Skip to main content.
ES & H Mission

ESH Web  Manual 
32: Polychlorinated Biphenyls
The website contains the same information that's in the PDF. Please use the pdf for printing.
Overview Requirements Standards Definitions    

Requirements

General

Roles and Responsibilities

Procedures and Specific Requirements

The following procedures are required for all PCB-containing equipment, fluids, material, and storage areas.

See Chapter 16, "Spills", for spill response procedures. See Chapter 17, "Hazardous Waste", and Chapter 40, "Hazardous Materials", for additional handling information.

Note: PCB-related spills must not be allowed to enter a storm drain. If this occurs, the impacted drainage system must be cleaned out and decontaminated.

Labeling

For labeling specifications, see PCBs: Labeling Specifications and Requirements [pdf].

Inspection

For inspection frequency and documentation requirements, see PCBs: Equipment Inspection and Reporting Requirements [pdf].

Personal Protective Equipment

For PPE requirements, see PCBs: Personal Protective Equipment Requirements [pdf].

 



Last update: