9/8 Perry
 
BL1 mask assembly, set reset and stopper after modification
Activity VS0445 completed.
 
9/9 McDougal
Perry
 
BL11 stopper  
9/10 McDougal
Perry
 
BL11 slit after mating with stopper  
9/11 McDougal
Perry
 
BL11 mask assembly
Activity VS0370 completed.
 
9/12 McDougal
Perry
 
BL6 monitored twist
Activity VS0395 completed.
 