UFx.py version 1.3 from 07/06/2018
Page 1 of 1
Created by user vjeran on 07/06/2018 17:19:00
SLAC Moving Wire Magnetic Measurement Summary
| Magnet ID : | Calibration |
| Directory : | S:\magdata\LCLS-II\Phase Shifter\Calibration\126Gcm_+By_downstream\Final Results\Stretched Wire |
| Date : | 06-29-2018 |
| Time : | 12:34:58 - 13:39:19 |
| Operator : | VV |
| Project : | LCLS-II |
| Device Type : | Phase Shifter |
| Run Number : | 1 |
| Data Type : | |
| Run Comment : | 126 Gauss*cm magnet, +By, downstream pos |
| gap | I1Y | I2Y | I1X | I2X |
|
- |
110.4 0.5 (5) |
6.1 0.3 (5) |
4.9 0.5 (5) |
1.2 0.4 (5) |
| integral | gap | -02.00;+00.00 | -01.00;+00.00 | +00.00;+00.00 | +01.00;+00.00 | +02.00;+00.00 |
| I1Y |
- |
108.1 0.6 (3) |
109.2 0.8 (3) |
108.3 0.6 (3) |
111.1 2.7 (3) |
108.8 0.4 (3) |
| I2Y |
- |
5.9 0.3 (3) |
6.1 0.4 (3) |
5.9 0.3 (3) |
4.9 2.3 (3) |
6.1 0.5 (3) |
| I1X |
- |
4.9 0.6 (3) |
5.5 0.9 (3) |
5.3 1.0 (3) |
5.0 0.5 (3) |
5.4 1.0 (3) |
| I2X |
- |
0.4 0.0 (3) |
0.7 0.3 (3) |
0.4 0.0 (3) |
1.0 0.4 (3) |
0.6 0.4 (3) |
| integral | gap | +00.00;-02.00 | +00.00;-01.00 | +00.00;+00.00 | +00.00;+01.00 | +00.00;+02.00 |
| I1Y |
- |
109.6 0.7 (3) |
109.7 0.5 (3) |
109.5 0.7 (3) |
109.9 0.3 (3) |
109.9 0.6 (3) |
| I2Y |
- |
6.3 0.2 (3) |
6.3 0.2 (2) |
6.3 0.1 (3) |
6.3 0.0 (2) |
6.3 0.1 (3) |
| I1X |
- |
4.7 0.3 (3) |
1.4 0.6 (3) |
3.5 2.4 (3) |
2.3 1.0 (3) |
2.5 2.2 (3) |
| I2X |
- |
0.6 0.2 (3) |
0.2 0.3 (3) |
0.5 0.5 (3) |
0.3 0.1 (3) |
0.3 0.4 (3) |