Stanford Linear Accelerator Center Alignment Engineering Down 2004 TimeLine

LCLS 2004 Downtime Preparation




 Project Number  Description

 Project Manager

 Area Manager
 BSY-023  BSY inject area survey 50Q1,2 & 3  Baker  (x4849)  Baker  (x4849)
 N/A  Linac GPS  LeCocq  (x2335)  LeCocq  (x2335)
 N/A  Triangle Test  LeCocq  (x2335)  LeCocq  (x2335)
 SWP-070  Survey vault and tie reference points  Boyce  (x3441)  Smith  (x2413)
 SWP-080  Survey locations for drilling and anchors  Boyce  (x3441)  Smith  (x2413)
 SDS-100  Survey vacuum components (Sec. 20)  Boyce  (x3441)  Smith  (x2413)
 SWP-150  Survey for penetr templates thru new wall  Boyce  (x3441)  Smith  (x2413)





06/03/2004 Sector 20 ROD Activity Report
06/04/2004 Sector 20 Locations
11/05/2004 Sector 20 Documentation Summary
11/10/2004 Sector 20 Linac Coordinates