Date Crew Summary Photo
8/25 McDougal
Perry
 
BL4 stopper final survey
BL3 stopper redo, final survey
 
8/26 McDougal
Perry
 
BL6 stopper redo, final survey
BL6 moveable mask preliminary survey
 
8/27 McDougal
Perry
 
BL6 moveable mask final survey
BL3 moveable mask final survey
Activity VS0320 completed.
 
8/28 McDougal
Perry
 
BL4 moveable mask final survey
BL4 fixed mask preliminary survey
 