Test Summary Run 1 Power off to gpib when lid closed Runs 2 to 4 Gap = 7.5 mm I1 and I2 set to 5 A Computer reboot around 3am Started run 3 Opened gap to 30 mm Run 3 ended, unnkown reason, maybe when remote computer went to sleep Started run 4 Closed gap to 7.5 mm Performed tests with water flowing in beam pipes Runs 5 to 7 8/16/24 Gap = 7.2 mm I1 and I2 set to 5 A Computer reboot around 6am Started run 6 At 11:00am opened gap to 30 mm At 2:00pm closed gap to 7.2 mm At 8:00pm set I1 and I2 to 0 At 9:00am opened gap to 30 mm At 12:00am closed gap to 7.2 mm At 5:30pm end test