UFx.py version 1.3 from 07/06/2018
Page 1 of 1
Created by user vjeran on 07/06/2018 17:15:51
SLAC Moving Wire Magnetic Measurement Summary
| Magnet ID : | Calibration |
| Directory : | S:\magdata\LCLS-II\Phase Shifter\Calibration\126Gcm_+Bx_downstream\Final Results\Stretched Wire |
| Date : | 07-02-2018 |
| Time : | 09:00:04 - 10:04:30 |
| Operator : | VV |
| Project : | LCLS-II |
| Device Type : | Phase Shifter |
| Run Number : | 1 |
| Data Type : | |
| Run Comment : | 126 Gauss*cm magnet rotated, +Bx, downstream pos |
| gap | I1Y | I2Y | I1X | I2X |
|
- |
-9.8 3.8 (5) |
-3.2 1.5 (5) |
118.4 8.0 (5) |
10.1 2.5 (5) |
| integral | gap | -02.00;+00.00 | -01.00;+00.00 | +00.00;+00.00 | +01.00;+00.00 | +02.00;+00.00 |
| I1Y |
- |
-19.1 6.9 (3) |
-13.7 0.9 (3) |
-9.2 8.4 (3) |
-11.9 3.3 (3) |
-8.3 3.7 (3) |
| I2Y |
- |
-2.7 1.6 (3) |
-1.6 0.8 (3) |
-3.3 1.5 (3) |
-3.9 2.4 (3) |
-2.1 2.0 (3) |
| I1X |
- |
122.3 1.1 (3) |
122.7 0.5 (3) |
124.3 1.8 (3) |
126.2 6.3 (3) |
121.6 6.2 (3) |
| I2X |
- |
8.7 2.5 (3) |
10.0 0.2 (3) |
8.6 0.5 (3) |
10.3 0.3 (3) |
8.6 1.5 (3) |
| integral | gap | +00.00;-02.00 | +00.00;-01.00 | +00.00;+00.00 | +00.00;+01.00 | +00.00;+02.00 |
| I1Y |
- |
-12.2 3.5 (3) |
-12.7 1.0 (3) |
-9.2 2.3 (3) |
-8.6 8.4 (3) |
-10.7 3.1 (3) |
| I2Y |
- |
-2.9 0.7 (3) |
-2.8 0.4 (3) |
-3.8 1.3 (3) |
-3.1 2.4 (3) |
-2.2 1.9 (3) |
| I1X |
- |
121.6 2.8 (3) |
118.1 7.7 (3) |
123.1 5.0 (3) |
118.1 4.7 (3) |
121.6 2.4 (3) |
| I2X |
- |
9.0 1.1 (3) |
7.8 2.1 (3) |
9.4 0.4 (3) |
10.1 0.5 (3) |
9.6 0.8 (3) |