|
View the entire chapter in a PDF format. Please use the pdf for printing.
Requirements:
Procedures and Specific Requirements (5.2)
Routine Discharges
SLAC's permit with the SBSA and WBSD specify wastewater discharge conditions for routine discharges. These are listed in Industrial Wastewater:
Permitted and Prohibited Discharge Reference
[pdf].
Non-routine Discharges
For any non-routine discharges, the existing permit must be updated or a non-routine permit must be applied for and issued. For additional information, see Industrial Wastewater:
Discharge Characterization Guidelines
[pdf].
Implementing BMPs for operations that produce industrial wastewater is essential to staying within SLAC's industrial wastewater discharge permit limits.
Note: For work that is performed outside, such as power washing of buildings, shielding material, equipment, and vehicles, see the BMPs in Chapter 26,"Stormwater", to ensure that no waste water enters the storm drains.
Sampling is carried out by specified entities at regular intervals. For
details see Industrial Wastewater:
Wastewater Sampling Requirements
[pdf].
continue to Training (5.3)
|