| Date |
Crew |
Summary |
Photo |
| 8/11 |
Carrillo Gaudreault Griffin
Rogers |
SSRL Vacuum: Finished BL4 stopper
to collimator and BL11 stopper to collimator.
Fiducialized kicker 3 |
|
| 8/12 |
Carrillo Imfeld |
SSRL Vacuum: Initial assembly of
kicker 3 |
|
| 8/12 |
Gaudreault Griffin Rogers |
SSRL Vacuum: Re-did BL11 fixed
mask to moveable mask tank (had a leak) |
|
| 8/12 |
Gaudreault Griffin Rogers |
SSRL Vacuum: Fiducialized BL7
stopper tank and set collimator to tank |
|
| 8/13 |
Carrillo Gaudreault Imfeld |
SSRL Vacuum: Final assembly of
K3/4S |
|
| 8/13 |
Gaudreault Griffin Rogers |
SSRL Vacuum: Checked
fiducialization on BL7 stopper tank after
welding. Started BL7 moveable mask to fixed mask
(redo - had a vacuum leak) |
|
| 8/14 |
Carrillo Gaudreault |
SSRL Vacuum: Refiducialized
kicker 1 and started straight assembly of kicker
1 raft |
|
| 8/15 |
McDougal Perry |
Building 31: Fiducialized septum
vacuum chamber |
|
| 8/15 |
Carrillo Gaudreault |
SSRL Vacuum: Worked on K1 raft
assembly. Refiducialized downbeam K1 SN01 |
|