Magnet ID :     Background
Directory : S:\magdata\LCLS-II\Phase Shifter\Background\Stretched Wire SXR\DATASET0001\Final Results\Stretched Wire
   
Date : 06-27-2018
Time : 10:33:49 - 11:38:11
Operator : VV
   
Project : DUMMY
Device Type : Phase Shifter
Run Number : 1
Data Type :
Run Comment : rewired (rack is back next to the bench)
   
gap I1Y I2Y I1X I2X
-
-11.2 3.7 (5)
-1.8 2.0 (5)
1.4 1.2 (5)
0.2 1.0 (5)

integral gap -02.00;+00.00 -01.00;+00.00 +00.00;+00.00 +01.00;+00.00 +02.00;+00.00
I1Y -
-13.4 0.3 (3)
-10.1 5.9 (3)
-11.4 5.2 (3)
-10.1 9.3 (3)
-8.5 3.4 (3)
I2Y -
-4.8 0.5 (3)
-2.1 2.8 (3)
-3.6 1.7 (3)
-1.2 2.5 (3)
-0.2 2.1 (3)
I1X -
3.8 0.9 (3)
1.2 6.2 (3)
0.8 3.6 (3)
1.2 1.5 (3)
-0.7 4.1 (3)
I2X -
0.2 1.4 (3)
0.1 2.1 (3)
0.0 0.7 (3)
0.6 1.5 (3)
0.9 1.0 (3)

integral gap +00.00;-02.00 +00.00;-01.00 +00.00;+00.00 +00.00;+01.00 +00.00;+02.00
I1Y -
-5.6 6.8 (3)
-6.7 4.3 (3)
-6.3 3.9 (3)
-10.7 2.8 (3)
-9.3 1.6 (3)
I2Y -
-3.3 1.2 (3)
-2.4 2.0 (3)
-1.8 1.1 (3)
-3.2 1.6 (3)
-2.9 1.5 (3)
I1X -
-0.4 3.8 (3)
-1.7 7.5 (3)
-0.7 1.9 (3)
0.1 2.0 (3)
1.0 3.8 (3)
I2X -
-1.5 0.5 (3)
0.9 1.3 (3)
0.2 1.0 (3)
0.2 0.6 (3)
-0.5 1.5 (3)

   
Magnet ID :     Background
Directory : S:\magdata\LCLS-II\Phase Shifter\Background\Stretched Wire\DATASET0001\Final Results\Stretched Wire