Summary of Measurements on the SSRL BL5 SkewQuad: Achim Weidemann 28-Apr-2006 Date Time Run Oper Comment ---------- -------- --- ----- --------> 02-24-2006 12:46:51 1 sa Integrated Strength with magnet at 45 deg. 3-30 A and at nominal 14.23 A 02-27-2006 11:20:39 2 sa Integrated Strength with magnet at 45 deg. 3-30 A and at nominal 14.23 A After 20 min warm up 02-28-2006 12:04:14 3 sa Integrated Strength with magnet at 22 deg. 3-30 A and at nominal 14.23 A After 20 min warm up 02-28-2006 15:26:53 4 sa BL vs X with magnet at 22 deg at 14.23 (nominal) & 30 A 04-19-2006 10:56:26 5 achim Center-finding -45deg (-=clockwise from downstream end) Assuming beam direction is from side with connectors (and tooling balls E,B) to side with tooling balls G,D, coil here is rotated by +45 degrees. Survey results of zero position are scanned at http://www-group.slac.stanford.edu/met/MagMeas/MAGDATA/SSRL/SkewQuad/BL5/BL5-surveydata-wirecenter+45deg.jpg or .bmp At BE end, Y -6 mil X -18 mil; at DG end, Y +3 mil, X -16 mil (from mech. center). 04-26-2006 09:37:02 6 achim Center-finding now rotated the other way (right side up from downstr/nonconnector end) Actual position documented in http://www-group.slac.stanford.edu/met/MagMeas/MAGDATA/SSRL/SkewQuad/BL5/2006-04-26-BL5at-45deg_downstr-end002.jpg http://www-group.slac.stanford.edu/met/MagMeas/MAGDATA/SSRL/SkewQuad/BL5/2006-04-26-BL5at-45deg_001.jpg (looking from downstream to upstream) and looking from the connector end downstream: http://www-group.slac.stanford.edu/met/MagMeas/MAGDATA/SSRL/SkewQuad/BL5/2006-04-26-BL5at-45deg_conn-end003.jpg Survey results are scanned in http://www-group.slac.stanford.edu/met/MagMeas/MAGDATA/SSRL/SkewQuad/BL5/BL5-surveydata-wirecenter+45deg.jpg or .bmp At BE end, Y +0 mil, X +12 mil; at DG end, Y +0 mil, X +12 mil. Also it was observed that the center of wire sags by 20 mil compared to ends. (So I took another center-finding measurement after raising wire by 10 mil): 04-26-2006 14:09:22 7 achim center-finding after raising wire by 10 mil and repeated this the next morning: 04-27-2006 08:46:19 8 achim center-find(Repeat of 7) Wire raised up 10 mil (compared to ru6) Magnet was flipped to -22.5 degree, surveyed and BL-vs X measurements 04-28-2006 10:44:34 9 achim BL vs X for 14.23 (twice) , -6to +6cm in 1 cm steps (although it says in the log header 14.23,30A, actual measurement was twice at 14.23 A, as seen from the current measurements) 04-28-2006 12:11:51 10 achim BL_vs_X, as run 9, at 30, 3 ,12 A 04-28-2006 ~14:10 Coil prepared for moving. Data are in http://www-group.slac.stanford.edu/met/MagMeas/MAGDATA/SSRL/SkewQuad/BL5/ This file is http://www-group.slac.stanford.edu/met/MagMeas/MAGDATA/SSRL/SkewQuad/BL5/summary.txt