PROCEEDINGS OF THE 5TH INTERNATIONAL
WORKSHOP ON ACCELERATOR ALIGNMENT

Foreword
H. Friedsam

Keynote

Evolution of the Accelerator Alignment Methods at DESY over the past thirty years
F. Löffler

Status Reports from Accelerator Facilities around the World

Review of the Metrology Aspects of the LHC Alignment
J.P. Quesnel

PEP-II Alignment
M. Pietryka, M. Gaydosh, R. Ruland

Status Report on the Survey and Alignment Efforts at Fermilab
T. Sager

Status Report: Relativistic Heavy Ion Collider
F. Karl

Survey and Alignment at the Advanced Light Source
G. Krebs

Alignment Result for Magnet Units of the SPring-8 Storage Ring
C. Zhang, S. Matsui, J. Ohnishi, K. Tsumaki

Status Report on the Long-Term Stability of the Advance Photon Source
H. Friedsam, H. Penicka, J. Error

Alignment Instrumentation, Software and Methods

LEGO: A Modular Approach to Accelerator Alignment Data Analysis
C. Le Cocq

Two Tier Client/Server Database Development for Alignment Data at the Relativistic Heavy Ion Collider and the Alternating Gradient Synchrotron
M. Hemmer

Measurement of Storage Ring Deformation and Smoothing Method for Pohang Light Source
S. Lee, A. Maeng, K. Seo

The Adjustment of the Fermilab Main Injector Underground Geodetic Survey
G. Wojcik, S. Lakanen

The Precise Alignment of the Fermilab KteV Experiment
V. Bocean, S. Childress, R. Coleman, R. Ford, D. Jensen

The Alignment Concept for the Fermilab Recycler Ring Using Permanent Magnets
B. Oshinowo

The SLAC Design and Manufacturing Process of Sphere-Mounted Reflectors
B. Fuss, B. Bell, G. Bowden, R. Ruland

Mechanically Induced Influences on the ESRF SR Beam
D. Martin, L. Farvacque

HLS-based Closed Orbit Feed-back at LEP
F. Tecker, W. Coosemans, A. Marin, K. Rybaltechenko, J. Wenninger

A New Hydrostatic Leveling System Developed for the Advanced Photon Source
L. Kivioja, H. Friedsam, M. Penicka

Pellissier H5 Hydrostatic Level
H. Imfeld, P. Pellissier, D. Plouffe, R. Ruland

Beam Based Alignment and Metrology Aspects for Large Physics Installations

Test Results of the BBA Method at the TRISTAN Accumulation Ring
K. Endo, H Fukuma, F.Q. Zhang

Impact of Beam Based Alignment on Polarisation at LEP
B. Dehning, G.-J. Ferri, P. Galbraith, G. Mugnai, M. Placidi, F. Sonnemann, F. Tecker

Alignment of the LHC Experimental Insertions
S. Weisz

A Two Dimensional Digital CCD Optical Position Sensor for Relative Alignment Monitoring
D. Eartly, S. Hansen, T. Droege, D. Prokofiev, R.H. Lee, J. Moromisato, E. Von Goeler

Prospects of Close Range Digital Photogrammetry in large physics installation Transparencies
C. Lasseur, J.C. Gayde, C. Humbertclaude

Survey and Alignment of the KLOE Experiment at the DAFNE
S. Dell’Agnello, A. Ceccarelli, A. Di Virgilio, S. Moccia

Alignment Topics pertaining to Linear Colliders, 4th Generation Light Sources and Related Facilities

4th Generation Light Source Alignment Issues
S. Milton

Pre-Alignment of CLIC Using the Double-Wire Method
W. Coosemans, H. Mainaud

Alignment of the Superconducting Cryostat for the Tesla Test Facility
F. Löffler

Concept for the Alignment of the planned Linear Collider at DESY
W. Schwarz

Fine Alignment of the ATP Damping Ring
M. Takano, S. Araki, Y. Funashashi, H. Hayano, T. Matsui, J. Urakawa

Seismic Studies for Fermilab Future Collider Projects
V. Shilsev, B. Baklakov, T. Bolshakov, A. Chupyra, A. Erokhin, P. Lebedev, J. Lach

Contributions to the IAG/FAG Joint Session

Experiences With An Active Target Total Station For Precise Angle Measurement
J. Greenwood

Leica TDA5000 -- Short Range Performance Tests with Corner Cube and Tooling Ball Reflectors
R. Gottwald, I. Müller, M. Obrist

A High-Accuracy Alignment System Based on the Dispersion Effect
B. Boeckem, H. Ingensand

Automated part positioning with the laser tracker
R. Loser, S. Kyle, D. Warren

Implementation and First Results of the Survey and Alignment of the Accelerator Facilities at GSI using the TASA System
I. Pschorn, H. Paluzek

EUCLID(TM): A High Accuracy, Position Compensated Laser Alignment System
R. Johnson

Considerations in the Measurement of Particle Accelerators with Laser Trackers
B. Bridges

Posters

Techniques Used in the Alignment of TJNAF’S Accelerators and Experimental Halls
C. Curtis, J. Dahlberg, W. Oren, K. Tremblay

Magnet Alignment of SPring-8 Booster Synchrotron
K. Fukami, H. Yonehara, S. Ohzuchi, M. Tanimoto, H. Tanaka, H. Suzuki, T. Aoki, N. Tani,
N. Hosoda, S. Hayashi, Y. Hirata, T. Nagafuchi, N. Suetake, Y. Yoshiwara, H. Itoh

Elevation Changes of the SPring-8 Storage Ring
S. Matsui, C. Zhang, K. Nakashima, H. Kishimoto, M. Tanaka

Optical Tooling with a Laptop Data Collector
M. Perry, F. Gaudreault, M. Gaydosh, M. Rogers

Re-Visiting SPEAR After 25 Years
M. Pietryka, M. Gaydosh, T. King

Active Mover Using Air-Spring and MLRB
S. Takeda, K. Kudo, A. Akiyama, H. Matsumoto, T. Shintake, M. Yoshioka, Y. Takeuchi

Magnet Alignment For The Fermilab Main Injector Project
B. Oshinowo, J. Greenwood, V. Bocean

Rigid, Adjustable Support of Aligned Elements via Six Struts
W. Thur, R. DeMarco, B. Baldock, K. Rex

Alignment without Magnet Fiducials
R. Ruland, G. Mülhaupt, M. Rohrer, P. Wiegand

The Poisson Alignment Reference System Implementation at the Advanced Proton Source
I. Feier, H. Friedsam, M. Penicka

Initial Calibration of a High Resolution Digital Camera for Accelerator Alignment
B. Fuss, C. Le Cocq, R. Ruland


Conclusive Remarks
M. Mayoud

Participants' Photo 1997