SLAC Magnetic Measurements Date: 11-18-2020 Time: 10:57:32 Project: LCLS-II Magnet Type: Radiation_Detection_System Magnet Name: Calib_PC33408 Serial Number: PC33408 Run Number: 50 Measurement Device: WalkerVs Operator: sda Comment: Start of Full Tunnel Run 13. Turned on 25 minutes ago, warming up. Undulator Gap Integral vs Gap Change Distance the gap was moved = 0.004000 m Time Gap Start Gap Change Voltage Integral (m) (m) (Vs) ---------- ----------- ------------ ------------------ 10:58:01 0.008000 0.0040000 0.0995983 10:58:26 0.008000 0.0040000 0.0995986 10:58:53 0.008000 0.0040000 0.0995988 10:59:18 0.008000 0.0040000 0.0995935 10:59:45 0.008000 0.0040000 0.0995987 11:00:11 0.008000 0.0040000 0.0996014 11:00:38 0.008000 0.0040000 0.0996001 11:01:03 0.008000 0.0040000 0.0996008 11:01:31 0.008000 0.0040000 0.0995999 11:01:58 0.008000 0.0040000 0.0996013