Magnet ID :     Calibration
Directory : S:\magdata\LCLS-II\Phase Shifter\Calibration\126Gcm_+By_upstream\Final Results\Stretched Wire
   
Date : 06-29-2018
Time : 13:55:22 - 14:59:47
Operator : VV
   
Project : LCLS-II
Device Type : Phase Shifter
Run Number : 1
Data Type :
Run Comment : 126 Gauss*cm magnet, +By, upstream pos
   
gap I1Y I2Y I1X I2X
-
112.2 1.1 (5)
37.6 3.1 (5)
6.4 5.5 (5)
0.0 1.2 (5)

integral gap -02.00;+00.00 -01.00;+00.00 +00.00;+00.00 +01.00;+00.00 +02.00;+00.00
I1Y -
107.0 6.7 (3)
109.7 2.9 (3)
110.9 6.5 (3)
108.7 3.9 (3)
111.6 5.8 (3)
I2Y -
34.2 4.9 (3)
37.4 3.6 (3)
37.5 4.6 (3)
37.9 3.4 (3)
39.5 4.0 (3)
I1X -
2.0 2.3 (3)
3.1 3.3 (3)
2.1 5.6 (3)
5.3 7.1 (3)
3.4 4.9 (3)
I2X -
0.8 3.5 (3)
1.6 1.5 (3)
2.7 3.4 (3)
0.8 2.2 (3)
0.3 1.2 (3)

integral gap +00.00;-02.00 +00.00;-01.00 +00.00;+00.00 +00.00;+01.00 +00.00;+02.00
I1Y -
109.5 2.8 (3)
109.0 6.8 (3)
109.5 7.1 (3)
107.4 1.1 (3)
108.8 2.6 (3)
I2Y -
38.0 0.3 (3)
37.6 1.8 (3)
38.6 0.6 (3)
39.5 0.5 (3)
37.0 0.3 (3)
I1X -
3.2 3.1 (3)
0.1 1.0 (3)
3.0 3.8 (3)
2.6 3.6 (3)
5.3 4.8 (3)
I2X -
1.4 1.1 (3)
1.8 1.1 (3)
1.0 1.1 (3)
-0.3 1.4 (3)
1.0 1.4 (3)