Magnet ID :     Background
Directory : S:\magdata\LCLS-II\Phase Shifter\Background\Stretched Wire HXR\DATASET0002\Final Results\Stretched Wire
   
Date : 10-05-2018
Time : 12:46:52 - 13:56:20
Operator : VV
   
Project : LCLS-II
Device Type : Phase Shifter
Run Number : 1
Data Type :
Run Comment : background measurement
   
gap I1Y I2Y I1X I2X
-
-8.3 4.4 (5)
-0.6 2.2 (5)
10.7 2.3 (5)
2.7 1.8 (5)

integral gap -02.00;+00.00 -01.00;+00.00 +00.00;+00.00 +01.00;+00.00 +02.00;+00.00
I1Y -
-6.7 12.3 (3)
-0.5 3.3 (3)
-6.2 1.7 (3)
5.4 0.7 (3)
3.1 6.7 (3)
I2Y -
-1.7 2.0 (3)
-0.0 1.0 (3)
-0.9 4.7 (3)
0.3 1.1 (3)
-4.2 2.6 (3)
I1X -
12.5 4.3 (3)
7.5 6.1 (3)
13.3 1.1 (3)
11.4 1.2 (3)
13.8 3.9 (3)
I2X -
1.5 4.1 (3)
0.1 2.9 (3)
0.7 3.5 (3)
0.8 1.1 (3)
2.4 1.6 (3)

integral gap +00.00;-02.00 +00.00;-01.00 +00.00;+00.00 +00.00;+01.00 +00.00;+02.00
I1Y -
-13.6 6.7 (3)
-9.0 5.8 (3)
-11.4 5.5 (3)
-5.9 7.5 (3)
-9.9 4.9 (3)
I2Y -
-2.0 0.9 (3)
-2.9 0.6 (3)
-2.7 0.3 (3)
-2.5 0.5 (3)
-3.4 3.5 (3)
I1X -
10.6 1.5 (3)
11.6 9.8 (3)
13.6 2.2 (3)
12.5 8.6 (3)
16.0 6.3 (3)
I2X -
1.9 2.4 (3)
-0.3 4.3 (3)
2.7 2.5 (3)
-0.8 4.7 (3)
0.5 1.0 (3)

   
Magnet ID :     Background
Directory : S:\magdata\LCLS-II\Phase Shifter\Background\Stretched Wire HXR\DATASET0002\Final Results\Stretched Wire