Scheduled
The "Scheduled" timelines represent the planned duration of each activity. The dates are based on the "SPEAR3 Removal & Installation" Master Schedule Layout - Rev. 11.35 dated March 25, 2003. |
Note that the corresponding revision number for the Master Schedule is shown in the lower left corner of the timeline graph.
|