8/18 Banuelos
Imfeld
 
Mapped cell 11 with total station
8/19 McDougal
Perry
 
BL2 M0 mirror tank  
8/19 Banuelos
Imfeld
 
Mapped cell 10 with laser tracker
8/19 McDougal
Perry
 
Marked 4 bolt pattern and read elevation on BTS caps (after grouting)  
8/20 Banuelos
Imfeld
 
Added level measurement to the mapping data in cells 10 and 11
8/22 McDougal
Perry
 
BL5 ID stand in elevation  