UFx.py version 1.3 from 07/06/2018
Page 1 of 1
Created by user vjeran on 07/06/2018 17:15:51
SLAC Moving Wire Magnetic Measurement Summary
| Magnet ID : | Calibration |
| Directory : | S:\magdata\LCLS-II\Phase Shifter\Calibration\126Gcm_+Bx_downstream\Final Results\Stretched Wire |
| Date : | 07-02-2018 |
| Time : | 09:00:04 - 10:04:30 |
| Operator : | VV |
| Project : | LCLS-II |
| Device Type : | Phase Shifter |
| Run Number : | 1 |
| Data Type : | |
| Run Comment : | 126 Gauss*cm magnet rotated, +Bx, downstream pos |
| gap | I1Y | I2Y | I1X | I2X |
|
- |
-11.5 0.8 (5) |
-2.6 0.4 (5) |
121.5 2.3 (5) |
9.3 0.7 (5) |
| integral | gap | -02.00;+00.00 | -01.00;+00.00 | +00.00;+00.00 | +01.00;+00.00 | +02.00;+00.00 |
| I1Y |
- |
-18.2 7.5 (3) |
-13.0 0.7 (3) |
-13.9 0.2 (3) |
-12.6 0.1 (3) |
-13.5 0.8 (3) |
| I2Y |
- |
-3.3 0.2 (3) |
-3.0 0.1 (3) |
-3.2 0.2 (3) |
-2.7 0.5 (3) |
-3.1 0.2 (3) |
| I1X |
- |
121.4 0.5 (3) |
121.8 0.6 (3) |
121.5 0.3 (3) |
121.9 0.5 (3) |
121.9 0.4 (3) |
| I2X |
- |
9.5 0.3 (3) |
10.0 0.1 (3) |
9.7 0.4 (3) |
9.8 0.3 (3) |
9.9 0.1 (3) |
| integral | gap | +00.00;-02.00 | +00.00;-01.00 | +00.00;+00.00 | +00.00;+01.00 | +00.00;+02.00 |
| I1Y |
- |
-11.7 0.1 (3) |
-11.2 0.5 (3) |
-11.7 0.1 (3) |
-11.1 0.3 (3) |
-11.5 0.4 (3) |
| I2Y |
- |
-2.8 0.1 (3) |
-2.5 0.1 (3) |
-2.8 0.1 (3) |
-2.4 0.1 (3) |
-2.7 0.2 (3) |
| I1X |
- |
121.2 0.8 (3) |
117.5 0.9 (3) |
119.6 2.9 (3) |
119.0 1.7 (3) |
118.3 2.0 (3) |
| I2X |
- |
9.6 0.1 (3) |
9.3 0.4 (3) |
9.4 0.4 (3) |
9.6 0.4 (3) |
9.4 0.4 (3) |