SLAC Magnetic Measurements Date: 09-11-2019 Time: 11:00:21 Project: LCLS-II Magnet Type: Radiation_Detection_System Magnet Name: SXU3_TCRM_Tension_27 Serial Number: SXU3 Run Number: 10 Measurement Device: Flex_Coil Operator: sda Comment: BNC cable dis and reconnected at 3458A as if measuring in the tunnel. 5 days later Undulator Gap Integral vs Gap Change Distance the gap was moved = 0.004000 m Time Gap Start Gap Change Voltage Integral (m) (m) (Vs) ---------- ----------- ------------ ------------------ 11:00:59 0.008000 0.0040001 -0.1424866 11:01:21 0.012000 -0.0040002 0.1424933 11:02:00 0.008000 0.0040004 -0.1425153 11:02:22 0.012000 -0.0040002 0.1425176 11:03:01 0.008000 0.0040004 -0.1425416 11:03:24 0.012000 -0.0040001 0.1424820 11:04:09 0.008000 0.0040003 -0.1425098 11:04:31 0.012000 -0.0040001 0.1425083 11:05:10 0.008000 0.0040003 -0.1425130 11:05:32 0.012000 -0.0040002 0.1424791 11:06:11 0.008000 0.0040004 -0.1425395 11:06:33 0.012000 -0.0040002 0.1424981 11:07:12 0.008000 0.0040004 -0.1425197 11:07:34 0.012000 -0.0040002 0.1424908 11:08:13 0.008000 0.0040005 -0.1425325 11:08:35 0.012000 -0.0040002 0.1424901 11:09:14 0.008000 0.0040005 -0.1425439 11:09:36 0.012000 -0.0040002 0.1425107 11:10:15 0.008000 0.0040004 -0.1425086 11:10:37 0.012000 -0.0040002 0.1424966