SLAC Magnetic Measurements Date: 03-05-2021 Time: 11:55:27 Project: LCLS-II Magnet Type: Radiation_Detection_System Magnet Name: SXU_006_Cell_26_Hysteresis Serial Number: PC33408 Run Number: 10 Measurement Device: Coil Operator: sda Comment: Gap moved between 8 and 7.5 three times. Undulator Gap Integral vs Gap Change Distance the gap was moved = 0.003999 m Time Gap Start Gap Change Voltage Integral (m) (m) (Vs) ---------- ----------- ------------ ------------------ 11:56:30 0.008001 0.0039991 0.1444051 11:57:01 0.012000 -0.0040005 -0.1444817 11:58:17 0.007999 0.0040012 0.1445099 11:58:51 0.012000 -0.0040006 -0.1444730 11:59:30 0.007999 0.0040008 0.1444963 12:00:13 0.012001 -0.0040008 -0.1444727 12:00:51 0.007999 0.0040008 0.1445024 12:01:35 0.012000 -0.0040007 -0.1444748 12:02:15 0.007999 0.0040008 0.1445023 12:02:50 0.012000 -0.0040007 -0.1444659 12:03:27 0.007999 0.0040007 0.1444881 12:04:04 0.012001 -0.0040006 -0.1444706 12:04:41 0.007999 0.0040006 0.1444854 12:05:16 0.012000 -0.0040007 -0.1444716 12:05:57 0.007999 0.0040009 0.1445049 12:06:37 0.012001 -0.0040007 -0.1444699 12:07:32 0.007999 0.0040008 0.1444991 12:08:04 0.012000 -0.0040006 -0.1444760 12:08:41 0.007999 0.0040009 0.1444980 12:09:15 0.012001 -0.0040007 -0.1444714