UFx.py version 1.3 from 07/06/2018
Page 1 of 1
Created by user vjeran on 07/06/2018 17:20:42
SLAC Moving Wire Magnetic Measurement Summary
| Magnet ID : | Calibration |
| Directory : | S:\magdata\LCLS-II\Phase Shifter\Calibration\126Gcm_-Bx\Final Results\Stretched Wire |
| Date : | 06-26-2018 |
| Time : | 14:30:06 - 15:34:13 |
| Operator : | VV |
| Project : | DUMMY |
| Device Type : | Phase Shifter |
| Run Number : | 1 |
| Data Type : | |
| Run Comment : | rewired; 126 Gauss*cm magnet (Bx negative) |
| gap | I1Y | I2Y | I1X | I2X |
|
- |
-11.5 0.7 (5) |
-3.3 0.3 (5) |
-123.2 0.7 (5) |
-25.8 0.3 (5) |
| integral | gap | -02.00;+00.00 | -01.00;+00.00 | +00.00;+00.00 | +01.00;+00.00 | +02.00;+00.00 |
| I1Y |
- |
-11.7 2.8 (3) |
-12.7 2.8 (3) |
-13.6 0.8 (3) |
-12.1 2.4 (3) |
-12.2 2.5 (3) |
| I2Y |
- |
-3.0 0.2 (3) |
-3.2 2.4 (3) |
-3.6 1.1 (3) |
-2.4 1.9 (3) |
-2.8 2.3 (3) |
| I1X |
- |
-124.0 1.0 (3) |
-123.6 0.5 (3) |
-124.3 0.7 (3) |
-123.6 0.6 (3) |
-124.2 0.8 (3) |
| I2X |
- |
-26.0 0.4 (3) |
-25.7 0.2 (3) |
-26.0 0.4 (3) |
-25.8 0.2 (3) |
-25.9 0.2 (3) |
| integral | gap | +00.00;-02.00 | +00.00;-01.00 | +00.00;+00.00 | +00.00;+01.00 | +00.00;+02.00 |
| I1Y |
- |
-11.8 0.9 (3) |
-12.0 0.6 (3) |
-11.9 1.0 (3) |
-11.7 0.3 (3) |
-11.6 1.0 (3) |
| I2Y |
- |
-3.0 0.3 (3) |
-3.1 0.1 (3) |
-3.1 0.2 (3) |
-3.0 0.2 (3) |
-3.1 0.2 (3) |
| I1X |
- |
-123.8 0.3 (3) |
-126.4 0.8 (3) |
-124.6 1.6 (3) |
-125.0 2.6 (3) |
-125.7 1.9 (3) |
| I2X |
- |
-25.7 0.5 (3) |
-26.1 0.4 (3) |
-26.0 0.6 (3) |
-26.1 0.4 (3) |
-26.0 0.6 (3) |