.000004718 V, v_off_fin = 0.000007243 V 10:56:48 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171065154 Vs 10:56:48 Integrated Voltage Measurement... 10:57:08 Voltage Offset Correction: v_off_ini = 0.000006403 V, v_off_fin = 0.000003941 V 10:57:08 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170982386 Vs 10:57:11 Temperature Measurement, Probe Number = 0, T = 20.090000 C 10:57:11 Temperature Measurement, Probe Number = 1, T = 20.017000 C 10:57:12 Temperature Measurement, Probe Number = 2, T = 20.097000 C 10:57:13 Temperature Measurement, Probe Number = 3, T = 20.040000 C 10:57:13 Temperature Measurement, Probe Number = 4, T = 20.543000 C 10:57:13 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.54 10:57:14 Integrated Voltage Measurement... 10:57:34 Voltage Offset Correction: v_off_ini = 0.000004805 V, v_off_fin = 0.000007970 V 10:57:34 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171065759 Vs 10:57:34 Integrated Voltage Measurement... 10:57:54 Voltage Offset Correction: v_off_ini = 0.000007284 V, v_off_fin = 0.000003615 V 10:57:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975656 Vs 10:57:57 Temperature Measurement, Probe Number = 0, T = 20.091000 C 10:57:57 Temperature Measurement, Probe Number = 1, T = 20.018000 C 10:57:58 Temperature Measurement, Probe Number = 2, T = 20.095000 C 10:57:59 Temperature Measurement, Probe Number = 3, T = 20.041000 C 10:57:59 Temperature Measurement, Probe Number = 4, T = 20.542000 C 10:57:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.54 10:58:00 Integrated Voltage Measurement... 10:58:19 Voltage Offset Correction: v_off_ini = 0.000005545 V, v_off_fin = 0.000007994 V 10:58:19 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171068935 Vs 10:58:19 Integrated Voltage Measurement... 10:58:39 Voltage Offset Correction: v_off_ini = 0.000007334 V, v_off_fin = 0.000004076 V 10:58:39 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170975369 Vs 10:58:42 Temperature Measurement, Probe Number = 0, T = 20.091000 C 10:58:42 Temperature Measurement, Probe Number = 1, T = 20.021000 C 10:58:43 Temperature Measurement, Probe Number = 2, T = 20.093000 C 10:58:44 Temperature Measurement, Probe Number = 3, T = 20.040000 C 10:58:44 Temperature Measurement, Probe Number = 4, T = 20.499000 C 10:58:44 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.50 10:58:45 Integrated Voltage Measurement... 10:59:04 Voltage Offset Correction: v_off_ini = 0.000004138 V, v_off_fin = 0.000007025 V 10:59:04 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062568 Vs 10:59:04 Integrated Voltage Measurement... 10:59:24 Voltage Offset Correction: v_off_ini = 0.000006406 V, v_off_fin = 0.000003815 V 10:59:24 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170980228 Vs 10:59:27 Temperature Measurement, Probe Number = 0, T = 20.094000 C 10:59:27 Temperature Measurement, Probe Number = 1, T = 20.022000 C 10:59:28 Temperature Measurement, Probe Number = 2, T = 20.097000 C 10:59:29 Temperature Measurement, Probe Number = 3, T = 20.042000 C 10:59:29 Temperature Measurement, Probe Number = 4, T = 20.535000 C 10:59:29 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.54 10:59:30 Integrated Voltage Measurement... 10:59:49 Voltage Offset Correction: v_off_ini = 0.000005145 V, v_off_fin = 0.000007981 V 10:59:49 Integrated Voltage Measurement Delta Gap = 0.0040006 m VT = 0.171074375 Vs 10:59:49 Integrated Voltage Measurement... 11:00:09 Voltage Offset Correction: v_off_ini = 0.000007646 V, v_off_fin = 0.000003496 V 11:00:09 Integrated Voltage Measurement Delta Gap = -0.0040004 m VT = -0.170976277 Vs 11:00:12 Temperature Measurement, Probe Number = 0, T = 20.094000 C 11:00:12 Temperature Measurement, Probe Number = 1, T = 20.022000 C 11:00:13 Temperature Measurement, Probe Number = 2, T = 20.095000 C 11:00:14 Temperature Measurement, Probe Number = 3, T = 20.043000 C 11:00:14 Temperature Measurement, Probe Number = 4, T = 20.539000 C 11:00:14 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.09 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.54 11:00:15 Integrated Voltage Measurement... 11:00:34 Voltage Offset Correction: v_off_ini = 0.000005571 V, v_off_fin = 0.000008397 V 11:00:34 Integrated Voltage Measurement Delta Gap = 0.0040005 m VT = 0.171080341 Vs 11:00:34 Integrated Voltage Measurement... 11:00:54 Voltage Offset Correction: v_off_ini = 0.000007872 V, v_off_fin = 0.000004138 V 11:00:54 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170972837 Vs 11:00:57 Temperature Measurement, Probe Number = 0, T = 20.095000 C 11:00:57 Temperature Measurement, Probe Number = 1, T = 20.028000 C 11:00:58 Temperature Measurement, Probe Number = 2, T = 20.099000 C 11:00:59 Temperature Measurement, Probe Number = 3, T = 20.046000 C 11:00:59 Temperature Measurement, Probe Number = 4, T = 20.514000 C 11:00:59 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.03 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.05 P4 = Room, Value = 20.51 11:01:00 Integrated Voltage Measurement... 11:01:20 Voltage Offset Correction: v_off_ini = 0.000005044 V, v_off_fin = 0.000007967 V 11:01:20 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171073597 Vs 11:01:21 Integrated Voltage Measurement... 11:01:41 Voltage Offset Correction: v_off_ini = 0.000007473 V, v_off_fin = 0.000004120 V 11:01:41 Integrated Voltage Measurement Delta Gap = -0.0040002 m VT = -0.170971523 Vs 11:01:44 Temperature Measurement, Probe Number = 0, T = 20.093000 C 11:01:44 Temperature Measurement, Probe Number = 1, T = 20.024000 C 11:01:45 Temperature Measurement, Probe Number = 2, T = 20.098000 C 11:01:46 Temperature Measurement, Probe Number = 3, T = 20.042000 C 11:01:46 Temperature Measurement, Probe Number = 4, T = 20.482000 C 11:01:46 Magnet Test Parameter Measurements P0 = Bottom 1, Value = 20.09 P1 = Bottom 2, Value = 20.02 P2 = Top 1, Value = 20.10 P3 = Top 2, Value = 20.04 P4 = Room, Value = 20.48 11:01:47 Integrated Voltage Measurement... 11:02:06 Voltage Offset Correction: v_off_ini = 0.000005330 V, v_off_fin = 0.000007246 V 11:02:06 Integrated Voltage Measurement Delta Gap = 0.0040004 m VT = 0.171062120 Vs 11:02:06 Integrated Voltage Measurement... 11:02:26 Voltage Offset Correction: v_off_ini = 0.000006404 V, v_off_fin = 0.000003600 V 11:02:26 Integrated Voltage Measurement Delta Gap = -0.0040003 m VT = -0.170985804 Vs