Stanford Linear Accelerator Center Alignment Engineering Down 2004 TimeLine

Scheduled



The "Scheduled" timelines represent the planned duration of each activity. The dates are based on information supplied by project leaders or other individuals.





Note that the revision date for the Alignment Engineering Group's Downtime Schedule is shown in the lower left corner of the timeline graph.






On all timeline screens, clicking on "Down 2004 TimeLine" in the upper right corner is another way to return to the main timeline screen.