Run Integrals. Values in Tm Run 1 (No Cover) Integral Bx = -1.4302e-05 Integral By = -4.2874e-05 Integral Bz = -6.4340e-06 Integral Bx Run 1 - Run 8 = -1.3232e-05 Integral By Run 1 - Run 8 = -3.9633e-05 Integral Bz Run 1 - Run 8 = -7.7822e-07 Integral Bx Run 1 - Run 10 = -8.5206e-06 Integral By Run 1 - Run 10 = -3.5856e-05 Integral Bz Run 1 - Run 10 = -8.6746e-07 Run 2 (With 0.025" Conetic cover. Stator at center) Integral Bx = 3.3480e-06 Integral By = 7.3410e-06 Integral Bz = -4.3110e-06 Run 3 (With 0.025" Conetic cover. Stator at +x limit) Integral Bx = 3.8660e-06 Integral Bx Run 2 - Run 3 = -5.1800e-07 Integral By = 1.0548e-05 Integral By Run 2 - Run 3 = -3.2070e-06 Integral Bz = -4.3880e-06 Integral Bz Run 2 - Run 3 = 7.7000e-08 Run 4 (With 0.025" Conetic cover. Stator at -x limit) Integral Bx = 3.5880e-06 Integral Bx Run 2 - Run 4 = -2.4000e-07 Integral Bx Run 3 - Run 4 = 2.7800e-07 Integral By = 1.1086e-05 Integral By Run 2 - Run 4 = -3.7450e-06 Integral By Run 3 - Run 4 = -5.3800e-07 Integral Bz = -4.2200e-06 Integral Bz Run 2 - Run 4 = -9.1000e-08 Integral Bz Run 3 - Run 4 = -1.6800e-07 Run 5 (Bxyz fields vs along beam axis (z) at x =0 and y = 0. With 0.025" Conetic box. Limot at +20 mm from center) Integral Bx = 3.6890e-06 Integral By = 1.3021e-05 Integral Bz = -4.4860e-06 Run 6 (Bxyz fields vs along beam axis (z) at x =0 and y = 0. With 0.025" Conetic box. Limot at center.) Integral Bx = 3.1050e-06 Integral Bx Run 6 - Run 7 = -5.8400e-07 Integral By = 1.1781e-05 Integral By Run 6 - Run 7 = -1.2400e-06 Integral Bz = -4.5450e-06 Integral Bz Run 6 - Run 7 = -5.9000e-08 Run 7 (Bxyz fields vs along beam axis (z) at x =0 and y = 0. With 0.025" Conetic box. Limot at -20 mm from center.) Integral Bx = -1.7070e-06 Integral Bx Run 6 - Run 7 = -1.9500e-07 Integral By = 1.1689e-05 Integral By Run 6 - Run 7 = 9.2000e-08 Integral Bz = -4.4670e-06 Integral Bz Run 6 - Run 7 = -7.8000e-08 Run 8 (Bxyz fields vs along beam axis (z) at x =0 and y = 0. No Cover at Linmot at center) Integral Bx = -2.2933e-05 Integral By = -4.3634e-05 Integral Bz = -6.9860e-06 Run 9 (Bxyz fields vs along beam axis (z) at x =0 and y = 0. No Cover at Linmot +20 mm) Integral Bx = 2.6900e-05 Integral Bx Run 8 - Run 9 = -4.9833e-05 Integral By = -3.4670e-06 Integral By Run 8 - Run 9 = -4.0167e-05 Integral Bz = -5.1010e-06 Integral Bz Run 8 - Run 9 = -1.8850e-06 Run 10 (Bxyz fields vs along beam axis (z) at x =0 and y = 0. No Cover at -20 mm) Integral Bx = -2.4250e-06 Integral Bx Run 8 - Run 10 = -2.0508e-05 Integral By = -3.0950e-06 Integral By Run 8 - Run 10 = -4.0539e-05 Integral Bz = -6.2050e-06 Integral Bz Run 8 - Run 10 = -7.8100e-07