UFx.py version 1.6 from 07/16/2018
Page 1 of 2
Created by user vjeran on 07/17/2018 13:36:47
SLAC Moving Stretched Wire Magnetic Field Measurement Summary
| Magnet ID : | Background |
| Directory : | S:\magdata\LCLS-II\Phase Shifter\Background\Stretched Wire SXR\DATASET0001\Final Results\Stretched Wire |
| Date : | 06-27-2018 |
| Time : | 10:33:49 - 11:38:11 |
| Operator : | VV |
| Project : | DUMMY |
| Device Type : | Phase Shifter |
| Run Number : | 1 |
| Data Type : | |
| Run Comment : | rewired (rack is back next to the bench) |
| gap | I1Y | I2Y | I1X | I2X |
|
- |
-11.2 3.7 (5) |
-1.8 2.0 (5) |
1.4 1.2 (5) |
0.2 1.0 (5) |
| integral | gap | -02.00;+00.00 | -01.00;+00.00 | +00.00;+00.00 | +01.00;+00.00 | +02.00;+00.00 |
| I1Y |
- |
-13.4 0.3 (3) |
-10.1 5.9 (3) |
-11.4 5.2 (3) |
-10.1 9.3 (3) |
-8.5 3.4 (3) |
| I2Y |
- |
-4.8 0.5 (3) |
-2.1 2.8 (3) |
-3.6 1.7 (3) |
-1.2 2.5 (3) |
-0.2 2.1 (3) |
| I1X |
- |
3.8 0.9 (3) |
1.2 6.2 (3) |
0.8 3.6 (3) |
1.2 1.5 (3) |
-0.7 4.1 (3) |
| I2X |
- |
0.2 1.4 (3) |
0.1 2.1 (3) |
0.0 0.7 (3) |
0.6 1.5 (3) |
0.9 1.0 (3) |
| integral | gap | +00.00;-02.00 | +00.00;-01.00 | +00.00;+00.00 | +00.00;+01.00 | +00.00;+02.00 |
| I1Y |
- |
-5.6 6.8 (3) |
-6.7 4.3 (3) |
-6.3 3.9 (3) |
-10.7 2.8 (3) |
-9.3 1.6 (3) |
| I2Y |
- |
-3.3 1.2 (3) |
-2.4 2.0 (3) |
-1.8 1.1 (3) |
-3.2 1.6 (3) |
-2.9 1.5 (3) |
| I1X |
- |
-0.4 3.8 (3) |
-1.7 7.5 (3) |
-0.7 1.9 (3) |
0.1 2.0 (3) |
1.0 3.8 (3) |
| I2X |
- |
-1.5 0.5 (3) |
0.9 1.3 (3) |
0.2 1.0 (3) |
0.2 0.6 (3) |
-0.5 1.5 (3) |
UFx.py version 1.6 from 07/16/2018
Page 2 of 2
Created by user vjeran on 07/17/2018 13:36:47
SLAC Moving Stretched Wire Magnetic Field Measurement Summary
| Magnet ID : | Background |
| Directory : | S:\magdata\LCLS-II\Phase Shifter\Background\Stretched Wire\DATASET0001\Final Results\Stretched Wire |