SLAC Magnetic Measurements Date: 03-05-2021 Time: 12:41:55 Project: LCLS-II Magnet Type: Radiation_Detection_System Magnet Name: SXU_006_Cell_26_Hysteresis Serial Number: PC33408 Run Number: 12 Measurement Device: Coil Operator: sda Comment: Gap cycled 3 times between 7.5 and 8 mm. Undulator Gap Integral vs Gap Change Distance the gap was moved = 0.004001 m Time Gap Start Gap Change Voltage Integral (m) (m) (Vs) ---------- ----------- ------------ ------------------ 12:43:20 0.008000 0.0040005 0.1445048 12:43:53 0.012000 -0.0040006 -0.1444849 12:44:26 0.007999 0.0040007 0.1445085 12:44:59 0.012000 -0.0040005 -0.1444951 12:45:33 0.008000 0.0040005 0.1445034 12:46:05 0.012000 -0.0040006 -0.1444903 12:46:39 0.007999 0.0040007 0.1445050 12:47:12 0.012000 -0.0040006 -0.1444839 12:47:48 0.007999 0.0040007 0.1445062 12:48:20 0.012000 -0.0040006 -0.1444864 12:48:53 0.007999 0.0040006 0.1445071 12:49:25 0.012000 -0.0040005 -0.1444821 12:49:59 0.007999 0.0040006 0.1445085 12:50:33 0.012000 -0.0040006 -0.1444850 12:51:43 0.008000 0.0040005 0.1445063 12:52:17 0.012000 -0.0040006 -0.1444876 12:52:52 0.007999 0.0040007 0.1445074 12:53:24 0.012000 -0.0040005 -0.1444876 12:53:59 0.007999 0.0040007 0.1445046 12:54:33 0.012000 -0.0040006 -0.1444769