Stanford Linear Accelerator Center Alignment Engineering Metrology Department


HLS Ring Floor Test

Results (July 2005)

Results (November 2005)


SPEAR3 Installation Activities (2003)

(Click on Activity Name or Timeline Bar for Details)



SPEAR3 General Notes

Fiducialization Results

Raft Assembly Results

Chamber Results 11-2003

Magnet Results 11-2003


For technical results, check for the link on the Alignment Engineering Group home page or click here.