UFx.py version 1.3 from 07/06/2018
Page 1 of 1
Created by user vjeran on 07/06/2018 17:16:26
SLAC Moving Wire Magnetic Measurement Summary
| Magnet ID : | Calibration |
| Directory : | S:\magdata\LCLS-II\Phase Shifter\Calibration\126Gcm_+Bx_upstream\Final Results\Stretched Wire |
| Date : | 06-29-2018 |
| Time : | 16:22:31 - 17:26:51 |
| Operator : | VV |
| Project : | LCLS-II |
| Device Type : | Phase Shifter |
| Run Number : | 1 |
| Data Type : | |
| Run Comment : | 126 Gauss*cm magnet rotated, +Bx, upstream pos |
| gap | I1Y | I2Y | I1X | I2X |
|
- |
-12.6 1.4 (5) |
-4.0 0.4 (5) |
121.2 0.7 (5) |
40.6 0.7 (5) |
| integral | gap | -02.00;+00.00 | -01.00;+00.00 | +00.00;+00.00 | +01.00;+00.00 | +02.00;+00.00 |
| I1Y |
- |
-15.2 1.6 (3) |
-12.1 0.5 (3) |
-13.5 1.2 (3) |
-12.1 0.5 (3) |
-12.6 1.5 (3) |
| I2Y |
- |
-3.8 0.5 (3) |
-3.7 0.6 (3) |
-4.0 0.6 (3) |
-3.4 0.1 (3) |
-3.7 0.6 (3) |
| I1X |
- |
119.4 0.8 (3) |
120.2 0.6 (3) |
120.2 0.6 (3) |
119.6 0.4 (3) |
120.2 0.6 (3) |
| I2X |
- |
40.4 0.0 (3) |
40.5 0.3 (3) |
40.5 0.2 (3) |
40.3 0.0 (3) |
40.5 0.3 (3) |
| integral | gap | +00.00;-02.00 | +00.00;-01.00 | +00.00;+00.00 | +00.00;+01.00 | +00.00;+02.00 |
| I1Y |
- |
-12.2 1.0 (3) |
-11.8 1.3 (3) |
-11.8 1.4 (3) |
-12.4 0.4 (3) |
-11.4 0.9 (3) |
| I2Y |
- |
-3.3 0.3 (2) |
-3.6 0.3 (3) |
-3.7 0.2 (2) |
-3.4 0.3 (3) |
-3.6 0.3 (3) |
| I1X |
- |
121.1 1.2 (3) |
116.6 1.3 (3) |
118.8 3.2 (3) |
118.5 2.1 (3) |
117.6 2.4 (3) |
| I2X |
- |
40.7 0.3 (3) |
40.4 0.4 (3) |
40.5 0.4 (3) |
40.5 0.3 (3) |
40.4 0.4 (3) |