8/18 McDougal
Perry
 
BL2 in-alcove alignment, injection stopper, graphite filter, Beryllium window assembly  
8/20 McDougal
Perry
 
BL8 in-alcove alignment, 8-1 M0 mirror, cold finger box, injection stopper reset
BL6 injection stopper
 
8/21 McDougal
Perry
 
BL7 injection stopper
BL8 cold finger allocation box
BL10 rough align injection stopper
8/22 McDougal
Perry
 
BLs 9 & 10 injection stopper final