SLAC Magnetic Measurements Date: 04-29-2014 Time: 16:41:21 Project: LCLS2 Magnet Type: Y_Corr Magnet Name: Beam_Pipe Serial Number: Run Number: 1 Measurement Device: 1wire Operator: sda Comment: Checkout of By beam pipe setup at +/- 2 amps and at 0. Test Currents for LR_Trim (A): -2.00 0.00 2.00 Test Currents for UR_Trim (A): -2.00 0.00 2.00 By 1st Field Integral Distance the wire was moved = 0.001000 m Number of turns in the wire = 1 Number of measurements for averaging = 7 LR_Trim +/- sigma UR_Trim +/- sigma Y X Integral sigIntegral (A) (A) (m) (m) (Tm) -------------+--------- -------------+--------- ----------- ----------- ------------+------------ -2.0033 0.0000 -2.0003 0.0000 0.000000 0.000000 -0.000915 0.000044 -0.0002 0.0000 -0.0009 0.0000 0.000000 0.000000 -0.000254 0.000095 2.0010 0.0000 1.9996 0.0000 0.000000 0.000000 0.000464 0.000054